Commonwealth Edison

Exelon incorporated in Pennsylvania in February 1999, is a utility services holding company engaged, through Generation, in the energy generation business, and through ComEd, PECO, BGE, PHI, Pepco, DPL and ACE in the energy delivery businesses discussed below. Exelon’s principal executive offices are located at 10 South Dearborn Street, Chicago, Illinois 60603.
Company profile
Employees
Incorporated
Location
Fiscal year end
Industry (SIC)
SEC CIK
Corporate docs
Calendar
24 Feb 21
22 Apr 21
31 Dec 21
Content analysis
?
Positive | ||
Negative | ||
Uncertain | ||
Constraining | ||
Legalese | ||
Litigous | ||
Readability |
H.S. freshman Avg
|
New words:
acumen, al, AndersonAnn, answer, Antidumping, arithmetic, asymmetric, attack, ban, BBB, BerzinLaurie, Biden, bold, CAROLINE, cheap, CheshireMayo, cichocki, claw, collaborative, ComptonChristopher, context, CraneA, CUB, DeBenedictisLinda, DeBenedictisPeter, deploy, derecognized, devoted, disbursed, disconnected, DPA, DPP, dramatically, dredge, drew, drove, dumping, electrification, enjoin, equitable, ERP, erratic, evolving, extra, fatally, FCA, feedback, fiduciary, field, fill, flawed, flexibility, foremost, FULGINITI, gave, gayle, giese, Glockner, healthcare, herewith, honor, humidity, Humphrey, IIIJohn, improper, improperly, indemnitee, Indian, Intermittent, internationally, intervention, jason, JoskowRobert, Jun, Justice, landscape, LawlessJohn, littleton, Marissa, memo, mental, mentorship, Monday, moot, MUFG, NaN, NEPOOL, NER, neutralize, ninety, nondeductible, overcollection, paramount, parity, plaintiff, Potter, Pritzker, proliferation, prosecute, prosecution, racketeering, recission, reconnection, refinance, regression, rescission, restitution, resuming, retracting, RichardsonMarjorie, RSA, Russia, Russian, seller, shedding, slower, SOA, Speaker, spring, SSA, stalling, strenuously, supervisory, survey, suspension, Swahl, symmetric, talent, thermal, thrive, timeline, tower, travel, turnover, unanticipated, unfiled, uninterrupted, unnecessary, unused, upcoming, USAO, vacatur, vehicle, veto, women, workplace, world, writ, YesACE, YesOvercollection, YesPECO, YesPepco
Removed:
administratively, aiken, allege, Ambient, andrew, ash, aspect, attribute, bad, bailey, bargain, basic, BB, Blue, BSER, budget, building, burial, Buzzard, California, Calpine, CCR, centrally, closed, collective, commenced, compliant, computing, concluding, concurring, ConEdison, confronting, Constitution, Consultative, consummated, coordination, corridor, craft, CSAPR, CWIP, DEC, decided, deconsolidated, deconsolidation, dilution, disbanded, discipline, distort, docket, easement, Eddystone, Effluent, EGTP, EMA, emitting, Entergy, entirety, entrainment, EO, EOs, EPS, EPSA, examination, experiencing, expired, expiry, feasible, feature, flat, foundation, gained, gerald, Gould, greenhouse, growing, GW, Houston, illiquidity, implied, importantly, incidence, infeasible, injunction, Interagency, intervened, intervenor, kozel, kV, left, length, listing, litigated, LSE, marketable, maximize, Medway, memorandum, merit, narrow, necessitate, necessitating, negotiate, nitrogen, nondiscriminatory, NOPR, notable, NOx, Obama, occupied, older, organized, ozone, Pacilio, partnering, photovoltaic, plate, presumptively, preventing, producer, prompted, proper, proposition, publication, railroad, recirculating, referencing, refused, register, rejected, reliant, relying, repeal, reply, resilient, Resort, restore, retrofitting, retrospectively, Rochester, RSSA, satisfying, scott, Secretary, selecting, solution, sponsorship, standalone, steadily, Street, supervised, Surety, sweeping, terminating, tested, topic, toxic, Trump, turbine, unaudited, Undergrounding, unreasonably, unseasonably, upheld, upholding, voluntary, Warming, withdraw
Financial reports
10-K
2020 FY
Annual report
24 Feb 21
10-Q
2020 Q3
Quarterly report
3 Nov 20
10-Q
2020 Q2
Quarterly report
4 Aug 20
10-Q
2020 Q1
Quarterly report
8 May 20
10-K
2019 FY
Annual report
11 Feb 20
10-Q
2019 Q3
Quarterly report
31 Oct 19
10-Q
2019 Q2
Quarterly report
1 Aug 19
10-Q
2019 Q1
Quarterly report
2 May 19
10-K
2018 FY
Annual report
8 Feb 19
10-Q
2018 Q3
Quarterly report
1 Nov 18
Current reports
8-K
Entry into a Material Definitive Agreement
9 Mar 21
8-K
Exelon Reports Fourth Quarter and Full Year 2020 Results
24 Feb 21
8-K
Departure of Directors or Certain Officers
29 Dec 20
8-K
Exelon Reports Third Quarter 2020 Results
3 Nov 20
8-K
Departure of Directors or Certain Officers
26 Aug 20
8-K
Exelon Reports Second Quarter 2020 Results
4 Aug 20
8-K
ComEd resolves previously disclosed matter related to historical lobbying practices and strengthens lobbying and compliance controls
17 Jul 20
8-K
Exelon Reports First Quarter 2020 Results
8 May 20
8-K
Entry into a Material Definitive Agreement
25 Feb 20
8-K
Exelon Reports Fourth Quarter and Full Year 2019 Results
11 Feb 20
Registration and prospectus
424B2
Prospectus for primary offering
4 Mar 21
FWP
Free writing prospectus
3 Mar 21
424B2
Prospectus for primary offering
2 Mar 21
424B2
Prospectus for primary offering
20 Feb 20
FWP
Free writing prospectus
18 Feb 20
424B2
Prospectus for primary offering
18 Feb 20
424B2
Prospectus for primary offering
5 Nov 19
FWP
Free writing prospectus
4 Nov 19
424B2
Prospectus for primary offering
4 Nov 19
S-3ASR
Automatic shelf registration
30 Aug 19
Proxies
DEF 14C
Information statement
9 Apr 21
DEF 14C
Information statement
3 Apr 20
DEF 14C
Information statement
26 Apr 19
DEF 14C
Information statement
26 Apr 18
DEF 14C
Information statement
27 Apr 17
DEF 14C
Information statement
28 Apr 16
DEF 14C
Information statement
27 Apr 15
DEF 14C
Information statement
24 Apr 14
DEF 14C
Information statement
29 Apr 13
DEF 14C
Information statement
29 Apr 03
Other
UPLOAD
Letter from SEC
16 Apr 20
UPLOAD
Letter from SEC
5 Apr 20
UPLOAD
Letter from SEC
8 Mar 20
UPLOAD
Letter from SEC
15 Aug 17
UPLOAD
Letter from SEC
30 Jul 17
UPLOAD
Letter from SEC
5 Jul 17
UPLOAD
Letter from SEC
14 Sep 15
UPLOAD
Letter from SEC
13 Aug 15
UPLOAD
Letter from SEC
23 Jun 13
UPLOAD
Letter from SEC
6 Jun 13
Patents
APP
Utility
Methods and Systems for Assessing Hosting Capacity In a Distribution System
18 Mar 20
Methods and systems are described for determining a distribution system's hosting capacity for distributed power generation.
APP
Utility
Methods and Systems for Determining a Linear Power Flow for a Distribution Network
18 Mar 20
Methods and systems are disclosed for determining active and/or reactive power flows in a distribution line of a distribution network.
APP
Utility
Methods and Systems for Determining Distribution Grid Hosting Capacity
20 Nov 19
Methods and systems for determining a hosting capacity in a distribution grid are disclosed herein.