Table of Contents


UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
WASHINGTON, D.C. 20549
     
FORM 10-K
     
xANNUAL REPORT PURSUANT TO SECTION 13 OR 15 (d)15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the fiscal year ended December 31, 20122013

or
¨TRANSITION REPORT PURSUANT TO SECTION 13 OR 15 (d)15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
For the transition period from                    to                    

Commission
File Number
 
Name of Registrant, State of Incorporation,
Address of Principal Executive Offices and Telephone Number
 
IRS Employer
Identification Number
1-9894 ALLIANT ENERGY CORPORATION 39-1380265
  (a Wisconsin corporation)  
  4902 N. Biltmore Lane  
  Madison, Wisconsin 53718  
  Telephone (608) 458-3311  
   
0-4117-11-4117 INTERSTATE POWER AND LIGHT COMPANY 42-0331370
  (an Iowa corporation)  
  Alliant Energy Tower  
  Cedar Rapids, Iowa 52401  
  Telephone (319) 786-4411  
   
0-337 WISCONSIN POWER AND LIGHT COMPANY 39-0714890
  (a Wisconsin corporation)  
  4902 N. Biltmore Lane  
  Madison, Wisconsin 53718  
  Telephone (608) 458-3311  
This combined Form 10-K is separately filed by Alliant Energy Corporation, Interstate Power and Light Company and Wisconsin Power and Light Company. Information contained in the Form 10-K relating to Interstate Power and Light Company and Wisconsin Power and Light Company is filed by each such registrant on its own behalf. Each of Interstate Power and Light Company and Wisconsin Power and Light Company makes no representation as to information relating to registrants other than itself.

Securities registered pursuant to Section 12 (b)12(b) of the Act:
 Title of ClassName of Each Exchange on Which Registered
Alliant Energy CorporationCommon Stock, $0.01 Par ValueNew York Stock Exchange
Alliant Energy CorporationCommon Share Purchase RightsNew York Stock Exchange
Interstate Power and Light Company8.375%5.100% Series BD Cumulative Perpetual Preferred Stock, $0.01 Par ValueNew York Stock Exchange
Wisconsin Power and Light Company4.50% Preferred Stock, No Par ValueNYSE Amex LLC

Securities registered pursuant to Section 12 (g)12(g) of the Act: Wisconsin Power and Light Company Preferred Stock
(Accumulation without Par Value)None

Indicate by check mark if the registrants are well-known seasoned issuers, as defined in Rule 405 of the Securities Act.
Yes x  No  ¨

Indicate by check mark if the registrants are not required to file reports pursuant to Section 13 or Section 15(d) of the Act.
Yes ¨  No  x
Indicate by check mark whether the registrants (1) have filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrants were required to file such reports) and (2) have been subject to such filing requirements for the past 90 days.    Yes x  No  ¨
Indicate by check mark whether the registrants have submitted electronically and posted on their corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrants were required to submit and post such files).    Yes  x    No  ¨

Indicate by check mark if disclosure of delinquent filers pursuant to Item 405 of Regulation S-K is not contained herein, and will not be contained, to the best of the registrants’ knowledge, in definitive proxy or information statements incorporated by reference in Part III of this Form 10-K or any amendment to this Form 10-K. x
Indicate by check mark whether the registrants are large accelerated filers, accelerated filers, non-accelerated filers, or smaller reporting companies. See the definitions of “large accelerated filer,” “accelerated filer” and “smaller reporting company” in Rule 12b-2 of the Exchange Act.
 Large Accelerated Filer Accelerated Filer Non-accelerated Filer Smaller Reporting Company Filer
Alliant Energy Corporationx      
Interstate Power and Light Company    x  
Wisconsin Power and Light Company    x  

Indicate by check mark whether the registrants are shell companies (as defined in Rule 12b-2 of the Exchange Act).    Yes ¨  No  x

The aggregate market value of the voting and non-voting common equity held by nonaffiliates as of June 30, 2012:2013:
Alliant Energy Corporation$5.05.6 billion
Interstate Power and Light Company$—
Wisconsin Power and Light Company$—
Number of shares outstanding of each class of common stock as of January 31, 2013:2014:
Alliant Energy CorporationCommon stock, $0.01 par value, 110,990,924110,943,669 shares outstanding
  
Interstate Power and Light CompanyCommon stock, $2.50 par value, 13,370,788 shares outstanding (all of which are owned beneficially and of record by Alliant Energy Corporation)
  
Wisconsin Power and Light CompanyCommon stock, $5 par value, 13,236,601 shares outstanding (all of which are owned beneficially and of record by Alliant Energy Corporation)

DOCUMENTS INCORPORATED BY REFERENCE

Portions of the Proxy Statement relating to Alliant Energy Corporation’s 20132014 Annual Meeting of Shareowners are, or will be upon filing with the Securities and Exchange Commission, incorporated by reference into Part III hereof.



Table of Contents


TABLE OF CONTENTS
 Page Number
 
 
   
   
   
   
   
   
   
 
 
 
 
 
 
 
 
  
  
  
  
  
  
  
  
  
  
   
   
   
 
 
   
   
   
   
   
   
   


Table of Contents


 Page Number
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
   
 
 
 
 
 
 
 
  



Table of Contents


DEFINITIONS

The following abbreviations or acronyms used in this Form 10-K are defined below:
Abbreviation or AcronymDefinition
2014 Alliant Energy Proxy StatementAlliant Energy’s Proxy Statement for the 2014 Annual Meeting of Shareowners
Act 322011 Wisconsin Act 32
AFUDCAllowance for funds used during construction
Alliant EnergyAlliant Energy Corporation
ANRANR Pipeline
AOCLAccumulated other comprehensive loss
AROAsset retirement obligation
ARRAuction revenue right
ARRAAmerican Recovery and Reinvestment Act of 2009
ATCAmerican Transmission Company LLC
ATIAE Transco Investments, LLC
ATR ActAmerican Taxpayer Relief Act of 2012
Audit CommitteeAudit Committee of the Board of Directors
BARTBest available retrofit technology
BLBase load units
CACertificate of authority
CAAClean Air Act
CAIRClean Air Interstate Rule
CAOChief Accounting Officer
Cash Balance PlanAlliant Energy Cash Balance Pension Plan
CAVRClean Air Visibility Rule
CCRCoal combustion residuals
CDDCooling degree days
CEOChief Executive Officer
CFOChief Financial Officer
CO2Carbon dioxide
CO2eCarbon dioxide-equivalent
ColumbiaColumbia Energy Center
Corporate ServicesAlliant Energy Corporate Services, Inc.
CourtU.S. District Court for the Western District of Wisconsin
CRANDICCedar Rapids and Iowa City Railway Company
CSAPRCross-State Air Pollution Rule
CWIPConstruction work in progress
DAECDuane Arnold Energy Center
DATCDuke-American Transmission Co.
D.C. Circuit CourtU.S. Court of Appeals for the D.C. Circuit
DCPAlliant Energy Deferred Compensation Plan
DLIPAlliant Energy Director Long Term Incentive Plan
DNRDepartment of Natural Resources
DthDekatherm
Eagle PointEagle Point Solar
EdgewaterEdgewater Generating Station
EECREnergy efficiency cost recovery
EEPEnergy efficiency plan
EGUElectric generating unit
EmeryEmery Generating Station
EPAU.S. Environmental Protection Agency
EPBEmissions plan and budget
EPSEarnings per weighted average common share

1

Table of Contents


Abbreviation or AcronymDefinition
ERISAEmployee Retirement Income Security Act of 1974
EROElectric Reliability Organization
EVPExecutive Vice President
FCSFirm Citygate Supplies
FERCFederal Energy Regulatory Commission
FTRFinancial transmission right
Fuel-relatedElectric production fuel and energy purchases
FWSU.S. Fish and Wildlife Service
GAAPU.S. generally accepted accounting principles
GCU CertificateCertificate of public convenience, use and necessity
GHGGreenhouse gases
HAPHazardous air pollution
HDDHeating degree days
IBEWInternational Brotherhood of Electrical Workers
IEAIndustrial Energy Applications, Inc.
INIntermediate units
IPLInterstate Power and Light Company
IPOInitial public offering
IRSInternal Revenue Service
ITCITC Midwest LLC
IUBIowa Utilities Board
KEESAKey Executive Employment and Severance Agreement
KewauneeKewaunee Nuclear Power Plant
KWhKilowatt-hour
LRZLocal resource zone
MACTMaximum achievable control technology
MarshalltownMarshalltown Generating Station
MATSMercury and Air Toxic Standard
MDAManagement’s Discussion and Analysis of Financial Condition and Results of Operations
MGPManufactured gas plant
MidAmericanMidAmerican Energy Company
MISOMidcontinent Independent System Operator, Inc.
MPUCMinnesota Public Utilities Commission
MROMidwest Reliability Organization
MVPMulti-value project
MWMegawatt
MWhMegawatt-hour
N/ANot applicable
NAAQSNational Ambient Air Quality Standards
NBPLNorthern Border Pipeline
NeenahNeenah Energy Facility
Nelson DeweyNelson Dewey Generating Station
NERNextEra Energy Resources, LLC
NERCNorth American Electric Reliability Corporation
NGPLNatural Gas Pipeline Co. of America
NNGNorthern Natural Gas Company
NO2Nitrogen dioxide
NOVNotice of violation
NOxNitrogen oxide
NRBNatural Resources Board
NSPSNew Source Performance Standards
NYSENew York Stock Exchange

2

Table of Contents


Abbreviation or AcronymDefinition
OCAIowa Office of Consumer Advocate
OIPAlliant Energy 2010 Omnibus Incentive Plan
PJMPJM Interconnection, LLC
PKPeaking units
PMParticulate matter
PM2.5Fine particulate matter
PPAPurchased power agreement
PRMPlanning reserve margin
PSCWPublic Service Commission of Wisconsin
PSDPrevention of significant deterioration
PUHCAPublic Utility Holding Company Act of 2005
RECRenewable energy credit
Receivables AgreementReceivables Purchase and Sale Agreement
RESRenewable energy standards
ResourcesAlliant Energy Resources, LLC
RiversideRiverside Energy Center
RMTRMT, Inc.
RPSRenewable portfolio standard
RTORegional Transmission Organization
SCRSelective catalytic reduction
SECSecurities and Exchange Commission
Sheboygan FallsSheboygan Falls Energy Facility
Sheboygan PowerSheboygan Power, LLC
SIPState implementation plan
SO2Sulfur dioxide
SRPSupplemental Retirement Plan
SSRSystem support resource
TBDTo be determined
TransDataTransData, Inc.
U.S.United States of America
VEBAVoluntary Employees’ Beneficiary Association
VestasVestas-American Wind Technology, Inc.
VIEVariable interest entity
VPVice President
WACCWeighted-average cost of capital
Whiting PetroleumWhiting Petroleum Corporation
WPLWisconsin Power and Light Company
WPL TranscoWPL Transco, LLC
XBRLExtensible Business Reporting Language


3

Table of Contents


FORWARD-LOOKING STATEMENTS
Statements contained in this Annual Report on Form 10-K that are not of historical fact are forward-looking statements intended to qualify for the safe harbors from liability established by the Private Securities Litigation Reform Act of 1995. These forward-looking statements can be identified as such because the statements include words such as “expect,” “anticipate,” “plan” or other words of similar import. Similarly, statements that describe future financial performance or plans or strategies are forward-looking statements. Such forward-looking statements are subject to certain risks and uncertainties that could cause actual results to differ materially from those expressed in, or implied by, such statements. Some, but not all, of the risks and uncertainties of Alliant Energy, Corporation (Alliant Energy), Interstate PowerIPL and Light Company (IPL) and Wisconsin Power and Light Company (WPL)WPL that could materially affect actual results include:

federal and state regulatory or governmental actions, including the impact of energy, tax, financial and health care legislation, and of regulatory agency orders;
IPL’s and WPL’s ability to obtain adequate and timely rate relief to allow for, among other things, the recovery of operating costs, fuel costs, transmission costs, deferred expenditures, capital expenditures, and remaining costs related to generating unitsEGUs that may be permanently closed, earning their authorized rates of return, and the payments to their parent of expected levels of dividends;
the ability to continue cost controls and operational efficiencies;
the impact of IPL’s retail electric base rate freeze in Iowa through 2013;
the impact of WPL’s retail electric and gas base rate freeze in Wisconsin through 2014;
weather effects on results of utility operations, including the impacts of temperature changes and drought conditions in IPL’s and WPL’s service territories on customers’ demand for electricity and gas;
the stateimpact of the economy in IPL’s and WPL’s service territories and the resulting implicationsimpacts on sales volumes, margins and the ability to collect unpaid bills;
the impact of energy efficiency, franchise retention and customer-owned generation on sales volumes and margins;
developments that adversely impact Alliant Energy’s, IPL’s and WPL’s ability to implement their strategic plan, including unanticipated issues with new emission controls equipment for various coal-fired electric generating facilitiesEGUs of IPL and WPL, IPL’s construction of its proposed natural gas-fired electric generating facilityEGU in Iowa, IPL’s recently approved purchased power agreement (PPA) with NextEra Energy Resources, LLC (NER), Alliant Energy Resources, LLC’s (Resources’)WPL’s potential generation investment, Resources’ selling price of the electricity output from its new 100 megawatt (MW)Franklin County wind project, and the potential decommissioning of certain generating facilitiesEGUs of IPL and WPL;
WPL, and the proposed sales of IPL’s electric and gas distribution assets in Minnesota;
issues related to the availability of generating facilitiesEGUs and the supply and delivery of fuel and purchased electricity and the price thereof, including the ability to recover and to retain the recovery of purchased power, fuel and fuel-related costs through rates in a timely manner;
the impact that fuel and fuel-related pricesprice changes may have on IPL’s and WPL’s customers’ demand for utility services;
the impact of distributed generation, including alternative electric suppliers, in IPL’s and WPL’s service territories on system reliability, operating expenses and customers’ demand for electricity;
issues associated with environmental remediation and environmental compliance, including compliance with the Consent Decree between WPL, the Sierra Club and the EPA, future changes in environmental laws and regulations, and litigation associated with environmental requirements;
the ability to defend against environmental claims brought by state and federal agencies, such as the United States of America (U.S.)Environmental Protection Agency (EPA),EPA, or third parties, such as the Sierra Club;
issues associated with environmental remediation efforts and with environmental compliance generally, including changing environmental laws and regulations and litigation associated with changing environmental laws and regulations;
the ability to recover through rates all environmental compliance and remediation costs, including costs for projects put on hold due to uncertainty of future environmental laws and regulations;
impacts that storms or natural disasters in IPL’s and WPL’s service territories may have on their operations and recovery of, and rate relief for, costs associated with restoration activities;
the direct or indirect effects resulting from terrorist incidents, including physical attacks and cyber terrorism,attacks, or responses to such incidents;
the impact of penalties or third-party claims related to, or in connection with, a failure to maintain the security of personally identifiable information, including associated costs to notify affected persons and to mitigate their information security concerns;
impacts of future tax benefits from deductions for repairs expenditures and allocation of mixed service costs and temporary differences from historical tax benefits from such deductions that are included in rates when the differences reverse in future periods;
any material post-closing adjustments related to any past asset divestitures, including the sale of RMT, Inc. (RMT);
RMT;
continued access to the capital markets on competitive terms and rates, and the actions of credit rating agencies;
inflation and interest rates;
changes to the creditworthiness of counterparties with which Alliant Energy, IPL and WPL have contractual arrangements, including participants in the energy markets and fuel suppliers and transporters;
issues related to electric transmission, including operating in Regional Transmission Organization (RTO)RTO energy and ancillary services markets, the impacts of potential future billing adjustments and cost allocation changes from RTOs and recovery of costs incurred;

4



unplanned outages, transmission constraints or operational issues impacting fossil or renewable generating facilitiesEGUs and risks related to recovery of resulting incremental costs through rates;
Alliant Energy’s ability to successfully pursue appropriate appeals with respect to, and any liabilities arising out of, the alleged violation of the Employee Retirement Income Security Act of 1974 (ERISA) by the Alliant Energy Cash Balance Pension Plan (Cash Balance Plan);
current or future litigation, regulatory investigations, proceedings or inquiries;

1



Alliant Energy’s ability to sustain its dividend payout ratio goal;
employee workforce factors, including changes in key executives, collective bargaining agreements and negotiations, work stoppages or additional restructurings;
impacts that storms or natural disasters, including forest or prairie fires, in IPL’s and WPL’s service territories may have on their operations and recovery of, and rate relief for, costs associated with restoration activities;
access to technological developments;
material changes in retirement and benefit plan costs;
the impact of performance-based compensation plans accruals;
the effect of accounting pronouncements issued periodically by standard-setting bodies;
the impact of changes to government incentivesproduction tax credits for wind projects;
the impact of adjustments made to deferred tax assets and liabilities from state apportionment assumptions;
the ability to utilize tax credits and net operating losses generated to date, and those that may be generated in the future, before they expire;
the ability to successfully complete tax audits, changes in tax accounting methods, including changes required by new tangible property regulations, and appeals with no material impact on earnings and cash flows; and
factors listed in MDA and in Item 1A Risk Factors.Management’s Discussion and Analysis of Financial Condition and Results of Operations (MDA) and in Item 1A Risk Factors.

Alliant Energy, IPL and WPL each assume no obligation, and disclaim any duty, to update the forward-looking statements in this Annual Report on Form 10-K.

WEBSITE ACCESS TO REPORTS
Alliant Energy makes its periodic and current reports, and amendments to those reports, available, free of charge, on its website at www.alliantenergy.com/investors on the same day as such material is electronically filed with, or furnished to, the Securities and Exchange Commission (SEC).SEC. Alliant Energy is not including the information contained on its website as a part of, or incorporating it by reference into, this Annual Report on Form 10-K.10-K, except as required by law.

PART I

This Annual Report on Form 10-K includes information relating to Alliant Energy, IPL and WPL (as well as Resources and Alliant Energy Corporate Services, Inc. (Corporate Services)). Where appropriate, information relating to a specific entity has been segregated and labeled as such. Unless otherwise noted, the information herein has been revised to excludeexcludes discontinued operations for all periods presented.

ITEM 1. BUSINESS

A. GENERAL
Alliant Energy was incorporated in Wisconsin in 1981 and maintains its principal executive offices in Madison, Wisconsin. Alliant Energy operates as a regulated investor-owned public utility holding company. Alliant Energy’s primary focus is to provide regulated electricity and natural gas service to approximately 1 million electric and approximately 415,000418,000 natural gas customers in the Midwest through its two public utility subsidiaries.subsidiaries, IPL and WPL. The primary first tier wholly-owned subsidiaries of Alliant Energy are: IPL, WPL, Resources and Corporate Services. An illustration of Alliant Energy’s first tier subsidiaries is shown below.
Alliant Energy
IPLWPLResourcesCorporate Services

A brief description of the primary first tier subsidiaries of Alliant Energy is as follows:

1) IPL - was incorporated in 1925 in Iowa as Iowa Railway and Light Corporation. IPL is a public utility engaged principally in the generation and distribution of electricity and the distribution and transportation of natural gas in selective markets in Iowa and southern Minnesota. In Iowa, IPL provides utility services to incorporated communities as directed by the Iowa Utilities Board (IUB)IUB and utilizes non-exclusive franchises, which cover the use of public right-of-ways for utility facilities in incorporated communities for a maximum term of 25 years. At December 31, 20122013, IPL supplied electric and natural gas service to 526,841528,355 and 233,820234,563 retail customers, respectively. IPL is also engaged in the generation and distribution of steam for two customers in Cedar Rapids, Iowa. In 20122013, 20112012 and 20102011, IPL had no single customer for which electric, gas, steam and/or other sales accounted for 10% or more of IPL’s consolidated revenues. Refer to Note 3(a) of the “Combined Notes to Consolidated Financial Statements” for discussion of IPL’s proposed sales of its Minnesota electric and natural gas distribution assets.


2



2) WPL - was incorporated in 1917 in Wisconsin as Eastern Wisconsin Electric Company. WPL is a public utility engaged principally in the generation and distribution of electricity and the distribution and transportation of natural gas in selective markets in southern and central Wisconsin. WPL operates in municipalities pursuant to permits of indefinite duration and state statutes authorizing utility operation in areas annexed by a municipality. At December 31, 20122013, WPL supplied electric

5



and natural gas service to 458,180460,396 and 181,028182,647 retail customers, respectively. In 20122013, 20112012 and 20102011, WPL had no single customer for which electric, gas and/or other sales accounted for 10% or more of WPL’s consolidated revenues. At December 31, 2013, WPL Transco LLC iswas a wholly-owned subsidiary of WPL and holdsheld WPL’s investment in the American Transmission Company LLC (ATC).ATC.

3) RESOURCES - was incorporated in 1988 in Wisconsin. In 2008, Resources was converted to a limited liability company. Alliant Energy’s non-regulated investments are organized under Resources. Refer to “Information Relating to Non-regulated Operations” for additional details.

4) CORPORATE SERVICES - was incorporated in 1997 in Iowa. Corporate Services provides administrative services to Alliant Energy, IPL, WPL and its subsidiaries.Resources.

Refer to Note 1517 of the “Combined Notes to Consolidated Financial Statements” for further discussion of business segments, which information is incorporated herein by reference.

B. INFORMATION RELATING TO ALLIANT ENERGY ON A CONSOLIDATED BASIS

1) EMPLOYEES - At December 31, 20122013, Alliant Energy’s consolidated subsidiaries had the following full- and part-time employees:
Number of Number of Total Percentage of EmployeesNumber of Number of Total Percentage of Employees
Bargaining Unit Other Number of Covered by CollectiveBargaining Unit Other Number of Covered by Collective
Employees Employees Employees Bargaining AgreementsEmployees Employees Employees Bargaining Agreements
IPL1,105
 546
 1,651
 67%1,119
 557
 1,676
 67%
WPL1,018
 254
 1,272
 80%1,026
 251
 1,277
 80%
Corporate Services26
 817
 843
 3%25
 853
 878
 3%
Resources:      

RMT (Alliant Energy sold RMT in January 2013)
 175
 175
 %
Other86
 28
 114
 75%
Resources85
 29
 114
 75%
2,235
 1,820
 4,055
 55%2,255
 1,690
 3,945
 57%

At December 31, 20122013, Alliant Energy employees covered by collective bargaining agreements were as follows:
 Number of Contract
 Employees Expiration Date
IPL:   
International Brotherhood of Electrical Workers (IBEW) Local 204 (Emery)13
4/30/13
IBEW Local 204 (Cedar Rapids)726757
 8/31/1317
IBEW Local 1439- Various17362
 6/30/14
IBEW Local 949219
9/30/15
IBEW Local 204 (Dubuque)82
9/30/15
IBEW Local 204 (Mason City)43
9/30/15
IBEW Local 14555
6/30/16Various
 1,1051,119
  
WPL - IBEW Local 9651,0181,026
 5/31/14
Resources - Various8685
 Various
Corporate Services - IBEW Local 2042625
 10/31/14
 2,2352,255
  

2) CAPITAL EXPENDITURE AND INVESTMENT PLANS - Refer to “Liquidity and Capital Resources - Cash Flows - Investing Activities - Construction and Acquisition Expenditures” in MDA for discussion of anticipated construction and acquisition expenditures for 20132014 through 20162017.

3) REGULATION - Alliant Energy, IPL and WPL are subject to regulation by various federal, state and local agencies. The following includes the primary regulations impacting Alliant Energy’s, IPL’s and WPL’s businesses.


3



Federal Energy Regulatory Commission (FERC)FERC -
Public Utility Holding Company Act of 2005 (PUHCA 2005)- - Alliant Energy is registered with FERC as a public utility holding company, pursuant to PUHCA, 2005, and is required to maintain certain records and to report certain transactions involving its public utilities, service company and other entities regulated by FERC. Corporate Services, IPL and WPL are subject to regulation by FERC under PUHCA 2005 for various matters including, but not limited to, affiliate transactions, public utility mergers, acquisitions and dispositions, and books, records and accounting requirements.

Energy Policy Act - - The Energy Policy Act requires creation of an Electric Reliability Organization (ERO)ERO to provide oversight by FERC. FERC designated the North American Electric Reliability Corporation (NERC)NERC as the overarching ERO. The Midwest Reliability Organization (MRO),MRO, which is a regional member of NERC, has direct responsibility for mandatory electric reliability standards for IPL and WPL.


6



Federal Power Act - - FERC also has jurisdiction, under the Federal Power Act, over certain electric utility facilities and operations, electric wholesale and transmission rates, dividend payments, issuance of securities (IPL(only IPL, and Corporate Services only)through March 31, 2014) and accounting practices of Corporate Services, IPL and WPL.

Electric Wholesale Rates - IPL and WPL have received wholesale electric market-based rate authority from FERC. Market-based rate authorization allows for wholesale sales of electricity within the Midwest Independent Transmission System Operator (MISO)MISO and PJM Interconnection, LLC (PJM) markets and in bilateral markets, based on the market value of the transactions. IPL and WPL also have FERC-approved cost-of-service based rates related to the provision of firm full- and partial-requirement wholesale electric sales. Both IPL’s and WPL’s wholesale cost-of-service tariffs are formula-based tariffs that allow for annual true-ups to actual costs, including fuel costs.

Electric Transmission Rates - FERC regulates the rates charged for electric transmission facilities used in interstate commerce. Neither IPL nor WPL own or operate electric transmission facilities; however, both IPL and WPL pay for the use of the interstate electric transmission system based upon FERC-regulated rates. IPL and WPL rely primarily uponon the use of the ITC Midwest LLC (ITC) and ATC transmission systems, respectively.

FERC Due to the formula rates used by ITC and ATC to charge their customers and possible future changes to these rates, there is performing an investigation into Attachment “O” protocols under the MISO tariff, focusing on the areas of participation, transparencyuncertainty regarding IPL’s and challenge procedures. IPL filed comments related to ITC’s Attachment “O” protocols. IPL supports increasing the participation, transparency and challenge procedures related to Attachment “O.” ITC filed comments contrary to IPL’s position, alleging that the status quo affords IPL adequate information to challenge ITC’s rates.WPL’s future electric transmission service expenses. Refer to “Other Future Considerations” in MDA for further discussion of IPL’s formal complaint filed with FERC in September 2012 alleging that ITC’s Attachment “FF” tariff is unjust, unreasonable and unduly discriminatory to IPL and its electric customers.transmission service charges.

Natural Gas Act - FERC regulates the transportation and sale for resale of natural gas in interstate commerce under the Natural Gas Act. Under the Natural Gas Act, FERC has authority over certain natural gas facilities and operations of IPL and WPL.

Environmental - Alliant Energy, IPL and WPL are subject to extensive environmental requirements. The EPA administers certain federal regulatory programs and has delegated the administration of other environmental regulatory programs to the applicable state environmental agencies. In general, the state agencies have jurisdiction over air and water quality, hazardous substances management, transportation and clean-up, and solid waste management requirements. In certain cases, the state environmental agencies have delegated the administration of environmental programs to local agencies. Alliant Energy, IPL and WPL are subject to these environmental regulations as a result of their current and past operations.

IUB - IPL is subject to regulation by the IUB related to its operations in Iowa for various matters including, but not limited to, retail utility rates and standards of service, accounting requirements and approval of the location and construction of electric generating facilities.EGUs.

Retail Utility Base Rates - IPL files periodic requests with the IUB for retail rate changes. These filings are based on historical test periods. The historical test periods may be adjusted for certain known and measurable changes to capital investments, cost of capital and operating and maintenance expenses consistent with IUB rules and regulations. Interim retail rates can be placed in effect 10 days after the rate application filing, subject to refund, and must be based on past precedent. The IUB must decide on requests for retail rate changes within 10 months of the date of the application for which changes are filed, or the interim rates granted become permanent. Refer to “Rate Matters” in MDA for details of a retail electric base rate freeze effective for IPL’s Iowa customers through 2013.


4



Retail Commodity Cost Recovery Mechanisms - IPL’s retail electric and natural gas tariffs contain automatic adjustment clauses for changes in prudently incurred commodity costs required to serve its retail customers in Iowa. Any over- or under-collection of commodity costs for each given month are automatically reflected in future billings to retail customers.

Retail Electric Transmission Cost Recovery Mechanism - Effective February 2011, electricElectric transmission service expenses were removed from base rates andare billed to IPL’s Iowa retail electric customers through thea transmission cost rider. This new cost recovery mechanism provides for subsequent adjustments to electric rates charged to Iowa retail electric customers for changes in electric transmission service expenses. Changes in the under-/over-collection of these costs are reflected in future billings to customers. The transmission cost rider will remain in effect until the IUB’s final decision in IPL’s next retail electric base rate case, at which time the rider will continue in its current form, continue in a modified form or be revisited.terminated.

Energy Efficiency Cost Recovery (EECR) Mechanism - In accordance with Iowa law, IPL is required to file an Energy Efficiency Plan (EEP)EEP every five years with the IUB. An EEP provides a utility’s plan and related budget to achieve specified levels of energy savings. IUB approval demonstrates that the IUB believes that IPL’s EEP is reasonably expected to achieve cost-effective delivery of the energy efficiency programs. To the extent approved by the IUB, costs associated with executing the EEP are recovered from ratepayers through an additional tariff called an EECR factor. The EECR factors are revised annually and include a reconciliation to eliminate any over- or under-recovery of energy efficiency expenses from prior periods.

Electric Generating FacilitiesUnits - IPL must obtain a GCU Certificate of Public Convenience, Use and Necessity (GCU Certificate) from the IUB in order to construct a new or significantly alter an existing electric generating facilityEGU located in Iowa with 25 MW or more of capacity.

Advance Rate-making Principles - Iowa Code §476.53law provides Iowa utilities with rate-making principles prior to making certain generation investments in Iowa. As a result, IPL must file for, and the IUB must render a decision on, rate-making principles for electric generating facilitiesEGUs located in Iowa, including new base-load (nuclear or coal-fired generation) facilitiesEGUs with a nameplate generating capacity of 300 MW or more, combined-cycle natural gas-fired facilitiesEGUs of any size and renewable generating resources, such

7



as wind facilities, of any size. Upon approval of rate-making principles by the IUB, IPL must either build the facilityEGU under the approved rate-making principles, or not at all.

Electric Generating FacilityUnit Emission Controls Projects - IPL is required to submit an Emissions Plan and Budget (EPB)EPB biennially to the IUB setting out a multi-year plan and budget for managing regulated emissions from its electric generating facilitiesEGUs in a cost-effective manner. IPL must simultaneously submit this plan and budget to the Iowa Department of Natural ResourcesDNR for a determination of whether the plan and budget meet state environmental requirements for regulated emissions. The reasonable costs associated with implementing the plan are expected to be included in IPL’s future retail electric rates.

Public Service Commission of Wisconsin (PSCW)PSCW - Alliant Energy is subject to regulation by the PSCW for the type and amount of Alliant Energy’s investments in non-utility businesses and other affiliated interest activities, among other matters. WPL is also subject to regulation by the PSCW related to its operations in Wisconsin for various matters including, but not limited to, retail utility rates and standards of service, accounting requirements, issuance and use of proceeds of securities, affiliate transactions, approval of the location and construction of electric generating facilitiesEGUs and certain other additions and extensions to facilities.

Retail Utility Base Rates - WPL files periodic requests with the PSCW for retail rate changes. These filings are required to be based on forward-looking test periods. There is no statutory time limit for the PSCW to decide retail base rate requests. However, the PSCW attempts to process retail base rate cases in approximately 10 months and has the ability to approve interim retail rate relief, subject to refund, if necessary. Refer to “Rate Matters” in MDA for details of a retail electric and gas base rate freeze effective for WPL’s customers during 2013 and 2014.

Retail Commodity Cost Recovery Mechanisms -
Electric - WPL’s retail electric base rates include estimates of annual fuel-related costs (fuel and purchased power energy costs) anticipated during the test period. During each retail electric rate proceeding, or in a separate fuel cost plan approval proceeding, the PSCW sets fuel monitoring ranges based on the forecasted fuel-related costs used to determine rates in such proceeding. If WPL’s actual fuel-related costs fall outside these fuel monitoring ranges, WPL is authorized to defer the incremental over- or under-collection of fuel-related costs from retail electric customers that are outside the approved ranges. DeferralDeferrals of under-collections are reduced to the extent actual return on common equity earned by WPL during the fuel cost plan year exceeds the applicable authorized return on common equity. Subject to review and approval by the PSCW, any deferred over- or under-collection of fuel-related costs for each year are reflected in future billings to retail customers.

5




Natural Gas - WPL’s retail natural gas tariffs contain an automatic adjustment clause for changes in prudently incurred natural gas costs required to serve its retail gas customers. Any over- or under-collection of natural gas costs for each given month are automatically reflected in future billings to retail customers.

EECREnergy Efficiency Cost Recovery Mechanism - WPL contributes a certain percentage of its annual retail utility revenues to help fund Focus on Energy, Wisconsin’s state-wide energy efficiency and renewable energy resource program. Estimated contributions to Focus on Energy, along with WPL-run energy efficiency program costs, are recovered from WPL’s retail customers through changes in base rates determined during periodic rate proceedings and include a reconciliation of such estimated amounts to actual costs incurred with any difference deferred for inclusion in future base rate changes.

New Electric Generating FacilitiesUnits - A Certificate of Authority (CA)CA application is required to be filed with the PSCW for construction approval of any new electric generating facilityEGU with a capacity of less than 100 MW. WPL must obtain a GCU Certificate of Public Convenience and Necessity from the PSCW in order to construct a new electric generating facilityEGU in Wisconsin with a capacity of 100 MW or more. In addition, WPL’s ownership and operation of electric generating facilitiesEGUs (including those located outside the state of Wisconsin) to serve Wisconsin customers is subject to retail utility rate regulation by the PSCW.

Electric Generating FacilityUnit Upgrades - A CA application is required to be filed with the PSCW for construction approval of any additions to electric generating facilities,EGUs, including emission controls projects that exceed a certain threshold amount. The current PSCW rules require a CA for projects with an estimated project cost of $10 million or more.

Advance Rate-making Principles - Wisconsin Statute §196.371law provides Wisconsin utilities with the opportunity to request rate-making principles prior to the purchase or construction of any nuclear or fossil-fueled electric generating facilityEGU or renewable generating resource, such as a wind facility, utilized to serve Wisconsin customers. WPL is not obligated to file for or accept authorized rate-making principles under Wisconsin Statute §196.371.law. WPL can proceed with an approved project under traditional rate-making terms or accept authorized rate-making principles under Wisconsin Statute §196.371.law.


8



Minnesota Public Utilities Commission (MPUC)MPUC - IPL is subject to regulation by the MPUC related to its operations in Minnesota for various matters including, but not limited to, retail utility rates and standards of service, accounting requirements, issuance and use of proceeds of securities that encumber property in Minnesota, affiliate transactions, and approval of the location and construction of electric generating facilitiesEGUs located in Minnesota with a capacity in excess of 50 MW.

Retail Utility Rates - Requests for retail rate change can be based on either historical or projected data and interim retail rates are permitted. IPL has historically requested retail rate relief based on historical test periods. The historical test periods may be adjusted for certain known and measurable capital additions placed in service by IPL and operating and maintenance expenses incurred by IPL within 12 months ofafter the end of the test year. Unless otherwise ordered, the MPUC must reach a final decision within 10 months of filing for retail rate relief; however, the MPUC can extend the timing by 90 days.

Renewable Energy Cost Recovery Mechanism - In 2011, IPL received an order from the MPUC approving the implementation of an automatic cost recovery rider on a temporary basis to recover costs associated with renewable generation. The renewable energy rider does not require a base rate case for annual revision of rates charged to IPL’s Minnesota retail electric customers, but requires that the renewable energy costs incurred be fully reconciled against the revenues collected for such costs. Initially,IPL utilizes this would allow recovery of IPL’smechanism to recover costs associated with its Whispering Willow - East wind project located in Iowa. In 2011, the MPUC deferred judgment on the prudence

Refer to Note 3(a) of the Whispering Willow“Combined Notes to Consolidated Financial Statements” for discussion of IPL’s proposed sales of its Minnesota electric and natural gas distribution assets.

Environmental - East wind project costs.Alliant Energy, IPL and WPL are subject to extensive environmental laws and regulations as a result of their current and past operations. The initial recovery amountenvironmental laws and regulations relate to the protection of the projectenvironment and health and safety matters, including those governing air emissions; water discharges; the management, storage and disposal of hazardous materials; and the clean-up of contaminated sites, including former MGP sites.

The EPA administers certain federal regulatory programs and has delegated the administration of other environmental regulatory programs to the applicable state environmental agencies. In general, the state agencies have jurisdiction over air and water quality, hazardous substances management, transportation and clean-up, and solid waste management requirements. In certain cases, the state environmental agencies have delegated the administration of environmental programs to local agencies.

Alliant Energy, IPL and WPL regularly obtain federal, state and local permits to assure compliance with environmental laws and regulations. Costs associated with such compliance have increased in recent years and are expected to continue to increase in the future. Alliant Energy, IPL and WPL anticipate that prudently incurred compliance and remediation costs for IPL and WPL will be allowedrecoverable, in whole or part, through the temporary renewable energy rider at a levelized cost of $51 per future rate case proceedings. Refer to “Environmental Mattersmegawatt-hour (MWh)” in MDA and Note 16(e). In January 2013, IPL filed a request with the MPUC for full cost recovery of the Minnesota retail portion“Combined Notes to Consolidated Financial Statements” for further discussion of electric and gas environmental matters, including current or proposed environmental regulations. Refer to “Strategic Overview - Environmental Compliance Plans” in MDA for details of Alliant Energy’s, IPL’s Whispering Willow - East wind project construction costs of approximately $30 million. IPL expectsand WPL’s future environmental compliance plans to receive a decision from the MPUC in 2013 for the final recovery amount for such costs.adhere to applicable environmental requirements.

Refer to Notes 1(b), 1(h)1(g), 2 and 13(e)16(e) of the “Combined Notes to Consolidated Financial Statements,” and “Rate Matters,” “Environmental Matters” and “LegislativeEnvironmental Matters” in MDA for additional information regarding regulation and utility rate matters.

4) STRATEGIC OVERVIEW - Refer to “Strategic Overview” in MDA for discussion of various strategic actions by Alliant Energy, IPL and WPL.


6



C. INFORMATION RELATING TO UTILITY OPERATIONS
Alliant Energy’s utility business (IPL and WPL) has three segments: a) electric operations; b) gas operations; and c) other, which includes IPL’s steam operations various other energy-related products and services, and the unallocated portions of the utility business. In 20122013, IPL’s and WPL’s operating revenues and operating income (loss) for these three utility business segments were as follows:
IPL WPLIPL WPL
Operating Operating Operating OperatingOperating Operating Operating Operating
Revenues Income Revenues Income (Loss)Revenues Income Revenues Income (Loss)
Electric83% 83% 88% 91%82% 82% 85% 92%
Gas14% 12% 12% 10%15% 14% 14% 9%
Other3% 5% % (1%)3% 4% 1% (1%)
100% 100% 100% 100%100% 100% 100% 100%


9

Table of Contents


1) ELECTRIC UTILITY OPERATIONS
General - Electric utility operations represent the largest operating segment for Alliant Energy, IPL and WPL. Alliant Energy’s electric utility operations are located in the Midwest with IPL providing electric service in Iowa and southern Minnesota and WPL providing electric service in southern and central Wisconsin. In September 2013, IPL signed a definitive agreement to sell its Minnesota electric distribution assets. Refer to Note 3(a) of the “Combined Notes to Consolidated Financial Statements” for discussion of this proposed sale. Refer to the “Electric Operating Information” tables for additional details regarding electric utility operations.

Jurisdictions - Electric utility revenues by state were as follows (dollars in millions):
2012 2011 20102013 2012 2011
Amount Percent Amount Percent Amount PercentAmount Percent Amount Percent Amount Percent
IPL:                      
Iowa
$1,295.5
 50% 
$1,327.2
 50% 
$1,386.0
 52%
$1,416.3
 52% 
$1,295.5
 50% 
$1,327.2
 50%
Minnesota75.6
 3% 81.1
 3% 78.3
 3%75.5
 3% 75.6
 3% 81.1
 3%
Subtotal1,371.1
 53% 1,408.3
 53% 1,464.3
 55%1,491.8
 55% 1,371.1
 53% 1,408.3
 53%
WPL:                      
Wisconsin1,218.2
 47% 1,227.5
 47% 1,209.9
 45%1,197.2
 45% 1,218.2
 47% 1,227.5
 47%

$2,589.3
 100% 
$2,635.8
 100% 
$2,674.2
 100%
$2,689.0
 100% 
$2,589.3
 100% 
$2,635.8
 100%

The percentage of electric utility revenues regulated by the IUB, PSCW, MPUC and FERC were as follows:
IPL WPLIPL WPL
2012 2011 2010 2012 2011 20102013 2012 2011 2013 2012 2011
IUB92% 90% 91% % % %93% 92% 90% % % %
PSCW% % % 86% 85% 84%% % % 85% 86% 85%
MPUC5% 6% 5% % % %5% 5% 6% % % %
FERC3% 4% 4% 14% 15% 16%2% 3% 4% 15% 14% 15%
100% 100% 100% 100% 100% 100%100% 100% 100% 100% 100% 100%

Customers - The number of electric customers and communities served at December 31, 20122013 was as follows:
Retail Customers Wholesale Customers Other Customers Total Customers Communities ServedRetail Customers Wholesale Customers Other Customers Total Customers Communities Served
IPL526,841
 8
 1,373
 528,222
 752
528,355
 8
 1,366
 529,729
 752
WPL458,180
 21
 2,245
 460,446
 606
460,396
 21
 2,262
 462,679
 607
985,021
 29
 3,618
 988,668
 1,358
988,751
 29
 3,628
 992,408
 1,359

IPL and WPL provide electric utility service to a diversified base of retail customers in several industries, with the largest concentrations in the food manufacturing, chemical (including ethanol) and paper industries. IPL’s retail customers in the above table are billed under base rates established by the IUB or MPUC that include recovery of and a return on investments in electric infrastructure and recovery of purchased electric capacity costs and other costs required to serve customers. Prior to 2011, electricElectric transmission service expenses were recovered from IPL’s retail electric customers in Iowa through changes in base rates. Effective February 2011, electric transmission service expenses were removed from base rates andare billed to IPL’s Iowa retail electric customers through a transmission cost rider. This new cost recovery mechanism provides for subsequent adjustments to electric rates charged to Iowa electric retail customers for changes in electric transmission service expenses. IPL’s electric production fuel and energy purchasesfuel-related costs are recovered pursuant to fuel adjustment clauses. WPL’s retail customers in the above table are billed under base rates established by the PSCW that include recovery of and a return on investments in electric infrastructure and recovery of electric production fuel andfuel-related costs, purchased energy costs, purchased

7



electric capacity costs, electric transmission service costs and other costs required to serve customers. Effective January 1, 2011, WPL defers electric production fuel and energy purchasesfuel-related costs that exceed or fall below established fuel monitoring ranges through a newan electric fuel cost recovery mechanism. WPL’s recovery of deferred electric production fuel and energy purchasesfuel-related costs is restricted if it earns in excess of its authorized return on common equity. Refer to “Rate Matters” in MDA for details of IPL’s plans to file an Iowa retail electric base rate case and WPL’s plans to file a retail electric and gas base rate case in late March 2014. Refer to Note 2 of the “Combined Notes to Consolidated Financial Statements” for additional discussion of utility rate filings by WPL in 2012.cases.

Wholesale customers in the above table, which primarily consist of municipalities and rural electric cooperatives, are billed under wholesale service agreements. These agreements include standardized pricing mechanisms that are detailed in tariffs approved by FERC through wholesale rate case proceedings. The tariffs include an annual true-up process for actual costs incurred. A significant majority of IPL’s and WPL’s wholesale service agreements have terms that end after 2016. Refer to Note 3(a) of the “Combined Notes to Consolidated Financial Statements” for discussion of IPL’s Minnesota electric distribution asset sales agreement, which includes a wholesale power supply agreement that is subject to FERC approval.

10




In addition, WPL has bulk power customers, included in “Other customers” in the above table, that are billed according to negotiated, long-term customer-specific contracts, pursuant to FERC-approved tariffs.

Seasonality - Electric sales are seasonal to some extent with the annual peak normally occurring in the summer months due to air conditioning requirements. Electric sales are also impacted to a certain extent in the winter months due to heating requirements. In 20122013, the maximum peak hour demands were as follows:
Alliant Energy IPL WPLAlliant Energy IPL WPL
MW5,886 3,130 2,8515,820 3,107 2,752
DateJuly 25 July 25 July 5July 17 July 17 July 18

Competition - Retail electric customers in Iowa, Wisconsin and Minnesota currently do not have the ability to choose their electric supplier. However,supplier, and IPL and WPL attempthave obligations to attract new customers intoserve all their service territories in an effort to keep energy rates low for all.retail electric customers. Although electric service in Iowa, Wisconsin and Minnesota is regulated, IPL and WPL still face competition from self-generation by large industrial customers, owners of distributed generation, alternative energy sources, and petitions to municipalize (Iowa) as well as service territory expansions by municipal utilities through annexations (Wisconsin). However, IPL and WPL attempt to attract new customers into their service territories in an effort to keep energy rates low for all its customers. Refer to “Other Future Considerations” in MDA for discussion of litigation related to a renewable power developer seeking to distribute energy in IPL’s service territory, which may impact IPL’s future electric sales.

In June 2010, the PSCW issued an order approvingapproved an economic development program, effective July 2010, which is intended to attract and retain industrial customers in WPL’s service territory. The program permits WPL to provideenter into a contract with eligible industrial customers for a discounted energy rate based upon specifically-defined conditions through December 2014. To be eligible for the program, each customer needs to demonstrate that it is also eligible for direct governmental assistance through a local, state or federal economic development program, in addition to other criteria. The discount amounts are limited to ensure recovery of marginal costs and will be decreased over time until a customer is paying the full tariff rate. Currently, there are three WPL customers utilizing the economic development program.

Renewable Energy Standards (RES) - As discussed in greater detail below, the states in which IPL and WPL operate have RES, which establish the amount of energy electric utilities or service providers must supply from renewable resources.

IPL - IPL has requirements to comply with RES in both Iowa and Minnesota and primarily relies upon RECs generated from the wind projects it owns and renewable energy acquired under PPAs to meet such requirements. IPL allocates its portfolio of renewable energy credits (RECs)RECs between its Iowa and Minnesota jurisdictions based on a load-ratio share. IPL has excess RECs in Iowa and a shortfall of RECs in Minnesota. However, the excess RECs in Iowa are much larger than the Minnesota shortfall partially due to the relatively small amount of IPL’s load served in Minnesota compared to Iowa. IPL’s surplus of RECs in Iowa couldare permitted to be used to meet the deficit of RECs in Minnesota. IPL expects to meet both its Iowa and Minnesota renewable energy requirements on a system-wide basis without the need to purchase additional RECs.

Iowa - IPL is required to purchase or own 5049.8 MW of nameplate capacity from alternate energy or small hydro facilities located in its service area. IPL has met thecurrently exceeds this Iowa requirement through 2012.requirement.

Minnesota -A Minnesota RES was established in 2007 that requires IPL to supply a minimum level of its total Minnesota retail electric sales with renewable energy sources by certain future dates. Based on this RES, IPL’s total Minnesota retail electric sales supplied with renewable energy sources must be at least 12% by 2012;currently and 17% by 2016;2016, 20% by 2020;2020, and 25% by 2025. Utilities in Minnesota may meet the requirements of the RES with renewable energy generated by the utility, renewable energy acquired under PPAs, or the use of accumulated or acquired RECs. IPL has met the 12% requirement and currently expects to satisfy future Minnesota RES requirements with its current wind generation and wind PPAs, supplemented as needed by acquiring additional RECs from its anticipated Iowa excess supply.

In addition to the above Minnesota requirement, IPL’s total Minnesota retail electric sales supplied with solar power must be at least 1.5% by 2020. IPL currently estimates that approximately 10 MW of solar power would be needed for compliance with this requirement by 2020.


811



WPL - AThe Wisconsin Renewable Portfolio Standard (RPS) was established in 2006 thatRES requires electric utilities in Wisconsin, including WPL to increase the portion of theirits total Wisconsin retail electric sales supplied by renewable energy sources above a benchmark of average retail sales from renewables in 2001, 2002 and 2003. The RPSRES required a 2% increase above the benchmark by 2010 and will require a 6% increase above the benchmark by 2015. Based on this RPS,RES, WPL was required to supply a minimum of 5.28% of its total Wisconsin retail electric sales with renewable energy sources by 2010 and will be required to increase this amount to 9.28% by 2015. Wisconsin utilitiesWPL may reach the RPSRES with renewable energy generated by the utility, acquiredit generates, it acquires under PPAs or through the use of renewable resource credits. WPL has met the 2010 requirements of this RPSRES and currently expects to meet the 2015 requirements of the RPSRES with its current renewable portfolio, which primarily consists of wind generation and wind PPAs.hydro.

Energy Conservation - IPL and WPL continue to promote energy conservation, including their customers’ ability to efficiently manage their energy use. Refer to “Strategic Overview - Energy Efficiency Programs” in MDA for discussion of energy efficiency programs at IPL and WPL.

Electric Supply - Alliant Energy, IPL and WPL have met historical customer demand of electricity and expect to continue meeting future demand through a mix of electric supply including internally generated electricity, PPAs and additional purchases from wholesale energy markets. Alliant Energy’s mix of electric supply experienced changeschanged in recent years with WPL’s purchases of the Neenah Energy Facility in 2009, Wisconsin Electric Power Company’s 25% interest in Edgewater Unit 5 in early 2011 and the Riverside Energy Center (Riverside)in the fourth quarter of 2012, the completion of wind projects including IPL’s Whispering Willow - East wind project in late 2009 and WPL’s Bent Tree - Phase I wind project in early 2011, and IPL’s retirement of various electric generating units.EGUs. Alliant Energy expects its mix of electric supply to change further in the next several years with IPL’s proposed construction of Marshalltown, WPL’s potential generation investment, IPL’s new DAEC PPA for a term of February 22, 2014 through December 31, 2025, WPL’s new 150 MW PPA for a term from January 1, 2014 through December 31, 2018, the Marshalltown Generating Station, the decision not to renewexpiration of WPL’s existing nuclearKewaunee PPA beyond itsin December 2013 expiration date, and the proposed retirement of additional generating units.EGUs. Alliant Energy, IPL and WPL periodically update their generation plans to identify longer term electric supply resource needs. These long-term generation plans are intended to meet customer demand, reduce reliance on PPAs and wholesale market purchases and mitigate the impacts of future plantEGU retirements while maintaining compliance with long-term electric demand planning reserve margins,PRMs, environmental requirements and RES established by regulators. Alliant Energy, IPL and WPL currently expect to meet utility customer demand in the future. However, unanticipated regional or local reliability issues could still arise in the event of unexpected delays in the construction of new generating and/or transmission facilities, retirement of generating facilities, generating facilityEGUs, EGU outages, transmission system outages or extended periods of extreme weather conditions. Refer to the “Electric Operating Information” tables for a profile of the sources of electric supply used to meet customer demand for Alliant Energy, IPL and WPL from 20082009 to 20122013. Refer to “Strategic Overview - Generation Plans” in MDA for details of Alliant Energy’s, IPL’s and WPL’s future generation plans.

Electric Demand Planning Reserve Margin (PRM)- - IPL and WPL are required to maintain a PRM above their load at the time of the MISO-wide peak to ensure reliability of electric service to their customers. The installed capacity reserve margin is 14.2%14.8% and the unforced capacity reserve margin is 6.2%7.3% for the June 1, 20132014 through May 31, 20142015 MISO planning year. IPL and WPL currently have adequate capacity to meet the MISO PRM requirements.requirements for the June 1, 2014 through May 31, 2015 MISO planning year.

Effective forBeginning with the June 1, 2013 through May 31, 2014 MISO planning year, MISO implemented a Local Resource Zone (LRZ)an LRZ concept. The purpose of the LRZ concept is to encourage adequate generating resources adjacent to the load served by such generating resources. IPL is located in LRZ No. 3, which covers the entire state of Iowa and a portion of southern Minnesota. WPL is located in LRZ No. 2, which covers the southern and eastern portions of Wisconsin and upper peninsula of Michigan. Subject to certain zonal transfer capacity limits, load-serving utilities (including IPL and WPL) are permitted to have generating capacity located outside of their respective LRZs if they procure firm point-to-point transmission service to import the capacity from another LRZ. If a utility chooses to import capacity from another LRZ without firm point-to-point transmission service, it will incur a zonal delivery charge. Neither IPL ornor WPL have current generating capacity located outside of their respective LRZs; therefore they do not expect to be subject to zonal delivery charges during the June 1, 2013 through May 31, 2014 and June 1, 2014 through May 31, 2015 MISO planning year.years.

Generation - IPL and WPL own a portfolio of electric generating facilitiesEGUs located in Iowa, Wisconsin and Minnesota with a diversified fuel mix including coal, natural gas and renewable resources. Refer to Properties” in Item 2 Properties for details of IPL’s and WPL’s electric generating stations.EGUs.


12



Generating Capacity - The generating capacity of IPL’s and WPL’s electric generating facilities isEGUs based upon MISO’s resource adequacy process, which uses the unforcedon nameplate capacity of the generating facilities. The generating capacity for the June 2012 to May 2013 planning period by primary fuel type in MWs wasis as follows:follows (in MWs):

9



IPL WPL TotalIPL WPL Total
Coal1,304
 1,348
 2,652
1,617
 1,338
 2,955
Natural gas (a)820
 1,183
 2,003
1,031
 1,448
 2,479
Oil242
 
 242
349
 
 349
Wind (b)
 7
 7
200
 269
 469
Hydro
 41
 41
Total2,366
 2,538
 4,904
3,197
 3,096
 6,293

(a)In December 2012, WPL purchased Riverside, a 600 MW natural gas-fired electric generating facility. WPL was credited 572 MW of capacity for this facility during the period from February 2013 to May 2013 based upon the MISO resource adequacy process. WPL is utilizing 497 MW of the accredited capacity from Riverside to satisfy its PRM requirements and has sold 75 MW of the accredited capacity to a third-party with a PPA.
(b)
As of December 31, 2012, completed wind projects owned by Alliant Energy’s regulated utilities included IPL’s 200 MW Whispering Willow - East wind project in Franklin County, Iowa, WPL’s 68 MW Cedar Ridge wind project in Fond du Lac County, Wisconsin and WPL’s 200 MW Bent Tree - Phase I wind project in Freeborn County, Minnesota. The amounts in the table above represent 0%, 10% and 0% of the capacity of IPL’s Whispering Willow - East, WPL’s Cedar Ridge and WPL’s Bent Tree - Phase I wind projects, respectively, based upon the MISO resource adequacy process, which is determined separately for each wind site, during the planning period from June 2012 to May 2013.

Fuel Costs - The average cost of delivered fuel per million British Thermal Units used for electric generation was as follows:
IPL WPLIPL WPL
2012 2011 2010 2012 2011 20102013 2012 2011 2013 2012 2011
All fuels
$2.26
 
$2.18
 
$2.17
 
$2.26
 
$2.28
 
$2.17

$2.36
 
$2.26
 
$2.18
 
$2.52
 
$2.26
 
$2.28
Coal1.91
 1.86
 1.73
 2.21
 2.22
 2.06
1.99
 1.91
 1.86
 2.21
 2.21
 2.22
Natural gas (a)3.79
 7.17
 9.79
 3.21
 6.30
 12.83
4.63
 3.79
 7.17
 4.86
 3.21
 6.30

(a)The average cost of natural gas includes commodity and transportation costs as well as gains and losses from swap and option contracts used to hedge the price of natural gas volumes expected to be used by Alliant Energy’sIPL’s and WPL’s natural gas-fired electric generating facilities.EGUs.

Coal - Coal is the primary fuel source for Alliant Energy’s, IPL’s and WPL’s internally generated electric supply and represented approximately 40% to 50%60% of their total sources of electric energy in 2012.2013. Alliant Energy, through Corporate Services as agent for IPL and WPL, has entered into contracts with different suppliers to help ensure that a specified supply of coal is available at known prices for IPL’s and WPL’s coal-fired generating facilitiesEGUs for 20132014 through 20172018. As of December 31, 20122013, existing contracts provide for a portfolio of coal supplies that cover approximately 77%76%, 44%69%, 36%57%, 9%30% and 7%20% of IPL’s and WPL’s estimated aggregate annual coal supply needs for 20132014 through 20172018, respectively. Alliant Energy, IPL and WPL believe this portfolio of coal supplies represents a reasonable balance between the risks of insufficient supplies and those associated with being unable to respond to future coal market changes. Alliant Energy, IPL and WPL expect to meet remaining coal requirements from either future term contracts or purchases in the spot market. Alliant Energy, through its subsidiaries Corporate Services, IPL and WPL, also enters into various coal transportation agreements to meet itsIPL’s and WPL’s coal supply requirements. As of December 31, 20122013, existing coal transportation agreements cover approximately 100%, 95% and 14% of IPL’s estimated coal transportation needs for 2013 through2014 and 2015,, respectively, and 100%, 100% and 31% of WPL’s estimated coal transportation needs for 2013 through2014 and 2015,, respectively.

Nearly all of the coal utilized by IPL and WPL is from the Wyoming Powder River Basin. A majority of this coal is transported by rail-car directly from Wyoming to IPL’s and WPL’s generating stations,EGUs, with the remainder transported from Wyoming to the Mississippi River by rail-car and then via barges to the final destination. As protection against interruptions in coal deliveries, IPL and WPL strive to maintain average coal inventory supply targets of 25 to 55 days for generating stationsEGUs with year-round deliveries and 30 to 150 days (depending upon the time of year) for generating stationsEGUs with seasonal deliveries. Actual inventory averages for 20122013 were 5442 days for generating stationsEGUs with year-round deliveries and 114106 days for generating stationsEGUs with seasonal deliveries. The average days on hand were computed based on actual tons of inventory divided by estimated average daily tons burned. Alliant Energy, IPL and WPL periodically test coal from sources other than the Wyoming Powder River Basin to determine which alternative sources of coal are most compatible with their generating stations.EGUs. Access to alternative sources of coal is expected to provide Alliant Energy, IPL and WPL with further protection against interruptions and lessen their dependence on their primary coal source.

Average delivered fossil fuel costs are expected to increase in the future due to price structures and adjustment provisions in existing coal contracts, rate structures and adjustment provisions in existing transportation contracts, expiration of legacy transportation contracts, fuel-related surcharges

10



incorporated by transportation carriers and expected future coal and transportation market trends. Existing coal commodity contracts with terms of greater than one year have fixed future year prices that generally reflect recent market trends. One of Alliant Energy’s existing coal contracts contain provisions for price adjustments should specific indices change beyond a certain threshold. Rate adjustment provisions in older transportation contracts are primarily based on changes in the Rail Cost Adjustment Factor as published by the U.S. Surface Transportation Board. Rate adjustment provisions in more recent transportation contracts are based on changes in the All Inclusive Index Less Fuel as

13



published by the Association of American Railroads. These more recent transportation contracts also contain fuel surcharges that are subject to change monthly based on changes in diesel fuel prices. Other factors that may impact coal prices for future commitments are increasing costs for supplier mineral rights, increasing costs to mine the coal, and changes in various associated laws and regulations. For example, emission restrictions related to sulfur dioxide (SO2), nitrogen oxide (NOx)SO2, NOx and mercury, along with other environmental limitations on generating stations,EGUs, continue to increase and will likely limit the ability to obtain, and further increase the cost of, adequate coal supplies. Factors that may impact future transportation rates include, but are not limited to: the need for railroads to enhance/enhance and expand infrastructure, for demand growth, corresponding investments in locomotives and crews, and the desire to improve margins on coal movements commensurate with margins on non-coal movements.

Alliant Energy, IPL and WPL believe they are reasonably insulated against coal price volatility given their current coal procurement process, the specific coal market in their primary purchase region and regulatory cost-recovery mechanisms. Alliant Energy’s coal procurement process stresses periodic purchases, staggering of contract terms, stair-stepped levels of supply going forward for multiple years and supplier diversity. Similarly, given the term lengths of their transportation agreements and strategic alignment of agreement expirations for negotiation purposes, Alliant Energy, IPL and WPL believesbelieve they are reasonably insulated against future higher coal transportation rates from the major railroads.

Natural Gas - Alliant Energy owns several larger natural gas-fired generating facilitiesEGUs, including IPL’s 565 MW Emery Generating Station,(603 MW), WPL’s 300 MW Neenah Energy Facility,(371 MW), WPL’s 600 MW Riverside Generating Station(675 MW) and Resources’ 300 MW Sheboygan Falls Energy Facility.(347 MW) facilities. WPL has exclusive rights to the output of the Sheboygan Falls Energy Facility under an affiliated lease agreement. IPL and WPL also own several smaller natural gas-fired EGUs currently and expect to convert some EGUs currently fueled with coal to natural gas in the future. These facilities help meet customer demand for electricity generally during peak hour demands and when natural gas prices are low enough to make natural gas-fired generation economical compared to other fuel sources. Internally generated electric supply from natural gas-fired generating facilitiesEGUs represented less thanapproximately 5% to 10% of Alliant Energy’s, IPL’s and WPL’s total sources of electric energy in 2012.2013. Alliant Energy manages the gas supply to these gas-fired generating facilitiesEGUs and provides supply through a combination of third-party deliveries and pipeline transportation and storage contracts held by IPL and WPL.

Wind - IPL’s 200 MW Whispering Willow - East wind project in Franklin County, Iowa began generating electricity in 2009. WPL’s 68 MW Cedar Ridge wind project in Fond du Lac County, Wisconsin began generating electricity in 2008. WPL’s 200201 MW Bent Tree - Phase I wind project in Freeborn County, Minnesota began full generation of electricity in early 2011. Internally generated electric supply from wind facilities represented less thanapproximately 5% of Alliant Energy’s, IPL’s and WPL’s total sources of electric energy in 2012.2013. All or some of the renewable energy attributes associated with generation from these sources may be used in future years to comply with RES or other regulatory requirements, or sold to third parties in the form of RECs or other environmental commodities.

Purchased Power - IPL and WPL periodically enter into PPAs and purchase electricity from wholesale energy markets to meet a portion of their customer demand for electricity. Purchased power represented approximately 40%30% to 45%50% of Alliant Energy’s, IPL’s and WPL’s total sources of electric energy in 20122013. IPL’s most significant PPA is with NER for the purchase of energy and capacity from the Duane Arnold Energy Center (DAEC) through February 2014. In January 2013, the IUB issued an order allowing IPL to proceed with a proposed DAEC PPA, which will provide IPL 431 MWs of capacity and the resulting energy from DAEC for a term from the expiration of the existing PPA in February 22, 2014 through December 31, 2025. WPL’s most significant PPA is with Dominion Resources, Inc. (Dominion)for the purchase of 150 MWs of energy and capacityfor a term from the Kewaunee Nuclear Power Plant (Kewaunee)January 1, 2014 through December 2013. In October 2012, Dominion announced plans to shut down Kewaunee in the second quarter of 2013. WPL currently expects that Dominion will provide WPL replacement energy and capacity under the terms of the Kewaunee PPA after the plant is shut down through the end of the PPA term in December 2013. As a result, WPL currently expects no material changes to the expected energy and capacity payments under the PPA.31, 2018.

Refer to Note 1(h)1(g) for discussion of IPL’s and WPL’s rate recovery of electric production fuel and purchased energyfuel-related costsNote 3(a) for details regarding PPAs accounted for as operating leases and Note 13(b)16(b) for details on IPL’s and WPL’s coal, natural gas and other purchased power commitments in the “Combined Notes to Consolidated Financial Statements.”


11



Electric Transmission-
IPL - IPL completed the sale ofcurrently receives substantially all its electric transmission assets located in Iowa, Minnesota and Illinois to ITC in 2007.services from ITC. ITC is an independent for-profit, transmission-only company and is a transmission-owning member of the MISO RTO, MRO and Reliability First Corporation Regional Entities. IPL currently receives substantially all its transmission services from ITC. The annual transmission service rates that ITC charges its customers is calculated each calendar year using a FERC-approved cost of service formula rate template referred to as Attachment “O.” Refer to “Other Future Considerations - Electric Transmission Service Charges” in MDA for additional information regarding transmission service charges from ITC. Refer to “Rate Matters - Recent Retail Base Rate Filings - IPL’s Iowa Retail Electric Rate Case (2009 Test Year)” in MDA for discussion of a transmission cost rider approved by the IUB in January 2011 for recovery of IPL’s electric transmission service expenses.

WPL - WPL transferredcurrently receives substantially all its transmission assetsservices from ATC. ATC is an independent for-profit, transmission-only company and is a transmission-owning member of the MISO RTO, MRO and Reliability First Corporation Regional Entities. The annual transmission service rates that ATC charges its customers are calculated each calendar year using a FERC-approved cost of service formula rate template referred to ATC in 2001 in exchange for an ownership interest in ATC. as Attachment “O.”


14



As of December 31, 20122013, WPL, through its ownership interest in WPL Transco, held a 16% ownership interest in ATC with a carrying value of $257$272 million. WPL’s investment in ATC generated equity income of $41$43 million in 20122013 for Alliant Energy and WPL. During 20122013, ATC distributed to WPL, through WPL’s ownership interest in WPL Transco, $34 million in the form of dividends, $33 million or approximately 80% of WPL’s equity earnings from ATC. Although no assurance can be given, Alliant Energy and WPL anticipatesanticipate ATC will continue a dividend payout ratio close to this level in the future.

In January 2014, WPL Transco’s operating agreement was amended to allow ATI, a wholly-owned subsidiary of Resources, to become a member of WPL Transco in addition to WPL. Beginning in 2014, WPL Transco’s capital contributions to ATC are expected to be funded from ATI instead of WPL. As a result of ATI funding these capital contributions to ATC, WPL’s ownership interest in ATC, through its ownership interest in WPL Transco, is expected to decrease over time and ATI’s ownership interest in ATC, through its ownership interest in WPL Transco, is expected to increase. ATC’s future dividends distributed to WPL and ATI will be based on their respective ownership interest in WPL Transco at the time of the dividend payment.

Alliant Energy currently anticipates makingthat ATI will fund capital contributions of $4approximately $10 million, $2$10 million and $20$15 million to ATC in 20132014, 20142015 and 20152016, respectively, to maintain its current ownership percentage and help fund future proposed transmission projectsprojects. These future proposed transmission projects require approval from various regulatory agencies to construct. Certain of these future proposed transmission projects are currently being challenged by other utilities and other transmission-only companies who have requested to own a portion of the future transmission projects proposed by ATC. Alliant Energy and WPL are currently unable to determine the impact these challenges may have on ATC’s plans to construct these proposed transmission projects and the resulting impact on theirATI’s future capital contributions to ATC and WPL’s and ATI’s equity earnings income and dividends received from ATC.

ATC is an independent for-profit, transmission-only company and is a transmission-owning member of the MISO RTO, MRO and Reliability First Corporation Regional Entities. ATC has transmission interconnections with various other transmission owning utilities in the Midwest. These interconnections enhance the overall reliability of the WPL delivery system and provide access to multiple sources of economic and emergency energy. WPL currently receives substantially all its transmission services from ATC. The annual transmission service rates that ATC charges its customers are calculated each calendar year using a FERC-approved cost of service formula rate template referred to as Attachment “O.” Refer to “Other Future Considerations - Electric Transmission Service Charges” in MDA for additional information regarding transmission service charges from ATC.

In 2011, Duke Energy Corporation and ATC announced the creation of Duke-American Transmission Co. (DATC),DATC, a joint venture that is expected to build, own and operate new electric transmission infrastructure in North America. In 2011, DATC announced its first set of transmission projects, which include seven new transmission lines in five Midwestern states to be constructed over the next 10 yearsa 10-year period for an aggregate cost of approximately $4 billion. These transmission projects are subject to approval by various regulatory agencies. Alliant Energy and WPL are currently unable to determine what impacts the joint venture and transmission line projects noted above, if constructed, will have on their future equity income, distributions from ATC, capital contributions to ATC, or ownership in ATC.

Refer to Note 1918 of the “Combined Notes to Consolidated Financial Statements” for details of agreements between ATC and WPL. Refer to “Other Future Considerations” in MDA for discussion of potential changes to ATC’s return on equity and regulatory capital structure for common equity, which could result in Alliant Energy and WPL realizing lower equity income and dividends from ATC in the future.

MISO Markets - IPL and WPL are members of MISO, a FERC-approved RTO, which is responsible for monitoring and ensuring equal access to the transmission system in their service territories. IPL and WPL participate in the wholesale energy and ancillary services markets operated by MISO, which are discussed in more detail below. IPL and WPL are parties to a system coordination and operating agreement whereby Corporate Services servesacts as agent on behalf of IPL and WPL. The agreement, which has been approved or reviewed by FERC and all state regulatory bodies having jurisdiction, provides a contractual basis for coordinated planning, construction, operation and maintenance of the interconnected electric generation systems of IPL and WPL.WPL pursuant to service agreements. As agent, of the agreement, Corporate Services enters into energy, capacity, ancillary services, and transmission service sale and purchase transactions.transactions within the markets operated by MISO and PJM. Corporate Services allocatesassigns such sales and purchases among IPL and WPL based on information provided bystatements received from MISO and procedures included in the agreement.PJM. Refer to Note 1918 of the “Combined Notes to Consolidated Financial Statements” for additional discussion of these allocatedassigned amounts.

Wholesale Energy Market - IPL and WPL began participationparticipate in the wholesale energy market operated by MISO in 2005.MISO. The market dictates the process by which IPL and WPL buy and sell wholesale electricity, obtain transmission services, schedule generation and ensure resource adequacy to reliably serve load. In the market, IPL and WPL submit day-ahead and/

12



or real-time bids and offers for energy. MISO evaluates IPL’s, WPL’s and other market participants’ offers, bids and energy injections into, and withdrawals from, the system to economically dispatch the entire MISO system on an hourly basis. MISO settles these hourly offers and bids based on locational marginal prices, which are market-driven values based on the specific time and location of the purchase and/or sale of energy. The market is intended to send price signals to stakeholders about where generation or transmission system expansion is needed. In addition, MISO may dispatch generators that support reliability needs, but that would not have operated based on economic needs. In these cases, MISO’s settlement assures that these generators are made whole financially for their variable costs. IPL and WPL may also periodically engage in related transactions in PJM’s bid/offer-based wholesale energy market, which are accounted for in a similar manner as the MISO transactions.


15



Ancillary Services Market - IPL and WPL also participate in MISO’s ancillary services market. The ancillary services market integrates the procurement and use of regulation and contingency reserves with the existing wholesale energy market. Regulation reserves refer to generation available to meet the moment-to-moment changes in generation that are necessary to meet changes in electricity demand. Contingency reserves refer to additional generation or demand response resources, either on-line or that can be brought on-line within 10 minutes, to meet certain major events such as the loss of a large EGU or transmission line.

Financial Transmission Rights (FTRs)and Auction Revenue Rights (ARRs) - In areas of constrained transmission capacity, costs could be higher due to congestion and its impact on locational marginal prices. As part of the MISO market restructuring in 2005, physical transmission rights of IPL and WPL were replaced with FTRs. FTRs provide a hedge for congestion costs that occur in the MISO day-ahead energy market. MISO allocates ARRs to IPL and WPL each year based on historical use of the transmission system. The revenue rights associated with the allocated ARRs are used by IPL and WPL to acquire FTRs through the FTR auctions operated by MISO. MISO allocates ARRs annually based on a fiscal year from June 1 through May 31. IPL’s and WPL’s current FTRs acquired from ARRs extend through May 31, 2013.2014.

Ancillary Services Market - IPL and WPL began participating in MISO’s ancillary services market that was launched in 2009. The ancillary services market integrates the procurement and use of regulation and contingency reserves with the existing wholesale energy market implemented in 2005. Regulation reserves refer to generation available to meet the moment-to-moment changes in generation that are necessary to meet changes in electricity demand. Contingency reserves refer to additional generation or demand response resources, either on-line or that can be brought on-line within 10 minutes, to meet certain major events such as the loss of a large generating unit or transmission line.

Multi-ValueMulti-value Projects (MVPs) - MISO tariffs billed to IPL and WPL include costs related to various shared transmission projects, including MVPs. MVPs include new large scale transmission projects that enable the reliable and economic delivery of energy in support of documented energy policy mandates, reduce market congestion or provide economic value across multiple pricing zones within MISO. MVP costs are socialized across the entire MISO footprint based on energy usage of each MISO participant. MISO tariffs billed to IPL and WPL also include costs related to other shared transmission projects, including projects designed to reduce market congestion, provide interconnection service to the transmission grid for new generation, and to ensure compliance with applicable standards. The costs of these projects are allocated to MISO participants in a way that is commensurate with the benefit to the participants’ pricing zone. The MISO transmission charges billed to IPL and WPL are expected to increase in the future due to the increased number of shared transmission projects occurring in the MISO region. Refer to “Other Future Considerations” in MDA for further discussion of MISO transmission charges billed to IPL and WPL.

Attachment Y Notices and System Support Resources (SSR) - MISO requires its market participants (including IPL and WPL, among others) who own electric generating facilitiesEGUs to submit an Attachment Y Notice if they plan to retire a facilityan EGU or suspend operations of a facilityan EGU for a period longer than two months. Pursuant toUpon receiving an Attachment Y Notice, MISO will conduct a study to determine whether all or a portion of the facility’sEGU’s capacity is necessary to maintain system reliability. If the facility’sEGU’s capacity is determined to be necessary to maintain system reliability, MISO designates the facilityEGU as an SSR. IfWhen an EGU is required to continue to operate for system reliability, the facility’s owner accepts themarket participant may enter into an SSR designation, the facility’s owner negotiates with MISOagreement and negotiate an annual revenue requirement designed to cover the future costs of maintaining availability of the SSR. The annual revenue requirement determined for each SSR is subject to FERC approval.with MISO. The annual revenue requirement for the SSR is subject to FERC approval and is assigned to certain load serving entities based on a MISO study.that benefit from the continued operations of the EGU. In April 2013, the PSCW issued an order allowing investor-owned Wisconsin utilities to defer SSR costs incurred through December 31, 2015. Alliant Energy, IPL and WPL are currently unable to estimate the amount of futureaggregate SSR charges that may be assigned to IPL and WPL as load serving entities. Alliant Energy, IPL and WPL are also currently unable to estimate the impacts of any potential SSR designations on electric generating facilitiesEGUs they plan to retire. Refer to “Strategic Overview - Generation Plans” in MDA for discussion of electric generating facilitiesEGUs that IPL and WPL currently plan to retire.retire and “Other Future Considerations” in MDA for discussion of additional costs expected to be allocated to WPL in the future resulting from an SSR agreement MISO filed in January 2014 with another utility related to one of their EGUs designated as an SSR in one of ATC’s local resource zones.

Electric Environmental Matters - Alliant Energy, IPL and WPL are subject to extensive environmental laws and regulations at a federal, state and local level relating to the protection of the environment and health and safety matters, including those governing air emissions; water discharges; the management, storage and disposal of hazardous materials; and the clean-up of contaminated sites. The laws impacting Alliant Energy’s, IPL’s and WPL’s electric operations include, but are not limited to, the Safe Drinking Water Act; Clean Water Act; Clean Air Act; National Environmental Policy Act of 1969; Toxic Substances Control Act; Resource Conservation and Recovery Act; Comprehensive Environmental Response, Compensation and Liability Act of 1980, as amended by the Superfund Amendments and Reauthorization Act and Emergency Planning and Community Right-to-Know Act of 1986; Endangered Species Act; Occupational Safety and Health Act; National Energy Policy Act, as amended; Federal Insecticide, Fungicide and Rodenticide Act; Hazardous Materials Transportation Act;

13



Pollution Prevention Act; and Department of Homeland Security Appropriations Act, as well as similar state laws, and regulations promulgated thereunder. Alliant Energy, IPL and WPL regularly obtain federal, state and local permits to assure compliance with environmental protection laws and regulations. Costs associated with such compliance have increased in recent years and are expected to continue to increase in the future. Alliant Energy, IPL and WPL anticipate that prudently incurred compliance and remediation costs for IPL and WPL will be recoverable, in whole or part, through future rate case proceedings. Refer to Note Environmental Matters” in MDA and Note 13(e)16(e) of the “Combined Notes to Consolidated Financial Statements” and “Environmental Matters” in MDA for further discussion of electric environmental matters, including current or proposed environmental regulations. Refer to “Strategic Overview - Environmental Compliance Plans” in MDA for details of Alliant Energy’s, IPL’s and WPL’s future environmental compliance plans to adhere to applicable environmental requirements.


16



Alliant Energy Corporation
Electric Operating Information2012 2011 2010 2009 20082013 2012 2011 2010 2009
Operating Revenues (in millions):                  
Residential
$975.9
 
$985.8
 
$1,001.5
 
$868.6
 
$844.7

$1,009.1
 
$975.9
 
$985.8
 
$1,001.5
 
$868.6
Commercial611.4
 612.1
 619.0
 556.8
 537.5
649.4
 611.4
 612.1
 619.0
 556.8
Industrial741.8
 748.9
 762.8
 710.7
 734.7
765.4
 741.8
 748.9
 762.8
 710.7
Retail subtotal2,329.1
 2,346.8
 2,383.3
 2,136.1
 2,116.9
2,423.9
 2,329.1
 2,346.8
 2,383.3
 2,136.1
Sales for resale:                  
Wholesale187.6
 189.8
 196.8
 190.1
 201.9
195.4
 187.6
 189.8
 196.8
 190.1
Bulk power and other23.8
 52.2
 44.1
 98.3
 31.1
17.7
 23.8
 52.2
 44.1
 98.3
Other48.8
 47.0
 50.0
 51.4
 61.4
52.0
 48.8
 47.0
 50.0
 51.4
Total
$2,589.3
 
$2,635.8
 
$2,674.2
 
$2,475.9
 
$2,411.3

$2,689.0
 
$2,589.3
 
$2,635.8
 
$2,674.2
 
$2,475.9
Electric Sales (000s MWh):                  
Residential7,679
 7,740
 7,836
 7,532
 7,664
7,824
 7,679
 7,740
 7,836
 7,532
Commercial6,352
 6,253
 6,219
 6,108
 6,181
6,432
 6,352
 6,253
 6,219
 6,108
Industrial11,555
 11,504
 11,213
 10,948
 12,490
11,471
 11,555
 11,504
 11,213
 10,948
Retail subtotal25,586
 25,497
 25,268
 24,588
 26,335
25,727
 25,586
 25,497
 25,268
 24,588
Sales for resale:                  
Wholesale3,317
 3,372
 3,325
 3,251
 3,813
3,564
 3,317
 3,372
 3,325
 3,251
Bulk power and other1,303
 1,757
 1,378
 2,583
 983
763
 1,303
 1,757
 1,378
 2,583
Other151
 151
 153
 155
 164
152
 151
 151
 153
 155
Total30,357
 30,777
 30,124
 30,577
 31,295
30,206
 30,357
 30,777
 30,124
 30,577
Customers (End of Period):                  
Residential844,388
 842,780
 841,726
 840,927
 840,644
847,350
 844,388
 842,780
 841,726
 840,927
Commercial137,791
 136,732
 135,832
 135,099
 134,536
138,520
 137,791
 136,732
 135,832
 135,099
Industrial2,842
 2,895
 2,875
 2,881
 2,934
2,881
 2,842
 2,895
 2,875
 2,881
Other3,647
 3,638
 3,632
 3,555
 3,534
3,657
 3,647
 3,638
 3,632
 3,555
Total988,668
 986,045
 984,065
 982,462
 981,648
992,408
 988,668
 986,045
 984,065
 982,462
Other Selected Electric Data:                  
Maximum peak hour demand (MW)5,886
 5,734
 5,425
 5,491
 5,491
5,820
 5,886
 5,734
 5,425
 5,491
Cooling degree days (a):                  
Cedar Rapids, Iowa (IPL) (normal - 740)1,052
 887
 923
 406
 583
884
 1,052
 887
 923
 406
Madison, Wisconsin (WPL) (normal - 625)1,070
 814
 829
 368
 538
709
 1,070
 814
 829
 368
Sources of electric energy (000s MWh):                  
Coal14,680
 16,440
 16,366
 15,321
 17,495
14,873
 14,680
 16,440
 16,366
 15,321
Purchased power:                  
Nuclear(b)5,483
 5,483
 5,667
 5,428
 5,465
5,544
 5,483
 5,483
 5,667
 5,428
Other (b)8,241
 7,529
 7,514
 9,542
 7,866
Wind (c)1,201
 1,188
 1,285
 1,254
 957
Other (c)5,541
 7,053
 6,244
 6,260
 8,585
Gas1,285
 588
 633
 661
 1,037
2,224
 1,285
 588
 633
 661
Other (b)1,381
 1,413
 820
 402
 245
Wind (c)1,375
 1,198
 1,188
 588
 222
Other (c)200
 183
 225
 232
 180
Total31,070
 31,453
 31,000
 31,354
 32,108
30,958
 31,070
 31,453
 31,000
 31,354
Revenue per kilowatt-hour (KWh) sold to retail customers (cents)9.10
 9.20
 9.43
 8.69
 8.04
Revenue per KWh sold to retail customers (cents)9.42
 9.10
 9.20
 9.43
 8.69
(a)Cooling degree days are calculated using a simple average of the high and low temperatures each day compared to a 65 degree base. Normal degree days are calculated using a rolling 20-year average of historical cooling degree days.
(b)2013 MWh includes replacement energy provided under the Kewaunee PPA after Kewaunee was shut down in May 2013.
(c)All or some of the renewable energy attributes associated with generation from these sources may be used in future years to comply with renewable energy standards or other regulatory requirements, or sold to third-partiesthird parties in the form of renewable energy credits or other environmental commodities.


1417



Interstate Power and Light Company
Electric Operating Information2012 2011 2010 2009 20082013 2012 2011 2010 2009
Operating Revenues (in millions):                  
Residential
$529.9
 
$543.2
 
$561.9
 
$478.9
 
$455.2

$574.3
 
$529.9
 
$543.2
 
$561.9
 
$478.9
Commercial365.3
 366.0
 378.7
 336.8
 319.4
409.6
 365.3
 366.0
 378.7
 336.8
Industrial408.0
 415.4
 441.9
 412.5
 407.0
442.9
 408.0
 415.4
 441.9
 412.5
Retail subtotal1,303.2
 1,324.6
 1,382.5
 1,228.2
 1,181.6
1,426.8
 1,303.2
 1,324.6
 1,382.5
 1,228.2
Sales for resale:                  
Wholesale27.8
 29.6
 29.8
 23.5
 23.4
30.0
 27.8
 29.6
 29.8
 23.5
Bulk power and other9.5
 24.6
 23.5
 37.3
 21.1
2.0
 9.5
 24.6
 23.5
 37.3
Other30.6
 29.5
 28.5
 26.6
 32.2
33.0
 30.6
 29.5
 28.5
 26.6
Total
$1,371.1
 
$1,408.3
 
$1,464.3
 
$1,315.6
 
$1,258.3

$1,491.8
 
$1,371.1
 
$1,408.3
 
$1,464.3
 
$1,315.6
Electric Sales (000s MWh):                  
Residential4,141
 4,223
 4,295
 4,113
 4,218
4,272
 4,141
 4,223
 4,295
 4,113
Commercial4,045
 3,953
 3,944
 3,851
 3,911
4,118
 4,045
 3,953
 3,944
 3,851
Industrial7,116
 7,080
 6,961
 6,829
 7,742
6,973
 7,116
 7,080
 6,961
 6,829
Retail subtotal15,302
 15,256
 15,200
 14,793
 15,871
15,363
 15,302
 15,256
 15,200
 14,793
Sales for resale:                  
Wholesale418
 417
 425
 403
 449
419
 418
 417
 425
 403
Bulk power and other377
 729
 683
 901
 682
98
 377
 729
 683
 901
Other81
 84
 83
 84
 90
80
 81
 84
 83
 84
Total16,178
 16,486
 16,391
 16,181
 17,092
15,960
 16,178
 16,486
 16,391
 16,181
Customers (End of Period):                  
Residential443,802
 443,358
 443,694
 443,615
 443,589
444,905
 443,802
 443,358
 443,694
 443,615
Commercial81,203
 80,506
 80,063
 79,805
 79,508
81,587
 81,203
 80,506
 80,063
 79,805
Industrial1,836
 1,906
 1,900
 1,914
 1,939
1,863
 1,836
 1,906
 1,900
 1,914
Other1,381
 1,381
 1,366
 1,376
 1,381
1,374
 1,381
 1,381
 1,366
 1,376
Total528,222
 527,151
 527,023
 526,710
 526,417
529,729
 528,222
 527,151
 527,023
 526,710
Other Selected Electric Data:                  
Maximum peak hour demand (MW)3,130
 3,131
 2,963
 2,981
 2,943
3,107
 3,130
 3,131
 2,963
 2,981
Cooling degree days (a):                  
Cedar Rapids, Iowa (normal - 740)1,052
 887
 923
 406
 583
884
 1,052
 887
 923
 406
Sources of electric energy (000s MWh):                  
Coal7,302
 8,456
 8,663
 8,162
 9,517
6,705
 7,302
 8,456
 8,663
 8,162
Purchased power:                  
Nuclear3,641
 3,624
 3,623
 3,577
 3,619
3,592
 3,641
 3,624
 3,623
 3,577
Wind (b)768
 743
 661
 606
 571
Other (b)3,980
 3,755
 3,620
 4,315
 3,154
3,766
 3,237
 3,094
 3,014
 3,744
Gas1,081
 532
 578
 636
 983
920
 1,081
 532
 578
 636
Wind (b)639
 579
 568
 353
 42
Other (b)617
 586
 375
 58
 23
22
 38
 18
 22
 16
Total16,621
 16,953
 16,859
 16,748
 17,296
16,412
 16,621
 16,953
 16,859
 16,748
Revenue per KWh sold to retail customers (cents)8.52
 8.68
 9.10
 8.30
 7.45
9.29
 8.52
 8.68
 9.10
 8.30
(a)Cooling degree days are calculated using a simple average of the high and low temperatures each day compared to a 65 degree base. Normal degree days are calculated using a rolling 20-year average of historical cooling degree days.
(b)All or some of the renewable energy attributes associated with generation from these sources may be used in future years to comply with renewable energy standards or other regulatory requirements, or sold to third-partiesthird parties in the form of renewable energy credits or other environmental commodities.


1518



Wisconsin Power and Light Company
Electric Operating Information2012 2011 2010 2009 20082013 2012 2011 2010 2009
Operating Revenues (in millions):                  
Residential
$446.0
 
$442.6
 
$439.6
 
$389.7
 
$389.5

$434.8
 
$446.0
 
$442.6
 
$439.6
 
$389.7
Commercial246.1
 246.1
 240.3
 220.0
 218.1
239.8
 246.1
 246.1
 240.3
 220.0
Industrial333.8
 333.5
 320.9
 298.2
 327.7
322.5
 333.8
 333.5
 320.9
 298.2
Retail subtotal1,025.9
 1,022.2
 1,000.8
 907.9
 935.3
997.1
 1,025.9
 1,022.2
 1,000.8
 907.9
Sales for resale:                  
Wholesale159.8
 160.2
 167.0
 166.6
 178.5
165.4
 159.8
 160.2
 167.0
 166.6
Bulk power and other14.3
 27.6
 20.6
 61.0
 10.0
15.7
 14.3
 27.6
 20.6
 61.0
Other18.2
 17.5
 21.5
 24.8
 29.2
19.0
 18.2
 17.5
 21.5
 24.8
Total
$1,218.2
 
$1,227.5
 
$1,209.9
 
$1,160.3
 
$1,153.0

$1,197.2
 
$1,218.2
 
$1,227.5
 
$1,209.9
 
$1,160.3
Electric Sales (000s MWh):                  
Residential3,538
 3,517
 3,541
 3,419
 3,446
3,552
 3,538
 3,517
 3,541
 3,419
Commercial2,307
 2,300
 2,275
 2,257
 2,270
2,314
 2,307
 2,300
 2,275
 2,257
Industrial4,439
 4,424
 4,252
 4,119
 4,748
4,498
 4,439
 4,424
 4,252
 4,119
Retail subtotal10,284
 10,241
 10,068
 9,795
 10,464
10,364
 10,284
 10,241
 10,068
 9,795
Sales for resale:                  
Wholesale2,899
 2,955
 2,900
 2,848
 3,364
3,145
 2,899
 2,955
 2,900
 2,848
Bulk power and other926
 1,028
 695
 1,682
 301
665
 926
 1,028
 695
 1,682
Other70
 67
 70
 71
 74
72
 70
 67
 70
 71
Total14,179
 14,291
 13,733
 14,396
 14,203
14,246
 14,179
 14,291
 13,733
 14,396
Customers (End of Period):                  
Residential400,586
 399,422
 398,032
 397,312
 397,055
402,445
 400,586
 399,422
 398,032
 397,312
Commercial56,588
 56,226
 55,769
 55,294
 55,028
56,933
 56,588
 56,226
 55,769
 55,294
Industrial1,006
 989
 975
 967
 995
1,018
 1,006
 989
 975
 967
Other2,266
 2,257
 2,266
 2,179
 2,153
2,283
 2,266
 2,257
 2,266
 2,179
Total460,446
 458,894
 457,042
 455,752
 455,231
462,679
 460,446
 458,894
 457,042
 455,752
Other Selected Electric Data:                  
Maximum peak hour demand (MW)2,851
 2,761
 2,654
 2,558
 2,583
2,752
 2,851
 2,761
 2,654
 2,558
Cooling degree days (a):                  
Madison, Wisconsin (normal - 625)1,070
 814
 829
 368
 538
709
 1,070
 814
 829
 368
Sources of electric energy (000s MWh):                  
Coal7,378
 7,984
 7,703
 7,159
 7,978
8,168
 7,378
 7,984
 7,703
 7,159
Purchased power:                  
Nuclear(b)1,842
 1,859
 2,044
 1,851
 1,846
1,952
 1,842
 1,859
 2,044
 1,851
Other (b)4,261
 3,774
 3,894
 5,227
 4,712
Wind (c)433
 445
 624
 648
 386
Other (c)1,775
 3,816
 3,150
 3,246
 4,841
Gas204
 56
 55
 25
 54
1,304
 204
 56
 55
 25
Other (b)764
 827
 445
 344
 222
Wind (c)736
 619
 620
 235
 180
Other (c)178
 145
 207
 210
 164
Total14,449
 14,500
 14,141
 14,606
 14,812
14,546
 14,449
 14,500
 14,141
 14,606
Revenue per KWh sold to retail customers (cents)9.98
 9.98
 9.94
 9.27
 8.94
9.62
 9.98
 9.98
 9.94
 9.27
(a)Cooling degree days are calculated using a simple average of the high and low temperatures each day compared to a 65 degree base. Normal degree days are calculated using a rolling 20-year average of historical cooling degree days.
(b)2013 MWh includes replacement energy provided under the Kewaunee PPA after Kewaunee was shut down in May 2013.
(c)All or some of the renewable energy attributes associated with generation from these sources may be used in future years to comply with renewable energy standards or other regulatory requirements, or sold to third-partiesthird parties in the form of renewable energy credits or other environmental commodities.


1619



2) GAS UTILITY OPERATIONS
General - Gas utility operations represent the second largest operating segment for Alliant Energy, IPL and WPL. Alliant Energy’s gas utility operations are located in the Midwest with IPL providing gas service in Iowa and southern Minnesota, and WPL providing gas service in southern and central Wisconsin. In September 2013, IPL signed a definitive agreement to sell its Minnesota natural gas distribution assets. Refer to Note 3(a) of the “Combined Notes to Consolidated Financial Statements” for discussion of this proposed sale. Refer to the “Gas Operating Information” tables for additional details regarding gas utility operations.

Jurisdictions - Gas utility revenues by state were as follows (dollars in millions):
2012 2011 20102013 2012 2011
Amount Percent Amount Percent Amount PercentAmount Percent Amount Percent Amount Percent
IPL:                      
Iowa
$216.6
 55% 
$263.3
 55% 
$261.5
 54%
$261.2
 56% 
$216.6
 55% 
$263.3
 55%
Minnesota10.1
 2% 13.0
 3% 12.8
 3%12.7
 3% 10.1
 2% 13.0
 3%
Subtotal226.7
 57% 276.3
 58% 274.3
 57%273.9
 59% 226.7
 57% 276.3
 58%
WPL:                      
Wisconsin169.6
 43% 200.4
 42% 206.3
 43%190.9
 41% 169.6
 43% 200.4
 42%

$396.3
 100% 
$476.7
 100% 
$480.6
 100%
$464.8
 100% 
$396.3
 100% 
$476.7
 100%

Customers - The number of gas customers and communities served at December 31, 20122013 were as follows:
Retail Transportation / Total CommunitiesRetail Transportation / Total Communities
Customers Other Customers Customers ServedCustomers Other Customers Customers Served
IPL233,820
 334
 234,154
 243
234,563
 365
 234,928
 243
WPL181,028
 240
 181,268
 239
182,647
 246
 182,893
 238
414,848
 574
 415,422
 482
417,210
 611
 417,821
 481

IPL’s and WPL’s retail gas customers in the above table are billed under base rates established by the IUB, MPUC or PSCW that include recovery of and a return on investments in gas infrastructure and recovery of costs required to serve customers. Commodity, storage and transportation costs incurred by IPL and WPL are recovered pursuant to natural gas cost recovery mechanisms. In addition to sales of natural gas to retail customers, IPL and WPL provide transportation service to commercial and industrial customers by moving customer-owned gas through Alliant Energy’s distribution systems to the customers’ meters. Revenues are collected for this service pursuant to transportation tariffs. Refer to “Rate Matters” in MDA for discussion of IPL’s and WPL’s recent retail gas rate cases.

Seasonality - Gas sales follow a seasonal pattern with an annual base-load of gas and a large heating peak occurring during the winter season. Natural gas obtained from producers, marketers and brokers, as well as gas in storage, is utilized to meet the peak heating season requirements. Storage contracts allow IPL and WPL to purchase gas in the summer, store the gas in underground storage fields and deliver it in the winter.

Competition - Federal and state regulatory policies are in place to bring competition to the gas industry. While the gas utility distribution function is expected to remain a regulated function, sales of the natural gas commodity and related services are subject to competition from third parties.third-parties. It remains uncertain if, and when, the current economic disincentives for smaller consumption customers to choose an alternative gas commodity supplier may be removed such that the utility business begins to face competition for the sale of gas to those customers.

Gas Supply - IPL and WPL maintain purchase agreements with over 70 suppliers of natural gas from various gas producing regions of the U.S. and Canada. The majority of the gas supply contracts are for terms of six months or less, with the remaining supply contracts having terms through March 2015.September 2016. IPL’s and WPL’s gas supply commitments are primarily market-based.

In more recent years, natural gas prices have fallen to levels not seen in a decade. Prices have fallen largely due to surging supply caused by shale gas production. Given the tariffs for IPL’s and WPL’s retail gas customers provide for subsequent adjustments to their rates in the cost of gas sold, the decreased natural gas prices do not have a material impact on their respective gas margins.


20



In providing gas commodity service to retail customers, Corporate Services administers a diversified portfolio of transportation and storage contracts on behalf of IPL and WPL. Transportation contracts with Northern Natural Gas Company (NNG), NNG, ANR, Pipeline (ANR), Natural Gas Pipeline Co. of America (NGPL), Guardian Pipeline (Guardian)NGPL and

17



Northern Border Pipeline (NBPL) NBPL allow access to gas supplies located in the U.S. and Canada. Arrangements with Firm Citygate Supplies (FCS)FCS provide IPL with gas delivered directly to its service territory. In 20122013, the maximum daily delivery capacity for IPL and WPL was as follows in dekatherms (Dths))(in Dths):
NNG ANR NGPL FCS Guardian NBPL TotalNNG ANR NGPL FCS NBPL Total
IPL191,669
 43,180
 78,585
 14,000
 
 4,085
 331,519
191,669
 43,180
 76,673
 15,000
 4,085
 330,607
WPL76,056
 167,467
 
 
 10,000
 
 253,523
76,056
 167,467
 
 
 
 243,523

Refer to Note 1(h)1(g) for information relating to utility natural gas cost recovery mechanisms and Note 13(b)16(b) for discussion of natural gas commitments in the “Combined Notes to Consolidated Financial Statements.”

Gas Environmental Matters - Alliant Energy is subject to extensive environmental laws and regulations at a federal, state and local level relating to the protection of the environment and health and safety matters, including remediation of former manufactured gas plant sites, as well as those governing air emissions, water discharges, and the management, storage and disposal of hazardous materials. The laws impacting Alliant Energy’s gas operations include, but are not limited to, the Safe Drinking Water Act; Clean Water Act; National Environmental Policy Act of 1969; Toxic Substances Control Act; Resource Conservation and Recovery Act; Comprehensive Environmental Response, Compensation and Liability Act of 1980, as amended by the Superfund Amendments and Reauthorization Act and Emergency Planning and Community Right-to-Know Act of 1986; Endangered Species Act; Occupational Safety and Health Act; National Energy Policy Act, as amended; Federal Insecticide, Fungicide and Rodenticide Act; Hazardous Materials Transportation Act; Pollution Prevention Act, and Department of Homeland Security Appropriations Act, as well as similar state laws, and regulations promulgated thereunder. Alliant Energy regularly obtains federal, state and local permits to assure compliance with environmental protection laws and regulations. Costs associated with such compliance have increased in recent years and are expected to continue to increase in the future. Alliant Energy anticipates that prudently incurred compliance and remediation costs for IPL and WPL will be recoverable, in whole or part, through future rate case proceedings. Refer to Note Note 13(e)16(e) of the “Combined Notes to Consolidated Financial Statements” and “Environmental Matters” in MDA for discussion of gas environmental matters.

Alliant Energy Corporation
Gas Operating Information2012 2011 2010 2009 20082013 2012 2011 2010 2009
Operating Revenues (in millions):                  
Residential
$224.3
 
$269.7
 
$273.7
 
$290.8
 
$385.0

$262.5
 
$224.3
 
$269.7
 
$273.7
 
$290.8
Commercial124.3
 155.1
 154.2
 174.7
 240.5
150.3
 124.3
 155.1
 154.2
 174.7
Industrial16.7
 24.5
 27.3
 30.7
 51.1
21.1
 16.7
 24.5
 27.3
 30.7
Retail subtotal365.3
 449.3
 455.2
 496.2
 676.6
433.9
 365.3
 449.3
 455.2
 496.2
Transportation/other31.0
 27.4
 25.4
 29.1
 33.8
30.9
 31.0
 27.4
 25.4
 29.1
Total
$396.3
 
$476.7
 
$480.6
 
$525.3
 
$710.4

$464.8
 
$396.3
 
$476.7
 
$480.6
 
$525.3
Gas Sales (000s Dths):                  
Residential23,071
 26,891
 27,128
 27,711
 30,630
29,916
 23,071
 26,891
 27,128
 27,711
Commercial17,115
 19,271
 18,691
 20,725
 22,461
21,892
 17,115
 19,271
 18,691
 20,725
Industrial3,068
 3,848
 4,158
 4,558
 5,558
3,803
 3,068
 3,848
 4,158
 4,558
Retail subtotal43,254
 50,010
 49,977
 52,994
 58,649
55,611
 43,254
 50,010
 49,977
 52,994
Transportation/other57,532
 52,210
 50,408
 54,518
 60,626
60,261
 57,532
 52,210
 50,408
 54,518
Total100,786
 102,220
 100,385
 107,512
 119,275
115,872
 100,786
 102,220
 100,385
 107,512
Retail Customers at End of Period:                  
Residential368,708
 367,497
 366,261
 365,597
 365,193
370,895
 368,708
 367,497
 366,261
 365,597
Commercial45,684
 45,667
 45,552
 45,641
 45,413
45,874
 45,684
 45,667
 45,552
 45,641
Industrial456
 496
 549
 571
 584
441
 456
 496
 549
 571
Total414,848
 413,660
 412,362
 411,809
 411,190
417,210
 414,848
 413,660
 412,362
 411,809
Other Selected Gas Data:                  
Heating degree days (a):                  
Cedar Rapids, Iowa (IPL) (normal - 6,794)5,901
 6,745
 6,868
 7,074
 7,636
7,232
 5,901
 6,745
 6,868
 7,074
Madison, Wisconsin (WPL) (normal - 7,089)5,964
 6,992
 6,798
 7,356
 7,714
7,627
 5,964
 6,992
 6,798
 7,356
Revenue per Dth sold to retail customers
$8.45
 
$8.98
 
$9.11
 
$9.36
 
$11.54

$7.80
 
$8.45
 
$8.98
 
$9.11
 
$9.36
Purchased gas costs per Dth sold to retail customers
$4.94
 
$5.88
 
$6.05
 
$6.47
 
$8.73

$4.90
 
$4.94
 
$5.88
 
$6.05
 
$6.47
(a)Heating degree days are calculated using a simple average of the high and low temperatures each day compared to a 65 degree base. Normal degree days are calculated using a rolling 20-year average of historical heating degree days.


1821



Interstate Power and Light Company
Gas Operating Information2012 2011 2010 2009 20082013 2012 2011 2010 2009
Operating Revenues (in millions):                  
Residential
$126.4
 
$155.2
 
$155.6
 
$168.6
 
$219.3

$152.8
 
$126.4
 
$155.2
 
$155.6
 
$168.6
Commercial69.7
 87.8
 88.4
 100.8
 137.3
85.7
 69.7
 87.8
 88.4
 100.8
Industrial12.8
 19.0
 18.4
 25.0
 40.4
16.1
 12.8
 19.0
 18.4
 25.0
Retail subtotal208.9
 262.0
 262.4
 294.4
 397.0
254.6
 208.9
 262.0
 262.4
 294.4
Transportation/other17.8
 14.3
 11.9
 14.4
 13.4
19.3
 17.8
 14.3
 11.9
 14.4
Total
$226.7
 
$276.3
 
$274.3
 
$308.8
 
$410.4

$273.9
 
$226.7
 
$276.3
 
$274.3
 
$308.8
Gas Sales (000s Dths):                  
Residential12,955
 15,660
 15,923
 16,072
 18,110
16,975
 12,955
 15,660
 15,923
 16,072
Commercial9,403
 10,677
 10,596
 11,451
 13,099
12,051
 9,403
 10,677
 10,596
 11,451
Industrial2,435
 3,023
 2,869
 3,787
 4,539
2,931
 2,435
 3,023
 2,869
 3,787
Retail subtotal24,793
 29,360
 29,388
 31,310
 35,748
31,957
 24,793
 29,360
 29,388
 31,310
Transportation/other30,992
 27,720
 28,071
 30,398
 34,993
32,019
 30,992
 27,720
 28,071
 30,398
Total55,785
 57,080
 57,459
 61,708
 70,741
63,976
 55,785
 57,080
 57,459
 61,708
Retail Customers at End of Period:                  
Residential207,121
 206,964
 206,979
 206,937
 206,866
207,853
 207,121
 206,964
 206,979
 206,937
Commercial26,439
 26,455
 26,470
 26,545
 26,603
26,460
 26,439
 26,455
 26,470
 26,545
Industrial260
 296
 343
 359
 367
250
 260
 296
 343
 359
Total233,820
 233,715
 233,792
 233,841
 233,836
234,563
 233,820
 233,715
 233,792
 233,841
Other Selected Gas Data:                  
Heating degree days (a):                  
Cedar Rapids, Iowa (normal - 6,794)5,901
 6,745
 6,868
 7,074
 7,636
7,232
 5,901
 6,745
 6,868
 7,074
Revenue per Dth sold to retail customers
$8.43
 
$8.92
 
$8.93
 
$9.40
 
$11.11

$7.97
 
$8.43
 
$8.92
 
$8.93
 
$9.40
Purchased gas cost per Dth sold to retail customers
$4.92
 
$5.96
 
$6.05
 
$6.61
 
$8.50

$4.96
 
$4.92
 
$5.96
 
$6.05
 
$6.61
(a)Heating degree days are calculated using a simple average of the high and low temperatures each day compared to a 65 degree base. Normal degree days are calculated using a rolling 20-year average of historical heating degree days.

Wisconsin Power and Light Company
Gas Operating Information2012 2011 2010 2009 20082013 2012 2011 2010 2009
Operating Revenues (in millions):                  
Residential
$97.9
 
$114.5
 
$118.1
 
$122.2
 
$165.7

$109.7
 
$97.9
 
$114.5
 
$118.1
 
$122.2
Commercial54.6
 67.3
 65.8
 73.9
 103.2
64.6
 54.6
 67.3
 65.8
 73.9
Industrial3.9
 5.5
 8.9
 5.7
 10.7
5.0
 3.9
 5.5
 8.9
 5.7
Retail subtotal156.4
 187.3
 192.8
 201.8
 279.6
179.3
 156.4
 187.3
 192.8
 201.8
Transportation/other13.2
 13.1
 13.5
 14.7
 20.4
11.6
 13.2
 13.1
 13.5
 14.7
Total
$169.6
 
$200.4
 
$206.3
 
$216.5
 
$300.0

$190.9
 
$169.6
 
$200.4
 
$206.3
 
$216.5
Gas Sales (000s Dths):                  
Residential10,116
 11,231
 11,205
 11,639
 12,520
12,941
 10,116
 11,231
 11,205
 11,639
Commercial7,712
 8,594
 8,095
 9,274
 9,362
9,841
 7,712
 8,594
 8,095
 9,274
Industrial633
 825
 1,289
 771
 1,019
872
 633
 825
 1,289
 771
Retail subtotal18,461
 20,650
 20,589
 21,684
 22,901
23,654
 18,461
 20,650
 20,589
 21,684
Transportation/other26,540
 24,490
 22,337
 24,120
 25,633
28,242
 26,540
 24,490
 22,337
 24,120
Total45,001
 45,140
 42,926
 45,804
 48,534
51,896
 45,001
 45,140
 42,926
 45,804
Retail Customers at End of Period:                  
Residential161,587
 160,533
 159,282
 158,660
 158,327
163,042
 161,587
 160,533
 159,282
 158,660
Commercial19,245
 19,212
 19,082
 19,096
 18,810
19,414
 19,245
 19,212
 19,082
 19,096
Industrial196
 200
 206
 212
 217
191
 196
 200
 206
 212
Total181,028
 179,945
 178,570
 177,968
 177,354
182,647
 181,028
 179,945
 178,570
 177,968
Other Selected Gas Data:                  
Heating degree days (a):                  
Madison, Wisconsin (normal - 7,089)5,964
 6,992
 6,798
 7,356
 7,714
7,627
 5,964
 6,992
 6,798
 7,356
Revenue per Dth sold to retail customers
$8.47
 
$9.07
 
$9.36
 
$9.31
 
$12.21

$7.58
 
$8.47
 
$9.07
 
$9.36
 
$9.31
Purchased gas cost per Dth sold to retail customers
$4.97
 
$5.77
 
$6.06
 
$6.28
 
$9.08

$4.83
 
$4.97
 
$5.77
 
$6.06
 
$6.28
(a)Heating degree days are calculated using a simple average of the high and low temperatures each day compared to a 65 degree base. Normal degree days are calculated using a rolling 20-year average of historical heating degree days.

1922




3) OTHER UTILITY OPERATIONS - STEAM - IPL’s Prairie Creek Generating Stationfacility is the primary source of steam for IPL’s two high-pressure steam customers. IPL’s largest high-pressure steam customer accounts for approximately 95%90% of IPL’s steam revenues. This customer is under contract through 2025 for annual steam usage of at least 3.8 million Dths, with certain conditions. IPL’s other high-pressure steam customer is under contract through 2025 for annual steam usage of at least 190,0000.2 million Dths for 2014, with certain conditions.

D. INFORMATION RELATING TO NON-REGULATED OPERATIONS

Resources manages a portfolio of wholly-owned subsidiaries and additional investments through the following distinct platforms:

Non-regulated Generation - owns Sheboygan Falls, a 347 MW, simple-cycle, natural gas-fired EGU near Sheboygan Falls, Wisconsin, which is leased to WPL for an initial period of 20 years ending in 2025, and the 99 MW Franklin County wind project in Franklin County, Iowa.

Transportation - includes a short-line railway that provides freight service between Cedar Rapids, Iowa and Iowa City, Iowa; a barge terminal and hauling services on the Mississippi River; and other transfer and storage services.

Non-regulated Generation - owns the 300 MW, simple-cycle, natural gas-fired Sheboygan Falls Energy Facility near Sheboygan Falls, Wisconsin, which is leased to WPL for an initial period of 20 years ending in 2025, and the 100 MW Franklin County wind project in Franklin County, Iowa, which was placed in service in the fourth quarter of 2012.

Other non-regulated investments - includeincludes the Whiting Petroleum Corporation (Whiting) tax sharing agreement receivable discussed in Note 4(b)5(b) of the “Combined Notes to Consolidated Financial Statements,” real estate investments, two corporate airplanes and several other modest investments.

ITEM 1A. RISK FACTORS

You should carefully consider each of the risks described below relating to Alliant Energy, IPL and WPL, together with all of the other information contained in this combined Annual Report on Form 10-K, before making an investment decision with respect to our securities. If any of the following risks develop into actual events, our business, financial condition or results of operations could be materially and adversely affected and you may lose all or part of your investment.

Our business is significantly impacted by government regulation and legislation - We are subject to extensive regulation by federal and state regulatory authorities, which significantly influences our operations and our ability to timely recover costs from customers and earn appropriate rates of return. In particular, regulatory authorities with jurisdiction over public utilities, including the IUB, the PSCW, the MPUC and FERC, regulate many aspects of our operations. Our operations are also governed by organizations such as the North American Electric Reliability Corporation, the Pipeline and MISO.Hazardous Materials Safety Administration, and the Midcontinent Independent System Operator, Inc. Operations impacted by these regulatory groups include: the rates charged to our customers; our ability to site and construct new generating facilities, such as the proposed natural gas generating facility in Marshalltown, Iowa, any potential new generation investment in Wisconsin, and future wind projects to utilize our remaining available wind sites, and the amount of costs associated therewith that may be recovered from customers; the installation of environmental emission controls equipment and the amount of costs for the construction and maintenance of such equipment that may be recovered from customers; our ability to decommission generating facilities and recover the costs incurred to decommission the facilities and the remaining carrying value of such facilities; the amount of certain sources of energy we must use, such as renewable sources and reductions in energy usage by customers; our ability to purchase generating facilities and the amount of costs associated therewith that may be recovered from customers; the rates paid to transmission operators and the amount of those costs, and how those costs are recovered from customers; our ability to enter into purchased power agreements, such as the purchased power agreement entered into with NextEra Energy, Inc., and the amount of costs associated therewith, and how those costs are recovered from customers; energy capacity standards and what forms of energy are considered when determining whether we meet those standards; the allocation of expenditures by transmission companies on transmission network upgrades and our ability to recover costs associated therewith from customers; reliability; safety; the issuance of securities; accounting matters; and transactions between affiliates. These regulatory authorities are also empowered to impose financial penalties and other sanctions if we are found to have violated statutes and regulations governing utility operations. Failure to obtain approvals from regulatory authorities for any of these matters, failure to receive approvals in a timely manner, or receiving approvals with uneconomical conditions may adversely impact our ability to achieve our strategic plan, cause us to record an impairment of our assets, and have a material adverse impact on our financial condition and results of operations.

In addition,These regulatory authorities are also empowered to impose financial penalties and other sanctions if we are found to have violated statutes and regulations governing utility operations. While we believe we comply in all material respects with applicable laws and regulations governing us, state or federal agencies may not agree and may find that we violated a law or

23



regulation. Such a finding could cause fines or penalties or could require us to implement new compliance programs, which could increase our costs of compliance and may adversely impact our financial condition and results of operations.

Our utility financial condition is influenced by how these regulatory authorities establish the rates we can charge our customers, our authorized rates of return and common equity levels, and the amount of deferred costs that may be recovered from customers. Our ability to obtain rate adjustments to earn authorized rates of return depends upon timely regulatory action under applicable statutes and regulations, and we cannot assure that rate adjustments will be obtained or

20



authorized rates of return on capital will be earned. In pending and future rate cases, IPL and WPL may not receive an adequate amount of rate relief, rates may be reduced, rate refunds may be required, rate adjustments may not be approved on a timely basis, costs may not be otherwise recovered through rates, future rates may be temporarily frozen (as is the case for IPL’s retail electric base rates through 2013 and WPL’s retail electric and gas base rates through 2014) and authorized rates of return on capital may be reduced. As a result, we may experience adverse impacts on our financial condition and results of operations. We are unable to predict the impact on our business and operating results from future regulatory activities of any of these agencies.

We are subject to a wide variety of regulations, including and in addition to those described above, which are constantly changing. Changes in regulations or the imposition of additional regulations may require us to incur additional costs or change business operations or our business plan, which may have an adverse impact on our financial condition and results of operations. While we believe we comply with all laws and regulations governing us, state or federal agencies may not agree and may find that our compliance programs are inadequate. Such a finding could cause fines or penalties or could require us to implement new compliance programs, which could increase our costs of compliance and may adversely impact our financial condition.

Provisions of the Wisconsin Utility Holding Company Act (WUHCA) limit our ability to invest in non-utility activities. Takeover attempts by potential purchasers who might be willing to pay a premium for our stock are also limited by certain provisions of WUHCAthe Wisconsin Utility Holding Company Act and the delays and conditions that generally result from the requirement that regulatory authorities approve such a transaction.

Large construction projects are subject to delays and cost increases that may not be recovered from customers - Our strategic plan includes installing environmental control equipment at our newer and more efficient coal-fired generating facilities, making other large-scale improvements to our newer and more-efficient coal-firedsuch generating facilities, and the construction of a natural gas-fired generating facility.facilities. These large construction projects are subject to various risks that could cause costs to increase or cause delays in completion. These risks include changes in costs of materials, equipment, commodities, fuel or labor; shortages in materials, equipment and qualified labor; changes to the scope or timing of the projects; general contractors or subcontractors not performing as required under their contracts; the inability to agree to contract terms or disputes in contract terms; poor initial cost estimates; work stoppages; adverse weather conditions; the inability to obtain necessary permits in a timely manner; adverse interpretation or enforcement of permit conditions; changes in applicable laws or regulations; governmental actions; legal action; unforeseen engineering or technology issues; limited access to capitalcapital; and other adverse economic conditions. If a construction project is not completed or is delayed, or final costs exceed the costs approved by our regulators, for example, if the Marshalltown Generating Station exceeds the cost cap approved by the IUB, we may not be able to recover all costs for the project in rates and we face increased risk of potential impairment of our investment in the project. Inability to recover costs, or inability to complete the project in a timely manner, could adversely impact our financial condition and results of operations.

We are subject to numerous environmental laws and regulations, compliance with which could be difficult and costly, and pursuant to which we could incur material liabilities - We are subject to environmental laws and regulations that affect many aspects of our past, present and future operations. TheseWe are also subject to a Consent Decree between WPL, the EPA and the Sierra Club, which resolved environmental claims related to WPL’s generating facilities. The regulations and the Consent Decree govern air emissions, water quality, cooling water intake structures, wastewater discharges, the generation, transport and disposal of coal combustion products and other solid wastes and hazardous substances, and the clean-up of contaminated sites. These laws and regulations require us to obtain and comply with a wide variety of environmental registrations, licenses, permits, inspections and other approvals, which are subject to renewal proceedings and legal challenges. Environmental laws, regulations and regulationsthe Consent Decree can also require us to restrict or limit the output of certain facilities or the use of certain fuels, to install emission controlcontrols equipment at our facilities, clean up spills and correct environmental hazards and other contamination. We may be required to pay all or a portion of the costcosts to remediate (i.e., clean-up) sites where our past activities, or the activities of certain other parties, caused environmental contamination, including sites of former manufactured gas plants operated by our predecessors. Compliance with these regulations can significantly increase capital spending, operating costs, and plant down-times and can negatively affect the affordability of rates we charge our customers. We cannot predict with certainty the amount and timing of all future expenditures (including the potential or magnitude of any fines or penalties, including the severity of any restriction on our operations) necessary to comply with, or as a result of liabilities under, these environmental laws, regulations, and regulations,the Consent Decree, although we expect the expenditures to be material.


24



Although we believe we comply in all material respects with currently applicable environmental laws, regulations, and regulations,the Consent Decree, we may receive notices of violation from state or federal agencies, as occurred when the EPA issued a notice of violation to WPL in 2009 alleging non-compliance with various permitting requirements under the Clean Air Act.agencies. Citizen groups or private individuals that feel environmental regulations are not being sufficiently enforced by regulatory agencies may bring legal action against those regulatory agencies or bring citizen enforcement actions against us. We may be subject to litigation over environmental issues, including claims for property damage or personal injury, or suits by citizen groups alleging violations of

21



environmental requirements. For example, WPL is currently involved in matters in whichthe Consent Decree resulted from allegations originally raised by the Sierra Club is allegingthat WPL violated various violationsprovisions of the Clean Air Act. If we are unsuccessful defending or settling litigation from governmental agencies or citizen groups, we could be subject to restrictions or prohibitions on operating our generation facilities, costly upgrades to our generating facilities, payment of damages or fines, requirements to complete other beneficial environmental projects, and litigation costs, all of which could be material. An adverse result in such legal actions could have a material adverse impact on our financial condition and results of operations.

We are also subject to existing and potential future governmental mandates to provide customers with clean energy, renewable energy and energy conservation offerings. These mandates are designed in part to mitigate the potential environmental impacts of utility operations. Failure to meet the requirements of these mandates may result in fines or penalties, which could have a material adverse effect on our results of operations. If our regulators do not allow us to recover all or a part of the costs incurred to comply with the mandates, it could have a material adverse effect on our results of operations.

Existing environmental laws or regulations may be revised and new laws or regulations seeking to protect the environment may be adopted or become applicable to us. These revised and new laws or regulations may include regulation of mercury, nitrogen oxide, sulfur dioxide, carbon dioxide (CO2) and other greenhouse gasgases (GHG) emissions, particulates, coal ash and other coal combustion products, and cooling water intake structures. Such changes could materially increase our cost of compliance. Our strategic plan was developed in part to comply with certain expected environmental laws and regulations as we anticipate they will be finally adopted. Revision of existing environmental laws or regulations may cause: (1) state utility commissions to not approve our plans to install environmental emission controlcontrols equipment at our existing generating facilities or not allow us to recover costs of such projects; (2) state utility commissions to not approve costs of emission allowances purchased to comply with environmental regulations that are no longer applicable to our operations; (3) co-owners in our jointly-owned facilities to not agree with our decision to move forward with these projects; or (4) our current plans todo not meet new requirements. These outcomes could have a material adverse effect on our financial condition and results of operations.

Actions related to global climate change and reducing greenhouse gases (GHG)GHG emissions could negatively impact us - The primary GHG emitted from our utility operations is CO2 from combustion of fossil fuels at our generating facilities, which are primarily coal-fired facilities. We could incur costs or other obligations to comply with any GHG regulations that are adopted in the future, and could become the target of legal claims or challenges, because generating electricity using fossil fuels emits CO2 and other GHGs. In particular, President Obama and his administration have affirmed that the regulation of GHG emissions continues to be a top priority. The EPA has issued proposed regulations governing GHG emissions from new generating facilities, which would impact the Marshalltown Generating Station and any new generation investment in Wisconsin. The EPA is also expected to propose regulations in 2014 governing GHG emissions from existing generating facilities, which potentially could impact all of our generating facilities. Due to the uncertainty of what form CO2 emissions regulations regarding our existing generating facilities could take and control technologies available to reduce GHG emissions, including CO2, and the unknown nature of potential compliance obligations should climate change regulations be enacted, we cannot provide any assurance regarding the potential impacts any future regulations would have on our operations. The impacts of such proposals could have a material adverse impact on our financial condition and results of operations.

Demand for energy may decrease - Adverse economic conditionsOur results of operations are affected by the demand for energy in our service territories, such as the most recent recession, reduce theterritories. We could lose customers, and therefore see lower demand for electricity and natural gas. We lost certain customers after plants closed due to the most recent recession and could lose additional customersenergy, due to economic conditions, customers constructing their own generation facilities, higher costs and rates charged to customers, or loss of service territory or franchises. Further, the energy conservation and technological advances that increase energy efficiency may temporarily or permanently reduce the demand for energy products. In addition, state and/or federal regulations require mandatory conservation measures, which would reduce the demand for energy. We may also lose wholesale customers to competitors. Technology improvements and regulatory developments are making distributed generation feasible for more of our customers. As more customers utilize distributed generation, demand for energy from us may decline. Future economic growth may not create enough growth for us to replace the lost energy demand from these customers. The loss of customers, the inability to replace those customers with new customers, and the decrease in demand for energy could negatively impact our financial condition and results of operations.

Regional and national economic conditions could have an unfavorable impact on us - Our utility and non-regulated businesses follow the economic cycles of the customers we serve and credit risk of counterparties we do business with.

25



Adverse economic conditions in our service territories reduce the demand for electricity and natural gas. We lost certain customers after plants closed due to the 2009 recession. Reduced volumes of electricity and natural gas sold, or the inability to collect unpaid bills from our customers from a deterioration in national or regional economic conditions, could adversely impact our financial condition and results of operations.

Our operating results may fluctuate on a seasonal and quarterly basis and can be adversely affected by the impacts of weather - Our electric and gas utility businesses are seasonal businesses and weather patterns can have a material impact on their operating performance. Demand for electricity is greater in the summer months associated with higher air conditioning needs. In addition, market prices for electricity generally peak in the summer due to the higher demand. Conversely, demand for natural gas depends significantly upon weather patterns in winter months due to heavy use in residential and commercial heating. As a result, our overall operating results in the future may fluctuate substantially on a seasonal basis. In addition, we have historically generated less revenues and income when weather conditions are warmer in the winter and cooler in the summer. Thus, unusually mild winters and summers could have an adverse effect on our financial condition and results of operations.


22



Threats of terrorism cyber attacks, and catastrophic events that could result from terrorism and cyber attacks may impact our operations in unpredictable ways - We are subject to direct and indirect effects of terrorist threats and activities. GenerationGenerating, transmission and transmissiondistribution facilities, in general, have been identified as potential targets of both physical attacks. Physical attacks on transmission and cyberdistribution facilities, including a substation in San Jose, California and substation and transmission facilities in Arkansas, appeared to be terrorist-style attacks. The risks posed by such attacks could include, among other things, the disruption of, volatility in, or other effects on capital markets, the increased cost of security and insurance; an adverse effect on our abilityinability to generate, purchase or distribute electric energy or obtain fuel sources, the increased cost of security and significantly slow growthinsurance, the disruption of, volatility in, or other effects on capital markets, and a decline in the economy within our service territories, all of which could adversely impact our financial condition and results of operations. In addition, the cost of repairing damage to our generating facilities and infrastructure due to acts of terrorism, and the loss of revenue if such events prevent us from providing utility service to our customers, could adversely impact our financial condition and results of operations. Further, an

A cyber attack could result in the unauthorized disclosuremay disrupt our operations or lead to a loss or misuse of confidential information.and proprietary information or potential liability - We operate in a highly regulatedan industry that requires the continuedcontinuous use and operation of sophisticated information technology systems and network infrastructure. In addition, in the ordinary course of business, we collect and retain sensitive information including personal information about our customers and employees. Cyber attacks targeting our electronic control systems used at our generating facilities and for electric and gas distribution systems, could result in a full or partial disruption of our electric and/or gas operations. Any disruption of these operations could result in a loss of service to customers and a significant decrease in revenues, as well as significant expense to repair system damage and remedy security breaches. Any theft, loss and or/fraudulent use of customer, shareowner, employee or proprietary data as a result of a cyber attack could subject us to significant litigation, liability and costs, as well as adversely impact our reputation with customers and regulators, among others.

We have instituted safeguards to protect our operational systems and information technology assets. FERC, through the North American Electric Reliability Corporation, requires certain safeguards be implemented to preventdeter cyber attacks. The safeguards we have may not always be effective due to the evolving nature of cyber attacks and cyber security. We cannot guarantee that such protections will be completely successful in the event of a cyber attack. If the technology systems were to fail or be breached by a cyber attack or a computer virus, and not be recovered in a timely fashion, we may be unable to fulfill critical business functions and confidential data could be compromised.

In connection with our business, we collect and retain personally identifiable information of our customers, shareowners and employees. Our customers, shareowners and employees expect that we will adequately protect their personal information, and the regulatory environment surrounding information security and privacy is increasingly demanding. A significant theft, loss or fraudulent use of customer, shareowner, employee or other data by cyber attack or otherwise could result in significant costs, fines or litigation, couldcompromised, adversely impact our reputation, and could adversely impactimpacting our financial condition.condition and results of operation.

We may not be able to fully recover costs related to commodity and transmission prices - The prices that we may obtain for electric energy may not compensate for changes in delivered coal, natural gas or electric energy spot-market costs, or changes in the relationship between such costs and the market prices of electric energy. As a result, we may be unable to pass on the changes in costs to our customers, especially at WPL where we do not have a retail electric automatic fuel cost adjustment clause, which allowswould allow for more consistent and timely cost recovery.

We are heavily exposed to changes in the price and availability of coal because the majority of the electricity generated by us is from our coal-fired generating facilities. We have contracts of varying durations for the supply and transportation of coal for most of our existing generating capability, but as these contracts end or otherwise are not honored, we may not be able to purchase coal on terms as favorable as the current contracts. Further, we currently rely on coal primarily from the Powder River Basin in Wyoming and any disruption of coal production in, or transportation from, that region may cause us to incur additional

26

Table of Contents


costs which may not be fully recovered through rates. Increases in prices and costs due to disruptions that are not fully and timely recovered in rates may adversely affect our financial condition and results of operations.

We are exposed to changes in the price and availability of natural gas. In addition to supplying natural gas to our natural gas customers, we also have responsibility to supply natural gas to certain natural gas-fired electric generating facilities that we own, whichown. This increases our exposure to volatile market prices of natural gas.gas, which have remained low recently, but have been volatile in the past. We have natural gas supply contracts in place, which are generally short-term in duration. The natural gas supply commitments are either fixed price in nature or market-based. As some of the contracts are market-based, and all of the contracts are short-term, we may not be able to purchase natural gas onwith terms and prices as favorable as the current contracts when the current contracts expire.contracts. Further, any disruption of production or transportation of natural gas, such as the recent pipeline explosion in Manitoba, Canada, may cause us to incur additional costs to purchase natural gas, thatwhich may not be fully recovered through rates and may adversely impact our financial condition and results of operations.

We may not be able to fully recover higher transmission costs related to changing transmission reliability requirements - Both IPL and WPL pay for the use of the interstate electric transmission system based upon FERC-regulated rates.that they do not own or control. Rates charged to IPL and WPL for such transmission service are regulated by FERC. FERC also regulates transmission owners’ operations in order to support the reliability of the transmission network. Changes are occurring in the transmission network which are required to, among other things, accommodate renewable energy and the decommissioning of older coal-fired generating facilities. These changes include socializing certain transmission network upgrades and system support resource payments, which may increase transmission costs to IPL and WPL. The prices that weIPL and WPL charge for electric energy may not totally compensate for changesthe increase in such transmission costs. As a result, weWe may be unable to fully pass on the changesincreases in such transmission costs to our customers, especially at WPL where we do not have a retail automatic transmission rider. IfIn addition, if the transmission rider at IPL is amended or removed, we may not be able to recover theIPL’s full transmission costs. Inability to fully recover transmission costs in a timely manner may adversely impact our financial condition and results of operations.

We face risks related to non-regulated operations - We rely on our non-regulated operations for a portion of our earnings. If our non-regulated investments do not perform at expected levels, we could experience diminished earnings. In particular, Franklin County Wind LLC is a non-regulated subsidiary that operates a non-regulated 100 MW wind project in Franklin County, Iowa, referred to as the Franklin County wind project. The Franklin County wind project does not currently have a buyer of its electrical output and its electrical output is being sold into the general market at prevailing market prices. Failure to find a buyer for the output, or selling the output at disadvantageous market prices, may cause the project to lose money or

23



cause an impairment of its assets. Such losses or impairments could adversely impact our financial condition and results of operations.

We are dependent on the capital markets and could be negatively impacted by disruptions in the capital markets - Successful implementation of our strategic plan and other long-term business strategies is dependent upon our ability to access the capital markets under competitive terms and rates. We have forecasted capital expenditures of approximately $3.5$3.6 billion over the next four years. In 2011, Standard & Poor’s Ratings Services loweredDisruption, uncertainty or volatility in those markets could increase our cost of capital or limit the availability of capital. Disruptions could be caused by Federal Reserve policies and actions including tapering of its long-term sovereign credit rating on the U.S. More recently,quantitative easing program, U.S. debt ceilingmanagement concerns, U.S. debt limit and fiscal policy concerns, together with continued signs of deterioratingbudget debates including government shutdowns, European sovereign debt conditions in Europe, could adversely affect the U.S. and global financial markets and economic conditions. In turn, any nationalconcerns, economic downturn or disruptionuncertainty, monetary policies, a negative view of the utility industry or our company, failures of financial marketsinstitutions or other factors. Any disruptions could reduceadversely impact our accessability to capital necessary to executeimplement our strategic plan and for our operations as we may be unable to access the credit markets or may face significantly higher costs of borrowing. plan.

We rely on our strong credit ratings to access the credit markets. If our credit ratings are downgraded for any reason, we could pay higher interest rates in future financings, the pool of potential lenders could be reduced, borrowing costs under existing credit facilities could increase, our access to the commercial paper market could be limited, or we could be required to provide additional credit assurance, including cash collateral, to contract counterparties. If our access to capital were to become significantly constrained or costs of capital increased significantly due to lowered credit ratings, prevailing industry conditions, regulatory constraints, the volatility of the capital markets or other factors, our financial condition and results of operations could be significantly adversely affected.

We are subject to employee workforce factors that could affect our businesses - We are subject to employee workforce factors, including loss or retirement of key personnel, and the availability of, and our ability to recruit, qualified personnel, thatwhich could affect our businesses and our financial condition and results of operations. Further, our workforce includes a significant number of employees who are nearing retirement. We need employees with specialized and technical skills in order to achieve our strategic plan. It may be difficult to retain current employees with these specialized skills, especially as they near retirement, and it may be difficult to find new employees with the necessary skills. We are also subject to collective bargaining agreements with approximately 2,2002,300 employees. Our contract with one unioncollective bargaining unit representing over 7001,000 of our employees is due to expire in August 2013.May 2014. Any work stoppage experienced in connections with negotiations of collective bargaining agreements could adversely affect our financial condition and our ability to implement our strategic plan.

We face risks associated with operating electric and natural gas infrastructure - The operation of electric generating facilities involves many risks, including start-up risks, breakdown or failure of equipment, the dependence on a specific fuel source, including the supply and transportation of fuel, the risk of performance below expected or contracted levels of output

27

Table of Contents


or efficiency, operator error and compliance with mandatory reliability standards. The operation of our energy delivery infrastructure involves many risks including breakdown or failure of equipment and forest or prairie fires developing from vegetation around our power lines. In addition, the North American transmission grid is highly interconnected and, in extraordinary circumstances, disruptions at particular points within the grid could cause an extensive power outage in our delivery systems. Further, the transmission system in our utilities’ service territories is constrained, limiting the ability to transmit electric energy within our service territories. The transmission constraints could result in an inability to deliver energy from generating facilities, particularly wind generating facilities, to the national grid, or not being able to access lower cost sources of electric energy. We also have obligations to provide electrical service under regulatory requirements and contractual commitments. Failure to meet our service obligations could adversely impact our financial condition and results of operations.

The operation of our natural gas distribution activities also involves many risks, such as leaks, explosions and mechanical problems, which could cause substantial financial losses. These risks could result in loss of human life, particularly in highly populated areas, significant damage to property, environmental emissions, impairment of our operations and substantial losses to us. We are also responsible for compliance with new and changing mandatory reliability and safety standards. Failure to meet these standards could result in substantial fines. We also have obligations to provide service under regulatory requirements and contractual commitments. Failure to meet our service obligations could adversely impact our financial condition and results of operations.

Storms or other natural disasters may impact our operations in unpredictable ways - Storms and other natural disasters, including events such as floods, tornadoes, blizzards, ice storms, or droughts may adversely impact our ability to generate, purchase or distribute electric energy or obtain fuel sources and may significantly slow growth or cause a decline in the economy within our service territories. Storms and natural disasters may prevent our customers from being able to operate, causing lower sales and revenues, which may not be replaced or recovered in rates.sources. In addition, we could incur large costs to repair damage to our generating facilities and infrastructure, or costs related to environmental remediation, due to storms or natural disasters. The restoration costs may not be fully covered by insurance policies. Damage to assets could also require

24

Table of Contents


us to take impairments, such as occurred with our damaged Sixth Street Generating Station after a flood. Some costs may not be recovered in rates, or there could be significant delays in cost recovery. Storms and natural disasters may prevent our customers from being able to operate or may significantly slow growth or cause a decline in the economy within our service territories. The reduced demand for energy could cause lower sales and revenues, which may not be replaced or recovered in rates. Any of these items could adversely affect our financial condition and results of operations.

We may incur material post-closing adjustments related to past asset and business divestitures - We recently sold RMT, Inc. (RMT), a non-regulated subsidiary. Pursuant to the terms of that sale, we may face unfavorable post-closing adjustments that could be material. In addition, we might be required to make payments on liabilities that we retained pursuant to the terms of the sale. In addition, Alliant Energy continues to guarantee RMT’s performance obligations related to certain of RMT’s projects that were commenced prior to Alliant Energy’s sale of RMT. Required material post-closing adjustments or payments on retained liabilities or guarantees with respect to RMT or other future asset or business divestitures, such as the proposed sales of our Minnesota electric and gas distribution assets, could have an adverse effect on our financial condition and results of operations.

We face risks related to non-regulated operations - We rely on our non-regulated operations for a portion of our earnings. If our non-regulated investments do not perform at expected levels, we could experience diminished earnings. In particular, Franklin County Wind LLC is a non-regulated subsidiary that operates a non-regulated 99 MW wind project in Franklin County, Iowa, referred to as the Franklin County wind project. The Franklin County wind project does not currently have a buyer of its electrical output and its electrical output is being sold into the general market at prevailing market prices. Failure to find a buyer for the output, or selling the output at disadvantageous market prices, may cause the project to lose money or cause an impairment of its assets. Such losses or impairments could adversely impact our financial condition and results of operations. In addition, a variety of operating parameters, including adverse weather conditions and breakdown or failure of equipment, could result in a material adverse impact on our financial condition and results of operations.

We are subject to limitations on our ability to pay dividends - Alliant Energy is a holding company with no significant operations of its own. Accordingly, the primary sources of funds for Alliant Energy to pay dividends to its shareowners are dividends and distributions from its subsidiaries, primarily its utility subsidiaries. Our subsidiaries are separate and distinct legal entities and have no obligation to pay any amounts to us, whether by dividends, loans or other payments. The ability of our subsidiaries to pay dividends or make distributions to us and, accordingly, our ability to pay dividends on Alliant Energy common stock will depend on regulatory limitations and the earnings, cash flows, capital requirements and general financial condition of our subsidiaries. Our utilities each have dividend payment restrictions based on the terms of theirany outstanding preferred stock and regulatory limitations applicable to them. If we do not receive adequate dividends and distributions from

28

Table of Contents


our subsidiaries, then we may not be able to make, or may have to reduce, dividend payments on Alliant Energy common stock.

Changes to certain tax elections, tax regulations and future taxable income could negatively impact our financial condition and results of operations - We have significantly reduced our federal and state income tax obligations for the past few years through tax planning strategies. These tax planning strategies have generated large annual taxable losses and tax credits over the past few years that have resulted in significant federal and state net operating losses (NOL) and federal tax credit carryforwards. We plan to utilize these NOLnet operating losses and tax credit carryforwards in the future to reduce our income tax obligations. If we cannot generate enough taxable income in the future to utilize all of the NOLnet operating losses and tax credit carryforwards before they expire, we may incur material charges to earnings. If the Internal Revenue Service (IRS)IRS does not agree with the deductions resulting from our tax planning strategies, our financial condition and results of operations may be adversely impacted. We are also expecting the IRS will publish guidance in the future which may compel us to change our tax methods of accounting related to certain of these tax planning strategies. Changes in our tax methods of accounting to comply with updated guidance could result in fewer deductions and material charges to our earnings due to the accounting impacts of rate making practices in Iowa, which could adversely impact our financial condition and results of operations.

Our utility business currently operates wind generating facilities, which generate material production tax credits for us to use to reduce our federal tax obligations. The amount of production tax credits we earn is dependent on the level of electricity output generated by our wind projects. Significantprojects and the applicable tax credit rate. A variety of operating and economic parameters, including significant transmission constraints, adverse weather conditions and breakdown or failure of equipment, could significantly reduce the production tax credits generated by our wind projects resulting in a material adverse impact on our financial condition and results of operations.

In addition, we have tax benefit riders in place in Iowa that provide billing credits to our customers. We have made certain assumptions regarding the timing of the tax benefit riders for accounting purposes. If those assumptions are not accurate, our results of operations and financial condition may be adversely impacted.

Lastly, if corporate tax rates wereor policies are changed within future federal or state legislation, we may be required to take material charges against earnings.

Poor performance of pension and other postretirement plan investments could negatively impact our financial condition - We have pension and other postretirement benefits plans that provide benefits to a large portion of our employees and retirees. Costs of providing benefits and related funding requirements of these plans are subject to changes in the market value of the assets that fund the plans. The funded status of the plans and the related costs reflected in our financial statements are affected by various factors, thatwhich are subject to an inherent degree of uncertainty, particularly in the currentincluding economic environment. The recent recessionconditions, financial market performance, interest rates, life expectancies and demographics. Recessions and volatility in the domestic and international financial markets have negatively affected the asset values of our pension plans.plans at various times in the past. Future losses of asset values may necessitate accelerated funding of the plans in the future to meet minimum federal government requirements. Downward pressure on the asset values of our pension plans may require us to fund obligations earlier than originally planned, which would have an adverse impact on our financial condition and results of operations.

Energy industry changes could have a negative effect on our businesses - We operate in a highly regulated business environment. The advent of new and unregulated markets has the potential to significantly impact our financial condition

25

Table of Contents


and results of operations. The evolution of the wholesale and transmission markets has the potential to significantly increase costs of transmission, costs associated with inefficient generation dispatching, costs of participation in the new markets and costs stemming from estimated payment settlements. Competitive pressures, including advances in technology that reduce the costs of alternative methods of producing electric energy to a level that is competitive with that of current electric production methods, could result in our utilities losing market share and customers and incurring stranded costs (i.e., assets and other costs rendered unrecoverable through customer rates as a result of competitive pricing), which would be borne by our shareowners. Increased competition from any restructuring efforts in our primary retail electric service territories may have a significant adverse impact on our financial condition and results of operations.

ITEM 1B. UNRESOLVED STAFF COMMENTS

None.

ITEM 2. PROPERTIES

IPL - At December 31, 2012, IPL’s electric generating facilities by primary fuel type were as follows. Generating capacity is based upon the capacity of the generating stations included in MISO’s resource adequacy process for the planning period from June 2012 to May 2013.
    No.   Primary Generating
    Of In-service Dispatch Capacity
Name of Generating Facility Location Units Dates Type (a) in MW
Ottumwa Generating Station (Unit 1) Ottumwa, IA 1 1981 BL 294
(b) 
Lansing Generating Station (Units 3-4) Lansing, IA 2 1957-1977 BL 221
(c)(d)
M.L. Kapp Generating Station (Unit 2) Clinton, IA 1 1967 BL 179
  
Burlington Generating Station (Unit 1) Burlington, IA 1 1968 BL 171
  
George Neal Generating Station (Unit 4) Sioux City, IA 1 1979 BL 160
(e) 
George Neal Generating Station (Unit 3) Sioux City, IA 1 1975 BL 130
(f) 
Prairie Creek Generating Station (Units 1,3,4) Cedar Rapids, IA 3 1958-1997 BL 120
  
Louisa Generating Station (Unit 1) Louisa, IA 1 1983 BL 29
(g) 
Total Coal           1,304
Emery Generating Station (Units 1-3) Mason City, IA 3 2004 IN 499
  
Fox Lake Generating Station (Units 1,3) Sherburn, MN 2 1950-1962 IN 70
(c)(d)
Sutherland Generating Station (Units 1,3) Marshalltown, IA 2 1955-1961 IN 79
(d) 
Dubuque Generating Station (Units 3-4) Dubuque, IA 2 1952-1959 IN 57
(d) 
Burlington Combustion Turbines (Units 1-4) Burlington, IA 4 1994-1996 PK 62
(d) 
Grinnell Combustion Turbines (Units 1-2) Grinnell, IA 2 1990-1991 PK 40
(d) 
Red Cedar Combustion Turbine (Unit 1) Cedar Rapids, IA 1 1996 PK 13
  
Total Gas           820
Marshalltown Combustion Turbines (Units 1-3) Marshalltown, IA 3 1978 PK 162
  
Lime Creek Combustion Turbines (Units 1-2) Mason City, IA 2 1991 PK 38
  
Centerville Combustion Turbines (Units 1-2) Centerville, IA 2 1990 PK 29
(d) 
Diesel Stations Iowa and Minnesota 9 1963-1996 PK 13
(d) 
Total Oil           242
Whispering Willow - East Franklin Co., IA 121 2009 IN 
(h) 
Total Wind           
Total generating capacity           2,366

(a)
Base load units (BL) are designed for nearly continuous operation at or near full capacity to provide the system base load. Intermediate units (IN) follow system load changes with frequent starts and curtailments of output during low demand. Peaking units (PK) are generally low efficiency, quick response units run only when there is high demand.
(b)Represents IPL’s 48% ownership interest in this 613 MW generating station, which is operated by IPL.

2629

Table of Contents


(c)
Capacity testing required by MISO’s resource adequacy process was not able to be completed for Lansing Generating Station Unit 3 and Fox Lake Generating Station Unit 1 resulting in no capacity being credited to these units for the planning period from June 2012 to May 2013.
(d)
Refer to “Strategic Overview - Generation Plans - Coal-Fired Generation - Plant Retirements or Fuel Switching” in MDA for discussion of EGUs that may be retired in the next five years.
(e)
Represents IPL’s 25.695% ownership interest in this 623 MW generating station, which is operated by MidAmerican Energy Company (MidAmerican).
(f)Represents IPL’s 28% ownership interest in this 464 MW generating station, which is operated by MidAmerican.
(g)Represents IPL’s 4% ownership interest in this 725 MW generating station, which is operated by MidAmerican.
(h)
Represents 0% of the capacity of this 200 MW wind project based upon the MISO resource adequacy process, which is determined separately for each wind site, during the planning period from June 2012 to May 2013. The 0% allocation resulted from the lack of firm transmission at this wind site during the planning period from June 2012 to May 2013.

At December 31, 2012, IPL owned approximately 19,728 miles of overhead electric distribution line and 2,777 miles of underground electric distribution cable, as well as 712 substation distribution transformers, substantially all of which are located in Iowa and Minnesota. IPL sold its electric transmission assets in 2007. IPL’s gas properties consist primarily of mains and services, meters, regulating and gate stations and other related distribution equipment. At December 31, 2012, IPL’s gas distribution facilities included approximately 5,034 miles and 237 miles of gas mains located in Iowa and Minnesota, respectively. IPL’s other property included in “Other plant in service” on its Consolidated Balance Sheets consists primarily of operating and storeroom facilities, vehicles, computer hardware and software, communication equipment and other miscellaneous tools and equipment.ITEM 2. PROPERTIES

IPL
WPLElectric - At December 31, 20122013, WPL’s electric generating facilitiesIPL’s EGUs by primary fuel type were as follows. Generating capacity is based upon the capacity of the generating stations included in MISO’s resource adequacy process for the planning period from June 2012 to May 2013.follows:
    No.   Primary Generating
    Of In-service Dispatch Capacity
Name of Generating Facility Location Units Dates Type (a) in MW
Columbia Energy Center (Units 1-2) Portage, WI 2 1975-1978 BL 482
(b) 
Edgewater Generating Station (Unit 5) Sheboygan, WI 1 1985 BL 399
  
Edgewater Generating Station (Unit 4) Sheboygan, WI 1 1969 BL 204
(c)(d)
Nelson Dewey Generating Station (Units 1-2) Cassville, WI 2 1959-1962 IN 193
(d) 
Edgewater Generating Station (Unit 3) Sheboygan, WI 1 1951 IN 70
(d) 
Total Coal           1,348
Riverside Energy Center (Units 1-3) Beloit, WI 3 2004 IN 572
(e) 
Neenah Energy Facility (Units 1-2) Neenah, WI 2 2000 PK 295
  
South Fond du Lac Combustion Turbines Fond du Lac, WI 2 1994 PK 149
(f) 
Rock River Combustion Turbines (Units 3-6) Beloit, WI 4 1967-1972 PK 134
  
Sheepskin Combustion Turbine (Unit 1) Edgerton, WI 1 1971 PK 33
  
Total Gas           1,183
Cedar Ridge Fond du Lac Co., WI 41 2008 IN 7
(g) 
Bent Tree - Phase I Freeborn Co., MN 77 2010-2011 IN 
(h) 
Total Wind           7
Prairie du Sac Hydro Plant Prairie du Sac, WI 8 1914-1940 IN 
(i) 
Kilbourn Hydro Plant Wisconsin Dells, WI 4 1926-1939 IN 
(i) 
Total Hydro           
Total generating capacity           2,538
      Primary Nameplate Generating
    In-service Dispatch Capacity Capacity
Name of EGU Location Dates Type (a) in MW in MW (b)
Ottumwa Generating Station (Unit 1) (c) Ottumwa, IA 1981 BL 348
 309
Lansing Generating Station (Unit 4) Lansing, IA 1977 BL 275
 230
M.L. Kapp Generating Station (Unit 2) (d) Clinton, IA 1967 BL 218
 177
Burlington Generating Station (Unit 1) Burlington, IA 1968 BL 212
 177
George Neal Generating Station (Unit 4) (e) Sioux City, IA 1979 BL 165
 160
George Neal Generating Station (Unit 3) (f) Sioux City, IA 1975 BL 154
 136
Prairie Creek Generating Station (Units 1,3,4) Cedar Rapids, IA 1958-1997 BL 213
 126
Louisa Generating Station (Unit 1) (g) Louisa, IA 1983 BL 32
 29
Total Coal       1,617
 1,344
           
Emery Generating Station (Units 1-3) Mason City, IA 2004 IN 603
 494
Fox Lake Generating Station (Units 1,3) (d) Sherburn, MN 1950-1962 IN 93
 82
Sutherland Generating Station (Units 1,3) (d) Marshalltown, IA 1955-1961 IN 119
 79
Dubuque Generating Station (Units 3-4) (d) Dubuque, IA 1952-1959 IN 66
 58
Burlington Combustion Turbines (Units 1-4) (d) Burlington, IA 1994-1996 PK 79
 58
Grinnell Combustion Turbines (Units 1-2) (d) Grinnell, IA 1990-1991 PK 48
 44
Red Cedar Combustion Turbine (Unit 1) Cedar Rapids, IA 1996 PK 23
 11
Total Gas       1,031
 826
           
Marshalltown Combustion Turbines (Units 1-3) Marshalltown, IA 1978 PK 189
 143
Lime Creek Combustion Turbines (Units 1-2) Mason City, IA 1991 PK 90
 56
Centerville Combustion Turbines (Units 1-2) (d) Centerville, IA 1990 PK 54
 29
Diesel Stations (9 Units) (d) Iowa and Minnesota 1963-1996 PK 16
 11
Total Oil       349
 239
           
Whispering Willow - East (121 Units) (h) Franklin Co., IA 2009 IN 200
 
Total Wind       200
 
           
Total generating capacity       3,197
 2,409

(a)BL are designed for nearly continuous operation at or near full capacity to provide the system base load. IN follow system load changes with frequent starts and curtailments of output during low demand. PK are generally low efficiency, quick response units that run onlyprimarily when there is high demand.
(b)Represents WPL’s 46.2% ownership interest
Based on the generating capacity of the EGUs included in this 1,043 MW generating station, which is operated by WPL.MISO’s resource adequacy process for the planning period from June 2013 through May 2014.
(c)Represents WPL’s 68.2%IPL’s 48% ownership interest in this 299726 MW generating station,(nameplate capacity) / 644 MW (generating capacity) EGU, which is operated by WPL.IPL.
(d)
Refer to “Strategic Overview - Generation Plans - Coal-Fired Generation - Plant Retirements or Fuel Switching” in MDA for discussion of EGUs that may be retired or changed from coal-fired to an alternative fuel source in the next fivefew years.
(e)Represents IPL’s 25.695% ownership interest in this 641 MW (nameplate capacity) / 623 MW (generating capacity) EGU, which is operated by MidAmerican.
(f)Represents IPL’s 28% ownership interest in this 550 MW (nameplate capacity) / 486 MW (generating capacity) EGU, which is operated by MidAmerican.
(g)Represents IPL’s 4% ownership interest in this 810 MW (nameplate capacity) / 725 MW (generating capacity) EGU, which is operated by MidAmerican.

2730

Table of Contents


(h)
Generating capacity represents 0% of the capacity of this wind project based upon the MISO resource adequacy process, which is determined separately for each wind site, during the planning period from June 2013 through May 2014. The 0% allocation resulted from the lack of firm transmission at this wind site during the planning period from June 2013 through May 2014.

At December 31, 2013, IPL owned approximately 19,696 miles of overhead electric distribution line and 2,843 miles of underground electric distribution cable, as well as 714 substation distribution transformers, substantially all of which are located in Iowa and Minnesota.

Gas - IPL’s gas properties consist primarily of mains and services, meters, regulating and gate stations and other related distribution equipment. At December 31, 2013, IPL’s gas distribution facilities included approximately 5,051 miles and 238 miles of gas mains located in Iowa and Minnesota, respectively.

Other - IPL’s other property included in “Property, plant and equipment - Other” on its Consolidated Balance Sheets consists primarily of steam service assets, operating and storeroom facilities, vehicles, computer hardware and software, communication equipment and other miscellaneous tools and equipment.

WPL
Electric - At December 31, 2013, WPL’s EGUs by primary fuel type were as follows:
      Primary Nameplate Generating
    In-service Dispatch Capacity Capacity
Name of EGU Location Dates Type (a) in MW in MW (b)
Columbia Energy Center (Units 1-2) (c) Portage, WI 1975-1978 BL 473
 504
Edgewater Generating Station (Unit 5) Sheboygan, WI 1985 BL 380
 402
Edgewater Generating Station (Unit 4) (d) (e) Sheboygan, WI 1969 BL 225
 211
Nelson Dewey Generating Station (Units 1-2) (e) Cassville, WI 1959-1962 BL 200
 207
Edgewater Generating Station (Unit 3) (e) Sheboygan, WI 1951 IN 60
 54
Total Coal       1,338
 1,378
           
Riverside Energy Center (Units 1-3) (f) Beloit, WI 2004 IN 675
 568
Neenah Energy Facility (Units 1-2) Neenah, WI 2000 PK 371
 279
South Fond du Lac Combustion Turbines (2 Units) (g) Fond du Lac, WI 1994 PK 191
 143
Rock River Combustion Turbines (Units 3-6) (h) Beloit, WI 1967-1972 PK 169
 85
Sheepskin Combustion Turbine (Unit 1) Edgerton, WI 1971 PK 42
 33
Total Gas       1,448
 1,108
           
Bent Tree - Phase I (122 Units) (i) Freeborn Co., MN 2010-2011 IN 201
 
Cedar Ridge (41 Units) (j) Fond du Lac Co., WI 2008 IN 68
 8
Total Wind       269
 8
           
Prairie du Sac Hydro Plant (8 Units) Prairie du Sac, WI 1914-1940 IN 31
 14
Kilbourn Hydro Plant (4 Units) Wisconsin Dells, WI 1926-1939 IN 10
 6
Total Hydro       41
 20
           
Total generating capacity       3,096
 2,514

(a)BL are designed for nearly continuous operation at or near full capacity to provide the system base load. IN follow system load changes with frequent starts and curtailments of output during low demand. PK are generally low efficiency, quick response units that run primarily when there is high demand.
(b)
Based on the generating capacity of the EGUs included in MISO’s resource adequacy process for the planning period from June 2013 through May 2014.
(c)Represents WPL’s 46.2% ownership interest in this 1,023 MW (nameplate capacity) / 1,091 MW (generating capacity) EGU, which is operated by WPL.
(d)Represents WPL’s 68.2% ownership interest in this 330 MW (nameplate capacity) / 309 MW (generating capacity) EGU, which is operated by WPL.

31

Table of Contents


(e)In December 2012, WPL purchased Riverside, a 600 MW natural gas-fired electric generating facility.
Refer to “Strategic Overview” in MDA for discussion of EGUs that may be retired or changed from coal-fired to an alternative fuel source in the next few years.
(f)
WPL was credited 572568 MW of generating capacity for this facility duringEGU for the planning period from FebruaryJune 2013 tothrough May 2013 based upon the MISO resource adequacy process.2014. WPL is utilizing 497468 MW of the accredited generating capacity from Riverside to satisfy its PRM requirements and has sold 75100 MW of the accredited capacity to a third-partythird party with a PPA.PPA through May 2014.
(f)(g)Represents Units 2 and 3, which WPL owns. WPL also operates South Fond du Lac Combustion Turbines Units 1 and 4.
(g)(h)
Represents 10%Rock River Combustion Turbine Unit 6 was not operating during the testing period for MISO’s resource adequacy process for the planning period from June 2013 through May 2014, resulting in no capacity being credited to the EGU for that planning period.
(i)
Generating capacity represents 0% of the capacity of this 68 MW wind project based upon the MISO resource adequacy process, which is determined separately for each wind site, during the planning period from June 2012 to2013 through May 2014. The 0% allocation resulted from the lack of firm transmission at this wind site during the planning period from June 2013 through May 2014.
(h)(j)
Represents 0%Generating capacity represents 12% of the capacity of this 200 MW wind project based upon the MISO resource adequacy process, which is determined separately for each wind site, during the planning period from June 2012 to2013 through May 20132014. The 0% allocation resulted from the lack of firm transmission at this wind site during the planning period from June 2012 to May 2013.
(i)
No capacity was credited to these facilities for the planning period from June 2012 to May 2013. It is expected that the hydro facilities will be credited capacity for the planning period from June 2013 to May 2014.

At December 31, 20122013, WPL owned approximately 16,42216,379 miles of overhead electric distribution line and 4,9625,070 miles of underground electric distribution cable, as well as 298303 substation distribution transformers, substantially all of which are located in Wisconsin. In 2001,Refer to Note 10(b) of the “Combined Notes to Consolidated Financial Statements” for information regarding WPL’s electric transmission assets were transferred to ATC.lease of Sheboygan Falls from Resources’ Non-regulated Generation business.

Gas - WPL’s gas properties consist primarily of mains and services, meters, regulating and gate stations and other related distribution equipment. At December 31, 20122013, WPL’s gas distribution facilities included approximately 4,0844,131 miles of gas mains located in Wisconsin.

Other - WPL’s other property included in “Other“Property, plant in service”and equipment - Other” on its Consolidated Balance Sheets consists primarily of operating and storeroom facilities, vehicles, computer hardware and software, communication equipment and other miscellaneous tools and equipment. Refer to Note 3(b) of the “Combined Notes to Consolidated Financial Statements” for information regarding WPL’s lease of the Sheboygan Falls Energy Facility from Resources’ Non-regulated Generation business.

Resources - Resources’ principal properties included in “Property, plant and equipment - Non-regulated and other” on Alliant Energy’s Consolidated Balance Sheet at December 31, 20122013 were as follows:

Non-regulated Generation - includesIncludes Sheboygan Falls, a 300 MW,347 MW, simple-cycle, natural gas-fired facility near Sheboygan Falls, Wisconsin that was placed in service in 2005 and is leased to WPL, and the 10099 MW (60 Units) Franklin County wind project in Franklin County, Iowa that was placed in service in the fourth quarter of 2012. The Sheboygan Falls Energy Facility was credited with 282 MW of generating capacity for MISO’s resource adequacy process for the planning period from June 2012 to2013 through May 20132014.

Transportation - includesIncludes a short-line railway in Iowa with 114 railroad track miles, 1213 active locomotives and 122102 railcars; and a barge terminal on the Mississippi River.River; and a coal terminal in Williams, Iowa.

Other non-regulated investments - includesIncludes two corporate airplanes and real estate investments.

Corporate Services
- Corporate Services’ property included in “Property, plant and equipment - Non-regulated and other” on Alliant Energy’s Consolidated Balance Sheet at December 31, 20122013 consisted primarily of computer software and the corporate headquarters building which was purchasedlocated in 2012 at the expiration of the lease term.Madison, Wisconsin.

ITEM 3. LEGAL PROCEEDINGS

Alliant Energy - None.

IPL - None.

WPL -
Air Permitting Violation Claims - Refer to Note 13(c) of the “Combined Notes to Consolidated Financial Statements” for discussion of air permitting violation claims related to WPL’s Edgewater Generating Station, Nelson Dewey Generating Station and Columbia Energy Center.None.

Environmental Matters
Additional information required by Item 3Other - Alliant Energy, IPL and WPL are involved in legal and administrative proceedings before various courts and agencies with regardrespect to environmental matters is includedarising in Information Relatingthe ordinary course of business. Although unable to Utility Operations” in Item 1 Business, “Environmental Matters” in MDApredict the outcome of these matters, Alliant Energy, IPL and Note 13(e)WPL believe that final disposition of the “Combined Notes to Consolidated Financial Statements,” which information is incorporated herein by reference.these actions will not have a material effect on their financial condition or results of operations.


2832



Rate Matters
The information required by Item 3 with regard to rate matters is included in “Information Relating to Alliant Energy on a Consolidated Basis - Regulation” and “Information Relating to Utility Operations” in Item 1 Business, Notes 1(b), 1(h) and 2 of the “Combined Notes to Consolidated Financial Statements” and “Rate Matters” in MDA, which information is incorporated herein by reference.

ITEM 4. MINE SAFETY DISCLOSURES

None.

EXECUTIVE OFFICERS OF THE REGISTRANTS
None of the executive officers for Alliant Energy, IPL or WPL listed below are related to any member of the Board of Directors or nominee for director or any other executive officer. All of the executive officers have no definite terms of office and serve at the pleasure of the Board of Directors. The executive officers of Alliant Energy, IPL and WPL as of the date of this filing are as follows (numbers following the names represent the officer’s age as of the date of this filing):

Executive Officers of Alliant Energy
Patricia L. Kampling, 53,54, has served as a director since January 2012, and as Chairman of the Board, President and Chief Executive Officer (CEO)CEO since April 2012. She previously served as President and Chief Operating Officer since February 2011, as Executive Vice President (EVP)EVP and Chief Financial Officer (CFO)CFO from September 2010 to February 2011, as EVP-CFO and Treasurer from January 2010 to September 2010, and as Vice President (VP)-CFOVP-CFO and Treasurer from January 2009 to January 2010, and as VP and Treasurer from January 2007 to January 2009.2010.
Thomas L. Aller, 63,64, was elected Senior VP-Operations SupportVP effective January 2013.February 2014. He previously served as Senior VP-Energy Resource DevelopmentVP-Operations Support since January 20092013 and as Senior VP-Energy DeliveryResource Development from January 20042009 to January 2009.2013. Mr. Aller announced his intent to retire effective March 31, 2014.
James H. Gallegos, 53, was elected Senior VP and General Counsel effective February 2014. He previously served as VP and General Counsel since November 2010, and as VP and Corporate General Counsel of BNSF Railway Company, a subsidiary of Burlington Northern and Santa Fe Corporation, from April 2003 to April 2010.
Thomas L. Hanson, 59,60, was elected Senior VP and CFO effective January 2013. He previously served as VP and CFO since May 2011, as VP-CFO and Treasurer from February 2011 to May 2011, as VP-Chief Accounting Officer (CAO)VP-CAO and Treasurer from September 2010 to February 2011, and as VP-Controller and CAO from January 2007 to September 2010.
Douglas R. Kopp, 60, was elected Senior VP effective March 2014. He previously served as VP-Environmental Affairs since January 2013, as Director-Environmental Affairs from January 2011 to January 2013, as Plant Manager of the Prairie Creek Generating Station from September 2010 to January 2011, as Plant Manager of the Sutherland Generating Station from May 2009 to September 2010 and as Plant Manager of the Sixth Street Generating Station from July 2006 to May 2009.
John O. Larsen, 49,50, was elected Senior VP-GenerationVP effective January 2010.February 2014. He previously served as Senior VP-Generation since January 2010 and as VP-Generation from August 2008 and as VP-Technical and Integrated Services fromto January 2004 to August 2008.
James H. Gallegos, 52, was elected VP and General Counsel effective November 2010. He previously served as VP and Corporate General Counsel of BNSF Railway Company, a subsidiary of Burlington Northern and Santa Fe Corporation from April 2003 to April 2010.
Robert J. Durian, 42,43, was elected Controller and CAO effective February 2011. He previously served as Controller since September 2010, as Assistant Controller from March 2009 to September 2010 and as Director of Financial Reporting from February 2006 to March 2009.

Executive Officers of IPL
Patricia L. Kampling, 53,54, has served as a director since January 2012, and as Chairman of the Board and CEO since April 2012.
Thomas L. Aller, 63,64, was elected President effective January 2004. Mr. Aller announced his intent to retire effective March 31, 2014.
Douglas R. Kopp, 60, was elected Senior VP effective March 2014 and President effective April 2014.
James H. Gallegos, 53, was elected Senior VP and General Counsel effective February 2014.
Thomas L. Hanson, 59,60, was elected Senior VP and CFO effective January 2013.
John O. Larsen, 49,50, was elected Senior VP-GenerationVP effective January 2010.
James H. Gallegos, 52, was elected VP and General Counsel effective November 2010.February 2014.
Robert J. Durian, 42,43, was elected Controller and CAO effective February 2011.

Executive Officers of WPL
Patricia L. Kampling, 53,54, has served as a director since January 2012, and as Chairman of the Board and CEO since April 2012.
John O. Larsen, 49,50, was elected President effective December 2010.
Thomas L. Aller, 63,64, was elected Senior VP-Operations SupportVP effective January 2013.February 2014. Mr. Aller announced his intent to retire effective March 31, 2014.
James H. Gallegos, 53, was elected Senior VP and General Counsel effective February 2014.
Thomas L. Hanson, 59,60, was elected Senior VP and CFO effective January 2013.
James H. GallegosDouglas R. Kopp, 52,60, was elected Senior VP and General Counsel effective November 2010.March 2014.
Robert J. Durian, 42,43, was elected Controller and CAO effective February 2011.


2933



PART II

ITEM 5. MARKET FOR REGISTRANTS’ COMMON EQUITY, RELATED STOCKHOLDER MATTERS AND ISSUER PURCHASES OF EQUITY SECURITIES

Stock Price - Alliant Energy’s common stock trades on the New York Stock ExchangeNYSE under the symbol “LNT.” Quarterly sales price ranges and dividends with respect to Alliant Energy’s common stock were as follows:
 2012 2011 2013 2012
Quarter High Low Dividend High Low Dividend High Low Dividend High Low Dividend
First 
$44.57
 
$41.86
 
$0.45
 
$40.68
 
$36.78
 
$0.425
 
$50.23
 
$43.73
 
$0.47
 
$44.57
 
$41.86
 
$0.45
Second 46.00
 42.00
 0.45
 42.14
 37.84
 0.425
 53.52
 46.79
 0.47
 46.00
 42.00
 0.45
Third 47.65
 42.95
 0.45
 42.09
 33.91
 0.425
 54.18
 48.17
 0.47
 47.65
 42.95
 0.45
Fourth 45.66
 42.21
 0.45
 44.49
 36.82
 0.425
 53.69
 48.83
 0.47
 45.66
 42.21
 0.45
Year 47.65
 41.86
 1.80
 44.49
 33.91
 1.70
 54.18
 43.73
 1.88
 47.65
 41.86
 1.80

Stock closing price at December 31, 20122013: $43.91$51.60

Shareowners - At December 31, 20122013, there were 32,37430,873 holders of record of Alliant Energy’s common stock, including holders through Alliant Energy’s Shareowner Direct Plan. Alliant Energy is the sole common shareowner of all 13,370,788 and 13,236,601 shares of IPL and WPL common stock, respectively, currently outstanding. As a result, there is no established public trading market for the common stock of either IPL or WPL.

Dividends - In November 2012,2013, Alliant Energy announced an increase in its targeted 20132014 annual common stock dividend to $1.88$2.04 per share, which is equivalent to a quarterly rate of $0.47$0.51 per share, beginning with the February 15, 20132014 dividend payment. The timing and amount of future dividends is subject to an approved dividend declaration from its Board of Directors, and is dependent upon earnings expectations, capital requirements, and general financial business conditions, among other factors.

Alliant Energy does not have any significant common stock dividend restrictions. Refer to Note 7 of the “Combined Notes to Consolidated Financial Statements” for information about IPL’s and WPL’s dividend restrictions and limitations on distributions to their parent company.

Common Stock Repurchases - A summary of Alliant Energy common stock repurchases for the quarter ended December 31, 20122013 was as follows:
 Total Number Average Price Total Number of Shares Maximum Number (or Approximate Total Number Average Price Total Number of Shares Maximum Number (or Approximate
 of Shares Paid Per Purchased as Part of Dollar Value) of Shares That May of Shares Paid Per Purchased as Part of Dollar Value) of Shares That May
Period Purchased (a) Share Publicly Announced Plan Yet Be Purchased Under the Plan (a) Purchased (a) Share Publicly Announced Plan Yet Be Purchased Under the Plan (a)
October 1 to October 31 3,324
 
$44.40
  N/A 2,966
 
$50.67
  N/A
November 1 to November 30 2,284
 42.39
  N/A 2,032
 53.57
  N/A
December 1 to December 31 14
 44.54
  N/A 56
 52.16
  N/A
 5,622
 43.58
   5,054
 51.85
  

(a)
All shares were purchased on the open market and held in a rabbi trust under the Alliant Energy Deferred Compensation Plan (DCP).DCP. There is no limit on the number of shares of Alliant Energy common stock that may be held under the DCP, which currently does not have an expiration date.

Other - Refer to “Security Ownership of Certain Beneficial Owners and Management and Related Stockholder Matters” in Item 12 for details of securities authorized for issuance under equity compensation plans.


3034



ITEM 6. SELECTED FINANCIAL DATA

Financial Information
Alliant Energy2012 (a) 2011 (a) 2010 (a) 2009 (b) 20082013 (a) 2012 (a) 2011 (a) 2010 2009 (b)
(dollars in millions, except per share data)(dollars in millions, except per share data)
Income Statement Data:  
Operating revenues
$3,094.5
 
$3,221.4
 
$3,262.1
 
$3,133.2
 
$3,272.3

$3,276.8
 
$3,094.5
 
$3,221.4
 
$3,262.1
 
$3,133.2
Income from continuing operations, net of tax340.8
 341.4
 310.2
 130.3
 284.5
382.1
 340.8
 341.4
 310.2
 130.3
Income (loss) from discontinued operations, net of tax(5.1) (19.5) (3.9) (0.6) 22.2
Loss from discontinued operations, net of tax(5.9) (5.1) (19.5) (3.9) (0.6)
Net income335.7
 321.9
 306.3
 129.7
 306.7
376.2
 335.7
 321.9
 306.3
 129.7
Amounts attributable to Alliant Energy common shareowners:                  
Income from continuing operations, net of tax324.9
 323.1
 291.5
 111.6
 265.8
364.2
 324.9
 323.1
 291.5
 111.6
Income (loss) from discontinued operations, net of tax(5.1) (19.5) (3.9) (0.6) 22.2
Loss from discontinued operations, net of tax(5.9) (5.1) (19.5) (3.9) (0.6)
Net income319.8
 303.6
 287.6
 111.0
 288.0
358.3
 319.8
 303.6
 287.6
 111.0
Common Stock Data:                  
Earnings per weighted average common share attributable to Alliant Energy common shareowners (basic and diluted):                  
Income from continuing operations, net of tax
$2.93
 
$2.92
 
$2.64
 
$1.01
 
$2.41

$3.29
 
$2.93
 
$2.92
 
$2.64
 
$1.01
Income (loss) from discontinued operations, net of tax
($0.04) 
($0.18) 
($0.04) 
$—
 
$0.20
Loss from discontinued operations, net of tax
($0.06) 
($0.04) 
($0.18) 
($0.04) 
$—
Net income
$2.89
 
$2.74
 
$2.60
 
$1.01
 
$2.61

$3.23
 
$2.89
 
$2.74
 
$2.60
 
$1.01
Common shares outstanding at year-end (000s)110,987
 111,019
 110,894
 110,656
 110,449
110,944
 110,987
 111,019
 110,894
 110,656
Dividends declared per common share
$1.80
 
$1.70
 
$1.58
 
$1.50
 
$1.40

$1.88
 
$1.80
 
$1.70
 
$1.58
 
$1.50
Market value per share at year-end
$43.91
 
$44.11
 
$36.77
 
$30.26
 
$29.18

$51.60
 
$43.91
 
$44.11
 
$36.77
 
$30.26
Book value per share at year-end
$28.25
 
$27.14
 
$26.09
 
$25.06
 
$25.56

$29.58
 
$28.25
 
$27.14
 
$26.09
 
$25.06
Market capitalization at year-end
$4,873.4
 
$4,897.0
 
$4,077.6
 
$3,348.5
 
$3,222.9

$5,724.7
 
$4,873.4
 
$4,897.0
 
$4,077.6
 
$3,348.5
Other Selected Financial Data:                  
Cash flows from operating activities
$841.1
 
$702.7
 
$984.9
 
$657.1
 
$338.2

$731.0
 
$841.1
 
$702.7
 
$984.9
 
$657.1
Construction and acquisition expenditures
$1,158.1
 
$673.4
 
$866.9
 
$1,202.6
 
$879.0

$798.3
 
$1,158.1
 
$673.4
 
$866.9
 
$1,202.6
Total assets at year-end
$10,785.5
 
$9,687.9
 
$9,282.9
 
$9,036.0
 
$8,201.5

$11,112.4
 
$10,785.5
 
$9,687.9
 
$9,282.9
 
$9,036.0
Long-term obligations, net
$3,141.5
 
$2,708.0
 
$2,710.3
 
$2,512.2
 
$1,887.1

$3,338.1
 
$3,141.5
 
$2,708.0
 
$2,710.3
 
$2,512.2
Times interest earned before income taxes (c)3.75X
 3.59X
 3.81X
 1.80X
 4.30X
3.52X
 3.75X
 3.59X
 3.81X
 1.80X
Capitalization ratios:                  
Common equity47% 50% 49% 49% 56%46% 47% 50% 49% 49%
Preferred stock of subsidiaries3% 3% 4% 4% 5%3% 3% 3% 4% 4%
Long- and short-term debt50% 47% 47% 47% 39%51% 50% 47% 47% 47%
Total100% 100% 100% 100% 100%100% 100% 100% 100% 100%

(a)
Refer to “Alliant Energy’s Results of Operations” in MDA for discussion of the 20122013, 20112012 and 20102011 results of operations.
(b)In 2009, Alliant Energy incurred $203 million of pre-tax losses related to the repurchase of its 2.5% Exchangeable Senior Notes due 2030.
(c)Represents the sum of income from continuing operations before income taxes plus interest expense, divided by interest expense. The calculation does not consider the “Loss on early extinguishment of debt” that Alliant Energy has incurred as part of interest expense.


3135



IPL2012 (a) 2011 (a) 2010 (a) 2009 20082013 (a) 2012 (a) 2011 (a) 2010 2009
(in millions)(in millions)
Operating revenues
$1,650.3
 
$1,740.1
 
$1,795.8
 
$1,708.0
 
$1,758.0

$1,818.8
 
$1,650.3
 
$1,740.1
 
$1,795.8
 
$1,708.0
Net income150.2
 139.3
 143.4
 153.0
 141.6
189.9
 150.2
 139.3
 143.4
 153.0
Earnings available for common stock137.6
 124.3
 128.0
 137.6
 126.2
173.6
 137.6
 124.3
 128.0
 137.6
Cash dividends declared on common stock122.9
 73.4
 
 
 29.1
128.1
 122.9
 73.4
 
 
Cash flows from operating activities291.0
 366.9
 549.6
 373.2
 113.7
232.6
 291.0
 366.9
 549.6
 373.2
Total assets5,457.0
 5,093.5
 4,937.6
 4,892.2
 4,210.9
5,806.0
 5,457.0
 5,093.5
 4,937.6
 4,892.2
Long-term obligations, net1,361.7
 1,311.0
 1,310.6
 1,160.9
 996.8
1,559.2
 1,361.7
 1,311.0
 1,310.6
 1,160.9

(a)
Refer to “IPL’s Results of Operations” in MDA for a discussion of the 20122013, 20112012 and 20102011 results of operations.

Alliant Energy is the sole common shareowner of all 13,370,788 shares of IPL’s common stock outstanding. As such, earnings per share data is not disclosed herein.

WPL2012 (a) 2011 (a) 2010 (a) 2009 20082013 (a) 2012 (a) 2011 (a) 2010 2009
(in millions)(in millions)
Operating revenues
$1,392.0
 
$1,434.4
 
$1,423.6
 
$1,386.1
 
$1,465.8

$1,406.3
 
$1,392.0
 
$1,434.4
 
$1,423.6
 
$1,386.1
Net income165.7
 163.5
 152.3
 89.5
 118.4
177.5
 165.7
 163.5
 152.3
 89.5
Earnings available for common stock162.4
 160.2
 149.0
 86.2
 115.1
175.9
 162.4
 160.2
 149.0
 86.2
Cash dividends declared on common stock112.0
 112.1
 109.5
 91.0
 91.3
116.3
 112.0
 112.1
 109.5
 91.0
Cash flows from operating activities427.4
 428.8
 372.4
 305.8
 239.7
423.3
 427.4
 428.8
 372.4
 305.8
Total assets4,762.6
 4,044.0
 3,889.6
 3,681.4
 3,265.5
4,804.4
 4,762.6
 4,044.0
 3,889.6
 3,681.4
Long-term obligations, net1,436.1
 1,190.7
 1,193.7
 1,146.3
 899.0
1,432.2
 1,436.1
 1,190.7
 1,193.7
 1,146.3

(a)
Refer to “WPL’s Results of Operations” in MDA for a discussion of the 20122013, 20112012 and 20102011 results of operations.

Alliant Energy is the sole common shareowner of all 13,236,601 shares of WPL’s common stock outstanding. As such, earnings per share data is not disclosed herein.

ITEM 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS (MDA)

This MDA includes information relating to Alliant Energy, Corporation (Alliant Energy), Interstate PowerIPL and Light Company (IPL) and Wisconsin Power and Light Company (WPL),WPL, as well as Alliant Energy Resources LLC (Resources)and Alliant Energy Corporate Services, Inc. (Corporate Services).Services. Where appropriate, information relating to a specific entity has been segregated and labeled as such. The following discussion and analysis should be read in conjunction with the Consolidated Financial Statements and Combined Notes to Consolidated Financial Statements included in this report. Unless otherwise noted, all “per share” references in MDA refer to earnings per diluted share.

CONTENTS OF MDA

Alliant Energy’s, IPL’s and WPL’s MDA consists of the following information:



3236




EXECUTIVE SUMMARY

Description of Business
General - Alliant Energy is an investor-owned public utility holding company whose primary subsidiaries are IPL, WPL, Resources and Corporate Services. IPL is a public utility engaged principally in the generation and distribution of electricity and the distribution and transportation of natural gas in selective markets in Iowa and southern Minnesota. WPL is a public utility engaged principally in the generation and distribution of electricity and the distribution and transportation of natural gas in selective markets in southern and central Wisconsin. At December 31, 2013, WPL, also ownsthrough its ownership interest in WPL Transco, held an approximate 16% interest in the American Transmission Company LLC (ATC),ATC, a transmission-only utility operating in Wisconsin, Michigan, Illinois and Minnesota.the Midwest. Resources is the parent company for Alliant Energy’s non-regulated businesses. Corporate Services provides administrative services to Alliant Energy and its subsidiaries. An illustration of Alliant Energy’s primary businesses as of December 31, 2013 is shown below.
  Alliant Energy  
      
     
Utility and Corporate Services Non-regulated and Parent (a)
 - Electric and gas services in IA (IPL)  - Transportation (Resources)
 - Electric and gas services in WI (WPL)  - Non-regulated Generation (Resources)
 - 16% interest in ATC (WPL)  - Parent Company
 - Electric and gas services in MN (IPL) (a)  
 - Corporate Services 

(a)
In JanuarySeptember 2013, Alliant Energy soldIPL signed definitive agreements to sell its remaining interest inMinnesota electric and natural gas distribution assets. Refer to Note 3(a)RMT, Inc. (RMT). of the “Combined Notes to Consolidated Financial Statements” for further discussion of these proposed sales.

Utility and Corporate Services - IPL and WPL own a portfolio of electric generating facilitiesEGUs located in Iowa, Wisconsin and Minnesota with a diversified fuel mix including coal, natural gas and renewable resources. The output from these generating facilities,EGUs, supplemented with purchased power, is used to provide electric service to approximately 1 million electric customers in the upper Midwest. The utility business also procures natural gas from various suppliers to provide service to approximately 415,000418,000 retail gas customers in the upper Midwest. Alliant Energy’s utility business is its primary source of earnings and cash flows. The earnings and cash flows from the utility and Corporate Services business are sensitive to various external factors including, but not limited to, the amount and timing of rates approved by regulatory authorities, the impact of weather and economic conditions on electric and gas sales volumes and other factors listed in “Risk Factors” in Item 1A and “Forward-looking Statements.”

Non-regulated Business and Parent - Resources manages various businesses including Non-regulated Generation (EGU management), Transportation (short-line railway and barge transportation services), Non-regulated Generation (electric generating facilities management) and several other modest investments. Parent includes the operations of Alliant Energy (parent holding company).

Financial Results - Alliant Energy’s earnings per weighted average common share (EPS) attributable to Alliant Energy common shareowners for 2012 and 2011 were as follows:
 2012 2011
Income from continuing operations
$2.93
 
$2.92
Loss from discontinued operations(0.04) (0.18)
Net income
$2.89
 
$2.74

Additional detailsDetails regarding Alliant Energy’s net income and EPS attributable to Alliant Energy common shareowners for 2013 and 2012were as follows (dollars in millions, except per share amount):
 2012 2011
 Net Income EPS Net Income EPS
Continuing operations:       
Utility and Corporate Services
$304.8
 
$2.75
 
$284.5
 
$2.57
Non-regulated and parent20.1
 0.18
 38.6
 0.35
Income from continuing operations324.9
 2.93
 323.1
 2.92
Loss from discontinued operations(5.1) (0.04) (19.5) (0.18)
Net income
$319.8
 
$2.89
 
$303.6
 
$2.74

33

Table of Contents
 2013 2012
 Net Income EPS Net Income EPS
Continuing operations:       
Utilities and Corporate Services
$356.5
 
$3.22
 
$304.8
 
$2.75
Non-regulated and parent7.7
 0.07
 20.1
 0.18
Income from continuing operations364.2
 3.29
 324.9
 2.93
Loss from discontinued operations(5.9) (0.06) (5.1) (0.04)
Net income
$358.3
 
$3.23
 
$319.8
 
$2.89



The table above includes utilityutilities and Corporate Services, and non-regulated and parent EPS from continuing operations, which are non-GAAP (accounting principles generally accepted in the United States of America (U.S.))non-GAAP financial measures. Alliant Energy believes utilityutilities and Corporate Services, and non-regulated and parent EPS from continuing operations are useful to investors because they facilitate an understanding of segment performance and trends and provide additional information about Alliant Energy’s operations on a basis consistent with the

37



measures that management uses to manage its operations and evaluate its performance. Alliant Energy’s management also uses utilityutilities and Corporate Services EPS from continuing operations to determine performance-based compensation.

UtilityUtilities and Corporate Services - Higher incomeEPS from continuing operations in 20122013 compared to 20112012 was primarily due to:
$0.120.32 per share of purchased electric capacity expense related to the Riverside PPA recorded in 2012;
$0.14 per share related to income tax impacts at IPL due to Iowa rate-making practices associated with mixed service costs and repairs projects;
$0.07 per share of impairment charges in 2011;
$0.06 per share of net regulatory-related charges from IPL’s Minnesota retail electric rate case decision in 2011;
$0.06 per share of lower generation operation and maintenance expenses;
$0.05 per share of higher electric margins from changes in the recovery of electric production fuel and energy purchases costs at WPL;
$0.05 per share of additional benefits costs related to an amendment to the Alliant Energy Cash Balance Pension Plan (Cash Balance Plan) in 2011; and
$0.05 per share of higher allowance for funds used during construction (AFUDC) in 2012 compared to 2011, primarily due to emission controls projects.

These items were partially offset by:
$0.14 per shareimpact of state income tax charges in the first quarter of 2012 due to changes in state apportionment projections caused by Alliant Energy’s plannedannounced sale of the RMT business;
$0.080.13 per share from the revenue requirement adjustment related to certain IPL tax benefits in 2013;
an estimated $0.13 per share of higher weather-normalized retail electric and gas sales in 2013 compared to 2012;
$0.11 per share of lower energy conservation cost recovery amortizations at WPL in 2013 compared to 2012;
$0.06 per share of lower income tax expense at IPL in 2013 compared to 2012 due to Iowa rate-making practices; and
an estimated $0.05 per share of net increases in revenues from higher electric and gas sales in 2013 compared to 2012 due to weather conditions.

These items were partially offset by:
$0.17 per share of higher depreciation expense in 20122013 compared to 2011; and2012, primarily due to WPL’s acquisition of Riverside in December 2012;
$0.070.09 per share of higher purchasedgeneration operation and maintenances expenses in 2013 compared to 2012;
$0.08 per share of higher electric capacitytransmission service expenses, net of recoveries, in 2013 compared to 2012;
$0.06 per share of higher performance-based compensation expense in 2013 compared to 2012;
$0.06 per share of charges related to nuclear purchased power agreements (PPAs)preferred stock redemptions at IPL and WPL in 20122013; and
$0.05 per share of higher distribution system operation and maintenance expenses in 2013 compared to 2011.
2012.

Non-regulated and parent - Lower incomeEPS from continuing operations in 20122013 compared to 20112012 was primarily due to $0.17$0.04 per share of tax benefitslosses incurred at the Franklin County wind project in 2011 from Wisconsin tax legislation.2013.

Refer to “Alliant Energy’s Results of Operations,” “IPL’s Results of Operations” and “WPL’s Results of Operations” for additional details regarding the various factors impacting their respective earnings during 20122013, 20112012 and 20102011.

Strategic Overview Highlights
Alliant Energy’s, IPL’s and WPL’s strategic plan focuses on their core business of delivering regulated electric and natural gas service in Iowa Wisconsin, and Minnesota.Wisconsin. The strategic plan is built upon three key elements: competitive costs, safe and reliable service, and balanced generation. Key strategic plan developments impacting Alliant Energy, IPL and WPL during include the following. Refer to “Strategic Overview2012” for a more detailed discussion of strategic plan developments.
January 2013 - The IUB issued an order allowing IPL to proceed with a PPA for the purchase of capacity and early 2013 include:energy generated by DAEC for a term of February 22, 2014 through December 31, 2025.
April 2012February 2013 - IPL and MidAmerican Energy Company (MidAmerican) each filed an updated Emissions Plan and Budget (EPB) with the Iowa Utilities Board (IUB).The IUB approved IPL’s most recent EPB, which includes emission controls projects for Ottumwa Unit 1 and Lansing Unit 4. MidAmerican’s EPB includes emission controls projects for George Neal Units 3 and 4. Alliant Energy and IPL currently expect the IUB to issue their decisions on IPL’s and MidAmerican’s EPBs in the first quarter of 2013.
July 2012April 2013 - WPL announced that its current environmental compliance plans include installing an SCR at Columbia Unit 2 to retire Edgewater Unit 3reduce NOx emissions. The SCR is expected to support compliance obligations for current and Nelson Dewey Units 1 and 2 by December 31, 2015, and fuel switchanticipated air quality regulatory requirements, including CAIR or retire Edgewater Unit 4 by December 31, 2018, subjectsome alternative to necessary approvals.
July 2012 -this rule that may be implemented. WPL filedcurrently expects to file a Certificate of Authority (CA)CA application with the Public Service CommissionPSCW in the second quarter of Wisconsin (PSCW)2014 for the SCR at Columbia Unit 2.
June 2013 - WPL received an order from the PSCW approving WPL’s CA application to install a scrubber and baghouse system at Edgewater Unit 5 to reduce sulfur dioxide (SO2) emissions at the generating facility.SO2 and mercury emissions. WPL expects a decision from the PSCW regarding this emission controls project by the second quarter of 2013. Subject to regulatory approval of the project and the timing of such approvals, WPLcurrently expects to begin construction of the project in 2014 and place it in service in 2016.
November 2012July 2013 - FERC issued an order requiring MISO, on behalf of ITC, to revise ITC’s Attachment “FF” tariff, which determines how much of the transmission network upgrade costs incurred to interconnect an EGU to ITC’s transmission system will be incurred by the owner of such EGU. The revisions to ITC’s Attachment “FF” tariff required by the FERC order result in the owners of the EGUs being responsible for a substantially higher portion of the transmission network upgrade costs required to meet MISO interconnection requirements. IPL and WPL currently anticipate that ITC will pursue an option separate from ITC’s revised Attachment “FF” tariff to self-fund the transmission network upgrades associated with Marshalltown and Bent Tree, respectively. As a result, ITC would incur the capital expenditures to construct the transmission network upgrades and include a direct charge for such transmission network upgrade costs as part of its electric transmission service costs billed to IPL and WPL as the owners of Marshalltown and Bent Tree, respectively.
September 2013 - IPL announced planssigned separate definitive agreements to retire Lansing Unit 3sell its Minnesota electric and Dubuque Units 3natural gas distribution assets. Proceeds from the sales are expected to be approximately $128 million in aggregate, subject to customary closing adjustments. The proceeds are expected to reduce Alliant Energy’s and 4 by December 31, 2014, and Fox Lake Units 1 and 3, Sutherland Units 1 and 3 and various other units by December 31, 2016. The retirement of IPL’s Fox Lake Units 1 and 3 and Sutherland Units 1 and 3 is contingent on the approval and construction of the proposed Marshalltown Generating Station, among other necessary approvals.
November 2012 - IPL filed for regulatory approvals to construct an approximate 600 megawatt (MW) natural gas-fired combined-cycle electric generating facility in Marshalltown, Iowa, referred to as the Marshalltown Generating Station.
future financing requirements. Pending all

3438

Table of Contents


These filings included an Applicationnecessary federal and state regulatory approvals, including the MPUC, FERC and the IUB, the transactions are expected to be concluded in the second half of 2014. The electric distribution asset sales agreement includes a wholesale power supply agreement, which is subject to FERC approval. The agreement contains a five-year termination notice, which may not be given until the fifth anniversary of the effective date of the agreement, resulting in a minimum term of 10 years. This wholesale power supply agreement includes standardized pricing mechanisms that are detailed in IPL’s current tariffs accepted by FERC through wholesale rate case proceedings.
November 2013 - Alliant Energy announced WPL currently expects to begin incurring capital expenditures in 2016 for a Generation Facility Citing Certificatepotential generation investment to address its future customer energy and capacity needs. Options under consideration include conversion of an advancedexisting natural gas-fired facility from simple-cycle to combined-cycle, or the construction of a new resource. WPL plans to complete a feasibility study of resource options and file the necessary regulatory applications for approval of the selected resource option with the PSCW by the end of 2014.
November 2013 - The IUB issued an order approving a siting certificate and establishing rate-making principles filing, which are both required to be approved by the IUB prior to construction of the new facility.for Marshalltown. The advanced rate-making principles filing includedinclude a fixed cost cap of $700$920 million excluding AFUDC(including costs to construct Marshalltown, a pipeline to supply natural gas to Marshalltown and transmission upgrade costs, and anetwork upgrades to transmit electricity from Marshalltown, as well as AFUDC), an 11% return on common equity for the 35-year depreciable life and a 10.3% return on common equity for the calculation of 11.25%. IPL expectsAFUDC. Any costs incurred in excess of the cost cap are expected to receive decisions onbe incorporated into rates if determined to be reasonable and prudent. The IUB’s approval is contingent upon the requiredreceipt of various state and federal permitting approvals. Pending all remaining regulatory approvals, for the new facility in the fourth quarter of 2013. Subject to regulatory approvals of the new facility and the timing of such approvals, IPL currently expects to begin construction of the facilityMarshalltown in 2014 and place it in service by the second quarterin 2017.
November 2013 - WPL received approval from MISO to retire Nelson Dewey Units 1 and 2. MISO has also approved WPL’s retirement of 2017.Edgewater Unit 3. Both approvals are contingent on completion of necessary transmission network upgrades.
November 2012December 2013 - IPL filedreceived an Energy Efficiency Plan (EEP)order from the IUB approving IPL’s EEP for 2014 through 2018 with the IUB.2018. The EEP includes proposedIPL spending of approximately $400 million for electric and natural gas energy efficiency programs in Iowa from 2014 through 2018, and aspiresis expected to conserve electric and natural gas usage equal to that of more than 100,000 homes.
December 2012January 2014 - WPL purchased the Riverside Energy Center (Riverside), a 600 MW natural gas-fired electric generating facility in Beloit, Wisconsin, from a subsidiary of Calpine Corporation. The purchase price, including certain transaction-related costs, was $403.5 million. WPL’s purchase of Riverside replaced the 490 MW of electricity output previously obtainedreceived an order from the Riverside PPAPSCW approving a request for generation performance and reliability improvements at Columbia Units 1 and 2. WPL expects to meetbegin construction in the long-term energy needsfirst half of its customers.
December 2012 - Resources’ Franklin County wind project was completed2015 and began generating electricity.
January 2013 - The IUB issued an order allowing IPL to move forward with a proposed PPA that was recently negotiated with NextEra Energy Resources, LLC (NER), a subsidiary of NextEra Energy, Inc., forplace the purchase of capacity and energy generatedprojects in service by the Duane Arnold Energy Center (DAEC) located near Palo, Iowa. The IUB’s January 2013 order authorized IPL to recover the Iowa retail portionend of the cost of the proposed PPA from Iowa retail electric customers through the energy adjustment clause.
Refer to “Strategic Overview” for additional details regarding these and other strategic plan developments.2017.

Rate Matters Highlights
Alliant Energy’s utility subsidiaries, IPL and WPL, are subject to federal regulation by the Federal Energy Regulatory Commission (FERC),FERC, which has jurisdiction over wholesale electric rates, and state regulation in Iowa, Wisconsin and Minnesota for retail utility rates. Key regulatory developments impacting Alliant Energy, IPL and WPL during include the following. Refer to “Rate Matters2012 and early 2013 include:
May 2012 - IPL filed” for a request with the IUB to increase annual rates for its Iowa retail gas customers. IPL’s request included a proposal to utilize approximately $36 millionmore detailed discussion of regulatory liabilities over a three-year period to credit bills of Iowa retail gas customers to help mitigate the impact of the proposed final rate increase on such customers. In conjunction with the filing, IPL implemented an interim retail gas rate increase of $9 million, or approximately 3%, on an annual basis, effective June 4, 2012. In November 2012, the IUB approved a settlement agreement between IPL, the Iowa developments.Office of Consumer Advocate (OCA) and the Iowa Consumers Coalition, which includes a final increase in annual rates for IPL’s Iowa retail gas customers of $11 million, or approximately 4%, effective January 10, 2013, a 9.6% return on common equity after the application of double leverage and adoption of IPL’s proposed gas tax benefit rider.
May 2012 - The PSCW issued an order approving the implementation of updated depreciation rates for WPL effective January 1, 2013 as a result of a recently completed depreciation study. The updated depreciation rates reflect recovery of the remaining net book value of Nelson Dewey Units 1 and 2, and Edgewater Unit 3 over a 10-year period beginning January 1, 2013. In February 2013, the PSCW issued an order approving WPL’s request to implement new depreciation rates for Riverside, effective January 1, 2013.
July 2012 - WPL received an order from the PSCW authorizing WPL to implement a decrease in annual base rates for WPL’s retail gas customers of $13 million effective January 1, 2013 followed by a freeze of such gas base rates through the end of 2014. The order also granted WPL authority to maintain customer base rates for its retail electric customers at their current levels through the end of 2014. Recovery of the costs for the planned acquisition of Riverside, the selective catalytic reduction (SCR) project at Edgewater Unit 5 and the scrubber and baghouse projects at Columbia Units 1 and 2 is included in the order. The order also included a return on common equity of 10.4% and the following related provisions: (1) WPL may request a change in retail base rates if its annual return on common equity falls below 8.5%; and (2) WPL must defer a portion of its earnings if its annual return on common equity exceeds 10.65%. The amount of earnings WPL must defer is equal to 50% of its excess earnings between 10.66% and 11.40% and 100% of any excess earnings above 11.40%.
December 2012 - WPL received an order from the PSCW authorizing an annual retail electric rate decrease of $29 million, or approximately 3%, effective January 1, 2013 as a result of decreases in fuel-related costs expected in 2013. WPL’s 2013 fuel-related costs will be subject to an annual bandwidth of plus or minus 2%.
January 2013 - The IUB authorized IPL to recover the Iowa retail portion of the costs of its proposed DAEC PPA from Iowa retail electric customers through the energy adjustment clause beginning February 22, 2014. The IUB is encouragingencouraged IPL to continue discussions with parties to the proposed DAEC PPA proceeding to resolve concerns expressed by such parties during the proceeding. Ifproceeding regarding rate impacts beginning in 2014. IPL is unable to reach an agreement with the parties to resolve their concerns, IPL commitspreparing to file an Iowa retail electric base rate case without interim rates in late March 2014 in case such discussions do not result in a resolution of the first quarterissues. Based on the terms of 2014 and agreesthe January 2013 order, if the IUB would order a rate decrease from such a rate case, IPL has agreed to subject its Iowa retail electric base rates to potential refund beginning February 22, 2014 if2014. IPL currently anticipates a decision from the IUB orders a rate decrease from

35

Tableon this matter by the end of Contents


such rate case. If IPL fails to file2014, either through an Iowa retail electric baseapproved rate case in the first quarter of 2014, the amount of costs IPL will be allowed to recover from its Iowa electric retail customers through the energy adjustment clause will be reduced by $12 million each month until temporary rates are set in IPL’s next Iowa retail electric base rate proceeding.or an approved settlement.
February 2013 - IPL received an order from the IUB approving the final amount of the regulatory liability from tax benefits for the2013 electric tax benefit rider tariff and a $24 million revenue requirement adjustment recognized during 2013.
November 2013 - Alliant Energy announced WPL currently expects to make a retail rate filing in late March 2014 based on a forward-looking test period that may include calendar years 2015 and 2016. The form and magnitude of such filing is currently being analyzed and could range from a future test year 2015 electric fuel plan to a full rate case for the 2015 and 2016 test period. Any rate changes granted are expected to be effective in early 2015.
December 2013 - IPL received an order from the IUB approving the 2014 electric tax benefit rider tariff and a $15 million revenue requirement adjustment to be recognized during 2014.
December 2013 - IPL received an order from the MPUC approving full cost recovery of the Minnesota retail portion of IPL’s Whispering Willow - East wind project construction costs of approximately $30 million, effective January 1, 2013.
ReferDecember 2013 - WPL received an order from the PSCW authorizing an annual retail electric rate increase of $19 million, or approximately 2%, effective January 1, 2014, to reflect anticipated increases in retail electric fuel-related costs in 2014 compared to the fuel-related cost estimates used to determine rates for 2013. WPL’s 2014 fuel-related costs will be subject to deferral if they fall outside an annual bandwidth of plus or minus 2% of the approved annual forecasted fuel-related costs.

39

Rate Matters
Table of Contents” for additional details regarding these and other regulatory developments.


January 2014 - IPL received an order from the IUB approving IPL’s transmission cost rider rates effective February 1, 2014.

Environmental Matters Highlights
Alliant Energy, IPL and WPL are subject to regulation of environmental matters by various federal, state and local authorities. Key environmental developments during 2012that may impact Alliant Energy, IPL and WPL include:
April 2012 - The U.S. Environmental Protection Agency (EPA) published proposed New Source Performance Standards (NSPS) for greenhouse gases (GHG), including carbon dioxide (CO2) emissions from new fossil-fueled electric generating units (EGUs) larger than 25 MW (not including simple-cycle combustion turbines), with an output-based emissions rate limitation of 1,000 pounds of CO2 per megawatt-hour (MWh). This emissions rate limitation is expected to be effective uponinclude the EPA’s issuance of the final rule in the second quarter of 2013. The proposed NSPS for new EGUs is expected to apply to IPL’s proposed construction of the Marshalltown Generating Station.
May 2012 - The EPA issued a final ozone National Ambient Air Quality Standard (NAAQS) rule that classifies Sheboygan County in Wisconsin as marginal non-attainment, which requires this area to achieve the eight-hour ozone NAAQS of a level of 0.075 parts per million (ppm) by December 2015. WPL operates Edgewater and the Sheboygan Falls Energy Facility in Sheboygan County, Wisconsin.
August 2012 - The U.S. Court of Appeals for the D.C. Circuit (D.C. Circuit Court) vacated the Cross-State Air Pollution Rule (CSAPR) and remanded it for further revision to the EPA. The D.C. Circuit Court order required the EPA to continue administering the Clean Air Interstate Rule (CAIR) pending the promulgation of a valid replacement for CSAPR. In January 2013, the D.C. Circuit Court denied the EPA’s request for rehearing of the decision that vacated and remanded CSAPR for further revision. Petitioners may seek the Supreme Court’s review of this decision, and during the interim, CAIR remains effective.
December 2012 - The EPA issued a final rule revising the fine particle primary NAAQS (PM2.5 NAAQS), which strengthens the annual standard from 15 micrograms per cubic meter (ug/m3) to 12 ug/m3. The EPA is expected to designate non-attainment areas for the revised annual PM2.5 NAAQS by December 2015.
December 2012 - The D.C. Circuit Court denied a request by petitioners for rehearing of the decision that upheld the EPA’s ability to regulate GHG. As a result, the EPA’s GHG regulations remain effective as well as the EPA’s ability to issue additional requirements to reduce GHG emissions. Petitioners may seek the Supreme Court’s review of this decision.
following. Refer to “Environmental Matters” for additional details regarding these and othera more detailed discussion of environmental developments.
April 2013 - WPL, along with the other owners of Edgewater and Columbia, entered into a Consent Decree with the EPA and the Sierra Club to resolve certain alleged air permitting violations, while admitting no liability. The Consent Decree was approved by the Court in June 2013 thereby resolving the related claims and requiring the installation of certain emission controls systems.
June 2013 - The EPA issued proposed effluent limitation guidelines, which would require changes to discharge limits for wastewater from steam generating facilities. Compliance with these proposed guidelines would be required after July 1, 2017 but before July 1, 2022, depending on each facility’s wastewater permit cycle for existing steam generating facilities and immediately upon operation for new steam generating facilities constructed after the issuance of the final guidelines.
June 2013 - President Obama announced plans to address climate change and issued a memorandum directing the EPA to proceed with rules to reduce CO2 emissions from new and existing fossil-fueled EGUs. In January 2014, the EPA published revised proposed NSPS for GHG emissions for new fossil-fueled EGUs. A date for finalizing these standards has not yet been established. The EPA is expected to issue proposed and final NSPS for GHG emissions for existing EGUs by June 1, 2014 and June 1, 2015, respectively, which would provide guidelines that states must follow to achieve required GHG emissions reductions. SIPs that provide details of how these guidelines are to be met would be required from state agencies by June 30, 2016.
June 2013 - The U.S. Supreme Court issued an order granting an EPA petition for review of a D.C. Circuit Court decision to vacate and remand CSAPR for further EPA review. The U.S. Supreme Court ruling on the CSAPR vacatur is expected in 2014, and during the interim, CAIR remains effective.

Legislative Matters Highlights
Alliant Energy, IPL and WPL monitor various legislative developments, including those relating to energy, tax, financial and other matters. Recent keyKey legislative developments impacting Alliant Energy, IPL and WPL during early include the following. Refer to “Legislative Matters2013 include:” for a more detailed discussion of legislative developments.
January 2013 - The American Taxpayer ReliefATR Act of 2012 (the ATR Act) was enacted. The most significant provision of the ATR Act for Alliant Energy, IPL and WPL relates to the extension of bonus depreciation deductions for certain expenditures for property that are incurred through December 31, 2013.
Refer to “Legislative Matters” for additional details regarding this legislative development.

Liquidity and Capital Resources Highlights
Based on their current liquidity positions and capital structures, Alliant Energy, IPL and WPL believe they will be able to secure the additional capital required to implement their strategic plan and to meet their long-term contractual obligations. Key financing developments impacting Alliant Energy, IPL and WPL during include the following. Refer to “2012Liquidity and early Capital Resources2013 include:” for a more detailed discussion of financing developments.
March 20122013 - IPL extended through March 2014 the purchase commitment from the third-party financial institution to which it sells its receivables.
September 2012 - Corporate Services issued $75 million8,000,000 shares of 3.45% senior notes due 2022.5.1% cumulative preferred stock and received proceeds of $200 million. The proceeds were used by IPL to repay short-termredeem all 6,000,000 outstanding shares of its 8.375% cumulative preferred stock for $150 million, reduce commercial paper classified as long-term debt primarily incurredby $40 million and for other general corporate purposes.
March 2013 - WPL redeemed all 1,049,225 outstanding shares of its 4.40% through 6.50% cumulative preferred stock for $61 million.
August 2013 - WPL received approval from the purchasePSCW to issue up to $400 million of long-term debt securities through 2014.
October 2013 - IPL issued $250 million of 4.7% senior debentures due 2043. The proceeds from the corporate headquarters buildingissuance were used by IPL to reduce cash proceeds received from its sales of accounts receivable program, reduce commercial paper classified as long-term debt by $65 million and for general working capital purposes.
November 20122013 - Alliant Energy announced an increase in its targeted 20132014 annual common stock dividend to $1.88$2.04 per share, which is equivalent to a quarterly rate of $0.47$0.51 per share, beginning with the February 15, 20132014 dividend payment.
November 20122013 - WPL issued $250IPL received authority from FERC to issue through December 31, 2015 up to $750 million of 2.25% debentures due 2022. The proceeds were used bylong-term debt securities in aggregate, up to $750 million of short-term debt securities at any time and up to $300 million of preferred stock in aggregate.
November 2013 - Alliant Energy, IPL and WPL announced their future financing plans, which include issuing up to fund a portion$600 million, $300 million and $300 million, respectively, of the purchase price of Riverside.
December 2012 - Franklin County Holdings, LLC borrowed $60 million under a variable-rate term loan credit agreement that exists throughadditional long-term debt in 2014. The proceeds were used to fund a portion of the costs of the Franklin County wind project.Alliant Energy currently

3640

Table of Contents


expects to issue approximately $150 million of common stock through 2016. Alliant Energy currently does not plan to issue any material amount of common stock in 2014.
December 20122013 - At December 31, 20122013, Alliant Energy and its subsidiaries had $733$721 million of available capacity under their revolving credit facilities, $20$121 million of available capacity at IPL under its sales of accounts receivable program and $21$10 million of cash and cash equivalents.
January 20132014 - Standard & Poor’s Ratings ServicesMoody’s Investors Service raised Alliant Energy’s IPL’s and WPL’s credit ratings.
February 2013 - IPL announced it will redeem all 6,000,000 outstanding shares of its 8.375% cumulative preferred stock in March 2013 at par value for approximately $150 million plus accrued and unpaid dividends to the redemption date. WPL announced it will redeem all 1,049,225 outstanding shares of its 4.40% through 6.50% cumulative preferred stock in March 2013 for approximately $61 million plus accrued and unpaid dividends to the redemption date.
Refer to “Liquidity and Capital Resources” for additional details regarding these and other financing developments and material commitments of capital expenditures.

Other Matters Highlights
Other key developments in 2012 that could impact Alliant Energy’s, IPL’s or WPL’s future financial condition or results of operations include the following. Refer to “Other Matters” for a more detailed discussion of potential impacts to future financial condition and results of operations.
operationsApril 2013 - IPL and MidAmerican filed a joint Notice of Appeal, and the IUB and the Iowa Association of Electric Cooperatives filed Notices of Appeal, with the Iowa Supreme Court related to a ruling by the Polk County, Iowa District Court in March 2013. This ruling found Eagle Point is not a public utility and could sell directly to the City of Dubuque the power generated by a 175 kilowatt solar unit installed on the City’s property. The District Court decision is currently stayed. Alliant Energy and IPL are unable to determine how this District Court ruling may impact the level of third-party solar development in IPL’s service territory and resulting impact on future demand of electricity by IPL’s customers.
July 2013 - FERC issued an order requiring MISO, on behalf of ITC, to revise ITC’s Attachment “FF” tariff to conform to the MISO Attachment “FF” tariff. In August 2013, MISO submitted a filing with the proposed tariff revisions, which became effective as follows:of the date of the July 2013 order. Also in August 2013, ITC filed a request for rehearing and/or clarification, and IPL filed a request for clarification. In February 2014, FERC issued an order that denied ITC’s request for rehearing, responded to the requests for clarification, accepted MISO’s tariff revisions and substantially affirmed its July 2013 order. The tariff revisions ordered by FERC are expected to reduce the amount of transmission network upgrade costs billed by ITC to IPL compared to what would have been billed under ITC’s prior Attachment “FF” tariff. Alliant Energy and IPL currently expect to pass on the Iowa retail portion of any changes in electric transmission service costs billed by ITC to IPL from the revision in ITC’s Attachment “FF” tariff to IPL’s retail electric customers in Iowa through the transmission cost recovery rider.
September 20122013 - ITC Midwest LLC (ITC) and ATC finalized their respectiveits Attachment “O” rates they proposerate it proposes to charge theirits customers in 20132014 for electric transmission services. The increase in ITC’s and ATC’s Attachment “O” rates,rate, as well as Midwest Independent Transmission System Operator (MISO)MISO transmission charges for shared transmission projects, are expected to contribute to material increases in future electric transmission service charges for IPL and WPL. Alliant Energy, IPL and WPL currently estimate their electric transmission service expenses in 20132014 will be approximately $70 million, $60 million and $10 million, respectively, higher than the comparable expenses charged in 2012.2013 by approximately $30 million, $20 million and $10 million, respectively. A significant portion of the increase in IPL’s electric transmission service expenses is expected to be offset with increases in electric revenues resulting from the automatic transmission cost recovery rider approved by the IUB and implemented in 2011. Recovery of arider. A significant portion of the increasesincrease in WPL’s electric transmission service expenses was utilized to set electric revenues approved by the PSCW in WPL’s latest retail electric base rate case.
November 2013 - A group of MISO industrial customer organizations filed a complaint with FERC requesting to: (1) reduce the base return on equity used by MISO transmission owners, including ITC and ATC, to 9.15%; (2) institute a regulatory capital structure not to exceed 50% of common equity; and (3) eliminate certain return on equity adders. ITC’s and ATC’s current authorized return on equity is 12.38% and 12.2%, respectively. ITC’s and ATC’s current authorized regulatory capital structure for 2013common equity is 60% and 2014 was requested as part50%, respectively. Any change to ITC’s and ATC’s return on equity and regulatory capital structure for common equity would impact the calculation of their respective Attachment “O” rates, resulting in changes to electric transmission service costs billed by ITC and ATC to their customers. Any changes in IPL’s electric transmission service costs billed by ITC to IPL are expected to be passed on to IPL’s Iowa retail electric customers through the transmission cost recovery rider. Any changes in WPL’s electric transmission service costs will be incorporated into WPL’s retail electric rates in a future retail electric base rate proceeding with the PSCW. In addition, any change to ATC’s return on equity and gas rate caseregulatory capital structure for common equity could result in Alliant Energy and WPL realizing lower equity income and dividends from ATC in the 2013/2014 test period.
Refer to “Other Matters” for additional details regarding potential impacts to future financial condition and results of operations.future.

STRATEGIC OVERVIEW

Strategic Plan - Alliant Energy’s, IPL’s and WPL’s strategic plan focuses on their core business of delivering regulated electric and natural gas service in their Iowa Wisconsin and MinnesotaWisconsin service territories. The strategic plan is built upon three key elements: competitive costs, safe and reliable service, and balanced generation.


41

Table of Contents


Competitive Costs - Providing competitive and predictable energy costs for customers is a key element of the strategic plan. Alliant Energy, IPL and WPL are aware that the majority of their costs become part of rates charged to their customers and any rate increase has an impact on their customers. Given that potential public policy changes and resulting increases in future energy costs are possible, Alliant Energy, IPL and WPL are focused on controlling their costs with the intent of providing competitive rates to their customers. Alliant Energy and IPL also have also proposedelectric and gas tax benefit riders, which utilize tax benefits from income tax strategies to provide credits on Iowa retail customers’ bills to help offset impacts of rate increases. Refer to Note 511 of the “Combined Notes to Consolidated Financial Statements” and “Rate Matters” for further discussion of the electric and gas tax benefit riders. Energy efficiency is also an important part of the strategic plan and is an option that provides customers with the opportunity to save on their energy bills. Alliant Energy’s, IPL’s and WPL’s approach to energy efficiency is based on regulations in Iowa Wisconsin and Minnesota.Wisconsin. The objective in each of these states is to meet prescribed goals in the most cost-effective manner. Refer to “Energy Efficiency Programs” below for further discussion of energy efficiency programs used by Alliant Energy, IPL and WPL.

Safe and Reliable Service - The strategic plan is intended to focus resources on providing safe and reliable electricity and natural gas service. Investments are expected to be targeted in system improvements, replacing aging infrastructure and distribution grid efficiency to maintain strong reliability. Alliant Energy, IPL and WPL monitor system performance and take the necessary steps to continually improve the safety and reliability of their service for their customers. Providing exceptional customer service, including emergency and outage response, is part of Alliant Energy’s, IPL’s and WPL’s mission and commitment to the customers they serve.

Balanced Generation - One of the key components of Alliant Energy’s, IPL’s and WPL’s strategic plan is focused on a balanced and flexible portfolio of energy resources that will meet their utility customers’ short- and long-term energy needs. Alliant Energy, IPL and WPL believe a diversified fuel mix for their EGUs is important to meeting the needs of their customers, shareowners and the environment while preparing for a potentially carbon-constrained environment in the future. The current generationstrategic plan includes the following diversified portfolio of energy resources:

37

Table of Contents


Natural gas - purchasing, constructing and/or constructing newconverting to natural gas-fired EGUs;
Coal - implementing emission controls and performance upgradesand reliability improvements at their newer, larger and more efficient coal-fired EGUs, and fuel switching at, and retirement of, certain older, smaller and less efficient coal-fired EGUs;
NuclearPPAs - entering intopurchasing electricity to meet a newportion of customer demand for electricity, including a nuclear generation PPA related to DAEC;DAEC for a term of February 22, 2014 through December 31, 2025; and
Renewable- completion of a new wind generating facility at Resources and evaluating potential future development of existing wind sites.

Installing emission controls at the more efficient coal-fired EGUs and increasing levels of energy produced by Alliant Energy’s, IPL’s and WPL’s wind projects and other renewable energy resources results in significant environmental benefits.

Additional details of changes to Alliant Energy’s, IPL’s and WPL’s generation portfolio, as well as discussion of investments in emission controls and performance and reliability upgrades, are included in “Generation Plans” below. In addition, Alliant Energy’s, IPL’s and WPL’s strategic plan includes new emission controls at their more efficient coal-fired EGUs to continue producing affordable energy for customers and to benefit the environment, which are included in “Environmental Compliance Plans” below.

Non-regulated Operations - The strategic plan for Alliant Energy’s non-regulated operations involves maintaining a modest portfolio of businesses that are accretive to earnings but not significant users of capital. In January 2013, Alliant Energy sold the remainder of its RMT business.

Generation Plans - Alliant Energy, IPL and WPL review and update, as deemed necessary and in accordance with regulatory requirements, their generation plans. Alliant Energy, IPL and WPL are currently evaluating the types of capacity and energy additions they will pursue to meet their customers’ long-term energy needs and are monitoring several related external factors that willcould influence those evaluations. Some of these external factors include regulatory policies and decisions, regarding proposed projects, changes in long-term projections of customer demand, availability and cost effectiveness of different generation technologies, forward market prices for fossil fuels, market conditions for obtaining financing, developments related to federal and state renewable portfolio standards,RPS, environmental requirements, such as any future requirements relating to GHG emissions or renewable energy sources, and federal and state tax incentives.


42

Table of Contents


Natural Gas-Fired Generation -
IPL’s Proposed Construction of Marshalltown Generating Station - In November 2012, IPL filed2013, the IUB issued an order approving a siting certificate and establishing rate-making principles for regulatory approvals to constructIPL’s construction of an approximate 600 MW natural gas-fired combined-cycle electric generating facilityEGU in Marshalltown, Iowa, referred to as Marshalltown. In November 2013, IPL accepted the Marshalltown Generating Station. These filings included an Application for a Generation Facility Citing Certificate and an advancedIUB’s rate-making principles, filing, which are both required to be approved byinclude the IUB prior to construction of the new facility. The advanced rate-making principles filing included requests for a fixedfollowing:

A cost cap of $700$920 million, excluding AFUDCincluding costs to construct Marshalltown, a pipeline to supply natural gas to Marshalltown and transmission upgrade costs, and a return on common equity of 11.25%. In addition, the filing included a request that anynetwork upgrades to transmit electricity from Marshalltown as well as AFUDC. Any costs incurred in excess of the cost cap are expected to be incorporated into rates if determined to be reasonable and prudent. This new facility is expected to meet
An 11% return on common equity for the 35-year depreciable life of Marshalltown and a portion10.3% return on common equity for the calculation of IPL’s long-term energy resource requirements caused by projected growth in customer demand and the impacts of anticipated retirements of IPL’s older, smaller and less efficient coal-fired and peaking EGUs dueAFUDC related to the ageconstruction of such unitsMarshalltown.
The application of double leverage is deferred until IPL’s next retail electric base rate case or other proceeding.

The IUB’s approval is contingent upon the receipt of various state and operationalfederal permitting approvals necessary to construct and environmental compliance considerations. IPL expectsoperate the EGU. In December 2013, the IUB approved the construction of a pipeline for the transportation of natural gas to receive decisions on the requiredMarshalltown. Pending all remaining regulatory approvals, for the new facility in the fourth quarter of 2013. Subject to regulatory approvals of the new facility and the timing of such approvals, IPL currently expects to begin construction of the facilityMarshalltown in 2014 and place it in service in 2017. Refer to “Transmission Network Upgrades” below for discussion of transmission network upgrade costs associated with Marshalltown.

WPL’s Potential Generation Investment - In 2013, WPL initiated a feasibility study of resource options to address its future customer energy and capacity needs as part of its long-term resource planning. Based on its long-term resource plans that include the retirements of Edgewater Unit 3 and Nelson Dewey Units 1 and 2 by the second quarterend of 2017.2015, and the retirement or fuel switching to natural gas of Edgewater Unit 4 by the end of 2018, WPL is currently planning for a new generation investment to address its customer energy and capacity needs in 2019 and beyond. WPL currently expects to begin incurring capital expenditures in 2016 for the potential generation investment. Options under consideration include conversion of an existing natural gas-fired facility from simple-cycle to combined-cycle, or the construction of a new resource. WPL plans to complete the feasibility study of resource options and file the necessary regulatory applications for approval of the selected resource option with the PSCW by the end of 2014. Refer to “Liquidity and Capital Resources - Construction and Acquisition Expenditures” for details regarding theestimated capital expenditures in 2013 through 2016 currently anticipated forassociated with this facility.

WPL’s Purchase of Riverside - In December 2012, WPL purchased Riverside, a 600 MW natural gas-fired electric generating facility in Beloit, Wisconsin, from a subsidiary of Calpine Corporation. The purchase price, including certain transaction-related costs, was $404 million. WPL’s purchase of Riverside replaced the 490 MW of electricity output previously obtained from the Riverside PPA to meet the long-term energy needs of its customers. Refer to Note 1(e) of the “Combined Notes to Consolidated Financial Statements” for further discussion of WPL’s purchase of Riverside. Refer to “Rate Matters” for discussion of the recovery of the Riverside acquisition costs from WPL’s retail electric customers addressed in the PSCW’s order issued in July 2012 related to WPL’s Wisconsin retail electric and gas rate case (2013/2014 test period).potential generation investment.

Coal-Fired Generation -
Emission Controls Projects - Alliant Energy’s, IPL’s and WPL’s strategic plan includes new emission controls at IPL’s and WPL’s newer, larger and more efficient coal-fired EGUs to continue producing affordable energy for customers and to benefit the environment. Refer to “Environmental Compliance Plans” below for details regarding these emission controls projects including the capital expenditures in 20132014 through 20162017 currently anticipated for these projects.

Generation Improvement Projects - Alliant Energy’s, IPL’s and WPL’s strategic plan includes investments in performance and reliability improvements at their newer, larger and more efficient coal-fired EGUs including IPL’s Lansing Unit 4 and

38

Table of Contents


Ottumwa Unit 1, and WPL’s Edgewater Unit 5, and Columbia Units 1 and 2. Refer to “Liquidity and Capital Resources - Construction and Acquisition Expenditures” for details regarding theestimated capital expenditures in 20132014 through 2016 currently anticipated2017 for these generation performance and reliability improvement projects.

Columbia Units 1 and 2 - In January 2014, WPL received an order from the PSCW approving a request for generation performance and reliability improvements at Columbia Units 1 and 2. WPL’s portion of the capital expenditures for the projects, excluding AFUDC, is currently estimated to be between $55 million and $65 million. WPL expects to begin construction in the first half of 2015 and place the projects in service by the end of 2017.


43

Table of Contents


Plant Retirements or Fuel Switching - Alliant Energy’s, IPL’s and WPL’s current strategic plan includes the retirement of, and fuel switching at, several older, smaller and less efficient EGUs. The following table provides a list of the EGUs recently retired in 2013 as well as EGUs that may be retired or changed from coal-fired to an alternative fuel source in the next fivefew years.
EGU (In-Service Year) Nameplate Rated Capacity (a) Actual / Expected Action (b)
IPL:    
Sixth Street (1900-1950)85 MWRetired in 2010
Dubuque Unit 2 (1929)15 MWRetired in 2010
M.L. Kapp Unit 1 (1947)19 MWRetired in 2010
Prairie Creek Unit 2 (1951)23 MWRetired in 2010
Sutherland Unit 2 (1955)38 MWRetired in 2010
Lansing Unit 2 (1949)12 MWRetired in 2010
Montgomery Unit 1 (1974)29 MWRetired in 2012
Lansing Unit 3 (1957) 38 MW Retire by December 31, 2014Retired in 2013
M.L. Kapp Unit 2 (1967)218 MWFuel switch in 2015 (c)
Dubuque Unit 3 (1952) 29 MW Retire by December 31, 2014 (c)2016 (d)
Dubuque Unit 4 (1959) 3837 MW Retire by December 31, 2014 (c)2016 (d)
Fox Lake Unit 1 (1950) 1211 MW Retire by December 31, 20162017
Fox Lake Unit 3 (1962) 82 MW Retire by December 31, 2016 (c)2017 (d) (e)
Sutherland Unit 1 (1955) 3837 MW Retire by December 31, 20162017 (e) (f)
Sutherland Unit 3 (1961) 82 MW Retire by December 31, 20162017 (e) (f)
Other units Approximately 200 MW Retire by December 31, 20162017 (e)
WPL:    
Edgewater Unit 3 (1951) 60 MW Retire by December 31, 2015 (c)(f)
Nelson Dewey Unit 1 (1959) 100 MW Retire by December 31, 2015 (c)(f)
Nelson Dewey Unit 2 (1962) 100 MW Retire by December 31, 2015 (c)(f)
Edgewater Unit 4 (1969) 225 MW (g) Fuel switch or retire by December 31, 2018

(a)Nameplate rated capacity represents the nominal amount of electricity an EGU is designed to produce. Each EGU is also assessed a generating capacity amount from MISO through its annual resource adequacy process. The generating capacity amount assessed by MISO is subject to change each year and is based upon the current performance capability of the EGU and is reduced based on historical forced outages.
(b)
As of December 31, 2012,2013, the aggregate net book value of EGUs that may be retired or refueled in the future was $68$64 million for IPL and $97 million for WPL.
(c)M.L. Kapp Unit 2 is expected to switch from coal to natural gas as its primary fuel type in 2015.
(d)Final MISO studies could indicate that the retirement of Dubuque Units 3 and 4 and Fox Lake Unit 3 Edgewater Unit 3 and Nelson Dewey Units 1 and 2 may result in reliability issues and that transmission network upgrades for system reliability are necessary to enable the retirement.such retirements. Under the current MISO tariff, the specific timing for the retirement of these EGUs could depend on the timing of the required transmission network upgrades as well as various operational, market and other factors.
(d)Dubuque Units 3 and 4 ceased coal firing in 2011 and are currently fueled with natural gas.
(e)The retirementretirements of IPL’s Fox Lake Unit 3, Sutherland Units 1 and 3, and other units isare contingent on the approval and construction of the proposed Marshalltown Generating Station.as well as various operational, market and other factors.
(f)SutherlandIn 2013, WPL received approval from MISO to retire Edgewater Unit 3, and Nelson Dewey Units 1 and 3 ceased coal firing in 2012 and are currently fueled with natural gas.2, contingent on completion of transmission network upgrades necessary for system reliability.
(g)Reflects WPL’s 68.2% ownership interest in Edgewater Unit 4.

Alliant Energy, IPL and WPL will workare working with MISO, state regulatory commissions and other regulatory agencies, as required, to determine the final timing of these actions. The expected dates for the retirement and fuel switching of these unitsEGUs are subject to change depending on operational, regulatory, market and other factors. Alliant Energy, IPL and WPL will also continue to evaluate the potential retirement of other EGUs within their generation fleet.

Nuclear Generation -
IPL’s DAEC PPA - In August 2012,January 2013, the IUB issued an order allowing IPL filed for regulatory approvals to enter intoproceed with a proposed PPA that was negotiated with NER, a subsidiary of NextEra Energy, Inc., for the purchase of capacity and energy generated by DAEC located near Palo, Iowa. In January 2013, theThe IUB issued an order allowing IPL to proceed with its proposed PPA and authorizingalso authorized IPL to recover the Iowa retail portion of the cost of the proposedDAEC PPA from Iowa retail electric customers through the energy adjustment clause. The terms of the PPA provide IPL the right to NER’s entire output quantities (70% of the total plant output) in exchange for payment from IPL to NER based on the amount of MWhs received by IPL. IPL has agreed to

39

Table of Contents


will purchase 431 MWs of capacity and the resulting energy from DAEC for a term from the expiration of the existing PPA in February 22, 2014 through December 31, 2025. Among the terms and conditions of the PPA are guarantees by NER to provide minimum amounts of capacity and energy. The PPA also contains provisions for the replacement of energy from alternative sources under certain conditions as well as provisions that convey to IPL the potential environmental attributes associated with its portion of the output from DAEC. Refer to “Rate Matters” for further discussion of the IUB’s January 2013 order approving the DAEC PPA.


WPL’s Kewaunee Nuclear Power Plant (Kewaunee) PPA - In October 2012, Dominion Resources, Inc. (Dominion) announced plans to shut down Kewaunee in the second quarter
44

Table of 2013. WPL currently expects that Dominion will provide WPL replacement energy and capacity under the terms of the Kewaunee PPA after the Kewaunee plant is shut down through the end of the PPA term in December 2013. As a result, WPL currently expects no material changes to the expected energy and capacity payments under the PPA.Contents


Wind Generation -
Resources’ Franklin County Wind Project - In 2011, Alliant Energy decided to build theThe Franklin County wind project which began generating electricity in the fourth quarter of 2012. Resources is currently selling the electricity output from the wind project into the MISO market as a merchant generator, and is evaluating different options to sell the electricity output from this wind project. Such options include entering into a PPA with an independent third-party,third party, entering into a PPA with either IPL or WPL and/or continuing to sell the output into the MISO market as a merchant generator. Refer to Notes 1(e), 1(f) and 4(d) of the “Combined Notes to Consolidated Financial Statements” for further discussion of the Franklin County wind project. Refer to “Critical Accounting Policies and Estimates - Long-lived Assets” for details of a recent assessment of the recoverability of the carrying amount of the Franklin County wind project.

Undeveloped Wind Sites - IPL has approximately 200 MW of wind site capacity remaining in Franklin County, Iowa. WPL has approximately 200 MW of wind site capacity remaining in Freeborn County, Minnesota. Future development of the balance of these wind sites will depend on numerous factors such as changes in customer demand, renewable portfolio standards,RPS, environmental requirements, electricity and fossil fuel prices, wind project costs, technology advancements and transmission capabilities.

Refer to Note 1(e)3 of the “Combined Notes to Consolidated Financial Statements” for further discussion of IPL’sthe Franklin County wind site.project and undeveloped wind sites.

Transmission Network Upgrades - In July 2013, FERC issued an order requiring MISO, on behalf of ITC, to revise ITC’s Attachment “FF” tariff. ITC’s Attachment “FF” tariff determines how much of the transmission network upgrade costs incurred to interconnect an EGU to ITC’s transmission system will be incurred by the owner of such EGU. The revisions to ITC’s Attachment “FF” tariff required by the FERC order result in the owners of the EGUs being responsible for a substantially higher portion of the transmission network upgrade costs required to meet MISO interconnection requirements. As a result of the July 2013 FERC order, IPL and WPL initially expected to incur capital expenditures for transmission network upgrades for Marshalltown and Bent Tree, respectively, that would have previously been reimbursed by ITC under the previous Attachment “FF” tariff. However, IPL and WPL currently anticipate that ITC will pursue an option under the terms of MISO’s Attachment “X” tariff to self-fund the transmission network upgrades associated with Marshalltown and Bent Tree. As a result, ITC would incur the capital expenditures to construct the transmission network upgrades and include a direct charge for such transmission network upgrade costs as part of its electric transmission service costs billed to IPL and WPL as the owners of Marshalltown and Bent Tree, respectively. Refer to “Other Future Considerations” for further discussion of ITC’s Attachment “FF” tariff.

Marshalltown - ITC is expected to construct the majority of the required transmission network upgrades for Marshalltown, which IPL currently expects to be completed in 2016. IPL currently expects any regulatory filings necessary for approval of the transmission network upgrades will be made after the execution of the interconnection agreement for Marshalltown, which is expected in the second quarter of 2014. IPL anticipates the required transmission network upgrades for Marshalltown will result in additional electric transmission service costs billed by ITC to IPL if ITC pursues the option to self-fund. IPL currently expects to pass on the Iowa retail portion of any changes in the electric transmission service costs to IPL’s retail electric customers in Iowa through the transmission cost recovery rider. IPL does not currently believe that the cost cap included in the IUB’s order approving construction of Marshalltown would be affected if ITC were to ultimately self-fund the transmission network upgrades for Marshalltown.

Bent Tree - Phase I Wind Project - ITC is expected to construct the majority of the transmission network upgrades for the Bent Tree - Phase I wind project, which WPL currently expects to be completed in 2016. WPL currently expects any regulatory filings necessary for approval of the transmission network upgrades will be made after the execution of a revised interconnection agreement for Bent Tree, which is expected in the second quarter of 2014. WPL anticipates the transmission network upgrades for Bent Tree will result in additional electric transmission service costs billed by ITC to WPL if ITC pursues the option to self-fund. WPL currently expects to seek recovery of any changes in the electric transmission service costs from WPL’s electric customers in future rates.

Utility Business Divestitures -
IPL’s Minnesota Electric and Natural Gas Distribution Assets - Refer to Note 3(a) of the “Combined Notes to Consolidated Financial Statements” for discussion of the proposed sales of IPL’s Minnesota electric and natural gas distribution assets. Alliant Energy and IPL currently do not expect the sales of these assets to have a significant impact on their earnings for 2014.


45



Environmental Compliance Plans - Alliant Energy, IPL and WPL have developed environmental compliance plans to help ensure cost effective compliance with current and proposed environmental laws and regulations. Alliant Energy, IPL and WPL expect these environmental laws and regulations will require significant reductions of future emissions of nitrogen oxide (NOx),NOx, SO2, particulate matter (PM),PM, mercury and other hazardous air pollution (HAPs)HAPs at their generating facilities.EGUs. Alliant Energy, IPL and WPL review and update, as deemed necessary and in accordance with regulatory requirements, their environmental compliance plans to address various external factors. Some of these external factors include regulatory decisions regarding proposed emission controls projects, developments related to environmental regulations, outcomes of legal proceedings, settlements reached with environmental agencies and citizens groups, availability and cost effectiveness of different emission reduction technologies, market prices for electricity and fossil fuels, market prices for emission allowances, market conditions for obtaining financings, and federal and state tax incentives. Refer to “Environmental Matters” for details of certain current and proposed environmental regulations, including regulations for which these plans are expected to support compliance obligations. The following table provides current estimates of capital expenditures planned for 20132014 through 20162017 as well as the total (past and future) project costs for certain emission controls projects included in Alliant Energy’s, IPL’s and WPL’s current environmental compliance plans (in millions):
 Actual/         
 Expected         Total Expected         Total
Generating Unit In-service Date Technology (a) 2013 2014 2015 2016 Project Cost In-service Date Technology (a) 2014 2015 2016 2017 Project Cost
IPL:                          
George Neal Units 3 & 4 (b) 2013/2014 Scrubber & Baghouse 
$60
 
$30
 
$—
 
$—
 $120-$140 2013/2014 Scrubber & Baghouse 
$20
 
$—
 
$—
 
$—
 $120-$140
Ottumwa Unit 1 2014 Scrubber & Baghouse 65
 25
 
 
 150-170 2014 Scrubber & Baghouse 30
 
 
 
 150-170
Lansing Unit 4 2015 Scrubber 15
 30
 10
 
 50-60 2015 Scrubber 20
 15
 
 
 50-60
Other Various 45
 35
 5
 5
 
 185
 120
 15
 5
 
WPL:                  
Columbia Units 1 & 2 2014 Scrubber & Baghouse 145
 20
 
 
 280-310 2014 Scrubber & Baghouse 30
 
 
 
 275-285
Edgewater Unit 5 2016 Scrubber & Baghouse 15
 70
 185
 140
 390-430 2016 Scrubber & Baghouse 85
 115
 85
 5
 280-320
Other Various 10
 
 
 20
 
 170
 90
 185
 160
 
Alliant Energy 
$355
 
$210
 
$200
 
$165
 
Columbia Unit 2 2018 SCR 
 15
 35
 35
 100-120

40




(a)
Baghouse, including carbon injection,Scrubber is a post-combustion process that injects carbon particleslime or lime slurry into the stream of gases leaving the generating facilityEGU boiler to facilitate theremove SO2 and other acid gases (including hydrochloric acid) and capture of mercurythem in filtersa solid or bags. This process can removeliquid waste by-product. A scrubber typically removes more than 85%90% of mercurythe SO2 emissions.
ScrubberBaghouse, including carbon injection, is a post-combustion process that injects lime or lime slurrycarbon particles into the stream of gases leaving the generating facilityEGU boiler to remove SO2 and other acid gases (including hydrochloric acid) andfacilitate the capture themof mercury in a solidfilters or liquid waste by-product. A scrubber typically removesbags. This process can remove more than 90%85% of mercury emissions.
SCR is a post-combustion process that injects ammonia or urea into the stream of gases leaving the EGU boiler to convert NOx emissions into nitrogen and water. The use of a catalyst enhances the effectiveness of the SO2conversion, enabling NOx emissions regardlessreductions of generating facility boiler type or design.up to 90%.
(b)George Neal Units 3 and 4 are operated by MidAmerican. IPL owns a 28% interest in George Neal Unit 3 and a 25.695% interest in George Neal Unit 4.

These capital expenditure estimates represent IPL’s or WPL’s respective portion of the total escalated capital expenditures and exclude AFUDC, if applicable. Capital expenditure estimates are subject to change based on future changes to plant-specific costs of emission controls technologies and environmental requirements. The August 2012 D.C. Circuit Court decision that vacated CSAPR and required the EPA to continue administering CAIR is not expected to impact Alliant Energy’s, IPL’s and WPL’s environmental controls projects included in their current environmental compliance plans, which are included in the table above. Refer to Note 1(e) of the “Combined Notes to Consolidated Financial Statements” for further discussion of IPL’s and WPL’s emission controls projects.

IPL’s Emission Controls Projects - Under Iowa law, IPL is required to file an EPB biennially. Filing of annual periodic reports regarding the implementation of IPL’s compliance plan and related budget identified in an EPB is also currently required under a settlement agreement between IPL and the OCA in Iowa.OCA. An EPB provides a utility’s compliance plan and related budget to meet applicable state environmental requirements and federal air quality standards. IUB approval of an EPB demonstrates that the IUB believes the EPB is reasonably expected to achieve cost-effective compliance with applicable state environmental requirements and federal air quality standards. In April 2012, IPL and MidAmerican each filed an updated EPB with the IUB. In September 2012, MidAmerican filed withFebruary 2013, the IUB a settlement on itsapproved IPL’s most recent EPB, reached with the OCA, which includes emission controls projects for George Neal Units 3 and 4. In November 2012, IPL filed with the IUB a settlement on its EPB reached with the OCA, which includes emission controls projects for Ottumwa Unit 1 and Lansing Unit 4. Alliant Energy and IPL currently expect4 listed in the above table. MidAmerican’s most recent EPB has also been approved by the IUB, to issue their decisions on IPL’swhich includes the emission controls projects for George Neal Units 3 and MidAmerican’s EPBs4 listed in the first quarter of 2013.above table.

George Neal Units 3 and 4, and Ottumwa Unit 1 - MidAmerican is currently constructingRefer to Note 3(a) of the “Combined Notes to Consolidated Financial Statements” for discussion of the scrubber and installing scrubbers and baghousesbaghouse projects at George Neal Units 3 and 4, to reduce SO2 emissions and mercury emissions at the generating facility. The scrubbers and baghouses at George Neal Units 3 and 4 are expected to support compliance obligations for current and anticipated air quality regulatory requirements, including CAIR, a modified CSAPR or some alternative to these rules that may be implemented, and the Utility Maximum Achievable Control Technology (MACT) Rule.

Ottumwa Unit 1 - IPL is currently constructing a scrubber and baghouse at Ottumwa Unit 1 to reduce SO2 and mercury emissions at the generating facility. The scrubber and baghouse at Ottumwa Unit 1 are expected to support compliance obligations for current and anticipated air quality regulatory requirements, including CAIR, a modified CSAPR or some alternative to these rules that may be implemented, and the Utility MACT Rule.1.

Lansing Unit 4 - IPL plans to installis constructing a scrubber at Lansing Unit 4 to reduce SO2 emissions at the generating facility.EGU. The scrubber at Lansing Unit 4 is expected to support compliance obligations for current and anticipated air quality regulatory requirements, including CAIR a modified CSAPR or some alternative to these rulesthis rule that may be implemented, and the Utility MACT Rule.implemented.


46



Other - Alliant Energy’sIPL is currently constructing lower-cost emission controls projects at Burlington Unit 1 and IPL’sPrairie Creek Units 3 and 4 to support compliance obligations for current environmental compliance plans also include additional planned expenditures for certain of IPL’s electric generating facilities thatand anticipated air quality regulatory requirements, including the MATS Rule. Alliant Energy and IPL currently anticipate the projects will be needed to complycompleted in 2014, at which time these generating facilities will be in compliance with current and anticipated environmental rules, regulations and other compliance requirements related to air quality, water quality and land and solid waste. The environmental compliance plans associated with these additional planned expenditures are subject to change pending further clarity on various pending and anticipated regulatory requirements.the MATS Rule.

WPL’s Emission Controls Projects - WPL must file a CA and receive authorization from the PSCW to proceed with any individual emission controls project with an estimated project cost of $10 million or more. In 2007, the PSCW approved the deferral of the retail portion of WPL’s incremental pre-certification and pre-construction costs for current or future emission controls projects requiring PSCW approval, effective on the request date of November 2006. Alliant Energy and WPL currently anticipate that deferred costs as of December 31, 2012 and thereafter will be recovered in WPL’s future rates and

41



therefore do not expect these costs to have an adverse impact on their financial condition or results of operations.

Columbia Units 1 and 2, and Edgewater Unit 5 - In May 2010,Refer to Note 3(a) of the “Combined Notes to Consolidated Financial Statements” for discussion of the scrubber and baghouse projects at Columbia Units 1 and 2, and Edgewater Unit 5.

Columbia Unit 2 - WPL received an order fromcurrently expects to file a CA application with the PSCW authorizingin the installationsecond quarter of 2014 to install an SCR system at EdgewaterColumbia Unit 52 to reduce NOx emissions at the facility. ThisEGU. The SCR system at Edgewater Unit 5 was placed in-service in December 2012. This SCR system is expected to support compliance obligations for current and anticipated air quality regulatory requirements, including CAIR a modified CSAPR or some alternative to these rulesthis rule that may be implemented, and the Wisconsin Reasonably Available Control Technology (RACT) Rule.

In July 2012, WPL filed a CA application with the PSCW to install a scrubber and baghouse system at Edgewater Unit 5 to reduce SO2 emissions at the generating facility. WPL expects a decision from the PSCW regarding this emission controls project by the second quarter of 2013. Subject to regulatory approval of the project and the timing of such approvals, WPL expects to begin construction of the project in 2014 and place it in service in 2016. The scrubber and baghouse system is expected to support compliance obligations for current and anticipated air quality regulatory requirements, including CAIR, a modified CSAPR or some alternative to these rules that may be implemented, the Utility MACT Rule and the Wisconsin State Mercury Rule.

Columbia Units 1 and 2 - In February 2011, WPL received approval from the PSCW to install scrubbers and baghouses at Columbia Units 1 and 2 to reduce SO2 and mercury emissions at the generating facility. The scrubbers and baghouses at Columbia Units 1 and 2 are expected to support compliance obligations for current and anticipated air quality regulatory requirements, including CAIR, a modified CSAPR or some alternative to these rules that may be implemented, the Utility MACT Rule and the Wisconsin State Mercury Rule.implemented.

OtherRefer to Note 16(e) - Alliant Energy’s and WPL’s current environmental compliance plans also include additional planned expendituresof the “Combined Notes to Consolidated Financial Statements” for discussion of a Consent Decree approved by the Court in June 2013, which includes a requirement for WPL to install emission controls systems noted above at certain of WPL’s electric generating facilities that Alliant Energy and WPL anticipate will be needed to comply with current and anticipated environmental rules, regulations and other compliance requirements related to air quality, water quality and land and solid waste. The environmental compliance plans associated with these additional planned expenditures are subject to change pending further clarity on various pending and anticipated regulatory requirements.its EGUs.

Energy Efficiency Programs - Alliant Energy, IPL and WPL have several energy efficiency programs and initiatives that help customers reduce their energy usage and related costs through the use of new energy efficient equipment, products and practices. The following are Alliant Energy’s, IPL’s and WPL’s current key energy efficiency programs:

IPL EEP -In November 2012,December 2013, IPL filedreceived an order from the IUB approving IPL’s EEP for 2014 through 2018 with the IUB.2018. The EEP includes IPL spending approximately $400 million for electric and natural gas energy efficiency programs in Iowa from 2014 through 2018, and aspiresis expected to conserve electric and natural gas usage equal to that of more than 100,000 homes. In accordance with Iowa law, IPL is required to file an EEP every five years. An EEP provides a utility’s plan and related budget to achieve specified levels of energy savings. IUB approval demonstrates that the IUB believes that IPL’s EEP is reasonably expected to achieve cost-effectivecost effective delivery of the energy efficiency programs. To the extent approved by the IUB, costs associated with executing the EEP are recovered from ratepayers through an additional tariff called an Energy Efficiency Cost Recovery (EECR)EECR factor. The EECR factors are revised annually and include a reconciliation to eliminate any over- or under-recovery of energy efficiency expenses from prior periods. There are no carrying costs associated with the cost recovery factors. The annual EECR factors are based on IPL’s approved budget as filed with its EEP, along with any over- or under-collection from prior periods, and therefore are not expected to have a material impact on Alliant Energy’s and IPL’s financial condition or results of operations.

Focus on Energy Program - In 20122013 and 20112012, WPL contributed 1.2% and 1.5%, respectively, of annual retail utility revenues to help fund Focus on Energy, Wisconsin’s state-wide energy efficiency and renewable energy resource program.

Shared Savings Programs - IPL and WPL offerhave historically offered energy efficiency programs to certain customers in Minnesota and Wisconsin referred to as Shared Savings programs. These programs providehave provided low-cost financing to help customers identify, purchase and install energy efficiency improvement projects. The customers repay IPL and WPL with monthly payments over a term up to five years. Refer to Note 4(c)5(c) of the “Combined Notes to Consolidated Financial Statements” for additional details of shared savingsShared Savings programs.


42



RATE MATTERS

Overview - Alliant Energy has two utility subsidiaries, IPL and WPL. Alliant Energy’s utility subsidiariesIPL and WPL are subject to federal regulation by FERC, which has jurisdiction over wholesale electric rates and certain natural gas facilities, and state regulation in Iowa, Wisconsin and Minnesota for retail utility rates and standards of service. Such regulatory oversight also covers IPL’s and WPL’s plans for construction and financing of new generation facilitiesEGUs and related activities.


47



Recent Retail Base Rate Filings - Details of IPL’s and WPL’s recent retail base rate cases impacting their historical and future results of operations are as follows (dollars in millions; Electric (E); Gas (G); Not Applicable (N/A)):
Retail Base Rate Cases 
Utility
Type
 
Filing
Date
 
Interim Increase
Implemented (a)(b)
 
Interim
Effective
Date
 
Final
Increase / (Decrease)
Granted (b)
 
Final
Effective Date
 
Utility
Type
 
Filing
Date
 
Interim Increase
Implemented (a)(b)
 
Interim
Effective
Date
 
Final
Increase / (Decrease)
Granted (b)
 
Final
Effective Date
WPL:          
Wisconsin 2013/2014 Test Period E/G May-12 N/A
 N/A E-$0;G-($13) Jan-13 E/G May-12 N/A
 N/A E-$0;G-($13) Jan-13
Wisconsin 2011 Test Year E Apr-10 N/A
 N/A 8
 Jan-11
IPL:          
Iowa 2011 Test Year G May-12 
$9
 Jun-12 11
 Jan-13 G May-12 
$9
 Jun-12 11
 Jan-13
Minnesota 2009 Test Year E May-10 14
 Jul-10 8
 Feb-12 (c) E May-10 14
 Jul-10 8
 Feb-12 (c)
Iowa 2009 Test Year E Mar-10 119
 Mar-10 114
 Apr-11 E Mar-10 119
 Mar-10 114
 Apr-11

(a)In Iowa, IPL’s interim rates can be implemented 10 days after the filing date, without regulatory review and are subject to refund, pending determination of final rates. In Minnesota, IPL’s interim rates can be implemented 60 days after the filing date, with regulatory review and are subject to refund, pending determination of final rates. The amount of the interim rates is replaced by the amount of final rates once the final rates are granted.effective.
(b)Base rate changes reflect both returns on additions to infrastructure and recovery of changes in costs incurred or expected to be incurred. Given that a portion of the rate changes will offset changes in costs, revenues from rate changes should not be expected to result in an equal change in net income for either IPL or WPL.
(c)
In January 2013, IPL filed a request with the Refer to “IPL’s Minnesota Public Utilities Commission (MPUC)Retail Electric Rate Case (2009 Test Year)” below for full cost recoverydetails of the Minnesota retail portionfinal recovery amount of IPL’s Whispering Willow - East wind project construction costs. IPL expects to receive a decision from the MPUC in 2013 for the final recovery amount of such costs.

WPLs Wisconsin Retail Electric and Gas Rate Case (2013/2014 Test Period) - In MayJuly 2012, WPL filed areceived an order from the PSCW authorizing WPL to implement its retail base rate filing as requested. The retail base rate filing request was based on a forward-looking test period that included 2013 and 2014. The filing requested approval for WPL to implement a decrease in annual base rates for WPL’s retail gas customers of $13 million effective January 1, 2013 followed by a freeze of such gas base rates through the end of 2014. The filing also requested authority to maintain customer base rates for WPL’s retail electric customers at their current levels through the end of 2014. Recovery of the costs for the acquisition of Riverside, the SCR project at Edgewater Unit 5 and the scrubber and baghouse projects at Columbia Units 1 and 2 were included in the request. The recovery of the costs for these capital projects wereare offset by decreases in rate base resulting from increased net deferred tax liabilities, the impact of changes in the amortizations of regulatory assets and regulatory liabilities, and the reduction of capacity payments. WPL’s May 2012 retail base rate filing included continuation of a 10.4% return on common equity and the following related provisions: (1) WPL may request a change in retail base rates during the test period if its annual regulatory return on common equity falls below 8.5%; and (2) WPL must defer a portion of its earnings if its annual regulatory return on common equity exceeds 10.65% during the test period. The amount of earnings WPL must defer is equal to 50% of its excess earnings between 10.66% and 11.40% and 100% of any excess earnings above 11.40%. In addition, the filing requested WPL maintain its ability to request deferrals based on current practices. In July 2012,As of December 31, 2013, Alliant Energy and WPL received an order from the PSCW authorizing WPL to implement its retail base rate filing as requested.did not record any material deferred amounts for these provisions.

Refer to “WPL’s Retail Fuel-related Rate Filings - 2013 Test Year”Filings” below for information on WPL’s retail fuel-related cost filingfilings for 2013. WPL currently expects to make a retail fuel-related cost filing for 2014 in the second or third quarter of 2013.2013 and 2014. Refer to Note 1(b)2 of the “Combined Notes to Consolidated Financial Statements” for details of impacts to “Regulatory assets” on Alliant Energy’s and WPL’s Consolidated Balance Sheets from the PSCW’s July 2012 order.

WPLs Retail Electric Rate Case (2011 Test Year) - In 2010, WPL filed a request with the PSCW to reopen the rate order for its 2010 test year to increase annual retail electric rates for 2011. The request was based on a forward-looking test period that included 2011. The key drivers for the filing included recovery of investments in WPL’s Bent Tree - Phase I wind project and expiring deferral credits, partially offset by lower variable fuel expenses. In December 2010, WPL received an order from the PSCW authorizing an annual retail electric rate increase of $8 million, or approximately 1%, effective January 1, 2011. The annual retail electric rate increase of $8 million reflects a $38 million increase in the non-fuel component of

43



rates and a $30 million decrease in the fuel component of rates. This $8 million increase in annual rates effective January 1, 2011, combined with the termination of the $9 million interim fuel-related rate increase after December 2010, resulted in a net $1 million decrease in annual retail electric rates charged to customers effective January 2011. Refer to “WPL’s Retail Fuel-related Rate Filings - 2010 Test Year” below for additional details of the interim fuel-related rate increase implemented in 2010 and a reduction to the 2011 test year base rate increase for refunds owed to retail electric customers related to interim fuel cost collections in 2010.

IPLs Iowa Retail Gas Rate Case (2011 Test Year) - In May 2012, IPL filed a request with the IUB to increase annual rates for its Iowa retail gas customers based on a 2011 historical test year as adjusted for certain known and measurable changes occurring up to 12 months after the commencement of the proceeding. The key drivers for the filing included recovery of capital investments since IPL’s last Iowa retail gas rate case filed in 2005. In conjunction with the filing, IPL implemented an interim retail gas rate increase of $9 million, or approximately 3%, on an annual basis, effective June 4, 2012.

In AugustNovember 2012, the IUB approved a settlement agreement between IPL, the OCA and the Iowa Consumers Coalition filed a unanimous settlement proposal with the IUB addressing all issues among these parties related to this rate case. In November 2012, the IUB approved the settlement agreement between the parties. The settlement agreement approved by the IUB includedIPL’s request resulting in a final increase in annual rates for IPL’s Iowa retail gas customers of $11 million, or approximately 4%, effective January 10, 2013, a 9.6% return on common equity after the application of double leverage and the adoption of IPL’s proposed gas tax benefit rider discussed below.

Gas Tax Benefit Rider - IPL’s May 2012 retail gas rate case filing with the IUB included a proposal to utilize regulatory liabilities to credit bills of Iowa retail gas customers to help mitigate the impact of the proposed final rate increase on such customers. IPL proposed to reduce customer bills utilizing a gas tax benefit rider over a three-year period by approximately $36 million in aggregate. In the unanimous settlement proposal filed with the IUB in August 2012, all parties agreed to IPL’s proposed utilization of a gas tax benefit rider over a three-year period. In November 2012, IPL received an order from the IUB approving the settlement agreement and authorizing the gas tax benefit rider. The

48



IUB’s order authorized up to $12 million of regulatory liabilities from tax benefits to be credited to IPL’s retail gas customers’ bills in Iowa duringannually from January 2013 through December 2015 through the gas tax benefit rider. In December 2012, IPL filed a report with the IUB that identified approximately $48 million of total tax benefits allocated for use with the gas tax benefit rider. Any remaining benefit, including any portion not utilized of the agreed upon amount from January 2013 through December 2015, will be credited to Iowa’s retail gas customers’ bills in 2016. IPL utilized $11 million of regulatory liabilities to credit Iowa retail gas customers’ bills in 2013. Refer to “IPL’s Iowa Retail Electric Rate Case (2009 Test Year)” below and Note 2 of the “Combined Notes to Consolidated Financial Statements” for additional discussion of the tax benefit riders.

IPL’s Minnesota Retail Electric Rate Case (2009 Test Year) - In 2010, IPL filed a request with the MPUC to increase annual rates for its Minnesota retail electric customers based on a 2009 historical test year as adjusted for certain known and measurable items at the time of the filing. The key drivers for the filing included recovery of investments in IPL’s Whispering Willow - East wind project and emission controls projects at Lansing Unit 4, and recovery of increased electric transmission service costs. In conjunction with the filing, IPL implemented an interim retail rate increase of $14 million, on an annual basis, effective July 6, 2010.

In November 2011, IPL received an order from the MPUC establishingauthorizing a final annual retail electric rate increase equivalent to $11 million. The final annual retail electric rate increase of $11 million includes $8 million of higher base rates, $2 million from the temporary renewable energy rider and $1 million from the utilization of regulatory liabilities to offset higher electric transmission service costs. Because the final rate increase level was below the interim retail rate increase level implemented in July 2010, IPL refunded $4 million, including interest, to its Minnesota retail electric customers in 2012.

The MPUC’s order also included the following details:

Approvedapproved IPL’s Minnesota renewable energy rider request on a temporary basis but deferred judgment on the prudence of the Whispering Willow - East wind project costs. InitialThe initial recovery amount of the project costs will bewere allowed through the temporary renewable energy rider at a levelized cost of $51 per MWh. In JanuaryDecember 2013, IPL filed a request withreceived an order from the MPUC forapproving full cost recovery of the Minnesota retail portion of IPL’s Whispering Willow - East wind project construction costs of approximately $30 million.million, effective January 1, 2013. IPL expectswill continue to receive a decision fromrecover all costs, including production tax credits, through the renewable energy rider until all costs are moved into base rates, subject to approval by the MPUC in 2013 for the final recovery amount for such costs.
Approved recovery of IPL’s FERC-approved 2010 electric transmission service costs including ITC’s 2008 true-up costs billed to IPL in 2010.
Approved an additional $5 million of regulatory liabilities owed to Minnesota retail electric customers from the gain on the sale of IPL’s electric transmission assets to ITC in 2007 to offset a portion of transmissionfuture rate increases. The MPUC approved the utilization of the $5 million of additional regulatory liabilities over a four-year period beginning with the effective date of interim rates in July 2010.proceeding.
Denied IPL’s proposed transmission cost recovery rider.
Approved recovery of $2 million of Sutherland #4 cancellation costs over a 25-year period.
Approved a return on common equity of 10.35% and a regulatory capital structure of 47.7% common equity, 43.9% long-term debt, 6.3% preferred equity and 2.1% short-term debt.

44




Refer to Note 1(b)2 of the “Combined Notes to Consolidated Financial Statements” for discussion of changes to regulatory assets and regulatory liabilities in 2011 based on the MPUC’s November 2011 order. Refer to Note 1(e)3(a) of the “Combined Notes to Consolidated Financial Statements” for discussion of an impairment recognizedadjustments made by Alliant Energy and IPL in 2011 based onand 2013 to the MPUC’s decision regarding the recoverycarrying value of IPL’s Whispering Willow - East wind project, costs.based on amounts IPL determined were probable of being disallowed for recovery from its Minnesota retail electric customers.

IPL’s Iowa Retail Electric Rate Case (2009 Test Year) - In 2010, IPL filed a request with the IUB to increase annual rates for its Iowa retail electric customers based on a 2009 historical test year as adjusted for certain known and measurable changes occurring up to 12 months after the commencement of the proceeding. The key drivers for the filing included recovery of investments in the Whispering Willow - East wind project and emission controls projects at Lansing Unit 4, and recovery of increased electric transmission service costs. In conjunction with the filing, IPL implemented an interim retail electric rate increase of $119 million, or approximately 10%, on an annual basis, effective March 20, 2010.

In February 2011, IPL received an order from the IUB authorizing a final annual retail electric rate increase of $114 million, or approximately 10%. Because the final rate increase level was below the interim rate increase level of $119 million implemented on March 20, 2010, IPL refunded $5 million, including interest, to its Iowa retail electric customers in 2011. The IUB issuedRefer to Note 2 of the “Combined Notes to Consolidated Financial Statements” for details of changes to regulatory assets and regulatory liabilities based on a separate order in January 2011 that included the following decisions for the 2009 test year rate case:

Approved IPL’s proposed transmission cost rider conditional upon IPL’s agreement to not file an electric base rate case for three years from the date of theIUB order.
Disallowed return on investment treatment for the portion of Whispering Willow - East costs incurred above the cost cap associated with the wind turbine generators. In August 2011, the IUB clarified the treatment of these costs to be included in IPL’s rate base with a zero return on investment.
Authorized use of regulatory liabilities to implement a tax benefit rider discussed below and offset certain electric transmission service costs expected in 2011 and certain capital costs for the Whispering Willow - East wind project.
Limited recovery of and return on investment treatment to 52.5% of the remaining net book value of Sixth Street.
Allowed recovery of $7 million of flood-related costs previously incurred in 2009.

Transmission Cost Rider - In January 2011, the IUB approved IPL’s proposal to implement a transmission cost rider for recovery of electric transmission service expenses incurred to provide electric service to IPL’s retail customers in Iowa. The IUB stipulated that the rider would be implemented on a pilot basis conditional upon IPL’s agreement to not file a retail electric base rate case for three years from the date of the order and meet additional reporting requirements. In January 2011, IPL accepted the transmission cost rider with the IUB’s conditions. The transmission cost rider will remain in effect until the IUB’s final decision in IPL’s next retail electric base rate case, wherebyat which time the rider will continue in its current form, continue in a modified form or be revisited.terminated. Effective February 2011, electric transmission service expenses were removed from base rates and billed to IPL’s Iowa retail electric customers through the transmission cost rider. This new cost recovery mechanism provides for subsequent adjustments to electric rates charged to Iowa retail electric customers for changes in electric transmission service expenses. The cumulative effects of the under-/over-collection of these costs will be recorded in

49

Table of Contents


regulatory assets or regulatory liabilities on Alliant Energy’s and IPL’s Consolidated Balance Sheets until they are reflected in future billings to customers.

In November 2013, IPL filed its latest request with the IUB to update the ratesIPL uses to bill its Iowa retail electric customers in 2014 under the transmission cost rider. In January 2014, IPL received an order from the IUB approving IPL’s rates for 2014 as requested, which became effective February 1, 2014. Refer to “Other Future Considerations - Electric Transmission Service Charges” for discussion of estimated increases in transmission service charges expected by IPL for 2014.

Electric Tax Benefit Rider - In 2009, IPL filed a request with the IUB to create a regulatory liability account for potential tax benefits resulting from changes in tax accounting methodologies and tax elections available under the Internal Revenue Code. These potential tax benefits are related to the tax treatment of repairrepairs expenditures, allocation of insurance proceeds from floods in 2008 and allocation of mixed service costs. In December 2012, IPL filed a report with the IUB requesting approval of the final amount of the regulatory liability account based on the tax benefits generated from these changes in tax accounting methodologies and tax elections that were sustained under Internal Revenue Service (IRS)IRS audit. The December 2012 report filed by IPL identified approximately $500 million of such tax benefits, which includes $452 million allocated for use with the electric tax benefit rider and $48 million allocated for use with the gas tax benefit rider discussed previously. The December 2012 report filed by IPL also requested authority fromIn February 2013, the IUB authorized IPL to utilizereduce the billing credits on customers’ bills by $24 million of the regulatory liability account in 2013 to recognize the revenue requirement impact of the changes in tax accounting methods. In February 2013, the IUB issued an order approving IPL’s December 2012 request, which will resultThis resulted in a revenue requirement adjustment expected to increaseincreasing Alliant Energy’s and IPL’s electric revenues by $24 million in 2013. Beginning in 2014, the revenue requirement adjustment is estimated to be $15 million per year until it is addressed in IPL’s next retail electric base rate case.

The electric tax benefit rider, which was approved by the IUB and implemented in early 2011, utilizes amounts from the regulatory liability account to credit bills of Iowa retail customers to help offset the impact of rate increases on such customers. These credits on customers’ electric bills reduce electric revenues each quarter based on customers’ kilowatt-hour (KWh)KWh usage. In 2013, 2012 and 2011, the electric tax benefit rider utilized $79 million, $83 million and $61 million of the regulatory liability

45

Table of Contents


account to credit IPL’s customers’ bills, at a rate of 0.568 cents per KWh and 0.504 cents per KWh, respectively. In JanuaryDecember 2013, the IUB issued an order approving IPL’s 20132014 electric tax benefit rider tariff, which proposes to utilize $56$85 million of the regulatory liability account in 20132014 to credit IPL’s retail electric customers’ bills. In December 2013, the IUB also authorized IPL to reduce the $85 million of billing credits on customers’ bills at a rateby $15 million in 2014 to recognize the revenue requirement impact of 0.386 cents per KWh.the changes in tax accounting methods.

The remaining $228$144 million of the regulatory liability account balance allocated for use with the electric tax benefit rider is currently expected to be utilized subsequent to 20132014 and will be dependent on future decisions by the IUB. Refer to Notes 1(b)2 and 511 of the “Combined Notes to Consolidated Financial Statements” and “Results of Operations - Income Taxes” for additional discussion of the impacts of the electric tax benefit rider on Alliant Energy’s and IPL’s regulatory assets and regulatory liabilities, income tax expense and effective income tax rates.

Management Audit - As part of the IUB’s February 2011 order related to IPL’s Iowa retail electric rate case (2009 test year), the IUB outlined plans for IPL’s management activities to be audited by a third-party vendor. This audit commenced in the third quarter of 2011. In September 2012, the IUB accepted the final IPL management audit report issued by the third-party vendor. In response to the audit, IPL expects to file a progress report by April 1, 2013 and its initial status report by October 1, 2013. Alliant Energy and IPL do not currently believe that the final report will have a significant impact upon their financial condition or results of operations.

Refer to Note 1(b) of the “Combined Notes to Consolidated Financial Statements” for additional details of the changes to regulatory assets and regulatory liabilities based on the IUB’s January 2011 order. Refer to Note 1(e) of the “Combined Notes to Consolidated Financial Statements” for additional details of the IUB’s decision in the January 2011 order disallowing IPL a return on a portion of its Whispering Willow - East wind project costs.

WPL’s Retail Fuel-related Rate Filings -
20132014 Test Year -In June 2012,December 2013, WPL filed a request withreceived an order from the PSCW to decreaseauthorizing an annual rates for WPL’s retail electric customersrate increase of $19 million, or approximately 2%, effective January 1, 2014, to reflect anticipated decreasesincreases in retail electric production fuel and energy purchasesfuel-related costs (fuel-related costs) in 20132014 compared to the fuel-related cost estimates used to determine rates for 2012.2013. WPL’s 2014 fuel-related costs will be subject to deferral if they fall outside an annual bandwidth of plus or minus 2% of the approved annual forecasted fuel-related costs. Deferral of under-collections are reduced to the extent WPL’s actual return on common equity exceeds the most recently authorized return on common equity.

2013 Test Year - In December 2012, WPL received an order from the PSCW authorizing an annual retail electric rate decrease of $29 million, or approximately 3%, effective January 1, 2013.2013 to reflect anticipated decreases in retail electric fuel-related costs in 2013 compared to the fuel-related cost estimates used to determine rates for 2012. WPL’s 2013 fuel-related costs will bewere subject to deferral if they fell outside an annual bandwidth of plus or minus 2%. of the approved annual forecasted fuel-related costs. Retail fuel-related costs incurred by WPL for 2013 did not fall outside of the fuel monitoring range.

2012 Test Year - In 2011, WPL filed a request with the PSCW to increase annual retail electric rates to recover anticipated increases in retail fuel-related costs in 2012 due to higher purchased power energy costs and emission compliance costs. In December 2011, WPL received an order from the PSCW authorizing an annual retail electric rate increase of $4 million, effective January 1, 2012 related to expected changesreflect anticipated increases in retail fuel-related costs in 2012 compared to fuel-related cost estimates used to determine rates for 2012. The2011. WPL’s 2012 fuel-related costs were subject to deferral if they fell outside an annual bandwidth of plus or minus 2%. of the approved annual forecasted fuel-related costs. Retail fuel-related costs incurred by WPL forin 2012 were lower than retail fuel-related costs used to determine rates for such period resulting in an over-collection of fuel-related costs for 2012 of approximately $17 million (including $11 million outside the approved fuel monitoring level by more than the 2% bandwidth resultingrange

50

Table of Contents


for 2012 recorded in future refunds anticipated to be used to offset fuel-related cost changes in 2014. As of December 31, 2012,“Regulatory liabilities” on Alliant EnergyEnergy’s and WPL recorded $11 million in regulatory liabilities on theirWPL’s Consolidated Balance Sheets as of December 31, 2012). In 2013, WPL refunded $12 million, including interest, to its retail electric customers for refunds anticipated to be used to offset fuel-related cost changes in 2014.these over-collections.

2010 Test YearPlanned Utility Rate Cases in 2014 -In 2010, WPL filed a request with the PSCW to increase annual retail electric rates to recover anticipated increased fuel-related costs in 2010. WPL received approval from the PSCW to implement an interim rate increase of $9 million, on an annual basis, effective in June 2010. Updated annual 2010 fuel-related costs during the proceeding resulted in WPL no longer qualifying for a fuel-related rate increase for 2010. In December 2010, the PSCW issued an order authorizing no increase in retail electric rates in 2010 related to fuel-related costs and required the interim rate increase to terminate at the end of 2010. The order also required WPL to use $5 million of the interim fuel rates collected in 2010 as a reduction to the 2011 test year base rate increase.

Potential Future IPLIPL’s Iowa Retail Electric Base Rate Case (2013 Test Year) - In January 2013, the IUB issued an order allowing IPL to proceed with its proposed DAEC PPA for a term of February 22, 2014 through December 31, 2025 and authorized IPL to recover the Iowa retail portion of the costs of such PPA from Iowa retail electric customers through the energy adjustment clause beginning February 22, 2014. The January 2013 order encouragesencouraged IPL to continue discussions with parties to the proposed DAEC PPA proceeding to resolve concerns expressed by such parties during the proceeding. Ifproceeding regarding rate impacts beginning in 2014. IPL is unable to reach an agreement with the parties to resolve their concerns, IPL commitspreparing to file an Iowa retail electric base rate case without interim rates in late March 2014 in case such discussions do not result in a resolution of the first quarterissues. The key drivers to determining the final rates in such a rate case are expected to be the reduction in purchased electric capacity expenses in 2014 with the expiration of 2014the existing DAEC PPA and agreessignificant additions to IPL’s rate base since its 2009 test year retail electric rate case for emission controls added to generating facilities to comply with environmental regulations, generation performance improvement projects and other capital expenditures to ensure reliable electric service. IPL currently believes the impact of the reduction in purchased electric capacity expenses on the determination of final rates will be largely offset by the significant rate base additions since IPL’s last retail electric rate case. However, IPL is currently unable to predict the final rates to be determined by the IUB from such a rate case. Final rates may also be dependent on other matters expected to be addressed in such rate case, including extension of the current temporary transmission rider, utilization of remaining regulatory liabilities related to the electric tax benefit rider and future revenue requirement adjustments related to certain tax benefits from tax accounting method changes. Based on the terms of the IUB’s January 2013 order discussed above, if the IUB would order a rate decrease from such a rate case, IPL has agreed to subject its Iowa retail electric base rates to potential refund beginning February 22, 2014 if2014. IPL currently anticipates a decision from the IUB orders a rate decrease from such rate case. If IPL fails to fileon this matter by the end of 2014, either through an Iowa retail electric baseapproved rate case or an approved settlement.

WPL’s Wisconsin Retail Electric and Gas Rate Case (2015/2016 Test Period) - WPL currently expects to make a retail rate filing in late March 2014 based on a forward-looking test period that may include calendar years 2015 and 2016. The form and magnitude of such filing is currently being analyzed and could range from a future test year 2015 electric fuel plan to a full rate case for the first quarter2015 and 2016 test period. The key non-fuel drivers for the anticipated filing include recovery of 2014, the amountscrubber and baghouse projects at Columbia Units 1 and 2 and partial recovery of the scrubber and baghouse projects at Edgewater Unit 5. The recovery of costs IPL willassociated with these capital projects is expected to be allowed to recover from its Iowa electric retail customers through thepartially offset by lower energy adjustment clause will be reduced by $12 million each month until temporary rates are set in IPL’s next Iowa retail electric base rate proceeding. In February 2013, one of the parties that participated in the proceeding filed a motion for reconsideration, which is still pending.


46

Table of Contents


Proposed Rule Changes -
Proposed Changes to Energy Adjustment Clause Rules in Iowa - In May 2012, IPL filed a request with the IUB for proposed changes to the energy adjustment clause rules in Iowa. IPL proposed modifications to includeconservation cost recovery of emission control chemicals and impacts of future EPA ruleamortizations. Any rate changes including recovery of certain emission allowance costs. IPL also proposedgranted are expected to allow the option of including production tax credits and renewable energy credit revenuesbe effective in the energy adjustment clause rules. IPL’s production tax credits related to its Whispering Willow - East wind project are currently being recovered in base rates. In December 2012, the IUB issued an order terminating the rulemaking without adopting IPL’s proposed revisions. The IUB’s order allows IPL the opportunity to address the recovery of these costs through the energy adjustment clause in a future rate case proceeding or rulemaking when there is more certainty with regard to the associated costs.early 2015.

Rate Case Details - Details of the currently effective rate orders in IPL’s and WPL’s key jurisdictions were as follows (Common Equity (CE); Preferred Equity (PE); Long-term Debt (LD); Short-term Debt (SD); Weighted-average Cost of Capital (WACC)):
 Authorized Return Average Authorized Return Average
 Test on Common Regulatory Capital Structure After-tax Rate Base Test on Common Regulatory Capital Structure After-tax Rate Base
Jurisdictions Period Equity (a) CE PE LD SD WACC (in millions) Period Equity (a) CE PE LD SD WACC (in millions)
IPL:                                
Iowa retail (IUB):        
Electric:        
- Emery (b) 2009 11.58% 48.2% 6.5% 45.3% N/A 8.85% 
$281
 2009 11.58% 48.2% 6.5% 45.3% N/A 8.85% 
$281
- Whispering Willow - East (b) 2009 11.09% 48.2% 6.5% 45.3% N/A 8.61% 266
 2009 11.09% 48.2% 6.5% 45.3% N/A 8.61% 266
- Other (b) 2009 9.53% 48.2% 6.5% 45.3% N/A 7.86% 1,843
 2009 9.53% 48.2% 6.5% 45.3% N/A 7.86% 1,843
Gas (c) 2011 9.56% 48.8% 5.0% 46.2% N/A 7.76% 255
 2011 9.56% 48.8% 5.0% 46.2% N/A 7.76% 255
Minnesota retail (MPUC):        
Electric 2009 10.35% 47.7% 6.3% 43.9% 2.1% 8.11% 126 (d)
 2009 10.35% 47.7% 6.3% 43.9% 2.1% 8.11% 126 (d)
Gas 1994 10.75% 41.0% 7.4% 44.0% 7.6% 8.82% 7
 1994 10.75% 41.0% 7.4% 44.0% 7.6% 8.82% 7
Wholesale electric (FERC) (e)
 2012 10.97% 48.7% 5.0% 46.3% N/A 8.34% 30
 2013 10.97% 48.9% 5.4% 45.7% N/A 8.32% 30
        
WPL:        
Wisconsin retail (PSCW):        
Electric 2013 10.40% 49.3% 2.0% 45.5% 3.2% 7.81% 2,105 (f)
 2014 10.40% 49.4% 1.9% 44.2% 4.5% 7.77% 2,240 (f)
Electric 2014 10.40% 49.4% 1.9% 44.2% 4.5% 7.77% 2,240 (f)
Gas 2013 10.40% 49.3% 2.0% 45.5% 3.2% 7.81% 196 (f)
Gas 2014 10.40% 49.4% 1.9% 44.2% 4.5% 7.77% 199 (f)
 2014 10.40% 49.4% 1.9% 44.2% 4.5% 7.77% 199 (f)
Wholesale electric (FERC) (g) 2012 10.90% 55.0% N/A 45.0% N/A 8.65% 194 (h)
 2013 10.90% 55.0% N/A 45.0% N/A 8.49% 273 (h)


51

Table of Contents


(a)Authorized returns on common equity may not be indicative of actual returns earned or projections of future returns.
(b)Authorized returns on common equity and after-tax WACC reflect application of double leverage pursuant to the IUB’s January 2011 order discussed above. Prior to the application of double leverage, authorized returns on common equity were: Emery Generating Station (Emery)-12.23%Emery-12.23%, Whispering Willow-East-11.7% and Other-10.0%, and after-tax WACC were: Emery-9.16%, Whispering Willow-East-8.91% and Other-8.09%.
(c)Authorized returns on common equity and after-tax WACC reflect application of double leverage pursuant to the unanimous settlement agreement approved in the IUB’s November 2012 order. Prior to the application of double leverage, authorized return on common equity was 10.0% and after-tax WACC was 8.0%.
(d)Average rate base amounts do not include Whispering Willow - East capital costs, which are currently being recovered through a temporary renewable energy rider approved by the MPUC. In January 2013, IPL filed a request with the MPUCRefer to “IPL’s Minnesota Retail Electric Rate Case (2009 Test Year)” above for full cost recoverydetails of the Minnesota retail portionfinal recovery amount of IPL’sthe Whispering Willow - East wind project construction costs. IPL expects to receive a decision from the MPUC in 2013 for the final recovery amount for suchcapital costs.
(e)IPL’s wholesale formula rates reflect annual changes in CE, PE, LD, WACC and rate base.
(f)
Average rate base amounts do not include construction work in progress (CWIP)CWIP or a cash working capital allowance. The PSCW provides a return on selected CWIP and a cash working capital allowance by adjusting the percentage return on rate base.
(g)WPL’s wholesale formula rates reflect annual changes in WACC and rate base.
(h)WPL’s wholesale average rate base reflects production-related rate base calculated as the simple average of the beginning of year and end of year balances in accordance with WPL’s approved formula rates. The 2012 amount excludes the impact of WPL’s acquisition of Riverside in December 2012. The impact of WPL’s acquisition of Riverside will be included in WPL’s wholesale formula rates beginning in 2013.

47

Table of Contents



Other -
WPL Depreciation Study - In May 2012, the PSCW issued an order approving the implementation of updated depreciation rates for WPL effective January 1, 2013 as a result of a recently completed depreciation study. The updated depreciation rates reflect recovery of the remaining net book value of Nelson Dewey Units 1 and 2, and Edgewater Unit 3 over a 10-year period beginning January 1, 2013. In November 2012, WPL filed a request with the PSCW to revise previously approved depreciation rates applicable to Riverside based on updated information regarding the expected carrying value of the assets being purchased. In February 2013, the PSCW issued an order approving WPL’s request to revise depreciation rates for Riverside, effective January 1, 2013. Refer to “Strategic Overview” for details of anticipated retirements of Nelson Dewey Units 1 and 2, and Edgewater Unit 3. Refer to Note 1(e) of the “Combined Notes to Consolidated Financial Statements” for details of the depreciation study.

In December 2012, FERC issued an order approving the implementation and inclusion of the updated depreciation rates in WPL’s wholesale formula rates effective January 1, 2013. In February 2013, WPL filed a request with FERC for new depreciation rates associated with Riverside effective January 1, 2013.

Service Agreement - In December 2011, the PSCW approved a revised service agreement between Corporate Services, and IPL and WPL. The revised service agreement became effective in February 2012. Pursuant to the current and previous service agreements, IPL and WPL receive various administrative and general services from Corporate Services. These services are billed to IPL and WPL at cost based on expenses incurred by Corporate Services for the benefit of IPL and WPL, respectively. These costs consist primarily of employee compensation, benefits and fees associated with various professional services. In accordance with the terms of the revised service agreement, Corporate Services began including a return on net assets as part of the costs billed to IPL and WPL in 2012.

FERC Audit - As part of routine procedures, in the fourth quarter of 2011, FERC commenced an audit of Alliant Energy, including its centralized service company (Corporate Services) and other affiliated companies. In January 2013, FERC issued a final report related to this audit. Alliant Energy, IPL and WPL do not believe that the final report will have a significant impact on their financial condition or results of operations.

ENVIRONMENTAL MATTERS

Overview - Alliant Energy, IPL and WPL are subject to regulation of environmental matters by federal, state and local authorities as a result of their current and past operations. Alliant Energy, IPL and WPL monitor these environmental matters and address them with emission abatement programs.by installing controls that reduce emissions and by implementing operational modifications or other measures to address compliance obligations. These programs are subject to continuing review and are periodically revised due to various factors, including but not limited to changes in environmental regulations, litigation of environmental requirements, construction plans and compliance costs. There is currently significant regulatory uncertainty with respect to the variousa number of environmental rules and regulations discussed below. Given the dynamic nature of environmental regulations and other related regulatory requirements, Alliant Energy, IPL and WPL have established an integrated planning process that is used for environmental compliance for their operations. Alliant Energy, IPL and WPL anticipate future expenditures for environmental compliance will be material, including significant capital investments. Alliant Energy, IPL and WPL anticipate that prudent expenditures incurred by IPL and WPL to comply with environmental requirements would likely would be recovered in rates from IPL’s and WPL’s customers. Refer to “Strategic Overview - Environmental Compliance Plans” for details of environmental compliance plans, including discussion of specific projects and the associated estimated capital expenditures. The following are major environmental matters that could potentially have a significant impact on Alliant Energy’s, IPL’s and WPL’s financial condition and results of operations.

Air Quality - The Clean Air Act (CAA)CAA and its amendments mandate preservation of air quality through existing regulations and periodic reviews to ensure adequacy of thesethe CAA provisions based on scientific data. As part of the basic framework under the CAA, the EPA is required to establish NAAQS rules, which serve to protect public health and welfare. These standardsrules address six “criteria” pollutants, four of which (NOx, SO2, PM and ozone) are particularly relevant to Alliant Energy’s, IPL’s and WPL’s electric utility operations. Ozone is not directly emitted from Alliant Energy’s, IPL’s and WPL’s generating facilities;EGUs; however, NOx emissions may contribute to its formation in the atmosphere. Fine particulate matter (PM2.5)PM2.5 may also be formed in the atmosphere from SO2 and NOx emissions.

State implementation plans (SIPs)SIPs document the collection of regulations that individual state agencies will apply to maintain NAAQS rules and related CAA requirements. The EPA must approve each SIP and if a SIP is not acceptable to the EPA or if a state chooses not to issue separate state rules, then the EPA can assume enforcement of the CAA in that state by issuing a federal implementation plan. Routinely monitored locations that do not comply with NAAQS rules may be classified by the

48

Table of Contents


EPA as non-attainment and require further actions to reduce emissions. Additional emissions standards may also be applied under the CAA regulatory framework beyond NAAQS rules. The specific federal and state air quality regulations that may affect Alliant Energy’s, IPL’s and WPL’s operations are listed in the table below. Alliant Energy, IPL and WPL also monitor various other potential environmental matters related to air quality, including: litigation of various federal rules issued under the CAA statutory authority; revisions to the New Source Review/Prevention of Significant Deterioration (PSD) permitting programs and NSPS; and proposed legislation or other regulatory actions to regulate the emission of GHG. Refer to the sections below the following tables for detailed discussion of the following air quality regulations.

52



  Emissions Alliant Energy’s Primary Facilities Actual/Anticipated
Environmental Regulation Regulated Potentially Affected Compliance Deadline
CAIR SO2, NOx Fossil-fueled EGUs over 25 MW capacity in IA and WI Phase I - NOx (2009) and SO2 (2010);2009/2010; Phase II - January 2015
CAVR SO2, NOx, PM Fossil-fueled EGUs built between 1962 and 1977 in IA WI and MNWI To Be Determined (TBD)TBD
Utility MACTMATS Rule Mercury and other HAPs Coal-fueled EGUs over 25 MW capacity in IA WI and MNWI April 2015 (a)
Wisconsin State Mercury Rule Mercury WPL’s coal-fueled EGUs over 25 MW capacity Phase I - 2010; Phase II - 2015
Wisconsin RACT RuleNOxWPL’s Edgewater Units 3-5Phase I - 2009; Phase II - 2013April 2016
Industrial Boiler and Process Heater MACT Rule Mercury and other HAPs IPL’s Prairie Creek boilers 1, 2 and 5 January 2016 (a)
Ozone NAAQS Rule NOx Fossil-fueled EGUs in non-attainment areas December 2015
Fine ParticleParticulate NAAQS Rule SO2, NOx, PM Fossil-fueled EGUs in non-attainment areas 2020
NO2 NAAQS Rule NO2 Fossil-fueled EGUs in non-attainment areas TBD
SO2 NAAQS Rule SO2 Fossil-fueled EGUs in non-attainment areas 20172018
GHG NSPSCO2Fossil-fueled EGUsNew units upon startup and existing units TBD

(a)An additional year for compliance can be requested, which may be granted on a case-by-case basis by state permitting authorities.

The following table lists the fossil-fueled EGUsgenerating facilities by primary fuel type that IPL and WPL currently own or operate with greater than 25 MW of nameplate capacity. All of IPL’s EGUsgenerating facilities listed below are located in Iowa except for Fox Lake Unit 3, which is located in Minnesota. All of WPL’s EGUsgenerating facilities listed below are located in Wisconsin. Refer to “Strategic Overview” for discussion of various EGUsgenerating facilities that may be retired or changed from coal-fired to an alternative fuel source in the next fivefew years.
IPL WPL
Coal Natural Gas Oil Coal Natural Gas
Ottumwa 1 Emery 1-3 Marshalltown 1-3 Columbia 1-2 Sheboygan Falls 1-2Riverside 1-3
Lansing 3-44 Fox Lake 3 Lime Creek 1-2 Edgewater 3-5 NeenahSheboygan Falls 1-2
M.L. Kapp 2 (a)Sutherland 1,3 (b)Centerville 1-2Nelson Dewey 1-2Neenah 1-2
Burlington 1 Dubuque 3-4   Nelson Dewey 1-2 South Fond du Lac 1-4
Burlington 1Sutherland 1,3 (a)Rock River 3,5-6
George Neal 3-4       Sheepskin 1Rock River 3,5-6
Prairie Creek 3-4       Riverside 1-3Sheepskin 1
Louisa 1        

(a)M.L. Kapp Unit 2 is expected to switch from coal to natural gas as its primary fuel type in 2015.
(b)In 2012, IPL switched Sutherland Units 1 and 3 to using natural gas as their primary fuel type; however, Sutherland Units 1 and 3 are still permitted to burn coal and are subject to all of the coal-burning EGU air regulations.

As discussed in greater detail below, a number of these air regulations are subject to legal challenges, reconsideration and/or other uncertainties that affect Alliant Energy’s, IPL’s and WPL’s ability to predict with certainty what impact such regulations may have on their financial condition and results of operations.

CAIR/CSAPR - CAIR includes a regional cap-and-trade system covering the eastern U.S., where compliance with SO2 and NOx emissions limits may be achieved by either adding emission controls and/or purchasing emission allowances. In 2011, the EPA issued CSAPR as a replacement to resolve flaws with CAIR identified in a 2008 opinion issued in response to legal challenges to this rule. This rule similarlyfor CAIR. CSAPR also included requirements to reduce SO2 and NOx (both annual and ozone season) emissions. IPL’s and WPL’s fossil-fueled EGUs with greater than 25 MWIn June 2013, the U.S. Supreme Court issued an order granting an EPA petition for review of capacity located in Iowa, Minnesota and Wisconsin would have been impacted by CSAPR requirements. In August 2012, however, thea D.C. Circuit Court vacated CSAPR, remanding it for further revisiondecision to the EPA. The D.C. Circuit Court order required the EPA to continue administering CAIR pending the promulgation of a valid replacement for CSAPR. In October 2012, the EPA, as well as several states, citiesvacate and other organizations, filed petitions for rehearing of the August 2012 decision that vacated CSAPR. In January 2013, the D.C.

49



Circuit Court denied the EPA’s request for rehearing of the decision that vacated and remandedremand CSAPR for further revision. Petitioners may seekEPA review. The U.S. Supreme Court ruling on the Supreme Court’s review of this decision,CSAPR vacatur is expected in 2014, and during the interim, CAIR remains effective. Given that these rules remain subject to potential further reconsideration by the EPA in response to legal challenges, Alliant Energy, IPL and WPL are currently unable to predict with certainty the impact on their financial condition or results of operations. Alliant Energy, IPL and WPL currently believe that CAIR will be replaced in the future, either by a modified CSAPR or another rule that addresses the interstate transport of air pollutants, and expect that capital investments and/or modifications to their EGUs to meet the final compliance requirements will be significant.


53

Table of Contents


Clean Air Visibility Rule (CAVR)CAVR - CAVR requires states to develop and implement plans to address visibility impairment in designated national parks and wilderness areas across the countryU.S. with a national goal of no impairment by 2064. These implementation plans require Best Available Retrofit Technology (BART)BART emission controls at certain IPL and WPL fossil-fueled EGUs that were built between 1962 and 1977 and other additional measures needed for reducing state contributions to regional haze. There are pending obligations under the EPA’s CAVR to complete BART determinations that would evaluate control options to reduce these emissions at certain fossil-fueled IPL and WPL EGUs that were under construction between 1962 and 1977. IPL’s facilities that may be impacted include Burlington Unit 1, George Neal Units 3 and 4, Prairie Creek Unit 4, M.L. Kapp Unit 2 and Lansing Unit 4. WPL’s facilities that may be impacted include Edgewater Unit 4, Nelson Dewey Unit 2, and Columbia Units 1 and 2.

In 2012, the EPA published a final rule (BART-CSAPR Rule) that would allowallowed BART obligations for SO2 and NOx emissions to be fulfilled by compliance with CSAPR. In 2012, the EPA also approved Wisconsin’s CAVR plans for Iowa, Wisconsin and Minnesota,plan, which would requirerelied on the EPA’s BART-CSAPR rule. In 2012, the EPA issued a federal plan specifying that Iowa’s compliance with CSAPR to fulfill BART requirements for SO2 and NOx emission reductions. In August 2012, the EPA rule that allowed for CAVR BART obligations towould be met by CSAPR was challenged in the D.C. Circuit Court. In October 2012, parties also filed legal challenges to the EPA’s final approvals of Iowa, Wisconsin and Minnesota CAVR plans including the application of CSAPRsufficient to meet BART requirements at affected EGUs. The D.C. Circuit Court has stayed action on these cases pending resolutionCAVR requirements.

As a result of the legal challengesCourt decision to vacate CSAPR, which will determine if CAVR is upheld or remanded for reconsideration. Itit is unknown whether the EPA will allow BART to be fulfilled by CAIR, a modified CSAPR or another rule pending the ongoing D.C. Circuit Court’slegal review of these regulations and the EPA’s responses to resolve the court orders on these rules. If the EPA does not allow for BART to be fulfilled by CAIR, a modified CSAPR or another rule, then facility-specific BART evaluations will be needed for each impacted unit to determine what emission controls must be installed to address visibility improvements. In addition, there are uncertainties whether additional emission reductions could be requiredgroups have legally challenged the EPA’s reliance on CSAPR to address regional haze impacts beyond BART.satisfy CAVR BART requirements. Alliant Energy, IPL and WPL are unable to predict with certainty the impact that CAVR might have on the operations of their existing EGUs until the legal challenges to CAIR and CSAPR are resolved.

Utility MACTMATS Rule - In 2011, the EPA issued the final Utility MACTMATS Rule, also referred to as the Mercury and Air Toxic Standard. The final rulewhich requires compliance with emission limits for mercury filterable PM asand other HAPs. In 2012, the EPA issued a substituteproposed reconsideration to the MATS Rule, including revisions to the startup and shutdown provisions for non-mercury metal HAPsexisting EGUs. In March 2013, the EPA announced that the final reconsideration rule for startup and hydrogen chloride (HCl) asshutdown provisions under the MATS Rule was delayed, but did not provide a substituterevised schedule for acid gas HAPs. The EPA also proposed alternative standards for total or individual non-mercury metals emissions (instead of filterable PM) and SO2 emissions (instead of HCl for acid gases if a scrubberissuance. Compliance with the MATS Rule is installed). In addition, work practice standards were proposed for organic HAPs emissions to ensure proper combustion. Compliance is currently anticipated to be required by April 2015. However,2015; however, an entity can request an additional year for compliance which may be granted on a case-by-case basis by state permitting authorities for units that are needed to assure power reliability, units needed while building replacement generation or repowering to gas, or units that need additional time to install air emission controls technology. In November 2012,February 2014, the EPA issued a proposed reconsideration to limited aspectsWisconsin DNR approved an extension to the Utility MACT rule including revisionsMATS compliance deadline for WPL’s Edgewater Unit 3 and Nelson Dewey Units 1 and 2 to the startup and shutdown provisions for existing EGUs.April 2016. The EPA plans to issue a final reconsideration rule by March 2013. The final Utility MACTMATS Rule is subject to legal challenge that is pending in the D.C. Circuit Court.Court and a ruling in the case is not expected until mid-2014 or later. Given that this rule remains subject to legal challenge in the D.C. Circuit Court and possible revision due to the proposed reconsideration, rule, Alliant Energy, IPL and WPL are currently unable to predict with certainty the impact of the final Utility MACT ruleMATS Rule on their financial condition and results of operations, but expect that capital investments and/or modifications to their electric generating facilitiesEGUs could be significant to comply with the rule.

Wisconsin State Mercury Rule - The second phase of the Wisconsin State Mercury Rule requires electric utility companies in Wisconsin to meet compliance requirements to reduce annual mercury emissions by 40% from a historic baseline beginning in 2010 (Phase I). In addition, this rule requires large coal-fueled EGUs with greater than 150 MW of capacity to either achieve a 90% annual mercury emissions reduction standard or limit the annual concentration of mercury emissions to 0.008 pounds of mercury per gigawatt-hour beginning in 2015 (Phase II).January 2015. Small coal-fueled EGUs between 25 MW and 150 MW of capacity must install Best Available Control Technology by January 2015 to reduce mercury emissions. As an alternative, this rulethe Wisconsin State Mercury Rule allows large and small EGUs to achieve compliance through averaging of covered emissions. In 2010, WPL filed its compliance plan with the Wisconsin Department of Natural Resources (DNR), which states WPL willexpects to utilize large and small EGU averaging to comply with this rule. In accordance with Wisconsin Statutes, EGUs complying with the additional mercury rule emission reduction requirements that commence in 2015. The

50

Table of Contents


issuance of the final Utility MACTMATS Rule is expected to initiate a review of, and may cause revisionsby April 2015 would no longer be subject to the Wisconsin State Mercury Rule. The Wisconsin NRB proposed changes to the Wisconsin State Mercury Rule that would extend the second phase compliance date to April 2016, thereby accommodating the MATS Rule compliance deadline. A decision regarding Wisconsin NRB proposed changes to the Wisconsin State Mercury Rule is expected in 2014. Alliant Energy and WPL continue to evaluate the impact of this state mercury rulethe Wisconsin State Mercury Rule and the federal Utility MACTMATS Rule discussed above on their financial condition and results of operations to determine if further mercury emission reductions that would be required.

Wisconsin RACT Rule - In 2004, the EPA designated 10 counties in Southeastern Wisconsin as non-attainment areas for the ozone NAAQS. This designation includes Sheboygan County, where WPL operates the Sheboygan Falls Energy Facility and Edgewater. In 2007, the Wisconsin DNR issued a RACT Rule that requires NOx emission reductions at EGUs as part of the federal ozone SIP submittal to address non-attainment areas in Wisconsin. Facility modifications are not necessary at the Sheboygan Falls Energy Facility to comply with this rule. As part of its environmental compliance plan, WPL completed investments for installation of NOx emission controls technologies at Edgewater, which met the 2009 to 2012 compliance requirements (Phase I). In the fourth quarter of 2012, WPL completed the installation of an SCR system at Edgewater to support achieving compliance with the 2013 requirements, which include facility boiler NOx rate limitations and a mass emissions cap (Phase II). Refer to “Strategic Overview - Environmental Compliance Plans - WPL’s Emission Controls Projects” for further discussion of the Edgewater SCR system.

Industrial Boiler and Process Heater MACT Rule - In December 2012, the EPA issued a final reconsidered Industrial Boiler and Process Heater MACT Rule with a compliance deadline of early 2016 for major sources.sources; however, an entity can request an additional year for compliance, which may be granted on a case-by-case basis by state permitting authorities. The rule is expected to apply to IPL’s Prairie Creek boilers 1, 2 and 5, and fossil-fueled auxiliary boilers and process heaters operated at other IPL and WPL fossil-fueled generating facilities. The rule requires compliance with HAPs emission limitations and work practice standards. The final rule remains subject to legal challenges in the D.C. Circuit Court. Alliant Energy, IPL and WPL are currently evaluating the final rule and plan to update their environmental compliance plans as needed. Given that this rule remains subject to legal challenges in the D.C. Circuit Court, Alliant Energy, IPL and WPL are currently unable to predict with certainty the impact of the Industrial Boiler and Process Heater MACT rule on their financial condition and results of operations, but expect that capital investments and/or modifications to their electric generating facilities to meet compliance requirements of the rule could be significant.

Ozone NAAQS Rule - InThe 2008 ozone NAAQS rule may require a reduction of NOx emissions in certain non-attainment areas based on classifications assigned by the EPA announced reductions in the primary NAAQS for eight-hour ozone to a levelEPA. There are five non-attainment classifications: marginal, moderate,

54

Table of 0.075 ppm from the previous standard of 0.08 ppm.Contents


serious, severe and extreme. In May 2012, the EPA issued a final rule that classifiesclassified Sheboygan County in Wisconsin as marginal ozone non-attainment, which requires this area to achieve the 2008 eight-hour ozone NAAQS by December 2015. WPL operates Edgewater and the Sheboygan Falls Energy Facility in Sheboygan County, Wisconsin. The final rule does not list any non-attainment areas as ozone non-attainment in Iowa or Minnesota that impact IPL. Another rule is currently expected to be issued byIn May 2013, the EPA in 2013issued a proposed rule to assist state agencies in developing SIPs. The SIPs will explain what actions and emission reductions may be required for compliance to achieve attainment. The Edgewater Unit 5 SCR system completed in the fourth quarter of 2012 is expected to assist with possible compliance obligations under anthe ozone NAAQS SIP for Wisconsin. GivenIn addition, the ozone NAAQS remains subjectEPA is expected to issue a proposed rulemaking in 2014 in response to legal challenges infor missing its five-year statutory deadline to re-evaluate the D.C. Circuit Court andlevel of the 2008 ozone NAAQS, which could make the standard more stringent. Given the Wisconsin DNR has not yet issued an eight-hour ozone non-attainment SIP, and the 2008 standard may be revised, Alliant Energy and WPL are currently unable to predict with certainty the impact of the ozone NAAQS changes for Sheboygan County, Wisconsin on their financial condition and results of operations.

Fine ParticleParticulate (PM2.5) NAAQS Rule - In December 2012, the EPA issued a final rule revising the PM2.5 NAAQS, which strengthensthat strengthened the annual standard from 15 ug/m3 to 12 ug/m3.PM2.5 NAAQS. The EPA is expected to designate non-attainment areas for the revised annual PM2.5 NAAQS by December 2014 with an effective date in early 2015. States with areas designated as non-attainment will be required to submit PM2.5 NAAQS SIPs within three years of the effective date of area designations by the EPA. The SIPs will explain what actions are needed in the non-attainment areas to achieve compliance with annual PM2.5 NAAQS. Compliance with the final rule is required five years after the effective date of the area designations by the EPA, which is expected to be required by 2020 for non-attainment areas designated by EPA in 2015.December 2014. Given that the PM2.5 NAAQS rule remains subject to legal challenges in the D.C. Circuit Court, the EPA has not yet designated non-attainment areas and the PM2.5 NAAQS SIPs have not been issued, Alliant Energy, IPL and WPL are currently unable to predict with certainty the impact of the final PM2.5 NAAQS rule on their financial condition and results of operations.

Nitrogen Dioxide (NO2)NO2 NAAQS Rule - In 2010, the EPA issued a final rule to strengthen the primary NAAQS for NOx as measured by NO2. The final rulethat establishes a new one-hour NAAQS for NO2 of 100 parts per billion (ppb) and associated ambient air monitoring requirements, while maintaining the current annual standard of 53 ppb.NO2. In February 2012, the EPA issued a final response to state recommendations and isrule that does not proposingpropose to designate any non-attainment areas in Iowa, Minnesota and Wisconsin.Wisconsin or Minnesota. The EPA is expected to re-evaluate these designations in 2016 based on expanded monitoring data. The schedule for compliance with this rule has not yet been established. Given that the EPA has not yet re-evaluated designations, Alliant Energy, IPL and WPL are currently unable to predict with certainty the impact of any potential NO2 NAAQS changes on their financial condition and results of operations.


51

Table of Contents


SO2 NAAQS Rule - In 2010, the EPA issued a final rule that establishes a new one-hour NAAQS for SO2 at a level of 75 ppb. The final rule also revokes bothSO2. In July 2013, the existing 24-hour and annual standards. The EPA plans to finalizefinalized non-attainment designations for certain areas in the U.S. currently exceeding the SO2 standard based on ambient monitoring data, including parts of Iowa and Wisconsin in June 2013.Wisconsin; however, IPL and WPL do not operate any EGUs in any areas expected to be designated as non-attainment in 2013.these areas. Compliance with the SO2 NAAQS rule is currently expected to be required by 20172018 for non-attainment areas finalized in 2013. Non-attainment designations for the remainder of Iowa and Wisconsinthe U.S. have been delayed to allow for modeling and collection of additional monitoring data. Given that this rule remains subject to legal challenges in the D.C. Circuit Court and the EPA has not yet issued final non-attainment designations for any areas where IPL or WPL operate EGUs, Alliant Energy, IPL and WPL are currently unable to predict with certainty the impact of any potential SO2 NAAQS changes on their financial condition and results of operations.

Air Permit Renewal Challenges GHG Emissions- Climate change continues to be assessed by policymakers including consideration of the appropriate actions to mitigate global warming. There is continued debate regarding the public policy response that the U.S. should adopt, involving both domestic actions and international efforts. As discussed in greater detail below, the EPA currently regulates GHG emissions under the Tailoring Rule for PSD construction permits and Title V operation permits, and President Obama has issued a memorandum directing the EPA to proceed with rules to reduce CO2 emissions from new and existing fossil-fueled EGUs. Additional proposals may be considered in the future, which could reduce GHG emissions through additional renewable energy standards and/or energy efficiency requirements.

In 2009, the EPA issued a finding that GHG emissions contribute to climate change, and therefore, threaten public health and welfare. This enabled the EPA to issue rules to report and regulate GHG emissions under the authority of the CAA. The EPA Mandatory GHG Reporting rule requires sources above certain threshold levels to monitor and report emissions. The primary GHG emitted from Alliant EnergyEnergy’s, IPL’s and WPLWPL’s utility operations is CO2 from the combustion of fossil fuels at their larger EGUs. Emissions of GHG are awarereported at the facility level in CO2e and include those facilities that emit 25,000 metric tons or more of certain public comments or petitions from citizen groups that have been submitted to the Wisconsin DNR orCO2e annually. Annual emissions reported to the EPA regarding the renewalfor electric utility and natural gas distribution operations, in terms of air operating permits at certaintotal mass of WPL’s generating facilities. CO2e, were as follows (in millions of metric tons):
 Alliant Energy IPL WPL
 2012 2011 2012 2011 2012 2011
CO2e emissions (a)25.2 26.7 10.8 12.1 14.4 14.6


55

Table of Contents


(a)CO2e emissions reported to the EPA represent all emissions from the facilities operated by IPL and WPL and do not reflect their share of co-owned facilities operated by other companies.

In some cases,2010, the EPA has responded to these commentsissued the GHG Tailoring Rule, which establishes a GHG emission threshold for major sources under the PSD construction permit and petitions with orders to the Wisconsin DNR to reconsider the air operating permits of WPL’s generating facilities. WPL has received renewed air permits for Columbia, Edgewater and Nelson Dewey from the Wisconsin DNR, which considered all public comments received as part of the renewal process. Below are recent developments regarding air permit renewal challenges for Columbia, Edgewater and Nelson Dewey.

Columbia - In 2011, the Sierra Club filed a lawsuit against the EPA in the U.S. District Court for the Western District of Wisconsin seeking to have the EPA take over the Title V air permit process for Columbia. The Sierra Club alleges the EPA must now act on the reconsideration of the permit since the Wisconsin DNR has exceeded its timeframe in which to respond to an EPA order issued in 2009. In 2011, the Wisconsin DNR proposed a revised draft operation permit for Columbia and WPL and the Sierra Club submitted comments objecting to its appropriateness. In June 2012, Alliant Energy received a notice from the EPA of its proposal for WPL to apply for a Federal Part 71 operation permit since the Wisconsin DNR has not addressed the EPA’s objections to the Title V operation permit issued by the Wisconsin DNRpermit. Legal challenges to Columbia. Alliant Energy has until March 15, 2013 to comment on the EPA’s proposal. Ifpermit authority to regulate GHG emissions under the GHG Tailoring Rule are pending review in the Supreme Court. There is no required deadline for the Supreme Court to issue a decision in this case.

In June 2013, President Obama announced plans to address climate change and issued a memorandum directing the EPA decides to requireproceed with rules to reduce CO2 emissions from new and existing fossil-fueled EGUs. In January 2014, the submittal of an operation permit, itEPA published revised proposed NSPS for GHG emissions for new fossil-fueled EGUs, which would establish CO2 emissions limits for certain new fossil-fueled EGUs. Marshalltown is expected to be impacted by these proposed standards and would be due within six monthsconstructed to achieve compliance with these standards. Also, WPL’s potential generation investment could be impacted by these standards. A date for finalizing these standards has not yet been established.

The EPA is expected to issue proposed and final NSPS for GHG emissions for existing EGUs by June 1, 2014 and June 1, 2015, respectively, which would provide guidelines that states must follow to achieve required GHG emissions reductions. SIPs that provide details of how these guidelines are to be met would be required from state agencies by June 30, 2016. Accordingly, the implications of the EPA’s notice to Alliant Energy.NSPS for GHG emissions from new and existing EGUs remains highly uncertain. Alliant Energy, and WPL believe the Title V operation permit previously issued by the Wisconsin DNR for Columbia is still valid. Alliant EnergyIPL and WPL are currently unable to predict with certainty the final outcome of this matter and the impact on their financial condition or results of operations.these standards, but expect that expenditures to comply with any regulations to reduce GHG emissions could be significant.

Edgewater - In 2010, WPL received a copy of a notice of intent to sue by the Sierra Club against the EPA based on what the Sierra Club asserts is unreasonable delay in the EPA performing its duties related to the reconsideration of the Edgewater Title V air permit. Specifically, the Sierra Club alleges that because the Wisconsin DNR has exceeded its timeframe in which to respond to an earlier EPA order, the EPA must now act on the reconsideration of the permit. In October 2012, the Wisconsin DNR made a revised proposed Title V air permit for Edgewater available for public comment. WPL and Sierra Club submitted comments on the proposed permit revision. Alliant Energy and WPL believe the previously issued air permit for Edgewater is still valid. Alliant Energy and WPL are currently unable to predict with certainty the outcome of this matter and the impact on their financial condition and results of operations.

Nelson Dewey - In September 2010, the Sierra Club petitioned the EPA and the Wisconsin DNR to reopen a Nelson Dewey air permit. The Sierra Club alleges that the Nelson Dewey air permit issued by the Wisconsin DNR in 2008 should be corrected because certain modifications were made at the facility without complying with the PSD program requirements. In 2010, WPL filed a response to the petition with the EPA and the Wisconsin DNR objecting to its claims and supporting the Wisconsin DNR’s issuance of the current permit. No action on this petition has been taken by the EPA or the Wisconsin DNR. Alliant Energy and WPL believe the previously issued air permit for Nelson Dewey is still valid. Alliant Energy and WPL are currently unable to predict with certainty the outcome of this petition and the impact on their financial condition and results of operations.

Air Permitting Violation ClaimsConsent Decree - Refer to Note 13(c)16(e) of the “Combined Notes to Consolidated Financial Statements” for discussion of a notice of violationConsent Decree approved by the Court in June 2013 and WPL’s obligations thereunder. The Consent Decree resolves an NOV issued by the EPA in 2009 and complaints filed by the Sierra Club in 2010 regarding alleged air permitting violations at Columbia, Edgewater and Nelson Dewey, Columbia and Edgewater.Dewey.

EPA Information Request - In October 2011, MidAmerican received an EPA Region VII request under Section 114 of the CAA for certain information relating to the historical operation of George Neal Units 3 and 4, and Louisa, which are coal-fueled generating units in Iowa that are jointly owned by IPL. IPL owns 28%, 25.695% and 4% of George Neal Unit 3, George Neal Unit 4 and Louisa, respectively. MidAmerican responded to this data request in December 2011. Depending upon the results of the EPA’s review of the information provided by MidAmerican, the EPA may perform any of the following: issue a notice of violation asserting that a violation of the CAA occurred; seek additional information from MidAmerican, IPL and/or third-parties who have information relating to the boilers; and/or close out the investigation.

52

Table of Contents


Alliant Energy and IPL cannot currently predict with certainty the impact of the EPA’s request and any subsequent action taken by the EPA or citizen groups on their financial condition and results of operations.

Other Air Quality Matters - IPL, the EPA, the State of Iowa and the Sierra Club are in discussions regarding CAA issues associated with IPL’s Iowa operations. Alliant Energy and IPL believe that they are in compliance with the CAA. IPL is pursuing these discussions because IPL believes there is an opportunity to reach an agreement among the parties that avoids potential litigation and the long-term planning and operational uncertainty associated with such litigation. Alliant Energy and IPL believe that any agreement could contain terms similar to those seen in other EPA CAA settlements, including, among others, the installation of emission controls, the retirement or fuel switching of EGUs, compliance with specified emission rates and emission caps, beneficial environmental mitigation projects and penalties.penalties, such as those addressed by the WPL Consent Decree. Alliant Energy and IPL are currently unable to predict with certainty the outcome of these discussions and the impact on their financial condition or results of operations.

Water Quality -
Section 316(b) of Federal Clean Water Act - The Federal Clean Water Act requires the EPA to regulate cooling water intake structures to assure that these structures reflect the “bestbest technology available”available for minimizing adverse environmental impacts to fish and other aquatic life. The second phase of this EPA rule is generally referred to as Section 316(b). Section 316(b) applies to existing cooling water intake structures at certain steam EGUs. In 2011, the EPA issued a revised proposed rule related to Section 316(b) Rule, whichof the Federal Clean Water Act. This rule applies to existing and new cooling water intake structures at certain steam EGUsgenerating and manufacturing facilities. IPL and WPL have identified nine (Ottumwa 1, Prairie Creek Units 3-4, Fox Lake Units 1 and 3, Lansing Units 3-4,Unit 4, Dubuque Units 3-4, M.L. Kapp Unit 2, Burlington Unit 1, George Neal Units 3-4 and Louisa Unit 1) and three (Columbia Units 1-2, Nelson Dewey Units 1-2 and Edgewater Units 3-5) electric generating facilities, respectively, which may be impacted by the revised Section 316(b) Rule. A final rule is currently expected to be issued by the EPA in 2013. The schedule for compliance with this rule has not yet been finalized; however,the first half of 2014, and compliance is currently expected to be required within eight years of the effective date of the final rule. Alliant Energy, IPL and WPL are currently unable to predict with certainty the impact of the EPA’s Section 316(b) rule on their financial condition and results of operations.

Wisconsin and Iowa State Thermal Rules - Section 316(a) of the Federal Clean Water Act requires the EPA to regulate thermal impacts from wastewater discharges of industrial facilities, including those from EGUs. All IPL and WPL facilities are subject to these standards upon state promulgation, which become applicable upon their incorporation into a facility’s wastewater discharge permit. States have authority to establish standards for these discharges in order to minimize adverse environmental impacts to aquatic life. In Iowa and Wisconsin, the Iowa DNR and Wisconsin DNR are required to regulate thermal impacts from wastewater discharges of industrial facilities in their respective states, including IPL and WPL facilities that discharge water into nearby rivers and streams. Compliance with the thermal rules will be evaluated on a case-by-case basis when wastewater discharge permits for IPL’s and WPL’s generating facilities are renewed. Alliant Energy, IPL and WPL continue to evaluate the thermal rule regulatory requirements and the compliance options available to meet the heat limitations for discharges from IPL’s and WPL’s EGUs. Alliant Energy, IPL and WPL are unable to predict with certainty the final requirements of these rules until wastewater discharge permits for impacted facilities are renewed. If capital investments and/or modifications are required, Alliant Energy, IPL and WPL believe these investments could be significant.

Hydroelectric Fish Passage Device - In 2002, FERC issued an order requiring WPL to developinstall a detailed engineering and biological evaluation of potential fish passages forpassage device at its Prairie du Sac hydro plant and install an agency-approved fish passage at that facility. The U.S. Fish and Wildlife Service (FWS)plant. WPL has been working with the FWS and the Wisconsin DNR have requested additional information to supporton the conceptual planfinal design for the fish passage.passage device. In March 2012, FERC approved an updated deadline to install an agency-approved fish passage device at the facility by July 1, 2015. In January 2013, the FWS initiated an environmental study of the fish passage device under the National Environmental Policy Act, which could result in changes to the design of the fish passage device. The FWS has indicated that this environmental study will be completed in 2014, during which time WPL is expected to request an extension of the project deadline from FERC. Alliant Energy and WPL currently believe the required capital investments and/or modifications to install the currently designed fish passage device at the facility willcould be approximately $15 million. Alliant Energy and WPL are currently reviewing the project, which may change their expected capital investments. In January 2013, WPL requested the FWS to delay or withdraw the fish passage requirement due to recent concerns regarding Asian carp and other invasive species. The FWS agreed to prepare an environmental impact study, which may take up to a year to complete, during which time WPL is expected to request a further extension of the project deadline. As of December 31, 2012, Alliant Energy and WPL have $5 million recorded in “Utility property, plant and equipment” on their Consolidated Balance Sheets for the fish passage device project.


5356

Table of Contents



Effluent Limitation Guidelines - In June 2013, the EPA issued proposed effluent limitation guidelines, which would require changes to discharge limits for wastewater from steam generating facilities. IPL and WPL have identified eleven (Emery Units 1-3, Ottumwa Unit 1, Prairie Creek Units 3-4, Fox Lake Units 1 and 3, Lansing Unit 4, Dubuque Units 3-4, M.L. Kapp Unit 2, Burlington Unit 1, Sutherland Units 1 and 3, George Neal Units 3-4 and Louisa Unit 1) and four (Riverside Units 1-3, Columbia Units 1-2, Nelson Dewey Units 1-2 and Edgewater Units 3-5) existing steam generating facilities, respectively, that are expected to be impacted by these guidelines. In addition, Marshalltown is expected to be impacted by these guidelines. Also, WPL’s potential generation investment could be impacted by these guidelines. Based on information in the proposed guidelines, IPL is currently unable to determine if Prairie Creek Unit 1 may be impacted by these guidelines. Compliance with these proposed guidelines would be required after July 1, 2017 but before July 1, 2022, depending on each facility’s wastewater permit cycle for existing steam generating facilities and immediately upon operation for new steam generating facilities constructed after the issuance of the final guidelines. Given that the EPA has not yet issued final guidelines, Alliant Energy, IPL and WPL are currently unable to predict with certainty the impact of these guidelines on their financial condition and results of operations, but believe the expenditures to comply with these guidelines could be significant.

Land and Solid Waste -
Coal Combustion Residuals (CCRs)- Alliant Energy, IPL and WPL are monitoring potential regulatory changes that may affect the rules for operation and maintenance of coal ash surface impoundments (ash ponds) and/or landfills, in the wake of a structural failure in the containment berm of a coal ash surface impoundment at a site operated by an unrelated, third-party utility. In 2009, IPL and WPL responded to information collection requests from the EPA for data on coal ash surface impoundments at certain of their facilities. The EPA continues to evaluate the responses and has been conducting site assessments of utilities’ coal ash surface impoundments, including certain coal ash surface impoundments operated by IPL and WPL.

In 2010, the EPA issued a proposed rule seeking comment regardingconsidering two potential regulatory options for management of CCRs: (1) regulate as a special waste under the federal hazardous waste regulations when the CCR is destined for disposal, but continue to allow beneficial use applications of CCRs as a non-hazardous material; or (2) regulate as a non-hazardous waste for all applications subject to new national standards. These proposed regulations include additional requirements with significant impact for CCR management, beneficial use applications and disposal. IPL and WPL have nine and four current or former coal generating facilities,coal-fired EGUs, respectively, with one or more existing coal ash surface impoundments at each location. In addition, IPL and WPL each have two active CCR company-owned landfills. All of these CCR disposal units would be subject to the proposed rule currently anticipated to be finalized in 2013.2014. The schedule for compliance with this rule has not yet been established. Alliant Energy, IPL and WPL are currently unable to predict with certainty the impact of these information collection requests, site inspections, or potential regulations for the management of CCRs, but expect that capital investments, operating expenditures and/or modifications to comply with CCR rules could be significant.

Closed Ash Landfill Sites - In 2004, IPL received communication from the Iowa DNR regarding an evaluation of groundwater monitoring results for four of its closed ash landfills and a request to further evaluate potential offsite groundwater impacts at two of its closed landfills. IPL has implemented a monitoring plan to evaluate the potential offsite groundwater impacts at the two closed landfills with the installation of additional groundwater monitoring wells and corresponding groundwater sampling and analysis. In July 2012, IPL received a response from the Iowa DNR stating IPL should continue monitoring these two closed landfills per the current monitoring plan. Alliant Energy and IPL are currently unable to predict with certainty the outcome of this matter and the impact on their financial condition and results of operations.

Polychlorinated Biphenyls (PCB) - In 2010, the EPA published an Advance Notice of Proposed Rulemaking to support a re-evaluation of all existing use authorizations for PCB-containing equipment. Based on the EPA’s review of the information obtained in response to this notice, significant changes in PCB regulations may be proposed, including a possible mandated phase out of all PCB-containing equipment. The EPA plans to issue a proposed PCB rule amendment for public comment by 2014. The schedule for compliance with this rule has not yet been established. Pending the development of a final rule, Alliant Energy, IPL and WPL are currently unable to predict with certainty the outcome of this possible regulatory change, but believe that the required capital investment and/or modifications resulting from these potential regulations could be significant.

Manufactured Gas Plant (MGP)MGP Sites - Refer to Note 13(e)16(e) of the “Combined Notes to Consolidated Financial Statements” for discussion of IPL’s and WPL’s MGP sites.

GHG Emissions- Climate change continues to be assessed by policymakers including consideration of the appropriate actions to mitigate global warming. There is continued debate regarding the public policy response that the U.S. should adopt, involving both domestic actions and international efforts. As discussed in greater detail below, the EPA is responding to a court ruling that requires issuance of federal rules to reduce GHG emissions under the existing CAA. Associated regulations to implement these federal GHG rules are also underway in Iowa, Wisconsin and Minnesota. Given the highly uncertain outcome and timing of future regulations regarding the control of GHG emissions, Alliant Energy, IPL and WPL currently cannot predict with certainty the financial impact of any future climate change regulations on their operations but believe the expenditures to comply with any new emissions regulations could be significant.

EPA Endangerment and Cause or Contribute Findings - In 2009, the EPA issued a final Endangerment and Cause or Contribute Findings for GHG under the CAA with an effective date of January 2010. This final action includes two distinct findings regarding GHG emissions under the CAA. First, the current and projected concentrations of GHG emissions in the atmosphere threaten the public health and welfare of current and future generations. This is referred to as the endangerment finding and includes the six key GHG emissions identified in the EPA’s mandatory GHG reporting rule. Second, the combined emissions of CO2, methane (CH4), nitrous oxide (N2O), and hydrofluorocarbons (HFCs) from new motor vehicles and motor vehicle engines contribute to the atmospheric concentrations of these key GHG emissions and hence to the threat

54

Table of Contents


of climate change. This is referred to as the cause or contribute finding. In 2010, the EPA, under authority from the GHG Endangerment and Cause or Contribute Findings, also issued a final rule that regulates GHG emissions from motor vehicles as a pollutant under the CAA. These findings by the EPA enable it to regulate GHG stationary sources, including electric utility operations and natural gas distribution operations. In December 2012, the D.C. Circuit Court denied a request by petitioners for rehearing of the decision that upheld the EPA’s ability to regulate GHG. As a result, the EPA’s GHG regulations remain effective as well as the EPA’s ability to issue additional requirements to reduce GHG emissions. Petitioners may seek the Supreme Court’s review of this decision.

EPA NSPS for GHG Emissions from Electric Utilities - The EPA has announced that it will issue GHG standards for electric utilities as NSPS for new and existing fossil-fueled EGUs. The EPA entered a settlement agreement that required the issuance of proposed regulations for new and existing power plants by July 2011 and final regulations no later than May 2012. As discussed below, the EPA did not meet these deadlines and final regulations are pending.

New EGUsOther - In April 2012, the EPA published proposed NSPS for GHG, including CO2 emissions from new fossil-fueled EGUs larger than 25 MW (not including simple-cycle combustion turbines), with an output-based emissions rate limitation of 1,000 pounds of CO2 per MWh. This emissions rate limitation is expected to be effective upon the EPA’s issuance of the final rule in the second quarter of 2013. The proposed NSPS for new EGUs is expected to apply to IPL’s proposed construction of an approximate 600 MW natural gas-fired combined-cycle electric generating facility in Marshalltown, Iowa, which will be designed to achieve compliance with the proposed CO2 emissions rate limitation.

Existing EGUs - The EPA’s issuance of proposed regulations for existing EGUs remains delayed but is anticipated by the end of 2013. For existing EGUs, the NSPS issued by the EPA is expected to include emission guidelines that states must use to develop plans for reducing EGU GHG emissions. The guidelines will be established based on demonstrated controls, GHG emission reductions, costs and expected timeframes for installation and compliance. Accordingly, the implications of the EPA’s NSPS rule for GHG emissions from existing EGUs are highly uncertain, including the nature of required emission controls and compliance schedule for mandating reductions of GHGs. Alliant Energy, IPL and WPL are currently unable to predict with certainty the final outcome of this proposed standard, but expect that expenditures to comply with any regulations to reduce GHG emissions could be significant.

EPA Mandatory GHG Reporting Rule - In 2009, the final EPA Mandatory GHG Reporting rule became effective. The final rule does not require control of GHG emissions, rather it requires that sources above certain threshold levels monitor and report emissions. The EPA anticipates that the data collected by this rule will improve the U.S. government’s ability to formulate a set of climate change policy options. The GHG emissions covered by the final EPA reporting rule include CO2, CH4, N2O, sulfur hexafluoride, HFCs, perfluorocarbons and other fluorinated gases. The primary GHG emitted from Alliant Energy’s, IPL’s and WPL’s utility operations is CO2 from the combustion of fossil fuels at their larger EGUs. Emissions of GHG are reported at the facility level in carbon dioxide-equivalent (CO2e) and include those facilities that emit 25,000 metric tons or more of CO2e annually. Alliant Energy, IPL and WPL continue to maintain and update their emissions monitoring methodologies and data collection procedures to capture all the GHG emissions data required for ongoing compliance with the EPA’s mandatory GHG reporting rule. This rule is subject to a legal challenge that is pending in the D.C. Circuit Court. Annual 2011 emissions, in terms of total mass of CO2e, as reported to the EPA for electric utility and natural gas distribution operations, were as follows (in millions):
 Alliant Energy IPL WPL
 Tons Metric Tons Tons Metric Tons Tons Metric Tons
CO2e emissions (a)29.4 26.7 13.3 12.1 16.1 14.6

(a)CO2e emissions reported to the EPA represent all emissions from the facilities operated by IPL and WPL and do not reflect their share of co-owned facilities operated by other companies.

Refer to Note 13(e)16(e) of the “Combined Notes to Consolidated Financial Statements,” Item 1 Business, “Strategic Overview” and “Liquidity and Capital Resources - Cash Flows - Investing Activities - Construction and Acquisition Expenditures” for further discussion of environmental matters.matters, including discussion of specific projects and the associated estimated capital expenditures.

LEGISLATIVE MATTERS

Overview - Alliant Energy, IPL and WPL monitor various legislative developments, including those relating to energy, tax, financial and other matters. Recent keyKey legislative developments impacting Alliant Energy, IPL and WPL include the following:


55

Table of Contents


American Taxpayer ReliefATR Act of 2012 (the ATR Act) - In January 2013, the ATR Act was enacted. The most significant provision of the ATR Act for Alliant Energy, IPL and WPL relates to the extension of bonus depreciation deductions for certain expenditures for property that are incurred through December 31, 2013. Based on capital projects placed into service in 2013 and projected to be placed into service in 2013 and 2014, Alliant Energy currently estimates its total bonus depreciation deductions to be claimed on its 2013 and 2014 U.S. federal income tax returns for calendar years 2013 and 2014 will be approximately $140$130 million ($70 million for IPL and $70$45 million for WPL) and $290$250 million ($140100 million for IPL and $150 million for WPL), respectively.


57

Table of Contents


ALLIANT ENERGY’S RESULTS OF OPERATIONS

Overview - “Executive Summary” provides an overview of Alliant Energy’s 2012, 20112013 and 20102012 earnings and the various components of Alliant Energy’s business. Additional details of Alliant Energy’s 20122013, 20112012 and 20102011 earnings are discussed below.

Utility Electric Margins - Electric margins are defined as electric operating revenues less electric production fuel, energy purchases and purchased electric capacity expenses. Management believes that electric margins provide a more meaningful basis for evaluating utility operations than electric operating revenues since electric production fuel, energy purchases and purchased electric capacity expenses are generally passed through to customers, and therefore, result in changes to electric operating revenues that are comparable to changes in electric production fuel, energy purchases and purchased electric capacity expenses. Electric margins and MWh sales for Alliant Energy were as follows:
Revenues and Costs (dollars in millions) MWhs Sold (MWhs in thousands)Revenues and Costs (dollars in millions) MWhs Sold (MWhs in thousands)
2012 2011 (a) 2010 (b) 2012 2011 (a) 2010 (b)2013 2012 (a) 2011 (b) 2013 2012 (a) 2011 (b)
Residential
$975.9
 
$985.8
 (1%) 
$1,001.5
 (2%) 7,679
 7,740
 (1%) 7,836
 (1%)
$1,009.1
 
$975.9
 3% 
$985.8
 (1%) 7,824
 7,679
 2% 7,740
 (1%)
Commercial611.4
 612.1
 —% 619.0
 (1%) 6,352
 6,253
 2% 6,219
 1%649.4
 611.4
 6% 612.1
 —% 6,432
 6,352
 1% 6,253
 2%
Industrial741.8
 748.9
 (1%) 762.8
 (2%) 11,555
 11,504
 —% 11,213
 3%765.4
 741.8
 3% 748.9
 (1%) 11,471
 11,555
 (1%) 11,504
 —%
Retail subtotal2,329.1
 2,346.8
 (1%) 2,383.3
 (2%) 25,586
 25,497
 —% 25,268
 1%2,423.9
 2,329.1
 4% 2,346.8
 (1%) 25,727
 25,586
 1% 25,497
 —%
Sales for resale:                        
Wholesale187.6
 189.8
 (1%) 196.8
 (4%) 3,317
 3,372
 (2%) 3,325
 1%195.4
 187.6
 4% 189.8
 (1%) 3,564
 3,317
 7% 3,372
 (2%)
Bulk power and other23.8
 52.2
 (54%) 44.1
 18% 1,303
 1,757
 (26%) 1,378
 28%17.7
 23.8
 (26%) 52.2
 (54%) 763
 1,303
 (41%) 1,757
 (26%)
Other48.8
 47.0
 4% 50.0
 (6%) 151
 151
 —% 153
 (1%)52.0
 48.8
 7% 47.0
 4% 152
 151
 1% 151
 —%
Total revenues/sales2,589.3
 2,635.8
 (2%) 2,674.2
 (1%) 30,357
 30,777
 (1%) 30,124
 2%2,689.0
 2,589.3
 4% 2,635.8
 (2%) 30,206
 30,357
 —% 30,777
 (1%)
Electric production fuel expense367.2
 428.3
 (14%) 387.9
 10%       431.0
 367.2
 17%��428.3
 (14%)       
Energy purchases expense345.1
 336.2
 3% 431.3
 (22%)       294.0
 345.1
 (15%) 336.2
 3%       
Purchased electric capacity expense271.5
 257.2
 6% 279.7
 (8%)       216.8
 271.5
 (20%) 257.2
 6%       
Margins(c)
$1,605.5
 
$1,614.1
 (1%) 
$1,575.3
 2%       
$1,747.2
 
$1,605.5
 9% 
$1,614.1
 (1%)       

(a)
Reflects the % change from 20112012 to 20122013. (b) Reflects the % change from 20102011 to 20112012.
(c)
Includes $79 million, $83 million and $61 million of credits on Iowa retail electric customers’ bills for 2013, 2012 and 2011, respectively, resulting from IPL’s electric tax benefit rider. IPL’s electric tax benefit rider resulted in reductions in electric revenues that were offset by reductions in income tax expense for 2013, 2012 and 2011.

2013 vs. 2012 Summary - Electric margins increased $142 million, or 9%, primarily due to $60 million of higher revenues at IPL related to increases in recovery of transmission costs related to the transmission rider, $59 million of purchased electric capacity expenses at WPL during 2012 related to the Riverside PPA, $24 million of revenues at IPL in 2013 due to the revenue requirement adjustment related to certain tax benefits from tax accounting method changes, $4 million of increased revenues due to lower credits on Iowa retail electric customers’ bills resulting from the electric tax benefit rider during 2013 compared to 2012 and an increase in weather-normalized retail sales volumes at WPL. These items were partially offset by an estimated $11 million decrease in electric margins from changes in sales caused by weather conditions in Alliant Energy’s service territories and $4 million of lower energy conservation revenues at IPL. The higher transmission rider revenues at IPL were offset by higher electric transmission service expenses at IPL. Changes in energy conservation revenues at IPL were mostly offset by changes in energy conservation expenses at IPL included in other operation and maintenance expenses.

2012 vs. 2011 Summary - Electric margins decreased $9 million, or 1%, primarily due to $22 million of decreased revenues due to higher credits on Iowa retail electric customers’ bills resulting from the electric tax benefit rider during 2012 compared to 2011. Other decreases to electric margins included $8 million of higher purchased electric capacity expenses at WPL related to the Kewaunee PPA, $6 million of higher purchased electric capacity expenses at IPL related to the DAEC PPA, $5 million of revenues recognized in 2011 related to interim fuel rates collected in 2010 at WPL and lower weather-normalized sales volumes at WPL. The electric tax benefit rider resulted in $83 million and $61 million of credits on Iowa retail electric customers’ bills during 2012 and 2011, respectively. IPL’s electric tax benefit rider resulted in reductions in electric revenues that were offset by reductions in income tax expense for the years ended December 31, 2012 and 2011. These items were partially offset by $16 million of higher revenues at IPL from changesrelated to increases in recovery of transmission costs related to the transmission rider implemented in 2011, a $10 million increase in electric margins from changes in the recovery of electric production fuel and energy purchases expenses at WPL, an estimated $7 million increase in electric margins from changes in sales caused by weather conditions in Alliant Energy’s service territories, $2

58

Table of Contents


$2 million of SO2 emission allowance charges at IPL in 2011 and an increase in weather-normalized sales volumes at IPL. The higher transmission rider revenues at IPL were offset by higher electric transmission service expenses. Estimated increases to Alliant Energy’s electric margins from the impacts of weather during 2012 and 2011 were $36 million and $29 million, respectively.expenses at IPL.

2011 vs. 2010 SummaryForecast - Electric margins increased $39In December 2013, the IUB authorized IPL to reduce the billing credits on customers’ bills by $15 million or 2%, primarily duein 2014 to recognize the revenue requirement impact of base retail rate increases (excluding fuel cost recoveries and transmission rider) at IPL and WPL, which increased electric revenues by $71

56

Table of Contents


million in 2011. Other increases to electric margins included $21 million of lower purchased electric capacity expenses at WPL related to the Kewaunee PPA, higher revenues at IPL related to changes in recovery of transmission costs due to the implementation of the transmission rider in 2011, an estimated $4 million increase in electric margins from changes in sales caused by weather conditionstax accounting methods in Alliant Energy’s service territories and a 3% increase in industrial sales volumes. Estimated increases to Alliant Energy’s electric margins from the impacts of weather in 2011 and 2010 were $29 million and $25 million, respectively. These items were partially offset by credits on Iowa retail electric customers’ bills in 2011 resulting from the implementation of the tax benefit rider, which decreased IPL’s electric revenues by $61 million in 2011, the impact of a wholesale formula rate change, which increased WPL’s electric revenues by $4 million in 2010, $4 million of lower energy conservation revenues at IPL, $3 million of higher purchased power electric capacity expenses at IPL related to the DAEC PPA, $2 million of SO2 emission allowance charges in 2011 and a decrease in weather-normalized residential sales volumes. Changes in energy conservation revenues are largely offset by changes in energy conservation expenses included in other operation and maintenance expenses.

Base Retail Rate Increases - Increases to Alliant Energy’s electric revenues from the impacts of base retail rate increases (excluding fuel cost recoveries and transmission rider, and net of any reserves for rate refunds) were as follows (dollars in millions):
2011 vs. 2010
Retail Base Rate CasesEffective DateRevenue Increases
WPL’s Wisconsin 2011 Test YearJanuary 1, 2011
$38
IPL’s Iowa 2009 Test YearMarch 20, 201026
IPL’s Minnesota 2009 Test YearJuly 6, 20107

$71

There were no material changes in base retail rates from 2011 to 2012.revenues. Refer to “Rate Matters” for additional information relating to these retail electric rate increases, a retail electric base rate freeze at WPL through December 31, 2014 and a retail electric base rate freeze at IPL through December 31, 2013.discussion.

Weather Conditions - Alliant Energy’s electric sales demand is seasonal to some extent with the annual peak normally occurring in the summer months due to air conditioning usage by its residential, commercial and wholesale customers. Cooling degree days (CDD)CDD data is used to measure the variability of temperatures during summer months and is correlated with electric sales demand. Heating degree days (HDD)HDD data is used to measure the variability of temperatures during winter months and is correlated with both electric and gas sales demand. Refer to “Utility Gas Margins - Weather Conditions” for details regarding HDD in Alliant Energy’s service territories. CDD in Alliant Energy’s service territories were as follows:
Actual  Actual  
CDD (a):2012 2011 2010 Normal (a)2013 2012 2011 Normal (a)
Cedar Rapids, Iowa (IPL)1,052
 887
 923
 740
884
 1,052
 887
 740
Madison, Wisconsin (WPL)1,070
 814
 829
 625
709
 1,070
 814
 625

(a)CDD are calculated using a simple average of the high and low temperatures each day compared to a 65 degree base. Normal degree days are calculated using a rolling 20-year average of historical CDD.

Estimated increases to electric margins from the impacts of weather were as follows (in millions):
 2013 2012 2011
IPL
$16
 
$15
 
$16
WPL9
 21
 13
Total Alliant Energy
$25
 
$36
 
$29

Electric Production Fuel and Energy Purchases (Fuel-related) Cost Recoveries - Alliant Energy burns coal and other fossil fuels to produce electricity at its generating facilities.EGUs. The cost of fossil fuels used during each period is included in electric production fuel expense. Alliant Energy also purchases electricity to meet the demand of its customers and charges these costs to energy purchases expense. The impact on electric margins of changes in electricity volumes generated from Alliant Energy’s generating facilities was largely offset by the impact of the changes in energy volumes purchased and changes in bulk power sales volumes discussed below.

2013 vs. 2012 Summary - Alliant Energy’s electric production fuel expense increased $64 million, or 17%, and energy purchases expense decreased $51 million, or 15%, in 2013. Higher MISO dispatch of WPL’s generation facilities during 2013 compared to 2012 resulted in an increase in electric production fuel expense and a decrease in energy purchases expense for Alliant Energy and WPL. These changes were partially due to the Riverside PPA being terminated in conjunction with WPL’s acquisition of Riverside in December 2012. Partially offsetting the decrease in energy purchases expense for Alliant Energy was an increase in energy purchases expense at IPL primarily due to higher prices for electricity purchased from wholesale energy markets (primarily MISO) in 2013.

2012 vs. 2011 Summary - Alliant Energy’s electric production fuel expense decreased $61 million, or 14%, and energy purchases expense increased $40$9 million, or 10%3%, in 2012 and 2011, respectively.. The 2012 decrease in electric production fuel expense was largely due to lower MISO dispatch of Alliant Energy’s generating facilities.EGUs. Alliant Energy’s generating facilitiesEGUs were dispatched at a lower level during 2012 because electricity could be purchased in the MISO market at prices that were lower than the cost to generate electricity at certain of Alliant Energy’s generating facilities.EGUs. The 2011 increase was primarily due to higher coal volumes burned at its generating facilities resulting from increased generation needed to serve the higher electricity demand in 2011 and higher delivered coal prices. Alliant Energy’s energy purchases expense increased $9 million, or 3%, and decreased $95 million, or 22%, in 2012 and 2011, respectively. The 2012 increase was largely due to increased electricity purchases in the MISO market. The 2011 decrease was primarily due to lower energy prices. The impact of the changes in energy volumes purchased were largely offset by the impact of changes in electricity volumes generated from Alliant Energy’s generating facilities and changes in bulk power sales volumes discussed below.


57

Table of Contents


Due to IPL’s rate recovery mechanisms for fuel-related costs, changes in fuel-related costs resulted in comparable changes in electric revenues, and therefore, did not have a significant impact on IPL’s electric margins. WPL’s rate recovery mechanism for wholesale fuel-related costs also provides for adjustments to its wholesale electric rates for changes in commodity costs, thereby mitigating impacts of changes to commodity costs on its electric margins.


59

Table of Contents


WPL’s retail fuel-related costs incurred in 2013 and 2012 were lower than the forecasted fuel-related costs used to set retail rates during such periods. WPL estimates the lower than forecasted retail fuel-related costs increased electric margins by approximately $4 million and $6 million in 2013 and 2012, respectively. WPL’s retail fuel-related costs incurred in 2011 were higher than the forecasted fuel-related costs used to set retail rates during such period. WPL estimates the lower than forecasted retail fuel-related costs increased electric margins by approximately $6 million in 2012. WPL’s retail fuel-related costs incurred in 2011 and 2010 were higher than the forecasted fuel-related costs used to set retail rates during such periods. WPL estimates the higher than forecasted retail fuel-related costs decreased electric margins by approximately $4 million and $3 million in 2011 and 2010, respectively.2011.

Refer to “Other Matters - Market Risk Sensitive Instruments and Positions” for discussion of risks associated with increased electric production fuel and energy purchases expenses on WPL’s electric margins. Refer to “Rate Matters” and Note 1(h)1(g) of the “Combined Notes to Consolidated Financial Statements” for additional information relating to recovery mechanisms for electric production fuel and energy purchases expenses.

Purchased Electric Capacity ExpenseExpenses - Alliant Energy enters into PPAs to help meet the electricity demand of IPL’s and WPL’s customers. Certain of these PPAs include minimum payments for IPL’s and WPL’s rights to electric generating capacity. The Riverside PPA terminated in conjunction with WPL’s acquisition of Riverside in December 2012. Details of purchased electric capacity expense included in the utility electric margins table above were as follows (in millions):
2012 2011 20102013 2012 2011
DAEC PPA (IPL)
$152
 
$146
 
$143

$154
 
$152
 
$146
Kewaunee PPA (WPL)61
 59
 51
Riverside PPA (WPL)59
 59
 58

 59
 59
Kewaunee PPA (WPL)59
 51
 72
Other2
 1
 7
2
 2
 1

$272
 
$257
 
$280

$217
 
$272
 
$257

At ForecastDecember 31, 2012, the future estimated purchased - Purchased electric capacity expense relatedexpenses are expected to decrease significantly in 2014 compared to 2013 due to the expiration of the existing DAEC (expiresPPA in February 2014)2014 and the expiration of the Kewaunee (expiresPPA in December 2013) PPAs were as follows (in millions):
 2013 2014 Total
DAEC PPA (IPL)
$154
 
$28
 
$182
Kewaunee PPA (WPL)62
 
 62
 
$216
 
$28
 
$244

WPL had a2013. Purchased electric capacity expenses from the existing DAEC PPA with a subsidiary of Calpine Corporation relatedare estimated to Riverside. In December 2012, WPL purchased Riverside and terminated the PPA.be $25 million in 2014. The new DAEC PPA effective February 2014 does not contain minimum payments for electric generating capacity.

Sales Trends - Retail sales volumes increased 1% in 2013 and were relatively flat in 2012. The 2013 increase was due to increases in weather-normalized retail sales volumes primarily at WPL related to economic recovery and modest customer growth experienced in WPL’s service territory. These increases were partially offset by the unseasonably warm weather conditions during the third quarter of 2012 and a decrease in industrial sales volumes at IPL in 2013 due to lower co-generation customer requirements.

Wholesale sales volumes increased 1%7% and decreased 2% in 2011. The 2011 increase was2013 and 2012, respectively, primarily due to higher usage per customer caused by weather conditions in Alliant Energy’s service territories and higher sales to industrial customers driven by increased production requirements. These items were largely offset by a decrease in weather-normalized residential sales volumes. Alliant Energy believes the decrease in weather-normalized residential sales volumes in 2011 was largely due to energy efficiency improvements implemented by customers and changes in customer’s usage patterns driven by economic challenges.

Wholesale sales volumes decreased 2% and increased 1% in 2012 and 2011, respectively, primarily due toimpact of changes in sales to WPL’s partial-requirement wholesale customers that have contractual options to be served by WPL, other power supply sources or the MISO market. The 2011 increase was also impacted by changes in weather conditions.

Bulk power and other revenue changes were largely due to changes in sales in the wholesale energy markets operated by MISO and PJM Interconnection, LLC.PJM. These changes are impacted by several factors including the availability of Alliant Energy’s generating facilitiesEGUs and electricity demand within these wholesale energy markets. Changes in bulk power and other sales revenues were largely offset by changes in fuel-related costs, and therefore, did not have a significant impact on electric margins.

Alliant Energy,Forecast - IPL and WPL are currently expecting relatively flatexpects a 1%-2% increase in weather-normalized retail electric sales in 20132014 compared to 2012. This is driven largely by low customer growth and modest economic growth. Alliant Energy and IPL are2013. WPL currently

58



expecting a decrease in credits on Iowa expects weather-normalized retail electric customers’ bills resulting from the electric tax benefit rider during 2013sales to be relatively flat in 2014 compared to 2012.2013.

Refer to “Rate Matters” for discussion of potential future retail electric base rate case filings by IPL and WPL in 2014. Refer to Note 2 of the “Combined Notes to Consolidated Financial Statements” for discussion of IPL’s electric tax benefit rider, and IPLrevenue requirement adjustment, which became effective in January 2013, and WPL retail rate cases, including a retail electric base rate freeze at WPL through December 31,the end of 2014 and aWPL’s retail electric basefuel-related rate freeze at IPL through December 31, 2013.increase effective January 1, 2014. Refer to “Other Future Considerations” for discussion of increased recoveries under the transmission riderlitigation related to expected increasesa renewable power developer seeking to distribute energy in IPL’s service territory, which may impact IPL’s future electric transmission service expenses.sales.


60

Table of Contents


Utility Gas Margins - Gas margins are defined as gas operating revenues less cost of gas sold. Management believes that gas margins provide a more meaningful basis for evaluating utility operations than gas operating revenues since cost of gas sold is generally passed through to customers, and therefore, results in changes to gas operating revenues that are comparable to changes in cost of gas sold. Gas margins and dekatherm (Dth)Dth sales for Alliant Energy were as follows:
Revenues and Costs (dollars in millions) Dths Sold (Dths in thousands)Revenues and Costs (dollars in millions) Dths Sold (Dths in thousands)
2012 2011 (a) 2010 (b) 2012 2011 (a) 2010 (b)2013 2012 (a) 2011 (b) 2013 2012 (a) 2011 (b)
Residential
$224.3
 
$269.7
 (17%) 
$273.7
 (1%) 23,071
 26,891
 (14%) 27,128
 (1%)
$262.5
 
$224.3
 17% 
$269.7
 (17%) 29,916
 23,071
 30% 26,891
 (14%)
Commercial124.3
 155.1
 (20%) 154.2
 1% 17,115
 19,271
 (11%) 18,691
 3%150.3
 124.3
 21% 155.1
 (20%) 21,892
 17,115
 28% 19,271
 (11%)
Industrial16.7
 24.5
 (32%) 27.3
 (10%) 3,068
 3,848
 (20%) 4,158
 (7%)21.1
 16.7
 26% 24.5
 (32%) 3,803
 3,068
 24% 3,848
 (20%)
Retail subtotal365.3
 449.3
 (19%) 455.2
 (1%) 43,254
 50,010
 (14%) 49,977
 —%433.9
 365.3
 19% 449.3
 (19%) 55,611
 43,254
 29% 50,010
 (14%)
Transportation/other31.0
 27.4
 13% 25.4
 8% 57,532
 52,210
 10% 50,408
 4%30.9
 31.0
 —% 27.4
 13% 60,261
 57,532
 5% 52,210
 10%
Total revenues/sales396.3
 476.7
 (17%) 480.6
 (1%) 100,786
 102,220
 (1%) 100,385
 2%464.8
 396.3
 17% 476.7
 (17%) 115,872
 100,786
 15% 102,220
 (1%)
Cost of gas sold217.2
 295.2
 (26%) 304.0
 (3%)       276.7
 217.2
 27% 295.2
 (26%)       
Margins(c)
$179.1
 
$181.5
 (1%) 
$176.6
 3%       
$188.1
 
$179.1
 5% 
$181.5
 (1%)       

(a)
Reflects the % change from 20112012 to 20122013. (b) Reflects the % change from 20102011 to 20112012.
(c)
Includes $11 million of credits on Iowa retail gas customers’ bills for 2013 resulting from IPL’s gas tax benefit rider. IPL’s gas tax benefit rider resulted in reductions in gas revenues that were offset by reductions in income tax expense for 2013.

2013 vs. 2012 Summary - Gas margins increased $9 million, or 5%, primarily due to an estimated $19 million increase in gas margins from changes in sales caused by weather conditions in Alliant Energy’s service territories, $6 million of higher revenues due to the impact of IPL’s retail gas base rate increase effective in January 2013, $5 million of higher energy conservation revenues at IPL and an increase in weather-normalized retail sales volumes primarily at WPL. Alliant Energy believes the increase in weather-normalized sales volumes is partially due to relatively low natural gas rates and higher gas volumes required by agricultural customers to dry grain in 2013. These items were partially offset by $15 million of lower revenues due to the impact of WPL’s retail gas base rate decrease effective in January 2013 and $11 million of decreased revenues during 2013 due to credits on Iowa retail gas customers’ bills resulting from the gas tax benefit rider at IPL. Changes in energy conservation revenues at IPL were mostly offset by changes in energy conservation expenses at IPL included in other operation and maintenance expenses.

2012 vs. 2011 Summary - Gas margins decreased $2 million, or 1%, in 2012 largely due to an estimated $13 million decrease in gas margins from changes in sales caused by weather conditions in Alliant Energy’s service territories. Estimated increases (decreases) to Alliant Energy’s gas margins from the impacts of weather during 2012 and 2011 were ($13) million and $0, respectively. This item was partially offset by an increase in weather-normalized sales volumes at WPL and $5 million of higher gas revenues due to the impact of an interim retail gas base rate increase effective in June 2012 at IPL. Alliant Energy believes the increase in weather-normalized sales volumes is partially due to relatively low natural gas prices.

2011 vs. 2010 Summary - Gas margins increased $5 million, or 3%, in 2011 primarily due to $4 million of higher energy conservation revenues at IPL. Changes in energy conservation revenues are largely offset by changes in energy conservation expenses in 2011.rates.

Natural Gas Cost Recoveries - In 20122013 and 20112012, Alliant Energy’s cost of gas sold increased $60 million, or 27%, and decreased $78 million, or 26%, respectively. The 2013 increase was primarily due to higher retail gas volumes caused by weather discussed below and $9 million, or 3%, respectively.higher gas volumes required by agricultural customers to dry grain in 2013. The 2012 and 2011 decreases weredecrease was primarily due to a decrease in natural gas prices. The 2012 decrease was also due toprices and lower retail gas volumes caused by weather discussed below. Due to Alliant Energy’s rate recovery mechanisms for natural gas costs, these changes in cost of gas sold resulted in comparable changes in gas revenues, and therefore, did not have a significant impact on gas margins. Refer to Note 1(h)1(g) of the “Combined Notes to Consolidated Financial Statements” for additional information relating to natural gas cost recoveries.

Weather Conditions - Alliant Energy’s gas sales demand follows a seasonal pattern with an annual base load of gas and a large heating peak occurring during the winter season. HDD data is used to measure the variability of temperatures during winter months and is correlated with gas sales demand. HDD in Alliant Energy’s service territories were as follows:
Actual  Actual  
HDD (a):2012 2011 2010 Normal (a)2013 2012 2011 Normal (a)
Cedar Rapids, Iowa (IPL)5,901
 6,745
 6,868
 6,794
7,232
 5,901
 6,745
 6,794
Madison, Wisconsin (WPL)5,964
 6,992
 6,798
 7,089
7,627
 5,964
 6,992
 7,089

(a)HDD are calculated using a simple average of the high and low temperatures each day compared to a 65 degree base. Normal degree days are calculated using a rolling 20-year average of historical HDD.


5961

Table of Contents


Estimated increases (decreases) to gas margins from the impacts of weather were as follows (in millions):
 2013 2012 2011
IPL
$3
 
($6) 
$—
WPL3
 (7) 
Total Alliant Energy
$6
 
($13) 
$—

Refer to “Rate Matters” for discussion of IPL’s gas tax benefit rider and retail rate cases, including an interim retail gas base rate increase effective June 4, 2012 and final retail gas base rate increase effective January 10, 2013 for IPL’s Iowa customers, a retail gas base rate decrease for WPL’s customers effective January 1, 2013 and IPL’sa potential future retail gas tax benefit rider.base rate case filing by WPL in 2014.

Non-regulatedUtility Other Revenues -
20122013 vs. 20112012 Summary - Alliant Energy’s non-regulatedOther revenues for the utilities increased $5$15 million in 20122013 primarily due to increased Transportation$7 million of higher coal sales at WPL and $6 million of capacity revenues resulting from increased demandrecognized by WPL during 2013. WPL recognized capacity revenues in 2013 related to a PPA with a third party for freight services providedthe sale of a portion of Riverside’s capacity assumed by Alliant Energy’s short-line railway companyWPL with the acquisition of Riverside in December 2012. The PPA expires in May 2014. Changes in utility other revenues were largely offset by related changes in utility other operation and increased demand for barge terminal and hauling services.maintenance expenses.

Electric Transmission Service Expenses -
2013 vs. 2012 Summary - Alliant Energy’s electric transmission service expense for the utilities increased $77 million in 2013 primarily due to $41 million of higher electric transmission service costs from ITC and MISO billed to IPL during 2013 compared to 2012 primarily due to an increase in transmission service rates, $22 million of changes in the under-/over-collection of electric transmission service expenses through the transmission cost rider at IPL and $11 million of higher electric transmission service costs from ATC and MISO billed to WPL during 2013 compared to 2012 primarily due to increases in transmission service rates. IPL is currently recovering the Iowa retail portion of its increased electric transmission service costs from its retail electric customers in Iowa through a transmission cost rider approved by the IUB in January 2011 resulting in an offsetting increase in electric revenues.

2012 vs. 2011 Summary - Alliant Energy’s electric transmission service expense for the utilities increased $18 million in 2012 primarily due to changes in transmission costs at IPL related to transmission services from ITC. The increase was primarily due to $10 million of higher electric transmission service costs billed by ITC to IPL during 2012 compared to 2011 due to a modest increase in transmission service rates, and the impact of IPL utilizing regulatory liabilities to credit a portion of the electric transmission service expensescosts billed to IPL by ITC during 2011. IPL is currently recovering the Iowa retail portion of these increased electric transmission service costs from its retail electric customers in Iowa through a pilot transmission cost rider approved by the IUB in January 2011 resulting in an offsetting increase in electric revenues.

2011 vs. 2010 Summary -Forecast Alliant Energy’s- Refer to “Other Future Considerations” for discussion of potential increases in future electric transmission service expenseservices expenses for the utilities increased $44 million in 2011 primarily due to higher transmission costs at IPL related to transmission services from ITC. The electric transmission service costs billed by ITC to IPL were $11 million higher in 2011 than those billed by ITC to IPL in 2010. In addition, deferrals and regulatory liability offsets approved by the IUB to reduce transmission service expenses were lower in 2011 compared to 2010 resulting in higher transmission service expense at IPL in 2011. In 2010, IPL deferred $41 million of electric transmission expenses related to the Iowa retail portion of 2008 under-recovered costs billed to IPL by ITC. IPL also utilized $4 million of regulatory liabilities to offset a portion of the Iowa retail electric transmission service expenses incurred in 2010. IPL utilized $19 million of regulatory liabilities to offset transmission service expenses related to the Iowa retail portion of 2009 under-recovered costs billed to IPL by ITC in 2011. The combined impact of the higher electric transmission service costs billed by ITC to IPL and these deferrals and regulatory liability offsets resulted in an increase in IPL’s electric transmission service costs of $37 million in 2011.WPL.

Refer to “Rate Matters” for additional discussion of the transmission rider approved by the IUB in January 2011. Refer to Other Future Considerations” for discussion of potential changes in future electric transmission services expenses for IPL and WPL. Refer to Notes 1(b)1(g) and 1(h)2 of the “Combined Notes to Consolidated Financial Statements” for additional information relating to recovery of electric transmission service expenses.


62

Table of Contents


Utility Other Operation and Maintenance Expenses - Alliant Energy’s other operation and maintenance expenses for the utilities increased $31 million and decreased $40 million and increased $13 million for 20122013 and 20112012, respectively, due to the following reasons (amounts represent variances between periods in millions):
2012 vs. 2011 Summary:Alliant Energy IPL WPL
Regulatory-related (charges) and credits from IPL’s Minnesota electric rate case order recorded in 2011 (a)
($11) 
($11) 
$—
Lower generation operation and maintenance expenses at IPL (b)(10) (10) 
Additional benefits costs for Cash Balance Plan amendment in 2011 (c)(10) (6) (4)
Regulatory asset impairments in 2011 (d)(9) (2) (7)
Regulatory-related credits from WPL’s 2013/2014 rate case decision recorded in 2012 (a)(5) 
 (5)
Wind site impairment charge at WPL in 2011 (e)(5) 
 (5)
SO2 emission allowance charge allocated to IPL’s steam business in 2011 (f)(2) (2) 
Allocated cost of capital charges from Corporate Services in 2012 (g)9
 5
 4
Contract cancellation charge at IPL in 2012 (h)3
 3
 
Other
 (2) 2
 
($40) 
($25) 
($15)

60

Table of Contents
2013 vs. 2012 Summary:Alliant Energy IPL WPL
Higher generation expenses (a)
$16
 
$3
 
$13
Higher performance-based compensation expenses (b)11
 6
 5
Higher distribution system expenses (c)10
 6
 4
Higher expenses related to coal sales at WPL (d)7
 
 7
Higher bad debt expense at IPL (e)6
 6
 
Regulatory-related credits from WPL’s 2013/2014 rate case decision recorded in 2012 (f)5
 
 5
Higher cost of capital charges from Corporate Services (g)5
 3
 2
Contract amortization expenses at WPL in 2013 (h)5
 
 5
Lower energy conservation cost recovery amortizations at WPL (i)(20) 
 (20)
Regulatory-related credit from IPL’s Minnesota decision regarding Whispering Willow - East recorded in 2013 (j)(7) (7) 
Contract cancellation charge at IPL in 2012 (k)(3) (3) 
Other(4) (2) (3)
 
$31
 
$12
 
$18


2011 vs. 2010 Summary:Alliant Energy IPL WPL
Regulatory-related charges and (credits) from IPL’s Minnesota electric rate case order recorded in 2011 (a)
$11
 
$11
 
$—
Additional benefits costs for Cash Balance Plan amendment in 2011 (c)10
 6
 4
Regulatory asset impairments in 2011 (d)9
 2
 7
Higher wind turbine operation and maintenance expenses at WPL (i)7
 
 7
Wind site impairment charge at WPL in 2011 (e)5
 
 5
Higher energy conservation cost recovery amortizations at WPL (j)3
 
 3
SO2 emission allowance charges allocated to IPL’s steam business in 2011 (f)2
 2
 
Regulatory-related (charges) and credits from IPL’s Iowa electric rate case order recorded in 2010 (a)(20) (20) 
Lower other postretirement benefits costs (k)(10) (6) (4)
Restructuring charges in 2010 (l)(4) (2) (2)
Asset impairment in 2010 related to Sixth Street (m)(4) (4) 
Other4
 1
 3
 
$13
 
($10) 
$23

2012 vs. 2011 Summary:Alliant Energy IPL WPL
Regulatory-related (charges) and credits from IPL’s Minnesota electric rate case order recorded in 2011 (f)
($11) 
($11) 
$—
Lower generation expenses at IPL (a)(10) (10) 
Additional benefits costs for Cash Balance Plan amendment in 2011 (l)(10) (6) (4)
Regulatory asset impairments in 2011 (m)(9) (2) (7)
Regulatory-related credits from WPL’s 2013/2014 rate case decision recorded in 2012 (f)(5) 
 (5)
Wind site impairment charge at WPL in 2011 (n)(5) 
 (5)
SO2 emission allowance charge allocated to IPL’s steam business in 2011 (o)(2) (2) 
Cost of capital charges from Corporate Services in 2012 (g)9
 5
 4
Contract cancellation charge at IPL in 2012 (k)3
 3
 
Other
 (2) 2
 
($40) 
($25) 
($15)
(a)Resulting from the timing of maintenance projects at IPL’s and WPL’s EGUs and additional operation and maintenance expenses related to Riverside, which was acquired in December 2012.
(b)Performance-based compensation expenses are largely based on the achievement of specific operational and financial performance measures compared to targets established within the performance-based compensation plans.
(c)Primarily due to increased maintenance of the electric and gas distribution systems at IPL and WPL.
(d)Changes in expenses related to coal sales at WPL were largely offset by changes in coal sales revenue at WPL.
(e)Higher bad debt expense at IPL was largely due to increases in past due accounts receivable during 2013.
(f)
Refer to Notes 1(b)2 and 1(e)3(a) of the “Combined Notes to Consolidated Financial Statements” for details of regulatory-related charges and credits incurredrecognized by Alliant Energy, IPL and WPL in 2010, 2011 and 2012 due to the decisions by the IUB in IPL’s Iowa retail electric rate case (2009 test year) in 2010, decisions by the MPUC in IPL’s Minnesota retail electric rate case (2009 test year) in 2011 and decisions by the PSCW in WPL’s Wisconsin retail electric and gas rate case (2013/2014 test period) in 2012. IPL also recognized a $7 million impairment charge in 2010 related to the remaining net book value of Sixth Street that the IUB did not allow IPL to recover as part of the decisions in IPL’s Iowa retail electric rate case (2009 test year).
(b)(g)Primarily resulting from the timingCost of maintenance projectscapital charges by Corporate Services to IPL and WPL in accordance with a new service agreement implemented during 2012. The 2013 increase was primarily due to increased property additions at IPL’s electric generating facilities.Corporate Services in 2013.
(c)(h)Resulting from the amortization of capacity rights related to a PPA with a third party for the sale of a portion of Riverside’s capacity WPL assumed with the acquisition of Riverside. The PPA expires in May 2014. These amortization expenses were largely offset by capacity revenues included in utility other revenues.
(i)The July 2012 PSCW order for WPL’s 2013/2014 test period electric and gas base rate case authorized lower energy conservation cost recovery amortizations for 2013. Regulatory amortizations at WPL related to energy conservation costs were $22 million, $42 million and $42 million for 2013, 2012 and 2011, respectively.
(j)
Refer to Note 3(a) of the “Combined Notes to Consolidated Financial Statements” for details of a regulatory-related credit recorded by IPL in 2013 due to decisions by the MPUC regarding recovery of costs for IPL’s Whispering Willow - East wind project.

63

Table of Contents


(k)Due to the cancellation of a services agreement at one of IPL’s EGUs in 2012.
(l)
Refer to Notes 6(a)12(a) and 13(c)16(c) of the “Combined Notes to Consolidated Financial Statements” for details of the additional benefit costs incurred by Alliant Energy, IPL and WPL in 2011 resulting from an amendment to the Cash Balance Plan and details of the Cash Balance Plan lawsuit.
(d)(m)
Refer to Note 1(b)2 of the “Combined Notes to Consolidated Financial Statements” for details of regulatory asset impairments incurred by Alliant Energy, IPL and WPL in 2011.
(e)(n)
Refer to Note 1(e)3(a) of the “Combined Notes to Consolidated Financial Statements” for details of the wind site impairment charge recorded by Alliant Energy and WPL in 2011.
(f)(o)
Refer to Note 1(b)2 of the “Combined Notes to Consolidated Financial Statements” for details of the SO2 emission allowance charges recorded by Alliant Energy and IPL in 2011.
(g)Cost of capital charges allocated by Corporate Services to IPL and WPL in accordance with a new service agreement effective in 2012.
(h)Due to the cancellation of a services agreement for one of IPL’s electric generating facilities in 2012.
(i)Alliant Energy and WPL started to incur operation and maintenance expenses to operate WPL’s Bent Tree - Phase I wind project in late 2010 when the wind project began generating electricity.
(j)WPL’s 2011 test year base retail electric rate case resulted in higher energy conservation cost recovery amortizations effective in January 2011.
(k)
Changes in pension and other postretirement benefits costs are largely based on changes in plan assets caused by contributions and returns on plan assets, changes in discount rates used to measure benefit obligations and plan amendments. An amendment to the defined benefit postretirement health care plans in 2011 resulted in lower other postretirement benefits costs in 2011. Refer to Note 6(a) of the “Combined Notes to Consolidated Financial Statements” for further details. These variance amounts exclude the portion of pension and other postretirement benefits costs allocated to capital projects.
(l)Resulting from the elimination of certain corporate and operations positions in 2010.
(m)Alliant Energy and IPL recognized a $4 million impairment in 2010 related to IPL’s Sixth Street electric assets as a result of a decision not to rebuild electric operations at Sixth Street.

Forecast - Alliant Energy and WPL currently expect theirexpects its other operation and maintenance expenses to decreaseincrease in 2013 as2014 compared to 20122013 primarily due to decreasesincreases in regulatory amortizations at WPL related to energy conservation that werecosts approved by the PSCW in WPL’s 2013/a July 2012 order. Regulatory amortizations at WPL related to energy conservation costs are expected to be $42 million for 2014 test period electric and gas base rate case and decreases in retirement plan costs. These items arecompared to $22 million for 2013. This item is expected to be partially offset by additional operation and maintenance expenses associated with Riverside, which WPL acquired in December 2012. Refer to “Other Future Considerations” for discussion of expected changesdecreases in retirement plan costs.costs in 2014 compared to 2013, resulting from increases in discount rates and higher than expected returns on retirement plan assets in 2013.


61

Table of Contents


Depreciation and Amortization Expenses -
2013 vs. 2012 Summary - Depreciation and amortization expenses increased $39 million in 2013 primarily due to depreciation expense at WPL related to Riverside, WPL’s SCR project at Edgewater Unit 5, which was placed in service in the fourth quarter of 2012, new depreciation rates implemented by WPL effective January 2013, and depreciation expense at the Franklin County wind project, which was placed in service in the fourth quarter of 2012.

2012 vs. 2011 Summary - Depreciation and amortization expenses increased $11 million in 2012 primarily due to higher depreciation rates at IPL effective January 1, 2012 resulting from IPL’s most recent depreciation study, and property additions at IPL and WPL. These items were partially offset by the impact of regulatory-related charges and credits to depreciation expense in 2012 compared to 2011 at WPL.

2011 vs. 2010 SummaryForecast - DepreciationAlliant Energy currently expects its depreciation and amortization expenses increased $33 millionto increase in 2011 primarily2014 compared to 2013 due to property additions, including $17 million of depreciation expense recognized in 2011 related to WPL’s Bent Tree - Phase I wind project, which began generating electricity in late 2010. Also contributing to the increase in 2011 was a depreciation adjustment recorded in 2010various emission controls projects at WPL, which is not anticipated to have a material impact on future periods.

Alliant EnergyIPL and WPL currently expect their depreciation expense to increase in 2013 as compared to 2012 primarily due to property additions, including the full year impact of depreciation from WPL’s purchase of Riverside in December 2012, depreciation from certain large projects placed in service in the fourth quarter of 2012, including WPL’s SCR project at Edgewater Unit 52013 and Resources’ Franklin County wind project, and property additionsexpected to be placed in 2013.service in 2014.

Interest Expense -
2013 vs. 2012 Summary - Alliant Energy’s interest expense increased $16 million in 2013 primarily due to $6 million of capitalized interest recognized in 2012 for the Franklin County wind project, $5 million of higher interest expense recorded in 2013 compared to 2012 for WPL’s 2.25% debentures issued in November 2012 to fund a portion of the purchase price of Riverside and $3 million of interest expense recorded in 2013 for IPL’s 4.7% senior debentures issued in October 2013.

2012 vs. 2011 Summary - Alliant Energy’s interest expense decreased $2 million in 2012 primarily due to $3 million of higher capitalized interest recognized in 2012 compared to 2011 for the Franklin County wind project.

2011 vs. 2010 SummaryForecast - Alliant Energy’s interest expense decreased $5 million in 2011 due to the following reasons (amounts represent variances between periods in millions):
 Alliant Energy IPL WPL
Interest expense variances from certain issuances of long-term debt:     
IPL’s $200 million of 3.65% senior debentures issued in August 2010
$5
 
$5
 
$—
WPL’s $150 million of 4.6% debentures issued in June 20103
 
 3
IPL’s $150 million of 3.3% senior debentures issued in June 20102
 2
 
Interest expense variances from certain reductions in long-term debt:     
IPL’s $200 million of 6.75% senior debentures retired in September 2010(10) (10) 
WPL’s $100 million of 7.625% debentures retired in March 2010(1) 
 (1)
Other (Alliant Energy variance includes impact of $3 million of capitalized interest in 2011 for the Franklin County wind project)(4) (1) (1)
 
($5) 
($4) 
$1

Alliant Energy and WPL currently expect theirexpects its interest expense to increase in 2013 as2014 compared to 20122013 due to financings relatedin 2013 and 2014 to WPL’s purchasefund capital expenditures for emission controls projects. Refer to “Liquidity and Capital Resources” for details of Riverside in December 2012.Alliant Energy’s financing forecast.

Refer to Note 9 of the “Combined Notes to Consolidated Financial Statements” for additional details of debt.

AFUDC -
2012 vs. 2011 Summary - Alliant Energy’s AFUDC increased $9 million and $10 million in for 2013 and 2012, respectively, primarily due to changes in AFUDC recognized in 2012 for IPL’s and WPL’s emission controls projects at Columbia Units 1 and 2, and Edgewater Unit 5, and IPL’s emission controls projects at Ottumwa Unit 1 and George Neal Units 3 and 4.

2011 vs. 2010 Summary - AFUDC decreased $6 million in 2011 primarily due to $10 million of AFUDC recognized in 2010 for WPL’s Bent Tree - Phase I wind project. This item was partially offset by $3 million of AFUDC recognized in 2011 for WPL’s Edgewater Unit 5 emission controls project.

Alliant Energy and IPL currently expect AFUDC to increase in 2013 as compared to 2012 primarily due to increased construction work in progress balances related to environmental projects at Ottumwa Unit 1, George Neal Units 3 and 4, and Lansing Unit 4.

Income Taxes - The effective income tax rates for Alliant Energy’s continuing operations were 20.8%, 16.9% and 32.3% for 2012, 2011 and 2010, respectively. Details of the effective income tax rates were as follows:

62

Table of Contents


 2012 2011 2010
Statutory federal income tax rate35.0% 35.0% 35.0%
State apportionment change due to announced sale of RMT3.5
 
 
IPL’s electric tax benefit rider(11.2) (8.8) 
Production tax credits(5.8) (6.6) (2.4)
Effect of rate-making on property-related differences(5.0) (2.0) (4.2)
Wisconsin tax legislation enacted in June 2011
 (4.6) 
Federal Health Care Legislation enacted in March 2010
 
 1.6
IRS audit completed in September 2010
 
 (1.4)
Other items, net4.3
 3.9
 3.7
Overall income tax rate20.8 % 16.9% 32.3%

2012 vs. 2011 Summary - The increase in the effective income tax rate for Alliant Energy’s continuing operations was primarily due to the reversal of $19 million of valuation allowances in 2011 due to passage of Wisconsin tax legislation, which changed the ability of companies to use prior net operating losses, and a $15 million state apportionment charge due to the announced sale of RMT in 2012. These items were partially offset by the impact of $13 million of additional income tax benefits in 2012 from the effect of rate-making on property-related differences resulting from changes in accounting methodologies for IPL’s allocation of mixed services costs and recording of repair expenditures, and an additional $12 million of income tax benefits in 2012 related to IPL’s tax benefit rider that began in 2011.

2011 vs. 2010 Summary - The decrease in the effective income tax rate for Alliant Energy’s continuing operations was primarily related to the impact of $36 million of income tax benefits related to IPL’s tax benefit rider that began in 2011 and the reversal of $19 million of valuation allowances in 2011 due to passage of Wisconsin tax legislation. In addition, Alliant Energy had $16 million of higher production tax credits in 2011 due to WPL’s Bent Tree - Phase I wind project, which began generating electricity in late 2010, and increased electricity generated from IPL’s Whispering Willow - East wind project primarily due to fewer transmission constraints in 2011 and $7 million of income tax expense recognized in 2010 related to the impacts of the Federal Health Care Legislation. These items were partially offset by higher state income taxes at IPL related to property-related differences for which Iowa deferred tax is not recorded in the income statement pursuant to Iowa rate-making principles, and $7 million of income tax benefits recorded in 2010 related to the impact of the IRS completing audits of Alliant Energy’s U.S. federal income tax returns for calendar years 2005 through 2008.

projects. Refer to Note 53(a) of the “Combined Notes to Consolidated Financial Statements” for additionaldetails of AFUDC recognized in 2013, 2012 and 2011.

Forecast - Alliant Energy currently expects AFUDC to increase in 2014 compared to 2013 primarily due to increased CWIP balances related to the construction of Marshalltown and emission controls projects at IPL’s Ottumwa Unit 1.


64

Table of Contents


Income Taxes - Refer to Note 11 of the “Combined Notes to Consolidated Financial Statements” for details of Alliant Energy’s effective income tax rates for continuing operations, including discussion of state apportionment changes, IPL’s tax benefit rider implemented in 2011,riders, production tax credits, taxthe effect of rate-making on property-related differences, at IPL,state apportionment changes and Wisconsin tax legislation enacted in 2011, Federal Health Care Legislation enacted2011.

Forecast - Alliant Energy currently expects its effective income tax rate to increase in 2010, and an IRS audit completed in 2010.2014 compared to 2013 due to anticipated lower tax benefits for the effect of rate-making on property-related differences. Refer to “Rate Matters” for discussion of IPL’sthe authorization IPL received from the IUB in December 2013 related to credits on Iowa retail electric customers’ bills associated with the electric tax benefit rider. Refer to “Critical Accounting Policies and Estimates - Income Taxes”rider for discussion of the effect of rate-making on property differences at IPL and changes to state apportionment projections resulting from Alliant Energy’s decision in February 2012 to sell RMT. Refer to “Other Future Considerations” for discussion of possible impacts to Alliant Energy’s future income taxes resulting from potential tax accounting method changes and trends in IPL’s and WPL’s production tax credits.2014.

Loss from Discontinued Operations, Net of Tax - RMT’s net loss in 2011 was largely driven by losses associated with certain large solar projects. Schedule delays, abandonment of work by the original subcontractor and the need to hire additional subcontractors to complete the solar projects in a timely manner resulted in significant additional costs for RMT in 2011. Refer to Note 1719 of the “Combined Notes to Consolidated Financial Statements” for additional discussion of Alliant Energy’s discontinued operations.

Preferred Dividend Requirements of Subsidiaries -
2013 vs. 2012 Summary - Preferred dividend requirements of subsidiaries increased $2 million in 2013 primarily due to IPL and WPL recording charges of $5 million and $1 million in 2013, respectively, related to the redemption of preferred stock. Refer to Note 8 of the “Combined Notes to Consolidated Financial Statements” for additional discussion of IPL’s and WPL’s preferred stock transactions.

2012 vs. 2011 Summary - Preferred dividend requirements of subsidiaries decreased $2 million in 2012 primarily due to a $2 million charge in the first quarter of 2011 related to IPL’s redemption of its 7.10% cumulative preferred stock in 2011.

In February 2013, IPL announced it will redeem all 6,000,000 outstanding shares of its 8.375% cumulative preferred stock in March 2013 at par value for approximately $150 million plus accrued and unpaid dividends to the redemption date. In February 2013, WPL announced it will redeem all 1,049,225 outstanding shares of its 4.40% through 6.50% cumulative preferred stock in March 2013 for approximately $61 million plus accrued and unpaid dividends to the redemption date. As a result of these preferred stock redemptions, Alliant Energy, IPL and WPL expect to record a charge of $6 million, $5 million and $1 million, respectively, in the first quarter of 2013 in “Preferred dividend requirements” in their Consolidated Statements of Income.

63

Table of Contents



IPL’S RESULTS OF OPERATIONS

Overview - Earnings available for common stock increased $13$36 million and decreased $4$13 million in 20122013 and 20112012, respectively. The 2013 increase was primarily due to higher electric revenues from the revenue requirement adjustment related to certain tax benefits from tax accounting method changes, which became effective in January 2013, higher AFUDC in 2013 for IPL’s emission controls projects, a lower effective income tax rate and higher gas revenues from increased sales and a rate increase implemented in January 2013. These items were partially offset by higher other operation and maintenance expenses. The 2012 increase was primarily due to regulatory-related charges and credits from the Minnesota 2009 test year base rate case recorded in 2011, a lower effective income tax rate and lower generation operation and maintenance expenses. These items were partially offset by higher depreciation and amortization expenses due to higher depreciation rates effective January 1, 2012, decreases in electric and gas margins from lower sales caused by weather conditions in 2012 and higher purchased electric capacity expenses related to the DAEC PPA. The 2011 decrease was primarily due to higher electric transmission service expenses, net of recoveries, higher state income taxes at IPL related to property-related differences for which Iowa deferred tax is not recorded in the income statement due to Iowa rate making principles and income tax benefits recognized in 2010 related to the completion of an IRS audit. These items were partially offset by the impact of base retail electric rate increases (excluding fuel cost recoveries and transmission rider) from the Iowa and Minnesota 2009 test year base rate cases and lower net regulatory-related charges and credits from such base rate case decisions.

Electric Margins - Electric margins are defined as electric operating revenues less electric production fuel, energy purchases and purchased electric capacity expenses. Management believes that electric margins provide a more meaningful basis for evaluating utility operations than electric operating revenues since electric production fuel, energy purchases and purchased electric capacity expenses are generally passed through to customers, and therefore, result in changes to electric operating revenues that are comparable to changes in electric production fuel, energy purchases and purchased electric capacity expenses. Electric margins and MWh sales for IPL were as follows:

65

Table of Contents


Revenues and Costs (dollars in millions) MWhs Sold (MWhs in thousands)Revenues and Costs (dollars in millions) MWhs Sold (MWhs in thousands)
2012 2011 (a) 2010 (b) 2012 2011 (a) 2010 (b)2013 2012 (a) 2011 (b) 2013 2012 (a) 2011 (b)
Residential
$529.9
 
$543.2
 (2%) 
$561.9
 (3%) 4,141
 4,223
 (2%) 4,295
 (2%)
$574.3
 
$529.9
 8% 
$543.2
 (2%) 4,272
 4,141
 3% 4,223
 (2%)
Commercial365.3
 366.0
 —% 378.7
 (3%) 4,045
 3,953
 2% 3,944
 —%409.6
 365.3
 12% 366.0
 —% 4,118
 4,045
 2% 3,953
 2%
Industrial408.0
 415.4
 (2%) 441.9
 (6%) 7,116
 7,080
 1% 6,961
 2%442.9
 408.0
 9% 415.4
 (2%) 6,973
 7,116
 (2%) 7,080
 1%
Retail subtotal1,303.2
 1,324.6
 (2%) 1,382.5
 (4%) 15,302
 15,256
 —% 15,200
 —%1,426.8
 1,303.2
 9% 1,324.6
 (2%) 15,363
 15,302
 —% 15,256
 —%
Sales for resale:                        
Wholesale27.8
 29.6
 (6%) 29.8
 (1%) 418
 417
 —% 425
 (2%)30.0
 27.8
 8% 29.6
 (6%) 419
 418
 —% 417
 —%
Bulk power and other9.5
 24.6
 (61%) 23.5
 5% 377
 729
 (48%) 683
 7%2.0
 9.5
 (79%) 24.6
 (61%) 98
 377
 (74%) 729
 (48%)
Other30.6
 29.5
 4% 28.5
 4% 81
 84
 (4%) 83
 1%33.0
 30.6
 8% 29.5
 4% 80
 81
 (1%) 84
 (4%)
Total revenues/sales1,371.1
 1,408.3
 (3%) 1,464.3
 (4%) 16,178
 16,486
 (2%) 16,391
 1%1,491.8
 1,371.1
 9% 1,408.3
 (3%) 15,960
 16,178
 (1%) 16,486
 (2%)
Electric production fuel expense193.8
 230.9
 (16%) 216.2
 7%       193.9
 193.8
 —% 230.9
 (16%)       
Energy purchases expense150.7
 152.2
 (1%) 201.8
 (25%)       188.2
 150.7
 25% 152.2
 (1%)       
Purchased electric capacity expense153.7
 147.7
 4% 145.0
 2%       155.2
 153.7
 1% 147.7
 4%       
Margins(c)
$872.9
 
$877.5
 (1%) 
$901.3
 (3%)       
$954.5
 
$872.9
 9% 
$877.5
 (1%)       

(a)
Reflects the % change from 20112012 to 20122013. (b) Reflects the % change from 20102011 to 20112012.
(c)
Includes $79 million, $83 million and $61 million of credits on Iowa retail electric customers’ bills for 2013, 2012 and 2011, respectively, resulting from the electric tax benefit rider. The electric tax benefit rider resulted in reductions in electric revenues that were offset by reductions in income tax expense for 2013, 2012 and 2011.

2013 vs. 2012 Summary - Electric margins increased $82 million, or 9%, primarily due to $60 million of higher revenues related to increases in recovery of transmission costs related to the transmission rider, $24 million of revenues during 2013 due to the revenue requirement adjustment related to certain tax benefits from tax accounting method changes and $4 million of increased revenues due to lower credits on Iowa retail electric customers’ bills resulting from the electric tax benefit rider during 2013 compared to 2012. These items were partially offset by $4 million of lower energy conservation revenues. Changes in energy conservation revenues were mostly offset by changes in energy conservation expenses included in other operation and maintenance expenses. The higher transmission rider revenues were offset by higher electric transmission service expenses.

2012 vs. 2011 Summary - Electric margins decreased $5 million, or 1%, primarily due to $22 million of decreased revenues during 2012 due to additional credits on Iowa retail electric customers’ bills resulting from the electric tax benefit rider. Other decreases to electric margins included $6 million of higher purchased electric capacity expenses related to the DAEC PPA and an estimated $1 million decrease in electric margins from changes in sales caused by weather conditions in IPL’s service territory. The electric tax benefit rider resulted in $83 million and $61 million of credits on Iowa retail electric customers’ bills during 2012 and 2011, respectively. IPL’s electric tax benefit rider resulted in reductions in electric revenues that were offset by reductions in income tax expenses for the years ended December 31, 2012 and 2011. Estimated increases to IPL’s electric margins from the impacts of weather during 2012 and 2011 were $15 million and $16 million, respectively.PPA. These items were partially offset by $16 million of higher revenues from changesincreases in recovery of transmission costs related to the transmission rider implemented in 2011, $2 million of SO2 emission allowance charges in 2011 and an increase in weather-normalized retail sales volumes. The higher transmission rider revenues were offset by higher electric transmission service expenses.

2011 vs. 2010 Summary - Electric margins decreased $24 million, or 3%, primarily due to credits on Iowa retail electric customers’ bills in 2011 resulting from the implementation of the tax benefit rider, which decreased IPL’s electric revenues by

64

Table of Contents


$61 million in 2011. Other decreases to electric margins included $4 million of lower energy conservation revenues, $3 million of higher purchased power electric capacity expenses at IPL related to the DAEC PPA, $2 million of SO2 emission allowance charges in 2011 and a decrease in weather-normalized residential sales volumes. These items were partially offset by the impact of base retail rate increases (excluding fuel cost recoveries and transmission rider) from the Iowa and Minnesota 2009 test year base rate cases, which increased IPL’s electric revenues by $33 million in aggregate in 2011, higher revenues at IPL related to changes in recovery of transmission costs due to the implementation of the transmission rider in 2011, an estimated $2 million increase in electric margins from changes in sales caused by weather conditions in IPL’s service territory and a 2% increase in industrial sales volumes. Estimated increases to IPL’s electric margins from the impacts of weather in 2011 and 2010 were $16 million and $14 million, respectively. Changes in energy conservation revenues are largely offset by changes in energy conservation expenses included in other operation and maintenance expenses.

Refer to “Alliant Energy’s Results of Operations - Utility Electric Margins” for details onof IPL’s CDD and HDD data, estimated impacts of weather, purchased electric capacity expenses, recoveries of electric production fuel and energy purchases expenses, sales trends and sales trends.items impacting IPL’s electric margin forecast. Refer to “Rate Matters” for additional discussion of IPL’s retail electric rate increases from its Iowa and Minnesota test year base rate cases, IPL’s electric tax benefit rider and a potential future IPL retail electric base rate freeze at IPL through December 31, 2013.case filing in 2014. Refer to “Other Future Considerations” for discussion of expected increased recoveries under the transmission rider related to expected increases in electric transmission service expenses.

Gas Margins - Gas margins are defined as gas operating revenues less cost of gas sold. Management believes that gas margins provide a more meaningful basis for evaluating utility operations than gas operating revenues since cost of gas sold is generally passed through to customers, and therefore, results in changes to gas operating revenues that are comparable to changes in cost of gas sold. Gas margins and Dth sales for IPL were as follows:

66

Table of Contents


Revenues and Costs (dollars in millions) Dths Sold (Dths in thousands)Revenues and Costs (dollars in millions) Dths Sold (Dths in thousands)
2012 2011 (a) 2010 (b) 2012 2011 (a) 2010 (b)2013 2012 (a) 2011 (b) 2013 2012 (a) 2011 (b)
Residential
$126.4
 
$155.2
 (19%) 
$155.6
 —% 12,955
 15,660
 (17%) 15,923
 (2%)
$152.8
 
$126.4
 21% 
$155.2
 (19%) 16,975
 12,955
 31% 15,660
 (17%)
Commercial69.7
 87.8
 (21%) 88.4
 (1%) 9,403
 10,677
 (12%) 10,596
 1%85.7
 69.7
 23% 87.8
 (21%) 12,051
 9,403
 28% 10,677
 (12%)
Industrial12.8
 19.0
 (33%) 18.4
 3% 2,435
 3,023
 (19%) 2,869
 5%16.1
 12.8
 26% 19.0
 (33%) 2,931
 2,435
 20% 3,023
 (19%)
Retail subtotal208.9
 262.0
 (20%) 262.4
 —% 24,793
 29,360
 (16%) 29,388
 —%254.6
 208.9
 22% 262.0
 (20%) 31,957
 24,793
 29% 29,360
 (16%)
Transportation/other17.8
 14.3
 24% 11.9
 20% 30,992
 27,720
 12% 28,071
 (1%)19.3
 17.8
 8% 14.3
 24% 32,019
 30,992
 3% 27,720
 12%
Total revenues/sales226.7
 276.3
 (18%) 274.3
 1% 55,785
 57,080
 (2%) 57,459
 (1%)273.9
 226.7
 21% 276.3
 (18%) 63,976
 55,785
 15% 57,080
 (2%)
Cost of gas sold124.9
 175.6
 (29%) 178.7
 (2%)       160.3
 124.9
 28% 175.6
 (29%)       
Margins(c)
$101.8
 
$100.7
 1% 
$95.6
 5%       
$113.6
 
$101.8
 12% 
$100.7
 1%       

(a)
Reflects the % change from 20112012 to 20122013. (b) Reflects the % change from 20102011 to 20112012.
(c)
Includes $11 million of credits on Iowa retail gas customers’ bills for 2013 resulting from the gas tax benefit rider. The gas tax benefit rider resulted in reductions in gas revenues that were offset by reductions in income tax expense for 2013.

2013 vs. 2012 Summary - Gas margins increased $12 million, or 12%, largely due to an estimated $9 million increase in gas margins from changes in sales caused by weather conditions in IPL’s service territory, $6 million of higher revenues due to the impact of IPL’s retail gas base rate increase effective in January 2013 and $5 million of higher energy conservation revenues. Changes in energy conservation revenues were mostly offset by changes in energy conservation expenses in other operation and maintenance expenses. These items were partially offset by $11 million of decreased revenues during 2013 due to credits on Iowa retail gas customers’ bills resulting from the gas tax benefit rider.

2012 vs. 2011 Summary - Gas margins increased $1 million, or 1%, in 2012 largely due to $5 million of higher gas revenues due to the impact of an interim retail gas base rate increase effective June 2012. This item was offset by an estimated $6 million decrease in gas margins from changes in sales caused by weather conditions in IPL’s service territory. Estimated increases (decreases) to IPL’s gas margins from the impacts of weather during the 2012 and 2011 were ($6) million and $0, respectively.

2011 vs. 2010 Summary - Gas margins increased $5 million, or 5%, in 2011 primarily due to $4 million of higher energy conservation revenues. Changes in energy conservation revenues are largely offset by changes in energy conservation expenses included in other operation and maintenance expenses.

Refer to “Alliant Energy’s Results of Operations - Utility Gas Margins” for details of IPL’s HDD data, estimated impacts of weather and discussion of the impacts on IPL’s gas margins of recoveries of natural gas costs. Refer to “Rate Matters” for discussion of an interim retail gas base rate increase effective June 4, 2012 and final retail gas base rate increase effective January 10, 2013 for IPL’s Iowa customers and IPL’s gas tax benefit rider.

Electric Transmission Service Expenses -
2013 vs. 2012 Summary - Electric transmission service expense increased $66 million in 2013 primarily due to $41 million of higher electric transmission service costs from ITC and MISO billed to IPL in 2013 compared to 2012 primarily due to an increase in transmission service rates and $22 million of changes in the under-/over-collection of electric transmission service expenses through the transmission cost rider. IPL is currently recovering the Iowa retail portion of these increased electric transmission service costs from its retail electric customers in Iowa through a transmission cost rider approved by the IUB in January 2011 resulting in an offsetting increase in electric revenues.

2012 vs. 2011 Summary - Electric transmission service expense increased $16 million in 2012 primarily due to changes in transmission costs related to transmission services from ITC. The increase was primarily due to $10 million of higher electric transmission service costs billed by ITC to IPL during 2012 compared to 2011 due to a modest increase in transmission service rates, and the impact of IPL utilizing regulatory liabilities to credit a portion of the transmission service expenses billed to IPL by ITC during 2011. IPL is currently recovering the Iowa retail portion of these increased electric

65

Table of Contents


transmission service costs from its retail electric customers in Iowa through a pilot transmission cost rider approved by the IUB in January 2011 resulting in an offsetting increase in electric revenues.

2011 vs. 2010 SummaryForecast - Refer to “Other Future ConsiderationsElectric transmission service expense increased $40 million” for discussion of potential increases in 2011 primarily due to higher transmission costs related tofuture electric transmission services from ITC. The electric transmission service costs billed by ITC to IPL were $11 million higher in 2011 than those billed by ITC to IPL in 2010. In addition, deferrals and regulatory liability offsets approved by the IUB to reduce transmission service expenses were lower in 2011 compared to 2010 resulting in higher transmission service expense at IPL in 2011. In 2010, IPL deferred $41 million of electric transmission expenses related to the Iowa retail portion of 2008 under-recovered costs billed to IPL by ITC. IPL also utilized $4 million of regulatory liabilities to offset a portion of the Iowa retail electric transmission service expenses incurred in 2010. IPL utilized $19 million of regulatory liabilities to offset transmission service expenses related to the Iowa retail portion of 2009 under-recovered costs billed to IPL by ITC in 2011. The combined impact of the higher electric transmission service costs billed by ITC to IPL and these deferrals and regulatory liability offsets resulted in an increase in IPL’s electric transmission service costs of $37 million in 2011.for IPL.

Refer to “Rate Matters” for additional discussion of the transmission rider approved by the IUB in January 2011. Refer to Other Future Considerations” for discussion of potential changes in future electric transmission services expenses for IPL. Refer to Notes 1(b)1(g) and 1(h)2 of the “Combined Notes to Consolidated Financial Statements” for additional information relating to recovery of electric transmission service expenses.

Other Operation and Maintenance Expenses -
2012 vs. 2011 Summary - Other operation and maintenance expenses increased $12 million and decreased $25 million primarily due to $11 million of regulatory-related chargesin 2013 and credits incurred by IPL in 2011 due to the oral decision issued by the MPUC in IPL’s Minnesota retail electric rate case (2009 test year), $10 million of lower generation operation and maintenance expenses primarily resulting from the timing of maintenance projects, $6 million of additional benefits costs in 2011 resulting from an amendment to the Cash Balance Plan, a $2 million charge recorded in 2011 related to SO2 emission allowance forward contracts allocated to IPL’s steam business and $2 million of regulatory asset impairment charges recorded in 2011. These items were partially offset by $5 million of cost of capital charges allocated to IPL by Corporate Services in 2012, and a $3 million contract cancellation charge recorded by IPL in 2012.

2011 vs. 2010 Summary - Other operation and maintenance expenses decreased $10 million primarily due to $20 million of regulatory-related charges and credits incurred by IPL in 2010 related to IUB decisions in the 2009 test year Iowa retail electric rate case, $6 million of lower other postretirement benefits costs primarily due to a plan amendment in 2011, a $4 million asset impairment charge recorded in 2010 related to Sixth Street, and $2 million of restructuring charges incurred in 2010 related to the elimination of certain corporate and operations positions. These items were partially offset by $11 million of regulatory-related charges and credits incurred by IPL in 2011 related to MPUC decisions in the 2009 test year Minnesota retail electric rate case, $6 million of additional benefits costs in 2011 resulting from an amendment to the Cash Balance Plan, a $2 million charge recorded in 2011 related to SO2 emission allowance forward contracts allocated to IPL’s steam business and $2 million of regulatory asset impairment charges recorded in 2011.

respectively. Refer to “Alliant Energy’s Results of Operations - Utility Other Operation and Maintenance Expenses” for additional details of the changes in IPL’s other operation and maintenance expenses.


67

Table of Contents


Forecast - IPL currently expects its other operation and maintenance expenses to decrease in 2014 compared to 2013 due to decreases in retirement plan costs in 2014 compared to 2013, resulting from increases in discount rates and higher than expected returns on retirement plan assets in 2013.

Depreciation and Amortization Expenses -
2012 vs. 2011 Summary - Depreciation and amortization expenses increased $10 million in 2012 primarily due to higher depreciation rates effective in January 1, 2012 resulting from IPL’s most recent depreciation study, and property additions.

Forecast - IPL currently expects its depreciation and amortization expenses to increase in 2014 compared to 2013 due to property additions, including various emission controls projects placed in service in 2013 and expected to be placed in service in 2014.

Interest Expense -
20112013 vs. 20102012 Summary - Interest expense decreased $4increased $3 million in 20112013 primarily due to the impact$3 million of interest expense recorded in 2013 for IPL’s 4.7% senior debentures issued in October 2013.

Forecast - IPL currently expects its interest expense to increase in 2014 compared to 2013 due to financings in 2013 and 2014 to fund capital expenditures for emission controls projects. Refer to “Liquidity and Capital Resources” for details of IPL’s retirement of $200 million of 6.75% senior debentures in September 2010. This item was partially offset by interest expense from IPL’s issuances of $200 million of 3.65% senior debentures in August 2010 and $150 million of 3.3% senior debentures in June 2010.financing forecast.

Refer to Note 9 of the “Combined Notes to Consolidated Financial Statements” for additional details of IPL’s debt.

AFUDC -
2012 vs. 2011 Summary - AFUDC increased $13 million and $3 million in 2013 and 2012, respectively, primarily due to changes in AFUDC recognized for emission controls projects. Refer to Note 3(a) of the “Combined Notes to Consolidated Financial Statements” for details of AFUDC recognized in 2013, 2012 for IPL’s emission controls projects at Ottumwa Unit 1 and George Neal Units 3 and 4.

66

Table of Contents
2011.



Forecast - IPL currently expects AFUDC to increase in 2013 as2014 compared to 20122013 primarily due to increased construction work in progressCWIP balances related to environmentalits construction of Marshalltown and emission controls projects at Ottumwa Unit 1, George Neal Units 3 and 4, and Lansing Unit 4.1.

Income Taxes - Refer to Note 11 of the “Combined Notes to Consolidated Financial Statements” for details of IPL’s effective income tax rates, were (15.2%), (2.7%)including discussion of the tax benefit riders, production tax credits, effect of rate-making on property-related differences and 22.8% instate apportionment changes.

Forecast - 2012, 2011 and 2010, respectively. Details of theIPL currently expects its effective income tax rates were as follows:
 2012 2011 2010
Statutory federal income tax rate35.0% 35.0% 35.0%
State apportionment change due to the announced sale of RMT6.2
 
 
Electric tax benefit rider implemented in February 2011(37.0) (26.5) 
Effect of rate-making on property-related differences(14.2) (5.3) (8.9)
Production tax credits(9.6) (9.1) (4.1)
IRS audit completed in September 2010
 
 (2.7)
Federal Health Care Legislation enacted in March 2010
 
 2.0
Other items, net4.4
 3.2
 1.5
Overall income tax rate(15.2%) (2.7%) 22.8%

2012 vs. 2011 Summary - The decreaserate to increase in the effective tax rate for 2012 was primarily2014 compared to 2013 due to $13 million of additional incomeanticipated lower tax benefits in 2012 fromfor the effect of rate-making on property-related differences resultingdifferences. Refer to “Rate Matters” for discussion of the authorization IPL received from changesthe IUB in accounting methodologies for IPL’s allocation of mixed services costs and recording of repair expenditures, and an additional $12 million of income tax benefits in 2012December 2013 related to IPL’scredits on Iowa retail electric customers’ bills associated with the electric tax benefit rider that began in 2011. These items were partially offset by an $8 million state apportionment charge due to the announced sale of RMT in 2012.for 2014.

2011Preferred Dividend Requirements -
2013 vs. 20102012 Summary - The decreasePreferred dividend requirements increased $4 million in the effective tax rate for 2011 was2013 primarily due to the impactIPL recording charges of $36 million of income tax benefits related to IPL’s tax benefit rider that began in 2011. The decrease in the effective tax rate was also due to $5 million of higher production tax credits primarily due to fewer transmission constraints at the Whispering Willow - East wind project during 2011, and $4 million of income tax expense recognized in 2010 related to the impactsredemption of the Federal Health Care Legislation. These items were partially offset by higher state income taxes at IPL related to property-related differences for which Iowa deferred tax is not recordedpreferred stock in the income statement pursuant to Iowa rate-making principles and $5 million of income tax benefits recorded by IPL in 2010 related to the impact of the IRS completing audits of Alliant Energy’s U.S. federal income tax returns for calendar years 2005 through 2008.

2013. Refer to Note 58 of the “Combined Notes to Consolidated Financial Statements” for additional discussion of state apportionment changes, IPL’s electric tax benefit rider, tax effect of rate-making on property-related differences at IPL, production tax credits, an IRS audit completed in 2010, and Federal Health Care Legislation enacted in 2010. Refer to “Rate Matters” for discussion of IPL’s tax benefit rider. Refer to “Critical Accounting Policies and Estimates” for discussion of the effect of rate-making on property-related differences at IPL and discussion of changes to state apportionment projections resulting from Alliant Energy’s decision in February 2012 to sell RMT. Refer to “Other Future Considerations” for discussion of possible impacts to IPL’s future income taxes resulting from potential tax accounting method changes and trends in production tax credits.preferred stock transactions.

Preferred Dividend Requirements -
2012 vs. 2011 Summary - Preferred dividend requirements decreased $2 million in 2012 primarily due to a $2 million charge in the first quarter of 2011 related to IPL’s redemption of its 7.10% cumulative preferred stock in 2011.

In February 2013, IPL announced it will redeem all 6,000,000 outstanding shares of its 8.375% cumulative preferred stock in March 2013 at par value for approximately $150 million plus accrued and unpaid dividends to the redemption date. IPL expects to record a $5 million charge in the first quarter of 2013 related to this transaction in “Preferred dividend requirements” in its Consolidated Statement of Income.


67

Table of Contents


WPL’S RESULTS OF OPERATIONS

Overview - WPL’s earnings available for common stock increased $2$14 million and $11$2 million in 20122013 and 20112012, respectively. The 2013 increase was primarily due to purchased electric capacity expense related to the Riverside PPA in 2012, lower energy conservation cost recovery amortizations and a lower effective tax rate. These items were partially offset by higher depreciation expense largely due to the purchase of Riverside in December 2012, lower gas revenues due to the impact of WPL’s retail gas base rate decrease effective in January 2013, higher electric transmission service costs from ATC and MISO and higher other operation and maintenance expenses. The 2012 increase was primarily due to various asset impairment charges in 2011, higher retail fuel-related cost recoveries and higher AFUDC recognized in 2012 for WPL’s emission controls projects. These items were partially offset by higher purchased electric capacity expenses related to the Kewaunee PPA and a state apportionment charge in 2012. The 2011 increase was primarily due to a base retail electric rate increase implemented in January 2011, lower purchased electric capacity expenses related to the Kewaunee PPA and increased production tax credits generated by the Bent Tree - Phase I wind project. These items were partially offset by higher operating expenses related to the Bent Tree - Phase I wind project and various asset impairment charges in 2011.


68

Table of Contents


Electric Margins - Electric margins are defined as electric operating revenues less electric production fuel, energy purchases and purchased electric capacity expenses. Management believes that electric margins provide a more meaningful basis for evaluating utility operations than electric operating revenues since electric production fuel, energy purchases and purchased electric capacity expenses are generally passed through to customers, and therefore, result in changes to electric operating revenues that are comparable to changes in electric production fuel, energy purchases and purchased electric capacity expenses. Electric margins and MWh sales for WPL were as follows:
Revenues and Costs (dollars in millions) MWhs Sold (MWhs in thousands)Revenues and Costs (dollars in millions) MWhs Sold (MWhs in thousands)
2012 2011 (a) 2010 (b) 2012 2011 (a) 2010 (b)2013 2012 (a) 2011 (b) 2013 2012 (a) 2011 (b)
Residential
$446.0
 $442.6 1% $439.6 1% 3,538
 3,517
 1% 3,541
 (1%)
$434.8
 $446.0 (3%) $442.6 1% 3,552
 3,538
 —% 3,517
 1%
Commercial246.1
 246.1
 —% 240.3
 2% 2,307
 2,300
 —% 2,275
 1%239.8
 246.1
 (3%) 246.1
 —% 2,314
 2,307
 —% 2,300
 —%
Industrial333.8
 333.5
 —% 320.9
 4% 4,439
 4,424
 —% 4,252
 4%322.5
 333.8
 (3%) 333.5
 —% 4,498
 4,439
 1% 4,424
 —%
Retail subtotal1,025.9
 1,022.2
 —% 1,000.8
 2% 10,284
 10,241
 —% 10,068
 2%997.1
 1,025.9
 (3%) 1,022.2
 —% 10,364
 10,284
 1% 10,241
 —%
Sales for resale:    
   
           
   
       
Wholesale159.8
 160.2
 —% 167.0
 (4%) 2,899
 2,955
 (2%) 2,900
 2%165.4
 159.8
 4% 160.2
 —% 3,145
 2,899
 8% 2,955
 (2%)
Bulk power and other14.3
 27.6
 (48%) 20.6
 34% 926
 1,028
 (10%) 695
 48%15.7
 14.3
 10% 27.6
 (48%) 665
 926
 (28%) 1,028
 (10%)
Other18.2
 17.5
 4% 21.5
 (19%) 70
 67
 4% 70
 (4%)19.0
 18.2
 4% 17.5
 4% 72
 70
 3% 67
 4%
Total revenues/sales1,218.2
 1,227.5
 (1%) 1,209.9
 1% 14,179
 14,291
 (1%) 13,733
 4%1,197.2
 1,218.2
 (2%) 1,227.5
 (1%) 14,246
 14,179
 —% 14,291
 (1%)
Electric production fuel expense173.4
 197.4
 (12%) 171.7
 15%       237.1
 173.4
 37% 197.4
 (12%)       
Energy purchases expense194.4
 184.0
 6% 229.5
 (20%)       105.8
 194.4
 (46%) 184.0
 6%       
Purchased electric capacity expense117.8
 109.5
 8% 134.7
 (19%)       61.6
 117.8
 (48%) 109.5
 8%       
Margins$732.6 $736.6 (1%) $674.0 9%       $792.7 $732.6 8% $736.6 (1%)       

(a)
Reflects the % change from 20112012 to 20122013. (b) Reflects the % change from 20102011 to 20112012.

2013 vs. 2012 Summary - Electric margins increased $60 million, or 8%, primarily due to $59 million of purchased electric capacity expenses related to the Riverside PPA in 2012 and an increase in weather-normalized retail sales volumes. These items were partially offset by an estimated $12 million decrease in electric margins from changes in sales caused by weather conditions in WPL’s service territory.

2012 vs. 2011 Summary - Electric margins decreased $4 million, or 1%, primarily due to $8 million of higher purchased electric capacity expenses related to the Kewaunee PPA in 2012 compared to 2011, $5 million of revenues recognized in 2011 related to interim fuel rates collected in 2010 and a decrease in weather-normalized sales volumes. These items were partially offset by a $10 million increase in electric margins from changes in the recovery of electric production fuel and energy purchases expenses and an estimated $8 million increase in electric margins from changes in sales caused by weather conditions in WPL’s service territory. Estimated increases to WPL’s electric margins from the impacts of weather during 2012 and 2011 were $21 million and $13 million, respectively.

2011 vs. 2010 Summary - Electric margins increased $63 million, or 9%, primarily due to the impact of a base retail electric rate increase (excluding fuel cost recoveries) implemented in January 2011, which increased WPL’s electric revenues by $38 million in 2011. Other increases in electric margins included $21 million of lower purchased electric capacity expenses related to the Kewaunee PPA, an estimated $2 million increase from changes in sales caused by weather conditions in WPL’s service territory in 2011 and a 4% increase in industrial sales volumes. Estimated increases to WPL’s electric margins from the impacts of weather in 2011 and 2010 were $13 million and $11 million, respectively. These items were partially offset by the impact of a wholesale formula rate change, which increased WPL’s electric revenues by $4 million in 2010 and a decrease in weather-normalized residential sales volumes.

Refer to “Alliant Energy’s Results of Operations - Utility Electric Margins” for details of WPL’s CDD and HDD data, estimated impacts of weather, purchased electric capacity expenses, recoveries of electric production fuel and energy purchases expenses, sales trends and sales trends.items impacting WPL’s electric margin forecast. Refer to “Rate Matters” for discussion of retail rate cases, including a retail electric base rate freeze through December 31, 2014 and a potential future retail electric base rate case filing in 2014.

68

Table of Contents



Gas Margins - Gas margins are defined as gas operating revenues less cost of gas sold. Management believes that gas margins provide a more meaningful basis for evaluating utility operations than gas operating revenues since cost of gas sold is generally passed through to customers, and therefore, results in changes to gas operating revenues that are comparable to changes in cost of gas sold. Gas margins and Dth sales for WPL were as follows:

69

Table of Contents


Revenues and Costs (dollars in millions) Dths Sold (Dths in thousands)Revenues and Costs (dollars in millions) Dths Sold (Dths in thousands)
2012 2011 (a) 2010 (b) 2012 2011 (a) 2010 (b)2013 2012 (a) 2011 (b) 2013 2012 (a) 2011 (b)
Residential
$97.9
 
$114.5
 (14%) 
$118.1
 (3%) 10,116
 11,231
 (10%) 11,205
 —%
$109.7
 
$97.9
 12% 
$114.5
 (14%) 12,941
 10,116
 28% 11,231
 (10%)
Commercial54.6
 67.3
 (19%) 65.8
 2% 7,712
 8,594
 (10%) 8,095
 6%64.6
 54.6
 18% 67.3
 (19%) 9,841
 7,712
 28% 8,594
 (10%)
Industrial3.9
 5.5
 (29%) 8.9
 (38%) 633
 825
 (23%) 1,289
 (36%)5.0
 3.9
 28% 5.5
 (29%) 872
 633
 38% 825
 (23%)
Retail subtotal156.4
 187.3
 (16%) 192.8
 (3%) 18,461
 20,650
 (11%) 20,589
 —%179.3
 156.4
 15% 187.3
 (16%) 23,654
 18,461
 28% 20,650
 (11%)
Transportation/other13.2
 13.1
 1% 13.5
 (3%) 26,540
 24,490
 8% 22,337
 10%11.6
 13.2
 (12%) 13.1
 1% 28,242
 26,540
 6% 24,490
 8%
Total revenues/sales169.6
 200.4
 (15%) 206.3
 (3%) 45,001
 45,140
 —% 42,926
 5%190.9
 169.6
 13% 200.4
 (15%) 51,896
 45,001
 15% 45,140
 —%
Cost of gas sold92.3
 119.6
 (23%) 125.3
 (5%)       116.4
 92.3
 26% 119.6
 (23%)       
Margins
$77.3
 
$80.8
 (4%) 
$81.0
 —%       
$74.5
 
$77.3
 (4%) 
$80.8
 (4%)       

(a)
Reflects the % change from 20112012 to 20122013. (b) Reflects the % change from 20102011 to 20112012.

2013 vs. 2012 Summary - Gas margins decreased $3 million, or 4%, largely due to $15 million of lower revenues due to the impact of WPL’s retail gas base rate decrease effective in January 2013. This item was partially offset by an estimated $10 million increase in gas margins from changes in sales caused by weather conditions in WPL’s service territory and an increase in weather-normalized retail sales volumes. WPL believes the increase in weather-normalized sales volumes is partially due to relatively low natural gas rates and higher gas volumes required by agricultural customers to dry grain in 2013.

2012 vs. 2011 Summary - Gas margins decreased $4 million, or 4%, in 2012 largely due to an estimated $7 million decrease in gas margins from changes in sales caused by weather conditions in WPL’s service territory. Estimated increases (decreases) to WPL’s gas margins from the impacts of weather during 2012 and 2011 were ($7) million and $0, respectively. This item was partially offset by an increase in weather normalized sales volumes. WPL believes the increase in weather-normalized sales volumes is partially due to relatively low natural gas prices.rates.

Refer to “Alliant Energy’s Results of Operations - Utility Gas Margins” for WPL’s HDD data, estimated weather impacts and discussion of the impacts on WPL’s gas margins of recoveries of natural gas costs. Refer to “Rate Matters” for discussion of retail rate cases, including a retail gas base rate decrease effective January 1,2013 and a potential future retail gas base rate case filing in 2014.

Other Revenues -
2013 vs. 2012 Summary - Other revenues increased $14 million in 2013 primarily due to $7 million of higher coal sales and $6 million of capacity revenues recognized during 2013. WPL recognized capacity revenues in 2013 related to a PPA with a third party for the sale of a portion of Riverside’s capacity assumed by WPL with the acquisition of Riverside in December 2012. The PPA expires in May 2014. Changes in other revenues were largely offset by related changes in other operation and maintenance expenses.

Electric Transmission Service Expenses -
2013 vs. 2012 Summary - Electric transmission service expense increased $11 million in 2013 primarily due to $11 million of higher electric transmission service costs from ATC and MISO billed to WPL in 2013 compared to 2012 primarily due to increases in transmission service rates.

Forecast - Refer to “Other Future Considerations” for discussion of potential changesincreases in future electric transmission services expenses for WPL.

Other Operation and Maintenance Expenses -
2012 vs. 2011 Summary - Other operation and maintenance expenses decreased $15 million primarily due to $7 million of regulatory asset impairment charges recorded in 2011, $5 million of regulatory-related credits from WPL’s 2013/2014 rate case decision recorded in 2012, a $5 million wind site impairment charge recorded in 2011 and $4 million of additional benefits costs recorded in 2011 resulting from an amendment to the Cash Balance Plan. These items were partially offset by $4 million of cost of capital charges allocated to WPL by Corporate Services in 2012.

2011 vs. 2010 Summary - Other operation and maintenance expenses increased $23$18 million primarily due to $7and decreased $15 million of higher wind turbine operation and maintenance expenses related to the Bent Tree - Phase I wind project, which began generating electricity in late 2010, $7 million of regulatory asset impairment charges recorded in 2011, a $5 million wind site impairment charge recorded in 2011, $4 million of additional benefits costs recorded in 2011 resulting from an amendment to the Cash Balance Plan and $3 million of higher energy conservation cost recovery amortizations. These items were partially offset by $4 million of lower other postretirement benefits costs primarily due to a plan amendment in 2011, and $2 million of restructuring charges incurred in 2010 related to the elimination of certain corporate and operations positions.

WPL currently expects its other operation and maintenance expense to decrease in 2013 as compared toand 2012, due to decreases in regulatory amortizations related to energy conservation and decreases in retirement plan costs, partially offset by additional operation and maintenance expenses associated with Riverside, which WPL acquired in December 2012.

respectively. Refer to “Alliant Energy’s Results of Operations - Utility Other Operation and Maintenance Expenses” for additional details of the changes in WPL’s other operation and maintenance expenses.

Forecast - WPL currently expects its other operation and maintenance expenses to increase in 2014 compared to 2013 due to increases in regulatory amortizations related to energy conservation costs approved by the PSCW in a July 2012 order. This item is expected to be partially offset by decreases in retirement plan costs in 2014 compared to 2013, resulting from increases in discount rates and higher than expected returns on retirement plan assets in 2013.

Depreciation and Amortization Expenses -
20122013 vs. 20112012 Summary - Depreciation and amortization expenses increased $1$31 million in 20122013 primarily due to property additions, largely offset by the impact of regulatory-related charges and credits to depreciation expense in 2012 compared to 2011.

69

Table of Contents



2011 vs. 2010 Summary - Depreciation and amortization expenses increased $32 million in 2011 primarily due to property additions, including $17 million of depreciation expense recognized in 2011 related to the Bent Tree - Phase I wind project, which began generating electricity in late 2010. Also contributing to the increase was a depreciation adjustment recorded in 2010, which is not anticipated to have a material impact on future periods.

WPL currently expects its depreciation expense to increase in 2013 as compared to 2012 primarily due to the full year impact of depreciation from its purchase of Riverside, in December 2012 and the SCR project at Edgewater Unit 5, which was placed in service in the fourth quarter of 2012.2012, and new depreciation rates implemented by WPL effective in January 2013.

70

Table of Contents



Forecast - WPL currently expects its depreciation and amortization expenses to increase in 2014 compared to 2013 due to property additions, including an emission controls project expected to be placed in service in 2014.

Interest Expense -
20112013 vs. 20102012 Summary - Interest expense increased $1$5 million in 20112013 primarily due to $5 million of higher interest expense fromrecorded in 2013 compared to 2012 for WPL’s issuance2.25% debentures issued in November 2012 to fund a portion of $150 millionthe purchase price of 4.6% debentures in June 2010. This item was substantially offset by the impact of WPL’s retirement of $100 million of 7.625% debentures in March 2010.Riverside.

Forecast - WPL currently expects its interest expense to increase in 2013 as2014 compared to 20122013 due to financings relatedin 2014 to its purchasefund capital expenditures for emission controls projects. Refer to “Liquidity and Capital Resources” for details of Riverside in December 2012.WPL’s financing forecast.

Refer to Note 9 of the “Combined Notes to Consolidated Financial Statements” for additional details of WPL’s debt.

AFUDC -
2012 vs. 2011 Summary -AFUDC decreased $4 million and increased $7 million in 2013 and 2012, respectively, primarily due to changes in AFUDC recognized in 2012 for WPL’s emission controls projects at Columbia Units 1 and 2, and Edgewater Unit 5.

2011 vs. 2010 Summary - AFUDC decreased $6 million in 2011 primarily due to $10 million of AFUDC recognized in 2010 for the Bent Tree - Phase I wind project. This item was partially offset by $3 million of AFUDC recognized in 2011 for the Edgewater Unit 5 emission controls project.

Income Taxes - WPL’s effective income tax rates were 36.3%, 33.4%, and 39.2% in 2012, 2011 and 2010, respectively. Details of the effective income tax rates were as follows:
 2012 2011 2010
Statutory federal income tax rate35.0 % 35.0 % 35.0 %
State apportionment change due to announced sale of RMT2.7
 
 
Production tax credits(4.7) (6.0) (1.4)
Federal Health Care Legislation enacted in March 2010
 
 1.2
Other items, net3.3
 4.4
 4.4
Overall income tax rate36.3 % 33.4 % 39.2 %

2012 vs. 2011 Summary - The increase in the effective income tax rate for 2012 was primarily due to a $7 million state apportionment charge due to the announced sale of RMT in 2012.

2011 vs. 2010 Summary - The decrease in the effective income tax rate for 2011 was primarily due to $11 million of higher production tax credits in 2011 largely due to the Bent Tree - Phase I wind project, which began generating electricity in late 2010, and $3 million of income tax expense recognized in 2010 related to the impacts of Federal Health Care Legislation enacted in March 2010.

projects. Refer to Note 53(a) of the “Combined Notes to Consolidated Financial Statements” for additional information regarding state apportionment changes,details of AFUDC recognized in 2013, 2012 and 2011.

Income Taxes - Refer to Note 11 of the “Combined Notes to Consolidated Financial Statements” for details of WPL’s effective income tax rates, including discussion of production tax credits and Federal Health Care Legislation enacted in 2010. Refer to “Other Future Considerations” for discussion of possible impacts to WPL’s future income taxes resulting from trends in production tax credits.state apportionment changes.

Preferred Dividend Requirements - In February 2013, WPL announced it will redeem all 1,049,225 outstanding shares of its 4.40% through 6.50% cumulative preferred stock in March 2013 for approximately $61 million plus accrued and unpaid dividends to the redemption date. WPL expects to record a $1 million charge in the first quarter of 2013 related to this transaction in “Preferred dividend requirements” in its Consolidated Statement of Income.


70

Table of Contents


LIQUIDITY AND CAPITAL RESOURCES

Overview - Alliant Energy, IPL and WPL expect to maintain adequate liquidity to operate their businesses and implement their strategic plan as a result of available capacity under their revolving credit facilities, IPL’s sales of accounts receivable program and operating cash flows generated by their utility business, supplemented by periodic issuances of long-term debt and equity securities.

Liquidity Position - At December 31, 20122013, Alliant Energy had $2110 million of cash and cash equivalents, $733721 million ($196205 million at the parent company, $224300 million at IPL and $313216 million at WPL) of available capacity under their revolving credit facilities and $20121 million of available capacity at IPL under its sales of accounts receivable program. Refer to “Cash Flows - Financing Activities - Short-term Debt” below and Note 9(a) of the “Combined Notes to Consolidated Financial Statements” for further discussion of the credit facilities. Refer to Note 4(a)5(a) of the “Combined Notes to Consolidated Financial Statements” for additional information on IPL’s sales of accounts receivable program.

Capital Structure - Alliant Energy, IPL and WPL plan to maintain debt-to-total capitalization ratios that are consistent with their investment-grade credit ratings. Alliant Energy, IPL and WPL currently expect to maintain capital structures in which debt would not exceed 45% to 55% of total capital and preferred stock would not exceed 5% to 10% of total capital. These targets may be adjusted depending on subsequent developments and their impact on Alliant Energy’s, IPL’s and WPL’s respective weighted average cost of capital and investment-grade credit ratings. Capital structures at December 31, 20122013 were as follows (dollars in millions):
Alliant Energy (Consolidated) IPL WPLAlliant Energy (Consolidated) IPL WPL
Common equity
$3,134.9
 47% 
$1,519.2
 50% 
$1,583.0
 52%
$3,281.4
 46% 
$1,679.7
 49% 
$1,642.4
 52%
Preferred stock205.1
 3% 145.1
 5% 60.0
 2%200.0
 3% 200.0
 6% 
 %
Noncontrolling interest1.8
 % 
 % 
 %1.8
 % 
 % 
 %
Long-term debt (incl. current maturities)3,138.1
 47% 1,359.5
 45% 1,331.5
 43%3,336.3
 47% 1,558.4
 45% 1,332.1
 42%
Short-term debt217.5
 3% 26.3
 % 86.6
 3%279.4
 4% 
 % 183.7
 6%

$6,697.4
 100% 
$3,050.1
 100% 
$3,061.1
 100%
$7,098.9
 100% 
$3,438.1
 100% 
$3,158.2
 100%

Alliant Energy, IPL and WPL intend to manage their capital structures and liquidity positions in such a way that facilitates their ability to raise the necessary funds reliably and on reasonable terms and conditions, while maintaining financial capital structures consistent with those approved by regulators and necessary to maintain appropriate credit quality. In addition to capital structures, other important financial considerations used to determine the characteristics of future financings include potential proceeds from asset sales, financial coverage ratios, flexibility in capital spending plans, regulatory orders and rate-making considerations, the levels of debt imputed by rating agencies, market conditions and the impact of tax initiatives. The

71

Table of Contents


most significant debt imputations relate to the sales of accounts receivable program, the DAEC and Kewaunee PPAs,PPA, and pension and other postretirement benefits obligations. The PSCW factors certain imputed debt adjustments in establishing a regulatory capital structure as part of WPL’s retail rate cases, particularly those related to PPAs.cases. The IUB and MPUC do not make any explicit adjustments for imputed debt in establishing capital ratios used in determining customer rates, although such adjustments are considered by IPL in recommending an appropriate capital structure.

Credit and Capital Markets - Alliant Energy, IPL and WPL are aware of the potential implications that credit and capital market disruptions might have on their ability to raise the external funding required for their respective operations and capital expenditure plans. Alliant Energy’s, IPL’s and WPL’s strategic initiatives include a desire to maintain sufficient liquidity resources to reasonably withstand such a disruption. Alliant Energy, IPL and WPL maintain revolving credit facilities to provide backstop liquidity to their commercial paper programs, ensure a committed source of liquidity in the event the commercial paper market becomes disrupted and efficiently manage their long-term financings. In addition, Alliant Energy and IPL maintain a sales of accounts receivable program at IPL as an alternative financing source.

Primary Sources and Uses of Cash - Alliant Energy’s, IPL’s and WPL’s most significant source of cash is from electric and gas sales to their utility customers. Cash from these sales reimburses IPL and WPL for prudently-incurred expenses to provide service to their utility customers and provides IPL and WPL a return of and a return on the assets used to provide such services. Utility operating cash flows are expected to cover the majority of IPL’s and WPL’s capital expenditures required to maintain their current infrastructure and to pay dividends to Alliant Energy’s shareowners. Capital needed to retire debt and fund capital expenditures related to environmental compliance programs and other large strategic projects is expected to be met primarily through external financings.


71

Table of Contents


Cash Flows - Selected information from the Consolidated Statements of Cash Flows was as follows (in millions):
Alliant Energy IPL WPLAlliant Energy IPL WPL
201220112010 201220112010 201220112010201320122011 201320122011 201320122011
Cash and cash equivalents, January 1
$11.4

$159.3

$175.3
 
$2.1

$5.7

$0.4
 
$2.7

$0.1

$18.5

$21.2

$11.4

$159.3
 
$4.5

$2.1

$5.7
 
$0.7

$2.7

$0.1
Cash flows from (used for):          
Operating activities841.1
702.7
984.9
 291.0
366.9
549.6
 427.4
428.8
372.4
731.0
841.1
702.7
 232.6
291.0
366.9
 423.3
427.4
428.8
Investing activities(1,155.5)(652.1)(866.5) (331.2)(200.6)(415.0) (710.2)(305.4)(449.3)(754.7)(1,155.5)(652.1) (423.3)(331.2)(200.6) (335.9)(710.2)(305.4)
Financing activities324.2
(198.5)(134.4) 42.6
(169.9)(129.3) 280.8
(120.8)58.5
12.3
324.2
(198.5) 190.6
42.6
(169.9) (87.6)280.8
(120.8)
Net increase (decrease)9.8
(147.9)(16.0) 2.4
(3.6)5.3
 (2.0)2.6
(18.4)(11.4)9.8
(147.9) (0.1)2.4
(3.6) (0.2)(2.0)2.6
Cash and cash equivalents, December 31
$21.2

$11.4

$159.3
 
$4.5

$2.1

$5.7
 
$0.7

$2.7

$0.1

$9.8

$21.2

$11.4
 
$4.4

$4.5

$2.1
 
$0.5

$0.7

$2.7

Operating Activities -
2013vs.2012 - Alliant Energy’s cash flows from operating activities decreased $110 million primarily due to $91 million of lower cash flows from changes in the level of IPL’s accounts receivable sold during 2013 and 2012, $63 million of cash flows from operations at RMT in 2012 due to changes in working capital requirements associated with renewable energy projects, lower cash flows from changes in prepaid gas and inventory levels of gas stored underground at IPL and WPL, and refunds paid by WPL to its retail electric customers during 2013 for over-collected fuel-related costs during 2012. These items were partially offset by $59 million of purchased electric capacity payments by WPL in 2012 related to the Riverside PPA, and the timing of electric fuel-related, natural gas and transmission cost recoveries at IPL.

IPL’s cash flows from operating activities decreased $58 million primarily due to $91 million of lower cash flows from changes in the level of accounts receivable sold in 2013 compared to 2012 and lower cash flows from changes in prepaid gas and inventory levels of gas stored underground. These items were partially offset by the timing of electric fuel-related, natural gas and transmission cost recoveries.

WPL’s cash flows from operating activities decreased $4 million primarily due to $26 million of lower cash flows caused by income tax payments in 2013 and income tax refunds in 2012, refunds paid by WPL to its retail electric customers during 2013 for over-collected fuel-related costs during 2012, and lower cash flows from changes in prepaid gas and inventory levels of gas stored underground. These items were largely offset by $59 million of purchased electric capacity payments in 2012 related to the Riverside PPA.


72

Table of Contents


2012vs.2011 - Alliant Energy’s cash flows from operating activities increased $138 million primarily due to $166 million of higher cash flows from operations at RMT due to changes in working capital requirements associated with renewable energy projects in 2012 and 2011 and $117 million of pension plan contributions in 2011. These items were partially offset by $85 million of lower cash flows from changes in the level of IPL’s accounts receivable sold during 2012 and 2011, $22 million of higher credits on retail electric customers’ bills in Iowa during 2012 compared to 2011 resulting from IPL’s electric tax benefit rider and changes in working capital during 2012 and 2011.

IPL’s cash flows from operating activities decreased $76 million primarily due to $85 million of lower cash flows from changes in the level of accounts receivable sold during 2012 and 2011, $22 million of higher credits on retail electric customers’ bills in Iowa during 2012 compared to 2011 resulting from the electric tax benefit rider and changes in working capital during 2012 and 2011. These items were partially offset by $58 million of pension plan contributions in 2011 and $22 million of lower income tax payments during 2012 compared to 2011.

WPL’s cash flows from operating activities decreased $1 million primarily due to $48 million of lower income tax refunds during 2012 compared to 2011. This item was largely offset by $47 million of pension plan contributions in 2011.

2011 vs. 2010IPL’s Sales of Accounts Receivable Program - Alliant Energy and IPL utilize the sales of accounts receivable program to finance a portion of their cash needs. Changes in IPL’s sales of accounts receivable program increased (decreased) Alliant Energy’s cash flows from operating activities decreased $282 million primarily due to $121 million of lowerand IPL’s cash flows from operations at RMT due to increased working capital requirements associated with additional renewable energy projectsby ($101) million, ($10) million and $75 million in 2013, 2012 and 2011 $117 million of pension plan contributions, respectively. The decrease in 2011, $105 million of lower income tax refunds and $61 million of credits on retail electric customers’ bills in Iowa in 2011 resulting from IPL’s implementation of the tax benefit rider. These items were partially offset by increased collections from IPL’s and WPL’s customers in 2011 caused by the impacts of rate increases, the timing of fuel-cost recoveries at IPL and $21 million of lower purchased electric capacity payments related to the Kewaunee PPA at WPL.

IPL’s cash flows from operating activities decreased $183 million2013 was primarily due to $151IPL using a portion of the proceeds from its issuance of $250 million of lowerlong-term debt in 2013 to reduce cash flowsproceeds from income tax paymentsits sales of accounts receivable program. The higher level of proceeds from the receivables sold in 2011 was primarily used by IPL to help fund working capital and income tax refundsconstruction expenditures, and to reduce short-term debt. The purchase commitment from the third party to which it sells its receivables expires in 2010, $61 million of credits on retail electric customers’ bills in Iowa in 2011 resulting from implementationMarch 2014. IPL is currently pursuing the extension of the tax benefit rider and $58 millionpurchase commitment. Refer to Note 5(a) of pension plan contributions in 2011. These items were partially offset by increased collections fromthe “Combined Notes to Consolidated Financial Statements” for additional details of IPL’s customers in 2011 caused by the impactssales of rate increases and the timing of fuel-cost recoveries.

WPL’s cash flows from operating activities increased $56 million primarily due to $47 million of higher income tax refunds, increased collections from WPL’s customers in 2011 caused by the impacts of a rate increase and $21 million of lower payments related to the Kewaunee PPA. These items were partially offset by $47 million of pension plan contributions in 2011.accounts receivable program.

RMT’s Working Capital Requirements - Cash flows from operations at RMT decreased significantly in 2013 compared to 2012 and increased significantly in 2012 compared to 2011 largely due to amounts collected in 2012 for customers’ large renewable energy projects completed in late 2011 and inearly 2012. In January 2013, Alliant Energy sold RMT.

Electric Fuel-related, Natural Gas and Transmission Cost Recoveries - IPL has cost recovery mechanisms applicable for its remaining interestretail electric and gas customers to provide for subsequent adjustments to its electric and gas rates for changes in RMT.electric fuel-related and natural gas costs. IPL also has a cost recovery mechanism applicable for its Iowa retail electric customers to provide for subsequent adjustments to its electric rates for changes in electric transmission service expenses. Changes in the timing of IPL’s electric fuel-related, natural gas and transmission cost recoveries resulted in $47 million of higher cash flows from operations for Alliant Energy and IPL in 2013 compared to 2012.

Income Tax Payments and Refunds - Income tax payments (refunds) for 2011 through 2013 were as follows (in millions):
 2013 2012 2011
IPL
$—
 
$3
 
$25
WPL23
 (3) (51)
Other subsidiaries(33) (20) 15
Alliant Energy
($10) 
($20) 
($11)

Alliant Energy’s income tax refunds in 2013, 2012 and 2011 were primarily due to federal and state claims filed related to net operating losses carried back to prior years. Alliant Energy, IPL and WPL currently do not expect to make any significant federal income tax payments in 2014 and 2015 based on their current federal net operating loss and credit carryforward positions and future amounts of bonus depreciation expected to be claimed on Alliant Energy’s U.S. federal income tax returns for calendar years 2013 and 2014. While no significant federal income tax payments in 2014 and 2015 are expected to occur, some tax payments and refunds may occur between consolidated group members (including IPL and WPL) under the tax sharing agreement between Alliant Energy and its subsidiaries. Refer to Note 11 of the “Combined Notes to Consolidated Financial Statements” for discussion of the carryforward positions.


7273

Table of Contents


Pension Plan Contributions - Contributions to qualified and non-qualified defined benefit pension plans for 20102011 through 20122013 were as follows (in millions):
2012 2011 20102013 2012 2011
IPL (a)
$—
 
$58
 
$—

$1
 
$—
 
$58
WPL (a)
 47
 

 
 47
Other subsidiaries16
 12
 8
2
 16
 12
Alliant Energy
$16
 
$117
 
$8

$3
 
$16
 
$117

(a)Pension plan contributions for IPL and WPL include contributions to their respective qualified pension plans as well as an assigned portion of the contributions to pension plans sponsored by Corporate Services.

Alliant Energy, IPL and WPL currently do not expect to make any significant pension plan contributions in 20132014 through 20152016 based on the funded status and assumed return on assets for each plan as of the December 31, 20122013 measurement date. Refer to Note 6(a)12(a) of the “Combined Notes to Consolidated Financial Statements” for discussion of the current funded levels of pension plans and contributions expected in 20132014.

IPL’s Sales of Accounts Receivable Program - Changes in cash flows related to IPL’s sales of accounts receivable program increased (decreased) Alliant Energy’s and IPL’s cash flows from operations by ($10) million, $75 million and $65 million in 2012, 2011 and 2010, respectively. The decrease in 2012 was primarily due to IPL relying less on its sales of accounts receivable program in 2012 to finance its cash needs. In 2011 and 2010, proceeds from the receivables sold were primarily used by IPL to help fund working capital and construction expenditures, and to reduce short-term debt. In March 2012, IPL extended through March 2014 the purchase commitment from the third-party financial institution to which it sells its receivables. Refer to Note 4(a) of the “Combined Notes to Consolidated Financial Statements” for additional details of IPL’s sales of accounts receivable program.

IPL’s Tax Benefit Riders - IPL implemented its electric tax benefit rider in early 2011 and its gas tax benefit rider in early 2013. These tax benefit riders provide credits on Iowa retail customers’ bills, which result in lower cash flows from operations for Alliant Energy and IPL. IPL’s electric tax benefit rider resulted in $83 million and $61 million of credits on Iowa retail electric customers’ bills during 2012 and 2011, respectively. IPL currently expects $56$85 million and $12 million of billing credits in 20132014 for its Iowa retail electric and gas customers, respectively. Refer to “Rate Matters,” “Alliant Energy’s Results of Operations,” “IPL’s Results of Operations,” and Notes Note 52 and 11 of the “Combined Notes to Consolidated Financial Statements” for further discussion of IPL’s tax benefit riders.

IncomeWhiting Petroleum Tax Payments and RefundsSharing Agreement - IncomeIn 2014, Alliant Energy currently expects to receive approximately $25 million from Whiting Petroleum related to its tax payments (refunds) received forsharing agreement, which is discussed in 2010Note 5(b) through of the “Combined Notes to Consolidated Financial Statements.”

Investing Activities -
2013vs.2012 were as follows (in millions):
 2012 2011 2010
IPL
$3
 
$25
 
($126)
WPL(3) (51) (4)
Other subsidiaries(20) 15
 14
Alliant Energy
($20) 
($11) 
($116)

- Alliant Energy’s IPL’s and WPL’s income tax refunds in 2012, 2011 and 2010 werecash flows used for investing activities decreased $401 million primarily due to claims filed with the IRS to carryback net operating losses to prior years.$294 million of lower utility construction and acquisition expenditures, a $62 million cash grant Alliant Energy IPLreceived during 2013 related to the Franklin County wind project, and WPL do not expectexpenditures in 2012 for the Franklin County wind project and Corporate Services’ purchase of its corporate headquarters building. The lower utility construction and acquisition expenditures were largely due to make any significant federal income tax paymentsexpenditures for WPL’s purchase of Riverside in 2012 and for emission controls projects at WPL’s Edgewater Unit 5 in 2012, partially offset by higher expenditures in 2013 for the emission controls projects at WPL’s Columbia Units 1 and 2014, based on the federal net operating loss2, and credit carryforward positions as of December 31, 2012. While no significant federal income tax payments in 2013IPL’s George Neal Units 3 and 2014 are expected to occur, some tax payments4 and refunds may occur between consolidated group members (including IPL and WPL) under the tax sharing agreement between Alliant Energy and its subsidiaries.Lansing Unit 4 . Refer to Note 55(d) of the “Combined Notes to Consolidated Financial Statements” for further discussion of the carryforward positions.Franklin County wind project cash grant.

Investing Activities -IPL’s cash flows used for investing activities increased $92 million due to $93 million of higher construction expenditures. The higher construction expenditures were largely due to higher expenditures in 2013 for emission controls projects at George Neal Units 3 and 4 and Lansing Unit 4.

WPL’s cash flows used for investing activities decreased $374 million primarily due to $387 million of lower construction and acquisition expenditures. The lower construction and acquisition expenditures resulted from expenditures in 2012 for the purchase of Riverside and emission controls projects at Edgewater Unit 5. These items were partially offset by higher expenditures in 2013 for emission controls projects at Columbia Units 1 and 2.

2012vs.2011 - Alliant Energy’s cash flows used for investing activities increased $503 million primarily due to $485 million of higher construction and acquisition expenditures and $12 million of net proceeds from the salesales of IEA and RMT’s environmental business unit in June 2011. The higher construction and acquisition expenditures resulted from expenditures during 2012 for WPL’s purchase of Riverside, Resources’the Franklin County wind project, Corporate Services’ purchase of its corporate headquarters building, at the expiration of the lease term, and emission controls projects at WPL’s Columbia Units 1 and 2, IPL’s Ottumwa Unit 1 and IPL’s George Neal Units 3 and 4. These items were partially offset by progress payments by IPL

73

Table of Contents


during 2011 for wind turbine generators that were sold to Resources in 2011, and expenditures during 2011 for WPL’s Bent Tree - Phase I wind project and WPL’s acquisition of the remaining 25% interest in Edgewater Unit 5.

IPL’s cash flows used for investing activities increased $131 million primarily due to $115 million of proceeds from the sale of wind project assets to Resources in 2011, and $14 million of higher construction expenditures. The higher construction expenditures resulted from expenditures during 2012 for the emission controls projects at Ottumwa Unit 1 and George Neal Units 3 and 4, partially offset by progress payments during 2011 for wind turbine generators that were sold to Resources in 2011.

74

Table of Contents



WPL’s cash flows used for investing activities increased $405 million primarily due to $404 million of higher construction and acquisition expenditures. The higher construction and acquisition expenditures resulted from expenditures during 2012 for the purchase of Riverside and emission controls projects at Columbia Units 1 and 2. These items were partially offset by expenditures during 2011 for the Bent Tree - Phase I wind project and the acquisition of the remaining 25% interest in Edgewater Unit 5.

2011 vs. 2010 - Alliant Energy’s cash flows used for investing activities decreased $214 million primarily due to $194 million of lower construction and acquisition expenditures and $12 million of net proceeds from the sale of RMT’s environmental business unit in 2011. The lower construction and acquisition expenditures resulted from expenditures during 2010 for WPL’s Bent Tree - Phase I wind project, IPL’s Lansing Unit 4 emission controls project and IPL’s Whispering Willow - East wind project. These items were partially offset by expenditures during 2011 for wind turbine generators for Resources’ Franklin County wind project, WPL’s acquisition of the remaining 25% interest in Edgewater Unit 5 and WPL’s emission controls project at Edgewater Unit 5.

IPL’s cash flows used for investing activities decreased $214 million primarily due to $115 million of proceeds from the sale of wind project assets to Resources in 2011 and $89 million of lower construction expenditures. The lower construction expenditures resulted from expenditures during 2010 for the Lansing Unit 4 emission controls project and Whispering Willow - East wind project. These items were partially offset by progress payments in 2011 for wind turbine generators that were subsequently sold to Resources in 2011.

WPL’s cash flows used for investing activities decreased $144 million primarily due to $136 million of lower construction and acquisition expenditures. The lower construction and acquisition expenditures resulted from expenditures during 2010 for the Bent Tree - Phase I wind project. This item was partially offset by expenditures during 2011 for the acquisition of the remaining 25% interest in Edgewater Unit 5 and the Edgewater Unit 5 emission controls project.

Construction and Acquisition Expenditures - Capital expenditures and financing plans are reviewed, approved and updated as part of Alliant Energy’s, IPL’s and WPL’s strategic and operationalfinancial planning processes. Significant capital projects and investments are subject to a cross-functional review prior to approval. Changes in Alliant Energy’s, IPL’s and WPL’s anticipated construction and acquisition expenditures may result from a number of reasons including economic conditions, regulatory requirements, changing legislation, ability to obtain adequate and timely rate relief, improvements in technology, changing market conditions and new opportunities. Alliant Energy, IPL and WPL have not yet entered into contractual commitments relating to the majority of their anticipated future capital expenditures. As a result, they have some discretion with regard to the level and timing of capital expenditures eventually incurred, and closely monitor and frequently update such estimates. Alliant Energy, IPL and WPL currently anticipate construction and acquisition expenditures for 20132014 through 20162017 as follows (in millions):
Alliant Energy IPL WPLAlliant Energy IPL WPL
2013201420152016 2013201420152016 20132014201520162014201520162017 2014201520162017 2014201520162017
Utility business (a):          
Generation - new IPL gas facility
$10

$100

$325

$200
 
$10

$100

$325

$200
 
$—

$—

$—

$—
Environmental355
210
200
165
 185
120
15
5
 170
90
185
160
Marshalltown
$185

$280

$190

$20
 
$185

$280

$190

$20
 
$—

$—

$—

$—
WPL generation investment (b)

45
245
 



 

45
245
Generation performance improvements35
75
25
45
 30
60
10
20
 5
15
15
25
70
25
45
35
 55
5
20
25
 15
20
25
10
Environmental compliance185
145
140
65
 95
30

15
 90
115
140
50
Electric and gas distribution systems315
320
315
295
 185
190
185
185
 130
130
130
110
Other380
410
405
410
 200
225
230
235
 180
185
175
175
125
140
120
95
 55
75
55
50
 70
65
65
45
Total utility business780
795
955
820
 
$425

$505

$580

$460
 
$355

$290

$375

$360
880
910
855
755
 
$575

$580

$450

$295
 
$305

$330

$405

$460
Corporate Services (b)40
45
30
20
    
Other (b)15
20
5
5
    
Corporate Services (c)55
35
20
20
    
Other non-utility (c)10
5
5
5
    

$835

$860

$990

$845
    
$945

$950

$880

$780
    


74

Table of Contents


(a)
Cost estimates represent Alliant Energy’s, IPL’s or WPL’s estimated portion of total escalated construction and acquisition expenditures and exclude AFUDC, if applicable. Refer to “Strategic Overview” for further discussion of key projects impacting construction and acquisition plans related to the generation and environmental compliance plans.utility business.
(b)
Initial cost estimates are based on WPL potentially constructing a 300 MW natural gas-fired combined-cycle EGU. These initial cost estimates are preliminary and will be updated in the future after the resource option is selected. Refer to “Strategic Overview” for further details on WPL’s potential generation investment, including WPL’s feasibility study of resource options.
(c)Cost estimates represent total escalated construction and acquisition expenditures and exclude capitalized interest.

Government Incentives for Wind Projects - Alliant Energy completed Resources’ 100 MW Franklin County wind project in the fourth quarter of 2012, which made the project eligible for one of the government incentives available under the American Recovery and Reinvestment Act (ARRA) enacted in 2009. Alliant Energy chose to elect the cash grant option, which is expected to result in approximately $62 million of grant proceeds in the first half of 2013. Refer to Note 4(d) of the “Combined Notes to Consolidated Financial Statements” for further discussion of the cash grant related to the Franklin County wind project.

Financing Activities -
2013vs.2012 - Alliant Energy’s cash flows from financing activities decreased $312 million primarily due to the impacts of $385 million of long-term debt issued in 2012 discussed below, payments of $211 million to redeem IPL’s and WPL’s cumulative preferred stock in 2013 and net changes in the amount of commercial paper outstanding at Alliant Energy, IPL and WPL. These items were partially offset by $250 million of proceeds from the issuance of 4.7% senior debentures by IPL in 2013 and $200 million of proceeds from IPL’s issuance of 5.1% cumulative preferred stock in 2013.

IPL’s cash flows from financing activities increased $148 million primarily due to $250 million of proceeds from the issuance of 4.7% senior debentures in 2013 and $200 million of proceeds from the issuance of 5.1% cumulative preferred stock in 2013. These items were partially offset by payments of $150 million to redeem 8.375% cumulative preferred stock in 2013 and changes in the amount of commercial paper outstanding.


75

Table of Contents


WPL’s cash flows used for financing activities increased $368 million primarily due to the impacts of $250 million of long-term debt issued in 2012 discussed below, $90 million of capital contributions from its parent company, Alliant Energy, in 2012 and payments of $61 million to redeem 4.4% through 6.5% cumulative preferred stock in 2013. These items were partially offset by changes in the amount of commercial paper outstanding.

2012vs.2011 - Alliant Energy’s cash flows from financing activities increased $523 million primarily due to the impacts of $385 million of long-term debt issued in 2012 discussed below, changes in the amount of commercial paper outstanding at Alliant Energy, IPL and WPL, and $40 million of payments to redeem IPL’s 7.10% cumulative preferred stock in April 2011.

IPL’s cash flows from financing activities increased $213 million primarily due to $101 million of repayments of capital to its parent company, Alliant Energy, during 2011, changes in the amount of commercial paper outstanding, $56 million of higher capital contributions from its parent company during 2012 compared to 2011, and $40 million of payments to redeem IPL’s 7.10% cumulative preferred stock in April 2011. These items were partially offset by $50 million of higher common stock dividends paid to its parent company during 2012 compared to 2011.

WPL’s cash flows from financing activities increased $402 million primarily due to the impacts of $250 million of long-term debt issued in 2012 discussed below, changes in the amount of commercial paper outstanding and $65 million of higher capital contributions from its parent company, Alliant Energy, during 2012 compared to 2011.

Increases in financing cash flows due to the issuance of long-term debt for 2012 vs. 2011 were as follows (in millions):
 Alliant Energy WPL
WPL’s 2.25% debentures in November 2012
$250
 
$250
Corporate Services’ 3.45% senior notes in September 201275
 
Franklin County Holdings, LLC variable-rate term loan credit agreement in December 201260
 
 
$385
 
$250

2011 vs. 2010 - Alliant Energy’s cash flows used for financing activities increased $64 million primarily due to the impacts of long-term debt issued and retired during 2010 discussed below and $40 million of payments to redeem IPL’s 7.10% cumulative preferred stock in 2011. These items were partially offset by changes in the amount of commercial paper outstanding at Alliant Energy, IPL and WPL.

IPL’s cash flows used for financing activities increased $41 million primarily due to the impacts of long-term debt issued and retired during 2010 discussed below, $73 million of common stock dividends paid to its parent company during 2011, and $40 million of payments to redeem its 7.10% cumulative preferred stock in 2011. These items were partially offset by changes in the amount of commercial paper outstanding.

WPL’s cash flows used for financing activities increased $179 million primarily due to changes in the amount of commercial paper outstanding, the impacts of long-term debt issued and retired during 2010 discussed below and $50 million of lower capital contributions from its parent company during 2011 compared to 2010.


75

Table of Contents


Increases (decreases) in financing cash flows due to changes in long-term debt for 2011 vs. 2010 were as follows (in millions):
 Alliant Energy IPL WPL
Proceeds from issuances:     
IPL’s 3.65% senior debentures issued in August 2010
($200) 
($200) 
$—
IPL’s 3.3% senior debentures issued in June 2010(150) (150) 
WPL’s 4.6% debentures issued in June 2010(150) 
 (150)
Payments to retire:     
IPL’s 6.75% senior debentures retired in September 2010206
 206
 
WPL’s 7.625% debentures retired in March 2010100
 
 100
 
($194) 
($144) 
($50)

FERC and Public Utility Holding Company Act Financing Authorizations - Under the Public Utility Holding Company Act of 2005,PUHCA, FERC has authority over the issuance of utility securities, except to the extent that a public utility’s primary state regulatory commission has retained jurisdiction over such matters. FERC currently has authority over the issuance of securities by IPL and Corporate Services. FERC does not have authority over the issuance of securities by Alliant Energy, WPL or Resources.

In October 2011,November 2013, IPL received authorization from FERC for $750 million of long-term debt securities issuances, $750 million of short-term debt securities outstanding (including borrowings from its parent, with $674 million of remaining authority as of through December 31, 2012) and $200 million of preferred stock issuances through 2013.2015 for the following (in millions):
Initial Authorization and Current Remaining Authority
Long-term debt securities issuances in aggregate
$750
Short-term debt securities outstanding at any time (including borrowings from its parent)750
Preferred stock issuances in aggregate300

In March 2012, Corporate Services received authorization from FERC for $150 million of long-term debt securities issuances in aggregate (with $75 million of remaining authority as of December 31, 20122013) and to maintain up to $200 million of short-term debt securities outstanding at any time through March 30, 2014. As of December 31, 20122013, Corporate Services has authority under the March 2012 order issued by FERC to receive an unspecified amount of capital contributions and advances from its parent or other affiliates through March 30, 2014. In January 2013, FERC accepted Corporate Services’ filing canceling its market-based rate authority tariff. As a result, Corporate Services will no longer be considered a public utility under the Federal Power Act and will no longer be required to seek authority from FERC for future securities issuances beyond the March 30, 2014 authorization period.

State Regulatory Financing Authorizations - In November 2011, WPL received authorization from the PSCW to have up to $400 million of short-term borrowings and/or letters of credit outstanding at any time through the earlier of the expiration date of WPL’s credit facility agreement (including extensions) or December 2019. As of December 31, 20122013, WPL also has remaining authority to issue up to $400 million of long-term debt securities in 2013aggregate in 2014 pursuant to a February 2012an August 2013 PSCW order.

In 2010, the MPUC issued an order that determined IPL does not need to obtain authorization to issue securities as long as IPL is not organized under the laws of the state of Minnesota and the securities issued do not encumber any of its property in the state of Minnesota. IPL currently does not have, and does not plan to issue, securities that encumber its property, thus IPL is not currently required to obtain approval from the MPUC for unsecured securities issuances. However, if in the future IPL were to subject its utility property in Minnesota to an encumbrance for the purpose of securing the payment of any indebtedness, IPL would be required to obtain an order from the MPUC approving such securities issuances.


76

Table of Contents


Shelf Registrations - Alliant Energy, IPL and WPL have current shelf registration statements on file with the Securities and Exchange CommissionSEC for availability to issue securities through December 2014 as follows:
 Alliant Energy IPL WPL
Aggregate amount available as of December 31, 20122013Unspecified $800350 million $550 million
Securities available to be issuedCommon stock, debt and other securities Preferred stock and debt securities Preferred stock and debt securities

Common Stock Dividends - Payment of common stock dividends is subject to dividend declaration by Alliant Energy’s Board of Directors. In November 2012, Alliant Energy announced an increase in its targeted 2013 annual common stock dividend to $1.88 per share, which is equivalent to a quarterly rate of $0.47 per share, beginning with the February 15, 2013 dividend payment. Alliant Energy’s general long-term goal is to maintain a dividend payout ratio that is competitive with the industry average. Based on that, Alliant Energy’s goal is to maintain a dividend payout ratio of approximately 60% to 70% of consolidated earnings from continuing operations. Alliant Energy’s dividend payout ratio was 61%57% of its consolidated earnings from continuing operations in 2012.2013. Refer to “Financing Forecast” below for discussion of expected common stock dividends in 2014. Refer to Note 7 of the “Combined Notes to Consolidated Financial Statements” for discussion of IPL’s and WPL’s dividend payment restrictions based on the terms of theirapplicable regulatory limitations and IPL’s outstanding preferred stock and applicable regulatory limitations.stock.


76

Table of Contents


Common Stock Issuances and Capital Contributions - Alliant Energy issued $1 million, $3 million and $6 milliona modest amount of additional common stock from the exercise of stock options under its equity-based compensation plans for employees in 2012, 2011 and 2010, respectively. Alliant Energy currently anticipates its only common stock issuances in through 2013 will be to issue new shares under its equity-based compensation plans for employees. Refer to Note 6(b) of the “Combined Notes to Consolidated Financial Statements”“Financing Forecast” below for discussion of Alliant Energy’sexpected issuances of common stock issuances in 2012 under its equity-based compensation plans for employees.through 2016. Refer to Note 7 of the “Combined Notes to Consolidated Financial Statements” for discussion of capital contributions from Alliant Energy to each of IPL, WPL, ResourcesCorporate Services and Corporate Services;Resources; payments of common stock dividends by IPL and WPL to their parent company; and repayments of capital by IPL and Resources to their parent company.

Preferred Stock Issuance and Redemptions - In February 2013, IPL announced it will redeem all 6,000,000 outstanding sharesRefer to Note 8 of its 8.375% cumulativethe “Combined Notes to Consolidated Financial Statements” for discussion of IPL’s and WPL’s preferred stock redemptions and IPL’s issuance of preferred stock in March 2013 at par value for approximately $150 million plus accrued and unpaid dividends to the redemption date. In February 2013, WPL announced it will redeem all 1,049,225 outstanding shares of its 4.40% through 6.50% cumulative preferred stock in March 2013 for approximately $61 million plus accrued and unpaid dividends to the redemption date. In 2011, IPL redeemed all 1,600,000 outstanding shares of its 7.10% cumulative preferred stock at par value for $40 million plus accrued and unpaid dividends up to the redemption date.2013.

Short-term Debt - Alliant Energy and its subsidiaries maintain committed revolving credit facilities to provide short-term borrowing flexibility and backstop liquidity for commercial paper outstanding. At December 31, 20122013, Alliant Energy'sEnergy’s short-term borrowing arrangements included three revolving credit facilities totaling $1 billion ($300 million for Alliant Energy at the parent company level, $300 million for IPL and $400 million for WPL), which expire in December 2016.. There are currently 1213 lenders that participate in the three credit facilities, with aggregate respective commitments ranging from $25$10 million to $113$135 million. EachIn 2013, each of the credit facilities was extended one year through December 2017, and each has a one-year extension renewal provision for two one-year extensions,remaining, subject to lender approval. Each of the credit facilities has a provision to expand the facility size up to $100 million, subject to lender approval for Alliant Energy and IPL, and subject to lender and regulatory approvals for WPL. During 20122013, the Alliant Energy parent company, IPL and WPL issued commercial paper to meet short-term financing requirements and did not borrow directly under their respective credit facilities.

Alliant Energy’s, IPL’s and WPL’s credit facility agreements each contain a financial covenant, which requires the entities to maintain certain debt-to-capital ratios in order to borrow under the credit facilities. The debt component of the capital ratios includes long- and short-term debt (excluding non-recourse debt and hybrid securities to the extent the total carrying value of such hybrid securities does not exceed 15% of consolidated capital of the applicable borrower), capital lease obligations, letters of credit, guarantees of the foregoing and new synthetic leases. Unfunded vested benefits under qualified pension plans are not included in the debt-to-capital ratios. The equity component of the capital ratios excludes accumulated other comprehensive income (loss).

The credit agreements contain provisions that prohibit placing liens on any of Alliant Energy’s, IPL’s or WPL’s property or their respective subsidiaries with certain exceptions. Exceptions include among others, liens to secure obligations of up to 5% of the consolidated assets of the applicable borrower (valued at carrying value), liens imposed by government entities, materialmens’ and similar liens, judgment liens, and liens to secure non-recourse debt not to exceed $100 million outstanding at any one time, and purchase money liens.

The credit agreements contain provisions that require, during their term, any proceeds from asset sales, with certain exclusions, in excess of 20% of Alliant Energy’s, IPL’s and WPL’s respective consolidated assets be used to reduce commitments under their respective facilities. Exclusions include, among others, certain sale and lease-back transactions and sales of non-regulated assets and accounts receivable.

The credit agreements contain customary events of default. In addition, Alliant Energy’s credit agreement contains a cross-default provision that would be triggered if Alliant Energy or any domestic, majority-owned subsidiary of Alliant Energy

77

Table of Contents


defaults on debt (other than non-recourse debt) totaling $50 million or more. A cross-default provision would be triggered for Alliant Energy under the IPL or WPL credit agreements if IPL or WPL, as applicable, or a majority-owned subsidiary accounting for 20% or more of IPL’s or WPL’s, as applicable, consolidated assets (valued at carrying value) defaults on debt totaling $50 million or more. A default by a minority-owned subsidiary and, in the case of the Alliant Energy credit agreement, a default by a foreign subsidiary, would not trigger a cross-default. A default by Alliant Energy, Corporate Services or Resources and its subsidiaries would not trigger a cross-default under either the IPL or WPL credit agreements, nor would a default by either of IPL or WPL constitute a cross-default event for the other. If an event of default under any of the credit agreements occurs and is continuing, then the lenders may declare any outstanding obligations under the credit agreements immediately due and payable. In addition, if any order for relief is entered under bankruptcy laws with respect to

77



Alliant Energy, IPL or WPL, then any outstanding obligations under the respective credit agreements would be immediately due and payable. In addition, IPL’s sales of accounts receivable program agreement contains a cross-default provision that is triggered if IPL or Alliant Energy incurs an event of default on debt totaling $50 million or more. If an event of default under IPL’s sales of accounts receivable program agreement occurs, then the counterparty could terminate such agreement. Refer to Note 4(a)5(a) of the “Combined Notes to Consolidated Financial Statements” for additional information on amounts outstanding under IPL’s sales of accounts receivable program.

A material adverse change representation is not required for borrowings under the credit agreements.

At December 31, 20122013, Alliant Energy, IPL and WPL were in compliance with all material covenants and other provisions of the credit agreements.

Refer to Note 9(a) of the “Combined Notes to Consolidated Financial Statements” for additional information on the credit facilities, commercial paper outstanding and debt-to-capital ratios.

Long-term Debt - In 2013 and 2012, there were no significant retirements of long-term debt. In 2013 and 2012, significant issuances of long-term debt were as follows (dollars in millions):
Company Principal Amount Type Interest Rate Maturity Date Use of Proceeds Principal Amount Type Interest Rate Maturity Date Use of Proceeds
2013:   
IPL 
$250
 Senior debentures 4.7% Oct-2043 Reduce cash proceeds received from its sales of accounts receivable program, reduce commercial paper classified as long-term debt and for general working capital purposes
2012:   
WPL 
$250
 Debentures 2.25% Nov-2022 Fund a portion of the purchase price of Riverside 250
 Debentures 2.25% Nov-2022 Fund a portion of the purchase price of Riverside
Corporate Services 75
 Senior notes 3.45% Sep-2022 Repay short-term debt primarily incurred for the purchase of the corporate headquarters building and for general working capital purposes 75
 Senior notes 3.45% Sep-2022 Repay short-term debt primarily incurred for the purchase of the corporate headquarters building and for general working capital purposes
Franklin County Holdings, LLC 60
 Variable-rate term loan credit agreement 1.1% at December 31, 2012 Dec-2014 Fund a portion of the costs of the Franklin County wind project 60
 Variable-rate term loan credit agreement 1.04% at December 31, 2013 Dec-2014 Fund a portion of the costs of the Franklin County wind project

Refer to Note 9(b) of the “Combined Notes to Consolidated Financial Statements” for further discussion of long-term debt.

Financing Forecast for 2013 - Alliant Energy, IPL and WPL currently anticipate the following financing activities to occur in the future. The financing activities of Alliant Energy and IPL are contingent on the completion of the sale of IPL’s Minnesota electric and natural gas distribution assets in 2014.

Long-term Debt - Alliant Energy, IPL and WPL currently expect to issue up to $500$600 million, $500$300 million and $0,$300 million, respectively, of preferred stock and/oradditional long-term debt in 2013. These amounts exclude2014. In addition, Alliant Energy currently anticipates refinancing $250 million of senior notes at the parent company and a $60 million term loan credit agreement at Franklin County Holdings LLC in the second half of 2014.
Common Stock Issuances - Alliant Energy currently expects to issue approximately $150 million of common stock through 2016. Alliant Energy currently does not plan to issue any commercial paper outstanding that may be classified as long-term debt.material amount of common stock in 2014.
Common Stock Dividends - In November 2013, Alliant Energy announced an increase in its targeted 2014 annual common stock dividend to $2.04 per share, which is equivalent to a quarterly rate of $0.51 per share, beginning with the February 2014 dividend payment. The timing and amount of future dividends is subject to an approved dividend declaration from its Board of Directors, and is dependent upon earnings expectations, capital requirements, and general financial business conditions, among other factors.

78




Creditworthiness -
Ratings Triggers - The long-term debt of Alliant Energy and its subsidiaries is not subject to any repayment requirements as a result of explicit credit rating downgrades or so-called “ratings triggers.” However, Alliant Energy and its subsidiaries are parties to various agreements including PPAs, commodity contracts and corporate guarantees that arecontain provisions dependent on maintaining investment-grade credit ratings. In the event of a significant downgrade, below investment-grade level, Alliant Energy or its subsidiaries may need to provide credit support, such as letters of credit or cash collateral equal to the amount of the exposure, or may need to unwind the contract or pay the underlying obligation. In the event of a significant downgrade, below investment-grade level, management believes Alliant Energy, IPL and WPL have sufficient liquidity to cover counterparty credit support or collateral requirements under these various agreements. In addition, a downgrade in the credit ratings of Alliant Energy, IPL or WPL could also result in them paying higher interest rates in future financings, reduce their pool of potential lenders, increase their borrowing costs under existing credit facilities or limit their access to the commercial paper market. Alliant Energy, IPL and WPL are committed to taking the necessary steps required to maintain investment-grade credit ratings. Current credit ratings and outlooks are as follows:

78



  Standard & Poor’s Ratings Services Moody’s Investors Service
Alliant Energy:Corporate/issuerA- Baa1A3
 Commercial paperA-2 P-2
 Senior unsecured long-term debtBBB+ Baa1A3
 OutlookStable Stable
IPL:Corporate/issuerA- A3
 Commercial paperA-2 P-2
 Senior unsecured long-term debtA- A3
 Preferred stockBBB Baa2
 OutlookStable Stable
WPL:Corporate/issuerA A2A1
 Commercial paperA-1 P-1
 Senior unsecured long-term debtA A2
Preferred stockBBB+Baa1A1
 OutlookStable Stable
Resources:Corporate/issuerA- Not rated

Credit ratings are not recommendations to buy or sell securities and are subject to change, and each rating should be evaluated independently of any other rating. Each of Alliant Energy, IPL or WPL assumes no obligation to update their respective credit ratings. Refer to Note 1215 of the “Combined Notes to Consolidated Financial Statements” for additional information on ratings triggers for commodity contracts accounted for as derivatives.

Off-Balance Sheet Arrangements -
Synthetic Leases - Alliant Energy and WPL utilize off-balance sheet synthetic operating leases related to the financing of certain utility railcars. Synthetic leases provide favorable financing rates to Alliant Energy and WPL while allowing them to maintain operating control of their leased assets. Refer to Note 3(a) of the “Combined Notes to Consolidated Financial Statements” for future minimum lease payments and residual value guarantees associated with these synthetic leases.

Special Purpose Entities - IPL maintains a Receivables Purchase and Sale Agreement (Agreement) whereby it may sell its customer accounts receivables, unbilled revenues and certain other accounts receivables to a third-party financial institutionthird party through wholly-owned and consolidated special purpose entities. In 2013, 2012 2011 and 2010,2011, IPL evaluated the third-party financial institutionthird party that purchases IPL’s receivable assets under the Agreement and believes that the third-party financial institutionthird party is a variable interest entity.VIE. However, IPL does not have a variable interest in the third-party financial institution.third party. Refer to “Cash Flows - Operating Activities - IPL’s Sales of Accounts Receivable Program” and Note 4(a)5(a) of the “Combined Notes to Consolidated Financial Statements” for information regarding IPL’s sales of accounts receivable program including an extension through March 2014 of the purchase commitment from the third-party financial institution to which IPL sells its receivables.program.

Guarantees Surety Bonds and Indemnifications - Alliant Energy has guarantees surety bonds and indemnifications outstanding at December 31, 20122013 related to its prior divestiture activities, including Alliant Energy’s sale of its remaining interest in RMT in January 2013.activities. Refer to Note 13(d)16(d) of the “Combined Notes to Consolidated Financial Statements” for additional information.


79



Certain Financial Commitments -
Contractual Obligations - Consolidated long-term contractual obligations as of December 31, 20122013 were as follows (in millions):
Alliant Energy2013 2014 2015 2016 2017 Thereafter Total
Operating expense purchase obligations (Note 13(b)):
             
Purchased power and fuel commitments (a)
$574
 
$183
 
$111
 
$31
 
$14
 
$6
 
$919
SO2 emission allowances
 
 12
 14
 8
 
 34
Other (b)22
 4
 3
 
 
 
 29
Long-term debt maturities (Note 9(b))
51
 358
 183
 3
 4
 2,551
 3,150
Interest - long-term debt obligations162
 162
 146
 142
 142
 1,694
 2,448
Capital purchase obligations (Note 13(a))
46
 
 
 
 
 
 46
Operating leases (Note 3(a))
9
 13
 5
 3
 2
 24
 56
Capital leases1
 1
 1
 
 
 1
 4
 
$865
 
$721
 
$461
 
$193
 
$170
 
$4,276
 
$6,686

79



IPL2013 2014 2015 2016 2017 Thereafter Total
Operating expense purchase obligations (Note 13(b)):
             
Alliant Energy2014 2015 2016 2017 2018 Thereafter Total
Operating expense purchase obligations (Note 16(b)):
             
Purchased power and fuel commitments (a)
$346
 
$91
 
$32
 
$13
 
$3
 
$6
 
$491

$487
 
$338
 
$265
 
$222
 
$195
 
$1,031
 
$2,538
SO2 emission allowances
 
 12
 14
 8
 
 34

 12
 14
 8
 
 
 34
Other (b)9
 2
 1
 
 
 
 12
8
 3
 
 
 
 
 11
Long-term debt maturities (Note 9(b))
50
 38
 150
 
 
 1,125
 1,363
359
 183
 3
 4
 355
 2,444
 3,348
Interest - long-term debt obligations74
 74
 70
 67
 67
 713
 1,065
173
 158
 154
 154
 153
 1,847
 2,639
Operating leases (Note 3(a))
4
 3
 3
 2
 2
 16
 30
Capital purchase obligations (Note 16(a))
86
 
 
 
 
 
 86
Operating leases (Note 10(a))
10
 9
 3
 3
 2
 22
 49
Capital leases
 1
 1
 
 
 1
 3
1
 1
 
 
 
 
 2

$483
 
$209
 
$269
 
$96
 
$80
 
$1,861
 
$2,998

$1,124
 
$704
 
$439
 
$391
 
$705
 
$5,344
 
$8,707
WPL2013 2014 2015 2016 2017 Thereafter Total
Operating expense purchase obligations (Note 13(b)):
             
Purchased power and fuel commitments (a)
$157
 
$58
 
$57
 
$13
 
$7
 
$—
 
$292
Other (b)11
 
 
 
 
 
 11
Long-term debt maturities (Note 9(b))

 8
 31
 
 
 1,300
 1,339
Interest - long-term debt obligations71
 71
 71
 69
 69
 960
 1,311
Capital purchase obligations (Note 13(a))
46
 
 
 
 
 
 46
Operating leases (Note 3(a))
4
 9
 2
 1
 
 
 16
Capital lease - Sheboygan Falls Energy Facility (Note 3(b))
15
 15
 15
 15
 15
 113
 188
Capital leases - other1
 
 
 
 
 
 1
 
$305
 
$161
 
$176
 
$98
 
$91
 
$2,373
 
$3,204
IPL2014 2015 2016 2017 2018 Thereafter Total
Operating expense purchase obligations (Note 16(b)):
             
Purchased power and fuel commitments (a)
$312
 
$188
 
$170
 
$152
 
$135
 
$1,031
 
$1,988
SO2 emission allowances
 12
 14
 8
 
 
 34
Other (b)5
 1
 
 
 
 
 6
Long-term debt maturities (Note 9(b))
38
 150
 
 
 350
 1,025
 1,563
Interest - long-term debt obligations86
 81
 79
 79
 79
 940
 1,344
Capital purchase obligations (Note 16(a))
35
 
 
 
 
 
 35
Operating leases (Note 10(a))
4
 3
 2
 2
 1
 15
 27
Capital leases
 1
 
 
 
 
 1
 
$480
 
$436
 
$265
 
$241
 
$565
 
$3,011
 
$4,998
WPL2014 2015 2016 2017 2018 Thereafter Total
Operating expense purchase obligations (Note 16(b)):
             
Purchased power and fuel commitments (a)
$175
 
$150
 
$95
 
$70
 
$60
 
$—
 
$550
Other (b)2
 
 
 
 
 
 2
Long-term debt maturities (Note 9(b))
9
 31
 
 
 
 1,299
 1,339
Interest - long-term debt obligations71
 71
 69
 69
 69
 890
 1,239
Capital purchase obligations (Note 16(a))
51
 
 
 
 
 
 51
Operating leases (Note 10(a))
6
 5
 1
 1
 
 
 13
Capital lease - Sheboygan Falls (Note 10(b))
15
 15
 15
 15
 15
 98
 173
Capital leases - other1
 
 
 
 
 
 1
 
$330
 
$272
 
$180
 
$155
 
$144
 
$2,287
 
$3,368

(a)
Purchased power and fuel commitments represent normal business contracts used to ensure adequate purchased power, coal and natural gas supplies, and to minimize exposure to market price fluctuations. Alliant Energy, through its subsidiary Corporate Services, has entered into varioussystem-wide coal contracts on behalf of IPL and WPL that include minimum future commitments. These commitments that have not yet been directlywere assigned to IPL and WPL. Such commitments are included in the Alliant Energy purchased power and fuel commitments but are not included in IPL’s or WPL’s purchased power and fuel commitments.WPL based on information available as of December 31, 2013 regarding expected future usage, which is subject to change.
(b)
Other operating expense purchase obligations represent individual commitments incurred during the normal course of business that exceeded $1 million at December 31, 20122013.


80



At December 31, 20122013, Alliant Energy’s, IPL’sEnergy, IPL and WPL’sWPL had no uncertain tax positions recorded as liabilities were not material, and are not included in the above tables.

liabilities. Refer to Note 6(a)12(a) of the “Combined Notes to Consolidated Financial Statements” for anticipated pension and other postretirement benefits funding amounts, which are not included in the above tables. Refer to “Cash Flows - Investing Activities - Construction and Acquisition Expenditures” for additional information on construction and acquisition programs. In addition, at December 31, 20122013, there were various other long-term liabilities and deferred credits included on the Consolidated Balance Sheets that, due to the nature of the liabilities, the timing of payments cannot be estimated and are therefore excluded from the above tables.

OTHER MATTERS

Market Risk Sensitive Instruments and Positions - Alliant Energy’s, IPL’s and WPL’s primary market risk exposures are associated with commodity prices, investment prices and interest rates. Alliant Energy, IPL and WPL have risk management policies to monitor and assist in mitigating these market risks and use derivative instruments to manage some of the exposures. Refer to Notes Notes 1(i)1(h) and 1215 of the “Combined Notes to Consolidated Financial Statements” for further discussion of derivative instruments.

Commodity Price - Alliant Energy, IPL and WPL are exposed to the impact of market fluctuations in the price and transportation costs of commodities they procure and market. Alliant Energy, IPL and WPL employ established policies and procedures to mitigate their risks associated with these market fluctuations, including the use of various commodity derivatives and contracts of various durations for the forward sale and purchase of these commodities. Alliant Energy’s, IPL’s and WPL’s exposure to commodity price risks in their utility businesses is also significantly mitigated by current rate-making structures in place for recovery of their electric production fuel and purchased energy expenses (fuel-related costs)fuel-related costs as well as their cost of natural gas purchased for resale. IPL’s electric and gas tariffs and WPL’s wholesale electric and gas

80



tariffs provide for subsequent monthly adjustments to their tariff rates for material changes in prudently incurred commodity costs. IPL’s and WPL’s rate mechanisms, combined with commodity derivatives, significantly reduce commodity risk associated with their electric and gas margins.

WPL’s retail electric margins have the most exposure to the impact of changes in commodity prices for Alliant Energy and WPL due largely to the current retail recovery mechanism in place in Wisconsin for fuel-related costs. The cost recovery mechanism applicable for WPL’s retail electric customers is based on forecasts of fuel-related costs expected to be incurred during forward-looking test year periods and fuel monitoring ranges determined by the PSCW during each retail electric rate proceeding or in a separate fuel cost plan approval proceeding. Under this cost recovery mechanism, if WPL’s actual fuel-related costs fall outside this fuel monitoring range during the test period, WPL is authorized to defer the incremental under-/over-collection of fuel-related costs from retail electric customers that are outside the approved ranges. Deferral of under-collection of fuel-related costs are reduced to the extent WPL’s return on common equity during the fuel cost plan year exceeds the most recently authorized return on common equity. Retail fuel-related costs incurred by WPL in 2012 were lower than retail fuel-related costs used to determine rates for such period resulting in an over-collection2013 did not fall outside of fuel-related costs for 2012 of approximately $17 million (including $11 million outside the approved range for 2012). As of December 31, 2012, Alliant Energy and WPL recorded $11 million in “Regulatory liabilities” on their Consolidated Balance Sheets for refunds expected to be used to adjust fuel-related cost changes in 2014.fuel monitoring range.

In December 2012,2013, the PSCW approved annual forecasted fuel-related costs per MWh of $23.28$25.11 based on $320$345 million of variable fuel-related costs for WPL’s 20132014 test period. These 20132014 fuel-related costs will be monitored using an annual bandwidth of plus or minus 2%. Based on the cost recovery mechanism in Wisconsin, the annual forecasted fuel-related costs approved by the PSCW in December 20122013 and an annual bandwidth of plus or minus 2%, Alliant Energy and WPL currently estimate the commodity risk exposure to their electric margins in 20132014 is approximately $5 million. However, if WPL’s return on common equity in 2014 exceeds the most recently authorized return on common equity, the commodity risk exposure to WPL’s electric margins in 2014 could increase.

Refer to “Rate Matters” and Note 1(h)1(g) of the “Combined Notes to Consolidated Financial Statements” for additional details of utility cost recovery mechanisms that significantly reduce Alliant Energy’s, IPL’s and WPL’s commodity risk.

Investment Price - Alliant Energy, IPL and WPL are exposed to investment price risk as a result of their investments in debt and equity securities, largely related to securities held by their pension and other postretirement benefits plans. Refer to Note 6(a)12(a) of the “Combined Notes to Consolidated Financial Statements” for details of the debt and equity securities held by their pension and other postretirement benefits plans. Refer to “Critical Accounting Policies and Estimates - Pensions and Other Postretirement Benefits” for the impact on Alliant Energy’s, IPL’s and WPL’s retirement plan costs of changes in the rate of returns earned by their plan assets.

Interest Rate - Alliant Energy IPL and WPL are exposed to risk resulting from changes in interest rates as a result of their issuance of variable-rate borrowings. In addition, Alliant Energy and IPL are exposed to risk resulting from changes in interest rates as a result of cash proceeds outstanding under IPL’s sales of accounts receivable program. Assuming the impact

81

Table of Contents


of a hypothetical 100 basis point increase in interest rates on variable-rate borrowings, commercial paper and cash proceeds outstanding under IPL’s sales of accounts receivable program at December 31, 20122013, Alliant Energy’s, IPL’s and WPL’s annual pre-tax expense would increase by approximately $5$4 million, $2 million$0 and $1$2 million, respectively.

Refer to Notes 4(a)Note 5(a) and Note 9 of the “Combined Notes to Consolidated Financial Statements” for additional information on cash proceeds outstanding under IPL’s sales of accounts receivable program, and short- andshort-and long-term variable-rate borrowings, respectively. Refer to “Critical Accounting Policies and Estimates - Pensions and Other Postretirement Benefits” for the impacts of changes in discount rates on retirement plan obligations and costs.

Critical Accounting Policies and Estimates - The preparation of consolidated financial statements in conformity with GAAP requires that management apply accounting policies and make estimates that affect results of operations and the amounts of assets and liabilities reported in the financial statements. Based on historical experience and various other factors, Alliant Energy, IPL and WPL believe the following accounting policies and estimates are critical to their business and the understanding of their financial results as they require critical assumptions and judgments by management. The results of these assumptions and judgments form the basis for making estimates regarding the results of operations and the amounts of assets and liabilities that are not readily apparent from other sources. Actual financial results may differ materially from these estimates. Alliant Energy’s, IPL’s and WPL’s management has discussed these critical accounting policies and estimates with the Audit Committee of their Board of Directors.Committee. Refer to Note 1 of the “Combined Notes to Consolidated Financial Statements” for additional discussion of accounting policies and the estimates used in the preparation of the consolidated financial statements.


81

Table of Contents


Contingencies - Alliant Energy, IPL and WPL make assumptions and judgments each reporting period regarding the future outcome of contingent events and record loss contingency amounts for any contingent events that are both probable and reasonably estimated based upon current available information. The amounts recorded may differ from the actual income or expense that occurs when the uncertainty is resolved. The estimates that Alliant Energy, IPL and WPL make in accounting for contingencies, and the gains and losses that they record upon the ultimate resolution of these uncertainties, could have a significant effect on the results of operations and the amount of assets and liabilities in their financial statements. Note 1316 of the “Combined Notes to Consolidated Financial Statements” provides discussion of contingencies assessed at December 31, 20122013 including various pending legal proceedings, guarantees and indemnifications that may have a material impact on Alliant Energy’s, IPL’s and WPL’s financial condition and results of operations.

Regulatory Assets and Regulatory Liabilities - Alliant Energy’s utility subsidiaries (IPL and WPL) are regulated by various federal and state regulatory agencies. As a result, they are subject to accounting guidance for regulated operations, which recognizes that the actions of a regulator can provide reasonable assurance of the existence of an asset or liability. Regulatory assets or regulatory liabilities arise as a result of a difference between GAAP and the accounting principles imposed by the regulatory agencies in the rate-making process. Regulatory assets generally represent incurred costs that have been deferred as they are probable of recovery in future customer rates. Regulatory liabilities generally represent obligations to make refunds to customers and amounts collected in rates for which the related costs have not yet been incurred. Alliant Energy, IPL and WPL recognize regulatory assets and regulatory liabilities in accordance with the rulings of applicable federal and state regulators, and future regulatory rulings may impact the carrying value and accounting treatment of their regulatory assets and regulatory liabilities.

Alliant Energy, IPL and WPL make assumptions and judgments each reporting period regarding whether their regulatory assets are probable of future recovery and their regulatory liabilities are probable future obligations by considering factors such as regulatory environment changes, rate orders issued by the applicable regulatory agencies and historical decisions by such regulatory agencies regarding similar regulatory assets and regulatory liabilities. The judgments useddecisions made by regulatory authorities have an impact on the recovery of costs, the rate of return on invested capital and the timing and amount of assets to be recovered by rates. A change in these judgmentsdecisions may result in a material impact on Alliant Energy’s, IPL’s and WPL’s results of operations and the amount of assets and liabilities in their financial statements. Note 1(b)2 of the “Combined Notes to Consolidated Financial Statements” provides details of the nature and amounts of Alliant Energy’s, IPL’s and WPL’s regulatory assets and regulatory liabilities assessed at December 31, 20122013 as well as material changes to their regulatory assets and regulatory liabilities during 20122013.

Long-Lived Assets - Alliant Energy, IPL and WPL complete periodic assessments regarding the recoverability of certain long-lived assets when factors indicate the carrying value of such assets may be impaired or such assets are planned to be sold. These assessments require significant assumptions and judgments by management. The long-lived assets assessed for impairment generally include assets within their non-regulated operations that are proposed to be sold or are generating operating losses, and certain long-lived assets within their regulated operations that may not be fully recovered from IPL’s and WPL’s customers as a result of regulatory decisions in the future.

82

Table of Contents



Non-regulated Operations - Factors considered in determining if an impairment review is necessary for long-lived assets within non-regulated operations include a significant underperformance of the assets relative to historical or projected future operating results, a significant change in the use of the acquired assets or business strategy related to such assets, and significant negative industry, regulatory or economic trends. When an impairment review is deemed necessary, a comparison is made between the expected undiscounted future cash flows and the carrying amount of the asset. If the carrying amount of the asset exceeds the expected undiscounted future cash flows, an impairment loss is recognized equal to the amount by which the carrying amount of the asset exceeds the fair value of the asset. The fair value is determined by the use of quoted market prices, appraisals, or the use of valuation techniques such as expected discounted future cash flows. Alliant Energy’s and IPL’s long-lived assets within their non-regulated operations assessed in 20122013 included a wind site currently expected to be used to develop a future wind project. In addition, Alliant Energy’s long-lived assets within its non-regulated operations assessed in 20122013 also included the Franklin County wind project.

Franklin County Wind Project - Alliant Energy completed construction of its 10099 MW Franklin County wind project and placed it into service in December 2012. In 2012, Alliant Energy performed an evaluation of the recoverabilityimpairment test of the carrying value of the Franklin County wind project given a significant change in the use of the asset as a result of it being placed into service, continued downturn in forward electricity prices in 2012 and no long-term off-take arrangement. The evaluationtest concluded the undiscounted cash flows expected from the Franklin County wind project during its estimated useful life exceeded its carrying value as of December 31, 2012,, resulting in no impairment. ChangesIn 2013, Alliant Energy evaluated if there were any significant changes in the undiscounted cash flows used in the 2012 impairment test, which may indicate a significant decrease in the market value of the Franklin County wind project. No significant changes in the undiscounted cash flows were identified, and as a result, an impairment test was not required in 2013. Future changes in the estimated cash flows could result in the undiscounted cash flows being less than the carrying amount and a future material impairment could be required.

82

Table of Contents


Primary factors that could have an effect on the future expected cash flows for the project include the price of electricity generated from the project during its useful life, the volume of electricity generated, the expected life of the project, probability of selling the wind project, and changes in anticipated operation and maintenance expenses. An impairment of the Franklin County wind project could be triggered in the future if long-term electricity prices stay at current depressed levels or decline, even further, or if the expected output or life of the project is significantly reduced. As of December 31, 20122013, the capitalized expenditures forcarrying value of the Franklin County wind project were $148 million.was $142 million and was recorded in “Non-regulated Generation property, plant and equipment” on Alliant Energy’s Consolidated Balance Sheet. Notes 1(e) and 1(f)Note 3 of the “Combined Notes to Consolidated Financial Statements” provideprovides additional discussion of the Franklin County wind project. Note 4(d) and “Other Future Considerations” provide discussion of a cash grant related to the Franklin County wind project.

Undeveloped Wind Site - As of December 31, 20122013, Alliant Energy and IPL have an undeveloped wind site with capitalized costs of $13 million related to IPL’s approximate 200 MW of wind site capacity in Franklin County, Iowa. Alliant Energy and IPL assessed the recoverability of this undeveloped wind site given the long-term period projected until the site is utilized and concluded no impairment test was required as ofin December 31, 20122013. Changes in the future use of this undeveloped wind site could result in a future material impairment. The future utilization of this undeveloped wind site is dependent on the future demand of wind energy in the region where the wind site is located. TheSuch future demand of wind energy in the region where the wind site is locateddemand is dependent on various factors including future government incentives for wind projects, energy policy and legislation including federal and state renewable energy standards and regulation of carbon emissions, electricity and fossil fuel prices, transmission constraints in the region where the wind site is located and further technological advancements for wind generation. Alliant Energy and IPL currently believe, based on a combination of the various factors, further wind development in the region where the wind site is located will occur. Alliant Energy and IPL could realize an impairment related to this wind site if one or more of these factors are no longer expected to occur, or actions by regulatory agencies with jurisdiction over IPL indicate the costs of the undeveloped wind site would not be approved to be recovered from customers.

Regulated Operations - Long-lived assets within regulated operations are reviewed for possible impairment whenever events or changes in circumstances indicate all or a portion of the carrying value of the assets may be disallowed for rate-making purposes. If IPL or WPL is disallowed recovery of any portion of the carrying value of its regulated property, plant and equipment that has been recently completed or is probable of abandonment,being retired early, an impairment charge is recognized equal to the amount of the carrying value that was disallowed.disallowed recovery. If IPL or WPL is disallowed a full or partial return on the carrying value of its regulated property, plant and equipment that has been recently completed or is probable of abandonment,being retired early, an impairment charge is recognized equal to the difference between the carrying amount of the asset and the present value of the future revenues expected from its regulated property, plant and equipment. Alliant Energy’s, IPL’s and WPL’s long-lived assets within their regulated operations that were assessed for impairment in 20122013 included transmission network upgrade costs related to WPL’s Bent Tree - Phase I wind project, the Minnesota retail electric portion of IPL’s Whispering Willow - East wind project, and IPL’s and WPL’s generating units subject to early retirement.


83

Table of Contents


WPL’s Bent Tree - Phase I Wind Project - Certain costs incurred by WPL placed the remaining portion ofin 2011 and 2012 related to transmission network upgrades at its 200 MW Bent Tree - Phase I wind project in service in 2011.have been subject to periodic recoverability assessments. In 2009, WPL requested that MISO conductJuly 2013, FERC issued an optional studyorder requiring changes to identify any local transmission constraints that would prevent full output of the Bent Tree wind project. Based on the results of the optional study performed by MISO, WPL requested that ITC perform a facilities study to determine the feasibility and cost of an upgrade to a local transmission line needed to enable Bent Tree to achieve full generation capacity, which ITC completed in 2010. WPL entered into a Facility Construction Agreement (FCA) with ITC and MISO in 2011 to address the local transmission system constraint. Pursuant to the FCA and ITC’s Attachment “FF” tariff, WPL advanced funds to ITCwhich results in 2011 and 2012 necessary to constructowners of the EGUs being responsible for a substantially higher portion of the transmission upgrades on ITC’s system.network upgrade costs required to meet MISO interconnection requirements. As a result, Alliant Energy and WPL do not expect reimbursement of these transmission network upgrade costs from ITC and could record an impairment of these costs in the future if WPL is not allowed to recover these costs from its electric customers. As of December 31, 20122013, Alliant Energy and WPL recorded $14 million in “Deferred charges and other” on their Consolidated Balance Sheets related to the projecttransmission network upgrades constructed by ITC. MISO is expected to complete the definitive planning phase study for Bent Tree in the first half of 2013. If the facilities are identified as required network upgrades as a result of the MISO definitive planning phase study, the facilities will be entitled to cost reimbursement from ITC, and WPL will be reimbursed by ITC for up to 100% of the transmission upgrade costs. While Alliant Energy and WPL believe their cost of the facilities will be reimbursed fully by ITC, Alliant Energy and WPL could record an impairment of these costs if they are determined not to be a required network upgrade and thus fail to qualify for reimbursement under ITC’s current Attachment “FF” tariff mechanism or if there is a change in ITC’s current Attachment “FF” tariff mechanism, and WPL is not able to recover these costs from its electric customers. Refer to “Other Future Considerations - Electric Transmission Service Charges” for further discussion of ITC’s Attachment “FF” tariff mechanism.transmission network upgrade costs.

IPL’s Whispering Willow - East Wind Project - Refer to Note 1(e)3(a) of the “Combined Notes to Consolidated Financial Statements” for discussion of an $8 million impairment ofadjustments made by Alliant Energy and IPL in 2011 and 2013 to the Minnesota retail portioncarrying value of IPL’s Whispering Willow - East wind project, costs during 2011 based on the MPUC’s August 2011 order.amounts IPL determined were probable of being disallowed for recovery from its Minnesota retail electric customers.


83

Table of Contents


Generating Units Subject to Early Retirement - Due to current and proposed environmental regulations, Alliant Energy, IPL and WPL are evaluating future plans for their electric generation fleet and have announced the early retirement of certain older and less-efficient EGUs. When it becomes probable that an EGU will be retired before the end of its useful life, Alliant Energy, IPL and WPL must assess whether the EGU meets the criteria to be considered abandoned.probable of abandonment. EGUs that are considered to be abandonedprobable of abandonment generally have material remaining net book values and are expected to cease operations in the near term significantly before the end of their original estimated useful lives. If an EGU meets the criteria to be considered abandoned,probable of abandonment, Alliant Energy, IPL and WPL must assess the probability of full recovery of the remaining carrying value of such EGU. If it is probable that regulators will not allow full recovery of and a full return on the remaining carrying amount of the abandoned EGU, an impairment charge is recognized equal to the difference between the remaining carrying value and the present value of the future revenues expected from the abandoned EGU. Alliant Energy, IPL and WPL evaluated their EGUs that are subject to early retirement and determined they did not have any EGUs that Edgewater Unit 3 and Nelson Dewey Units 1 and 2 met the criteria to be considered abandonedprobable of abandonment as of December 31, 20122013. ChangesAlliant Energy and WPL concluded that no impairment was required as of December 31, 2013 for Edgewater Unit 3 and Nelson Dewey Units 1 and 2 given that WPL is recovering the remaining net book value of these EGUs over a 10-year period beginning January 1, 2013 pursuant to a PSCW order issued in May 2012. Refer to Note 3(a) of “Combined Notes to Consolidated Financial Statements” for additional details of the EGUs anticipated to be retired in the conclusions of whether an EGU is considered abandoned and the probability of regulators allowing full recovery of and return on the remaining carrying amount of EGUs considered to be abandoned could result in future material impairments.future. Refer to “Strategic Overview” for discussion of EGUs that may be retired by Alliant Energy, IPL and WPL in the future, along with the aggregate net book valuesvalue of these EGUs.

Unbilled Revenues - Unbilled revenues are primarily associated with Alliant Energy’s, IPL’s and WPL’s utility operations. Energy sales to individual customers are based on the reading of customers’ meters, which occurs on a systematic basis throughout the month. Amounts of energy delivered to customers since the date of the last meter reading are estimated at the end of each reporting period and the corresponding estimated unbilled revenue is recorded. The unbilled revenue estimate is based on daily system demand volumes, estimated customer usage by class, weather impacts, line losses and the most recent customer rates. Such process involves the use of various judgments and assumptions and significant changes in these judgments and assumptions could have a material impact on Alliant Energy’s, IPL’s and WPL’s results of operations. As of December 31, 20122013, unbilled revenues related to Alliant Energy’s utility operations were $158$178 million ($7786 million at IPL and $81$92 million at WPL). Note 4(a)5(a) of the “Combined Notes to Consolidated Financial Statements” provides discussion of IPL’s unbilled revenues as of December 31, 20122013 sold to a third-party financial institutionthird party related to its sales of accounts receivable program.

Pensions and Other Postretirement Benefits - Alliant Energy, IPL and WPL sponsor various defined benefit pension and other postretirement benefits plans that provide benefits to a significant portion of their employees. Alliant Energy, IPL and WPL make assumptions and judgments periodically to estimate the obligations and costs related to their retirement plans. There are many judgments and assumptions involved in determining an entity’s pension and other postretirement liabilities and costs each period including employee demographics (including age, life expectancies and compensation levels), discount rates, assumed rates of return and funding. Changes made to plan provisions may also impact current and future benefits costs. Judgments and assumptions are supported by historical data and reasonable projections and are reviewed at least annually. The following table shows the impacts of changing certain key actuarial assumptions discussed above (in millions):
Alliant Energy Defined Benefit Pension Plans Other Postretirement Benefits Plans
Change in Actuarial Assumption Impact on Projected Benefit Obligation at December 31, 2012 Impact on 2013 Net Periodic Benefit Costs Impact on Projected Benefit Obligation at December 31, 2012 Impact on 2013 Net Periodic Benefit Costs
1% change in discount rate 
$161
 
$10
 
$21
 
$2
1% change in expected rate of return N/A
 9
 N/A
 1
IPL Defined Benefit Pension Plans Other Postretirement Benefits Plans
Change in Actuarial Assumption Impact on Projected Benefit Obligation at December 31, 2012 Impact on 2013 Net Periodic Benefit Costs Impact on Projected Benefit Obligation at December 31, 2012 Impact on 2013 Net Periodic Benefit Costs
1% change in discount rate 
$74
 
$5
 
$9
 
$1
1% change in expected rate of return N/A
 5
 N/A
 1
WPL Defined Benefit Pension Plans Other Postretirement Benefits Plans
Change in Actuarial Assumption Impact on Projected Benefit Obligation at December 31, 2012 Impact on 2013 Net Periodic Benefit Costs Impact on Projected Benefit Obligation at December 31, 2012 Impact on 2013 Net Periodic Benefit Costs
1% change in discount rate 
$70
 
$5
 
$8
 
$1
1% change in expected rate of return N/A
 4
 N/A
 


84

Table of Contents


  Defined Benefit Pension Plans Other Postretirement Benefits Plans
Change in Actuarial Assumption Impact on Projected Benefit Obligation at December 31, 2013 Impact on 2014 Net Periodic Benefit Costs Impact on Projected Benefit Obligation at December 31, 2013 Impact on 2014 Net Periodic Benefit Costs
Alliant Energy        
1% change in discount rate 
$137
 
$9
 
$19
 
$2
1% change in expected rate of return N/A
 10
 N/A
 1
IPL        
1% change in discount rate 64
 4
 8
 1
1% change in expected rate of return N/A
 5
 N/A
 1
WPL        
1% change in discount rate 59
 5
 8
 1
1% change in expected rate of return N/A
 4
 N/A
 

Note 6(a)12(a) of the “Combined Notes to Consolidated Financial Statements” provides additional details of pension and other postretirement benefits plans. Note 13(c)16(c) of the “Combined Notes to Consolidated Financial Statements” provides recent developments of the class-action lawsuit filed against the Cash Balance Plan in 2008.

Income Taxes -Alliant Energy, IPL and WPL are subject to income taxes in various jurisdictions. Alliant Energy, IPL and WPL make assumptions and judgments each reporting period to estimate their income tax assets, liabilities, benefits and expenses. Judgments and assumptions are supported by historical data and reasonable projections. Significant changes in these judgments and assumptions could have a material impact on Alliant Energy’s, IPL’s and WPL’s financial condition and results of operations. Alliant Energy’s IPL’s and WPL’sIPL’s critical assumptions and judgments for 20122013 include projections of qualifying repairs expenditures and allocation of mixed service costs due to the impact of Iowa rate-making principles on such property-related differences,differences. Alliant Energy’s, IPL’s and WPL’s critical assumptions and judgments include projections of future taxable income used to determine their ability to utilize net operating losses and credit carryforwards prior to their expiration and the states in which such future taxable income will be apportioned.

Effect of Rate-making on Property-related Differences - Alliant Energy’s and IPL’s effective income tax rates are normally impacted by certain property-related differences at IPL for which deferred tax is not recorded in the income statement pursuant to Iowa rate-making principles. In 2009, IPL filed a request with the IUB to create a regulatory liability account for potential tax benefits and expenses resulting from certain of these property-related differences caused by changesChanges in accounting methodologies and tax elections available under the Internal Revenue Code. These tax benefits related to the tax treatment of repair expenditures, allocation of insurance proceeds from the floods in 2008 and allocation of mixed services costs. In 2010, IPL received approval from the IUB to record any tax benefits and expenses from these changes in accounting methodologies in a regulatory liability account until the IRS audit process related to such changes in accounting methodologies was completed. The IRS audit process was completed for allocation of mixed service costs with the income tax return for calendar year 2010 and repairs expenditures with the income tax return for calendar year 2011. As a result, IPL has recognized the tax benefits and expenses from the change in accounting method for allocation of mixed service costs through 2010 and the tax benefits and expenses from the change in accounting method for repairs expenditures through 2011 in a regulatory liability referred to as the tax benefit riders. The tax benefits and expenses from the changes in accounting method for allocation of mixed service costs subsequent to 2010 and the tax benefits and expenses from the changes in accounting method for repairs expenditures subsequent to 2011 are being recorded consistent with general Iowa rate-making principles, which impact income tax expense and benefits at Alliant Energy and IPL. Changes inmethods or assumptions regarding the amount of IPL’s qualifying repairs expenditures, and allocation of mixed service costs, and retirement or removal of depreciable property could result in a material impact on Alliant Energy’s and IPL’s financial condition and results of operations. Refer to Note 51(c) of the “Combined Notes to Consolidated Financial Statements” and “Rate Mattersfor further discussion of regulatory accounting for taxes. Refer to Note 11 of the tax benefit riders and“Combined Notes to Consolidated Financial Statements” for details of how the effect of rate-making on property-related differences impacted Alliant Energy’s and IPL’s effective income tax rates for 2013, 2012 and 2011. Refer to “Other Future Considerations” for further discussion of potential tax accounting method changes.

Carryforward Utilization- Alliant Energy, IPL and WPL have generated significant federal tax creditscredit carryforwards and federal and state net operating losses that are currently being carried forward.loss carryforwards. Based on current projections of current and future taxable income, Alliant Energy, IPL and WPL plan to utilize substantially all of these carryforwards prior to their expiration. Changes in assumptions regarding Alliant Energy’s, IPL’s and WPL’s current and future taxable income could require valuation allowances in the future resulting in a material impact on their financial condition and results of operations.

State Apportionment - Alliant Energy, IPL and WPL utilize state apportionment projections to record their deferred tax assets and liabilities each reporting period. Deferred tax assets and liabilities for temporary differences between the tax basis of assets and liabilities and the amounts reported in the consolidated financial statements are recorded utilizing currently enacted tax rates and estimates of future state apportionment rates expected to be in effect at the time the temporary differences reverse. These state apportionment projections are most significantly impacted by the estimated amount of revenues expected in the future from each state jurisdiction for Alliant Energy’s consolidated tax group, including both its regulated operations and its non-regulated operations. Alliant Energy, IPL and WPL recorded $15 million, $8 million and $7 million, respectively, of income tax expense in the first quarter of 2012 due to changes in state apportionment projections caused by the anticipated sale of Alliant Energy’s RMT business that was completed in January 2013. A significant majority of the additional income tax expense recognized from changes in state apportionment projections were recorded at IPL and WPL due to their large deferred tax liability positions at December 31, 2011.

Refer to Note 1(c) of the “Combined Notes to Consolidated Financial Statements” for further discussion of regulatory accounting for taxes. Refer to Note 511 of the “Combined Notes to Consolidated Financial Statements” for further discussion of federal tax credit carryforwards, and federal and state net operating loss carryforwards, state apportionment impacts, and details of uncertain tax positions.carryforwards.


85

Table of Contents


Other Future Considerations - In addition to items discussed earlier in MDA, the “Combined Notes to Consolidated Financial Statements” in Item 8 and “Risk Factors” in Item 1A, the following items could impact Alliant Energy’s, IPL’s or WPL’s future financial condition or results of operations:

Electric Transmission Service Charges - IPL and WPL currently receive substantially all their transmission services from ITC and ATC, respectively. The annual transmission service rates that ITC or ATC charges their customers are calculated each calendar year using a FERC-approved cost of service formula rate template referred to as Attachment “O.“O,The Attachment “O” ratewhich is based on ITC’s or ATC’s projected net revenue requirement for the upcoming calendar year (i.e., the year the rates will be billed) as well as any true-up adjustment for any over- or under-recovered amounts from previous calendar years. For ITC, the true-up adjustment is applied two years subsequent to the collected year. For ATC, an over-collection is refunded to its customers in the subsequent year and an under-collection is recovered two years subsequent to the collected year.administered by MISO. Because Attachment “O” is a FERC-approved formula rate, ITC and ATC can implement new rates each calendar year without filing a request with FERC. However, new rates are subject to challenge by either FERC ifor customers. If the rates proposed by ITC or ATC are determined by FERC to be unjust or unreasonable or another mechanism is determined by FERC to be just and reasonable. FERCreasonable, ITC’s or ATC’s rates would change accordingly. Due to the formula rates

85

Table of Contents


used by ITC and ATC to charge their customers and possible future changes to these rates as discussed below, there is currently performing an investigation into Attachment “O” protocols focusing onuncertainty regarding the areaslong-term trends of participation, transparencyIPL’s and challenge procedures. IPL filed comments related to ITC’s Attachment “O” protocols. Alliant Energy, IPL and WPL are currently unable to determine what impacts this investigation will have onWPL’s future electric transmission service charges.expenses.

20132014 Electric Transmission Service Expenses -
20132014 Rates Charged by ITC to IPL - In September 2012,2013, ITC filed with MISO the Attachment “O” rate it proposes to charge its customers in 20132014 for electric transmission services. The proposed rate was based on ITC’s net revenue requirement for 20132014 as well as a true-up adjustment credit related to amounts that ITC over-recovered from its customers in 2011.2012 and a true-up adjustment credit related to a FERC audit of ITC. The 20132014 Attachment “O” rate filed with MISO is approximately 15%13% higher than the rate ITC charged its customers in 2012.2013.

20132014 Rates Charged by ATC to WPL - In September 2012, ATC shared with its customersWPL does not expect any material changes in the 2014 Attachment “O” rate it proposesbilled by ATC compared to charge them in 2013 for electric transmission services. The proposed rate was based on ATC’s net revenue requirement for 2013 as well as a true-up adjustment credit related to amounts that ATC over-recovered from its customers in 2011. The 2013 Attachment “O” rate is approximately 5% higher than the rate ATC charged its customersbilled in 2012.2013.

MISO Transmission Charges Billed to IPL and WPL - MISO tariffs billed to IPL and WPL include costs related to various shared transmission projects including Multi-Value Projects (MVPs).MVPs. MVPs include new large scale transmission projects that enable the reliable and economic delivery of energy in support of documented energy policy mandates or provide economic value across multiple pricing zones within MISO. MVP costs are socialized across the entire MISO footprint based on energy usage of each MISO participant. MISO tariffs billed to IPL and WPL also include costs related to other shared transmission projects, including projects designed to reduce market congestion, to provide interconnection to the transmission grid for new generation, and to ensure compliance with applicable reliability standards. The costs of these projects are primarily allocated to MISO participants in a way that is commensurate with the benefit to the participants’ pricing zone. The MISO transmission charges billed to IPL and WPL are expected to increase in the future due to the increased number of shared transmission projects occurring in the MISO region.

The increase in ITC’s and ATC’s Attachment “O” ratesrate and MISO transmission charges for shared transmission projects are expected to contribute to material increases in future electric transmission service charges for IPL and WPL. IPL’s expected increase for 2014 is partially offset by the impact of electric transmission service expenses IPL over-collected from its Iowa retail electric customers in 2013 under its transmission cost recovery rider, which will reduce electric transmission service expenses billed to Iowa customers in 2014. As a result, Alliant Energy, IPL and WPL currently estimate their electric transmission service expenses in 20132014 will be higher than the comparable expenses charged in 20122013 by approximately $70$30 million, $60$20 million and $10 million, respectively. A significant portion of the increase in IPL’s electric transmission service expenses is expected to be offset with increases in electric revenues resulting from the automatic transmission cost recovery rider approved by the IUB and implemented in 2011.rider. A significant portion of the increase in WPL’s electric transmission service expenses was utilized to set electric revenues approved by the PSCW in WPL’s latest retail electric base rate case.


86

Table of Contents


ITC’s Attachment “FF” Tariff - In September 2012, IPL filed a formal complaint with FERC alleging thatregarding ITC’s Attachment “FF” tariff. ITC’s Attachment “FF” tariff is unjust, unreasonable and unduly discriminatorydetermines how much of the transmission network upgrade costs incurred to IPL and its customers.interconnect an EGU to ITC’s transmission system will be incurred by the owner of such EGU. In the complaint, IPL allegesalleged that its customers have made material incremental payments of $32 million in incremental costs for the period 2008 through 2011under ITC’s Attachment “FF” tariff without obtaining equal benefits, as compared to costs that would have been charged under the version ofMISO’s Attachment “FF” tariff applicable in the majority of the MISO pricing zones without obtaining equal benefits. The complaint filed withzones. In July 2013, FERC also includes estimates that IPL’s customers could make aggregate paymentsissued an order requiring MISO, on behalf of $138 million in incremental costs for the period 2012 through 2016. IPL requested in its formal complaint that FERC investigateITC, to revise ITC’s Attachment “FF” tariff establish a refund date of September 14, 2012 with respect to the complaint, and establish hearing procedures. IPL also requested that if FERC determines that ITC’s Attachment “FF” tariff is unjust and unreasonable then it should require ITC to file revisions to conform its Attachment “FF” tariff to the MISO Attachment “FF” tariff. In August 2013, MISO submitted a filing with these tariff revisions, which is applicable in the majoritybecame effective as of the other pricing zones. In October 2012,date of the July 2013 order. Also in August 2013, ITC filed a responserequest for rehearing and/or clarification, and IPL filed a request for clarification. In February 2014, FERC issued an order that denied ITC’s request for rehearing, responded to IPL’s formal complaint.the requests for clarification, accepted MISO’s tariff revisions and substantially affirmed its July 2013 order. The revised Attachment “FF” tariff is expected to reduce the amount of transmission network upgrade costs billed by ITC to IPL compared to what would have been billed under ITC’s prior Attachment “FF” tariff. Alliant Energy and IPL are currently unableexpect to predict what action FERC may take regarding IPL’s formal complaint or a time-line under which FERC may act, but believepass on the outcome could be material to the future amountIowa retail portion of any changes in electric transmission service costs billed by ITC to IPL. Alliant Energy and IPL expect any changesfrom the revision in the amount ofITC’s Attachment “FF” tariff to IPL’s retail electric transmission services expenses resulting from IPL’s formal complaint will have a comparable offsetting impactcustomers in electric revenues due toIowa through the automatic transmission cost recovery rider approved byrider. Refer to “Strategic Overview” for further discussion of the IUBJuly 2013 FERC order and implemented in 2011.IPL’s and WPL’s anticipation that ITC will self-fund the transmission network upgrades associated with Marshalltown and Bent Tree, respectively.

FERC Order 1000 - In 2011, FERC issued Order 1000, which reforms its electric transmission planning and cost allocation requirements for public utility transmission providers. One substantial change from the order is the requirement for projects with regional cost allocation to have the federal right of first refusal (ROFR) removed. Incumbent public utility transmission providers no longer have a federal ROFRright of first refusal to build, own and operate large-scale transmission projects located within their service territory that have regional cost sharing. In theTo comply with this requirement, MISO footprint, the removalis creating a

86

Table of ROFR is expected to create a Contents


competitive bidding process for projects subject to the ROFRright of first refusal removal, andwhich could lead to a potential decrease in the expected costs of impacted future transmission projects. Alliant Energy, IPL and WPL are currently unable to determine what impacts, if any, this order may have on their future electric transmission service charges.

MISO Transmission Owner Return on Equity Complaint - In November 2013, a group of MISO industrial customer organizations filed a complaint with FERC requesting to: (1) reduce the base return on equity used by MISO transmission owners, including ITC and ATC, to 9.15%; (2) institute a regulatory capital structure not to exceed 50% of common equity; and (3) eliminate certain return on equity adders. ITC’s and ATC’s current authorized return on equity is 12.38% and 12.2%, respectively. ITC’s and ATC’s current authorized regulatory capital structure for common equity is 60% and 50%, respectively. Any change to ITC’s and ATC’s return on equity and regulatory capital structure for common equity would impact the calculation of their respective Attachment “O” rates, resulting in changes to electric transmission service costs billed by ITC and ATC to their customers. Any changes in IPL’s electric transmission service costs billed by ITC to IPL are expected to be passed on to IPL’s Iowa retail electric customers through the transmission cost recovery rider. Any changes in WPL’s electric transmission service costs will be incorporated into WPL’s retail electric rates in a future retail electric base rate proceeding with the PSCW. In addition, any change to ATC’s return on equity and regulatory capital structure for common equity could result in Alliant Energy and WPL realizing lower equity income and dividends from ATC in the future. Alliant Energy, IPL and WPL are currently unable to determine the timing and nature of any FERC actions related to this complaint and resulting changes to their financial condition and results of operations.

MISO Attachment “O” Protocols - In 2012, IPL filed comments in a FERC inquiry related to MISO’s Attachment “O” protocols. In May 2013, FERC issued an order that determined the MISO Attachment “O” protocols to be insufficient. FERC ordered MISO and the impacted transmission owners, including ITC and ATC, to make certain changes to their protocols. In September 2013, MISO transmission owners, including ITC and ATC, submitted proposed revisions to their Attachment “O” rate protocols to FERC for approval. Alliant Energy, IPL and WPL are currently unable to determine the timing of final FERC approval and what impacts the changes in protocols will have on their future electric transmission service charges.

FERC AuditSales Trends - In January 2012, Eagle Point filed a Petition for Declaratory Order requesting that the IUB declare Eagle Point is not a public utility subject to the service territory laws in Iowa. Specifically, Eagle Point sought to sell directly to the City of ITC - FERC audit staff conducted an auditDubuque the power generated by a 175 kilowatt solar unit installed on the City’s property. IPL, MidAmerican, the Iowa Association of ITC’s compliance with certainElectric Cooperatives, a coalition of FERC’s regulationssolar power advocates, and conditions establishedthe OCA actively participated in FERC’s approval of ITC’s acquisition of IPL’s electric transmission assets.the related IUB proceeding. In September 2011, FERC audit staffApril 2012, the IUB issued an audit reportorder finding that identified certain findings and recommendations related to specific aspectsEagle Point’s proposed arrangement would make it a public utility operating in IPL’s exclusive service territory in violation of Iowa’s service territory laws. In May 2012, Eagle Point requested review of the accounting treatment forIUB’s April 2012 order from the acquisition.Polk County, Iowa District Court. In March 2013, the District Court issued a ruling that vacated the IUB’s decision, and found Eagle Point did not constitute a public utility and could enter into its proposed direct sales arrangement with the City of Dubuque. In April 2013, IPL and MidAmerican filed a joint Notice of Appeal with the Iowa Supreme Court. The IUB and the Iowa Association of Electric Cooperatives also filed Notices of Appeal with the Iowa Supreme Court, and Eagle Point submitted a Notice of Cross-Appeal. In January 2013, FERC approved the issuance of a $3 million refund to IPL through a true-up adjustment in 2014, under its formula rates from ITC. IPL currently expects to pass on the Iowa retail potion ofSupreme Court heard oral arguments in the case. The District Court decision is currently stayed. Alliant Energy and IPL are currently unable to determine how this refund to its electric customers in Iowa in 2014 through the transmission cost rider.

Government Incentives for Wind Projects - Alliant Energy’s, IPL’s and WPL’s generation plans have included building wind projects to produce electricity to meet customer demand and renewable portfolio standards. In addition to producing electricity, these wind projects also generate material incentives depending on when they are placed in service. The ARRA enacted in 2009 provided incentives to owners of wind projects placed into service between January 1, 2009 and December 31, 2012. The incentive options available to qualified wind projects under the ARRA include production tax credits for a 10-year period based on the electricity output generatedDistrict Court ruling, if upheld by the wind project, an investment tax credit equal to 30% of the qualified cost basis of the wind project, or a government grant equal to 30% of the qualified cost basis of wind projects that began construction in 2009 and 2010. In 2010, the Tax Relief, Unemployment Insurance Reauthorization and Job Creation Act of 2010 modified the requirements for the government grant incentive. The government grant incentive is now available for qualified wind projects that began construction in 2009, 2010 and 2011 and are placed into service by December 31, 2012.

Alliant Energy has four wind projects that currently qualify for one of the government incentives: (1) WPL’s Cedar Ridge wind project (68 MW capacity) that began generating electricity in late 2008; (2) IPL’s Whispering Willow - East wind project (200 MW capacity) that began generating electricity in late 2009; (3) WPL’s Bent Tree - Phase I wind project (200 MW capacity) that began generating electricity in late 2010; and (4) Resources’ Franklin County wind project (100 MW capacity) that began generating electricity in late 2012. Based on an evaluation of the most beneficial alternative for customers, Alliant Energy, IPL and WPL chose to recognize production tax credits for the three IPL and WPL wind projects. Alliant Energy chose to elect the government cash grant equal to 30% of the qualified cost basis of its Franklin County wind project. Refer to Note 4(d) of the “Combined Notes to Consolidated Financial Statements” for discussion of possible federal spending cuts, or sequestration, whichIowa Supreme Court, may cause Alliant Energy to reevaluate its options on government incentive elections for the Franklin County wind project.


87

Table of Contents


Production Tax Credits - The amount of production tax credits earned is dependent onimpact the level of third-party solar development in IPL’s service territory and resulting impact on future demand of electricity output generated by each wind project, which is impacted by a variety of operating and economic parameters including transmission availability. Any incentives for IPL’s and WPL’s wind projects are expected to be utilized in determining customers’ rates. Production tax credits earned for these wind projects in customers.2010, 2011 and 2012, along with estimates of production tax credits currently expected to be earned in 2013, are as follows (in millions):
       Estimated
 2010 2011 2012 2013
Whispering Willow - East (IPL)
$8
 
$12
 
$13
 $13 - $14
Bent Tree - Phase I (WPL)1
 9
 9
 13 - 14
Cedar Ridge (WPL)3
 5
 4
 3 - 4
 
$12
 
$26
 
$26
 $29 - $32

Potential Tax Accounting Method Changes - Alliant Energy, IPL and WPL are currently assessing potential tax accounting method changes as a result of certain final and proposed regulations issued by the U.S. Department of the Treasury and procedures issued by the IRS. In May 2013, the IRS issued a revenue procedure identifying the units of property that can be utilized for determining repairs on electric generation assets. In September 2013, the U.S. Department of the Treasury issued both final and proposed tangible property regulations released in 2011. In addition, Alliant Energy, IPL and WPL anticipate the IRS will publish guidance clarifying the tax treatment of costs incurred to acquire, maintain or improve tangible property and to retire and remove depreciable assets.property. In January 2014, the IRS issued guidance containing the procedures to comply with the tangible property regulations. In addition, Alliant Energy, IPL and WPL currently anticipate the IRS will publish additional guidance clarifying regulations related to the tax treatment of repairs expenditures for gas distribution property. The outcomes of the assessment of the January 2014 guidance and additional guidance could result in Alliant Energy, IPL and WPL filing additional tax accounting method changes with the IRS. If approved by the IRS, these tax accounting method changes could materially impact Alliant Energy’s and IPL’s future income tax benefits and expenses due to Iowa rate-making principles, which do not recognize deferred income tax benefits and expenses for certain property-related differences at IPL including costs incurred to retire and remove depreciable assets.IPL.


87

Table of Contents


Retirement Plan Costs - Alliant Energy’s, IPL’s and WPL’s net periodic benefit costs related to their defined benefit pension and other postretirement benefits plans are currently expected to be lower in 20132014 compared to 20122013 by approximately $13$18 million, $7$9 million and $5$8 million, respectively,respectively. These amounts do not include the impact of $9 million of additional benefit costs related to the Cash Balance Plan in 2013. The decrease in net periodic benefit costs is primarily due to the use of higher discount rates as of December 31, 2013 and higher than expected returns on plan assets resulting in increases in retirement plan assets during 2012 and settlement losses in 2012 related to payments made to retired executives of Alliant Energy.2013. Approximately 30% to 40% of net periodic benefit costs are allocated to capital projects each year. As a result, the decrease in net periodic benefit costs is not expected to result in a comparable decrease in other operation and maintenance expenses. Refer to Note 6(a)12(a) of the “Combined Notes to Consolidated Financial Statements” for additional details of Alliant Energy’s, IPL’s and WPL’s defined benefit pension and other postretirement benefits plans.

Performance-based Compensation Plans - Alliant Energy’s total compensation package includes a performance-based compensation program, which provides substantially all of Alliant Energy’s non-bargaining employees an opportunity to receive annual cash payments based on the achievement of specific short-term annual operational and financial performance measures. In 2013, Alliant Energy, IPL and WPL incurred $41 million, $23 million and $17 million, respectively, of performance-based compensation expense. The current operational performance measures for 20132014 relate to diversity, safety, customer satisfaction, service reliability and the availability of certain generating facilities.EGUs. The current financial performance measures for 20132014 relate to earnings per share from continuing operations and cash flows from operations generated by IPL, WPL and Corporate Services, as adjusted pursuant to the terms of the Omnibus Incentive Plan.OIP. In addition, the total compensation program for certain key employees includes long-term awards issued under equity-based compensation plans. Alliant Energy allocates a significant portion of performance-based compensation plan costs to IPL and WPL. Refer to Note 6(b)12(b) of the “Combined Notes to Consolidated Financial Statements” for details of the equity-based compensation plans. Alliant Energy, IPL and WPL are currently unable to determine what impacts these performance-based compensation plans will have on their future financial condition or results of operations.

System Support Resource - In 2013, MISO designated another utility’s EGU located in a local resource zone for which ATC provides transmission services as an SSR. In January 2014, MISO filed an SSR agreement with the owner of the designated EGU, which established an annual revenue requirement of approximately $52 million, effective February 1, 2014. The revenue requirement has been requested to be allocated among ATC’s customers located in the local resource zone, including WPL. If approved by FERC, WPL’s estimated share of this annual revenue requirement is expected to be approximately $10 million. Although MISO’s tariff only allows SSR agreements with a term of one year, WPL currently expects that the SSR agreement and revenue requirement for this EGU could be extended for several years until transmission facilities are constructed to eliminate the need for this EGU. WPL currently expects to defer any SSR costs incurred through December 31, 2015 pursuant to an April 2013 PSCW order.

ITEM 7A. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

Quantitative and Qualitative Disclosures About Market Risk are reported in “Other Matters - Market Risk Sensitive Instruments and Positions” in MDA.


88

Table of Contents


ITEM 8. FINANCIAL STATEMENTS AND SUPPLEMENTARY DATA

MANAGEMENT’S ANNUAL REPORT ON INTERNAL CONTROL OVER FINANCIAL REPORTING

The management of Alliant Energy Corporation and subsidiaries (Alliant Energy) is responsible for establishing and maintaining adequate internal control over financial reporting, as such term is defined in Rules 13a-15(f) and 15d-15(f) under the Securities Exchange Act of 1934. Alliant Energy’s internal control over financial reporting is designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with accounting principles generally accepted in the United States of America.

Because of the inherent limitations of internal control over financial reporting, misstatements may not be prevented or detected on a timely basis. Also, projections of any evaluation of the effectiveness of the internal control over financial reporting to future periods are subject to the risk that the controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

Alliant Energy’s management assessed the effectiveness of Alliant Energy’s internal control over financial reporting as of December 31, 20122013 using the criteria set forth in Internal Control - Integrated Framework (1992) issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on this assessment, Alliant Energy’s management concluded that, as of December 31, 20122013, Alliant Energy’s internal control over financial reporting was effective.

Deloitte & Touche LLP, Alliant Energy’s independent registered public accounting firm, has audited Alliant Energy’s internal control over financial reporting. That report is set forth immediately prior to the report of Deloitte & Touche LLP on the financial statements included herein.


/s/ Patricia L. Kampling
Patricia L. Kampling
Chairman, President and Chief Executive Officer


/s/ Thomas L. Hanson
Thomas L. Hanson
Senior Vice President and Chief Financial Officer


/s/ Robert J. Durian
Robert J. Durian
Controller and Chief Accounting Officer


February 26, 201325, 2014


89

Table of Contents


REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM


To the Board of Directors and Shareowners of
Alliant Energy Corporation
Madison, Wisconsin

We have audited the internal control over financial reporting of Alliant Energy Corporation and subsidiaries (the “Company”) as of December 31, 20122013, based on the criteria established in Internal Control - Integrated Framework (1992) issued by the Committee of Sponsoring Organizations of the Treadway Commission. The Company’s management is responsible for maintaining effective internal control over financial reporting and for its assessment of the effectiveness of internal control over financial reporting, included in the accompanying Management’s Annual Report on Internal Control over Financial Reporting. Our responsibility is to express an opinion on the Company’s internal control over financial reporting based on our audit.

We conducted our audit in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether effective internal control over financial reporting was maintained in all material respects. Our audit included obtaining an understanding of internal control over financial reporting, assessing the risk that a material weakness exists, testing and evaluating the design and operating effectiveness of internal control based on the assessed risk, and performing such other procedures as we considered necessary in the circumstances. We believe that our audit provides a reasonable basis for our opinion.

A company’s internal control over financial reporting is a process designed by, or under the supervision of, the company’s principal executive and principal financial officers, or persons performing similar functions, and effected by the company’s board of directors, management, and other personnel to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. A company’s internal control over financial reporting includes those policies and procedures that (1) pertain to the maintenance of records that, in reasonable detail, accurately and fairly reflect the transactions and dispositions of the assets of the company; (2) provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that receipts and expenditures of the company are being made only in accordance with authorizations of management and directors of the company; and (3) provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use, or disposition of the company’s assets that could have a material effect on the financial statements.

Because of the inherent limitations of internal control over financial reporting, including the possibility of collusion or improper management override of controls, material misstatements due to error or fraud may not be prevented or detected on a timely basis. Also, projections of any evaluation of the effectiveness of the internal control over financial reporting to future periods are subject to the risk that the controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

In our opinion, the Company maintained, in all material respects, effective internal control over financial reporting as of December 31, 20122013, based on the criteria established in Internal Control - Integrated Framework (1992) issued by the Committee of Sponsoring Organizations of the Treadway Commission.

We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the consolidated financial statements and financial statement schedules as of and for the year ended December 31, 20122013 of the Company and our report dated February 26, 201325, 2014, expressed an unqualified opinion on those financial statements and financial statement schedules.


/s/ DELOITTE & TOUCHE LLP
DELOITTE & TOUCHE LLP

Milwaukee, Wisconsin
February 26, 201325, 2014

90

Table of Contents


REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM


To the Board of Directors and Shareowners of
Alliant Energy Corporation
Madison, Wisconsin

We have audited the accompanying consolidated balance sheets of Alliant Energy Corporation and subsidiaries (the “Company”) as of December 31, 20122013 and 20112012, and the related consolidated statements of income, common equity, and cash flows for each of the three years in the period ended December 31, 20122013. Our audits also included the financial statement schedules listed in the Index at Item 15. These financial statements and financial statement schedules are the responsibility of the Company’s management. Our responsibility is to express an opinion on the financial statements and financial statement schedules based on our audits.

We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. An audit includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements. An audit also includes assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for our opinion.

In our opinion, such consolidated financial statements present fairly, in all material respects, the financial position of the Company as of December 31, 20122013 and 20112012, and the results of its operations and its cash flows for each of the three years in the period ended December 31, 20122013, in conformity with accounting principles generally accepted in the United States of America. Also, in our opinion, such financial statement schedules, when considered in relation to the basic consolidated financial statements taken as a whole, present fairly, in all material respects, the information set forth therein.

We have also audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the Company’s internal control over financial reporting as of December 31, 20122013, based on the criteria established in Internal Control-Integrated Framework (1992) issued by the Committee of Sponsoring Organizations of the Treadway Commission and our report dated February 26, 201325, 2014 expressed an unqualified opinion on the Company’s internal control over financial reporting.


/s/ DELOITTE & TOUCHE LLP
DELOITTE & TOUCHE LLP

Milwaukee, Wisconsin
February 26, 201325, 2014


91

Table of Contents


ALLIANT ENERGY CORPORATION
CONSOLIDATED STATEMENTS OF INCOME
Year Ended December 31,Year Ended December 31,
2012 2011 20102013 2012 2011
(dollars in millions, except per share amounts)(in millions, except per share amounts)
Operating revenues:          
Utility:          
Electric
$2,589.3
 
$2,635.8
 
$2,674.2

$2,689.0
 
$2,589.3
 
$2,635.8
Gas396.3
 476.7
 480.6
464.8
 396.3
 476.7
Other56.7
 62.0
 64.6
71.3
 56.7
 62.0
Non-regulated52.2
 46.9
 42.7
51.7
 52.2
 46.9
Total operating revenues3,094.5
 3,221.4
 3,262.1
3,276.8
 3,094.5
 3,221.4
Operating expenses:          
Utility:          
Electric production fuel and energy purchases712.3
 764.5
 819.2
725.0
 712.3
 764.5
Purchased electric capacity271.5
 257.2
 279.7
216.8
 271.5
 257.2
Electric transmission service341.3
 323.8
 279.5
418.3
 341.3
 323.8
Cost of gas sold217.2
 295.2
 304.0
276.7
 217.2
 295.2
Other operation and maintenance590.0
 630.2
 617.2
620.7
 590.0
 630.2
Non-regulated operation and maintenance11.9
 18.0
 19.4
14.9
 11.9
 18.0
Depreciation and amortization332.4
 321.0
 287.3
370.9
 332.4
 321.0
Taxes other than income taxes98.2
 98.2
 95.8
99.6
 98.2
 98.2
Total operating expenses2,574.8
 2,708.1
 2,702.1
2,742.9
 2,574.8
 2,708.1
Operating income519.7
 513.3
 560.0
533.9
 519.7
 513.3
Interest expense and other:          
Interest expense156.7
 158.3
 162.8
172.8
 156.7
 158.3
Equity income from unconsolidated investments, net(41.3) (39.3) (38.1)(43.7) (41.3) (39.3)
Allowance for funds used during construction(21.9) (12.0) (18.0)(30.8) (21.9) (12.0)
Interest income and other(4.0) (4.3) (4.6)(0.4) (4.0) (4.3)
Total interest expense and other89.5
 102.7
 102.1
97.9
 89.5
 102.7
Income from continuing operations before income taxes430.2
 410.6
 457.9
436.0
 430.2
 410.6
Income taxes89.4
 69.2
 147.7
53.9
 89.4
 69.2
Income from continuing operations, net of tax340.8
 341.4
 310.2
382.1
 340.8
 341.4
Loss from discontinued operations, net of tax(5.1) (19.5) (3.9)(5.9) (5.1) (19.5)
Net income335.7
 321.9
 306.3
376.2
 335.7
 321.9
Preferred dividend requirements of subsidiaries15.9
 18.3
 18.7
17.9
 15.9
 18.3
Net income attributable to Alliant Energy common shareowners
$319.8
 
$303.6
 
$287.6

$358.3
 
$319.8
 
$303.6
Weighted average number of common shares outstanding (basic) (000s)110,753
 110,626
 110,442
Weighted average number of common shares outstanding (diluted) (000s)110,768
 110,678
 110,521
Weighted average number of common shares outstanding (basic and diluted)110.8
 110.8
 110.7
Earnings per weighted average common share attributable to Alliant Energy common shareowners (basic and diluted):
          
Income from continuing operations, net of tax
$2.93
 
$2.92
 
$2.64

$3.29
 
$2.93
 
$2.92
Loss from discontinued operations, net of tax(0.04) (0.18) (0.04)(0.06) (0.04) (0.18)
Net income
$2.89
 
$2.74
 
$2.60

$3.23
 
$2.89
 
$2.74
Amounts attributable to Alliant Energy common shareowners:          
Income from continuing operations, net of tax
$324.9
 
$323.1
 
$291.5

$364.2
 
$324.9
 
$323.1
Loss from discontinued operations, net of tax(5.1) (19.5) (3.9)(5.9) (5.1) (19.5)
Net income attributable to Alliant Energy common shareowners
$319.8
 
$303.6
 
$287.6

$358.3
 
$319.8
 
$303.6
Dividends declared per common share
$1.80
 
$1.70
 
$1.58

The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.

92

Table of Contents


ALLIANT ENERGY CORPORATION
CONSOLIDATED BALANCE SHEETS
December 31,December 31,
2012 20112013 2012
(in millions)(in millions)
ASSETS      
Property, plant and equipment:      
Utility:      
Electric plant in service
$9,070.7
 
$8,165.4
Gas plant in service878.4
 852.9
Other plant in service506.2
 510.1
Electric plant
$9,415.7
 
$9,070.7
Gas plant909.9
 878.4
Other plant547.9
 506.2
Accumulated depreciation (accum. depr.)(3,513.0) (3,206.0)(3,726.2) (3,513.0)
Net plant6,942.3
 6,322.4
7,147.3
 6,942.3
Construction work in progress:      
Columbia Energy Center Units 1 and 2 emission controls (WPL)130.4
 9.0
265.0
 130.4
Ottumwa Generating Station Unit 1 emission controls (IPL)73.7
 7.7
135.1
 73.7
George Neal Generating Station Units 3 and 4 emission controls (IPL)66.9
 8.3
George Neal Generating Station Unit 3 emission controls (IPL)54.6
 26.5
Other147.8
 232.2
223.2
 188.2
Other, less accum. depr. of $5.6 and $5.321.2
 34.9
Other, less accum. depr. of $5.6 for both periods22.3
 21.2
Total utility7,382.3
 6,614.5
7,847.5
 7,382.3
Non-regulated and other:      
Non-regulated Generation, less accum. depr. of $31.0 and $26.4258.6
 270.6
Alliant Energy Corporate Services, Inc. and other, less accum. depr. of $200.2 and $177.4197.1
 148.2
Non-regulated Generation, less accum. depr. of $40.0 and $31.0249.4
 258.6
Alliant Energy Corporate Services, Inc. and other, less accum. depr. of $214.2 and $200.2229.6
 197.1
Total non-regulated and other455.7
 418.8
479.0
 455.7
Total property, plant and equipment7,838.0
 7,033.3
8,326.5
 7,838.0
Current assets:      
Cash and cash equivalents21.2
 11.4
9.8
 21.2
Accounts receivable, less allowance for doubtful accounts:      
Customer94.9
 88.1
81.8
 94.9
Unbilled utility revenues81.4
 75.1
92.3
 81.4
Other209.4
 114.9
299.2
 209.4
Income tax refunds receivable18.2
 39.1
Production fuel, at weighted average cost103.1
 101.9
103.6
 103.1
Materials and supplies, at weighted average cost63.1
 58.5
69.6
 63.1
Gas stored underground, at weighted average cost37.7
 57.7
38.6
 37.7
Regulatory assets83.5
 103.6
53.9
 83.5
Prepaid gross receipts tax40.4
 40.2
40.8
 40.4
Deferred income tax assets170.2
 22.8
136.7
 170.2
Assets held for sale27.9
 119.6
Prepayments and other43.3
 37.7
Other84.9
 89.4
Total current assets994.3
 870.6
1,011.2
 994.3
Investments:      
Investment in American Transmission Company LLC257.0
 238.8
272.1
 257.0
Other62.0
 61.9
57.5
 62.0
Total investments319.0
 300.7
329.6
 319.0
Other assets:      
Regulatory assets1,528.9
 1,391.4
1,359.3
 1,528.9
Deferred charges and other105.3
 91.9
85.8
 105.3
Total other assets1,634.2
 1,483.3
1,445.1
 1,634.2
Total assets
$10,785.5
 
$9,687.9

$11,112.4
 
$10,785.5

The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.

93

Table of Contents


ALLIANT ENERGY CORPORATION
CONSOLIDATED BALANCE SHEETS (Continued)
ALLIANT ENERGY CORPORATION
CONSOLIDATED BALANCE SHEETS (Continued)
ALLIANT ENERGY CORPORATION
CONSOLIDATED BALANCE SHEETS (Continued)
December 31,December 31,
2012 20112013 2012
(in millions, except per
share and share amounts)
(in millions, except per
share and share amounts)
CAPITALIZATION AND LIABILITIES      
Capitalization:      
Alliant Energy Corporation common equity:      
Common stock - $0.01 par value - 240,000,000 shares authorized; 110,987,400 and 111,018,821 shares outstanding
$1.1
 
$1.1
Common stock - $0.01 par value - 240,000,000 shares authorized; 110,943,669 and 110,987,400 shares outstanding
$1.1
 
$1.1
Additional paid-in capital1,511.2
 1,510.8
1,507.8
 1,511.2
Retained earnings1,630.7
 1,510.2
1,780.7
 1,630.7
Accumulated other comprehensive loss(0.8) (0.8)(0.2) (0.8)
Shares in deferred compensation trust - 216,030 and 262,735 shares at a weighted average cost of $33.61 and $31.68 per share(7.3) (8.3)
Shares in deferred compensation trust - 227,469 and 216,030 shares at a weighted average cost of $35.25 and $33.61 per share(8.0) (7.3)
Total Alliant Energy Corporation common equity3,134.9
 3,013.0
3,281.4
 3,134.9
Cumulative preferred stock of Interstate Power and Light Company145.1
 145.1
200.0
 145.1
Noncontrolling interest1.8
 1.8
1.8
 1.8
Total equity3,281.8
 3,159.9
3,483.2
 3,281.8
Cumulative preferred stock of Wisconsin Power and Light Company60.0
 60.0

 60.0
Long-term debt, net (excluding current portion)3,136.6
 2,703.1
2,977.8
 3,136.6
Total capitalization6,478.4
 5,923.0
6,461.0
 6,478.4
Current liabilities:      
Current maturities of long-term debt1.5
 1.4
358.5
 1.5
Commercial paper217.5
 102.8
279.4
 217.5
Accounts payable339.3
 267.8
365.0
 339.3
Regulatory liabilities189.7
 164.7
196.6
 189.7
Accrued taxes48.0
 46.9
50.0
 48.0
Accrued interest48.0
 46.6
50.7
 48.0
Derivative liabilities31.1
 55.9
Liabilities held for sale31.4
 62.1
Other113.5
 107.0
133.1
 176.0
Total current liabilities1,020.0
 855.2
1,433.3
 1,020.0
Other long-term liabilities and deferred credits:      
Deferred income tax liabilities1,934.2
 1,592.2
2,112.7
 1,934.2
Regulatory liabilities726.4
 745.4
624.9
 726.4
Pension and other benefit obligations364.0
 312.7
206.6
 364.0
Other262.5
 259.4
273.9
 262.5
Total long-term liabilities and deferred credits3,287.1
 2,909.7
3,218.1
 3,287.1
Commitments and contingencies (Note 13)   
Commitments and contingencies (Note 16)


 

Total capitalization and liabilities
$10,785.5
 
$9,687.9

$11,112.4
 
$10,785.5

The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.


94

Table of Contents


ALLIANT ENERGY CORPORATION
CONSOLIDATED STATEMENTS OF CASH FLOWS
Year Ended December 31,Year Ended December 31,
2012 2011 20102013 2012 2011
(in millions)(in millions)
Cash flows from operating activities:          
Net income
$335.7
 
$321.9
 
$306.3

$376.2
 
$335.7
 
$321.9
Adjustments to reconcile net income to net cash flows from operating activities:          
Depreciation and amortization332.9
 323.8
 292.3
370.9
 332.9
 323.8
Other amortizations55.0
 56.3
 51.8
40.2
 55.0
 56.3
Deferred tax expense and investment tax credits143.3
 10.2
 216.6
Deferred taxes and investment tax credits108.3
 143.3
 10.2
Equity income from unconsolidated investments, net(41.3) (39.3) (38.1)(43.7) (41.3) (39.3)
Distributions from equity method investments34.2
 32.3
 32.2
35.4
 34.2
 32.3
Equity component of allowance for funds used during construction(14.1) (7.6) (11.2)(20.3) (14.1) (7.6)
Non-cash valuation and regulatory-related charges3.3
 25.5
 38.0
Other(2.6) (5.2) (4.7)
Non-cash valuation charges and other(3.7) 0.7
 20.3
Other changes in assets and liabilities:          
Accounts receivable61.3
 (54.3) 16.3
(49.2) 61.3
 (54.3)
Sales of accounts receivable(10.0) 75.0
 65.0
(101.0) (10.0) 75.0
Income tax refunds receivable20.9
 0.3
 130.4
Regulatory assets(178.1) (413.1) (20.8)140.5
 (178.1) (413.1)
Regulatory liabilities16.4
 168.3
 8.4
(90.8) 16.4
 168.3
Derivative liabilities(37.6) 10.7
 (52.0)
Deferred income tax liabilities87.6
 148.5
 28.9
Non-current taxes payable(2.9) (5.1) (66.6)
Deferred income taxes101.9
 69.7
 147.3
Pension and other benefit obligations51.3
 8.9
 (20.1)(157.4) 51.3
 8.9
Other(14.2) 45.6
 12.2
23.7
 (15.9) 52.7
Net cash flows from operating activities841.1
 702.7
 984.9
731.0
 841.1
 702.7
Cash flows used for investing activities:          
Construction and acquisition expenditures:          
Utility business - Riverside Energy Center(403.5) 
 
Utility business - purchase of Riverside Energy Center
 (403.5) 
Utility business - other(622.0) (608.1) (833.3)(731.6) (622.0) (608.1)
Alliant Energy Corporate Services, Inc. and non-regulated businesses(132.6) (65.3) (33.6)(66.7) (132.6) (65.3)
Advances for customer energy efficiency projects(0.4) (5.1) (17.1)
Proceeds from Franklin County wind project cash grant62.4
 
 
Collections of advances for customer energy efficiency projects22.9
 31.0
 34.2
16.6
 22.9
 31.0
Other(19.9) (4.6) (16.7)(35.4) (20.3) (9.7)
Net cash flows used for investing activities(1,155.5) (652.1) (866.5)(754.7) (1,155.5) (652.1)
Cash flows from (used for) financing activities:          
Common stock dividends(199.3) (188.1) (174.6)(208.3) (199.3) (188.1)
Preferred dividends paid by subsidiaries(15.9) (16.8) (18.7)(11.4) (15.9) (16.8)
Payments to redeem cumulative preferred stock of IPL
 (40.0) 
Payments to redeem cumulative preferred stock of IPL and WPL(211.0) 
 (40.0)
Proceeds from issuance of cumulative preferred stock of IPL200.0
 
 
Proceeds from issuance of long-term debt385.0
 0.4
 500.0
250.0
 385.0
 0.4
Payments to retire long-term debt(1.4) (1.3) (307.8)
Net change in commercial paper164.7
 55.4
 (142.6)11.9
 164.7
 55.4
Other(8.9) (8.1) 9.3
(18.9) (10.3) (9.4)
Net cash flows from (used for) financing activities324.2
 (198.5) (134.4)12.3
 324.2
 (198.5)
Net increase (decrease) in cash and cash equivalents9.8
 (147.9) (16.0)(11.4) 9.8
 (147.9)
Cash and cash equivalents at beginning of period11.4
 159.3
 175.3
21.2
 11.4
 159.3
Cash and cash equivalents at end of period
$21.2
 
$11.4
 
$159.3

$9.8
 
$21.2
 
$11.4
Supplemental cash flows information:          
Cash paid (refunded) during the period for:          
Interest, net of capitalized interest
$155.2
 
$157.6
 
$165.5

$171.7
 
$155.2
 
$157.6
Income taxes, net of refunds
($20.3) 
($10.8) 
($116.2)
($9.6) 
($20.3) 
($10.8)
Significant non-cash investing and financing activities:          
Accrued capital expenditures
$105.3
 
$49.7
 
$75.0

$103.8
 
$105.3
 
$49.7
The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.

95

Table of Contents


ALLIANT ENERGY CORPORATION
CONSOLIDATED STATEMENTS OF COMMON EQUITY
          Total          Total
      Accumulated Shares in Alliant      Accumulated Shares in Alliant
  Additional   Other Deferred Energy  Additional   Other Deferred Energy
Common Paid-In Retained Comprehensive Compensation CommonCommon Paid-In Retained Comprehensive Compensation Common
Stock Capital Earnings Income (Loss) Trust EquityStock Capital Earnings Income (Loss) Trust Equity
(in millions)(in millions)
2010:           
2011:           
Beginning balance$1.1 
$1,499.1
 
$1,281.7
 
($1.4) 
($7.9) 
$2,772.6
$1.1 
$1,506.8
 
$1,394.7
 
($1.4) 
($7.6) 
$2,893.6
Net income attributable to Alliant Energy common shareowners    287.6
     287.6
    303.6
     303.6
Common stock dividends ($1.58 per share)    (174.6)     (174.6)
Common stock issued, repurchased and other, net  7.7
     0.3
 8.0
Ending balance1.1
 1,506.8
 1,394.7
 (1.4) (7.6) 2,893.6
2011:           
Net income attributable to Alliant Energy common shareowners    303.6
     303.6
Common stock dividends ($1.70 per share)    (188.1)     (188.1)    (188.1)     (188.1)
Common stock issued, repurchased and other, net  4.0
     (0.7) 3.3
Other  4.0
     (0.7) 3.3
Other comprehensive income, net of tax      0.6
   0.6
      0.6
   0.6
Ending balance1.1
 1,510.8
 1,510.2
 (0.8) (8.3) 3,013.0
1.1 1,510.8
 1,510.2
 (0.8) (8.3) 3,013.0
2012:                      
Net income attributable to Alliant Energy common shareowners    319.8
     319.8
    319.8
     319.8
Common stock dividends ($1.80 per share)    (199.3)     (199.3)    (199.3)     (199.3)
Common stock issued, repurchased and other, net  0.4
     1.0
 1.4
Other  0.4
     1.0
 1.4
Ending balance
$1.1
 
$1,511.2
 
$1,630.7
 
($0.8) 
($7.3) 
$3,134.9
1.1
 1,511.2
 1,630.7
 (0.8) (7.3) 3,134.9
2013:           
Net income attributable to Alliant Energy common shareowners    358.3
     358.3
Common stock dividends ($1.88 per share)    (208.3)     (208.3)
Preferred stock issuance costs  (5.4)       (5.4)
Other  2.0
     (0.7) 1.3
Other comprehensive income, net of tax      0.6
   0.6
Ending balance
$1.1
 
$1,507.8
 
$1,780.7
 
($0.2) 
($8.0) 
$3,281.4

The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.

96

Table of Contents



MANAGEMENT’S ANNUAL REPORT ON INTERNAL CONTROL OVER FINANCIAL REPORTING

The management of Interstate Power and Light Company and subsidiary (IPL) is responsible for establishing and maintaining adequate internal control over financial reporting, as such term is defined in Rules 13a-15(f) and 15d-15(f) under the Securities Exchange Act of 1934. IPL’s internal control over financial reporting is designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with accounting principles generally accepted in the United States of America.

Because of the inherent limitations of internal control over financial reporting, misstatements may not be prevented or detected on a timely basis. Also, projections of any evaluation of the effectiveness of the internal control over financial reporting to future periods are subject to the risk that the controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

IPL’s management assessed the effectiveness of IPL’s internal control over financial reporting as of December 31, 20122013 using the criteria set forth in Internal Control - Integrated Framework (1992) issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on this assessment, IPL’s management concluded that, as of December 31, 20122013, IPL’s internal control over financial reporting was effective.


/s/ Patricia L. Kampling
Patricia L. Kampling
Chairman and Chief Executive Officer


/s/ Thomas L. Hanson
Thomas L. Hanson
Senior Vice President and Chief Financial Officer


/s/ Robert J. Durian
Robert J. Durian
Controller and Chief Accounting Officer


February 26, 201325, 2014


97

Table of Contents


REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM


To the Board of Directors and Shareowners of
Interstate Power and Light Company
Cedar Rapids, Iowa

We have audited the accompanying consolidated balance sheets of Interstate Power and Light Company and subsidiary (the “Company”) as of December 31, 20122013 and 20112012, and the related consolidated statements of income, common equity, and cash flows for each of the three years in the period ended December 31, 20122013. Our audits also included the financial statement schedule listed in the Index at Item 15. These financial statements and the financial statement schedule are the responsibility of the Company’s management. Our responsibility is to express an opinion on the financial statements and the financial statement schedule based on our audits.

We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. The Company is not required to have, nor were we engaged to perform, an audit of its internal control over financial reporting. Our audits included consideration of internal control over financial reporting as a basis for designing audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the Company’s internal control over financial reporting. Accordingly, we express no such opinion. An audit also includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for our opinion.

In our opinion, such consolidated financial statements present fairly, in all material respects, the financial position of the Company as of December 31, 20122013 and 20112012, and the results of its operations and its cash flows for each of the three years in the period ended December 31, 20122013, in conformity with accounting principles generally accepted in the United States of America. Also, in our opinion, the financial statement schedule, when considered in relation to the basic consolidated financial statements taken as a whole, presents fairly, in all material respects, the information set forth therein.

/s/ DELOITTE & TOUCHE LLP
DELOITTE & TOUCHE LLP

Milwaukee, Wisconsin
February 26, 201325, 2014


98

Table of Contents


INTERSTATE POWER AND LIGHT COMPANY
CONSOLIDATED STATEMENTS OF INCOME
Year Ended December 31,Year Ended December 31,
2012 2011 20102013 2012 2011
(in millions)(in millions)
Operating revenues:          
Electric utility
$1,371.1
 
$1,408.3
 
$1,464.3

$1,491.8
 
$1,371.1
 
$1,408.3
Gas utility226.7
 276.3
 274.3
273.9
 226.7
 276.3
Steam and other52.5
 55.5
 57.2
53.1
 52.5
 55.5
Total operating revenues1,650.3
 1,740.1
 1,795.8
1,818.8
 1,650.3
 1,740.1
Operating expenses:          
Electric production fuel and energy purchases344.5
 383.1
 418.0
382.1
 344.5
 383.1
Purchased electric capacity153.7
 147.7
 145.0
155.2
 153.7
 147.7
Electric transmission service235.0
 219.2
 179.1
301.4
 235.0
 219.2
Cost of gas sold124.9
 175.6
 178.7
160.3
 124.9
 175.6
Other operation and maintenance350.0
 375.0
 384.5
362.3
 350.0
 375.0
Depreciation and amortization188.9
 179.1
 177.0
191.1
 188.9
 179.1
Taxes other than income taxes53.0
 52.0
 51.6
54.4
 53.0
 52.0
Total operating expenses1,450.0
 1,531.7
 1,533.9
1,606.8
 1,450.0
 1,531.7
Operating income200.3
 208.4
 261.9
212.0
 200.3
 208.4
Interest expense and other:          
Interest expense78.5
 78.7
 82.2
81.3
 78.5
 78.7
Allowance for funds used during construction(8.4) (5.8) (5.5)(21.0) (8.4) (5.8)
Interest income and other(0.2) (0.2) (0.5)(0.3) (0.2) (0.2)
Total interest expense and other69.9
 72.7
 76.2
60.0
 69.9
 72.7
Income before income taxes130.4
 135.7
 185.7
152.0
 130.4
 135.7
Income tax expense (benefit)(19.8) (3.6) 42.3
Income tax benefit(37.9) (19.8) (3.6)
Net income150.2
 139.3
 143.4
189.9
 150.2
 139.3
Preferred dividend requirements12.6
 15.0
 15.4
16.3
 12.6
 15.0
Earnings available for common stock
$137.6
 
$124.3
 
$128.0

$173.6
 
$137.6
 
$124.3
Earnings per share data is not disclosed given Alliant Energy Corporation is the sole shareowner of all shares of IPL’s common stock outstanding during the periods presented.
The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.

99

Table of Contents


INTERSTATE POWER AND LIGHT COMPANY
CONSOLIDATED BALANCE SHEETS
December 31,December 31,
2012 20112013 2012
(in millions)(in millions)
ASSETS      
Property, plant and equipment:      
Electric plant in service
$4,815.2
 
$4,684.0
Gas plant in service441.4
 428.2
Steam and other plant in service289.1
 281.3
Electric plant
$5,034.9
 
$4,815.2
Gas plant456.8
 441.4
Steam and other plant302.8
 289.1
Accumulated depreciation(1,930.7) (1,833.8)(2,025.3) (1,930.7)
Net plant3,615.0
 3,559.7
3,769.2
 3,615.0
Construction work in progress:      
Ottumwa Generating Station Unit 1 emission controls73.7
 7.7
135.1
 73.7
George Neal Generating Station Units 3 and 4 emission controls66.9
 8.3
George Neal Generating Station Unit 3 emission controls54.6
 26.5
Other82.8
 80.6
156.7
 123.2
Other, less accumulated depreciation of $4.1 and $4.019.8
 19.8
Other, less accumulated depreciation of $4.1 for both periods21.2
 19.8
Total property, plant and equipment3,858.2
 3,676.1
4,136.8
 3,858.2
Current assets:      
Cash and cash equivalents4.5
 2.1
4.4
 4.5
Accounts receivable, less allowance for doubtful accounts95.0
 75.2
246.9
 95.0
Income tax refunds receivable14.9
 28.4
Production fuel, at weighted average cost75.2
 67.7
75.6
 75.2
Materials and supplies, at weighted average cost33.3
 31.5
39.4
 33.3
Gas stored underground, at weighted average cost17.2
 25.5
18.9
 17.2
Regulatory assets47.6
 59.0
28.5
 47.6
Deferred income tax assets79.3
 13.5
87.7
 79.3
Prepayments and other24.6
 20.2
Other34.5
 39.5
Total current assets391.6
 323.1
535.9
 391.6
Investments17.6
 16.8
18.6
 17.6
Other assets:      
Regulatory assets1,170.3
 1,058.3
1,085.0
 1,170.3
Deferred charges and other19.3
 19.2
29.7
 19.3
Total other assets1,189.6
 1,077.5
1,114.7
 1,189.6
Total assets
$5,457.0
 
$5,093.5

$5,806.0
 
$5,457.0

The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.

100

Table of Contents


INTERSTATE POWER AND LIGHT COMPANY
CONSOLIDATED BALANCE SHEETS (Continued)
INTERSTATE POWER AND LIGHT COMPANY
CONSOLIDATED BALANCE SHEETS (Continued)
INTERSTATE POWER AND LIGHT COMPANY
CONSOLIDATED BALANCE SHEETS (Continued)
December 31,December 31,
2012 20112013 2012
(in millions, except per
share and share amounts)
(in millions, except per
share and share amounts)
CAPITALIZATION AND LIABILITIES      
Capitalization:      
Interstate Power and Light Company common equity:      
Common stock - $2.50 par value - 24,000,000 shares authorized; 13,370,788 shares outstanding
$33.4
 
$33.4

$33.4
 
$33.4
Additional paid-in capital1,037.8
 927.7
1,152.8
 1,037.8
Retained earnings448.0
 433.3
493.5
 448.0
Total Interstate Power and Light Company common equity1,519.2
 1,394.4
1,679.7
 1,519.2
Cumulative preferred stock145.1
 145.1
200.0
 145.1
Total equity1,664.3
 1,539.5
1,879.7
 1,664.3
Long-term debt, net1,359.5
 1,309.0
Long-term debt, net (excluding current portion)1,520.0
 1,359.5
Total capitalization3,023.8
 2,848.5
3,399.7
 3,023.8
Current liabilities:      
Current maturities of long-term debt38.4
 
Commercial paper26.3
 7.1

 26.3
Accounts payable163.2
 118.2
187.1
 163.2
Accounts payable to associated companies29.3
 36.7
29.1
 29.3
Regulatory liabilities130.1
 137.1
143.8
 130.1
Accrued taxes46.8
 43.8
51.1
 46.8
Accrued interest22.8
 22.8
Derivative liabilities14.1
 24.5
Other36.2
 32.3
74.8
 73.1
Total current liabilities468.8
 422.5
524.3
 468.8
Other long-term liabilities and deferred credits:      
Deferred income tax liabilities1,087.3
 936.9
1,193.0
 1,087.3
Regulatory liabilities571.3
 584.2
471.1
 571.3
Pension and other benefit obligations122.9
 101.9
48.6
 122.9
Other182.9
 199.5
169.3
 182.9
Total other long-term liabilities and deferred credits1,964.4
 1,822.5
1,882.0
 1,964.4
Commitments and contingencies (Note 13)   
Commitments and contingencies (Note 16)


 

Total capitalization and liabilities
$5,457.0
 
$5,093.5

$5,806.0
 
$5,457.0

The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.


101

Table of Contents


INTERSTATE POWER AND LIGHT COMPANY
CONSOLIDATED STATEMENTS OF CASH FLOWS (UNAUDITED)
Year Ended December 31,Year Ended December 31,
2012 2011 20102013 2012 2011
(in millions)(in millions)
Cash flows from operating activities:          
Net income
$150.2
 
$139.3
 
$143.4

$189.9
 
$150.2
 
$139.3
Adjustments to reconcile net income to net cash flows from operating activities:          
Depreciation and amortization188.9
 179.1
 177.0
191.1
 188.9
 179.1
Deferred tax expense (benefit) and investment tax credits19.3
 (58.6) 116.0
4.2
 19.3
 (58.6)
Equity component of allowance for funds used during construction(5.2) (3.5) (3.0)(13.8) (5.2) (3.5)
Non-cash valuation and regulatory-related charges3.0
 14.8
 30.5
Other7.6
 8.7
 3.7
Non-cash valuation charges and other(0.7) 10.6
 23.5
Other changes in assets and liabilities:          
Accounts receivable(0.7) 22.4
 5.1
(55.9) (0.7) 22.4
Sales of accounts receivable(10.0) 75.0
 65.0
(101.0) (10.0) 75.0
Income tax refunds receivable13.5
 (9.3) 84.3
Production fuel(7.5) 12.4
 21.0
Regulatory assets(129.0) (328.8) (49.5)71.4
 (129.0) (328.8)
Regulatory liabilities(12.1) 156.3
 17.5
(82.3) (12.1) 156.3
Derivative liabilities(17.5) 9.6
 (29.0)
Deferred income tax liabilities78.6
 145.9
 42.0
Non-current taxes payable(2.8) (4.8) (28.4)
Deferred income taxes92.4
 64.6
 145.5
Pension and other benefit obligations21.0
 (8.3) (9.0)(74.3) 21.0
 (8.3)
Other(6.3) 16.7
 (37.0)11.6
 (6.6) 25.0
Net cash flows from operating activities291.0
 366.9
 549.6
232.6
 291.0
 366.9
Cash flows used for investing activities:          
Utility construction and acquisition expenditures(307.5) (293.7) (382.8)(400.2) (307.5) (293.7)
Proceeds from sale of wind project assets to affiliate
 115.3
 

 
 115.3
Other(23.7) (22.2) (32.2)(23.1) (23.7) (22.2)
Net cash flows used for investing activities(331.2) (200.6) (415.0)(423.3) (331.2) (200.6)
Cash flows from (used for) financing activities:          
Common stock dividends(122.9) (73.4) 
(128.1) (122.9) (73.4)
Preferred stock dividends(12.6) (13.5) (15.4)(10.8) (12.6) (13.5)
Capital contributions from parent110.0
 54.0
 50.0
120.0
 110.0
 54.0
Repayment of capital to parent
 (100.7) (118.2)
 
 (100.7)
Payments to redeem cumulative preferred stock
 (40.0) 
(150.0) 
 (40.0)
Proceeds from issuance of cumulative preferred stock200.0
 
 
Proceeds from issuance of long-term debt
 
 350.0
250.0
 
 
Payments to retire long-term debt
 
 (206.3)
Net change in commercial paper69.2
 7.1
 (190.0)(76.3) 69.2
 7.1
Other(1.1) (3.4) 0.6
(14.2) (1.1) (3.4)
Net cash flows from (used for) financing activities42.6
 (169.9) (129.3)190.6
 42.6
 (169.9)
Net increase (decrease) in cash and cash equivalents2.4
 (3.6) 5.3
(0.1) 2.4
 (3.6)
Cash and cash equivalents at beginning of period2.1
 5.7
 0.4
4.5
 2.1
 5.7
Cash and cash equivalents at end of period
$4.5
 
$2.1
 
$5.7

$4.4
 
$4.5
 
$2.1
Supplemental cash flows information:          
Cash paid (refunded) during the period for:          
Interest
$78.3
 
$78.0
 
$82.0

$80.7
 
$78.3
 
$78.0
Income taxes, net of refunds
$3.3
 
$25.3
 
($125.9)
($0.1) 
$3.3
 
$25.3
Significant non-cash investing and financing activities:          
Accrued capital expenditures
$53.4
 
$23.9
 
$45.7

$58.1
 
$53.4
 
$23.9

The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.

102

Table of Contents


INTERSTATE POWER AND LIGHT COMPANY
CONSOLIDATED STATEMENTS OF COMMON EQUITY
      Total      Total
  Additional   IPL  Additional   IPL
Common Paid-In Retained CommonCommon Paid-In Retained Common
Stock Capital Earnings EquityStock Capital Earnings Equity
(in millions)(in millions)
2010:       
2011:       
Beginning balance
$33.4
 
$1,042.2
 
$254.4
 
$1,330.0

$33.4
 
$974.0
 
$382.4
 
$1,389.8
Earnings available for common stock    128.0
 128.0
Capital contribution from parent  50.0
   50.0
Repayment of capital to parent  (118.2)   (118.2)
Ending balance33.4
 974.0
 382.4
 1,389.8
2011:       
Earnings available for common stock    124.3
 124.3
    124.3
 124.3
Common stock dividends    (73.4) (73.4)    (73.4) (73.4)
Capital contribution from parent  54.0
   54.0
  54.0
   54.0
Repayment of capital to parent  (100.7)   (100.7)  (100.7)   (100.7)
Other  0.4
   0.4
  0.4
   0.4
Ending balance33.4
 927.7
 433.3
 1,394.4
33.4
 927.7
 433.3
 1,394.4
2012:              
Earnings available for common stock    137.6
 137.6
    137.6
 137.6
Common stock dividends    (122.9) (122.9)    (122.9) (122.9)
Capital contribution from parent  110.0
   110.0
  110.0
   110.0
Other  0.1
   0.1
  0.1
   0.1
Ending balance
$33.4
 
$1,037.8
 
$448.0
 
$1,519.2
33.4
 1,037.8
 448.0
 1,519.2
2013:       
Earnings available for common stock    173.6
 173.6
Common stock dividends    (128.1) (128.1)
Capital contribution from parent  120.0
   120.0
Preferred stock issuance costs  (5.4)   (5.4)
Other  0.4
   0.4
Ending balance
$33.4
 
$1,152.8
 
$493.5
 
$1,679.7

The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.


103

Table of Contents



MANAGEMENT’S ANNUAL REPORT ON INTERNAL CONTROL OVER FINANCIAL REPORTING

The management of Wisconsin Power and Light Company and subsidiary (WPL) is responsible for establishing and maintaining adequate internal control over financial reporting, as such term is defined in Rules 13a-15(f) and 15d-15(f) under the Securities Exchange Act of 1934. WPL’s internal control over financial reporting is designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with accounting principles generally accepted in the United States of America.

Because of the inherent limitations of internal control over financial reporting, misstatements may not be prevented or detected on a timely basis. Also, projections of any evaluation of the effectiveness of the internal control over financial reporting to future periods are subject to the risk that the controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.

WPL’s management assessed the effectiveness of WPL’s internal control over financial reporting as of December 31, 20122013 using the criteria set forth in Internal Control - Integrated Framework (1992) issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on this assessment, WPL’s management concluded that, as of December 31, 20122013, WPL’s internal control over financial reporting was effective.


/s/ Patricia L. Kampling
Patricia L. Kampling
Chairman and Chief Executive Officer


/s/ Thomas L. Hanson
Thomas L. Hanson
Senior Vice President and Chief Financial Officer


/s/ Robert J. Durian
Robert J. Durian
Controller and Chief Accounting Officer


February 26, 201325, 2014


104

Table of Contents


REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM


To the Board of Directors and ShareownersShareowner of
Wisconsin Power and Light Company
Madison, Wisconsin

We have audited the accompanying consolidated balance sheets of Wisconsin Power and Light Company and subsidiary (the “Company”) as of December 31, 20122013 and 20112012, and the related consolidated statements of income, common equity, and cash flows for each of the three years in the period ended December 31, 20122013. Our audits also included the financial statement schedule listed in the Index at Item 15. These financial statements and the financial statement schedule are the responsibility of the Company’s management. Our responsibility is to express an opinion on the financial statements and the financial statement schedule based on our audits.

We conducted our audits in accordance with the standards of the Public Company Accounting Oversight Board (United States). Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement. The Company is not required to have, nor were we engaged to perform, an audit of its internal control over financial reporting. Our audits included consideration of internal control over financial reporting as a basis for designing audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the Company’s internal control over financial reporting. Accordingly, we express no such opinion. An audit also includes examining, on a test basis, evidence supporting the amounts and disclosures in the financial statements, assessing the accounting principles used and significant estimates made by management, as well as evaluating the overall financial statement presentation. We believe that our audits provide a reasonable basis for our opinion.

In our opinion, such consolidated financial statements present fairly, in all material respects, the financial position of the Company as of December 31, 20122013 and 20112012, and the results of its operations and its cash flows for each of the three years in the period ended December 31, 20122013, in conformity with accounting principles generally accepted in the United States of America. Also, in our opinion, the financial statement schedule, when considered in relation to the basic consolidated financial statements taken as a whole, presents fairly, in all material respects, the information set forth therein.

/s/ DELOITTE & TOUCHE LLP
DELOITTE & TOUCHE LLP

Milwaukee, Wisconsin
February 26, 201325, 2014


105

Table of Contents


WISCONSIN POWER AND LIGHT COMPANY
CONSOLIDATED STATEMENTS OF INCOME
Year Ended December 31,Year Ended December 31,
2012 2011 20102013 2012 2011
(in millions)(in millions)
Operating revenues:          
Electric utility
$1,218.2
 
$1,227.5
 
$1,209.9

$1,197.2
 
$1,218.2
 
$1,227.5
Gas utility169.6
 200.4
 206.3
190.9
 169.6
 200.4
Other4.2
 6.5
 7.4
18.2
 4.2
 6.5
Total operating revenues1,392.0
 1,434.4
 1,423.6
1,406.3
 1,392.0
 1,434.4
Operating expenses:          
Electric production fuel and energy purchases367.8
 381.4
 401.2
342.9
 367.8
 381.4
Purchased electric capacity117.8
 109.5
 134.7
61.6
 117.8
 109.5
Electric transmission service106.3
 104.6
 100.4
116.9
 106.3
 104.6
Cost of gas sold92.3
 119.6
 125.3
116.4
 92.3
 119.6
Other operation and maintenance240.0
 255.2
 232.7
258.4
 240.0
 255.2
Depreciation and amortization140.9
 140.1
 108.6
172.2
 140.9
 140.1
Taxes other than income taxes42.1
 43.6
 41.9
41.8
 42.1
 43.6
Total operating expenses1,107.2
 1,154.0
 1,144.8
1,110.2
 1,107.2
 1,154.0
Operating income284.8
 280.4
 278.8
296.1
 284.8
 280.4
Interest expense and other:          
Interest expense80.2
 79.9
 78.6
85.0
 80.2
 79.9
Equity income from unconsolidated investments(42.1) (38.7) (37.8)(43.7) (42.1) (38.7)
Allowance for funds used during construction(13.5) (6.2) (12.5)(9.8) (13.5) (6.2)
Interest income and other(0.1) 
 (0.1)(0.1) (0.1) 
Total interest expense and other24.5
 35.0
 28.2
31.4
 24.5
 35.0
Income before income taxes260.3
 245.4
 250.6
264.7
 260.3
 245.4
Income taxes94.6
 81.9
 98.3
87.2
 94.6
 81.9
Net income165.7
 163.5
 152.3
177.5
 165.7
 163.5
Preferred dividend requirements3.3
 3.3
 3.3
1.6
 3.3
 3.3
Earnings available for common stock
$162.4
 
$160.2
 
$149.0

$175.9
 
$162.4
 
$160.2

Earnings per share data is not disclosed given Alliant Energy Corporation is the sole shareowner of all shares of WPL’s common stock outstanding during the periods presented.
The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.

106

Table of Contents


WISCONSIN POWER AND LIGHT COMPANY
CONSOLIDATED BALANCE SHEETS
December 31,December 31,
2012 20112013 2012
(in millions)(in millions)
ASSETS      
Property, plant and equipment:      
Electric plant in service
$4,255.5
 
$3,481.4
Gas plant in service437.0
 424.7
Other plant in service217.1
 228.8
Electric plant
$4,380.8
 
$4,255.5
Gas plant453.1
 437.0
Other plant245.1
 217.1
Accumulated depreciation(1,582.3) (1,372.2)(1,700.9) (1,582.3)
Net plant3,327.3
 2,762.7
3,378.1
 3,327.3
Leased Sheboygan Falls Energy Facility, less accumulated amortization of $46.7 and $40.677.0
 83.2
Leased Sheboygan Falls Energy Facility, less accumulated amortization of $52.9 and $46.770.9
 77.0
Construction work in progress:      
Columbia Energy Center Units 1 and 2 emission controls130.4
 9.0
265.0
 130.4
Other65.0
 151.6
66.5
 65.0
Other, less accumulated depreciation of $1.5 and $1.31.4
 15.1
Other, less accumulated depreciation of $1.5 for both periods1.1
 1.4
Total property, plant and equipment3,601.1
 3,021.6
3,781.6
 3,601.1
Current assets:      
Cash and cash equivalents0.7
 2.7
0.5
 0.7
Accounts receivable, less allowance for doubtful accounts:      
Customer83.3
 76.2
73.0
 83.3
Unbilled utility revenues81.4
 75.1
92.3
 81.4
Other48.5
 38.2
33.1
 48.5
Production fuel, at weighted average cost27.9
 34.2
28.0
 27.9
Materials and supplies, at weighted average cost28.5
 25.7
28.9
 28.5
Gas stored underground, at weighted average cost20.5
 32.2
19.7
 20.5
Regulatory assets35.9
 44.6
25.4
 35.9
Prepaid gross receipts tax40.4
 40.2
40.8
 40.4
Deferred income tax assets85.6
 6.0
43.3
 85.6
Prepayments and other16.0
 10.9
Other17.6
 16.0
Total current assets468.7
 386.0
402.6
 468.7
Investments:      
Investment in American Transmission Company LLC257.0
 238.8
272.1
 257.0
Other19.6
 19.8
19.5
 19.6
Total investments276.6
 258.6
291.6
 276.6
Other assets:      
Regulatory assets358.6
 333.1
274.3
 358.6
Deferred charges and other57.6
 44.7
54.3
 57.6
Total other assets416.2
 377.8
328.6
 416.2
Total assets
$4,762.6
 
$4,044.0

$4,804.4
 
$4,762.6

The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.

107

Table of Contents


WISCONSIN POWER AND LIGHT COMPANY
CONSOLIDATED BALANCE SHEETS (Continued)
WISCONSIN POWER AND LIGHT COMPANY
CONSOLIDATED BALANCE SHEETS (Continued)
WISCONSIN POWER AND LIGHT COMPANY
CONSOLIDATED BALANCE SHEETS (Continued)
December 31,December 31,
2012 20112013 2012
(in millions, except per
share and share amounts)
(in millions, except per
share and share amounts)
CAPITALIZATION AND LIABILITIES  
Capitalization:      
Wisconsin Power and Light Company common equity:      
Common stock - $5 par value - 18,000,000 shares authorized; 13,236,601 shares outstanding
$66.2
 
$66.2

$66.2
 
$66.2
Additional paid-in capital959.2
 869.0
959.0
 959.2
Retained earnings557.6
 507.2
617.2
 557.6
Total Wisconsin Power and Light Company common equity1,583.0
 1,442.4
1,642.4
 1,583.0
Cumulative preferred stock60.0
 60.0

 60.0
Long-term debt, net1,331.5
 1,082.2
Long-term debt, net (excluding current portion)1,323.6
 1,331.5
Total capitalization2,974.5
 2,584.6
2,966.0
 2,974.5
Current liabilities:      
Current maturities of long-term debt8.5
 
Commercial paper86.6
 25.7
183.7
 86.6
Accounts payable126.4
 98.5
120.0
 126.4
Accounts payable to associated companies13.2
 20.5
26.0
 13.2
Regulatory liabilities59.6
 27.6
52.8
 59.6
Accrued taxes28.3
 9.1
1.4
 28.3
Accrued interest22.2
 21.6
22.2
 22.2
Derivative liabilities17.0
 31.4
Other32.2
 23.2
36.9
 49.2
Total current liabilities385.5
 257.6
451.5
 385.5
Other long-term liabilities and deferred credits:      
Deferred income tax liabilities844.1
 672.5
897.1
 844.1
Regulatory liabilities155.1
 161.2
153.8
 155.1
Capital lease obligations - Sheboygan Falls Energy Facility99.1
 103.3
94.5
 99.1
Pension and other benefit obligations159.7
 128.0
88.4
 159.7
Other144.6
 136.8
153.1
 144.6
Total long-term liabilities and deferred credits1,402.6
 1,201.8
1,386.9
 1,402.6
Commitments and contingencies (Note 13)   
Commitments and contingencies (Note 16)


 

Total capitalization and liabilities
$4,762.6
 
$4,044.0

$4,804.4
 
$4,762.6

The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.

108

Table of Contents


WISCONSIN POWER AND LIGHT COMPANY
CONSOLIDATED STATEMENTS OF CASH FLOWS
Year Ended December 31,Year Ended December 31,
2012 2011 20102013 2012 2011
(in millions)(in millions)
Cash flows from operating activities:          
Net income
$165.7
 
$163.5
 
$152.3

$177.5
 
$165.7
 
$163.5
Adjustments to reconcile net income to net cash flows from operating activities:          
Depreciation and amortization140.9
 140.1
 108.6
172.2
 140.9
 140.1
Other amortizations43.7
 42.4
 39.5
29.5
 43.7
 42.4
Deferred tax expense and investment tax credits88.6
 93.7
 98.5
Deferred taxes and investment tax credits86.5
 88.6
 93.7
Equity income from unconsolidated investments(42.1) (38.7) (37.8)(43.7) (42.1) (38.7)
Distributions from equity method investments34.2
 32.3
 32.2
35.4
 34.2
 32.3
Equity component of allowance for funds used during construction(8.9) (4.1) (8.2)(6.5) (8.9) (4.1)
Non-cash valuation charges and other(2.9) 10.8
 
(0.2) (2.9) 10.8
Other changes in assets and liabilities:          
Accounts receivable(11.0) 9.8
 4.6
Income tax refunds receivable(2.9) 39.9
 40.7
(0.3) (2.9) 39.9
Regulatory assets(49.1) (84.3) 28.7
69.1
 (49.1) (84.3)
Regulatory liabilities28.5
 12.0
 (9.1)(8.5) 28.5
 12.0
Derivative liabilities(20.1) 1.1
 (23.0)
Non-current taxes payable(0.1) (0.3) (38.5)
Accrued taxes(26.9) 19.2
 (2.1)
Pension and other benefit obligations31.7
 8.8
 (2.5)(71.3) 31.7
 8.8
Other31.2
 1.8
 (13.6)10.5
 (19.2) 14.5
Net cash flows from operating activities427.4
 428.8
 372.4
423.3
 427.4
 428.8
Cash flows used for investing activities:          
Utility construction and acquisition expenditures:          
Riverside Energy Center(403.5) 
 
Purchase of Riverside Energy Center
 (403.5) 
Other(314.5) (314.4) (450.5)(331.4) (314.5) (314.4)
Advances for customer energy efficiency projects(0.4) (5.1) (16.0)
Collections of advances for customer energy efficiency projects20.9
 26.8
 30.3
15.8
 20.9
 26.8
Other(12.7) (12.7) (13.1)(20.3) (13.1) (17.8)
Net cash flows used for investing activities(710.2) (305.4) (449.3)(335.9) (710.2) (305.4)
Cash flows from (used for) financing activities:          
Common stock dividends(112.0) (112.1) (109.5)(116.3) (112.0) (112.1)
Preferred stock dividends(3.3) (3.3) (3.3)(0.6) (3.3) (3.3)
Capital contributions from parent90.0
 25.0
 75.0

 90.0
 25.0
Payments to redeem cumulative preferred stock(61.0) 
 
Proceeds from issuance of long-term debt250.0
 
 150.0

 250.0
 
Payments to retire long-term debt
 
 (100.0)
Net change in commercial paper60.9
 (21.7) 47.4
97.1
 60.9
 (21.7)
Other(4.8) (8.7) (1.1)(6.8) (4.8) (8.7)
Net cash flows from (used for) financing activities280.8
 (120.8) 58.5
(87.6) 280.8
 (120.8)
Net increase (decrease) in cash and cash equivalents(2.0) 2.6
 (18.4)(0.2) (2.0) 2.6
Cash and cash equivalents at beginning of period2.7
 0.1
 18.5
0.7
 2.7
 0.1
Cash and cash equivalents at end of period
$0.7
 
$2.7
 
$0.1

$0.5
 
$0.7
 
$2.7
Supplemental cash flows information:          
Cash paid (refunded) during the period for:          
Interest
$79.5
 
$79.9
 
$80.9

$85.0
 
$79.5
 
$79.9
Income taxes, net of refunds
($3.3) 
($51.3) 
($3.8)
$22.9
 
($3.3) 
($51.3)
Significant non-cash investing and financing activities:          
Accrued capital expenditures
$39.5
 
$19.7
 
$27.4

$37.7
 
$39.5
 
$19.7

The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.

109

Table of Contents


WISCONSIN POWER AND LIGHT COMPANY
CONSOLIDATED STATEMENTS OF COMMON EQUITY
      Total      Total
  Additional   WPL  Additional   WPL
Common Paid-In Retained CommonCommon Paid-In Retained Common
Stock Capital Earnings EquityStock Capital Earnings Equity
(in millions)(in millions)
2010:       
2011:       
Beginning balance
$66.2
 
$768.9
 
$419.6
 
$1,254.7

$66.2
 
$844.0
 
$459.1
 
$1,369.3
Earnings available for common stock    149.0
 149.0
Common stock dividends    (109.5) (109.5)
Capital contribution from parent  75.0
   75.0
Other  0.1
   0.1
Ending balance66.2
 844.0
 459.1
 1,369.3
2011:       
Earnings available for common stock    160.2
 160.2
    160.2
 160.2
Common stock dividends    (112.1) (112.1)    (112.1) (112.1)
Capital contribution from parent  25.0
   25.0
  25.0
   25.0
Ending balance66.2
 869.0
 507.2
 1,442.4
66.2
 869.0
 507.2
 1,442.4
2012:              
Earnings available for common stock    162.4
 162.4
    162.4
 162.4
Common stock dividends    (112.0) (112.0)    (112.0) (112.0)
Capital contribution from parent  90.0
   90.0
  90.0
   90.0
Other  0.2
   0.2
  0.2
   0.2
Ending balance
$66.2
 
$959.2
 
$557.6
 
$1,583.0
66.2
 959.2
 557.6
 1,583.0
2013:       
Earnings available for common stock    175.9
 175.9
Common stock dividends    (116.3) (116.3)
Other  (0.2)   (0.2)
Ending balance
$66.2
 
$959.0
 
$617.2
 
$1,642.4

The accompanying Combined Notes to Consolidated Financial Statements are an integral part of these statements.


110

Table of Contents


ALLIANT ENERGY CORPORATION
INTERSTATE POWER AND LIGHT COMPANY
WISCONSIN POWER AND LIGHT COMPANY

COMBINED NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

(1) SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES
(a) General -
Description of Business - Alliant Energy Corporation’s (Alliant Energy’s)Energy’s consolidated financial statements include the accounts of Alliant Energy and its consolidated subsidiaries. Alliant Energy is an investor-owned public utility holding company, whose primary wholly-owned subsidiaries are Interstate PowerIPL, WPL, Resources and Light Company (IPL), Wisconsin Power and Light Company (WPL), Alliant Energy Resources, LLC (Resources) and Alliant Energy Corporate Services, Inc. (Corporate Services).Services.

IPL’s consolidated financial statements include the accounts of IPL and its consolidated subsidiary, IPL SPE LLC, which is used for IPL’s sales of accounts receivable program. IPL is a direct subsidiary of Alliant Energy and is engaged principally in the generation and distribution of electricity and the distribution and transportation of natural gas. IPL is also engaged in the generation and distribution of steam for two customers in Cedar Rapids, Iowa. IPL’s service territories are located in Iowa and southern Minnesota. Refer to Note 3(a) for discussion of IPL’s proposed sales of its Minnesota electric and natural gas distribution assets.

WPL’s consolidated financial statements include the accounts of WPL and its consolidated subsidiary, WPL Transco, LLC, which holds WPL’s investment in the American Transmission Company LLC (ATC).ATC. WPL is a direct subsidiary of Alliant Energy and is engaged principally in the generation and distribution of electricity and the distribution and transportation of natural gas. WPL’s service territories are located in southern and central Wisconsin.

Resources is comprised of Transportation, Non-regulated Generation and other non-regulated investments. Transportation includes a short-line railway that provides freight service between Cedar Rapids, Iowa and Iowa City, Iowa; barge terminal and hauling services on the Mississippi River; and other transfer and storage services. Non-regulated Generation owns theSheboygan Falls, a 300megawatt (MW)347, MW, simple-cycle, natural gas-fired Sheboygan Falls Energy FacilityEGU near Sheboygan Falls, Wisconsin, which is leased to WPL for an initial period of 20 years ending in 2025. In addition, Non-regulated Generation owns the non-regulated 10099 MW Franklin County wind project located in Franklin County, Iowa, which was placed in service in the fourth quarter of 2012.Iowa. Refer to Note 1719 for discussion of the Industrial Energy Applications, Inc. (IEA)IEA business and RMT, Inc.’s (RMT’s)RMT’s environmental consulting and engineering services business unit, which were both sold in 2011, and the remaining portion of Alliant Energy’s RMT business, which was sold in January 2013.

Corporate Services is the subsidiary formed to provide administrative services to Alliant Energy and its subsidiaries.

Basis of Presentation - The consolidated financial statements reflect investments in controlled subsidiaries on a consolidated basis and Alliant Energy’s, IPL’s and WPL’s proportionate shares of jointly ownedjointly-owned utility facilities.EGUs. Unconsolidated investments, which Alliant Energy and WPL do not control, but do have the ability to exercise significant influence over operating and financial policies, are accounted for under the equity method of accounting. Investments that do not meet the criteria for consolidation or the equity method of accounting are accounted for under the cost method. Alliant Energy, IPL and WPL did not reflect any variable interest entities (VIEs)VIEs on a consolidated basis in the consolidated financial statements. Refer to Notes 1(q)1(n) and 10(a)6(a) for further discussion of VIEs and equity method investments, respectively.

All intercompany balances and transactions, other than certain transactions affecting the rate-making process at IPL and WPL, have been eliminated from the consolidated financial statements. Such transactions not eliminated include costs that are recoverable from customers through rate-making processes. The consolidated financial statements are prepared in conformity with accounting principles generally accepted in the United States of America (U.S.) (GAAP),GAAP, which give recognition to the rate-making and accounting practices of the Federal Energy Regulatory Commission (FERC)FERC and state commissions having regulatory jurisdiction. Certain prior period amounts in the Consolidated Financial Statements and Combined Notes to Consolidated Financial Statements have been reclassified to conform to the current period presentation for comparative purposes. Unless otherwise noted, the notes herein have been revised to exclude discontinued operations and assets and liabilities held for sale for all periods presented.

Use of Estimates - The preparation of the consolidated financial statements requires management to make estimates and assumptions that affect: (a) the reported amounts of assets and liabilities and the disclosure of contingent assets and liabilities at the date of the financial statements; and (b) the reported amounts of revenues and expenses during the reporting period. Actual results could differ from those estimates.


111

Table of Contents



(b) Regulatory Assets and Regulatory Liabilities - Alliant Energy, IPL and WPL are subject to regulation by FERC and various state regulatory commissions. As a result, Alliant Energy, IPL and WPL are subject to GAAP provisions for regulated operations, which provide that rate-regulated public utilities record certain costs and credits allowed in the rate-making process in different periods than for non-regulated entities. Regulatory assets generally represent incurred costs that have been deferred as they are probable of recovery in future customer rates. Regulatory liabilities generally represent obligations to make refunds to customers and amounts collected in rates for which the related costs have not yet been incurred. Amounts deferred as regulatory assets or accrued as regulatory liabilities are generally recognized in the Consolidated Statements of Income at the time they are reflected in rates. Refer to Note 2 for additional discussion of regulatory assets and regulatory liabilities.

(c) Income Taxes - Alliant Energy, IPL and WPL follow the liability method of accounting for deferred income taxes, which requires the establishment of deferred income tax assets and liabilities, as appropriate, for temporary differences between the tax basis of assets and liabilities and the amounts reported in the consolidated financial statements. Deferred income taxes are recorded using currently enacted tax rates and estimates of state apportionment rates. Changes in deferred income tax assets and liabilities associated with certain property-related differences at IPL are accounted for differently than other subsidiaries of Alliant Energy due to rate-making practices in Iowa. Rate-making practices in Iowa do not include the impact of certain deferred tax expenses (benefits) in the determination of retail rates. Based on these rate-making practices, deferred tax expense (benefit) related to these property-related differences at IPL is not recorded in the income statement but instead charged to regulatory assets or regulatory liabilities until these temporary differences reverse. Refer to Note 2 for further discussion of regulatory assets and regulatory liabilities associated with property-related differences at IPL. In Wisconsin, the PSCW has allowed rate recovery of deferred taxes on all temporary differences since 1991.

Alliant Energy, IPL and WPL recognize positions taken, or expected to be taken, in income tax returns that are more-likely-than-not to be realized, assuming that the position will be examined by tax authorities with full knowledge of all relevant information. If it is more-likely-than-not that a tax position, or some portion thereof, will not be sustained, the related tax benefits are not recognized in the consolidated financial statements. Uncertain tax positions may result in an increase in income taxes payable, a reduction of income tax refunds receivable or changes in deferred income taxes. Also, when uncertainty about the deductibility of an amount is limited to the timing of such deductibility, the increase in taxes payable (or reduction in tax refunds receivable) is accompanied by offsetting changes in deferred income taxes. Generally Alliant Energy, IPL and WPL recognize current taxes payable related to uncertain tax positions in “Accrued taxes” and non-current taxes payable related to uncertain tax positions in “Other long-term liabilities and deferred credits” on the Consolidated Balance Sheets. However, if the uncertain tax position would be settled through the reduction of a net operating loss rather than through the payment of cash, the uncertain tax position is reflected in deferred income taxes on the Consolidated Balance Sheets. Refer to Note 11 for further discussion of uncertain tax positions.

Alliant Energy, IPL and WPL defer investment tax credits and amortize the credits to income over the average lives of the related property. Other tax credits for Alliant Energy, IPL and WPL reduce income tax expense in the year claimed.

Alliant Energy, IPL and WPL have elected the alternative transition method to calculate their beginning pool of excess tax benefits available to absorb any tax deficiencies associated with recognition of share-based payment awards.

Alliant Energy files a consolidated federal income tax return, which includes the aggregate taxable income or loss of Alliant Energy and its subsidiaries. In addition, a combined return including Alliant Energy and all of its subsidiaries is filed in Wisconsin. Alliant Energy subsidiaries with a presence in Iowa file as part of a consolidated return in Iowa. Under the terms of a tax sharing agreement between Alliant Energy and its subsidiaries, the subsidiaries calculate state income tax using consolidated apportionment rates applied to separate company taxable income.

(d) Cash and Cash Equivalents - Cash and cash equivalents include short-term liquid investments that have original maturities of less than 90 days.

(e) Property, Plant and Equipment -
Utility -
General - Utility plant is recorded at the original cost of acquisition or construction, which includes material, labor, contractor services, AFUDC and allocable overheads, such as supervision, engineering, benefits, certain taxes and transportation. Repairs, replacements and renewals of items of property determined to be less than a unit of property or that do not increase the property’s life or functionality are charged to maintenance expense. Ordinary retirements of utility plant and salvage value are netted and charged to accumulated depreciation upon removal from utility plant accounts and no gain

112

Table of Contents


or loss is recognized consistent with rate-making policies. Removal costs incurred reduce the regulatory liability. Property, plant and equipment that is probable of being retired early is classified as plant anticipated to be retired early.

Depreciation - IPL and WPL use a combination of remaining life and straight-line depreciation methods as approved by their respective regulatory commissions. The composite or group method of depreciation is used, in which a single depreciation rate is applied to the gross investment in a particular class of property. This method pools similar assets and then depreciates each group as a whole. Periodic depreciation studies are performed to determine the appropriate group lives, net salvage, estimated cost of removal and group depreciation rates. These depreciation studies are subject to review and approval by IPL’s and WPL’s respective regulatory commissions. Depreciation expense is included within the recoverable cost of service component of rates charged to customers. The average rates of depreciation for electric, gas and other properties, consistent with current rate-making practices, were as follows:
 IPL WPL
 2013 2012 2011 2013 (a) 2012 2011
Electric - generation3.6% 3.7% 3.5% 3.3% 3.2% 3.3%
Electric - distribution2.5% 2.5% 2.4% 2.7% 2.9% 2.9%
Gas3.4% 3.4% 3.5% 2.5% 2.6% 2.6%
Other4.4% 4.5% 4.8% 5.1% 5.3% 5.2%

(a)In 2012, the PSCW issued an order approving the implementation of updated depreciation rates for WPL effective January 1, 2013 as a result of a recently completed depreciation study. In 2013, the PSCW and FERC issued orders approving WPL’s requests to revise depreciation rates associated with the acquisition of Riverside effective January 1, 2013.

AFUDC - AFUDC represents costs to finance construction additions including a return on equity component and cost of debt component as required by regulatory accounting. AFUDC for IPL’s construction projects is calculated in accordance with FERC guidelines. AFUDC for WPL’s retail and wholesale jurisdiction construction projects is calculated in accordance with PSCW and FERC guidelines, respectively. The AFUDC recovery rates, computed in accordance with the prescribed regulatory formula, were as follows:
 2013 2012 2011
IPL (FERC formula)8.2% 8.2% 8.5%
WPL (PSCW formula - retail jurisdiction) (a)8.2% 8.8% 8.8%
WPL (FERC formula - wholesale jurisdiction)4.5% 7.9% 6.2%

(a)
Consistent with the PSCW’s retail rate case order issued in 2009, WPL accrued AFUDC on 100% of CWIP related to the Edgewater Unit 5 SCR emission controls project and the Columbia Units 1 and 2 scrubber and baghouse emission controls project in 2012 and 2011. Consistent with the PSCW’s retail rate case order issued in 2012, WPL earned a return on 50% of the estimated CWIP related to its Columbia Units 1 and 2 scrubber and baghouse emission controls project for 2013 and accrued AFUDC on the remaining 50% in 2013.

Non-regulated and Other -
General - Non-regulated and other property, plant and equipment is recorded at the original cost of acquisition or construction, which includes material, labor and contractor services. Repairs, replacements and renewals of items of property determined to be less than a unit of property or that do not increase the property’s life or functionality are charged to maintenance expense. Upon retirement or sale of non-regulated and other property, plant and equipment, the original cost and related accumulated depreciation are removed from the accounts and any gain or loss is included in the Consolidated Statements of Income.

(f) Operating Revenues -
Utility - Revenues from Alliant Energy’s utility business are primarily from electricity and natural gas sales and are recognized on an accrual basis as services are rendered or commodities are delivered to customers. Energy sales to individual customers are based on the reading of customers’ meters, which occurs on a systematic basis throughout each reporting period. Amounts of energy delivered to customers since the date of the last meter reading are estimated at the end of each reporting period and the corresponding estimated unbilled revenue is recorded in such reporting period. The unbilled revenue estimate is based on daily system demand volumes, estimated customer usage by class, weather impacts, line losses and the most recent customer rates.


113

Table of Contents


IPL and WPL accrue revenues from their wholesale customers to the extent that the actual net revenue requirements calculated in accordance with FERC-approved formula rates for the reporting period are higher or lower than the amounts billed to wholesale customers during such period. In accordance with authoritative guidance, regulatory assets or regulatory liabilities are recorded as the offset for these accrued revenues under formulaic rate-making programs. IPL’s estimated recovery amount is recorded in the current period of service and is reflected in customer bills within two years under the provisions of approved formula rates. WPL’s estimated recovery amount is recorded in the current period of service and subject to final adjustments after a customer audit period in the subsequent year. Final settled recovery amounts are reflected in WPL’s customer bills within two years under the provisions of approved formula rates.

IPL and WPL participate in bid/offer-based wholesale energy and ancillary services markets operated by MISO. IPL’s and WPL’s customers and generating resources are located in the MISO region. MISO requires that all load serving entities and generation owners, including IPL and WPL, submit hourly day-ahead and/or real-time bids and offers for energy and ancillary services. The MISO day-ahead and real-time transactions are grouped together, resulting in a net supply to or net purchase from MISO for each hour of each day. The net supply to MISO is recorded in “Electric utility operating revenues” and the net purchase from MISO is recorded in “Electric production fuel and energy purchases” in the Consolidated Statements of Income. IPL and WPL also engage in transactions in PJM’s bid/offer-based wholesale energy market, which are accounted for similar to the MISO transactions.

Non-regulated - Revenues from Alliant Energy’s non-regulated businesses are primarily from its Transportation business and are recognized on an accrual basis as services are rendered or goods are delivered to customers.

Taxes Collected from Customers - Certain of Alliant Energy’s subsidiaries serve as collection agents for sales or various other taxes and record revenues on a net basis. Operating revenues do not include the collection of the aforementioned taxes.

(g) Utility Cost Recovery Mechanisms -
Electric Production Fuel and Energy Purchases (Fuel-related Costs) - Alliant Energy, IPL and WPL incur fuel-related costs each period to generate and purchase electricity to meet the demand of their electric customers. These fuel-related costs include the cost of fossil fuels (primarily coal and natural gas) used during each period to produce electricity at their EGUs, electricity purchased each period from wholesale energy markets (primarily MISO) and under PPAs, costs for allowances acquired to allow certain emissions (primarily SO2 and NOx) from their EGUs and costs for chemicals utilized to control emissions from their EGUs. Alliant Energy, IPL and WPL record these fuel-related costs in “Electric production fuel and energy purchases” in the Consolidated Statements of Income.

IPL Retail - The cost recovery mechanisms applicable for IPL’s retail electric customers provide for subsequent adjustments to their electric rates for changes in fuel-related costs. Fuel adjustment clause rules applicable to IPL’s Iowa retail jurisdiction also currently allow IPL to recover prudently incurred costs for emission allowances required to comply with EPA regulations including the Acid Rain program and CAIR through the fuel adjustment clause. Changes in the under-/over-collection of these costs each period are recognized in “Electric production fuel and energy purchases” in Alliant Energy’s and IPL’s Consolidated Statements of Income. The cumulative effects of the under-/over-collection of these costs are recorded in current “Regulatory assets” or current “Regulatory liabilities” on Alliant Energy’s and IPL’s Consolidated Balance Sheets until they are reflected in future billings to customers. The fuel adjustment clause rules applicable to IPL’s Iowa retail jurisdiction currently do not contain a provision for recovery of emission controls chemical costs to flow through the fuel adjustment clause. The fuel adjustment clause rules applicable to IPL’s Minnesota retail jurisdiction currently do not contain a provision for recovery of emission allowance costs or emission controls chemical costs through the fuel adjustment clause.

Effective February 22, 2014, IPL will recover the Iowa retail portion of the DAEC PPA costs from its Iowa retail electric customers through the fuel adjustment clause pursuant to a January 2013 IUB order. This PPA does not contain minimum payments for electric generating capacity.

WPL Retail - The cost recovery mechanisms applicable for WPL’s retail electric customers are based on forecasts of certain fuel-related costs expected to be incurred during forward-looking test year periods and fuel monitoring ranges determined by the PSCW during each electric retail rate proceeding or in a separate fuel cost plan approval proceeding. However, if WPL’s actual fuel-related costs fall outside these fuel monitoring ranges during the test period, WPL is authorized to defer the incremental under-/over-collection of fuel-related costs that are outside the approved ranges. Deferral of under-collections are reduced to the extent actual return on common equity earned by WPL during the fuel cost plan year exceeds the most recently authorized return on common equity. Deferred amounts for fuel-related costs outside the approved fuel monitoring ranges are recognized in “Electric production fuel and energy purchases” in Alliant Energy’s and WPL’s Consolidated Statements of Income each period. The cumulative effects of these deferred amounts are recorded in current “Regulatory assets” or current “Regulatory liabilities” on Alliant Energy’s and WPL’s Consolidated Balance Sheets until they are reflected

114

Table of Contents


in future billings to customers. Effective January 2012, WPL’s retail fuel-related costs include costs for emission allowances and emission controls chemicals. Prior to 2012, WPL’s retail fuel-related costs excluded costs for emission allowances and emission controls chemicals.

IPL and WPL Wholesale - The cost recovery mechanisms applicable for IPL’s and WPL’s wholesale electric customers provide for subsequent adjustments to their electric rates for changes in fuel-related costs. Changes in the under-/over-collection of these costs are recognized in “Electric production fuel and energy purchases” in the Consolidated Statements of Income each period. The cumulative effects of the under-/over-collection of these costs are recorded in current “Regulatory assets” or current “Regulatory liabilities” on the Consolidated Balance Sheets until they are reflected in future billings to customers. IPL’s and WPL’s costs for emission allowances and emission controls chemicals are recovered through the capacity charge component of their respective wholesale formula rates.

Purchased Electric Capacity - Alliant Energy, IPL and WPL enter into PPAs to help meet the electricity demand of their customers. Certain of these PPAs include minimum payments for IPL’s and WPL’s rights to electric generating capacity, which are charged each period to “Purchased electric capacity” in the Consolidated Statements of Income. Purchased electric capacity expenses are recovered from IPL’s and WPL’s retail electric customers through changes in base rates determined during periodic rate proceedings. Purchased electric capacity expenses are recovered from IPL’s and WPL’s wholesale electric customers through annual changes in base rates determined by a formula rate structure.

Electric Transmission Service - Alliant Energy, IPL and WPL incur costs for the transmission of electricity to their customers and charge these costs each period to “Electric transmission service” in the Consolidated Statements of Income.

IPL Retail - Electric transmission service expenses are recovered from IPL’s Iowa retail electric customers through a transmission cost rider. This cost recovery mechanism provides for subsequent adjustments to electric rates charged to Iowa electric retail customers for changes in electric transmission service expenses. Changes in the under-/over-collection of these costs are recognized in “Electric transmission service” in Alliant Energy’s and IPL’s Consolidated Statements of Income each period. The cumulative effects of the under-/over-collection of these costs are recorded in current “Regulatory assets” or current “Regulatory liabilities” on Alliant Energy’s and IPL’s Consolidated Balance Sheets until they are reflected in future billings to customers. The transmission cost rider will remain in effect until the IUB’s final decision in IPL’s next retail electric base rate case, at which time the rider will continue in its current form, continue in a modified form or be terminated.

WPL Retail - Electric transmission service expenses are recovered from WPL’s retail electric customers through changes in base rates determined during periodic rate proceedings.

IPL and WPL Wholesale - Electric transmission service expenses are recovered from IPL’s and WPL’s wholesale electric customers through annual changes in base rates determined by a formula rate structure.

Cost of Gas Sold - Alliant Energy, IPL and WPL incur costs for the purchase, transportation and storage of natural gas to serve their gas customers and charge the costs associated with the natural gas delivered to customers during each period to “Cost of gas sold” in the Consolidated Statements of Income. The tariffs for IPL’s and WPL’s retail gas customers provide for subsequent adjustments to their rates for changes in the cost of gas sold. Changes in the under-/over-collection of these costs are also recognized in “Cost of gas sold” in the Consolidated Statements of Income each period. The cumulative effects of the under-/over-collection of these costs are recorded in current “Regulatory assets” or current “Regulatory liabilities” on the Consolidated Balance Sheets until they are reflected in future billings to customers.

Energy Efficiency Costs - Alliant Energy, IPL and WPL incur costs to fund energy efficiency programs and initiatives that help customers reduce their energy usage and charge the costs incurred for these programs and initiatives to “Utility - Other operation and maintenance” in the Consolidated Statements of Income each period. Energy efficiency costs incurred by IPL are recovered from its retail electric and gas customers in Iowa through an additional tariff called an EECR factor. EECR factors are revised annually and include a reconciliation to eliminate any under-/over-collection of energy efficiency costs from prior periods. Energy efficiency costs incurred by WPL are recovered from retail electric and gas customers through changes in base rates determined during periodic rate proceedings. Reconciliations of any under-/over-collection of energy efficiency costs from prior periods are also addressed in WPL’s periodic rate proceedings. Changes in the under-/over-collection of energy efficiency costs each period for IPL and WPL are recognized in “Utility - Other operation and maintenance” in the Consolidated Statements of Income. The cumulative effects of the under-/over-collection of these costs for IPL and WPL are recorded in current “Regulatory assets” or current “Regulatory liabilities” on the Consolidated Balance Sheets until they are reflected in future billings to customers.

Refer to Note 2 for additional information regarding these utility cost recovery mechanisms.

115

Table of Contents



(h) Financial Instruments - Alliant Energy, IPL and WPL periodically use financial instruments for risk management purposes to mitigate exposures to fluctuations in certain commodity prices and transmission congestion costs. The fair value of those financial instruments that are determined to be derivatives are recorded as assets or liabilities on the Consolidated Balance Sheets. At the end of each reporting period, derivative instruments representing unrealized gain positions are reported as derivative assets, and derivative instruments representing unrealized loss positions are reported as derivative liabilities. Alliant Energy, IPL and WPL also have certain commodity purchase and sales contracts that quality for and have been designated under the normal purchase and sale exception, and based on this designation, such contracts are accounted for on the accrual basis of accounting. Alliant Energy, IPL and WPL have elected to not net the fair value amounts of derivatives subject to a master netting arrangement by counterparty. Alliant Energy, IPL and WPL do not offset fair value amounts recognized for the right to reclaim cash collateral (receivable) or the obligation to return cash collateral (payable) against fair value amounts recognized for derivative instruments executed with the same counterparty under the same master netting arrangement. Refer to Note 2 for discussion of the recognition of regulatory assets and regulatory liabilities related to the unrealized losses and gains on IPL’s and WPL’s derivative instruments. Refer to Notes 14, 15 and 16(f) for further discussion of derivatives and related credit risk.

(i) Asset Impairments -
Property, Plant and Equipment of Regulated Operations - Property, plant and equipment of regulated operations are reviewed for possible impairment whenever events or changes in circumstances indicate all or a portion of the carrying value of the assets may be disallowed for rate-making purposes. If IPL or WPL are disallowed recovery of any portion of the carrying value of their regulated property, plant and equipment that is under construction, has been recently completed or is probable of abandonment, an impairment charge is recognized equal to the amount of the carrying value that was disallowed. If IPL or WPL are disallowed a full or partial return on the carrying value of their regulated property, plant and equipment that is under construction, has been recently completed or is probable of abandonment, an impairment charge is recognized equal to the difference between the carrying value and the present value of the future revenues expected from their regulated property, plant and equipment. Refer to Note 3(a) for discussion of adjustments made by Alliant Energy and IPL in 2011 and 2013 to the carrying value of IPL’s Whispering Willow - East wind project, based on amounts IPL determined were probable of being disallowed for recovery from its Minnesota retail electric customers.

Property, Plant and Equipment of Non-regulated Operations - Property, plant and equipment of non-regulated operations are reviewed for possible impairment whenever events or changes in circumstances indicate the carrying value of the assets may not be recoverable. Impairment is indicated if the carrying value of an asset exceeds its undiscounted future cash flows. An impairment charge is recognized equal to the amount the carrying value exceeds the asset’s fair value.

Unconsolidated Equity Investments - If events or circumstances indicate the carrying value of investments accounted for under the equity method of accounting may not be recoverable, potential impairment is assessed by comparing the fair value of these investments to their carrying values as well as assessing if a decline in fair value is temporary. If an impairment is indicated, a charge is recognized equal to the amount the carrying value exceeds the investment’s fair value. Refer to Note 6(a) for additional discussion of investments accounted for under the equity method of accounting.

(j) Emission Allowances - Emission allowances are granted by the EPA at zero cost and permit the holder of the allowances to emit certain gaseous by-products of fossil fuel combustion, including SO2 and NOx. Unused emission allowances may be bought and sold or carried forward to be utilized in future years. Purchased emission allowances are recorded as intangible assets at their original cost and evaluated for impairment as long-lived assets to be held and used. Emission allowances allocated to or acquired by Alliant Energy, IPL or WPL are held primarily for consumption.

Amortization of emission allowances is based upon a weighted average cost for each category of vintage year utilized during the reporting period and is recorded in “Electric production fuel and energy purchases” in the Consolidated Statements of Income as follows (in millions):
 Alliant Energy IPL WPL
 2013 2012 2011 2013 2012 2011 2013 2012 2011
Amortization expense$— $— $13.4 $— $— $12.9 $— $— $0.5

No amortization expense for emission allowances held at December 31, 2013 is currently expected to be recorded during 2014 through 2018.


116

Table of Contents


Cash inflows and outflows related to sales and purchases of emission allowances are presented in investing activities in the Consolidated Statements of Cash Flows. Refer to Note 2 for information regarding regulatory assets related to emission allowances.

(k) Asset Retirement Obligations - The fair value of any retirement costs associated with an asset for which Alliant Energy, IPL and WPL have a legal obligation is recorded as a liability with an equivalent amount added to the asset cost when an asset is placed in service or when sufficient information becomes available to determine a reasonable estimate of the fair value of future retirement costs. The fair value of AROs is determined using discounted cash flows analyses. The liability is accreted to its present value each period and the capitalized cost is depreciated over the useful life of the related asset. Accretion and depreciation expenses related to AROs for IPL’s and WPL’s regulated operations are recorded to regulatory assets on the Consolidated Balance Sheets. Upon regulatory approval to recover IPL’s AROs expenditures, its regulatory assets are amortized to depreciation and amortization expense in Alliant Energy’s and IPL’s Consolidated Statements of Income over the same time period that IPL’s customer rates are increased to recover the ARO expenditures. Effective January 1, 2013, WPL’s regulatory assets related to AROs are being recovered as a component of depreciation rates included in the most recent depreciation study approved by the PSCW in its May 2012 order. Accretion and depreciation expenses related to AROs for Alliant Energy’s non-regulated operations are recorded to depreciation and amortization expense in Alliant Energy’s Consolidated Statements of Income. Upon settlement of the ARO liability, an entity settles the obligation for its recorded amount or incurs a gain or loss. Any gains or losses related to AROs for IPL’s and WPL’s regulated operations are recorded to regulatory liabilities or regulatory assets on the Consolidated Balance Sheets. Refer to Note 13 for additional discussion of AROs.

(l) Debt Issuance and Retirement Costs - Alliant Energy, IPL and WPL defer and amortize debt issuance costs and debt premiums or discounts over the expected lives of respective debt issues, considering maturity dates and, if applicable, redemption rights held by others. Alliant Energy’s non-regulated businesses and Corporate Services expense in the period of retirement any unamortized debt issuance costs and debt premiums or discounts on debt retired early. Refer to Note 2 for information on regulatory assets related to IPL’s and WPL’s debt retired early or refinanced.

(m) Allowance for Doubtful Accounts - Alliant Energy, IPL and WPL maintain allowances for doubtful accounts for estimated losses resulting from the inability of their customers to make required payments. Alliant Energy, IPL and WPL estimate the allowance for doubtful accounts based on historical write-offs, customer arrears and other economic factors within their service territories. Allowance for doubtful accounts at December 31 was as follows (in millions):
 Alliant Energy IPL WPL
 2013 2012 2013 2012 2013 2012
Customer (a)
$1.4
 
$1.3
 
$—
 
$—
 
$1.4
 
$1.3
Other3.4
 2.7
 0.7
 0.7
 0.3
 0.5
 
$4.8
 
$4.0
 
$0.7
 
$0.7
 
$1.7
 
$1.8

(a)
Refer to Note 5(a) for discussion of IPL’s allowance for doubtful accounts, which is included in its sales of accounts receivable program.

(n) Variable Interest Entities - An entity is considered a VIE if its equity investors do not have sufficient equity at risk for the entity to finance its activities without additional subordinated financial support from other parties or its equity investors lack any of the following characteristics: (1) power, through voting rights or similar rights, to direct the activities of the entity that most significantly impact the entity’s economic performance; (2) the obligation to absorb expected losses of the entity; or (3) the right to receive expected benefits of the entity. The primary beneficiary of a VIE is required to consolidate the VIE. Alliant Energy, IPL and WPL did not reflect any VIEs on a consolidated basis in the consolidated financial statements.

(o) Cash Flows Presentation - Alliant Energy presents cash flows from continuing operations together with cash flows from discontinued operations in its Consolidated Statements of Cash Flows.

(p) Comprehensive Income - In 2013, 2012 and 2011, Alliant Energy’s other comprehensive income was $0.6 million, $0 and $0.6 million, respectively; therefore, its comprehensive income was substantially equal to its net income and its comprehensive income attributable to Alliant Energy common shareowners was substantially equal to its net income attributable to Alliant Energy common shareowners for such periods. In 2013, 2012 and 2011, IPL and WPL had no other comprehensive income; therefore their comprehensive income was equal to their net income and their comprehensive income available for common stock was equal to their earnings available for common stock for such periods.


117

Table of Contents


(2) REGULATORY MATTERS
Regulatory Assets - At December 31, regulatory assets were comprised of the following items (in millions):
Alliant Energy IPL WPLAlliant Energy IPL WPL
2012 2011 2012 2011 2012 20112013 2012 2013 2012 2013 2012
Tax-related
$770.7
 
$634.7
 
$746.2
 
$614.6
 
$24.5
 
$20.1

$829.7
 
$770.7
 
$798.6
 
$746.2
 
$31.1
 
$24.5
Pension and other postretirement benefits costs549.2
 514.1
 279.3
 264.9
 269.9
 249.2
355.3
 549.2
 174.2
 279.3
 181.1
 269.9
Asset retirement obligations (AROs)62.4
 65.9
 38.6
 48.7
 23.8
 17.2
AROs65.7
 62.4
 36.7
 38.6
 29.0
 23.8
Emission allowances30.0
 30.0
 30.0
 30.0
 
 
Environmental-related costs25.0
 34.9
 21.0
 30.3
 4.0
 4.6
Derivatives40.2
 77.7
 16.3
 33.5
 23.9
 44.2
21.1
 40.2
 5.9
 16.3
 15.2
 23.9
Environmental-related costs34.9
 38.9
 30.3
 32.2
 4.6
 6.7
Emission allowances30.0
 30.0
 30.0
 30.0
 
 
Debt redemption costs19.8
 21.8
 13.6
 15.1
 6.2
 6.7
17.9
 19.8
 12.2
 13.6
 5.7
 6.2
Proposed clean air compliance projects costs16.7
 14.9
 7.8
 6.9
 8.9
 8.0
IPL’s electric transmission service costs16.6
 24.9
 16.6
 24.9
 
 
8.3
 16.6
 8.3
 16.6
 
 
Proposed coal-fired base-load projects costs14.2
 21.5
 10.1
 15.3
 4.1
 6.2
Other57.7
 50.6
 29.1
 31.2
 28.6
 19.4
60.2
 88.6
 26.6
 47.0
 33.6
 41.6

$1,612.4
 
$1,495.0
 
$1,217.9
 
$1,117.3
 
$394.5
 
$377.7

$1,413.2
 
$1,612.4
 
$1,113.5
 
$1,217.9
 
$299.7
 
$394.5

A portion of the regulatory assets in the above table are not earning a return. These regulatory assets are expected to be recovered from customers in future rates,rates; however, the respective carrying costs of these assets are not expected to be recovered from customers in future rates. At December 31, 20122013, IPL and WPL had $6839 million and $13 million, respectively, of regulatory assets representing past expenditures that were not earning a return. IPL’s regulatory assets that were not earning a return consisted primarily of debt redemption costs and electric transmission service costs, costs for proposed coal-fired base-load and clean air compliance projects, and debt redemption costs. WPL’s regulatory assets that were not earning a return consisted primarily of amounts related to wholesale customer rate recovery.recovery, which is discussed in Note 1(f). The other regulatory assets reported in the above table either earn a return or the cash has not yet been expended, in which case the assets are offset by liabilities that also do not incur a carrying cost.

Tax-related - IPL and WPL record regulatory assets for certain temporary differences (primarily related to utility property, plant and equipment at IPL) that result in a decrease in current rates charged to customers and an increase in future rates charged to customers based on the timing of income tax expense that is used to determine such rates. These temporary differences include the impactimpacts of qualifying deductions for repairs expenditures and allocation of mixed service costs, and Iowa accelerated tax depreciation, which contributesall contribute to lower current income tax expense during the first part of an asset’s useful life and higher current tax expense during the last part of an asset’s useful life. These regulatory assets will be recovered from customers in the future when these temporary differences reverse resulting in additional current income tax expense used to determine customers’ rates. During 2012,2013, Alliant Energy’s and IPL’s “Tax-related” regulatory assets in the above table increased primarily due to changes in the estimated amount of qualifying repair expenditures and allocation of mixed service costsrepairs expenditure deductions at IPL.

Pension and other postretirement benefits costs - The Iowa Utilities Board (IUB)IUB and the Public Service Commission of Wisconsin (PSCW)PSCW have authorized IPL and WPL to record the retail portion of their respective previously unrecognized net actuarial gains and losses, and prior service costs and credits, as regulatory assets in lieu of accumulated other comprehensive loss (AOCL)AOCL on the Consolidated Balance Sheets, as these amounts are expected to be recovered in future rates. IPL and WPL also recognize the wholesale portion of their previously unrecognized net actuarial gains and losses, and prior service costs and credits, as regulatory assets on the Consolidated Balance Sheets because these costs are expected to be recovered in rates in future periods under the formula rate structure. These regulatory assets will be increased or decreased as the net actuarial gains or losses, and prior service costs or credits, are subsequently amortized and recognized as a component of net periodic benefit costs. Regulatory assets are also increased or decreased as a result of the annual defined benefit plan measurement process. During 2013, Alliant Energy’s, IPL’s and WPL’s pension and other postretirement benefits costs regulatory assets decreased due to a decrease in unrecognized net actuarial losses caused by higher discount rates and higher returns on assets compared to assumptions used in the annual defined benefit plan measurement process as of December 31, 2012.


112

Table of Contents


Pension and other postretirement benefits costs are included within the recoverable cost of service component of rates charged to IPL’s and WPL’s customers. The recoverable costs included in customers’ rates are based upon pension and other postretirement benefits costs determined in accordance with GAAP and are calculated using different methods for the various regulatory jurisdictions in which IPL and WPL operate. The methods for IPL’s and WPL’s primary regulatory jurisdictions are described below. The IUB authorized IPL in its most recent Iowa retail electric rate case order to recover from its retail electric customers in Iowa an allocated portion of annual costs equal to a two-yeartwo-year simple average of actual costs incurred during its test year (2009) and an estimate of costs for its forward-looking post-test year (2010). The PSCW authorized WPL in its most recent Wisconsin retail rate case to recover from its electric and gas retail customers in base rates an estimated allocated portion of annual costs equal to the costs expected to be incurred during the 2013 and 2014 rate freezetest year period. WPL

118



is authorized to recover from its wholesale customers an allocated portion of actual pension costs incurred each year. In accordance with FERC-approved formula rates, any over- or under-collection of these costs each year are refunded to or recovered from customers through subsequent changes to wholesale customer rates. WPL is authorized to recover from its wholesale customers an allocated portion of other postretirement benefits costs based on the amount of other postretirement benefits costs incurred in 2006. Refer to Note 6(a)12(a) for additional details regarding pension and other postretirement benefits costs.

AROs - Alliant Energy, IPL and WPL believe it is probable that any differences between expenses accrued for legal AROs related to their regulated operations and expenses recovered currently in rates will be recoverable in future rates, and are deferring the differences as regulatory assets. The decrease in IPL’s regulatory assets related to AROs is primarily due to revisions in estimated cash flows based on revised remediation timing and cost information for asbestos remediation at Sixth Street. The increase in WPL’s regulatory assets related to AROs is primarily due to revisions in estimated cash flows based on revised remediation timing and cost information for remediation of the coal yard and ash pond at Rock River. Refer to Note 1813 for additional details of AROs.

Derivatives - In accordance with IPL’s and WPL’s fuel and natural gas recovery mechanisms, prudently incurred costs from derivative instruments are recovered from customers in the future after any losses are realized and gains from derivative instruments are refunded to customers in the future after any gains are realized. Based on these recovery mechanisms, the changes in the fair value of derivative liabilities/assets resulted in comparable changes to regulatory assets/liabilities on the Consolidated Balance Sheets. Refer to Note 12 for additional details of derivative assets and derivative liabilities.

Environmental-related costs - The IUB has permitted IPL to recover prudently incurred costs by allowing a representative level of manufactured gas plant (MGP) costs in the recoverable cost of service component of rates, as determined in its most recent retail gas rate case. Under the current rate-making treatment approved by the PSCW, the MGP expenditures of WPL are deferred and collected from retail gas customers over a five-year period after new rates are implemented. The Minnesota Public Utilities Commission (MPUC) allows the deferral of MGP-related costs applicable to IPL’s Minnesota sites and IPL has received approval to recover such costs in retail gas rates in Minnesota in its most recent retail gas rate case. Regulatory assets recorded by IPL and WPL reflect the probable future rate recovery of MGP expenditures. Refer to Note 13(e) for additional details of environmental-related MGP costs.

Emission allowances - IPL entered into forward contracts in 2007 to purchase sulfur dioxide (SO2)SO2 emission allowances with vintage years of 2014 through 2017 from various counterparties for $34 million to meet future Clean Air Interstate Rule (CAIR)CAIR emission reduction standards. Any SO2 emission allowances acquired under these forward contracts may be used to meet requirements under the existing Acid Rain program regulations or the more stringent CAIR emission reduction standards but are not eligible to be used for compliance requirements under the Cross-State Air Pollution Rule (CSAPR).CSAPR. In 2011, the U.S. Environmental Protection Agency (EPA)EPA issued CSAPR to replace CAIR with an anticipated effective date in 2012. As a result of the issuance of CSAPR, Alliant Energy and IPL concluded in 2011 that the allowances to be acquired under these forward contracts would not be needed by IPL to comply with expected environmental regulations in the future. The value of these allowances was nominal, which was significantly below the $34$34 million contract price for these allowances. As a result, Alliant Energy and IPL recognized charges of $34 million for these forward contracts in 2011 with an offsetting obligation recorded in other long-term liabilities and deferred credits. Alliant Energy and IPL concluded that $30 million of the charges are probable of recovery from IPL’s customers, and therefore, were recorded to regulatory assets in 2011. The remaining $4 million of charges were determined not to be probable of recovery from IPL’s customers resulting in $2 million of charges related to electric customers recorded to “Electric production fuel and energy purchases” and $2 million of charges related to steam customers recorded to “Utility - Other operation and maintenance” in Alliant Energy’s and IPL’s Consolidated Statements of Income in 2011. In August 2012, the U.S. Court of Appeals for the D.C. Circuit (D.C. Circuit Court)Court vacated and remanded CSAPR for further revision to the EPA. The D.C. Circuit Court order also requires the EPA to continue administering CAIR pending the promulgation of a valid replacement for CSAPR. Despite CSAPR being vacated, the current value of these allowances continues to be nominal and significantly below the $34$34 million contract price for these

113



allowances. Alliant Energy and IPL currently believe that CAIR will be replaced in the future, either by a modified CSAPR or another rule that addresses the interstate transport of air pollutants.

Environmental-related costs - The IUB has permitted IPL to recover prudently incurred costs by allowing a representative level of MGP costs in the recoverable cost of service component of rates, as determined in its most recent retail gas rate case. Under the current rate-making treatment approved by the PSCW, the MGP expenditures of WPL are deferred and collected from retail gas customers over a five-year period after new rates are implemented. The MPUC allows the deferral of MGP-related costs applicable to IPL’s Minnesota sites and IPL has received approval to recover such costs in retail gas rates in Minnesota in its most recent retail gas rate case. Regulatory assets recorded by IPL and WPL reflect the probable future rate recovery of MGP expenditures. Refer to Note 16(e) for additional details of environmental-related MGP costs.

Derivatives - In accordance with IPL’s and WPL’s fuel and natural gas recovery mechanisms, prudently incurred costs from derivative instruments are recovered from customers in the future after any losses are realized and gains from derivative instruments are refunded to customers in the future after any gains are realized. Based on these recovery mechanisms, the changes in the fair value of derivative liabilities/assets resulted in comparable changes to regulatory assets/liabilities on the Consolidated Balance Sheets. Refer to Note 15 for additional details of derivative assets and derivative liabilities.

Debt redemption costs - For debt retired early with no subsequent re-issuance, IPL and WPL defer any debt repayment premiums and unamortized debt issuance costs and discounts as regulatory assets. These regulatory assets are amortized over the remaining original life of the debt retired early. Debt repayment premiums and other losses resulting from the refinancing of debt by IPL and WPL are deferred as regulatory assets and amortized over the life of the new debt issued.

Proposed clean air compliance plan (CACP) projects costs - CACP projects require material expenditures for activities related to determining the feasibility of environmental compliance projects under consideration. These expenditures are commonly referred to as preliminary survey and investigation charges. The wholesale portion of these amounts is recorded as regulatory assets on the Consolidated Balance Sheets in accordance with FERC regulations. In Iowa, no specific retail authorization is required before charging these costs to regulatory asset accounts. In Wisconsin, the retail portion of these amounts is expensed immediately unless otherwise authorized by the PSCW. However, since these amounts are material for WPL’s CACP projects, WPL requested and received deferral accounting approval to record the retail portion of these costs as regulatory assets on the Consolidated Balance Sheets.

For IPL, amounts deferred and recorded as preliminary survey and investigation charges do not include any accrual of carrying costs or allowance for funds used during construction (AFUDC). Upon management’s decision to proceed with a project, including receipt of certain regulatory approvals, all such amounts included as preliminary survey and investigation charges are transferred to construction work in progress (CWIP) and begin to accrue AFUDC.

For WPL, the wholesale portion of amounts deferred and recorded as preliminary survey and investigation charges do not include any accrual of carrying costs or AFUDC. WPL’s retail portion of deferred preliminary survey and investigation charges (commonly referred to as pre-certification expenditures) and construction expenditures incurred prior to project approval that are recorded in regulatory assets include accrual of carrying costs as prescribed in the approved deferral order. Upon regulatory approval of the project, the wholesale portion of deferred preliminary survey and investigation charges as well as all pre-construction expenditures are transferred to CWIP and begin to accrue AFUDC. The retail portion of deferred preliminary survey and investigation charges or pre-certification expenditures remain as regulatory assets until they are approved for inclusion in revenue requirements and amortized to expense.

Alliant Energy, IPL and WPL anticipate the remaining costs for proposed CACP projects are probable of recovery from future rates charged to customers. The recovery period for these remaining costs will generally be determined by regulators in future rate proceedings.

IPL’s electric transmission service costs - In 2010, IPL incurred electric transmission service costs billed by ITC Midwest LLC (ITC) under the Attachment “O” rate for ITC’s under-recovered 2008 costs. In 2010, the IUB issued an order authorizing IPL to defer the Iowa retail portion of these under-recovered costs and amortize the deferred costs over a 5-yearfive-year period ending December 2014. In accordance with this order, IPL is amortizing $8 million of this regulatory asset annually, with an equal and offsetting amount of amortization of IPL’s regulatory liability related to its electric transmission assets sale. The IUB determined that IPL should not include the unamortized balance of these deferred costs in electric rate base during the 5-year recovery period. The IUB also authorized IPL to use up to $46 million of regulatory liabilities from its 2007 electric transmission assets sale to offset these deferred costs as they are amortized. In 2010, $41 million (portion allocated to Iowa retail customers) of the Attachment “O” costs were deferred by IPL and recognized as a regulatory asset.

Proposed coal-fired base-load projects costs -
IPL’s coal-fired base-load project - In 2009, IPL announced a decision to cancel the construction of the proposed 630 MW coal-fired electric generating facility in Marshalltown, Iowa referred to as Sutherland #4. In 2010, IPL received approval from the IUB to recover $26 million of the costs incurred for Sutherland #4 from its retail customers in Iowa by amortizing the costs over a 5-year period ending August 2014. In accordance with this approval, IPL is amortizing $5 million of this regulatory asset annually, with an equal and offsetting amount of amortization of IPL’s regulatory liability resulting from the sale of the Duane Arnold Energy Center (DAEC). The IUB determined that IPL should not include the unamortized balance of these Sutherland #4 costs in electric rate base during the 5-yearfive-year recovery period.

In accordance with the MPUC’s November 2011 order related to IPL’s 2009 test year Minnesota retail electric rate case, IPL was authorized to recover $2 million of previously incurred plant cancellation costs for Sutherland #4 over a 25-year period ending in 2037. As a result, Alliant Energy and IPL recorded a $2 million increase to regulatory assets, and a $2 million credit to “Utility - Other operation and maintenance” in their Consolidated Statements of Income in 2011.

114119

Table of Contents



WPL’s coal-fired base-load project - In 2008, the PSCW issued an order denying WPL’s application to construct a 300 MW coal-fired electric generating facility in Cassville, Wisconsin referred to as Nelson Dewey #3. In 2009, WPL received approval from the PSCW to recover $11 million of project costs from its retail customers over a 5-year period ending December 2014. In accordance with this approval, WPL is amortizing $2 million of this regulatory asset annually.

Other - Alliant Energy, IPL and WPL assess whether IPL’s and WPL’s regulatory assets are probable of future recovery by considering factors such as applicable regulations, recent orders by the applicable regulatory agencies, historical treatment of similar costs by the applicable regulatory agencies and regulatory environment changes. Based on these assessments, Alliant Energy, IPL and WPL believe the regulatory assets recognized as of December 31, 20122013 in the above table are probable of future recovery. However, no assurance can be made that IPL and WPL will recover all of these regulatory assets in future rates. If future recovery of a regulatory asset ceases to be probable, the regulatory asset will be charged to expense in the period in which future recovery ceases to be probable.

Based on the PSCW’s July 2012 order related to WPL’s 2013/2014 test period Wisconsin retail electric and gas rate case, WPL was authorized to recover previously incurred costs associated with the acquisition of a 25% ownership interest in Edgewater Unit 5 and proposed emission controls projects. As a result, Alliant Energy and WPL recorded a $5 million increase to regulatory assets, and a $5 million credit to “Utility - Other operation and maintenance” in their Consolidated Statements of Income in 2012.

Based on assessments completed in 2011, Alliant Energy, IPL and WPL recognized impairment charges of $9 million, $2 million and $7 million, respectively, for regulatory assets that were no longer probable of future recovery. The regulatory asset impairment charges were recorded by Alliant Energy, IPL and WPL as reductions in regulatory assets and charges to “Utility - Other operation and maintenance” in their Consolidated Statements of Income in 2011.

Based on the PSCW’s July 2012MPUC’s November 2011 order related to WPL’s 2013/2014IPL’s 2009 test period Wisconsinyear Minnesota retail electric and gas rate case, WPLIPL was authorized to recover $2 million of previously incurred plant cancellation costs associated with the acquisition offor Sutherland #4 over a 25% ownership interest25-year period ending in Edgewater Unit 5 and proposed CACP projects.2037. As a result, Alliant Energy and WPLIPL recorded a $52 million increase to “Regulatory assets” on their Consolidated Balance Sheetsregulatory assets, and a $52 million credit to “Utility - Other operation and maintenance” in their Consolidated Statements of Income in 2012.

Based on the IUB’s February 2011 order related to IPL’s 2009 test year Iowa retail electric rate case, IPL was authorized to recover from its retail electric customers in Iowa operation and maintenance expenses incurred in 2009 for restoration activities from severe flooding in IPL’s service territory. As a result, Alliant Energy and IPL recorded a $7 million regulatory asset in 2010 with an offsetting pre-tax regulatory-related credit of $7 million in “Utility - Other operation and maintenance” in their Consolidated Statements of Income in 2010. In addition, the IUB’s February 2011 order also authorized IPL to recover from its retail electric customers in Iowa a portion of the remaining net book value of Sixth Street and previously impaired CWIP assets related to Sixth Street, which was shut down as a result of the flooding. As a result, Alliant Energy and IPL recorded a $16 million regulatory asset in 2010 with an offsetting increase of $14 million in utility accumulated depreciation and a credit of $2 million in “Utility - Other operation and maintenance” in their Consolidated Statements of Income in 2010.2011.

Regulatory Liabilities - At December 31, regulatory liabilities were comprised of the following items (in millions):
Alliant Energy IPL WPLAlliant Energy IPL WPL
2012 2011 2012 2011 2012 20112013 2012 2013 2012 2013 2012
Cost of removal obligations
$408.7
 
$404.9
 
$268.0
 
$261.9
 
$140.7
 
$143.0

$418.9
 
$408.7
 
$277.7
 
$268.0
 
$141.2
 
$140.7
IPL’s tax benefit riders355.8
 349.6
 355.8
 349.6
 
 
265.4
 355.8
 265.4
 355.8
 
 
Energy conservation cost recovery55.1
 29.6
 10.0
 4.7
 45.1
 24.9
52.7
 55.1
 9.3
 10.0
 43.4
 45.1
IPL’s electric transmission assets sale32.5
 45.1
 32.5
 45.1
 
 
21.6
 32.5
 21.6
 32.5
 
 
IPL’s electric transmission cost recovery14.6
 
 14.6
 
 
 
Commodity cost recovery17.7
 23.8
 5.2
 23.2
 12.5
 0.6
7.5
 17.7
 5.5
 5.2
 2.0
 12.5
IPL’s DAEC sale9.5
 14.6
 9.5
 14.6
 
 
Other36.8
 42.5
 20.4
 22.2
 16.4
 20.3
40.8
 46.3
 20.8
 29.9
 20.0
 16.4

$916.1
 
$910.1
 
$701.4
 
$721.3
 
$214.7
 
$188.8

$821.5
 
$916.1
 
$614.9
 
$701.4
 
$206.6
 
$214.7

Regulatory liabilities related to cost of removal obligations, to the extent expensed through depreciation rates, reduce rate base. A significant portion of the remaining regulatory liabilities are not used to reduce rate base in the revenue requirement calculations utilized in IPL’s and WPL’s respective rate proceedings.

Cost of removal obligations - Alliant Energy, IPL and WPL collect in rates future removal costs for many assets that do not have associated legal AROs. Alliant Energy, IPL and WPL record a regulatory liability for the estimated amounts they have collected in rates for these future removal costs less amounts spent on removal activities.

IPL’s tax benefit riders - At December 31, 2013, Alliant Energy’s and IPL’s “IPL’s tax benefit riders” regulatory liabilities in the above table increased primarilyconsisted of $228.9 million and $36.5 million for the electric and gas tax benefit riders, respectively. These regulatory liabilities decreased $90 million in aggregate in 2013 due to changes in the estimated amounts of qualifying repair expenditures and allocation of mixed service

115

Table of Contents
following items:


costs at IPL. These items were offset by regulatory liabilities used to credit IPL’s Iowa retail electric customers’ bills in 2012.Electric tax benefit rider - In January 2011, the IUB approved IPL’s proposedan electric tax benefit rider proposed by IPL, which utilizes tax-related regulatory liabilities to credit bills of Iowa retail electric customers beginning in February 2011 to help offset the impact of rate increases on such customers. These regulatory liabilities are related to projected tax benefits from tax accounting methodologiesmethod changes for repairs expenditures, allocation of mixed service costs and tax elections available under the Internal Revenue Code to credit IPL’s retail electric customer billsallocation of insurance proceeds from floods in Iowa during 2011, 2012 and 2013.2008. Alliant Energy and IPL recognize an offsetting reduction to income tax expense for the after-tax amounts credited to IPL’s retail electric customers’ bills in Iowa, resulting in no impact to Alliant Energy’s and IPL’s net income from the electric tax benefit rider. In 2013, 2012 and 2011, Alliant Energy and IPL utilized $79 million, $83 million and $61$61 million,, respectively, of electric tax benefit rider-related regulatory liabilities accumulated in prior years to credit IPL’s Iowa retail electric customers’

120

Table of Contents


bills. In 2013, 2012 and 2011, the$79 million, $83 million and $61$61 million reductions to “Electric operating revenues” resulted in $33 million, $35 million and $25$25 million of credits to “Income tax expense (benefit)” as a result of the decrease in taxable income in Alliant Energy’s and IPL’s Consolidated Statements of Income in 2013, 2012 and 2011, respectively. In 2013, 2012 and 2011, additional reductions to “Income tax expense (benefit)” of $46 million, $48 million and $36$36 million,, respectively, were also recognized in Alliant Energy’s and IPL’s Consolidated Statements of Income representing the tax benefits realized related to the electric tax benefit rider.

In December 2012,2013, the IUB issued an order authorizing $56$85 million of regulatory liabilities from tax benefits to be credited to IPL’s retail electric customers’ bills in Iowa during 20132014 through the electric tax benefit rider.

Gas tax benefit rider - In November 2012, the IUB issued an order authorizing $12approved a gas tax benefit rider proposed by IPL, which utilizes up to $12 million of regulatory liabilities annually to credit bills of Iowa retail gas customers beginning in January 2013 through December 2015 to help offset the impact of rate increases on such customers. These regulatory liabilities are related to tax benefits from tax benefits toaccounting method changes for repairs expenditures, allocation of mixed service costs and allocation of insurance proceeds from floods in 2008. Any remaining benefit, including any portion not utilized of the agreed upon amount from January 2013 through December 2015, will be credited to IPL’sIowa’s retail gas customers’ bills in Iowa during2016. In 2013, through aAlliant Energy and IPL utilized $11 million of gas tax benefit rider.rider-related regulatory liabilities to credit IPL’s Iowa retail gas customers’ bills. In February 2013, the IUB issued an order authorizing IPL to utilize $2411 million reduction to “Gas operating revenues” resulted in $4 million of regulatory liabilities during credits to “Income tax expense (benefit)” as a result of the decrease in taxable income in Alliant Energy’s and IPL’s Consolidated Statements of Income in 2013 from. In 2013, additional reductions to “Income tax expense (benefit)” of $7 million were also recognized in Alliant Energy’s and IPL’s Consolidated Statements of Income representing the tax benefits forrealized related to the electricgas tax benefit rider to recognize the revenue requirement impact of the changes in tax accounting methods. rider.

Refer to Note 2 for discussion of the gas tax benefit rider for IPL’s Iowa retail gas customers and Note 511 for additional details regarding theIPL’s tax benefit rider for IPL’s Iowa retail electric customers.riders.

Energy conservation cost recovery - WPL collectsand IPL collect revenues from itstheir customers to offset certain expenditures incurred by WPL and IPL for conservation programs, including state mandated programs and WPL’s Shared Savings program.programs. Differences between forecasted costs used to set rates and actual costs for these programs are deferred as a regulatory asset or regulatory liability. In 2012, WPL’s forecasted costs used to set current rates exceeded actual costs for these programs, resulting in the increase to Alliant Energy’s and WPL’s “Energy conservation cost recovery” regulatory liability.

IPLIPL’s electric transmission assets sale - In 2007, IPL completed the sale of its electric transmission assets to ITC and recognized a gain based on the terms of the agreement. Upon closing of the sale, IPL established a regulatory liability of $89 million pursuant to conditions established by the IUB when it allowed the transaction to proceed. The regulatory liability represented the present value of IPL’s obligation to refund to its customers payments beginning in the year IPL’s customers experience an increase in rates related to the transmission charges assessed by ITC. The regulatory liability accrues interest at the monthly average U.S. Treasury rate for three-year maturities.

Iowa retail portion - In 2009, the IUB issued an order authorizing IPL to use a portion of this regulatory liability to reduce Iowa retail electric customers’ rates by $12 million for the period from July 2009 through February 2010 with billing credits included in the monthly energy adjustment clause. In 2010, the IUB issued an order authorizing IPL to use up to $46 milliona portion of this regulatory liability to offset electric transmission service costs expected to be billed to IPL by ITC in 2010 related to ITC’s 2008 transmission revenue adjustment. IPL expects to utilize $41 million of this regulatory liability over a 5-yearfive-year period ending December 2014 to offset the Iowa retail portion of transmission costs billed to IPL by ITC in 2010 related to ITC’s 2008 transmission revenue adjustment. As a result, IPL is amortizing $8 million of this regulatory liability annually, with an equal and offsetting amount of amortization for IPL’s regulatory asset related to electric transmission service costs.

In accordance with the IUB’s 2011 order related to IPL’s 2009 test year Iowa retail electric rate case, IPL was authorized to utilize regulatory liabilities in 2011 to offset transmission service expenses related to the Iowa retail portion of 2009 under-recovered costs billed to IPL. As a result, Alliant Energy and IPL recorded a reduction of $19 million in regulatory liabilities, and a reduction of $19 million in “Electric transmission service” in their Consolidated Statements of Income in 2011. The IUB also authorized IPL to utilize $3 million of this regulatory liability in 2011 to reduce IPL’s Iowa retail electric rate base associated with the Whispering Willow - East wind project.

Minnesota retail portion - In 2010, the MPUC issued an interim rate order authorizing IPL to use a portion of this regulatory liability to implement an alternative transaction adjustment through its energy adjustment clause resulting in annual credits to its Minnesota retail electric customers beginning in July 2010 to coincide with the effective date of the interim rate increase for Minnesota retail customers. The amounts of the annual credits are dependent upon the level of kilowatt-hoursKWhs sold to IPL’s Minnesota retail customers. In accordance with the MPUC’s November 2011 order related to IPL’s 2009 test year Minnesota retail electric rate case, IPL was authorized to refund a higher amount of the gain realized from the sale of its electric

116121

Table of Contents


electric transmission assets in 2007 to its Minnesota retail electric customers than previously estimated. As a result, Alliant Energy and IPL recorded a $5 million increase to regulatory liabilities, and a $5 million charge to “Utility - Other operation and maintenance” in their Consolidated Statements of Income in 2011 for the additional amount to be refunded.

Refunds related to any remaining balance of IPL’s electric transmission assets sale regulatory liability are expected to be determined in future rate proceedings.proceedings or as part of the proposed sale of Minnesota electric distribution assets.

IPL’s electric transmission cost recovery - Refer to Note 1(g) for additional details of IPL’s electric transmission service cost recovery mechanism.

Commodity cost recovery - Refer to Note 1(h)1(g) for additional details of IPL’s and WPL’s cost recovery mechanisms. Refer to Note 2“WPL’s Retail Fuel-related Rate Filing (2012 Test Year)” below for discussion of certain rate refund reserves recorded as regulatory liabilities on the Consolidated Balance Sheets.

IPL’s DAEC sale - In 2006, IPL completed the sale of its 70% ownership interest in DAEC and recognized a regulatory liability of approximately $59 million from the transaction based on the terms of the sale agreement. Pursuantrefunds made to the IUB order approving the DAEC sale, the gain resulting from the sale was used to establish a regulatory liability. In 2009, IPL received $12 million as part of a settlement of a claim filed against the U.S. Department of Energy (DOE) in 2004 for recovery of damages due to the DOE’s delay in accepting spent nuclear fuel produced at DAEC. IPL recognized the $12 million received from the settlement as an increase to the regulatory liability established with the sale of DAEC. The regulatory liability accrues interest at the monthly average U.S. Treasury rate for three-year maturities.

In 2009, the IUB authorized IPL to utilize $29 million of this regulatory liability to reduce electric plant in service in 2009 related to the cumulative AFUDC recognized for the Whispering Willow - East wind project. In 2010, IPL received approval from the IUB to utilize $26 million of this regulatory liability to offset the amortization of costs incurred for the Sutherland #4 project over a 5-year period ending August 2014. As a result, IPL is amortizing $5 million of this regulatory liability annually, with an equal and offsetting amount of amortization for IPL’s regulatory asset related to the Sutherland #4 project. In 2011, the IUB authorized IPL to utilize $23 million of this regulatory liability to reduce IPL’s IowaWPL’s retail electric rate basecustomers in 2011 for the Whispering Willow - East wind project.

Refunds related to any remaining balance of IPL’s DAEC sale regulatory liability are expected to be determined in future rate proceedings.

(c) Income Taxes - Alliant Energy, IPL and WPL follow the liability method of accounting for deferred income taxes, which requires the establishment of deferred income tax assets and liabilities, as appropriate, for temporary differences between the tax basis of assets and liabilities and the amounts reported in the consolidated financial statements. Deferred income taxes are recorded using currently enacted tax rates and estimates of state apportionment rates. Changes in deferred income tax assets and liabilities associated with certain property-related differences at IPL are accounted for differently than other subsidiaries of Alliant Energy due to rate-making practices in Iowa. Rate-making practices in Iowa do not include the impact of certain deferred tax expenses (benefits) in the determination of retail rates. Based on these rate-making practices, deferred tax expense (benefit) related to these property-related differences at IPL is not recorded in the income statement but instead charged to regulatory assets or regulatory liabilities until these temporary differences are reversed. Refer to Note 1(b) for further discussion of regulatory assets and regulatory liabilities associated with property-related differences at IPL. In Wisconsin, the PSCW has allowed rate recovery of deferred taxes on all temporary differences since 1991.

Alliant Energy, IPL and WPL recognize positions taken, or expected to be taken, in income tax returns that are more-likely-than-not to be realized, assuming that the position will be examined by tax authorities with full knowledge of all relevant information. If it is more-likely-than-not that a tax position, or some portion thereof, will not be sustained, the related tax benefits are not recognized in the consolidated financial statements. Uncertain tax positions may result in an increase in income taxes payable, a reduction of income tax refunds receivable or changes in deferred taxes. Also, when uncertainty about the deductibility of an amount is limited to the timing of such deductibility, the increase in taxes payable (or reduction in tax refunds receivable) is accompanied by a decrease in deferred tax liabilities. Generally Alliant Energy, IPL and WPL recognize current taxes payable related to uncertain tax positions in “Accrued taxes” and non-current taxes payable related to uncertain tax positions in “Other long-term liabilities and deferred credits” on the Consolidated Balance Sheets. However, if the uncertain tax position would be settled through the reduction of a net operating loss rather than through the payment of cash, the uncertain tax position is reflected in “Deferred income taxes” on the Consolidated Balance Sheets. Refer to Note 5 for further discussion of uncertain tax positions.

Alliant Energy, IPL and WPL defer investment tax credits and amortize the credits to income over the average lives of the related property. Other tax credits for Alliant Energy, IPL and WPL reduce income tax expense in the year claimed.

Alliant Energy, IPL and WPL have elected the alternative transition method to calculate their beginning pool of excess tax benefits available to absorb any tax deficiencies associated with recognition of share-based payment awards.

117

Table of Contents



Alliant Energy files a consolidated federal income tax return, which includes the aggregate taxable income or loss of Alliant Energy and its subsidiaries. In addition, a combined return including Alliant Energy and all of its subsidiaries is filed in Wisconsin. Alliant Energy subsidiaries with a presence in Iowa file as part of a consolidated return in Iowa. Under the terms of a tax sharing agreement between Alliant Energy and its subsidiaries, the subsidiaries calculate state income tax using consolidated apportionment rates applied to separate company taxable income.

(d) Cash and Cash Equivalents - Cash and cash equivalents include short-term liquid investments that have original maturities of less than 90 days.

(e) Utility Property, Plant and Equipment -
General - Utility plant in service (other than acquisition adjustments) is recorded at the original cost of acquisition or construction, which includes material, labor, contractor services, AFUDC and allocable overheads, such as supervision, engineering, benefits, certain taxes and transportation. Repairs, replacements and renewals of items of property determined to be less than a unit of property or that do not increase the property’s life or functionality are charged to maintenance expense. Ordinary retirements of utility plant in service and salvage value are netted and charged to accumulated depreciation upon removal from utility plant in service accounts and no gain or loss is recognized consistent with rate-making policies. Removal costs incurred reduce the regulatory liability.

Electric Plant In Service - Electric plant in service by functional category at December 31 was as follows (in millions):
 Alliant Energy IPL WPL
 2012 2011 2012 2011 2012 2011
Generation
$4,798.9
 
$4,100.6
 
$2,393.0
 
$2,392.3
 
$2,405.9
 
$1,708.3
Distribution3,981.5
 3,782.1
 2,205.9
 2,074.8
 1,775.6
 1,707.3
Other290.3
 282.7
 216.3
 216.9
 74.0
 65.8
 
$9,070.7
 
$8,165.4
 
$4,815.2
 
$4,684.0
 
$4,255.5
 
$3,481.4

The increase in Alliant Energy’s and WPL’s generation portion of electric plant in service was primarily due to WPL’s purchase of Riverside and installation of emission controls at Edgewater Unit 5 in the fourth quarter of 2012.

Wind Generation Projects -
Wind Site in Franklin County, Iowa - In 2007, IPL acquired approximately 500 MW of wind site capacity in Franklin County, Iowa. The initial 200 MW of the wind site was utilized for IPL’s Whispering Willow - East wind project, which began generating electricity in 2009. In 2011, IPL sold 100 MW of wind site capacity to Resources for construction of a non-regulated wind project referred to as the Franklin County wind project. Future development of the balance of the wind site by IPL will depend on numerous factors such as renewable portfolio standards, environmental legislation, fossil fuel prices, technology advancements and transmission capabilities. As of December 31, 2012, Alliant Energy’s and IPL’s capitalized costs related to the remaining approximately 200 MW of wind site capacity in Franklin County, Iowa were $13 million and were recorded in “Other property, plant and equipment” on their Consolidated Balance Sheets.

IPL’s Whispering Willow - East Wind Project - In 2008, IPL received approval from the IUB to construct the 200 MW Whispering Willow - East wind project. The advanced rate-making principles for this project, as approved by the IUB in 2008, included a predetermined level, or “cost cap,” of $417 million for construction costs. Final construction costs for the project exceeded this cost cap. In January 2011, IPL received an order from the IUB allowing IPL to recover all of its Whispering Willow - East wind project construction costs. However, the IUB did not allow IPL to recover a return on a portion of costs above the cost cap. As a result, Alliant Energy and IPL recognized a $21 million impairment related to the disallowance, which was recorded as a charge to “Utility - Other operation and maintenance” in their Consolidated Statements of Income in 2010.

In 2011, IPL received an order from the MPUC approving a temporary recovery rate for the Minnesota retail portion of its Whispering Willow - East wind project construction costs. In its order, the MPUC did not conclude on the prudence of these project costs. The prudence of these project costs and the final recovery rate for these costs will be addressed in a separate proceeding that is expected to be completed in 2013. The initial recovery rate approved by the MPUC is below the amount required by IPL to recover the Minnesota retail portion of its total project costs. Based on its interpretation of the order, IPL currently believes that it is probable it will not be allowed to recover the entire Minnesota retail portion of its project costs. IPL currently believes the most likely outcome of the final rate proceeding will result in the MPUC effectively disallowing recovery of approximately $8 million of project costs out of a total of approximately $30 million of project costs allocated to

118

Table of Contents


the Minnesota retail jurisdiction. As a result, Alliant Energy and IPL recognized an $8 million impairment related to this probable disallowance, which was recorded as a reduction to electric plant in service and a charge to “Utility - Other operation and maintenance” in their Consolidated Statements of Income in 2011. This amount is subject to change until the MPUC determines the final recovery rate for these project costs.

Franklin County Wind Project - In 2008, Alliant Energy entered into a master supply agreement with Vestas-American Wind Technology, Inc. (Vestas) to purchase 500 MW of wind turbine generator sets and related equipment. Alliant Energy utilized 400 MW of these wind turbine generator sets and related equipment to construct IPL’s Whispering Willow - East and WPL’s Bent Tree - Phase I wind projects. In 2011, Alliant Energy decided to utilize the remaining 100 MW of wind turbine generator sets and related equipment at Resources to build the Franklin County wind project. In 2011, IPL sold the assets for this wind project to Resources for $115.3 million, which represented IPL’s book value for progress payments to date for the 100 MW of wind turbine generator sets and related equipment and land rights in Franklin County, Iowa. In addition, Resources assumed the remaining progress payments to Vestas for the 100 MW of wind turbine generator sets and related equipment. The proceeds received by IPL were recorded in investing activities in IPL’s Consolidated Statement of Cash Flows in 2011. Refer to Note 1(f) for further discussion of the Franklin County wind project.

Wind Site in Green Lake and Fond du Lac Counties in Wisconsin - In 2009, WPL purchased development rights to an approximate 100 MW wind site in Green Lake and Fond du Lac Counties in Wisconsin. Due to events in 2011 resulting in uncertainty regarding wind siting requirements in Wisconsin and increased risks with permitting this wind site, WPL determined it would be difficult to sell or effectively use the site for wind development. As a result, WPL recognized a $5 million impairment in 2011 for the amount of capitalized costs incurred for this site. Alliant Energy and WPL recorded the impairment as a reduction in other utility property, plant and equipment, and a charge to “Utility - Other operation and maintenance” in their Consolidated Statements of Income in 2011.

Environmental Compliance Plans Projects -
IPL’s George Neal Units 3 and 4 Emission Controls Project - MidAmerican Energy Company is currently installing scrubbers and baghouses at George Neal Units 3 and 4 to reduce SO2 and mercury emissions at the generating facility. IPL owns a 28.0% and 25.695% interest in George Neal Units 3 and 4, respectively. Construction began in the fourth quarter of 2011 and is expected to be completed in 2013 and 2014. The scrubbers and baghouses are expected to help meet requirements under CAIR or some alternative to this rule that may be implemented and the Utility Maximum Achievable Control Technology (MACT) Rule. As of December 31, 2012, Alliant Energy and IPL recorded capitalized expenditures of $66 million and AFUDC of $1 million for IPL’s allocated portion of the scrubbers and baghouses in “Construction work in progress - George Neal Generating Station Units 3 and 4 emission controls” on their Consolidated Balance Sheets.

IPL’s Ottumwa Unit 1 Emission Controls Project - IPL is currently installing a scrubber and baghouse at Ottumwa Unit 1 to reduce SO2 and mercury emissions at the generating facility. IPL owns a 48% interest in Ottumwa Unit 1. Construction began in the second quarter of 2012 and is expected to be completed in 2014. The scrubber and baghouse are expected to help meet requirements under CAIR or some alternative to this rule that may be implemented and the Utility MACT Rule. As of December 31, 2012, Alliant Energy and IPL recorded capitalized expenditures of $72 million and AFUDC of $2 million for IPL’s allocated portion of the scrubber and baghouse in “Construction work in progress - Ottumwa Generating Station Unit 1 emission controls” on their Consolidated Balance Sheets.

WPL’s Edgewater Unit 5 Emission Controls Project - In 2010, WPL began installing a selective catalytic reduction (SCR) system at Edgewater Unit 5 to reduce nitrogen oxide (NOx) emissions at the generating facility. The SCR is expected to help meet requirements under the Wisconsin Reasonably Available Control Technology (RACT) Rule, which require additional NOx emission reductions at Edgewater by May 2013. Construction was completed in the fourth quarter of 2012, which resulted in a transfer of the capitalized project costs from “Construction work in progress - Other” to “Electric plant in service” on Alliant Energy’s and WPL’s Consolidated Balance Sheets in 2012. At December 31, 2012, the capitalized project costs consisted of capitalized expenditures of $132 million and AFUDC of $11 million for the SCR system.

WPL’s Columbia Units 1 and 2 Emission Controls Project - WPL is currently installing scrubbers and baghouses at Columbia Units 1 and 2 to reduce SO2 and mercury emissions at the generating facility. WPL owns a 46.2% interest in Columbia Units 1 and 2. Construction began in the first quarter of 2012 and is expected to be completed in 2014. The scrubbers and baghouses are expected to help meet requirements under CAIR or some alternative to this rule that may be implemented, the Utility MACT Rule and the Wisconsin State Mercury Rule. As of December 31, 2012, Alliant Energy and WPL recorded capitalized expenditures of $126 million and AFUDC of $4 million for WPL’s allocated portion of the scrubbers and baghouses in “Construction work in progress - Columbia Energy Center Units 1 and 2 emission controls” on their Consolidated Balance Sheets.

119

Table of Contents



Natural Gas-Fired Electric Generation Project -
WPL’s Purchase of Riverside - On December 31, 2012, WPL purchased Riverside, a 600 MW natural gas-fired electric generating facility in Beloit, Wisconsin, from a subsidiary of Calpine Corporation. The purchase price, including certain transaction-related costs, was $403.5 million. Riverside was originally placed into service in 2004. WPL’s purchase of Riverside replaced the 490 MW of electricity output previously obtained from the Riverside PPA to meet the long-term energy needs of its customers. Refer to Note 3(a) for further discussion of the Riverside PPA terminated with the purchase. As of the closing date, the carrying values of the assets purchased were as follows (in millions):
Electric plant in service
$512.7
Accumulated depreciation(121.4)
Current assets4.2
Other assets8.0

$403.5

Alliant Energy and WPL recorded intangible assets of $8.0 million for contract rights related to a PPA with a third-party for a portion of Riverside’s capacity that were assumed with the acquisition of Riverside. This PPA expires in May 2014. As of December 31, 2012, these intangible assets were included in “Deferred charges and other” on their Consolidated Balance Sheets. At December 31, 2012, Alliant Energy’s and WPL’s estimated amortization expense related to these contract rights for 2013 and 2014 was $5.4 million and $2.6 million, respectively.

Depreciation - IPL and WPL use a combination of remaining life and straight-line depreciation methods as approved by their respective regulatory commissions. The composite or group method of depreciation is used, in which a single depreciation rate is applied to the gross investment in a particular class of property. This method pools similar assets and then depreciates each group as a whole. Periodic depreciation studies are performed to determine the appropriate group lives, net salvage, estimated cost of removal and group depreciation rates. These depreciation studies are subject to review and approval by IPL’s and WPL’s respective regulatory commissions. Depreciation expense is included within the recoverable cost of service component of rates charged to customers. The average rates of depreciation for electric, gas and other properties, consistent with current rate-making practices, were as follows:
 IPL WPL
 2012 2011 2010 2012 2011 2010
Electric - generation3.7% 3.5% 3.7% 3.2% 3.3% 2.9%
Electric - distribution2.5% 2.4% 2.7% 2.9% 2.9% 2.6%
Gas3.4% 3.5% 3.3% 2.6% 2.6% 2.2%
Other4.5% 4.8% 4.9% 5.3% 5.2% 6.5%

In May 2012, the PSCW issued an order approving the implementation of updated depreciation rates for WPL effective January 1, 2013 as a result of a recently completed depreciation study. In February 2013, the PSCW issued an order approving WPL’s request to revise depreciation rates for Riverside, effective January 1, 2013. WPL estimates the new average rates of depreciation for its electric generation, electric distribution and gas properties will be approximately 3.4%, 2.7% and 2.5%, respectively, during 2013.

AFUDCUtility Rate Cases - AFUDC represents costs to finance construction additions including a return on equity component and cost of debt component as required by regulatory accounting. The concurrent credit for the amount of AFUDC capitalized is recorded as “Allowance for funds used during construction” in the Consolidated Statements of Income. The amount of AFUDC generated by equity and debt components was as follows (in millions):
 Alliant Energy IPL WPL
 2012 2011 2010 2012 2011 2010 2012 2011 2010
Equity
$14.1
 
$7.6
 
$11.2
 
$5.2
 
$3.5
 
$3.0
 
$8.9
 
$4.1
 
$8.2
Debt7.8
 4.4
 6.8
 3.2
 2.3
 2.5
 4.6
 2.1
 4.3
 
$21.9
 
$12.0
 
$18.0
 
$8.4
 
$5.8
 
$5.5
 
$13.5
 
$6.2
 
$12.5

WPL recognized $11 million and $3 million of AFUDC in 2012 and 2011, respectively, for its Edgewater Unit 5 and Columbia Units 1 and 2 emission controls projects. WPL recognized $1 million and $10 million of AFUDC in 2011 and 2010, respectively, for its Bent Tree - Phase I wind project, a portion of which was placed in service in 2010 and 2011.


120

Table of Contents


AFUDC for IPL’s construction projects is calculated in accordance with FERC guidelines. AFUDC for WPL’s retail and wholesale jurisdiction construction projects is calculated in accordance with PSCW and FERC guidelines, respectively. The AFUDC recovery rates, computed in accordance with the prescribed regulatory formula, were as follows:
 2012 2011 2010
IPL (FERC formula)8.2% 8.5% 4.8%
WPL (PSCW formula - retail jurisdiction) (a)8.8% 8.8% 8.8%
WPL (FERC formula - wholesale jurisdiction)7.9% 6.2% 7.2%

(a)
Consistent with the PSCW’s retail rate case order issued in 2009, WPL earned a current return on 50% of the estimated CWIP related to its Bent Tree - Phase I wind project for 2010 and accrued AFUDC on the remaining 50% in 2010. Consistent with the PSCW’s retail order issued in 2009, WPL accrued AFUDC on 100% of CWIP related to the Edgewater Unit 5 emission controls project and the Columbia Units 1 and 2 emission controls project in 2012, 2011 and 2010. Consistent with the PSCW’s retail rate case order issued in 2012, WPL will earn a return on 50% of the estimated CWIP related to its Columbia Units 1 and 2 emission controls project for 2013 and will accrue AFUDC on the remaining 50% in 2013.

(f) Non-regulated and Other Property, Plant and Equipment -
General - Non-regulated and other property, plant and equipment is recorded at the original cost of acquisition or construction, which includes material, labor and contractor services. Repairs, replacements and renewals of items of property determined to be less than a unit of property or that do not increase the property’s life or functionality are charged to maintenance expense. Upon retirement or sale of non-regulated and other property, plant and equipment, the original cost and related accumulated depreciation are removed from the accounts and any gain or loss is included in the Consolidated Statements of Income.

The Franklin County wind project and the Sheboygan Falls Energy Facility within Alliant Energy’s Non-regulated Generation business represent a large portion of the non-regulated and other property, plant and equipment. The Franklin County wind project was placed in service in the fourth quarter of 2012 and is being depreciated using the straight-line method over a 30-year period. As of December 31, 2012, Alliant Energy recorded $148 million (capitalized expenditures of $130 million, capitalized interest of $9 million, and AROs of $9 million) in “Non-regulated Generation property, plant and equipment” on its Consolidated Balance Sheet related to the wind project. Refer to Note 4(d) for discussion of a cash grant expected to be received related to the Franklin County wind project, which reduced the cost of the project. The Sheboygan Falls Energy Facility was placed into service in 2005 and is being depreciated using the straight-line method over a 35-year period. As of December 31, 2012, Alliant Energy recorded $111 million in “Non-regulated Generation property, plant and equipment” on its Consolidated Balance Sheet related to the Sheboygan Falls Energy Facility. The property, plant and equipment related to Corporate Services, Transportation and other non-regulated investments is recorded in “Alliant Energy Corporate Services, Inc. and other property, plant and equipment” on Alliant Energy’s Consolidated Balance Sheets and is depreciated using the straight-line method over periods ranging from 5 to 30 years.

The increase in “Alliant Energy Corporate Services, Inc. and other property, plant and equipment” on Alliant Energy’s Consolidated Balance Sheets during 2012 was primarily due to Alliant Energy exercising its option under the corporate headquarters lease to purchase the building at the expiration of the lease term for $48 million.

Refer to Note 1(e) for further discussion of the Franklin County wind project and Note 18 for discussion of the Franklin County wind project AROs.

(g) Operating Revenues -
Utility - Revenues from Alliant Energy’s utility business are primarily from electricity and natural gas sales and are recognized on an accrual basis as services are rendered or commodities are delivered to customers. Energy sales to individual customers are based on the reading of customers’ meters, which occurs on a systematic basis throughout each reporting period. Amounts of energy delivered to customers since the date of the last meter reading are estimated at the end of each reporting period and the corresponding estimated unbilled revenue is recorded. The unbilled revenue estimate is based on daily system demand volumes, estimated customer usage by class, weather impacts, line losses and the most recent customer rates.

IPL and WPL accrue revenues from their wholesale customers to the extent that the actual net revenue requirements calculated in accordance with FERC-approved formula rates for the reporting period are higher than the amounts billed to wholesale customers during such period. In accordance with authoritative guidance, regulatory assets are recorded as the

121

Table of Contents


offset for these accrued revenues under formulaic rate-making programs. IPL’s estimated recovery amount is recorded in the current period of service and is reflected in customer bills within two years under the provisions of approved formula rates. WPL’s estimated recovery amount is recorded in the current period of service and subject to final adjustments after a customer audit period in the subsequent year. Final settled recovery amounts are reflected in WPL’s customer bills within two years under the provisions of approved formula rates.

IPL and WPL participate in bid/offer-based wholesale energy and ancillary services markets operated by the Midwest Independent Transmission System Operator (MISO). IPL’s and WPL’s customers and generating resources are located in the MISO region. MISO requires that all load serving entities and generation owners, including IPL and WPL, submit hourly day-ahead and/or real-time bids and offers for energy and ancillary services. The MISO day-ahead and real-time transactions are grouped together, resulting in a net supply to or net purchase from MISO of megawatt-hours (MWhs) for each hour of each day. The net supply to MISO is recorded in “Electric utility operating revenues” and the net purchase from MISO is recorded in “Electric production fuel and energy purchases” in the Consolidated Statements of Income. IPL and WPL also engage in transactions in PJM Interconnection, LLC’s bid/offer-based wholesale energy market, which are accounted for similar to the MISO transactions.

Non-regulated - Revenues from Alliant Energy’s non-regulated businesses are primarily from its Transportation business and are recognized on an accrual basis as services are rendered or goods are delivered to customers.

Taxes Collected from Customers - Certain of Alliant Energy’s subsidiaries serve as collection agents for sales or various other taxes and record revenues on a net basis. Operating revenues do not include the collection of the aforementioned taxes.

(h) Utility Cost Recovery Mechanisms -
Electric Production Fuel and Energy Purchases (Fuel-related Costs) - Alliant Energy, IPL and WPL incur fuel-related costs each period to generate and purchase electricity to meet the demand of their electric customers. These fuel-related costs include the cost of fossil fuels (primarily coal and natural gas) used during each period to produce electricity at their generating facilities, electricity purchased each period from wholesale energy markets (primarily MISO) and under PPAs, costs for allowances acquired to allow certain emissions (primarily SO2 and NOx) from their generating facilities and costs for chemicals utilized to control emissions from their generating facilities. Alliant Energy, IPL and WPL record these fuel-related costs in “Electric production fuel and energy purchases” in the Consolidated Statements of Income.

IPL Retail - The cost recovery mechanisms applicable for IPL’s retail electric customers provide for subsequent adjustments to their electric rates for changes in electric production fuel and purchased energy costs. Fuel adjustment clause rules applicable to IPL’s Iowa retail jurisdiction also currently allow IPL to recover prudently incurred costs for emission allowances required to comply with EPA regulations including the Acid Rain program and CAIR through the fuel adjustment clause. Changes in the under-/over-collection of these costs each period are recognized in “Electric production fuel and energy purchases” in Alliant Energy’s and IPL’s Consolidated Statements of Income. The cumulative effects of the under-/over-collection of these costs are recorded in current “Regulatory assets” or current “Regulatory liabilities” on Alliant Energy’s and IPL’s Consolidated Balance Sheets until they are reflected in future billings to customers. The fuel adjustment clause rules applicable to IPL’s Iowa retail jurisdiction currently do not contain a provision for recovery of emission control chemical costs to flow through the fuel adjustment clause. The fuel adjustment clause rules applicable to IPL’s Minnesota retail jurisdiction currently do not contain a provision for recovery of emission allowance costs or emission control chemical costs through the fuel adjustment clause.

WPL Retail - The cost recovery mechanism applicable for WPL’s retail electric customers was changed effective January 2011. For periods prior to 2011, WPL’s retail electric rates approved by the PSCW were based on forecasts of forward-looking test periods and included estimates of future electric production fuel and purchased energy costs anticipated during the test period. During each electric retail rate proceeding, the PSCW set fuel monitoring ranges based on the forecasted electric production fuel and purchased energy costs used to determine retail base rates. If WPL’s actual electric production fuel and purchased energy costs fell outside these fuel monitoring ranges during the test period, WPL and/or other parties could request, and the PSCW could authorize, an adjustment to future retail electric rates based on changes in electric production fuel and purchased energy costs only. The PSCW could also authorize an interim retail rate increase. However, if the final retail rate increase was less than the monitoring range threshold required to be met in order to request interim rate relief, all interim rates collected would be subject to refund to WPL’s retail customers with interest at the current authorized return on common equity rate. In addition, if the final retail rate increase was less than the interim retail rate increase, WPL must refund any excess collections above the final rate increase to its retail customers with interest at the current authorized return on common equity rate.


122

Table of Contents


For periods after 2010, the cost recovery mechanism applicable for WPL’s retail electric customers continues to be based on forecasts of certain fuel-related costs expected to be incurred during forward-looking test year periods and fuel monitoring ranges determined by the PSCW during each electric retail rate proceeding or in a separate fuel cost plan approval proceeding. However, under the post-2010 cost recovery mechanism, if WPL’s actual fuel-related costs fall outside these fuel monitoring ranges during the test period, WPL is authorized to defer the incremental under-/over-collection of fuel costs that are outside the approved ranges. Deferral of under-collections are reduced to the extent actual return on common equity earned by WPL during the fuel cost plan year exceeds the most recently authorized return on common equity. Such deferred amounts are recognized in “Electric production fuel and energy purchases” in Alliant Energy’s and WPL’s Consolidated Statements of Income each period. The cumulative effects of these deferred amounts are recorded in current “Regulatory assets” or current “Regulatory liabilities” on Alliant Energy’s and WPL’s Consolidated Balance Sheets until they are reflected in future billings to customers. Effective January 2012, WPL’s retail fuel-related costs include costs for emission allowances and emission control chemicals. Prior to 2012, WPL’s retail fuel-related costs excluded costs for emission allowances and emission control chemicals.

IPL and WPL Wholesale - The cost recovery mechanisms applicable for IPL’s and WPL’s wholesale electric customers provide for subsequent adjustments to their electric rates for changes in electric production fuel and purchased energy costs. Changes in the under-/over-collection of these costs are recognized in “Electric production fuel and energy purchases” in the Consolidated Statements of Income each period. The cumulative effects of the under-/over-collection of these costs are recorded in current “Regulatory assets” or current “Regulatory liabilities” on the Consolidated Balance Sheets until they are reflected in future billings to customers. IPL’s and WPL’s costs for emission allowances and emission control chemicals are recovered through the capacity charge component of their respective wholesale formula rates.

Purchased Electric Capacity - Alliant Energy, IPL and WPL enter into PPAs to help meet the electricity demand of their customers. Certain of these PPAs include minimum payments for IPL’s and WPL’s rights to electric generating capacity, which are charged each period to “Purchased electric capacity” in the Consolidated Statements of Income. Purchased electric capacity expenses are recovered from IPL’s and WPL’s retail electric customers through changes in base rates determined during periodic rate proceedings. Purchased electric capacity expenses are recovered from IPL’s and WPL’s wholesale electric customers through annual changes in base rates determined by a formula rate structure.

Electric Transmission Service - Alliant Energy, IPL and WPL incur costs for the transmission of electricity to their customers and charge these costs each period to “Electric transmission service” in the Consolidated Statements of Income. Electric transmission service expenses are recovered from WPL’s retail electric customers through changes in base rates determined during periodic rate proceedings. Electric transmission service expenses are recovered from IPL’s and WPL’s wholesale electric customers through annual changes in base rates determined by a formula rate structure.

Prior to 2011, electric transmission service expenses were recovered from IPL’s retail electric customers through changes in base rates determined during periodic rate proceedings. In January 2011, the IUB approved IPL’s proposal to implement a transmission cost rider for recovery of electric transmission service expenses with certain conditions. The IUB stipulated that the rider would be implemented on a pilot basis conditional upon IPL’s agreement to not file an electric base rate case for three years from the date of the order and meet additional reporting requirements. In January 2011, IPL accepted the transmission cost rider with the IUB’s conditions. Effective February 2011, electric transmission service expenses were removed from base rates and billed to IPL’s Iowa electric retail customers through the transmission cost rider. This new cost recovery mechanism provides for subsequent adjustments to electric rates charged to Iowa electric retail customers for changes in electric transmission service expenses. Changes in the under-/over-collection of these costs each period are recognized in “Electric transmission service” in Alliant Energy’s and IPL’s Consolidated Statements of Income. The cumulative effects of the under-/over-collection of these costs are recorded in current “Regulatory assets” or current “Regulatory liabilities” on Alliant Energy’s and IPL’s Consolidated Balance Sheets until they are reflected in future billings to customers.

Cost of Gas Sold - Alliant Energy, IPL and WPL incur costs for the purchase, transportation and storage of natural gas to serve their gas customers and charge the costs associated with the natural gas delivered to customers during each period to “Cost of gas sold” in the Consolidated Statements of Income. The tariffs for IPL’s and WPL’s retail gas customers provide for subsequent adjustments to their rates for changes in the cost of gas sold. Changes in the under-/over-collection of these costs are also recognized in “Cost of gas sold” in the Consolidated Statements of Income. The cumulative effects of the under-/over-collection of these costs are recorded in current “Regulatory assets” or current “Regulatory liabilities” on the Consolidated Balance Sheets until they are reflected in future billings to customers.


123

Table of Contents


Energy Efficiency Costs - Alliant Energy, IPL and WPL incur costs to fund energy efficiency programs and initiatives that help customers reduce their energy usage and charge these costs incurred each period to “Utility - Other operation and maintenance” in the Consolidated Statements of Income. Energy efficiency costs incurred by IPL are recovered from its retail electric and gas customers in Iowa through an additional tariff called an energy efficiency cost recovery (EECR) factor. EECR factors are revised annually and include a reconciliation to eliminate any under-/over-collection of energy efficiency costs from prior periods. Energy efficiency costs incurred by WPL are recovered from retail electric and gas customers through changes in base rates determined during periodic rate proceedings. Reconciliation of any under-/over-collection of energy efficiency costs from prior periods are also addressed in periodic rate proceedings. Changes in the under-/over-collection of energy efficiency costs each period are recognized in “Utility - Other operation and maintenance” in the Consolidated Statements of Income. The cumulative effects of the under-/over-collection of these costs are recorded in current “Regulatory assets” or current “Regulatory liabilities” on the Consolidated Balance Sheets until they are reflected in future billings to customers.

Refer to Notes 1(b) and 2 for additional information regarding these utility cost recovery mechanisms.

(i) Financial Instruments - Alliant Energy, IPL and WPL periodically use financial instruments for risk management purposes to mitigate exposures to fluctuations in certain commodity prices and transmission congestion costs. The fair value of those financial instruments that are determined to be derivatives are recorded as assets or liabilities on the Consolidated Balance Sheets. Derivative instruments representing unrealized gain positions are reported as derivative assets, and derivative instruments representing unrealized loss positions are reported as derivative liabilities at the end of each reporting period. Alliant Energy, IPL and WPL also have certain commodity purchase and sales contracts that have been designated, and qualify for, the normal purchase and sale exception and based on this designation, these contracts are accounted for on the accrual basis of accounting. Alliant Energy, IPL and WPL do not offset fair value amounts recognized for the right to reclaim cash collateral (receivable) or the obligation to return cash collateral (payable) against fair value amounts recognized for derivative instruments executed with the same counterparty under the same master netting arrangement. Refer to Note 1(b) for discussion of the recognition of regulatory assets and regulatory liabilities related to the unrealized losses and gains on IPL’s and WPL’s derivative instruments. Refer to Notes 12 and 13(f) for further discussion of derivatives and related credit risk, respectively.

(j) Pension and Other Postretirement Benefits Plans - Corporate Services sponsors various pension and other postretirement benefits plans. Some of the costs related to these plans are directly assigned to IPL and WPL for IPL’s and WPL’s non-bargaining employees who are participants in Corporate Services’ qualified and non-qualified defined benefit pension plans. The remaining costs related to Corporate Services’ plans are allocated to IPL, WPL, Resources and the parent company based on labor costs of plan participants. Refer to Note 6(a) for additional information on defined benefit pension plans costs directly assigned to IPL and WPL.

(k) Asset Impairments -
Property, Plant and Equipment of Regulated Operations - Property, plant and equipment of regulated operations are reviewed for possible impairment whenever events or changes in circumstances indicate all or a portion of the carrying value of the assets may be disallowed for rate-making purposes. If IPL or WPL are disallowed recovery of any portion of the carrying value of their regulated property, plant and equipment that has been recently completed or is probable of abandonment, an impairment charge is recognized equal to the amount of the carrying value that was disallowed. If IPL or WPL are disallowed a full or partial return on the carrying value of their regulated property, plant and equipment that has been recently completed or is probable of abandonment, an impairment charge is recognized equal to the difference between the carrying value and the present value of the future revenues expected from their regulated property, plant and equipment. Refer to Note 1(e) for discussion of impairments recorded by Alliant Energy and IPL in 2011 and 2010 related to IPL’s Whispering Willow - East wind project.

Property, Plant and Equipment of Non-regulated Operations and Intangible Assets - Property, plant and equipment of non-regulated operations and intangible assets are reviewed for possible impairment whenever events or changes in circumstances indicate the carrying value of the assets may not be recoverable. Impairment is indicated if the carrying value of an asset exceeds its undiscounted future cash flows. An impairment charge is recognized equal to the amount the carrying value exceeds the asset’s fair value. Refer to Note 1(e) for discussion of an impairment recorded by Alliant Energy and WPL in 2011 related to WPL’s Green Lake and Fond du Lac Counties wind site.

Unconsolidated Equity Investments - If events or circumstances indicate the carrying value of investments accounted for under the equity method of accounting may not be recoverable, potential impairment is assessed by comparing the fair value of these investments to their carrying values as well as assessing if a decline in fair value is temporary. If an impairment is

124

Table of Contents


indicated, a charge is recognized equal to the amount the carrying value exceeds the investment’s fair value. Refer to Note 10(a) for additional discussion of investments accounted for under the equity method of accounting.

(l) Operating Leases - Historically, WPL had certain PPAs that provided it exclusive rights to all or a substantial portion of the output from the specific generating facility over the contract term and that had pricing factors that required accounting for the PPAs as operating leases. Costs associated with these PPAs were included in “Electric production fuel and energy purchases” and “Purchased electric capacity” in Alliant Energy’s and WPL’s Consolidated Statements of Income based on monthly payments for these PPAs. Monthly capacity payments related to one of these PPAs was higher during the peak demand period from May 1 through September 30 and lower in all other periods during each calendar year. These seasonal differences in capacity charges were consistent with expected market pricing trends and the expected usage of energy from the facility. In December 2012, WPL purchased Riverside, which terminated the Riverside PPA. The Riverside PPA was accounted for as an operating lease.

(m) Emission Allowances - Emission allowances are granted by the EPA at zero cost and permit the holder of the allowances to emit certain gaseous by-products of fossil fuel combustion, including SO2 and NOx. Unused emission allowances may be bought and sold or carried forward to be utilized in future years. Purchased emission allowances are recorded as intangible assets at their original cost and evaluated for impairment as long-lived assets to be held and used. Emission allowances allocated to or acquired by Alliant Energy, IPL or WPL are held primarily for consumption.

Amortization of emission allowances is based upon a weighted average cost for each category of vintage year utilized during the reporting period and is recorded in “Electric production fuel and energy purchases” in the Consolidated Statements of Income as follows (in millions):
 Alliant Energy IPL WPL
 2012 2011 2010 2012 2011 2010 2012 2011 2010
Amortization expense$— $13.4 $16.5 $— $12.9 $13.1 $— $0.5 $3.4

No amortization expense for emission allowances held at December 31, 2012 is currently expected to be recorded during 2013 through 2017.

Cash inflows and outflows related to sales and purchases of emission allowances are recorded as investing activities in the Consolidated Statements of Cash Flows. Refer to Note 1(b) for information regarding regulatory assets related to emission allowances.

(n) AROs - The fair value of any retirement costs associated with an asset for which Alliant Energy, IPL and WPL have a legal obligation is recorded as a liability with an equivalent amount added to the asset cost when an asset is placed in service or when sufficient information becomes available to determine a reasonable estimate of the fair value of future retirement costs. The fair value of AROs is generally determined using discounted cash flow analyses. The liability is accreted to its present value each period and the capitalized cost is depreciated over the useful life of the related asset. Accretion and depreciation expenses related to AROs for IPL’s and WPL’s regulated operations are recorded to regulatory assets on the Consolidated Balance Sheets. Upon regulatory approval to recover IPL’s AROs expenditures, its regulatory assets are amortized to depreciation and amortization expense in Alliant Energy’s and IPL’s Consolidated Statements of Income over the same time period that IPL’s customer rates are increased to recover the ARO expenditures. Effective January 1, 2013, WPL’s regulatory assets related to AROs are being recovered as a component of depreciation rates included in the most recent depreciation study approved by the PSCW in its May 2012 order. Accretion and depreciation expenses related to AROs for Alliant Energy’s non-regulated operations are recorded to depreciation and amortization expense in Alliant Energy’s Consolidated Statements of Income.

Upon settlement of the ARO liability, an entity settles the obligation for its recorded amount or incurs a gain or loss. Any gains or losses related to AROs for IPL’s and WPL’s regulated operations are recorded to regulatory liabilities or regulatory assets on the Consolidated Balance Sheets. Any gains or losses related to AROs for Alliant Energy’s non-regulated operations are recorded to non-regulated operating revenue or non-regulated operation and maintenance expense in Alliant Energy’s Consolidated Statements of Income.

Refer to Note 18 for additional discussion of AROs.


125

Table of Contents


(o) Debt Issuance and Retirement Costs - Alliant Energy, IPL and WPL defer and amortize debt issuance costs and debt premiums or discounts over the expected lives of respective debt issues, considering maturity dates and, if applicable, redemption rights held by others. Alliant Energy’s non-regulated businesses and Corporate Services expense in the period of retirement any unamortized debt issuance costs and debt premiums or discounts on debt retired early. Refer to Note 1(b) for information on regulatory assets related to IPL’s and WPL’s debt retired early or refinanced.

(p) Allowance for Doubtful Accounts - Alliant Energy, IPL and WPL maintain allowances for doubtful accounts for estimated losses resulting from the inability of their customers to make required payments. Alliant Energy, IPL and WPL estimate the allowance for doubtful accounts based on historical write-offs, customer arrears and other economic factors within their service territories. Allowance for doubtful accounts at December 31 was as follows (in millions):
 Alliant Energy IPL WPL
 2012 2011 2012 2011 2012 2011
Customer (a)
$1.3
 
$1.6
 
$—
 
$—
 
$1.3
 
$1.6
Other2.7
 2.6
 0.7
 0.9
 0.5
 0.3
 
$4.0
 
$4.2
 
$0.7
 
$0.9
 
$1.8
 
$1.9

(a)
Refer to Note 4(a) for discussion of IPL’s sales of accounts receivable program.

(q) Variable Interest Entities (VIEs) - An entity is considered a VIE if its equity investors do not have sufficient equity at risk for the entity to finance its activities without additional subordinated financial support from other parties or its equity investors lack any one of the following three characteristics: (1) power, through voting rights or similar rights, to direct the activities of the entity that most significantly impact the entity’s economic performance; (2) the obligation to absorb expected losses of the entity; or (3) the right to receive expected benefits of the entity. The primary beneficiary of a VIE is required to consolidate the VIE. If Alliant Energy, IPL or WPL have a variable interest in a VIE, a determination as to who the primary beneficiary is must be assessed.

Historically, after making exhaustive efforts, Alliant Energy and WPL concluded they were unable to obtain the information necessary from the counterparty (a subsidiary of Calpine Corporation) for the Riverside Energy Center (Riverside)purchased power agreement (PPA) for Alliant Energy and WPL to determine whether the counterparty was a VIE and if WPL was the primary beneficiary. In December 2012, WPL purchased Riverside, thereby terminating the Riverside PPA. Refer to Note 1(e) for details of WPL’s purchase of Riverside.

(r) Cash Flows Presentation - Alliant Energy reports cash flows from continuing operations together with cash flows from discontinued operations in its Consolidated Statements of Cash Flows.

(s) Comprehensive Income (Loss) - In 2012, 2011 and 2010, Alliant Energy’s other comprehensive income was $0, $0.6 million and $0, respectively; therefore, its comprehensive income was substantially equal to its net income and its comprehensive income attributable to Alliant Energy common shareowners was substantially equal to its net income attributable to Alliant Energy common shareowners for such periods. In 2012, 2011 and 2010, IPL and WPL had no other comprehensive income; therefore their comprehensive income was equal to their net income and their comprehensive income available for common stock was equal to their earnings available for common stock for such periods.

(2) UTILITY RATE CASES
WPL’s Wisconsin Retail Electric and Gas Rate Case (2013/2014 Test Period) - In MayJuly 2012, WPL filed a retail base rate filing based on a forward-looking test period that included 2013 and 2014. The filing requested approval forreceived an order from the PSCW authorizing WPL to implement a decrease in annual base rates for WPL’s retail gas customers of $13 million effective January 1, 2013, followed by a freeze of such gas base rates through the end of 2014. The filingorder also requested authorityauthorized WPL to maintain customer base rates for WPL’sits retail electric customers at their current levels through the end of 2014. RecoveryThe order included provisions that require WPL to defer a portion of the costs for the acquisitionits earnings if its annual regulatory return on common equity exceeds certain levels during 2013 or 2014 and allows WPL to request a change in retail base rates during this period if its annual regulatory return on common equity falls below a certain level. As of Riverside, the SCR project at Edgewater Unit 5December 31, 2013, Alliant Energy and the scrubber and baghouse projects at Columbia Units 1 and 2 were included in the request. The recovery of the costsWPL did not record any material deferred amounts for these capital projects are offset by decreases in rate base resulting from increased net deferred tax liabilities, the impact of changes in the amortizations of regulatory assets and regulatory liabilities, and the reduction of capacity payments. In July 2012, WPL received an order from the PSCW authorizing WPL to implement its retail base rate filing as requested.provisions. Refer to Note 1(b)“Regulatory Assets” above for detailsdiscussion of increases to “Regulatory assets” on Alliant Energy’s and WPL’s Consolidated Balance Sheets and regulatory-related credits to “Utility - Other operation and maintenance” in Alliant Energy’s and WPL’s Consolidated Statements of Incomerecorded in 2012 as a result of the PSCW’s order authorizing WPL to recover previously incurred costs associated with the acquisition of a 25% interest in Edgewater Unit 5 and proposed CACPemission controls projects.


126

Table of Contents


WPL’s Wisconsin Retail Electric Rate Case (2011 Test Year) - In April 2010, WPL filed a request with the PSCW to reopen the rate order for its 2010 test year to increase annual retail electric rates for 2011. The request was based on a forward-looking test period that included 2011. The key drivers for the filing included recovery of investments in WPL’s Bent Tree - Phase I wind project and expiring deferral credits, partially offset by lower variable fuel expenses. In December 2010, WPL received an order from the PSCW authorizing an annual retail electric rate increase of $8 million, or approximately 1%, effective January 1, 2011. This $8 million increase in annual rates effective January 1, 2011, combined with the termination of the $9 million interim fuel-related rate increase after December 2010, resulted in a net $1 million decrease in annual retail electric rates charged to customers effective January 2011. Refer to “WPL’s Retail Fuel-related Rate Case (2010 Test Year)” below for additional details of the interim fuel-related rate increase implemented in 2010 and a $5 million reduction to the 2011 test year base rate increase for refunds owed to retail electric customers related to interim fuel cost collections in 2010.

IPL’s Iowa Retail Gas Rate Case (2011 Test Year) - In May 2012, IPL filed a request with the IUB to increase annual rates for its Iowa retail gas customers based on a 2011 historical test year as adjusted for certain known and measurable changes occurring up to 12 months after the commencement of the proceeding. The key drivers for the filing included recovery of capital investments since IPL’s last Iowa retail gas rate case filed in 2005. IPL’s request included a proposal to utilize regulatory liabilities to credit bills of Iowa retail gas customers to help mitigate the impact of the proposed final rate increase on such customers. IPL proposed to reduce customer bills utilizing a gas tax benefit rider over a three-year period by approximately $36 million in aggregate. In conjunction with the filing, IPL implemented an interim retail gas rate increase of $9 million, or approximately 3%, on an annual basis, effective June 4, 2012, without regulatory review and subject to refund pending determination of final rates from the request. In 2012, Alliant Energy and IPL recorded $5 million in gas revenues from IPL’s Iowa retail gas customers related to the interim retail gas rate increase. In AugustNovember 2012, the IUB approved a settlement agreement between IPL, the Iowa Office of Consumer AdvocateOCA and the Iowa Consumers Coalition filed a unanimous settlement proposal with the IUB addressing all issues among these parties related to this rate case. In November 2012, the IUB approved the settlement agreement between the parties. The parties agreed to, and the IUB approved, anIPL’s request, resulting in a final increase in annual rates for IPL’s Iowa retail gas customers of $11 million, or approximately 4%, effective January 10, 2013. The parties and the IUB also agreed to IPL’s proposed gas tax benefit rider. In 2013, Alliant Energy and IPL recorded $11 million in gas revenues from IPL’s Iowa retail gas customers related to the final retail gas rate increase. Refer to “Regulatory Liabilities” above for additional details on IPL’s gas tax benefit rider.

IPL’s Iowa Retail Electric Rate Case (2009 Test Year) -
Electric Tax Benefit Rider - In March 2010, IPL filed a request withFebruary 2013, the IUB issued an order allowing IPL to increase annual rates for itsrecognize a revenue requirement adjustment of $24 million in 2013 related to certain tax benefits from tax accounting method changes. The revenue requirement adjustment is recognized through the energy adjustment clause as a reduction of the credits on IPL’s Iowa retail electric customers based on a 2009 historical test year as adjusted for certain knowncustomers’ bills from the electric tax benefit rider. In 2013, Alliant Energy and measurable changes occurring up to 12 months after the commencementIPL recognized $24 million of the proceeding. The key driversrevenue requirement adjustment resulting in increases to electric revenues in their Consolidated Statements of Income. In December 2013, the IUB authorized IPL to reduce the billing credits on customers’ bills by $15 million in 2014 from tax benefits for the filing included recovery of investments inelectric tax benefit rider to recognize the Whispering Willow - East wind project and emission controls projects at Lansing Unit 4, and recovery of increased electric transmission service costs. In conjunction with the filing, IPL implemented an interim retail electric rate increase of $119 million, on an annual basis, effective March 20, 2010. In February 2011, IPL received an order from the IUB authorizing a final annual retail electric rate increase of $114 million, or approximately 10%. In 2011, IPL refunded $5 million, including interest, to its retail electric customers in Iowa. Refer to Note 1(b) for discussionrevenue requirement impact of the impacts of the IUB’s decisionchanges in this rate case on Alliant Energy’s and IPL’s regulatory assets and regulatory liabilities. Refer to Note 1(e) for discussion of the IUB’s decision in this rate case, which disallowed IPL a return on a portion of its Whispering Willow - East wind project costs.tax accounting methods.

IPL’s Minnesota Retail Electric Rate Case (2009 Test Year) - In May 2010, IPL filed a request with the MPUC to increase annual rates for its Minnesota retail electric customers based on a 2009 historical test year as adjusted for certain known and measurable items at the time of the filing. The key drivers for the filing included recovery of investments in the Whispering Willow - East wind project and emission controls projects at Lansing Unit 4, and recovery of increased electric transmission service costs. In conjunction with the filing, IPL implemented an interim retail rate increase of $14 million, on an annual basis, effective July 6, 2010. In November 2011, IPL received an order from the MPUC authorizing a final annual retail electric rate increase equivalent to $11 million. The final annual retail electric rate increase of $11 million includes $8

122



million of higher base rates, $2 million from the temporary renewable energy rider and $1 million from the utilization of regulatory liabilities to offset higher electric transmission service costs. Refer to Note 1(b)“Regulatory Assets” and “Regulatory Liabilities” above for discussion of changes to regulatory assets and regulatory liabilities in 2011 based on the MPUC’s decisions in this rate case. Refer to Note 1(e)3(a) for discussion of an impairment recognizedadjustments made by Alliant Energy and IPL in 2011 based onand 2013 to the MPUC’s decision regarding the recoverycarrying value of IPL’s Whispering Willow - East wind project, costs.based on amounts IPL determined were probable of being disallowed for recovery from its Minnesota retail electric customers.

WPL’s Retail Fuel-related Rate Case (2013Filing (2014 Test Year)- In June 2012,December 2013, WPL filed a request withreceived an order from the PSCW to decreaseauthorizing an annual rates for WPL’s retail electric customersrate increase of $19 million, or approximately 2%, effective January 1, 2014 to reflect anticipated decreasesincreases in retail fuel-related costs in 20132014 compared to the fuel-related cost estimates used to determine rates for 2012.2013. WPL’s 2014 fuel-related costs will be subject to deferral if they fall outside an annual bandwidth of plus or minus 2% of the approved annual forecasted fuel-related costs.

WPL’s Retail Fuel-related Rate Filing (2013 Test Year) - In December 2012, WPL received an order from the PSCW authorizing an annual retail electric rate decrease of $29 million, or approximately 3%, effective January 1, 2013.2013 to reflect anticipated decreases in retail fuel-related costs in 2013 compared to the fuel-related cost estimates used to determine rates for 2012. WPL’s 2013 fuel-related costs will be monitored usingwere subject to deferral if they fell outside an annual bandwidth of plus or minus 2%. of the approved annual forecasted fuel-related costs. Retail fuel-related costs incurred by WPL for 2013 did not fall outside of the fuel monitoring range.

127




WPL’s Retail Fuel-related Rate CaseFiling (2012 Test Year) - In May 2011, WPL filed a request with the PSCW to increase annual retail electric rates to recover anticipated increases in retail fuel-related costs in 2012 due to higher purchased power energy costs and emission compliance costs. In December 2011, WPL received an order from the PSCW authorizing an annual retail electric rate increase of $4 million, effective January 1, 2012 related to expected changesreflect anticipated increases in retail fuel-related costs in 2012 compared to the fuel-related cost estimates used to determine rates for 2012.2011. The 2012 fuel-related costs were subject to an annual bandwidth of plus or minus 2%. Retail fuel-related costs incurred by WPL forin 2012 were lower than retail fuel-related costs used to determine rates for such period resulting in an over-collection of fuel-related costs for 2012 of approximately $17 million (including $11 million outside the approved fuel monitoring level by more than the 2% bandwidth resulting in future refunds anticipated to be used to offset fuel-related cost changes in 2014. As of December 31,range for 2012, Alliant Energy and WPL recorded$11 million in “Regulatory liabilities” on theirAlliant Energy’s and WPL’s Consolidated Balance Sheets for refunds anticipated to be used to adjust fuel-related cost changes in 2014.

WPL’s Retail Fuel-related Rate Case (2010 Test Year)-as of December 31, 2012). In April 2010, WPL filed a request with the PSCW to increase annual retail electric rates to recover anticipated increased fuel-related costs in 2010.August 2013, WPL received approvalan order from the PSCW to implement an interim rate increase of $9refund $12 million,, on an annual basis, effective in June 2010. Updated annual 2010 fuel-related costs during the proceeding resulted in WPL no longer qualifying for a fuel-related rate increase for 2010. In December 2010, the PSCW issued an order authorizing no increase in including interest, to its retail electric ratescustomers for these over-collections, which WPL completed in 2010 related to fuel-related costs and required the interim rate increase to terminate at the end of 2010. The order also authorized WPL to use $5 million of the interim fuel rates collected in 2010 as a reduction to the 2011 test year base rate increase.September 2013.

Refer to Note 1(h)1(g) for further discussion of WPL’s fuel cost recovery mechanismmechanism.

(3) PROPERTY, PLANT AND EQUIPMENT
(a) Utility -
Electric Plant - At December 31, details of electric plant were as follows (in millions):
 Alliant Energy IPL WPL
 2013 2012 2013 2012 2013 2012
Plant in service:           
Generation (a)
$4,792.0
 
$4,798.9
 
$2,513.2
 
$2,393.0
 
$2,278.8
 
$2,405.9
Distribution4,179.6
 3,981.5
 2,311.2
 2,205.9
 1,868.4
 1,775.6
Other286.3
 290.3
 210.5
 216.3
 75.8
 74.0
Plant anticipated to be retired early (b)157.8
 
 
 
 157.8
 
 
$9,415.7
 
$9,070.7
 
$5,034.9
 
$4,815.2
 
$4,380.8
 
$4,255.5

(a)
The decrease in Alliant Energy’s and WPL’s generation portion of electric plant in service was primarily due to classifying Edgewater Unit 3 and Nelson Dewey Units 1 and 2 as “Plant anticipated to be retired early” as of December 31, 2013, which is discussed below. Partially offsetting this decrease at Alliant Energy, and contributing to the increase in IPL’s generation portion of electric plant in service, was an increase at IPL due to a scrubber and baghouse at George Neal Unit 4 being placed in service in the fourth quarter of 2013. As of December 31, 2013, the capitalized project costs for the George Neal Unit 4 scrubber and baghouse were $61 million.
(b)In 2013, WPL received approval from MISO to retire Edgewater Unit 3, and Nelson Dewey Units 1 and 2. WPL currently anticipates retiring these EGUs by December 31, 2015, contingent on completion of transmission network upgrades needed for system reliability. WPL is recovering the remaining net book value of these EGUs over a 10-year period beginning January 1, 2013 pursuant to a May 2012 PSCW order.


123



Wind Generation Projects -
Wind Site in Franklin County, Iowa - In 2007, IPL acquired approximately 500 MW of wind site capacity in Franklin County, Iowa. The initial 200 MW of the wind site was utilized for IPL’s Whispering Willow - East wind project, which began generating electricity in 2009. In 2011, IPL sold approximately 100 MW of wind site capacity to Resources for construction of a non-regulated wind project referred to as the Franklin County wind project. Future development of the balance of the wind site by IPL will depend on numerous factors such as RPS, environmental legislation, fossil fuel prices, technology advancements and transmission capabilities. As of December 31, 2013, Alliant Energy’s and IPL’s capitalized costs related to the remaining approximately 200 MW of wind site capacity in Franklin County, Iowa were $13 million and were recorded in “Other property, plant and equipment” on their Consolidated Balance Sheets.

IPL’s Whispering Willow - East Wind Project - In 2011, IPL received an order from the MPUC approving a temporary recovery rate for the Minnesota retail portion of its Whispering Willow - East wind project construction costs. In its order, the MPUC did not reach a conclusion as to the prudence of these project costs. The prudence of these project costs and the final recovery rate was addressed in a separate proceeding in 2013. The initial recovery rate approved by the MPUC was below the amount required by IPL to recover the Minnesota retail portion of its total project costs. Based on its interpretation of the order, IPL believed that it was probable it would not be allowed to recover the entire Minnesota retail portion of its project costs. IPL estimated the most likely outcome of the final rate proceeding would result in the MPUC effectively disallowing recovery of approximately $8 million of project costs out of a total of approximately $30 million of project costs allocated to the Minnesota retail jurisdiction. As a result, Alliant Energy and IPL recognized an $8 million impairment related to this probable disallowance, which was recorded as a reduction to electric plant and a charge to “Utility - Other operation and maintenance” in their Consolidated Statements of Income in 2011.

In December 2013, IPL received an order from the MPUC approving full cost recovery of the Minnesota retail portion of IPL’s Whispering Willow - East wind project construction costs effective January 1, 2013. As a result, Alliant Energy and IPL recognized a $7 million regulatory-related credit, which was recorded as an an increase to “Electric plant” on their Consolidated Balance Sheets and a decrease to “Utility - Other operation and maintenance” in their Consolidated Statements of Income in 2013.

Franklin County Wind Project - In 2008, Alliant Energy entered into a master supply agreement with Vestas to purchase 500 MW of wind turbine generator sets and related equipment. Alliant Energy utilized 401 MW of these wind turbine generator sets and related equipment to construct IPL’s Whispering Willow - East and WPL’s Bent Tree - Phase I wind projects. In 2011, IPL sold the remaining 99 MW of wind turbine generator sets and related equipment to Resources for $115.3 million, which represented IPL’s book value for progress payments to date for the wind turbine generator sets and related equipment and land rights in Franklin County, Iowa. In addition, Resources assumed the remaining progress payments to Vestas for the 99 MW of wind turbine generator sets and related equipment. The proceeds received by IPL are presented in investing activities in IPL’s Consolidated Statement of Cash Flows in 2011. Refer to Note 1(b)3(b) for further discussion of the Franklin County wind project.

Wind Site in Green Lake and Fond du Lac Counties in Wisconsin - In 2009, WPL purchased development rights to an approximate 100 MW wind site in Green Lake and Fond du Lac Counties in Wisconsin. Due to events in 2011 resulting in uncertainty regarding wind siting requirements in Wisconsin and increased risks with permitting this wind site, WPL determined it would be difficult to sell or effectively use the site for wind development. As a result, WPL recognized a $5 million impairment in 2011 for the amount of capitalized costs incurred for this site. Alliant Energy and WPL recorded the impairment as a reduction in other utility property, plant and equipment, and a charge to “Utility - Other operation and maintenance” in their Consolidated Statements of Income in 2011.

Environmental Compliance Plans Emission Controls Projects -
IPL’s George Neal Units 3 and 4 - In 2011, MidAmerican began installing scrubbers and baghouses at George Neal Units 3 and 4 to reduce SO2 and mercury emissions at the EGUs. The scrubbers and baghouses are expected to help meet requirements under the MATS Rule and CAIR or some alternative to CAIR that may be implemented. IPL owns a 28.0% and 25.695% interest in George Neal Units 3 and 4, respectively.

Construction of the scrubber and baghouse at George Neal Unit 4 was completed in the fourth quarter of 2013, which resulted in a transfer of the capitalized project costs from “Construction work in progress - Other” to “Electric plant” on Alliant Energy’s and IPL’s Consolidated Balance Sheets in 2013. As of December 31, 2013, the capitalized project costs consisted of capital expenditures of $57 million and AFUDC of $4 million for IPL’s allocated portion of the George Neal Unit 4 scrubber and baghouse.


124



Construction of the scrubber and baghouse at George Neal Unit 3 is expected to be completed in 2014. As of December 31, 2013, Alliant Energy and IPL recorded capitalized expenditures of $53 million and AFUDC of $2 million for IPL’s allocated portion of the George Neal Unit 3 scrubber and baghouse in “Construction work in progress - George Neal Generating Station Unit 3 emission controls” on their Consolidated Balance Sheets.

IPL’s Ottumwa Unit 1 - IPL is currently installing a scrubber and baghouse at Ottumwa Unit 1 to reduce SO2 and mercury emissions at the EGU. IPL owns a 48% interest in Ottumwa Unit 1. Construction began in the second quarter of 2012 and is expected to be completed in 2014. The scrubber and baghouse are expected to help meet requirements under the MATS Rule and CAIR or some alternative to CAIR that may be implemented. As of December 31, 2013, Alliant Energy and IPL recorded capitalized expenditures of $125 million and AFUDC of $10 million for IPL’s allocated portion of the scrubber and baghouse in “Construction work in progress - Ottumwa Generating Station Unit 1 emission controls” on their Consolidated Balance Sheets.

WPL’s Columbia Units 1 and 2 - WPL is currently installing scrubbers and baghouses at Columbia Units 1 and 2 to reduce SO2 and mercury emissions at the EGU. WPL owns a 46.2% interest in Columbia Units 1 and 2. Construction began in the first quarter of 2012 and is expected to be completed in 2014. The scrubbers and baghouses are expected to help meet requirements under the MATS Rule and CAIR or some alternative to CAIR that may be implemented. As of December 31, 2013, Alliant Energy and WPL recorded capitalized expenditures of $254 million and AFUDC of $11 million for WPL’s allocated portion of the scrubbers and baghouses in “Construction work in progress - Columbia Energy Center Units 1 and 2 emission controls” on their Consolidated Balance Sheets.

WPL’s Edgewater Unit 5 - In June 2013, WPL received an order from the PSCW approving WPL’s CA application to install a scrubber and baghouse at Edgewater Unit 5 to reduce SO2 and mercury emissions at the EGU. WPL currently expects to begin construction of the project in 2014 and place it in service in 2016. The scrubber and baghouse are expected to help meet requirements under the MATS Rule and CAIR or some alternative to CAIR that may be implemented.

Proposed Sales of IPL’s Minnesota Electric and Natural Gas Distribution Assets - In September 2013, IPL signed a definitive agreement to sell its Minnesota electric distribution assets to Southern Minnesota Energy Cooperative, a combined group of various neighboring electric cooperatives. Also in September 2013, IPL signed a definitive agreement to sell its Minnesota natural gas distribution assets to Minnesota Energy Resources Corporation, a subsidiary of Integrys Energy Group, Inc. Proceeds from the sales are expected to be approximately $128 million in aggregate, subject to customary closing adjustments. The proceeds are expected to reduce Alliant Energy’s and IPL’s future financing requirements. Pending all necessary federal and state regulatory approvals, including the MPUC, FERC and the IUB, the transactions are expected to be concluded in the second half of 2014.

The sales price of the assets expected to be sold, which primarily consist of property, plant and equipment, and working capital items, is expected to result in a modest gain. Any after-tax gain realized from the transaction may be subject to refund to IPL’s customers. As of December 31, 2013, IPL’s assets and liabilities included in the sale agreements did not meet the criteria to be classified as held for sale due to uncertainties in the regulatory approval process. The operating results of IPL’s Minnesota electric and natural gas distribution businesses also did not qualify as discontinued operations as of December 31, 2013.

The electric distribution asset sales agreement includes a wholesale power supply agreement between IPL and Southern Minnesota Energy Cooperative, which is subject to FERC approval. The agreement contains a five-year termination notice, which may not be given until the fifth anniversary of the effective date of the agreement, resulting in a minimum term of 10 years. The agreement remains in effect indefinitely, unless notice to terminate is provided by either party. This wholesale power supply agreement includes standardized pricing mechanisms that are detailed in IPL’s current tariffs accepted by FERC through wholesale rate case proceedings. IPL’s current return on common equity authorized by FERC related to its wholesale electric rates is 10.97%. As a result of IPL’s requirement to supply electricity to Southern Minnesota Energy Cooperative under the wholesale power supply agreement, the sale of the electric distribution assets is not expected to have a significant impact on IPL’s current generation plans or operating results.


125



AFUDC - AFUDC represents costs to finance construction additions including a return on equity component and cost of debt component as required by regulatory accounting. The concurrent credit for the amount of AFUDC capitalized is recorded as “Allowance for funds used during construction” in the Consolidated Statements of Income. The amount of AFUDC generated by equity and debt components was as follows (in millions):
 Alliant Energy IPL WPL
 2013 2012 2011 2013 2012 2011 2013 2012 2011
Equity
$20.3
 
$14.1
 
$7.6
 
$13.8
 
$5.2
 
$3.5
 
$6.5
 
$8.9
 
$4.1
Debt10.5
 7.8
 4.4
 7.2
 3.2
 2.3
 3.3
 4.6
 2.1
 
$30.8
 
$21.9
 
$12.0
 
$21.0
 
$8.4
 
$5.8
 
$9.8
 
$13.5
 
$6.2

AFUDC related to various construction projects was recognized in Alliant Energy’s, IPL’s and WPL’s Consolidated Statements of Income as follows (in millions):
 2013 2012 2011
IPL:     
Emission controls - Ottumwa Unit 1
$8.0
 
$2.0
 
$—
Emission controls - George Neal Units 3 and 45.1
 0.9
 
Other7.9
 5.5
 5.8
 21.0
 8.4
 5.8
WPL:     
Emission controls - Columbia Units 1 and 27.2
 3.9
 0.2
Emission controls - Edgewater Unit 5
 7.2
 2.9
Other2.6
 2.4
 3.1
 9.8
 13.5
 6.2
Alliant Energy
$30.8
 
$21.9
 
$12.0

(b) Non-regulated and Other - The non-regulated and other property, plant and equipment on Alliant Energy’s Consolidated Balance Sheets includes the following:

Franklin County Wind Project - The Franklin County wind project was placed into service in 2012 and is depreciated using the straight-line method over a 30-year period. As of December 31, 2013, Alliant Energy recorded $142 million in “Non-regulated Generation property, plant and equipment” on its Consolidated Balance Sheet related to the wind project. Refer to Note 3(a) for further discussion of the wind project, Note 5(d) for discussion of variousa cash grant received in 2013 related to the wind project and Note 13 for discussion of the wind project AROs.

Sheboygan Falls - Sheboygan Falls was placed into service in 2005 and is depreciated using the straight-line method over a 35-year period. As of December 31, 2013, Alliant Energy recorded $107 million in “Non-regulated Generation property, plant and equipment” on its Consolidated Balance Sheet related to Sheboygan Falls.

Other - The property, plant and equipment related to Corporate Services, Transportation and other rate matters.non-regulated investments is recorded in “Alliant Energy Corporate Services, Inc. and other property, plant and equipment” on Alliant Energy’s Consolidated Balance Sheets and is depreciated using the straight-line method over periods ranging from 5 to 30 years.


126



(4) JOINTLY-OWNED ELECTRIC UTILITY PLANT
Under joint ownership agreements with other utilities, IPL and WPL have undivided ownership interests in jointly-owned coal-fired EGUs. Each of the respective owners is responsible for the financing of its portion of the construction costs. KWh generation and operating expenses are primarily divided between the joint owners on the same basis as ownership. IPL’s and WPL’s shares of expenses from jointly-owned coal-fired EGUs are included in the corresponding operating expenses (e.g., electric production fuel, other operation and maintenance, etc.) in their Consolidated Statements of Income. Refer to Note 2 for further discussion of cost of removal obligations. Information relative to IPL’s and WPL’s ownership interest in these jointly-owned coal-fired EGUs at December 31, 2013 was as follows (dollars in millions):
       Accumulated Construction Cost of Removal
 In-service Ownership Electric Provision for Work in Obligations Included in
 Dates Interest % Plant Depreciation Progress Regulatory Liabilities
IPL           
Ottumwa Unit 11981 48.0% 
$246.8
 
$125.3
 
$154.6
 
$12.8
George Neal Unit 41979 25.7% 180.4
 70.1
 0.6
 11.8
George Neal Unit 31975 28.0% 59.5
 40.3
 59.1
 5.7
Louisa Unit 11983 4.0% 35.2
 19.7
 0.1
 3.2
     521.9
 255.4
 214.4
 33.5
WPL           
Columbia Units 1-21975-1978 46.2% 255.5
 159.4
 270.5
 10.1
Edgewater Unit 41969 68.2% 93.2
 51.6
 0.7
 2.3
     348.7
 211.0
 271.2
 12.4
Alliant Energy    
$870.6
 
$466.4
 
$485.6
 
$45.9

(5) RECEIVABLES
(a) Sales of Accounts Receivable - IPL maintains a Receivables Agreement whereby it may sell its customer accounts receivables, unbilled revenues and certain other accounts receivables to a third party through wholly-owned and consolidated special purpose entities. In March 2014, the purchase commitment from the third party to which it sells its receivables expires. IPL is currently pursuing the extension of the purchase commitment. IPL accounts for sales of receivables under the Receivables Agreement as transfers of financial assets. In exchange for the receivables sold, IPL receives cash proceeds from the third party (based on seasonal limits up to $180 million, including $150 million as of December 31, 2013), and deferred proceeds recorded in accounts receivable on Alliant Energy’s and IPL’s Consolidated Balance Sheets. IPL makes monthly payments to the third party of an amount that varies based on interest rates, the length of time the cash proceeds remain outstanding and the total amount under commitment by the third party. IPL has historically used proceeds from the sales of receivables to maintain flexibility in its capital structure, take advantage of favorable short-term rates and finance a portion of its cash needs.

Deferred proceeds are payable by the third party solely from the collections of the receivables, but only after paying any required expenses to the third party and the collection agent. Corporate Services acts as collection agent for the third party and receives a fee for collection services. IPL believes that the allowance for doubtful accounts related to its sales of receivables is a reasonable approximation of any credit risk of the customers that generated the receivables. Therefore, the carrying amount of deferred proceeds, after being reduced by the allowance for doubtful accounts, approximates the fair value of the deferred proceeds due to the short-term nature of the collection period. The carrying amount of deferred proceeds represents IPL’s maximum exposure to loss related to the receivables sold.

As of December 31, 2013 and 2012, IPL sold $238.0 million and $198.4 million aggregate amounts of receivables, respectively. IPL’s maximum and average outstanding cash proceeds, and costs incurred related to the sales of accounts receivable program, were as follows (in millions):
 2013 2012 2011
Maximum outstanding aggregate cash proceeds (based on daily outstanding balances)$170.0 $160.0 $160.0
Average outstanding aggregate cash proceeds (based on daily outstanding balances)105.9 119.8 118.1
Costs incurred1.1 1.4 1.5


127



As of December 31, the attributes of IPL’s receivables sold under the Receivables Agreement were as follows (in millions):
 2013 2012
Customer accounts receivable$151.6 $118.2
Unbilled utility revenues86.2 77.4
Other receivables0.2 2.8
Receivables sold238.0 198.4
Less: cash proceeds (a)29.0 130.0
Deferred proceeds209.0 68.4
Less: allowance for doubtful accounts5.5 1.6
Fair value of deferred proceeds$203.5 $66.8
Outstanding receivables past due$21.5 $16.1

(a)Changes in cash proceeds are presented in “Sales of accounts receivable” in operating activities in Alliant Energy’s and IPL’s Consolidated Statements of Cash Flows.

Refer to Note 9(b) for discussion of IPL’s issuance of $250.0 million of senior debentures in 2013. A portion of the proceeds from the issuance was used by IPL in 2013 to reduce cash proceeds received from the third party under its sales of accounts receivable program.

Additional attributes of IPL’s receivables sold under the Receivables Agreement were as follows (in millions):
 2013 2012 2011
Collections reinvested in receivables$1,880.8 $1,771.6 $1,795.7
Credit losses, net of recoveries11.9 10.0 10.9

(b) Whiting Petroleum Tax Sharing Agreement - Prior to an IPO of Whiting Petroleum in 2003, Alliant Energy and Whiting Petroleum entered into a tax separation and indemnification agreement pursuant to which Alliant Energy and Whiting Petroleum made tax elections. These tax elections had the effect of increasing the tax basis of the assets of Whiting Petroleum’s consolidated tax group based on the sales price of Whiting Petroleum’s shares in the IPO. The increase in the tax basis of the assets was included in income in Alliant Energy’s U.S. federal income tax return for the calendar year 2003. Pursuant to the tax separation and indemnification agreement, Whiting Petroleum will be obligated to pay Resources 90% of any tax benefits realized annually due to the additional tax deductions from the increase in tax basis for years ending on or prior to December 31, 2013. Such tax benefits will generally be calculated by comparing Whiting Petroleum’s actual taxes to the taxes that would have been owed by Whiting Petroleum had the increase in basis not occurred. In 2014, Whiting Petroleum will be obligated to pay Resources the present value of the remaining tax benefits assuming all such tax benefits will be realized in future years. At the IPO closing date, Alliant Energy recorded a receivable from Whiting Petroleum based on the estimated present value of the payments expected from Whiting Petroleum. At December 31, the carrying values of this receivable were recorded on Alliant Energy’s Consolidated Balance Sheets as follows (in millions):
 2013 2012
Prepayments and other
$25
 
$2
Deferred charges and other
 25
 
$25
 
$27

(c) Advances for Customer Energy Efficiency Projects - WPL and IPL have historically offered energy efficiency programs to certain of their customers in Wisconsin and Minnesota, respectively. The energy efficiency programs have provided low-cost financing to help customers identify, purchase and install energy efficiency improvement projects. The customers repay WPL and IPL with monthly payments over a term up to 5 years. The advances for and collections of customer energy efficiency projects are presented as investing activities in the Consolidated Statements of Cash Flows. The current portion and non-current portion of outstanding advances for customer energy efficiency projects are recorded in “Accounts receivable - other” and “Deferred charges and other,” respectively, on the Consolidated Balance Sheets. At December 31, outstanding advances for customer energy efficiency projects were as follows (in millions):

128



 Alliant Energy IPL WPL
 2013 2012 2013 2012 2013 2012
Current portion
$8.2
 
$14.9
 
$0.4
 
$0.8
 
$7.8
 
$14.1
Non-current portion7.3
 13.0
 0.2
 0.6
 7.1
 12.4
 
$15.5
 
$27.9
 
$0.6
 
$1.4
 
$14.9
 
$26.5

(d) Franklin County Wind Project Cash Grant - The ARRA provides incentives for wind projects placed into service between January 1, 2009 and December 31, 2012. In accordance with the ARRA, Alliant Energy filed an application with the U.S. Department of the Treasury in February 2013 requesting a cash grant for a portion of the qualifying project expenditures of the Franklin County wind project that was placed into service in December 2012. Alliant Energy elected to record the anticipated cash grant as a reduction of the carrying value of the Franklin County wind project, which resulted in a decrease of $62 million in “Property, plant and equipment - Non-regulated Generation” on its Consolidated Balance Sheet in 2012. In 2013, Alliant Energy received the proceeds from the cash grant, resulting in a $62.4 million decrease in “Accounts receivable - other” on its Consolidated Balance Sheets in 2013. The grant proceeds received by Alliant Energy are presented in investing activities in Alliant Energy’s Consolidated Statements of Cash Flows. The grant proceeds were used by Alliant Energy to reduce short-term borrowings incurred during the construction of the wind project.

(3)(6) INVESTMENTS
(a) Unconsolidated Equity Investments - Alliant Energy’s and WPL’s unconsolidated investments accounted for under the equity method of accounting are as follows (in millions):
 Ownership Carrying Value at  
 Interest at December 31, Equity (Income) / Loss
 December 31, 2013 2013 2012 2013 2012 2011
Alliant Energy           
ATC (a)16% 
$272.1
 
$257.0
 
($42.7) 
($41.3) 
($37.8)
Wisconsin River Power Company50% 7.0
 7.3
 (1.0) (0.8) (0.9)
OtherVarious 2.3
 2.3
 
 0.8
 (0.6)
   
$281.4
 
$266.6
 
($43.7) 
($41.3) 
($39.3)
WPL           
ATC (a)16% 
$272.1
 
$257.0
 
($42.7) 
($41.3) 
($37.8)
Wisconsin River Power Company50% 7.0
 7.3
 (1.0) (0.8) (0.9)
   
$279.1
 
$264.3
 
($43.7) 
($42.1) 
($38.7)

(a)
Alliant Energy and WPL have the ability to exercise significant influence over ATC’s financial and operating policies through their participation on ATC’s Board of Directors. Refer to Note 18 for information regarding related party transactions with ATC.

Summary aggregate financial information from the financial statements of these investments is as follows (in millions):
 Alliant Energy WPL
 2013 2012 2011 2013 2012 2011
Operating revenues
$634
 
$611
 
$575
 
$634
 
$611
 
$575
Operating income334
 326
 307
 334
 325
 308
Net income248
 234
 218
 250
 239
 226
As of December 31:           
Current assets86
 67
   84
 66
  
Non-current assets3,553
 3,321
   3,527
 3,292
  
Current liabilities383
 252
   383
 252
  
Non-current liabilities1,682
 1,652
   1,681
 1,651
  


129



(b) Cash Surrender Value of Life Insurance Policies - Alliant Energy, IPL and WPL have various life insurance policies that cover certain current and former employees and directors. At December 31, the cash surrender value of these investments was as follows (in millions):
 Alliant Energy IPL WPL
 2013 2012 2013 2012 2013 2012
Cash surrender value$46.5 $50.5 $17.3 $16.0 $12.3 $12.1

(7) COMMON EQUITY
Common Share Activity - A summary of Alliant Energy’s common stock activity was as follows:
 2013 2012 2011
Shares outstanding, January 1110,987,400
 111,018,821
 110,893,901
Equity-based compensation plans (Note 12(b))
(23,374) 20,195
 164,400
Other(20,357) (51,616) (39,480)
Shares outstanding, December 31110,943,669
 110,987,400
 111,018,821

At December 31, 2013, Alliant Energy had a total of 6.9 million shares available for issuance in the aggregate, pursuant to its OIP, Shareowner Direct Plan and 401(k) Savings Plan.

Shareowner Rights Agreement - Alliant Energy has established an amended and restated Shareowner Rights Agreement. The rights under this agreement will only become exercisable if a person or group has acquired, or announced an intention to acquire, 15% or more of Alliant Energy’s outstanding common stock. Each right will initially entitle registered shareowners to purchase from Alliant Energy one-half of one share of Alliant Energy’s common stock. The rights will be exercisable at an initial price of $110.00 per full share, subject to adjustment. If any shareowner acquires 15% or more of the outstanding common stock of Alliant Energy, each right (subject to limitations) will entitle its holder to purchase, at the right’s then current exercise price, a number of common shares of Alliant Energy or of the acquirer having a market value at the time of twice the right’s per full share exercise price. Alliant Energy’s Board of Directors is authorized to reduce the 15% ownership threshold to not less than 10%. The amended and restated Shareowner Rights Agreement expires in December 2018.

Dividend Restrictions - Alliant Energy does not have any significant common stock dividend restrictions. IPL and WPL each have common stock dividend restrictions based on applicable regulatory limitations. IPL also has common stock dividend restrictions based on the terms of its outstanding preferred stock. As of December 31, 2013, IPL and WPL were in compliance with all such dividend restrictions.

IPL is restricted from paying common stock dividends to its parent company, Alliant Energy, if for any past or current dividend period, dividends on its preferred stock have not been paid, or declared and set apart for payment. IPL has paid all dividends on its preferred stock through 2013.

IPL’s most significant regulatory limitation on distributions to its parent company requires IPL to obtain IUB approval for a reasonable utility capital structure if its actual 13-month average common equity ratio (calculated on a financial basis consistent with IPL’s rate cases) falls below 42% of total capitalization. As of December 31, 2013, IPL’s amount of retained earnings that were free of dividend restrictions was $494 million.

Currently, WPL’s most significant regulatory limitation on distributions to its parent company is included in an order issued by the PSCW in 2012 that prohibits WPL from paying annual common stock dividends in excess of $119 million in 2014 if WPL’s actual 13-month average common equity ratio (calculated on a financial basis consistent with WPL’s rate cases) would fall below 51.03%. As of December 31, 2013, WPL’s amount of retained earnings that were free of dividend restrictions was $119 million for 2014.

Restricted Net Assets of Subsidiaries - IPL and WPL do not have regulatory authority to lend or advance any amounts to their parent company. As of December 31, the amount of net assets of IPL and WPL that were not available to be transferred to their parent company, Alliant Energy, in the form of loans, advances or cash dividends without the consent of IPL’s and WPL’s regulatory authorities was as follows (in billions):
 2013 2012
IPL
$1.2
 
$1.1
WPL1.5
 1.5

130




Capital Transactions With Subsidiaries - IPL, WPL and Resources paid common stock dividends and repayments of capital to their parent company, Alliant Energy, as follows (in millions):
 IPL WPL Resources
 2013 2012 2011 2013 2012 2011 2013 2012 2011
Common stock dividends
$128.1
 
$122.9
 
$73.4
 
$116.3
 
$112.0
 
$112.1
 
$—
 
$—
 
$—
Repayments of capital
 
 100.7
 
 
 
 95.0
 
 
Total distributions from common equity
$128.1
 
$122.9
 
$174.1
 
$116.3
 
$112.0
 
$112.1
 
$95.0
 
$—
 
$—

IPL, WPL, Resources and Corporate Services received capital contributions from their parent company, Alliant Energy, as follows (in millions):
 2013 2012 2011
IPL
$120.0
 
$110.0
 
$54.0
WPL
 90.0
 25.0
Corporate Services
 30.0
 
Resources
 
 65.0

(8) REDEEMABLE PREFERRED STOCK
Information related to the carrying value of cumulative preferred stock, net at December 31 was as follows (dollars in millions):
Liquidation Preference/ Stated Value Shares Outstanding Series Redemption (none are mandatorily redeemable) 2013 2012
IPL (16,000,000 shares authorized):      
$25 8,000,000 5.1% On or after March 15, 2018 
$200.0
 
$—
$25 6,000,000 8.375% (a) 
 150.0
Less: discount       
 (4.9)
        200.0
 145.1
WPL (16,000,000 and 3,750,000 shares authorized as of December 31, 2013 and 2012, respectively):  
$25 to $100 1,049,225 4.40-6.50% (b) 
 60.0
Alliant Energy       
$200.0
 
$205.1

(a)In 2013, IPL redeemed all 6,000,000 outstanding shares of its 8.375% cumulative preferred stock for $150 million plus accrued and unpaid dividends to the redemption date. Alliant Energy and IPL recorded a $5 million charge in 2013 related to this transaction in “Preferred dividend requirements” in their Consolidated Statements of Income.
(b)In 2013, WPL redeemed all 1,049,225 outstanding shares of its 4.40% through 6.50% cumulative preferred stock for $61 million plus accrued and unpaid dividends to the redemption date. Alliant Energy and WPL recorded a $1 million charge in 2013 related to this transaction in “Preferred dividend requirements” in their Consolidated Statements of Income.

IPL - In 2013, IPL issued 8,000,000 shares of 5.1% cumulative preferred stock and received proceeds of $200 million. The proceeds were used by IPL to redeem its 8.375% cumulative preferred stock, reduce commercial paper classified as long-term debt by $40 million and for other general corporate purposes. Alliant Energy and IPL incurred $5 million of issuance costs related to this transaction, which were recorded as a reduction of “Additional paid-in capital” on Alliant Energy’s and IPL’s Consolidated Balance Sheets in 2013. On or after March 15, 2018, IPL may, at its option, redeem the 5.1% cumulative preferred stock for cash at a redemption price of $25 per share plus accrued and unpaid dividends up to the redemption date.

The current articles of incorporation of IPL contain a provision that grants the holders of its cumulative preferred stock voting rights to elect two members of IPL’s Board of Directors if preferred dividends equal to six or more quarterly dividend requirements (whether or not consecutive) are in arrears. Such voting rights would not provide the holders of IPL’s preferred stock control of the decision on redemption of IPL’s preferred stock and could not force IPL to exercise its call option. The articles of incorporation of IPL in effect as of December 31, 2012 contained similar provisions as the current articles of incorporation of IPL. Therefore, IPL’s 5.1% and 8.375% cumulative preferred stock were presented in total equity on Alliant Energy’s and IPL’s Consolidated Balance Sheets in a manner consistent with noncontrolling interests.

WPL - The articles of organization of WPL in effect as of December 31, 2012 contained a provision that granted the holders of its preferred stock voting rights to elect a majority of WPL’s Board of Directors if preferred dividends equal to the annual

131



dividend requirements were in arrears. The exercise of such voting rights would have provided the holders of WPL’s preferred stock control of the decision on redemption of WPL’s preferred stock and could have forced WPL to exercise its call option. Therefore, the contingent control right and the embedded call option caused WPL’s preferred stock to be presented outside of total equity on Alliant Energy’s and WPL’s Consolidated Balance Sheets at December 31, 2012 in a manner consistent with temporary equity.

Refer to Note 14 for information on the fair value of cumulative preferred stock.

(9) DEBT
(a) Short-term Debt - Alliant Energy and its subsidiaries maintain committed bank lines of credit to provide short-term borrowing flexibility and back-stop liquidity for commercial paper outstanding. At December 31, 2013, Alliant Energy’s short-term borrowing arrangements included three revolving credit facilities totaling $1 billion ($300 million for Alliant Energy at the parent company level, $300 million for IPL and $400 million for WPL), which expire in December 2017. Information regarding commercial paper classified as short-term debt and back-stopped by the credit facilities was as follows (dollars in millions):
 Alliant Energy IPL WPL
 2013 2012 2013 2012 2013 2012
December 31           
Commercial paper:           
Amount outstanding$279.4 $217.5 $— $26.3 $183.7 $86.6
Weighted average interest rates0.2% 0.4% N/A 0.4% 0.1% 0.3%
Weighted average remaining maturity4 days 11 days N/A 2 days 6 days 19 days
Available credit facility capacity (a)$720.6 $732.5 $300.0 $223.7 $216.3 $313.4
 Alliant Energy IPL WPL
 2013 2012 2013 2012 2013 2012
For the year ended           
Maximum amount outstanding
(based on daily outstanding balances)
$293.9 $217.5 $26.3 $35.4 $190.0 $86.6
Average amount outstanding
(based on daily outstanding balances)
$210.5 $99.8 $1.3 $5.9 $123.5 $11.7
Weighted average interest rates0.2% 0.4% 0.4% 0.4% 0.2% 0.3%

(a)
At December 31, 2012, Alliant Energy’s and IPL’s available credit facility capacities reflect outstanding commercial paper classified as both short- and long-term debt. Refer to Note 9(b) for further discussion of $50.0 million of commercial paper outstanding at December 31, 2012 classified as long-term debt on Alliant Energy’s and IPL’s Consolidated Balance Sheets. Alliant Energy and its subsidiaries did not have any commercial paper classified as long-term debt as of December 31, 2013.

Alliant Energy’s, IPL’s and WPL’s credit facility agreements each contain a financial covenant, which requires the entities to maintain certain debt-to-capital ratios in order to borrow under the credit facilities. The required debt-to-capital ratios compared to the actual debt-to-capital ratios at December 31, 2013 were as follows:
 Alliant Energy IPL WPL
RequirementLess than 65% Less than 58% Less than 58%
Actual51% 45% 50%

The debt component of the capital ratios includes long- and short-term debt (excluding non-recourse debt and hybrid securities to the extent the total carrying value of such hybrid securities does not exceed 15% of consolidated capital of the applicable borrower), capital lease obligations, certain letters of credit, guarantees of the foregoing and new synthetic leases. Unfunded vested benefits under qualified pension plans are not included in the debt-to-capital ratios. The equity component of the capital ratios excludes accumulated other comprehensive income (loss).


132



(b) Long-Term Debt - Long-term debt, net as of December 31 was as follows (dollars in millions):
 2013 2012
 Alliant Energy IPL WPL Alliant Energy IPL WPL
Senior Debentures:           
3.3%, due 2015
$150.0
 
$150.0
 
$—
 
$150.0
 
$150.0
 
$—
5.875%, due 2018100.0
 100.0
 
 100.0
 100.0
 
7.25%, due 2018250.0
 250.0
 
 250.0
 250.0
 
3.65%, due 2020200.0
 200.0
 
 200.0
 200.0
 
5.5%, due 202550.0
 50.0
 
 50.0
 50.0
 
6.45%, due 2033100.0
 100.0
 
 100.0
 100.0
 
6.3%, due 2034125.0
 125.0
 
 125.0
 125.0
 
6.25%, due 2039300.0
 300.0
 
 300.0
 300.0
 
4.7%, due 2043 (a)250.0
 250.0
 
 
 
 
 1,525.0
 1,525.0
 
 1,275.0
 1,275.0
 
Debentures:           
5%, due 2019250.0
 
 250.0
 250.0
 
 250.0
4.6%, due 2020150.0
 
 150.0
 150.0
 
 150.0
2.25%, due 2022250.0
 
 250.0
 250.0
 
 250.0
6.25%, due 2034100.0
 
 100.0
 100.0
 
 100.0
6.375%, due 2037300.0
 
 300.0
 300.0
 
 300.0
7.6%, due 2038250.0
 
 250.0
 250.0
 
 250.0
 1,300.0
 
 1,300.0
 1,300.0
 
 1,300.0
Pollution Control Revenue Bonds:           
5%, due 201438.4
 38.4
 
 38.4
 38.4
 
5%, due 2014 and 201524.5
 
 24.5
 24.5
 
 24.5
5.375%, due 201514.6
 
 14.6
 14.6
 
 14.6
 77.5
 38.4
 39.1
 77.5
 38.4
 39.1
Other:           
Commercial paper, 0.4% at December 31, 2012 (b)
 
 
 50.0
 50.0
 
4% senior notes, due 2014250.0
 
 
 250.0
 
 
Term loan credit agreement through 2014, 1% at December 31, 201360.0
 
 
 60.0
 
 
3.45% senior notes, due 202275.0
 
 
 75.0
 
 
5.06% senior secured notes, due 2014 to 202460.5
 
 
 61.9
 
 
Other, 1% at December 31, 2013, due 2014 to 20250.4
 
 
 0.5
 
 
 445.9
 
 
 497.4
 50.0
 
Subtotal3,348.4
 1,563.4
 1,339.1
 3,149.9
 1,363.4
 1,339.1
Current maturities(358.5) (38.4) (8.5) (1.5) 
 
Unamortized debt (discount) and premium, net(12.1) (5.0) (7.0) (11.8) (3.9) (7.6)
Long-term debt, net
$2,977.8
 
$1,520.0
 
$1,323.6
 
$3,136.6
 
$1,359.5
 
$1,331.5

(a)In 2013, IPL issued $250.0 million of 4.7% senior debentures due 2043. The proceeds from the issuance were used by IPL to reduce cash proceeds received from its sales of accounts receivable program, reduce commercial paper classified as long-term debt by $65 million and for general working capital purposes.
(b)At December 31, 2012, $50.0 million of commercial paper was recorded in “Long-term debt, net” on Alliant Energy’s and IPL’s Consolidated Balance Sheets due to the existence of long-term credit facilities that back-stop this commercial paper balance, along with Alliant Energy’s and IPL’s intent and ability to refinance these balances on a long-term basis.

Five-Year Schedule of Debt Maturities - At December 31, 2013, debt maturities for 2014 to 2018 were as follows (in millions):
 2014 2015 2016 2017 2018
IPL
$38
 
$150
 
$—
 
$—
 
$350
WPL9
 31
 
 
 
Resources62
 2
 3
 4
 5
Alliant Energy parent company250
 
 
 
 
Alliant Energy
$359
 
$183
 
$3
 
$4
 
$355

133




At December 31, 2013, there were no significant sinking fund requirements related to the long-term debt on the Consolidated Balance Sheets.

Indentures - Alliant Energy maintains an indenture related to its 4% senior notes due 2014. IPL maintains an indenture related to its senior debentures due 2015 through 2043. WPL maintains an indenture related to its debentures due 2019 through 2038. Sheboygan Power, Resources’ wholly-owned subsidiary, maintains an indenture related to the issuance of its 5.06% senior secured notes due 2014 to 2024.

Optional Redemption Provisions - Alliant Energy and its subsidiaries have certain issuances of long-term debt that contain optional redemption provisions which, if elected by the issuer at its sole discretion, could require material redemption premium payments by the issuer. The redemption premium payments under these optional redemption provisions are variable and dependent on applicable U.S. Treasury rates at the time of redemption. At December 31, 2013, the debt issuances that contained these optional redemption provisions included all of IPL’s outstanding senior debentures, all of WPL’s outstanding debentures, Alliant Energy’s senior notes due 2014, Corporate Services’ senior notes due 2022 and Sheboygan Power’s senior secured notes due 2014 to 2024.

Security Provisions - Sheboygan Power’s 5.06% senior secured notes due 2014 to 2024 are secured by Sheboygan Falls and related assets.

Unamortized Debt Issuance Costs - Unamortized debt issuance costs recorded in “Deferred charges and other” on the Consolidated Balance Sheets at December 31 were as follows (in millions):
 Alliant Energy IPL WPL
 2013 2012 2013 2012 2013 2012
Unamortized debt issuance costs$19.9 $19.5 $9.7 $8.0 $9.0 $9.8

Carrying Amount and Fair Value of Long-term Debt - Refer to Note 14 for information on the carrying amount and fair value of long-term debt outstanding at December 31, 2013 and 2012.

(10) LEASES
(a) Operating Leases - Alliant Energy, IPL and WPL have entered into various agreements related to property, plant and equipment rights that are accounted for as operating leases. Historically, Alliant Energy’s and WPL’s most significant operating lease related to the Riverside PPA, which contained fixed rental payments related to capacity and contingent rental payments related to the energy portion (actual MWhs) of the PPA. Costs associated with the Riverside PPA were included in “Electric production fuel and energy purchases” and “Purchased electric capacity” in Alliant Energy’s and WPL’s Consolidated Statements of Income based on monthly payments for the Riverside PPA. In December 2012, WPL purchased Riverside, thereby terminating the Riverside PPA. Rental expenses associated with operating leases were as follows (in millions):
Alliant Energy IPL WPLAlliant Energy IPL WPL
2012 2011 2010 2012 2011 2010 2012 2011 20102013 2012 2011 2013 2012 2011 2013 2012 2011
Operating lease rental expenses (excluding contingent rentals)
$69
 
$70
 
$70
 
$4
 
$4
 
$4
 
$64
 
$63
 
$63

$9
 
$69
 
$70
 
$4
 
$4
 
$4
 
$5
 
$64
 
$63
Contingent rentals (primarily related to certain PPAs)6
 5
 5
 
 1
 1
 5
 4
 4
Contingent rentals (primarily related to Riverside PPA)
 6
 5
 
 
 1
 
 5
 4

$75
 
$75
 
$75
 
$4
 
$5
 
$5
 
$69
 
$67
 
$67

$9
 
$75
 
$75
 
$4
 
$4
 
$5
 
$5
 
$69
 
$67

At December 31, 20122013, future minimum operating lease payments, excluding contingent rentals, were as follows (in millions):
 2013 2014 2015 2016 2017 Thereafter Total
Alliant Energy
$9
 
$13
 
$5
 
$3
 
$2
 
$24
 
$56
IPL4
 3
 3
 2
 2
 16
 30
WPL4
 9
 2
 1
 
 
 16

Alliant Energy’s and WPL’s future minimum operating lease payments in the above table include synthetic leases related to the financing of certain utility railcars. The entities that lease these assets to Alliant Energy and WPL do not meet consolidation requirements and are not included on Alliant Energy’s or WPL’s Consolidated Balance Sheets. Alliant Energy and WPL have guaranteed the residual value of the related assets, which total $4 million in the aggregate. The guarantees extend through the maturity of each respective underlying lease with remaining terms up to three years. Residual value guarantee amounts have been included in the future minimum operating lease payments.
 2014 2015 2016 2017 2018 Thereafter Total
Alliant Energy
$10
 
$9
 
$3
 
$3
 
$2
 
$22
 
$49
IPL4
 3
 2
 2
 1
 15
 27
WPL6
 5
 1
 1
 
 
 13


128134



(b) Capital Leases -
WPL - In 2005, WPL entered into a 20-year agreement with Resources’ Non-regulated Generation business to lease the Sheboygan Falls, Energy Facility (SFEF), with an option for two lease renewal periods thereafter. The lease became effective in 2005 when SFEFSheboygan Falls began commercial operation. WPL is responsible for the operation of SFEFSheboygan Falls and has exclusive rights to its output. In 2005, the PSCW approved this affiliated lease agreement with initial monthly lease payments of approximately $1.3 million. The lease payments were based on a 50% debt to capital ratio, a return on equity of 10.9%, a cost of debt based on the cost of senior notes issued by Resources’ Non-regulated Generation business in 2005 and certain costs incurred to construct the facility. In accordance with its order approving the lease agreement, the PSCW reserved the right to review the capital structure, return on equity and cost of debt every five years from the date of the order. No revisions to the lease werehave been made in 2010.since its inception. The capital lease asset is amortized using the straight-line method over the 20-year lease term. Since the inception of the lease in 2005, WPL’s retail and wholesale rates have included recovery of the monthly SFEFSheboygan Falls lease payments. SFEFSheboygan Falls lease expenses were included in WPL’s Consolidated Statements of Income as follows (in millions):
2012 2011 20102013 2012 2011
Interest expense
$11.3
 
$11.7
 
$12.0

$10.9
 
$11.3
 
$11.7
Depreciation and amortization6.2
 6.2
 6.2
6.2
 6.2
 6.2

$17.5
 
$17.9
 
$18.2

$17.1
 
$17.5
 
$17.9

At December 31, 20122013, WPL’s estimated future minimum capital lease payments for SFEFSheboygan Falls were as follows (in millions):
 2013 2014 2015 2016 2017 Thereafter Total Less: amount representing interest Present value of minimum capital lease payments
SFEF$15 $15 $15 $15 $15 $113 $188 $85 $103
 2014 2015 2016 2017 2018 Thereafter Total Less: amount representing interest Present value of minimum capital lease payments
Sheboygan Falls$15 $15 $15 $15 $15 $98 $173 $74 $99

(4) RECEIVABLES
(a) Sales of Accounts Receivable - IPL maintains a Receivables Purchase and Sale Agreement (Agreement) whereby it may sell its customer accounts receivables, unbilled revenues and certain other accounts receivables to a third-party financial institution through wholly-owned and consolidated special purpose entities. In March 2012, IPL extended through March 2014 the purchase commitment from the third-party financial institution to which it sells its receivables. IPL accounts for sales of receivables under the Agreement as transfers of financial assets. In exchange for the receivables sold, IPL receives cash proceeds from the third-party financial institution (based on seasonal limits up to $180 million including $150 million as of December 31, 2012), and deferred proceeds recorded in “Accounts receivable” on Alliant Energy’s and IPL’s Consolidated Balance Sheets. IPL makes monthly payments to the third-party financial institution of an amount that varies based on interest rates, the length of time the cash proceeds remain outstanding and the total amount under commitment by the third-party financial institution. IPL has historically used proceeds from the sales of receivables to maintain flexibility in its capital structure, take advantage of favorable short-term rates and finance a portion of its cash needs.

Deferred proceeds are payable by the third-party financial institution solely from the collections of the receivables, but only after paying any required expenses to the third-party financial institution and the collection agent. Corporate Services acts as collection agent for the third-party financial institution and receives a fee for collection services. IPL believes that the allowance for doubtful accounts related to its sales of receivables is a reasonable approximation of any credit risk of the customers that generated the receivables. Therefore, the carrying amount of deferred proceeds, after being reduced by the allowance for doubtful accounts, approximates the fair value of the deferred proceeds due to the short-term nature of the collection period. The carrying amount of deferred proceeds represents IPL’s maximum exposure to loss related to the receivables sold.

As of December 31, 2012 and 2011, IPL sold $198.4 million and $195.3 million aggregate amounts of receivables, respectively. IPL’s maximum and average outstanding cash proceeds, and costs incurred related to the sales of accounts receivable program were as follows (in millions):
 2012 2011 2010
Maximum outstanding aggregate cash proceeds (based on daily outstanding balances)$160.0 $160.0 $160.0
Average outstanding aggregate cash proceeds (based on daily outstanding balances)119.8 118.1 78.1
Costs incurred1.4 1.5 1.4


129



As of December 31, the attributes of IPL’s receivables sold under the Agreement were as follows (in millions):
 2012 2011
Customer accounts receivable$118.2 $122.4
Unbilled utility revenues77.4 65.4
Other receivables2.8 7.5
Receivables sold198.4 195.3
Less: cash proceeds (a)130.0 140.0
Deferred proceeds68.4 55.3
Less: allowance for doubtful accounts1.6 1.6
Fair value of deferred proceeds$66.8 $53.7
Outstanding receivables past due$16.1 $15.9

(a)Changes in cash proceeds are recorded in “Sales of accounts receivable” in operating activities in Alliant Energy’s and IPL’s Consolidated Statements of Cash Flows.

Additional attributes of IPL’s receivables sold under the Agreement were as follows (in millions):
 2012 2011 2010
Collections reinvested in receivables$1,771.6 $1,795.7 $1,354.2
Credit losses, net of recoveries10.0 10.9 7.9

(b) Whiting Petroleum Corporation (Whiting) Tax Sharing Agreement - Prior to an initial public offering (IPO) of Whiting in 2003, Alliant Energy and Whiting entered into a tax separation and indemnification agreement pursuant to which Alliant Energy and Whiting made tax elections. These tax elections had the effect of increasing the tax basis of the assets of Whiting’s consolidated tax group based on the sales price of Whiting’s shares in the IPO. The increase in the tax basis of the assets was included in income in Alliant Energy’s U.S. federal income tax return for the calendar year 2003. Pursuant to the tax separation and indemnification agreement, Whiting will be obligated to pay Resources 90% of any tax benefits realized annually due to the additional tax deductions from the increase in tax basis for years ending on or prior to December 31, 2013. Such tax benefits will generally be calculated by comparing Whiting’s actual taxes to the taxes that would have been owed by Whiting had the increase in basis not occurred. In 2014, Whiting will be obligated to pay Resources the present value of the remaining tax benefits assuming all such tax benefits will be realized in future years. At the IPO closing date, Alliant Energy recorded a receivable from Whiting based on the estimated present value of the payments expected from Whiting. At December 31, 2012 and 2011, the carrying value of this receivable was $27 million and $27 million, respectively. The current and non-current portions of this receivable are recorded in “Prepayments and other” and “Deferred charges and other,” respectively, on Alliant Energy’s Consolidated Balance Sheets.

(c) Advances for Customer Energy Efficiency Projects - WPL and IPL offer energy efficiency programs to certain of their customers in Wisconsin and Minnesota, respectively. The energy efficiency programs provide low-cost financing to help customers identify, purchase and install energy efficiency improvement projects. The customers repay WPL and IPL with monthly payments over a term up to 5 years. The advances for and collections of customer energy efficiency projects are recorded as investing activities in the Consolidated Statements of Cash Flows. The current portion and non-current portion of outstanding advances for customer energy efficiency projects are recorded in “Accounts receivable - other” and “Deferred charges and other,” respectively, on the Consolidated Balance Sheets. At December 31, outstanding advances for customer energy efficiency projects were as follows (in millions):
 Alliant Energy IPL WPL
 2012 2011 2012 2011 2012 2011
Current portion
$14.9
 
$22.2
 
$0.8
 
$1.7
 
$14.1
 
$20.5
Non-current portion13.0
 28.2
 0.6
 1.7
 12.4
 26.5
 
$27.9
 
$50.4
 
$1.4
 
$3.4
 
$26.5
 
$47.0

(d) Franklin County Wind Project Cash Grant - The American Recovery and Reinvestment Act of 2009 (ARRA) provides incentives for wind projects placed into service between January 1, 2009 and December 31, 2012. In accordance with the ARRA, Alliant Energy filed an application with the U.S. Department of the Treasury in February 2013 requesting a cash grant for 30% of qualifying project expenditures of the Franklin County wind project that was placed into service in December 2012. Since the requirements to receive the cash grant were met in 2012, Alliant Energy recorded $62 million in “Accounts receivable - other” on its Consolidated Balance Sheet as of December 31, 2012 for the proceeds expected to be received in 2013 from the cash grant. Alliant Energy elected to record the anticipated cash grant as a reduction of the carrying value of the Franklin County wind project which resulted in a decrease of $62 million in “Non-regulated Generation

130



property, plant and equipment” on its Consolidated Balance Sheet as of December 31, 2012. In addition, 50% of the expected grant proceeds will generate a timing difference between the book and tax basis of the wind project and the other 50% of the expected grant will generate a permanent decrease in the tax basis of the wind project. Alliant Energy elected to account for the permanent decrease in the tax basis of the wind project as a reduction to the wind project’s carrying value. As a result, Alliant Energy recorded $20 million in long-term deferred income tax assets, with an offsetting decrease in “Non-regulated Generation property, plant and equipment” on its Consolidated Balance Sheet as of December 31, 2012 for the impact of the permanent decrease in the tax basis of the wind project.

The Budget Control Act of 2011 is currently scheduled to introduce automatic federal spending cuts, or sequestration, if a budget reduction plan does not occur by March 1, 2013. A portion of government grant funding may be subject to sequestration for any government grant that is not received by March 1, 2013. In the event of sequestration, Alliant Energy may reevaluate its options on electing the cash grant for the Franklin County wind project.

(5)(11) INCOME TAXES
Income Tax Expense (Benefit) - The components of “Income tax expense (benefit)” in the Consolidated Statements of Income were as follows (in millions):
Alliant Energy IPL WPLAlliant Energy IPL WPL
2012 2011 2010 2012 2011 2010 2012 2011 20102013 2012 2011 2013 2012 2011 2013 2012 2011
Current tax expense (benefit):                                  
Federal
($29.3) 
$58.6
 
$7.1
 
($7.7) 
$54.5
 
($22.4) 
$7.2
 
($4.3) 
$26.8

$4.4
 
($29.3) 
$58.6
 
$11.7
 
($7.7) 
$54.5
 
($5.7) 
$7.2
 
($4.3)
State11.6
 15.7
 10.6
 9.1
 20.0
 (7.6) (0.9) (7.1) 14.7
(3.6) 11.6
 15.7
 (0.1) 9.1
 20.0
 6.0
 (0.9) (7.1)
IPL’s electric tax benefit rider(48.3) (35.9) 
 (48.3) (35.9) 
 
 
 
IPL’s tax benefit riders(52.9) (48.3) (35.9) (52.9) (48.3) (35.9) 
 
 
Deferred tax expense (benefit):                                  
Federal157.8
 99.0
 165.5
 37.4
 (11.6) 100.9
 81.1
 111.3
 63.3
123.9
 157.8
 99.0
 20.0
 37.4
 (11.6) 92.7
 81.1
 111.3
State23.9
 (16.8) 4.9
 3.2
 (16.4) (2.8) 20.3
 19.0
 6.6
15.6
 23.9
 (16.8) (0.8) 3.2
 (16.4) 11.8
 20.3
 19.0
Production tax credits(24.8) (27.1) (11.2) (12.5) (12.3) (7.7) (12.3) (14.8) (3.5)(31.0) (24.8) (27.1) (14.4) (12.5) (12.3) (16.6) (12.3) (14.8)
Investment tax credits(1.7) (1.8) (1.8) (0.6) (0.6) (0.6) (1.1) (1.2) (1.2)(1.6) (1.7) (1.8) (0.6) (0.6) (0.6) (1.0) (1.1) (1.2)
Provision recorded as a change in uncertain tax positions:                                  
Current8.0
 16.3
 (84.0) 8.1
 16.6
 (41.1) (0.1) (0.3) (41.7)
 8.0
 16.3
 
 8.1
 16.6
 
 (0.1) (0.3)
Deferred(7.6) (38.3) 59.6
 (8.2) (17.6) 26.2
 0.6
 (20.7) 33.3
(0.4) (7.6) (38.3) 
 (8.2) (17.6) (0.4) 0.6
 (20.7)
Provision recorded as a change in accrued interest(0.2) (0.5) (3.0) (0.3) (0.3) (2.6) (0.2) 
 
(0.5) (0.2) (0.5) (0.8) (0.3) (0.3) 0.4
 (0.2) 

$89.4
 
$69.2
 
$147.7
 
($19.8) 
($3.6) 
$42.3
 
$94.6
 
$81.9
 
$98.3

$53.9
 
$89.4
 
$69.2
 
($37.9) 
($19.8) 
($3.6) 
$87.2
 
$94.6
 
$81.9


135



Income Tax Rates - The overall income tax rates shown in the following table were computed by dividing income tax expense (benefit) by income from continuing operations before income taxes.
Alliant Energy IPL WPLAlliant Energy IPL WPL
2012 2011 2010 2012 2011 2010 2012 2011 20102013 2012 2011 2013 2012 2011 2013 2012 2011
Statutory federal income tax rate35.0% 35.0% 35.0% 35.0% 35.0% 35.0% 35.0% 35.0% 35.0%35.0% 35.0% 35.0% 35.0% 35.0% 35.0% 35.0% 35.0% 35.0%
State income taxes, net of federal benefits5.7
 4.6
 4.8
 5.8
 4.3
 4.1
 5.5
 5.0
 5.1
5.7
 5.7
 4.6
 5.4
 5.8
 4.3
 6.0
 5.5
 5.0
State apportionment change due to announced sale of RMT3.5
 
 
 6.2
 
 
 2.7
 
 
IPL’s electric tax benefit rider(11.2) (8.8) 
 (37.0) (26.5) 
 
 
 
IPL’s tax benefit riders(12.1) (11.2) (8.8) (34.8) (37.0) (26.5) 
 
 
Production tax credits(5.8) (6.6) (2.4) (9.6) (9.1) (4.1) (4.7) (6.0) (1.4)(7.1) (5.8) (6.6) (9.5) (9.6) (9.1) (6.3) (4.7) (6.0)
Effect of rate-making on property-related differences(5.0) (2.0) (4.2) (14.2) (5.3) (8.9) (1.1) (0.5) (1.1)(6.0) (5.0) (2.0) (15.9) (14.2) (5.3) (0.8) (1.1) (0.5)
Adjustment of prior period taxes
 0.2
 0.3
 0.2
 1.7
 (1.8) (0.3) 
 2.0
(1.3) 
 0.2
 (3.6) 0.2
 1.7
 (0.1) (0.3) 
State apportionment change due to announced sale of RMT
 3.5
 
 
 6.2
 
 
 2.7
 
Wisconsin tax legislation
 (4.6) 
 
 
 
 
 
 

 
 (4.6) 
 
 
 
 
 
Federal Health Care Legislation
 
 1.6
 
 
 2.0
 
 
 1.2
Other items, net(1.4) (0.9) (2.8) (1.6) (2.8) (3.5) (0.8) (0.1) (1.6)(1.8) (1.4) (0.9) (1.5) (1.6) (2.8) (0.9) (0.8) (0.1)
Overall income tax rate20.8% 16.9% 32.3% (15.2%) (2.7%) 22.8% 36.3% 33.4% 39.2%12.4% 20.8% 16.9% (24.9%) (15.2%) (2.7%) 32.9% 36.3% 33.4%

IPL’s tax benefit riders - Alliant Energy’s and IPL’s effective income tax rates include the impact of reducing income tax expense with offsetting reductions to regulatory liabilities as a result of implementing the tax benefit riders. Refer to Note 2 for additional details on IPL’s tax benefit riders.

Production tax credits - Alliant Energy, IPL and WPL earn production tax credits from the wind projects they own and operate. Production tax credits are based on the electricity generated by each wind project during the first 10 years of operation. Alliant Energy has three wind projects that are currently generating production tax credits: WPL’s 68 MW Cedar Ridge wind project, which began generating electricity in 2008; IPL’s 200 MW Whispering Willow - East wind project, which began generating electricity in 2009; and WPL’s 201 MW Bent Tree - Phase I wind project, which began generating electricity in 2010. Production tax credits (net of state tax impacts) resulting from these wind projects are included in the table below (in millions). Production tax credits for the Whispering Willow - East and Bent Tree - Phase I wind projects increased in 2013 primarily due to higher levels of electricity output generated by the wind projects.
 Alliant Energy IPL WPL
 2013 2012 2011 2013 2012 2011 2013 2012 2011
Whispering Willow - East (IPL)
$14.4
 
$12.5
 
$12.3
 
$14.4
 
$12.5
 
$12.3
 
$—
 
$—
 
$—
Bent Tree - Phase I (WPL)12.5
 9.3
 9.3
 
 
 
 12.5
 9.3
 9.3
Cedar Ridge (WPL)4.1
 4.0
 4.5
 
 
 
 4.1
 4.0
 4.5
 31.0
 25.8
 26.1
 14.4
 12.5
 12.3
 16.6
 13.3
 13.8
Deferral
 (1.0) 1.0
 
 
 
 
 (1.0) 1.0
 
$31.0
 
$24.8
 
$27.1
 
$14.4
 
$12.5
 
$12.3
 
$16.6
 
$12.3
 
$14.8

Effect of rate-making on property-related differences - Alliant Energy’s and IPL’s income tax expense and benefits are impacted by certain property-related differences at IPL for which deferred tax is not recognized in the income statement pursuant to Iowa rate-making principles. In 2012, the IRS audit to review the change in accounting method for allocation of mixed service costs and repairs expenditures was completed. Prior to 2012, tax expense and benefits at IPL related to mixed service costs and repairs expenditures book-to-tax differences were recorded in the tax benefit riders regulatory liability. Upon completion of the IRS audit, the tax expenses and benefits related to mixed service costs and repairs expenditures at IPL were recorded as a component of income tax expense beginning in 2012 pursuant to Iowa rate-making principles. The impact of the change in tax accounting methods for allocation of mixed service costs and repairs expenditures at IPL resulted in an increase in tax benefits for Alliant Energy and IPL in 2012. In 2013, the primary factor contributing to the increase in the current tax benefits recorded for the effect of rate-making on property-related differences was increased repairs expenditures and the equity component of AFUDC at IPL. Refer to Note 2 for additional details on IPL’s tax benefit riders.


136



State apportionment change due to announced sale of RMT - Alliant Energy, IPL and WPL utilize state apportionment projections to record their deferred tax assets and liabilities each reporting period. Deferred tax assets and liabilities for temporary differences between the tax basis of assets and liabilities and the amounts reported in the consolidated financial statements are recorded utilizing currently enacted tax rates and estimates of future state apportionment rates expected to be in effect at the time the temporary differences reverse. These state apportionment projections are most significantly impacted by the estimated amount of revenues expected in the future from each state jurisdiction for Alliant Energy’s consolidated tax

131



group, groups, including both its regulated operations and its non-regulated operations. In the first quarter of 2012, Alliant Energy, IPL and WPL recorded $15 million, $8 million and $7 million, respectively, of deferred income tax expense due to changes in state apportionment projections caused by the plannedannounced sale of Alliant Energy’s RMT business.

IPL’s electric tax benefit rider - In January 2011, the IUB approved an electric tax benefit rider proposed by IPL, which utilizes tax-related regulatory liabilities to credit bills of Iowa retail electric customers beginning in February 2011 to help offset the impact of recent rate increases on such customers. These regulatory liabilities are related to tax benefits from tax accounting method changes for repairs expenditures, allocation of mixed service costs and allocation of insurance proceeds from the floods in 2008. Alliant Energy’s and IPL’s effective income tax rates in 2012 and 2011 include the impact of reducing income tax expense with offsetting reductions to regulatory liabilities as a result of implementing the electric tax benefit rider. Refer to Note 1(b) for additional details on IPL’s electric tax benefit rider.

Production tax credits - Alliant Energy, IPL and WPL earn production tax credits from the wind projects they own and operate. Production tax credits are based on the electricity generated by each wind project during the first 10 years of operation. Alliant Energy has three wind projects that are currently generating production tax credits: WPL’s 68 MW Cedar Ridge wind project, which began generating electricity in late 2008; IPL’s 200 MW Whispering Willow - East wind project, which began generating electricity in late 2009; and WPL’s 200 MW Bent Tree - Phase I wind project, which began generating electricity in late 2010. Production tax credits (net of state tax impacts) resulting from these wind projects were as follows (in millions):
 Alliant Energy IPL WPL
 2012 2011 2010 2012 2011 2010 2012 2011 2010
Whispering Willow - East (IPL)
$12.5
 
$12.3
 
$7.7
 
$12.5
 
$12.3
 
$7.7
 
$—
 
$—
 
$—
Bent Tree - Phase I (WPL) (a)9.3
 9.3
 1.2
 
 
 
 9.3
 9.3
 1.2
Cedar Ridge (WPL)4.0
 4.5
 3.3
 
 
 
 4.0
 4.5
 3.3
 25.8
 26.1
 12.2
 12.5
 12.3
 7.7
 13.3
 13.8
 4.5
Deferral (a)(1.0) 1.0
 (1.0) 
 
 
 (1.0) 1.0
 (1.0)
 
$24.8
 
$27.1
 
$11.2
 
$12.5
 
$12.3
 
$7.7
 
$12.3
 
$14.8
 
$3.5

(a)In 2010 and 2012, WPL deferred the retail portion of the production tax credits generated in 2010 from its Bent Tree - Phase I wind project pursuant to orders issued by the PSCW in December 2009 and July 2012, respectively. As a result of a regulatory assessment completed in 2011, the retail portion of the production tax credit deferral recorded in 2010 was reversed.

Effect of rate-making on property-related differences - Alliant Energy’s and IPL’s income tax expense and benefits are impacted by certain property-related differences at IPL for which deferred tax is not recognized in the income statement pursuant to Iowa rate-making principles. In 2012, the primary factor contributing to the increase in tax benefits recorded for the effect of rate-making on property-related differences is related to repair expenditures and the allocation of mixed service costs at IPL. The Internal Revenue Service (IRS) audit process was completed for allocation of mixed service costs with the income tax return for calendar year 2010 and repairs expenditures with the income tax return for calendar year 2011. The tax benefits and expenses from the change in accounting method for allocation of mixed service costs subsequent to 2010 and the tax benefits and expenses from the change in accounting method for repairs expenditures subsequent to 2011 are being recorded consistent with general Iowa rate-making principles, which resulted in an increase in tax benefits for Alliant Energy and IPL in 2012 of approximately $13 million. In 2011, a primary factor contributing to the decrease in tax benefits recorded for the effect of rate-making on property-related differences is related to a decrease in tax depreciation for IPL’s Whispering Willow - East wind project, which was placed into service in late 2009. The net income tax benefits related to tax depreciation for IPL’s Whispering Willow - East wind project were $3 million, $6 million and $12 million in 2012, 2011 and 2010, respectively.

Adjustment of prior period taxes - In 2010, the IRS completed the audits of Alliant Energy’s U.S. federal income tax returns for calendar years 2005 through 2008. The net impact of the completion of these audits and reversal of reserves for uncertain tax positions related to those audits resulted in Alliant Energy and IPL recognizing net income tax benefits in 2010 of $7 million and $5 million, respectively. These income tax benefits decreased Alliant Energy’s and IPL’s effective tax rate by 1.5% and 2.7%, respectively, and are included, along with other adjustments, in “Adjustment of prior period taxes” in the 2010 column of the above table. The net impact of the completion of the 2005 through 2008 audits and reversal of reserves for uncertain tax positions related to these audits did not have a material impact on WPL’s income tax rates for 2010.

Wisconsin tax legislation - In 2011, the 2011 Wisconsin Act 32 (Act 32) was enacted. The most significant provision of Act 32 for Alliant Energy authorizes combined groups to share net operating loss carryforwards that were incurred by group

132



members prior to January 1, 2009 and utilize these shared net operating losses over 20 years beginning after December 31, 2011. Based on this provision of Act 32, Alliant Energy anticipated its Wisconsin combined group would be able to fully utilize $368 million of Wisconsin net operating losses incurred by Alliant Energy and Resources prior to January 1, 2009 to offset future taxable income, and therefore, reversed previously recorded deferred tax asset valuation allowances related to state net operating loss carryforwards of $19 million in 2011.

Federal health care legislation - In 2010, the Patient Protection and Affordable Care Act, and Health Care and Education Reconciliation Act of 2010 (Federal Health Care Legislation) were enacted. One of the most significant provisions of the Federal Health Care Legislation for Alliant Energy, IPL and WPL requires a reduction in their tax deductions for retiree health care costs beginning in 2013, to the extent their drug expenses are reimbursed under the Medicare Part D retiree drug subsidy program. The reduction in the future deductibility of retiree health care costs accrued as of December 31, 2009 required Alliant Energy, IPL and WPL to record deferred income tax expense of $7 million, $4 million and $3 million, respectively, in 2010.

Deferred Tax Assets and Liabilities - The deferred income tax (assets) and liabilities included on Alliant Energy’s Consolidated Balance Sheets at December 31 arise from the following temporary differences (in millions):
2012 20112013 2012
DeferredDeferred Tax  DeferredDeferred Tax DeferredDeferred Tax  DeferredDeferred Tax 
Alliant EnergyTax AssetsLiabilitiesNet Tax AssetsLiabilitiesNetTax AssetsLiabilitiesNet Tax AssetsLiabilitiesNet
Property
$—

$2,143.8

$2,143.8
 
$—

$1,926.4

$1,926.4

$—

$2,316.3

$2,316.3
 
$—

$2,143.8

$2,143.8
Investment in ATC
104.3
104.3
 
93.8
93.8

120.7
120.7
 
104.3
104.3
Deferred portion of tax gain on IPL’s electric transmission assets sale
50.7
50.7
 
75.5
75.5
Net operating losses carryforward - state(46.8)
(46.8) (39.9)
(39.9)(35.3)
(35.3) (46.8)
(46.8)
Regulatory liability - IPL’s tax benefit riders(107.8)
(107.8) (144.6)
(144.6)
Federal credit carryforward(133.8)
(133.8) (107.4)
(107.4)(167.8)
(167.8) (133.8)
(133.8)
Regulatory liability - IPL’s tax benefit rider(144.6)
(144.6) (140.6)
(140.6)
Net operating losses carryforward - federal(306.0)
(306.0) (336.1)
(336.1)(251.9)
(251.9) (306.0)
(306.0)
Other(113.7)208.2
94.5
 (128.2)224.7
96.5
(108.9)210.7
101.8
 (113.7)258.9
145.2
Subtotal(744.9)2,507.0
1,762.1
 (752.2)2,320.4
1,568.2
(671.7)2,647.7
1,976.0
 (744.9)2,507.0
1,762.1
Valuation allowances1.9

1.9
 1.2

1.2



 1.9

1.9

($743.0)
$2,507.0

$1,764.0
 
($751.0)
$2,320.4

$1,569.4

($671.7)
$2,647.7

$1,976.0
 
($743.0)
$2,507.0

$1,764.0
 2012 2011
Other current assets
($170.2) 
($22.8)
Deferred income taxes1,934.2
 1,592.2
Total deferred tax liabilities
$1,764.0
 
$1,569.4
 2013 2012
Current deferred tax assets
($136.7) 
($170.2)
Non-current deferred tax liabilities2,112.7
 1,934.2
Total net deferred tax liabilities
$1,976.0
 
$1,764.0

The deferred income tax (assets) and liabilities included on IPL’s Consolidated Balance Sheets at December 31 arise from the following temporary differences (in millions):
2012 20112013 2012
DeferredDeferred Tax  DeferredDeferred Tax DeferredDeferred Tax  DeferredDeferred Tax 
IPLTax AssetsLiabilitiesNet Tax AssetsLiabilitiesNetTax AssetsLiabilitiesNet Tax AssetsLiabilitiesNet
Property
$—

$1,243.9

$1,243.9
 
$—

$1,134.1

$1,134.1

$—

$1,338.1

$1,338.1
 
$—

$1,243.9

$1,243.9
Pension and other postretirement benefits obligations
64.9
64.9
 
67.6
67.6
Deferred portion of tax gain on electric transmission assets sale
50.7
50.7
 
75.5
75.5
Federal credit carryforward(37.4)
(37.4) (25.0)
(25.0)(52.9)
(52.9) (37.4)
(37.4)
Regulatory liability - tax benefit riders(107.8)
(107.8) (144.6)
(144.6)
Net operating losses carryforward - federal(131.0)
(131.0) (154.4)
(154.4)(111.3)
(111.3) (131.0)
(131.0)
Regulatory liability - tax benefit rider(144.6)
(144.6) (140.6)
(140.6)
Other(70.4)31.9
(38.5) (76.5)42.7
(33.8)(64.0)103.2
39.2
 (70.4)147.5
77.1

($383.4)
$1,391.4

$1,008.0
 
($396.5)
$1,319.9

$923.4

($336.0)
$1,441.3

$1,105.3
 
($383.4)
$1,391.4

$1,008.0
 2012 2011
Other current assets
($79.3) 
($13.5)
Deferred income taxes1,087.3
 936.9
Total deferred tax liabilities
$1,008.0
 
$923.4
 2013 2012
Current deferred tax assets
($87.7) 
($79.3)
Non-current deferred tax liabilities1,193.0
 1,087.3
Total net deferred tax liabilities
$1,105.3
 
$1,008.0


133137




The deferred income tax (assets) and liabilities included on WPL’s Consolidated Balance Sheets at December 31 arise from the following temporary differences (in millions):
2012 20112013 2012
DeferredDeferred Tax  DeferredDeferred Tax DeferredDeferred Tax  DeferredDeferred Tax 
WPLTax AssetsLiabilitiesNet Tax AssetsLiabilitiesNetTax AssetsLiabilitiesNet Tax AssetsLiabilitiesNet
Property
$—

$793.3

$793.3
 
$—

$697.1

$697.1

$—

$859.1

$859.1
 
$—

$793.3

$793.3
Investment in ATC
104.3
104.3
 
93.8
93.8

120.7
120.7
 
104.3
104.3
Pension and other postretirement benefits obligations
46.4
46.4
 
49.6
49.6
Customer advances(9.6)
(9.6) (11.6)
(11.6)
Federal credit carryforward(39.4)
(39.4) (26.1)
(26.1)(57.1)
(57.1) (39.4)
(39.4)
Net operating losses carryforward - federal(142.2)
(142.2) (141.1)
(141.1)(106.9)
(106.9) (142.2)
(142.2)
Other(31.6)37.3
5.7
 (29.3)34.1
4.8
(37.6)75.6
38.0
 (41.2)83.7
42.5

($222.8)
$981.3

$758.5
 
($208.1)
$874.6

$666.5

($201.6)
$1,055.4

$853.8
 
($222.8)
$981.3

$758.5
 2012 2011
Other current assets
($85.6) 
($6.0)
Deferred income taxes844.1
 672.5
Total deferred tax liabilities
$758.5
 
$666.5
 2013 2012
Current deferred tax assets
($43.3) 
($85.6)
Non-current deferred tax liabilities897.1
 844.1
Total net deferred tax liabilities
$853.8
 
$758.5

Property -
BonusProperty-related differences were primarily related to accelerated depreciation, deductions -including bonus depreciation. In 2010,January 2013, the Small Business JobsATR Act of 2010 (SBJA) and the Tax Relief, Unemployment Insurance Reauthorization and Job Creation Act of 2010 (the Act) werewas enacted. The most significant provisions of the SBJA and theATR Act for Alliant Energy, IPL and WPL are related to the extension of bonus depreciation deductions for certain expenditures for property that are placed in servicewere incurred through December 31, 2012.2013. Based on capital projects expected to be placed into serviceproperty expenditures incurred in 2012,2013, Alliant Energy currently estimates its total bonus depreciation deductions to be claimed inon its 2012U.S. federal income tax return for calendar year 2013 will be approximately $284130 million ($6770 million for IPL and $11745 million for WPL and $100 million for Resources)WPL).

Deferred portion of tax gain on IPLs electric transmission asset saleInvestment in ATC - Alliant Energy and IPL recognizedWPL has a $527 million taxable gain upon the salepartial ownership interest in ATC, which has generated deferred tax liabilities primarily from tax depreciation deductions taken at ATC in excess of IPL’s electric transmission assetsbook depreciation. The increase in 2007. Under the provisions of the 2005 Energy Tax Act, Alliant Energy and IPL deferred its income tax obligation associated with the taxable gain over an eight-year period, with one-eighth of the income tax obligation recognizedliabilities in each of the years of 2007 through 2014.2013 was primarily due to bonus depreciation deductions estimated at ATC.

Carryforwards - At December 31, 20122013, tax carryforwards and associated deferred tax assets and expiration dates were estimated as follows (in millions):
Alliant EnergyTax Carryforwards 
Deferred
Tax Assets
 
Earliest
Expiration Date
Tax Carryforwards 
Deferred
Tax Assets
 
Earliest
Expiration Date
Federal net operating losses
$892
 
$306
 2029
$735
 
$252
 2029
State net operating losses871
 47
 2014686
 35
 2018
Federal tax credits136
 134
 2022170
 168
 2022
  
$487
   
$455
 
IPLTax Carryforwards 
Deferred
Tax Assets
 
Earliest
Expiration Date
Tax Carryforwards 
Deferred
Tax Assets
 
Earliest
Expiration Date
Federal net operating losses
$382
 
$131
 2029
$325
 
$111
 2029
State net operating losses254
 15
 2018189
 10
 2018
Federal tax credits38
 37
 202254
 53
 2022
  
$183
   
$174
 
WPLTax Carryforwards 
Deferred
Tax Assets
 
Earliest
Expiration Date
Tax Carryforwards 
Deferred
Tax Assets
 
Earliest
Expiration Date
Federal net operating losses
$414
 
$142
 2029
$312
 
$107
 2029
State net operating losses152
 8
 201899
 5
 2018
Federal tax credits40
 39
 202258
 57
 2022
  
$189
   
$169
 

134




At December 31, 20122013, Alliant Energy’s state net operating losses carryforwards had expiration dates ranging from 20142018 to 20322031 with 99%98% expiring after 20202024. At December 31, 20122013, IPL’s state net operating losses carryforwards had expiration dates ranging from 2018 to 20322031 with 99%95% expiring after 20212024. At December 31, 20122013, WPL’s state net operating losses carryforwards had expiration dates ranging from 2018 to 20322031 with 99%98% expiring after 20232024.


138



Regulatory liability - tax benefit riders - Refer to Note 2 for discussion of regulatory liabilities associated with IPL’s tax benefit riders.

Uncertain Tax Positions - A reconciliation of the beginning and ending amounts of uncertain tax positions, excluding interest, is as follows (in millions):
 Alliant Energy IPL WPL
 2012 2011 2010 2012 2011 2010 2012 2011 2010
Balance, January 1
$23.5
 
$66.7
 
$101.7
 
$10.9
 
$33.0
 
$58.4
 
$12.6
 
$33.7
 
$42.1
Additions based on tax positions related to the current year0.7
 0.7
 3.8
 
 0.1
 2.5
 0.7
 0.6
 1.3
Additions for tax positions of prior years (a)
 
 9.1
 
 
 3.8
 
 
 5.2
Reductions for tax positions of prior years (b)(23.5) (43.9) (31.8) (10.9) (22.2) (22.7) (12.6) (21.7) (8.0)
Settlements with taxing authorities
 
 (16.1) 
 
 (9.0) 
 
 (6.9)
Balance, December 31 (c)
$0.7
 
$23.5
 
$66.7
 
$—
 
$10.9
 
$33.0
 
$0.7
 
$12.6
 
$33.7
 Alliant Energy IPL WPL
 2013 2012 2011 2013 2012 2011 2013 2012 2011
Balance, January 1
$0.7
 
$23.5
 
$66.7
 
$—
 
$10.9
 
$33.0
 
$0.7
 
$12.6
 
$33.7
Additions based on tax positions related to the current year
 0.7
 0.7
 
 
 0.1
 
 0.7
 0.6
Reductions for tax positions of prior years (a)(0.7) (23.5) (43.9) 
 (10.9) (22.2) (0.7) (12.6) (21.7)
Balance, December 31
$—
 
$0.7
 
$23.5
 
$—
 
$—
 
$10.9
 
$—
 
$0.7
 
$12.6

(a)The additions for tax positions of prior years were related to positions taken by Alliant Energy, IPL and WPL on their federal and state tax returns related to the capitalization and dispositions of property.
(b)In 2012, the reductions for tax positions of prior years were due to the finalization of Alliant Energy’s federal income tax return audits for calendar years 2005 through 2009. In 2011, the reductions for tax positions of prior years were related to guidance published by the IRS clarifying the treatment of repairrepairs expenditures for electric distribution property. In 2010, the reductions of tax positions of prior years were primarily related to deductions taken by Alliant Energy, IPL and WPL on their federal and state tax returns that were settled under audit for amounts less than the reductions of tax positions recorded.
(c)

At December 31, 2013, 2012 and 2011,$0 and $10 million, respectively, of uncertain tax positions balances for both Alliant Energy and IPL included amounts recorded in regulatory liability accounts.

At December 31, 2012, 2011 and 2010, there were no penalties accrued related to uncertain tax positions. Additional information regarding uncertainpositions, and interest accrued and tax positions at favorably impacting future effective tax rates for continuing operations were not material. As of December 31, is as follows (in millions):
 Alliant Energy IPL WPL
 2012 2011 2010 2012 2011 2010 2012 2011 2010
Tax positions favorably impacting future effective tax rates for continuing operations
$0.7
 
$—
 
$—
 
$—
 
$—
 
$—
 
$0.7
 
$—
 
$—
Interest accrued
 0.4
 0.7
 
 0.4
 0.7
 
 
 
2013
, Alliant Energy, IPL and WPL do not expect to have material changes to their unrecognized tax benefits during the next 12 months.

Open tax years - Tax years that remain subject to the statute of limitations are as follows:
Major Jurisdiction Alliant Energy IPL WPL Alliant Energy IPL WPL
Consolidated federal income tax returns (a) 2005-2011 2005-2011 2005-2011 2010-2012 2010-2012 2010-2012
Consolidated Iowa income tax returns (b) 2005-2011 2005-2011 2005-2011 2010-2012 2010-2012 2010-2012
Wisconsin income tax returns 2005-2008 N/A 2005-2008
Wisconsin combined tax returns 2009-2011 2009-2011 2009-2011
Wisconsin combined tax returns (c) 2009-2012 2009-2012 2009-2012

(a)
20052010 through 20102012 federal tax returns are effectively settled.settled as a result of participation in the IRS Compliance Assurance Program, which allows Alliant Energy and the IRS to work together to resolve issues related to Alliant Energy’s current tax year before filing its federal income tax return. The statute of limitations for 20052010 through 2008 has been extended to June 30, 2013. The statute of limitations for 2009 through 20112012 federal tax returns expires three years from the extended due date of the federal tax return.their respective filing dates.
(b)2005The statute of limitations for the 2010 through 2008 are open2012 Iowa tax returns expires three years from their respective filing dates.
(c)The statute of limitations for federal audit adjustments only.the 2009 through 2012 Wisconsin combined tax returns expires four years from their respective filing dates.

Reasonably possible changes to uncertain tax positions in 2013 - In 2013, statutes of limitations will expire for Alliant Energy’s, IPL’s and WPL’s tax returns in multiple state jurisdictions. The expiration of the statutes of limitations will not have any impact on Alliant Energy’s, IPL’s and WPL’s uncertain tax positions in 2013. It is reasonably possible that Alliant Energy, IPL and WPL could have material changes to their unrecognized tax benefits during the next 12 months as a result of the expected issuance in 2013 of revenue procedures clarifying the treatment of repair expenditures for electric generation

135

Table of Contents


and gas distribution property. An estimate of the expected changes during the next 12 months cannot be determined at this time.

(6)(12) BENEFIT PLANS
(a) Pension and Other Postretirement Benefits Plans - Alliant Energy, IPL and WPL provide retirement benefits to substantially all of their employees through various qualified and non-qualified non-contributory defined benefit pension plans, and/or through defined contribution plans (including 401(k) savings plans). Alliant Energy’s, IPL’s and WPL’s qualified and non-qualified non-contributory defined benefit pension plans are currently closed to new hires. Benefits of the non-contributory defined benefit pension plans are based on the plan participant’s years of service, age and compensation. Benefits of the defined contribution plans are based on the plan participant’s years of service, age, compensation and contributions. Alliant Energy, IPL and WPL also provide certain defined benefit postretirement health care and life benefits to eligible retirees. In general, the retiree health care plans consist of fixed benefit subsidy structures and the retiree life insurance plans are non-contributory.


139

Table of Contents


Assumptions - The assumptions for defined benefit pension and other postretirement benefits plans at the measurement date of December 31 were as follows (Not Applicable (N/A)):follows:
Alliant EnergyDefined Benefit Pension Plans Other Postretirement Benefits PlansDefined Benefit Pension Plans Other Postretirement Benefits Plans
2012 2011 2010 2012 2011 20102013 2012 2011 2013 2012 2011
Discount rate for benefit obligations4.11% 4.86% 5.56% 3.82% 4.60% 5.25%4.97% 4.11% 4.86% 4.59% 3.82% 4.60%
Discount rate for net periodic cost4.86% 5.56% 5.80% 4.60% 5.25% 5.55%4.11% 4.86% 5.56% 3.82% 4.60% 5.25%
Expected rate of return on plan assets7.90% 7.90% 8.00% 7.50% 7.00% 6.90%7.60% 7.90% 7.90% 7.40% 7.50% 7.00%
Rate of compensation increase3.50%-4.50% 3.50%-4.50% 3.50%-4.50% 3.50% 3.50% 3.50%3.50%-4.50% 3.50%-4.50% 3.50%-4.50% 3.50% 3.50% 3.50%
Medical cost trend on covered charges:            
Initial trend rate (end of year)N/A N/A N/A 7.50% 8.00% 7.00%N/A N/A N/A 7.00% 7.50% 8.00%
Ultimate trend rateN/A N/A N/A 5.00% 5.00% 5.00%N/A N/A N/A 5.00% 5.00% 5.00%
IPLQualified Defined Benefit Pension Plan Other Postretirement Benefits PlansQualified Defined Benefit Pension Plan Other Postretirement Benefits Plans
2012 2011 2010 2012 2011 20102013 2012 2011 2013 2012 2011
Discount rate for benefit obligations4.20% 4.95% 5.70% 3.76% 4.60% 5.25%5.05% 4.20% 4.95% 4.55% 3.76% 4.60%
Discount rate for net periodic cost4.95% 5.70% 5.80% 4.60% 5.25% 5.55%4.20% 4.95% 5.70% 3.76% 4.60% 5.25%
Expected rate of return on plan assets7.90% 7.90% 8.00% 7.40% 7.30% 7.10%7.60% 7.90% 7.90% 7.50% 7.40% 7.30%
Rate of compensation increase3.50% 3.50% 3.50% 3.50% 3.50% 3.50%3.50% 3.50% 3.50% 3.50% 3.50% 3.50%
Medical cost trend on covered charges:  
Initial trend rate (end of year)N/A N/A N/A 7.50% 8.00% 7.00%N/A N/A N/A 7.00% 7.50% 8.00%
Ultimate trend rateN/A N/A N/A 5.00% 5.00% 5.00%N/A N/A N/A 5.00% 5.00% 5.00%
WPLQualified Defined Benefit Pension Plan Other Postretirement Benefits PlansQualified Defined Benefit Pension Plan Other Postretirement Benefits Plans
2012 2011 2010 2012 2011 20102013 2012 2011 2013 2012 2011
Discount rate for benefit obligations4.20% 4.95% 5.70% 3.81% 4.60% 5.25%5.05% 4.20% 4.95% 4.56% 3.81% 4.60%
Discount rate for net periodic cost4.95% 5.70% 5.80% 4.60% 5.25% 5.55%4.20% 4.95% 5.70% 3.81% 4.60% 5.25%
Expected rate of return on plan assets7.90% 7.90% 8.00% 7.00% 6.30% 6.30%7.60% 7.90% 7.90% 7.20% 7.00% 6.30%
Rate of compensation increase3.50% 3.50% 3.50% 3.50% 3.50% 3.50%3.50% 3.50% 3.50% 3.50% 3.50% 3.50%
Medical cost trend on covered charges:  
Initial trend rate (end of year)N/A N/A N/A 7.50% 8.00% 7.00%N/A N/A N/A 7.00% 7.50% 8.00%
Ultimate trend rateN/A N/A N/A 5.00% 5.00% 5.00%N/A N/A N/A 5.00% 5.00% 5.00%

Expected rate of return on plan assets - The expected rate of return on plan assets is determined by analysis of projected asset class returns based on the target asset class allocations. Alliant Energy, IPL and WPL use a forward-looking building blocks approach and also review historical returns, survey information and capital market information to support the expected rate of return on plan assets assumption. Refer to “Investment Policy and Strategy for Plan Assets” below for additional information related to Alliant Energy’s, IPL’s and WPL’s investment policy and strategy and mix of assets for the pension and other postretirement benefits plans.


136

Table of Contents


Medical cost trend on covered charges - The assumed medical trend rates are critical assumptions used in determining the service and interest cost and accumulated postretirement benefit obligation related to postretirement benefits costs. A 1% change in the medical trend rates for 20122013, holding all other assumptions constant, would have the following effects (in millions):
Alliant Energy IPL WPLAlliant Energy IPL WPL
1% Increase 1% Decrease 1% Increase 1% Decrease 1% Increase 1% Decrease1% Increase 1% Decrease 1% Increase 1% Decrease 1% Increase 1% Decrease
Effect on total of service and interest cost components
$0.4
 
($0.4) 
$0.2
 
($0.2) 
$0.2
 
($0.2)
$0.4
 
($0.3) 
$0.2
 
($0.2) 
$0.2
 
($0.2)
Effect on postretirement benefit obligation2.6
 (2.4) 1.2
 (1.1) 1.2
 (1.2)2.4
 (2.2) 1.1
 (1.0) 1.2
 (1.1)

Net Periodic Benefit Costs (Credits) - The components of net periodic benefit costs (credits) for Alliant Energy’s, IPL’s and WPL’s sponsored defined benefit pension and other postretirement benefits plans and defined benefit pension plans amounts directly assigned to IPL and WPL, are included in the tables below (in millions). In the “IPL” and “WPL” tables below, the qualified defined benefit pension plans costs represent only those respective costs for IPL’s and WPL’s bargaining unit employees covered under the qualified plans that are sponsored by IPL and WPL, respectively. Also in the “IPL” and “WPL” tables below, the other postretirement benefits plans costs (credits) represent costs (credits) for all IPL and WPL employees, respectively. The “Directly assigned defined benefit pension plans” tables below includerespectively, as well as amounts directly assigned to each of IPL and WPL related to IPL’s and WPL’s current and former non-bargaining employees who are participants in the Alliant Energy and Corporate Services sponsored qualified and non-qualified defined benefit pension plans.non-
Alliant EnergyDefined Benefit Pension Plans Other Postretirement Benefits Plans (a)
2012 2011 2010 2012 2011 2010
Service cost
$13.5
 
$11.4
 
$11.9
 
$6.9
 
$7.0
 
$9.3
Interest cost51.6
 52.0
 52.3
 10.2
 12.3
 14.9
Expected return on plan assets (b)(68.8) (63.8) (62.1) (7.5) (7.9) (7.7)
Amortization of (c):           
Transition obligation
 
 
 
 
 0.1
Prior service cost (credit)0.3
 0.7
 0.9
 (12.0) (10.0) (2.4)
Actuarial loss33.3
 21.1
 23.8
 6.3
 5.3
 7.4
Additional benefit costs (d)0.1
 10.2
 
 
 
 
Settlement losses (e)5.4
 1.1
 1.4
 
 
 
 
$35.4
 
$32.7
 
$28.2
 
$3.9
 
$6.7
 
$21.6
IPLQualified Defined Benefit Pension Plan Other Postretirement Benefits Plans (a)
2012 2011 2010 2012 2011 2010
Service cost
$7.5
 
$6.1
 
$6.2
 
$3.0
 
$2.6
 
$3.4
Interest cost17.1
 16.7
 16.5
 4.4
 5.5
 6.8
Expected return on plan assets (b)(23.0) (20.0) (19.5) (5.1) (5.4) (5.3)
Amortization of (c):           
Transition obligation
 
 
 
 
 0.1
Prior service cost (credit)0.4
 0.5
 0.6
 (6.3) (5.0) (1.1)
Actuarial loss10.2
 5.7
 7.2
 3.5
 2.9
 4.0
 
$12.2
 
$9.0
 
$11.0
 
($0.5) 
$0.6
 
$7.9
WPLQualified Defined Benefit Pension Plan Other Postretirement Benefits Plans (a)
2012 2011 2010 2012 2011 2010
Service cost
$5.2
 
$4.5
 
$4.9
 
$2.7
 
$2.9
 
$3.6
Interest cost16.4
 16.1
 15.7
 4.1
 4.9
 5.5
Expected return on plan assets (b)(22.3) (20.0) (19.1) (1.3) (1.3) (1.3)
Amortization of (c):           
Prior service cost (credit)0.5
 0.5
 0.5
 (3.9) (3.4) (0.7)
Actuarial loss12.1
 7.1
 8.5
 2.3
 2.1
 2.5
Additional benefit costs0.1
 
 
 
 
 
 
$12.0
 
$8.2
 
$10.5
 
$3.9
 
$5.2
 
$9.6

137140

Table of Contents


qualified defined benefit pension plans. In the “IPL” and “WPL” tables below, the other postretirement benefits plans costs (credits) represent costs (credits) for IPL and WPL employees, respectively.
Directly assigned defined benefit pension plansIPL WPL
2012 2011 2010 2012 2011 2010
Interest cost
$7.0
 
$7.3
 
$7.8
 
$5.2
 
$5.5
 
$5.6
Expected return on plan assets (b)(9.6) (9.7) (9.7) (7.3) (7.3) (7.3)
Amortization of (c):           
Prior service credit(0.2) (0.2) (0.3) (0.1) (0.2) (0.2)
Actuarial loss3.9
 3.0
 2.9
 3.6
 3.0
 2.8
Additional benefit costs (d)
 2.8
 
 
 0.7
 
 
$1.1
 
$3.2
 
$0.7
 
$1.4
 
$1.7
 
$0.9
Alliant EnergyDefined Benefit Pension Plans Other Postretirement Benefits Plans
2013 2012 2011 2013 2012 2011
Service cost
$15.7
 
$13.5
 
$11.4
 
$6.3
 
$6.9
 
$7.0
Interest cost49.0
 51.6
 52.0
 8.5
 10.2
 12.3
Expected return on plan assets (a)(74.0) (68.8) (63.8) (8.1) (7.5) (7.9)
Amortization of prior service cost (credit) (b)0.2
 0.3
 0.7
 (11.9) (12.0) (10.0)
Amortization of actuarial loss (c)36.2
 33.3
 21.1
 4.9
 6.3
 5.3
Additional benefit costs (d) (e)9.0
 0.1
 10.2
 
 
 
Settlement losses (f)
 5.4
 1.1
 
 
 
 
$36.1
 
$35.4
 
$32.7
 
($0.3) 
$3.9
 
$6.7
IPLDefined Benefit Pension Plans Other Postretirement Benefits Plans
2013 2012 2011 2013 2012 2011
Service cost
$8.6
 
$7.5
 
$6.1
 
$2.9
 
$3.0
 
$2.6
Interest cost22.9
 24.1
 24.0
 3.6
 4.4
 5.5
Expected return on plan assets (a)(35.2) (32.6) (29.7) (5.6) (5.1) (5.4)
Amortization of prior service cost (credit) (b)0.1
 0.2
 0.3
 (6.3) (6.3) (5.0)
Amortization of actuarial loss (c)15.2
 14.1
 8.7
 2.7
 3.5
 2.9
Additional benefit costs (d) (e)2.6
 
 2.8
 
 
 
 
$14.2
 
$13.3
 
$12.2
 
($2.7) 
($0.5) 
$0.6
WPLDefined Benefit Pension Plans Other Postretirement Benefits Plans
2013 2012 2011 2013 2012 2011
Service cost
$5.9
 
$5.2
 
$4.5
 
$2.5
 
$2.7
 
$2.9
Interest cost20.7
 21.6
 21.6
 3.4
 4.1
 4.9
Expected return on plan assets (a)(31.9) (29.6) (27.3) (1.3) (1.3) (1.3)
Amortization of prior service cost (credit) (b)0.3
 0.4
 0.3
 (3.9) (3.9) (3.4)
Amortization of actuarial loss (c)17.1
 15.7
 10.1
 1.9
 2.3
 2.1
Additional benefit costs (d) (e)0.6
 0.1
 0.7
 
 
 
 
$12.7
 
$13.4
 
$9.9
 
$2.6
 
$3.9
 
$5.2

(a)
In 2011, Alliant Energy, IPL and WPL amended their defined benefit postretirement health care plans resulting in a revision to the method and level of coverage provided for participants more than 65 years of age. This amendment was determined to be a significant event, which required Alliant Energy, IPL and WPL to remeasure their defined benefit postretirement health care plans in 2011. The amendment resulted in a decrease in Alliant Energy’s, IPL’s and WPL’s postretirement benefit obligations of $55 million, $30 million and $16 million, respectively, in 2011 with the impact of the remeasurement on net periodic benefit costs being recognized prospectively from the remeasurement date. The impact of the remeasurement decreased Alliant Energy’s, IPL’s and WPL’s net periodic benefit costs by $11.3 million, $7.2 million, and $3.8 million in 2011, respectively. The discount rate used for the remeasurement was 5.20%. All other assumptions used for the remeasurement were consistent with the measurement assumptions used at December 31, 2010.
(b)The expected return on plan assets is based on the expected rate of return on plan assets and the fair value approach to the market-related value of plan assets.
(b)Unrecognized prior service costs (credits) for the postretirement benefits plans are amortized over the average future service period to full eligibility of the participants of each plan.
(c)
Unrecognized net actuarial gains or losses in excess of 10% of the greater of the plans’ benefit obligations or assets are amortized over the average future service lives of plan participants, except for the Alliant Energy Cash Balance Pension Plan (Cash Balance Plan) where gains or losses outside the 10% threshold are amortized over the time period the participants are expected to receive benefits. Unrecognized prior service
(d)
In 2013, Alliant Energy filed a stipulation agreement with the Court related to the class-action lawsuit against the Cash Balance Plan. As a result, Alliant Energy recognized $9.0 million of additional benefits costs (credits)in 2013 related to the agreement. IPL recognized $5.5 million ($2.6 million directly assigned and $2.9 million allocated by Corporate Services) and WPL recognized $2.8 million ($0.6 million directly assigned and $2.2 million allocated by Corporate Services) of additional benefits costs in 2013 related to the agreement. Refer to Note 16(c) for additional information regarding the postretirement benefits plans are amortized over the average future service period to full eligibility of the participants of each plan.Cash Balance Plan.
(d)(e)
Alliant Energy reached an agreement with the IRS, which resulted in a favorable determination letter for the Cash Balance Plan in 2011. The agreement with the IRS required Alliant Energy to amend the Cash Balance Plan, which was completed in 2011 resulting in aggregate additional benefits of $10.2 million paid by Alliant Energy to certain former participants in the Cash Balance Plan in 2011. Alliant Energy recognized $10.2 million of additional benefits costs in 2011 related to these benefits. IPL recognized $6.3 million ($2.8 million directly assigned and $3.5 million allocated by Corporate Services) and WPL recognized $3.4 million ($0.7 million directly assigned and $2.7 million allocated by Corporate Services) of additional benefits costs in 2011 related to these benefits. Refer to Note 13(c)16(c) for additional information regarding the Cash Balance Plan.
(e)(f)Settlement losses related to payments made to retired executives of Alliant Energy.


141

Table of Contents


Corporate Services provides services to IPL and WPL, and as a result, IPL and WPL are allocated pension and other postretirement benefits costs (credits) associated with Corporate Services employees. Such costs (credits) are allocated to IPL and WPL based on labor costs of plan participants. The following table includes the allocated qualified and non-qualified pension and other postretirement benefits costs (credits) associated with Corporate Services employees providing services to IPL and WPL (in millions):
Pension Benefits Costs (a) Other Postretirement Benefits CostsPension Benefits Costs (a) Other Postretirement Benefits Costs (Credits)
2012 2011 2010 2012 2011 20102013 2012 2011 2013 2012 2011
IPL
$4.9
 
$5.8
 
$2.9
 
$0.1
 
$0.3
 
$2.0

$4.8
 
$4.9
 
$5.8
 
($0.3) 
$0.1
 
$0.3
WPL3.6
 4.2
 1.9
 0.1
 0.2
 1.3
3.6
 3.6
 4.2
 (0.2) 0.1
 0.2

(a)
Includes settlement losses relatedRefer to payments made to retired executives of Alliant Energy in 2012. In 2011,IPL’s and WPL’s “Net Periodic Benefit Costs (Credits)” tables above for additional qualified pension benefits costs resulting from the 2011 amendmentrelated to the Cash Balance Plan allocated to IPL and WPL by Corporate Services were $3.5 millionin 2013 and $2.7 million, respectively.
2011.


138

Table of Contents


The estimated amortization from “Regulatory assets” and “Regulatory liabilities” on the Consolidated Balance Sheets and AOCL on Alliant Energy’s Consolidated Balance Sheet into net periodic benefit cost in 20132014 is as follows (in millions):
 Alliant Energy IPL WPL
   Other Qualified Other Qualified Other
 Defined Benefit Postretirement Defined Benefit Postretirement Defined Benefit Postretirement
 Pension Plans Benefits Plans Pension Plan Benefits Plans Pension Plan Benefits Plans
Actuarial loss
$36.2
 
$4.9
 
$10.9
 
$2.7
 
$13.2
 
$1.9
Prior service cost (credit)0.2
 (11.9) 0.4
 (6.3) 0.5
 (3.9)
 
$36.4
 
($7.0) 
$11.3
 
($3.6) 
$13.7
 
($2.0)
Directly assigned defined benefit pension plansIPL WPL
Actuarial loss
$4.2
 
$3.9
Prior service credit(0.2) (0.2)
 
$4.0
 
$3.7

In addition to the estimated amortizations from “Regulatory assets” and “Regulatory liabilities” in the above tables for IPL and WPL, $1.3 million and $0.9 million, respectively, of amortizations are expected in 2013 from “Regulatory assets” and “Regulatory liabilities” associated with Corporate Services employees participating in other Alliant Energy sponsored plans allocated to IPL and WPL.
 Alliant Energy IPL WPL
   Other   Other   Other
 Defined Benefit Postretirement Defined Benefit Postretirement Defined Benefit Postretirement
 Pension Plans Benefits Plans Pension Plans Benefits Plans Pension Plans Benefits Plans
Actuarial loss
$19.5
 
$2.4
 
$8.0
 
$1.1
 
$9.2
 
$1.2
Prior service cost (credit)
 (11.9) 
 (6.3) 0.3
 (3.9)
 
$19.5
 
($9.5) 
$8.0
 
($5.2) 
$9.5
 
($2.7)

Alliant Energy’s, IPL’s and WPL’s net periodic benefit costs are primarily included in “Utility - Other operation and maintenance” in the Consolidated Statements of Income.

Benefit Plan Assets and Obligations - A reconciliation of the funded status of Alliant Energy’s qualified and non-qualified defined benefit pension and other postretirement benefits plans to the amounts recognized on Alliant Energy’s Consolidated Balance Sheets at December 31 was as follows (in millions):
Alliant EnergyDefined Benefit Other PostretirementDefined Benefit Other Postretirement
Pension Plans Benefits PlansPension Plans Benefits Plans
2012 2011 2012 20112013 2012 2013 2012
Change in projected benefit obligation:              
Net projected benefit obligation at January 1
$1,081.4
 
$953.0
 
$224.2
 
$274.9

$1,207.5
 
$1,081.4
 
$223.2
 
$224.2
Service cost13.5
 11.4
 6.9
 7.0
15.7
 13.5
 6.3
 6.9
Interest cost51.6
 52.0
 10.2
 12.3
49.0
 51.6
 8.5
 10.2
Plan participants’ contributions
 
 2.7
 6.4

 
 2.6
 2.7
Plan amendments (a)
 10.2
 
 (56.6)
Additional benefit costs0.1
 
 
 
9.0
 0.1
 
 
Actuarial (gain) loss135.4
 126.2
 (1.6) (0.8)(94.1) 135.4
 (13.2) (1.6)
Early Retiree Reinsurance Program (ERRP) proceeds
 
 
 0.6
Gross benefits paid(74.5) (71.4) (19.2) (20.8)(73.7) (74.5) (18.7) (19.2)
Federal subsidy on other postretirement benefits paid
 
 
 1.2
Net projected benefit obligation at December 311,207.5
 1,081.4
 223.2
 224.2
1,113.4
 1,207.5
 208.7
 223.2
Change in plan assets:              
Fair value of plan assets at January 1897.4
 823.0
 120.4
 122.7
965.6
 897.4
 123.1
 120.4
Actual return on plan assets126.9
 28.9
 14.3
 2.6
128.5
 126.9
 14.4
 14.3
Employer contributions15.8
 116.9
 4.9
 9.5
2.5
 15.8
 3.5
 4.9
Plan participants’ contributions
 
 2.7
 6.4

 
 2.6
 2.7
Gross benefits paid(74.5) (71.4) (19.2) (20.8)(73.7) (74.5) (18.7) (19.2)
Fair value of plan assets at December 31965.6
 897.4
 123.1
 120.4
1,022.9
 965.6
 124.9
 123.1
Under funded status at December 31
($241.9) 
($184.0) 
($100.1) 
($103.8)
($90.5) 
($241.9) 
($83.8) 
($100.1)

139142

Table of Contents


Alliant EnergyDefined Benefit Other PostretirementDefined Benefit Other Postretirement
Pension Plans Benefits PlansPension Plans Benefits Plans
2012 2011 2012 20112013 2012 2013 2012
Amounts recognized on the Consolidated Balance Sheets consist of:              
Non-current assets
$—
 
$—
 
$3.5
 
$1.3

$—
 
$—
 
$14.5
 
$3.5
Other current liabilities(2.4) (4.6) (2.8) 
(2.4) (2.4) (4.8) (2.8)
Pension and other benefit obligations(239.5) (179.4) (100.8) (105.1)(88.1) (239.5) (93.5) (100.8)
Net amount recognized at December 31
($241.9) 
($184.0) 
($100.1) 
($103.8)
($90.5) 
($241.9) 
($83.8) 
($100.1)
Amounts recognized in Regulatory Assets, Regulatory Liabilities and AOCL consist of (b):       
Amounts recognized in Regulatory Assets, Regulatory Liabilities and AOCL consist of (a):       
Net actuarial loss
$533.4
 
$494.8
 
$62.1
 
$76.7

$348.6
 
$533.4
 
$38.1
 
$62.1
Prior service credit(7.2) (6.9) (40.5) (52.5)(7.4) (7.2) (28.6) (40.5)

$526.2
 
$487.9
 
$21.6
 
$24.2

$341.2
 
$526.2
 
$9.5
 
$21.6

(a)Refer to “Net Periodic Benefit Costs” above for additional information regarding plan amendments to the defined benefit pension and other postretirement benefits plans in 2011.
(b)
Refer to Note 1(b)2 and Alliant Energy’s Consolidated Statements of Common Equity for amounts recognized in “Regulatory assets” and “AOCL,” respectively, on Alliant Energy’s Consolidated Balance Sheets. At December 31, 20122013 and 20112012, $2.75.1 million and $3.32.7 million, respectively, of regulatory liabilities were recognized related to Alliant Energy’s other postretirement benefits plans.

In the “IPL” and “WPL” tables below, the defined benefit pension plans amounts represent those respective amounts for IPL’s and WPL’s bargaining unit employees covered under the qualified plans that are sponsored by IPL and WPL, respectively, as well as amounts directly assigned to each of IPL and WPL related to IPL’s and WPL’s current and former non-bargaining employees who are participants in the Alliant Energy and Corporate Services sponsored qualified and non-qualified defined benefit pension plans.

A reconciliation of the funded status of IPL’s sponsored qualified and non-qualified defined benefit pension and other postretirement benefits plans to the amounts recognized on IPL’s Consolidated Balance Sheets at December 31 was as follows (in millions):
IPLQualified Defined Benefit Other PostretirementDefined Benefit Other Postretirement
Pension Plan Benefits PlansPension Plans Benefits Plans
2012 2011 2012 20112013 2012 2013 2012
Change in projected benefit obligation:              
Net projected benefit obligation at January 1
$344.5
 
$293.8
 
$97.5
 
$128.5

$559.2
 
$499.9
 
$96.0
 
$97.5
Service cost7.5
 6.1
 3.0
 2.6
8.6
 7.5
 2.9
 3.0
Interest cost17.1
 16.7
 4.4
 5.5
22.9
 24.1
 3.6
 4.4
Plan participants’ contributions
 
 0.9
 2.0

 
 0.9
 0.9
Plan amendments (a)
 
 
 (30.1)
Additional benefit costs2.6
 
 
 
Actuarial (gain) loss38.2
 45.2
 (1.4) (2.7)(44.3) 56.1
 (7.0) (1.4)
ERRP proceeds
 
 
 0.2
Gross benefits paid(18.9) (17.3) (8.4) (9.1)(35.0) (28.4) (8.6) (8.4)
Federal subsidy on other postretirement benefits paid
 
 
 0.6
Net projected benefit obligation at December 31388.4
 344.5
 96.0
 97.5
514.0
 559.2
 87.8
 96.0
Change in plan assets:              
Fair value of plan assets at January 1298.7
 256.9
 74.7
 77.5
458.8
 426.1
 78.8
 74.7
Actual return on plan assets42.5
 9.1
 9.4
 1.4
61.2
 60.4
 10.0
 9.4
Employer contributions
 50.0
 2.2
 2.9
0.9
 0.7
 0.1
 2.2
Plan participants’ contributions
 
 0.9
 2.0

 
 0.9
 0.9
Gross benefits paid(18.9) (17.3) (8.4) (9.1)(35.0) (28.4) (8.6) (8.4)
Fair value of plan assets at December 31322.3
 298.7
 78.8
 74.7
485.9
 458.8
 81.2
 78.8
Under funded status at December 31
($66.1) 
($45.8) 
($17.2) 
($22.8)
($28.1) 
($100.4) 
($6.6) 
($17.2)

140143

Table of Contents


IPLQualified Defined Benefit Other PostretirementDefined Benefit Other Postretirement
Pension Plan Benefits PlansPension Plans Benefits Plans
2012 2011 2012 20112013 2012 2013 2012
Amounts recognized on the Consolidated Balance Sheets consist of:              
Non-current assets
$—
 
$—
 
$8.8
 
$—
Other current liabilities(0.8) (0.8) 
 
Pension and other benefit obligations
($66.1) 
($45.8) 
($17.2) 
($22.8)(27.3) (99.6) (15.4) (17.2)
Amounts recognized in Regulatory Assets and Regulatory Liabilities consist of (b):       
Net amount recognized at December 31
($28.1) 
($100.4) 
($6.6) 
($17.2)
Amounts recognized in Regulatory Assets and Regulatory Liabilities consist of (a):       
Net actuarial loss
$149.7
 
$141.1
 
$32.0
 
$41.0

$146.1
 
$231.6
 
$18.2
 
$32.0
Prior service cost (credit)0.7
 1.1
 (21.3) (27.6)
Prior service credit(2.6) (2.5) (15.0) (21.3)

$150.4
 
$142.2
 
$10.7
 
$13.4

$143.5
 
$229.1
 
$3.2
 
$10.7

(a)Refer to “Net Periodic Benefit Costs” above for additional information regarding plan amendments to the defined benefit pension and other postretirement benefits plans in 2011.
(b)
Refer to Note 1(b)2 for amounts recognized in “Regulatory assets” on IPL’s Consolidated Balance Sheets. At December 31, 20122013 and 20112012, $1.41.0 million and $2.81.4 million, respectively, of regulatory liabilities were recognized related to IPL’s other postretirement benefits plans.

A reconciliation of the funded status of WPL’s sponsored qualified and non-qualified defined benefit pension and other postretirement benefits plans to the amounts recognized on WPL’s Consolidated Balance Sheets at December 31 was as follows (in millions):
WPLQualified Defined Benefit Other PostretirementDefined Benefit Other Postretirement
Pension Plan Benefits PlansPension Plans Benefits Plans
2012 2011 2012 20112013 2012 2013 2012
Change in projected benefit obligation:              
Net projected benefit obligation at January 1
$332.5
 
$283.3
 
$89.6
 
$103.3

$506.7
 
$447.7
 
$89.1
 
$89.6
Service cost5.2
 4.5
 2.7
 2.9
5.9
 5.2
 2.5
 2.7
Interest cost16.4
 16.1
 4.1
 4.9
20.7
 21.6
 3.4
 4.1
Plan participants’ contributions
 
 1.2
 3.3

 
 1.2
 1.2
Plan amendments (a)
 
 
 (18.2)
Additional benefit costs0.1
 
 
 
0.6
 0.1
 
 
Actuarial loss43.4
 43.3
 0.3
 2.3
ERRP proceeds
 
 
 0.2
Actuarial (gain) loss(41.1) 57.9
 (3.0) 0.3
Gross benefits paid(17.4) (14.7) (8.8) (9.6)(32.0) (25.8) (7.6) (8.8)
Federal subsidy on other postretirement benefits paid
 
 
 0.5
Net projected benefit obligation at December 31380.2
 332.5
 89.1
 89.6
460.8
 506.7
 85.6
 89.1
Change in plan assets:              
Fair value of plan assets at January 1289.6
 255.2
 25.1
 25.0
415.4
 386.6
 22.3
 25.1
Actual return on plan assets41.0
 9.1
 2.5
 0.9
55.2
 54.5
 2.5
 2.5
Employer contributions
 40.0
 2.3
 5.5
0.2
 0.1
 3.3
 2.3
Plan participants’ contributions
 
 1.2
 3.3

 
 1.2
 1.2
Gross benefits paid(17.4) (14.7) (8.8) (9.6)(32.0) (25.8) (7.6) (8.8)
Fair value of plan assets at December 31313.2
 289.6
 22.3
 25.1
438.8
 415.4
 21.7
 22.3
Under funded status at December 31
($67.0) 
($42.9) 
($66.8) 
($64.5)
($22.0) 
($91.3) 
($63.9) 
($66.8)
WPLDefined Benefit Other Postretirement
 Pension Plans Benefits Plans
 2013 2012 2013 2012
Amounts recognized on the Consolidated Balance Sheets consist of:       
Non-current assets
$—
 
$—
 
$5.8
 
$3.5
Other current liabilities(0.2) (0.2) (4.8) (2.8)
Pension and other benefit obligations(21.8) (91.1) (64.9) (67.5)
Net amount recognized at December 31
($22.0) 
($91.3) 
($63.9) 
($66.8)
Amounts recognized in Regulatory Assets and Regulatory Liabilities consist of (a):       
Net actuarial loss
$152.2
 
$233.7
 
$18.3
 
$24.3
Prior service credit(0.7) (0.4) (9.5) (13.4)
 
$151.5
 
$233.3
 
$8.8
 
$10.9

141144

Table of Contents


WPLQualified Defined Benefit Other Postretirement
 Pension Plan Benefits Plans
 2012 2011 2012 2011
Amounts recognized on the Consolidated Balance Sheets consist of:       
Non-current assets
$—
 
$—
 
$3.5
 
$1.3
Other current liabilities
 
 (2.8) 
Pension and other benefit obligations(67.0) (42.9) (67.5) (65.8)
Net amount recognized at December 31
($67.0) 
($42.9) 
($66.8) 
($64.5)
Amounts recognized in Regulatory Assets and Regulatory Liabilities consist of (b):       
Net actuarial loss
$155.3
 
$142.7
 
$24.3
 
$27.8
Prior service cost (credit)1.9
 2.4
 (13.4) (17.3)
 
$157.2
 
$145.1
 
$10.9
 
$10.5

(a)Refer to “Net Periodic Benefit Costs” above for additional information regarding plan amendments to the defined benefit pension and other postretirement benefits plans in 2011.
(b)
Refer to Note 1(b)2 for amounts recognized in “Regulatory assets” on WPL’s Consolidated Balance Sheets. At December 31, 20122013 and 20112012, $0.21.1 million and $00.2 million, respectively, of regulatory liabilities were recognized related to WPL’s other postretirement benefits plans.

Included in the following tables are accumulated benefit obligations, aggregate amounts applicable to defined benefit pension and other postretirement benefits plans with accumulated benefit obligations in excess of plan assets, as well as defined benefit pension plans with projected benefit obligations in excess of plan assets as of the December 31 measurement date (Not Applicable (N/A); in millions):
Alliant EnergyDefined Benefit Other Postretirement
 Pension Plans Benefits Plans
 2012 2011 2012 2011
Accumulated benefit obligations
$1,155.5
 
$1,029.4
 
$223.2
 
$224.2
Plans with accumulated benefit obligations in excess of plan assets:       
Accumulated benefit obligations1,155.5
 1,029.4
 223.2
 224.2
Fair value of plan assets965.6
 897.4
 123.1
 120.4
Plans with projected benefit obligations in excess of plan assets:       
Projected benefit obligations1,207.5
 1,081.4
 N/A
 N/A
Fair value of plan assets965.6
 897.4
 N/A
 N/A
IPLQualified Defined Benefit Other Postretirement
 Pension Plan Benefits Plans
 2012 2011 2012 2011
Accumulated benefit obligations
$359.6
 
$314.6
 
$96.0
 
$97.5
Plans with accumulated benefit obligations in excess of plan assets:       
Accumulated benefit obligations359.6
 314.6
 96.0
 97.5
Fair value of plan assets322.3
 298.7
 78.8
 74.7
Plans with projected benefit obligations in excess of plan assets:       
Projected benefit obligations388.4
 344.5
 N/A
 N/A
Fair value of plan assets322.3
 298.7
 N/A
 N/A
WPLQualified Defined Benefit Other Postretirement
 Pension Plan Benefits Plans
 2012 2011 2012 2011
Accumulated benefit obligations
$363.7
 
$314.7
 
$89.1
 
$89.6
Plans with accumulated benefit obligations in excess of plan assets:       
Accumulated benefit obligations363.7
 314.7
 89.1
 89.6
Fair value of plan assets313.2
 289.6
 22.3
 25.1
Plans with projected benefit obligations in excess of plan assets:       
Projected benefit obligations380.2
 332.5
 N/A
 N/A
Fair value of plan assets313.2
 289.6
 N/A
 N/A

142

Table of Contents



The “Directly assigned defined benefit pension plans” table below includes amounts directly assigned to each of IPL and WPL related to their current and former non-bargaining employees who are participants in the Alliant Energy and Corporate Services sponsored qualified and non-qualified defined benefit pension plans. A reconciliation of the funded status of the directly assigned qualified and non-qualified defined benefit pension plans to the amounts recognized on IPL’s and WPL’s Consolidated Balance Sheets at December 31 was as follows (in millions):
Directly assigned defined benefit pension plansIPL WPL
 2012 2011 2012 2011
Change in projected benefit obligation:       
Net projected benefit obligation at January 1
$155.4
 
$144.4
 
$115.2
 
$107.4
Interest cost7.0
 7.3
 5.2
 5.5
Plan amendments
 2.8
 
 0.7
Actuarial loss17.9
 13.2
 14.5
 10.3
Gross benefits paid(9.5) (12.3) (8.4) (8.7)
Net projected benefit obligation at December 31170.8
 155.4
 126.5
 115.2
Change in plan assets:       
Fair value of plan assets at January 1127.4
 127.6
 97.0
 95.6
Actual return on plan assets17.9
 4.2
 13.5
 3.2
Employer contributions0.7
 7.9
 0.1
 6.9
Gross benefits paid(9.5) (12.3) (8.4) (8.7)
Fair value of plan assets at December 31136.5
 127.4
 102.2
 97.0
Under funded status at December 31
($34.3) 
($28.0) 
($24.3) 
($18.2)
Alliant EnergyDefined Benefit Other Postretirement
 Pension Plans Benefits Plans
 2013 2012 2013 2012
Accumulated benefit obligations
$1,071.7
 
$1,155.5
 
$208.7
 
$223.2
Plans with accumulated benefit obligations in excess of plan assets:       
Accumulated benefit obligations406.5
 1,155.5
 208.7
 223.2
Fair value of plan assets347.6
 965.6
 124.9
 123.1
Plans with projected benefit obligations in excess of plan assets:       
Projected benefit obligations1,113.4
 1,207.5
 N/A
 N/A
Fair value of plan assets1,022.9
 965.6
 N/A
 N/A
Directly assigned defined benefit pension plansIPL WPL
 2012 2011 2012 2011
Amounts recognized on the Consolidated Balance Sheets consist of:       
Other current liabilities
($0.8) 
($0.8) 
($0.2) 
($0.2)
Pension and other benefit obligations(33.5) (27.2) (24.1) (18.0)
Net amount recognized at December 31
($34.3) 
($28.0) 
($24.3) 
($18.2)
Amounts recognized in Regulatory Assets (a):       
Net actuarial loss
$81.9
 
$76.2
 
$78.4
 
$73.7
Prior service credit(3.2) (3.4) (2.3) (2.4)
 
$78.7
 
$72.8
 
$76.1
 
$71.3
Accumulated benefit obligations
$170.8
 
$155.4
 
$126.5
 
$115.2
IPLDefined Benefit Other Postretirement
 Pension Plan Benefits Plans
 2013 2012 2013 2012
Accumulated benefit obligations
$491.5
 
$530.4
 
$87.8
 
$96.0
Plans with accumulated benefit obligations in excess of plan assets:       
Accumulated benefit obligations159.3
 530.4
 87.8
 96.0
Fair value of plan assets144.6
 458.8
 81.2
 78.8
Plans with projected benefit obligations in excess of plan assets:       
Projected benefit obligations514.0
 559.2
 N/A
 N/A
Fair value of plan assets485.9
 458.8
 N/A
 N/A

(a)
Refer to Note 1(b) for amounts recognized in “Regulatory assets” on IPL’s and WPL’s Consolidated Balance Sheets.
WPLDefined Benefit Other Postretirement
 Pension Plan Benefits Plans
 2013 2012 2013 2012
Accumulated benefit obligations
$446.7
 
$490.2
 
$85.6
 
$89.1
Plans with accumulated benefit obligations in excess of plan assets:       
Accumulated benefit obligations115.6
 490.2
 85.6
 89.1
Fair value of plan assets106.8
 415.4
 21.7
 22.3
Plans with projected benefit obligations in excess of plan assets:       
Projected benefit obligations460.8
 506.7
 N/A
 N/A
Fair value of plan assets438.8
 415.4
 N/A
 N/A

In addition to the amounts recognized in “Regulatory assets and regulatory liabilities” in the above tables for IPL and WPL, “Regulatory assets” and “Regulatory liabilities” were recognized for amounts associated with Corporate Services employees participating in other Alliant Energy sponsored benefit plans that were allocated to IPL and WPL at December 31 as follows (in millions):
IPL WPLIPL WPL
2012 2011 2012 20112013 2012 2013 2012
Regulatory assets
$38.1
 
$33.7
 
$25.5
 
$22.3

$26.5
 
$38.1
 
$19.8
 
$25.5
Regulatory liabilities0.6
 0.3
 0.4
 0.2
1.7
 0.6
 1.3
 0.4


145

Table of Contents


Estimated Future Employer Contributions and Benefit Payments - Alliant Energy, IPL and WPL estimate thatEstimated funding for the qualified defined benefit pension,and non-qualified defined benefit pension and other postretirement benefits plans and the directly assigned qualified and non-qualified defined benefit pension plans amounts, duringfor 20132014 will beis as follows (in millions):
 Alliant Energy IPL WPL
Qualified defined benefit pension plans
$—
 
$—
 
$—
Non-qualified defined benefit pension plans (a)2.4
 N/A
 N/A
Directly assigned defined benefit pension plans (b)N/A
 0.8
 0.2
Other postretirement benefits plans3.0
 
 3.0
 Alliant Energy IPL WPL
Defined benefit pension plans (a)
$2.4
 
$0.7
 
$0.2
Other postretirement benefits plans5.1
 
 5.0

143

Table of Contents



(a)Alliant Energy sponsors several non-qualified defined benefit pension plans that cover certain current and former key employees of IPL and WPL. Alliant Energy allocates pension costs to IPL and WPL for these plans.
(b)Amounts directly assigned to In addition, IPL and WPL amounts reflect funding for their non-bargaining employees who are participants in the Alliant Energy and Corporate Services sponsored qualified and non-qualified defined benefit pension plans.

Expected benefit payments andfor the directly assigned qualified and non-qualified defined benefit pension benefits amounts,plans, which reflect expected future service, as appropriate, are as follows (in millions):
Alliant Energy2013 2014 2015 2016 2017 2018 - 20222014 2015 2016 2017 2018 2019 - 2023
Qualified and non-qualified defined benefit pension benefits
$61.9
 
$64.7
 
$68.5
 
$66.6
 
$69.2
 
$374.1
Defined benefit pension benefits
$71.2
 
$68.0
 
$66.3
 
$67.8
 
$71.2
 
$378.6
Other postretirement benefits16.6
 16.2
 16.3
 16.4
 16.6
 84.2
17.0
 16.7
 16.3
 16.3
 16.7
 83.5

$78.5
 
$80.9
 
$84.8
 
$83.0
 
$85.8
 
$458.3

$88.2
 
$84.7
 
$82.6
 
$84.1
 
$87.9
 
$462.1
IPL2013 2014 2015 2016 2017 2018 - 20222014 2015 2016 2017 2018 2019 - 2023
Qualified defined benefit pension benefits
$15.9
 
$16.9
 
$17.9
 
$18.9
 
$20.0
 
$116.0
Directly assigned defined benefit pension benefits12.6
 13.4
 14.1
 12.1
 13.5
 60.2
Defined benefit pension benefits
$32.2
 
$29.9
 
$31.3
 
$32.8
 
$34.4
 
$180.4
Other postretirement benefits8.0
 7.3
 7.2
 7.1
 7.2
 35.9
7.7
 7.3
 7.1
 7.0
 7.2
 35.4

$36.5
 
$37.6
 
$39.2
 
$38.1
 
$40.7
 
$212.1

$39.9
 
$37.2
 
$38.4
 
$39.8
 
$41.6
 
$215.8
WPL2013 2014 2015 2016 2017 2018 - 20222014 2015 2016 2017 2018 2019 - 2023
Qualified defined benefit pension benefits
$14.4
 
$15.2
 
$16.1
 
$17.0
 
$18.0
 
$108.7
Directly assigned defined benefit pension benefits10.5
 10.2
 11.4
 9.8
 9.5
 43.0
Defined benefit pension benefits
$26.4
 
$27.2
 
$27.1
 
$28.3
 
$29.4
 
$155.8
Other postretirement benefits6.3
 6.5
 6.7
 6.7
 6.8
 34.3
6.9
 7.0
 6.7
 6.7
 6.9
 33.9

$31.2
 
$31.9
 
$34.2
 
$33.5
 
$34.3
 
$186.0

$33.3
 
$34.2
 
$33.8
 
$35.0
 
$36.3
 
$189.7

Investment Policy and Strategy for Plan Assets - Alliant Energy’s, IPL’s and WPL’s investment policies and their strategies employed with respect to assets of defined benefit pension and other postretirement benefits plans are to combine both preservation of principal and prudent and reasonable risk-taking to protect the integrity of plan assets, in order to meet the obligations to plan participants while minimizing benefit costs over the long term. It is recognized that risk and volatility are present with all types of investments. However, risk is mitigated at the total fund level through diversification by asset class including both U.S. and international equity and fixed income exposure, global asset and risk parity strategies, the number of individual investments, and sector and industry limits. Global asset and risk parity strategies include investments in global equity, global debt, commodities and currencies.

Defined Benefit Pension Plans Assets - For assets of defined benefit pension plans, the mix among asset classes is controlled by long-term asset allocation targets. Historical performance results and future expectations suggest that equity securities will provide higher total investment returns than debt securities over a long-term investment horizon. Consistent with the goals of meeting obligations to plan participants and minimizing benefit costs over the long-term, the defined benefit pension plans have a long-term investment posture more heavily weighted towards equity holdings. The asset allocation is monitored regularly and appropriate steps are taken as needed to rebalance the assets within the prescribed ranges. Alliant Energy, IPL and WPL also use an overlay management service to help maintain target allocations and liquidity needs. The overlay manager is authorized to use derivative financial instruments to facilitate this service. ProhibitedFor separately managed accounts, prohibited investment vehicles include, but may not be limited to, direct ownership of real estate, margin trading, oil and gas limited partnerships and securities of the managers’ firms or affiliate firms. If the investment vehicle is a commingled account or mutual fund, it is not possible to place restrictions on any aspect of fund management. At December 31, 20122013, the current target ranges and actual allocations for Alliant Energy’s, IPL’s and WPL’s defined benefit pension plan assets were as follows:
 Target Range Actual
 Allocation Allocation
Cash and equivalents%-5% 4%
Equity securities:     
U.S. large cap core10%-20% 13%
U.S. large cap value6%-16% 11%
U.S. large cap growth6%-16% 11%
U.S. small cap value%-6% 3%
U.S. small cap growth%-6% 3%
International - developed markets11%-23% 16%
International - emerging markets%-8% 4%
Global asset allocation securities5%-15% 10%
Fixed income securities15%-35% 25%

144146

Table of Contents


 Target Range Actual
 Allocation Allocation
Cash and equivalents%-5% 3%
Equity securities:     
U.S. large cap core8%-18% 13%
U.S. large cap value2.5%-12.5% 7%
U.S. large cap growth2.5%-12.5% 8%
U.S. small cap value%-4% 2%
U.S. small cap growth%-4% 2%
International - developed markets7%-19% 13%
International - emerging markets%-10% 5%
Global asset allocation securities5%-15% 10%
Risk parity allocation securities5%-15% 9%
Fixed income securities20%-40% 28%

Other Postretirement Benefits Plans Assets - Other postretirement benefits plans assets are comprised of specific assets within certain defined benefit pension plans (401(h) assets) as well as assets held in Voluntary Employees’ Beneficiary Association (VEBA)VEBA trusts. The investment policy and strategy of the 401(h) assets mirrors those of the defined benefit pension plans, which are discussed above. For VEBA trusts with assets greater than $5 million, the mix among asset classes is controlled by long-term allocation targets. The asset allocation is monitored regularly and appropriate steps are taken as needed to rebalance the assets within the prescribed ranges. Prohibited investment vehicles include, but may not be limitedMutual funds are used to direct ownership of real estate, margin trading, oil and gas limited partnerships and securities ofachieve the managers’ firms or affiliate firms. If the investment vehicle is a commingled account or mutual fund, it is not possible to place restrictions on any aspect of fund management.desired diversification. At December 31, 20122013, the current target ranges and actual allocations for Alliant Energy’s, IPL’s and WPL’s VEBA trusts with assets greater than $5 million were as follows:
Target Range ActualTarget Range Actual
Allocation AllocationAllocation Allocation
Cash and equivalents%-5% 2%%-5% 1%
Equity securities:    
Domestic25%-45% 34%25%-45% 37%
International10%-20% 15%10%-20% 15%
Global asset allocation securities20%-40% 29%20%-40% 28%
Fixed income securities10%-30% 20%10%-30% 19%

Securities Lending Program - In 2013, Alliant Energy, IPL and WPL have aterminated their securities lending program with a third-party agent that allowsthird party agent. The program allowed the agent to lend certain securities from their defined benefit pension and other postretirement benefits plans to selected entities against receipt of collateral (in the form of cash, government and agency securities or letters of credit) as provided for and determined in accordance with its securities lending agency agreement. Initial collateral levels are no less than 100% of the market value of loans to non-affiliated borrowers of U.S. government securities; 102% of the market value of loans to affiliated borrowers of U.S. government securities; 102% of the market value of loans on U.S. corporate bonds and U.S. equity securities; 105% of the market value of loans on non-U.S. securities; and 102% of the market value of loans on all other securities. Refer to “Fair Value Measurements” below for details of fair value of invested collateral and amounts due to borrowers for the securities lending program.program at December 31, 2012.

Fair Value Measurements - The following tables report a framework for measuring fair value. The fair value hierarchy prioritizes the inputs to valuation techniques used to measure fair value. The three levels of the fair value hierarchy and examples of each are as follows:

Level 1 - Pricing inputs are quoted prices available in active markets for identical assets or liabilities as of the reporting date. Alliant Energy’s, IPL’s and WPL’s investments in equity and fixed income securities held in registered investment companies and directly held equity securities are valued at the closing price reported in the active market in which the securities are traded.

Level 2 - Pricing inputs are quoted prices for similar assetassets or liabilities in active markets, quoted prices for identical or similar assets or liabilities in inactive markets, inputs other than quoted prices that are observable for the asset or liability and inputs that are derived principally from or corroborated by observable market data by correlation or other means. Alliant Energy’s, IPL’s and WPL’s investments in corporate bonds and government and agency obligations are valued at the closing price reported in the active market for similar assets in which the individual securities are traded or based on yields currently available on comparable securities of issuers with similar credit ratings. Alliant Energy’s, IPL’s and WPL’s investments in equity and fixed income securities in common/collective trusts are valued at the net asset value of shares held by the plans, which is based on the fair market value of the underlying investments in equity and fixed income securities of the common/collective trusts. Level 2 plan assets at December 31, 2012 also consistconsisted of asset backedasset-backed securities within their securities lending invested collateral.


147

Table of Contents


Level 3 - Pricing inputs are unobservable inputs for assets or liabilities for which little or no market data exist and require significant management judgment or estimation. At December 31, 2012, Alliant Energy’s, IPL’s and WPL’s Level 3 plan assets includeincluded certain asset backedasset-backed securities and corporate bonds within their securities lending invested collateral.


145

Table of Contents


The fair value hierarchy gives the highest priority to quoted prices in active markets (Level 1) and the lowest priority to unobservable data (Level 3). In some cases, the inputs used to measure fair value might fall in different levels of the fair value hierarchy. The lowest level input that is significant to a fair value measurement in its entirety determines the applicable level in the fair value hierarchy. Assessing the significance of a particular input to the fair value measurement in its entirety requires judgment, considering factors specific to the asset or liability.

The methods described above may produce a fair value calculation that may not be indicative of net realizable value or reflective of future fair values. Furthermore, while Alliant Energy, IPL and WPL believe their valuation methods are appropriate and consistent with other market participants, the use of different methodologies or assumptions to determine the fair value of certain financial instruments could result in a different fair value measurement at the reporting date.

At December 31, the fair values of Alliant Energy’s qualified and non-qualified defined benefit pension plans assets by asset category and fair value hierarchy level were as follows (in millions):
Alliant Energy2012 2011
 Fair Level Level Level Fair Level Level Level
 Value 1 2 3 Value 1 2 3
Cash and equivalents
$43.9
 
$—
 
$43.9
 
$—
 
$117.5
 
$117.5
 
$—
 
$—
Equity securities:               
U.S. large cap core129.0
 129.0
 
 
 110.7
 110.7
 
 
U.S. large cap value107.9
 
 107.9
 
 91.6
 
 91.6
 
U.S. large cap growth105.8
 
 105.8
 
 91.5
 
 91.5
 
U.S. small cap value30.4
 
 30.4
 
 25.7
 
 25.7
 
U.S. small cap growth25.0
 25.0
 
 
 21.7
 21.7
 
 
International - developed markets153.7
 80.3
 73.4
 
 126.4
 65.4
 61.0
 
International - emerging markets38.5
 38.5
 
 
 30.4
 30.4
 
 
Global asset allocation securities94.5
 56.3
 38.2
 
 
 
 
 
Fixed income securities:               
Corporate bonds30.7
 
 30.7
 
 57.1
 
 57.1
 
Government and agency obligations49.2
 
 49.2
 
 87.8
 
 87.8
 
Fixed income funds162.6
 0.2
 162.4
 
 146.7
 0.2
 146.5
 
Securities lending invested collateral4.4
 
 2.9
 1.5
 9.3
 4.7
 2.8
 1.8
 975.6
 
$329.3
 
$644.8
 
$1.5
 916.4
 
$350.6
 
$564.0
 
$1.8
Accrued investment income0.6
       1.0
      
Due to brokers, net (pending trades with brokers)(1.5)       (4.7)      
Due to borrowers for securities lending program(9.1)       (15.3)      
Total pension plan assets
$965.6
       
$897.4
      

At December 31, the fair values of IPL’s and WPL’s qualified and non-qualified defined benefit pension plan assets associated with IPL’s and WPL’s current and former non-bargaining employees who are participants in Alliant Energy and Corporate Services sponsored plans that were directly assigned to IPL and WPL, along with the percentage these assets represent of the fair values by asset category and fair value hierarchy level shown in the above table were as follows (dollars in millions):
 IPL WPL
 2012 2011 2012 2011
Fair values of directly assigned amounts$136.5 $127.4 $102.2 $97.0
Percentage represented14.1% 14.2% 10.6% 10.8%
 2013 2012
 Fair Level Level Level Fair Level Level Level
 Value 1 2 3 Value 1 2 3
Cash and equivalents
$32.6
 
$—
 
$32.6
 
$—
 
$43.9
 
$—
 
$43.9
 
$—
Equity securities:               
U.S. large cap core134.1
 134.1
 
 
 129.0
 129.0
 
 
U.S. large cap value77.0
 
 77.0
 
 107.9
 
 107.9
 
U.S. large cap growth77.4
 
 77.4
 
 105.8
 
 105.8
 
U.S. small cap value20.7
 
 20.7
 
 30.4
 
 30.4
 
U.S. small cap growth20.8
 20.8
 
 
 25.0
 25.0
 
 
International - developed markets136.3
 68.0
 68.3
 
 153.7
 80.3
 73.4
 
International - emerging markets48.4
 48.4
 
 
 38.5
 38.5
 
 
Global asset allocation securities99.1
 56.7
 42.4
 
 94.5
 56.3
 38.2
 
Risk parity allocation securities96.1
 
 96.1
 
 
 
 
 
Fixed income securities:               
Corporate bonds29.2
 
 29.2
 
 30.7
 
 30.7
 
Government and agency obligations49.1
 
 49.1
 
 49.2
 
 49.2
 
Fixed income funds202.2
 0.2
 202.0
 
 162.6
 0.2
 162.4
 
Securities lending invested collateral
 
 
 
 4.4
 
 2.9
 1.5
 1,023.0
 
$328.2
 
$694.8
 
$—
 975.6
 
$329.3
 
$644.8
 
$1.5
Accrued investment income0.7
       0.6
      
Due to brokers, net (pending trades with brokers)(0.8)       (1.5)      
Due to borrowers for securities lending program
       (9.1)      
Total pension plan assets
$1,022.9
       
$965.6
      


146148

Table of Contents


At December 31, the fair values of IPL’s qualified and non-qualified defined benefit pension planplans assets by asset category and fair value hierarchy level were as follows (in millions):
IPL2012 2011
2013 2012
Fair Level Level Level Fair Level Level LevelFair Level Level Level Fair Level Level Level
Value 1 2 3 Value 1 2 3Value 1 2 3 Value 1 2 3
Cash and equivalents
$14.6
 
$—
 
$14.6
 
$—
 
$39.1
 
$39.1
 
$—
 
$—

$15.4
 
$—
 
$15.4
 
$—
 
$20.8
 
$—
 
$20.8
 
$—
Equity securities:                              
U.S. large cap core43.1
 43.1
 
 
 36.8
 36.8
 
 
63.7
 63.7
 
 
 61.3
 61.3
 
 
U.S. large cap value36.0
 
 36.0
 
 30.5
 
 30.5
 
36.6
 
 36.6
 
 51.3
 
 51.3
 
U.S. large cap growth35.3
 
 35.3
 
 30.5
 
 30.5
 
36.8
 
 36.8
 
 50.3
 
 50.3
 
U.S. small cap value10.2
 
 10.2
 
 8.6
 
 8.6
 
9.8
 
 9.8
 
 14.4
 
 14.4
 
U.S. small cap growth8.3
 8.3
 
 
 7.2
 7.2
 
 
9.9
 9.9
 
 
 11.9
 11.9
 
 
International - developed markets51.3
 26.8
 24.5
 
 42.1
 21.8
 20.3
 
64.8
 32.3
 32.5
 
 73.0
 38.2
 34.8
 
International - emerging markets12.9
 12.9
 
 
 10.1
 10.1
 
 
23.0
 23.0
 
 
 18.3
 18.3
 
 
Global asset allocation securities31.5
 18.8
 12.7
 
 
 
 
 
47.1
 27.0
 20.1
 
 44.9
 26.7
 18.2
 
Risk parity allocation securities45.7
 
 45.7
 
 
 
 
 
Fixed income securities:                              
Corporate bonds10.2
 
 10.2
 
 19.0
 
 19.0
 
13.9
 
 13.9
 
 14.6
 
 14.6
 
Government and agency obligations16.4
 
 16.4
 
 29.2
 
 29.2
 
23.3
 
 23.3
 
 23.4
 
 23.4
 
Fixed income funds54.3
 0.1
 54.2
 
 48.8
 0.1
 48.7
 
96.1
 0.1
 96.0
 
 77.3
 0.1
 77.2
 
Securities lending invested collateral1.5
 
 1.0
 0.5
 3.1
 1.6
 0.9
 0.6

 
 
 
 2.1
 
 1.4
 0.7
325.6
 
$110.0
 
$215.1
 
$0.5
 305.0
 
$116.7
 
$187.7
 
$0.6
486.1
 
$156.0
 
$330.1
 
$—
 463.6
 
$156.5
 
$306.4
 
$0.7
Accrued investment income0.2
       0.4
      0.2
       0.3
      
Due to brokers, net (pending trades with brokers)(0.5)       (1.6)      (0.4)       (0.8)      
Due to borrowers for securities lending program(3.0)       (5.1)      
       (4.3)      
Total pension plan assets
$322.3
       
$298.7
      
$485.9
       
$458.8
      

At December 31, the fair values of WPL’s qualified and non-qualified defined benefit pension planplans assets by asset category and fair value hierarchy level were as follows (in millions):
WPL2012 2011
2013 2012
Fair Level Level Level Fair Level Level LevelFair Level Level Level Fair Level Level Level
Value 1 2 3 Value 1 2 3Value 1 2 3 Value 1 2 3
Cash and equivalents
$14.2
 
$—
 
$14.2
 
$—
 
$37.9
 
$37.9
 
$—
 
$—

$14.0
 
$—
 
$14.0
 
$—
 
$18.9
 
$—
 
$18.9
 
$—
Equity securities:                              
U.S. large cap core41.8
 41.8
 
 
 35.7
 35.7
 
 
57.5
 57.5
 
 
 55.5
 55.5
 
 
U.S. large cap value35.0
 
 35.0
 
 29.6
 
 29.6
 
33.1
 
 33.1
 
 46.4
 
 46.4
 
U.S. large cap growth34.3
 
 34.3
 
 29.5
 
 29.5
 
33.2
 
 33.2
 
 45.5
 
 45.5
 
U.S. small cap value9.9
 
 9.9
 
 8.3
 
 8.3
 
8.9
 
 8.9
 
 13.1
 
 13.1
 
U.S. small cap growth8.1
 8.1
 
 
 7.0
 7.0
 
 
8.9
 8.9
 
 
 10.8
 10.8
 
 
International - developed markets49.9
 26.1
 23.8
 
 40.8
 21.1
 19.7
 
58.5
 29.2
 29.3
 
 66.1
 34.5
 31.6
 
International - emerging markets12.5
 12.5
 
 
 9.8
 9.8
 
 
20.8
 20.8
 
 
 16.6
 16.6
 
 
Global asset allocation securities30.7
 18.3
 12.4
 
 
 
 
 
42.5
 24.3
 18.2
 
 40.6
 24.2
 16.4
 
Risk parity allocation securities41.2
 
 41.2
 
 
 
 
 
Fixed income securities:                              
Corporate bonds9.9
 
 9.9
 
 18.4
 
 18.4
 
12.5
 
 12.5
 
 13.2
 
 13.2
 
Government and agency obligations16.0
 
 16.0
 
 28.3
 
 28.3
 
21.0
 
 21.0
 
 21.2
 
 21.2
 
Fixed income funds52.8
 0.1
 52.7
 
 47.4
 0.1
 47.3
 
86.8
 0.1
 86.7
 
 70.0
 0.1
 69.9
 
Securities lending invested collateral1.4
 
 0.9
 0.5
 3.0
 1.5
 0.9
 0.6

 
 
 
 1.9
 
 1.2
 0.7
316.5
 
$106.9
 
$209.1
 
$0.5
 295.7
 
$113.1
 
$182.0
 
$0.6
438.9
 
$140.8
 
$298.1
 
$—
 419.8
 
$141.7
 
$277.4
 
$0.7
Accrued investment income0.2
       0.3
      0.2
       0.2
      
Due to brokers, net (pending trades with brokers)(0.5)       (1.5)      (0.3)       (0.7)      
Due to borrowers for securities lending program(3.0)       (4.9)      
       (3.9)      
Total pension plan assets
$313.2
       
$289.6
      
$438.8
       
$415.4
      


147149

Table of Contents


At December 31, the fair values of Alliant Energy’s other postretirement benefits plans assets by asset category and fair value hierarchy level were as follows (in millions):
Alliant Energy2012 2011
2013 2012
Fair Level Level Level Fair Level Level LevelFair Level Level Level Fair Level Level Level
Value 1 2 3 Value 1 2 3Value 1 2 3 Value 1 2 3
Cash and equivalents
$8.4
 
$—
 
$8.4
 
$—
 
$14.0
 
$14.0
 
$—
 
$—

$3.9
 
$—
 
$3.9
 
$—
 
$8.4
 
$—
 
$8.4
 
$���
Equity securities:                              
U.S. blend32.9
 32.9
 
 
 
 
 
 
36.8
 36.8
 
 
 32.9
 32.9
 
 
U.S. large cap core2.8
 2.8
 
 
 37.1
 37.1
 
 
2.9
 2.9
 
 
 2.8
 2.8
 
 
U.S. large cap value2.4
 
 2.4
 
 2.4
 
 2.4
 
1.7
 
 1.7
 
 2.4
 
 2.4
 
U.S. large cap growth2.3
 
 2.3
 
 2.4
 
 2.4
 
1.7
 
 1.7
 
 2.3
 
 2.3
 
U.S. mid cap core
 
 
 
 17.8
 17.8
 
 
U.S. small cap core
 
 
 
 4.7
 4.7
 
 
U.S. small cap value0.7
 
 0.7
 
 0.6
 
 0.6
 
0.5
 
 0.5
 
 0.7
 
 0.7
 
U.S. small cap growth0.6
 0.6
 
 
 0.5
 0.5
 
 
0.5
 0.5
 
 
 0.6
 0.6
 
 
International - blend14.3
 14.3
 
 
 
 
 
 
15.4
 15.4
 
 
 14.3
 14.3
 
 
International - developed markets3.4
 1.8
 1.6
 
 3.3
 1.7
 1.6
 
3.0
 1.5
 1.5
 
 3.4
 1.8
 1.6
 
International - emerging markets0.8
 0.8
 
 
 0.8
 0.8
 
 
1.1
 1.1
 
 
 0.8
 0.8
 
 
Global asset allocation securities30.4
 29.6
 0.8
 
 
 
 
 
30.4
 29.5
 0.9
 
 30.4
 29.6
 0.8
 
Risk parity allocation securities2.1
 
 2.1
 
 
 
 
 
Fixed income securities:                              
Corporate bonds0.7
 
 0.7
 
 6.1
 
 6.1
 
0.6
 
 0.6
 
 0.7
 
 0.7
 
Government and agency obligations1.1
 
 1.1
 
 5.6
 
 5.6
 
1.1
 
 1.1
 
 1.1
 
 1.1
 
Fixed income funds22.4
 18.8
 3.6
 
 25.4
 21.6
 3.8
 
23.2
 18.8
 4.4
 
 22.4
 18.8
 3.6
 
Securities lending invested collateral0.1
 
 0.1
 
 0.4
 0.2
 0.1
 0.1

 
 
 
 0.1
 
 0.1
 
123.3
 
$101.6
 
$21.7
 
$—
 121.1
 
$98.4
 
$22.6
 
$0.1
124.9
 
$106.5
 
$18.4
 
$—
 123.3
 
$101.6
 
$21.7
 
$—
Accrued investment income
       0.1
      
Due to brokers, net (pending trades with brokers)
       (0.2)      
Due to borrowers for securities lending program(0.2)       (0.6)      
       (0.2)      
Total other postretirement benefits plan assets
$123.1
       
$120.4
      
$124.9
       
$123.1
      

At December 31, the fair values of IPL’s other postretirement benefits plans assets by asset category and fair value hierarchy level were as follows (in millions):
IPL2012 2011
2013 2012
Fair Level Level Level Fair Level Level LevelFair Level Level Level Fair Level Level Level
Value 1 2 3 Value 1 2 3Value 1 2 3 Value 1 2 3
Cash and equivalents
$3.3
 
$—
 
$3.3
 
$—
 
$2.1
 
$2.1
 
$—
 
$—

$1.5
 
$—
 
$1.5
 
$—
 
$3.3
 
$—
 
$3.3
 
$—
Equity securities:                              
U.S. blend24.3
 24.3
 
 
 
 
 
 
27.8
 27.8
 
 
 24.3
 24.3
 
 
U.S. large cap core0.8
 0.8
 
 
 29.3
 29.3
 
 
0.7
 0.7
 
 
 0.8
 0.8
 
 
U.S. large cap value0.7
 
 0.7
 
 0.8
 
 0.8
 
0.4
 
 0.4
 
 0.7
 
 0.7
 
U.S. large cap growth0.7
 
 0.7
 
 0.8
 
 0.8
 
0.4
 
 0.4
 
 0.7
 
 0.7
 
U.S. mid cap core
 
 
 
 14.7
 14.7
 
 
U.S. small cap value0.2
 
 0.2
 
 0.2
 
 0.2
 
0.1
 
 0.1
 
 0.2
 
 0.2
 
U.S. small cap growth0.2
 0.2
 
 
 0.2
 0.2
 
 
0.1
 0.1
 
 
 0.2
 0.2
 
 
International - blend10.6
 10.6
 
 
 
 
 
 
11.6
 11.6
 
 
 10.6
 10.6
 
 
International - developed markets1.0
 0.5
 0.5
 
 1.2
 0.6
 0.6
 
0.8
 0.4
 0.4
 
 1.0
 0.5
 0.5
 
International - emerging markets0.2
 0.2
 
 
 0.3
 0.3
 
 
0.3
 0.3
 
 
 0.2
 0.2
 
 
Global asset allocation securities21.5
 21.3
 0.2
 
 
 
 
 
21.6
 21.4
 0.2
 
 21.5
 21.3
 0.2
 
Risk parity allocation securities0.5
 
 0.5
 
 
 
 
 
Fixed income securities:                              
Corporate bonds0.2
 
 0.2
 
 4.6
 
 4.6
 
0.1
 
 0.1
 
 0.2
 
 0.2
 
Government and agency obligations0.3
 
 0.3
 
 4.1
 
 4.1
 
0.3
 
 0.3
 
 0.3
 
 0.3
 
Fixed income funds14.9
 13.9
 1.0
 
 16.5
 15.1
 1.4
 
15.0
 13.9
 1.1
 
 14.9
 13.9
 1.0
 
Securities lending invested collateral
 
 
 
 0.2
 0.1
 0.1
 

 
 
 
 
 
 
 
78.9
 
$71.8
 
$7.1
 
$—
 75.0
 
$62.4
 
$12.6
 
$—
81.2
 
$76.2
 
$5.0
 
$—
 78.9
 
$71.8
 
$7.1
 
$—
Accrued investment income
       0.1
      
Due to borrowers for securities lending program(0.1)       (0.4)      
       (0.1)      
Total other postretirement benefits plan assets
$78.8
       
$74.7
      
$81.2
       
$78.8
      


148150

Table of Contents


At December 31, the fair values of WPL’s other postretirement benefits plans assets by asset category and fair value hierarchy level were as follows (in millions):
WPL2012 2011
2013 2012
Fair Level Level Level Fair Level Level LevelFair Level Level Level Fair Level Level Level
Value 1 2 3 Value 1 2 3Value 1 2 3 Value 1 2 3
Cash and equivalents
$3.9
 
$—
 
$3.9
 
$—
 
$10.5
 
$10.5
 
$—
 
$—

$1.4
 
$—
 
$1.4
 
$—
 
$3.9
 
$—
 
$3.9
 
$—
Equity securities:                              
U.S. blend3.1
 3.1
 
 
 
 
 
 
3.6
 3.6
 
 
 3.1
 3.1
 
 
U.S. large cap core1.3
 1.3
 
 
 1.2
 1.2
 
 
1.5
 1.5
 
 
 1.3
 1.3
 
 
U.S. large cap value1.2
 
 1.2
 
 1.0
 
 1.0
 
0.8
 
 0.8
 
 1.2
 
 1.2
 
U.S. large cap growth1.1
 
 1.1
 
 1.0
 
 1.0
 
0.8
 
 0.8
 
 1.1
 
 1.1
 
U.S. small cap core
 
 
 
 4.7
 4.7
 
 
U.S. small cap value0.3
 
 0.3
 
 0.3
 
 0.3
 
0.2
 
 0.2
 
 0.3
 
 0.3
 
U.S. small cap growth0.3
 0.3
 
 
 0.2
 0.2
 
 
0.2
 0.2
 
 
 0.3
 0.3
 
 
International - blend1.3
 1.3
 
 
 
 
 
 
1.5
 1.5
 
 
 1.3
 1.3
 
 
International - developed markets1.6
 0.8
 0.8
 
 1.3
 0.7
 0.6
 
1.5
 0.7
 0.8
 
 1.6
 0.8
 0.8
 
International - emerging markets0.4
 0.4
 
 
 0.3
 0.3
 
 
0.5
 0.5
 
 
 0.4
 0.4
 
 
Global asset allocation securities3.6
 3.2
 0.4
 
 
 
 
 
3.8
 3.3
 0.5
 
 3.6
 3.2
 0.4
 
Risk parity allocation securities1.1
 
 1.1
 
 
 
 
 
Fixed income securities:                              
Corporate bonds0.3
 
 0.3
 
 1.1
 
 1.1
 
0.3
 
 0.3
 
 0.3
 
 0.3
 
Government and agency obligations0.5
 
 0.5
 
 1.0
 
 1.0
 
0.5
 
 0.5
 
 0.5
 
 0.5
 
Fixed income funds3.5
 1.8
 1.7
 
 2.6
 1.0
 1.6
 
4.0
 1.8
 2.2
 
 3.5
 1.8
 1.7
 
Securities lending invested collateral
 
 
 
 0.1
 0.1
 
 

 
 
 
 
 
 
 
22.4
 
$12.2
 
$10.2
 
$—
 25.3
 
$18.7
 
$6.6
 
$—
21.7
 
$13.1
 
$8.6
 
$—
 22.4
 
$12.2
 
$10.2
 
$—
Due to brokers, net (pending trades with brokers)
       (0.1)      
Due to borrowers for securities lending program(0.1)       (0.1)      
       (0.1)      
Total other postretirement benefits plan assets
$22.3
       
$25.1
      
$21.7
       
$22.3
      

For the various defined benefit pension and other postretirement benefits plans, Alliant Energy common stock represented less than 1% of total plan assets held in the plans at December 31, 20122013 and 20112012.

Cash Balance Plan - Alliant Energy’s defined benefit pension plans include the Cash Balance Plan, thatwhich provides benefits for certain non-bargaining unit employees. The Cash Balance Plan has been closed to new hires since 2005. Effective 2008, Alliant Energy amended the Cash Balance Plan by discontinuing additional contributions into employees’ Cash Balance Plan accounts and increased its level of contributions to its 401(k) Savings Plan. In 2009, Alliant Energy amended the Cash Balance Plan by changing participants’ future interest credit formula to use the annual change in the consumer price index. This amendment provides participants an interest crediting rate that is 3% more than the annual change in the consumer price index. Refer to Note 13(c)16(c) for discussion of a class-action lawsuit filed against the Cash Balance Plan in 2008 and an agreement Alliant Energy reached with the IRS, which resulted in a favorable determination letter for the Cash Balance Plan in 2011.2008.

401(k) Savings Plans - A significant number of Alliant Energy, IPL and WPL employees participate in defined contribution retirement plans (401(k) savings plans). Alliant Energy common stock represented 12.5%11.3% and 14.6%12.5% of total assets held in 401(k) savings plans at December 31, 20122013 and 20112012, respectively. Costs related to the 401(k) savings plans, which are partially based on the participants’ level of contribution,contributions, were as follows (in millions):
 Alliant Energy IPL (a) WPL (a)
 2012 2011 2010 2012
 2011
 2010
 2012 2011 2010
401(k) costs
$18.5
 
$18.4
 
$18.5
 
$9.6
 
$9.2
 
$8.8
 
$8.1
 
$8.4
 
$8.9
 Alliant Energy IPL (a) WPL (a)
 2013 2012 2011 2013
 2012
 2011
 2013 2012 2011
401(k) costs
$19.2
 
$18.5
 
$18.4
 
$9.9
 
$9.6
 
$9.2
 
$8.5
 
$8.1
 
$8.4

(a)IPL’s and WPL’s amounts include allocated costs associated with Corporate Services employees.

(b) Equity-based Compensation Plans - In 2010, Alliant Energy’s shareowners approved the Alliant Energy 2010 Omnibus Incentive Plan (OIP),OIP, which permits the grant of stock options, restricted stock, restricted stock units, performance shares, performance units, and other stock-based awards and performance-based cash awards to key employees. At December 31, 20122013, performance shares and restricted stock were outstanding and 4.24.1 million shares of Alliant Energy’s common stock remained available for grants under the OIP. Upon shareowner approval of the OIP, the Alliant Energy 2002 Equity Incentive Plan (EIP) terminated resulting in no new awards authorized to be granted under the EIP. All awards previously granted under the EIP that are still outstanding remain valid and continue to be subject to all of the terms and conditions of the EIP. At December 31, 2012, non-qualified stock options, restricted stock and performance shares were outstanding under the EIP

149

Table of Contents


and another predecessor plan under which new awards can no longer be granted. Alliant Energy satisfies payouts related to equity awards under the OIP and EIP through the issuance of new shares of its common stock. Alliant Energy also has the Alliant Energy Director Long Term Incentive Plan (DLIP),DLIP, which permits the grant of long-term performance-based awards, including performance units and restricted cash awards to certain key employees. At December 31, 20122013, performance units and performance contingent cash awards were outstanding under the DLIP. There is no limit to the number of grants that can be made under the DLIP and Alliant Energy satisfies all payouts under the DLIP through cash.cash payments.


151

Table of Contents


A summary of compensation expense (allocated(including amounts allocated to IPL and WPL) and the related income tax benefits recognized for share-based compensation awards was as follows (in millions):
Alliant Energy IPL WPLAlliant Energy IPL WPL
2012 2011 2010 2012 2011 2010 2012 2011 20102013 2012 2011 2013 2012 2011 2013 2012 2011
Compensation expense
$6.9
 
$10.1
 
$7.5
 
$3.6
 
$5.5
 
$4.0
 
$3.0
 
$4.1
 
$3.0

$12.0
 
$6.9
 
$10.1
 
$6.2
 
$3.6
 
$5.5
 
$5.2
 
$3.0
 
$4.1
Income tax benefits2.8
 4.0
 3.0
 1.5
 2.2
 1.6
 1.2
 1.7
 1.2
4.8
 2.8
 4.0
 2.5
 1.5
 2.2
 2.1
 1.2
 1.7

As of December 31, 20122013, total unrecognized compensation cost related to share-based compensation awards was $6.15.4 million, which is expected to be recognized over a weighted average period of between 1 and 2 years. Share-based compensation expense is recognized on a straight-line basis over the requisite service periods and is primarily recorded in “Utility - Other operation and maintenance” in the Consolidated Statements of Income.

Performance Shares and Units - Payouts of performance shares and units to key employees are contingent upon achievement over 3-year periods of specified performance criteria, which currently include metrics of total shareowner return relative to investor-owned utility peer groups. Payouts of nonvested performance shares and units issued in 2012 and after are prorated at retirement, death or disability based on time worked during the first year of the performance period and achievement of the performance criteria. Upon achievement of the performance criteria, payouts of these performance shares and units to participants who terminate employment after the first year of the performance period due to retirement, death or disability are not prorated. Payouts of nonvested performance shares and units issued prior to 2012 are prorated at retirement, death, disability or involuntary termination without cause based on time worked during the full or entire performance period and achievement of the performance criteria. Participants’ nonvested performance shares and units are forfeited if the participant voluntarily leaves Alliant Energy or is terminated for cause. Nonvested performance shares and units do not have non-forfeitable rights to dividends when dividends are paid to common shareowners. Alliant Energy assumes it will make future payouts of its performance shares and units in cash; therefore, performance shares and units are accounted for as liability awards.

Performance Shares - Performance shares can be paid out in shares of Alliant Energy’s common stock, cash or a combination of cash and stock and are adjusted by a performance multiplier, which ranges from zero to 200% based on the performance criteria. A summary of the performance shares activity was as follows:
2012 2011 20102013 2012 2011
Shares (a) Shares (a) Shares (a)Shares (a) Shares (a) Shares (a)
Nonvested shares, January 1236,979
 234,518
 256,579
145,277
 236,979
 234,518
Granted45,612
 64,217
 72,487
49,093
 45,612
 64,217
Vested (b)(111,980) (57,838) 
(54,430) (111,980) (57,838)
Forfeited (c)(25,334) (3,918) (94,548)
 (25,334) (3,918)
Nonvested shares, December 31145,277
 236,979
 234,518
139,940
 145,277
 236,979

(a)
Share amounts represent the target number of performance shares. Each performance share’s value is based on the price of one share of Alliant Energy’s common stock at the end of the performance period. The actual number of shares that will be paid out upon vesting is dependent upon actual performance and may range from zero to 200% of the target number of shares.
(b)
In 2013, 54,430 performance shares granted in 2010 vested at 197.5% of the target, resulting in payouts valued at $4.8 million, which consisted of a combination of cash and common stock (4,177 shares). In 2012, 111,980 performance shares granted in 2009 vested at 162.5% of the target, resulting in payouts valued at $8.0 million, which consisted of a combination of cash and common stock (6,399 shares). In 2011, 57,838 performance shares granted in 2008 vested at 75% of the target, resulting in payouts valued at $1.6$1.6 million,, which consisted of a combination of cash and common stock (1,387(1,387 shares).
(c)
In 2010, 57,100 performance shares granted in 2007 were forfeited without payout because the specified performance criteria for such shares were not met. The remaining forfeitures during 2012, 2011 and 2010Forfeitures were primarily caused by retirements and voluntary terminations of participants.


150152

Table of Contents


Performance Units - Performance units must be paid out in cash and are adjusted by a performance multiplier, which ranges from zero to 200% based on the performance criteria. A summary of the performance unit activity was as follows:
2012 2011 20102013 2012 2011
Units (a) Units (a) Units (a)Units (a) Units (a) Units (a)
Nonvested units, January 142,996
 23,128
 
64,969
 42,996
 23,128
Granted24,686
 23,975
 23,795
22,201
 24,686
 23,975
Vested (b)(19,760) 
 
Forfeited(2,713) (4,107) (667)(1,498) (2,713) (4,107)
Nonvested units, December 3164,969
 42,996
 23,128
65,912
 64,969
 42,996

(a)
Unit amounts represent the target number of performance units. Each performance unit’s value is based on the average price of one share of Alliant Energy’s common stock on the grant date of the award. The actual payout for performance units is dependent upon actual performance and may range from zero to 200% of the target number of units.
(b)In 2013, 19,760 performance units granted in 2010 vested at 197.5% of the target, resulting in cash payouts valued at $1.3 million.

Fair Value of Awards - Information related to fair values of nonvested performance shares and units at December 31, 20122013, by year of grant, were as follows:
Performance Shares Performance UnitsPerformance Shares Performance Units
2012 Grant 2011 Grant 2010 Grant 2012 Grant 2011 Grant 2010 Grant2013 Grant 2012 Grant 2011 Grant 2013 Grant 2012 Grant 2011 Grant
Nonvested awards45,612
 45,235
 54,430
 23,969
 21,095
 19,905
49,093
 45,612
 45,235
 21,935
 23,226
 20,751
Alliant Energy common stock closing price on December 31, 2012
$43.91
 
$43.91
 
$43.91
      
Alliant Energy common stock closing price on December 31, 2013
$51.60
 
$51.60
 
$51.60
      
Alliant Energy common stock average price on grant date      
$43.05
 
$38.75
 
$32.56
      
$47.58
 
$43.05
 
$38.75
Estimated payout percentage based on performance criteria89% 107% 198% 89% 107% 198%110% 109% 148% 110% 109% 148%
Fair values of each nonvested award
$39.08
 
$46.98
 
$86.72
 
$38.31
 
$41.46
 
$64.30

$56.76
 
$56.24
 
$76.11
 
$52.34
 
$46.92
 
$57.16

At December 31, 20122013, fair values of nonvested performance shares and units were calculated using a Monte Carlo simulation to determine the anticipated total shareowner returns of Alliant Energy and its investor-owned utility peer groups. Expected volatility was based on historical volatilities using daily stock prices over the past three years. Expected dividend yields were calculated based on the most recent quarterly dividend rates announced prior to the measurement date and stock prices at the measurement date. The risk-free interest rate was based on the three-year U.S. Treasury rate in effect as of the measurement date.

Performance-contingent Restricted Stock - Restricted stock consists of time-based and performance-contingent restricted stock.

Time-based Restricted Stock - The current restriction period for outstanding time-based restricted stock is up to three years. Nonvested shares of time-based restricted stock generally become vested upon retirement. Compensation costs related to awards granted to retirement-eligible employees are generally expensed on the date of grant. Participants’ nonvested time-based restricted stock issued prior to 2012 is forfeited if the participant voluntarily leaves Alliant Energy or is terminated for cause. Participants’ nonvested time-based restricted stock issued prior to 2012 is fully vested in the event of retirement, death, disability or involuntary termination without cause. The fair value of time-based restricted stock is based on the average market price at the grant date. A summary of the time-based restricted stock activity was as follows:
 2012 2011 2010
 Shares 
Weighted
Average
Fair Value
 Shares 
Weighted
Average
Fair Value
 Shares 
Weighted
Average
Fair Value
Nonvested shares, January 135,800
 
$30.87
 70,033
 
$32.27
 125,349
 
$32.47
Granted
 
 5,000
 39.86
 
 
Vested(32,466) 29.95
 (38,633) 34.60
 (54,016) 32.72
Forfeited
 
 (600) 29.41
 (1,300) 32.78
Nonvested shares, December 313,334
 39.86
 35,800
 30.87
 70,033
 32.27

Performance-contingent Restricted Stock - Vesting of performance-contingent restricted stock grants are based on the achievement of certain performance targets (currently specified earnings growth). The performance metric for the 2012, 2011 and 2010 grants isgrowth of consolidated net income growth.from continuing operations). If performance targets are not met within the performance period, which currently ranges from two to four years, these restricted stock grants are forfeited. Payouts of nonvested performance-contingent restricted stock issued in 2012 and after are prorated at retirement, death or disability based on time worked during the first

151

Table of Contents


year of the performance period and achievement of the performance criteria. Upon achievement of the performance criteria, payouts of this performance-contingent restricted stock to participants who terminate employment after the first year of the performance period due to retirement, death or disability are not prorated. Nonvested shares of performance-contingent restricted stock issued prior to 2012 are prorated at retirement based on time worked during the full or entire performance period and vest only if and when the performance criteria are met. Participants’ nonvested performance-contingent restricted stock is forfeited if the participant voluntarily leaves Alliant Energy or is terminated for cause. The fair value of performance-contingent restricted stock is based on the average market price at the grant date. A summary of the performance-contingent restricted stock activity was as follows:

153

Table of Contents


2012 2011 20102013 2012 2011
Shares 
Weighted
Average
Fair Value
 Shares 
Weighted
Average
Fair Value
 Shares 
Weighted
Average
Fair Value
Shares 
Weighted
Average
Fair Value
 Shares 
Weighted
Average
Fair Value
 Shares 
Weighted
Average
Fair Value
Nonvested shares, January 1301,738
 
$32.60
 296,190
 
$32.32
 226,007
 
$32.25
211,651
 
$32.42
 301,738
 
$32.60
 296,190
 
$32.32
Granted45,612
 43.05
 64,217
 38.75
 72,487
 32.56
49,093
 47.58
 45,612
 43.05
 64,217
 38.75
Vested (a)(65,172) 32.56
 (53,274) 37.93
 
 

 
 (65,172) 32.56
 (53,274) 37.93
Forfeited (b)(70,527) 39.93
 (5,395) 38.00
 (2,304) 32.56
(101,822) 23.67
 (70,527) 39.93
 (5,395) 38.00
Nonvested shares, December 31211,651
 32.42
 301,738
 32.60
 296,190
 32.32
158,922
 42.71
 211,651
 32.42
 301,738
 32.60

(a)
In 2012 and 2011, 65,172 and 53,274 performance-contingent restricted shares granted in 2010 and 2007, respectively, vested because the specified performance criteria for such shares were met.
(b)
In 2013 and 2012,101,822 and 65,516 performance-contingent restricted shares granted in 2009 and 2008, respectively, were forfeited because the specified performance criteria for such shares were not met. The remaining forfeitures during 2012, and 2011 and 2010 were primarily caused by retirements and terminations of participants.

Non-qualifiedTime-based Restricted Stock Options - Options were granted at the market price of the shares on the date of grant, vested over three years and expire no later than 10 years after the grant date. Alliant Energy has not granted any options since 2004. A summary of the stock option activity was as follows:
 2012 2011 2010
 Shares 
Weighted
Average
Exercise
Price
 Shares 
Weighted
Average
Exercise
Price
 Shares 
Weighted
Average
Exercise
Price
Outstanding, January 163,889
 
$24.21
 163,680
 
$24.51
 384,331
 
$27.02
Exercised(38,711) 24.41
 (99,791) 24.71
 (191,433) 28.93
Expired
 
 
 
 (29,218) 28.59
Outstanding and exercisable, December 3125,178
 23.89
 63,889
 24.21
 163,680
 24.51

The weighted average remaining contractual term for options outstanding and exercisable atAt December 31, 20122013, the amount of nonvested shares of time-based restricted stock was not material.1 year. The aggregate intrinsic value of options outstanding and exercisable at December 31, 2012 was $0.5 million. Other information related to stock option activity was as follows (in millions):
 2012 2011 2010
Cash received from stock options exercised
$0.9
 
$2.5
 
$5.5
Aggregate intrinsic value of stock options exercised0.8
 1.6
 1.1
Income tax benefit from the exercise of stock options0.3
 0.7
 0.4

Performance Contingent Cash Awards - Performance contingent cash award payouts to key employees are based on the achievement of certain performance targets (currently specified growth of consolidated net income growth)from continuing operations). If performance targets are not met within the performance period, which currently ranges from two to four years, there are no payouts for these awards. Payouts of nonvested awards issued in 2012 and after are prorated at retirement, death or disability based on time worked during the first year of the performance period and achievement of the performance criteria. Upon achievement of the performance criteria, payouts of these 2012 awards to participants who terminate employment after the first year of the performance period due to retirement, death or disability are not prorated. Nonvested awards issued prior to 2012 are prorated at retirement based on time worked during the full or entire performance period and achievement of the performance criteria. Participants’ nonvested awards are forfeited if the participant voluntarily leaves Alliant Energy or is terminated for cause. Each performance contingent cash award’s value is based on the price of one share of Alliant Energy’s common stock at the end of the performance period. Alliant Energy accounts for performance contingent cash awards as liability awards because payouts will be made in the form of cash. A summary of the performance contingent cash awards activity was as follows:

152

Table of Contents


2012 2011 20102013 2012 2011
Awards Awards AwardsAwards Awards Awards
Nonvested awards, January 146,676
 23,428
 
59,639
 46,676
 23,428
Granted36,936
 23,975
 23,795
39,530
 36,936
 23,975
Vested (a)(21,605) 
 

 (21,605) 
Forfeited(2,368) (727) (367)(2,192) (2,368) (727)
Nonvested awards, December 3159,639
 46,676
 23,428
96,977
 59,639
 46,676

(a)
In 2012, 21,605 performance contingent cash awards granted in 2010 vested, resulting in cash payouts valued at $0.9 million.

Non-qualified Stock Options - Alliant Energy has not granted any options since 2004. In 2013, the last of the outstanding options were exercised, resulting in no options outstanding at December 31, 2013.

(c) Deferred Compensation Plan (DCP) - Alliant Energy maintains a DCP under which key employees may defer up to 100% of base salary and performance-based compensation and directors may elect to defer all or part of their retainer and committee fees. Key employees who have made the maximum allowed contribution to the Alliant Energy 401(k) Savings Plan may receive an additional credit to the DCP. Key employees and directors may elect to have their deferrals credited to a company stock account, an interest account or equity accounts based on certain benchmark funds.

Company Stock Accounts - The DCP does not permit diversification of deferrals credited to the company stock account and all distributions from participants’ company stock accounts are made in the form of shares of Alliant Energy common stock. The deferred compensation obligations for participants’ company stock accounts are recorded in “Additional paid-in capital” and the shares of Alliant Energy common stock held in a rabbi trust to satisfy this obligation are recorded in “Shares in deferred compensation trust” on Alliant Energy’s Consolidated Balance Sheets. At December 31, the carrying value of the

154

Table of Contents


deferred compensation obligation for the company stock accounts and the shares in the deferred compensation trust based on the historical value of the shares of Alliant Energy common stock contributed to the rabbi trust, and the fair market value of the shares held in the rabbi trust were as follows (in millions):
2012 20112013 2012
Carrying value
$7.3
 
$8.3

$8.0
 
$7.3
Fair market value9.5
 11.6
11.7
 9.5

Interest and Equity Accounts - Distributions from participants’ interest and equity accounts are in the form of cash payments. The deferred compensation obligations for participants’ interest and equity accounts are recorded in “Pension and other benefit obligations” on Alliant Energy’s and IPL’s Consolidated Balance Sheets. At December 31, the carrying value of Alliant Energy’s and IPL’s deferred compensation obligations for participants’ interest and equity accounts, which approximates fair market value, was as follows (in millions):
 Alliant Energy IPL
 2012 2011 2012 2011
Carrying value$16.3 $20.5 $5.0 $5.0
 Alliant Energy IPL
 2013 2012 2013 2012
Carrying value$15.9 $16.3 $5.2 $5.0

(7) COMMON EQUITY(13) ASSET RETIREMENT OBLIGATIONS
Common Share Activity - A summary ofAROs recognized by Alliant Energy’s common stock activity was as follows:
 2012 2011 2010
Shares outstanding, January 1111,018,821
 110,893,901
 110,656,498
Equity-based compensation plans (Note 6(b))
20,195
 164,400
 260,316
Other (a)(51,616) (39,480) (22,913)
Shares outstanding, December 31110,987,400
 111,018,821
 110,893,901

(a)Includes shares transferred from employees to Alliant Energy, to satisfy tax withholding requirements in connection with the vesting of certain restricted stock under the equity-based compensation plans.

At December 31, 2012, Alliant Energy had a total of 8.4 million shares available for issuance in the aggregate, pursuant to its OIP, Shareowner Direct Plan and 401(k) Savings Plan.


153

Table of Contents


Shareowner Rights Agreement - Alliant Energy has established an amended and restated Shareowner Rights Agreement. The rights under this agreement will only become exercisable if a person or group has acquired, or announced an intention to acquire, 15% or more of Alliant Energy’s outstanding common stock. Each right will initially entitle registered shareowners to purchase from Alliant Energy one-half of one share of Alliant Energy’s common stock. The rights will be exercisable at an initial price of $110.00 per full share, subject to adjustment. If any shareowner acquires 15% or more of the outstanding common stock of Alliant Energy, each right (subject to limitations) will entitle its holder to purchase, at the right’s then current exercise price, a number of common shares of Alliant Energy or of the acquirer having a market value at the time of twice the right’s per full share exercise price. Alliant Energy’s Board of Directors is authorized to reduce the 15% ownership threshold to not less than 10%. The amended and restated Shareowner Rights Agreement expires in December 2018.

Dividend Restrictions - Alliant Energy does not have any significant common stock dividend restrictions. IPL and WPL each have common stock dividend restrictions based onrelate to legal obligations for the termsremoval, closure or dismantlement of their outstanding preferred stockseveral assets including, but not limited to, wind projects, certain ash ponds, certain coal yards, active ash landfills and applicable regulatory limitations. At December 31, 2012, IPL and WPL were in compliance with all such dividend restrictions.

IPL and WPL are restricted from paying common stock dividends to their parent company,above ground storage tanks. Alliant Energy, if for any past or current dividend period, dividends on their respective preferred stock have not been paid, or declared and set apart for payment. IPL and WPL have paid all dividends on their respective preferred stock through 2012.

IPL’s most significant regulatory limitation on distributions to its parent company requires IPL to obtain IUB approval for a reasonable utility capital structure if its actual 13-month average common equity ratio (calculated on a financial basis consistent with IPL’s rate cases) falls below 42% of total capitalization. As of December 31, 2012, IPL’s amount of retained earnings that were free of dividend restrictions was $387 million.

Currently, WPL’s most significant regulatory limitation on distributions to its parent company is included in an order issued by the PSCW in 2012 that prohibits WPL from paying annual common stock dividends in excess of $119 million in 2013 if WPL’s actual 13-month average common equity ratio (calculated on a financial basis consistent with WPL’s rate cases) falls below 51.03%. WPL’s dividends are also restricted to the extent that such dividend would reduce WPL’s common stock equity ratio to less than 25%. As of December 31, 2012, WPL’s amount of retained earnings that were free of dividend restrictions was $119 million for 2013.

Restricted Net Assets of Subsidiaries - IPL and WPL do not have regulatory authority to lend or advance any amounts to their parent company. As of December 31, the amount of net assets of IPL and WPL that were not available to be transferred to their parent company in the form of cash dividends without the consent ofEnergy’s, IPL’s and WPL’s recognized AROs also include legal obligations for the management and final disposition of asbestos and polychlorinated biphenyls. Alliant Energy’s, IPL’s and WPL’s AROs are recorded in “Other long-term liabilities and deferred credits” on the Consolidated Balance Sheets. Refer to Note 2 for information regarding regulatory authorities was as follows (in billions):
 2012 2011
IPL
$1.1
 
$1.0
WPL1.5
 1.3

Capital Transactions With Subsidiaries - IPL, WPL and Resources paid common stock dividends and repaymentsassets related to AROs. A reconciliation of capital to their parent company, Alliant Energy,the changes in AROs associated with long-lived assets is as follows (in millions):
 IPL WPL Resources
 2012 2011 2010 2012 2011 2010 2012 2011 2010
Common stock dividends
$122.9
 
$73.4
 
$—
 
$112.0
 
$112.1
 
$109.5
 
$—
 
$—
 
$—
Repayments of capital
 100.7
 118.2
 
 
 
 
 
 65.0
Total distributions from common equity
$122.9
 
$174.1
 
$118.2
 
$112.0
 
$112.1
 
$109.5
 
$—
 
$—
 
$65.0

IPL, WPL, Resources and Corporate Services received capital contributions from their parent company, Alliant Energy, as follows (in millions):
 2012 2011 2010
IPL
$110.0
 
$54.0
 
$50.0
WPL90.0
 25.0
 75.0
Resources
 65.0
 
Corporate Services30.0
 
 


154

Table of Contents


(8) REDEEMABLE PREFERRED STOCK
Information related to the carrying value of cumulative preferred stock of subsidiaries, net at December 31 was as follows (dollars in millions):
Liquidation Preference/ Stated Value Authorized Shares Shares Outstanding Series Redemption (none are mandatorily redeemable) 2012 2011
IPL:            
$25 16,000,000 6,000,000 8.375% On or after March 15, 2013 
$150.0
 
$150.0
Less: discount         (4.9) (4.9)
          145.1
 145.1
WPL:            
$100 (a) 99,970 4.50% Any time 10.0
 10.0
$100 (a) 74,912 4.80% Any time 7.5
 7.5
$100 (a) 64,979 4.96% Any time 6.5
 6.5
$100 (a) 29,957 4.40% Any time 3.0
 3.0
$100 (a) 29,947 4.76% Any time 3.0
 3.0
$100 (a) 150,000 6.20% Any time 15.0
 15.0
$25 (a) 599,460 6.50% Any time 15.0
 15.0
          60.0
 60.0
Alliant Energy         
$205.1
 
$205.1
 Alliant Energy IPL WPL
 2013 2012 2013 2012 2013 2012
Balance, January 1
$101.5
 
$91.1
 
$45.5
 
$56.2
 
$46.9
 
$34.9
Revisions in estimated cash flows (a)5.6
 (6.4) 0.1
 (9.2) 5.5
 2.8
Liabilities settled(2.3) (3.4) (0.6) (3.3) (1.7) (0.1)
Liabilities incurred (b)1.2
 16.8
 1.2
 
 
 7.7
Accretion expense3.7
 3.4
 1.7
 1.8
 1.7
 1.6
Balance, December 31
$109.7
 
$101.5
 
$47.9
 
$45.5
 
$52.4
 
$46.9

(a)
WPL hasIn 2012, IPL recorded revisions in estimated cash flows of 3,750,000($8.2) million authorized shares in total.based on revised remediation timing and cost information for asbestos remediation at Sixth Street.
(b)
In 2012, Resources recorded AROs of $9.1 million related to its Franklin County wind project and WPL recorded AROs of $7.6 million related to Nelson Dewey.

IPL - The articlesIn addition, certain of incorporation of IPL contain a provision that grantsAlliant Energy’s, IPL’s and WPL’s AROs related to EGU assets have not been recognized. Due to an indeterminate remediation date, the holders of its preferred stock voting rights to elect two members of IPL’s Board of Directors if preferred dividends equal to the annual dividend requirements are in arrears. Such voting rights would not provide the holders of IPL’s preferred stock controlfair values of the decision on redemption of IPL’s preferred stock and could not force IPL to exercise its call option. Therefore, IPL’s preferred stock is presented in total equity on Alliant Energy’s and IPL’s Consolidated Balance Sheets in a manner consistent with noncontrolling interests.

In February 2013, IPL announced itAROs for these assets cannot be currently estimated. A liability for these AROs will redeem all 6,000,000 outstanding shares of its 8.375% cumulative preferred stock in March 2013 at par value for approximately $150 million plus accrued and unpaid dividends to the redemption date. Alliant Energy and IPL expect to record a $5 million charge in the first quarter of 2013 related to this transaction in “Preferred dividend requirements” in their Consolidated Statements of Income.

WPL - The articles of organization of WPL contain a provision that grants the holders of its preferred stock voting rights to elect a majority of WPL’s Board of Directors if preferred dividends equal to the annual dividend requirements are in arrears. The exercise of such voting rights would provide the holders of WPL’s preferred stock control of the decision on redemption of WPL’s preferred stock and could force WPL to exercise its call option. Therefore, the contingent control right and the embedded call option cause WPL’s preferred stock to be presented outside of total equity on Alliant Energy’s and WPL’s Consolidated Balance Sheets in a manner consistent with temporary equity.

In February 2013, WPL announced it will redeem all 1,049,225 outstanding shares of its 4.40% through 6.50% cumulative preferred stock in March 2013 for approximately $61 million plus accrued and unpaid dividends to the redemption date. Alliant Energy and WPL expect to record a $1 million charge in the first quarter of 2013 related to this transaction in “Preferred dividend requirements” in their Consolidated Statements of Income.

Refer to Note 11 for information on therecorded when fair value is determinable. Removal costs of cumulative preferred stock of subsidiaries.these facilities are being recovered in rates and are recorded in regulatory liabilities.


155

Table of Contents


(9) DEBT
(a) Short-term Debt - Alliant Energy and its subsidiaries maintain committed bank lines of credit to provide short-term borrowing flexibility and backstop liquidity for commercial paper outstanding. At December 31, 2012, Alliant Energy’s short-term borrowing arrangements included three revolving credit facilities totaling $1 billion ($300 million for Alliant Energy at the parent company level, $300 million for IPL and $400 million for WPL), which expire in December 2016. Information regarding commercial paper classified as short-term debt and backstopped by the credit facilities was as follows (dollars in millions):
 Alliant Energy IPL WPL
 2012 2011 2012 2011 2012 2011
December 31           
Commercial paper:           
Amount outstanding$217.5 $102.8 $26.3 $7.1 $86.6 $25.7
Weighted average interest rates0.4% 0.3% 0.4% 0.4% 0.3% 0.3%
Weighted average remaining maturity11 days 3 days 2 days 3 days 19 days 3 days
Available credit facility capacity (a)$732.5 $897.2 $223.7 $292.9 $313.4 $374.3
 Alliant Energy IPL WPL
 2012 2011 2012 2011 2012 2011
For the year ended           
Maximum amount outstanding
(based on daily outstanding balances)
$217.5 $124.4 $35.4 $54.4 $86.6 $96.5
Average amount outstanding
(based on daily outstanding balances)
$99.8 $27.7 $5.9 $6.0 $11.7 $17.6
Weighted average interest rates0.4% 0.3% 0.4% 0.3% 0.3% 0.3%

(a)
Alliant Energy’s and IPL’s available credit facility capacities reflect outstanding commercial paper classified as both short- and long-term debt at December 31, 2012. Refer to Note 9(b) for further discussion of $50.0 million of commercial paper outstanding at December 31, 2012 classified as long-term debt on Alliant Energy’s and IPL’s Consolidated Balance Sheets.

Alliant Energy’s, IPL’s and WPL’s credit facility agreements each contain a financial covenant, which requires the entities to maintain certain debt-to-capital ratios in order to borrow under the credit facilities. The required debt-to-capital ratios compared to the actual debt-to-capital ratios at December 31, 2012 were as follows:
 Alliant Energy IPL WPL
RequirementLess than 65% Less than 58% Less than 58%
Actual50% 45% 48%

The debt component of the capital ratios includes long- and short-term debt (excluding non-recourse debt and hybrid securities to the extent the total carrying value of such hybrid securities does not exceed 15% of consolidated capital of the applicable borrower), capital lease obligations, letters of credit, guarantees of the foregoing and new synthetic leases. Unfunded vested benefits under qualified pension plans are not included in the debt-to-capital ratios. The equity component of the capital ratios excludes accumulated other comprehensive income (loss).


156

Table of Contents


(b) Long-Term Debt - Long-term debt, net as of December 31 was as follows (dollars in millions):
 2012 2011
 Alliant Energy IPL WPL Alliant Energy IPL WPL
Senior Debentures:           
3.3%, due 2015
$150.0
 
$150.0
 
$—
 
$150.0
 
$150.0
 
$—
5.875%, due 2018100.0
 100.0
 
 100.0
 100.0
 
7.25%, due 2018250.0
 250.0
 
 250.0
 250.0
 
3.65%, due 2020200.0
 200.0
 
 200.0
 200.0
 
5.5%, due 202550.0
 50.0
 
 50.0
 50.0
 
6.45%, due 2033100.0
 100.0
 
 100.0
 100.0
 
6.3%, due 2034125.0
 125.0
 
 125.0
 125.0
 
6.25%, due 2039300.0
 300.0
 
 300.0
 300.0
 
 1,275.0
 1,275.0
 
 1,275.0
 1,275.0
 
Debentures:           
5%, due 2019250.0
 
 250.0
 250.0
 
 250.0
4.6%, due 2020150.0
 
 150.0
 150.0
 
 150.0
2.25%, due 2022 (a)250.0
 
 250.0
 
 
 
6.25%, due 2034100.0
 
 100.0
 100.0
 
 100.0
6.375%, due 2037300.0
 
 300.0
 300.0
 
 300.0
7.6%, due 2038250.0
 
 250.0
 250.0
 
 250.0
 1,300.0
 
 1,300.0
 1,050.0
 
 1,050.0
Pollution Control Revenue Bonds:           
5%, due 201438.4
 38.4
 
 38.4
 38.4
 
5%, due 2014 and 201524.5
 
 24.5
 24.5
 
 24.5
5.375%, due 201514.6
 
 14.6
 14.6
 
 14.6
 77.5
 38.4
 39.1
 77.5
 38.4
 39.1
Other:           
Commercial paper, 0.4% at December 31, 2012 (b)50.0
 50.0
 
 
 
 
4% senior notes, due 2014250.0
 
 
 250.0
 
 
Term loan credit agreement through 2014, 1.1% at December 31, 2012 (c)60.0
 
 
 
 
 
3.45% senior notes, due 2022 (d)75.0
 
 
 
 
 
5.06% senior secured notes, due 2013 to 202461.9
 
 
 63.3
 
 
Other, 1% at December 31, 2012, due 2013 to 20250.5
 
 
 0.5
 
 
 497.4
 50.0
 
 313.8
 
 
Subtotal3,149.9
 1,363.4
 1,339.1
 2,716.3
 1,313.4
 1,089.1
Current maturities(1.5) 
 
 (1.4) 
 
Unamortized debt (discount) and premium, net(11.8) (3.9) (7.6) (11.8) (4.4) (6.9)
Long-term debt, net
$3,136.6
 
$1,359.5
 
$1,331.5
 
$2,703.1
 
$1,309.0
 
$1,082.2

(a)
In 2012, WPL issued $250.0 million of 2.25% debentures due 2022. The proceeds from the issuance were used by WPL to fund a portion of the purchase price of Riverside.
(b)
As of December 31, 2012, $50.0 million of commercial paper was recorded in “Long-term debt, net” on Alliant Energy’s and IPL’s Consolidated Balance Sheets due to the existence of long-term credit facilities that back-stop this commercial paper balance, along with Alliant Energy’s and IPL’s intent and ability to refinance these balances on a long-term basis. As of December 31, 2012, this commercial paper balance had a remaining maturity of 8 days.
(c)
In 2012, Franklin County Holdings LLC, Resources’ wholly-owned subsidiary, entered into a $60.0 million variable-rate term loan credit agreement that exists through 2014 to fund a portion of the costs of its Franklin County wind project, which was placed into service in the fourth quarter of 2012.
(d)
In 2012, Corporate Services issued $75 million of 3.45% senior notes due 2022. The proceeds from the issuance were used by Corporate Services to repay short-term debt primarily incurred for the purchase of the corporate headquarters building and for general working capital purposes.


157

Table of Contents


Five-Year Schedule of Debt Maturities - At December 31, 2012, debt maturities for 2013 to 2017 were as follows (in millions):
 2013 2014 2015 2016 2017
IPL (a)
$50
 
$38
 
$150
 
$—
 
$—
WPL
 8
 31
 
 
Resources1
 62
 2
 3
 4
Alliant Energy parent company
 250
 
 
 
Alliant Energy
$51
 
$358
 
$183
 
$3
 
$4

(a)
IPL’s amount for 2013 includes $50.0 million of commercial paper that was recorded in “Long-term debt, net” on Alliant Energy’s and IPL’s Consolidated Balance Sheets as described above.

At December 31, 2012, there were no significant sinking fund requirements related to the long-term debt on the Consolidated Balance Sheets.

Indentures - Alliant Energy maintains an indenture related to its 4% senior notes due 2014. IPL maintains an indenture related to its senior debentures due 2015 through 2039. WPL maintains an indenture related to its debentures due 2019 through 2038. Sheboygan Power, LLC, Resources’ wholly-owned subsidiary, maintains an indenture related to the issuance of its 5.06% senior secured notes due 2013 to 2024.

Optional Redemption Provisions - Alliant Energy and its subsidiaries have certain issuances of long-term debt that contain optional redemption provisions which, if elected by the issuer at its sole discretion, could require material redemption premium payments by the issuer. The redemption premium payments under these optional redemption provisions are variable and dependent on applicable U.S. Treasury rates at the time of redemption. At December 31, 2012, the debt issuances that contained these optional redemption provisions included Alliant Energy’s senior notes due 2014, Corporate Services’ senior notes due 2022, IPL’s senior debentures due 2015 through 2039, WPL’s debentures due 2019 through 2038 and Sheboygan Power, LLC’s senior secured notes due 2013 to 2024.

Security Provisions - Sheboygan Power, LLC’s 5.06% senior secured notes due 2013 to 2024 are secured by the Sheboygan Falls Energy Facility and related assets.

Unamortized Debt Issuance Costs - Unamortized debt issuance costs recorded in “Deferred charges and other” on the Consolidated Balance Sheets at December 31 were as follows (in millions):
 Alliant Energy IPL WPL
 2012 2011 2012 2011 2012 2011
Unamortized debt issuance costs$19.5 $19.1 $8.0 $9.0 $9.8 $8.4

Carrying Amount and Fair Value of Long-term Debt - Refer to Note 11 for information on the carrying amount and fair value of long-term debt outstanding at December 31, 2012 and 2011.

(10) INVESTMENTS
(a) Unconsolidated Equity Investments - Alliant Energy’s and WPL’s unconsolidated investments accounted for under the equity method of accounting are as follows (in millions):
 Ownership Carrying Value at  
 Interest at December 31, Equity (Income) / Loss
 December 31, 2012 2012 2011 2012 2011 2010
Alliant Energy           
ATC (a)16% 
$257.0
 
$238.8
 
($41.3) 
($37.8) 
($36.9)
Wisconsin River Power Company50% 7.3
 7.7
 (0.8) (0.9) (0.9)
OtherVarious 2.3
 3.1
 0.8
 (0.6) (0.3)
   
$266.6
 
$249.6
 
($41.3) 
($39.3) 
($38.1)
WPL           
ATC (a)16% 
$257.0
 
$238.8
 
($41.3) 
($37.8) 
($36.9)
Wisconsin River Power Company50% 7.3
 7.7
 (0.8) (0.9) (0.9)
   
$264.3
 
$246.5
 
($42.1) 
($38.7) 
($37.8)

158

Table of Contents



(a)
Alliant Energy and WPL have the ability to exercise significant influence over ATC’s financial and operating policies through their participation on ATC’s Board of Directors. Refer to Note 19 for information regarding related party transactions with ATC.

Summary aggregate financial information from the financial statements of these investments is as follows (in millions):
 Alliant Energy WPL
 2012 2011 2010 2012 2011 2010
Operating revenues
$611
 
$575
 
$564
 
$611
 
$575
 
$564
Operating income326
 307
 307
 325
 308
 308
Net income234
 218
 226
 239
 226
 221
As of December 31:           
Current assets67
 62
   66
 61
  
Non-current assets3,321
 3,100
   3,292
 3,071
  
Current liabilities252
 299
   252
 299
  
Non-current liabilities1,652
 1,490
   1,651
 1,487
  

(b) Cash Surrender Value of Life Insurance Policies - Alliant Energy, IPL and WPL have various life insurance policies that cover certain current and former employees and directors. At December 31, the cash surrender value of these investments was as follows (in millions):
 Alliant Energy IPL WPL
 2012 2011 2012 2011 2012 2011
Cash surrender value$50.5 $49.2 $16.0 $15.1 $12.1 $11.9

(11)(14) FAIR VALUE MEASUREMENTS
Fair Value of Financial Instruments - The carrying amounts of Alliant Energy’s, IPL’s and WPL’s current assets and current liabilities approximate fair value because of the short maturity of such financial instruments. Carrying amounts and the related estimated fair values of other financial instruments at December 31 were as follows (in millions):
 Alliant Energy IPL WPL
 
Carrying
Amount
 
Fair
Value
 
Carrying
Amount
 
Fair
Value
 
Carrying
Amount
 
Fair
Value
2012           
Assets:           
Derivative assets (Note 12)

$26.2
 
$26.2
 
$17.5
 
$17.5
 
$8.7
 
$8.7
Deferred proceeds (sales of receivables) (Note 4(a))
66.8
 66.8
 66.8
 66.8
 
 
Capitalization and liabilities:           
Long-term debt (including current maturities) (Note 9(b))
3,138.1
 3,860.5
 1,359.5
 1,679.9
 1,331.5
 1,713.3
Cumulative preferred stock of subsidiaries (Note 8)
205.1
 212.6
 145.1
 151.8
 60.0
 60.8
Derivative liabilities (Note 12)
40.4
 40.4
 16.1
 16.1
 24.3
 24.3
2011           
Assets:           
Derivative assets (Note 12)
15.7
 15.7
 10.6
 10.6
 5.1
 5.1
Deferred proceeds (sales of receivables) (Note 4(a))
53.7
 53.7
 53.7
 53.7
 
 
Capitalization and liabilities:           
Long-term debt (including current maturities) (Note 9(b))
2,704.5
 3,325.3
 1,309.0
 1,560.4
 1,082.2
 1,439.0
Cumulative preferred stock of subsidiaries (Note 8)
205.1
 222.5
 145.1
 164.3
 60.0
 58.2
Derivative liabilities (Note 12)
78.0
 78.0
 33.6
 33.6
 44.4
 44.4
 Alliant Energy IPL WPL
 
Carrying
Amount
 
Fair
Value
 
Carrying
Amount
 
Fair
Value
 
Carrying
Amount
 
Fair
Value
2013           
Assets:           
Derivative assets (Note 15)

$26.7
 
$26.7
 
$21.1
 
$21.1
 
$5.6
 
$5.6
Deferred proceeds (sales of receivables) (Note 5(a))
203.5
 203.5
 203.5
 203.5
 
 
Capitalization and liabilities:           
Long-term debt (including current maturities) (Note 9(b))
3,336.3
 3,712.3
 1,558.4
 1,726.4
 1,332.1
 1,532.9
Cumulative preferred stock (Note 8)
200.0
 167.0
 200.0
 167.0
 
 
Derivative liabilities (Note 15)
20.8
 20.8
 5.2
 5.2
 15.6
 15.6
2012           
Assets:           
Derivative assets (Note 15)
26.2
 26.2
 17.5
 17.5
 8.7
 8.7
Deferred proceeds (sales of receivables) (Note 5(a))
66.8
 66.8
 66.8
 66.8
 
 
Capitalization and liabilities:           
Long-term debt (including current maturities) (Note 9(b))
3,138.1
 3,860.5
 1,359.5
 1,679.9
 1,331.5
 1,713.3
Cumulative preferred stock (Note 8)
205.1
 212.6
 145.1
 151.8
 60.0
 60.8
Derivative liabilities (Note 15)
40.4
 40.4
 16.1
 16.1
 24.3
 24.3


159

Table of Contents


Valuation Hierarchy - Fair value measurement accounting establishes a fair value hierarchy that prioritizes the inputs to valuation techniques used to measure fair value. The three levels of the fair value hierarchy and examples of each are as follows:

Level 1 - Pricing inputs are quoted prices available in active markets for identical assets or liabilities as of the reporting date. As of December 31, 2013, Level 1 items included IPL’s 5.1% cumulative preferred stock. As of December 31, 2012, Level 1 items included IPL’s 8.375% cumulative preferred stock and WPL’s 4.50% cumulative preferred stock.

Level 2 - Pricing inputs are quoted prices for similar assets or liabilities in active markets or quoted prices for identicalor similar assets or liabilities in markets that are not active as of the reporting date. As of December 31, 20122013 and 20112012, Level 2 items included certain of IPL’s and WPL’s non-exchange traded commodity contracts.contracts and substantially all of the long-term debt instruments. Level 2 items as of December 31, 2012 also included the remainder of WPL’s cumulative preferred stock and substantially all of the long-term debt instruments.stock.

Level 3 - Pricing inputs are unobservable inputs for assets or liabilities for which little or no market data exist and require significant management judgment or estimation. As of December 31, 20122013 and 20112012, Level 3 items included IPL’s deferred proceeds, and IPL’s and WPL’s financial transmission rights (FTRs)FTRs and certain non-exchange traded commodity contracts.

The fair value hierarchy gives the highest priority to quoted prices in active markets (Level 1) and the lowest priority to unobservable data (Level 3). In some cases, the inputs used to measure fair value might fall in different levels of the fair value hierarchy. The lowest level input that is significant to a fair value measurement in its entirety determines the applicable level in the fair value hierarchy. Assessing the significance of a particular input to the fair value measurement in its entirety requires judgment, considering factors specific to the asset or liability.

Valuation Techniques -
Derivative assets and derivative liabilities - Alliant Energy, IPL and WPL periodically use derivative instruments for risk management purposes to mitigate exposures to fluctuations in certain commodity prices and transmission congestion costs, and maintain risk policies that govern the use of such derivative instruments. As of December 31, 20122013 and 20112012, Alliant Energy’s, IPL’s and WPL’s derivative instruments were not designated as hedging instruments and included the following:

156

Table of Contents


Risk management purposeType of instrument
Mitigate pricing volatility for: 
Electricity purchased to supply customersElectric swap and physical purchaseforward contracts (IPL and WPL)
Fuel used to supply natural gas-fired electric generating facilitiesEGUsNatural gas swap and physical purchase contracts (IPL and WPL)
 Natural gas options (WPL)
Natural gas supplied to retail customersNatural gas options and physical purchaseforward contracts (IPL and WPL)
 Natural gas swap contracts (IPL)
Fuel used at coal-fired generating facilitiesEGUsCoal physical purchaseforward contract with volumetric optionality (WPL)(IPL and WPL)
Optimize the value of natural gas pipeline capacityNatural gas physical purchase and saleforward contracts (IPL and WPL)
 Natural gas swap contracts (IPL)
Manage transmission congestion costsFTRs (IPL and WPL)

IPL’s and WPL’s swap, option and physical forward commodity contracts were non-exchange-based derivative instruments and were valued using indicative price quotations available throughfrom a pricing vendor that provides daily exchange forward price settlements, from broker or dealer quotations, from market publications or from on-line exchanges. The indicative price quotations reflected the average of the bid-ask mid-point prices and were obtained from sources believed to provide the most liquid market for the commodity. IPL and WPL corroborated a portion of these indicative price quotations using quoted prices for similar assets or liabilities in active markets and categorized derivative instruments based on such indicative price quotations as Level 2. IPL’s and WPL’s commodity contracts that were valued using indicative price quotations based on significant assumptions such as seasonal or monthly shaping and indicative price quotations that could not be readily corroborated were categorized as Level 3. IPL’s and WPL’s swap, option and physical forward commodity contracts were predominately at liquid trading points. IPL’s and WPL’s FTRs were valued using monthly or annual auction shadow prices from relevant auctions and were categorized as Level 3. Refer to Note 1215 for additional details of derivative assets and derivative liabilities.


160

TableLevel 3 inputs include observable and unobservable inputs used in the fair value measurements of Contents


IPL’s and WPL’s commodity contracts. The observable inputs are obtained from third-party pricing sources, counterparties and brokers and include bids, offers, historical transactions (including historical price differences between locations with both observable and unobservable prices) and executed trades. The significant unobservable inputs (Level 3 inputs) used in the fair value measurement of IPL’s and WPL’s commodity contracts are forecasted electricity, natural gas and coal prices, and the expected volatility of such prices. Significant changes in any of those inputs would result in a significantly lower or higher fair value measurement. These commodity contracts were valued using a market approach technique that utilizes significant observable inputs to estimate forward commodity prices. Forward electric and coal prices are estimated using market information obtained from counterparties and brokers, including bids, offers, historical transactions (including historical price differences between locations with both observable and unobservable prices) and executed trades. Forward natural gas prices are estimated using the most recent quoted observable inputs applied to future months (including historical price differences between locations with both observable and unobservable prices). Observable inputs are obtained from third-party pricing data sources and include bids, offers, historical transactions and executed trades. Forward electric price commodity curves that extend beyond currently available observable inputs utilize market prices for the most recent period for which observable inputs are available. Observable inputs include bids, offers, historical transactions and executed trades.

Deferred proceeds (sales of receivables) - The fair value of IPL’s deferred proceeds related to its sales of receivablesaccounts receivable program was calculated each reporting date using the cost approach valuation technique. The fair value represents the carrying amount of receivables sold less the allowance for doubtful accounts associated with the receivables sold and cash proceeds received from the receivables sold due to the short-term nature of the collection period. These inputs were considered unobservable and deferred proceeds were categorized as Level 3. Deferred proceeds represent IPL’s maximum exposure to loss related to the receivables sold. Refer to Note 4(a)5(a) for additional information regarding deferred proceeds.

Long-term debt (including current maturities) - ForThe fair value of long-term debt instruments that are actively traded, the fair value was based uponon quoted market prices for similar liabilities onat each reporting date. For long-term debt instruments that are not actively traded, the fair value was baseddate or on a discounted cash flow methodology, andwhich utilizes assumptions of current market pricing curves at each reporting date. Refer to Note 9(b) for additional information regarding long-term debt.

Cumulative preferred stock of subsidiaries - TheAs of December 31, 2013, the fair value of IPL’s 5.1% cumulative preferred stock was based on its closing market price quoted by the NYSE. As of December 31, 2012, the fair value of IPL’s 8.375% cumulative preferred stock was based on its closing market price quoted by the New York Stock Exchange on each reporting date. TheNYSE, the fair value of WPL’s 4.50% cumulative preferred stock was based on the closing market price quoted by the NYSE Amex LLC, on each reporting date. Theand the fair value of WPL’s remaining preferred stock was calculated based on the market yield of similar securities on each reporting date.securities. Refer to Note 8 for additional information regarding cumulative preferred stock of subsidiaries.stock.


157

Table of Contents


Items subject to fair value measurement disclosure requirements were as follows (Not Applicable (N/A); in(in millions):
Alliant Energy2012 20112013 2012
Fair Level Level Level Fair Level Level LevelFair Level Level Level Fair Level Level Level
Value 1 2 3 Value 1 2 3Value 1 2 3 Value 1 2 3
Assets:                              
Derivatives - commodity contracts
$26.2
 
$—
 
$4.8
 
$21.4
 
$15.7
 
$—
 
$3.4
 
$12.3

$26.7
 
$—
 
$4.7
 
$22.0
 
$26.2
 
$—
 
$4.8
 
$21.4
Deferred proceeds66.8
 
 
 66.8
 53.7
 
 
 53.7
203.5
 
 
 203.5
 66.8
 
 
 66.8
Capitalization and liabilities:                              
Long-term debt (including current maturities)3,860.5
 
 3,860.0
 0.5
 N/A
 N/A
 N/A
 N/A
3,712.3
 
 3,711.8
 0.5
 3,860.5
 
 3,860.0
 0.5
Cumulative preferred stock of subsidiaries212.6
 162.3
 50.3
 
 N/A
 N/A
 N/A
 N/A
Cumulative preferred stock167.0
 167.0
 
 
 212.6
 162.3
 50.3
 
Derivatives - commodity contracts40.4
 
 30.9
 9.5
 78.0
 
 64.8
 13.2
20.8
 
 3.2
 17.6
 40.4
 
 30.9
 9.5
IPL2012 20112013 2012
Fair Level Level Level Fair Level Level LevelFair Level Level Level Fair Level Level Level
Value 1 2 3 Value 1 2 3Value 1 2 3 Value 1 2 3
Assets:                              
Derivatives - commodity contracts
$17.5
 
$—
 
$3.1
 
$14.4
 
$10.6
 
$—
 
$1.3
 
$9.3

$21.1
 
$—
 
$3.0
 
$18.1
 
$17.5
 
$—
 
$3.1
 
$14.4
Deferred proceeds66.8
 
 
 66.8
 53.7
 
 
 53.7
203.5
 
 
 203.5
 66.8
 
 
 66.8
Capitalization and liabilities:                              
Long-term debt (including current maturities)1,679.9
 
 1,679.9
 
 N/A
 N/A
 N/A
 N/A
1,726.4
 
 1,726.4
 
 1,679.9
 
 1,679.9
 
Cumulative preferred stock151.8
 151.8
 
 
 N/A
 N/A
 N/A
 N/A
167.0
 167.0
 
 
 151.8
 151.8
 
 
Derivatives - commodity contracts16.1
 
 14.2
 1.9
 33.6
 
 28.6
 5.0
5.2
 
 1.7
 3.5
 16.1
 
 14.2
 1.9

161

Table of Contents


WPL2012 20112013 2012
Fair Level Level Level Fair Level Level LevelFair Level Level Level Fair Level Level Level
Value 1 2 3 Value 1 2 3Value 1 2 3 Value 1 2 3
Assets:                              
Derivatives - commodity contracts
$8.7
 
$—
 
$1.7
 
$7.0
 
$5.1
 
$—
 
$2.1
 
$3.0

$5.6
 
$—
 
$1.7
 
$3.9
 
$8.7
 
$—
 
$1.7
 
$7.0
Capitalization and liabilities:                              
Long-term debt (including current maturities)1,713.3
 
 1,713.3
 
 N/A
 N/A
 N/A
 N/A
1,532.9
 
 1,532.9
 
 1,713.3
 
 1,713.3
 
Cumulative preferred stock60.8
 10.5
 50.3
 
 N/A
 N/A
 N/A
 N/A

 
 
 
 60.8
 10.5
 50.3
 
Derivatives - commodity contracts24.3
 
 16.7
 7.6
 44.4
 
 36.2
 8.2
15.6
 
 1.5
 14.1
 24.3
 
 16.7
 7.6

Alliant Energy, IPL and WPL generally record gains and losses from IPL’s and WPL’s derivative instruments with offsets to regulatory assets or regulatory liabilities, based on their fuel and natural gas cost recovery mechanisms, as well as other specific regulatory authorizations. Based on these recovery mechanisms, the changes in the fair value of derivative liabilities resulted in comparable changes to regulatory assets, and the changes in the fair value of derivative assets resulted in comparable changes to regulatory liabilities on the Consolidated Balance Sheets.


158

Table of Contents


Information for fair value measurements using significant unobservable inputs (Level 3 inputs) was as follows (in millions):
Alliant EnergyCommodity Contract  Commodity Contract Derivative  
Derivative Assets and  
(Liabilities), net Deferred ProceedsAssets and (Liabilities), net Deferred Proceeds
2012 2011 2012 20112013 2012 2013 2012
Beginning balance, January 1
($0.9) 
$2.8
 
$53.7
 
$152.9

$11.9
 
($0.9) 
$66.8
 
$53.7
Total net losses (realized/unrealized) included in changes in net assets (a)(7.6) (7.3) 
 
(12.7) (7.6) 
 
Transfers into Level 3 (b)(1.1) 0.2
 
 
0.1
 (1.1) 
 
Transfers out of Level 3 (c)8.3
 
 
 
2.0
 8.3
 
 
Purchases35.8
 21.8
 
 
50.9
 35.8
 
 
Settlements (d)(22.6) (18.4) 13.1
 (99.2)(47.8) (22.6) 136.7
 13.1
Ending balance, December 31
$11.9
 
($0.9) 
$66.8
 
$53.7

$4.4
 
$11.9
 
$203.5
 
$66.8
The amount of total net losses for the period included in changes in net assets attributable to the change in unrealized losses relating to assets and liabilities held at December 31 (a)
($2.6) 
($7.3) 
$—
 
$—

($12.7) 
($2.6) 
$—
 
$—
IPLCommodity Contract  Commodity Contract Derivative  
Derivative Assets and  
(Liabilities), net Deferred ProceedsAssets and (Liabilities), net Deferred Proceeds
2012 2011 2012 20112013 2012 2013 2012
Beginning balance, January 1
$4.3
 
$4.3
 
$53.7
 
$152.9

$12.5
 
$4.3
 
$66.8
 
$53.7
Total net losses (realized/unrealized) included in changes in net assets (a)(3.5) (3.1) 
 
(4.6) (3.5) 
 
Transfers into Level 3 (b)(1.1) 
 
 

 (1.1) 
 
Transfers out of Level 3 (c)2.4
 
 
 
1.0
 2.4
 
 
Purchases26.8
 18.1
 
 
46.1
 26.8
 
 
Settlements (d)(16.4) (15.0) 13.1
 (99.2)(40.4) (16.4) 136.7
 13.1
Ending balance, December 31
$12.5
 
$4.3
 
$66.8
 
$53.7

$14.6
 
$12.5
 
$203.5
 
$66.8
The amount of total net gains (losses) for the period included in changes in net assets attributable to the change in unrealized gains (losses) relating to assets and liabilities held at December 31 (a)
$1.5
 
($3.1) 
$—
 
$—

($4.6) 
$1.5
 
$—
 
$—

162

Table of Contents


WPLCommodity ContractCommodity Contract Derivative
Derivative Assets and
(Liabilities), netAssets and (Liabilities), net
2012 20112013 2012
Beginning balance, January 1
($5.2) 
($1.5)
($0.6) 
($5.2)
Total net losses (realized/unrealized) included in changes in net assets (a)(4.1) (4.2)(8.1) (4.1)
Transfers into Level 3 (b)
 0.2
0.1
 
Transfers out of Level 3 (c)5.9
 
1.0
 5.9
Purchases9.0
 3.7
4.8
 9.0
Settlements(6.2) (3.4)(7.4) (6.2)
Ending balance, December 31
($0.6) 
($5.2)
($10.2) 
($0.6)
The amount of total net losses for the period included in changes in net assets attributable to the change in unrealized losses relating to assets and liabilities held at December 31 (a)
($4.1) 
($4.2)
($8.1) 
($4.1)

(a)Gains and losses related to derivative assets and derivative liabilities are generally recorded in “Regulatory assets” and “Regulatory liabilities” on the Consolidated Balance Sheets.
(b)Markets for similar assets and liabilities became inactive and observable market inputs became unavailable for transfers into Level 3. The transfers were valued as of the beginning of the period.
(c)Observable market inputs became available for certain commodity contracts previously classified as Level 3 for transfers out of Level 3. The transfers were valued as of the beginning of the period.
(d)Settlements related to deferred proceeds are due to the change in the carrying amount of receivables sold less the allowance for doubtful accounts associated with the receivables sold and cash proceeds received from the receivables sold.

159

Table of Contents



Commodity Contracts - As of December 31, 20122013, the fair values of Alliant Energy’s, IPL’s and WPL’s electric, natural gas and coal commodity contracts categorized as Level 3, excluding FTRs, were recognized as net derivative liabilities of $3.213.9 million, net derivative assets of $1.52.1 million and net derivative liabilities of $4.711.8 million, respectively. As of December 31, 20122013, Alliant Energy’s, IPL’s and WPL’s FTRs categorized as Level 3 were recognized as net derivative assets of $15.118.3 million, $11.016.7 million and $4.11.6 million, respectively.

(12)(15) DERIVATIVE INSTRUMENTS
Commodity and Foreign Exchange Derivatives -
Purpose - Alliant Energy, IPL and WPL periodically use derivative instruments for risk management purposes to mitigate exposures to fluctuations in certain commodity prices and transmission congestion costs. Refer to Note 1114 for detailed discussion of Alliant Energy’s, IPL’s and WPL’s derivative instruments as of December 31, 20122013 and 20112012.

Notional Amounts - As of December 31, 20122013, gross notional amounts by delivery year related to outstanding swap contracts, option contracts, physical forward contracts, FTRs and coal contracts that were accounted for as commodity derivative instruments were as follows (units in thousands):
 2013 2014 2015 Total
Alliant Energy       
Electricity (MWhs)4,130
 2,670
 876
 7,676
FTRs (MWs)28
 
 
 28
Natural gas (dekatherms (Dths))72,105
 7,747
 450
 80,302
Coal (tons)896
 981
 562
 2,439
IPL       
Electricity (MWhs)2,209
 549
 
 2,758
FTRs (MWs)15
 
 
 15
Natural gas (Dths)57,731
 3,535
 225
 61,491
WPL       
Electricity (MWhs)1,921
 2,121
 876
 4,918
FTRs (MWs)13
 
 
 13
Natural gas (Dths)14,374
 4,212
 225
 18,811
Coal (tons)896
 981
 562
 2,439


163

Table of Contents


The notional amounts in the above table were computed by aggregating the absolute value of purchase and sale positions within commodities for each delivery year.
 2014 2015 2016 2017 2018 Total
Alliant Energy           
Electricity (MWhs)5,895
 2,717
 1,318
 1,314
 1,314
 12,558
FTRs (MWhs)7,707
 
 
 
 
 7,707
Natural gas (Dths)47,669
 8,956
 1,639
 
 
 58,264
Coal (tons)1,591
 936
 955
 868
 714
 5,064
IPL           
Electricity (MWhs)2,159
 527
 
 
 
 2,686
FTRs (MWhs)4,923
 
 
 
 
 4,923
Natural gas (Dths)37,535
 7,381
 1,639
 
 
 46,555
Coal (tons)270
 
 216
 129
 184
 799
WPL           
Electricity (MWhs)3,736
 2,190
 1,318
 1,314
 1,314
 9,872
FTRs (MWhs)2,784
 
 
 
 
 2,784
Natural gas (Dths)10,134
 1,575
 
 
 
 11,709
Coal (tons)1,321
 936
 739
 739
 530
 4,265

Financial Statement Presentation - Alliant Energy, IPL and WPL record derivative instruments at fair value each reporting date on the balance sheet as assets or liabilities. At December 31, the fair values of current derivative assets wereare included in “Prepayments and other,“Other current assets,” non-current derivative assets wereare included in “Deferred charges and other,” current derivative liabilities wereare included in “Derivative“Other current liabilities” and non-current derivative liabilities wereare included in “Other long-term liabilities and deferred credits” on the Consolidated Balance Sheets as follows (in millions):
Alliant Energy IPL WPLAlliant Energy IPL WPL
Commodity contracts2012 2011 2012 2011 2012 20112013 2012 2013 2012 2013 2012
Current derivative assets
$23.5
 
$12.7
 
$17.0
 
$9.2
 
$6.5
 
$3.5

$25.6
 
$23.5
 
$20.2
 
$17.0
 
$5.4
 
$6.5
Non-current derivative assets2.7
 3.0
 0.5
 1.4
 2.2
 1.6
1.1
 2.7
 0.9
 0.5
 0.2
 2.2
Current derivative liabilities31.1
 55.9
 14.1
 24.5
 17.0
 31.4
6.7
 31.1
 3.0
 14.1
 3.7
 17.0
Non-current derivative liabilities9.3
 22.1
 2.0
 9.1
 7.3
 13.0
14.1
 9.3
 2.2
 2.0
 11.9
 7.3

Changes in unrealized gains (losses) from commodity derivative instruments not designated as hedging instruments were recorded with offsets to regulatory assets or regulatory liabilities on the Consolidated Balance Sheets as follows (in millions):
  Alliant Energy IPL WPL
  2012 2011 2010 2012 2011 2010 2012 2011 2010
Commodity contractsRegulatory assets
($37.9) 
($79.6) 
($78.4) 
($16.8) 
($42.4) 
($47.8) 
($21.1) 
($37.2) 
($30.6)
Commodity contractsRegulatory liabilities20.3
 9.3
 11.5
 13.5
 6.4
 10.6
 6.8
 2.9
 0.9
Foreign exchange contractsRegulatory liabilities
 
 3.8
 
 
 3.8
 
 
 
 Alliant Energy IPL WPL
 2013 2012 2011 2013 2012 2011 2013 2012 2011
Regulatory assets
($14.7) 
($37.9) 
($79.6) 
($6.6) 
($16.8) 
($42.4) 
($8.1) 
($21.1) 
($37.2)
Regulatory liabilities22.2
 20.3
 9.3
 11.8
 13.5
 6.4
 10.4
 6.8
 2.9

Net unrealized lossesgains (losses) from commodity contracts during 20122013, 20112012 and 20102011 were primarily due to impacts of decreaseschanges in electricity and natural gas prices during such periods.


160

Table of Contents


Credit Risk-related Contingent Features - Alliant Energy, IPL and WPL have entered into various agreements that contain credit risk-related contingent features including requirements for them to maintain certain credit ratings from each of the major credit rating agencies and/or limitations on their liability positions under the various agreements based upon their credit ratings. In the event of a downgrade in their credit ratings or if their liability positions exceed certain contractual limits, Alliant Energy, IPL or WPL may need to provide credit support in the form of letters of credit or cash collateral up to the amount of their exposure under the contracts, or may need to unwind the contracts and pay the underlying liability positions.

Certain of these agreements with credit risk-related contingency features are accounted for as derivative instruments. The aggregate fair value of all derivatives with credit risk-related contingent features that were in a net liability position on December 31, 20122013 was $40.420.8 million, $16.15.2 million and $24.315.6 million for Alliant Energy, IPL and WPL, respectively. At December 31, 20122013, Alliant Energy, IPL and WPL all had investment-grade credit ratings. However, IPL exceeded its liability position with one counterparty requiring it to post $0.5 million of cash collateral. If the most restrictive credit risk-related contingent features for derivative agreements in a net liability position were triggered on December 31, 20122013, Alliant Energy, IPL and WPL would be required to post an additional $39.920.8 million, $15.65.2 million and $24.315.6 million, respectively, of credit support to their counterparties.

Balance Sheet Offsetting - Alliant Energy, IPL and WPL do not net the fair value amounts of derivative instruments subject to a master netting arrangement by counterparty on the Consolidated Balance Sheets. However, if Alliant Energy, IPL and WPL did net the fair value amounts of derivative instruments by counterparty, derivative assets and derivative liabilities related to commodity contracts would have been presented on their Consolidated Balance Sheets as follows (in millions):
 Alliant Energy IPL WPL
 Gross   Gross   Gross  
 (as reported) Net (as reported) Net (as reported) Net
December 31, 2013           
Derivative assets
$26.7
 
$23.5
 
$21.1
 
$19.5
 
$5.6
 
$4.0
Derivative liabilities20.8
 17.6
 5.2
 3.6
 15.6
 14.0
December 31, 2012           
Derivative assets26.2
 19.3
 17.5
 14.5
 8.7
 4.8
Derivative liabilities40.4
 33.5
 16.1
 13.1
 24.3
 20.4

Alliant Energy, IPL and WPL also do not offset fair value amounts recognized for the right to reclaim cash collateral (receivable) or the obligation to return cash collateral (payable) against fair value amounts recognized for derivative instruments executed with the same counterparty under the same master netting arrangement. In addition, trade receivables and payables associated with derivative assets and derivative liabilities are also subject to a master netting arrangement. As of December 31, 2013 and 2012, the related cash collateral and trade receivables and payables were not material and were not included in the above table.

(13)(16) COMMITMENTS AND CONTINGENCIES
(a) Capital Purchase Obligations - Alliant Energy, IPL and WPL have entered into capital purchase obligations that contain minimum future commitments related to capital expenditures for certain of their emission controlcontrols and generation performance improvement projects. At December 31, 2012, Alliant Energy’s and WPL’s minimum future commitments related to capital expenditures forThese projects include the installation of scrubbers and baghouses at IPL’s Ottumwa Unit 1 and WPL’s Columbia Units 1 and 2 to reduce SO2 and mercury emissions at the generating facilityEGUs and generation performance improvements at IPL’s Ottumwa Unit 1. At December 31, 2013, Alliant Energy’s, IPL’s and WPL’s minimum future commitments related to these projects were $4686 million., $35 million and $51 million, respectively.


161

Table of Contents


(b) Operating Expense Purchase Obligations - Alliant Energy, IPL and WPL have entered into various commodity supply, transportation and storage contracts to meet their obligations to deliverprovide electricity and natural gas to IPL’s and WPL’s utility customers. Alliant Energy, IPL and WPL also enter into other operating expense purchase obligations with various vendors for other goods and services. At December 31, 20122013, minimum future commitments related to these operating expense purchase obligations were as follows (in millions):

164

Table of Contents


Alliant Energy2013 2014 2015 2016 2017 Thereafter Total2014 2015 2016 2017 2018 Thereafter Total
Purchased power (a):                          
DAEC (IPL) (b)
$200
 
$34
 
$—
 
$—
 
$—
 
$—
 
$234

$120
 
$119
 
$127
 
$138
 
$128
 
$1,025
 
$1,657
Kewaunee Nuclear Power Plant (Kewaunee) (WPL)77
 
 
 
 
 
 77
Other8
 14
 30
 
 
 
 52
52
 73
 45
 44
 44
 
 258
285
 48
 30
 
 
 
 363
172
 192
 172
 182
 172
 1,025
 1,915
Natural gas163
 55
 37
 21
 10
 6
 292
187
 65
 34
 10
 2
 6
 304
Coal (c)126
 80
 44
 10
 4
 
 264
128
 81
 59
 30
 21
 
 319
SO2 emission allowances (d)
 
 12
 14
 8
 
 34

 12
 14
 8
 
 
 34
Other (e)22
 4
 3
 
 
 
 29
8
 3
 
 
 
 
 11

$596
 
$187
 
$126
 
$45
 
$22
 
$6
 
$982

$495
 
$353
 
$279
 
$230
 
$195
 
$1,031
 
$2,583
IPL2013 2014 2015 2016 2017 Thereafter Total2014 2015 2016 2017 2018 Thereafter Total
Purchased power (a):                          
DAEC (b)
$200
 
$34
 
$—
 
$—
 
$—
 
$—
 
$234

$120
 
$119
 
$127
 
$138
 
$128
 
$1,025
 
$1,657
Other1
 
 
 
 
 
 1

 
 1
 
 
 
 1
201
 34
 
 
 
 
 235
120
 119
 128
 138
 128
 1,025
 1,658
Natural gas109
 29
 21
 8
 3
 6
 176
129
 37
 15
 3
 1
 6
 191
Coal (c)36
 28
 11
 5
 
 
 80
63
 32
 27
 11
 6
 
 139
SO2 emission allowances (d)
 
 12
 14
 8
 
 34

 12
 14
 8
 
 
 34
Other (e)9
 2
 1
 
 
 
 12
5
 1
 
 
 
 
 6

$355
 
$93
 
$45
 
$27
 
$11
 
$6
 
$537
$317 
$201
 
$184
 
$160
 
$135
 
$1,031
 
$2,028
WPL2013 2014 2015 2016 2017 Thereafter Total2014 2015 2016 2017 2018 Thereafter Total
Purchased power (a):             
Kewaunee
$77
 
$—
 
$—
 
$—
 
$—
 
$—
 
$77
Other7
 14
 30
 
 
 
 51
84
 14
 30
 
 
 
 128
Purchased power (a)
$52
 
$73
 
$44
 
$44
 
$44
 
$—
 
$257
Natural gas54
 26
 16
 13
 7
 
 116
58
 28
 19
 7
 1
 
 113
Coal (c)19
 18
 11
 
 
 
 48
65
 49
 32
 19
 15
 
 180
Other (e)11
 
 
 
 
 
 11
2
 
 
 
 
 
 2

$168
 
$58
 
$57
 
$13
 
$7
 
$—
 
$303

$177
 
$150
 
$95
 
$70
 
$60
 
$—
 
$552

(a)
Includes payments required by PPAs for capacity rights (Alliant Energy and IPL only) and minimum quantities of MWhs required to be purchased. Refer to Note 1918 for additional information on purchased power transactions.
(b)
IPL is obligated to pay for capacityIncludes commitments incurred under an existing PPA that expires February 2014 and energy delivered under the DAEC PPA. If energy delivered under the DAECa new PPA is less than the targeted energy amount, an adjustment payment is made toeffective February 2014. The new PPA grants IPL which is reflected in IPL’s energy adjustment clause. In January 2013, the IUB issued an order approving a proposed DAEC PPA, with rights to purchase 431 MWs of capacity and the resulting energy from DAEC for a term from the expiration of the existing PPA in February 2014 through December 31, 2025. As of December 31, 2012, there was no minimum future commitment forIf energy delivered under the proposed DAEC PPA.new PPA is less than the targeted energy amount, an adjustment payment will be made to IPL, which will be reflected in IPL’s fuel adjustment clause.
(c)
IPL and WPL entered into coal contracts (directly assigned to certain generating stations) and coal transportation contracts (directly assigned to corresponding transloading terminals), the amounts of which are included in each of the tables above. Also included in Alliant Energy’s and IPL’s tables is IPL’s respective portion of coal and coal transportation contracts related to jointly-owned generating stations not operated by IPL. In addition, Corporate Services entered into system-wide coal contracts on behalf of IPL and WPL of $71 million, $34 million, $22 million, $5 million and $4 million for 2013, 2014, 2015, 2016 and 2017, respectively, to allow flexibility for the changing needs of the quantity of coal consumed by each. Coal contract quantities are allocated to specific IPL or WPL generating stations at or before the time of delivery based on various factors including projected heat input requirements, combustion compatibility and efficiency.that include minimum future commitments. These system-wide coal contracts have not been directlycommitments were assigned to IPL and WPL since the specific needs of each utility were not yet knownbased on information available as of December 31, 2012 and therefore are excluded from IPL’s and WPL’s tables above.
2013 regarding expected future usage, which is subject to change.
(d)
Refer to Note 1(b)2 for discussion of $34 million of charges recognized by Alliant Energy and IPL in 2011 for forward contracts to purchase SO2 emission allowances.

165

Table of Contents


(e)
Includes individual commitments incurred during the normal course of business that exceeded $1 million at December 31, 20122013.

Alliant Energy, IPL and WPL enter into certain contracts that are considered leases and are therefore not included here, but are included in Note 310.


162

Table of Contents


(c) Legal Proceedings -
Air Permitting Violation ClaimsCash Balance Plan - In 2009, the EPA sent a Notice of Violation (NOV) to WPL as an owner and the operator of the Edgewater Generating Station (Edgewater), the Nelson Dewey Generating Station (Nelson Dewey) and the Columbia Energy Center (Columbia). The NOV alleges that the owners of Edgewater, Nelson Dewey and Columbia failed to comply with appropriate pre-construction review and permitting requirements and as a result violated the Prevention of Significant Deterioration (PSD) program requirements, Title V Operating Permit requirements of the Clean Air Act (CAA) and the Wisconsin state implementation plan (SIP).

In September 2010, Sierra Club filed in the U.S. District Court for the Western District of Wisconsin a complaint against WPL, as owner and operator of Nelson Dewey and Columbia, based on allegations that modifications were made at the facilities without complying with the PSD program requirements, Title V Operating Permit requirements of the CAA and state regulatory counterparts contained within the Wisconsin SIP designed to implement the CAA. In October 2010, WPL responded to these claims related to Nelson Dewey and Columbia by filing with the U.S. District Court an answer denying the Columbia allegations and a motion to dismiss the Nelson Dewey allegations based on statute of limitations arguments. In November 2010, WPL filed a motion to dismiss the Nelson Dewey and Columbia allegations based on lack of jurisdiction. Sierra Club responded to the motions. In May 2012, the parties filed a Stipulation of Dismissal without Prejudice, and the court closed the case, although the Sierra Club is permitted to file a future lawsuit against WPL.

In September 2010, Sierra Club filed in the U.S. District Court for the Eastern District of Wisconsin a complaint against WPL, as owner and operator of Edgewater, which contained similar allegations regarding air permitting violations at Edgewater. In the Edgewater complaint, additional allegations were made regarding violations of emission limits for visible emissions. In February 2011, WPL responded to these claims related to Edgewater by filing with the U.S. District Court an answer denying the allegations and a motion to dismiss the allegations based on lack of jurisdiction.

Alliant Energy and WPL are defending against the allegations in the NOV and both lawsuits because they believe the projects at Edgewater, Nelson Dewey and Columbia were routine or not projected to increase emissions and therefore did not violate the requirements of the CAA. Simultaneously, WPL, the other owners of Edgewater and Columbia, the EPA and Sierra Club (collectively “the parties”) are exploring settlement options. Alliant Energy and WPL believe that the parties have reached agreement on general terms to settle these air permitting violation claims and are currently negotiating a consent decree based upon those general terms. Those terms are subject to change during the negotiations. Based on a review of existing EPA consent decrees, Alliant Energy and WPL anticipate that the final consent decree could include the installation of emission controls technology, changed operating conditions (including use of fuels other than coal and retirement of units), limitations on emissions, beneficial environmental mitigation projects and a civil penalty.

Once the parties agree to the final terms, the Court must approve the consent decree. Alliant Energy and WPL cannot predict the outcome of these claims, but believe the outcome could be significant if the parties are unable to reach final agreement, or reach final agreement on different terms than currently anticipated, or if the Court does not approve the final consent decree.

Alliant Energy and WPL currently expect to recover any material costs that could be incurred by WPL related to the terms of the final consent decree from WPL’s electric customers. Alliant Energy and WPL do not currently believe any material losses from these air permitting violation claims are both probable and reasonably estimated and therefore have not recognized any material loss contingency amounts related to these claims as of December 31, 2012.

Alliant Energy Cash Balance Pension Plan (Plan) - In February 2008, a class-action lawsuit was filed against the Cash Balance Plan in the U.S. District Court for the Western District of Wisconsin (Court).Court. The complaint alleged that certain Cash Balance Plan participants who received distributions prior to their normal retirement age did not receive the full benefit to which they were entitled in violation of the Employee Retirement Income Security Act of 1974 (ERISA)ERISA because the Cash Balance Plan applied an improper interest crediting rate to project the cash balance account to their normal retirement age. These Cash Balance Plan participants were limited to individuals who, prior to normal retirement age, received a lump-sum distribution or an annuity payment. The Court originally certified two subclasses of plaintiffs that in aggregate include all persons vested or partially vested in the Plan who received these distributions from January 1, 1998 to August 17, 2006 including: (1) persons who received distributions from

166

Table of Contents


January 1, 1998 through February 28, 2002; and (2) persons who received distributions from March 1, 2002 to August 17, 2006.

In June 2010,2011, the Court issued an opinion and order that granted the plaintiffs’ motion for summary judgment on liability. In December 2010, the Court issued an opinion and order that decided the interest crediting rate that the Plan used to project the cash balance accounts of the plaintiffs during the class period should have been 8.2% and that a pre-retirement mortality discount would not be applied to the damages calculation. In May 2011, theCash Balance Plan was amended and the Cash Balance Plan subsequently made approximately $10 million in additional payments in 2011 to certain former participants in the Cash Balance Plan. This amendment was required based on an agreement Alliant Energy reached with the IRS, which resulted in a favorable determination letter for the Cash Balance Plan in 2011. In November 2011, plaintiffs filed a motion for leave to file a supplemental complaint to assert that the 2011 amendment to the Plan was itself an ERISA violation. In March 2012, the Plan and the plaintiffs each filed motions for summary judgment related to the supplemental complaint, and the plaintiffs filed a motion for class certification, seeking to amend the class definition and for appointment of class representatives and class counsel.

In July 2012, the Court issued an opinion and order granting plaintiffs’ motion for class certification, but only as to the interest crediting rate and the pre-retirement mortality discount claims of lump-sum recipients. As a result of the opinion and order, two new subclasses were certified in lieu of the prior subclass certification. Subclass A involves persons who received a lump-sum distribution between January 1, 1998 and August 17, 2006 and who received an interest crediting rate of less than 8.2%under the Plan as amended in May 2011. Subclass B involves persons who received a lump-sum distribution between January 1, 1998 and August 17, 2006 and who would have received a larger benefit under the Plan as amended in May 2011 if a pre-retirement mortality discount had not been applied. In the opinion and order the Court then granted plaintiffs’ motion for summary judgment as to the two subclasses, and denied as moot the parties’ motions for summary judgment with respect to issues beyond the two subclasses. In August 2012, as amended in September 2012, the Court entered a final judgment for the two subclasses in the total amount of $18.7 million. The judgment amount includes pre-judgment interest through July 2012 and takes into account the approximate $10 million of additional benefits paid by the Plan following the Plan amendment in 2011. In September 2012, the Planclass-action lawsuit, which was appealed the judgment, and the interlocutory orders that led to the judgment, to the Seventh Circuit Court of Appeals. In November 2012,August 2013, the Seventh Circuit Court of Appeals ruled on the case and remanded it to the Court to determine final damages. The Cash Balance Plan entered into a stipulation agreement with the plaintiffs, which was filed its opening briefwith the Court in which it seeksDecember 2013 settling all open matters in the case. In January 2014, the Court entered final judgment in the total amount of $9.0 million. Plaintiffs’ attorney’s fees and costs will be paid from the final damages.

Due to reverse all or partthe stipulation agreement filed with the Court in December 2013, Alliant Energy, IPL and WPL recognized the additional benefits to be paid to the plaintiffs in their Consolidated Statements of Income in 2013. As a result of the judgment. The judgment discussed above did not address any award forJanuary 2014 final Court order requiring plaintiffs’ attorney’s fees or costs. In September 2012,and costs to be paid out of the plaintiffs filed a motion withfinal judgment, Alliant Energy, IPL and WPL reversed the Court forreserve previously recorded related to payment of plaintiffs’ attorney’s fees and costs incosts. As a result of recognizing the amountadditional benefits of $9.6$9.0 million, of which $4.3 million was requested to be paid out of the common fund awarded to the two subclasses inplaintiffs and reversing the September 2012 judgment. In February 2013, the Court awardedpreviously recorded reserve of $6.7 million for plaintiffs’ attorney’s fees and costs, there was not a net material impact on Alliant Energy’s, IPL’s or WPL’s results of operations for 2013.

Flood Damage Claims - In June 2013, several plaintiffs purporting to represent a class of residential and commercial property owners filed a complaint against CRANDIC, Alliant Energy and various other defendants in the Iowa District Court for Linn County. Plaintiffs asserted claims of negligence and strict liability based on their allegations that CRANDIC (along with other defendants) caused or exacerbated flooding of the Cedar River in June 2008. In July 2013, the case was removed from state court to federal court based on federal jurisdiction. In September 2013, the U.S. District Court for the Northern District of Iowa dismissed the plaintiffs’ claims and transferred the case for resolution to the Surface Transportation Board, the administrative agency that oversees the Interstate Commerce Commission Termination Act. In October 2013, the plaintiffs appealed the federal court’s dismissal of the case to the Eighth Circuit Court of Appeals. Alliant Energy and CRANDIC believe the case is without merit and will continue to vigorously contest the case. As a result, Alliant Energy does not currently believe any material losses from these claims are both probable and reasonably estimated, and therefore, has not recognized any material loss contingency amounts for this complaint as ofDecember 31, 2013. Due to the early stages of the claim and the lack of specific damages identified, Alliant Energy is currently unable to provide an estimate of potential loss or range of potential loss.

Smart Meters Patents - In 2011, a lawsuit was filed against WPL in the Court by TransData, a company that is claiming it has valid patents covering wireless smart electric meter technology. TransData alleges in the lawsuit that WPL used meters that contain technology that allegedly infringe on patents owned by TransData. In 2012, the lawsuit was transferred to the U.S. District Court for the Western District of Oklahoma, whereby the lawsuit was consolidated with lawsuits TransData previously filed against various other utility companies. The smart meters in question were purchased by WPL from a third-party vendor. The third-party vendor, while not a party to the litigation, is defending WPL. WPL also believes that it has an indemnification agreement with the third-party vendor for any judgment that may result from the litigation. TransData is seeking injunctive relief and recovery of an unspecified amount of $6.4 million. The Court ordered that all of the fees and costs be paid from the $18.7 million judgment previously awarded and not be in addition to that judgment.damages. Alliant Energy IPL and WPL do not currently believe any material losses from this lawsuit are both probable and reasonably estimated, and therefore, have not recognized any material loss contingency amounts for the final judgment of damagesthis lawsuit as of December 31, 20122013. A material loss contingency for the judgment will not be recognized unless a final unappealable ruling is received, or a settlement is reached, which results in an amendmentDue to the Planlack of specific damages identified and paymentthe status of additional benefits to Plan participants. Alliant Energy, IPL andthe litigation, WPL areis currently unable to predict the final outcomeprovide an estimate of the class-action lawsuitpotential loss or the ultimate impact on their financial condition or resultsrange of operations but believe an adverse outcome could have a material effect on their retirement plan funding and expense.

RMT Contract Disputes - In September 2011, RMT filed a lawsuit in the U.S. District Court for the Western District of Wisconsin, which alleged, among other things, breach of contract against Cable System Installation (CSI), a subcontractor to RMT on several solar projects in New Jersey. The lawsuit sought to recover all costs incurred by RMT as a result of the breaches of contract by CSI. CSI filed an answer and counterclaims against RMT asserting that RMT owed CSI additional amounts for work performed under the contract that have not been paid to date. CSI filed liens against the projects based on claims that they have not been paid for work performed under the contract with RMT and filed lawsuits in New Jersey to foreclose upon the liens that it has filed in that jurisdiction. Vendors of CSI also filed lawsuits against RMT and liens against the projects based on claims that they have not been paid as required under their agreements with CSI. In January 2013, RMT entered into a confidential settlement agreement, which includes the release of all claims by all parties to this matter and the discharge of all liens related to this matter. The terms of the settlement did not have a material impact on Alliant Energy’s financial condition or results of operations.potential loss.

Other - Alliant Energy, IPL and WPL are involved in other legal and administrative proceedings before various courts and agencies with respect to matters arising in the ordinary course of business. Although unable to predict the outcome of these matters, Alliant Energy, IPL and WPL believe that appropriate reserves have been established and final disposition of these actions will not have a material effect on their financial condition or results of operations.


167163



(d) Guarantees and Indemnifications -
RMT - In January 2013, Alliant Energy sold its remaining interest in RMT. RMT providesprovided renewable energy services including construction and high voltage connection services for wind and solar projects. As part of the sale, Alliant Energy provided indemnifications to the buyer of RMT for losses resulting from potential breach of the representations and warranties made by Alliant Energy as of the sale date and for the potential breach of its obligations under the sale agreement. These indemnifications are limited to $3 million and expire in July 2014. The dollar limit on these indemnifications is subject to increase,

In addition, Alliant Energy, as part of the sale, indemnified the buyer for any claims, including claims of warranty under the project obligations that were commenced or are based on actions that occurred prior to the amount, if any,sale, except for liabilities already accounted for through adjustments to the purchase price. The indemnification obligations either cease to exist when the statute of contingent consideration Alliant Energylimitation for such claims is entitled to receivemet or, in the case of RMT’s projects, when the warranty period under the terms ofagreements expires. The warranty periods for RMT’s projects generally range from 12 to 60 months with the sale. Although unable to predict the outcome of these matters, Alliant Energy believes the likelihood of having to make any material cash payments under these indemnifications is remote.latest expiring in 2016.

Alliant Energy also continues to guarantee RMT’s performance obligations related to certain of RMT’s projects that were commenced prior to Alliant Energy’s sale of RMT. As of December 31, 20122013, Alliant Energy had $615347 million of performance guarantees outstanding with $270 million, $294 million and $5153 million expiring in2013, 2014 and 2015, respectively. RMT

Although Alliant Energy has also provided surety bonds in support of the payment and performance obligations ofreceived warranty claims related to certain of these projects, it does not currently believe that material losses are both probable and Alliant Energy has guaranteed RMT’s indemnity obligations to the holders of such bonds. As of December 31, 2012, RMT provided $18 million in surety bonds guaranteed by Alliant Energy, which expire in 2013. Alliant Energy currently believes that no material cash payments will be madereasonably estimated, and therefore, has not recognized any material liabilities related to these obligationsmatters as of December 31, 20122013. Due to the early stages of the warranty claims, Alliant Energy is currently unable to provide an estimate of potential loss or range of potential loss. Refer to Note 1719 for further discussion of RMT.

Whiting Petroleum - In 2004, Alliant Energy sold its remaining interest in Whiting. Whiting Petroleum. Whiting Petroleum is an independent oil and gas company. Alliant Energy continues to guarantee the obligations related to the abandonment obligations of certain offshore platforms inoff the coast of California and related onshore plant and equipment that were owned by Whiting Petroleum prior to Alliant Energy’s sale of Whiting.Whiting Petroleum. The guarantee does not include a maximum limit. As of December 31, 20122013, the present value of the abandonment obligations is estimated at $3032 million. Alliant Energy believes that no payments will be made under this guarantee. Alliant Energy has not recognized any material liabilities related to this guarantee as of December 31, 20122013.

Refer to Note 3(a) for discussion of Alliant Energy’s and WPL’s residual value guarantees of their synthetic leases.

(e) Environmental Matters - Alliant Energy, IPL and WPL are subject to environmental regulations as a result of their current and past operations. These regulations are designed to protect public health and the environment and have resulted in compliance, remediation, containment and monitoring obligations, which are recorded as environmental liabilities. At December 31, current environmental liabilities were included in “Other current liabilities” and non-current environmental liabilities were included in “Other long-term liabilities and deferred credits” on the Consolidated Balance Sheets as follows (in millions):
Alliant Energy IPL WPLAlliant Energy IPL WPL
2012 2011 2012 2011 2012 20112013 2012 2013 2012 2013 2012
Current environmental liabilities
$3.7
 
$4.8
 
$2.5
 
$3.5
 
$1.2
 
$1.3

$3.6
 
$3.7
 
$2.8
 
$2.5
 
$0.8
 
$1.2
Non-current environmental liabilities25.3
 28.8
 23.2
 24.9
 2.1
 3.8
15.4
 25.3
 13.6
 23.2
 1.7
 2.1

$29.0
 
$33.6
 
$25.7
 
$28.4
 
$3.3
 
$5.1

$19.0
 
$29.0
 
$16.4
 
$25.7
 
$2.5
 
$3.3

MGP Sites - IPL and WPL have current or previous ownership interests in v40 and 14arious sites respectively,that are previously associated with the production of gas for which theyIPL and WPL have, or may be liablehave in the future, liability for investigation, remediation and monitoring costs. IPL and WPL have received letters from state environmental agencies requiring no further action at 13 and 9 of these sites, respectively. Additionally, IPL has met state environmental agency expectations at 3 additional sites requiring no further action for soil remediation. IPL and WPL are working pursuant to the requirements of various federal and state agencies to investigate, mitigate, prevent and remediate, where necessary, the environmental impacts to property, including natural resources, at and around thethese former MGP sites in order to protect public health and the environment. IPL and WPL are currently monitoring and/or remediating 27 and 5 sites, respectively.

Alliant Energy, IPL and WPL record environmental liabilities related to these former MGP sites based upon periodic studies. Such amounts are based on the best current estimate of the remaining amount to be incurred for investigation, remediation and monitoring costs for those sites where the investigation process has been or is substantially completed, and the minimum of the estimated cost range for those sites where the investigation is in its earlier stages. There are inherent uncertainties associated with the estimated remaining costs for MGP projects primarily due to unknown site conditions and potential changes in regulatory agency requirements. It is possible that future cost estimates will be greater than current estimates as the investigation process proceeds and as additional facts become known. The amounts recognized as liabilities are reduced for expenditures incurred and are adjusted as further information develops or circumstances change. Costs of future

164

Table of Contents


expenditures for environmental remediation obligations are not discounted. Management currently estimates the range of

168



remaining costs to be incurred for the investigation, remediation and monitoring of these sites to be $1813 million ($1611 million for IPL and $2 million for WPL) to $4230 million ($3827 million for IPL and $43 million for WPL). At December 31, 20122013, Alliant Energy, IPL and WPL recorded $2919 million, $2616 million and $3 million, respectively, in other current and non-current environmental liabilities for their remaining costs to be incurred for these MGP sites.

Refer to Note 1(b)2 for discussion of regulatory assets recorded by IPL and WPL, which reflect the probable future rate recovery of MGP expenditures. Considering the current rate treatment, and assuming no material change therein, Alliant Energy, IPL and WPL believe that the clean-up costs incurred for these MGP sites will not have a material effect on their financial condition or results of operations. Settlement has been reached with all of IPL’s and WPL’s insurance carriers regarding reimbursement for their MGP-related costs and such amounts have been accounted for as directed by the applicable regulatory jurisdiction.

WPL Consent Decree - In 2009, the EPA sent an NOV to WPL as an owner and the operator of Edgewater, Nelson Dewey and Columbia alleging that the owners of Edgewater, Nelson Dewey and Columbia failed to comply with appropriate pre-construction review and permitting requirements and as a result violated the PSD program requirements, Title V Operating Permit requirements of the CAA and the Wisconsin SIP. In 2010, the Sierra Club filed complaints against WPL, as owner and operator of Nelson Dewey and Columbia, and separately as owner and operator of Edgewater, based on allegations that modifications were made at the facilities without complying with the PSD program requirements, Title V Operating Permit requirements of the CAA and state regulatory counterparts contained within the Wisconsin SIP designed to implement the CAA.

In April 2013, WPL, along with the other owners of Edgewater and Columbia, entered into a Consent Decree with the EPA and the Sierra Club to resolve the claims relating to Edgewater, Columbia and Nelson Dewey, while admitting no liability. In June 2013, the Consent Decree was approved by the Court, thereby resolving all claims against WPL. Under the Consent Decree, WPL is required to install the following emission controls systems:

SCR system at Edgewater Unit 5 by May 1, 2013 (placed in-service in December 2012);
Scrubbers and baghouses at Columbia Units 1 and 2 by December 31, 2014;
Scrubber and baghouse at Edgewater Unit 5 by December 31, 2016; and
SCR system at Columbia Unit 2 by December 31, 2018.

WPL is also required to fuel switch or retire Nelson Dewey Units 1 and 2 and Edgewater Unit 3 by December 31, 2015, and Edgewater Unit 4 by December 31, 2018. In addition, the Consent Decree establishes emission rate limits for SO2, NOx and PM for Columbia Units 1 and 2, Nelson Dewey Units 1 and 2 and Edgewater Units 4 and 5. The Consent Decree also includes annual plant-wide emission caps for SO2 and NOx for Columbia, Edgewater and Nelson Dewey. WPL paid a civil penalty of approximately $2 million in 2013 and will complete approximately $7 million in environmental mitigation projects.

Final recovery of the costs expected to be incurred related to the Consent Decree will be decided by the PSCW in future rate cases or other proceedings. Alliant Energy and WPL currently expect to recover any material costs incurred by WPL related to compliance with the terms of the Consent Decree from WPL’s electric customers, except for costs related to certain of the environmental mitigation projects and the civil penalty.

Other Environmental Contingencies - In addition to the environmental liabilities discussed above, Alliant Energy, IPL and WPL are also monitoring various environmental regulations that may have a significant impact on their future operations. Several of these environmental regulations are subject to legal challenges, reconsideration and/or other uncertainties. Given uncertainties regarding the outcome, timing and compliance plans for these environmental matters, Alliant Energy, IPL and WPL are currently not able to determine the complete financial impact of these regulations but do believe that future capital investments and/or modifications to their electric generating facilitiesEGUs to comply with these regulations could be significant. Specific current, proposed or potential environmental matters that may require significant future expenditures are included below along with a brief description of these environmental regulations.


165



Air Quality -
CAIR/CSAPRCAIR - CAIR is an emissions trading program that requires SO2 and NOx emissions reductions at certain of IPL’s and WPL’s fossil-fueled electric generating units (EGUs) with greater than 25 MW capacityEGUs located in Iowa and Wisconsin through installation of emission controls and/or purchases of allowances. The requirements for SO2 and NOx reductions started in 2010 and 2009, respectively. CSAPR was expected to replace CAIR starting in 2012, however, it was subsequently vacated and remanded to the EPA for further revision by the D.C. Circuit Court. In January 2013, the D.C. Circuit Court denied the EPA’s request for rehearing of the decision that vacated and remanded CSAPR for further revision. Petitioners may seek the Supreme Court’s review of this decision and, during the interim, CAIR remains effective.

Clean Air Visibility Rule (CAVR)CAVR addresses regional haze atrequires states to develop and implement plans to address visibility impairment in designated national parks and wilderness areas and is expected toareas. These implementation plans require reductions in visibility-impairing emissions, including SO2, NOx and particulate matter, from certain EGUs by installingBART emission controls including those determinedand other additional measures needed for reducing state contributions to be Best Available Retrofit Technology (BART). In 2012, the EPA published a final rule that would allow BART obligations for SO2 and NOx emissions to be fulfilled by compliance with CSAPR. In 2012, the EPA also approved the Iowa, Minnesota and Wisconsin CAVR plans, which would require compliance with CSAPR to fulfill BART requirements for SO2 and NOx emission reductions. In 2012, CSAPR requirements were vacated by the D.C. Circuit Court and the related rule that allowed for CAVR BART obligations to be met by CSAPR was challenged in the D.C. Circuit Court. It is unknown whether the EPA will allow BART to be fulfilled by CAIR, a modified CSAPR or another rule. This outcome remains uncertain pending the ongoing D.C. Circuit Court’s review of these regulations and the EPA’s responses to resolve the court orders on these rules.regional haze.

Utility MACTMATS Rule requires compliance with numerical emission limitations and work practice standardslimits for the control of mercury and other federal hazardous air pollutants for coal-fueled EGUs with greater than 25 MW capacity.HAPs. Compliance is currently expected to be required by April 2015. In 2012, the EPA issued a proposed reconsideration to limited aspects to the Utility MACT rule including revisions to the startup and shutdown provisions2015; however, an entity can request an additional year for existingcompliance for certain EGUs. The EPA plans to issue a final reconsideration rule by March 2013.

Wisconsin State Mercury Rule requires WPL’s existing coal-fueled EGUs to reduce annualcomply with mercury emissions by 40% from a historic baselineemission limits beginning in 2010, and to either achieve a 90% annual mercury emissions reduction standard or limit the annual concentration of mercury emissions to 0.008 pounds of mercury per gigawatt-hour beginning in 2015.

Wisconsin RACT Rule requires NOx emissions reductions at Edgewater to support achieving compliance with 2013 requirements since it is located in Sheboygan County, which is currently designated as a non-attainment area for Ozone National Ambient Air Quality Standards (NAAQS). WPL installed NOx emission controls technologies at Edgewater, which met the 2009 to 2012 compliance requirements under this rule. In 2012, WPL completed the installation of an SCR at Edgewater to support achieving compliance with the 2013 requirements.2010.

Industrial Boiler and Process Heater MACT Rule requires reductions of emissions of hazardous air pollutantscompliance with HAPs emission limitations at certain EGUs and fossil-fueled auxiliary boilers and process heaters located at EGUs. In December 2012, the EPA issued a final reconsidered

169



rule with a compliance deadline ofEGUs by early 2016 for major sources. The final rule remains subject to legal challenges in the D.C. Circuit Court.2016.

Ozone NAAQS Rule reduced- The ozone NAAQS rule may require a reduction of NOx emissions in certain non-attainment areas based on classifications assigned by the primary standard to a level of 0.075 parts per million.EPA. In 2012, the EPA issued a final rule that classifies Sheboygan County in Wisconsin as marginal ozone non-attainment, which requires this area to achieve compliance with the eight-hour ozone NAAQS by December 2015. WPL operates Edgewater and the Sheboygan Falls Energy Facility in Sheboygan County, Wisconsin.

Fine ParticleParticulate (PM2.5) NAAQS Rule - In 2012, the EPA issuedrequires a final rule revising the fine particle primary NAAQS (PM2.5 NAAQS), which strengthens the annual standard from 15micrograms per cubic meter (ug/m3) to 12 ug/m3.reduction of SO2, NOx and PM emissions in certain non-attainment areas. The EPA is expected to designate non-attainment areas for the revised annual PM2.5 NAAQS by December 2015.2014. Compliance with the final rule is expected to be required by 2020 for non-attainment areas designated in 2015.2014.

Nitrogen Dioxide (NO2)EPA NSPS for GHG Emissions from Electric Utilities NAAQS Rule requires awould establish CO2 emissions limits for certain new one-hour NAAQSfossil-fueled EGUs. Marshalltown is expected to be impacted by these proposed standards and would be constructed to achieve compliance with these standards. Also, WPL’s potential generation investment could be impacted by these standards. A date for NO2 at a level of 100parts per billion (ppb) and associated ambient air monitoring requirements, while maintaining the current annual standard of 53 ppb.finalizing these standards has not yet been established. The EPA is expected to re-evaluate non-attainment areasissue proposed and final NSPS for the NO2 NAAQS in 2016 based on expanded monitoring data. The scheduleGHG emissions for compliance has not yet been established.

SO2 NAAQS Rule requires a new one-hour NAAQS for SO2 at a levelexisting EGUs by June 1, 2014 and June 1, 2015, respectively, which would provide guidelines that states must follow to achieve required GHG emissions reductions. SIPs that provide details of 75 ppb. The EPA plans to finalize non-attainment designations for the SO2 NAAQS for certain parts of Iowa and Wisconsin in June 2013. The compliance deadline for SO2 NAAQS is currently expectedhow these guidelines are to be met would be required from state agencies by 2017 for non-attainment areas finalized in 2013.June 30, 2016.

Water Quality -
Section 316(b) of the Federal Clean Water Act proposal is expected towould require modifications to cooling water intake structures to assure that these structures reflect the “best technology available” for minimizing adverse environmental impacts to fish and other aquatic life. The schedule for compliance has not yet been finalized; however, compliance will likely be required within eight years of the effective date of the final rule. A final rule is expected to be issued by the EPA in 2013.

Wisconsin and Iowa State Thermal Rules may require modifications to certain of WPL’s and IPL’s EGUs to limit the amount of heat those facilities can discharge into Wisconsin and Iowa waters, respectively. Compliance with the thermal rules will be evaluated on a case-by-case basis as discharge permits for WPL’s and IPL’s EGUs are renewed.

Hydroelectric Fish Passage Device - FERC issued an order requiringWPL is currently required to install an agency-approved fish passage to be installeddevice at WPL’sits Prairie du Sac hydro plant by December 2012. In 2012, FERC extended the installation deadline to July 1, 2015. In January 2013, WPL requested

Effluent Limitation Guidelines proposal would require changes to discharge limits for wastewater from steam EGUs. Compliance with these proposed guidelines would be required after July 1, 2017 but before July 1, 2022, depending on each facility’s wastewater permit cycle for existing steam EGUs and immediately upon operation for new steam EGUs constructed after the U.S. Fish and Wildlife Service (FWS) delay or withdraw the fish passage requirement due to recent concerns regarding Asian carp and other invasive species. The FWS agreed to prepare an environmental impact study, during which time WPL is expected to request a further extensionissuance of the project deadlines.final guidelines.

Land and Solid Waste -
Coal Combustion Residuals (CCR)CCR could impose additional requirements for CCR management, beneficial use applications and disposal including operation and maintenance of coal ash surface impoundments (ash ponds) and/or landfills. The EPA issued a proposed regulation for public comment in 2010, and a final rule is expected in 2013. The schedule for compliance with the CCR Rule has not yet been established.

Polychlorinated Biphenyls (PCB) - The EPA is re-evaluating the existing authorized uses of PCB-containing equipment and other applications. The EPA is expected to issue proposed PCB rules for public comment in 2014 and could include a possible mandate to phase out all PCB-containing equipment. The schedule for compliance with the PCB rule has not yet been established.

Greenhouse Gases (GHG) Emissions -
EPA New Source Performance Standards (NSPS) for GHG Emissions from Electric Utilities is expected to require performance standards for GHG emissions from new and existing fossil-fueled EGUs. In 2012, the EPA published proposed NSPS for GHG, including carbon dioxide (CO2) emissions from new fossil-fueled EGUs larger than 25 MW (not including simple-cycle combustion turbines), with an output-based emissions rate limitation of 1,000 pounds of CO2 per MWh. This emissions rate limitation is expected to be effective upon the EPA’s issuance of the final rule in the second quarter of 2013. The issuance of proposed regulations for existing EGUs remains delayed and it is anticipated the EPA will issue proposed regulations by the end of 2013. The schedule for compliance with the NSPS has not yet been established.


170166

Table of Contents


(f) Credit Risk - Alliant Energy, IPL and WPL are subject to credit risk related to the ability of counterparties to meet their contractual payment obligations or the potential non-performance of counterparties to deliver contracted commodities and other goods or services at the contracted price.

IPL and WPL provide regulated electricity and natural gas services to residential, commercial, industrial and wholesale customers in the Midwest region of the U.S. The geographic concentration of their customers did not contribute significantly to their overall exposure to credit risk. In addition, as a result of their diverse customer base, IPL and WPL did not have any significant concentration of credit risk for receivables arising from the sale of electricity andor natural gas services.

IPL and WPL are typically net buyers of commodities (primarily electricity, coal and natural gas) required to provide regulated electricity and natural gas services to their customers. As a result, IPL and WPL are also subject to credit risk related to their counterparties’ failures to deliver commodities at the contracted price.

Alliant Energy, IPL and WPL maintain credit policies to minimize their credit risk. These credit policies include evaluation of the financial condition of counterparties, use of credit risk-related contingent provisions in certain commodity agreements that require credit support from counterparties that exceed certain exposure limits, diversification of counterparties to minimize concentrations of credit risk and the use of standardized agreements that facilitate the netting of cash flows associated with a single counterparty.

In 2013, IPL entered into a new PPA, which grants IPL rights to purchase 431 MWs of capacity and the resulting energy from DAEC for a term from the expiration of the existing PPA in February 2014 through December 31, 2025. This PPA exposes Alliant Energy and IPL to risk of counterparty non-performance. However, such risk is mitigated by IPL’s fuel-related cost recovery mechanisms. Refer to Note 16(b) for further discussion of the DAEC PPA.

Based on these credit policies and utility cost recovery mechanisms, it is unlikely that a material effect on Alliant Energy’s, IPL’s or WPL’s financial condition or results of operations would occur as a result of counterparty non-performance. However, there is no assurance that such policies will protect Alliant Energy, IPL and WPL against all losses from non-performance by counterparties.

Refer to Notes 1(p)1(m) and 1215 for details of allowances for doubtful accounts and credit risk-related contingent features, respectively.

(g) Collective Bargaining Agreements - At December 31, 20122013, employees covered by collective bargaining agreements represented 55%57%, 67% and 80% of total employees of Alliant Energy, IPL and WPL, respectively. In August 2013, IPL’sMay 2014, WPL’s collective bargaining agreement with International Brotherhood of Electrical WorkersIBEW Local 204 (Cedar Rapids)965 expires, representing 18%26% and 44%80% of total employees of Alliant Energy and IPL,WPL, respectively.

(14) JOINTLY-OWNED ELECTRIC UTILITY PLANT
Under joint ownership agreements with other utilities, IPL and WPL have undivided ownership interests in jointly-owned coal-fired electric generating facilities. Each of the respective owners is responsible for the financing of its portion of the construction costs. Kilowatt-hour generation and operating expenses are primarily divided between the joint owners on the same basis as ownership. IPL’s and WPL’s shares of expenses from jointly-owned coal-fired electric generating facilities are included in the corresponding operating expenses (e.g., electric production fuel, other operation and maintenance, etc.) in their Consolidated Statements of Income. Refer to Note 1(b) for further discussion of cost of removal obligations. Information relative to IPL’s and WPL’s ownership interest in these jointly-owned coal-fired electric generating facilities at December 31, 2012 was as follows (dollars in millions):
       Accumulated Construction Cost of Removal
 In-service Ownership Plant in Provision for Work in Obligations Included in
 Dates Interest % Service Depreciation Progress Regulatory Liabilities
IPL           
Ottumwa Unit 11981 48.0% 
$239.2
 
$118.8
 
$84.0
 
$12.0
George Neal Unit 41979 25.7% 97.1
 67.8
 44.5
 11.5
George Neal Unit 31975 28.0% 59.1
 39.1
 27.2
 5.6
Louisa Unit 11983 4.0% 35.0
 19.2
 0.2
 3.0
     430.4
 244.9
 155.9
 32.1
WPL           
Columbia Units 1-21975-1978 46.2% 247.0
 157.9
 133.5
 10.2
Edgewater Unit 41969 68.2% 91.8
 49.2
 0.4
 2.2
     338.8
 207.1
 133.9
 12.4
Alliant Energy    
$769.2
 
$452.0
 
$289.8
 
$44.5


171

Table of Contents


(15)(17) SEGMENTS OF BUSINESS
Alliant Energy - Alliant Energy’s principal businesses as of December 31, 20122013 are:
Utility - includes the operations of IPL and WPL, which serve customers in Iowa, Wisconsin and Minnesota. The utility business has three reportable segments: a) utility electric operations; b) utility gas operations; and c) utility other, which includes steam operations various other energy-related products and services and the unallocated portions of the utility business. Various line items in the following tables are not allocated to the electric and gas segments for management reporting purposes, and therefore, are included only in “Total Utility.”
Non-regulated, Parent and Other - includes the operations of Resources and its subsidiaries, Corporate Services, the Alliant Energy parent company, and any Alliant Energy parent company consolidating adjustments. Resources’ businesses include Transportation, Non-regulated Generation and other non-regulated investments described in Note 1(a).

Alliant Energy’s administrative support services are directly charged to the applicable segment where practicable. In all other cases, administrative support services are allocated to the applicable segment based on services agreements. Intersegment revenues were not material to Alliant Energy’s operations and there was no single customer whose revenues were 10% or more of Alliant Energy’s consolidated revenues. Certain financial information relating to Alliant Energy’s business segments, products and services and geographic information was as follows (in millions):
 Utility Non-Regulated, Alliant Energy
2012Electric Gas Other Total Parent and Other Consolidated
Operating revenues
$2,589.3
 
$396.3
 
$56.7
 
$3,042.3
 
$52.2
 
$3,094.5
Depreciation and amortization299.3
 29.1
 1.4
 329.8
 2.6
 332.4
Operating income426.2
 51.5
 7.4
 485.1
 34.6
 519.7
Interest expense, net of AFUDC      136.8
 (2.0) 134.8
Equity (income) loss from unconsolidated investments, net(42.1) 
 
 (42.1) 0.8
 (41.3)
Interest income and other      (0.3) (3.7) (4.0)
Income taxes      74.8
 14.6
 89.4
Income from continuing operations, net of tax      315.9
 24.9
 340.8
Loss from discontinued operations, net of tax      
 (5.1) (5.1)
Net income      315.9
 19.8
 335.7
Preferred dividends      15.9
 
 15.9
Net income attributable to Alliant Energy common shareowners      300.0
 19.8
 319.8
Total assets8,438.8
 814.8
 966.0
 10,219.6
 565.9
 10,785.5
Investments in equity method subsidiaries264.3
 
 
 264.3
 2.3
 266.6
Construction and acquisition expenditures994.0
 31.4
 0.1
 1,025.5
 132.6
 1,158.1
 Utility Non-Regulated, Alliant Energy
2011Electric Gas Other Total Parent and Other Consolidated
Operating revenues
$2,635.8
 
$476.7
 
$62.0
 
$3,174.5
 
$46.9
 
$3,221.4
Depreciation and amortization289.0
 28.4
 1.8
 319.2
 1.8
 321.0
Operating income (loss)444.2
 47.8
 (3.2) 488.8
 24.5
 513.3
Interest expense, net of AFUDC      146.6
 (0.3) 146.3
Equity income from unconsolidated investments, net(38.7) 
 
 (38.7) (0.6) (39.3)
Interest income and other      (0.2) (4.1) (4.3)
Income tax expense (benefit)      78.3
 (9.1) 69.2
Income from continuing operations, net of tax      302.8
 38.6
 341.4
Loss from discontinued operations, net of tax      
 (19.5) (19.5)
Net income      302.8
 19.1
 321.9
Preferred dividends      18.3
 
 18.3
Net income attributable to Alliant Energy common shareowners      284.5
 19.1
 303.6
Total assets7,524.5
 831.9
 781.1
 9,137.5
 550.4
 9,687.9
Investments in equity method subsidiaries246.5
 
 
 246.5
 3.1
 249.6
Construction and acquisition expenditures542.7
 38.0
 27.4
 608.1
 65.3
 673.4

172167

Table of Contents


Utility Non-Regulated, Alliant EnergyUtility Non-Regulated, Alliant Energy
2010Electric Gas Other Total Parent and Other Consolidated
2013Electric Gas Other Total Parent and Other Consolidated
Operating revenues
$2,674.2
 
$480.6
 
$64.6
 
$3,219.4
 
$42.7
 
$3,262.1

$2,689.0
 
$464.8
 
$71.3
 
$3,225.1
 
$51.7
 
$3,276.8
Depreciation and amortization255.1
 25.2
 5.3
 285.6
 1.7
 287.3
333.0
 28.8
 1.5
 363.3
 7.6
 370.9
Operating income (loss)489.8
 53.4
 (2.5) 540.7
 19.3
 560.0
Operating income444.5
 57.3
 6.3
 508.1
 25.8
 533.9
Interest expense, net of AFUDC      142.8
 2.0
 144.8
      135.5
 6.5
 142.0
Equity income from unconsolidated investments, net(37.8) 
 
 (37.8) (0.3) (38.1)(43.7) 
 
 (43.7) 
 (43.7)
Interest income and other      (0.6) (4.0) (4.6)      (0.4) 
 (0.4)
Income taxes      140.6
 7.1
 147.7
      49.3
 4.6
 53.9
Income from continuing operations, net of tax      295.7
 14.5
 310.2
      367.4
 14.7
 382.1
Loss from discontinued operations, net of tax      
 (3.9) (3.9)      
 (5.9) (5.9)
Net income      295.7
 10.6
 306.3
      367.4
 8.8
 376.2
Preferred dividends      18.7
 
 18.7
      17.9
 
 17.9
Net income attributable to Alliant Energy common shareowners      277.0
 10.6
 287.6
      349.5
 8.8
 358.3
Total assets7,227.2
 817.6
 782.4
 8,827.2
 455.7
 9,282.9
9,018.6
 859.3
 732.5
 10,610.4
 502.0
 11,112.4
Investments in equity method subsidiaries236.0
 
 
 236.0
 2.5
 238.5
279.1
 
 
 279.1
 2.3
 281.4
Construction and acquisition expenditures729.1
 39.9
 64.3
 833.3
 33.6
 866.9
677.3
 47.0
 7.3
 731.6
 66.7
 798.3
 Utility Non-Regulated, Alliant Energy
2012Electric Gas Other Total Parent and Other Consolidated
Operating revenues
$2,589.3
 
$396.3
 
$56.7
 
$3,042.3
 
$52.2
 
$3,094.5
Depreciation and amortization299.3
 29.1
 1.4
 329.8
 2.6
 332.4
Operating income426.2
 51.5
 7.4
 485.1
 34.6
 519.7
Interest expense, net of AFUDC      136.8
 (2.0) 134.8
Equity (income) loss from unconsolidated investments, net(42.1) 
 
 (42.1) 0.8
 (41.3)
Interest income and other      (0.3) (3.7) (4.0)
Income taxes      74.8
 14.6
 89.4
Income from continuing operations, net of tax      315.9
 24.9
 340.8
Loss from discontinued operations, net of tax      
 (5.1) (5.1)
Net income      315.9
 19.8
 335.7
Preferred dividends      15.9
 
 15.9
Net income attributable to Alliant Energy common shareowners      300.0
 19.8
 319.8
Total assets8,438.8
 814.8
 966.0
 10,219.6
 565.9
 10,785.5
Investments in equity method subsidiaries264.3
 
 
 264.3
 2.3
 266.6
Construction and acquisition expenditures994.0
 31.4
 0.1
 1,025.5
 132.6
 1,158.1
 Utility Non-Regulated, Alliant Energy
2011Electric Gas Other Total Parent and Other Consolidated
Operating revenues
$2,635.8
 
$476.7
 
$62.0
 
$3,174.5
 
$46.9
 
$3,221.4
Depreciation and amortization289.0
 28.4
 1.8
 319.2
 1.8
 321.0
Operating income (loss)444.2
 47.8
 (3.2) 488.8
 24.5
 513.3
Interest expense, net of AFUDC      146.6
 (0.3) 146.3
Equity income from unconsolidated investments, net(38.7) 
 
 (38.7) (0.6) (39.3)
Interest income and other      (0.2) (4.1) (4.3)
Income tax expense (benefit)      78.3
 (9.1) 69.2
Income from continuing operations, net of tax      302.8
 38.6
 341.4
Loss from discontinued operations, net of tax      
 (19.5) (19.5)
Net income      302.8
 19.1
 321.9
Preferred dividends      18.3
 
 18.3
Net income attributable to Alliant Energy common shareowners      284.5
 19.1
 303.6
Total assets7,524.5
 831.9
 781.1
 9,137.5
 550.4
 9,687.9
Investments in equity method subsidiaries246.5
 
 
 246.5
 3.1
 249.6
Construction and acquisition expenditures542.7
 38.0
 27.4
 608.1
 65.3
 673.4


168

Table of Contents


Products and Services - Alliant Energy’s consolidated operating revenues by segment were as follows:
2012 2011 20102013 2012 2011
Utility electric operations84% 82% 82%82% 84% 82%
Utility gas operations13% 15% 15%14% 13% 15%
Utility other2% 2% 2%2% 2% 2%
Other1% 1% 1%2% 1% 1%
100% 100% 100%100% 100% 100%

Geographic Information - At December 31, 20122013, 20112012 and 20102011, Alliant Energy, IPL and WPL did not have any long-lived assets to be held and used in foreign countries.

IPL - IPL is a utility serving customers in Iowa and Minnesota and includes three reportable segments: a) electric operations; b) gas operations; and c) other, which includes steam operations various other energy-related products and services and the unallocated portions of the utility business. Various line items in the following tables are not allocated to the electric and gas segments for management reporting purposes, and therefore, are included only in “Total.” Intersegment revenues were not material to IPL’s operations and there was no single customer whose revenues were 10% or more of IPL’s consolidated revenues. Certain financial information relating to IPL’s business segments was as follows (in millions):
2013Electric Gas Other Total
Operating revenues
$1,491.8
 
$273.9
 
$53.1
 
$1,818.8
Depreciation and amortization173.1
 16.5
 1.5
 191.1
Operating income173.1
 29.8
 9.1
 212.0
Interest expense, net of AFUDC      60.3
Interest income and other      (0.3)
Income tax benefit      (37.9)
Net income      189.9
Preferred dividends      16.3
Earnings available for common stock      173.6
Total assets4,905.3
 518.8
 381.9
 5,806.0
Construction and acquisition expenditures365.4
 27.5
 7.3
 400.2
2012Electric Gas Other Total
Operating revenues
$1,371.1
 
$226.7
 
$52.5
 
$1,650.3
Depreciation and amortization171.2
 16.3
 1.4
 188.9
Operating income166.2
 24.2
 9.9
 200.3
Interest expense, net of AFUDC      70.1
Interest income and other      (0.2)
Income tax benefit      (19.8)
Net income      150.2
Preferred dividends      12.6
Earnings available for common stock      137.6
Total assets4,500.9
 479.5
 476.6
 5,457.0
Construction and acquisition expenditures291.0
 16.4
 0.1
 307.5
2011Electric Gas Other Total
Operating revenues
$1,408.3
 
$276.3
 
$55.5
 
$1,740.1
Depreciation and amortization161.3
 16.0
 1.8
 179.1
Operating income181.6
 20.6
 6.2
 208.4
Interest expense, net of AFUDC      72.9
Interest income and other      (0.2)
Income tax benefit      (3.6)
Net income      139.3
Preferred dividends      15.0
Earnings available for common stock      124.3
Total assets4,208.2
 471.1
 414.2
 5,093.5
Construction and acquisition expenditures245.6
 21.2
 26.9
 293.7


173169

Table of Contents


2011Electric Gas Other Total
Operating revenues
$1,408.3
 
$276.3
 
$55.5
 
$1,740.1
Depreciation and amortization161.3
 16.0
 1.8
 179.1
Operating income181.6
 20.6
 6.2
 208.4
Interest expense, net of AFUDC      72.9
Interest income and other      (0.2)
Income tax benefit      (3.6)
Net income      139.3
Preferred dividends      15.0
Earnings available for common stock      124.3
Total assets4,208.2
 471.1
 414.2
 5,093.5
Construction and acquisition expenditures245.6
 21.2
 26.9
 293.7
2010Electric Gas Other Total
Operating revenues
$1,464.3
 
$274.3
 
$57.2
 $1,795.8
Depreciation and amortization157.1
 14.6
 5.3
 177.0
Operating income (loss)239.7
 23.6
 (1.4) 261.9
Interest expense, net of AFUDC      76.7
Interest income and other      (0.5)
Income taxes      42.3
Net income      143.4
Preferred dividends      15.4
Earnings available for common stock      128.0
Total assets4,025.3
 460.3
 452.0
 4,937.6
Construction and acquisition expenditures298.8
 20.0
 64.0
 382.8

WPL - WPL is a utility serving customers in Wisconsin and includes three reportable segments: a) electric operations; b) gas operations; and c) other, which includes various other energy-related products and services and the unallocated portions of the utility business. Various line items in the following tables are not allocated to the electric and gas segments for management reporting purposes, and therefore, are included only in “Total.” Intersegment revenues were not material to WPL’s operations and there was no single customer whose revenues were 10% or more of WPL’s consolidated revenues. Certain financial information relating to WPL’s business segments was as follows (in millions):
2012Electric Gas Other Total
2013Electric Gas Other Total
Operating revenues
$1,218.2
 
$169.6
 
$4.2
 
$1,392.0

$1,197.2
 
$190.9
 
$18.2
 
$1,406.3
Depreciation and amortization128.1
 12.8
 
 140.9
159.9
 12.3
 
 172.2
Operating income (loss)260.0
 27.3
 (2.5) 284.8
271.4
 27.5
 (2.8) 296.1
Interest expense, net of AFUDC      66.7
      75.2
Equity income from unconsolidated investments(42.1) 
 
 (42.1)(43.7) 
 
 (43.7)
Interest income and other      (0.1)      (0.1)
Income taxes      94.6
      87.2
Net income      165.7
      177.5
Preferred dividends      3.3
      1.6
Earnings available for common stock      162.4
      175.9
Total assets3,937.9
 335.3
 489.4
 4,762.6
4,113.3
 340.5
 350.6
 4,804.4
Investments in equity method subsidiaries264.3
 
 
 264.3
279.1
 
 
 279.1
Construction and acquisition expenditures703.0
 15.0
 
 718.0
311.9
 19.5
 
 331.4
2012Electric Gas Other Total
Operating revenues$1,218.2 
$169.6
 
$4.2
 
$1,392.0
Depreciation and amortization128.1 12.8 
 140.9
Operating income (loss)260.0 27.3 (2.5) 284.8
Interest expense, net of AFUDC      66.7
Equity income from unconsolidated investments(42.1)  
 (42.1)
Interest income and other      (0.1)
Income taxes      94.6
Net income      165.7
Preferred dividends      3.3
Earnings available for common stock      162.4
Total assets3,937.9 335.3 489.4
 4,762.6
Investments in equity method subsidiaries264.3  
 264.3
Construction and acquisition expenditures703.0 15.0 
 718.0
2011Electric Gas Other Total
Operating revenues$1,227.5 
$200.4
 
$6.5
 
$1,434.4
Depreciation and amortization127.7 12.4
 
 140.1
Operating income (loss)262.6 27.2
 (9.4) 280.4
Interest expense, net of AFUDC      73.7
Equity income from unconsolidated investments(38.7) 
 
 (38.7)
Income taxes      81.9
Net income      163.5
Preferred dividends      3.3
Earnings available for common stock      160.2
Total assets3,316.3 360.8
 366.9
 4,044.0
Investments in equity method subsidiaries246.5 
 
 246.5
Construction and acquisition expenditures297.1 16.8
 0.5
 314.4


174170

Table of Contents


2011Electric Gas Other Total
Operating revenues$1,227.5 
$200.4
 
$6.5
 
$1,434.4
Depreciation and amortization127.7 12.4  140.1
Operating income (loss)262.6 27.2 (9.4) 280.4
Interest expense, net of AFUDC      73.7
Equity income from unconsolidated investments(38.7)   (38.7)
Income taxes      81.9
Net income      163.5
Preferred dividends      3.3
Earnings available for common stock      160.2
Total assets3,316.3 360.8 366.9 4,044.0
Investments in equity method subsidiaries246.5   246.5
Construction and acquisition expenditures297.1 16.8 0.5 314.4
2010Electric Gas Other Total
Operating revenues$1,209.9 
$206.3
 
$7.4
 
$1,423.6
Depreciation and amortization98.0 10.6  108.6
Operating income (loss)250.1 29.8 (1.1) 278.8
Interest expense, net of AFUDC      66.1
Equity income from unconsolidated investments(37.8)   (37.8)
Interest income and other      (0.1)
Income taxes      98.3
Net income      152.3
Preferred dividends      3.3
Earnings available for common stock      149.0
Total assets3,201.9 357.3 330.4 3,889.6
Investments in equity method subsidiaries236.0   236.0
Construction and acquisition expenditures430.3 19.9
 0.3
 450.5

(16) SELECTED CONSOLIDATED QUARTERLY FINANCIAL DATA (UNAUDITED)
Alliant Energy - All “per share” references refer to earnings per diluted share. Summation of the individual quarters may not equal annual totals due to rounding. Refer to Note 17 for additional information on discontinued operations.
 2012 2011
 March 31 June 30 Sep. 30 Dec. 31 March 31 June 30 Sep. 30 Dec. 31
 (in millions, except per share data)
Operating revenues
$765.7
 
$690.3
 
$887.6
 
$750.9
 
$877.2
 
$712.5
 
$870.9
 
$760.8
Operating income95.6
 108.8
 213.7
 101.6
 127.3
 70.6
 209.4
 106.0
Amounts attributable to Alliant Energy common shareowners:               
Income from continuing operations, net of tax39.3
 65.5
 149.0
 71.1
 72.0
 50.3
 136.9
 63.9
Income (loss) from discontinued operations, net of tax(4.4) 0.4
 1.7
 (2.8) 1.5
 0.8
 (14.9) (6.9)
Net income34.9
 65.9
 150.7
 68.3
 73.5
 51.1
 122.0
 57.0
Earnings per weighted average common share attributable to Alliant Energy common shareowners:               
Income from continuing operations, net of tax0.36
 0.60
 1.34
 0.64
 0.65
 0.45
 1.23
 0.58
Income (loss) from discontinued operations, net of tax(0.04) 
 0.02
 (0.02) 0.01
 0.01
 (0.13) (0.07)
Net income0.32
 0.60
 1.36
 0.62
 0.66
 0.46
 1.10
 0.51


175

Table of Contents


IPL - Earnings per share data is not disclosed for IPL given Alliant Energy is the sole shareowner of all shares of IPL’s common stock outstanding during the periods presented.
 2012 2011
 March 31 June 30 Sep. 30 Dec. 31 March 31 June 30 Sep. 30 Dec. 31
 (in millions)
Operating revenues
$398.7
 
$360.7
 
$497.7
 
$393.2
 
$477.5
 
$374.1
 
$484.5
 
$404.0
Operating income23.9
 35.4
 112.0
 29.0
 47.1
 18.5
 116.5
 26.3
Net income (loss)(1.5) 19.6
 106.5
 25.6
 27.1
 1.0
 101.4
 9.8
Earnings available (loss) for common stock(4.7) 16.6
 103.3
 22.4
 21.7
 (2.3) 98.3
 6.6

WPL - Earnings per share data is not disclosed for WPL given Alliant Energy is the sole shareowner of all shares of WPL’s common stock outstanding during the periods presented.
 2012 2011
 March 31 June 30 Sep. 30 Dec. 31 March 31 June 30 Sep. 30 Dec. 31
 (in millions)
Operating revenues
$354.5
 
$315.7
 
$376.6
 
$345.2
 
$388.5
 
$326.8
 
$374.6
 
$344.5
Operating income64.6
 61.5
 93.4
 65.3
 74.8
 45.5
 86.9
 73.2
Net income31.9
 36.1
 56.7
 41.0
 44.4
 25.0
 51.4
 42.7
Earnings available for common stock31.1
 35.2
 55.9
 40.2
 43.6
 24.1
 50.6
 41.9

(17) DISCONTINUED OPERATIONS AND ASSETS AND LIABILITIES HELD FOR SALE
In 2011, Alliant Energy sold its IEA business to narrow its strategic focus and risk profile and received net proceeds of $5 million. In 2011, RMT sold its environmental business unit and received net proceeds of $12 million. In January 2013, Alliant Energy sold the remainder of its RMT business in order to narrow its strategic focus and risk profile. The final gain or loss from the sale of RMT is subject to a working capital adjustment and potential contingent consideration. Alliant Energy does not currently believe the final gain or loss related to the sale of RMT will be material. The RMT business qualified as assets and liabilities held for sale as of December 31, 2012.

The operating results of RMT and IEA have been separately classified and reported as discontinued operations in Alliant Energy’s Consolidated Statements of Income. A summary of the components of discontinued operations in Alliant Energy’s Consolidated Statements of Income was as follows (in millions):
 2012 2011 2010
Operating revenues
$289.2
 
$445.0
 
$160.3
Operating expenses297.0
 476.9
 166.8
Interest expense and other0.7
 
 1.0
Loss before income taxes(8.5) (31.9) (7.5)
Income tax benefit(3.4) (12.4) (3.6)
Loss from discontinued operations, net of tax
($5.1) 
($19.5) 
($3.9)

A summary of the assets and liabilities held for sale on Alliant Energy’s Consolidated Balance Sheets as of December 31 was as follows (in millions):
 2012 2011
Assets held for sale:   
Property, plant and equipment, net
$—
 
$3.8
Current assets27.9
 115.5
Other assets
 0.3
Total assets held for sale27.9
 119.6
Liabilities held for sale:   
Current liabilities31.4
 62.0
Other long-term liabilities and deferred credits
 0.1
Total liabilities held for sale31.4
 62.1
Net assets (liabilities) held for sale
($3.5) 
$57.5


176

Table of Contents


Based on the terms of the January 2013 sale of RMT, the fair value of the business, less costs to sell, was not less than the carrying amount.

(18) ASSET RETIREMENT OBLIGATIONS (AROs)
AROs recognized by Alliant Energy, IPL and WPL relate to legal obligations for the removal, closure or dismantlement of several assets including, but not limited to, wind projects, certain ash ponds, certain coal yards, active ash landfills and above ground storage tanks. Alliant Energy’s, IPL’s and WPL’s recognized AROs also include legal obligations for the management and final disposition of asbestos and PCB. Alliant Energy’s, IPL’s and WPL’s AROs are recorded in “Other long-term liabilities and deferred credits” on the Consolidated Balance Sheets. Refer to Note 1(b) for information regarding regulatory assets related to AROs. A reconciliation of the changes in AROs associated with long-lived assets is as follows (in millions):
 Alliant Energy IPL WPL
 2012 2011 2012 2011 2012 2011
Balance, January 1
$91.1
 
$75.9
 
$56.2
 
$43.6
 
$34.9
 
$32.3
Revisions in estimated cash flows (a)(6.4) 7.8
 (9.2) 7.7
 2.8
 0.1
Liabilities settled(3.4) (0.9) (3.3) (0.8) (0.1) (0.1)
Liabilities incurred (b)16.8
 4.0
 
 3.1
 7.7
 0.9
Accretion expense3.4
 4.3
 1.8
 2.6
 1.6
 1.7
Balance, December 31
$101.5
 
$91.1
 
$45.5
 
$56.2
 
$46.9
 
$34.9

(a)
In 2012 and 2011, IPL recorded revisions in estimated cash flows of ($8.2) million and $7.0 million, respectively, based on revised remediation timing and cost information for asbestos remediation at Sixth Street.
(b)
In 2012, Resources recorded AROs of $9.1 million related to its Franklin County wind project and WPL recorded AROs of $7.6 million related to Nelson Dewey.

In addition, certain of Alliant Energy’s, IPL’s and WPL’s AROs related to electric generating facility assets have not been recognized. Due to an indeterminate remediation date, the fair values of the AROs for these assets cannot be currently estimated. A liability for these AROs will be recorded when fair value is determinable. Removal costs of these facilities are being recovered in rates and are recorded in regulatory liabilities.

(19) RELATED PARTIES
System Coordination and Operating AgreementService Agreements - IPL and WPL are parties to a system coordination and operating agreement wherebyservice agreements with an affiliate, Corporate Services serves as agent on behalf of IPL and WPL. The agreement, which has been approved or reviewed by FERC and all state regulatory bodies having jurisdiction, provides a contractual basis for coordinated planning, construction, operation and maintenance of the interconnected electric generation systems of IPL and WPL. As agent of the agreement, Corporate Services enters into energy, capacity, ancillary services, and transmission sale and purchase transactions. Corporate Services allocates such sales and purchases among IPL and WPL based on procedures included in the agreement. The sales credited to and purchases billed to IPL and WPL were as follows (in millions):
 IPL WPL
 2012 2011 2010 2012 2011 2010
Sales credited
$10
 
$31
 
$28
 
$14
 
$28
 
$24
Purchases billed301
 307
 341
 61
 77
 73

Service Agreement - Services. Pursuant to athese service agreement,agreements, IPL and WPL receive various administrative and general services from an affiliate, Corporate Services.services. These services are billed to IPL and WPL at cost based on expenses incurred by Corporate Services for the benefit of IPL and WPL, respectively. These costs consisted primarily of employee compensation and benefits, and fees associated with various professional services. In 2012, Corporate Services executed a revised service agreement with IPLservices and WPL and began including a return on net assetsassets. Corporate Services also acts as partagent on behalf of its billingsIPL and WPL pursuant to the service agreements. As agent, Corporate Services enters into energy, capacity, ancillary services, and transmission sale and purchase transactions within MISO and PJM. Corporate Services assigns such sales and purchases among IPL and WPL based on statements received from MISO and PJM.

The amounts billed for services provided to IPL and WPL. WPL were as follows (in millions):
 IPL WPL
 2013 2012 2011 2013 2012 2011
Corporate Services billings
$140
 
$129
 
$153
 
$103
 
$102
 
$119

The amountssales credited to and purchases billed to IPL and WPL were as follows (in millions):
 IPL WPL
 2012 2011 2010 2012 2011 2010
Corporate Services billings
$129
 
$153
 
$170
 
$102
 
$119
 
$127
 IPL WPL
 2013 2012 2011 2013 2012 2011
Sales credited
$7
 
$10
 
$31
 
$12
 
$14
 
$28
Purchases billed365
 301
 307
 68
 61
 77

As of December 31, net intercompany payables to Corporate Services were as follows (in millions):
2012 20112013 2012
IPL
$72
 
$82

$62
 
$72
WPL40
 48
46
 40


177

Table of Contents


ATC - Pursuant to various agreements, WPL receives a range of transmission services from ATC. WPL provides operation, maintenance, and construction services to ATC. WPL and ATC also bill each other for use of shared facilities owned by each party. The related amounts billed between the parties were as follows (in millions):
2012 2011 20102013 2012 2011
ATC billings to WPL
$90
 
$90
 
$92

$96
 
$90
 
$90
WPL billings to ATC11
 12
 11
12
 11
 12

As of December 31, 20122013 and 20112012, WPL owed ATC net amounts of $68 million and $6 million, respectively.

IPL’s Sale of Certain Wind Project Assets to Resources - Pursuant to a wind development asset purchase and sale agreement, in 2011, IPL sold Resources wind project assets for the Franklin County wind project at IPL’s cost in 2011 forof $115.3 million. Refer to Note 1(e)3(a) for additional information.

WPL’s Sheboygan Falls Energy Facility Lease - Refer to Note 3(b)10(b) for discussion of WPL’s Sheboygan Falls Energy Facility lease.

(20) EARNINGS PER SHARE(19) DISCONTINUED OPERATIONS AND ASSETS AND LIABILITIES HELD FOR SALE
A reconciliationIn 2011, Alliant Energy sold its IEA business and RMT’s environmental business unit to narrow its strategic focus and risk profile and received aggregate net proceeds of $17 million for these businesses. In 2013, Alliant Energy sold the remainder of its RMT business to further narrow its strategic focus and risk profile. Alliant Energy did not recognize any material gains or losses related to the sales of these businesses. Alliant Energy does not currently believe that adjustments to the gain or loss related to the sale of the weighted average common shares outstanding usedremainder of RMT in periods after December 31, 2013 will be material.


171

Table of Contents


The operating results of RMT and IEA have been separately classified and reported as discontinued operations in Alliant Energy’s Consolidated Statements of Income. A summary of the basic and diluted earnings per weighted average common share (EPS) calculationcomponents of discontinued operations in Alliant Energy’s Consolidated Statements of Income was as follows (in thousands)millions):
 2013 2012 2011
Operating revenues
$0.9
 
$289.2
 
$445.0
Operating expenses9.9
 297.0
 476.9
Interest expense and other
 0.7
 
Loss before income taxes(9.0) (8.5) (31.9)
Income tax benefit(3.1) (3.4) (12.4)
Loss from discontinued operations, net of tax
($5.9) 
($5.1) 
($19.5)

As of December 31, 2012, Alliant Energy’s Consolidated Balance Sheet included assets held for sale recorded in “Other current assets” and liabilities held for sale recorded in “Other current liabilities” as follows (in millions):
Current assets
$27.9
Current liabilities31.4
Net liabilities held for sale
($3.5)

(20) SELECTED CONSOLIDATED QUARTERLY FINANCIAL DATA (UNAUDITED)
Alliant Energy - All “per share” references refer to earnings per diluted share. Summation of the individual quarters may not equal annual totals due to rounding. Refer to Note 19 for additional information on discontinued operations.
 2013 2012
 March 31 June 30 Sep. 30 Dec. 31 March 31 June 30 Sep. 30 Dec. 31
 (in millions, except per share data)
Operating revenues
$859.6
 
$718.0
 
$866.6
 
$832.6
 
$765.7
 
$690.3
 
$887.6
 
$750.9
Operating income120.7
 103.2
 201.4
 108.6
 95.6
 108.8
 213.7
 101.6
Amounts attributable to Alliant Energy common shareowners:               
Income from continuing operations, net of tax72.9
 65.9
 158.9
 66.5
 39.3
 65.5
 149.0
 71.1
Income (loss) from discontinued operations, net of tax(3.0) (0.6) (1.3) (1.0) (4.4) 0.4
 1.7
 (2.8)
Net income69.9
 65.3
 157.6
 65.5
 34.9
 65.9
 150.7
 68.3
Earnings per weighted average common share attributable to Alliant Energy common shareowners:               
Income from continuing operations, net of tax0.66
 0.59
 1.43
 0.60
 0.36
 0.60
 1.34
 0.64
Income (loss) from discontinued operations, net of tax(0.03) 
 (0.01) (0.01) (0.04) 
 0.02
 (0.02)
Net income0.63
 0.59
 1.42
 0.59
 0.32
 0.60
 1.36
 0.62

IPL - Earnings per share data is not disclosed for IPL given Alliant Energy is the sole shareowner of all shares of IPL’s common stock outstanding during the periods presented.
 2012 2011 2010
Weighted average common shares outstanding:     
Basic EPS calculation110,753
 110,626
 110,442
Effect of dilutive share-based awards15
 52
 79
Diluted EPS calculation110,768
 110,678
 110,521
 2013 2012
 March 31 June 30 Sep. 30 Dec. 31 March 31 June 30 Sep. 30 Dec. 31
 (in millions)
Operating revenues
$477.9
 
$383.4
 
$494.4
 
$463.1
 
$398.7
 
$360.7
 
$497.7
 
$393.2
Operating income41.1
 34.7
 100.0
 36.2
 23.9
 35.4
 112.0
 29.0
Net income (loss)31.5
 24.7
 112.6
 21.1
 (1.5) 19.6
 106.5
 25.6
Earnings available (loss) for common stock22.9
 22.2
 110.0
 18.5
 (4.7) 16.6
 103.3
 22.4


172



For 2012, 2011WPL and- 2010, there were no potentially dilutive securities excluded fromEarnings per share data is not disclosed for WPL given Alliant Energy is the calculationsole shareowner of diluted EPS.all shares of WPL’s common stock outstanding during the periods presented.
 2013 2012
 March 31 June 30 Sep. 30 Dec. 31 March 31 June 30 Sep. 30 Dec. 31
 (in millions)
Operating revenues
$369.8
 
$319.9
 
$360.9
 
$355.7
 
$354.5
 
$315.7
 
$376.6
 
$345.2
Operating income72.7
 59.7
 95.9
 67.8
 64.6
 61.5
 93.4
 65.3
Net income43.6
 34.4
 61.3
 38.2
 31.9
 36.1
 56.7
 41.0
Earnings available for common stock42.0
 34.4
 61.3
 38.2
 31.1
 35.2
 55.9
 40.2

ITEM 9. CHANGES IN AND DISAGREEMENTS WITH ACCOUNTANTS ON ACCOUNTING AND FINANCIAL DISCLOSURE

None.

ITEM 9A. CONTROLS AND PROCEDURES

Alliant Energy’s, IPL’s and WPL’s management evaluated, with the participation of each of Alliant Energy’s, IPL’s and WPL’s Chief Executive Officer (CEO), Chief Financial Officer (CFO)CEO, CFO and Disclosure Committee, the effectiveness of the design and operation of Alliant Energy’s, IPL’s and WPL’s disclosure controls and procedures as of the end of the quarter ended December 31, 20122013 pursuant to the requirements of the Securities Exchange Act of 1934, as amended. Based on their evaluation, the CEO and the CFO concluded that Alliant Energy’s, IPL’s and WPL’s disclosure controls and procedures were effective as of the end of the quarter ended December 31, 20122013.

The information required by Item 9A relating to “Management’s Annual Report on Internal Control Overover Financial Reporting” and, with respect to Alliant Energy, “Report of Independent Registered Public Accounting Firm,” is incorporated herein by reference to the relevant information in Item 8 Financial Statements and Supplementary Data. There was no change in Alliant Energy’s, IPL’s and WPL’s internal control over financial reporting that occurred during the quarter ended December 31, 20122013 that has materially affected, or is reasonably likely to materially affect, Alliant Energy’s, IPL’s or WPL’s internal control over financial reporting.

ITEM 9B. OTHER INFORMATION

None.

PART III

ITEM 10. DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE

The directors of Alliant Energy, IPL and WPL are the same, and therefore, the information required by Item 10 relating to directors and nominees for election of directors is the same for all registrants. The information required by Item 10 relating to directors and nominees for election of directors at the 20132014 Annual Meeting of Shareowners is incorporated herein by

178



reference to the relevant information under the caption “Election of Directors” in Alliant Energy’s Proxy Statement for the 2013 Annual Meeting of Shareowners (the 20132014 Alliant Energy Proxy Statement),Statement, which will be filed with the SEC within 120 days after the end of Alliant Energy’s, IPL’s and WPL’s fiscal years. The information required by Item 10 relating to the timely filing of reports under Section 16 of the Securities Exchange Act of 1934 is incorporated herein by reference to the relevant information under the caption “Section 16(a) Beneficial Ownership Reporting Compliance” in the 20132014 Alliant Energy Proxy Statement. Information regarding executive officers of Alliant Energy, IPL and WPL may be found in Part I of this report under the caption “Executive Officers of the Registrants.” The information required by Item 10 relating to audit committees and audit committee financial experts is incorporated herein by reference to the relevant information under the caption “Meetings and Committees of the Board” in the 20132014 Alliant Energy Proxy Statement. The code of ethics, also referred to as the Code of Conduct, of Alliant Energy, IPL and WPL are the same. The information required by Item 10 relating to Alliant Energy’s, IPL’s and WPL’s Code of Conduct is incorporated herein by reference to the relevant information under the caption “Corporate Governance” in the 20132014 Alliant Energy Proxy Statement.


173



ITEM 11. EXECUTIVE COMPENSATION

The directors and executive officers for Alliant Energy, IPL and WPL for which compensation information must be included are the same. Therefore, the information required by Item 11 for each of Alliant Energy, IPL and WPL is incorporated herein by reference to the relevant information under the captions “Compensation Discussion and Analysis,” “Compensation and Personnel Committee Report,” “Summary Compensation Table,” “Grants of Plan-Based Awards,” “Outstanding Equity Awards at Fiscal Year-End,” “Option Exercises and Stock Vested,” “Pension Benefits,” “Nonqualified Deferred Compensation,” “Potential Payments Upon Termination or Change in Control” and “Director Compensation” in the 20132014 Alliant Energy Proxy Statement, which will be filed with the SEC within 120 days after the end of Alliant Energy’s, IPL’s and WPL’s fiscal years.

ITEM 12. SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELATED STOCKHOLDER MATTERS

ALLIANT ENERGY
Information regarding Alliant Energy’s equity compensation plans as of December 31, 20122013 was as follows (Not Applicable (N/A)):follows:
 (A) (C) (A) (C)
 Number of securities to be (B) Number of securities remaining available Number of securities to be (B) Number of securities remaining available
 issued upon exercise of Weighted-average exercise for future issuance under equity issued upon exercise of Weighted-average exercise for future issuance under equity
 outstanding options, price of outstanding options, compensation plans (excluding outstanding options, price of outstanding options, compensation plans (excluding
Plan Category warrants and rights warrants and rights securities reflected in column (A)) warrants and rights warrants and rights securities reflected in column (A))
Equity compensation plans approved by shareowners 314,371 (a) $36.69 4,203,477 (b) 256,132 (a) $43.67 4,056,198 (b)
Equity compensation plans not approved by shareowners (c) N/A N/A N/A (d) N/A N/A N/A (d)
 314,371 $36.69 4,203,477 256,132
 $43.67 4,056,198

(a)
Represents performance shares and options to purchase shares of Alliant Energy’s common stock granted under the Alliant Energy Long-Term Equity Incentive Plan, as amended, the Alliant Energy Amended and Restated 2002 Equity Incentive Plan (EIP), and the Alliant Energy 2010 Omnibus Incentive Plan (OIP).OIP. The performance shares may be paid out in shares of Alliant Energy’s common stock, cash, or a combination of cash and stock and are adjusted by a performance multiplier, which ranges from zero to 200%, based on the performance criteria. The performance shares included in column (A) of the table reflect an assumed payout in the form of Alliant Energy’s common stock at the maximum performance multiplier of 200% for the 20122013 and 20112012 grants and at the actual performance multiplier of 198%148% for the 20102011 grants.
(b)
All of the available shares under the OIP may be issued upon the exercise of stock options or may be issued as awards in the form of restricted stock, restricted stock units, performance shares, performance units and other stock-based awards. As of December 31, 20122013, there were performance shares and restricted stock awards outstanding under the OIP. Upon shareowner approval of the OIP in 2010, the EIP terminated resulting in no new awards authorized to be granted under the EIP. All awards previously granted under the EIP that are still outstanding remain valid and continue to be subject to all of the terms and conditions of the EIP. Excludes 113,163 and 101,822160,589 shares of non-vested restricted common stock previously issued and outstanding under the OIP and EIP, respectively, at December 31, 20122013.
(c)
As of December 31, 20122013, there were 216,030227,469 shares of Alliant Energy’s common stock outstanding under the Alliant Energy Deferred Compensation Plan (DCP),DCP, which is described in Note 6(c)12(c) of the “Combined Notes to Consolidated Financial Statements.”

179



(d)There is no limit on the number of shares of Alliant Energy’s common stock that may be held under the DCP.

The remainder of the information required by Item 12 is incorporated herein by reference to the relevant information under the caption “Ownership of Voting Securities” in the 20132014 Alliant Energy Proxy Statement, which will be filed with the SEC within 120 days after the end of Alliant Energy’s fiscal year.

IPL AND WPL
None of IPL’s or WPL’s directors or executive officers own any shares of preferred stock in IPL or WPL, respectively.IPL. The remainder of the information required by Item 12 is incorporated herein by reference to the relevant information under the caption “Ownership of Voting Securities” in the 20132014 Alliant Energy Proxy Statement, which will be filed with the SEC within 120 days after the end of IPL’s and WPL’s fiscal years.

ITEM 13. CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR INDEPENDENCE

The information required by Item 13 for each of Alliant Energy, IPL and WPL is incorporated herein by reference to the relevant information under the caption “Corporate Governance” in the 20132014 Alliant Energy Proxy Statement, which will be filed with the SEC within 120 days after the end of Alliant Energy’s, IPL’s and WPL’s fiscal years.


174



ITEM 14. PRINCIPAL ACCOUNTING FEES AND SERVICES

ALLIANT ENERGY
The information required by Item 14 is incorporated herein by reference to the relevant information under the caption “Report of the Audit Committee” in the 20132014 Alliant Energy Proxy Statement, which will be filed with the SEC within 120 days after the end of Alliant Energy’s fiscal year.

IPL AND WPL
Each of IPL’s and WPL’s Audit Committee of the Board of Directors (Committee) has adopted a policy that requires advance approval of all audit, audit-related, tax and other permitted services performed by the independent registered public accounting firm. The policy provides for pre-approval by the Audit Committee of specifically defined audit and non-audit services after the Audit Committee is provided with the appropriate level of details regarding the specific services to be provided. The policy does not permit delegation of the Audit Committee’s authority to management. In the event the need for specific services arises between Audit Committee meetings, the Audit Committee has delegated to the Chairperson of the Audit Committee authority to approve permitted services provided that the Chairperson reports any decisions to the Audit Committee at its next scheduled meeting. The principal accounting fees billed to Alliant Energy by its independent registered public accounting firm, all of which were approved in advance by the Audit Committee, directly related and allocated to IPL and WPL were as follows (in thousands):
IPL WPLIPL WPL
2012 2011 2012 20112013 2012 2013 2012
Fees % of Total Fees % of Total Fees % of Total Fees % of TotalFees % of Total Fees % of Total Fees % of Total Fees % of Total
Audit fees
$824
 91% 
$904
 89% 
$898
 87% 
$872
 96%
$1,011
 91% 
$824
 91% 
$888
 92% 
$898
 87%
Audit-related fees75
 8% 73
 7% 135
 13% 33
 4%81
 7% 75
 8% 57
 6% 135
 13%
Tax fees
 % 31
 3% 
 % 
 %14
 1% 
 % 11
 1% 
 %
All other fees5
 1% 4
 1% 4
 % 3
 %5
 1% 5
 1% 5
 1% 4
 %

$904
 100% 
$1,012
 100% 
$1,037
 100% 
$908
 100%
$1,111
 100% 
$904
 100% 
$961
 100% 
$1,037
 100%

IPL’s and WPL’s audit fees for 20122013 and 20112012 consisted of the respective fees billed for the audits of the consolidated financial statements of IPL and its subsidiary and WPL and its subsidiaries,subsidiary, for reviews of financial statements included in Form 10-Q filings, and for services normally provided in connection with statutory and regulatory filings, such as financing transactions. IPL’s and WPL’s audit fees also included their respective portion of fees for the 20122013 and 20112012 audits of Alliant Energy’s consolidated financial statements and effectiveness of internal controls over financial reporting. IPL’s and WPL’s audit-related fees for 20122013 and 20112012 consisted of the fees billed for services rendered related to employee benefits plan audits and attest services not required by statute or regulations. IPL’s and WPL’s tax fees for 20112013 consisted of the fees billed for professional services rendered for tax compliance, tax advice and tax planning, including all services performed by the tax professional staff of affiliates of the independent registered public accounting firm, except those rendered in connection with the audit. All other fees for 20122013 and 20112012 for IPL and WPL consisted of license fees for accounting research software products and seminars. The Audit Committee does not consider the provision of non-audit services by the independent registered public accounting firm described above to be incompatible with maintaining independence of the independent registered public accounting firm.


180



PART IV

ITEM 15. EXHIBITS, FINANCIAL STATEMENT SCHEDULES

(1)
Consolidated Financial Statements - Refer to Item 8 Financial Statements and Supplementary Data.

(2)
Financial Statement Schedules -
Schedule I. Condensed Parent Company Financial Statements
Schedule II. Valuation and Qualifying Accounts and Reserves

NOTE: All other schedules are omitted because they are not applicable or not required, or because that required information is shown either in the consolidated financial statements or in the notes thereto.

(3)
Exhibits Required by SEC Regulation S-K - Exhibits for Alliant Energy, IPL and WPL are listed in the Exhibit Index, which is incorporated herein by reference.


175



SCHEDULE I - CONDENSED PARENT COMPANY FINANCIAL STATEMENTS

ALLIANT ENERGY CORPORATION
(Parent Company Only)
CONDENSED STATEMENTS OF INCOME
Year Ended December 31,Year Ended December 31,
2012 2011 20102013 2012 2011
(in millions)(in millions)
Operating revenues
$2
 
$4
 
$1

$2
 
$2
 
$4
Operating expenses1
 1
 2
1
 1
 1
Operating income (loss)1
 3
 (1)
Operating income1
 1
 3
Interest expense and other:          
Equity earnings from consolidated subsidiaries(322) (304) (292)(362) (322) (304)
Interest expense11
 11
 11
11
 11
 11
Interest income(4) (2) (1)(2) (4) (2)
Total interest expense and other(315) (295) (282)(353) (315) (295)
Income before income taxes316
 298
 281
354
 316
 298
Income tax benefit(4) (5) (6)(4) (4) (5)
Net income
$320
 
$303
 
$287

$358
 
$320
 
$303

The accompanying Notes to Condensed Financial Statements are an integral part of these statements.

ALLIANT ENERGY CORPORATION
(Parent Company Only)
CONDENSED BALANCE SHEETS
December 31,December 31,
2012 20112013 2012
(in millions)(in millions)
ASSETS      
Current assets:      
Notes receivable from affiliated companies
$77
 
$211

$72
 
$77
Income tax refunds receivable
 11
Other2
 5
3
 2
79
 227
75
 79
Investments:      
Investments in consolidated subsidiaries3,447
 3,129
3,585
 3,447
Other20
 20
14
 20
3,467
 3,149
3,599
 3,467
Other assets5
 6
6
 5
Total assets
$3,551
 
$3,382

$3,680
 
$3,551

The accompanying Notes to Condensed Financial Statements are an integral part of these statements.


181176



ALLIANT ENERGY CORPORATION
(Parent Company Only)
CONDENSED BALANCE SHEETS (continued)
December 31,December 31,
2012 20112013 2012
(in millions)(in millions)
CAPITALIZATION AND LIABILITIES      
Capitalization:      
Common stock and additional paid-in capital
$1,512
 
$1,512

$1,509
 
$1,512
Retained earnings1,627
 1,506
1,777
 1,627
Accumulated other comprehensive loss(1) (1)
 (1)
Shares in deferred compensation trust(7) (8)(8) (7)
Total common equity3,131
 3,009
3,278
 3,131
Long-term debt, net250
 250

 250
3,381
 3,259
3,278
 3,381
Current liabilities:      
Current maturities of long-term debt250
 
Commercial paper105
 70
96
 105
Other21
 14
10
 21
126
 84
356
 126
Other long-term liabilities and deferred credits:      
Deferred income taxes38
 32
39
 38
Other6
 7
7
 6
44
 39
46
 44
Total capitalization and liabilities
$3,551
 
$3,382

$3,680
 
$3,551

The accompanying Notes to Condensed Financial Statements are an integral part of these statements.

ALLIANT ENERGY CORPORATION
(Parent Company Only)
CONDENSED STATEMENTS OF CASH FLOWS

Year Ended December 31,Year Ended December 31,

2012
2011
20102013
2012
2011

(in millions)(in millions)
Net cash flows from operating activities
$260


$193


$110

$238


$260


$193
Cash flows from (used for) investing activities:







Cash flows used for investing activities:







Capital contributions to consolidated subsidiaries(230)
(144)
(125)(120)
(230)
(144)
Capital repayments from consolidated subsidiaries

101

183
95



101
Net change in notes receivable from affiliates134
 
 
5
 134
 
Other1




(2)
1


Net cash flows from (used for) investing activities(95)
(43)
58
Net cash flows used for investing activities(22)
(95)
(43)
Cash flows used for financing activities:















Common stock dividends(199)
(188)
(175)(208)
(199)
(188)
Net change in borrowings with affiliates

(155)
50




(155)
Net change in commercial paper35

70


(9)
35

70
Proceeds from issuance of common stock1

2

6
Other(2)
(2)
(1)1

(1)

Net cash flows used for financing activities(165)
(273)
(120)(216)
(165)
(273)
Net increase (decrease) in cash and cash equivalents

(123)
48
Net decrease in cash and cash equivalents



(123)
Cash and cash equivalents at beginning of period

123

75




123
Cash and cash equivalents at end of period
$—


$—


$123

$—


$—


$—
Supplemental cash flows information:















Cash paid (refunded) during the period for:















Interest, net of capitalized interest
$11


$11


$11

$13


$11


$11
Income taxes, net of refunds(29)
(6)
(11)7

(29)
(6)

The accompanying Notes to Condensed Financial Statements are an integral part of these statements.


182177



ALLIANT ENERGY CORPORATION
(Parent Company Only)
NOTES TO CONDENSED FINANCIAL STATEMENTS

Pursuant to rules and regulations of the Securities and Exchange Commission,SEC, the Condensed Financial Statements of Alliant Energy Corporation (Parent Company Only) do not reflect all of the information and notes normally included with financial statements prepared in accordance with accounting principles generally accepted in the United States of America.GAAP. Therefore, these Condensed Financial Statements should be read in conjunction with the Consolidated Financial Statements and related Combined Notes to Consolidated Financial Statements included in Alliant Energy’s 20122013 Form 10-K, Part II, Item 8, which is incorporated herein by reference.

In the Condensed Financial Statements of Alliant Energy Corporation (Parent Company Only), investments in subsidiaries are accounted for using the equity method.

SCHEDULE II - VALUATION AND QUALIFYING ACCOUNTS AND RESERVES
    Additions  
 Balance,Charged toCharged to Other Balance,
DescriptionJanuary 1ExpenseAccounts (a)Deductions (b)December 31
 (in millions)
Valuation and Qualifying Accounts Which are Deducted in the Balance Sheet From the Assets to Which They Apply:
 Accumulated Provision for Uncollectible Accounts:    
  Alliant Energy Corporation (c)     
   Year ended December 31, 2012
$4.2

$6.6

$1.2

$8.0

$4.0
   Year ended December 31, 20113.2
7.8
1.9
8.7
4.2
   Year ended December 31, 20104.5
6.8
1.8
9.9
3.2
  Interstate Power and Light Company (c)    
   Year ended December 31, 2012
$0.9

$6.4

$—

$6.6

$0.7
   Year ended December 31, 20110.4
7.4

6.9
0.9
   Year ended December 31, 20102.5
5.6

7.7
0.4
  Wisconsin Power and Light Company    
   Year ended December 31, 2012
$1.9

$0.1

$1.2

$1.4

$1.8
   Year ended December 31, 20111.7
0.1
1.9
1.8
1.9
   Year ended December 31, 20102.0
0.1
1.8
2.2
1.7
 Accumulated Provision for Uncollectible Accounts:    
  Alliant Energy (c)     
   Year ended December 31, 2013
$4.0

$13.6

$0.6

$13.4

$4.8
   Year ended December 31, 20124.2
6.6
1.2
8.0
4.0
   Year ended December 31, 20113.2
7.8
1.9
8.7
4.2
  IPL (c)    
   Year ended December 31, 2013
$0.7

$12.7

$—

$12.7

$0.7
   Year ended December 31, 20120.9
6.4

6.6
0.7
   Year ended December 31, 20110.4
7.4

6.9
0.9
  WPL    
   Year ended December 31, 2013
$1.8

$—

$0.6

$0.7

$1.7
   Year ended December 31, 20121.9
0.1
1.2
1.4
1.8
   Year ended December 31, 20111.7
0.1
1.9
1.8
1.9
Note: The above provisions relate to various customer, notes and other receivable balances included in various line items on the respective Consolidated Balance Sheets.

Other Reserves:
 Accumulated Provision for Other Reserves (d):
  Alliant Energy Corporation    
   Year ended December 31, 2012
$25.9

$9.6

$—

$2.1

$33.4
   Year ended December 31, 201124.0
8.8

6.9
25.9
   Year ended December 31, 201020.9
11.5

8.4
24.0
  Interstate Power and Light Company    
   Year ended December 31, 2012
$10.2

$2.1

$—

$0.7

$11.6
   Year ended December 31, 20118.8
3.6

2.2
10.2
   Year ended December 31, 20109.0
2.0

2.2
8.8
  Wisconsin Power and Light Company    
   Year ended December 31, 2012
$11.7

$3.1

$—

$1.3

$13.5
   Year ended December 31, 201112.8
3.7

4.8
11.7
   Year ended December 31, 201010.7
7.5

5.4
12.8
 Accumulated Provision for Other Reserves (d):
  Alliant Energy    
   Year ended December 31, 2013
$33.4

$23.2

$—

$18.4

$38.2
   Year ended December 31, 201225.9
9.6

2.1
33.4
   Year ended December 31, 201124.0
8.8

6.9
25.9
  IPL    
   Year ended December 31, 2013
$11.6

$9.3

$—

$2.8

$18.1
   Year ended December 31, 201210.2
2.1

0.7
11.6
   Year ended December 31, 20118.8
3.6

2.2
10.2
  WPL    
   Year ended December 31, 2013
$13.5

$8.8

$—

$6.1

$16.2
   Year ended December 31, 201211.7
3.1

1.3
13.5
   Year ended December 31, 201112.8
3.7

4.8
11.7
(a)Accumulated provision for uncollectible accounts: In accordance with its regulatory treatment, certain amounts provided by Wisconsin Power and Light CompanyWPL are recorded in regulatory assets.
(b)Deductions are of the nature for which the reserves were created. In the case of the accumulated provision for uncollectible accounts, deductions from this reserve are reduced by recoveries of amounts previously written off.
(c)
Refer to Note 4(a)5(a) of the “Combined Notes to Consolidated Financial Statements” for discussion of IPL’s sales of accounts receivable program.
(d)Other reserves are largely related to injury and damage claims arising in the ordinary course of business.

183178



SIGNATURES

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the Registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized on the 26th25th day of February 20132014.

ALLIANT ENERGY CORPORATION
 
By: /s/ Patricia L. Kampling
 Patricia L. Kampling
 Chairman, President and Chief Executive Officer

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities indicated on the 26th25th day of February 20132014.
/s/Patricia L. Kampling Chairman, President, Chief Executive Officer and Director (Principal Executive Officer)
 Patricia L. Kampling  
    
/s/Thomas L. Hanson Senior Vice President and Chief Financial Officer (Principal Financial Officer)
 Thomas L. Hanson  
    
/s/Robert J. Durian Controller and Chief Accounting Officer (Principal Accounting Officer)
 Robert J. Durian  
/s/Patrick E. Allen Director
 Patrick E. Allen  
    
/s/Michael L. Bennett Director
 Michael L. Bennett  
    
/s/Darryl B. Hazel Director
 Darryl B. Hazel  
    
/s/Singleton B. McAllister Director
 Singleton B. McAllister  
    
/s/Ann K. Newhall Director
 Ann K. Newhall  
    
/s/Dean C. Oestreich Director
 Dean C. Oestreich  
    
/s/David A. Perdue Director
 David A. Perdue  
    
/s/Judith D. PyleDirector
Judith D. Pyle
/s/Carol P. Sanders Director
 Carol P. Sanders  
/s/Susan D. WhitingDirector
Susan D. Whiting

184179



SIGNATURES

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the Registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized on the 26th25th day of February 20132014.

INTERSTATE POWER AND LIGHT COMPANY
 
By: /s/ Patricia L. Kampling
 Patricia L. Kampling
 Chairman and Chief Executive Officer

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities indicated on the 26th25th day of February 20132014.
/s/Patricia L. Kampling Chairman, Chief Executive Officer and Director (Principal Executive Officer)
 Patricia L. Kampling  
    
/s/Thomas L. Hanson Senior Vice President and Chief Financial Officer (Principal Financial Officer)
 Thomas L. Hanson  
    
/s/Robert J. Durian Controller and Chief Accounting Officer (Principal Accounting Officer)
 Robert J. Durian  
/s/Patrick E. Allen Director
 Patrick E. Allen  
    
/s/Michael L. Bennett Director
 Michael L. Bennett  
    
/s/Darryl B. Hazel Director
 Darryl B. Hazel  
    
/s/Singleton B. McAllister Director
 Singleton B. McAllister  
    
/s/Ann K. Newhall Director
 Ann K. Newhall  
    
/s/Dean C. Oestreich Director
 Dean C. Oestreich  
    
/s/David A. Perdue Director
 David A. Perdue  
    
/s/Judith D. PyleDirector
Judith D. Pyle
/s/Carol P. Sanders Director
 Carol P. Sanders  
/s/Susan D. WhitingDirector
Susan D. Whiting

185180



SIGNATURES

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the Registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized on the 26th25th day of February 20132014.

WISCONSIN POWER AND LIGHT COMPANY
 
By: /s/ Patricia L. Kampling
 Patricia L. Kampling
 Chairman and Chief Executive Officer

Pursuant to the requirements of the Securities Exchange Act of 1934, this report has been signed below by the following persons on behalf of the registrant and in the capacities indicated on the 26th25th day of February 20132014.
/s/Patricia L. Kampling Chairman, Chief Executive Officer and Director (Principal Executive Officer)
 Patricia L. Kampling  
    
/s/Thomas L. Hanson Senior Vice President and Chief Financial Officer (Principal Financial Officer)
 Thomas L. Hanson  
    
/s/Robert J. Durian Controller and Chief Accounting Officer (Principal Accounting Officer)
 Robert J. Durian  
/s/Patrick E. Allen Director
 Patrick E. Allen  
    
/s/Michael L. Bennett Director
 Michael L. Bennett  
    
/s/Darryl B. Hazel Director
 Darryl B. Hazel  
    
/s/Singleton B. McAllister Director
 Singleton B. McAllister  
    
/s/Ann K. Newhall Director
 Ann K. Newhall  
    
/s/Dean C. Oestreich Director
 Dean C. Oestreich  
    
/s/David A. Perdue Director
 David A. Perdue  
    
/s/Judith D. PyleDirector
Judith D. Pyle
/s/Carol P. Sanders Director
 Carol P. Sanders  
/s/Susan D. WhitingDirector
Susan D. Whiting


186181



ALLIANT ENERGY CORPORATION
INTERSTATE POWER AND LIGHT COMPANY
WISCONSIN POWER AND LIGHT COMPANY

Exhibit Index to Annual Report on Form 10-K
For the fiscal year ended December 31, 20122013

The following Exhibits are filed herewith or incorporated herein by reference.

Pursuant to Item 601(b)(4)(iii) of Regulation S-K, the registrants agree to furnish to the Securities and Exchange Commission, upon request, any instrument defining the rights of holders of unregistered long-term debt not filed as an exhibit to this combined Form 10-K. No such instrument authorizes securities in excess of 10% of the total assets of Alliant Energy, Corporation (Alliant Energy), Interstate Power and Light Company (IPL)IPL or Wisconsin Power and Light Company (WPL),WPL, as the case may be.
Exhibit Number Description
  
3.1 Restated Articles of Incorporation of Alliant Energy, as amended (incorporated by reference to Exhibit 4.1 to Alliant Energy’s Registration Statement on Form S-8, dated July 26, 2004 (Reg. No. 333-117654))
   
3.2 Restated Bylaws of Alliant Energy, effective as of December 6, 2006May 10, 2013 (incorporated by reference to Exhibit 3.1 to Alliant Energy’s Form 8-K, dated December 6, 2006May 9, 2013 (File No. 1-9894))
   
3.3 Amended and Restated Articles of OrganizationIncorporation of WPL, as amendedeffective May 9, 2013 (incorporated by reference to Exhibit 3.13.4 to WPL’s Form 10-Q for the quarter ended June 30, 19948-K, dated May 9, 2013 (File No. 0-337))
   
3.4 Restated Bylaws of WPL, effective as of December 6, 2006May 10, 2013 (incorporated by reference to Exhibit 3.23.5 to WPL’s Form 8-K, dated December 6, 2006May 9, 2013 (File No. 0-337))
   
3.5 Amended and Restated Articles of Incorporation of IPL, effective May 10, 2013 (incorporated by reference to Exhibit 3.53.2 to IPL’s Form 10-K for the year 20038-K, dated May 9, 2013 (File No. 0-4117-1)1-4117))
   
3.6 Articles of Amendment of IPL (Regarding Designation and Authorization of 5.1% Series D Cumulative Perpetual Preferred Stock) (incorporated by reference to Exhibit 3.1 to IPL’s Form 8-K, dated March 14, 2013 (File No. 1-4117))
3.7Restated Bylaws of IPL, effective as of December 6, 2006May 10, 2013 (incorporated by reference to Exhibit 3.3 to IPL’s Form 8-K, dated December 6, 2006May 9, 2013 (File No. 0-4117-1)1-4117))
   
4.1 Third Amended and Restated Five Year Credit Agreement, dated December 14, 2011, among Alliant Energy and the Banks set forth therein (incorporated by reference to Exhibit 99.1 to Alliant Energy’s Form 8-K, dated December 14, 2011 (File No. 1-9894))
   
4.2 Senior Note Indenture, dated as of September 30, 2009, between Alliant Energy and Wells Fargo Bank, N.A. (incorporated by reference to Exhibit 4.28 to Alliant Energy’s Registration Statement on Form S-3 (Reg. No. 333-162214))
   
4.3 Officer’s Certificate, dated as of September 30, 2009, creating Alliant Energy’s 4.00% Senior Notes due October 15, 2014 (incorporated by reference to Exhibit 4.2 to Alliant Energy’s Form 8-K, dated September 30, 2009 (File No. 1-9894))
   
4.4 Amended and Restated Rights Agreement, dated as of December 11, 2008, between Alliant Energy and Wells Fargo Bank, N.A. (incorporated by reference to Exhibit 4.1 to Alliant Energy’s Registration Statement on Form 8-A/A, dated December 11, 2008 (File No. 1-9894))
   
4.5 Third Amended and Restated Five Year Credit Agreement, dated December 14, 2011, among WPL and the Banks set forth therein (incorporated by reference to Exhibit 99.3 to WPL’s Form 8-K, dated December 14, 2011 (File No. 0-337))
   
4.6 Indenture, dated as of June 20, 1997, between WPL and Wells Fargo Bank, N.A., Successor, as Trustee (incorporated by reference to Exhibit 4.33 to Amendment No. 2 to WPL’s Registration Statement on Form S-3 (Reg. No. 033-60917))
   
4.7 Officers’ Certificate, dated as of July 28, 2004, creating WPL’s 6.25% Debentures due July 31, 2034 (incorporated by reference to Exhibit 4.1 to WPL’s Form 8-K, dated July 30, 2004 (File No. 0-337))
   
4.8 Officers’ Certificate, dated as of August 8, 2007, creating WPL’s 6.375% Debentures due August 15, 2037 (incorporated by reference to Exhibit 4.1 to WPL’s Form 8-K, dated August 8, 2007 (File No. 0-337))
   
4.9 Officer’s Certificate, dated as of October 1, 2008, creating WPL’s 7.60% Debentures due October 1, 2038 (incorporated by reference to Exhibit 4.2 to WPL’s Form 8-K, dated October 1, 2008 (File No. 0-337))
   
4.10 Officers’ Certificate, dated as of July 7, 2009, creating WPL’s 5.00% Debentures due July 15, 2019 (incorporated by reference to Exhibit 4.2 to WPL’s Form 8-K, dated July 7, 2009 (File No. 0-337))
   

182



4.11 Officers’ Certificate, dated as of June 10, 2010, creating WPL’s 4.60% Debentures due June 15, 2020 (incorporated by reference to Exhibit 4.2 to WPL’s Form 8-K, dated June 10, 2010 (File No. 0-337))
   

187



4.12 Officers’ Certificate, dated as of November 19, 2012, creating WPL’s 2.25% Debentures due November 15, 2022 (incorporated by reference to Exhibit 4.1 to WPL’s Form 8-K, dated November 14, 2012 (File No. 0-337))
   
4.13 Third Amended and Restated Five Year Credit Agreement, dated December 14, 2011, among IPL and the Banks set forth therein (incorporated by reference to Exhibit 99.2 to IPL’s Form 8-K, dated December 14, 2011 (File No. 0-4117-1)1-4117))
   
4.14 Indenture (For Senior Unsecured Debt Securities), dated as of August 20, 2003, between IPL and The Bank of New York Mellon Trust Co., N.A. (f/k/a The Bank of New York Trust Co., N.A.), as Trustee (incorporated by reference to Exhibit 4.11 to IPL’s Registration Statement on Form S-3 (Reg. No. 333-108199))
   
4.15 Officer’s Certificate, dated as of September 10, 2003, creating IPL’s 5.875% Senior Debentures due September 15, 2018 (incorporated by reference to Exhibit 4.1 to IPL’s Form 8-K, dated September 10, 2003 (File No. 0-4117-1)1-4117))
   
4.16 Officer’s Certificate, dated as of October 14, 2003, creating IPL’s 6.45% Senior Debentures due October 15, 2033 (incorporated by reference to Exhibit 4.1 to IPL’s Form 8-K, dated October 14, 2003 (File No. 0-4117-1)1-4117))
   
4.17 Officer’s Certificate, dated as of May 3, 2004, creating IPL’s 6.30% Senior Debentures due May 1, 2034 (incorporated by reference to Exhibit 4.1 to IPL’s Form 8-K, dated May 3, 2004 (File No. 0-4117-1)1-4117))
   
4.17a Officer’s Certificate, dated as of August 2, 2004, reopening IPL’s 6.30% Senior Debentures due May 1, 2034 (incorporated by reference to Exhibit 4.1 to IPL’s Form 8-K, dated August 2, 2004 (File No. 0-4117-1)1-4117))
   
4.18 Officer’s Certificate, dated as of July 18, 2005, creating IPL’s 5.50% Senior Debentures due July 15, 2025 (incorporated by reference to Exhibit 4 to IPL’s Form 8-K, dated July 18, 2005 (File No. 0-4117-1)1-4117))
   
4.19 Officer’s Certificate, dated as of October 1, 2008, creating IPL’s 7.25% Senior Debentures due October 1, 2018 (incorporated by reference to Exhibit 4.1 to IPL’s Form 8-K, dated October 1, 2008 (File No. 0-4117-1)1-4117))
   
4.20 Officer’s Certificate, dated as of July 7, 2009, creating IPL’s 6.25% Senior Debentures due July 15, 2039 (incorporated by reference to Exhibit 4.1 to IPL’s Form 8-K, dated July 7, 2009 (File No. 0-4117-1)1-4117))
   
4.21 Officer’s Certificate, dated as of June 10, 2010, creating IPL’s 3.30% Senior Debentures due June 15, 2015 (incorporated by reference to Exhibit 4.1 to IPL’s Form 8-K, dated June 10, 2010 (File No. 0-4117-1)1-4117))
   
4.22 Officer’s Certificate, dated as of August 23, 2010, creating IPL’s 3.65% Senior Debentures due September 1, 2020 (incorporated by reference to Exhibit 4.1 to IPL’s Form 8-K, dated August 23, 2010 (File No. 0-4117-1)1-4117))
4.23Officer’s Certificate, dated as of October 8, 2013, creating IPL’s 4.70% Senior Debentures due October 15, 2043 (incorporated by reference to Exhibit 4.1 to IPL’s Form 8-K, dated October 3, 2013 (File No. 1-4117))
4.24Form of Preferred Stock Certificate of IPL (incorporated by reference to Exhibit 4.1 to IPL’s Form 8-K, dated March 14, 2013 (File No. 1-4117))
   
10.1 Operating Agreement of American Transmission Company LLC,ATC, dated as of January 1, 2001 (incorporated by reference to Exhibit 10.16 to WPL’s Form 10-K for the year 2000 (File No. 0-337))
   
10.2# Alliant Energy Long-Term Equity Incentive Plan, as amended (incorporated by reference to Exhibit 10.1 to Alliant Energy’s Form 10-Q for the quarter ended June 30, 1999 (File No. 1-9894))
10.3#Alliant Energy Amended and Restated 2002 Equity Incentive Plan (EIP) (incorporated by reference to Appendix A to Alliant Energy’s definitive proxy statement filed on Schedule 14A on April 5, 2006 (File No. 1-9894))
10.3a#Form of Non-qualified Stock Option Agreement pursuant to the Alliant Energy EIP (incorporated by reference to Exhibit 10.1 to Alliant Energy’s Form 10-Q for the quarter ended September 30, 2004 (File No. 1-9894))
10.3b#Form of 2010 Performance Share Agreement pursuant to the Alliant Energy EIP (incorporated by reference to Exhibit 10.4d to Alliant Energy’s Form 10-K for the year 2009 (File No. 1-9894))
10.4#Alliant Energy 2010 Omnibus Incentive Plan (OIP)OIP (incorporated by reference to Appendix A to Alliant Energy’s definitive proxy statement filed on Schedule 14A on April 1, 2010 (File No. 1-9894))
   
10.4a#10.2a# Amendment to the Alliant Energy OIP (incorporated by reference to Exhibit 10.1 to Alliant Energy’s Form 8-K, dated December 1, 2011 (File No. 1-9894))
   
10.4b#10.2b# Form of Performance Share Agreement pursuant to the Alliant Energy OIP (incorporated by reference to Exhibit 10.5a to Alliant Energy’s Form 10-K for the year 2010 (File No. 1-9894))
   
10.4c#10.2c# Form of Performance Share Agreement pursuant to the Alliant Energy OIP, amended in 2012 (incorporated by reference to Exhibit 10.4c to Alliant Energy’s Form 10-K for the year 2011 (File No. 1-9894))
   

188



10.4d#10.2d# Form of Performance Contingent Restricted Stock Agreement pursuant to the Alliant Energy OIP (incorporated by reference to Exhibit 10.5b to Alliant Energy’s Form 10-K for the year 2010 (File No. 1-9894))
   
10.4e#10.2e# Form of Performance Contingent Restricted Stock Agreement pursuant to the Alliant Energy OIP, amended in 2012 (incorporated by reference to Exhibit 10.4e to Alliant Energy’s Form 10-K for the year 2011 (File No. 1-9894))
   
10.4f#10.2f# Form of Restricted Stock Agreement pursuant to the Alliant Energy OIP (incorporated by reference to Exhibit 10.1 to Alliant Energy’s Form 10-Q for the quarter ended March 31, 2011 (File No. 1-9894))
   

183



10.4g#
10.2g# Form of Restricted Stock Agreement pursuant to the Alliant Energy OIP, amended in 2012 (incorporated by reference to Exhibit 10.4g to Alliant Energy’s Form 10-K for the year 2011 (File No. 1-9894))
   
10.5#10.3# Alliant Energy Director Long Term Incentive Plan (DLIP),DLIP, for director-level employees (incorporated by reference to Exhibit 10.6 to Alliant Energy’s Form 10-K for the year 2010 (File No. 1-9894))
   
10.5a#10.3a# Form of Restricted Cash Agreement pursuant to the Alliant Energy DLIP (incorporated by reference to Exhibit 10.6a to Alliant Energy’s Form 10-K for the year 2010 (File No. 1-9894))
   
10.5b#10.3b# Form of Performance Restricted Award Agreement pursuant to the Alliant Energy DLIP (incorporated by reference to Exhibit 10.6b to Alliant Energy’s Form 10-K for the year 2010 (File No. 1-9894))
   
10.5c#10.3c# Alliant Energy DLIP, for director-level employees, amended in 2012 (incorporated by reference to Exhibit 10.5c to Alliant Energy’s Form 10-K for the year 2011 (File No. 1-9894))
   
10.5d#10.3d# Form of Restricted Cash Agreement pursuant to the Alliant Energy DLIP, amended in 2012 (incorporated by reference to Exhibit 10.5d to Alliant Energy’s Form 10-K for the year 2011 (File No. 1-9894))
   
10.5e#10.3e# Form of Performance Restricted Award Agreement pursuant to the Alliant Energy DLIP, amended in 2012 (incorporated by reference to Exhibit 10.5e to Alliant Energy’s Form 10-K for the year 2011 (File No. 1-9894))
   
10.6#10.4# Alliant Energy Deferred Compensation Plan,DCP, as amended and restated effective January 1, 2011 (incorporated by reference to Exhibit 10.1 to Alliant Energy’s Form 8-K, dated December 8, 2010 (File No. 1-9894))
   
10.6a#10.4a# Amendment to the Alliant Energy Deferred Compensation Plan,DCP, as amended and restated (incorporated by reference to Exhibit 10.2 to Alliant Energy’s Form 8-K, dated December 1, 2011 (File No. 1-9894))
   
10.7#10.5# Alliant Energy Rabbi Trust Agreement for Deferred Compensation PlansDCPs (incorporated by reference to Exhibit 10.19 to Alliant Energy’s Form 10-K for the year 2005 (File No. 1-9894))
   
10.8#10.6# Alliant Energy Excess Retirement Plan (incorporated by reference to Exhibit 10.1 to Alliant Energy’s Form 10-Q for the quarter ended September 30, 2008 (File No. 1-9894))
   
10.8a#10.6a# Amendment to the Alliant Energy Excess Retirement Plan (incorporated by reference to Exhibit 10.4 to Alliant Energy’s Form 8-K, dated December 1, 2011 (File No. 1-9894))
   
10.9#10.7# Form of Supplemental Retirement Plan (SRP)SRP Agreement by and between Alliant Energy and each of T.L. Aller, T.L. Hanson, P.L. Kampling and J.O. Larsen (incorporated by reference to Exhibit 10.3 to Alliant Energy’s Form 8-K, dated December 10, 2008 (File No. 1-9894))
   
10.10#10.8# Alliant Energy Defined Contribution SRP (incorporated by reference to Exhibit 10.1 to Alliant Energy’s Form 10-Q for the quarter ended September 30, 2010 (File No. 1-9894))
   
10.10a#10.8a# Amendment to the Alliant Energy Defined Contribution SRP (incorporated by reference to Exhibit 10.3 to Alliant Energy’s Form 8-K, dated December 1, 2011 (File No. 1-9894))
   
10.11#10.9# Form of Key Executive Employment and Severance Agreement (KEESA),KEESA, by and between Alliant Energy and P.L. Kampling (incorporated by reference to Exhibit 10.1 to Alliant Energy’s Form 8-K, dated October 27, 2010 (File No. 1-9894))
   
10.12#10.10# Form of KEESA, by and between Alliant Energy and each of T.L. Aller, J.H. Gallegos, T.L. Hanson, D.R. Kopp and J.O. Larsen (incorporated by reference to Exhibit 10.3 to Alliant Energy’s Form 10-Q for the quarter ended June 30, 2008 (File No. 1-9894))
   
10.13#10.11# Form of Amendment Number One to KEESA, by and between Alliant Energy and each of P.L. Kampling, T.L. Aller, J.H. Gallegos, T.L. Hanson, D.R. Kopp and J.O. Larsen (incorporated by reference to Exhibit 10.6 to Alliant Energy’s Form 8-K, dated December 1, 2011 (File No. 1-9894))
   
10.14#10.12# Executive Severance Benefit under the Alliant Energy Severance Plan Summary Plan Description, effective March 19, 2008 (incorporated by reference to Exhibit 10.1 to Alliant Energy’s Form 8-K, dated March 19, 2008 (File No. 1-9894))
   

189



10.14a#10.12a# Amendment to the Executive Severance Benefit under the Alliant Energy Severance Plan Summary Plan Description (incorporated by reference to Exhibit 10.5 to Alliant Energy’s Form 8-K, dated December 1, 2011 (File No. 1-9894))
   
10.15#10.13#Executive Employee Reimbursement Agreement, by and between Alliant Energy and R.J. Durian
10.14# Summary of Compensation and Benefits for Non-Employee Directors of Alliant Energy, IPL and WPL, effective January 1, 20132014
   
12.1 Ratio of Earnings to Fixed Charges for Alliant Energy
   
12.2 Ratio of Earnings to Fixed Charges and Ratio of Earnings to Combined Fixed Charges and Preferred Dividend Requirements for IPL
   
12.3 Ratio of Earnings to Fixed Charges and Ratio of Earnings to Combined Fixed Charges and Preferred Dividend Requirements for WPL
   
21.1 Subsidiaries of Alliant Energy

184



   
21.2 Subsidiaries of WPL
   
23.1 Consent of Independent Registered Public Accounting Firm for Alliant Energy
   
23.2 Consent of Independent Registered Public Accounting Firm for IPL
   
23.3 Consent of Independent Registered Public Accounting Firm for WPL
   
31.1 Certification of the Chairman, President and CEO for Alliant Energy
   
31.2 Certification of the Senior Vice PresidentVP and CFO for Alliant Energy
   
31.3 Certification of the Chairman and CEO for IPL
   
31.4 Certification of the Senior Vice PresidentVP and CFO for IPL
   
31.5 Certification of the Chairman and CEO for WPL
   
31.6 Certification of the Senior Vice PresidentVP and CFO for WPL
   
32.1 Written Statement of the CEO and CFO Pursuant to 18 U.S.C.§1350 for Alliant Energy
   
32.2 Written Statement of the CEO and CFO Pursuant to 18 U.S.C.§1350 for IPL
   
32.3 Written Statement of the CEO and CFO Pursuant to 18 U.S.C.§1350 for WPL
   
101.INS* XBRL Instance Document
   
101.SCH* XBRL Taxonomy Extension Schema Document
   
101.CAL* XBRL Taxonomy Extension Calculation Linkbase Document
   
101.LAB* XBRL Taxonomy Extension Label Linkbase Document
   
101.PRE* XBRL Taxonomy Extension Presentation Linkbase Document
   
101.DEF* XBRL Taxonomy Extension Definition Linkbase Document

# A management contract or compensatory plan or arrangement.
* Filed as Exhibit 101 to this report are the following documents formatted in Extensible Business Reporting Language (XBRL):XBRL: (i) Alliant Energy’s, IPL’s and WPL’s Consolidated Statements of Income for the years ended December 31, 20122013, 20112012 and 20102011; (ii) Alliant Energy’s, IPL’s and WPL’s Consolidated Balance Sheets as of December 31, 20122013 and 20112012; (iii) Alliant Energy’s, IPL’s and WPL’s Consolidated Statements of Cash Flows for the years ended December 31, 20122013, 20112012 and 20102011; (iv) Alliant Energy’s, IPL’s and WPL’s Consolidated Statements of Common Equity for the years ended December 31, 20122013, 20112012 and 20102011; and (v) the Combined Notes to Consolidated Financial Statements.


190185