UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
     
FORM 10-Q
     
QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the quarterly period ended June 30, 20192020
or
TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the transition period from            to            
Commission file number 001-16383
colorlogoonwhitecmyka57.gif
CHENIERE ENERGY, INC.
(Exact name of registrant as specified in its charter)
     
Delaware95-4352386
(State or other jurisdiction of incorporation or organization)(I.R.S. Employer Identification No.)
700 Milam Street,Suite 1900
Houston,Texas77002
(Address of principal executive offices)(Zip
700 Milam Street, Suite 1900
Houston, Texas77002
(Address of principal executive offices) (Zip Code)
(713375-5000
(Registrant’s telephone number, including area code)
     
Securities registered pursuant to Section 12(b) of the Act: 
Title of each classTrading SymbolName of each exchange on which registered
Common Stock, $ 0.003 par valueLNGNYSE American
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes    No 
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).  Yes     No 
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company” and “emerging growth company” in Rule 12b-2 of the Exchange Act.
 Large accelerated filer Accelerated filer
 Non-accelerated filer Smaller reporting company
    Emerging growth company
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act.
Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes    No   
As of August 2, 2019,July 31, 2020, the issuer had 256,779,983252,252,909 shares of Common Stock outstanding.
 



CHENIERE ENERGY, INC.
TABLE OF CONTENTS



 
 
 
 
 
 
   
   
   
   
   
   
   
   
 


i


DEFINITIONS
As used in this quarterly report, the terms listed below have the following meanings: 

Common Industry and Other Terms
Bcf billion cubic feet
Bcf/d billion cubic feet per day
Bcf/yr billion cubic feet per year
Bcfe billion cubic feet equivalent
DOE U.S. Department of Energy
EPC engineering, procurement and construction
FERC Federal Energy Regulatory Commission
FTA countries countries with which the United States has a free trade agreement providing for national treatment for trade in natural gas
GAAP generally accepted accounting principles in the United States
Henry Hub the final settlement price (in USD per MMBtu) for the New York Mercantile Exchange’s Henry Hub natural gas futures contract for the month in which a relevant cargo’s delivery window is scheduled to begin
LIBOR London Interbank Offered Rate
LNG liquefied natural gas, a product of natural gas that, through a refrigeration process, has been cooled to a liquid state, which occupies a volume that is approximately 1/600th of its gaseous state
MMBtu million British thermal units, an energy unit
mtpa million tonnes per annum
non-FTA countries countries with which the United States does not have a free trade agreement providing for national treatment for trade in natural gas and with which trade is permitted
SEC U.S. Securities and Exchange Commission
SPA LNG sale and purchase agreement
TBtu trillion British thermal units, an energy unit
Train an industrial facility comprised of a series of refrigerant compressor loops used to cool natural gas into LNG
TUA terminal use agreement


Abbreviated Legal Entity Structure

The following diagram depicts our abbreviated legal entity structure as of June 30, 2019,2020, including our ownership of certain subsidiaries, and the references to these entities used in this quarterly report:
ceiorgchart63019a05.gif
Unless the context requires otherwise, references to “Cheniere,” the “Company,” “we,” “us” and “our” refer to Cheniere Energy, Inc. and its consolidated subsidiaries, including our publicly traded subsidiary, Cheniere Partners.
Unless the context requires otherwise, references to the “CCH Group” refer to CCH HoldCo II, CCH HoldCo I, CCH, CCL and CCP, collectively.




PART I.FINANCIAL INFORMATION
ITEM 1.CONSOLIDATED FINANCIAL STATEMENTS
CHENIERE ENERGY, INC. AND SUBSIDIARIES
CONSOLIDATED BALANCE SHEETS (1)
(in millions, except share data)



June 30, December 31,June 30, December 31,
2019 20182020 2019
ASSETS(unaudited)  (unaudited)  
Current assets      
Cash and cash equivalents$2,279
 $981
$2,039
 $2,474
Restricted cash1,161
 2,175
505
 520
Accounts and other receivables433
 585
Accounts and other receivables, net646
 491
Inventory290
 316
207
 312
Derivative assets127
 63
284
 323
Other current assets135
 114
146
 92
Total current assets4,425
 4,234
3,827
 4,212
      
Property, plant and equipment, net29,073
 27,245
29,950
 29,673
Operating lease assets, net502
 
520
 439
Debt issuance costs, net55
 72
Non-current derivative assets103
 54
589
 174
Goodwill77
 77
77
 77
Deferred tax assets337
 529
Other non-current assets, net337
 305
546
 388
Total assets$34,572
 $31,987
$35,846
 $35,492
      
LIABILITIES AND STOCKHOLDERS’ EQUITY 
  
   
Current liabilities 
  
 
  
Accounts payable$120
 $58
$26
 $66
Accrued liabilities1,572
 1,169
735
 1,281
Current debt
 239
237
 
Deferred revenue136
 139
23
 161
Current operating lease liabilities292
 
179
 236
Derivative liabilities84
 128
239
 117
Other current liabilities3
 9
25
 13
Total current liabilities2,207
 1,742
1,464
 1,874
      
Long-term debt, net29,944
 28,179
30,807
 30,774
Non-current operating lease liabilities202
 
347
 189
Non-current finance lease liabilities58
 57
58
 58
Non-current derivative liabilities94
 22
161
 151
Other non-current liabilities44
 58
13
 11
      
Commitments and contingencies (see Note 16)


 


Commitments and contingencies (see Note 17)


 


      
Stockholders’ equity 
  
 
  
Preferred stock, $0.0001 par value, 5.0 million shares authorized, none issued
 

 
Common stock, $0.003 par value   
Authorized: 480.0 million shares at June 30, 2019 and December 31, 2018   
Issued: 270.5 million shares at June 30, 2019 and 269.8 million shares at December 31, 2018


 


Outstanding: 257.5 million shares at June 30, 2019 and 257.0 million shares at December 31, 20181
 1
Treasury stock: 13.0 million shares and 12.8 million shares at June 30, 2019 and December 31, 2018, respectively, at cost(423) (406)
Common stock, $0.003 par value, 480.0 million shares authorized   
Issued: 272.9 million shares at June 30, 2020 and 270.7 million shares at December 31, 2019


 


Outstanding: 252.2 million shares at June 30, 2020 and 253.6 million shares at December 31, 20191
 1
Treasury stock: 20.7 million shares and 17.1 million shares at June 30, 2020 and December 31, 2019, respectively, at cost(870) (674)
Additional paid-in-capital4,097
 4,035
4,227
 4,167
Accumulated deficit(4,129) (4,156)(2,936) (3,508)
Total stockholders’ deficit(454) (526)
Total stockholders’ equity (deficit)422
 (14)
Non-controlling interest2,477
 2,455
2,574
 2,449
Total equity2,023
 1,929
2,996
 2,435
Total liabilities and equity$34,572
 $31,987
Total liabilities and stockholders’ equity$35,846
 $35,492
(1)
Amounts presented include balances held by our consolidated variable interest entity (“VIE”), Cheniere Partners, as further discussed in Note 8— Non-controlling Interest and Variable Interest Entity. As of June 30, 2020, total assets and liabilities of Cheniere Partners, which are included in our Consolidated Balance Sheets, were $18.9 billion and $18.1 billion, respectively, including $1.3 billion of cash and cash equivalents and $0.2 billion of restricted cash.

The accompanying notes are an integral part of these consolidated financial statements.

3



CHENIERE ENERGY, INC. AND SUBSIDIARIES

CONSOLIDATED STATEMENTS OF OPERATIONS
(in millions, except per share data)
(unaudited)
Three Months Ended June 30, Six Months Ended June 30,Three Months Ended June 30, Six Months Ended June 30,
2019 2018 2019 20182020 2019 2020 2019
Revenues              
LNG revenues$2,173
 $1,442
 $4,316
 $3,608
$2,295
 $2,173
 $4,863
 $4,316
Regasification revenues67
 65
 133
 130
68
 67
 135
 133
Other revenues52
 36
 104
 47
39
 52
 113
 104
Total revenues2,292
 1,543
 4,553
 3,785
2,402
 2,292
 5,111
 4,553
              
Operating costs and expenses              
Cost of sales (excluding depreciation and amortization expense shown separately below)1,277
 873
 2,491
 2,051
Cost of sales (excluding items shown separately below)803
 1,277
 1,527
 2,491
Operating and maintenance expense295
 147
 516
 287
355
 295
 671
 516
Development expense3
 3
 4
 4
1
 3
 5
 4
Selling, general and administrative expense77
 73
 150
 140
73
 77
 154
 150
Depreciation and amortization expense204
 111
 348
 220
233
 204
 466
 348
Impairment expense and loss on disposal of assets4
 
 6
 

 4
 5
 6
Total operating costs and expenses1,860
 1,207
 3,515
 2,702
1,465
 1,860
 2,828
 3,515
              
Income from operations432
 336
 1,038
 1,083
937
 432
 2,283
 1,038
              
Other income (expense)              
Interest expense, net of capitalized interest(372) (216) (619) (432)(407) (372) (819) (619)
Loss on modification or extinguishment of debt
 (15) 
 (15)(43) 
 (44) 
Derivative gain (loss), net(74) 32
 (109) 109
Other income16
 10
 32
 17
Interest rate derivative loss, net(25) (74) (233) (109)
Other income, net5
 16
 14
 32
Total other expense(430) (189) (696) (321)(470) (430) (1,082) (696)
              
Income before income taxes and non-controlling interest2

147

342

762
467

2

1,201

342
Income tax benefit (provision)

3

(3)
(12)
Income tax provision(63)


(194)
(3)
Net income2

150

339

750
404

2

1,007

339
Less: net income attributable to non-controlling interest116

168

312

411
207

116

435

312
Net income (loss) attributable to common stockholders$(114)
$(18)
$27

$339
$197

$(114)
$572

$27

Net income (loss) per share attributable to common stockholders—basic (1)$(0.44)
$(0.07)
$0.11

$1.42
$0.78

$(0.44)
$2.27

$0.11
Net income (loss) per share attributable to common stockholders—diluted (1)$(0.44) $(0.07) $0.11
 $1.40
$0.78
 $(0.44) $2.26
 $0.11






















Weighted average number of common shares outstanding—basic257.4
 242.8
 257.3
 239.2
252.1
 257.4
 252.6
 257.3
Weighted average number of common shares outstanding—diluted257.4
 242.8
 258.6
 241.7
252.4
 257.4
 253.3
 258.6

 
(1)
(1)Earnings per share in the table may not recalculate exactly due to rounding because it is calculated based on whole numbers, not the rounded numbers presented.






The accompanying notes are an integral part of these consolidated financial statements.

4



CHENIERE ENERGY, INC. AND SUBSIDIARIES

CONSOLIDATED STATEMENTS OF STOCKHOLDERS’ EQUITY
(in millions)
(unaudited)
Three and Six Months Ended June 30, 2019               
 Total Stockholders’ Equity   
 Common Stock Treasury Stock Additional Paid-in Capital Accumulated Deficit Non-controlling Interest 
Total
Equity
 Shares Par Value Amount Shares Amount    
Balance at December 31, 2018257.0

$1

12.8

$(406)
$4,035

$(4,156)
$2,455

$1,929
Vesting of restricted stock units0.6
 
 
 
 
 
 
 
Share-based compensation
 
 
 
 28
 
 
 28
Shares withheld from employees related to share-based compensation, at cost(0.2) 
 0.2
 (12) 
 
 
 (12)
Net income attributable to non-controlling interest
 
 
 
 
 
 196
 196
Distributions and dividends to non-controlling interest
 
 
 
 
 
 (144) (144)
Net income
 
 
 
 
 141
 
 141
Balance at March 31, 2019257.4
 1
 13.0
 (418) 4,063
 (4,015) 2,507
 2,138
Vesting of restricted stock units0.1
 
 
 
 
 
 
 
Share-based compensation
 
 
 
 33
 
 
 33
Shares withheld from employees related to share-based compensation, at cost
 
 
 (2) 
 
 
 (2)
Shares repurchased, at cost
 
 
 (3) 
 
 
 (3)
Net income attributable to non-controlling interest
 
 
 
 
 
 116
 116
Equity portion of convertible notes, net
 
 
 
 1
 
 
 1
Distributions and dividends to non-controlling interest
 
 
 
 
 
 (146) (146)
Net loss
 
 
 
 
 (114) 
 (114)
Balance at June 30, 2019257.5
 $1
 13.0
 $(423) $4,097
 $(4,129) $2,477
 $2,023
Three and Six Months Ended June 30, 2020               
 Total Stockholders’ Equity   
 Common Stock Treasury Stock Additional Paid-in Capital Accumulated Deficit Non-controlling Interest 
Total
Equity
 Shares Par Value Amount Shares Amount    
Balance at December 31, 2019253.6

$1

17.1

$(674)
$4,167

$(3,508)
$2,449

$2,435
Vesting of restricted stock units and performance stock units2.1
 
 
 
 
 
 
 
Share-based compensation
 
 
 
 29
 
 
 29
Issued shares withheld from employees related to share-based compensation, at cost(0.7) 
 0.7
 (39) 
 
 
 (39)
Shares repurchased, at cost(2.9) 
 2.9
 (155) 
 
 
 (155)
Net income attributable to non-controlling interest
 
 
 
 
 
 228
 228
Distributions and dividends to non-controlling interest
 
 
 
 
 
 (154) (154)
Net income
 
 
 
 
 375
 
 375
Balance at March 31, 2020252.1
 1
 20.7
 (868) 4,196
 (3,133) 2,523
 2,719
Vesting of restricted stock units and performance stock units0.1
 
 
 
 
 
 
 
Share-based compensation
 
 
 
 31
 
 
 31
Issued shares withheld from employees related to share-based compensation, at cost
 
 
 (2) 
 
 
 (2)
Net income attributable to non-controlling interest
 
 
 
 
 
 207
 207
Distributions and dividends to non-controlling interest
 
 
 
 
 
 (156) (156)
Net income
 
 
 
 
 197
 
 197
Balance at June 30, 2020252.2
 $1
 20.7
 $(870) $4,227
 $(2,936) $2,574
 $2,996









The accompanying notes are an integral part of these consolidated financial statements.

5



CHENIERE ENERGY, INC. AND SUBSIDIARIES

CONSOLIDATED STATEMENTS OF STOCKHOLDERS’ EQUITY—CONTINUED
(in millions)
(unaudited)
Three and Six Months Ended June 30, 2018               
Three and Six Months Ended June 30, 2019               
Total Stockholders’ Equity   Total Stockholders’ Equity   
Common Stock Treasury Stock Additional Paid-in Capital Accumulated Deficit Non-controlling Interest Total
Equity
Common Stock Treasury Stock Additional Paid-in Capital Accumulated Deficit Non-controlling Interest Total
Equity
Shares Par Value Amount Shares Amount Shares Par Value Amount Shares Amount 
Balance at December 31, 2017237.6
 $1
 12.5
 $(386) $3,248
 $(4,627) $3,004
 $1,240
Balance at December 31, 2018257.0
 $1
 12.8
 $(406) $4,035
 $(4,156) $2,455
 $1,929
Vesting of restricted stock units0.3
 
 
 
 
 
 
 
0.6
 
 
 
 
 
 
 
Share-based compensation
 
 
 
 16
 
 
 16

 
 
 
 28
 
 
 28
Shares withheld from employees related to share-based compensation, at cost
 
 0.1
 (6) 
 
 
 (6)
Issued shares withheld from employees related to share-based compensation, at cost(0.2) 
 0.2
 (12) 
 
 
 (12)
Net income attributable to non-controlling interest
 
 
 
 
 
 243
 243

 
 
 
 
 
 196
 196
Distributions and dividends to non-controlling interest
 
 
 
 
 
 (143) (143)
 
 
 
 
 
 (144) (144)
Net income
 
 
 
 
 357
 
 357

 
 
 
 
 141
 
 141
Balance at March 31, 2018237.9
 1
 12.6
 (392) 3,264
 (4,270) 3,104
 1,707
Issuance of stock to acquire additional interest in Cheniere Holdings10.3
 
 
 
 376
 
 (376) 
Balance at March 31, 2019257.4
 1
 13.0
 (418) 4,063
 (4,015) 2,507
 2,138
Vesting of restricted stock units0.1
 
 
 
 
 
 
 
Share-based compensation
 
 
 
 23
 
 
 23

 
 
 
 33
 
 
 33
Shares withheld from employees related to share-based compensation, at cost(0.1) 
 
 (2) 
 
 
 (2)
Issued shares withheld from employees related to share-based compensation, at cost
 
 
 (2) 
 
 
 (2)
Shares repurchased, at cost
 
 
 (3) 
 
 
 (3)
Net income attributable to non-controlling interest
 
 
 
 
 
 168
 168

 
 
 
 
 
 116
 116
Equity portion of convertible notes, net
 
 
 
 1
 
 
 1

 
 
 
 1
 
 
 1
Distributions and dividends to non-controlling interest
 
 
 
 
 
 (145) (145)
 
 
 
 
 
 (146) (146)
Net loss
 
 
 
 
 (18) 
 (18)
 
 
 
 
 (114) 
 (114)
Balance at June 30, 2018248.1
 $1
 12.6
 $(394) $3,664
 $(4,288) $2,751
 $1,734
Balance at June 30, 2019257.5
 $1
 13.0
 $(423) $4,097
 $(4,129) $2,477
 $2,023


The accompanying notes are an integral part of these consolidated financial statements.

6



CHENIERE ENERGY, INC. AND SUBSIDIARIES

CONSOLIDATED STATEMENTS OF CASH FLOWS
(in millions)
(unaudited)
Six Months Ended June 30,Six Months Ended June 30,
2019 20182020 2019
Cash flows from operating activities      
Net income$339
 $750
$1,007
 $339
Adjustments to reconcile net income to net cash provided by operating activities:      
Depreciation and amortization expense348
 220
466
 348
Share-based compensation expense61
 58
57
 61
Non-cash interest expense93
 30
34
 93
Amortization of debt issuance costs, deferred commitment fees, premium and discount44
 35
Amortization of operating lease assets158
 
Amortization of debt issuance costs, premium and discount70
 44
Non-cash operating lease costs166
 158
Loss on modification or extinguishment of debt
 15
44
 
Total losses (gains) on derivatives, net(147) 4
Net cash provided by (used for) settlement of derivative instruments62
 (8)
Total gains on derivatives, net(361) (147)
Net cash provided by settlement of derivative instruments117
 62
Impairment expense and loss on disposal of assets6
 
5
 6
Other2
 (5)
Impairment or loss on equity method investments1
 2
Deferred taxes192
 
Changes in operating assets and liabilities:      
Accounts and other receivables59
 80
Accounts and other receivables, net(155) 59
Inventory33
 10
104
 33
Other current assets(46) (61)(37) (46)
Accounts payable and accrued liabilities(80) (132)(369) (80)
Deferred revenue(2) (13)(138) (2)
Operating lease liabilities(163) 
(145) (163)
Other, net(7) (1)(30) (7)
Net cash provided by operating activities760
 982
1,028
 760
      
Cash flows from investing activities      
Property, plant and equipment, net(1,508) (1,508)(983) (1,508)
Investment in equity method investment(34) 
(100) (34)
Other
 16
(7) 
Net cash used in investing activities(1,542) (1,492)(1,090) (1,542)
      
Cash flows from financing activities      
Proceeds from issuances of debt2,021
 1,799
2,597
 2,021
Repayments of debt(630) (281)(2,380) (630)
Debt issuance and deferred financing costs(20) (46)
Debt issuance and other financing costs(59) (20)
Debt extinguishment costs
 (8)(40) 
Distributions and dividends to non-controlling interest(290) (288)(310) (290)
Payments related to tax withholdings for share-based compensation(14) (8)(41) (14)
Repurchase of common stock(3) 
(155) (3)
Other2
 

 2
Net cash provided by financing activities1,066
 1,168
Net cash provided by (used in) financing activities(388) 1,066
      
Net increase in cash, cash equivalents and restricted cash284
 658
Net increase (decrease) in cash, cash equivalents and restricted cash(450) 284
Cash, cash equivalents and restricted cash—beginning of period3,156
 2,613
2,994
 3,156
Cash, cash equivalents and restricted cash—end of period$3,440
 $3,271
$2,544
 $3,440
Balances per Consolidated Balance Sheet:
June 30,
June 30, 20192020
Cash and cash equivalents$2,279
$2,039
Restricted cash1,161
505
Total cash, cash equivalents and restricted cash$3,440
$2,544

The accompanying notes are an integral part of these consolidated financial statements.

7


  
CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
(unaudited)


NOTE 1—NATURE OF OPERATIONS AND BASIS OF PRESENTATION

We ownare operating and operate twoconstructing 2 natural gas liquefaction and export facilities at Sabine Pass and Corpus Christi. The Sabine Pass LNG terminal is located in Cameron Parish, Louisiana, on the Sabine-Neches Waterway less than four miles from the Gulf Coast. Cheniere Partners, through its subsidiary SPL, is in various stages of constructing andcurrently operating six5 natural gas liquefaction facilitiesTrains and is constructing 1 additional Train for a total production capacity of approximately 30 mtpa of LNG (the “SPL Project”) at the Sabine Pass LNG terminal adjacent to the existing regasification facilities through a wholly owned subsidiary, SPL. Trains 1 through 5 are operational and Train 6 is under construction.terminal. The Sabine Pass LNG terminal has operational regasification facilities owned by Cheniere Partners’ wholly owned subsidiary, SPLNG, that include pre-existing infrastructure of 5 LNG storage tanks, 2 marine berths and vaporizers and an additional marine berth that is under construction. Cheniere Partners also owns a 94-mile pipeline that interconnects the Sabine Pass LNG terminal with a number of large interstate pipelines owned by Cheniere Partners’ wholly owned(the “Creole Trail Pipeline”) through its subsidiary, CTPL. As of June 30, 2020, we owned 100% of the general partner interest and 48.6% of the limited partner interest in Cheniere Partners.

The Corpus Christi LNG terminal is located near Corpus Christi, Texas and is operated and constructed by our wholly owned subsidiary, CCL. We are currently operating 2 Trains and 1 additional Train is undergoing commissioning for a total production capacity of approximately 15 mtpa of LNG. We also operate a 23-mile natural gas supply pipeline that interconnects the Corpus Christi LNG terminal with several interstate and intrastate natural gas pipelines (the “Corpus Christi Pipeline” and together with the liquefaction facilities,Trains, the “CCL Project”) through our wholly owned subsidiary, CCP. The CCL Project, is being developed in stages with the first phase being three Trains (“Phase 1”). The first stage includes Trains 1 and 2, twoonce fully constructed, will contain 3 LNG storage tanks one completeand 2 marine berth and a second partial berth and all of the CCL Project’s necessary infrastructure facilities (“Stage 1”). The second stage includes Train 3, one LNG storage tank and the completion of the second partial berth (“Stage 2”). Train 1 is operational, Train 2 is undergoing commissioning and Train 3 is under construction.berths.

Additionally, separate from the CCH Group, we are developing an expansion of the Corpus Christi LNG terminal adjacent to the CCL Project (“Corpus Christi Stage 3”) and filed an application with FERC in June 2018through our subsidiary CCL Stage III, for sevenup to 7 midscale Trains with an expected aggregate nominaltotal production capacity of approximately 9.510 mtpa of LNG. We received approval from FERC in November 2019 to site, construct and one LNG storage tank.operate the expansion project.

We remain focused on expansionoperational excellence and customer satisfaction. Increasing demand of LNG has allowed us to expand our existing sites by leveraging existing infrastructure.liquefaction infrastructure in a financially disciplined manner. We continue to considerhold significant land positions at both the Sabine Pass LNG terminal and the Corpus Christi LNG terminal which provide opportunity for further liquefaction capacity expansion. The development of these sites or other projects, including infrastructure projects in support of natural gas supply and LNG demand, which,will require, among other things, will require acceptable commercial and financing arrangements before we make a final investment decision (“FID”).

Basis of Presentation

The accompanying unaudited Consolidated Financial Statements of Cheniere have been prepared in accordance with GAAP for interim financial information and with Rule 10-01 of Regulation S-X. Accordingly, they do not include all of the information and footnotes required by GAAP for complete financial statements and should be read in conjunction with the Consolidated Financial Statements and accompanying notes included in our annual report on Form 10-K for the fiscal year ended December 31, 20182019.. In our opinion, all adjustments, consisting only of normal recurring adjustments necessary for a fair presentation, have been included.

Results of operations for the three and six months ended June 30, 20192020 are not necessarily indicative of the results of operations that will be realized for the year ending December 31, 2019.2020.

Recent Accounting Standards

We adopted ASU 2016-02,In March 2020, the Financial Accounting Standards Board (“FASB”) issued Accounting Standards Update (“ASU”) 2020-04, LeasesReference Rate Reform (Topic 842)848): Facilitation of the Effects of Reference Rate Reform on Financial Reporting,. This guidance primarily provides temporary optional expedients which simplify the accounting for contract modifications to existing debt agreements expected to arise from the market transition from LIBOR to alternative reference rates. The optional expedients were available to be used upon issuance of this guidance but we have not yet applied the guidance because we have not yet modified any of our existing contracts for reference rate reform. Once we apply an optional expedient to a modified contract and adopt this standard, the guidance will be applied to all subsequent amendments thereto (“ASC 842”) on January 1, 2019 usingapplicable contract modifications until December 31, 2022, at which time the optional transition approach to apply the standard at the beginning of the first quarter of 2019 withexpedients are no retrospective adjustments to prior periods. The adoption of the standard resulted in the recognition of right-of-use assets and lease liabilities for operating leases of approximately $550 million on our Consolidated Balance Sheets, with no material impact on our Consolidated Statements of Operations or Consolidated Statements of Cash Flows. We have elected the practical expedients to (1) carryforward prior conclusions related to lease identification and classification for existing leases, (2) combine lease and non-lease components of an arrangement for all classes of leased assets, (3) omit short-term leases with a term of 12 months or less from recognition on the balance sheet and (4) carryforward our existing accounting for land easements not previously accounted for as leases. See Note 11—Leases for additional information on our leases following the adoption of this standard.longer available.


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

NOTE 2—RESTRICTED CASH
 
Restricted cash consists of funds that are contractually andor legally restricted as to usage or withdrawal and have been presented separately from cash and cash equivalents on our Consolidated Balance Sheets. As of June 30, 20192020 and December 31, 2018,2019, restricted cash consisted of the following (in millions):
 June 30, December 31, June 30, December 31,
 2019 2018 2020 2019
Current restricted cash        
SPL Project $596
 $756
 $167
 $181
Cheniere Partners and cash held by guarantor subsidiaries 
 785
CCL Project 279
 289
 101
 80
Cash held by our subsidiaries restricted to Cheniere 286
 345
 237
 259
Total current restricted cash $1,161
 $2,175
 $505
 $520


Pursuant to the accounts agreements entered into with the collateral trustees for the benefit of SPL’s debt holders and CCH’s debt holders, SPL and CCH are required to deposit all cash received into reserve accounts controlled by the collateral trustees.  The usage or withdrawal of such cash is restricted to the payment of liabilities related to the SPL Project and the CCL Project (collectively, the “Liquefaction Projects”) and other restricted payments.

In May 2019, Cheniere Partners entered into The majority of the $1.5 billion credit facilities (the “2019 CQP Credit Facilities”), which replaced the previous $2.8 billion credit facilities (the “2016 CQP Credit Facilities”). The cash held by our subsidiaries restricted to Cheniere Partnersrelates to advance funding for operation and its guarantor subsidiaries was restricted in use under the termsconstruction needs of the 2016 CQP Credit Facilities and the related depositary agreement governing the extension of credit to Cheniere Partners, but is no longer restricted under the 2019 CQP Credit Facilities.Liquefaction Projects.

NOTE 3—ACCOUNTS AND OTHER RECEIVABLES

As of June 30, 20192020 and December 31, 2018,2019, accounts and other receivables, net consisted of the following (in millions):
 June 30, December 31, June 30, December 31,
 2019 2018 2020 2019
Trade receivables        
SPL and CCL $257
 $330
 $467
 $328
Cheniere Marketing 145
 205
 41
 113
Other accounts receivable 31
 50
 138
 50
Total accounts and other receivables $433
 $585
Total accounts and other receivables, net $646
 $491


NOTE 4—INVENTORY

As of June 30, 20192020 and December 31, 2018,2019, inventory consisted of the following (in millions):
 June 30, December 31, June 30, December 31,
 2019 2018 2020 2019
Natural gas $19
 $30
 $18
 $16
LNG 38
 24
 24
 67
LNG in-transit 104
 173
 21
 93
Materials and other 129
 89
 144
 136
Total inventory $290
 $316
 $207
 $312



CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

NOTE 5—PROPERTY, PLANT AND EQUIPMENT
 
As of June 30, 20192020 and December 31, 2018,2019, property, plant and equipment, net consisted of the following (in millions):
 June 30, December 31, June 30, December 31,
 2019 2018 2020 2019
LNG terminal costs        
LNG terminal and interconnecting pipeline facilities $23,650
 $13,386
 $27,453
 $27,305
LNG site and related costs 319
 86
 322
 322
LNG terminal construction-in-process 6,529
 14,864
 4,484
 3,903
Accumulated depreciation (1,625) (1,299) (2,494) (2,049)
Total LNG terminal costs, net 28,873
 27,037
 29,765
 29,481
Fixed assets and other  
  
  
  
Computer and office equipment 22
 17
 24
 23
Furniture and fixtures 22
 22
 19
 22
Computer software 104
 100
 114
 110
Leasehold improvements 42
 41
 43
 42
Land 59
 59
 59
 59
Other 20
 21
 25
 21
Accumulated depreciation (127) (111) (154) (141)
Total fixed assets and other, net 142
 149
 130
 136
Assets under finance lease        
Tug vessels 60
 60
 60
 60
Accumulated depreciation (2) (1) (5) (4)
Total assets under finance lease, net 58
 59
 55
 56
Property, plant and equipment, net $29,073
 $27,245
 $29,950
 $29,673


Depreciation expense was $203$231 million and $111$203 million during the three months ended June 30, 20192020 and 2018,2019, respectively, and $346$463 million and $219$346 million during the six months ended June 30, 20192020 and 2018,2019, respectively.

We realize offsets to LNG terminal costs for sales of commissioning cargoes that were earned or loaded prior to the start of commercial operations of the respective Train during the testing phase for its construction. We realized offsets to LNG terminal costs of $202 million during the six months ended June 30, 2019 for salesthat were related to the sale of commissioning cargoes frombecause these amounts were earned or loaded prior to the start of commercial operations of the respective Trains of the Liquefaction Projects.Projects, during the testing phase for its construction. We did not0t realize any offsets to LNG terminal costs during the three months ended June 30, 2019 and the three and six months ended June 30, 2018.2020 and the three months ended June 30, 2019.

NOTE 6—DERIVATIVE INSTRUMENTS
 
We have entered into the following derivative instruments that are reported at fair value:
interest rate swaps (“CCH Interest Rate Derivatives”) to hedge the exposure to volatility in a portion of the floating-rate interest payments underon CCH’s amended and restated credit facilities (“CCH Interest Rate Derivatives”facility (the “CCH Credit Facility”) and to hedge against changes in interest rates that could impact anticipated future issuance of debt by CCH (“CCH Interest Rate Forward Start Derivatives” and, collectively with the CCH Interest Rate Derivatives, the “Interest Rate Derivatives”);
commodity derivatives consisting of natural gas supply contracts for the commissioning and operation of the SPL Project, CCL ProjectLiquefaction Projects and potential future development of Corpus Christi Stage 3 (“Physical Liquefaction Supply Derivatives”) and associated economic hedges (collectively, the “Liquefaction Supply Derivatives”);
financial derivatives to hedge the exposure to the commodity markets in which we have contractual arrangements to purchase or sell physical LNG (“LNG Trading Derivatives”); and
foreign currency exchange (“FX”) contracts to hedge exposure to currency risk associated with both LNG Trading Derivatives and operations in countries outside of the United States (“FX Derivatives”).
We recognize our derivative instruments as either assets or liabilities and measure those instruments at fair value. None of our derivative instruments are designated as cash flow or fair value hedging instruments, and changes in fair value are recorded within our Consolidated Statements of Operations to the extent not utilized for the commissioning process.

CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

The following table shows the fair value of our derivative instruments that are required to be measured at fair value on a recurring basis as of June 30, 20192020 and December 31, 2018,2019, which are classified as derivative assets, non-current derivative assets, derivative liabilities or non-current derivative liabilities in our Consolidated Balance Sheets (in millions):
Fair Value Measurements as ofFair Value Measurements as of
June 30, 2019 December 31, 2018June 30, 2020 December 31, 2019
Quoted Prices in Active Markets
(Level 1)
 Significant Other Observable Inputs
(Level 2)
 Significant Unobservable Inputs
(Level 3)
 Total Quoted Prices in Active Markets
(Level 1)
 Significant Other Observable Inputs
(Level 2)
 Significant Unobservable Inputs
(Level 3)
 TotalQuoted Prices in Active Markets
(Level 1)
 Significant Other Observable Inputs
(Level 2)
 Significant Unobservable Inputs
(Level 3)
 Total Quoted Prices in Active Markets
(Level 1)
 Significant Other Observable Inputs
(Level 2)
 Significant Unobservable Inputs
(Level 3)
 Total
CCH Interest Rate Derivatives asset (liability)$
 $(88) $
 $(88) $
 $18
 $
 $18
CCH Interest Rate Derivatives liability$
 $(191) $
 $(191) $
 $(81) $
 $(81)
CCH Interest Rate Forward Start Derivatives liability
 (7) 
 (7) 
 
 
 

 (102) 
 (102) 
 (8) 
 (8)
Liquefaction Supply Derivatives asset (liability)
 1
 89
 90
 6
 (19) (29) (42)11
 (1) 590
 600
 5
 6
 138
 149
LNG Trading Derivatives asset (liability)(4) 51
 
 47
 1
 (25) 
 (24)(2) 153
 
 151
 
 165
 
 165
FX Derivatives asset
 10
 
 10
 
 15
 
 15

 15
 
 15
 
 4
 
 4


We value our CCH Interest Rate Derivatives and CCH Interest Rate Forward Start Derivatives using an income-based approach utilizing observable inputs to the valuation model including interest rate curves, risk adjusted discount rates, credit spreads and other relevant data. We value our LNG Trading Derivatives and our Liquefaction Supply Derivatives using a market or option-based approach incorporating present value techniques, as needed, using observable commodity price curves, when available, and other relevant data. We value our FX Derivatives with a market approach using observable FX rates and other relevant data.

The fair value of our Physical Liquefaction Supply Derivatives is predominantly driven by observable and unobservable market commodity prices and, as applicable to our natural gas supply contracts, our assessment of the associated conditions precedent,events deriving fair value, including evaluating whether the respective market is available as pipeline infrastructure is developed. The fair value of our Physical Liquefaction Supply Derivatives incorporates risk premiums related to the satisfaction of conditions precedent, such as completion and placement into service of relevant pipeline infrastructure to accommodate marketable physical gas flow. As of June 30, 20192020 and December 31, 2018,2019, some of our Physical Liquefaction Supply Derivatives existed within markets for which the pipeline infrastructure was under development to accommodate marketable physical gas flow.

We include a portion of our Physical Liquefaction Supply Derivatives as Level 3 within the valuation hierarchy as the fair value is developed through the use of internal models which incorporate significant unobservable inputs. In instances where observable data is unavailable, consideration is given to the assumptions that market participants would use in valuing the asset or liability. This includes assumptions about market risks, such as future prices of energy units for unobservable periods, liquidity, volatility and contract duration. In determining and recording fair value, we do not use third party sources that derive price based on proprietary models or market surveys.

The Level 3 fair value measurements of natural gas positions within our Physical Liquefaction Supply Derivatives could be materially impacted by a significant change in certain natural gas and international LNG prices. The following table includes quantitative information for the unobservable inputs for our Level 3 Physical Liquefaction Supply Derivatives as of June 30, 2019:2020:
  
Net Fair Value Asset (Liability)
(in millions)
 Valuation Approach Significant Unobservable Input Range of Significant Unobservable Inputs Range/ Weighted Average (1)
Physical Liquefaction Supply Derivatives $89590 Market approach incorporating present value techniques Henry Hub Basis Spreadbasis spread $(0.700)(0.546) - $0.056$0.172 / $(0.023)
    Option pricing model International LNG pricing spread, relative to Henry Hub (1)(2) 128%46% - 176%171% / 126%

 
(1)    Spread contemplates U.S. dollar-denominated pricing.
(1)Unobservable inputs were weighted by the relative fair value of the instruments.
(2)Spread contemplates U.S. dollar-denominated pricing.


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

Increases or decreases in basis or pricing spreads, in isolation, would decrease or increase, respectively, the fair value of our Physical Liquefaction Supply Derivatives.

The following table shows the changes in the fair value of our Level 3 Physical Liquefaction Supply Derivatives during the three and six months ended June 30, 20192020 and 20182019 (in millions):
 Three Months Ended June 30, Six Months Ended June 30, Three Months Ended June 30, Six Months Ended June 30,
 2019 2018 2019 2018 2020 2019 2020 2019
Balance, beginning of period $31
 $10
 $(29) $43
 $674
 $31
 $138
 $(29)
Realized and mark-to-market gains (losses):        
Realized and mark-to-market gains:        
Included in cost of sales 7
 (1) 23
 (12) (84) 7
 452
 23
Purchases and settlements:                
Purchases 50
 6
 50
 6
 (4) 50
 (3) 50
Settlements 1
 (4) 45
 (25) 1
 1
 (1) 45
Transfers out of Level 3 (1) 
 1
 
 
Transfers into Level 3, net (1) 3
 
 4
 
Balance, end of period $89
 $12
 $89
 $12
 $590
 $89
 $590
 $89
Change in unrealized gains (losses) relating to instruments still held at end of period $7
 $(1) $23
 $(12) $(84) $7
 $452
 $23
 
(1)    Transferred to Level 2 as a result of observable market for the underlying natural gas purchase agreements.
(1)Transferred into Level 3 as a result of unobservable market, or out of Level 3 as a result of observable market, for the underlying natural gas purchase agreements.

Derivative assets and liabilities arising from our derivative contracts with the same counterparty are reported on a net basis, as all counterparty derivative contracts provide for the unconditional right of set-off in the event of default. The use of derivative instruments exposes us to counterparty credit risk, or the risk that a counterparty will be unable to meet its commitments in instances when our derivative instruments are in an asset position. Additionally, counterparties are at risk that we will be unable to meet our commitments in instances where our derivative instruments are in a liability position. We incorporate both our own nonperformance risk and the respective counterparty’s nonperformance risk in fair value measurements. In adjusting the fair value of our derivative contracts for the effect of nonperformance risk, we have considered the impact of netting and any applicable credit enhancements, such as collateral postings, set-off rights and guarantees.

Interest Rate Derivatives

During the six months ended June 30, 2019, there were no changes to the terms of the CCH Interest Rate Derivatives entered into by CCH to protect against volatility of future cash flows and hedge a portion of the variable interest payments on its credit facility (the “CCH Credit Facility”).

In June 2019, we entered into the CCH Interest Rate Forward Start Derivatives to hedge against changes in interest rates that could impact anticipated future issuance of debt by CCH, which is anticipated by the end of 2020.

Cheniere Partners previously had interest rate swaps (“CQP Interest Rate Derivatives” and, collectively with the CCH Interest Rate Derivatives and the CCH Interest Rate Forward Start Derivatives, the “Interest Rate Derivatives”) to hedge a portion of the variable interest payments on its credit facilities, which were terminated in October 2018.

As of June 30, 2019,2020, we had the following Interest Rate Derivatives outstanding:
Notional Amounts
  Initial Notional AmountJune 30, 2020 Maximum Notional AmountDecember 31, 2019 Effective DateMaturity DateTerm Weighted Average Fixed Interest Rate Paid Variable Interest Rate Received
CCH Interest Rate Derivatives $29 million$4.7 billion 
May 20, 2015
$4.5 billion
 
May 31, 2022
(1)
 2.30% One-month LIBOR
CCH Interest Rate Forward Start Derivatives $1.0 billion250 million
$250 million
September 30, 2020 (2)
2.05%
Three-month LIBOR
CCH Interest Rate Forward Start Derivatives $1.0 billion500 million
June 30,$500 million

December 31, 2020 (2)
September 30, 2030
2.06%
2.11%
Three-month LIBOR

(1)Represents the maturity date.
(2)Represents the effective date. These forward start derivatives have terms of 10 years with a mandatory termination date consistent with the effective date.


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

The following table shows the fair value and location of the Interest Rate Derivatives on our Consolidated Balance Sheets (in millions):
 June 30, 2019 December 31, 2018
 CCH Interest Rate Derivatives CCH Interest Rate Forward Start Derivatives Total CCH Interest Rate Derivatives CCH Interest Rate Forward Start Derivatives Total
Consolidated Balance Sheet Location           
Derivative assets$
 $
 $
 $10
 $
 $10
Non-current derivative assets
 
 
 8
 
 8
Total derivative assets





18



18
     

     

Derivative liabilities(21) 
 (21) 
 
 
Non-current derivative liabilities(67) (7) (74) 
 
 
Total derivative liabilities(88)
(7)
(95)





     

     

Derivative asset (liability), net$(88)

$(7)
$(95)
$18

$

$18
 June 30, 2020 December 31, 2019
 CCH Interest Rate Derivatives CCH Interest Rate Forward Start Derivatives Total CCH Interest Rate Derivatives CCH Interest Rate Forward Start Derivatives Total
Consolidated Balance Sheets Location           
Derivative liabilities$(100) $(102) $(202) $(32) $(8) $(40)
Non-current derivative liabilities(91) 
 (91) (49) 
 (49)
Total derivative liabilities$(191)
$(102)
$(293)
$(81)
$(8)
$(89)

The following table shows the changes in the fair value and settlements of our Interest Rate Derivatives recorded in interest rate derivative gain (loss),loss, net on our Consolidated Statements of Operations during the three and six months ended June 30, 20192020 and 20182019 (in millions):
  Three Months Ended June 30, Six Months Ended June 30,
  2019 2018 2019 2018
CCH Interest Rate Derivatives gain (loss) $(67) $29
 $(102) $98
CCH Interest Rate Forward Start Derivatives loss (7) 
 (7) 
CQP Interest Rate Derivatives gain 
 3
 
 11
  Three Months Ended June 30, Six Months Ended June 30,
  2020 2019 2020 2019
CCH Interest Rate Derivatives loss $(15) $(67) $(138) $(102)
CCH Interest Rate Forward Start Derivatives loss (10) (7) (95) (7)


Commodity Derivatives

SPL, CCL and CCL Stage III have entered into physical natural gas supply contracts and associated economic hedges to purchase natural gas for the commissioning and operation of the SPL Project, the CCL ProjectLiquefaction Projects and potential future development of Corpus Christi Stage 3, respectively, which are primarily indexed to the natural gas market and international LNG indices. The remaining terms of the index-based physical natural gas supply contracts range up to approximately 15 years, some of which commence upon the satisfaction of certain conditions precedent.events or states of affairs.

We have entered into, and may from time to time enter into, financial LNG Trading Derivatives in the form of swaps, forwards, options or futures to economically hedge exposure to the commodity markets in which we have contractual arrangements to purchase or sell physical LNG. We have entered into LNG Trading Derivatives to secure a fixed price position to minimize future cash flow variability associated with LNG purchase and sale transactions.


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

The following table shows the fair value and location of our Liquefaction Supply Derivatives and LNG Trading Derivatives (collectively, “Commodity Derivatives”) on our Consolidated Balance Sheets (in millions, except notional amount):
June 30, 2019 December 31, 2018June 30, 2020 December 31, 2019
Liquefaction Supply Derivatives (1) LNG Trading Derivatives (2) Total Liquefaction Supply Derivatives (1) LNG Trading Derivatives (2) TotalLiquefaction Supply Derivatives (1) LNG Trading Derivatives (2) Total Liquefaction Supply Derivatives (1) LNG Trading Derivatives (2) Total
Consolidated Balance Sheet Location           
Consolidated Balance Sheets Location           
Derivative assets$24
 $92
 $116
 $13
 $24
 $37
$133
 $138
 $271
 $93
 $225
 $318
Non-current derivative assets94
 9
 103
 46
 
 46
564
 23
 587
 174
 
 174
Total derivative assets118
 101
 219
 59
 24
 83
697
 161
 858
 267
 225
 492
                      
Derivative liabilities(13) (50) (63) (79) (48) (127)(27) (10) (37) (16) (60) (76)
Non-current derivative liabilities(15) (4) (19) (22) 
 (22)(70) 
 (70) (102) 
 (102)
Total derivative liabilities(28) (54) (82) (101) (48) (149)(97) (10) (107) (118) (60) (178)
                      
Derivative asset (liability), net$90
 $47
 $137
 $(42) $(24) $(66)
Derivative asset, net$600
 $151
 $751
 $149
 $165
 $314
                      
Notional amount, net (in TBtu) (3)6,781
 50
   5,832
 12
  10,264
 19
   9,177
 4
  

 
    
(1)Does not include collateral callsposted with counterparties by us of $6$2 million and $5$7 million for such contracts, which are included in other current assets in our Consolidated Balance Sheets as of June 30, 20192020 and December 31, 2018,2019, respectively. Includes derivative assets of $2 million and $2 million and non-current assets of $1$5 million and $3 million as of June 30, 20192020 and December 31, 2018, respectively, for a natural gas supply contract CCL has with a related party.2019,

CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

respectively, and non-current assets of $2 million as of both June 30, 2020 and December 31, 2019 for natural gas supply contracts that SPL and CCL have with related parties.
(2)Does not include collateral posted with counterparties by us of $15$17 million and $9$5 million deposited for such contracts, which are included in other current assets in our Consolidated Balance Sheets as of June 30, 20192020 and December 31, 2018,2019, respectively.
(3)SPL had secured up to approximately 3,437Includes 182 TBtu and 3,464120 TBtu as of June 30, 20192020 and December 31, 2018, respectively. CCL had secured up to approximately 2,787 TBtu and 2,801 TBtu of natural gas feedstock through2019, respectively, for natural gas supply contracts as of June 30, 2019that SPL and December 31, 2018, respectively, of which 57 TBtu and 55 TBtu, respectively, were for a natural gas supply contract CCL hashave with a related party. Corpus Christi Stage 3 had secured up to approximately 754 TBtu of natural gas feedstock through natural gas supply contracts as of June 30, 2019.parties.

The following table shows the changes in the fair value, settlements and location of our Commodity Derivatives recorded on our Consolidated Statements of Operations during the three and six months ended June 30, 20192020 and 20182019 (in millions):
Consolidated Statements of Operations Location (1) Three Months Ended June 30, Six Months Ended June 30,Consolidated Statements of Operations Location (1) Three Months Ended June 30, Six Months Ended June 30,
 2019 2018 2019 2018 2020 2019 2020 2019
LNG Trading Derivatives gain (loss)LNG revenues $94
 $(76) $158
 $(70)LNG revenues $(34) $94
 $106
 $158
LNG Trading Derivatives lossCost of sales (51) 
 (51) 
LNG Trading Derivatives gain (loss)Cost of sales 34
 (51) 
 (51)
Liquefaction Supply Derivatives gain (loss) (2)LNG revenues (1) 
 1
 
LNG revenues (13) (1) (14) 1
Liquefaction Supply Derivatives gain (loss) (2)(3)Cost of sales 57
 (3) 139
 (53)Cost of sales (62) 57
 475
 139
 
(1)Fair value fluctuations associated with commodity derivative activities are classified and presented consistently with the item economically hedged and the nature and intent of the derivative instrument.
(2)Does not include the realized value associated with derivative instruments that settle through physical delivery.
(3)IncludesCCL recorded $25 million and $24 million and $36 million that CCL recorded in cost of sales under a natural gas supply contract with a related party during the three months ended June 30, 2020 and 2019, respectively, including $1 million of Liquefaction Supply Derivatives gain and $1 million of Liquefaction Supply Derivatives loss, respectively. During the six months ended June 30, 2020 and 2019, CCL recorded $48 million and $36 million in cost of sales under a natural gas supply contract with a related party, respectively, including $2 million of Liquefaction Supply Derivatives gain and $3 million of Liquefaction Supply Derivatives loss, respectively. Of this amount, $4As of June 30, 2020 and December 31, 2019, $8 million wasand $3 million, respectively, were included in accrued liabilities as of June 30, 2019. CCL did not have any transactions during the three and six months ended June 30, 2018 underrelated to this contract.


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

FX Derivatives

Cheniere Marketing has entered into FX Derivatives to protect against the volatility in future cash flows attributable to changes in international currency exchange rates. The FX Derivatives economically hedge the foreign currency exposure arising from cash flows expended for both physical and financial LNG transactions.

The following table shows the fair value and location of our FX Derivatives on our Consolidated Balance Sheets (in millions):
 Fair Value Measurements as of Fair Value Measurements as of
Consolidated Balance Sheet Location June 30, 2019 December 31, 2018Consolidated Balance Sheets Location June 30, 2020 December 31, 2019
FX DerivativesDerivative assets $11
 $16
Derivative assets $13
 $5
FX DerivativesDerivative liabilities 
 (1)Non-current derivative assets 2
 
FX DerivativesNon-current derivative liabilities (1) 
Derivative liabilities 
 (1)


The total notional amount of our FX Derivatives was $942$146 million and $379$827 million as of June 30, 20192020 and December 31, 2018,2019, respectively.
    

CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

The following table shows the changes in the fair value, settlements and location of our FX Derivatives recorded on our Consolidated Statements of Operations during the three and six months ended June 30, 20192020 and 20182019 (in millions):
   Three Months Ended June 30, Six Months Ended June 30,
 Consolidated Statements of Operations Location 2019 2018 2019 2018
FX Derivatives gainLNG revenues $
 $12
 $9
 $10
   Three Months Ended June 30, Six Months Ended June 30,
 Consolidated Statements of Operations Location 2020 2019 2020 2019
FX Derivatives gainLNG revenues $2
 $
 $27
 $9


Consolidated Balance SheetSheets Presentation

Our derivative instruments are presented on a net basis on our Consolidated Balance Sheets as described above. The following table shows the fair value of our derivatives outstanding on a gross and net basis (in millions):
 Gross Amounts Recognized Gross Amounts Offset in the Consolidated Balance Sheets Net Amounts Presented in the Consolidated Balance Sheets Gross Amounts Recognized Gross Amounts Offset in the Consolidated Balance Sheets Net Amounts Presented in the Consolidated Balance Sheets
Offsetting Derivative Assets (Liabilities)  
As of June 30, 2019      
As of June 30, 2020      
CCH Interest Rate Derivatives $(191) $
 $(191)
CCH Interest Rate Forward Start Derivatives (102) 
 (102)
Liquefaction Supply Derivatives 715
 (18) 697
Liquefaction Supply Derivatives (102) 5
 (97)
LNG Trading Derivatives 163
 (2) 161
LNG Trading Derivatives (21) 11
 (10)
FX Derivatives 22
 (7) 15
As of December 31, 2019     

CCH Interest Rate Derivatives $(88) $
 $(88) $(81) $
 $(81)
CCH Interest Rate Forward Start Derivatives (7) 
 (7) (8) 
 (8)
Liquefaction Supply Derivatives 121
 (3) 118
 281
 (14) 267
Liquefaction Supply Derivatives (35) 7
 (28) (126) 8
 (118)
LNG Trading Derivatives 109
 (8) 101
 229
 (4) 225
LNG Trading Derivatives (62) 8
 (54) (60) 
 (60)
FX Derivatives 21
 (10) 11
 9
 (4) 5
FX Derivatives (11) 10
 (1) (6) 5
 (1)
As of December 31, 2018     

CCH Interest Rate Derivatives $19
 $(1) $18
Liquefaction Supply Derivatives 95
 (36) 59
Liquefaction Supply Derivatives (121) 20
 (101)
LNG Trading Derivatives 112
 (88) 24
LNG Trading Derivatives (92) 44
 (48)
FX Derivatives 30
 (14) 16
FX Derivatives (2) 1
 (1)



CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

NOTE 7—OTHER NON-CURRENT ASSETS

As of June 30, 20192020 and December 31, 2018,2019, other non-current assets, net consisted of the following (in millions):
 June 30, December 31, June 30, December 31,
 2019 2018 2020 2019
Advances made to municipalities for water system enhancements $89
 $90
 $86
 $87
Advances and other asset conveyances to third parties to support LNG terminals 55
 54
 61
 55
Advances made under EPC and non-EPC contracts 6
 29
Equity method investments 206
 108
Debt issuance costs and debt discount, net 86
 45
Tax-related payments and receivables 21
 21
 20
 20
Equity method investments 124
 94
Advances made under EPC and non-EPC contracts 11
 14
Contract assets, net 58
 18
Other 37
 32
 23
 26
Total other non-current assets, net $337
 $305
 $546
 $388


Equity Method Investments

Our equity method investments consist of interests in privately-held companies. In 2017, we acquired an equity interest in Midship Holdings, LLC (“Midship Holdings”), which manages the business and affairs of Midship Pipeline Company, LLC (“Midship Pipeline”). Midship Pipeline is currently constructing an approximately 200-mile natural gas pipeline project (the “Midship Project”) that connects production in the Anadarko Basin to Gulf Coast markets. Construction of the Midship Project commenced in the first quarter of 2019.

Subsequent to Midship Project obtaining its financing in the form of credit facilities, in conjunction with existing equity, Midship Holdings is able to finance its current activities without additional subordinated financial support. As a result of the total equity investment at risk being sufficient to finance its activities, Midship Holdings is no longer a variable interest entity. We continue to report Midship Holdings, which we account for as an equity method investment dueinvestment. See Note 8—Other Non-Current Assets of our Notes to Consolidated Financial Statements in our ability to exercise significant influence overannual report on Form 10-K for the operating and financial policies of Midship Holdings through our non-controlling voting rights on its board of managers. fiscal year ended December 31, 2019 for further information.


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

Our investment in Midship Holdings, net of impairment losses, was $117$205 million and $85$105 million at June 30, 20192020 and December 31, 2018,2019, respectively.

Cheniere LNG O&M Services, LLC (“O&M Services”), our wholly owned subsidiary, provides the development, construction, operation and maintenance services associated with the Midship Project pursuant to agreements in which O&M Services receives an agreed upon fee and reimbursement of costs incurred. O&M Services recorded $3 million in each ofduring both the three months ended June 30, 2020 and 2019 and 2018$6 million and $7 million and $4 million in the six months ended June 30, 20192020 and 2018,2019, respectively, of other revenues and $2 million and $4$3 million of accounts receivable as of June 30, 20192020 and December 31, 2018,2019, respectively, for services provided to Midship Pipeline under these agreements. CCL has entered into a transportation precedent agreement and a negotiated rate agreement with Midship Pipeline to secure firm pipeline transportation capacity for a period of 10 years following commencementcommencing May 2020. CCL recorded $2 million in operating and maintenance expense during both the three and six months ended June 30, 2020 and $1 million of the Midship Project. In May 2018, CCL issued a letter of credit to Midship Pipeline for drawings up to an aggregate maximum amount of $16 million. Midship Pipeline had not made any drawings on this letter of creditaccounts payable as of June 30, 2019.2020 under this agreement. In March 2020, CCH and CCL entered into a guaranty agreement whereby CCH absolutely and irrevocably guarantees CCL’s obligation under the transportation precedent agreement with Midship Pipeline.

NOTE 8—NON-CONTROLLING INTEREST AND VARIABLE INTEREST ENTITY

We own a 48.6% limited partner interest in Cheniere Partners in the form of 104.5 million common units and 135.4 million subordinated units, with the remaining non-controlling interest held by Blackstone CQP Holdco LP (“Blackstone CQP Holdco”) and the public. We also own 100% of the general partner interest and the incentive distribution rights in Cheniere Partners. Cheniere Partners is accounted for as a consolidated variable interest entity. See Note 10—9—Non-Controlling Interest and Variable Interest EntitiesEntity of our Notes to Consolidated Financial Statements in our annual report on Form 10-K for the fiscal year ended December 31, 20182019 for further information.

The following table presents the summarized assets and liabilities (in millions) of Cheniere Partners, our consolidated VIE, which are included in our Consolidated Balance Sheets. The assets in the table below may only be used to settle obligations of Cheniere Partners. In addition, there is no recourse to us for the consolidated VIE’s liabilities. The assets and liabilities in the table below include third-party assets and liabilities of Cheniere Partners only and exclude intercompany balances that eliminate in consolidation.
  June 30, December 31,
  2020 2019
ASSETS    
Current assets    
Cash and cash equivalents $1,341
 $1,781
Restricted cash 167
 181
Accounts and other receivables, net 291
 297
Other current assets 221
 184
Total current assets 2,020
 2,443
     
Property, plant and equipment, net 16,584
 16,368
Other non-current assets, net 310
 309
Total assets $18,914
 $19,120
     
LIABILITIES    
Current liabilities    
Accrued liabilities $410
 $709
Other current liabilities 47
 210
Total current liabilities 457
 919
     
Long-term debt, net 17,566
 17,579
Other non-current liabilities 92
 104
Total liabilities $18,115
 $18,602



CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

NOTE 9—ACCRUED LIABILITIES
  
As of June 30, 20192020 and December 31, 2018,2019, accrued liabilities consisted of the following (in millions): 
 June 30, December 31, June 30, December 31,
 2019 2018 2020 2019
Interest costs and related debt fees $405
 $233
 $249
 $293
Accrued natural gas purchases 402
 610
 202
 460
LNG terminals and related pipeline costs 630
 125
 108
 327
Compensation and benefits 58
 117
 57
 115
Accrued LNG inventory 3
 14
 11
 6
Other accrued liabilities 74
 70
 108
 80
Total accrued liabilities $1,572
 $1,169
 $735
 $1,281

 

CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

NOTE 10—DEBT
 
As of June 30, 20192020 and December 31, 2018,2019, our debt consisted of the following (in millions): 
 June 30, December 31, June 30, December 31,
 2019 2018 2020 2019
Long-term debt:        
SPL   

    
5.625% Senior Secured Notes due 2021 (“2021 SPL Senior Notes”) $2,000
 $2,000
 $
 $2,000
6.25% Senior Secured Notes due 2022 (“2022 SPL Senior Notes”) 1,000
 1,000
 1,000
 1,000
5.625% Senior Secured Notes due 2023 (“2023 SPL Senior Notes”) 1,500
 1,500
 1,500
 1,500
5.75% Senior Secured Notes due 2024 (“2024 SPL Senior Notes”) 2,000
 2,000
 2,000
 2,000
5.625% Senior Secured Notes due 2025 (“2025 SPL Senior Notes”) 2,000
 2,000
 2,000
 2,000
5.875% Senior Secured Notes due 2026 (“2026 SPL Senior Notes”) 1,500
 1,500
 1,500
 1,500
5.00% Senior Secured Notes due 2027 (“2027 SPL Senior Notes”) 1,500
 1,500
 1,500
 1,500
4.200% Senior Secured Notes due 2028 (“2028 SPL Senior Notes”) 1,350
 1,350
 1,350
 1,350
4.500% Senior Secured Notes due 2030 (“2030 SPL Senior Notes”) 2,000
 
5.00% Senior Secured Notes due 2037 (“2037 SPL Senior Notes”) 800
 800
 800
 800
$1.2 billion SPL Working Capital Facility executed in 2020 (“2020 SPL Working Capital Facility”) 
 
Cheniere Partners        
5.250% Senior Notes due 2025 (“2025 CQP Senior Notes”) 1,500
 1,500
 1,500
 1,500
5.625% Senior Notes due 2026 (“2026 CQP Senior Notes”) 1,100
 1,100
 1,100
 1,100
2016 CQP Credit Facilities 
 
2019 CQP Credit Facilities 649
 
4.500% Senior Notes due 2029 (“2029 CQP Senior Notes”) 1,500
 1,500
CQP Credit Facilities executed in 2019 (“2019 CQP Credit Facilities”) 
 
CCH        
7.000% Senior Secured Notes due 2024 (“2024 CCH Senior Notes”) 1,250
 1,250
 1,250
 1,250
5.875% Senior Secured Notes due 2025 (“2025 CCH Senior Notes”) 1,500
 1,500
 1,500
 1,500
5.125% Senior Secured Notes due 2027 (“2027 CCH Senior Notes”) 1,500
 1,500
 1,500
 1,500
3.700% Senior Secured Notes due 2029 (“2029 CCH Senior Notes”) 1,500
 1,500
4.80% Senior Secured Notes due 2039 (“4.80% CCH Senior Notes”) 727
 727
3.925% Senior Secured Notes due 2039 (“3.925% CCH Senior Notes”) 475
 475
CCH Credit Facility 6,138
 5,156
 3,283
 3,283
CCH HoldCo II        
11.0% Convertible Senior Secured Notes due 2025 (“2025 CCH HoldCo II Convertible Senior Notes”) 1,536
 1,455
 1,278
 1,578
Cheniere        
4.875% Convertible Unsecured Notes due 2021 (“2021 Cheniere Convertible Unsecured Notes”) 1,248
 1,218
 1,216
 1,278
4.25% Convertible Senior Notes due 2045 (“2045 Cheniere Convertible Senior Notes”) 625
 625
 625
 625
$1.25 billion Cheniere Revolving Credit Facility (“Cheniere Revolving Credit Facility”) 
 
 375
 
$2.62 billion Cheniere Term Loan Credit Agreement (“Cheniere Term Loan Facility”) 
 
Unamortized premium, discount and debt issuance costs, net (752) (775) (672) (692)
Total long-term debt, net 29,944
 28,179
 30,807

30,774
        
Current debt:        
$1.2 billion SPL Working Capital Facility (“SPL Working Capital Facility”) 
 
2021 Cheniere Convertible Unsecured Notes 93
 
$1.2 billion SPL Working Capital Facility executed in 2015 (“2015 SPL Working Capital Facility”) 
 
$1.2 billion CCH Working Capital Facility (“CCH Working Capital Facility”) 
 168
 141
 
Cheniere Marketing trade finance facilities 
 71
 6
 
Unamortized premium, discount and debt issuance costs, net (3) 
Total current debt 
 239
 237


        
Total debt, net $29,944
 $28,418
 $31,044

$30,774


2019 Debt Issuances and Terminations

2016 CQP Credit Facilities

In May 2019, the remaining commitments under the 2016 CQP Credit Facilities were terminated.  There were no write-offs of debt issuance costs associated with the termination of the 2016 CQP Credit Facilities.


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

2019 CQP2020 Material Debt Activities

Cheniere Term Loan Facility
In June 2020, we entered into the $2.62 billion delayed draw Cheniere Term Loan Facility, which was subsequently increased to $2.695 billion in July 2020. In July 2020, borrowings under the Cheniere Term Loan Facility were used to (1) redeem the remaining outstanding principal amount of the 2025 CCH HoldCo II Convertible Senior Notes, subsequent to the $300 million redemption in March 2020, pursuant to the amended and restated note purchase agreement for the 2025 CCH HoldCo II Convertible Senior Notes which allowed CCH HoldCo II to redeem the outstanding notes with cash at a price of $1,080 per $1,000 principal amount, (2) repurchase $844 million in aggregate principal amount of outstanding 2021 Cheniere Convertible Unsecured Notes at individually negotiated prices from a small number of investors and (3) pay the related fees and expenses. The remaining borrowings under the Cheniere Term Loan Facility are expected to be used to repay and/or repurchase a portion of the remaining principal amount of the 2021 Cheniere Convertible Unsecured Notes and for the payment of related fees and expenses.

Loans under the Cheniere Term Loan Facility accrue interest at a variable rate per annum equal to LIBOR or the base rate plus the applicable margin. The applicable margin for LIBOR and base rate loans range from (1) 2.00% to 2.75% and 1.00% to 1.75% per annum, respectively, in the first year (2) 2.50% to 3.25% and 1.50% to 2.25% per annum, respectively, in the second year and (3) 3.00% to 3.75% and 2.00% to 2.75% per annum, respectively, in the third year until maturity, in each case, based on the credit ratings then in effect assigned to loans under the Cheniere Term Loan Facility. Interest on LIBOR loans is due and payable at the end of each LIBOR period, and interest on base rate loans is due and payable at the end of each calendar quarter.

We will pay a commitment fee equal to 30% of the margin for LIBOR loans multiplied by the average daily amount of undrawn commitments. If the Cheniere Term Loan Facility is still outstanding on the first anniversary of the Closing Date, as defined by the credit agreement, we will pay duration fees in an amount equal to 0.25% of the aggregate amount of commitments as of July 10, 2020, which was the date the loans were first borrowed under the Cheniere Term Loan Facility (the “Payment Date”). Furthermore, if the Cheniere Term Loan Facility is still outstanding on the second anniversary of the Closing Date, as defined by the credit agreement, we will pay 0.50% of the aggregate amount of commitments as of the Payment Date. Annual administrative fees must also be paid to the administrative agent for the Cheniere Term Loan Facility.

The Cheniere Term Loan Facility matures on June 18, 2023. Subject to customary exceptions, we are required to make mandatory prepayments with respect to the Cheniere Term Loan Facility using the net proceeds of certain events on a pro rata basis and on terms consistent with required prepayments under the Cheniere Revolving Credit FacilitiesFacility. Loans under the Cheniere Term Loan Facility may be voluntarily prepaid, in whole or in part, at any time, without premium or penalty. Borrowings under the Cheniere Term Loan Facility are subject to customary conditions precedent. The Cheniere Term Loan Facility includes representations, warranties, affirmative and negative covenants and events of default customary for companies like us with lenders of the type participating in the Cheniere Term Loan Facility and consistent with the equivalent provisions contained in the Cheniere Revolving Credit Facility.

The Cheniere Term Loan Facility is secured by a first priority security interest (subject to permitted liens and other customary exceptions) on a pari passu basis with the Cheniere Revolving Credit Facility in substantially all of our assets and equity interests in direct subsidiaries (other than certain excluded subsidiaries). Upon redemption of the 2025 CCH HoldCo II Convertible Senior Notes in July 2020, the equity interests in CCH HoldCo II were pledged as collateral to secure the obligations under the Cheniere Revolving Credit Facility and the Cheniere Term Loan Facility.

2030 SPL Senior Notes

In May 2019, Cheniere Partners2020, SPL issued an aggregate principal amount of $2.0 billion of the 2030 SPL Senior Notes. The proceeds of the notes, along with cash on hand, were used to redeem all of SPL’s outstanding 2021 SPL Senior Notes, resulting in the recognition of debt extinguishment costs of $43 million for the three and six months ended June 30, 2020 relating to the payment of early redemption fees and write off of unamortized debt premium and issuance costs.

The 2030 SPL Senior Notes mature on May 15, 2030 and accrue interest at a fixed rate of 4.500% per annum, which is payable semi-annually in cash in arrears. The 2030 SPL Senior Notes are governed by the same base indenture (the “SPL Indenture”) as all other series of the SPL senior notes (collectively, the “SPL Senior Notes”), except for the 2037 SPL Senior Notes, and are further governed by the Eighth Supplemental Indenture and the Eleventh Supplemental Indenture (together with the SPL Indenture,

CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

the “2030 SPL Notes Indenture”). The 2030 SPL Notes Indenture contains customary terms and events of default and certain covenants that, among other things, limit SPL’s ability and the ability of SPL’s restricted subsidiaries to incur additional indebtedness or issue preferred stock, make certain investments or pay dividends or distributions, transfer assets, including capital stock of SPL’s restricted subsidiaries, restrict dividends or other payments by restricted subsidiaries, incur liens, sell assets, enter into transactions with affiliates and consolidate, merge or sell, lease or otherwise dispose of all or substantially all of SPL’s assets and enter into certain LNG sales contracts.

The 2030 SPL Senior Notes are SPL’s senior secured obligation, ranking equally in right of payment with its other existing and future unsubordinated debt and senior to any of its future subordinated debt.

At any time prior to November 15, 2029, SPL may redeem all or a part of the 2030 SPL Senior Notes at a redemption price equal to the ‘make-whole’ price set forth in the Eleventh Supplemental Indenture, plus accrued and unpaid interest, if any, to the date of redemption. SPL may also, at any time on or after November 15, 2029, redeem the 2030 SPL Senior Notes, in whole or in part, at a redemption price equal to 100% of the principal amount of the 2030 SPL Senior Notes to be redeemed, plus accrued and unpaid interest, if any, to the date of redemption.
In connection with the closing of the 2030 SPL Senior Notes offering, SPL entered into a registration rights agreement (the “SPL Registration Rights Agreement”). Under the SPL Registration Rights Agreement, SPL and any future guarantors of the 2030 SPL Senior Notes, have agreed to file with the SEC and cause to become effective a registration statement relating to an offer to exchange any and all of the 2030 SPL Senior Notes for a like aggregate principal amount of debt securities of SPL with terms identical in all material respects to the 2030 SPL Senior Notes sought to be exchanged (other than with respect to restrictions on transfer or to any increase in annual interest rate) within 360 days after the notes issuance date of May 8, 2020. Under specified circumstances, SPL has agreed to cause to become effective a shelf registration statement relating to resales of the 2030 SPL Senior Notes. SPL will be obligated to pay additional interest on the 2030 SPL Senior Notes if it fails to comply with its obligations to register the 2030 SPL Senior Notes within the specified time period.

2020 SPL Working Capital Facility

In March 2020, SPL entered into the $1.52020 SPL Working Capital Facility with aggregate commitments of $1.2 billion, 2019 CQP Credit Facilities, which consist of a $750 million term loan (“CQP Term Facility”) and a $750 million revolving credit facility (“CQP Revolving Facility”). Borrowings underreplaced the 2019 CQP Credit Facilities will2015 SPL Working Capital Facility. The 2020 SPL Working Capital Facility is intended to be used for loans to fund the developmentSPL (“SPL Revolving Loans”), swing line loans to SPL (“SPL Swing Line Loans”) and construction of Train 6 of the SPL Project and subject to a sublimit, for general corporate purposes. The CQP Revolving Facility is also available for the issuance of letters of credit.

credit on behalf of SPL, primarily for (1) the refinancing of the 2015 SPL Working Capital Facility, (2) fees and expenses related to the 2020 SPL Working Capital Facility, (3) SPL and its future subsidiaries’ gas purchase obligations and (4) SPL and certain of its future subsidiaries’ general corporate purposes. SPL may, from time to time, request increases in the commitments under the 2020 SPL Working Capital Facility of up to $800 million.
Loans under the 2019 CQP Credit Facilities will2020 SPL Working Capital Facility accrue interest at a variable rate per annum equal to LIBOR or the base rate (equal to the highest of the senior facility agent’s published prime rate, the federal funds effective rate, as published by the Federal Reserve Bank of New York, plus 0.50%, and the adjusted one-monthone month LIBOR plus 1.0%1%), plus the applicable margin. Under the CQP Term Facility, theThe applicable margin for LIBOR loans under the 2020 SPL Working Capital Facility is 1.50%1.125% to 1.750% per annum (depending on the then-current rating of SPL), and the applicable margin for base rate loans under the 2020 SPL Working Capital Facility is 0.50%0.125% to 0.750% per annum in each case with a 0.25% step-up beginning on May 29, 2022. Under the CQP Revolving Facility, the applicable margin for LIBOR loans is 1.25% to 2.125% per annum, and the applicable margin for base rate loans is 0.25% to 1.125% per annum, in each case depending(depending on the then-current rating of Cheniere Partners.SPL). Interest on LIBOR loans is due and payable at the end of each applicable LIBOR period, (and at the end of every three-month period within the LIBOR period, if any), and interest on base rate loans is due and payable at the end of each calendarfiscal quarter. Interest on loans deemed to be made in connection with a draw upon a letter of credit is due and payable on the date the loan becomes due.

Cheniere Partners incurred $20 million of discounts and debt issuance costs in conjunction with the entry into the 2019 CQP Credit Facilities. Cheniere PartnersSPL pays a commitment fee equal to an annual rate of 30%0.1% to 0.3% (depending on the then-current rating of SPL), which accrues on the margin for LIBOR loans multiplied by the average daily amount of the undrawntotal commitment payable quarterly in arrears.less the sum of (1) the outstanding principal amount of SPL Revolving Loans, (2) letters of credit issued and (3) the outstanding principal amount of SPL Swing Line Loans. If draws are made upon a letter of credit issued under the 2020 SPL Working Capital Facility and SPL does not elect for such draw to be deemed an SPL LC Loan (an “SPL LC Draw”), SPL is required to pay the full amount of the SPL LC Draw on or prior to noon eastern time on the business day of the SPL LC Draw. An SPL LC Draw accrues interest at the base rate plus the applicable margin. As of June 30, 2020, 0 SPL LC Draws had been made upon any letters of credit issued under the 2020 SPL Working Capital Facility.

The 2019 CQP Credit Facilities mature2020 SPL Working Capital Facility matures on May 29, 2024. The principal of any loans under the 2019 CQP Credit Facilities must be repaid in quarterly installments commencing on May 29, 2023 based on an amortization schedule. Any outstanding balanceMarch 19, 2025, but may be repaid, in whole or in part, at any time without premium or penalty, exceptextended with consent of the lenders. The 2020 SPL Working Capital Facility provides for interest hedging and interest rate breakage costs. mandatory prepayments under customary circumstances.

CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

The 2019 CQP Credit Facilities contain2020 SPL Working Capital Facility contains customary conditions precedent for extensions of credit, as well as customary affirmative and negative covenants,covenants. SPL is restricted from making certain distributions under agreements governing its indebtedness generally until, among other requirements, satisfaction of a 12-month forward-looking and limit Cheniere Partners’ ability to make restricted payments, including distributions, to once per fiscal quarter and one true-up per fiscal quarter as long as certain conditionsbackward-looking 1.25:1.00 debt service reserve ratio test. The obligations of SPL under the 2020 SPL Working Capital Facility are satisfied.

The 2019 CQP Credit Facilities are unconditionally guaranteedsecured by each subsidiarysubstantially all of Cheniere Partners other thanthe assets of SPL Sabine Pass LNG-LP, LLC and certain subsidiaries of Cheniere Partners owning other development projects, as well as certain other specified subsidiaries and membersa pledge of all of the foregoing entities.membership interests in SPL and certain future subsidiaries of SPL on a pari passu basis by a first priority lien with the SPL Senior Notes.

Credit Facilities

Below is a summary of our credit facilities outstanding as of June 30, 20192020 (in millions):
  SPL Working Capital Facility (1) 2019 CQP Credit Facilities CCH Credit Facility CCH Working Capital Facility Cheniere Revolving Credit Facility
Original facility size $1,200
 $1,500
 $8,404
 $350
 $750
Incremental commitments 
 
 1,566
 850
 500
Less:          
Outstanding balance 
 649
 6,138
 
 
Commitments prepaid or terminated 
 
 3,832
 
 
Letters of credit issued 415
 
 
 338
 
Available commitment $785

$851
 $

$862

$1,250
           
Interest rate on outstanding balance LIBOR plus 1.75% or base rate plus 0.75% (2) LIBOR plus 1.75% or base rate plus 0.75% LIBOR plus 1.25% - 1.75% or base rate plus 0.25% - 0.75% LIBOR plus 1.75% - 2.50% or base rate plus 0.75% - 1.50%
Weighted average interest rate of outstanding balance n/a 3.92% 4.15% n/a n/a
Maturity date 
December 31, 2020
 
May 29, 2024
 
June 30, 2024
 
June 29, 2023
 
December 23, 2022

  2020 SPL Working Capital Facility 2019 CQP Credit Facilities CCH Credit Facility CCH Working Capital Facility Cheniere Revolving Credit Facility Cheniere Term Loan Facility (1)
Original facility size $1,200
 $1,500
 $8,404
 $350
 $750
 $2,620
Incremental commitments 
 
 1,566
 850
 500
 
Less:            
Outstanding balance 
 
 3,283
 141
 375
 
Commitments prepaid or terminated 
 750
 6,687
 
 
 
Letters of credit issued 409
 
 
 392
 313
 
Available commitment $791

$750

$

$667
 $562
 $2,620
             
Interest rate on available balance LIBOR plus 1.125% - 1.750% or base rate plus 0.125% - 0.750% LIBOR plus 1.25% - 2.125% or base rate plus 0.25% - 1.125% LIBOR plus 1.75% or base rate plus 0.75% LIBOR plus 1.25% - 1.75% or base rate plus 0.25% - 0.75% LIBOR plus 1.75% - 2.50% or base rate plus 0.75% - 1.50% (2)
Weighted average interest rate of outstanding balance n/a n/a 1.93% 1.43% 1.93% n/a
Maturity date 
March 19, 2025
 
May 29, 2024
 
June 30, 2024
 
June 29, 2023
 
December 13, 2022
 
June 18, 2023
 
(1)The SPL Working CapitalIn July 2020, we received incremental commitments of $75 million and borrowed $2,323 million under the Cheniere Term Loan Facility, was amendedwhich reduced the available commitment to $372 million following these transactions.
(2)LIBOR plus (1) 2.00% to 2.75% per annum in May 2019the first year, (2) 2.50% to 3.25% per annum in connection with commercializationthe second year and financing of Train 6 of(3) 3.00% to 3.75% per annum in the SPL Project. All terms ofthird year until maturity, or base rate plus (1) 1.00% to 1.75% per annum in the SPL Working Capital Facility substantially remained unchanged.first year, (2) 1.50% to 2.25% per annum in the second year and (3) 2.00% to 2.75% per annum in the third year until maturity.


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

(2)LIBOR plus 1.50% or base rate plus 0.50%, with a 0.25% step-up beginning on May 29, 2022 for the CQP Term Facility. LIBOR plus 1.25% to 2.125% or base rate plus 0.25% to 1.125%, depending on the then-current rating of Cheniere Partners for the CQP Revolving Facility.

Convertible Notes

Below is a summary of our convertible notes outstanding as of June 30, 20192020 (in millions):
 2021 Cheniere Convertible Unsecured Notes 2025 CCH HoldCo II Convertible Senior Notes 2045 Cheniere Convertible Senior Notes 2021 Cheniere Convertible Unsecured Notes (1) 2025 CCH HoldCo II Convertible Senior Notes 2045 Cheniere Convertible Senior Notes
Aggregate original principal $1,000
 $1,000
 $625
 $1,000
 $1,000
 $625
Add: interest paid-in-kind 309
 578
 
Less: aggregate principal redeemed 
 (300) 
Aggregate remaining principal $1,309
 $1,278
 $625
      
Debt component, net of discount and debt issuance costs $1,172
 $1,519
 $311
 $1,271
 $1,264
 $316
Equity component $210
 $
 $194
 $211
 $
 $194
Interest payment method Paid-in-kind
 Paid-in-kind (1)
 Cash
 Paid-in-kind
 Paid-in-kind / cash (2)
 Cash
Conversion by us (2) 
 (3)
 (4)
Conversion by holders (2) (5)
 (6)
 (7)
Conversion by us (3) 
 (4)
 (5)
Conversion by holders (3) (6)
 (4)
 (7)
Conversion basis Cash and/or stock
 Stock
 Cash and/or stock
 Cash and/or stock
 Cash and/or stock
 Cash and/or stock
Conversion value in excess of principal $
 $
 $
 $
 n/a
 $
Maturity date 
May 28, 2021

 
May 13, 2025

 
March 15, 2045

 
May 28, 2021

 
May 13, 2025

 
March 15, 2045

Contractual interest rate 4.875% 11.0% 4.25% 4.875% 11.0% 4.25%
Effective interest rate (8) 8.4% 11.9% 9.4% 8.1% 15.6% 9.4%
Remaining debt discount and debt issuance costs amortization period (9) 1.9 years
 1.3 years
 25.7 years
 0.9 years
 0.3 years
 24.7 years
 

(1)In July 2020, we subsequently repurchased $844 million in aggregate principal amount of outstanding notes at individually negotiated prices from a small number of investors. The aggregate remaining principal after this repurchase was $465 million, which exceeded the remaining commitments under the Cheniere Term Loan Facility by $93 million. As such, $93 million has been reflected as current debt on our Consolidated Balance Sheet as of June 30, 2020.
(2)Prior to the substantial completion of Train 2 of the CCL Project in August 2019, interest will bewas paid entirely in kind. Following this date,substantial completion, the interest generally must behas been paid in cash; however, a portion of the interest may, in the future, be paid in kind under certain specified circumstances.
(2)(3)Conversion is subject to various limitations and conditions.
(3)(4)Convertible into cash or stock at our option on or after the later of March 1, 2020 until September 2, 2020, and the substantial completion of Traininto stock upon conversion notice by us or note holders after September 2, of the CCL Project,2020, provided that our market capitalization is not less than $10.0 billion (“Eligible Conversion Date”). The conversion price for stock is the lower of (1) a 10% discount to the average of the daily volume-weighted average price (“VWAP”) of our common stock for the 90 trading day period prior to the date notice is provided, and (2) a 10% discount to the closing price of our common stock on the trading day preceding the date notice is provided. The conversion price for cash is $1,080 per $1,000 principal amount of the notes. We redeemed an aggregate outstanding principal amount of $300 million in March 2020 and redeemed the remaining outstanding principal amount in July 2020, both with cash.
(4)(5)Redeemable at any time after March 15, 2020 at a redemption price payable in cash equal to the accreted amount of the 2045 Cheniere Convertible Senior Notes to be redeemed, plus accrued and unpaid interest, if any, to such redemption date.
(5)(6)Initially convertible at $93.64 (subject to adjustment upon the occurrence of certain specified events), provided that the closing price of our common stock is greater than or equal to the conversion price on the conversion date.
(6)Convertible on or after the six-month anniversary of the Eligible Conversion Date, provided that our total market capitalization is not less than $10.0 billion, at a price equal to the average of the daily VWAP of our common stock for the 90 trading day period prior to the date on which notice of conversion is provided.
(7)Prior to December 15, 2044, convertible only under certain circumstances as specified in the indenture; thereafter, holders may convert their notes regardless of these circumstances. The conversion rate will initially equal 7.2265 shares of our common stock per $1,000 principal amount of the 2045 Cheniere Convertible Senior Notes, which corresponds to an initial conversion price of approximately $138.38 per share of our common stock (subject to adjustment upon the occurrence of certain specified events).

CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

(8)Rate to accrete the discounted carrying value of the convertible notes to the face value over the remaining amortization period.

CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

(9)We amortize any debt discount and debt issuance costs using the effective interest over the period through contractual maturity except for the 2025 CCH HoldCo II Convertible Senior Notes, which are amortized through the date they are first convertible by holders into our common stock.

Restrictive Debt Covenants

As of June 30, 2019,2020, each of our issuers was in compliance with all covenants related to their respective debt agreements.

Interest Expense

Total interest expense, net of capitalized interest, including interest expense related to our convertible notes, consisted of the following (in millions):
 Three Months Ended June 30, Six Months Ended June 30, Three Months Ended June 30, Six Months Ended June 30,
 2019 2018 2019 2018 2020 2019 2020 2019
Interest cost on convertible notes:                
Interest per contractual rate $64
 $58
 $126
 $116
 $57
 $64
 $120
 $126
Amortization of debt discount 9
 8
 19
 16
 20
 9
 34
 19
Amortization of debt issuance costs 3
 2
 6
 4
 4
 3
 7
 6
Total interest cost related to convertible notes 76
 68
 151
 136
 81

76

161

151
Interest cost on debt and finance leases excluding convertible notes 382
 344
 755

680
 388
 382
 779

755
Total interest cost 458
 412
 906
 816
 469
 458
 940
 906
Capitalized interest (86) (196) (287) (384) (62) (86) (121) (287)
Total interest expense, net $372

$216
 $619
 $432
Total interest expense, net of capitalized interest $407

$372

$819
 $619


Fair Value Disclosures

The following table shows the carrying amount which is net of unamortized premium, discount and debt issuance costs, and estimated fair value of our debt (in millions):
 June 30, 2019 December 31, 2018 June 30, 2020 December 31, 2019
 Carrying
Amount
 Estimated
Fair Value
 Carrying
Amount
 Estimated
Fair Value
 Carrying
Amount
 Estimated
Fair Value
 Carrying
Amount
 Estimated
Fair Value
Senior notes (1) $19,483
 $21,499
 $19,466
 $19,901
 $22,700
 $24,698
 $22,700
 $24,650
2037 SPL Senior Notes (2) 791
 912
 791
 817
 800
 948
 800
 934
4.80% CCH Senior Notes (2) 727
 841
 727
 830
3.925% CCH Senior Notes (2) 475
 502
 475
 495
Credit facilities (3) 6,668
 6,668
 5,294
 5,294
 3,805
 3,805
 3,283
 3,283
2021 Cheniere Convertible Unsecured Notes (2) 1,172
 1,302
 1,126
 1,236
 1,309
 1,332
 1,278
 1,312
2025 CCH HoldCo II Convertible Senior Notes (2) 1,519
 1,771
 1,432
 1,612
 1,278
 1,495
 1,578
 1,807
2045 Cheniere Convertible Senior Notes (4) 311
 489
 310
 431
 625
 394
 625
 498
 
(1)Includes 2021(1) the SPL Senior Notes 2022except the 2037 SPL Senior Notes, 2023 SPL Senior Notes, 2024 SPL Senior Notes, 2025 SPL Senior Notes, 2026 SPL Senior Notes, 2027 SPL Senior Notes, 2028 SPL Senior Notes,(2) all series of the CQP senior notes including the 2025 CQP Senior Notes, 2026 CQP Senior Notes and 2029 CQP Senior Notes and (3) the CCH senior notes sold on a private placement basis in reliance on Section 4(a)(2) of the Securities Act and Rule 144A and Regulation S thereunder including the 2024 CCH Senior Notes, 2025 CCH Senior Notes, 2027 CCH Senior Notes and 20272029 CCH Senior Notes. The Level 2 estimated fair value was based on quotes obtained from broker-dealers or market makers of these senior notes and other similar instruments.
(2)The Level 3 estimated fair value was calculated based on inputs that are observable in the market or that could be derived from, or corroborated with, observable market data, including our stock price and interest rates based on debt issued by parties with comparable credit ratings to us and inputs that are not observable in the market. 
(3)Includes 2015 SPL Working Capital Facility, 2016 CQP Credit Facilities,2020 SPL Working Capital Facility, 2019 CQP Credit Facilities, CCH Credit Facility, CCH Working Capital Facility, Cheniere Revolving Credit Facility, Cheniere Term Loan Facility and Cheniere Marketing trade finance facilities. The Level 3 estimated fair value approximates the principal amount because the interest rates are variable and reflective of market rates and the debt may be repaid, in full or in part, at any time without penalty. 

CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

Marketing trade finance facilities. The Level 3 estimated fair value approximates the principal amount because the interest rates are variable and reflective of market rates and the debt may be repaid, in full or in part, at any time without penalty. 
(4)The Level 1 estimated fair value was based on unadjusted quoted prices in active markets for identical liabilities that we had the ability to access at the measurement date.


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

NOTE 11—LEASES

Our leased assets consist primarily of (1) LNG vessel time charters (“vessel charters”), (2) tug vessels, (3) office space and facilities and (4) land sites, all of which are classified as operating leases except for our tug vessels at the Corpus Christi LNG terminal, which are classified as finance leases.

ASC 842 requires a lessee to recognize leases on its balance sheet by recording a lease liability representing the obligation to make future lease payments and a right-of-use asset representing the right to use the underlying asset for the lease term. As our leases generally do not provide an implicit rate, in order to calculate the lease liability, we discounted our expected future lease payments using our relevant subsidiary’s incremental borrowing rate at the later of January 1, 2019 or the commencement date of the lease. The incremental borrowing rate is an estimate of the rate of interest that a given subsidiary would have to pay to borrow on a collateralized basis over a similar term to that of the lease term.

Many of our leases contain renewal options exercisable at our sole discretion. Options to renew a lease are included in the lease term and recognized as part of the right-of-use asset and lease liability only to the extent they are reasonably certain to be exercised, such as when necessary to satisfy obligations that existed at the execution of the lease or when the non-renewal would otherwise result in an economic penalty.

We have elected the practical expedient to omit leases with an initial term of 12 months or less (“short-term lease”) from recognition on the balance sheet. We recognize short-term lease payments on a straight-line basis over the lease term and variable payments under short-term leases in the period in which the obligation is incurred.

Certain of our leases contain non-lease components which are not separated from the lease components when calculating the right-of-use asset and lease liability per our use of the practical expedient to combine both components of an arrangement for all classes of leased assets.

Certain of our leases also contain variable payments, such as inflation, that are not included when calculating the right-of-use asset and lease liability unless the payments are in-substance fixed.

We recognize lease expense for operating leases on a straight-line basis over the lease term. We recognize lease expense for finance leases as the sum of the amortization of the right-of-use assets on a straight-line basis and the interest on lease liabilities using the effective interest method over the lease term.

The following table shows the classification and location of our right-of-use assets and lease liabilities on our Consolidated Balance Sheets (in millions):
Consolidated Balance Sheet Location June 30, 2019Consolidated Balance Sheets Location June 30, 2020 December 31, 2019
Right-of-use assets—OperatingOperating lease assets, net $502
Operating lease assets, net $520
 $439
Right-of-use assets—FinancingProperty, plant and equipment, net 58
Property, plant and equipment, net 55
 56
Total right-of-use assets $560
 $575
 $495
      
Current operating lease liabilitiesCurrent operating lease liabilities $292
Current operating lease liabilities $179
 $236
Current finance lease liabilitiesOther current liabilities 1
Other current liabilities 1
 1
Non-current operating lease liabilitiesNon-current operating lease liabilities 202
Non-current operating lease liabilities 347
 189
Non-current finance lease liabilitiesNon-current finance lease liabilities 58
Non-current finance lease liabilities 58
 58
Total lease liabilities $553
 $585
 $484


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

The following table shows the classification and location of our lease cost on our Consolidated Statements of Operations (in millions):
Consolidated Statements of Operations Location Three Months Ended June 30, Six Months Ended June 30,
Consolidated Statement of Operations Location Three Months Ended June 30, 2019 Six Months Ended June 30, 2019 2020 2019 2020 2019
Operating lease cost (1)Operating costs and expenses (2) $140
 $277
Operating costs and expenses (2) $98
 $140
 $239
 $277
Finance lease cost:         

  
Amortization of right-of-use assetsDepreciation and amortization expense 1
 2
Depreciation and amortization expense 1
 1
 2
 2
Interest on lease liabilitiesInterest expense, net of capitalized interest 3
 5
Interest expense, net of capitalized interest 3
 3
 5
 5
Total lease cost $144
 $284
 $102
 $144
 $246
 $284
 
(1)Includes short-term lease costs of $16 million and $46 million during the three months ended June 30, 2020 and 2019, respectively, and $51 million and $93 million of short-termduring the six months ended June 30, 2020 and 2019, respectively. Also includes variable lease costs paid to the lessor of $4 million and $8 million during the three months ended June 30, 2020 and 2019, respectively, and $9 million and $13 million of variable lease costs incurred during the three and six months ended June 30, 2020 and 2019, respectively.
(2)Presented in cost of sales, operating and maintenance expense or selling, general and administrative expense consistent with the nature of the asset under lease.


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

Future annual minimum lease payments for operating and finance leases as of June 30, 20192020 are as follows (in millions): 
Years Ending December 31,Operating Leases (1) Finance LeasesOperating Leases (1) Finance Leases
2019$192
 $5
2020167
 10
$135
 $5
202139
 10
121
 10
202219
 10
85
 10
202319
 10
71
 10
202471
 10
Thereafter166
 146
221
 136
Total lease payments602
 191
704
 181
Less: Interest(108) (132)(178) (122)
Present value of lease liabilities$494
 $59
$526
 $59
 
(1)Does not include $1.6$1.7 billion of legally binding minimum lease payments primarily for vessel charters which were executed as of June 30, 20192020 but will commence in future period primarily between 2020 and 2021in the next two years and have fixed minimum lease terms of up to seven years.

Future annual minimum lease payments for operating and capital leases as of December 31, 2018, prepared in accordance with accounting standards prior to the adoption of ASC 842, were as follows (in millions):
Years Ending December 31,Operating Leases (1) Capital Leases (2)
2019 (3)$380
 $5
2020184
 5
2021238
 5
2022264
 5
2023264
 5
Thereafter999
 73
Total lease payments2,329
 98
Less: Interest
 (39)
Present value of lease liabilities$2,329
 $59
(1)
Includes certain lease option renewals that are reasonably assured and payments for certain non-lease components. Also includes $79 million in payments for short-term leases and $1.6 billion in payments for LNG vessel charters which were previously executed but will commence primarily between 2020 and 2021.
(2)Does not include payments for non-lease components of $98 million.
(3)Does not include $43 million in aggregate payments we will receive from our LNG vessel subcharters.

CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

The following table shows the weighted-average remaining lease term (in years) and the weighted-average discount rate for our operating leases and finance leases:
 June 30, 2020 December 31, 2019
 Operating Leases Finance Leases Operating Leases Finance Leases
Weighted-average remaining lease term (in years)8.6 18.2 8.4 18.7
Weighted-average discount rate (1)7.4% 16.2% 5.2% 16.2%
 June 30, 2019
 Operating Leases Finance Leases
Weighted-average remaining lease term (in years)7.2 19.3
Weighted-average discount rate (1)5.4% 16.2%

 
(1)The finance leases commenced prior to the adoption of ASC 842.the current leasing standard under GAAP. In accordance with previous accounting guidance, the implied rate is based on the fair value of the underlying assets.

The following table includes other quantitative information for our operating and finance leases (in millions):
Six Months Ended June 30,
Six Months Ended June 30, 20192020 2019
Cash paid for amounts included in the measurement of lease liabilities:    
Operating cash flows from operating leases$174
$157
 $174
Operating cash flows from finance leases5
5
 5
Financing cash flows from finance leases
Right-of-use assets obtained in exchange for new operating lease liabilities106
246
 106


LNG Vessel Subcharters

From time to time, we sublease certain LNG vessels under charter to third parties while retaining our existing obligation to the original lessor. We have elected the practical expedient for lessors to combine lease and non-lease components and since the lease component is the predominant component of each arrangement, these subleases are accounted for as operating leases. The subleases have lease terms of up to one year and many contain short-term renewal options exercisable at the discretion of the third party. As of June 30, 2020 and December 31, 2019, we had $13$1 million and $9 million in future minimum sublease payments to be received from LNG vessel subcharters, respectively, which will be recognized entirely within 2019.2020. We recognize fixedrecognized $23 million and $31 million of sublease income, including $8 million and $5 million of variable lease payments, during the three months ended June 30, 2020 and 2019, respectively, in other revenues on a straight-line basis over the lease termour Consolidated Statements of the sublease while variable sublease income is recognized when earned.Operations. We recognized $31$75 million and $68 million of sublease income, including $5$23 million and $10 million of variable lease payments, during the three and six months ended June 30, 2020 and 2019, respectively, in other revenues on our Consolidated Statements of Operations.


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

NOTE 12—REVENUES FROM CONTRACTS WITH CUSTOMERS

The following table represents a disaggregation of revenue earned from contracts with customers during the three and six months ended June 30, 20192020 and 20182019 (in millions):
 Three Months Ended June 30, Six Months Ended June 30, Three Months Ended June 30, Six Months Ended June 30,
 2019 2018 2019 2018 2020 2019 2020 2019
LNG revenues(1) $2,080
 $1,516
 $4,147
 $3,668
 $2,340
 $2,080
 $4,744
 $4,147
Regasification revenues 67
 65
 133
 130
 68
 67
 135
 133
Other revenues 21
 13
 36
 23
 16
 21
 38
 36
Total revenues from customers 2,168
 1,594
 4,316
 3,821
 2,424
 2,168
 4,917
 4,316
Net derivative gains (losses) (1)(2) 93
 (64) 169
 (60) (45) 93
 119
 169
Other revenues (2) 31
 13
 68
 24
Other (3) 23
 31
 75
 68
Total revenues $2,292
 $1,543
 $4,553
 $3,785
 $2,402
 $2,292
 $5,111
 $4,553
 
(1)
LNG revenues include revenues for LNG cargoes in which our customers exercised their contractual right to not take delivery but remained obligated to pay fixed fees irrespective of such election. LNG revenues during the three and six months ended June 30, 2020 included $708 million and $761 million, respectively, in revenues associated with LNG cargoes for which customers have notified us that they will not take delivery, of which $458 million would have otherwise been recognized subsequent to June 30, 2020, if the cargoes were lifted pursuant to the delivery schedules with the customers. LNG revenues during the three months ended June 30, 2020 excluded $53 million that would have otherwise been recognized during the quarter if the cargoes were lifted pursuant to the delivery schedules with the customers. Revenue is generally recognized upon receipt of irrevocable notice that a customer will not take delivery because our customers have no contractual right to take delivery of such LNG cargo in future periods and our performance obligations with respect to such LNG cargo have been satisfied.
(2)
See Note 6—Derivative Instruments for additional information about our derivatives.
(2)(3)
Includes revenues from LNG vessel subcharters. See Note 11—Leases for additional information about our subleases.


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

Contract Assets and Liabilities

The following table shows our contract assets, net, which we classifyare classified as other non-current assets, net on our Consolidated Balance Sheets (in millions):
  June 30, December 31,
  2019 2018
Contract assets $8
 $
  June 30, December 31,
  2020 2019
Contract assets, net $58
 $18


Contract assets represent our right to consideration for transferring goods or services to the customer under the terms of a sales contract when the associated consideration is not yet due. Changes in contract assets during the six months ended June 30, 20192020 were primarily attributable to revenue recognized due to the delivery of LNG under certain SPAs for which the associated consideration was not yet due.

The following table reflects the changes in our contract liabilities, which we classify as deferred revenue on our Consolidated Balance Sheets (in millions):
 Six Months Ended June 30, 2019 Six Months Ended June 30, 2020
Deferred revenues, beginning of period $139
 $161
Cash received but not yet recognized 136
 23
Revenue recognized from prior period deferral (139) (161)
Deferred revenues, end of period $136
 $23



CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

Transaction Price Allocated to Future Performance Obligations

Because many of our sales contracts have long-term durations, we are contractually entitled to significant future consideration which we have not yet recognized as revenue. The following table discloses the aggregate amount of the transaction price that is allocated to performance obligations that have not yet been satisfied as of June 30, 20192020 and December 31, 2018:2019:
 June 30, 2019 December 31, 2018 June 30, 2020 December 31, 2019
 Unsatisfied Transaction Price (in billions) Weighted Average Recognition Timing (years) (1) Unsatisfied Transaction Price (in billions) Weighted Average Recognition Timing (years) (1) Unsatisfied Transaction Price (in billions) Weighted Average Recognition Timing (years) (1) Unsatisfied Transaction Price (in billions) Weighted Average Recognition Timing (years) (1)
LNG revenues $108.4
 11 $106.6
 11 $103.7
 10 $106.4
 11
Regasification revenues 2.5
 5 2.6
 6 2.3
 5 2.4
 5
Total revenues $110.9
 
 $109.2
  $106.0
 
 $108.8
 
 
(1)The weighted average recognition timing represents an estimate of the number of years during which we shall have recognized half of the unsatisfied transaction price.

We have elected the following exemptions which omit certain potential future sources of revenue from the table above:
(1)We omit from the table above all performance obligations that are part of a contract that has an original expected delivery duration of one year or less.
(2)The table above excludes substantially all variable consideration under our SPAs and TUAs. We omit from the table above all variable consideration that is allocated entirely to a wholly unsatisfied performance obligation or to a wholly unsatisfied promise to transfer a distinct good or service that forms part of a single performance obligation when that performance obligation qualifies as a series. The table above excludes substantially all variable consideration under our SPAs and TUAs. The amount of revenue from variable fees that is not included in the transaction price will vary based on the future prices of Henry Hub throughout the contract terms, to the extent customers elect to take delivery of their LNG, and adjustments to the consumer price index. Certain of our contracts contain additional variable consideration based on the outcome of contingent events and the movement of various indexes. We have not included such variable consideration in the transaction price to the extent the consideration is considered constrained due to the uncertainty of ultimate pricing and receipt. Approximately 26% and 52% of our LNG revenues from contracts included in the table above during the three months ended June 30, 2020 and 2019, respectively, and approximately 34% and 55% of our LNG revenues from contracts with a duration of over one yearincluded in the table above during the threesix months ended June 30, 2020 and 2019, respectively, were related to variable consideration received from customers. During each of the three and 2018, respectively,six months ended June 30, 2020 and 2019, approximately 55%3% of our LNGregasification revenues were related to variable consideration received from contracts with a duration of over one year duringcustomers.

CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

each of the six months ended June 30, 2019 and 2018, were related to variable consideration received from customers. During each of the three and six months ended June 30, 2019 and 2018, approximately 3% of our regasification revenues were related to variable consideration received from customers.

We have enteredmay enter into contracts to sell LNG that are conditioned upon one or both of the parties achieving certain milestones such as reaching FID on a certain liquefaction Train, obtaining financing or achieving substantial completion of a Train and any related facilities. These contracts are considered completed contracts for revenue recognition purposes and are included in the transaction price above when the conditions are considered probable of being met.

NOTE 13—INCOME TAXES

We recorded an income tax benefitprovision of zero$63 million and $3 million0 during the three months ended June 30, 20192020 and 2018,2019, respectively, and an income tax provision of $3$194 million and $12$3 million during the six months ended June 30, 2020 and 2019, and 2018, respectively. Changes in the income tax recorded between comparative periods are primarily attributable to changes in the income earned and tax transfer pricing applied to our U.K. integrated marketing function.

The effective tax ratesrate for the three and six months ended June 30, 2020 was 13.5% and 16.2%, respectively, which were lower than the 21% federal statutory rate primarily due to income allocated to non-controlling interest that is not taxable to Cheniere. The effective tax rate decreased for the three months ended June 30, 2020 from the six months ended June 30, 2020 due to an additional tax expense of $38 million recorded during the first quarter related to a one-time discrete event related to an internal tax restructuring. The effective tax rate for the three and six months ended June 30, 2019 was 0% and 2018 were0.9%, which are lower than the 21% federal statutory rate during the 2019 and 2018 interim periods primarily as a result ofdue to maintaining a valuation allowance against our federal and state net deferred tax assets. Due to historical losses and other available evidence related to our ability to generate taxable income, we continue to maintain a valuation allowance against our federal and state net deferred tax assets at June 30, 2019.


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

NOTE 14—SHARE-BASED COMPENSATION
  
We have granted restricted stock shares, restricted stock units, performance stock units and phantom units to employees and non-employee directors under the 2011 Incentive Plan, as amended (the “2011 Plan”) and, the 2015 Employee Inducement Incentive Plan.

Plan and the 2020 Incentive Plan that was approved by our shareholders in May 2020.
For the six months ended June 30, 2019,2020, we granted 1.31.2 million restricted stock units and 0.20.3 million performance stock units at target performance under the 2011 Plan to certain employees. Additionally, 0.2 million incremental shares of our common stock were issued based on performance results from previously-granted performance stock unit awards. Restricted stock units are stock awards that vest over a service period of three years and entitle the holder to receive shares of our common stock upon vesting, subject to restrictions on transfer and to a risk of forfeiture if the recipient terminates employment with us prior to the lapse of the restrictions. Performance stock units provide for cliff vesting after a period of three years with payouts based on metrics dependent upon market and performance achieved over the period from January 1, 20192020 through December 31, 20212022 compared to pre-established performance targets. The settlement amounts of the awards are based on market and performance metrics which include cumulative distributable cash flow per share, and in certain circumstances, absolute total shareholder return (“TSR”ATSR”) of our common stock. Where applicable, the compensation for performance stock units is based on fair value assigned to the market metric of TSRATSR using a Monte Carlo model upon grant, which remains constant through the vesting period, and a performance metric, which will vary due to changing estimates regarding the expected achievement of the performance metric of cumulative distributable cash flow per share. The number of shares that may be earned at the end of the vesting period ranges from 25%0% up to 300% of the target award amount if the threshold performance is met.amount. Both restricted stock units and performance stock units will be settled in Cheniere common stock (on a one-for-one basis) and are classified as equity awards.

Total share-based compensation consisted of the following (in millions):
 Three Months Ended June 30, Six Months Ended June 30, Three Months Ended June 30, Six Months Ended June 30,
 2019 2018 2019 2018 2020 2019 2020 2019
Share-based compensation costs, pre-tax:                
Equity awards $32
 $22
 $61
 $39
 $31
 $32
 $60
 $61
Liability awards 2
 15
 5
 32
 1
 2
 1
 5
Total share-based compensation 34

37

66

71
 32

34

61
 66
Capitalized share-based compensation (1) (7) (5) (13) (3) (1) (4) (5)
Total share-based compensation expense $33

$30

$61

$58
 $29

$33

$57
 $61
Tax benefit associated with share-based compensation expense $
 $
 $1
 $2
 $1
 $
 $19
 $1



CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

NOTE 15—NET INCOME (LOSS) PER SHARE ATTRIBUTABLE TO COMMON STOCKHOLDERS

Basic net income (loss) per share attributable to common stockholders (“EPS”) excludes dilution and is computed by dividing net income (loss) attributable to common stockholders by the weighted average number of common shares outstanding during the period. Diluted EPS reflects potential dilution and is computed by dividing net income (loss) attributable to common stockholders by the weighted average number of common shares outstanding during the period increased by the number of additional common shares that would have been outstanding if the potential common shares had been issued. The dilutive effect of unvested stock is calculated using the treasury-stock method and the dilutive effect of convertible securities is calculated using the if-converted method.


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

The following table reconciles basic and diluted weighted average common shares outstanding for the three and six months ended June 30, 20192020 and 20182019 (in millions, except per share data):
 Three Months Ended June 30, Six Months Ended June 30, Three Months Ended June 30, Six Months Ended June 30,
 2019 2018 2019 2018 2020 2019 2020 2019
Weighted average common shares outstanding:                
Basic 257.4
 242.8
 257.3
 239.2
 252.1
 257.4
 252.6
 257.3
Dilutive unvested stock 
 
 1.3
 2.5
 0.3
 
 0.7
 1.3
Diluted 257.4
 242.8
 258.6
 241.7
 252.4
 257.4
 253.3
 258.6
                
Basic net income (loss) per share attributable to common stockholders $(0.44) $(0.07) $0.11
 $1.42
 $0.78
 $(0.44) $2.27
 $0.11
Diluted net income (loss) per share attributable to common stockholders $(0.44) $(0.07) $0.11
 $1.40
 $0.78
 $(0.44) $2.26
 $0.11


Potentially dilutive securities that were not included in the diluted net income (loss) per share computations because their effects would have been anti-dilutive were as follows (in millions):
 Three Months Ended June 30, Six Months Ended June 30, Three Months Ended June 30, Six Months Ended June 30,
 2019 2018 2019 2018 2020 2019 2020 2019
Unvested stock (1) 3.8
 5.2
 3.8
 2.6
 2.8
 3.8
 2.5
 3.8
Convertible notes (2) 17.8
 17.2
 17.8
 17.2
 

 

    
2021 Cheniere Convertible Unsecured Notes (2) 
 13.3
 
 13.3
2025 CCH HoldCo II Convertible Senior Notes (3) 
 
 
 
2045 Cheniere Convertible Senior Notes 4.5
 4.5
 4.5
 4.5
Total potentially dilutive common shares 21.6
 22.4
 21.6
 19.8
 7.3
 21.6
 7.0
 21.6
 
(1)Does not include 0.7 million shares for each of the three and six months ended June 30, 2020 and 0.6 million shares for each of the three and six months ended June 30, 2019, and 0.4 million shares for each of the three and six months ended June 30, 2018respectively, of unvested stock because the performance conditions had not yet been satisfied as of June 30, 2019 and 2018, respectively.the respective dates.
(2)Includes number of shares in aggregate issuable upon conversionSince we have the intent and ability to settle the remaining outstanding principal amount of the 2021 Cheniere Convertible Unsecured Notes in cash and the 2045excess conversion premium (the “conversion spread”) in either cash or shares, the treasury stock method was applied for calculating any potential dilutive effect of the conversion spread on net income per share for the three and six months ended June 30, 2020. However, since the average market price of our common stock did not exceed the conversion price of our 2021 Cheniere Convertible Unsecured Notes, the conversion spread was excluded from the computation of diluted net income per share for the three and six months ended June 30, 2020.
(3)
Since we had the intent and ability to settle the principal amount and the premium upon redemption of the 2025 CCH HoldCo II Convertible Senior Notes.Notes in cash, as previously described in Note 10—Debt, the 2025 CCH HoldCo II Convertible Senior Notes were not included in the computation of net income per share for the three and six months ended June 30, 2020. There were no shares related to the conversion of the 2025 CCH HoldCo II Convertible Senior Notes included in the computation of diluted net income (loss) per share for the 2025 CCH HoldCo II Convertible Senior Notesthree and six months ended June 30, 2019, because the substantive non-market-basednon-market based contingencies underlying the eligible conversion date havewere not been met as of June 30, 2019.


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

NOTE 16—SHARE REPURCHASE PROGRAM

On June 3, 2019, we announced that our Board of Directors (“Board”) authorized a 3-year, $1.0 billion share repurchase program. The following table presents information with respect to repurchases of common stock during the three and six months ended June 30, 2020 and 2019:
 Three Months Ended June 30, Six Months Ended June 30,
 2020 2019 2020 2019
Aggregate common stock repurchased
 44,600
 2,875,376
 44,600
Weighted average price paid per share$
 $68.30
 $53.88
 $68.30
Total amount paid (in millions)$
 $3
 $155
 $3

As of June 30, 2020, we had up to $596 million of the share repurchase program available. Under the share repurchase program, repurchases can be made from time to time using a variety of methods, which may include open market purchases, privately negotiated transactions or otherwise, all in accordance with the rules of the SEC and other applicable legal requirements. The timing and amount of any shares of our common stock that are repurchased under the share repurchase program will be determined by our management based on market conditions and other factors.  The share repurchase program does not obligate us to acquire any particular amount of common stock, and may be modified, suspended or discontinued at any time or from time to time at our discretion.

NOTE 17—COMMITMENTS AND CONTINGENCIES

We have various contractual obligations which are recorded as liabilities in our Consolidated Financial Statements. Other items, such as certain purchase commitments and other executed contracts which do not meet the definition of a liability as of June 30, 2019,2020, are not recognized as liabilities but require disclosures in our Consolidated Financial Statements.

Environmental and Regulatory Matters

Our LNG terminals and pipelines are subject to extensive regulation under federal, state and local statutes, rules, regulations and laws. These laws require that we engage in consultations with appropriate federal and state agencies and that we obtain and maintain applicable permits and other authorizations. Failure to comply with such laws could result in legal proceedings, which may include substantial penalties. We believe that, based on currently known information, compliance with these laws and regulations will not have a material adverse effect on our results of operations, financial condition or cash flows.

Legal Proceedings

We are, and may in the future be, involved as a party to various legal proceedings, which are incidental to the ordinary course of business. We regularly analyze current information and, as necessary, provide accruals for probable liabilities on the eventual disposition of these matters. While the results of these litigation matters and claims cannot be predicted with certainty, we believe the reasonably possible losses from such matters, individually and in the aggregate, are not material. Additionally, we believe the probable final outcome of such matters will not have a material adverse effect on our consolidated results of operations, financial position or cash flows.


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

Parallax Litigation

In 2015, our wholly owned subsidiary, Cheniere LNG Terminals, LLC (“CLNGT”), entered into discussions with Parallax Enterprises, LLC (“Parallax Enterprises”) regarding the potential joint development of two liquefaction plants in Louisiana (the “Potential Liquefaction Transactions”). While the parties negotiated regarding the Potential Liquefaction Transactions, CLNGT loaned Parallax Enterprises approximately $46 million, as reflected in a secured note dated April 23, 2015, as amended on June 30, 2015, September 30, 2015 and November 4, 2015 (the “Secured Note”). The Secured Note was secured by all assets of Parallax Enterprises and its subsidiary entities. On June 30, 2015, Parallax Enterprises’ parent entity, Parallax Energy LLC (“Parallax Energy”), executed a Pledge and Guarantee Agreement further securing repayment of the Secured Note by providing a parent guaranty and a pledge of all of the equity of Parallax Enterprises in satisfaction of the Secured Note (the “Pledge Agreement”). CLNGT and Parallax Enterprises never executed a definitive agreement to pursue the Potential Liquefaction Transactions. The Secured Note matured on December 11, 2015, and Parallax Enterprises failed to make payment. On February 3, 2016, CLNGT filed an action against Parallax Energy, Parallax Enterprises and certain of Parallax Enterprises’ subsidiary entities, styled Cause No. 4:16-cv-00286, Cheniere LNG Terminals, LLC v. Parallax Energy LLC, et al., in the United States District Court for the Southern District of Texas (the “Texas Federal Suit”). CLNGT asserted claims in the Texas Federal Suit for (1) recovery of all amounts due under the Secured Note and (2) declaratory relief establishing that CLNGT is entitled to enforce its rights under the Secured Note and Pledge Agreement in accordance with each instrument’s terms and that CLNGT has no obligations of any sort to Parallax Enterprises concerning the Potential Liquefaction Transactions. On March 11, 2016, Parallax Enterprises and the other defendants in the Texas Federal Suit moved to dismiss the suit for lack of subject matter jurisdiction. On August 2, 2016, the court denied the defendants’ motion to dismiss without prejudice and permitted the parties to pursue jurisdictional discovery.

On March 11, 2016, Parallax Enterprises filed a suit against us and CLNGT styled Civil Action No. 62-810, Parallax Enterprises LLP v. Cheniere Energy, Inc. and Cheniere LNG Terminals, LLC, in the 25th Judicial District Court of Plaquemines Parish, Louisiana (the “Louisiana Suit”), wherein Parallax Enterprises asserted claims for breach of contract, fraudulent inducement, negligent misrepresentation, detrimental reliance, unjust enrichment and violation of the Louisiana Unfair Trade Practices Act. Parallax Enterprises predicated its claims in the Louisiana Suit on an allegation that we and CLNGT breached a purported agreement to jointly develop the Potential Liquefaction Transactions. Parallax Enterprises sought $400 million in alleged economic damages and rescission of the Secured Note. On April 15, 2016, we and CLNGT removed the Louisiana Suit to the United States District Court for the Eastern District of Louisiana, which subsequently transferred the Louisiana Suit to the United States District Court for the Southern District of Texas, where it was assigned Civil Action No. 4:16-cv-01628 and transferred to the same judge presiding over the Texas Federal Suit for coordinated handling. On August 22, 2016, Parallax Enterprises voluntarily dismissed all claims asserted against CLNGT and us in the Louisiana Suit without prejudice to refiling.

On July 27, 2017, the Parallax entities named as defendants in the Texas Federal Suit reurged their motion to dismiss and simultaneously filed counterclaims against CLNGT and third party claims against us for breach of contract, breach of fiduciary duty, promissory estoppel, quantum meruit and fraudulent inducement of the Secured Note and Pledge Agreement, based on substantially the same factual allegations Parallax Enterprises made in the Louisiana Suit. These Parallax entities also simultaneously filed an action styled Cause No. 2017-49685, Parallax Enterprises, LLC, et al. v. Cheniere Energy, Inc., et al., in the 61st District Court of Harris County, Texas (the “Texas State Suit”), which asserts substantially the same claims these entities asserted in the Texas Federal Suit. On July 31, 2017, CLNGT withdrew its opposition to the dismissal of the Texas Federal Suit without prejudice on jurisdictional grounds and the federal court subsequently dismissed the Texas Federal Suit without prejudice. We and CLNGT simultaneously filed an answer and counterclaims in the Texas State Suit, asserting the same claims CLNGT had previously asserted in the Texas Federal Suit. Additionally, CLNGT filed third party claims against Parallax principals Martin Houston, Christopher Bowen Daniels, Howard Candelet and Mark Evans, as well as Tellurian Investments, Inc., Driftwood LNG, LLC, Driftwood LNG Pipeline LLC and Tellurian Services LLC, formerly known as Parallax Services LLC, including claims for tortious interference with CLNGT’s collateral rights under the Secured Note and Pledge Agreement, fraudulent transfer, conspiracy/aiding and abetting. Discovery in the Texas State Suit is ongoing. Trial is currently set for February 2020.
On February 15, 2019, we filed an action with CLNGT against Charif Souki, our former Chairman of the Board and Chief Executive Officer, styled, Cause No. 2019-11529, Cheniere Energy, Inc. and Cheniere LNG Terminals, LLC v. Charif Souki, in the 55th District Court of Harris County, Texas, which asserts claims of breach of fiduciary duties, fraudulent transfer, tortious interference with CLNGT’s collateral rights under the Secured Note and Pledge Agreement and conspiracy/aiding and abetting. On April 29, 2019, the court consolidated the Souki matter with the earlier filed pending case against Parallax, Tellurian and the individual defendants in the Texas State Suit.


CHENIERE ENERGY, INC. AND SUBSIDIARIES
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS—CONTINUED
(unaudited)

We do not expect that the resolution of any of the foregoing litigation will have a material adverse impact on our financial results.

NOTE 17—18—CUSTOMER CONCENTRATION
  
The following table shows customers with revenues of 10% or greater of total revenues from external customers and customers with accounts receivable, net and contract assets, net balances of 10% or greater of total accounts receivable, net and contract assets, net from external customers:
 Percentage of Total Revenues from External Customers Percentage of Accounts Receivable from External CustomersPercentage of Total Revenues from External Customers Percentage of Accounts Receivable, Net and Contract Assets, Net from External Customers
 Three Months Ended June 30, Six Months Ended June 30, June 30, December 31,Three Months Ended June 30, Six Months Ended June 30, June 30, December 31,
 2019 2018 2019 2018 2019 20182020 2019 2020 2019 2020 2019
Customer A 17% 21% 18% 19% 11% 21%15% 17% 15% 18% * 12%
Customer B 11% 17% 11% 14% 15% 14%12% 11% 10% 11% * *
Customer C 11% 18% 12% 22% 15% 18%10% 11% * 12% 11% 13%
Customer D 12% 16% 13% 11% 14% ** 12% * 13% * *
Customer E * * * * 13% ** * * * 10% *
Customer F * * * * * 10%

 
* Less than 10%

NOTE 18—19—SUPPLEMENTAL CASH FLOW INFORMATION

The following table provides supplemental disclosure of cash flow information (in millions): 
 Six Months Ended June 30, Six Months Ended June 30,
 2019 2018 2020 2019
Cash paid during the period for interest on debt and finance leases, net of amounts capitalized $271
 $282
Cash paid during the period for interest on debt, net of amounts capitalized $750
 $271
Cash paid for income taxes 20
 4
 1
 20


The balance in property, plant and equipment, net funded with accounts payable and accrued liabilities was $958$222 million and $935$958 million as of June 30, 2020 and 2019, and 2018, respectively.

See Note 11—Leases for our supplemental cash flow information related to our leases.


ITEM 2.MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
 
Information Regarding Forward-Looking Statements
This quarterly report contains certain statements that are, or may be deemed to be, “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended (the “Securities Act”), and Section 21E of the Securities Exchange Act of 1934, as amended (the “Exchange Act”). All statements, other than statements of historical or present facts or conditions, included herein or incorporated herein by reference are “forward-looking statements.” Included among “forward-looking statements” are, among other things: 
statements that we expect to commence or complete construction of our proposed LNG terminals, liquefaction facilities, pipeline facilities or other projects, or any expansions or portions thereof, by certain dates, or at all;
statements regarding future levels of domestic and international natural gas production, supply or consumption or future levels of LNG imports into or exports from North America and other countries worldwide or purchases of natural gas, regardless of the source of such information, or the transportation or other infrastructure or demand for and prices related to natural gas, LNG or other hydrocarbon products;
statements regarding any financing transactions or arrangements, or our ability to enter into such transactions;
statements regarding the amount and timing of share repurchases;
statements relating to the construction of our Trains and pipelines, including statements concerning the engagement of any EPC contractor or other contractor and the anticipated terms and provisions of any agreement with any EPC or other contractor, and anticipated costs related thereto;
statements regarding any SPA or other agreement to be entered into or performed substantially in the future, including any revenues anticipated to be received and the anticipated timing thereof, and statements regarding the amounts of total LNG regasification, natural gas liquefaction or storage capacities that are, or may become, subject to contracts;
statements regarding counterparties to our commercial contracts, construction contracts, and other contracts;
statements regarding our planned development and construction of additional Trains andor pipelines, including the financing of such Trains or pipelines;
statements that our Trains, when completed, will have certain characteristics, including amounts of liquefaction capacities;
statements regarding our business strategy, our strengths, our business and operation plans or any other plans, forecasts, projections, or objectives, including anticipated revenues, capital expenditures, maintenance and operating costs and cash flows, any or all of which are subject to change;
statements regarding legislative, governmental, regulatory, administrative or other public body actions, approvals, requirements, permits, applications, filings, investigations, proceedings or decisions;
statements regarding our anticipated LNG and natural gas marketing activities;
statements regarding the outbreak of volumes expected to be made available toCOVID-19 and its impact on our integrated marketing function;business and operating results, including any customers not taking delivery of LNG cargoes, the ongoing credit worthiness of our contractual counterparties, any disruptions in our operations or construction of our Trains and the health and safety of our employees, and on our customers, the global economy and the demand for LNG; and
any other statements that relate to non-historical or future information.
All of these types of statements, other than statements of historical or present facts or conditions, are forward-looking statements. In some cases, forward-looking statements can be identified by terminology such as “may,” “will,” “could,” “should,” “achieve,” “anticipate,” “believe,” “contemplate,” “continue,” “estimate,” “expect,” “intend,” “plan,” “potential,” “predict,” “project,” “pursue,” “target,” the negative of such terms or other comparable terminology. The forward-looking statements contained in this quarterly report are largely based on our expectations, which reflect estimates and assumptions made by our management. These estimates and assumptions reflect our best judgment based on currently known market conditions and other factors. Although we believe that such estimates are reasonable, they are inherently uncertain and involve a number of risks and uncertainties beyond our control. In addition, assumptions may prove to be inaccurate. We caution that the forward-looking

statements contained in this quarterly report are not guarantees of future performance and that such statements may not be realized or the forward-looking statements or events may not occur. Actual results may differ materially from those anticipated or implied in forward-looking statements as a result of a variety of factors described in this quarterly report and in the other reports and other information that we file with the SEC, including those discussed under “Risk Factors” in our annual report on Form 10-K for the fiscal year ended December 31, 20182019 and our quarterly report on Form 10-Q for the quarterly period ended March, 31, 2020. All forward-looking statements attributable to us or persons acting on our behalf are expressly qualified in their entirety by these risk factors. These forward-looking statements speak only as of the date made, and other than

as required by law, we undertake no obligation to update or revise any forward-looking statement or provide reasons why actual results may differ, whether as a result of new information, future events or otherwise.

Introduction
 
The following discussion and analysis presents management’s view of our business, financial condition and overall performance and should be read in conjunction with our Consolidated Financial Statements and the accompanying notes. This information is intended to provide investors with an understanding of our past performance, current financial condition and outlook for the future. Our discussion and analysis includes the following subjects: 
Overview of Business 
Overview of Significant Events 
Impact of COVID-19 and Market Environment
Liquidity and Capital Resources
Results of Operations 
Off-Balance Sheet Arrangements  
Summary of Critical Accounting Estimates 
Recent Accounting Standards

Overview of Business
 
Cheniere, a Delaware corporation, is a Houston-based energy infrastructure company primarily engaged in LNG-related businesses. Our vision is toWe provide clean, secure and affordable LNG to integrated energy companies, utilities and energy trading companies around the world. We aspire to the world, while responsiblyconduct our business in a safe and responsible manner, delivering a reliable, competitive and integrated source of LNG in a safe and rewarding work environment.to our customers. We own and operate the Sabine Pass LNG terminal in Louisiana, one of the largest LNG production facilities in the world, through our ownership interest in and management agreements with Cheniere Partners, which is a publicly traded limited partnership that we created in 2007. As of June 30, 2019,2020, we owned 100% of the general partner interest and 48.6% of the limited partner interest in Cheniere Partners. We also own and operate the Corpus Christi LNG terminal in Texas, which is wholly owned by us. The liquefaction of natural gas into LNG allows it to be shipped economically from the United States where natural gas is abundant and inexpensive to produce to our international customers in areas where natural gas demand and infrastructure exist.

The Sabine Pass LNG terminal is located in Cameron Parish, Louisiana, on the Sabine-Neches Waterway less than four miles from the Gulf Coast. Cheniere Partners, through its subsidiary SPL, is in various stages of constructing andcurrently operating sixfive natural gas liquefaction facilitiesTrains and is constructing one additional Train for a total production capacity of approximately 30 mtpa of LNG (the “SPL Project”) at the Sabine Pass LNG terminal adjacent to the existing regasification facilities through a wholly owned subsidiary, SPL. Trains 1 through 5 are operational and Train 6 is under construction. Each Train is expected to have a nominal production capacity, which is prior to adjusting for planned maintenance, production reliability, potential overdesign and debottlenecking opportunities, of approximately 4.5 mtpa of LNG per Train.terminal. The Sabine Pass LNG terminal has operational regasification facilities owned by Cheniere Partners’ wholly owned subsidiary, SPLNG, that include pre-existing infrastructure of five LNG storage tanks with aggregate capacity of approximately 16.917 Bcfe, two existing marine berths and one under construction that can each accommodate vessels with nominal capacity of up to 266,000 cubic meters and vaporizers with regasification capacity of approximately 4.04 Bcf/d. Cheniere Partners also owns a 94-mile pipeline through its subsidiary, CTPL, that interconnects the Sabine Pass LNG terminal with a number of large interstate pipelines through a wholly owned subsidiary, CTPL.pipelines.

We also own and operate a second natural gas liquefaction and export facility at the Corpus Christi LNG terminal near Corpus Christi, Texas, and operateare currently operating two Trains and one additional Train is undergoing commissioning for a total production capacity of approximately 15 mtpa of LNG. Additionally, we are operating a 23-mile natural gas supply pipeline that interconnects the Corpus Christi LNG terminal with several interstate and intrastate natural gas pipelines (the “Corpus Christi Pipeline” and together with the liquefaction facilities,Trains, the “CCL Project”) through our wholly owned subsidiaries CCL and CCP, respectively. The CCL Project, is being developed in stages with the first phase being three Trains (“Phase 1”),once fully constructed, will contain three LNG storage tanks with

aggregate capacity of approximately 10.110 Bcfe and two marine berths that can each accommodate vessels with nominal capacity of up to 266,000 cubic meters. The first stage (“Stage 1”) includes Trains 1 and 2, two LNG storage tanks, one complete marine berth and a second partial berth and all of the CCL Project’s necessary infrastructure facilities. The second stage (“Stage 2”) includes Train 3, one LNG storage tank and the completion of the second partial berth. Train 1 is operational, Train 2 is undergoing commissioning and Train 3 is under construction. Each Train is expected to have a nominal production capacity, which is prior to adjusting for planned maintenance, production reliability, potential overdesign and debottlenecking opportunities, of approximately 4.5 mtpa of LNG per Train.


We have contracted approximately 85% of the expected aggregate nominaltotal production capacity from the SPL Project and the CCL Project (collectively, the “Liquefaction Projects”) on a long-termterm basis. This includes volumes contracted under SPAs in which the customers are required to pay a fixed fee with respect to the contracted volumes irrespective of their election to cancel or suspend deliveries of LNG cargoes, as well as volumes contracted under integrated production marketing (“IPM”) gas supply agreements.

Additionally, separate from the CCH Group, we are developing an expansion of the Corpus Christi LNG terminal adjacent to the CCL Project (“Corpus Christi Stage 3”) and filed an application with FERC in June 2018through our subsidiary CCL Stage III for up to seven midscale Trains with an expected aggregate nominaltotal production capacity of approximately 9.510 mtpa of LNG. We received approval from FERC in November 2019 to site, construct and one LNG storage tank.

We have made an equity investment in Midship Holdings, LLC (“Midship Holdings”), which managesoperate the business and affairs of Midship Pipeline Company, LLC (“Midship Pipeline”). Midship Pipeline is constructing a pipeline (the “Midship Project”) with expected capacity of up to 1.44 million Dekatherms per day that will connect new gas production in the Anadarko Basin to Gulf Coast markets, including markets serving the Liquefaction Projects. Construction of the Midship Project commenced in the first quarter of 2019.expansion project.

We remain focused on expansionoperational excellence and customer satisfaction. Increasing demand of LNG has allowed us to expand our existing sites by leveraging existing infrastructure.liquefaction infrastructure in a financially disciplined manner. We continue to considerhold significant land positions at both the Sabine Pass LNG terminal and the Corpus Christi LNG terminal which provide opportunity for further liquefaction capacity expansion. The development of these sites or other projects, including infrastructure projects in support of natural gas supply and LNG demand, which,will require, among other things, will require acceptable commercial and financing arrangements before we can make a final investment decision (“FID”).

Overview of Significant Events

Our significant accomplishmentsevents since January 1, 20192020 and through the filing date of this Form 10-Q include the following:
Strategic
In June 2019, our board of directors (the “Board”) appointed Michele A. Evans to serve as a member of the Board. Ms. Evans was also appointed to the Audit Committee and the Governance and Nominating Committee of the Board.
In May 2019, our wholly owned subsidiary CCL Stage III entered into an integrated production marketing transaction with Apache Corporation to purchase 140,000 MMBtu per day of natural gas, for a term of approximately 15 years, at a price based on international LNG indices, net of a fixed liquefaction fee and certain costs incurred by Cheniere.
In May 2019, the board of directors of the general partner of Cheniere Partners made a positive FID with respect to Train 6 of the SPL Project and issued a full notice to proceed with construction to Bechtel Oil, Gas and Chemicals, Inc. (“Bechtel”) in June 2019.
In March 2019, we received a positive Environmental Assessment from the FERC relating to Corpus Christi Stage 3 and anticipate receiving all remaining necessary regulatory approvals for the project by the end of 2019.
In February 2019,April 2020, Midship Pipeline Company, LLC, in which we holdhave an indirect equity interest, issued full notice to proceed to constructinvestment, placed into service the Midship natural gas pipeline and related compression and interconnect facilities following receipt of final Notice to Proceed from the FERC and obtaining financing to construct the Midship Project.facilities.
Operational
As of July 31, 2019, over 7502020, more than 1,175 cumulative LNG cargoes totaling over 80 million tonnes of LNG have been produced, loaded and exported from the Liquefaction Projects.
In June 2019, first LNG production from Train 2 ofFinancial
We completed the CCL Project occurred, and the first commissioning cargo from Train 2 was exported.following debt transactions:
In June 2020, we entered into the $2.62 billion delayed draw term loan credit agreement (the “Cheniere Term Loan Facility”), which in July 2020 was subsequently increased to $2.695 billion. In July 2020, borrowings under the Cheniere Term Loan Facility were used to (1) redeem the remaining outstanding principal amount of the 11.0% Convertible Senior Secured Notes due 2025 (the “2025 CCH HoldCo II Convertible Senior Notes”), subsequent to the $300 million redemption in March 2020, pursuant to the amended and restated note purchase agreement for the 2025 CCH HoldCo II Convertible Senior Notes which allowed CCH HoldCo II to redeem the outstanding notes with cash at a price of $1,080 per $1,000 principal amount, (2) repurchase $844 million in aggregate principal amount of outstanding 4.875% Convertible Unsecured Notes due 2021 (the “2021 Cheniere Convertible Unsecured Notes”) at individually negotiated prices from a small number of investors and (3) pay the related fees and expenses. The remaining borrowings under the Cheniere Term Loan Facility are expected to be used to repay and/or repurchase a portion of the remaining outstanding principal amount of the 2021 Cheniere Convertible Unsecured Notes and for the payment of related fees and expenses.
In May 2020, SPL issued an aggregate principal amount of $2.0 billion of 4.500% Senior Secured Notes due 2030 (the “2030 SPL Senior Notes”). Net proceeds of the offering, along with cash on hand, were used to redeem all of SPL’s outstanding 5.625% Senior Notes due 2021 (the “2021 SPL Senior Notes”).
In March 2020, SPL entered into a $1.2 billion Working Capital Revolving Credit and Letter of Credit Reimbursement Agreement (the “2020 SPL Working Capital Facility”), which refinanced its previous working capital facility, reduced the interest rate and extended the maturity date to March 2025.

In February 2019 and March 2019, CCL and SPL achieved substantial completion of Train 1 of the CCL Project and Train 5 of the SPL Project, respectively, and commenced operating activities.
Financial
In June 2019, we announced a capital allocation framework which prioritizes investments in the growth of our liquefaction platform, improvement of consolidated leverage metrics, and a return of excess capital to shareholders under a three-year, $1.0 billion share repurchase program.
In June 2019,May 2020, the date of first commercial delivery was reached under the 20-year SPAs with EndesaPT Pertamina (Persero), Naturgy LNG GOM, Limited, Woodside Energy Trading Singapore Pte Ltd, Iberdrola, S.A. and PT Pertamina (Persero)Électricité de France, S.A. relating to Train 12 of the CCL Project.

In August 2020, Moody’s Investors Service upgraded its rating of CCH’s senior secured debt from Ba1 (Positive Outlook) to Baa3.

Impact of COVID-19 and Market Environment

The business environment in which we operate has been impacted by the recent downturn in the energy market as well as the outbreak of COVID-19 and its progression into a pandemic in March 2020. As a result of these developments, our growth estimates for LNG in 2020 have moderated from previous expectations. Annual LNG demand grew by approximately 13% in 2019 to approximately 360 mtpa. In a report published in the month of April 2020, IHS Markit projected LNG demand in 2020 to reach 363 mtpa, down from a pre-COVID-19 estimate of approximately 377 mtpa. This implies a year-over-year rate of growth of below 1% in 2020 compared to an implied pre-COVID-19 year-over-year growth estimate of approximately 5%. While worldwide demand increased by approximately 5% during the six months ended June 30, 2020 compared to the comparable period of 2019, we expect to potentially see year-over-year declines in some future months as reduced economic activity affects LNG demand and high storage inventory levels reduce the need for imports. The robust LNG supply additions over the past several years, along with warmer winters and now strict virus containment measures, have exerted downward pressure on global gas prices. As an example, the Dutch Title Transfer Facility (“TTF”), a virtual trading point for natural gas in the Netherlands, averaged $1.76 during the three months ended June 30, 2020, 60% lower than the comparable period of 2019, while the Japan Korean Marker (“JKM”), an LNG benchmark price assessment for spot physical cargoes delivered ex-ship into certain key markets in Asia, averaged $2.68 during the three months ended June 30, 2020, 50% lower than the comparable period of 2019. As a result of the weaker LNG market environment, as well as customer-specific variables, we have recently experienced an increase in the number of LNG cargoes for which customers have notified us that they will not take delivery. While this may impact our expected LNG production, we do not expect it to have a material adverse impact on our forecasted financial results for 2020, due to the highly contracted nature of our business and the fact that customers continue to be obligated to pay fixed fees for cargoes in relation to which they have exercised their contractual right to cancel. As such, during the three and six months ended June 30, 2020, we recognized $708 million and $761 million, respectively, in revenues associated with LNG cargoes for which customers have notified us that they will not take delivery, of which $458 million would have otherwise been recognized subsequent to June 30, 2020, if the cargoes were lifted pursuant to the delivery schedules with the customers.

In addition, in response to the COVID-19 pandemic, we have modified certain business and workforce practices to protect the safety and welfare of our employees who continue to work at our facilities and offices worldwide, as well as implemented certain mitigation efforts to ensure business continuity. In March 2020, we began consulting with a medical advisor, and implemented social distancing through revised shift schedules, work from home policies and designated remote work locations where appropriate, restricted non-essential business travel and began requiring self-screening for employees and contractors. In April 2020, we began providing temporary housing for our workforce for our facilities, implemented temperature testing, incorporated medical and social workers to support employees, enforced prior self-isolation and screening for temporary housing and implemented marine operations with zero contact during loading activities. These measures have resulted in increased costs. While response measures continue to evolve and in certain cases moderate, we expect to incur incremental operating costs associated with business continuity and protection of our workforce until the risks associated with the pandemic diminish. As of June 2019, CCH and its subsidiaries, as guarantors, entered into a note purchase agreement (“CCH Note Purchase Agreement”) with Allianz Global Investors GmbH to issue an aggregate principal amount of $72730, 2020, we have incurred approximately $62 million of 4.80% Senior Secured Notes due 2039 (the “2039 CCH Senior Notes”), with closing and funding of the 2039 CCH Senior Notes conditional in part on the 2039 CCH Senior Notes receiving at least two investment grade ratings within 18 months of the date of the CCH Note Purchase Agreement.
In May 2019, Cheniere Partners entered into five-year, $1.5 billion credit facilities (the “2019 CQP Credit Facilities”), which consist of a $750 million delayed draw term loan (“CQP Term Facility”) and a $750 million revolving credit facility (“CQP Revolving Facility”), to fund a portion of the development and construction of Train 6, a third LNG berth and supporting infrastructure at the SPL Project.
In March 2019, the date of first commercial delivery was reached under the 20-year SPA with BG Gulf Coast LNG, LLC relating to Train 4 of the SPL Project.such costs.

Liquidity and Capital Resources

Although results are consolidated for financial reporting, Cheniere,SPL, Cheniere Partners, SPLCCH Group and the CCH GroupCheniere operate with independent capital structures. Our capital requirements include capital and investment expenditures, repayment of long-term debt and repurchase of our shares. We expect the cash needs for at least the next twelve months will be met for each of these independent capital structures as follows:
SPL through project debt and borrowings, operating cash flows and equity contributions from Cheniere Partners;
Cheniere Partners through operating cash flows from SPLNG, SPL and CTPL and debt or equity offerings;
CCH Group through operating cash flows from CCL and CCP, project debt and borrowings and equity contributions from Cheniere; and

Cheniere through project financing, existing unrestricted cash, debt and equity offerings by us or our subsidiaries, operating cash flows, borrowings, services fees from our subsidiaries and distributions from our investment in Cheniere Partners.

The following table provides a summary of our liquidity position at June 30, 20192020 and December 31, 20182019 (in millions):
June 30, December 31,June 30, December 31,
2019 20182020 2019
Cash and cash equivalents(1)$2,279
 $981
$2,039
 $2,474
Restricted cash designated for the following purposes:      
SPL Project596
 756
167
 181
Cheniere Partners and cash held by guarantor subsidiaries
 785
CCL Project279
 289
101
 80
Other286
 345
237
 259
Available commitments under the following credit facilities:      
$1.2 billion SPL Working Capital Facility (“SPL Working Capital Facility”)785
 775
$1.5 billion 2019 CQP Credit Facilities851
 
$2.8 billion Cheniere Partners’ Credit Facilities (“2016 CQP Credit Facilities”)
 115
Amended and restated CCH Credit Facility (“CCH Credit Facility”)
 982
$1.2 billion Amended and Restated SPL Working Capital Facility (“2015 SPL Working Capital Facility”)
 786
2020 SPL Working Capital Facility791
 
CQP Credit Facilities executed in 2019 (“2019 CQP Credit Facilities”)750
 750
$1.2 billion CCH Working Capital Facility (“CCH Working Capital Facility”)862
 716
667
 729
$1.25 billion Cheniere Revolving Credit Facility (“Cheniere Revolving Credit Facility”)1,250
 1,250
562
 665
Cheniere Term Loan Facility (2)2,620
 
(1)
Amounts presented include balances held by our consolidated variable interest entity (“VIE”), Cheniere Partners, as discussed in Note 8—Non-controlling Interest and Variable Interest Entity of our Notes to Consolidated Financial Statements. As of June 30, 2020 and December 31, 2019, assets of Cheniere Partners, which are included in our Consolidated Balance Sheets, included $1.3 billion and $1.8 billion, respectively, of cash and cash equivalents.
(2)In July 2020, we received incremental commitments of $75 million and borrowed $2,323 million under the Cheniere Term Loan Facility, which reduced the available commitment to $372 million following these transactions.

For additional information regarding our debt agreements, see Note 10—Debt of our Notes to Consolidated Financial Statements in this quarterly report and Note 12—11—Debt of our Notes to Consolidated Financial Statements in our annual report on Form 10-K for the fiscal year ended December 31, 2018.2019.
Sabine Pass LNG Terminal
Liquefaction Facilities

The SPL Project is one of the largest LNG production facilities in the world. Through Cheniere Partners, we are currently operating five Trains and two marine berths at the SPL Project. We have received authorization from the FERC to site, construct and operate Trains 1 through 6, as well as for the construction of a third marine berth. We have achieved substantial completion of the first five Trains of the SPL Project and commenced commercial operating activities for each Train at various times starting in May 2016. The following table summarizes the project completion and construction status of Train 6 of the SPL Project as of June 30, 2020:
SPL Train 6
Overall project completion percentage63.9%
Completion percentage of:
Engineering96.5%
Procurement91.1%
Subcontract work44.3%
Construction25.3%
Date of expected substantial completion2H 2022


The following orders have been issued by the DOE authorizing the export of domestically produced LNG by vessel from the Sabine Pass LNG terminal:
Trains 1 through 4—FTA countries for a 30-year term, which commenced in May 2016, and non-FTA countries for a 20-year term, which commenced in June 2016, in an amount up to a combined total of the equivalent of 16 mtpa (approximately 803 Bcf/yr of natural gas).
Trains 1 through 4—FTA countries for a 25-year term and non-FTA countries for a 20-year term, both of which commenced in December 2018, in an amount up to a combined total of the equivalent of approximately 203 Bcf/yr of natural gas (approximately 4 mtpa).
Trains 5 and 6—FTA countries and non-FTA countries for a 20-year term, which partially commenced in June 2019 and the remainder commenced in September 2019, in an amount up to a combined total of 503.3 Bcf/yr of natural gas (approximately 10 mtpa).

In each case, the terms of these authorizations began on the earlier of the date of first export thereunder or the date specified in the particular order. In addition, SPL received an order providing for a three-year makeup period with respect to each of the non-FTA orders for LNG volumes SPL was authorized but unable to export during any portion of the initial 20-year export period of such order.

The DOE issued an order authorizing SPL to export domestically produced LNG by vessel from the Sabine Pass LNG terminal to FTA countries and non-FTA countries over a two-year period commencing January 2020, in an aggregate amount up to the equivalent of 600 Bcf of natural gas (however, exports under this order, when combined with exports under the orders above, may not exceed 1,509 Bcf/yr).

An application was filed in September 2019 seeking authorization to make additional exports from the SPL Project to FTA countries for a 25-year term and to non-FTA countries for a 20-year term in an amount up to the equivalent of approximately 153 Bcf/yr of natural gas, for a total SPL Project export capacity of approximately 1,662 Bcf/yr. The terms of the authorizations are requested to commence on the date of first commercial export from the SPL Project of the volumes contemplated in the application. In April 2020, the DOE issued an order authorizing SPL to export to FTA countries related to this application, but has not yet issued an order authorizing SPL to export to non-FTA countries for the corresponding LNG volume. A corresponding application for authorization to increase the total LNG production capacity of the SPL Project from the currently authorized level to approximately 1,662 Bcf/yr was also submitted to the FERC and is currently pending.

Customers

SPL has entered into fixed price long-term SPAs generally with terms of 20 years (plus extension rights) with eight third parties for Trains 1 through 6 of the SPL Project. Under these SPAs, the customers will purchase LNG from SPL on a free on board (“FOB”) basis for a price consisting of a fixed fee per MMBtu of LNG (a portion of which is subject to annual adjustment for inflation) plus a variable fee per MMBtu of LNG generally equal to approximately 115% of Henry Hub. The customers may elect to cancel or suspend deliveries of LNG cargoes, with advance notice as governed by each respective SPA, in which case the customers would still be required to pay the fixed fee with respect to the contracted volumes that are not delivered as a result of such cancellation or suspension. We refer to the fee component that is applicable regardless of a cancellation or suspension of LNG cargo deliveries under the SPAs as the fixed fee component of the price under SPL’s SPAs. We refer to the fee component that is applicable only in connection with LNG cargo deliveries as the variable fee component of the price under SPL’s SPAs. The variable fees under SPL’s SPAs were generally sized at the time of entry into each SPA with the intent to cover the costs of gas purchases and transportation and liquefaction fuel to produce the LNG to be sold under each such SPA. The SPAs and contracted volumes to be made available under the SPAs are not tied to a specific Train; however, the term of each SPA generally commences upon the date of first commercial delivery of a specified Train.

In aggregate, the annual fixed fee portion to be paid by the third-party SPA customers is approximately $2.9 billion for Trains 1 through 5. After giving effect to an SPA that Cheniere has committed to provide to SPL by the end of 2020, the annual fixed fee portion to be paid by the third-party SPA customers would increase to at least $3.3 billion, which is expected to occur upon the date of first commercial delivery of Train 6.

In addition, Cheniere Marketing has an agreement with SPL to purchase, at Cheniere Marketing’s option, any LNG produced by SPL in excess of that required for other customers. See Marketing section for additional information regarding agreements entered into by Cheniere Marketing.

Natural Gas Transportation, Storage and Supply

To ensure SPL is able to transport adequate natural gas feedstock to the Sabine Pass LNG terminal, it has entered into transportation precedent and other agreements to secure firm pipeline transportation capacity with CTPL and third-party pipeline companies. SPL has entered into firm storage services agreements with third parties to assist in managing variability in natural gas needs for the SPL Project. SPL has also entered into enabling agreements and long-term natural gas supply contracts with third parties in order to secure natural gas feedstock for the SPL Project. As of June 30, 2020, SPL had secured up to approximately 4,855 TBtu of natural gas feedstock through long-term and short-term natural gas supply contracts with remaining terms that range up to 9 years, a portion of which is subject to conditions precedent.

Construction

SPL entered into lump sum turnkey contracts with Bechtel Oil, Gas and Chemicals, Inc. (“Bechtel”) for the engineering, procurement and construction of Trains 1 through 6 of the SPL Project, under which Bechtel charges a lump sum for all work performed and generally bears project cost, schedule and performance risks unless certain specified events occur, in which case Bechtel may cause SPL to enter into a change order, or SPL agrees with Bechtel to a change order.

The total contract price of the EPC contract for Train 6 of the SPL Project is approximately $2.5 billion, including estimated costs for the third marine berth that is currently under construction. As of June 30, 2020, we have incurred $1.6 billion under this contract.

Regasification Facilities
The Sabine Pass LNG terminal has operational regasification capacity of approximately 4 Bcf/d and aggregate LNG storage capacity of approximately 17 Bcfe. Approximately 2 Bcf/d of the regasification capacity at the Sabine Pass LNG terminal has been reserved under two long-term third-party TUAs, under which SPLNG’s customers are required to pay fixed monthly fees, whether or not they use the LNG terminal.  Each of Total Gas & Power North America, Inc. (“Total”) and Chevron U.S.A. Inc. (“Chevron”) has reserved approximately 1 Bcf/d of regasification capacity and is obligated to make monthly capacity payments to SPLNG aggregating approximately $125 million annually, prior to inflation adjustments, for 20 years that commenced in 2009. Total S.A. has guaranteed Total’s obligations under its TUA up to $2.5 billion, subject to certain exceptions, and Chevron Corporation has guaranteed Chevron’s obligations under its TUA up to 80% of the fees payable by Chevron.

The remaining approximately 2 Bcf/d of capacity has been reserved under a TUA by SPL. SPL is obligated to make monthly capacity payments to SPLNG aggregating approximately $250 million annually, prior to inflation adjustments, continuing until at least May 2036. SPL entered into a partial TUA assignment agreement with Total, whereby upon substantial completion of Train 5 of the SPL Project, SPL gained access to substantially all of Total’s capacity and other services provided under Total’s TUA with SPLNG. This agreement provides SPL with additional berthing and storage capacity at the Sabine Pass LNG terminal that may be used to provide increased flexibility in managing LNG cargo loading and unloading activity, permit SPL to more flexibly manage its LNG storage capacity and accommodate the development of Train 6. Notwithstanding any arrangements between Total and SPL, payments required to be made by Total to SPLNG will continue to be made by Total to SPLNG in accordance with its TUA. During the three months ended June 30, 2020 and 2019, SPL recorded $33 million and $32 million, respectively, and during the six months ended June 30, 2020 and 2019, SPL recorded $65 million and $40 million, respectively, as operating and maintenance expense under this partial TUA assignment agreement.

Under each of these TUAs, SPLNG is entitled to retain 2% of the LNG delivered to the Sabine Pass LNG terminal.

Capital Resources

We currently expect that SPL’s capital resources requirements with respect to the SPL Project will be financed through project debt and borrowings, cash flows under the SPAs and equity contributions from Cheniere Partners. We believe that with the net proceeds of borrowings, available commitments under the 2020 SPL Working Capital Facility, 2019 CQP Credit Facilities, cash flows from operations and equity contributions from Cheniere Partners, SPL will have adequate financial resources available to meet its currently anticipated capital, operating and debt service requirements with respect to Trains 1 through 6 of the SPL Project. Additionally, SPLNG generates cash flows from the TUAs, as discussed above.

The following table provides a summary of our capital resources from borrowings and available commitments for the Sabine Pass LNG Terminal, excluding equity contributions to our subsidiaries and cash flows from operations (as described in Sources and Uses of Cash), at June 30, 2020 and December 31, 2019 (in millions):
  June 30, December 31,
  2020 2019
Senior notes (1) $17,750
 $17,750
Credit facilities outstanding balance (2) 
 
Letters of credit issued (3) 409
 414
Available commitments under credit facilities (3) 1,541
 1,536
Total capital resources from borrowings and available commitments (4) $19,700
 $19,700
(1)Includes SPL’s 2021 SPL Senior Notes, 6.25% Senior Secured Notes due 2022, 5.625% Senior Secured Notes due 2023, 5.75% Senior Secured Notes due 2024, 5.625% Senior Secured Notes due 2025, 5.875% Senior Secured Notes due 2026 (the “2026 SPL Senior Notes”), 5.00% Senior Secured Notes due 2027 (the “2027 SPL Senior Notes”), 4.200% Senior Secured Notes due 2028 (the “2028 SPL Senior Notes”), 2030 SPL Senior Notes and 5.00% Senior Secured Notes due 2037 (the “2037 SPL Senior Notes”) (collectively, the “SPL Senior Notes”), as well as Cheniere Partners’ $1.5 billion of 5.250% Senior Notes due 2025 (the “2025 CQP Senior Notes”), $1.1 billion of 5.625% Senior Notes due 2026 (the “2026 CQP Senior Notes”) and the 4.500% Senior Notes due 2029 (the “2029 CQP Senior Notes”) (collectively, the “CQP Senior Notes”).
(2)Includes outstanding balances under the 2015 SPL Working Capital Facility, 2020 SPL Working Capital Facility and 2019 CQP Credit Facilities, inclusive of any portion of the 2020 SPL Working Capital Facility and 2019 CQP Credit Facilities that may be used for general corporate purposes.
(3)Consists of 2015 SPL Working Capital Facility, 2020 SPL Working Capital Facility and 2019 CQP Credit Facilities.
(4)Does not include equity contributions that may be available from Cheniere’s borrowings and available cash and cash equivalents.

For additional information regarding our debt agreements related to the Sabine Pass LNG Terminal, see Note 10—Debt of our Notes to Consolidated Financial Statements in this quarterly report and Note 11—Debt of our Notes to Consolidated Financial Statements in our annual report on Form 10-K for the fiscal year ended December 31, 2019.

Cheniere

ConvertibleSPL Senior Notes

In November 2014, weMay 2020, SPL issued an aggregate principal amount of $1.0$2.0 billion of Convertible Unsecuredthe 2030 SPL Senior Notes. The 2030 SPL Senior Notes due 2021 (the “2021 Cheniere Convertible Unsecured Notes”). accrue interest at a fixed rate of 4.500% per annum, which is payable semi-annually in cash in arrears.

The 2021 Cheniere Convertible UnsecuredSPL Senior Notes are convertible atgoverned by a common indenture (the “SPL Indenture”) and the optionterms of the holder into our common stock at the then applicable conversion rate, provided that the closing price of our common stock is greater than or equal to the conversion price on the date of conversion. In March 2015, we issued $625 million aggregate

principal amount of 4.25% Convertible2037 SPL Senior Notes due 2045are governed by a separate indenture (the “2045 Cheniere Convertible“2037 SPL Senior Notes”Notes Indenture”). We haveBoth the right, at our option, atSPL Indenture and the 2037 SPL Senior Notes Indenture contain terms and events of default and certain covenants that, among other things, limit SPL’s ability and the ability of SPL’s restricted subsidiaries to incur additional indebtedness or issue preferred stock, make certain investments or pay dividends or distributions on capital stock or subordinated indebtedness or purchase, redeem or retire capital stock, sell or transfer assets, including capital stock of SPL’s restricted subsidiaries, restrict dividends or other payments by restricted subsidiaries, incur liens, enter into transactions with affiliates, dissolve, liquidate, consolidate, merge, sell or lease all or substantially all of SPL’s assets and enter into certain LNG sales contracts. Subject to permitted liens, the SPL Senior Notes are secured on a pari passu first-priority basis by a security interest in all of the membership interests in SPL and substantially all of SPL’s assets. SPL may not make any distributions until, among other requirements, deposits are made into debt service reserve accounts as required and a debt service coverage ratio test of 1.25:1.00 is satisfied.

At any time after March 15, 2020,prior to three months before the respective dates of maturity for each series of the SPL Senior Notes (except for the 2026 SPL Senior Notes, 2027 SPL Senior Notes, 2028 SPL Senior Notes, 2030 SPL Senior Notes and 2037 SPL Senior Notes, in which case the time period is six months before the respective dates of maturity), SPL may redeem all or any part of such series of the 2045 Cheniere ConvertibleSPL Senior Notes at a redemption price equal to the accreted‘make-whole’ price (except for the 2037 SPL Senior Notes, in which case the redemption price is equal to the “optional redemption” price) set forth in the respective indentures governing the SPL Senior Notes, plus accrued and unpaid interest, if any, to the date of redemption. SPL may also, at any time within three

months of the respective maturity dates for each series of the SPL Senior Notes (except for the 2026 SPL Senior Notes, 2027 SPL Senior Notes, 2028 SPL Senior Notes, 2030 SPL Senior Notes and 2037 SPL Senior Notes, in which case the time period is within six months of the respective dates of maturity), redeem all or part of such series of the SPL Senior Notes at a redemption price equal to 100% of the principal amount of such series of the 2045 Cheniere ConvertibleSPL Senior Notes to be redeemed, plus accrued and unpaid interest, if any, to the date of redemption.

Both the 2037 SPL Senior Notes Indenture and the SPL Indenture include restrictive covenants. SPL may incur additional indebtedness in the future, including by issuing additional notes, and such redemption date. Weindebtedness could be at higher interest rates and have different maturity dates and more restrictive covenants than the option to satisfycurrent outstanding indebtedness of SPL, including the conversion obligation for the 2021 Cheniere Convertible UnsecuredSPL Senior Notes and the 2045 Cheniere Convertible2020 SPL Working Capital Facility. Under the 2037 SPL Senior Notes with cash, common stock orIndenture and the SPL Indenture, SPL may not make any distributions until, among other requirements, deposits are made into debt service reserve accounts as required and a combination thereof.

Cheniere Revolving Credit Facilitydebt service coverage ratio test of 1.25:1.00 is satisfied. Semi-annual principal payments for the 2037 SPL Senior Notes are due on March 15 and September 15 of each year beginning September 15, 2025 and are fully amortizing according to a fixed sculpted amortization schedule.

In December 2018, we amendedconnection with the closing of the 2030 SPL Senior Notes offering, SPL entered into a registration rights agreement (the “SPL Registration Rights Agreement”). Under the SPL Registration Rights Agreement, SPL and restatedany future guarantors of the Cheniere Revolving Credit2030 SPL Senior Notes, have agreed to file with the SEC and cause to become effective a registration statement relating to an offer to exchange any and all of the 2030 SPL Senior Notes for a like aggregate principal amount of debt securities of SPL with terms identical in all material respects to the 2030 SPL Senior Notes sought to be exchanged (other than with respect to restrictions on transfer or to any increase in annual interest rate) within 360 days after the notes issuance date of May 8, 2020. Under specified circumstances, SPL has agreed to cause to become effective a shelf registration statement relating to resales of the 2030 SPL Senior Notes. SPL will be obligated to pay additional interest on the 2030 SPL Senior Notes if it fails to comply with its obligations to register the 2030 SPL Senior Notes within the specified time period.

2015 SPL Working Capital Facility to increase total

In March 2020, SPL terminated the remaining commitments under the Cheniere Revolving Credit2015 SPL Working Capital Facility. As of December 31, 2019, SPL had $786 million of available commitments, $414 million aggregate amount of issued letters of credit and no outstanding borrowings under the 2015 SPL Working Capital Facility.

2020 SPL Working Capital Facility from $750 million to $1.25 billion.

In March 2020, SPL entered into the 2020 SPL Working Capital Facility with aggregate commitments of $1.2 billion, which replaced the 2015 SPL Working Capital Facility. The Cheniere Revolving Credit2020 SPL Working Capital Facility is intended to fund, throughbe used for loans to SPL, swing line loans to SPL and the issuance of letters of credit equity capital contributionson behalf of SPL, primarily for (1) the refinancing of the 2015 SPL Working Capital Facility, (2) fees and expenses related to CCH HoldCo IIthe 2020 SPL Working Capital Facility, (3) SPL and its subsidiaries for the developmentfuture subsidiaries’ gas purchase obligations and (4) SPL and certain of the CCL Project and, provided that certain conditions are met, forits future subsidiaries’ general corporate purposes.

The Cheniere Revolving Credit Facility matures on December 13, 2022 and contains representations, warranties and affirmative and negative covenants customary for companies like us with lenders of the type participating SPL may, from time to time, request increases in the Cheniere Revolving Credit Facility that limit our ability to make restricted payments, including distributions, unless certain conditions are satisfied, as well as limitations on indebtedness, guarantees, hedging, liens, investments and affiliate transactions. Under the Cheniere Revolving Credit Facility, we are required to ensure that the sum of our unrestricted cash and the amount of undrawn commitments under the Cheniere Revolving Credit Facility is at least equal to the lesser of (1) 20% of the commitments under the Cheniere Revolving Credit2020 SPL Working Capital Facility and (2) $200of up to $800 million. As of June 30, 2020, SPL had $791 million (the “Liquidity Covenant”).

From and after the time at which certain specified conditions are met (the “Trigger Point”), we will have increased flexibility under the Cheniere Revolving Credit Facility to, among other things, (1) make restricted payments and (2) raise incremental commitments. The Trigger Point will occur once (1) completion has occurred for each of Train 1 of the CCL Project (as defined in the CCH Indenture) and Train 5 of the SPL Project (as defined in SPL’s common terms agreement), which has occurred in February 2019 and March 2019, respectively; (2) theavailable commitments, $409 million aggregate principal amount of outstanding loans plus drawn and unreimbursedissued letters of credit and no outstanding borrowings under the Cheniere Revolving Credit Facility is less than or equal to 10% of aggregate commitments under the Cheniere Revolving Credit Facility and (3) we elect on a go-forward basis to be governed by a non-consolidated leverage ratio covenant not to exceed 5.75:1.00 (the “Springing Leverage Covenant”), which following such election will apply at any time that the aggregate principal amount of outstanding loans plus drawn and unreimbursed letters of credit under the Cheniere Revolving Credit Facility is greater than 30% of aggregate commitments under the Cheniere Revolving Credit2020 SPL Working Capital Facility. Following the Trigger Point, at any time that the Springing Leverage Covenant is in effect, the Liquidity Covenant will not apply.

The Cheniere Revolving Credit2020 SPL Working Capital Facility matures on March 19, 2025, but may be extended with consent of the lenders. The 2020 SPL Working Capital Facility provides for mandatory prepayments under customary circumstances.

The 2020 SPL Working Capital Facility contains customary conditions precedent for extensions of credit, as well as customary affirmative and negative covenants. SPL is restricted from making certain distributions under agreements governing its indebtedness generally until, among other requirements, satisfaction of a 12-month forward-looking and backward-looking 1.25:1.00 debt service reserve ratio test. The obligations of SPL under the 2020 SPL Working Capital Facility are secured by substantially all of the assets of SPL as well as a pledge of all of the membership interests in SPL and certain future subsidiaries of SPL on a pari passu basis by a first priority security interest (subject to permitted liens and other customary exceptions) in substantially all of our assets, including our interests in our direct subsidiaries (excluding CCH HoldCo II and certain other subsidiaries).lien with the SPL Senior Notes.

Cash Receipts from Subsidiaries

Our ownership interest in the Sabine Pass LNG terminal is held through Cheniere Partners. As of June 30, 2019, we owned a 48.6% limited partner interest in Cheniere Partners in the form of 104.5 million common units and 135.4 million subordinated units. We also own 100% of the general partner interest and the incentive distribution rights in Cheniere Partners. We are eligible to receive quarterly equity distributions from Cheniere Partners related to our ownership interests and our incentive distribution rights.

We also receive fees for providing management services to some of our subsidiaries. We received $36 million and $38 million in total service fees from these subsidiaries during each of the six months ended June 30, 2019 and 2018, respectively.

Share Repurchase Authorization

On June 3, 2019, we announced that our Board authorized a 3-year, $1.0 billion share repurchase program. During the three months ended June 30, 2019, we repurchased an aggregate of 44,600 shares of our common stock for $3 million, for a weighted average price per share of $68.30. As of June 30, 2019, we had $997 million of the share repurchase authorization available. Under the share repurchase program, repurchases can be made from time to time using a variety of methods, which may include open market purchases, privately negotiated transactions or otherwise, all in accordance with the rules of the SEC and other

applicable legal requirements. The timing and amount of any shares of our common stock that are repurchased under the share repurchase program will be determined by our management based on market conditions and other factors.

Cheniere Partners

CQP Senior Notes

The $1.5 billion of 5.250%CQP Senior Notes due 2025 (the “2025 CQP Senior Notes”) and $1.1 billion of 5.625% Senior Notes due 2026 (the “2026 CQP Senior Notes”) (collectively, the “CQP Senior Notes”) are jointly and severally guaranteed by each of Cheniere Partners’ subsidiaries other than SPL (the “CQP Guarantors”) and, subject to certain conditions governing its guarantee, Sabine Pass LP.LP (each a “Guarantor” and collectively, the “CQP Guarantors”). The CQP Senior Notes are governed by the same base indenture (the “CQP Base Indenture”). The 2025 CQP Senior Notes are further governed by the First Supplemental Indenture, (together with the CQP Base Indenture, the “2025 CQP Notes Indenture”) and the 2026 CQP Senior Notes are further governed by the Second Supplemental Indenture (together withand the 2029 CQP Senior Notes are further governed by the Third Supplemental Indenture. The indentures governing the CQP Base Indenture, the “2026 CQPSenior Notes Indenture”). The 2025 CQP Notes Indenture and the 2026 CQP Notes Indenture contain customary terms and events of default and certain covenants that, among other things, limit the ability of Cheniere Partners and the CQP Guarantors to incur liens and sell assets, enter into transactions with affiliates, enter into sale-leaseback transactions and consolidate, merge or sell, lease or otherwise dispose of all or substantially all of the applicable entity’s properties or assets.

At any time prior to October 1, 2020 for the 2025 CQP Senior Notes, and October 1, 2021 for the 2026 CQP Senior Notes and October 1, 2024 for the 2029 CQP Senior Notes, Cheniere Partners may redeem all or a part of the applicable CQP Senior Notes at a redemption price equal to 100% of the aggregate principal amount of the CQP Senior Notes redeemed, plus the “applicable premium” set forth in the respective indentures governing the CQP Senior Notes, plus accrued and unpaid interest, if any, to the date of redemption. In addition, at any time prior to October 1, 2020 for the 2025 CQP Senior Notes, and October 1, 2021 for the 2026 CQP Senior Notes and October 1, 2024 for the 2029 CQP Senior Notes, Cheniere Partners may redeem up to 35% of the aggregate principal amount of the CQP Senior Notes with an amount of cash not greater than the net cash proceeds from certain equity offerings at a redemption price equal to 105.250% of the aggregate principal amount of the 2025 CQP Senior Notes, and 105.625% of the aggregate principal amount of the 2026 CQP Senior Notes and 104.5% of the aggregate principal amount of the 2029 CQP Senior Notes redeemed, plus accrued and unpaid interest, if any, to the date of redemption. Cheniere Partners also may at any time on or after October 1, 2020 through the maturity date of October 1, 2025 for the 2025 CQP Senior Notes, and October 1, 2021 through the maturity date of October 1, 2026 for the 2026 CQP Senior Notes and October 1, 2024 through the maturity date of October 1, 2029 for the 2029 CQP Senior Notes, redeem the CQP Senior Notes, in whole or in part, at the redemption prices set forth in the respective indentures governing the CQP Senior Notes.

The CQP Senior Notes are Cheniere Partners’ senior obligations, ranking equally in right of payment with Cheniere Partners’ other existing and future unsubordinated debt and senior to any of its future subordinated debt. After applying the proceeds from the 2026 CQP Senior Notes, the CQP Senior Notes became unsecured. In the event that the aggregate amount of Cheniere Partners’ secured indebtedness and the secured indebtedness of the CQP Guarantors (other than the CQP Senior Notes or any other series of notes issued under the CQP Base Indenture) outstanding at any one time exceeds the greater of (1) $1.5 billion and (2) 10% of net tangible assets, the CQP Senior Notes will be secured to the same extent as such obligations under the 2019 CQP Credit Facilities. The obligations under the 2019 CQP Credit Facilities are secured on a first-priority basis (subject to permitted encumbrances) with liens on substantially all the existing and future tangible and intangible assets and rights of Cheniere Partners and the CQP Guarantors and equity interests in the CQP Guarantors (except, in each case, for certain excluded properties set forth in the 2019 CQP Credit Facilities). The liens securing the CQP Senior Notes, if applicable, will be shared equally and ratably (subject to permitted liens) with the holders of other senior secured obligations, which include the 2019 CQP Credit Facilities obligations and any future additional senior secured debt obligations.

2016 CQP Credit Facilities

In May 2019, the remaining commitments under the 2016 CQP Credit Facilities were terminated. 

2019 CQP Credit Facilities

In May 2019, Cheniere Partners entered into the 2019 CQP Credit Facilities, which consistconsisted of athe $750 million term loan (“CQP Term Facility”), which was prepaid and aterminated upon issuance of the 2029 CQP Senior Notes in September 2019, and the $750 million revolving credit facility (“CQP Revolving Facility”). Borrowings under the 2019 CQP Credit Facilities will be used to fund the development and construction of Train 6 of the SPL Project and for general corporate purposes, subject to a sublimit, for general corporate purposes. Theand the 2019 CQP Revolving Facility isCredit Facilities are also available for the issuance of letters of credit.


Loans As of both June 30, 2020 and December 31, 2019, Cheniere Partners had $750 million of available commitments and no letters of credit issued or loans outstanding under the 2019 CQP Credit Facilities will accrue interest at a variable rate per annum equal to LIBOR or the base rate (equal to the highest of the prime rate, the federal funds effective rate, as published by the Federal Reserve Bank of New York, plus 0.50%, and the adjusted one-month LIBOR plus 1.0%), plus the applicable margin. Under the CQP Term Facility, the applicable margin for LIBOR loans is 1.50% per annum, and the applicable margin for base rate loans is 0.50% per annum, in each case with a 0.25% step-up beginning on May 29, 2022. Under the CQP Revolving Facility, the applicable margin for LIBOR loans is 1.25% to 2.125% per annum, and the applicable margin for base rate loans is 0.25% to 1.125% per annum, in each case depending on the then-current rating of Cheniere Partners. Interest on LIBOR loans is due and payable at the end of each applicable LIBOR period (and at the end of every three month period within the LIBOR period, if any), and interest on base rate loans is due and payable at the end of each calendar quarter.

Cheniere Partners pays a commitment fee equal to an annual rate of 30% of the margin for LIBOR loans multiplied by the average daily amount of the undrawn commitment, payable quarterly in arrears.Facilities.

The 2019 CQP Credit Facilities mature on May 29, 2024. The principal of any loans under the 2019 CQP Credit Facilities must be repaid in quarterly installments commencing on May 29, 2023 based on an amortization schedule. Any outstanding balance may be repaid, in whole or in part, at any time without premium or penalty, except for interest hedging and interest rate breakage costs. The 2019 CQP Credit Facilities contain conditions precedent for extensions of credit, as well as customary affirmative and negative covenants, and limit Cheniere Partners’ ability to make restricted payments, including distributions, to once per fiscal quarter and one true-up per fiscal quarter as long as certain conditions are satisfied.


The 2019 CQP Credit Facilities are unconditionally guaranteed and secured by each subsidiarya first priority lien (subject to permitted encumbrances) on substantially all of Cheniere Partners other than SPL, Sabine Pass LNG-LP, LLCPartners’ and the CQP Guarantors’ existing and future tangible and intangible assets and rights and equity interests in the CQP Guarantors (except, in each case, for certain subsidiaries of Cheniere Partners owning other development projects, as well as certain other specified subsidiaries and members ofexcluded properties set forth in the foregoing entities.2019 CQP Credit Facilities).

Sabine PassCorpus Christi LNG Terminal

Liquefaction Facilities

We are in various stages of constructingcurrently operating two Trains and operating the SPL Projectone marine berth at the Sabine Pass LNG terminal adjacent to the existing regasification facilities.CCL Project, commissioning one additional Train and constructing an additional marine berth. We have received authorization from the FERC to site, construct and operate Trains 1 through 6.3 of the CCL Project. We have achieved substantial completioncompleted construction of Trains 1 2, 3, 4 and 52 of the SPLCCL Project and commenced commercial operating activities in May 2016, September 2016, March 2017, October 2017February 2019 and MarchAugust 2019, respectively. The following table summarizes the project completion and construction status of Train 63 of the SPLCCL Project, including the related infrastructure, as of June 30, 2019:2020:
  SPLCCL Train 63
Overall project completion percentage 32.4%90.5%
Completion percentage of: 
Engineering 74.1%100.0%
Procurement 48.2%100.0%
Subcontract work 30.7%83.2%
Construction 2.1%77.5%
DateExpected date of expected substantial completion 1H 20232021

The following orders have been issued by the DOE authorizing the export of domestically produced LNG by vessel from the Sabine Pass LNG terminal:
Trains 1 through 4—FTA countries for a 30-year term, which commenced on May 15, 2016, and non-FTA countries for a 20-year term, which commenced on June 3, 2016, in an amount up to a combined total of the equivalent of 16 mtpa (approximately 803 Bcf/yr of natural gas).
Trains 1 through 4—FTA countries for a 25-year term and non-FTA countries for a 20-year term in an amount up to a combined total of the equivalent of approximately 203 Bcf/yr of natural gas (approximately 4 mtpa).
Trains 5 and 6—FTA countries and non-FTA countries for a 20-year term, in an amount up to a combined total of 503.3 Bcf/yr of natural gas (approximately 10 mtpa).

In each case, the terms of these authorizations begin on the earlier of the date of first export thereunder or the date specified in the particular order, which ranges from five to 10 years from the date the order was issued. In addition, SPL received an order

providing for a three-year makeup period with respect to each of the non-FTA orders for LNG volumes SPL was authorized but unable to export during any portion of the initial 20-year export period of such order.

In January 2018, the DOE issued orders authorizing SPL to export domestically produced LNG by vessel from the Sabine Pass LNG terminal to FTA countries and non-FTA countries over a two-year period commencing January 2018, in an aggregate amount up to the equivalent of 600 Bcf of natural gas (however, exports under this order, when combined with exports under the orders above, may not exceed 1,509 Bcf/yr).

Customers

SPL has entered into fixed price SPAs generally with terms of at least 20 years (plus extension rights) with eight third parties for Trains 1 through 6 of the SPL Project, including an agreement anticipated to be assigned from Cheniere Marketing. Under these SPAs, the customers will purchase LNG from SPL for a price consisting of a fixed fee per MMBtu of LNG (a portion of which is subject to annual adjustment for inflation) plus a variable fee per MMBtu of LNG equal to approximately 115% of Henry Hub. In certain circumstances, the customers may elect to cancel or suspend deliveries of LNG cargoes, in which case the customers would still be required to pay the fixed fee with respect to the contracted volumes that are not delivered as a result of such cancellation or suspension. We refer to the fee component that is applicable regardless of a cancellation or suspension of LNG cargo deliveries under the SPAs as the fixed fee component of the price under SPL’s SPAs. We refer to the fee component that is applicable only in connection with LNG cargo deliveries as the variable fee component of the price under SPL’s SPAs. The variable fees under SPL’s SPAs were sized at the time of entry into each SPA with the intent to cover the costs of gas purchases and transportation related to, and operating and maintenance costs to produce, the LNG to be sold under each such SPA. The SPAs and contracted volumes to be made available under the SPAs are not tied to a specific Train; however, the term of each SPA generally commences upon the date of first commercial delivery of a specified Train.

In aggregate, the annual fixed fee portion to be paid by the third-party SPA customers is approximately $2.3 billion for Trains 1 through 4 and increasing to $2.9 billion upon the date of first commercial delivery of Train 5, with the applicable fixed fees starting from the date of first commercial delivery from the applicable Train, as specified in each SPA.

Natural Gas Transportation, Storage and Supply

To ensure SPL is able to transport adequate natural gas feedstock to the Sabine Pass LNG terminal, it has entered into transportation precedent and other agreements to secure firm pipeline transportation capacity with CTPL and third-party pipeline companies. SPL has entered into firm storage services agreements with third parties to assist in managing variability in natural gas needs for the SPL Project. SPL has also entered into enabling agreements and long-term natural gas supply contracts with third parties in order to secure natural gas feedstock for the SPL Project. As of June 30, 2019, SPL had secured up to approximately 3,437 TBtu of natural gas feedstock through long-term and short-term natural gas supply contracts.

Construction

SPL entered into lump sum turnkey contracts with Bechtel for the engineering, procurement and construction of Trains 1 through 6 of the SPL Project, under which Bechtel charges a lump sum for all work performed and generally bears project cost risk unless certain specified events occur, in which case Bechtel may cause SPL to enter into a change order, or SPL agrees with Bechtel to a change order.

The total contract price of the EPC contract for Train 6 of the SPL Project is approximately $2.5 billion, including estimated costs for an optional third marine berth.

Regasification Facilities
The Sabine Pass LNG terminal has operational regasification capacity of approximately 4.0 Bcf/d and aggregate LNG storage capacity of approximately 16.9 Bcfe. Approximately 2.0 Bcf/d of the regasification capacity at the Sabine Pass LNG terminal has been reserved under two long-term third-party TUAs, under which SPLNG’s customers are required to pay fixed monthly fees, whether or not they use the LNG terminal.  Each of Total Gas & Power North America, Inc. (“Total”) and Chevron U.S.A. Inc. (“Chevron”) has reserved approximately 1.0 Bcf/d of regasification capacity and is obligated to make monthly capacity payments to SPLNG aggregating approximately $125 million annually, prior to inflation adjustments, for 20 years that commenced

in 2009. Total S.A. has guaranteed Total’s obligations under its TUA up to $2.5 billion, subject to certain exceptions, and Chevron Corporation has guaranteed Chevron’s obligations under its TUA up to 80% of the fees payable by Chevron.

The remaining approximately 2.0 Bcf/d of capacity has been reserved under a TUA by SPL. SPL is obligated to make monthly capacity payments to SPLNG aggregating approximately $250 million annually, prior to inflation adjustments, continuing until at least May 2036. SPL entered into a partial TUA assignment agreement with Total, whereby upon substantial completion of Train 5 of the SPL Project, SPL gained access to substantially all of Total’s capacity and other services provided under Total’s TUA with SPLNG. This agreement provides SPL with additional berthing and storage capacity at the Sabine Pass LNG terminal that may be used to provide increased flexibility in managing LNG cargo loading and unloading activity, permit SPL to more flexibly manage its LNG storage capacity and accommodate the development of Train 6. Notwithstanding any arrangements between Total and SPL, payments required to be made by Total to SPLNG will continue to be made by Total to SPLNG in accordance with its TUA. During the three months ended June 30, 2019 and 2018, SPL recorded $32 million and $7.5 million, respectively, and during the six months ended June 30, 2019 and 2018, SPL recorded $40 million and $15 million, respectively, as operating and maintenance expense under this partial TUA assignment agreement.

Under each of these TUAs, SPLNG is entitled to retain 2% of the LNG delivered to the Sabine Pass LNG terminal.

Capital Resources

We currently expect that SPL’s capital resources requirements with respect to the SPL Project will be financed through project debt and borrowings, cash flows under the SPAs and equity contributions from Cheniere Partners. We believe that with the net proceeds of borrowings, available commitments under the SPL Working Capital Facility, 2019 CQP Credit Facilities and cash flows from operations, we will have adequate financial resources available to meet our currently anticipated capital, operating and debt service requirements with respect to Trains 1 through 6 of the SPL Project. SPL began generating cash flows from operations from the SPL Project in May 2016, when Train 1 achieved substantial completion and initiated operating activities. Trains 2, 3, 4 and 5 subsequently achieved substantial completion in September 2016, March 2017, October 2017 and March 2019, respectively. We realized offsets to LNG terminal costs of $74 million in the six months ended June 30, 2019, respectively, that were related to the sale of commissioning cargoes because these amounts were earned or loaded prior to the start of commercial operations of Train 5 of the SPL Project during the testing phase for its construction. We did not realize any offsets to LNG terminal costs in the three months ended June 30, 2019 and the three and six months ended June 30, 2018. Additionally, SPLNG generates cash flows from the TUAs, as discussed above.
The following table provides a summary of our capital resources from borrowings and available commitments for the Sabine Pass LNG Terminal, excluding equity contributions to our subsidiaries and cash flows from operations (as described in Sources and Uses of Cash), at June 30, 2019 and December 31, 2018 (in millions):
  June 30, December 31,
  2019 2018
Senior notes (1) $16,250
 $16,250
Credit facilities outstanding balance (2) 649
 
Letters of credit issued (3) 415
 425
Available commitments under credit facilities (3) 1,636
 775
Total capital resources from borrowings and available commitments (4) $18,950
 $17,450
(1)Includes SPL’s 5.625% Senior Secured Notes due 2021, 6.25% Senior Secured Notes due 2022, 5.625% Senior Secured Notes due 2023, 5.75% Senior Secured Notes due 2024, 5.625% Senior Secured Notes due 2025, 5.875% Senior Secured Notes due 2026 (the “2026 SPL Senior Notes”), 5.00% Senior Secured Notes due 2027 (the “2027 SPL Senior Notes”), 4.200% Senior Secured Notes due 2028 (the “2028 SPL Senior Notes”) and 5.00% Senior Secured Notes due 2037 (the “2037 SPL Senior Notes”) (collectively, the “SPL Senior Notes”) and Cheniere Partners’ 2025 CQP Senior Notes and 2026 CQP Senior Notes.
(2)Includes outstanding balances under the SPL Working Capital Facility and 2019 CQP Credit Facilities, inclusive of any portion of the 2019 CQP Credit Facilities that may be used for general corporate purposes.
(3)Consists of SPL Working Capital Facility and 2019 CQP Credit Facilities. Balance at December 31, 2018 did not include the letters of credit issued or available commitments under the terminated 2016 CQP Credit Facilities, which were not specifically for the Sabine Pass LNG Terminal.

(4)Does not include Cheniere’s additional borrowings from the 2021 Cheniere Convertible Unsecured Notes and the 2045 Cheniere Convertible Senior Notes, which may be used for the Sabine Pass LNG Terminal.

For additional information regarding our debt agreements related to the Sabine Pass LNG Terminal, see Note 10—Debt of our Notes to Consolidated Financial Statements in this quarterly report and Note 12—Debt of our Notes to Consolidated Financial Statements in our annual report on Form 10-K for the year ended December 31, 2018.

SPL Senior Notes

The SPL Senior Notes are secured on a pari passu first-priority basis by a security interest in all of the membership interests in SPL and substantially all of SPL’s assets.

At any time prior to three months before the respective dates of maturity for each series of the SPL Senior Notes (except for the 2026 SPL Senior Notes, 2027 SPL Senior Notes, 2028 SPL Senior Notes and 2037 SPL Senior Notes, in which case the time period is six months before the respective dates of maturity), SPL may redeem all or part of such series of the SPL Senior Notes at a redemption price equal to the “make-whole” price (except for the 2037 SPL Senior Notes, in which case the redemption price is equal to the “optional redemption” price) set forth in the respective indentures governing the SPL Senior Notes, plus accrued and unpaid interest, if any, to the date of redemption. SPL may also, at any time within three months of the respective maturity dates for each series of the SPL Senior Notes (except for the 2026 SPL Senior Notes, 2027 SPL Senior Notes, 2028 SPL Senior Notes and 2037 SPL Senior Notes, in which case the time period is within six months of the respective dates of maturity), redeem all or part of such series of the SPL Senior Notes at a redemption price equal to 100% of the principal amount of such series of the SPL Senior Notes to be redeemed, plus accrued and unpaid interest, if any, to the date of redemption.

Both the indenture governing the 2037 SPL Senior Notes (the “2037 SPL Senior Notes Indenture”) and the common indenture governing the remainder of the SPL Senior Notes (the “SPL Indenture”) include restrictive covenants. SPL may incur additional indebtedness in the future, including by issuing additional notes, and such indebtedness could be at higher interest rates and have different maturity dates and more restrictive covenants than the current outstanding indebtedness of SPL, including the SPL Senior Notes and the SPL Working Capital Facility. Under the 2037 SPL Senior Notes Indenture and the SPL Indenture, SPL may not make any distributions until, among other requirements, deposits are made into debt service reserve accounts as required and a debt service coverage ratio test of 1.25:1.00 is satisfied. Semi-annual principal payments for the 2037 SPL Senior Notes are due on March 15 and September 15 of each year beginning September 15, 2025.
SPL Working Capital Facility

In September 2015, SPL entered into the SPL Working Capital Facility, which is intended to be used for loans to SPL (“SPL Working Capital Loans”), the issuance of letters of credit on behalf of SPL, as well as for swing line loans to SPL (“SPL Swing Line Loans”), primarily for certain working capital requirements related to developing and placing into operation the SPL Project. SPL may, from time to time, request increases in the commitments under the SPL Working Capital Facility of up to $760 million and, upon the completion of the debt financing of Train 6 of the SPL Project, request an incremental increase in commitments of up to an additional $390 million. As of June 30, 2019 and December 31, 2018, SPL had $785 million and $775 million of available commitments and $415 million and $425 million aggregate amount of issued letters of credit under the SPL Working Capital Facility, respectively. SPL did not have any amounts outstanding under the SPL Working Capital Facility as of both June 30, 2019 and December 31, 2018.

The SPL Working Capital Facility matures on December 31, 2020, and the outstanding balance may be repaid, in whole or in part, at any time without premium or penalty upon three business days’ notice. Loans deemed made in connection with a draw upon a letter of credit have a term of up to one year. SPL Swing Line Loans terminate upon the earliest of (1) the maturity date or earlier termination of the SPL Working Capital Facility, (2) the date 15 days after such SPL Swing Line Loan is made and (3) the first borrowing date for a SPL Working Capital Loan or SPL Swing Line Loan occurring at least three business days following the date the SPL Swing Line Loan is made. SPL is required to reduce the aggregate outstanding principal amount of all SPL Working Capital Loans to zero for a period of five consecutive business days at least once each year.

The SPL Working Capital Facility contains conditions precedent for extensions of credit, as well as customary affirmative and negative covenants. The obligations of SPL under the SPL Working Capital Facility are secured by substantially all of the assets of SPL as well as all of the membership interests in SPL on a pari passu basis with the SPL Senior Notes.


Corpus Christi LNG Terminal

Liquefaction Facilities

We are in various stages of constructing and operating the CCL Project at the Corpus Christi LNG terminal. We have received authorization from the FERC to site, construct and operate Stages 1 and 2 of the CCL Project. We achieved substantial completion of Train 1 of the CCL Project and commenced operating activities in February 2019. The following table summarizes the overall project status of the CCL Project as of June 30, 2019:
 CCL Stage 1 CCL Stage 2
Overall project completion percentage99.5% 62.4%
Completion percentage of:    
Engineering100% 94.3%
Procurement100% 92.5%
Subcontract work96.4% 12.2%
Construction99.2% 29.2%
Expected date of substantial completionTrain 23Q 2019 Train 32H 2021

Separate from the CCH Group, we are also developing Corpus Christi Stage 3 through our subsidiary CCL Stage III, adjacent to the CCL Project. We filed an application with thereceived approval from FERC in June 2018 forNovember 2019 to site, construct and operate seven midscale Trains with an expected aggregate nominaltotal production capacity of approximately 9.510 mtpa and one LNG storage tank.of LNG.

The following orders have been issued by the DOE authorizing the export of domestically produced LNG by vessel from the Corpus Christi LNG terminal:
CCL Project—FTA countries for a 25-year term and to non-FTA countries for a 20-year term, both of which commenced in June 2019, up to a combined total of the equivalent of 767 Bcf/yr (approximately 15 mtpa) of natural gas.
Corpus Christi Stage 3—FTA countries for a 25-year term and to non-FTA countries for a 20-year term in an amount equivalent to 514582.14 Bcf/yr (approximately 1011 mtpa) of natural gas (the “Stage 3 FTA”). The application for authorization to export that same 514 Bcf/yr of domestically produced LNG by vessel to non-FTA countries is currently pending before the DOE (the “Stage 3 Non-FTA”).gas.

In each case, the terms of these authorizations begin on the earlier of the date of first export thereunder or the date specified in the particular order, which ranges from seven to 10 years from the date the order was issued.

In June 2018, we requested that DOE vacateAn application was filed in September 2019 to authorize additional exports from the Stage 3 FTA and permit us to withdraw the pending Stage 3 Non-FTA. These requests were made due to certain changes to Corpus Christi Stage 3.

In conjunction with the submission in June 2018 of our FERC application for Corpus Christi Stage 3, we submitted a new application for long-term multi-contract authorization to export up to a combined total of 582.14 Bcf/yr (approximately 11.45 mtpa) of natural gasCCL Project to FTA countries for a 25-year term and to non-FTA countries for a 20-year term.term in an amount up to the equivalent of approximately 108 Bcf/yr of natural gas, for a total CCL Project export of 875.16 Bcf/yr. The termterms of each authorization is expectedthe authorizations are requested to begincommence on the earlier of the date of first commercial export of LNG produced by Corpus Christi Stage 3 or the date which is seven years from the issuanceCCL Project of such authorizations.the volumes contemplated in the application. DOE’s authorization for FTA countries has been granted. The DOE application for non-FTA countries is currently pending before the DOE.

Customers

CCL has entered into fixed price long-term SPAs generally with terms of 20 years (plus extension rights) with nine third parties for Trains 1 through 3 of the CCL Project. Under these SPAs, the customers will purchase LNG from CCL on a FOB basis for a price consisting of a fixed fee per MMBtu of LNG (a portion of which is subject to annual adjustment for inflation) plus a variable fee per MMBtu of LNG equal to approximately 115% of Henry Hub. In certain circumstances, theThe customers may elect to cancel or suspend deliveries of LNG cargoes, with advance notice as governed by each respective SPA, in which case the customers would still be required to pay the fixed fee with respect to the contracted volumes that are not delivered as a result of such cancellation or suspension. We refer to the fee component that is applicable regardless of a cancellation or suspension of LNG cargo deliveries under the SPAs as the fixed fee component of the price under our SPAs. We refer to the fee component that is applicable only in connection with LNG cargo deliveries as the variable fee component of the price under our SPAs.SPAs. The variable fee under CCL’s

SPAs entered into in connection with the development of the CCL Project was sized at the time of entry into each SPA with the intent to cover the costs of gas purchases and transportation related to, and operating and maintenance costsliquefaction fuel to produce the LNG to be sold under each such SPA. The SPAs and contracted

volumes to be made available under the SPAs are not tied to a specific Train; however, the term of each SPA generally commences upon the date of first commercial delivery for the applicable Train, as specified in each SPA.

In aggregate, the minimum annual fixed fee portion to be paid by the third-party SPA customers is approximately $550 million for Train 1, increasing to approximately $1.4 billion upon the date of first commercial delivery for TrainTrains 1 and 2 and further increasing to approximately $1.8 billion following the substantial completion of Train 3 of the CCL Project.

In addition, Cheniere Marketing has entered into SPAsagreements with CCL to purchasepurchase: (1) approximately 15 TBtu per annum of LNG andwith an approximate term of 23 years, (2) any LNG produced by CCL in excess of that required for other customers at Cheniere Marketing’s option.option and (3) approximately 44 TBtu of LNG with a term of up to seven years associated with the IPM gas supply agreement between CCL and EOG. See Marketing section for additional information regarding agreements entered into by Cheniere Marketing.

Natural Gas Transportation, Storage and Supply

To ensure CCL is able to transport adequate natural gas feedstock to the Corpus Christi LNG terminal, it has entered into transportation precedent agreements to secure firm pipeline transportation capacity with CCP and certain third-party pipeline companies. CCL has entered into a firm storage services agreement with a third party to assist in managing variability in natural gas needs for the CCL Project. CCL has also entered into enabling agreements and long-term natural gas supply contracts with third parties, and will continue to enter into such agreements, in order to secure natural gas feedstock for the CCL Project. As of June 30, 2019,2020, CCL had secured up to approximately 2,7872,935 TBtu of natural gas feedstock through long-term natural gas supply contracts with remaining terms that range up to 10 years, a portion of which is subject to the achievement of certain project milestones and other conditions precedent.

CCL Stage III has also entered into long-term natural gas supply contracts with third parties, and anticipates continuing to enter into such agreements, in order to secure natural gas feedstock for Corpus Christi Stage 3. As of June 30, 2020, CCL Stage III had secured up to approximately 2,361 TBtu of natural gas feedstock through long-term natural gas supply contracts with remaining terms that range up to approximately 15 years, which is subject to the achievement of certain project milestones and other conditions precedent.

A portion of the natural gas feedstock transactions for CCL and CCL Stage III are IPM transactions, in which the natural gas producers are paid based on a global gas market price less a fixed liquefaction fee and certain costs incurred by us.

Construction

CCL entered into separate lump sum turnkey contracts with Bechtel for the engineering, procurement and construction of StagesTrains 1 and 2through 3 of the CCL Project under which Bechtel charges a lump sum for all work performed and generally bears project cost, riskschedule and performance risks unless certain specified events occur, in which case Bechtel may cause CCL to enter into a change order, or CCL agrees with Bechtel to a change order.

The total contract pricesprice of the EPC contract for Stage 1 and the EPC contract for Stage 2,Train 3, which do not include the Corpus Christi Pipeline, areis currently under construction, is approximately $7.8 billion and $2.4 billion, respectively, reflecting amounts incurred under change orders through June 30, 2019. Total expected capital costs2020. As of June 30, 2020, we have incurred $2.2 billion under this contract.

Final Investment Decision for Trains 1 throughCorpus Christi Stage 3 are estimated to be between $11.0 billion and $12.0 billion before financing costs and between $15.0 billion and $16.0 billion after financing costs including, in each case, estimated owner’s costs and contingencies.

FID for Corpus Christi Stage 3 will be subject to, among other things, entering into an EPC contract, obtaining additional commercial support for the project and securing the necessary financing arrangements.
Pipeline Facilities

In December 2014,November 2019, the FERC issued a certificate of public convenience and necessity under Section 7(c) of the Natural Gas Act of 1938, as amended, authorizingauthorized CCP to construct and operate the pipeline for Corpus Christi Pipeline.Stage 3. The Corpus Christi Pipeline ispipeline will be designed to transport 2.251.5 Bcf/d of natural gas feedstock required by the CCL ProjectCorpus Christi Stage 3 from the existing regional natural gas pipeline grid. The construction of the Corpus Christi Pipeline was completed in the second quarter of 2018.


Capital Resources

The CCH Group expects to finance the construction costs of the CCL Project from one or more of the following: project financing, operating cash flows from CCL and CCP, project debt and equity contributions from Cheniere. We realized offsets to LNG terminal costs of $128 million in the six months ended June 30, 2019 that were related to the sale of commissioning cargoes because these amounts were earned or loaded prior to the start of commercial operations of Train 1 during the testing phase for its construction. We did not realize any offsets to LNG terminal costs in the three months ended June 30, 2019. The following table provides a summary of the capital resources of the CCH Group from borrowings and available commitments for the CCL Project, excluding equity contributions from Cheniere, at June 30, 20192020 and December 31, 20182019 (in millions):
 June 30, December 31, June 30, December 31,
 2019 2018 2020 2019
Senior notes (1) $4,250
 $4,250
 $6,952
 $6,952
11.0% Convertible Senior Secured Notes due 2025 (2) 1,000
 1,000
 700
 1,000
Credit facilities outstanding balance (3) 6,138
 5,324
 3,424
 3,283
Letters of credit issued (3) 338
 316
 392
 471
Available commitments under credit facilities (3) 862
 1,698
 667
 729
Total capital resources from borrowings and available commitments (4) $12,588
 $12,588
 $12,135
 $12,435
 
(1)Includes CCH’s 7.000% Senior Secured Notes due 2024 (the “2024 CCH Senior Notes”), 5.875% Senior Secured Notes due 2025 (the “2025 CCH Senior Notes”) and, 5.125% Senior Secured Notes due 2027 (the “2027 CCH Senior Notes”), 3.700% Senior Secured Notes due 2029 (the “2029 CCH Senior Notes”), 4.80% Senior Secured Notes due 2039 (the “4.80% CCH Senior Notes”) and 3.925% Senior Secured Notes due 2039 (the “3.925% CCH Senior Notes”) (collectively, the “CCH Senior Notes”).
(2)Aggregate original principal amount before debt discount and debt issuance costs.costs and interest paid-in-kind.
(3)Includes CCH’s amended and restated credit facility (“CCH Credit FacilityFacility”) and CCH Working Capital Facility.
(4)Does not include Cheniere’s additional borrowings from 2021 Cheniere Convertible Unsecured Notes, 2045 Cheniere Convertible Senior Notes and Cheniere Revolving Credit Facility, whichequity contributions that may be used for the CCL Project.available from Cheniere’s borrowings and available cash and cash equivalents.

For additional information regarding our debt agreements related to the CCL Project, see Note 10—Debt of our Notes to Consolidated Financial Statements in this quarterly report and Note 12—Debt of our Notes to Consolidated Financial Statements in our annual report on Form 10-K for the year ended December 31, 2018.

2025 CCH HoldCo II Convertible Senior Notes

In May 2015, CCH HoldCo II issued $1.0 billion aggregate principal amount of 11.0% Convertible Senior Secured Notes duethe 2025 (the “2025 CCH HoldCo II Convertible Senior Notes”)Notes on a private placement basis. The 2025 CCH HoldCo II Convertible Senior Notes arewere convertible at the option of CCH HoldCo II or the holders on or after March 1, 2020 and September 1, 2020, respectively, provided the total market capitalization of Cheniere at that varioustime was not less than $10.0 billion and certain other conditions are met.were satisfied. CCH HoldCo II iswas restricted from making distributions to Cheniere under agreements governing its indebtedness generally until, among other requirements, Trains 1 and 2 of the CCL Project are in commercial operation and a historical debt service coverage ratio and a projected fixed debt service coverage ratio of 1.20:1.00 arewere achieved. The 2025 CCH HoldCo II Convertible Senior Notes were secured by a pledge by us of 100% of the equity interests in CCH HoldCo II, and a pledge by CCH HoldCo II of 100% of the equity interests in CCH HoldCo I. In addition, the 2025 CCH HoldCo II Convertible Senior Notes were secured by a security interest in the account into which all distributions from CCH HoldCo I to CCH HoldCo II must be deposited.

In May 2018, the amended and restated note purchase agreement under which the 2025 CCH HoldCo II Convertible Senior Notes were issued was subsequently amended in connection with commercialization and financing of Train 3 of the CCL Project and to provide the note holders with certain prepayment rights related thereto consistent with those under the CCH Credit Facility.  All terms ofIn February 2020, the amended and restated note purchase agreement for the 2025 CCH HoldCo II Convertible Senior Notes substantially remained unchanged.was further amended to allow CCH HoldCo II the option to redeem all or a portion of the outstanding notes with cash at a price of $1,080 per $1,000 principal amount, at the time of any CCH HoldCo II- or noteholder-initiated conversion through September 2, 2020. In March 2020, CCH HoldCo II redeemed an aggregate outstanding principal amount of $300 million and in July 2020, redeemed the remaining outstanding principal amount with borrowings under the Cheniere Term Loan Facility.

CCH Senior Notes

The CCH Senior Notes are jointly and severally guaranteed by CCH’s subsidiaries, CCL, CCP and Corpus Christi Pipeline GP, LLC (the(each a “CCH Guarantor” and collectively, the “CCH Guarantors”). The indentureindentures governing the CCH Senior Notes (the “CCH Indenture”) containscontain customary terms and events of default and certain covenants that, among other things, limit CCH’s ability and the ability of CCH’s restricted subsidiaries to: incur additional indebtedness or issue preferred stock; make certain investments or pay dividends

or distributions on membership interests or subordinated indebtedness or purchase, redeem or retire membership interests; sell or transfer assets, including membership or partnership interests of CCH’s restricted subsidiaries; restrict dividends or other payments by restricted subsidiaries to CCH or any of CCH’s restricted subsidiaries; incur liens; enter into transactions with affiliates; dissolve, liquidate, consolidate, merge, sell or lease all or substantially all of the properties or assets of CCH and its restricted subsidiaries taken as a

whole; or permit any CCH Guarantor to dissolve, liquidate, consolidate, merge, sell or lease all or substantially all of its properties and assets. The covenants included in the respective indentures that govern the CCH Senior Notes are subject to a number of important limitations and exceptions.

The CCH Senior Notes are CCH’s senior secured obligations, ranking senior in right of payment to any and all of CCH’s future indebtedness that is subordinated to the CCH Senior Notes and equal in right of payment with CCH’s other existing and future indebtedness that is senior and secured by the same collateral securing the CCH Senior Notes. The CCH Senior Notes are secured by a first-priority security interest in substantially all of CCH’s and the CCH Guarantors’ assets.

At any time prior to six months before the respective dates of maturity for each series of the CCH Senior Notes, CCH may redeem all or part of such series of the CCH Senior Notes at a redemption price equal to the “make-whole” price set forth in the CCH Indenture,appropriate indenture, plus accrued and unpaid interest, if any, to the date of redemption. CCH also may atAt any time within six months of the respective dates of maturity for each series of the CCH Senior Notes, CCH may redeem all or part of such series of the CCH Senior Notes, in whole or in part, at a redemption price equal to 100% of the principal amount of the CCH Senior Notes to be redeemed, plus accrued and unpaid interest, if any, to the date of redemption.

CCH Credit Facility

In May 2018, CCH amended and restated the CCH Credit Facility to increase total commitments under the CCH Credit Facility from $4.6 billion to $6.1 billion. The obligations of CCH under the CCH Credit Facility are secured by a first priority lien on substantially all of the assets of CCH and its subsidiaries and by a pledge by CCH HoldCo I of its limited liability company interests in CCH. As of both June 30, 20192020 and December 31, 2018,2019, CCH had zero and $1.0 billion ofno available commitments and $6.1 billion and $5.2$3.3 billion of loans outstanding under the CCH Credit Facility, respectively.Facility.

The CCH Credit Facility matures on June 30, 2024, with principal payments due quarterly commencing on the earlier of (1) the first quarterly payment date occurring more than three calendar months following the completion of the CCL Project as defined in the common terms agreement and (2) a set date determined by reference to the date under which a certain LNG buyer linked to the last Train of the CCL Project to become operational is entitled to terminate its SPA for failure to achieve the date of first commercial delivery for that agreement. Scheduled repayments will be based upon a 19-year tailored amortization, commencing the first full quarter after the completion of Trains 1 through 3 and designed to achieve a minimum projected fixed debt service coverage ratio of 1.50:1.

Under the CCH Credit Facility, CCH is required to hedge not less than 65% of the variable interest rate exposure of its senior secured debt. CCH is restricted from making certain distributions under agreements governing its indebtedness generally until, among other requirements, the completion of the construction of Trains 1 through 3 of the CCL Project, funding of a debt service reserve account equal to six months of debt service and achieving a historical debt service coverage ratio and fixed projected debt service coverage ratio of at least 1.25:1.00.

CCH Working Capital Facility

In June 2018, CCH amended and restated the CCH Working Capital Facility to increase total commitments under the CCH Working Capital Facility from $350 million to $1.2 billion. The CCH Working Capital Facility is intended to be used for loans to CCH (“CCH Working Capital Loans”) and the issuance of letters of credit on behalf of CCH for certain working capital requirements related to developing and placing into operationsoperating the CCL Project and for related business purposes. Loans under the CCH Working Capital Facility are guaranteed by the CCH Guarantors. CCH may, from time to time, request increases in the commitments under the CCH Working Capital Facility of up to the maximum allowed for working capital under the Common Terms Agreement that was entered into concurrently with the CCH Credit Facility. As of June 30, 20192020 and December 31, 2018,2019, CCH had $862$667 million and $716$729 million of available commitments, $338$392 million and $316$471 million aggregate amount of issued letters of credit and zero$141 million and $168 millionzero of loans outstanding under the CCH Working Capital Facility, respectively.

The CCH Working Capital Facility matures on June 29, 2023, and CCH may prepay the CCH Working Capital Loans and loans made in connection with a draw upon any letter of credit (“CCH LC Loans”) at any time without premium or penalty upon

three business days’ notice and may re-borrow at any time. CCH LC Loans have a term of up to one year. CCH is required to reduce the aggregate outstanding principal amount of all CCH Working Capital Loans to zero for a period of five consecutive business days at least once each year.

The CCH Working Capital Facility contains conditions precedent for extensions of credit, as well as customary affirmative and negative covenants. The obligations of CCH under the CCH Working Capital Facility are secured by substantially all of the assets of CCH and the CCH Guarantors as well as all of the membership interests in CCH and each of the CCH Guarantors on a pari passu basis with the CCH Senior Notes and the CCH Credit Facility.


Cheniere
CCH Note Purchase Agreement
Convertible Notes

In June 2019, CCH entered into the CCH Note Purchase Agreement with Allianz Global Investors GmbH to issueNovember 2014, we issued an aggregate principal amount of $727 million$1.0 billion of the 2039 CCH2021 Cheniere Convertible Unsecured Notes. The 2021 Cheniere Convertible Unsecured Notes are convertible at the option of the holder into our common stock at the then applicable conversion rate, provided that the closing price of our common stock is greater than or equal to the conversion price on the date of conversion. In March 2015, we issued $625 million aggregate principal amount of unsecured 2045 Cheniere Convertible Senior Notes. We have the right, at our option, at any time after March 15, 2020, to redeem all or any part of the 2045 Cheniere Convertible Senior Notes which will be jointly and severally guaranteed byat a redemption price equal to the CCH Guarantors. The conditions to closing and issuanceaccreted amount of the 2039 CCH2045 Cheniere Convertible Senior Notes includeto be redeemed, plus accrued and unpaid interest, if any, to such redemption date. We have the receipt of at least two investment grade ratings for the 2039 CCH Senior Notes, in addition to other customary conditions to closing. Pursuant to the CCH Note Purchase Agreement, CCH has up to 12 months, subject to a six-month extension at CCH’s option to satisfy the conditions to closingconversion obligation for the 2021 Cheniere Convertible Unsecured Notes and issuance. The net proceeds from the 2039 CCH2045 Cheniere Convertible Senior Notes will be used by CCHwith cash, common stock or a combination thereof. In July 2020, we repurchased $844 million in aggregate principal amount of the outstanding 2021 Cheniere Convertible Unsecured Notes at individually negotiated prices from a small number of investors.

Cheniere Revolving Credit Facility

In December 2018, we amended and restated the Cheniere Revolving Credit Facility to repay a portion of its outstanding termincrease total commitments under the Cheniere Revolving Credit Facility from $750 million to $1.25 billion. The Cheniere Revolving Credit Facility is intended to fund, through loans and pay fees, costsletters of credit, equity capital contributions to CCH HoldCo II and expenses incurred in connection withits subsidiaries for the repaymentdevelopment of such outstanding term loans and/or the transactions contemplated in the CCH Note Purchase Agreement.

Restrictive Debt Covenants

CCL Project and, provided that certain conditions are met, for general corporate purposes. As of June 30, 2020 and December 31, 2019, we had $562 million and $665 million of available commitments, $313 million and $585 million aggregate amount of issued letters of credit and $375 million and zero of loans outstanding under the Cheniere Revolving Credit Facility, respectively.

The Cheniere Revolving Credit Facility matures on December 13, 2022 and contains representations, warranties and affirmative and negative covenants customary for companies like us with lenders of the type participating in the Cheniere Revolving Credit Facility that limit our ability to make restricted payments, including distributions, unless certain conditions are satisfied, as well as limitations on indebtedness, guarantees, hedging, liens, investments and affiliate transactions. Under the Cheniere Revolving Credit Facility, we are required to ensure that the sum of our unrestricted cash and the amount of undrawn commitments under the Cheniere Revolving Credit Facility is at least equal to the lesser of (1) 20% of the commitments under the Cheniere Revolving Credit Facility and (2) $200 million (the “Liquidity Covenant”). However, at any time that the aggregate principal amount of outstanding loans plus drawn and unreimbursed letters of credit under the Cheniere Revolving Credit Facility is greater than 30% of aggregate commitments under the Cheniere Revolving Credit Facility, the Liquidity Covenant will not apply and we will instead be governed by a quarterly non-consolidated leverage ratio covenant not to exceed 5.75:1.00 (the “Springing Leverage Covenant”).

The Cheniere Revolving Credit Facility is secured by a first priority security interest (subject to permitted liens and other customary exceptions) in substantially all of our assets, including our interests in our direct subsidiaries (excluding CCH HoldCo II and certain other subsidiaries).

Cheniere Term Loan Facility

In June 2020, we entered into the Cheniere Term Loan Facility, which was subsequently increased to $2.695 billion in July 2020. In July 2020, borrowings under the Cheniere Term Loan Facility were used to (1) redeem the remaining outstanding principal amount of the 2025 CCH HoldCo II Convertible Senior Notes, (2) repurchase $844 million in aggregate principal amount of outstanding 2021 Cheniere Convertible Unsecured Notes at individually negotiated prices from a small number of investors and

(3) pay the related fees and expenses. The remaining borrowings under the Cheniere Term Loan Facility are expected to be used to repay and/or repurchase a portion of the remaining principal amount of the 2021 Cheniere Convertible Unsecured Notes and for the payment of related fees and expenses. As of June 30, 2020, we had $2.6 billion of available commitments and no letters of credit issued or loans outstanding under the Cheniere Term Loan Facility. Subsequent to the borrowings in July 2020, we had $372 million of available commitments under the Cheniere Term Loan Facility.
The Cheniere Term Loan Facility matures on June 18, 2023. Loans under the Cheniere Term Loan Facility may be voluntarily prepaid, in whole or in part, at any time, without premium or penalty. Borrowings under the Cheniere Term Loan Facility are subject to customary conditions precedent. The Cheniere Term Loan Facility includes representations, warranties, affirmative and negative covenants and events of default customary for companies like us with lenders of the type participating in the Cheniere Term Loan Facility and consistent with the equivalent provisions contained in the Cheniere Revolving Credit Facility.

The Cheniere Term Loan Facility is secured by a first priority security interest (subject to permitted liens and other customary exceptions) on a pari passu basis with the Cheniere Revolving Credit Facility in substantially all of our assets and equity interests in direct subsidiaries (other than certain excluded subsidiaries). Upon redemption of the 2025 CCH HoldCo II Convertible Senior Notes in July 2020, the equity interests in CCH HoldCo II were pledged as collateral to secure the obligations under the Cheniere Revolving Credit Facility and the Cheniere Term Loan Facility.

Cash Receipts from Subsidiaries

Our ownership interest in the Sabine Pass LNG terminal is held through Cheniere Partners. As of June 30, 2020, we owned a 48.6% limited partner interest in Cheniere Partners in the form of 104.5 million common units and 135.4 million subordinated units. We also own 100% of the general partner interest and the incentive distribution rights in Cheniere Partners. We are eligible to receive quarterly equity distributions from Cheniere Partners related to our ownership interests and our incentive distribution rights.

We also receive fees for providing management services to some of our subsidiaries. We received $53 million and $36 million in total service fees from these subsidiaries during the each of the six months ended June 30, 2020 and 2019, respectively.

Share Repurchase Program

On June 3, 2019, we announced that our issuers wasBoard of Directors (“Board”) authorized a 3-year, $1.0 billion share repurchase program. During the six months ended June 30, 2020, we repurchased an aggregate of 2.9 million shares of our common stock for $155 million, for a weighted average price per share of $53.88. During the six months ended June 30, 2019, we repurchased an aggregate of 44,600 shares of our common stock for $3 million, for a weighted average price per share of $68.30. As of June 30, 2020, we had up to $596 million of the share repurchase program available. Under the share repurchase program, repurchases can be made from time to time using a variety of methods, which may include open market purchases, privately negotiated transactions or otherwise, all in complianceaccordance with all covenants relatedthe rules of the SEC and other applicable legal requirements. The timing and amount of any shares of our common stock that are repurchased under the share repurchase program will be determined by our management based on market conditions and other factors.  The share repurchase program does not obligate us to their respective debt agreements.acquire any particular amount of common stock, and may be modified, suspended or discontinued at any time or from time to time at our discretion.

Marketing

We market and sell LNG produced by the Liquefaction Projects that is not required for other customers through our integrated marketing function. We are developinghave, and continue to develop, a portfolio of long-, medium- and short-term SPAs to transport and unload commercial LNG cargoes to locations worldwide, which isworldwide. These volumes are expected to be primarily sourced by LNG produced by the Liquefaction Projects but supplemented by volumevolumes procured from other locations worldwide, as needed. As of June 30, 2019,2020, we have sold or have options to sell approximately 5,0664,746 TBtu of LNG to be delivered to customers between 20192020 and 2045, excluding volume for an agreement anticipated to be assigned to SPL in the future.2045.  The cargoes have been sold either on a free on board (“FOB”)FOB basis (delivered to the customer at the Sabine Pass LNG terminal or the Corpus Christi LNG terminal)terminal, as applicable) or a delivered at terminal (“DAT”) basis (delivered to the customer at their LNG receiving terminal). We have chartered LNG vessels to be utilized infor cargoes sold on a DAT transactions.basis. In addition, we have entered into a long-term agreement to sell LNG cargoes on a DAT basis that is conditioned upon the buyer achieving certain milestones.


Cheniere Marketing entered into uncommitted trade finance facilities with available commitments of $420$209 million as of June 30, 2019,2020, primarily to be used for the purchase and sale of LNG for ultimate resale in the course of its operations. The finance facilities are intended to be used for advances, guarantees or the issuance of letters of credit or standby letters of credit on behalf of Cheniere Marketing. As of June 30, 20192020 and December 31, 2018,2019, Cheniere Marketing had $10 million and $31$41 million, respectively, in standby letters of credit and guarantees outstanding under the finance facilities. As of June 30, 20192020 and December 31, 2018,2019, Cheniere Marketing had $6 million and zero, and $71 million, respectively, inof loans outstanding under the finance facilities. Cheniere Marketing pays interest or fees on utilized commitments.

Corporate and Other Activities
 
We are required to maintain corporate and general and administrative functions to serve our business activities described above.  We are also in various stagesThe development of developingour sites or other projects, including infrastructure projects in support of natural gas supply and LNG demand, which,will require, among other things, will require acceptable commercial and financing arrangements before we make an FID.
We have made an equity investment in Midship Holdings, LLC (“Midship Holdings”), which manages the business and affairs of Midship Pipeline. Midship Pipeline which is constructing a pipelineoperates the Midship Project with expectedcurrent capacity of up to 1.441.1 million Dekatherms per day that will connectconnects new gas production in the Anadarko Basin to Gulf Coast markets, including markets serving the Liquefaction Projects. The Midship Project was placed in service in April 2020.


Restrictive Debt Covenants

As of June 30, 2020, each of our issuers was in compliance with all covenants related to their respective debt agreements.

LIBOR

The use of LIBOR is expected to be phased out by the end of 2021. It is currently unclear whether LIBOR will be utilized beyond that date or whether it will be replaced by a particular rate. We intend to continue to work with our lenders to pursue any amendments to our debt agreements that are currently subject to LIBOR and will continue to monitor, assess and plan for the phase out of LIBOR.
Sources and Uses of Cash

The following table summarizes the sources and uses of our cash, cash equivalents and restricted cash for the six months ended June 30, 20192020 and 20182019 (in millions). The table presents capital expenditures on a cash basis; therefore, these amounts differ from the amounts of capital expenditures, including accruals, which are referred to elsewhere in this report. Additional discussion of these items follows the table. 
Six Months Ended June 30,Six Months Ended June 30,
2019 20182020 2019
Operating cash flows$760
 $982
$1,028
 $760
Investing cash flows(1,542) (1,492)(1,090) (1,542)
Financing cash flows1,066
 1,168
(388) 1,066
      
Net increase in cash, cash equivalents and restricted cash284

658
Net increase (decrease) in cash, cash equivalents and restricted cash(450)
284
Cash, cash equivalents and restricted cash—beginning of period3,156
 2,613
2,994
 3,156
Cash, cash equivalents and restricted cash—end of period$3,440
 $3,271
$2,544
 $3,440

Operating Cash Flows

Our operating cash net inflows during the six months ended June 30, 2020 and 2019 and 2018 were $760$1,028 million and $982$760 million, respectively. The $222$268 million decreaseincrease in operating cash inflows in 20192020 compared to 20182019 was primarily related to increased operating costsrevenues related to LNG cargoes for which customers have notified us that they will not take delivery and expenses, partially offset by increased cash receipts from the sale of LNG cargoes, as a result of the additional Trains that were operating at the Liquefaction Projects in 2019. In addition to Trains 1 through 4 of the SPL Project that were operational during both the six months ended June 30, 2019 and 2018, Train 5 of the SPL Project and Train 1 of the CCL Project were operational for approximately four months during the six months ended June 30, 2019.2020.


Investing Cash Flows

Investing cash net outflows during the six months ended June 30, 2020 and 2019 and 2018 were $1,542$1,090 million and $1,492$1,542 million, respectively, and were primarily used to fund the construction costs for the Liquefaction Projects. These costs are capitalized as construction-in-process until achievement of substantial completion. Additionally, we invested $100 million and $34 million in Midship Holdings, our equity method investment, during the six months ended June 30, 2019.2020 and 2019, respectively.

Financing Cash Flows

Financing cash net outflows during the six months ended June 30, 2020 were $388 million, primarily as a result of:
issuance of an aggregate principal amount of $2.0 billion of the 2030 SPL Senior Notes, which along with cash on hand was used to redeem all of the outstanding 2021 SPL Senior Notes.
$455 million of borrowings and $80 million of repayments under the Cheniere Revolving Credit Facility;
$141 million of borrowings under the CCH Working Capital Facility;
$300 million partial redemption of the 2025 CCH HoldCo II Convertible Senior Notes;
$310 million of distributions to non-controlling interest by Cheniere Partners;
$155 million paid to repurchase approximately 3 million shares of our common stock under the share repurchase program;
$59 million of debt issuance costs primarily related to up-front fees paid upon closing of the 2020 SPL Working Capital Facility and 2030 SPL Senior Notes and premiums paid for partially redeeming the 2025 CCH HoldCo II Convertible Senior Notes;
$41 million paid for tax withholdings for share-based compensation; and
$40 million of debt extinguishment costs primarily related to the redemption of the 2021 SPL Senior Notes.

Financing cash net inflows during the six months ended June 30, 2019 were $1,066 million, primarily as a result of:
$982 million of borrowings under the CCH Credit Facility;
$649 million of borrowings under the 2019 CQP Credit Facilities;
$390 million of borrowings and $558 million in repayments under the CCH Working Capital Facility;
$290 million of distributions to non-controlling interest by Cheniere Partners;
$72 million of net repayments related to our Cheniere Marketing trade financing facilities;
$20 million of debt issuance costs primarily related to the up-front fees paid upon the closing of the 2019 CQP Credit Facilities; and
$14 million paid for tax withholdings for share-based compensation.

Financing cash net inflows

Results of Operations

The following charts summarize the number of Trains that were in operation during the year ended December 31, 2019 and the six months ended June 30, 2020 and total revenues and total LNG volumes loaded from our Liquefaction Projects (including both operational and commissioning volumes) during the six months ended June 30, 2018 were $1.2 billion, primarily as a result of:2020 and 2019:
$1.7 billion of borrowings and $281 million in repayments under the CCH Credit Facility;chart-6487a76e9c0ab3be367a17.jpg
$14 million of borrowings under the CCH Working Capital Facility;
$123 million of net borrowings related to our Cheniere Marketing trade financing facilities;
$46 million of debt issuance costs related to up-front fees paid for the amendment and restatement of the CCH Credit Facility and the CCH Working Capital Facility;

$8 million in debt extinguishment costs;
$288 million of distributions and dividends to non-controlling interest by Cheniere Partners and Cheniere Holdings; and
$8 million paid for tax withholdings for share-based compensation.

Results of Operationschart-2a42d92e7759c23ef3ba17.jpgchart-62c08b85d09a6223e2aa17.jpg

The following table summarizes the volumes of operational and commissioning LNG cargoes that were loaded from the Liquefaction Projects, which were recognized on our Consolidated Financial Statements during the three and six months ended June 30, 2019:2020:
Three Months Ended June 30, 2019 Six Months Ended June 30, 2019Three Months Ended June 30, 2020 Six Months Ended June 30, 2020
(in TBtu)Operational Commissioning Operational CommissioningOperational Commissioning Operational Commissioning
Volumes loaded during the current period361
 3
 645
 28
278
 
 733
 
Volumes loaded during the prior period but recognized during the current period27
 
 25
 3
29
 
 33
 
Less: volumes loaded during the current period and in transit at the end of the period(36) (3) (36) (3)(2) 
 (2) 
Total volumes recognized in the current period352
 
 634
 28
305
 
 764
 

Our consolidated net lossincome attributable to common stockholders was $114$197 million, or $0.44$0.78 per share (basic and diluted), in the three months ended June 30, 2019,2020, compared to net loss attributable to common stockholders of $18$114 million, or $0.07$0.44 per

share (basic and diluted), in the three months ended June 30, 2018.2019. This $96$311 million increase in net lossincome attributable to common stockholders in 20192020 was primarily attributable to decreased margins per MMBtu dueaccelerated revenues recognized from canceled cargoes for which customers have notified us that they will not take delivery, partially offset by increases in (1) net income attributable to decreased pricingnon-controlling interest, (2) income tax provision, (3) operating and maintenance expense, (4) loss on LNG, increasedmodification or extinguishment of debt, (5) interest expense, net of amounts capitalized increased operating and maintenance expense, increased derivative loss, net, and increased(6) depreciation and amortization expense, which were partially offset by decreased net income attributable to non-controlling interest.expense.

Our consolidated net income attributable to common stockholders was $572 million, or $2.27 per share—basic and $2.26 per share—diluted, in the six months ended June 30, 2020, compared to net income attributable to common stockholders of $27 million, or $0.11 per share (basic and diluted), in the six months ended June 30, 2019, compared to net income attributable to common stockholders of $3392019. This $545 million or $1.42 per share—basic and $1.40 per share—diluted, in the six months ended June 30, 2018. This $312 million decreaseincrease in net income attributable to common stockholders in 20192020 was primarily attributable to decreased margins per MMBtu dueaccelerated revenues recognized from canceled cargoes for which customers have notified us that they will not take delivery and increased gains from commodity derivatives to decreased pricing on LNG, increased operating and maintenance expense, increased derivative loss, net, increasedsecure natural gas feedstock for the Liquefaction Projects, partially offset by increases in (1) interest expense, net of amounts capitalized, (2) income tax provision, (3) operating and increased depreciation and amortizationmaintenance expense, which were partially offset by decreased(4) interest rate derivative loss, net, (5) net income attributable to non-controlling interest.interest, (6) depreciation and amortization expense and (7) loss on modification or extinguishment of debt.

We enter into derivative instruments to manage our exposure to (1) changing interest rates, (2) commodity-related marketing and price risks and (3) foreign exchange volatility. Derivative instruments are reported at fair value on our Consolidated Financial Statements. In some cases, the underlying transactions economically hedged receive accrual accounting treatment, whereby revenues and expenses are recognized only upon delivery, receipt or realization of the underlying transaction. Because the recognition of derivative instruments at fair value has the effect of recognizing gains or losses relating to future period exposure, use of derivative instruments may increase the volatility of our results of operations based on changes in market pricing, counterparty credit risk and other relevant factors.

Revenues
Three Months Ended June 30, Six Months Ended June 30,Three Months Ended June 30, Six Months Ended June 30,
(in millions)2019 2018 Change 2019 2018 Change2020 2019 Change 2020 2019 Change
LNG revenues$2,173
 $1,442
 $731
 $4,316
 $3,608
 $708
$2,295
 $2,173
 $122
 $4,863
 $4,316
 $547
Regasification revenues67
 65
 2
 133
 130
 3
68
 67
 1
 135
 133
 2
Other revenues52
 36
 16
 104
 47
 57
39
 52
 (13) 113
 104
 9
Total revenues$2,292

$1,543

$749

$4,553

$3,785

$768
$2,402

$2,292

$110

$5,111

$4,553

$558

We begin recognizing LNG revenues from the Liquefaction Projects following the substantial completion and the commencement of operating activities of the respective Trains. In addition to Trains 1 through 4 of the SPL Project that were operational during both the six months ended June 30, 2019 and 2018, Train 5 of the SPL Project and Train 1 of the CCL Project

were operational for approximately four months during the six months ended June 30, 2019. The additional revenue from the increased volume of LNG sold following the achievement of substantial completion of these Trains in the three and six months ended June 30, 20192020 increased from the comparable periodsperiod in 2018 was2019 primarily due to $708 million and $761 million, respectively, in revenues associated with LNG cargoes for which customers have notified us that they will not take delivery, of which $458 million would have otherwise been recognized subsequent to June 30, 2020, if the cargoes were lifted pursuant to the delivery schedules with the customers. LNG revenues during the three months ended June 30, 2020 excluded $53 million that would have otherwise been recognized during the quarter if the cargoes were lifted pursuant to the delivery schedules with the customers. During the three months ended June 30, 2020, the accelerated revenues recognized were partially offset by decreased revenues per MMBtu and decreased volume recognized as revenues. During the six months ended June 30, 2020, LNG revenues also increased as a result of increased volume recognized as revenues due to increased Trains in operation over the comparable period, partially offset by decreased revenues per MMBtu. As we have recognized accelerated revenues associated with LNG cargoes for which was primarily affected by sales made at current market prices by our integrated marketing function.customers have notified us that they will not take delivery, we may expect decreased revenues in future periods for which the deliveries would have occurred. We expect our LNG revenues to increase in the future upon Train 3 of the CCL Project and Train 6 of the SPL Project and Trains 2 and 3 of the CCL Project becoming operational.

Prior to substantial completion of a Train, amounts received from the sale of commissioning cargoes from that Train are offset against LNG terminal construction-in-process, because these amounts are earned or loaded during the testing phase for the construction of that Train. WeDuring the six months ended June 30, 2019, we realized offsets to LNG terminal costs of $202 million corresponding to 28 TBtu of LNG in the six months ended June 30, 2019 that were related to the sale of commissioning cargoes from the Liquefaction Projects. We did not realize any offsets to LNG terminal costs induring the three months ended June 30, 2019 and the three and six months ended June 30, 2018.2020.

Also included in LNG revenues are gains and losses from derivative instruments which include the realized value associated with a portion of derivative instruments that settle through physical delivery and the sale of unutilized natural gas procured for the liquefaction process. DuringWe recognized revenues of $62 million and $183 million during the three months ended June 30, 2020 and 2019, respectively, and 2018, we realized $183$273 million of gains and $34$317 million of losses, respectively, from these transactions and other revenues. Duringduring the six months ended June 30, 2020 and 2019, respectively, related to derivative instruments and 2018, we realized $317 million and $8 million, respectively, of gainsother revenues from these transactions and other revenues.transactions.


The following table presents the components of LNG revenues and the corresponding LNG volumes sold.sold:
Three Months Ended June 30, Six Months Ended June 30,Three Months Ended June 30, Six Months Ended June 30,
2019 2018 2019 20182020 2019 2020 2019
LNG revenues (in millions):
              
LNG from the Liquefaction Projects sold under third party long-term agreements (1)$1,393
 $1,118
 $2,910
 $2,111
$1,244
 $1,393
 $3,151
 $2,910
LNG from the Liquefaction Projects sold by our integrated marketing function under short-term agreements566
 282
 905
 1,303
150
 566
 475
 905
LNG procured from third parties31
 76
 184
 186
132
 31
 203
 184
Other revenues and derivative gains (losses)183
 (34) 317
 8
LNG revenues associated with cargoes not delivered per customer notification (2)707
 
 761
 
Other revenues and derivative gains62
 183
 273
 317
Total LNG revenues$2,173
 $1,442
 $4,316
 $3,608
$2,295
 $2,173
 $4,863
 $4,316
              
Volumes sold as LNG revenues (in TBtu):
       
Volumes delivered as LNG revenues (in TBtu):
       
LNG from the Liquefaction Projects sold under third party long-term agreements (1)241
 189
 477
 354
253
 241
 619
 477
LNG from the Liquefaction Projects sold by our integrated marketing function under short-term agreements111
 41
 157
 149
52
 111
 145
 157
LNG procured from third parties5
 10
 23
 21
34
 5
 48
 23
Total volumes sold as LNG revenues357
 240
 657
 524
Total volumes delivered as LNG revenues339
 357
 812
 657
 
(1)     Long-term agreements include agreements with tenure of 12 months or more.
(1)Long-term agreements include agreements with a tenure of 12 months or more.
(2)LNG revenues include revenues with no corresponding volumes attributable to LNG cargoes for which customers have notified us that they will not take delivery.

Operating costs and expenses
Three Months Ended June 30, Six Months Ended June 30,Three Months Ended June 30, Six Months Ended June 30,
(in millions)2019 2018 Change 2019 2018 Change2020 2019 Change 2020 2019 Change
Cost of sales$1,277
 $873
 $404
 $2,491
 $2,051
 $440
$803
 $1,277
 $(474) $1,527
 $2,491
 $(964)
Operating and maintenance expense295
 147
 148
 516
 287
 229
355
 295
 60
 671
 516
 155
Development expense3
 3
 
 4
 4
 
1
 3
 (2) 5
 4
 1
Selling, general and administrative expense77
 73
 4
 150
 140
 10
73
 77
 (4) 154
 150
 4
Depreciation and amortization expense204
 111
 93
 348
 220
 128
233
 204
 29
 466
 348
 118
Impairment expense and loss on disposal of assets4
 
 4
 6
 
 6

 4
 (4) 5
 6
 (1)
Total operating costs and expenses$1,860
 $1,207
 $653
 $3,515
 $2,702
 $813
$1,465
 $1,860
 $(395) $2,828
 $3,515
 $(687)


Our total operating costs and expenses increaseddecreased during the three and six months ended June 30, 20192020 from the three and six months ended June 30, 2018,2019, primarily as a result of the increase indecreased cost of sales, partially offset by increased operating and maintenance expense and depreciation and amortization expense from additional operating Trains between each of the periods and increased third-party service and maintenance costs from additional maintenance and related activities at the SPL Project.periods.

Cost of sales includes costs incurred directly for the production and delivery of LNG from the Liquefaction Projects, to the extent those costs are not utilized for the commissioning process. Cost of sales increaseddecreased during the three and six months ended June 30, 20192020 from the three and six months ended June 30, 20182019, primarily due to increased volumes of natural gas feedstock for our LNG sales as a result of substantial completion of Train 5 ofdecrease in the SPL Project and Train 1 of the CCL Project, partially offset by decreased pricing of natural gas feedstock, and increased vessel charter costs. Partially offsetting the increase in cost of natural gas feedstock between the periods. This decrease during the six months ended June 30, 2020 was partially offset by increased volumes and an increase in derivative gains from an increase in fair value of the commodity derivatives associated with hedges to secure natural gas feedstock for the Liquefaction Projects, primarily due to a favorable shift in the long-term forward prices.prices relative to our hedged position. Cost of sales also includes vessel charter costs, port and canal fees, variable transportation and storage costs costs associated with a portion of derivative instruments that settle through physical delivery and the sale of natural gas procured for the liquefaction process and other costs to convert natural gas into LNG.

Operating and maintenance expense primarily includes costs associated with operating and maintaining the Liquefaction Projects. The increase inAdditionally, operating and maintenance expense includes costs incurred in response to the COVID-19 pandemic, as further described earlier in Impact of COVID-19 and Market Environment. Excluding the costs incurred in response to the COVID-19 pandemic, operating and maintenance expense (including affiliates) did not materially change between the three months ended June 30, 2020 and 2019 due to comparable volume of LNG sold between the periods, and increased during the three andsix months

ended June 30, 2020 from the six months ended June 30, 2019, from the three and six months ended June 30, 2018 was primarily related to: (1)due to increased natural gas transportation and storage capacity demand charges from additional Trains operating Train 5 of the SPL Project and Train 1 of the CCL Project following the respective substantial completions, (2) increased cost of maintenance and related activities at the SPL Project, (3) increased payrollLiquefaction Projects between the periods and benefit costs from increased headcount to operate Train 5 of the SPL Project and Train 1 of the CCL Project and (4) increased TUA reservation charges paiddue to Total from payments under the partial TUA assignment agreement. Operating and maintenance expense also includes insurance and regulatory costs and other operating costs.

Depreciation and amortization expense increased during the three and six months ended June 30, 20192020 from the three and six months ended June 30, 20182019 as a result of commencing operationsan increased number of Train 5 of the SPL Project and Train 1 of the CCL Project in March 2019 and February 2019, respectively, and completing construction of the Corpus Christi Pipeline in the second quarter of 2018,operational Trains, as the related assets began depreciating upon reaching substantial completion.

We expect our operating costs and expenses to generally increase in the future upon Train 3 of the CCL Project and Train 6 of the SPL Project and Trains 2 and 3 of the CCL Project achieving substantial completion, although we expect certain costs will not proportionally increase with the number of operational Trains as cost efficiencies will be realized.

Other expense (income)
Three Months Ended June 30, Six Months Ended June 30,Three Months Ended June 30, Six Months Ended June 30,
(in millions)2019 2018 Change 2019 2018 Change2020 2019 Change 2020 2019 Change
Interest expense, net of capitalized interest$372
 $216
 $156
 $619
 $432
 $187
$407
 $372
 $35
 $819
 $619
 $200
Loss on modification or extinguishment of debt
 15
 (15) 
 15
 (15)43
 
 43
 44
 
 44
Derivative loss (gain), net74
 (32) 106
 109
 (109) 218
Other income(16) (10) (6) (32) (17) (15)
Interest rate derivative loss, net25
 74
 (49) 233
 109
 124
Other income, net(5) (16) 11
 (14) (32) 18
Total other expense$430
 $189
 $241
 $696
 $321
 $375
$470
 $430
 $40
 $1,082
 $696
 $386

Interest expense, net of capitalized interest, increased during the three and six months ended June 30, 2019 compared to2020 from the three and six months ended June 30, 2018,2019 primarily as a result of increased outstanding debt (before unamortized premium, discount and debt issuance costs, net) from $27.6 billion as of June 30, 2018 to $30.7 billion as of June 30, 2019, primarily due to increased borrowings under the CCH Credit Facility, as well as a decrease in the portion of total interest costs that could be capitalizedis eligible for capitalization as additional Trains of the Liquefaction Projects completed construction between the periods. ForDuring the three months ended June 30, 20192020 and 2018,2019, we incurred $458$469 million and $412$458 million of total interest cost, respectively, of which we capitalized $86$62 million and $196$86 million, respectively, which was primarily related to interest costs incurred to construct the constructionremaining assets of the Liquefaction Projects. ForDuring the six months ended June 30, 20192020 and 2018,2019, we incurred $906$940 million and $816$906 million of total interest cost, respectively, of which we capitalized $287$121 million and $384$287 million, respectively, which was primarily related to interest costs incurred to construct the constructionremaining assets of the Liquefaction Projects.

Loss on modification or extinguishment of debt during the three and six months ended June 30, 2019 decreased from the comparable periods in 2018. Loss on modification or extinguishment of debt recognized in 2018 was attributable to $15 million

of debt modification and extinguishment costs relating to the incurrence of third-party fees and write-off of unamortized debt issuance costs as a result of the amendment and restatement of the CCH Credit Facility.

Derivative loss, net increased during the three and six months ended June 30, 20192020 from the comparable periods in 2019. Loss on modification or extinguishment of debt recognized in 2020 was attributable to $43 million of debt extinguishment costs relating to the payment of early redemption fees and write off of unamortized debt premiums and issuance costs associated with the early redemption of the 2021 SPL Senior Notes. As a result of the redemption of the remaining outstanding principal amount of the 2025 CCH HoldCo II Convertible Senior Notes and partial repurchase of the 2021 Cheniere Convertible Unsecured Notes in July 2020, we expect loss on modification or extinguishment of debt to increase in the third quarter of 2020.

Interest rate derivative loss, net decreased during the three months ended June 30, 2020 compared to the three andmonths ended June 30, 2019, primarily due to a favorable shift in the long-term forward LIBOR curve between the periods. Interest rate derivative loss, net increased during the six months ended June 30, 2018,2020 compared to the six months ended June 30, 2019, primarily due to an unfavorable shift in the long-term forward LIBOR curve between the periods.

Other income, net increased during the three and six months ended June 30, 2019 as2020 compared to the three and six months ended June 30, 2018,2019, primarily due to an increase in interest income earned on our cash and cash equivalents.equivalents and restricted cash.

Income tax benefit (provision)provision
Three Months Ended June 30, Six Months Ended June 30,Three Months Ended June 30, Six Months Ended June 30,
(in millions)2019 2018 Change 2019 2018 Change2020 2019 Change 2020 2019 Change
Income before income taxes and non-controlling interest$2
 $147
 (145) $342
 $762
 $(420)$467
 $2
 $465
 $1,201
 $342
 $859
Income tax benefit (provision)
 3
 (3) (3) (12) 9
           
Income tax provision(63) 
 (63) (194) (3) (191)
Effective tax rate% 2.0%   0.9% 1.6%  13.5% %   16.2% 0.9%  

IncomeThe effective tax benefitrates for the three and six months ended June 30, 2020 were lower than the 21% federal statutory rate primarily due to income allocated to non-controlling interest that is not taxable to Cheniere. The effective tax rate decreased $3 million during for

the three months ended June 30, 2019 and income tax provision decreased $9 million during2020 from the six months ended June 30, 2019, respectively, from2020 due to an additional tax expense of $38 million recorded during the comparable periods in 2018 primarily attributablefirst quarter related to changes in the income earned anda one-time discrete event related to an internal tax transfer pricing applied to our U.K. integrated marketing function.restructuring. The effective tax rates during each ofrate for the three and six months ended June 30, 2019 and 2018 wereis lower than the 21% federal statutory rate primarily as a result ofdue to maintaining a valuation allowance against our federal and state net deferred tax assets. Given our current and anticipated future earnings, we believe that there is a reasonable possibility that within approximately 6 to 18 months, sufficient positive evidence may become available to allow us to conclude that a significant portion

On July 28, 2020, the U.S. Department of the valuation allowance will no longer be needed. The releaseTreasury released final regulations and proposed regulations providing guidance on the business interest expense limitation under Section 163(j) of the valuation allowance would resultInternal Revenue Code. We are currently in the recognitionprocess of certain deferred tax assetsevaluating the effect of these regulations on our Consolidated Financial Statements and an income tax benefit in the period the release is recorded. However, the precise timing and amount of the valuation allowance release are subject to change on the basis of the level of profitability that we are able to achieve.related disclosures.

Net income attributable to non-controlling interest
Three Months Ended June 30, Six Months Ended June 30,Three Months Ended June 30, Six Months Ended June 30,
(in millions)2019 2018 Change 2019 2018 Change2020 2019 Change 2020 2019 Change
Net income attributable to non-controlling interest$116
 $168
 $(52) $312
 $411
 $(99)$207
 $116
 $91
 $435
 $312
 $123

Net income attributable to non-controlling interest decreasedincreased during the three and six months ended June 30, 20192020 from the three and six months ended June 30, 20182019 primarily due to the decrease of non-controlling interest as a result of our merger with Cheniere Holdings in September 2018, in which all publicly-held shares of Cheniere Holdings were canceled and the non-controlling interest in Cheniere Holdings was reduced to zero. Net income attributable to non-controlling interest also decreased during the three months ended June 30, 2019 from the three months ended June 30, 2018 due to the decreasean increase in consolidated net income recognized by Cheniere Partners in which the non-controlling interests are held.Partners. The consolidated net income recognized by Cheniere Partners decreasedincreased from $281 million in the three months ended June 30, 2018 to $232 million in the three months ended June 30, 2019 due anto $406 million in the three months ended June 30, 2020 and increased from $617 million in the six months ended June 30, 2019 to $841 million in the six months ended June 30, 2020. The increase during the periods was primarily a result of accelerated revenues recognized from canceled cargoes for which customers have notified us that they will not take delivery, partially offset by increases in (1) interest expense, net of capitalized interest, as a result(2) loss on modification or extinguishment of the decrease in the portion of total interest costs that could be capitalized as an additional Train of the SPL Project completed construction between the periods.debt, (3) operating and maintenance expense and (4) depreciation and amortization expense.

Off-Balance Sheet Arrangements
 
As of June 30, 2019,2020, we had no transactions that met the definition of off-balance sheet arrangements that may have a current or future material effect on our consolidated financial position or operating results.


Summary of Critical Accounting Estimates

The preparation of our Consolidated Financial Statements in conformity with GAAP requires management to make certain estimates and assumptions that affect the amounts reported in the Consolidated Financial Statements and the accompanying notes. There have been no significant changes to our critical accounting estimates from those disclosed in our annual report on Form 10-K for the fiscal year ended December 31, 20182019.

Recent Accounting Standards

For descriptions of recently issued accounting standards, see Note 1—Nature of Operations and Basis of Presentation of our Notes to Consolidated Financial Statements.

ITEM 3.    QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
Cash Investments

We have cash investments that we manage based on internal investment guidelines that emphasize liquidity and preservation of capital. Such cash investments are stated at historical cost, which approximates fair market value on our Consolidated Balance Sheets.
 
Marketing and Trading Commodity Price Risk

We have entered into commodity derivatives consisting of natural gas supply contracts for the commissioning and operation of the SPL Project, the CCL Project and potential future development of Corpus Christi Stage 3 (“Liquefaction Supply Derivatives”). We have also entered into financial derivatives to hedge the exposure to the commodity markets in which we have contractual arrangements to purchase or sell physical LNG (“LNG Trading Derivatives”). In order to test the sensitivity of the fair value of the Liquefaction Supply Derivatives and the LNG Trading Derivatives to changes in underlying commodity prices, management modeled a 10% change in the commodity price for natural gas for each delivery location and a 10% change in the commodity price for LNG, respectively, as follows (in millions):
June 30, 2019 December 31, 2018June 30, 2020 December 31, 2019
Fair Value Change in Fair Value Fair Value Change in Fair ValueFair Value Change in Fair Value Fair Value Change in Fair Value
Liquefaction Supply Derivatives$90
 $127
 $(42) $6
$600
 $184
 $149
 $179
LNG Trading Derivatives47
 39
 (24) 9
151
 5
 165
 22


Interest Rate Risk

We are exposed to interest rate risk primarily when we incur debt related to project financing. Interest rate risk is managed in part by replacing outstanding floating-rate debt with fixed-rate debt with varying maturities. CCH has entered into interest rate swaps to hedge the exposure to volatility in a portion of the floating-rate interest payments under the CCH Credit Facility (“CCH Interest Rate Derivatives”) and to hedge against changes in interest rates that could impact anticipated future issuance of debt by CCH (“CCH Interest Rate Forward Start Derivatives”). In order to test the sensitivity of the fair value of the CCH Interest Rate Derivatives to changes in interest rates, management modeled a 10% change in the forward one-month LIBOR curve across the remaining terms of the CCH Interest Rate Derivatives and CCH Interest Rate Forward Start Derivatives as follows (in millions):
June 30, 2019 December 31, 2018June 30, 2020 December 31, 2019
Fair Value Change in Fair Value Fair Value Change in Fair ValueFair Value Change in Fair Value Fair Value Change in Fair Value
CCH Interest Rate Derivatives$(88) $25
 $18
 $37
$(191) $2
 $(81) $19
CCH Interest Rate Forward Start Derivatives(7) 20
 
 
(102) 7
 (8) 15


Foreign Currency Exchange Risk

We have entered into foreign currency exchange (“FX”) contracts to hedge exposure to currency risk associated with operations in countries outside of the United States (“FX Derivatives”). In order to test the sensitivity of the fair value of the FX Derivatives to changes in FX rates, management modeled a 10% change in FX rate between the U.S. dollar and the applicable foreign currencies as follows (in millions):
 June 30, 2019 December 31, 2018
 Fair Value Change in Fair Value Fair Value Change in Fair Value
FX Derivatives$10
 $1
 $15
 $1
 June 30, 2020 December 31, 2019
 Fair Value Change in Fair Value Fair Value Change in Fair Value
FX Derivatives$15
 $2
 $4
 $

See Note 6—Derivative Instruments for additional details about our derivative instruments.

ITEM 4.CONTROLS AND PROCEDURES
 
We maintain a set of disclosure controls and procedures that are designed to ensure that information required to be disclosed by us in the reports filed by us under the Exchange Act, is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms. As of the end of the period covered by this report, we evaluated, under the supervision and with the participation of our management, including our Chief Executive Officer and our Chief Financial Officer, the effectiveness of our disclosure controls and procedures pursuant to Rule 13a-15 of the Exchange Act. Based on that evaluation, our Chief Executive Officer and our Chief Financial Officer concluded that our disclosure controls and procedures are effective.
 
During the most recent fiscal quarter, there have been no changes in our internal control over financial reporting that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting. 




PART II.     OTHER INFORMATION

ITEM 1.    LEGAL PROCEEDINGS

We may in the future be involved as a party to various legal proceedings, which are incidental to the ordinary course of business. We regularly analyze current information and, as necessary, provide accruals for probable liabilities on the eventual disposition of these matters. Other than discussed below, thereThere have been no material changes to the legal proceedings disclosed in our annual report on Form 10-K for the fiscal year ended December 31, 20182019.

In February 2018, the Pipeline and Hazardous Materials Safety Administration (“PHMSA”) issued a Corrective Action Order (the “CAO”) to SPL in connection with a minor LNG leak from one tank and minor vapor release from a second tank at the Sabine Pass LNG terminal. These two tanks have been taken out of operational service while we conduct analysis, repair and remediation. On April 20, 2018, SPL and PHMSA executed a Consent Agreement and Order (the “Consent Order”) that replaces and supersedes the CAO. On July 9, 2019, PHMSA and FERC issued a joint letter setting out operating conditions required to be met prior to SPL returning the tanks to service. We continue to coordinate with PHMSA and FERC to address the matters relating to the February 2018 leak, including repair approach and related analysis. We do not expect that the Consent Order and related analysis, repair and remediation will have a material adverse impact on our financial results or operations.

ITEM 1A.RISK FACTORS
 
There have been no material changes from the risk factors disclosed in our annual report on Form 10-K for the fiscal year ended December 31, 20182019, except for the updates presented in our quarterly report on Form 10-Q for the quarterly period ended March 31, 2020.

ITEM 2.UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS

Purchase of Equity Securities by the Issuer and Affiliated Purchasers

The following table summarizes stock repurchases for the three months ended June 30, 2019:2020:
Period Total Number of Shares Purchased (1) Average Price Paid Per Share (2) Total Number of Shares Purchased as a Part of Publicly Announced Plans Approximate Dollar Value of Shares That May Yet Be Purchased Under the Plans (3)
April 1 - 30, 2019 425 $64.70  
May 1 - 31, 2019 13,973 $67.87  
June 1 - 30, 2019 45,266 $68.24 44,600 $996,954,020
Period Total Number of Shares Purchased (1) Average Price Paid Per Share (2) Total Number of Shares Purchased as a Part of Publicly Announced Plans Approximate Dollar Value of Shares That May Yet Be Purchased Under the Plans (3)
April 1 - 30, 2020 1,672 $33.92  $595,952,809
May 1 - 31, 2020 3,242 $43.24  $595,952,809
June 1 - 30, 2020  $—  $595,952,809
Total 4,914 $40.07   
 
(1)Includes issued shares surrendered to us by participants in our share-based compensation plans for payment of applicable tax withholdings on the vesting of share-based compensation awards. Associated shares surrendered by participants are repurchased pursuant to settleterms of the participants’ personal tax liabilities that resulted fromplan and award agreements and not as part of the lapsing of restrictions on shares awarded to the participants under these plans.publicly announced share repurchase plan.
(2)The price paid per share was based on the closingaverage trading price of our common stock on the dates on which we repurchased the shares.
(3)
On June 3, 2019, we announced that our Board authorized a 3-year, $1 billion share repurchase program. For additional information, see Note 16—Share Repurchase Program.


ITEM 6.EXHIBITS
Exhibit No. Description
10.14.1 
10.2*10.1 
10.3*10.2
10.3†
10.4†
10.5†
10.6†
10.7†
10.8†
10.9* 
10.4*10.10* 
10.5*10.11* 
10.6*
31.1* 
31.2* 
32.1** 
32.2** 
101.INS* XBRL Instance Document - the instance document does not appear in the Interactive Data File because its XBRL tags are embedded within the Inline XBRL document.
101.SCH* Inline XBRL Taxonomy Extension Schema Document
101.CAL* Inline XBRL Taxonomy Extension Calculation Linkbase Document
101.DEF* Inline XBRL Taxonomy Extension Definition Linkbase Document

Exhibit No.Description
101.LAB* Inline XBRL Taxonomy Extension Labels Linkbase Document
101.PRE* Inline XBRL Taxonomy Extension Presentation Linkbase Document
104*Cover Page Interactive Data File (formatted as Inline XBRL and contained in Exhibit 101)
 
*Filed herewith.
**Furnished herewith.
Management contract or compensatory plan or arrangement.


SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

  CHENIERE ENERGY, INC.
    
Date:August 7, 20195, 2020By:/s/ Michael J. Wortley
   Michael J. Wortley
   Executive Vice President and Chief Financial Officer
   (on behalf of the registrant and
as principal financial officer)
    
Date:August 7, 20195, 2020By:/s/ Leonard E. Travis
   Leonard E. Travis
   Senior Vice President and Chief Accounting Officer
   (on behalf of the registrant and
as principal accounting officer)




5459