UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
     
FORM 10-Q
     
x QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

  For the quarterly period ended March 31,June 30, 2015
OR
¨ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the transition period from            to            
Commission File No. 001-16383
CHENIERE ENERGY, INC.
(Exact name of registrant as specified in its charter)
     
Delaware001-1638395-4352386
(State or other jurisdiction of incorporation or organization)(Commission File Number)(I.R.S. Employer Identification No.)
  
700 Milam Street, Suite 1900 
Houston, Texas77002
(Address of principal executive offices)(Zip code)
(713) 375-5000
(Registrant’s telephone number, including area code)
     
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes  x  No  o¨ 
Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files).    Yes  x    No  o¨ 
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company. See the definitions of “large accelerated filer,” “accelerated filer” and “smaller reporting company” in Rule 12b-2 of the Exchange Act. (Check one):
Large accelerated filer x
Accelerated filer                    ¨
Non-accelerated filer   ¨
Smaller reporting company   ¨
          (Do not check if a smaller reporting company)
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes  ¨   No  x 
As of April 17,July 21, 2015, the issuer had 236,613,300236,573,788 shares of Common Stock outstanding.
 



CHENIERE ENERGY, INC.
TABLE OF CONTENTS


 
 
 
 
 
 
   
   
   
   
   
   
   
   
   
 




i




DEFINITIONS

As commonly used in the liquefied natural gas industry, to the extent applicable, and as used in this quarterly report, the following terms have the following meanings: 

Common Industry and Other Terms
Bcf/d billion cubic feet per day
Bcf/yr billion cubic feet per year
Bcfe billion cubic feet equivalent
DOEU.S. Department of Energy
EPC engineering, procurement and construction
FERC Federal Energy Regulatory Commission
FTA countriescountries with which the United States has a free trade agreement providing for national treatment for trade in natural gas
GAAP generally accepted accounting principles in the United States
Henry Hub the final settlement price (in USD per MMBtu) for the New York Mercantile Exchange’s Henry Hub natural gas futures contract for the month in which a relevant cargo’s delivery window is scheduled to begin
LIBOR London Interbank Offered Rate
LNG liquefied natural gas, a product of natural gas consisting primarily of methane (CH4) that is in liquid form at near atmospheric pressure
MMBtu million British thermal units, an energy unit
mtpa million metric tonnes per annum
non-FTA countriescountries without a free trade agreement providing for national treatment for trade in natural gas and with which trade is permitted
SEC Securities and Exchange Commission
SPA LNG sale and purchase agreement
Train a refrigerant compressor train used in the industrial process to convert natural gas into LNG
TUA terminal use agreement

1


Abbreviated Organizational Structure

Company AbbreviationsThe following diagram depicts our abbreviated organizational structure as of June 30, 2015, including our ownership of certain subsidiaries, and the references to these entities used in this quarterly report:
CCH HoldCo IICheniere CCH HoldCo II, LLC
CCLCorpus Christi Liquefaction, LLC
Cheniere HoldingsCheniere Energy Partners LP Holdings, LLC
Cheniere InvestmentsCheniere Energy Investments, LLC
Cheniere MarketingCheniere Marketing, LLC
Cheniere PartnersCheniere Energy Partners, L.P.
Cheniere Partners GPCheniere Energy Partners GP, LLC
Corpus Christi HoldingsCheniere Corpus Christi Holdings, LLC
Cheniere Corpus Christi PipelineCheniere Corpus Christi Pipeline, L.P.
CTPLCheniere Creole Trail Pipeline, L.P.
Sabine Pass LNGSabine Pass LNG, L.P.
SPLSabine Pass Liquefaction, LLC

Unless the context requires otherwise, references to “Cheniere,” the “Company,” “we,” “us” and “our” refer to Cheniere Energy, Inc. (NYSE MKT: LNG) and its consolidated subsidiaries, including our publicly traded subsidiaries, Cheniere Partners (NYSE MKT: CQP) and Cheniere Holdings (NYSE MKT: CQH).




12


PART I.        FINANCIAL INFORMATION
ITEM 1.    CONSOLIDATED FINANCIAL STATEMENTS
CHENIERE ENERGY, INC. AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS
(in thousands, except share data)






 March 31, December 31,
 2015 2014
ASSETS(unaudited)  
Current assets   
Cash and cash equivalents$2,158,338
 $1,747,583
Restricted cash and cash equivalents457,456
 481,737
Accounts and interest receivable32,503
 4,419
LNG inventory16,282
 4,294
Prepaid expenses and other38,480
 20,844
Total current assets2,703,059
 2,258,877
    
Non-current restricted cash and cash equivalents1,856,524
 550,811
Property, plant and equipment, net9,852,970
 9,246,753
Debt issuance costs, net217,363
 242,323
Non-current derivative assets472
 11,744
Goodwill76,819
 76,819
Other non-current assets215,840
 186,356
Total assets$14,923,047
 $12,573,683
    
LIABILITIES AND STOCKHOLDERS’ EQUITY 
  
Current liabilities 
  
Accounts payable$20,953
 $13,426
Accrued liabilities255,815
 169,147
Deferred revenue26,653
 26,655
Derivative liabilities18,046
 23,247
Total current liabilities321,467
 232,475
    
Long-term debt, net12,117,880
 9,806,084
Non-current deferred revenue12,500
 13,500
Other non-current liabilities116,829
 20,107
    
Commitments and contingencies

 

    
Stockholders’ equity 
  
Preferred stock, $0.0001 par value, 5.0 million shares authorized, none issued
 
Common stock, $0.003 par value   
Authorized: 480.0 million shares at March 31, 2015 and December 31, 2014   
Issued and outstanding: 236.7 million shares at March 31, 2015 and December 31, 2014712
 712
Treasury stock: 10.7 million shares and 10.6 million shares at March 31, 2015 and December 31, 2014, respectively, at cost(296,523) (292,752)
Additional paid-in-capital2,989,221
 2,776,702
Accumulated deficit(2,916,548) (2,648,839)
Total stockholders’ deficit(223,138) (164,177)
Non-controlling interest2,577,509
 2,665,694
Total equity2,354,371
 2,501,517
Total liabilities and equity$14,923,047
 $12,573,683



The accompanying notes are an integral part of these consolidated financial statements.

2



CHENIERE ENERGY, INC. AND SUBSIDIARIES

CONSOLIDATED STATEMENTS OF OPERATIONS
(in thousands, except per share data)
(unaudited)
 Three Months Ended
 March 31,
 2015 2014
Revenues   
LNG terminal revenues$67,581
 $66,419
Marketing and trading revenues662
 657
Other126
 474
Total revenues68,369
 67,550
    
Operating costs and expenses   
General and administrative expense58,017
 73,808
Operating and maintenance expense37,153
 13,687
Depreciation expense17,769
 15,475
Development expense16,096
 12,112
Other332
 80
Total operating costs and expenses129,367
 115,162
    
Loss from operations(60,998) (47,612)
    
Other income (expense)   
Interest expense, net(59,612) (40,270)
Loss on early extinguishment of debt(88,992) 
Derivative loss, net(125,936) (34,681)
Other income372
 310
Total other expense(274,168) (74,641)
    
Loss before income taxes and non-controlling interest(335,166)
(122,253)
Income tax provision(678)
(92)
Net loss(335,844)
(122,345)
Less: net loss attributable to non-controlling interest(68,135)
(24,535)
Net loss attributable to common stockholders$(267,709)
$(97,810)






Net loss per share attributable to common stockholders—basic and diluted$(1.18)
$(0.44)
 




Weighted average number of common shares outstanding—basic and diluted226,328

223,207













 June 30, December 31,
 2015 2014
ASSETS(unaudited)  
Current assets   
Cash and cash equivalents$1,470,207
 $1,747,583
Restricted cash684,073
 481,737
Accounts and interest receivable6,746
 4,419
LNG inventory13,954
 4,294
Other current assets88,382
 20,844
Total current assets2,263,362
 2,258,877
    
Non-current restricted cash739,145
 550,811
Property, plant and equipment, net13,799,113
 9,246,753
Debt issuance costs, net637,301
 242,323
Non-current derivative assets21,363
 11,744
Goodwill76,819
 76,819
Other non-current assets222,399
 186,356
Total assets$17,759,502
 $12,573,683
    
LIABILITIES AND STOCKHOLDERS’ EQUITY 
  
Current liabilities 
  
Accounts payable$23,799
 $13,426
Accrued liabilities565,832
 169,129
Deferred revenue26,671
 26,655
Derivative liabilities23,937
 23,247
Other current liabilities600
 18
Total current liabilities640,839
 232,475
    
Long-term debt, net14,854,794
 9,806,084
Non-current deferred revenue11,500
 13,500
Other non-current liabilities37,013
 20,107
    
Commitments and contingencies (see Footnote 11)

 

    
Stockholders’ equity 
  
Preferred stock, $0.0001 par value, 5.0 million shares authorized, none issued
 
Common stock, $0.003 par value   
Authorized: 480.0 million shares at June 30, 2015 and December 31, 2014   
Issued and outstanding: 236.6 million shares and 236.7 million shares at June 30, 2015 and December 31, 2014, respectively711
 712
Treasury stock: 10.7 million shares and 10.6 million shares at June 30, 2015 and December 31, 2014, respectively, at cost(298,926) (292,752)
Additional paid-in-capital3,014,483
 2,776,702
Accumulated deficit(3,035,043) (2,648,839)
Total stockholders’ deficit(318,775) (164,177)
Non-controlling interest2,534,131
 2,665,694
Total equity2,215,356
 2,501,517
Total liabilities and equity$17,759,502
 $12,573,683

The accompanying notes are an integral part of these consolidated financial statements.

3



CHENIERE ENERGY, INC. AND SUBSIDIARIES

CONSOLIDATED STATEMENTSTATEMENTS OF STOCKHOLDERS’ EQUITYOPERATIONS
(in thousands)thousands, except per share data)
(unaudited)

 Total Stockholders’ Equity   
 Common Stock Treasury Stock Additional Paid-in Capital Accumulated Deficit Non-controlling Interest 
Total
Equity
 Shares Amount Shares Amount    
Balance at December 31, 2014236,745
 $712
 10,596
 $(292,752) $2,776,702
 $(2,648,839) $2,665,694
 $2,501,517
Exercise of stock options31
 
 
 
 958
 
 
 958
Forfeitures of restricted stock(67) 
 11
 
 
 
 
 
Share-based compensation
 
 
 
 17,458
 
 
 17,458
Shares repurchased related to share-based compensation(50) 
 50
 (3,771) 
 
 
 (3,771)
Excess tax benefit from share-based compensation
 
 
 
 21
 
 
 21
Equity portion of issuance of convertible notes, net
 
 
 
 194,082
 
 
 194,082
Loss attributable to non-controlling interest
 
 
 
 
 
 (68,135) (68,135)
Distributions to non-controlling interest
 
 
 
 
 
 (20,050) (20,050)
Net loss
 
 
 
 
 (267,709) 
 (267,709)
Balance at March 31, 2015236,659
 $712
 10,657
 $(296,523) $2,989,221
 $(2,916,548) $2,577,509
 $2,354,371
 Three Months Ended Six Months Ended
 June 30, June 30,
 2015 2014 2015 2014
Revenues       
LNG terminal revenues$67,905
 $66,841
 $135,486
 $133,260
Marketing and trading revenues (losses)(706) 324
 (44) 981
Other826
 480
 952
 954
Total revenues68,025
 67,645
 136,394
 135,195
        
Operating costs and expenses       
General and administrative expense107,856
 67,720
 165,873
 141,528
Operating and maintenance expense18,877
 29,409
 56,030
 43,096
Depreciation expense20,154
 17,298
 37,923
 32,773
Development expense16,609
 15,263
 32,705
 27,375
Other109
 90
 441
 170
Total operating costs and expenses163,605
 129,780
 292,972
 244,942
        
Loss from operations(95,580) (62,135) (156,578) (109,747)
        
Other income (expense)       
Interest expense, net(85,486) (43,789) (145,098) (84,059)
Loss on early extinguishment of debt(7,281) (114,335) (96,273) (114,335)
Derivative gain (loss), net45,755
 (60,178) (80,181) (94,859)
Other income (expense)283
 (189) 655
 121
Total other expense(46,729) (218,491) (320,897) (293,132)
        
Loss before income taxes and non-controlling interest(142,309)
(280,626)
(477,475)
(402,879)
Income tax benefit (provision)507

(84)
(171)
(176)
Net loss(141,802)
(280,710)
(477,646)
(403,055)
Less: net loss attributable to non-controlling interest(23,307)
(78,782)
(91,442)
(103,317)
Net loss attributable to common stockholders$(118,495)
$(201,928)
$(386,204)
$(299,738)












Net loss per share attributable to common stockholders—basic and diluted$(0.52)
$(0.90)
$(1.71)
$(1.34)
 










Weighted average number of common shares outstanding—basic and diluted226,481

223,602

226,405

223,406


















The accompanying notes are an integral part of these consolidated financial statements.

4



CHENIERE ENERGY, INC. AND SUBSIDIARIES

CONSOLIDATED STATEMENT OF STOCKHOLDERS’ EQUITY
(in thousands)
(unaudited)

 Total Stockholders’ Equity   
 Common Stock Treasury Stock Additional Paid-in Capital Accumulated Deficit Non-controlling Interest 
Total
Equity
 Shares Amount Shares Amount    
Balance at December 31, 2014236,745
 $712
 10,596
 $(292,752) $2,776,702
 $(2,648,839) $2,665,694
 $2,501,517
Exercise of stock options57
 
 
 
 1,914
 
 
 1,914
Issuances of restricted stock16
 
 
 
 
 
 
 
Forfeitures of restricted stock(138) (1) 14
 
 1
 
 
 
Share-based compensation
 
 
 
 37,411
 
 
 37,411
Shares repurchased related to share-based compensation(80) 
 80
 (6,174) 
 
 
 (6,174)
Excess tax benefit from share-based compensation
 
 
 
 129
 
 
 129
Equity portion of issuance of convertible notes, net
 
 
 
 198,326
 
 
 198,326
Loss attributable to non-controlling interest
 
 
 
 
 
 (91,442) (91,442)
Distributions to non-controlling interest
 
 
 
 
 
 (40,121) (40,121)
Net loss
 
 
 
 
 (386,204) 
 (386,204)
Balance at June 30, 2015236,600
 $711
 10,690
 $(298,926) $3,014,483
 $(3,035,043) $2,534,131
 $2,215,356


















The accompanying notes are an integral part of these consolidated financial statements.

5



CHENIERE ENERGY, INC. AND SUBSIDIARIES

CONSOLIDATED STATEMENTS OF CASH FLOWS
(in thousands)
(unaudited)
Three Months EndedSix Months Ended
March 31,June 30,
2015 20142015 2014
Cash flows from operating activities      
Net loss$(335,844) $(122,345)$(477,646) $(403,055)
Adjustments to reconcile net loss to net cash used in operating activities:      
Use of (investment in) restricted cash and cash equivalents for certain operating activities75,233
 (16,329)
Loss on early extinguishment of debt88,992
 
96,273
 114,335
Depreciation expense17,769
 15,475
37,923
 32,773
Amortization of debt issuance costs and discount9,116
 2,217
24,900
 5,639
Share-based compensation16,140
 35,942
66,378
 62,013
Non-cash LNG inventory write-downs17,502
 
17,366
 14,978
Total losses on derivatives, net126,183
 34,323
80,198
 94,859
Net cash used for settlement of derivative instruments(37,262) (1,469)(88,934) (17,437)
Other8,803
 1,006
29,133
 (1,826)
Changes in restricted cash for certain operating activities(55,410) 82,927
Changes in operating assets and liabilities:      
Accounts and interest receivable(28,083) 600
(2,396) 461
Accounts payable and accrued liabilities73,002
 43,379
42,101
 22,856
LNG inventory(29,491) 3,001
(27,026) (14,376)
Deferred revenue(1,003) (830)(1,985) (1,955)
Other, net(15,237) (13,189)(35,830) (3,533)
Net cash used in operating activities(14,180) (18,219)(294,955) (11,341)
      
Cash flows from investing activities      
Property, plant and equipment, net(590,998) (773,376)(4,294,814) (1,352,400)
Use of restricted cash and cash equivalents for the acquisition of property, plant and equipment572,623
 761,858
Use of restricted cash for the acquisition of property, plant and equipment4,183,620
 1,303,011
Other(46,164) (12,495)(101,836) (5,894)
Net cash used in investing activities(64,539) (24,013)(213,030) (55,283)
      
Cash flows from financing activities      
Proceeds from issuances of long-term debt2,500,000
 
5,205,000
 2,584,500
Use of (investment in) restricted cash and cash equivalents(1,929,288) 33,743
Investment in restricted cash(4,518,880) (2,282,903)
Debt issuance and deferred financing costs(58,395) (13,957)(411,149) (85,367)
Distributions and dividends to non-controlling interest(20,050) (19,786)(40,121) (39,644)
Repayments of long-term debt
 (177,000)
Payments related to tax withholdings for share-based compensation(3,771) (7,742)(6,174) (9,218)
Proceeds from exercise of stock options958
 3,691
1,914
 6,265
Other20
 44
19
 (964)
Net cash provided by (used in) financing activities489,474
 (4,007)230,609
 (4,331)
      
Net increase (decrease) in cash and cash equivalents410,755
 (46,239)
Net decrease in cash and cash equivalents(277,376) (70,955)
Cash and cash equivalents—beginning of period1,747,583
 960,842
1,747,583
 960,842
Cash and cash equivalents—end of period$2,158,338
 $914,603
$1,470,207
 $889,887


 






The accompanying notes are an integral part of these consolidated financial statements.

56


  
CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
(unaudited)


NOTE 1—BASIS OF PRESENTATION

The accompanying unaudited Consolidated Financial Statements of Cheniere Energy, Inc. have been prepared in accordance with GAAP for interim financial information and with Rule 10-01 of Regulation S-X. Accordingly, they do not include all of the information and footnotes required by GAAP for complete financial statements. In our opinion, all adjustments, consisting only of normal recurring adjustments necessary for a fair presentation, have been included. Certain reclassifications have been made to conform prior period information to the current presentation.  The reclassifications had no effect on our overall consolidated financial position, results of operations or cash flows.

Results of operations for the three and six months ended March 31,June 30, 2015 are not necessarily indicative of the results of operations that will be realized for the year ending December 31, 2015.

For further information, refer to the Consolidated Financial Statements and accompanying notes included in our Annual Report on Form 10-K for the year ended December 31, 2014.

NOTE 2—RESTRICTED CASH AND CASH EQUIVALENTS
 
Restricted cash and cash equivalents consistconsists of funds that are contractually restricted as to usage or withdrawal and have been presented separately from cash and cash equivalents on our Consolidated Balance Sheets. Restricted cash and cash equivalents includeincludes the following:
 
Sabine Pass LNGSPLNG Senior Notes Debt Service Reserve
 
Sabine Pass LNGSPLNG has consummated private offerings of an aggregate principal amount of $1,665.5 million, before discount, of 7.50% Senior Secured Notes due 2016 (the “2016 Sabine Pass LNGSPLNG Senior Notes”) and $420.0 million of 6.50% Senior Secured Notes due 2020 (the “2020 Sabine Pass LNGSPLNG Senior Notes” and collectively with the 2016 SPLNG Senior Notes, the “SPLNG Senior Notes”). Collectively, the 2016 Sabine Pass LNG Senior Notes and the 2020 Sabine Pass LNG Senior Notes are referred to as the “Sabine Pass LNG Senior Notes.” Under the indentures governing the Sabine Pass LNGSPLNG Senior Notes (the “Sabine Pass LNG“SPLNG Indentures”), except for permitted tax distributions, Sabine Pass LNGSPLNG may not make distributions until certain conditions are satisfied, including: (i)(1) there must be on deposit in an interest payment account an amount equal to one-sixth of the semi-annual interest payment multiplied by the number of elapsed months since the last semi-annual interest payment, and (ii)(2) there must be on deposit in a permanent debt service reserve fund an amount equal to one semi-annual interest payment. Distributions are permitted only after satisfying the foregoing funding requirements, a fixed charge coverage ratio test of 2:1 and other conditions specified in the Sabine Pass LNGSPLNG Indentures.

As of March 31,both June 30, 2015 and December 31, 2014, we classified $53.0 million and $15.0 million respectively, as current restricted cash and cash equivalents for the payment of current interest due. As of both March 31,June 30, 2015 and December 31, 2014, we classified the permanent debt service reserve fund of $76.1 million as non-current restricted cash and cash equivalents.cash. These cash accounts are controlled by a collateral trustee; therefore, these amounts are shown as restricted cash and cash equivalents on our Consolidated Balance Sheets.
   
SPL Reserve

During 2013, SPL entered into four credit facilities aggregating $5.9 billion (collectively, the “2013 LiquefactionSPL Credit Facilities”). In June 2015, SPL entered into four credit facilities aggregating $4.6 billion (collectively, the “2015 SPL Credit Facilities”), which replaced the 2013 SPL Credit Facilities. Under the terms and conditions of the 2013 Liquefaction2015 SPL Credit Facilities, SPL is required to deposit all cash received into reserve accounts controlled by a collateral trustee. The usage or withdrawal of such cash is restricted to the payment of liabilities related to the natural gas liquefaction facilities in Cameron Parish, Louisiana (the “SPL Project”); therefore, these amounts are shown as restricted cash and cash equivalents on our Consolidated Balance Sheets.

During 2013, SPL issued an aggregate principal amount of $2.0 billion, before premium, of 5.625% Senior Secured Notes due 2021 (the “2021 SPL Senior Notes”), $1.0 billion of 6.25% Senior Secured Notes due 2022 (the “2022 SPL Senior Notes”) and $1.0 billion of 5.625% Senior Secured Notes due 2023 (the “Initial 2023 SPL Senior Notes”). During 2014, SPL issued an aggregate principal amount of $2.0 billion of 5.75% Senior Secured Notes due 2024 (the “2024 SPL Senior Notes”) and additional 5.625% Senior Secured Notes due 2023 (the “Additional 2023 SPL Senior Notes” and collectively with the Initial 2023 SPL Senior Notes, the “2023 SPL Senior Notes”) in an aggregate principal amount of $0.5 billion, before premium. DuringIn March 2015, SPL issued

6


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—Continued
(unaudited)

an aggregate principal amount of $2.0 billion of 5.625% Senior Secured Notes due 2025 (the “2025 SPL Senior Notes” and collectively with the 2021 SPL Senior Notes, the 2022 SPL Senior Notes, the 2023 SPL Senior Notes and the 2024 SPL Senior

7


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

Notes, the “SPL Senior Notes”). The use of cash proceeds from the SPL Senior Notes is restricted to the payment of liabilities related to the SPL Project; therefore, these amounts are shown as restricted cash on our Consolidated Balance Sheets. See Note 7—Long-Term Debt for additional details about our long-term debt.

As of March 31,June 30, 2015 and December 31, 2014, we classified $186.3$340.5 million and $155.8 million, respectively, as current restricted cash and cash equivalents held by SPL for the payment of current liabilities, including interest payments, related to the SPL Project and $1,767.4$656.0 million and $457.1 million, respectively, as non-current restricted cash and cash equivalents held by SPL for future SPL Project construction costs.

CTPL Reserve
In May 2013, CTPL entered into a $400.0 million term loan facility (the “2017 CTPL“CTPL Term Loan”). As of March 31,June 30, 2015 and December 31, 2014, we classified $22.1$19.0 million and $24.9 million, respectively, as current restricted cash and cash equivalents held by CTPL for the payment of current liabilities and $6.0 millionzero and $11.3 million, respectively, as non-current restricted cash and cash equivalents held by CTPL because such funds may only be used for modifications of the 94-mile Creole Trail Pipeline, which interconnects the Sabine Pass LNG terminal with a number of large interstate pipelines, in order to enable bi-directional natural gas flow, and for the payment of interest during construction of such modifications. The restricted cash reserved to pay interest during construction is controlled by a collateral agent, and can only be released by the collateral agent upon satisfaction of certain terms and conditions. CTPL is required to pay annual fees to the administrative and collateral agents.

CCH Reserve

In May 2015, CCH entered into a credit facility agreement for an aggregate commitment of approximately $11.5 billion (the “2015 CCH Credit Facility”), comprising approximately $8.4 billion linked to the first stage (“Stage 1”) of the natural gas liquefaction and export facility and pipeline facility near Corpus Christi, Texas (the “CCL Project”), which includes Trains 1 and 2, two LNG storage tanks, one complete marine berth and second partial berth and all of the project’s necessary infrastructure facilities, and the Corpus Christi Pipeline, a 23-mile, 48” natural gas pipeline that will interconnect the Corpus Christi LNG terminal with several interstate and intrastate natural gas pipelines (the “Corpus Christi Pipeline”) and approximately $3.1 billion linked to the second stage (“Stage 2”) of the CCL Project, which includes Train 3, one LNG storage tank and the completion of the second partial berth. Under the terms and conditions of the 2015 CCH Credit Facility, all cash reserved to pay interest during construction is controlled by a collateral agent. These funds can only be released by the collateral agent upon satisfaction of certain terms and conditions and are classified as restricted on our Consolidated Balance Sheets. CCH is required to pay annual fees to the administrative and collateral agents. As of June 30, 2015, we classified $92.0 million and zero as current restricted cash and non-current restricted cash, respectively, held by CCH.

Other Restricted Cash and Cash Equivalents
  
As of March 31,June 30, 2015 and December 31, 2014, $172.5$196.0 million and $250.1 million, respectively, of cash and cash equivalents werewas held by Sabine Pass LNG,SPLNG, Cheniere Partners and Cheniere Holdings that werewas restricted to Cheniere.  In addition, as of March 31,June 30, 2015 and December 31, 2014, $23.6$21.6 million and $35.9 million, respectively, had been classified as current restricted cash, and cash equivalents, and as of March 31,June 30, 2015 and December 31, 2014, $7.0 million and $6.3 million, respectively, had been classified as non-current restricted cash and cash equivalents on our Consolidated Balance Sheets due to various other contractual restrictions.


8


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

NOTE 3—PROPERTY, PLANT AND EQUIPMENT
 
Property, plant and equipment consists of LNG terminal costs and fixed assets and other, as follows (in thousands):
March 31, December 31,June 30, December 31,
2015 20142015 2014
LNG terminal costs      
LNG terminal$2,271,016
 $2,269,429
$2,466,559
 $2,269,429
LNG terminal construction-in-process7,747,197
 7,155,046
11,495,832
 7,155,046
LNG site and related costs, net9,393
 9,395
9,391
 9,395
Accumulated depreciation(365,231) (350,497)(381,285) (350,497)
Total LNG terminal costs, net9,662,375
 9,083,373
13,590,497
 9,083,373
Fixed assets and other 
  
 
  
Computer and office equipment9,152
 7,464
10,145
 7,464
Furniture and fixtures16,626
 10,733
16,620
 10,733
Computer software56,743
 46,882
64,320
 46,882
Leasehold improvements36,482
 36,067
38,047
 36,067
Land and other100,550
 92,403
Land59,087
 55,522
Other53,624
 36,881
Accumulated depreciation(28,958) (30,169)(33,227) (30,169)
Total fixed assets and other, net190,595
 163,380
208,616
 163,380
Property, plant and equipment, net$9,852,970
 $9,246,753
$13,799,113
 $9,246,753
 

7


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—Continued
(unaudited)


NOTE 4—DERIVATIVE INSTRUMENTS
 
We have entered into the following derivative instruments that are reported at fair value:
commodity derivatives to hedge the exposure to variability in expected future cash flowsprice risk attributable to the future salefuture: (1) sales of our LNG inventory (“LNG Inventory Derivatives”);
commodity derivatives to hedge the exposure to price risk attributable to futureand (2) purchases of natural gas to be utilized as fuel to operate the Sabine Pass LNG terminal (“FuelNatural Gas Derivatives”);
commodity derivatives consisting of natural gas purchase agreements and associated economic hedges to secure natural gas feedstock for the SPL Project (“Term GasLiquefaction Supply Derivatives”);
interest rate swaps to hedge the exposure to volatility in a portion of the floating-rate interest payments under the 2013 Liquefaction2015 SPL Credit Facilities (“SPL Interest Rate Derivatives”); and
contingent interest rate swaps to hedge the exposure to volatility in a portion of the floating-rate interest payments that are expected under the credit facilities among Corpus Christi Holdings and various banks2015 CCH Credit Facility (“ContingentCCH Interest Rate Derivatives”).
None of our derivative instruments are designated as cash flow hedging instruments, and changes in fair value are recorded within our Consolidated Statements of Operations.



9


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)


The following table (in thousands) shows the fair value of our derivative instruments that are required to be measured at fair value on a recurring basis as of March 31,June 30, 2015 and December 31, 2014, which are classified as prepaid expenses and other current assets, non-current derivative assets, derivative liabilities and other non-current liabilities in our Consolidated Balance Sheets.
 Fair Value Measurements as of
 March 31, 2015 December 31, 2014
 
Quoted Prices in Active Markets
(Level 1)
 Significant Other Observable Inputs (Level 2) Significant Unobservable Inputs (Level 3) Total 
Quoted Prices in Active Markets
(Level 1)
 Significant Other Observable Inputs (Level 2) Significant Unobservable Inputs (Level 3) Total
LNG Inventory Derivatives asset$
 $367
 $
 $367
 $
 $1,140
 $
 $1,140
Fuel Derivatives liability
 (755) 
 (755) 
 (921) 
 (921)
Term Gas Supply Derivatives asset
 
 342
 342
 
 
 342
 342
SPL Interest Rate Derivatives liability
 (11,692) 
 (11,692) 
 (12,036) 
 (12,036)
Contingent Interest Rate Derivatives liability
 (89,552) 
 (89,552) 
 
 
 
 Fair Value Measurements as of
 June 30, 2015 December 31, 2014
 
Quoted Prices in Active Markets
(Level 1)
 Significant Other Observable Inputs (Level 2) Significant Unobservable Inputs (Level 3) Total 
Quoted Prices in Active Markets
(Level 1)
 Significant Other Observable Inputs (Level 2) Significant Unobservable Inputs (Level 3) Total
Natural Gas Derivatives asset (liability)$
 $(315) $
 $(315) $
 $219
 $
 $219
Liquefaction Supply Derivatives asset (liability)
 (27) 440
 413
 
 
 342
 342
SPL Interest Rate Derivatives liability
 (8,172) 
 (8,172) 
 (12,036) 
 (12,036)
CCH Interest Rate Derivatives asset
 5,335
 
 5,335
 
 
 
 

The estimated fair values of our LNG InventoryNatural Gas Derivatives and Fuelthe economic hedges related to the Liquefaction Supply Derivatives are the amounts at which the instruments could be exchanged currently between willing parties. We value these derivatives using observable commodity price curves and other relevant data. We value our interest rate derivatives using valuations based on the initial trade prices. Using an income-based approach, subsequent valuations are based on observable inputs to the valuation model including interest rate curves, risk adjusted discount rates, credit spreads and other relevant data.

The fair value of SPL’s Term Gassubstantially all of the Liquefaction Supply Derivatives is developed through the use of internal models which are impacted by inputs that are unobservable in the marketplace. As a result, the fair value of SPL’s Term Gasthe Liquefaction Supply Derivatives is designated as Level 3 within the valuation hierarchy. The curves used to generate the fair value of the Term GasLiquefaction Supply Derivatives are based on basis adjustments applied to forward curves for a liquid trading point. In addition, there may be observable liquid market basis information in the near term, but terms of a particular Term GasLiquefaction Supply DerivativeDerivatives contract may exceed the period for which such information is available, resulting in a Level 3 classification. In these instances, fair value of the contract incorporates extrapolation assumptions made in the determination of the market basis price for future delivery periods in which applicable commodity basis prices were either not observable or lacked corroborative market data. Internal fair value models that include contractual pricing

8


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—Continued
(unaudited)

with a fixed basis include fixed basis amounts for delivery at locations for which no market currently exists. Internal fair value models also include conditions precedent to the respective long-term natural gas purchase agreements. As of March 31,June 30, 2015 and December 31, 2014, the majority of SPL’s Term Gasthe Liquefaction Supply Derivatives existed within markets for which the pipeline infrastructure has not been developed to accommodate marketable physical gas flow. Therefore, our internal fair value models were based on a market price that equated to our own contractual pricing due to: (i)(1) the inactive and unobservable market and (ii)(2) conditions precedent and their impact on the uncertainty in the timing of our actual receipt of the physical volumes associated with each forward. The fair value of the Term GasLiquefaction Supply Derivatives is predominantly driven by market commodity basis prices and our assessment of the associated conditions precedent, including evaluating whether the respective market is available as pipeline infrastructure is developed.

There were no transfers into or out of Level 3 Liquefaction Supply Derivatives for the three and six months ended March 31,June 30, 2015 and 2014. As all of our Term Gasthe physical Liquefaction Supply Derivatives are either purely index-priced or index-priced with a fixed basis, we do not believe that a significant change in market commodity prices would have a material impact on our Level 3 fair value measurements. The following table (in thousands, except natural gas basis spread) includes quantitative information for the unobservable inputs for the Level 3 Liquefaction Supply Derivatives as of March 31,June 30, 2015:
  Net Fair Value Asset Valuation Technique Significant Unobservable Input Significant Unobservable Inputs Range
Term GasLiquefaction Supply Derivatives $342440 Income Approach Basis Spread $ (0.350) - $0.046$0.020


10


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

Derivative assets and liabilities arising from our derivative contracts with the same counterparty are reported on a net basis, as all counterparty derivative contracts provide for net settlement.  

Commodity Derivatives

We recognize all commodity derivative instruments, including our LNG Inventory Derivatives, FuelNatural Gas Derivatives and Term Gasthe Liquefaction Supply Derivatives (collectively, “Commodity Derivatives”), as either assets or liabilities and measure those instruments at fair value.  Changes in the fair value of our Commodity Derivatives are reported in earnings.

The following table (in thousands) shows the fair value and location of our Commodity Derivatives on our Consolidated Balance Sheets:
 March 31, 2015 December 31, 2014 June 30, 2015 December 31, 2014
 LNG Inventory Derivatives (1) Fuel Derivatives (1) Term Gas Supply Derivatives Total Commodity Derivatives LNG Inventory Derivatives (1) Fuel Derivatives (1) Term Gas Supply Derivatives Total Commodity Derivatives Natural Gas Derivatives (1) Liquefaction Supply Derivatives Total Natural Gas Derivatives (1) Liquefaction Supply Derivatives Total
Balance Sheet Location                            
Prepaid expenses and other $367
 $(755) $190
 $(198) $1,140
 $(921) $76
 $295
Other current assets $181
 $307
 $488
 $219
 $76
 $295
Non-current derivative assets 
 
 472
 472
 
 
 586
 586
 
 426
 426
 
 586
 586
Total derivative assets 367
 (755) 662
 274
 1,140
 (921) 662
 881
 181
 733
 914
 219
 662
 881
                            
Derivative liabilities 
 
 (133) (133) 
 
 (53) (53) (496) (222) (718) 
 (53) (53)
Other non-current liabilities 
 
 (187) (187) 
 
 (267) (267) 
 (98) (98) 
 (267) (267)
Total derivative liabilities 
 
 (320) (320) 
 
 (320) (320) (496) (320) (816) 
 (320) (320)
                            
Net derivative assets (liabilities) $367
 $(755) $342
 $(46) $1,140
 $(921) $342
 $561
Derivative asset (liability), net $(315) $413
 $98
 $219
 $342
 $561
 
(1)Does not include collateral of $5.9$6.3 million and $5.7 million deposited for such contracts, which is included in prepaid expenses and other current assets in our Consolidated Balance Sheets as of March 31,June 30, 2015 and December 31, 2014, respectively.

9


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—Continued
(unaudited)


The following table (in thousands) shows the changes in the fair value and settlements and location of our Commodity Derivatives recorded on our Consolidated Statements of Operations during the three and six months ended March 31,June 30, 2015 and 2014:
   Three Months Ended March 31,
 Statement of Operations Location 2015 2014
LNG Inventory Derivatives gain (loss)Marketing and trading revenues $(206) $184
Fuel Derivatives gain (loss)Marketing and trading revenues (41) 165
LNG Inventory Derivatives gain (loss)Derivative loss, net 754
 (435)
Fuel Derivatives gainDerivative loss, net 
 242
Term Gas Supply Derivatives gain (loss) (1)Operating and maintenance expense 
 
  Three Months Ended June 30, Six Months Ended June 30,
 Statement of Operations Location2015 2014 2015 2014
Natural Gas Derivatives gain (loss)Marketing and trading revenues (losses)$67
 $21
 $(98) $370
Natural Gas Derivatives gain (loss)Derivative gain (loss), net(294) (56) 460
 (258)
Natural Gas Derivatives gainOperating and maintenance expense
 
 
 44
Liquefaction Supply Derivatives gain (1)Operating and maintenance expense81
 
 81
 
 
(1)    There were no physical settlements during the reporting period.

The use of Commodity Derivatives exposes us to counterparty credit risk, or the risk that a counterparty will be unable to meet its commitments in instances when our Commodity Derivatives are in an asset position.

11


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)


LNG Inventory and FuelNatural Gas Derivatives

Our LNG Inventory Derivatives and FuelNatural Gas Derivatives are executed through over-the-counter contracts which are subject to nominal credit risk as these transactions are settled on a daily margin basis with investment grade financial institutions. We are required by these financial institutions to use margin deposits as credit support for these commodity derivativeour Natural Gas Derivatives activities.

Term GasLiquefaction Supply Derivatives

SPL has entered into index-based physical natural gas supply contracts and associated economic hedges to secure natural gas feedstock for the SPL Project. The terms of thesethe physical contracts range from approximately one to seven years and commence upon the occurrence of conditions precedent, including the date of first commercial operation of specified Trains of the SPL Project. We recognize SPL’s Term Gasthe Liquefaction Supply Derivatives as either assets or liabilities and measure those instruments at fair value. Changes in the fair value of SPL’s Term Gasthe Liquefaction Supply Derivatives are reported in earnings. As of March 31,June 30, 2015, SPL has secured up to approximately 2,161.92,162.8 million MMBtu of natural gas feedstock through long-term natural gas purchase agreements, of which the forward notional natural gas buy position of SPL’s Term Gasthe Liquefaction Supply Derivatives was approximately 1,249.41,250.3 million MMBtu.MMBtu, which were recorded as derivatives due to minimum purchase requirements.

Interest Rate Derivatives

SPL Interest Rate Derivatives

SPL has entered into SPL Interest Rate Derivatives to protect against volatility of future cash flows and hedge a portion of the variable interest payments on the 2013 Liquefaction2015 SPL Credit Facilities. The SPL Interest Rate Derivatives hedge a portion of the expected outstanding borrowings over the term of the 2013 Liquefaction2015 SPL Credit Facilities.

In March 2015, SPL settled a portion of the SPL Interest Rate Derivatives and recognized a derivative loss of $34.7 million within our Consolidated Statements of Operations in conjunction with the termination of approximately $1.8 billion of commitments under the 2013 LiquefactionSPL Credit Facilities as discussed in Note 7—Long-Term Debt.Debt. In May 2014, SPL settled a portion of its interest rate derivatives related to the 2013 SPL Credit Facilities and recognized a derivative loss of $9.3 million within our Consolidated Statements of Operations in conjunction with the early termination of approximately $2.1 billion of commitments under the 2013 SPL Credit Facilities.


10


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—Continued
(unaudited)

ContingentCCH Interest Rate Derivatives

In February 2015, Corpus Christi HoldingsCCH entered into ContingentCCH Interest Rate Derivatives to protect against volatility of future cash flows and hedge a portion of the variable interest payments on anticipated debt facilities that will be used to pay forthe 2015 CCH Credit Facility. The CCH Interest Rate Derivatives hedge a portion of the costsexpected outstanding borrowings over the term of developing, constructing and placing into service the natural gas liquefaction and export facility and pipeline facility near Corpus Christi, Texas (the “CCL Project”).2015 CCH Credit Facility. The ContingentCCH Interest Rate Derivatives have a seven-year term and its settlement is conditionalwere contingent upon reaching a final investment decision with respect to the CCL Project. We will contemplate making this final investment decision based upon, among other things, entering into acceptable commercial arrangements, receiving regulatory authorizations and obtaining adequate financingProject, which was reached in May 2015. Upon meeting the contingency related to construct the facility. Upon reaching a final investment decision to commence construction of the CCL Project,CCH Interest Rate Derivatives in May 2015, we estimate that we will pay $46.1 million to $65.4paid $50.1 million related to contingency and syndication premiums.premiums, which is included in derivative gain (loss), net on our Consolidated Statements of Operations.

As of March 31,June 30, 2015, we had the following interest rate derivatives outstanding:
  Initial Notional Amount Maximum Notional Amount Effective Date Maturity Date Weighted Average Fixed Interest Rate Paid Variable Interest Rate Received
SPL Interest Rate Derivatives $20.0 million $691.0690.8 million August 14, 2012 July 31, 2019 1.98% One-month LIBOR
ContingentCCH Interest Rate Derivatives (1) $28.8 million $5.45.5 billion May 8,20, 2015 May 31, 2022 2.32%2.29% One-month LIBOR


12

(1)The effective date represents management’s estimate of commencement of first monthly settlement of the contingent interest rate derivative instruments, and the maturity date is based on the contractual term of the instruments once effective.

CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

The following table (in thousands) shows the fair value of our interest rate derivatives:
 March 31, 2015 December 31, 2014 June 30, 2015 December 31, 2014
 SPL Interest Rate Derivatives Contingent Interest Rate Derivatives Total SPL Interest Rate Derivatives Contingent Interest Rate Derivatives Total SPL Interest Rate Derivatives CCH Interest Rate Derivatives Total SPL Interest Rate Derivatives CCH Interest Rate Derivatives Total
Balance Sheet Location                        
Other current assets $
 $
 $
 $
 $
 $
Non-current derivative assets $
 $
 $
 $11,158
 $
 $11,158
 
 20,937
 20,937
 11,158
 
 11,158
Total derivative assets 
 
 
 11,158
 
 11,158
 
 20,937
 20,937
 11,158
 
 11,158
                        
Derivative liabilities (7,119) (10,794) (17,913) (23,194) 
 (23,194) (7,617) (15,602) (23,219) (23,194) 
 (23,194)
Other non-current liabilities (4,573) (78,758) (83,331) 
 
 
 (555) 
 (555) 
 
 
Total derivative liabilities (11,692) (89,552) (101,244) (23,194) 
 (23,194) (8,172) (15,602) (23,774) (23,194) 
 (23,194)
                        
Derivative liabilities, net $(11,692) $(89,552) $(101,244) $(12,036) $
 $(12,036)
Derivative asset (liability), net $(8,172) $5,335
 $(2,837) $(12,036) $
 $(12,036)

The following table (in thousands) shows the changes in the fair value and settlements of our interest rate derivatives, including contingency and syndication premiums related to the CCH Interest Rate Derivatives, recorded in derivative loss,gain (loss), net on our Consolidated Statements of Operations during the three and six months ended March 31,June 30, 2015 and 2014:
 Three Months Ended March 31,
 2015 2014
SPL Interest Rate Derivatives loss$(37,138) $(34,479)
Contingent Interest Rate Derivatives loss(89,552) 
  Three Months Ended June 30, Six Months Ended June 30,
  2015 2014 2015 2014
SPL Interest Rate Derivatives gain (loss) $1,469
 $(60,122) $(35,669) $(94,601)
CCH Interest Rate Derivatives gain (loss) 44,580
 
 (44,972) 


11


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—Continued
(unaudited)

Balance Sheet Presentation

Our Commodity Derivatives and interest rate derivatives are presented on a net basis on our Consolidated Balance Sheets as described above. The following table (in thousands) shows the fair value of our derivatives outstanding on a gross and net basis:
  Gross Amounts Recognized Gross Amounts Offset in the Consolidated Balance Sheets Net Amounts Presented in the Consolidated Balance Sheets
Offsetting Derivative Assets (Liabilities)   
As of March 31, 2015:      
LNG Inventory Derivatives $367
 $(4) $371
Fuel Derivatives (755) (755) 
Term Gas Supply Derivatives 662
 
 662
Term Gas Supply Derivatives (320) 
 (320)
SPL Interest Rate Derivatives (11,692) 
 (11,692)
Contingent Interest Rate Derivatives (89,552) 
 (89,552)
As of December 31, 2014:      
LNG Inventory Derivatives 1,140
 1,056
 84
Fuel Derivatives (921) (921) 
Term Gas Supply Derivatives 662
 
 662
Term Gas Supply Derivatives (320) 
 (320)
SPL Interest Rate Derivatives 11,158
 
 11,158
SPL Interest Rate Derivatives (23,194) 
 (23,194)
  Gross Amounts Recognized Gross Amounts Offset in the Consolidated Balance Sheets Net Amounts Presented in the Consolidated Balance Sheets
Offsetting Derivative Assets (Liabilities)   
As of June 30, 2015      
Natural Gas Derivatives $(595) $280
 $(315)
Liquefaction Supply Derivatives 733
 
 733
Liquefaction Supply Derivatives (320) 
 (320)
SPL Interest Rate Derivatives (8,172) 
 (8,172)
CCH Interest Rate Derivatives 20,937
 
 20,937
CCH Interest Rate Derivatives (15,602) 
 (15,602)
As of December 31, 2014      
Natural Gas Derivatives 223
 (4) 219
Liquefaction Supply Derivatives 662
 
 662
Liquefaction Supply Derivatives (320) 
 (320)
SPL Interest Rate Derivatives 11,158
 
 11,158
SPL Interest Rate Derivatives (23,194) 
 (23,194)

NOTE 5—NON-CONTROLLING INTEREST
 
Cheniere Holdings was formed by us to hold our limited partner interest in Cheniere Partners and in December 2013, completed its initial public offering. Additionally, in November 2014, Cheniere Holdings sold 10.1 million common shares at $22.76 per common share to redeem from us the same number of common shares. As of both March 31,June 30, 2015 and December 31, 2014, our ownership interest in Cheniere Holdings was 80.1%, with the remaining non-controlling interest held by the public. Cheniere Holdings owns a 55.9% limited partner interest in Cheniere Partners in the form of 12.0 million common units, 45.3 million Class B units and 135.4 million subordinated units, with the remaining non-controlling interest held by Blackstone CQP

13


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

Holdco LP (“Blackstone”) and the public. We also own 100% of the general partner interest and the incentive distribution rights in Cheniere Partners.

NOTE 6—ACCRUED LIABILITIES
  
As of March 31,June 30, 2015 and December 31, 2014, accrued liabilities consisted of the following (in thousands): 
 March 31, December 31, June 30, December 31,
 2015 2014 2015 2014
Interest expense and related debt fees $167,376
 $112,858
 $235,996
 $112,858
Payroll 18,595
 6,425
Employee-related costs 78,908
 6,425
LNG liquefaction costs 28,201
 22,014
 229,375
 22,014
LNG terminal costs 9,352
 1,077
 6,477
 1,077
Other accrued liabilities 32,291
 26,773
 15,076
 26,755
Total accrued liabilities $255,815
 $169,147
 $565,832
 $169,129
 

12


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—Continued
(unaudited)

NOTE 7—LONG-TERM DEBT
 
As of March 31,June 30, 2015 and December 31, 2014, our long-term debt consisted of the following (in thousands): 
 March 31, December 31, Interest June 30, December 31,
 2015 2014 Rate 2015 2014
Long-term debt        
2016 Sabine Pass LNG Senior Notes $1,665,500
 $1,665,500
2020 Sabine Pass LNG Senior Notes 420,000
 420,000
2016 SPLNG Senior Notes 7.500% $1,665,500
 $1,665,500
2020 SPLNG Senior Notes 6.500% 420,000
 420,000
2021 SPL Senior Notes 2,000,000
 2,000,000
 5.625% 2,000,000
 2,000,000
2022 SPL Senior Notes 1,000,000
 1,000,000
 6.250% 1,000,000
 1,000,000
2023 SPL Senior Notes 1,500,000
 1,500,000
 5.625% 1,500,000
 1,500,000
2024 SPL Senior Notes 2,000,000
 2,000,000
 5.750% 2,000,000
 2,000,000
2025 SPL Senior Notes 2,000,000
 
 5.625% 2,000,000
 
2021 Convertible Unsecured Notes 1,004,469
 1,004,469
2045 Convertible Senior Notes 625,000
 
2017 CTPL Term Loan 400,000
 400,000
2015 SPL Credit Facilities (1) (2) 
 
2021 Cheniere Convertible Unsecured Notes 4.875% 1,028,953
 1,004,469
2025 CCH Holdco II Convertible Senior Notes 11.000% 1,003,667
 
2045 Cheniere Convertible Senior Notes 4.250% 625,000
 
CTPL Term Loan (3) 400,000
 400,000
2015 CCH Credit Facility (4) (5) 1,705,000
 
Total long-term debt 12,614,969
 9,989,969
 15,348,120
 9,989,969
Long-term debt premium (discount)  
  
  
  
2016 Sabine Pass LNG Senior Notes (7,824) (8,998)
2016 SPLNG Senior Notes (6,651) (8,998)
2021 SPL Senior Notes 9,819
 10,177
 9,457
 10,177
2023 SPL Senior Notes 6,918
 7,088
 6,745
 7,088
2021 Convertible Unsecured Notes (183,243) (189,717)
2045 Convertible Senior Notes (320,575) 
2017 CTPL Term Loan (2,184) (2,435)
2021 Cheniere Convertible Unsecured Notes (180,862) (189,717)
2045 Cheniere Convertible Senior Notes (320,083) 
CTPL Term Loan (1,932) (2,435)
Total long-term debt, net $12,117,880
 $9,806,084
 $14,854,794
 $9,806,084
(1)Matures on the earlier of December 31, 2020 or the second anniversary of the completion date of Trains 1 through 5 of the SPL Project.
(2)Variable interest rate, at SPL’s election, is LIBOR or the base rate plus the applicable margin. The applicable margins for LIBOR loans range from 1.30% to 1.75%, depending on the applicable 2015 SPL Credit Facility, and the applicable margin for base rate loans is 1.75%. Interest on LIBOR loans is due and payable at the end of each LIBOR period, and interest on base rate loans is due and payable at the end of each quarter.
(3)Variable interest rate, at CTPL’s election, is LIBOR or the base rate plus the applicable margin. CTPL has historically elected LIBOR loans, for which the applicable margin is 3.25% and is due and payable at the end of each LIBOR period.

14


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

(4)Matures on the earlier of May 13, 2022 or the second anniversary of the completion date of the first two Trains of the CCL Project.
(5)Variable interest rate, at CCH’s election, is LIBOR or the base rate plus the applicable margin. The applicable margins for LIBOR loans are 2.25% prior to completion of the first two Trains of the CCL Project and 2.50% on completion and thereafter. The applicable margins for base rate loans are 1.25% prior to completion of the first two Trains of the CCL Project and 1.50% on completion and thereafter. Interest on LIBOR loans is due and payable at the end of each applicable interest period, and interest on base rate loans is due and payable at the end of each quarter.

For the three months ended March 31,June 30, 2015 and 2014, we incurred $180.6$241.2 million and $128.6$140.4 million of total interest cost, respectively, of which we capitalized and deferred $121.0$155.7 million and $88.3$96.6 million, respectively, of interest cost, including amortization of debt issuance costs, primarily related to the construction of the first four Trains of the SPL Project. For the six months ended June 30, 2015 and 2014, we incurred $421.9 million and $269.0 million of total interest cost, respectively, of which we capitalized and deferred $276.8 million and $184.9 million, respectively, of interest cost, including amortization of debt issuance costs, primarily related to this construction.

Sabine Pass LNGSPLNG Senior Notes
 
As of both March 31, 2015 and December 31, 2014, Sabine Pass LNG had an aggregate principal amount of $1,665.5 million, before discount, of the 2016 Sabine Pass LNG Senior Notes and $420.0 million of the 2020 Sabine Pass LNG Senior Notes outstanding. Borrowings under the 2016 Sabine Pass LNG Senior Notes and 2020 Sabine Pass LNG Senior Notes accrue interest at a fixed rate of 7.50% and 6.50%, respectively. The terms of the 2016 Sabine Pass LNG Senior Notes and 2020 Sabine Pass LNG Senior Notes are substantially similar. Interest on the Sabine Pass LNG Senior Notes is payable semi-annually in arrears. Subject to permitted liens, the Sabine Pass LNG Senior Notes are secured on a first-priority basis by a security interest in all of Sabine Pass LNG’s equity interests and substantially all of its operating assets.

Sabine Pass LNG may redeem all or part of the 2016 Sabine Pass LNG Senior Notes at any time, and from time to time, at a redemption price equal to 100% of the principal plus any accrued and unpaid interest plus the greater of:
1.0% of the principal amount of the 2016 Sabine Pass LNG Senior Notes; or
the excess of: (a) the present value at such redemption date of (i) the redemption price of the 2016 Sabine Pass LNG Senior Notes plus (ii) all required interest payments due on the 2016 Sabine Pass LNG Senior Notes (excluding accrued but unpaid interest to the redemption date), computed using a discount rate equal to the treasury rate as of such redemption date plus 50 basis points; over (b) the principal amount of the 2016 Sabine Pass LNG Senior Notes, if greater.
Sabine Pass LNG may redeem all or part of the 2020 Sabine Pass LNG Senior Notes at any time on or after November 1, 2016, at fixed redemption prices specified in the indenture governing the 2020 Sabine Pass LNG Senior Notes, plus accrued and unpaid interest, if any, to the date of redemption. Sabine Pass LNG may also, at its option, redeem all or part of the 2020 Sabine Pass LNG Senior Notes at any time prior to November 1, 2016, at a “make-whole” price set forth in the indenture governing the 2020 Sabine Pass LNG Senior Notes, plus accrued and unpaid interest, if any, to the date of redemption. At any time before November 1, 2015, Sabine Pass LNG may redeem up to 35% of the aggregate principal amount of the 2020 Sabine Pass LNG

13


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—Continued
(unaudited)

Senior Notes at a redemption price of 106.5% of the principal amount of the 2020 Sabine Pass LNG Senior Notes to be redeemed, plus accrued and unpaid interest, if any, to the redemption date, in an amount not to exceed the net proceeds of one or more completed equity offerings as long as Sabine Pass LNG redeems the 2020 Sabine Pass LNG Senior Notes within 180 days of the closing date for such equity offering and at least 65% of the aggregate principal amount of the 2020 Sabine Pass LNG Senior Notes originally issued remains outstanding after the redemption.
Under the Sabine Pass LNGSPLNG Indentures, except for permitted tax distributions, Sabine Pass LNGSPLNG may not make distributions until certain conditions are satisfied as described in Note 2—Restricted Cash and Cash Equivalents.. During the threesix months ended March 31,June 30, 2015 and 2014, Sabine Pass LNGSPLNG made distributions of $70.8$199.6 million and $63.4$173.0 million, respectively, after satisfying all the applicable conditions in the Sabine Pass LNGSPLNG Indentures.
SPL Senior Notes

In February 2013 and April 2013, SPL issued an aggregate principal amount of $2.0 billion, before premium, of the 2021 SPL Senior Notes. In April 2013 and May 2014, SPL issued an aggregate principal amount of $1.5 billion, before premium, of the 2023 SPL Senior Notes. Borrowings under the 2021 SPL Senior Notes and 2023 SPL Senior Notes accrue interest at a fixed rate of 5.625%. In November 2013, SPL issued an aggregate principal amount of $1.0 billion of the 2022 SPL Senior Notes, for which borrowings accrue interest at a fixed rate of 6.25%. In May 2014, SPL issued an aggregate principal amount of $2.0 billion of the 2024 SPL Senior Notes, for which borrowings accrue interest at a fixed rate of 5.75%. In March 2015, SPL issued an aggregate principal amount of $2.0 billion of the 2025 SPL Senior Notes, for which borrowings accrue interest at a fixed rate of 5.625%. Interest on the SPL Senior Notes is payable semi-annually in arrears.

The terms of the 2025 SPL Senior Notes are governed by athe same common indenture (the “SPL Indenture”). The SPL Indenture contains customary terms and events of default and certain covenants that, amongwith the other things, limit SPL’s ability and the ability of SPL’s restricted subsidiaries to: incur additional indebtedness; issue preferred stock, make certain investments or pay dividends or distributions on capital stock or subordinated indebtedness; purchase, redeem or retire capital stock; sell or transfer assets, including capital stock of SPL’s restricted subsidiaries; restrict dividends or other payments by restricted subsidiaries; incur liens; enter into transactions with affiliates; consolidate, merge, sell or lease all or substantially all of SPL’s assets; and enter into certain LNG sales contracts. Subject to permitted liens, the SPL Senior Notes are secured on a pari passu first-priority basis by a security interest in all of the membership interests in SPL and substantially all of SPL’s assets. SPL may not make any distributions until, among other requirements, substantial completion of Trains 1 and 2 has occurred, deposits are made into debt service reserve accounts and a debt service coverage ratio for the prior 12-month period and a projected debt service coverage ratio for the upcoming 12-month period of 1.25:1.00 are satisfied.

At any time prior to three months before the respective dates of maturity for each series of the SPL Senior Notes, SPL may redeem all or part of such series of the SPL Senior Notes at a redemption price equal to the “make-whole” price set forth in the SPL Indenture, plus accrued and unpaid interest, if any, to the date of redemption. SPL may also, at any time within three months of the respective maturity dates for each series of the SPL Senior Notes, redeem all or part of such series of the SPL Senior Notes at a redemption price equal to 100% of the principal amount of such series of the SPL Senior Notes to be redeemed, plus accrued and unpaid interest, if any, to the date of redemption.

Notes. In connection with the closing of the sale of the 2025 SPL Senior Notes, SPL entered into a Registration Rights Agreement dated March 3, 2015 (the “2025 LiquefactionSPL Registration Rights Agreement”). Under the terms of the 2025 LiquefactionSPL Registration Rights Agreement, SPL has agreed, and any future guarantors of the 2025 SPL Senior Notes will agree, to use commercially reasonable efforts to file with the SEC and cause to become effective a registration statement within 360 days after March 3, 2015 with respect to an offer to exchange any and all of the 2025 SPL Senior Notes for a like aggregate principal amount of debt securities of SPL with terms identical in all material respects to the respective 2025 SPL Senior Notes sought to be exchanged (other than with respect to restrictions on transfer or to any increase in annual interest rate), and that are registered under the Securities Act of 1933, as amended (the “Securities Act”). SPL has agreed, and any future guarantors of the 2025 SPL Senior Notes will agree, to use commercially reasonable efforts to cause such registration statement to become effective within 360 days after March 3, 2015. Under specified circumstances, SPL has also agreed, and any future guarantors will also agree, to use commercially reasonable efforts to cause to become effective a shelf registration statement relating to resales of the 2025 SPL Senior Notes. SPL will be obligated to pay additional interest if it fails to comply with its obligations to register the 2025 SPL Senior Notes within the specified time periods.


14


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—Continued
(unaudited)

2013 Liquefaction2015 SPL Credit Facilities

In May 2013,June 2015, SPL entered into the 2013 Liquefaction2015 SPL Credit Facilities with commitments aggregating $5.9$4.6 billion. The 2013 Liquefaction2015 SPL Credit Facilities are being used to fund a portion of the costs of developing, constructing and placing into operation the first four Trains 1 through 5 of the SPL Project. The 2013 Liquefaction Credit Facilities will mature on the earlier of May 28, 2020 or the second anniversary of the completion date of the first four Trains of the SPL Project, as defined in the 2013 Liquefaction Credit Facilities. Borrowings under the 2013 Liquefaction2015 SPL Credit Facilities may be refinanced, in whole or in part, at any time without premium or penalty, except forpenalty; however, interest rate hedging and interest rate breakage costs.costs may be incurred. As of March 31,June 30, 2015, and December 31, 2014, SPL had $0.9$4.6 billion and $2.7 billion, respectively, of available commitments and no outstanding borrowings as of both dates, under the 2013 Liquefaction2015 SPL Credit Facilities.

SPL made an initial $100.0incurred $89.9 million borrowing under the 2013 Liquefaction Credit Facilities in June 2013 after meeting the required conditions precedent. In November 2013, in conjunction with SPL’s issuance of the 2022 SPL Senior Notes, SPL terminated approximately $885 million of commitments under the 2013 Liquefaction Credit Facilities. In May 2014, SPL repaid its borrowings under the 2013 Liquefaction Credit Facilities upon the issuance of the Additional 2023 SPL Senior Notes and the 2024 SPL Senior Notes, as well as terminated approximately $2.1 billion of commitments under the 2013 Liquefaction Credit Facilities.

In March 2015, in conjunction with SPL’s issuance of the 2025 SPL Senior Notes, SPL terminated approximately $1.8 billion of commitments under the 2013 Liquefaction Credit Facilities. This termination resulted in a write-off of debt issuance costs and deferred commitment fees associatedin connection with the 2013 Liquefaction2015 SPL Credit Facilities. In addition to interest, SPL is required to pay insurance/guarantee premiums of 0.45% per annum on any drawn amounts under the covered tranches of the 2015 SPL Credit Facilities.  The 2015 SPL Credit Facilities of $89.0 million in March 2015.

Borrowings under the 2013 Liquefaction Credit Facilities accrue interest at a variable rate per annum equal to, at SPL’s election, LIBOR or the base rate, plus the applicable margin. The applicable margins for LIBOR loans range from 2.3% to 3.0% prior to the completion of Train 4 and from 2.3% to 3.25% after such completion, depending on the applicable 2013 Liquefaction Credit Facility. Interest on LIBOR loans is due and payable at the end of each LIBOR period. The 2013 Liquefaction Credit Facilities requiredalso require SPL to pay certain up-front fees to the agents and lenders in the aggregate amount of approximately $144 million and provide for a quarterly commitment fee calculated at either: (1) a rate per annum equal to 40% of the applicable margin, for LIBOR loans, multiplied by the average daily amount of the undrawn commitment, due quarterly in arrears. Annual administrative fees must also be paid toor (2) 0.70% of the agent andundrawn commitment, depending on the trustee.applicable 2015 SPL Credit Facility. The principal of the loans made under the 2013 Liquefaction2015 SPL Credit Facilities must be repaid in quarterly installments, commencing with the earlier of June 30, 2020 and the last day of the first full calendar quarter after the Train 4 completion date as defined inof Trains 1 through 5 of the 2013 Liquefaction Credit Facilities, or September 30, 2018.SPL Project. Scheduled repayments are based upon an 18-year amortization profile, with the remaining balance due upon the maturity of the 2013 Liquefaction2015 SPL Credit Facilities.

Under the terms and conditions of the 2013 Liquefaction Credit Facilities, all cash held by SPL is controlled by a collateral trustee. These funds can only be released by the collateral trustee upon satisfaction of certain terms and conditions related to the use of proceeds, and are classified as restricted cash and cash equivalents on our Consolidated Balance Sheets.
15


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)


The 2013 Liquefaction2015 SPL Credit Facilities contain conditions precedent for any subsequent borrowings, as well as customary affirmative and negative covenants. The obligations of SPL under the 2013 Liquefaction2015 SPL Credit Facilities are secured by substantially all of the assets of SPL as well as all of the membership interests in SPL on a pari passu basis with the SPL Senior Notes.

Under the terms of the 2013 Liquefaction2015 SPL Credit Facilities, within 90 days of the closing date, SPL is required to hedge not less than 75%65% of the variable interest rate exposure of its projected outstanding borrowings, calculated on a weighted average basis in comparison to its anticipated draw of principal. See Note 4— Derivative Instruments.
2013 SPL Credit Facilities

 In May 2013, SPL entered into the 2013 SPL Credit Facilities to fund a portion of the costs of developing, constructing and placing into operation Trains 1 through 4 of the SPL Project. As of December 31, 2014, SPL had no outstanding borrowings under the 2013 SPL Credit Facilities. In June 2015, the 2013 SPL Credit Facilities were replaced with the 2015 SPL Credit Facilities.

In March 2015, in conjunction with SPL’s issuance of the 2025 SPL Senior Notes, SPL terminated approximately $1.8 billion of commitments under the 2013 SPL Credit Facilities. This termination and the replacement of the 2013 SPL Credit Facilities with the 2015 SPL Credit Facilities in June 2015 resulted in a write-off of debt issuance costs and deferred commitment fees associated with the 2013 SPL Credit Facilities of $7.3 million and $96.3 million for the three and six months ended June 30, 2015, respectively.

Convertible Notes

2021 Cheniere Convertible Unsecured Notes

In November 2014, we issued an aggregate principal amount of $1.0 billion Convertible Unsecured Notes due 2021 (the “2021 Cheniere Convertible Unsecured Notes”) on a private placement basis in reliance on the exemption from registration provided for under section 4(a)(2) of the Securities Act and Regulation S promulgated thereunder. The 2021 Cheniere Convertible Unsecured Notes accrue interest at a rate of 4.875% per annum, which is payable in kind semi-annually in arrears by increasing the principal amount of the 2021 Cheniere Convertible Unsecured Notes outstanding. One year after the closing date, the 2021 Cheniere Convertible Unsecured Notes

15


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—Continued
(unaudited)

will be convertible at the option of the holder into our common stock at the then-applicable conversion rate, provided that the closing price of our common stock is greater than or equal to the conversion price on the conversion date. The initial conversion price was $93.64 and is subject to adjustment upon the occurrence of certain specified events. We have the option to satisfy the conversion obligation with cash, common stock or a combination thereof.

Under GAAP, certain convertible debt instruments that may be settled in cash upon conversion are required to be separately accounted for as liability (debt) and equity (conversion option) components of the instrument in a manner that reflects the issuer’s non-convertible debt borrowing rate. We determined that the fair value of the debt component was $808.8 million and the residual value of the equity component was $191.2 million as of the issuance date. As of both March 31,June 30, 2015 and December 31, 2014, the carrying value of the equity component was $195.7 million and $191.5 million.million, respectively. The debt component is accreted to the total principal amount due at maturity by amortizing the debt discount. The effective rate of interest to amortize the debt discount was approximately 9.1% and 9.2% as of both March 31,June 30, 2015 and December 31, 2014, respectively, and the remaining period over which the debt discount will be amortized was 6.25.9 years as of March 31,June 30, 2015. As of June 30, 2015, the if-converted value of the 2021 Cheniere Convertible Unsecured Notes did not exceed the principal balance.

2025 CCH Holdco II Convertible Senior Notes

In May 2015, CCH HoldCo II issued $1.0 billion aggregate principal amount of 11% Senior Secured Notes due 2025 (the “2025 CCH Holdco II Convertible Senior Notes”) on a private placement basis in reliance on the exemption from registration provided for under section 4(a)(2) of the Securities Act. The 2025 CCH Holdco II Convertible Senior Notes were issued pursuant to the amended and restated note purchase agreement entered into among CCH HoldCo II, EIG Management Company, LLC, The Bank of New York Mellon, the Company and the note purchasers. The $1.0 billion principal of the 2025 CCH Holdco II Convertible Senior Notes will be used to partially fund costs associated with Stage 1 of the CCL Project and the Corpus Christi Pipeline. The purchasers have made commitments, which will expire on May 1, 2016, to acquire an additional $500 million of 2025 CCH Holdco

16


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

II Convertible Senior Notes (the “Second Phase Funding”) upon satisfaction of incremental customary conditions precedent related to the construction of Stage 2 of the CCL Project. The 2025 CCH Holdco II Convertible Senior Notes bear interest at a rate of 11.0% per annum, which is payable quarterly in arrears. Prior to the substantial completion of Train 2 of the CCL Project if the Second Phase Funding has not occurred, and to the substantial completion of Train 3 of the CCL Project following the occurrence of the Second Phase Funding, interest on the 2025 CCH Holdco II Convertible Senior Notes will be paid entirely in kind. Following this date, the interest generally must be paid in cash; however, a portion of the interest may be paid in kind under certain specified circumstances. The 2025 Convertible Notes are secured by a pledge by us of 100% of the equity interests in CCH HoldCo II, and a pledge by CCH HoldCo II of 100% of the equity interests in Cheniere CCH HoldCo I.

At our option, the outstanding 2025 CCH Holdco II Convertible Senior Notes are convertible into our common stock on or after the later of (1) 58 months from May 1, 2015, and (2) the substantial completion of Train 2 of the CCL Project and any 2025 CCH Holdco II Convertible Senior Notes issued in connection with the issuanceSecond Phase Funding will be convertible on or after the substantial completion of Train 3 of the 2021CCL Project (in each case, the “Eligible Conversion Date”). The conversion price for 2025 CCH Holdco II Convertible UnsecuredSenior Notes we have agreedconverted at our option is the lower of (1) a 10% discount to use our reasonable best efforts to prepare and file a shelf registration statement to cover resalesthe average of the 2021 Convertible Unsecured Notes.  If we faildaily volume-weighted average price (“VWAP”) of our common stock for the 90 trading day period prior to satisfy this obligation, we may be requiredthe date on which notice of conversion is provided, and (2) a 10% discount to pay additional interest to holdersthe closing price of our common stock on the trading day preceding the date on which notice of conversion is provided. At the option of the 2021holders, the 2025 CCH Holdco II Convertible UnsecuredSenior Notes under certain circumstances.are convertible on or after the six-month anniversary of the applicable Eligible Conversion Date at a conversion price equal to the average of the daily VWAP of our common stock for the 90 trading day period prior to the date on which notice of conversion is provided. Conversions are also subject to various limitations and conditions. As of June 30, 2015, the value of the 2025 CCH Holdco II Convertible Senior Notes if converted at the holders’ option did not exceed the principal balance.

2045 Cheniere Convertible Senior Notes

In March 2015, we issued $625.0 million aggregate principal amount of 4.25% Convertible Senior Notes due 2045 (the “2045 Cheniere Convertible Senior Notes”) to certain investors through a registered direct offering. The 2045 Cheniere Convertible Senior Notes were issued with an original issue discount of 20% and accrue interest at a rate of 4.25% per annum, which is payable semi-annually in arrears. We have the right, at our option, at any time after March 15, 2020, to redeem all or any part of the 2045 Cheniere Convertible Senior Notes at a redemption price payable in cash equal to the accreted amount of the 2045 Cheniere Convertible Senior Notes to be redeemed, plus accrued and unpaid interest, if any, to such redemption date. The conversion rate will initially equal 7.2265 shares of our common stock per $1,000 principal amount of the 2045 Cheniere Convertible Senior Notes, which corresponds to an initial conversion price of approximately $138.38 per share of our common stock. The conversion rate is subject to adjustment upon the occurrence of certain specified events. We have the option to satisfy the conversion obligation with cash, common stock or a combination thereof.

We determined that the fair value of the debt component of the 2045 Cheniere Convertible Senior Notes was $304.3 million and the residual value of the equity component was $195.7 million as of the issuance date, excluding debt issuance costs. As of March 31,June 30, 2015, the carrying value of the equity component was $194.1 million. The debt component is accreted to the total principal amount due at maturity by amortizing the debt discount. The effective rate of interest to amortize the debt discount was approximately 9.4% as of March 31,June 30, 2015, and the remaining period over which the debt discount will be amortized was 30.029.7 years. As of June 30, 2015, the if-converted value of the 2045 Cheniere Convertible Senior Notes did not exceed the principal balance.

Interest expense, before capitalization, related to the 2021 Cheniere Convertible Unsecured Notes, the 2025 CCH Holdco II Convertible Senior Notes and the 2045 Cheniere Convertible Senior Notes (together, the “Convertible Notes”) consisted of the following (in thousands):
  Three Months Ended March 31,
  2015 2014
Interest per contractual rate $13,939
 $
Amortization of debt discount 6,598
 
Amortization of debt issuance costs 14
 
Total interest expense related to the Convertible Notes $20,551
 $

Convertible Note Purchase Agreement with EIG

On January 16, 2015, CCH HoldCo II, our wholly owned direct subsidiary, entered into a note purchase agreement, as amended and restated on March 1, 2015, with EIG Management Company, LLC (“EIG”), the Bank of New York Mellon, us and the note purchasers named therein pursuant to which those note purchasers agreed to purchase $1.5 billion aggregate principal amount of convertible senior secured notes from CCH Holdco II (the “2025 Convertible Notes”).
  Three Months Ended June 30, Six Months Ended June 30,
  2015 2014 2015 2014
Interest per contractual rate $33,603
 $
 $47,542
 $
Amortization of debt discount 7,116
 
 13,714
 
Amortization of debt issuance costs 601
 
 615
 
Total interest expense related to the Convertible Notes $41,320
 $
 $61,871
 $

1617


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—ContinuedCONTINUED
(unaudited)

2017
CTPL Term Loan

In May 2013,As of June 30, 2015, CTPL entered intohad borrowed the 2017full amount of $400.0 million available under the CTPL Term Loan, which is being used to fund modifications to the Creole Trail Pipeline and for general business purposes. CTPL incurred $10.0 million of direct lender fees that were recorded as a debt discount.Loan. The 2017 CTPL Term Loan matures in 2017 when the full amount of the outstanding principal obligations must be repaid.  CTPL’s loansThe outstanding balance may be repaid, in whole or in part, at any time without premium or penalty. As

2015 CCH Credit Facility

In May 2015, CCH entered into the 2015 CCH Credit Facility, which is being used to fund a portion of March 31, 2015, CTPL had borrowed the full amountcosts associated with the development, construction, operation and maintenance of $400.0 million availablethe CCL Project.  The total commitment under the 2017 CTPL Term Loan.

2015 CCH Credit Facility is approximately $11.5 billion, comprising approximately $8.4 billion linked to Stage 1 of the CCL Project and the Corpus Christi Pipeline and approximately $3.1 billion linked to Stage 2 of the CCL Project. Borrowings under the 2017 CTPL Term Loan accrue2015 CCH Credit Facility may be refinanced, in whole or in part, at any time without premium or penalty; however, interest rate hedging and interest rate breakage costs may be incurred. As of June 30, 2015, CCH had $6.7 billion of available commitments and $1.7 billion of outstanding borrowings under the 2015 CCH Credit Facility.
CCH incurred $289.8 million of debt issuance costs in connection with the 2015 CCH Credit Facility. In addition to interest, CCH will incur a commitment fee at a variable rate per annum equal to at CTPL’s election, LIBOR or40% of the base rate, plus the applicable margin. The applicable margin for LIBOR loans, is 3.25%. Interest on LIBOR loans is due and payable atmultiplied by the end of each LIBOR period.

Under the terms and conditionsoutstanding undrawn debt commitments. The principal of the 2017 CTPL Term Loan, all cash reserved to pay interest during construction is controlledloans made under the 2015 CCH Credit Facility must be repaid in quarterly installments, commencing on the earlier of (1) the first quarterly payment date occurring more than three calendar months following project completion and (2) a set date determined by a collateral agent. These funds can only be released by the collateral agent upon satisfaction of certain terms and conditions and are classified as restricted on our Consolidated Balance Sheets. CTPL is also required to pay annual feesreference to the administrativedate under which a certain LNG buyer linked to the last Train to become operational is entitled to terminate its SPA for failure to achieve the date of first commercial delivery for that agreement. Scheduled repayments will be based upon a 19-year tailored amortization, commencing the first full quarter after the project completion and collateral agents.designed to achieve a minimum projected fixed debt service coverage ratio of 1.55x.

The 2017 CTPL Term Loan2015 CCH Credit Facility contains conditions precedent for borrowings, as well as customary affirmative and negative covenants. The obligations of CTPLCCH under the 2017 CTPL Term Loan2015 CCH Credit Facility are secured by a first priority lien on substantially all of the personal propertyassets of CTPLCCH and allits subsidiaries and by a pledge by CCH HoldCo I of its limited liability company interests in CCH.

Under the terms of the general partner and limited partner interests in CTPL.

Cheniere Partners has guaranteed (i) the obligations of CTPL under the 2017 CTPL Term Loan if the maturity2015 CCH Credit Facility, within 90 days of the CTPL loansclosing date, CCH is accelerated followingrequired to hedge not less than 65% of the termination by SPLvariable interest rate exposure of a transportation precedent agreement in limited circumstances and (ii) the obligations of Cheniere Investments, Cheniere Partners’ wholly owned subsidiary, in connection with its obligations under an equity contribution agreement (a) to pay operating expenses of CTPL until CTPL receives revenues under a service agreement with SPL and (b) to fund interest payments on the CTPL loans after the funds in an interest reserve account have been exhausted.

senior secured debt.
SPL LC Agreement

In April 2014, SPL entered into a $325.0 million senior letter of credit and reimbursement agreement (the “SPL LC Agreement”) that it uses for the issuance of letters of credit for certain working capital requirements related to the SPL Project. SPL pays (a)(1) a commitment fee in an amount equal to an annual rate of 0.75% of an amount equal to the unissued portion of letters of credit available pursuant to the SPL LC Agreement and (b)(2) a letter of credit fee equal to an annual rate of 2.5% of the undrawn portion of all letters of credit issued under the SPL LC Agreement. If draws are made upon any letters of credit issued under the SPL LC Agreement, the amount of the draw will be deemed a loan issued to SPL.  SPL is required to pay the full amount of this loan on or prior to the business day immediately succeeding the deemed issuance of the loan.  These loans accrue interest at a rate of 2.0% plus the base rate as defined in the SPL LC Agreement. As of March 31,June 30, 2015 and December 31, 2014, SPL had issued letters of credit in an aggregate amount of $72.5$72.9 million and $9.5 million, respectively, and as of both March 31,June 30, 2015 and December 31, 2014, no draws had been made upon any letters of credit issued under the SPL LC Agreement.


1718


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—ContinuedCONTINUED
(unaudited)

Fair Value Disclosures

The following table (in thousands) shows the carrying amount and estimated fair value of our long-term debt:
 March 31, 2015 December 31, 2014 June 30, 2015 December 31, 2014
 
Carrying
Amount
 
Estimated
Fair Value
 
Carrying
Amount
 
Estimated
Fair Value
 
Carrying
Amount
 
Estimated
Fair Value
 
Carrying
Amount
 
Estimated
Fair Value
2016 Sabine Pass LNG Senior Notes, net of discount (1) $1,657,676
 $1,757,136
 $1,656,502
 $1,718,621
2020 Sabine Pass LNG Senior Notes (1) 420,000
 428,400
 420,000
 428,400
2016 SPLNG Senior Notes, net of discount (1) $1,658,849
 $1,745,939
 $1,656,502
 $1,718,621
2020 SPLNG Senior Notes (1) 420,000
 435,750
 420,000
 428,400
2021 SPL Senior Notes, net of premium (1) 2,009,819
 2,024,893
 2,010,177
 1,985,050
 2,009,457
 2,049,646
 2,010,177
 1,985,050
2022 SPL Senior Notes (1) 1,000,000
 1,030,000
 1,000,000
 1,020,000
 1,000,000
 1,027,500
 1,000,000
 1,020,000
2023 SPL Senior Notes, net of premium (1) 1,506,918
 1,506,918
 1,507,089
 1,476,947
 1,506,745
 1,493,561
 1,507,089
 1,476,947
2024 SPL Senior Notes (1) 2,000,000
 2,000,000
 2,000,000
 1,970,000
 2,000,000
 1,982,500
 2,000,000
 1,970,000
2025 SPL Senior Notes (1) 2,000,000
 1,975,000
 
 
 2,000,000
 1,960,000
 
 
2021 Convertible Unsecured Notes (2) 821,226
 1,132,006
 814,751
 1,025,563
2045 Convertible Senior Notes (3) 304,425
 518,863
 
 
2017 CTPL Term Loan, net of discount (4) 397,816
 400,000
 397,565
 400,000
2015 SPL Credit Facilities (2) 
 
 
 
2021 Cheniere Convertible Unsecured Notes, net of discount (3) 848,091
 1,054,059
 814,751
 1,025,563
2025 CCH Holdco II Convertible Senior Notes (3) 1,003,667
 928,591
 
 
2045 Cheniere Convertible Senior Notes, net of discount (4) 304,917
 470,706
 
 
CTPL Term Loan, net of discount (2) 398,068
 400,000
 397,565
 400,000
2015 CCH Credit Facility (2) 1,705,000
 1,705,000
 
 
 
(1)The Level 2 estimated fair value was based on quotations obtained from broker-dealers who make markets in these and similar instruments based on the closing trading prices on March 31,June 30, 2015 and December 31, 2014, as applicable.
(2)The Level 3 estimated fair value approximates the principal amount because the interest rates are variable and reflective of market rates and the debt may be repaid, in full or in part, at any time without penalty. 
(3)The Level 3 estimated fair value was calculated based on inputs that are observable in the market or that could be derived from, or corroborated with, observable market data, including our stock price and interest rates based on debt issued by parties with comparable credit ratings to us and inputs that are not observable in the market. 
(3)(4)The Level 1 estimated fair value was based on unadjusted quoted prices in active markets for identical liabilities that we had the ability to access at the measurement date.
(4)The Level 3 estimated fair value approximates the principal amount because the interest rates are variable and reflective of market rates and CTPL has the ability to call this debt at any time without penalty. 

NOTE 8—INCOME TAXES
  
We are not presently a taxpayer for federal or state income tax purposes and have not recorded a net liability for federal or state income taxes in any of the periods included in the accompanying financial statements.Consolidated Financial Statements. However, we are presently an international taxpayer and have recorded a net expensebenefit (expense) of $0.7$0.5 million and $0.1$(0.1) million for the three months ended March 31,June 30, 2015 and 2014, respectively, and a net expense of $0.2 million for each of the six months ended June 30, 2015 and 2014 for international income taxes.

We experienced an ownership change within the provisions of Internal Revenue Code (“IRC”) Section 382 in 2008, 2010 and 2012. An analysis of the annual limitation on the utilization of our net operating losses (“NOLs”) was performed in accordance with IRC Section 382. It was determined that IRC Section 382 will not limit the use of our NOLs in full over the carryover period. We will continue to monitor trading activity in our shares which may cause an additional ownership change which could ultimately affect our ability to fully utilize our existing tax NOL carryforwards.

NOTE 9—SHARE-BASED COMPENSATION
  
We have granted stock, restricted stock, phantom units and options to purchase common stock to employees, outside directors, and a consultant under the Cheniere Energy, Inc. Amended and Restated 1997 Stock Option Plan (the “1997 Plan”), Amended and Restated 2003 Stock Incentive Plan, as amended (the “2003 Plan”), and 2011 Incentive Plan, as amended (the “2011 Plan”) and the 2014-2018 Long-Term Cash Incentive Program (the “2014-2018 LTIP”).

19


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)


The 1997 Plan provides for the issuance of stock options to purchase up to 5.0 million shares of our common stock, all of which have been granted. Non-qualified stock options were granted to employees, contract service providers and outside directors. The 2003 Plan and 2011 Plan provide for the issuance of 21.0 million shares and 35.0 million shares, respectively, of our common stock that may be in the form of non-qualified stock options, incentive stock options, purchased stock, restricted (non-vested) stock, bonus (unrestricted) stock, stock appreciation rights, phantom units and other share-based performance awards deemed by the Compensation Committee of our Board of Directors (the “Compensation Committee”) to be consistent with the purposes of

18


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—Continued
(unaudited)

the 2003 Plan and 2011 Plan. As of March 31,June 30, 2015, all of the shares under the 2003 Plan have been granted and approximately 2726.9 million shares, net of cancellations, have been granted under the 2011 Plan.

In April 2015, the Compensation Committee recommended and the Board of Directors approved the 2014-2018 LTIP, which is a sub-plan of the Company’s 2015 Long-Term Cash Incentive Plan. The 2014-2018 LTIP consists of phantom units settled in cash with five consecutive annual performance periods commencing on November 1 and ending on October 31 of each year through October 31, 2018. Awards under the 2014-2018 LTIP will be subject to a three-year vesting schedule, with one third of the phantom units vesting and becoming payable on each of the first, second and third anniversaries of the date of the grant (with the exception of the initial grant for the 2014 performance period, which will vest and become payable on each of February 1, 2016, February 1, 2017 and February 1, 2018). The 2014-2018 LTIP is 100% performance-based and will reward long-term performance measured against growth in the Company’s market capitalization, referred to in the plan documents as total shareholder value (“TSV”), above certain thresholds. Under the 2014-2018 LTIP, the general pool is awarded generally between 2% and 4% of the growth in TSV and the senior executive pool is capped at 2% of the growth in TSV, with the Chief Executive Officer’s compensation targeted at 50% of the senior executive pool, subject to adjustment at the discretion of the Compensation Committee. The number of phantom units comprising the senior executive pool has also been capped, and cannot exceed an amount equal to 1.5% of the shares of our common stock outstanding in any one year.

Phantom units are share-based awards issued to employees over a vesting period that entitle the grantee to receive the cash equivalent to the value of a share of our common stock upon each vesting. Phantom units are not eligible to receive quarterly distributions. The Company initially records compensation cost equal tobased on the fair value ofCompany’s stock price on the award at the measurementgrant date, which is determined to be the earlier of the performance commitment date or the service completion date. In addition, compensation cost for unvested phantom unit awardsincluded in accrued liabilities on our Consolidated Balance Sheets, and is adjusted quarterly for any changes in the Company’s stock price. During the three and six months ended March 31,June 30, 2015, and 2014, we granted approximately 72,0005.5 million and zero5.6 million phantom units, respectively, to employees.employees, including units awarded under the 2014-2018 LTIP. We did not grant any phantom units to employees during the three and six months ended June 30, 2014.

For the three months ended March 31,June 30, 2015 and 2014, the total share-based compensation expense, net of capitalization, recognized in our net loss was $16.1$50.3 million and $35.9$26.1 million, respectively, and for the same periods we capitalized as part of the cost of capital assets $1.9$18.4 million and $1.8$2.5 million, respectively. For the six months ended June 30, 2015 and 2014, the total share-based compensation expense, net of capitalization, recognized in our net loss was $66.4 million and $62.0 million, respectively, and for the same periods we capitalized as part of the cost of capital assets $20.3 million and $4.3 million, respectively. We did not recognize any cumulative adjustments in our compensation expense for the threesix months ended March 31,June 30, 2015 and 2014.
 
The total unrecognized compensation cost at March 31,June 30, 2015 relating to non-vested share-based compensation arrangements was $153.5$462.2 million, which is expected to be recognized over a weighted average period of 2.62.5 years.
 
We received $1.0$0.9 million and $3.7$2.6 million in the three months ended March 31,June 30, 2015 and 2014, respectively, and $1.9 million and $6.3 million in the six months ended June 30, 2015 and 2014, respectively, of proceeds from the exercise of stock options.

During the three and six months ended March 31, 2015 andJune 30, 2014, we recognized zero and $10.8$10.8 million,, respectively, of share-based compensation expense related to the modification of long-term commercial bonus awards resulting from an employee termination. We did not recognize any share-based compensation expense related to such modifications in the three and six months ended June 30, 2015.


20


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

NOTE 10—NET LOSS PER SHARE ATTRIBUTABLE TO COMMON STOCKHOLDERS

Basic net loss per share attributable to common stockholders (“EPS”) excludes dilution and is computed by dividing net loss attributable to common stockholders by the weighted average number of common shares outstanding during the period. Diluted EPS reflects potential dilution and is computed by dividing net loss attributable to common stockholders by the weighted average number of common shares outstanding during the period increased by the number of additional common shares that would have been outstanding if the potential common shares had been issued.
 
The following table reconciles basic and diluted weighted average common shares outstanding for the three and six months ended March 31,June 30, 2015 and 2014 (in thousands, except for loss per share):
Three Months EndedThree Months Ended Six Months Ended
March 31,June 30, June 30,
2015 20142015 2014 2015 2014
Weighted average common shares outstanding:          
Basic226,328
 223,207
226,481
 223,602
 226,405
 223,406
Dilutive common stock options (1)
 

 
 
 
Diluted226,328
 223,207
226,481
 223,602
 226,405
 223,406
          
Basic and diluted net loss per share attributable to common stockholders$(1.18) $(0.44)$(0.52) $(0.90) $(1.71) $(1.34)
 
(1)
Stock options and unvested stock of 10.310.1 million shares and 14.5 million shares for the three months ended March 31,June 30, 2015 and 2014, respectively, and 10.1 million shares and 14.4 million shares for the six months ended June 30, 2015 and 2014, respectively, representing securities that could potentially dilute basic EPS in the future were not included in the diluted net loss per share computations because their effect would have been anti-dilutive. In addition, 21.138.6 million shares in aggregate, issuable upon conversion of the 2021 Cheniere Convertible Unsecured Notes, the 2025 CCH Holdco II Convertible Senior Notes and the 2045 Cheniere Convertible Senior Notes, as described in Note 7—Long-Term Debt, were not included in the computation of diluted net loss per share for the three and six months ended June 30, 2015 because the computation of diluted net loss per share utilizing the “if-converted” method would be anti-dilutive.


19


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—Continued
(unaudited)

NOTE 11—COMMITMENTS AND CONTINGENCIES

Legal Proceedings

During the second quarter of 2014, four lawsuits were filed in the Court of Chancery of the State of Delaware (the “Court”) against us and/or certain of our present and former officers and directors that challenged the manner in which abstentions were treated in connection with the stockholder vote on Amendment No. 1 to the 2011 Incentive Plan (“Amendment No. 1”), pursuant to which, among other things, the number of shares of common stock available for issuance under the 2011 Plan was increased from 10.0 million to 35.0 million shares. The lawsuits contended that abstentions should have been counted as “no” votes in tabulating the outcome of the vote and that the stockholders did not approve Amendment No. 1 when abstentions are counted as such. The lawsuits further contended that portions of the Amended and Restated Bylaws of Cheniere Energy, Inc. adopted on April 3, 2014 were invalid and that certain disclosures relating to these matters made by us were misleading. The lawsuits asserted claims for breach of contract and breach of fiduciary duty (both on a class and a derivative basis) and claims for unjust enrichment (on a derivative basis). The lawsuits sought, among other things, a declaration that the February 1, 2013 stockholder vote on Amendment No. 1 was void, disgorgement of all compensation distributed as a result of Amendment No. 1, voiding the awards made from the shares reserved pursuant to Amendment No. 1 and monetary damages. On June 16, 2014, we filed a verified application with the Court pursuant to 8 Del. C. § 205 (the “Section 205 Action”) in which we asked the Court to declare valid the issuance, pursuant to the 2011 Plan, of the 25.0 million additional shares of our common stock covered by Amendment No. 1, whether occurring in the past or the future.

The parties to the above-referenced lawsuits and the Section 205 Action entered into a Stipulation and Agreement of Compromise, Settlement and Release dated December 12, 2014, (the “Stipulation”), subject to its terms and conditions, including receipt, among other things, of Court approval, to resolve the litigation. On March 16, 2015, the Court approved the settlement of the litigation and awarded plaintiffs’ counsel fees, which were paid by our insurers in April 2015.


21


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

NOTE 12—BUSINESS SEGMENT INFORMATION
  
We have two reportable segments: LNG terminal segment and LNG and natural gas marketing segment. We determine our reportable segments by identifying each segment that engaged in business activities from which it may earn revenues and incur expenses, had operating results regularly reviewed by the entities’ chief operating decision maker for purposes of resource allocation and performance assessment, and had discrete financial information. Substantially all of our revenues from external customers andare attributed to the United States. Substantially all of our long-lived assets are attributed to or located in the United States.

Our LNG terminal segment consists of the Sabine Pass and Corpus Christi LNG terminals. We own and operate the Sabine Pass LNG terminal located on the Sabine Pass shipping channel in Louisiana through our ownership interest in and management agreements with Cheniere Partners. We own 100% of the general partner interest in Cheniere Partners and 80.1% of the common shares of Cheniere Holdings, which owns a 55.9% limited partner interest in Cheniere Partners. We are also developing and constructing a natural gas liquefaction facility near Corpus Christi, Texas.
 
Our LNG and natural gas marketing segment consists of LNG and natural gas marketing activities by Cheniere Marketing. Cheniere Marketing is developing a platform for LNG sales to international markets with professional staff based in the United States, United Kingdom, Singapore and Chile.


2022


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—ContinuedCONTINUED
(unaudited)

The following table summarizes revenues (losses), loss from operations and total assets for each of our reporting segments (in thousands): 
SegmentsSegments
LNG Terminal LNG & Natural Gas Marketing Corporate and Other (1) 
Total
Consolidation
LNG Terminal LNG & Natural Gas Marketing Corporate and Other (1) 
Total
Consolidation
As of or for the Three Months Ended March 31, 2015      
As of or for the Three Months Ended June 30, 2015       
Revenues (losses) from external customers (2)$68,532
 $(706) $199
 $68,025
Intersegment revenues (losses) (3)491
 6,354
 (6,845) 
Depreciation expense16,071
 244
 3,839
 20,154
Loss from operations(17,767) (26,367) (51,446) (95,580)
Interest expense, net(59,465) 
 (26,021) (85,486)
Loss before income taxes and non-controlling interest (4)(33,403) (26,816) (82,090) (142,309)
Share-based compensation25,778
 6,052
 36,835
 68,665
Goodwill76,819
 
 
 76,819
Total assets15,964,158
 567,541
 1,227,803
 17,759,502
Expenditures for additions to long-lived assets3,944,191
 1,400
 20,874
 3,966,465
       
As of or for the Three Months Ended June 30, 2014       
Revenues from external customers (2)$67,580
 $662
 $127
 $68,369
$66,841
 $324

$480
 $67,645
Intersegment revenues (losses) (3)103
 7,017
 (7,120) 
734
 1,900
 (2,634) 
Depreciation expense14,941
 200
 2,628
 17,769
14,810
 109
 2,379
 17,298
Loss from operations(25,089) (5,183) (30,726) (60,998)(20,607) (14,907) (26,621) (62,135)
Interest expense, net(42,845) 
 (16,767) (59,612)(43,895) 
 106
 (43,789)
Loss before income taxes and non-controlling interest (4)(277,655) (5,390) (52,121) (335,166)(234,123) (15,189) (31,314) (280,626)
Share-based compensation3,197
 4,035
 10,759
 17,991
3,512
 2,421
 22,686
 28,619
Goodwill76,819
 
 
 76,819
76,819
 
 
 76,819
Total assets12,481,669
 570,287
 1,871,091
 14,923,047
10,861,606
 63,020
 934,669
 11,859,295
Expenditures for additions to long-lived assets590,245
 714
 28,781
 619,740
809,658
 471
 6,315
 816,444
      
       
As of or for the Three Months Ended March 31, 2014       
For the Six Months Ended June 30, 2015      
Revenues (losses) from external customers (2)$136,112
 $(44) $326
 $136,394
Intersegment revenues (losses) (3)594
 13,371
 (13,965) 
Depreciation expense31,012
 444
 6,467
 37,923
Loss from operations(42,856) (31,550) (82,172) (156,578)
Interest expense, net(102,310) 
 (42,788) (145,098)
Loss before income taxes and non-controlling interest (4)(311,058) (32,206) (134,211) (477,475)
Share-based compensation28,917
 10,087
 47,651
 86,655
Expenditures for additions to long-lived assets4,534,436
 2,114
 49,655
 4,586,205
      
For the Six Months Ended June 30, 2014       
Revenues from external customers (2)$67,119
 $658
 $(227) $67,550
$133,260
 $982
 $953
 $135,195
Intersegment revenues (losses) (3)72
 2,174
 (2,246) 
1,506
 4,074
 (5,580) 
Depreciation expense14,406
 152
 917
 15,475
29,216
 261
 3,296
 32,773
Loss from operations(7,516) (11,594) (28,502) (47,612)(28,123) (26,501) (55,123) (109,747)
Interest expense, net(40,373) 
 103
 (40,270)(84,268) 
 209
 (84,059)
Loss before income taxes and non-controlling interest (4)(77,354) (11,727) (33,172) (122,253)(311,477) (26,916) (64,486) (402,879)
Share-based compensation3,050
 6,510
 28,138
 37,698
6,562
 8,931
 50,824
 66,317
Goodwill76,819
 
 
 76,819
Total assets8,520,986
 62,955
 940,675
 9,524,616
Expenditures for additions to long-lived assets659,779
 314
 25,911
 686,004
1,469,437
 785
 32,225
 1,502,447
 
(1)Includes corporate activities, business development, oil and gas exploration, development and exploitation, strategic activities and certain intercompany eliminations. These activities have been included in the corporate and other column due to the lack of a material impact that these activities have on our Consolidated Financial Statements.

23


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

(2)Substantially all of the LNG terminal revenues relate to regasification capacity reservation fee payments made by Total Gas & Power North America, Inc. and Chevron U.S.A. Inc. LNG and natural gas marketing and trading revenue consists primarily of the domestic marketing of natural gas imported into the Sabine Pass LNG terminal.
(3)Intersegment revenues (losses) related to our LNG and natural gas marketing segment are primarily a result of international revenue allocations using a cost plus transfer pricing methodology. These LNG and natural gas marketing segment intersegment revenues (losses) are eliminated with intersegment revenues (losses) in our Consolidated Statements of Operations.
(4)Items to reconcile loss from operations and loss before income taxes and non-controlling interest include consolidated other income (expense) amounts as presented on our Consolidated Statements of Operations primarily related to our LNG terminal segment.

NOTE 13—SUPPLEMENTAL CASH FLOW INFORMATION

The following table provides supplemental disclosure of cash flow information (in thousands): 
 Three Months Ended March 31, Six Months Ended June 30,
 2015 2014 2015 2014
Cash paid during the year for interest, net of amounts capitalized and deferred $
 $16,567
 $46,165
 $49,219
Balance in property, plant and equipment, net funded with accounts payable and accrued liabilities 150,623
 66,241
 383,722
 286,388
 

21


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—Continued
(unaudited)

NOTE 14—RECENT ACCOUNTING STANDARDS

In May 2014, the Financial Accounting Standards Board (the “FASB”) amended its guidance on revenue recognition. The core principle of this amendment is that an entity should recognize revenue to depict the transfer of promised goods or services to customers in an amount that reflects the consideration to which the entity expects to be entitled in exchange for those goods or services. This guidance is effective for annual reporting periods beginning after December 15, 2016, including interim periods within that reporting period, with earlier adoption not permitted. This guidance may be adopted either retrospectively to each prior reporting period presented or as a cumulative-effect adjustment as of the date of adoption. We are currently evaluating the impact of the provisions of this guidance on our consolidated financial position, results of operationsConsolidated Financial Statements and cash flows.related disclosures.

In August 2014, the FASB issued authoritative guidance that requires an entity’s management to evaluate, for each reporting period, whether there are conditions and events that raise substantial doubt about the entity’s ability to continue as a going concern within one year after the financial statements are issued. Additional disclosures are required if management concludes that conditions or events raise substantial doubt about the entity’s ability to continue as a going concern. This guidance is effective for annual reporting periods ending after December 15, 2016, and for annual periods and interim periods thereafter, with earlier adoption permitted. The adoption of this guidance is not expected to have an impact on our Consolidated Financial Statements or related disclosures.

In February 2015, the FASB amended its guidance on consolidation analysis. This amendment primarily affects asset managers and reporting entities involved with limited partnerships or similar entities, but the analysis is relevant in the evaluation of any reporting organization’s requirement to consolidate a legal entity. This guidance changes (1) the identification of variable interests, (2) the variable interest entity characteristics for a limited partnership or similar entity and (3) the primary beneficiary determination. This guidance is effective for annual reporting periods beginning after December 15, 2015, including interim periods within that reporting period, with earlier adoption permitted. This guidance may be adopted either retrospectively to each prior reporting period presented or as a cumulative-effect adjustment as of the date of adoption. We are currently evaluating the impact of the provisions of this guidance on our consolidated financial position, results of operationsConsolidated Financial Statements and cash flows.related disclosures.

In April 2015, the FASB issued authoritative guidance that requires debt issuance costs related to a recognized debt liability to be presented in the balance sheet as a direct deduction from the debt liability rather than as an asset. This guidance is effective for annual reporting periods beginning after December 15, 2015, including interim periods within that reporting period, with earlier adoption permitted. This guidance must be adopted retrospectively to each prior reporting period presented and disclosures will be required for a change in accounting principles. Upon adoptionWe are currently evaluating the impact of the provisions of this standard, the balance of long-term debt, net will be reduced by the balance of debt issuance costs, netguidance on our Consolidated Balance Sheets.


24


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

In April 2015, the FASB issued authoritative guidance that clarifies the circumstances under which a cloud computing customer would account for the arrangement as a license of internal-use software. This guidance is effective for annual reporting periods beginning after December 15, 2015, including interim periods within that reporting period, with earlier adoption permitted. This guidance may be adopted either retrospectively or prospectively to arrangements entered into, or materially modified, after the effective date. The adoption of this guidance is not expected to have an impact on our Consolidated Financial Statements or related disclosures.

In July 2015, the FASB issued revised guidance related to the measurement of inventory. Inventory would be measured at the lower of cost and net realizable value. Net realizable value is the estimated selling prices in the ordinary course of business, less reasonably predictable costs of completion, disposal and transportation. This guidance is effective for annual reporting periods beginning after December 15, 2016, including interim periods within that reporting period, with earlier adoption permitted. This guidance should be adopted prospectively. We are currently evaluating the impact of the provisions of this guidance on our consolidated financial position, results of operationsConsolidated Financial Statements and cash flows.related disclosures.

NOTE 15—SUBSEQUENT EVENTS

2014-2018 Long-Term Cash Incentive Program

In April 2015, our Board of Directors approved and granted awards under the new 2014-2018 Long-Term Cash Incentive Program (“2014-2018 LTIP”), which is a sub-plan of the Company’s 2015 Long-Term Cash Incentive Plan adopted in April 2015. The 2014-2018 LTIP consists of phantom units settled in cash with five consecutive annual performance periods commencing on November 1 and ending on October 31 of each year through October 31, 2018. Awards under the 2014-2018 LTIP will be subject to a three-year vesting schedule, with one third of the phantom units vesting and becoming payable on each of the first, second and third anniversaries of the date of the grant (with the exception of the initial grant for the 2014 performance period, which will vest and become payable on each of February 1, 2016, February 1, 2017 and February 1, 2018). The 2014-2018 LTIP is 100% performance-based and will reward long-term performance measured against growth in the Company’s market capitalization, referred to in the plan documents as total shareholder value (“TSV”), above certain thresholds. Under the 2014-2018 LTIP, the general pool is awarded generally between 2% and 4% of the growth in TSV and the senior executive pool is capped at 2% of the

22


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—Continued
(unaudited)

growth in TSV, with the Chief Executive Officer’s compensation targeted at 50% of the senior executive pool, subject to adjustment at the discretion of the Compensation Committee. The number of phantom units comprising the senior executive pool has also been capped, and cannot exceed an amount equal to 1.5% of our common shares outstanding in any one year.

2325


ITEM 2.MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
 
Information Regarding Forward-Looking Statements
 
This quarterly report contains certain statements that are, or may be deemed to be, “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended (the “Exchange Act”). All statements, other than statements of historical facts, included herein or incorporated herein by reference are “forward-looking statements.” Included among “forward-looking statements” are, among other things: 
statements that we expect to commence or complete construction of our proposed LNG terminals, liquefaction facilities, pipeline facilities or other projects, or any expansions thereof, by certain dates, or at all;
statements regarding future levels of domestic and international natural gas production, supply or consumption or future levels of LNG imports into or exports from North America and other countries worldwide or purchases of natural gas, regardless of the source of such information, or the transportation or other infrastructure or demand for and prices related to natural gas, LNG or other hydrocarbon products;
statements regarding any financing transactions or arrangements, or ability to enter into such transactions;
statements relating to the construction of our Trains, including statements concerning the engagement of any EPC contractor or other contractor and the anticipated terms and provisions of any agreement with any EPC or other contractor, and anticipated costs related thereto;
statements regarding any SPA or other agreement to be entered into or performed substantially in the future, including any revenues anticipated to be received and the anticipated timing thereof, and statements regarding the amounts of total LNG regasification, liquefaction or storage capacities that are, or may become, subject to contracts;
statements regarding counterparties to our commercial contracts, construction contracts and other contracts;
statements regarding our planned development and construction of additional Trains, including the financing of such Trains;
statements that our Trains, when completed, will have certain characteristics, including amounts of liquefaction capacities;
statements regarding our business strategy, our strengths, our business and operation plans or any other plans, forecasts, projections, or objectives, including anticipated revenues and capital expenditures, any or all of which are subject to change;
statements regarding legislative, governmental, regulatory, administrative or other public body actions, approvals, requirements, permits, applications, filings, investigations, proceedings or decisions;
statements regarding our anticipated LNG and natural gas marketing activities; and 
any other statements that relate to non-historical or future information.
All of these types of statements, other than statements of historical fact, are forward-looking statements. In some cases, forward-looking statements can be identified by terminology such as “may,” “will,” “could,” “should,” “expect,” “plan,” “project,” “intend,” “anticipate,” “believe,” “estimate,” “predict,” “potential,” “pursue,” “target,” “continue,” the negative of such terms or other comparable terminology. The forward-looking statements contained in this quarterly report are largely based on our expectations, which reflect estimates and assumptions made by our management. These estimates and assumptions reflect our best judgment based on currently known market conditions and other factors. Although we believe that such estimates are reasonable, they are inherently uncertain and involve a number of risks and uncertainties beyond our control. In addition, assumptions may prove to be inaccurate. We caution that the forward-looking statements contained in this quarterly report are not guarantees of future performance and that such statements may not be realized or the forward-looking statements or events may not occur. Actual results may differ materially from those anticipated or implied in forward-looking statements due to factors described in this quarterly report and in the other reports and other information that we file with the SEC. These forward-looking statements speak only as of the date made, and other than as required by law, we undertake no obligation to publicly update or revise any forward-looking statement, whether as a result of new information, future events or otherwise.
 
Our actual results could differ materially from those anticipated in these forward-looking statements as a result of a variety of factors, including those discussed under “Risk Factors” in our Annual Report on Form 10-K for the year ended December 31,

26


2014. All forward-looking statements attributable to us or persons acting on our behalf are expressly qualified in their entirety by

24


these risk factors. Other than as required under the securities laws, we assume no obligation to update or revise these forward-looking statements or provide reasons why actual results may differ.

Introduction
 
The following discussion and analysis presents management’s view of our business, financial condition and overall performance and should be read in conjunction with our Consolidated Financial Statements and the accompanying notes. This information is intended to provide investors with an understanding of our past performance, current financial condition and outlook for the future. Our discussion and analysis include the following subjects: 
Overview of Business 
Overview of Significant Events 
Liquidity and Capital Resources 
Results of Operations 
Off-Balance Sheet Arrangements  
Summary of Critical Accounting Estimates 
Recent Accounting Standards

Overview of Business
 
Cheniere, a Delaware corporation, is a Houston-based energy company primarily engaged in LNG-related businesses. We own and operate the Sabine Pass LNG terminal in Louisiana through our ownership interest in and management agreements with Cheniere Partners, which is a publicly traded limited partnership that we created in 2007. We own 100% of the general partner interest in Cheniere Partners and 80.1% of Cheniere Holdings, which is a publicly traded limited liability company formed in 2013 that owns a 55.9% limited partner interest in Cheniere Partners. We are currently developing and constructing two natural gas liquefaction and export facilities.

The Sabine Pass LNG terminal is located on the Sabine Pass deepwater shipping channel less than four miles from the Gulf Coast. The Sabine Pass LNG terminal has operational regasification facilities owned by Cheniere Partners’ wholly owned subsidiary, Sabine Pass LNG,SPLNG, that includes existing infrastructure of five LNG storage tanks with capacity of approximately 16.9 Bcfe, two docks that can accommodate vessels with nominal capacity of up to 266,000 cubic meters and vaporizers with regasification capacity of approximately 4.0 Bcf/d. Cheniere Partners is developing and constructing natural gas liquefaction facilities (the “SPL Project”) at the Sabine Pass LNG terminal adjacent to the existing regasification facilities through a wholly owned subsidiary, SPL. Cheniere Partners plans to construct up to six Trains, which are in various stages of development. Each Train is expected to have a nominal production capacity of approximately 4.5 mtpa of LNG. Cheniere Partners also owns the 94-mile Creole Trail Pipeline through a wholly owned subsidiary, CTPL, which interconnects the Sabine Pass LNG terminal with a number of large interstate pipelines.

We are developing and constructing a second natural gas liquefaction and export facility and pipeline facility on over 1,000 acres of land that we own or control near Corpus Christi, Texas (the “CCL Project”) through wholly owned subsidiaries CCL and Cheniere Corpus Christi Pipeline,CCP, respectively. As currently contemplated, theThe Corpus Christi LNG terminal would be designedis being developed for up to threefive Trains, with expected aggregate nominal production capacity of approximately 13.522.5 mtpa of LNG, threefour LNG storage tanks with capacity of approximately 10.113.5 Bcfe and two docks that can accommodate vessels with nominal capacity of up to 266,000 cubic meters. The CCL Project is being developed in stages. The first stage (“Stage 1”) includes Trains 1 and 2, two LNG storage tanks, one complete marine berth and a second partial berth and all of the CCL Project’s necessary infrastructure facilities, the second stage (“Stage 2”) includes Train 3, one LNG storage tank and the completion of the second partial berth and the third stage (“Stage 3”) includes Trains 4 and 5 and one LNG storage tank. The CCL Project also would includeincludes a 23-mile, 48” natural gas supply pipeline that wouldwill interconnect the Corpus Christi LNG terminal with several interstate and intrastate natural gas pipelines (the “Corpus Christi Pipeline”).

One of our subsidiaries, Cheniere Marketing, is engaged in the LNG and natural gas marketing business and is seeking to develop a portfolio of long-term, short-term and spot SPAs. Cheniere Marketing has entered into SPAs with SPL and CCL to purchase LNG produced by the SPL Project and the CCL Project.

27



We are also in various stages of developing other projects, including a liquid hydrocarbon export project in Texas along the Gulf Coast, which, among other things, will require acceptable commercial and financing arrangements before we make a final investment decision.Coast.


25


Overview of Significant Events

Our significant accomplishments since January 1, 2015 and through the filing date of this Form 10-Q include the following:  
Cheniere
We issued an aggregate principal amount of $625.0 million Convertible Senior Notes due 2045 (the “2045 Cheniere Convertible Senior Notes”) through a registered direct offering. The 2045 Cheniere Convertible Senior Notes were issued with an original issue discount of 20% and accrue interest at a rate of 4.25% per annum, which is payable semi-annually in arrears. The net proceeds of $495.7 million, after deducting estimated fees and estimated offering expenses of $4.3 million, are being used for general corporate purposes.
Cheniere Marketing and CCL received authorization from the DOE to export up to a combined total of the equivalent of 767 Bcf/yr of domestically produced LNG by vessel from the CCL Project to non-FTA countries for a 20-year term.
CCH entered into a credit facility (the “2015 CCH Credit Facility”) to be used for costs associated with the development, construction, operation and maintenance of the CCL Project, with commitments of $8.4 billion linked to Stage 1 of the CCL Project and the Corpus Christi Pipeline and an additional $3.1 billion linked to Stage 2 of the CCL Project.
CCH HoldCo II issued $1.0 billion aggregate principal amount of 11% Senior Secured Notes due 2025 (the “2025 CCH Holdco II Convertible Senior Notes”), which will be used to pay a portion of the capital costs associated with Stage 1 of the CCL Project and the Corpus Christi Pipeline.
CCL issued a notice to proceed (“NTP”) to Bechtel Oil, Gas and Chemicals, Inc. (“Bechtel”) under the lump sum turnkey contract for the engineering, procurement and construction of Stage 1 of the CCL Project (the “EPC Contract (CCL Stage 1)”).
We have agreed in principle to partner with Parallax Enterprises, LLC (“Parallax”) to develop up to 11 mtpa of LNG production capacity through Parallax’s two mid-scale natural gas liquefaction projects in Louisiana along the Gulf Coast.
Cheniere Partners
SPL issued an aggregate principal amount of $2.0 billion of 5.625% Senior Secured Notes due 2025 (the “2025 SPL Senior Notes”). Net proceeds from the offering will be used to pay a portion of the capital costs associated with the construction of the first four Trains of the SPL Project.
We received authorization from the FERC to site, construct and operate Trains 5 and 6 of the SPL Project.
SPL received authorization from the DOE to export up to a combined total of the equivalent of 503.3 Bcf/yr of domestically produced LNG by vessel from Trains 5 and 6 of the SPL Project to non-FTA countries for a 20-year term.
SPL entered into a lump sum turnkey contract for the engineering, procurement and construction of Train 5 of the SPL Project (the “EPC Contract (Train 5)”).
SPL entered into four credit facilities (collectively, the “2015 SPL Credit Facilities”) totaling $4.6 billion, which replaced its existing credit facilities. The 2015 SPL Credit Facilities will be used to fund a portion of the costs of developing, constructing and placing into operation Trains 1 through 5 of the SPL Project.
SPL issued an NTP to Bechtel under the EPC Contract (Train 5).

Liquidity and Capital Resources

Although results are consolidated for financial reporting, Cheniere, Cheniere Holdings, Cheniere Partners, SPL and Sabine Pass LNGSPLNG operate with independent capital structures. We expect the cash needs for at least the next twelve months will be met for each of these independent capital structures as follows:
Sabine Pass LNGSPLNG through operating cash flows, and existing unrestricted cash;cash and debt offerings or equity contributions;
SPL through project debt and equity financings;financings and operating cash flows;

28


Cheniere Partners through operating cash flows from Sabine Pass LNGSPLNG and SPL, existing unrestricted cash;cash and debt or equity offerings;
Cheniere Holdings through distributions from Cheniere Partners; and
Cheniere through existing unrestricted cash, services fees from Cheniere Holdings, Cheniere Partners and its other subsidiaries, distributions from our investments in Cheniere Holdings and Cheniere Partners and operating cash flows from our LNG and natural gas marketing business. In addition, we expect to finance the construction costs of the CCL LNG terminal from one or more of the following: project financing, existing unrestricted cash, debt and equity offerings by us or our subsidiaries, and operating cash flow.flows, services fees from Cheniere Holdings, Cheniere Partners and its other subsidiaries and distributions from our investments in Cheniere Holdings and Cheniere Partners.

As of March 31,June 30, 2015, we had cash and cash equivalents of $2,158.3$1,470.2 million available to Cheniere. In addition, we had current and non-current restricted cash and cash equivalents of $2,314.0$1,423.2 million (which included current and non-current restricted cash and cash equivalents available to CCH HoldCo II, Cheniere Holdings, Cheniere Partners, SPL and Sabine Pass LNG)SPLNG) designated for the following purposes: $1,953.7$92.0 million for the CCL Project; $996.5 million for the SPL Project; $28.1$19.0 million for CTPL; $129.1$91.1 million for interest payments related to the Sabine Pass LNGSPLNG Senior Notes described below; and $203.1$224.6 million for other restricted purposes.

In November 2014, we issued an aggregate principal amount of $1.0 billion Convertible Unsecured Notes due 2021 (the “2021 Cheniere Convertible Unsecured Notes”). Beginning one year after the closing date, the 2021 Cheniere Convertible Unsecured Notes will be convertible at the option of the holder into our common stock at an initialthe then applicable conversion rate, provided that the closing price of $93.64, provided that our closing price of common stock is greater than or equal to $93.64the conversion price on the conversion date. The initial conversion rateprice was $93.64 and is subject to adjustment upon the occurrence of certain specified events. We have the option to satisfy the conversion obligation with cash, common stock or a combination thereof.

In March 2015, we issued the 2045 Cheniere Convertible Senior Notes. We have the right, at our option, at any time after March 15, 2020, to redeem all or any part of the 2045 Cheniere Convertible Senior Notes at a redemption price payable in cash equal to the accreted amount of the 2045 Cheniere Convertible Senior Notes to be redeemed, plus accrued and unpaid interest, if any, to such redemption date. The conversion rate will initially equal 7.2265 shares of our common stock per $1,000 principal amount of the 2045 Cheniere Convertible Senior Notes, which corresponds to an initial conversion price of approximately $138.38 per share of our common stock. The conversion rate is subject to adjustment upon the occurrence of certain specified events. We have the option to satisfy the conversion obligation with cash, common stock or a combination thereof.

Substantially all of our revenues from external customers and long-lived assets are attributed to or located in the United States.


26


Cheniere Holdings

Cheniere Holdings was formed by us to hold our Cheniere Partners limited partner interests, thereby allowing us to segregate our lower risk, stable, cash flow generating assets from our higher risk, early stage development projects and marketing activities. As of March 31,June 30, 2015, we had an 80.1% direct ownership interest in Cheniere Holdings. We receive dividends on our Cheniere Holdings shares from the distributions that Cheniere Holdings receives from Cheniere Partners, and we receive management fees for managing Cheniere Holdings. For the threesix months ended March 31,June 30, 2015, we received $3.5$7.2 million in dividends on our Cheniere Holdings common shares and $0.3$0.5 million of management fees from Cheniere Holdings.

Cheniere Partners
 
Our ownership interest in the Sabine Pass LNG terminal is held through Cheniere Partners. As of March 31,June 30, 2015, we own 80.1% of Cheniere Holdings, which owns a 55.9% limited partner interest in Cheniere Partners in the form of 11,963,488 common units, 45,333,334 Class B units and 135,383,831 subordinated units. We also own 100% of the general partner interest and the incentive distribution rights in Cheniere Partners.
 
Prior to the initial public offering by Cheniere Holdings, we received quarterly equity distributions from Cheniere Partners related to our limited partner and 2% general partner interests. We will continue to receive quarterly equity distributions from Cheniere Partners related to our 2% general partner interest, and we receive fees for providing services to Cheniere Partners, Sabine Pass LNG,SPLNG, SPL and CTPL. During the threesix months ended March 31,June 30, 2015, we received $0.5$1.0 million in distributions on our general partner interest and $19.1$32.9 million in total service fees from Cheniere Partners, Sabine Pass LNG,SPLNG, SPL and CTPL.

Cheniere Partners’ common unit and general partner distributions are being funded from accumulated operating surplus. We have not received distributions on our subordinated units with respect to the quarters ended on or after June 30, 2010. Cheniere

29


Partners will not make distributions on our subordinated units until it generates additional cash flow from the SPL Project, Sabine Pass LNG’sSPLNG’s excess capacity or other new business, which would be used to make quarterly distributions on our subordinated units before any increase in distributions to the common unitholders.

Cheniere Partners’ Class B units are subject to conversion, mandatorily or at the option of the Class B unitholders under specified circumstances, into a number of common units based on the then-applicable conversion value of the Class B units. The Cheniere Partners Class B units are not entitled to cash distributions except in the event of a liquidation of Cheniere Partners, a merger, consolidation or other combination of Cheniere Partners with another person or the sale of all or substantially all of the assets of Cheniere Partners. On a quarterly basis beginning on the initial purchase of the Class B units and ending on the conversion date of the Class B units, the conversion value of the Class B units increases at a compounded rate of 3.5% per quarter, subject to an additional upward adjustment for certain equity and debt financings. The accreted conversion ratio of the Class B units owned by Cheniere Holdings and Blackstone CQP Holdco LP (“Blackstone”) was 1.461.51 and 1.44,1.49, respectively, as of March 31,June 30, 2015. We expect the Class B units to mandatorily convert into common units within 90 days of the substantial completion date of Train 3 of the SPL Project, which Cheniere Partners currently expects to occur before March 31,April 30, 2017. If the Class B units are not mandatorily converted by July 2019, the holders of the Class B units have the option to convert the Class B units into common units at that time.

LNG Terminal Business

Sabine Pass LNG Terminal

Regasification Facilities
 
The Sabine Pass LNG terminal has operational regasification capacity of approximately 4.0 Bcf/d and aggregate LNG storage capacity of approximately 16.9 Bcfe. Approximately 2.0 Bcf/d of the regasification capacity at the Sabine Pass LNG terminal has been reserved under two long-term third-party TUAs, under which Sabine Pass LNG’sSPLNG’s customers are required to pay fixed monthly fees, whether or not they use the LNG terminal.  Each of Total Gas & Power North America, Inc. (“Total”) and Chevron U.S.A. Inc. (“Chevron”) has reserved approximately 1.0 Bcf/d of regasification capacity and is obligated to make monthly capacity payments to Sabine Pass LNGSPLNG aggregating approximately $125 million annually for 20 years that commenced in 2009. Total S.A. has guaranteed Total’s obligations under its TUA up to $2.5 billion, subject to certain exceptions, and Chevron Corporation has guaranteed Chevron’s obligations under its TUA up to 80% of the fees payable by Chevron.


27


The remaining approximately 2.0 Bcf/d of capacity has been reserved under a TUA by SPL. SPL is obligated to make monthly capacity payments to Sabine Pass LNGSPLNG aggregating approximately $250 million annually, continuing until at least 20 years after SPL delivers its first commercial cargo at the SPL Project.

Under each of these TUAs, Sabine Pass LNGSPLNG is entitled to retain 2% of the LNG delivered to the Sabine Pass LNG terminal.

Liquefaction Facilities

The SPL Project is being developed and constructed at the Sabine Pass LNG terminal adjacent to the existing regasification facilities. We commenced construction of Trains 1 and 2 and the related new facilities needed to treat, liquefy, store and export natural gas in August 2012. Construction of Trains 3 and 4 and the related facilities commenced in May 2013. In April 2015, we received authorization from the FERC to site, construct and operate Trains 5 and 6. In June 2015, we commenced construction of Train 5 and the related facilities.

The U.S. Department of Energy (the “DOE”)DOE has authorized the export of up to a combined total of the equivalent of 16 mtpa (approximately 803 Bcf/yr) of domestically produced LNG by vessel from the Sabine Pass LNG terminal to countries with which the United States has a free trade agreement providing for national treatment for trade in natural gas (“FTA countries”)countries for a 30-year term beginning on the earlier of the date of first export or September 7, 2020; and to allnon-FTA countries without a free trade agreement providing for national treatment for trade in natural gas and with which trade is permitted (“non-FTA countries”) for a 20-year term, beginning on the earlier of the date of first export or August 7, 2017.term. The DOE further issued an order authorizing SPL to export up to the equivalent of approximately 203 Bcf/yr of domestically produced LNG from the Sabine Pass LNG terminal to FTA countries for a 25-year period. SPL’s application for authorization to export that same 203 Bcf/yr of domestically produced LNG from the Sabine Pass LNG terminal to non-FTA countries is currently pending at the DOE. Additionally, the DOE further issued orders authorizing SPL to export an additionalup to a combined total of 503.3 Bcf/yr in total of domestically produced LNG from the Sabine Pass LNG terminal to FTA countries and non-FTA countries for a 20-year term. SPL’s applications for authorizationThe Sierra Club has requested a rehearing of the non-FTA order pertaining to export that samethe 503.3 Bcf/yr, and the DOE has not yet ruled on this request. In each case, the terms of domestically produced LNGthese authorizations begin on the earlier of the date of

30


first export thereunder or the date specified in the particular order, which ranges from 5 to 10 years from the Sabine Pass LNG terminal to non-FTA countries are currently pending atdate the DOE.order was issued.

As of March 31,June 30, 2015, the overall project completion percentages for Trains 1 and 2 and Trains 3 and 4 of the SPL Project were approximately 87.2%92.2% and 62.6%69.2%, respectively, which are ahead of the contractual schedule. Based on our current construction schedule, we anticipate that Train 1 will produce LNG as early as late 2015, and Trains 2 3 and 4through 5 are expected to commence operations on a staggered basis thereafter.
    
Customers

SPL has entered into foursix fixed price, 20-year SPAs with third parties that in the aggregate equate to 16approximately 19.75 mtpa (approximately 803 Bcf/yr) of LNG that commence with the date of first commercial delivery for Trains 1 through 4,5, which are fully permitted. In addition, SPL has entered into two fixed price, 20-year SPAs with third parties for another 3.75 mtpa of LNG that commence with the date of first commercial delivery for Train 5. However, SPL has not yet received approval from the DOE for the export of LNG from Train 5 to non-FTA countries. These two SPAs contain certain conditions precedent, including, but not limited to, receiving regulatory approvals, securing necessary financing arrangements and making a final investment decision with respect to Train 5, which must be satisfied by June 30, 2015 or either party to the respective SPA may terminate its SPA, following notice and a cure period. Under thethese SPAs, the customers will purchase LNG from SPL for a price consisting of a fixed fee plus 115% of Henry Hub per MMBtu of LNG. In certain circumstances, the customers may elect to cancel or suspend deliveries of LNG cargoes, in which case the customers would still be required to pay the fixed fee with respect to cargoes that are not delivered. A portion of the fixed fee will be subject to annual adjustment for inflation. The SPAs and contracted volumes to be made available under the SPAs are not tied to a specific Train; however, the term of each SPA commences upon the start of operations of the specified Train.

In aggregate, the fixed fee portion to be paid by these customers is approximately $2.3$2.9 billion annually for Trains 1 through 4, and $2.9 billion annually if we make a positive final investment decision with respect to Train 5, with the applicable fixed fees starting from the commencement of commercial operations of the applicable Train. These fixed fees equal approximately $411 million, $564 million, $650 million, $648 million and $588 million for each of Trains 1 through 5, respectively.

In addition, Cheniere Marketing has entered into an amended and restated SPA with SPL to purchase, at Cheniere Marketing’s option, any LNG produced by SPL in excess of that required for other customers at a price of 115% of Henry Hub plus $3.00 per MMBtu of LNG.


28


Natural Gas Transportation and Supply

For SPL’s natural gas feedstock transportation requirements, it has entered into transportation precedent agreements to secure firm pipeline transportation capacity with CTPL and third-party pipeline companies. SPL has also entered into enabling agreements and long-term natural gas purchase agreements with third parties in order to secure natural gas feedstock for the SPL Project. As of March 31,June 30, 2015, SPL has secured up to approximately 2,161.92,162.8 million MMBtu of natural gas feedstock through long-term natural gas purchase agreements.
    
Construction

Trains 1 through 4 are being designed, constructed and commissioned by Bechtel. SPL entered into lump sum turnkey contracts with Bechtel for the engineering, procurement and construction of Trains 1 and 2 (the “EPC Contract (Trains 1 and 2)”) and Trains 3 and 4 (the “EPC Contract (Trains 3 and 4)”)through 5, under which Bechtel charges a lump sum for all work performed and generally bears project cost risk unless certain specified events occur, in which case Bechtel may cause SPL to enter into a change order, or SPL agrees with Bechtel to a change order.

The total contract prices of the EPC contract for Trains 1 and 2 (“EPC Contract (Trains 1 and 2)”), EPC contract for Trains 3 and 4 (“EPC Contract (Trains 3 and 4)”) and EPC Contract (Train 5) are approximately $4.1 billion, $3.8 billion and $3.8$3.0 billion, respectively, reflecting amounts incurred under change orders through March 31,June 30, 2015. Total expected capital costs for Trains 1 through 45 are estimated to be between $9.0$12.5 billion and $10.0$13.5 billion before financing costs and between $12.0$17.0 billion and $13.0$18.0 billion after financing costs including, in each case, estimated owner’s costs and contingencies.

Pipeline Facilities

CTPL owns the Creole Trail Pipeline, a 94-mile pipeline interconnecting the Sabine Pass LNG terminal with a number of large interstate pipelines. In December 2013, CTPL began construction of certain modifications to allow the Creole Trail Pipeline to be able to transport natural gas to the Sabine Pass LNG terminal. Cheniere Partners estimates that the capital costs to modify the Creole Trail Pipeline will be approximately $105 million. The modifications are expected to beterminal, which were completed in service in time for the commissioning and testing of Trains 1 and 2.April 2015.


31


Final Investment Decision on Train 5 and Train 6

We will contemplate making a final investment decisionan FID to commence construction of Train 5 and Train 6 of the SPL Project based upon, among other things, entering into an EPC contracts,contract, entering into acceptable commercial arrangements receiving regulatory authorizations and obtaining adequate financing to construct the Trains.Train.

Capital Resources

We currently expect that SPL’s capital resources requirements with respect to Trains 1 through 45 of the SPL Project will be financed through one or more of the following: borrowings, equity contributions from Cheniere Partners and cash flows under the SPAs. We believe that with the net proceeds of borrowings, unfunded commitments under the 2013 Liquefaction2015 SPL Credit Facilities (as defined below) and cash flows from operations, we will have adequate financial resources available to complete Trains 1 through 45 of the SPL Project and to meet its currently anticipated capital, operating and debt service requirements. We currently project that SPL will generate cash flow from the SPL Project by late 2015,early 2016, when Train 1 of the SPL Project is anticipated to achieve initial LNG production.
    
Senior Secured Notes

As of March 31,June 30, 2015, Cheniere Partners’ subsidiaries had seven series of senior secured notes outstanding (collectively, the “Senior Notes”):
$1.7 billion of 7.50% Senior Secured Notes due 2016 issued by Sabine Pass LNGSPLNG (the “2016 Sabine Pass LNGSPLNG Senior Notes”);
$0.4 billion of 6.50% Senior Secured Notes due 2020 issued by Sabine Pass LNGSPLNG (the “2020 Sabine Pass LNGSPLNG Senior Notes” and collectively with the 2016 Sabine Pass LNGSPLNG Senior Notes, the “Sabine Pass LNG“SPLNG Senior Notes”);
$2.0 billion of 5.625% Senior Secured Notes due 2021 issued by SPL (the “2021 SPL Senior Notes”);

29


$1.0 billion of 6.25% Senior Secured Notes due 2022 issued by SPL (the “2022 SPL Senior Notes”);
$1.5 billion of 5.625% Senior Secured Notes due 2023 issued by SPL (the “2023 SPL Senior Notes”);
$2.0 billion of 5.75% Senior Secured Notes due 2024 issued by SPL (the “2024 SPL Senior Notes” and collectively with the 2021 SPL Senior Notes, the 2022 SPL Senior Notes, the 2023 SPL Senior Notes and the 2025 SPL Senior Notes, the “SPL Senior Notes”); and
$2.0 billion of the 2025 SPL Senior Notes.

Interest on the Senior Notes is payable semi-annually in arrears. Subject to permitted liens, the Sabine Pass LNGSPLNG Senior Notes are secured on a pari passu first-priority basis by a security interest in all of Sabine Pass LNG’sSPLNG’s equity interests and substantially all of Sabine Pass LNG’sSPLNG’s operating assets. The SPL Senior Notes are secured on a first-priority basis by a security interest in all of the membership interests in SPL and substantially all of SPL’s assets.
Sabine Pass LNG
SPLNG may redeem all or part of its 2016 Sabine Pass LNGSPLNG Senior Notes at any time at a redemption price equal to 100% of the principal plus any accrued and unpaid interest plus the greater of:
1.0% of the principal amount of the 2016 Sabine Pass LNGSPLNG Senior Notes; or
the excess of: (a)(1) the present value at such redemption date of (i)(a) the redemption price of the 2016 Sabine Pass LNGSPLNG Senior Notes plus (ii)(b) all required interest payments due on the 2016 Sabine Pass LNGSPLNG Senior Notes (excluding accrued but unpaid interest to the redemption date), computed using a discount rate equal to the treasury rate as of such redemption date plus 50 basis points; over (b)(2) the principal amount of the 2016 Sabine Pass LNGSPLNG Senior Notes, if greater.
Sabine Pass LNG
SPLNG may redeem all or part of the 2020 Sabine Pass LNGSPLNG Senior Notes at any time on or after November 1, 2016 at fixed redemption prices specified in the indenture governing the 2020 Sabine Pass LNGSPLNG Senior Notes, plus accrued and unpaid interest, if any, to the date of redemption. Sabine Pass LNGSPLNG may also, at its option, redeem all or part of the 2020 Sabine Pass LNGSPLNG Senior Notes at any time prior to November 1, 2016, at a “make-whole” price set forth in the indenture governing the 2020 Sabine Pass LNGSPLNG Senior Notes, plus accrued and unpaid interest, if any, to the date of redemption. At any time before November 1, 2015, Sabine Pass LNGSPLNG may redeem up to 35% of the aggregate principal amount of the 2020 Sabine Pass LNGSPLNG Senior Notes at a redemption price of 106.5% of the principal amount of the 2020 Sabine Pass LNGSPLNG Senior Notes to be redeemed, plus accrued and unpaid interest, if any, to the redemption date, in an amount not to exceed the net proceeds of one or more completed equity offerings as long as Sabine Pass LNGSPLNG redeems the 2020 Sabine Pass LNGSPLNG Senior Notes within 180 days of the

32


closing date for such equity offering and at least 65% of the aggregate principal amount of the 2020 Sabine Pass LNGSPLNG Senior Notes originally issued remains outstanding after the redemption.

At any time prior to three months before the respective dates of maturity for each series of the SPL Senior Notes, SPL may redeem all or part of such series of the SPL Senior Notes at a redemption price equal to the “make-whole” price set forth in the common indenture governing the SPL Senior Notes, plus accrued and unpaid interest, if any, to the date of redemption. SPL may also, at any time within three months of the respective maturity dates for each series of the SPL Senior Notes, redeem all or part of such series of the SPL Senior Notes at a redemption price equal to 100% of the principal amount of such series of the SPL Senior Notes to be redeemed, plus accrued and unpaid interest, if any, to the date of redemption.

Under the indentures governing the Sabine Pass LNGSPLNG Senior Notes (the “Sabine Pass LNG“SPLNG Indentures”), except for permitted tax distributions, Sabine Pass LNGSPLNG may not make distributions until, among other requirements, deposits are made into debt service reserve accounts and a fixed charge coverage ratio test of 2:1 is satisfied. Under the common indenture governing the SPL Senior Notes, SPL may not make any distributions until, among other requirements, substantial completion of Trains 1 and 2 has occurred, deposits are made into debt service reserve accounts and a debt service coverage ratio test of 1.25:1.00 is satisfied. During the threesix months ended March 31,June 30, 2015 and 2014, Sabine Pass LNGSPLNG made distributions of $70.8$199.6 million and $63.4$173.0 million, respectively, after satisfying all the applicable conditions in the Sabine Pass LNGSPLNG Indentures.

The SPL Senior Notes are governed by a common indenture with restrictive covenants. SPL may incur additional indebtedness in the future, including by issuing additional notes, and such indebtedness could be at higher interest rates and have different maturity dates and more restrictive covenants than the current outstanding indebtedness of SPL, including the SPL Senior Notes, the 2013 Liquefaction2015 SPL Credit Facilities and a $325.0 million senior letter of credit and reimbursement agreement (the “SPL LC Agreement”) described below.
    

30


2013 Liquefaction2015 SPL Credit Facilities

In May 2013,June 2015, SPL entered into four credit facilities aggregating $5.9 billion (collectively, the “2013 Liquefaction Credit Facilities”). In conjunction with SPL’s issuances of the respective series of SPL Senior Notes in November 2013 and May 2014, SPL terminated approximately $885 million and $2.1 billion, respectively, of commitments under the 2013 Liquefaction Credit Facilities. In March 2015, in conjunction with SPL’s issuance of the 2025 SPL Senior Notes, SPL further terminated approximately $1.8 billion of commitments under the 2013 Liquefaction Credit Facilities. As a result, as of March 31, 2015 SPL has availableCredit Facilities with commitments aggregating $0.9 billion under the 2013 Liquefaction$4.6 billion. The 2015 SPL Credit Facilities which will beare being used to fund a portion of the costs of developing, constructing and placing into operation Trains 1 through 45 of the SPL Project. Borrowings under the 2015 SPL Credit Facilities may be refinanced, in whole or in part, at any time without premium or penalty; however, interest rate hedging and interest rate breakage costs may be incurred. As of June 30, 2015, SPL had $4.6 billion of available commitments and no outstanding borrowings under the 2015 SPL Credit Facilities.

The principal of the loans made under the 2013 Liquefaction Credit Facilities must be repaid in quarterly installments, commencing with the earlier of the last day of the first full calendar quarter after the Train 4 completion date, as defined in the 2013 Liquefaction Credit Facilities, or September 30, 2018. Loans under the 2013 Liquefaction2015 SPL Credit Facilities accrue interest at a variable rate per annum equal to, at SPL’s election, LIBOR or the base rate plus the applicable margin. The applicable marginsmargin for LIBOR loans rangeranges from 2.3%1.30% to 3.0% prior to the completion of Train 4 and from 2.3% to 3.25% after such completion,1.75%, depending on the applicable 2013 Liquefaction2015 SPL Credit Facility.Facility, and the applicable margin for base rate loans is 1.75%. Interest on LIBOR loans is due and payable at the end of each LIBOR period and interest on base rate loans is due and payable at the end of each quarter. In addition, SPL is required to pay insurance/guarantee premiums of 0.45% per annum on any drawn amounts under the covered tranches of the 2015 SPL Credit Facilities. The 2013 Liquefaction2015 SPL Credit Facilities also require SPL to pay a quarterly commitment fee calculated at either: (1) a rate per annum equal to 40% of the applicable margin, for LIBOR loans, multiplied by the average daily amount of the undrawn commitments. Interestcommitment, or (2) 0.70% of the undrawn commitment, depending on LIBORthe applicable 2015 SPL Credit Facility. The principal of the loans made under the 2015 SPL Credit Facilities must be repaid in quarterly installments, commencing with the earlier of June 30, 2020 and the commitment feeslast day of the first full calendar quarter after the completion date of Trains 1 through 5 of the SPL Project. Scheduled repayments are based upon an 18-year amortization profile, with the remaining balance due and payable atupon the endmaturity of each LIBOR period and quarterly, respectively.the 2015 SPL Credit Facilities

The obligations of SPL under the 2015 SPL Credit Facilities are secured by substantially all of the assets of SPL as well as all of the membership interests in SPL on a pari passu basis with the SPL Senior Notes.

Under the terms of the 2013 Liquefaction2015 SPL Credit Facilities, within 90 days of the closing date, SPL is required to hedge not less than 75%65% of the variable interest rate exposure of its projected outstanding borrowings, calculated on a weighted average basis in comparison to its anticipated draw of principal.


33


2013 SPL Credit Facilities
2017
 In May 2013, SPL entered into four credit facilities aggregating $5.9 billion (collectively, the “2013 SPL Credit Facilities”) to fund a portion of the costs of developing, constructing and placing into operation Trains 1 through 4 of the SPL Project. In June 2015, the 2013 SPL Credit Facilities were replaced with the 2015 SPL Credit Facilities.

In March 2015, in conjunction with SPL’s issuance of the 2025 SPL Senior Notes, SPL terminated approximately $1.8 billion of commitments under the 2013 SPL Credit Facilities. This termination and the replacement of the 2013 SPL Credit Facilities with the 2015 SPL Credit Facilities in June 2015 resulted in a write-off of debt issuance costs and deferred commitment fees associated with the 2013 SPL Credit Facilities of $7.3 million and $96.3 million for the three and six months ended June 30, 2015, respectively.

CTPL Term Loan

CTPL has a $400.0 million term loan facility (“2017 CTPL Term Loan”), which is beingwas used to fund modifications to the Creole Trail Pipeline and for general business purposes. The 2017 CTPL Term Loan matures in 2017 when the full amount of the outstanding principal obligations must be repaid. CTPL’s loan may be repaid, in whole or in part, at any time without premium or penalty. As of March 31,June 30, 2015, CTPL had borrowed the full amount of $400.0 million available under the 2017 CTPL Term Loan. Borrowings under the 2017 CTPL Term Loan accrue interest at a variable rate per annum equal to, at CTPL’s election, LIBOR or the base rate, plus the applicable margin. The applicable margin for LIBOR loans is 3.25%. Interest on LIBOR loans is due and payable at the end of each LIBOR period.

SPL LC Agreement

In April 2014, SPL entered into the SPL LC Agreement that it uses for the issuance of letters of credit for certain working capital requirements related to the SPL Project.  SPL pays (a)(1) a commitment fee in an amount equal to an annual rate of 0.75% of an amount equal to the unissued portion of letters of credit available pursuant to the SPL LC Agreement and (b)(2) a letter of credit fee equal to an annual rate of 2.5% of the undrawn portion of all letters of credit issued under the SPL LC Agreement. If draws are made upon any letters of credit issued under the SPL LC Agreement, the amount of the draw will be deemed a loan issued to SPL.  SPL is required to pay the full amount of this loan on or prior to the business day immediately succeeding the deemed issuance of the loan.  These loans accrue interest at a rate of 2.0% plus the base rate as defined in the SPL LC Agreement. As of March 31,June 30, 2015, SPL had issued letters of credit in an aggregate amount of $72.5$72.9 million and no draws had been made upon any letters of credit issued under the SPL LC Agreement.

Corpus Christi LNG Terminal
 
Liquefaction Facilities

In September 2011, we formedThe CCL to develop a natural gas liquefaction facility near Corpus Christi, TexasProject is being developed and constructed on over 1,000 acres of land that we own or control. As currently contemplated,control near Corpus Christi, Texas. In December 2014, we received authorization from the CCL facilities would be designed for up to three Trains, with expected aggregate nominal production capacity of approximately 13.5 mtpa of LNG, three LNG storage tanks with capacity of approximately 10.1 Bcfe and two docks that can accommodate vessels with nominal capacity of up to 266,000 cubic meters.


31


On December 30, 2014, the FERC issued an order granting CCL authorization under Section 3 of the Natural Gas Act of 1938, as amended (“NGA”), to site, construct and operate TrainsStages 1 through 3.and 2 of the CCL Project. In May 2015, we made a positive FID with respect to Stage 1 of the CCL Project and issued an NTP to Bechtel under the EPC Contract (CCL Stage 1). We recently began the development of Stage 3 of the CCL Project and commenced the regulatory approval process in June 2015.

The DOE has authorized the export of up to a combined total of the equivalent of 767 Bcf/yr of domestically produced LNG by vessel from the CCL Project to FTA countries for a 25-year term and to non-FTA countries for a 20-year term. The Sierra Club has requested a rehearing of the non-FTA order, and the FERCDOE has not yet ruled on this request. In August 2012, Cheniere Marketing filed an application witheach case, the DOEterms of these authorizations begin on the earlier of the date of first export thereunder or the date specified in the particular order, which ranges from 7 to export up to the equivalent of 15 mtpa (approximately 767 Bcf/yr) of domestically produced LNG to FTA and non-FTA countries10 years from the CCL Project. In October 2012,date the DOE granted Cheniere Marketing authority to export up to the equivalent of 15 mtpa (approximately 767 Bcf/yr) of domestically produced LNG to FTA countries from the CCL Project. CCLorder was added as an additional authorization holder to the FTA permit and an additional applicant to the non-FTA application. In addition, the FERC order requires us to obtain certain additional FERC approvals as construction progresses.issued.

Customers

CCL has entered into eight fixed price, 20-year SPAs with seven third parties withthat in the aggregate annual contract quantities ofequate to approximately 8.4 mtpa of LNG. However, CCL has not yet received approval fromLNG that commence with the DOEdate of first commercial delivery for the export of LNG to non-FTA countries.Trains 1 through 3, which are fully permitted. Under these eight SPAs, the customers will purchase LNG from CCL for a price consisting of a fixed fee of $3.50 plus 115% of Henry Hub per MMBtu of LNG. In certain circumstances, the customers may elect to cancel or suspend deliveries of LNG cargoes,

34


in which case the customers would still be required to pay the fixed fee with respect to cargoes that are not delivered. A portion of the fixed fee will be subject to annual adjustment for inflation. The SPAs and contracted volumes to be made available under the SPAs are not tied to a specific Train; however, the term of each SPA commences upon the start of operations of a specified Train. Each of the SPAs contain certain conditions precedent, including, but not limited to, receiving regulatory approvals, securing necessary financing arrangements and making a final investment decision, which must be satisfied by June 30, 2015 or either party to each SPA may terminate its SPA, following notice and a cure period.

In aggregate, the fixed fee portion to be paid by these customers is approximately $1.4 billion annually for Trains 1 and 2, and $1.5 billion if we make a positive final investment decisionsFID with respect to Trains 1 through 3,Stage 2 of the CCL Project, with the applicable fixed fees starting from the commencement of commercial operations of the applicable Train. These fixed fees equal approximately $619 million, $776 million and $140 million for each of Trains 1 through 3, respectively.

Natural Gas Transportation and Supply

For its natural gas feedstock transportation requirements, CCL has entered into transportation precedent agreements to secure firm pipeline transportation capacity with third party pipeline companies and Cheniere Corpus Christi Pipeline.CCP. CCL has also entered into enabling agreements with third parties and will continue to enter into such agreements in order to secure natural gas feedstock for the CCL Project.

Construction

In December 2013, CCL entered into separate lump sum turnkey contracts with Bechtel for the engineering, procurement and construction of TrainsStages 1 and related facilities for2 of the CCL Project under which Bechtel charges a lump sum for all work performed and generally bears project cost risk unless certain specified events occur, in which case Bechtel may cause CCL to enter into a change order, or CCL agrees with Bechtel to a change order. The total contract prices of the EPC contracts for Stages 1 and 2, which do not include the pipeline, are approximately $7.5 billion and $2.4 billion, respectively, reflecting amounts incurred under change orders through June 30, 2015. Total expected capital costs for the three TrainsStages 1 and the related facilities, excluding pipeline facilities,2 are estimated to be between $11.5$12.0 billion and $12.0$13.0 billion, before financing costs, and between $15.0 billion and $16.0 billion after financing costs including, an estimate forin each case, estimated owner’s costs and contingencies.

Pipeline Facilities

On December 30, 2014, the FERC issued a certificate of public convenience and necessity under Section 7(c) of the NGANatural Gas Act of 1938, as amended, authorizing Cheniere Corpus Christi PipelineCCP to construct and operate the Corpus Christi Pipeline. The Corpus Christi Pipeline is designed to transport 2.25 Bcf/d of feed and fuel gas required by the CCL Project from the existing regional natural gas pipeline grid.

Final Investment Decision on Stage 2

We will contemplate making a final investment decisionan FID to commence construction of Stage 2 of the CCL Project based upon, among other things, entering into acceptable commercial arrangements, receiving regulatory authorizations and obtaining adequate financing to construct the facility.arrangements.


32


Capital Resources

We expect to finance the construction costs of the CCL Project from one or more of the following: project financing, existing unrestricted cash, offerings by us or our subsidiaries of debt or equity and operating cash flow.

2025 CCH Holdco II Convertible Senior Notes

In May 2015, CCH HoldCo II issued $1.0 billion aggregate principal amount of the 2025 CCH Holdco II Convertible Senior Notes on a private placement basis. The $1.0 billion principal of the 2025 CCH Holdco II Convertible Senior Notes will be used to partially fund costs associated with Stage 1 of the CCL Project and the Corpus Christi Pipeline. The purchasers have made commitments, which will expire on May 1, 2016, to acquire an additional $500 million of 2025 CCH Holdco II Convertible Senior Notes (the “Second Phase Funding”) upon satisfaction of incremental customary conditions precedent related to the construction of Stage 2 of the CCL Project. The 2025 CCH Holdco II Convertible Senior Notes bear interest at a rate of 11.0% per annum, which is payable quarterly in arrears. Prior to the substantial completion of Train 2 of the CCL Project if the Second Phase Funding has not occurred, and to the substantial completion of Train 3 of the CCL Project following the occurrence of the Second Phase Funding, interest on the 2025 CCH Holdco II Convertible Senior Notes will be paid entirely in kind. Following this date,

35


the interest generally must be paid in cash; however, a portion of the interest may be paid in kind under certain specified circumstances. The 2025 Convertible Notes are secured by a pledge by us of 100% of the equity interests in CCH HoldCo II, and a pledge by CCH HoldCo II of 100% of the equity interests in Cheniere CCH HoldCo I.

At our option, the outstanding 2025 CCH Holdco II Convertible Senior Notes are convertible into our common stock on or after the later of (1) 58 months from May 1, 2015, and (2) the substantial completion of Train 2 of the CCL Project and any 2025 CCH Holdco II Convertible Senior Notes issued in connection with the Second Phase Funding will be convertible on or after the substantial completion of Train 3 of the CCL Project (in each case, the “Eligible Conversion Date”). The conversion price for 2025 CCH Holdco II Convertible Senior Notes converted at our option is the lower of (1) a 10% discount to the average of the daily volume-weighted average price (“VWAP”) of our common stock for the 90 trading day period prior to the date on which notice of conversion is provided, and (2) a 10% discount to the closing price of our common stock on the trading day preceding the date on which notice of conversion is provided. At the option of the holders, the 2025 CCH Holdco II Convertible Senior Notes are convertible on or after the six-month anniversary of the applicable Eligible Conversion Date at a conversion price equal to the average of the daily VWAP of our common stock for the 90 trading day period prior to the date on which notice of conversion is provided. Conversions are also subject to various limitations and conditions.

2015 CCH Credit Facility

In May 2015, CCH entered into the 2015 CCH Credit Facility, which is being used to fund a portion of the costs associated with the development, construction, operation and maintenance of the CCL Project.  The total commitment under the 2015 CCH Credit Facility is approximately $11.5 billion, comprising approximately $8.4 billion linked to Stage 1 of the CCL Project and the Corpus Christi Pipeline and approximately $3.1 billion linked to Stage 2 of the CCL Project. Borrowings under the 2015 CCH Credit Facility may be refinanced, in whole or in part, at any time without premium or penalty; however, interest rate hedging and interest rate breakage costs may be incurred. As of June 30, 2015, CCH had $6.7 billion of available commitments and $1.7 billion of outstanding borrowings under the 2015 CCH Credit Facility.

The principal of the loans made under the 2015 CCH Credit Facility must be repaid in quarterly installments, commencing on the earlier of (1) the first quarterly payment date occurring more than three calendar months following project completion and (2) a set date determined by reference to the date under which a certain LNG buyer linked to the last Train to become operational is entitled to terminate its SPA for failure to achieve the date of first commercial delivery for that agreement. Scheduled repayments will be based upon a 19-year tailored amortization, commencing the first full quarter after the project completion and designed to achieve a minimum projected fixed debt service coverage ratio of 1.55x. Loans under the 2015 CCH Credit Facility accrue interest at a variable rate per annum equal to, at CCH’s election, LIBOR or the base rate, plus the applicable margin. The applicable margins for LIBOR loans are 2.25% prior to completion and 2.50% on completion and thereafter. The applicable margins for base rate loans are 1.25% prior to completion and 1.50% on completion and thereafter. Interest on LIBOR loans is due and payable at the end of each applicable interest period and interest on base rate loans is due and payable at the end of each quarter. The 2015 CCH Credit Facility also requires CCH to pay a commitment fee at a rate per annum equal to 40% of the margin for LIBOR loans, multiplied by the outstanding undrawn debt commitments.

The obligations of CCH under the 2015 CCH Credit Facility are secured by a first priority lien on substantially all of the assets of CCH and its subsidiaries and by a pledge by CCH HoldCo I of its limited liability company interests in CCH.

Under the terms of the 2015 CCH Credit Facility, within 90 days of the closing date, CCH is required to hedge not less than 65% of the variable interest rate exposure of its senior secured debt.
LNG and Natural Gas Marketing Business
 
Our wholly owned subsidiary, Cheniere Marketing, is engaged in the LNG and natural gas marketing business and is seeking to develop a portfolio of long-term, short-term and spot LNG purchase and sale agreements. Cheniere Marketing has purchased, transported and unloaded commercial LNG cargoes into the Sabine Pass LNG terminal and has used trading strategies intended to maximize margins on these cargoes. Cheniere Marketing, or one of its wholly owned subsidiaries, has secured the following rights and obligations to support its business:
the right to deliver cargoes to the Sabine Pass LNG terminal during the construction of the SPL Project in exchange for payment of 80% of the expected gross margin from each cargo to Cheniere Energy Investments, LLC, a wholly owned subsidiary of Cheniere Partners;

36


pursuant to an amended and restated SPA with SPL, the right to purchase, at Cheniere Marketing’s option, any LNG produced by SPL in excess of that required for other customers at a price of 115% of Henry Hub plus $3.00 per MMBtu of LNG;
pursuant to SPAs with CCL, the right to purchase, at Cheniere Marketing’s option, any LNG produced by CCL not required for other customers; and
three LNG vessel time charters with subsidiaries of two ship owners, Dynagas, Ltd. (“Dynagas”) and Teekay LNG Operating LLC (“Teekay”). The annual payments for the vessel charters will be approximately $92 million. The charters have an initial term of 5 years with the option to renew with Dynagas for a 2-year extension with similar terms as the initial term. Cheniere Marketing expects to receive delivery ofreceived the first vessel from Dynagas in June 2015 and expects to receive the remaining two vessels from Teekay in January 2016 and June 2016.
In addition, Cheniere Marketing has sold LNG cargoes to be delivered to multiple counterparties between 2016 and 2018, with delivery obligations conditioned on the performance of the SPL Project.  The cargoes have been sold with a portfolio of delivery points, either on a Free on Board basis, delivered to the counterparty at the Sabine Pass LNG terminal, or a Delivered at Terminal (“DAT”) basis, delivered to the counterparty’s LNG receiving terminal. Cheniere Marketing has chartered LNG vessels, as described above, to be utilized in DAT transactions. In addition, a wholly owned subsidiary of Cheniere Marketing has entered into a long-term agreement to sell LNG cargoes on a DAT basis, with delivery obligations conditioned on CCL achieving certain milestones, including a final investment decision.basis.  The agreement is also conditioned upon the buyer achieving its owncertain milestones, including reaching a final investment decision related to certain projects and obtaining related financing.

Corporate and Other Activities
 
We are required to maintain corporate general and administrative functions to serve our business activities described above.  We are also in various stages of developing other projects, including a liquid hydrocarbon export project in Texas along the Gulf Coast. EachIn addition, we have agreed in principle to partner with Parallax to develop up to 11 mtpa of theseLNG production capacity through Parallax’s two mid-scale natural gas liquefaction projects among other things, will require acceptable commercial and financing arrangements before we make a final investment decision.in Louisiana along the Gulf Coast.


33


Sources and Uses of Cash
 
The following table summarizes (in thousands) the sources and uses of our cash and cash equivalents for the threesix months ended March 31,June 30, 2015 and 2014. The table presents capital expenditures on a cash basis; therefore, these amounts differ from the amounts of capital expenditures, including accruals, which are referred to elsewhere in this report. Additional discussion of these items follows the table. 

37


Three Months Ended March 31,Six Months Ended June 30,
2015 20142015 2014
Sources of cash and cash equivalents      
Proceeds from issuances of long-term debt$2,500,000
 $
$5,205,000
 $2,584,500
Use of restricted cash and cash equivalents for the acquisition of property, plant and equipment572,623
 761,858
Use of restricted cash and cash equivalents for financing activities
 33,743
Use of restricted cash for the acquisition of property, plant and equipment4,183,620
 1,303,011
Proceeds from exercise of stock options958
 3,691
1,914
 6,265
Other20
 44
19
 
Total sources of cash and cash equivalents3,073,601
 799,336
9,390,553
 3,893,776
      
Uses of cash and cash equivalents 
  
 
  
Investment in restricted cash and cash equivalents(1,929,288) 
Investment in restricted cash(4,518,880) (2,282,903)
Property, plant and equipment, net(590,998) (773,376)(4,294,814) (1,352,400)
Debt issuance and deferred financing costs(58,395) (13,957)(411,149) (85,367)
Repayments of long-term debt
 (177,000)
Distributions and dividends to non-controlling interest(20,050) (19,786)(40,121) (39,644)
Payments related to tax withholdings for share-based compensation(6,174) (9,218)
Operating cash flow(14,180) (18,219)(294,955) (11,341)
Payments related to tax withholdings for share-based compensation(3,771) (7,742)
Other(46,164) (12,495)(101,836) (6,858)
Total uses of cash and cash equivalents(2,662,846) (845,575)(9,667,929) (3,964,731)
      
Net increase (decrease) in cash and cash equivalents410,755
 (46,239)
Net decrease in cash and cash equivalents(277,376) (70,955)
Cash and cash equivalents—beginning of period1,747,583
 960,842
1,747,583
 960,842
Cash and cash equivalents—end of period$2,158,338
 $914,603
$1,470,207
 $889,887

Proceeds from Issuances of Long-Term Debt, Debt Issuance and Deferred Financing Costs and Repayments of Long-Term Debt

In March 2015, SPL issued an aggregate principal amount of $2.0 billion of the 2025 SPL Senior Notes. InAlso in March 2015, we issued an aggregate principal amount of $625.0 million of the 2045 Cheniere Convertible Senior Notes, with an original issue discount of 20%, for net proceeds of $495.7 million. In May 2015, CCH HoldCo II issued an aggregate principal amount of $1.0 billion of the 2025 CCH Holdco II Convertible Senior Notes. Also in May 2015, CCH entered into the 2015 CCH Credit Facility and borrowed $1.7 billion under this facility during the second quarter of 2015. In June 2015, SPL entered into the 2015 SPL Credit Facilities aggregating $4.6 billion, which terminated and replaced the 2013 SPL Credit Facilities. Debt issuance and deferred financing costs in the threesix months ended March 31,June 30, 2015 primarily relate to up-front fees paid upon the closing of these offerings.transactions.

In May 2014, SPL issued the 2024 SPL Senior Notes and additional 5.625% Senior Secured Notes due 2023 in an aggregate principal amount of $0.5 billion (the “Additional 2023 SPL Senior Notes”) for total net proceeds of approximately $2.5 billion. Debt issuance and deferred financing costs in the six months ended June 30, 2014 primarily relate to up-front fees paid upon the closing of this offering in May 2014.

During the six months ended June 30, 2014, SPL repaid its $177.0 million of borrowings under the 2013 SPL Credit Facilities upon the issuance of the Additional 2023 SPL Senior Notes and the 2024 SPL Senior Notes.

Use of Restricted Cash and Cash Equivalents for the Acquisition of Property, Plant and Equipment and Property, Plant and Equipment, net

During the threesix months ended March 31,June 30, 2015 and 2014, we used $572.6$4,183.6 million and $761.9$1,303.0 million, respectively, of restricted cash and cash equivalents for investing activities to fund $591.0$4,294.8 million and $773.4a portion of the $1,352.4 million used for the acquisition of property, plant and equipment during the threesix months ended March 31,June 30, 2015 and 2014, respectively, ofrespectively. These costs primarily related to the construction costs for Trains 1 through 45 of the SPL Project.  The costs associated with the construction of TrainsProject and Stage 1 through 4 of the SPLCCL Project and are capitalized as construction-in-process.

Investment in (Use of) Restricted Cash and Cash Equivalents

In the threesix months ended March 31,June 30, 2015, we invested $1,929.3$4,518.9 million in restricted cash and cash equivalents primarily related to the net proceeds from the 2025 SPL Senior Notes, partially offset by the use of restricted cash related to payment of commitment fees for the 2013 Liquefaction Credit Facilities and the payment of distributions to non-controlling interest. In the threesix months

38


ended March 31,June 30, 2014, we used $33.7invested $2,282.9 million ofin restricted cash and cash equivalentsprimarily related to the payment of commitment fees fornet proceeds from the 2013 Liquefaction Credit Facilities2024 SPL Senior Notes and the payment of distributions to non-controlling interest.Additional 2023 SPL Senior Notes issued in May 2014.


34


Distributions and Dividends to Non-controlling Interest
 
During the threesix months ended March 31,June 30, 2015 and 2014, Cheniere Partners and Cheniere Holdings, collectively, made distributions and paid dividends of $20.1$40.1 million and $19.8$39.6 million, respectively, to non-affiliated common unitholders and common shareholders.

Payments Related to Tax Withholdings for Share-based Compensation

During the threesix months ended March 31,June 30, 2015 and 2014, we used $3.8$6.2 million and $7.7$9.2 million, respectively, of cash and cash equivalents to purchase restricted stock that was returned to us by employees to cover taxes related to their restricted stock that vested during such periods.

Operating Cash Flow

We had a cash outflow from operating activities of $14.2$295.0 million during the threesix months ended March 31,June 30, 2015, compared to a cash outflow of $18.2$11.3 million during the threesix months ended March 31,June 30, 2014. This decreaseincrease in operating cash outflows primarily related to the timing of amounts paid to third parties for the construction of the SPL Project and the CCL Project and fees paid upon meeting the contingency related to the interest rate swaps we entered into to hedge the exposure to volatility in a portion of the floating-rate interest payments under the 2015 CCH Credit Facility (the “CCH Interest Rate Derivatives”). These amounts were partially offset by cash paid to purchase LNG to maintain the cryogenic readiness of the regasification facilities at the Sabine Pass LNG terminal and the timing of receivables due from third parties.

Other

Other cash outflows increased from $12.5 million during the three months ended March 31, 2014 to $46.2$6.9 million during the threesix months ended March 31,June 30, 2014 to $101.8 million during the six months ended June 30, 2015, primarily for payments made to a municipal water district for water system enhancements that will increase potable water supply to our Sabine Pass LNG terminal.terminal and investments made in connection with the mid-scale natural gas liquefaction projects being developed with Parallax.

Issuance of Common Stock
 
 During the threesix months ended March 31,June 30, 2015 and 2014, we issued zero16,000 and 0.20.4 million shares, respectively, of restricted stock to new and existing employees.

Results of Operations
 
Three Months Ended March 31,June 30, 2015 vs. Three Months Ended March 31,June 30, 2014

Our consolidated net loss attributable to common stockholders was $267.7$118.5 million, or $1.18$0.52 per share (basic and diluted), in the three months ended March 31,June 30, 2015 compared to a net loss attributable to common stockholders of $97.8$201.9 million, or $0.44$0.90 per share (basic and diluted), in the three months ended March 31,June 30, 2014. This $169.9$83.4 million increasedecrease in net loss was primarily a result of increased derivative loss, net, increased operating and maintenance expense, increaseddecreased loss on early extinguishment of debt and increased interest expense,derivative gain (loss), net, which was partially offset by increased net loss attributable to non-controlling interest and decreased general and administrative expense (“G&A Expense”). Derivative loss, net and increased $91.3interest expense, net.

Loss on early extinguishment of debt decreased $107.1 million in the three months ended March 31,June 30, 2015, as compared to the three months ended March 31, 2014, primarily as a result of new contingent interest rate derivatives entered into during the quarter. Loss on early extinguishment of debt increased $89.0 million in the three months ended March 31, 2015, as compared to the three months ended March 31,June 30, 2014, due to the $7.3 million write-off of debt issuance costs and deferred commitment fees in connection with the termination and replacement of approximately $1.8the 2013 SPL Credit Facilities with the 2015 SPL Credit Facilities in June 2015, as compared to the $114.3 million write-off of debt issuance costs in connection with the early extinguishment of $2.1 billion of commitments under the 2013 LiquefactionSPL Credit Facilities in March 2015. Operating and maintenance expenseMay 2014. Derivative gain (loss), net increased $23.5$106.0 million from a loss of $60.2 million in the three months ended March 31,June 30, 2014 to a gain of $45.8 million in the three months ended June 30, 2015, primarily as a result of an increase in long-term LIBOR during the three months ended June 30, 2015, partially offset by the loss recognized upon meeting the contingency related to the CCH Interest Rate Derivatives, as compared to a decrease in long-term LIBOR during the three months ended June 30, 2014.

39



G&A Expense increased $40.1 million in the three months ended June 30, 2015, as compared to the three months ended March 31,June 30, 2014, primarily as a result of the expense incurreddue to purchase LNG to maintain the cryogenic readiness of the regasification facilities at the Sabine Pass LNG terminal and increased costs to manage the operation and maintenance of the Sabine Pass LNG terminal.share-based compensation. Interest expense, net increased $19.3$41.7 million in the three months ended March 31,June 30, 2015, as compared to the three months ended March 31,June 30, 2014, primarily as a result of an increase in our indebtedness outstanding inas of June 30, 2015 from the issuance of the 2021 Convertible Unsecured Notes in November 2014 and the issuance of the 2045 Convertible Senior Notes in March 2015.compared to June 30, 2014. For the three months ended March 31,June 30, 2015 and 2014, we incurred $180.6$241.2 million and $128.6$140.4 million of total interest cost, respectively, of which we capitalized and deferred $121.0$155.7 million and $88.3$96.6 million, respectively, which were directly related to the construction of the first four Trains of the SPL Project. Net

Six Months Ended June 30, 2015 vs. Six Months Ended June 30, 2014

Our consolidated net loss attributable to non-controllingcommon stockholders was $386.2 million, or $1.71 per share (basic and diluted), in the six months ended June 30, 2015 compared to a net loss attributable to common stockholders of $299.7 million, or $1.34 per share (basic and diluted), in the six months ended June 30, 2014. This $86.5 million increase in net loss was primarily a result of increased interest expense, net and increased $43.6G&A Expense, which was partially offset by decreased loss on early extinguishment of debt and decreased derivative loss, net.

Interest expense, net increased $61.0 million in the threesix months ended March 31,June 30, 2015, as compared to the threesix months ended March 31, 2014, as a result of increased net loss recorded by Cheniere Partners primarily for the reasons above.

35


G&A Expense decreased $15.8 million in the three months ended March 31, 2015, as compared to the three months ended March 31,June 30, 2014, primarily as a result of share-basedan increase in our indebtedness outstanding as of June 30, 2015 compared to June 30, 2014. For the six months ended June 30, 2015 and 2014, we incurred $421.9 million and $269.0 million of total interest cost, respectively, of which we capitalized and deferred $276.8 million and $184.9 million, respectively, which were directly related to the construction of the SPL Project. G&A Expense increased $24.3 million in the six months ended June 30, 2015, as compared to the six months ended June 30, 2014, primarily due to increased professional fees and increased compensation expense as a result of increased headcount.

Loss on early extinguishment of debt decreased $18.1 million in the six months ended June 30, 2015, as compared to the six months ended June 30, 2014, primarily due to $96.3 million of debt issuance costs and deferred commitment fees written off in connection with the termination of approximately $1.8 billion of commitments under the 2013 SPL Credit Facilities in March 2015 and the replacement of the 2013 SPL Credit Facilities with the 2015 SPL Credit Facilities in June 2015, as compared to the $114.3 million write-off of debt issuance costs in connection with the early extinguishment of $2.1 billion of commitments under the 2013 SPL Credit Facilities in May 2014. Derivative loss, net decreased $14.7 million during the six months ended June 30, 2015, as compared to the six months ended June 30, 2014. The derivative loss recognized during the threesix months ended March 31,June 30, 2014 was attributable to a decrease in long-term LIBOR. The derivative loss recognized during the six months ended June 30, 2015 was primarily attributable to the loss recognized upon meeting the contingency related to the modificationCCH Interest Rate Derivatives, as well as the loss recognized in March 2015 upon the termination of long-term commercial bonus awards resulting from an employee termination.interest rate swaps associated with approximately $1.8 billion of commitments that were terminated under the 2013 SPL Credit Facilities.

Off-Balance Sheet Arrangements
 
As of March 31,June 30, 2015, we had no “off-balance sheet arrangements” that may have a current or future material effect on our consolidated financial position or results of operations. 

Summary of Critical Accounting Estimates

The preparation of our Consolidated Financial Statements in conformity with GAAP requires management to make certain estimates and assumptions that affect the amounts reported in the Consolidated Financial Statements and the accompanying notes.  There have been no significant changes to our critical accounting estimates from those disclosed in our Annual Report on Form 10-K for the year ended December 31, 2014.

Recent Accounting Standards

For descriptions of recently issued accounting standards, see Part 1. Financial Information, Item 1. Notes to Consolidated Financial Statements, Note 14—Recent Accounting Standards.


40


ITEM 3.    QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
 
Cash Investments
 
We have cash investments that we manage based on internal investment guidelines that emphasize liquidity and preservation of capital. Such cash investments are stated at historical cost, which approximates fair market value on our Consolidated Balance Sheets.
 
Marketing and Trading Commodity Price Risk

We have entered into:
commodity derivatives to hedge the exposure to variability in expected future cash flowsprice risk attributable to the future salefuture: (1) sales of our LNG inventory (“LNG Inventory Derivatives”);
commodity derivatives to hedge the exposure to price risk attributable to futureand (2) purchases of natural gas to be utilized as fuel to operate the Sabine Pass LNG terminal (“FuelNatural Gas Derivatives”); and
commodity derivatives consisting of natural gas purchase agreements to secure natural gas feedstock for the SPL Project (“Term GasLiquefaction Supply Derivatives”).

We use one-day value at risk (“VaR”) with a 95% confidence interval and other methodologies for market risk measurement and control purposes of our LNG Inventory Derivatives and FuelNatural Gas Derivatives. The VaR is calculated using the Monte Carlo simulation method. AsThe VaR related to our Natural Gas Derivatives was $0.2 million as of March 31, 2015, our commodity derivatives that are sensitive to changes in natural gas prices had a VaR of $0.6 million.June 30, 2015.

In order to test the sensitivity of the fair value of the Term GasLiquefaction Supply Derivatives to changes in underlying commodity prices, management modeled a 10% change in the basis price for natural gas for each delivery location. As of March 31,June 30, 2015, we estimated the fair value of our Term Gasthe Liquefaction Supply Derivatives to be $0.3$0.4 million. Based on actual derivative contractual volumes, a 10% increase or decrease in underlying basis price would have resulted in a change in the fair value of the Term GasLiquefaction Supply Derivatives of $0.4 million as of March 31,June 30, 2015.

Interest Rate Risk

SPL has entered into interest rate swaps to hedge the exposure to volatility in a portion of the floating-rate interest payments under the 2013 Liquefaction2015 SPL Credit Facilities (“SPL Interest Rate Derivatives”). In order to test the sensitivity of the fair value of

36


the SPL Interest Rate Derivatives to changes in interest rates, management modeled a 10% change in the forward 1-month LIBOR curve across the full 7-year term of the SPL Interest Rate Derivatives. This 10% change in interest rates would have resulted in a change in the fair value of the SPL Interest Rate Derivatives of $3.8$3.5 million as of March 31,June 30, 2015.

Corpus Christi HoldingsCCH has entered into interest rate swaps to protect againsthedge the exposure to volatility of future cash flows and hedgein a portion of the variablefloating-rate interest payments on upcoming debt facilities that will be used to pay for a portion ofunder the costs of developing, constructing and placing into service the CCL Project2015 CCH Credit Facility (“ContingentCCH Interest Rate Derivatives”). In order to test the sensitivity of the fair value of the ContingentCCH Interest Rate Derivatives to changes in interest rates, management modeled a 10% change in the forward 1-month LIBOR curve across the full 7-year term of the ContingentCCH Interest Rate Derivatives. This 10% change in interest rates would have resulted in a change in the fair value of the ContingentCCH Interest Rate Derivatives of $52.7$58.4 million as of March 31,June 30, 2015.

ITEM 4.    CONTROLS AND PROCEDURES

We maintain a set of disclosure controls and procedures that are designed to ensure that information required to be disclosed by us in the reports filed by us under the Exchange Act, is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms. As of the end of the period covered by this report, we evaluated, under the supervision and with the participation of our management, including our Chief Executive Officer and our Chief Financial Officer, the effectiveness of our disclosure controls and procedures pursuant to Rule 13a-15 of the Exchange Act. Based on that evaluation, our Chief Executive Officer and our Chief Financial Officer concluded that our disclosure controls and procedures are effective.

During the most recent fiscal quarter, there have been no changes in our internal control over financial reporting that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

3741


PART II.    OTHER INFORMATION
ITEM 1.    LEGAL PROCEEDINGS

Cheniere may in the future be involved as a party to various legal proceedings, which are incidental to the ordinary course of business. Cheniere regularly analyzes current information and, as necessary, provide accruals for probable liabilities on the eventual disposition of these matters.

On May 29, 2014, an alleged stockholder of Cheniere commenced a putative class and derivative actionPlease see Part II, Item 1, “Legal Proceedings” in the Court of Chancery ofCompany's Quarterly Report on Form 10-Q for the State of Delaware (the “Court”) against Cheniere, certain members of Cheniere’s Board of Directors and certain of Cheniere’s present and former officers captioned Jones v. Souki, et al., C.A. No. 9710-VCL. Since May 29, 2014, additional litigations were filed captioned Macguire v. Souki, et al., C.A. No. 9746-VCL, Shenker v. Souki, et al., C.A. No. 9763-VCL and Davidoff v. Souki, et al., C.A. No. 9825-VCL. These lawsuits were consolidated into In re Cheniere Energy, Inc. Stockholders Litigation, Consolidated C.A. No. 9710-VCL (Del. Ch.) (the “Stockholder Action”). In general terms, these litigations challenged the manner in which abstentions were treated in connection with the stockholder vote on Amendment No. 1 to the Cheniere Energy, Inc. 2011 Incentive Plan (“Amendment No. 1”), pursuant to which, among other things, the number of shares of common stock available for issuance under the Cheniere Energy, Inc. 2011 Incentive Plan (the “2011 Plan”) was increased from 10 million to 35 million shares. The lawsuits contended that abstentions should have been counted as “no” votes in tabulating the outcome of the vote and that the stockholders did not approve Amendment No. 1 when abstentions are counted as such. The lawsuits further contended that portions of the Amended and Restated Bylaws of Cheniere Energy, Inc. adopted on April 3, 2014 were invalid and that certain disclosures relating to these matters made by Cheniere were misleading. The lawsuits asserted claims for breach of contract and breach of fiduciary duty (both on a class and a derivative basis) and claims for unjust enrichment (on a derivative basis). The lawsuits sought, among other things, a declaration that the February 1, 2013 stockholder vote on Amendment No. 1 was void, disgorgement of all compensation distributed as a result of Amendment No. 1, voiding the awards made from the shares reserved pursuant to Amendment No. 1 and monetary damages.

On June 16, 2014, the defendants filed with the Court a joint motion to stay or dismiss the consolidated action with prejudice and Cheniere filed a verified application pursuant to 8 Del. C. § 205 (the “Section 205 Action”) in which Cheniere asked the Court to declare valid the issuance, pursuant to the 2011 Plan, whether occurring in the past or future, of the 25 million additional shares of common stock of Cheniere covered by Amendment No. 1. On June 27, 2014, the Court entered an order staying the stockholder litigation pending resolution of the Section 205 Action. On July 11, 2014, Cheniere filed a memorandum of law in support of its motion for judgment on Application I asserted in the Section 205 Action (that it correctly tabulated votes in connection with the stockholder vote on Amendment No. 1). On July 25, 2014, certain of the plaintiffs in the lawsuits (who have been given permission to intervene in the Section 205 Action) filed a brief in opposition to Cheniere’s motion for judgment on Application I in the Section 205 Action. Briefing on these issues was completed on August 20, 2014, and the Court held a hearing on the motion on August 26, 2014.

The parties to the Stockholder Action and the Section 205 Action entered into a Stipulation and Agreement of Compromise, Settlement and Release dated December 12, 2014 (the “Stipulation”) to resolve the litigation. Onperiod ended March 16, 2015, the Court approved the settlement of the Stockholder Action and the Section 205 Action on the terms contemplated by the Stipulation. Following Court approval, the Stipulation resulted in the dismissal with prejudice of the Stockholder Action and the Section 205 Action and a release being granted to the defendants by the plaintiffs and a class of Cheniere’s stockholders. As part of the settlement: (i) the Court validated, pursuant to 8 Del. C. § 205, all awards made pursuant to the 2011 Plan (whether vested or unvested) and declared that recipients of such awards are entitled to keep their awarded shares, subject to the terms and conditions of the award agreements, including any outstanding requirements for vesting; (ii) except with respect to the unawarded shares discussed below, Cheniere will not seek stockholder approval for any share-based compensation prior to January 1, 2017, such that no share-based compensation will be awarded to company executives, directors or consultants other than to the extent stockholders have already approved such compensation or such compensation was approved pursuant to 8 Del. C. § 205 (notwithstanding the foregoing, authorized stock (unissued or treasury) may be used to compensate new employees and a cash pay award (bonus, incentive, etc.) tied to the performance of Cheniere’s stock shall not constitute share-based compensation); (iii) all compensation-related votes through September 17, 2022 will be subject to a majority of the shares present and entitled to vote standard (pursuant to which abstentions will be counted as the functional equivalent of “no” votes and broker non-votes will not be considered in determining the outcome of the resolution, but will be counted for purposes of establishing a quorum); and (iv) the Compensation Committee will be comprised exclusively of independent directors as defined by the NYSE MKT (or the rules of the primary exchange on which Cheniere’s common stock is listed in the future). With respect to the shares authorized pursuant to Amendment No. 1, but not awarded: (i) Cheniere will not award any of these shares unless the issuance of the shares is approved by a new stockholder vote; (ii) no earlier than 90 days after Court approval of the settlement, Cheniere may submit the issue of

38


the unawarded shares to a stockholder vote; and (iii) if stockholders approve issuance of the unawarded shares, no more than 1 million of those shares may be awarded to Mr. Souki. In addition, in connection with approving the Stipulation, the Court also awarded plaintiffs’ counsel fees, which were paid by the Company’s insurers.31, 2015.

ITEM 1A.     RISK FACTORS
 
There have been no material changes from the risk factors disclosed in our Annual Report on Form 10-K for the year ended December 31, 2014.

ITEM 2.    UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS

Purchase of Equity Securities by the Issuer and Affiliated Purchasers

The following table summarizes stock repurchases for the three months ended March 31,June 30, 2015:
Period Total Number of Shares Purchased (1) Average Price Paid Per Share (2) Total Number of Shares Purchased as a Part of Publicly Announced Plans Maximum Number of Units That May Yet Be Purchased Under the Plans
January 1 - 31, 2015 3,837 $71.32  
February 1 - 28, 2015 23,226 $71.38  
March 1 - 31, 2015 23,239 $80.50  
Period Total Number of Shares Purchased (1) Average Price Paid Per Share (2) Total Number of Shares Purchased as a Part of Publicly Announced Plans Maximum Number of Units That May Yet Be Purchased Under the Plans
April 1 - 30, 2015 19,065 $77.66  
May 1 - 31, 2015 11,525 $77.84  
June 1 - 30, 2015  $—  
 
(1)Represents shares surrendered to us by participants in our share-based compensation plans to settle the participants’ personal tax liabilities that resulted from the lapsing of restrictions on shares awarded to the participants under these plans.
(2)The price paid per share was based on the closing trading price of our common stock on the dates on which we repurchased shares from the participants under our share-based compensation plans.

ITEM 5.    OTHER INFORMATION
Compliance Disclosure
Pursuant to Section 13(r) of the Exchange Act, if during the quarter ended March 31,June 30, 2015, we or any of our affiliates had engaged in certain transactions with Iran or with persons or entities designated under certain executive orders, we would be required to disclose information regarding such transactions in our Quarterly Report on Form 10-Q as required under Section 219 of the Iran Threat Reduction and Syria Human Rights Act of 2012 (“ITRA”). During the quarter ended March 31,June 30, 2015, we did not engage in any transactions with Iran or with persons or entities related to Iran.
    
Blackstone, an affiliate of The Blackstone Group L.P. (“Blackstone Group”), is a holder of approximately 29% of the outstanding equity interests of Cheniere Partners and has three representatives on the Board of Directors of Cheniere Partners’ general partner. Accordingly, Blackstone Group may be deemed an “affiliate” of Cheniere Partners, as that term is defined in Exchange Act Rule 12b-2.

We have received notice from Blackstone Group that it may include in its Quarterly Report on Form 10-Q for the quarterly period ended March 31, 2015 disclosures pursuant to ITRA regarding one of its portfolio companies that may be deemed to be an affiliate of Blackstone Group. Because of the broad definition of “affiliate” in Exchange Act Rule 12b-2, this portfolio company of Blackstone Group, through Blackstone Group’s ownership of Cheniere Partners, may also be deemed to be an affiliate of ours. We have received notice from Blackstone Group that Travelport Limited (“Travelport”) has engaged in the following activities: as part of its global business in the travel industry, Travelport provides certain passenger travel-related Travel Commerce Platform and airline IT services to Iran Air and airline IT services to Iran Air Tours. The gross revenues and net profits attributable to such activities during the quarter ended March 31, 2015 have not been reported by Travelport. Blackstone Group has informed us that Travelport intends to continue these business activities with Iran Air and Iran Air Tours as such activities are either exempt from applicable sanctions prohibitions or specifically licensed by the Office of Foreign Assets Control.


3942


ITEM 6.    EXHIBITS
Exhibit No. Description
3.1*Amended and Restated Bylaws of Cheniere Energy, Inc.
4.1 Sixth Supplemental Indenture,Amendment to Amended and Restated Note Purchase Agreement, dated as of March 3,16, 2015, between Sabine Pass Liquefaction,by and among Issuer, the Company, EIG Management Company, LLC, as administrative agent and The Bank of New York Mellon, as Trustee under the Indenture (Incorporated by reference to Exhibit 4.1 to Cheniere Energy Partners, L.P.’s Current Report on Form 8-K (SEC File No. 001-33366), filed on March 3, 2015)
4.2Indenture, dated as of March 9, 2015, between Cheniere Energy, Inc. and The Bank of New York Mellon, as Trustee (Incorporated by reference to Exhibit 4.1 to the Company’s Current Report on Form 8-K (SEC File No. 001-16383), filed on March 13, 2015)
4.3First Supplemental Indenture, dated as of March 9, 2015, between Cheniere Energy, Inc. and The Bank of New York Mellon, as Trusteenote purchasers named therein (Incorporated by reference to Exhibit 4.2 to the Company’s Current Report on Form 8-K (SEC File No. 001-16383), filed on MarchMay 13, 2015)
4.44.2 FormAmendment 2 to Amended and Restated Note Purchase Agreement, dated as of 4.25% Convertible Senior Note due 2045May 8, 2015, with effect as of May 1, 2015, by and among Issuer, the Company, EIG Management Company, LLC, as administrative agent and the note purchasers named therein (Incorporated by reference to Exhibit 4.3 to the Company’s Current Report on Form 8-K (SEC File No. 001-16383), filed on MarchMay 13, 2015)
4.3Form of 11.0% Senior Secured Notes due 2025 (Incorporated by reference to Exhibit 4.4 to the Company’s Current Report on Form 8-K (SEC File No. 001-16383), filed on May 13, 2015)
10.1 Note PurchaseLump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Sabine Pass LNG Stage 3 Liquefaction Facility, dated as of January 16,May 4, 2015, by and between Sabine Pass Liquefaction, LLC and Bechtel Oil, Gas and Chemicals, Inc. (Portions of this exhibit have been omitted and filed separately with the Securities and Exchange Commission pursuant to a request for confidential treatment.) (Incorporated by reference to Exhibit 10.1 to Cheniere Energy Partners, L.P.’s Current Report on Form 8-K/A (SEC File No. 001-33366), filed on July 1, 2015)
10.2Common Terms Agreement, dated May 13, 2015, among Cheniere CCH HoldCo II,Corpus Christi Holdings, LLC, Cheniere Corpus Christi Pipeline, L.P., Corpus Christi Pipeline GP, LLC, Corpus Christi Liquefaction, LLC, Société Générale as issuer, Cheniere Energy, Inc. (solely for purposes of acknowledgingTerm Loan Facility Agent and agreeing to Section 9 thereof), EIG Management Company, LLC, as administrative agent, The Bank of New York Mellon, as collateral agent,Intercreditor Agent and the note purchasers named thereinany other facility agents party thereto from time (Incorporated by reference to Exhibit 10.1 to the Company’s Current Report on Form 8-K (SEC File No. 001-16383), filed on January 16,May 13, 2015)
10.2*Amendment No. 1 of LNG Sale and Purchase Agreement (FOB), dated February 24, 2015, between Corpus Christi Liquefaction, LLC (Seller) and Électricité de France, S.A. (Buyer)
10.3 AmendedCommon Security and Restated Note PurchaseAccount Agreement, dated as of March 1,May 13, 2015, by and among Cheniere CCH HoldCo II,Corpus Christi Holdings, LLC, Cheniere Corpus Christi Pipeline, L.P., Corpus Christi Pipeline GP, LLC, Corpus Christi Liquefaction, LLC, the Initial Senior Creditor Group Representatives and Senior Creditor Group Representatives from time to time, for the benefit of all Senior Creditors, Société Générale as issuer, Cheniere Energy, Inc. (solelythe Intercreditor Agent for purposes of acknowledgingthe Facility Lenders and agreeing to Section 9 thereof), EIG Management Company, LLC,any Hedging Banks, Société Générale as administrative agent, Thethe Security Trustee and Mizuho Bank, of New York Mellon,Ltd as collateral agent, and the note purchasers named thereinAccount Bank (Incorporated by reference to Exhibit 10.110.2 to the Company’s Current Report on Form 8-K (SEC File No. 001-16383), filed on March 2,May 13, 2015)
10.4 Registration RightsPledge Agreement, dated as of March 3,May 13, 2015, between Sabine Pass Liquefaction,among Cheniere CCH HoldCo I, LLC and J.P. Morgan Securities LLCSociété Générale as Security Trustee (Incorporated by reference to Exhibit 10.110.3 to Cheniere Energy Partners, L.P.’sthe Company’s Current Report on Form 8-K (SEC File No. 001-33366)001-16383), filed on March 3,May 13, 2015)
10.5*10.5 Amendment and Restated LNG Sale and PurchaseTerm Loan Facility Agreement, (FOB)dated May 13, 2015, among Cheniere Corpus Christi Holdings, LLC, Cheniere Corpus Christi Pipeline, L.P., dated March 20, 2015, betweenCorpus Christi Pipeline GP, LLC, Corpus Christi Liquefaction, LLC, (Seller)Term Lenders party thereto from time to time and PT Pertamina (Persero) (Buyer)Société Générale as the Term Loan Facility Agent (Incorporated by reference to Exhibit 10.4 to the Company’s Current Report on Form 8-K (SEC File No. 001-16383), filed on May 13, 2015)
10.6 Equity Contribution Agreement, dated May 13, 2015, among Cheniere Corpus Christi Holdings, LLC, and the Company (Incorporated by reference to Exhibit 10.5 to the Company’s Current Report on Form 8-K (SEC File No. 001-16383), filed on May 13, 2015)
10.7Registration Rights Agreement, dated May 13, 2015, among the Company, Cheniere CCH HoldCo II, LLC, and EIG Management Company, LLC as Agent on behalf of the Note Holders (Incorporated by reference to Exhibit 10.6 to the Company’s Current Report on Form 8-K (SEC File No. 001-16383), filed on May 13, 2015)
10.8Pledge Agreement, dated May 13, 2015, among the Company, EIG Management Company, LLC as Agent for the Note Holders, and The Bank of New York Mellon as the Collateral Agent for the Note Holders (Incorporated by reference to Exhibit 10.7 to the Company’s Current Report on Form 8-K (SEC File No. 001-16383), filed on May 13, 2015)
10.9Pledge Agreement, dated May 13, 2015, among Cheniere CCH HoldCo II, LLC, EIG Management Company, LLC as Agent for the Note Holders, and The Bank of New York Mellon as the Collateral Agent for the Note Holders (Incorporated by reference to Exhibit 10.8 to the Company’s Current Report on Form 8-K (SEC File No. 001-16383), filed on May 13, 2015)
10.10Change ordersorder to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Sabine Pass LNG Liquefaction Facility, dated as of November 11, 2011, between Sabine Pass Liquefaction, LLC and Bechtel Oil, Gas and Chemicals, Inc.: (i) the Change Order CO-00039 Increase to Existing Facility Labor Provisional SumCO-00041 Additional Building Utility Tie-in Packages and Decrease to SalesFire and Use Tax Provisional Sum,Gas Modifications, dated February 12,April 9, 2015 and (ii) the Change Order CO-00040 Load Shedding and LNG Tank Tie-In Crane, dated February 24, 2015 (Portions of this exhibit have been omitted and filed separately with the SEC pursuant to a request for confidential treatment) (Incorporated by reference to Exhibit 10.2 to Sabine Pass Liquefaction, LLC’s Quarterly Report on Form 10-Q (SEC File No. 333-192373), filed on AprilJuly 30, 2015)

43


10.7
Exhibit No.Description
10.11 Change ordersorder to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Sabine Pass LNG Stage 2 Liquefaction Facility, dated as of December 20, 2012, between Sabine Pass Liquefaction, LLC and Bechtel Oil, Gas and Chemicals, Inc.: (i) the Change Order CO-00016 Louisiana SalesCO-00018 Permanent Restroom Trailers and Use TaxInstallation of Tie-In for GTG Fuel Gas Interconnect, dated May 21, 2015 (Incorporated by reference to Exhibit 10.3 to Sabine Pass Liquefaction, LLC’s Quarterly Report on Form 10-Q (SEC File No. 333-192373), filed on July 30, 2015)
10.12Change order to the Lump Sum Turnkey Agreement for the Engineering, Procurement and Construction of the Sabine Pass LNG Stage 3 Liquefaction Facility, dated as of May 4, 2015, between Sabine Pass Liquefaction, LLC and Bechtel Oil, Gas and Chemicals, Inc.: the Change Order CO-00001 Currency and Fuel Provisional Sum Adjustment, dated February 12, 2015 and (ii) the Change Order CO-00017 Load Shedding Study and Scope Change, dated February 24,June 25, 2015 (Portions of this exhibit have been omitted and filed separately with the SEC pursuant to a request for confidential treatment) (Incorporated by reference to Exhibit 10.310.4 to Sabine Pass Liquefaction, LLC’s Quarterly Report on Form 10-Q (SEC File No. 333-192373), filed on AprilJuly 30, 2015)
10.8†10.13Second Amended and Restated Credit Agreement (Term Loan A), dated as of June 30, 2015, among Sabine Pass Liquefaction, LLC, as Borrower, Société Générale, as the Commercial Banks Facility Agent and the Common Security Trustee, and the lenders from time to time party thereto (Incorporated by reference to Exhibit 10.1 to Cheniere Energy Partners, L.P.’s Current Report on Form 8-K (SEC File No. 001-33366), filed on July 1, 2015)
10.14Second Amended and Restated Common Terms Agreement, dated as of June 30, 2015, among Sabine Pass Liquefaction, LLC, as Borrower, the representatives and agents from time to time parties thereto, and Société Générale, as the Common Security Trustee and Intercreditor Agent (Incorporated by reference to Exhibit 10.2 to Cheniere Energy Partners, L.P.’s Current Report on Form 8-K (SEC File No. 001-33366), filed on July 1, 2015)
10.15KEXIM Direct Facility Agreement, dated as of June 30, 2015, among Sabine Pass Liquefaction, LLC, as Borrower, The Export-Import Bank of Korea, a governmental financial institution of the Republic of Korea (“KEXIM”), as the KEXIM Direct Facility Lender, Shinhan Bank New York Branch, as the KEXIM Facility Agent, and Société Générale, as the Common Security Trustee (Incorporated by reference to Exhibit 10.3 to Cheniere Energy Partners, L.P.’s Current Report on Form 8-K (SEC File No. 001-33366), filed on July 1, 2015)
10.16KEXIM Covered Facility Agreement, dated as of June 30, 2015, among Sabine Pass Liquefaction, LLC, as Borrower, Shinhan Bank New York Branch, as the KEXIM Facility Agent, Société Générale, as the Common Security Trustee, KEXIM and the lenders from time to time party thereto (Incorporated by reference to Exhibit 10.4 to Cheniere Energy Partners, L.P.’s Current Report on Form 8-K (SEC File No. 001-33366), filed on July 1, 2015)
10.17Amended and Restated KSURE Covered Facility Agreement, dated as of June 30, 2015, among Sabine Pass Liquefaction, LLC, as Borrower, The Korea Development Bank, New York Branch, as the KSURE Covered Facility Agent, Société Générale, as the Common Security Trustee, and the lenders from time to time party thereto (Incorporated by reference to Exhibit 10.5 to Cheniere Energy Partners, L.P.’s Current Report on Form 8-K (SEC File No. 001-33366), filed on July 1, 2015)
10.18†Cheniere Energy, Inc. Retirement Policy (Incorporated by reference to Exhibit 10.1 to the Company’s Current Report on Form 8-K (SEC File No. 001-16383), filed on June 17, 2015)
10.19Amendment No. 1 to Meg Gentle's Assignment Letter, dated June 17, 2015 (Incorporated by reference to Exhibit 3.1 to the Company’s Current Report on Form 8-K (SEC File No. 001-16383), filed on June 17, 2015)
10.20*†Form of Restricted Stock Grant under the Cheniere Energy, Inc. 2011 Incentive Plan (Director)
10.21† Cheniere Energy, Inc. 2015 Long-Term Cash Incentive Plan (Incorporated by reference to Exhibit 10.1 to the Company’s Current Report on Form 8-K (SEC File No. 001-16383), filed on April 27,24, 2015)
10.9*†10.22* Cheniere Energy,Change orders to the Fixed Price Separated Turnkey Agreement for the Engineering, Procurement and Construction of the Corpus Christi Stage 1 Liquefaction Facility, dated as of December 6, 2013, between Corpus Christi Liquefaction, LLC and Bechtel Oil, Gas and Chemicals, Inc. 2014-2018 Long-Term Cash Incentive Program
10.10*†Form: (1) the Change Order CO-00001 Cost Impacts Associated with Delay in NTP, dated March 9, 2015, (2) the Change Order CO-00002 DLE/IAC Scope Change, dated March 25, 2015, (3) the Change Order CO-00003 Currency and Fuel Provisional Sum Closures, dated May 13, 2015 and (4) the Change Order CO-00004 Bridging Extension Through May 17, 2015, dated May 12, 2015 (Portions of Phantom Unit Award underthis exhibit have been omitted and filed separately with the Cheniere Energy, Inc. 2015 Incentive Plan (US - Executive)
10.11*†Form of Phantom Unit Award under the Cheniere Energy, Inc. 2015 Incentive Plan (US - Non-Executive)
10.12*†Form of Phantom Unit Award under the Cheniere Energy, Inc. 2015 Incentive Plan (UK - Executive)
10.13*†Form of Phantom Unit Award under the Cheniere Energy, Inc. 2015 Incentive Plan (UK - Non-Executive)
10.14*†Form of Phantom Unit Award under the Cheniere Energy, Inc. 2015 Incentive Plan (US - Consultant)
10.15*†Form of Phantom Unit Award under the Cheniere Energy, Inc. 2015 Incentive Plan (UK - Consultant)SEC pursuant to a request for confidential treatment)
31.1* Certification by Chief Executive Officer required by Rule 13a-14(a) and 15d-14(a) under the Exchange Act

40


Exhibit No.Description
31.2*     Certification by Chief Financial Officer required by Rule 13a-14(a) and 15d-14(a) under the Exchange Act
32.1**    Certification by Chief Executive Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002
32.2**     Certification of Chief Financial Officer pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002
101.INS* XBRL Instance Document

44


Exhibit No.Description
101.SCH* XBRL Taxonomy Extension Schema Document
101.CAL* XBRL Taxonomy Extension Calculation Linkbase Document
101.DEF* XBRL Taxonomy Extension Definition Linkbase Document
101.LAB* XBRL Taxonomy Extension Labels Linkbase Document
101.PRE* XBRL Taxonomy Extension Presentation Linkbase Document
 
*Filed herewith.
**Furnished herewith.
Management contract or compensatory plan or arrangement


4145



SIGNATURES

 
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized. 
 
  CHENIERE ENERGY, INC.
    
Date:AprilJuly 30, 2015By:/s/ Michael J. Wortley
   Michael J. Wortley
   Senior Vice President and Chief Financial Officer
   
(on behalf of the registrant and
as principal financial officer)
    
Date:AprilJuly 30, 2015By:/s/ Leonard Travis
   Leonard Travis
   Vice President and Chief Accounting Officer
   
(on behalf of the registrant and
as principal accounting officer)


4246