UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549

FORM 10-Q
(Mark One)
þQUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
 For the quarterly period endedMarch 31, 20192020
oTRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934
 For the transition period from                        to
Commission
File Number
 
Exact Name of Registrant
as specified in its charter
 
State or Other Jurisdiction of
Incorporation or Organization
 
IRS Employer
Identification Number
1-9936 EDISON INTERNATIONAL California 95-4137452
1-2313 SOUTHERN CALIFORNIA EDISON COMPANY California 95-1240335
EDISON INTERNATIONAL SOUTHERN CALIFORNIA EDISON COMPANY
2244 Walnut Grove Avenue 2244 Walnut Grove Avenue
(P.O. Box 976) (P.O. Box 800)
Rosemead,California91770 Rosemead,California91770
(Address of principal executive offices) (Address of principal executive offices)
(626)302-2222  (626)302-1212 
(Registrant's telephone number, including area code) (Registrant's telephone number, including area code)

Securities registered pursuant to Section 12(b) of the Act:
Edison International:
Title of each classTrading Symbol(s)Name of each exchange on which registered
Common Stock, no par valueEIXNYSELLC

Southern California Edison Company:
EDISON INTERNATIONALTitle of each classTrading Symbol(s)SOUTHERN CALIFORNIA EDISON COMPANYName of each exchange on which registered
2244 Walnut Grove Avenue
(P.O. Box 976)
Rosemead, California 91770
(Address of principal executive offices)
Cumulative Preferred Stock, 4.08% Series
SCEpBNYSE American LLC
Cumulative Preferred Stock, 4.24% SeriesSCEpCNYSE American LLC
Cumulative Preferred Stock, 4.32% SeriesSCEpD
2244 Walnut Grove Avenue
(P.O. Box 800)
Rosemead, California 91770
(Address of principal executive offices)NYSE American LLC
(626) 302-2222
(Registrant's telephone number, including area code)
Cumulative Preferred Stock, 4.78% Series
SCEpE
(626) 302-1212
(Registrant's telephone number, including area code)NYSE American LLC


Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
Edison International        Yesþ No oSouthern California Edison Company    Yesþ No o


Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files).
Edison International        Yesþ No oSouthern California Edison Company    Yesþ No ¨
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, smaller reporting company, or an emerging growth company. See the definitions of "large accelerated filer," accelerated filer," "smaller reporting company," and "emerging growth company" in Rule 12b-12 of the Exchange Act. (Check One):
Edison International
Large Accelerated Filerþ
Accelerated Filer¨
Non-accelerated Filer¨
Smaller Reporting Company¨
Emerging growth company¨
þ
Southern California Edison Company
Large Accelerated Filer¨
Accelerated Filer¨
Non-accelerated Filerþ
Smaller Reporting Company¨
Emerging growth company¨
  þ
If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act.
Edison International        o     Southern California Edison Company        ¨


Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).

Edison International        Yes ¨ No þSouthern California Edison Company    Yes¨ No þ
Indicate the number of shares outstanding of each of the issuer's classes of common stock, as of the latest practicable date:
Common Stock outstanding as of April 26, 2019:27, 2020:  
Edison International 325,811,206363,560,677 shares
Southern California Edison Company 434,888,104 shares
   
   














TABLE OF CONTENTS
      SEC Form 10-Q Reference Number
 
 
Part I, Item 2
  
   
   
  
Southern California WildfiresWildfire Mitigation and MudslidesWildfire Insurance Expenses
 
 
 
  
 
 
 
  
  
 
  
 
  
 
  
 
  
  
   
  
 
  
  
  
 
 




i











 
Part I, Item 3
Part I, Item 1
 
 
Part I, Item 3
Part I, Item 1
 
  
 
 
  
  
  
 
 
   
   
  
 
  
Note 7. RevenueCredit Agreements
 
   
  
 
   
  
 
   
   
   
   
  
 
Part I, Item 4
  
  
  
Part II, Item 1
Thomas Fire and Koenigstein Fire Litigation




ii











  
 
 
Part II, Item 21A
Part II, Item 5
Part II, Item 6
 
This is a combined Form 10-Q separately filed by Edison International and Southern California Edison Company. Information contained herein relating to an individual company is filed by such company on its own behalf.






iii











GLOSSARY
The following terms and abbreviations appearing in the text of this report have the meanings indicated below.
2017/2018 Wildfire/Mudslide Events the Thomas Fire, the Koenigstein Fire, the Montecito Mudslides and the Woolsey Fire, collectively
20182019 Form 10-K Edison International's and SCE's combined Annual Report on Form 10-K for the year ended December 31, 20182019
AFUDCAB 1054 allowance for funds used during constructionCalifornia Assembly Bill 1054, executed by the Governor of California on July 12, 2019
ALJAB 1054 Excluded Capital Expenditures administrative law judgeapproximately $1.6 billion in wildfire risk mitigation capital expenditures that SCE will exclude from the equity portion of SCE's rate base as required under AB 1054
AB 1054 Liability Capa cap on the aggregate requirement to reimburse the Wildfire Insurance Fund over a trailing three calendar year period which applies if certain conditions are met and is equal to 20% of the equity portion of the utility's transmission and distribution rate base in the year of the applicable prudency determination
ARO(s) asset retirement obligation(s)
Bcf billion cubic feet
bonus depreciationFederal tax deduction of a percentage of the qualifying property placed in service during periods permitted under tax laws
BRRBA Base Revenue Requirement Balancing Account
CAISO California Independent System Operator
Cal AdvocatesCPUC's Public Advocates Office (formerly known as the Office of Ratepayer Advocates or ORA)
CAL FIRE California Department of Forestry and Fire Protection
CCAs Community Choice Aggregators which are cities, counties, and certain other public agencies with the authority to generate and/or purchase electricity for their local residents and businesses
Commission on Catastrophic Wildfire Cost and RecoveryCOVID-19 Commission on Catastrophic Wildfire Cost and Recovery established by the California Governor’s Office of Planning and Research as required by California Senate Bill 901Coronavirus disease 2019
CPUC California Public Utilities Commission
December 2017 WildfiresCSRP several wind-driven wildfires, including the Thomas Fire and the Koenigstein Fire, that occurred in December 2017 and impacted portions of SCE'sCustomer Service Re-platform, a SCE project to implement a new customer service territorysystem
DERs distributed energy resources
DOEU.S. Department of Energy
DRPDistributed Resources Plan
Edison Energy Edison Energy, LLC, a wholly-owned subsidiary of Edison Energy Group that advises and provides energy solutions to large energy users
Edison Energy Group Edison Energy Group, Inc., a wholly-owned subsidiary of Edison International, is a holding company for subsidiaries engaged in competitive businesses that provide energy services to commercial and industrial customers
EME Edison Mission Energy
EME Settlement AgreementSettlement Agreement by and among Edison Mission Energy, Edison International and the Consenting Noteholders identified therein, dated February 18, 2014
Electric Service Provider an entity that offers electric power and ancillary services to retail customers, that take final delivery of electric powerother than electrical corporations (like SCE) and do not resell the powerCCAs
ERRA Energy Resource Recovery Account
FASBFinancial Accounting Standards Board
FERC Federal Energy Regulatory Commission
FERC 2018 Settlement PeriodJanuary 1, 2018 through November 11, 2019
FHPMAFire Hazard Prevention Memorandum Account
Fitch Fitch Ratings, Inc.
GAAP generally accepted accounting principles
GHG greenhouse gas
GRC general rate case
GS&RP Grid Safety and Resiliency Program
GWh gigawatt-hours
HLBVhypothetical liquidation at book value
IRSInternal Revenue Service


iv






Joint Proxy Statement Edison International's and SCE's definitive Proxy Statement filed with the SEC in connection with Edison International's and SCE's Annual Shareholders' Meeting held on April 25, 201923, 2020
Koenigstein Fire 
a wind-driven fire that originated near Koenigstein Road in the City of Santa Paula in Ventura County on December 4, 2017

kVunit of electrical potential equal to 1000 volts
MD&A 
Management's Discussion and Analysis of Financial Condition and Results
of Operations in this report


iv






MHIMitsubishi Heavy Industries, Inc. and related companies
Montecito Mudslides 
the mudslides and flooding in Montecito, Santa Barbara County, that occurred in
January 2018
Moody's Moody's Investors Service, Inc.
MWmegawatts
MWdcmegawatts measured for solar projects representing the accumulated peak capacity of all the solar modules
NDCTPNuclear Decommissioning Cost Triennial Proceeding
NEILNuclear Electric Insurance Limited
NEM net energy metering
NERC North American Electric Reliability Corporation
NOLnet operating loss
NRC Nuclear Regulatory Commission
OIIPABA Order Instituting Investigation
OII PartiesSCE, SDG&E, The Alliance for Nuclear Responsibility, The California Large Energy Consumers Association, California State University, Citizens Oversight dba Coalition to Decommission San Onofre, the Coalition of California Utility Employees, the Direct Access Customer Coalition, Ruth Henricks, Cal Advocates, TURN, and Women's Energy Matters, all of whom are parties to the Revised San Onofre Settlement AgreementPortfolio Allocation Balancing Account
Palo Verde nuclear electric generating facility located near Phoenix, Arizona in which SCE holds a 15.8% ownership interest
PBOP(s) postretirement benefits other than pension(s)
PCIA Power Charge Indifference Adjustment
PG&E Pacific Gas & Electric Company
Prior San Onofre Settlement AgreementSan Onofre OII Settlement Agreement by and among TURN, Cal Advocates, SDG&E, the Coalition of California Utility Employees, and Friends of the Earth, dated November 20, 2014
Revised San Onofre
Settlement Agreement
Revised San Onofre OII Settlement Agreement among OII Parties, dated January 30, 2018 and modified on August 2, 2018
ROE return on common equity
RPSRenewables portfolio standard
S&P Standard & Poor's Financial Services LLC
San Onofre 
retired nuclear generating facility located in south
San Clemente, California in which SCE holds a 78.21% ownership interest
SCE Southern California Edison Company, a wholly-owned subsidiary of Edison International
SDG&E San Diego Gas & Electric
SEC U.S. Securities and Exchange Commission
SED Safety and Enforcement Division of the CPUC
SoCalGas Southern California Gas Company
SoCore Energy 
SoCore Energy LLC, a former subsidiary of Edison Energy Group that was sold in
April 2018
TAMA Tax Accounting Memorandum Account
Tax Reform Tax Cuts and Jobs Act signed into law on December 22, 2017
Thomas Fire a wind-driven fire that originated in the Anlauf Canyon area Ventura County on December 4, 2017
TOU Time-Of-Use
TURNThe Utility Reform Network


v






US EPA U.S. Environmental Protection Agency
VCFD The Ventura County Fire Department
WEMAWildfire Expense Memorandum Account
WMP a wildfire mitigation plan required to be filed annuallyevery three years under California Senate Bill 901AB 1054 to describe a utility's plans to construct, operate, and maintain electrical lines and equipment that will help minimize the risk of catastrophic wildfires caused by such electrical lines and equipment
Wildfire Insurance FundThe insurance fund established under AB 1054
Woolsey Fire a wind-driven fire that originated in Ventura County in November 2018









viv











FORWARD-LOOKING STATEMENTS
This quarterly report on Form 10-Q contains "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. Forward-looking statements reflect Edison International's and SCE's current expectations and projections about future events based on Edison International's and SCE's knowledge of present facts and circumstances and assumptions about future events and include any statements that do not directly relate to a historical or current fact. Other information distributed by Edison International and SCE that is incorporated in this report, or that refers to or incorporates this report, may also contain forward-looking statements. In this report and elsewhere, the words "expects," "believes," "anticipates," "estimates," "projects," "intends," "plans," "probable," "may," "will," "could," "would," "should," and variations of such words and similar expressions, or discussions of strategy or plans, are intended to identify forward-looking statements. Such statements necessarily involve risks and uncertainties that could cause actual results to differ materially from those anticipated. Some of the risks, uncertainties and other important factors that could cause results to differ from those currently expected, or that otherwise could impact Edison International and SCE, include, but are not limited to the:
ability of SCE to recover its costs through regulated rates, including costs related to uninsured wildfire-related and mudslide-related liabilities, costs incurred to mitigate the risk of utility equipment causing future wildfires, costs incurred to implement SCE's new customer service system and capital spendingcosts incurred prioras a result of the COVID-19 pandemic;
ability of SCE to formal regulatory approval;implement its WMP, including effectively implementing Public Safety Power Shut-Offs when appropriate;
ability to obtain sufficient insurance at a reasonable cost, including insurance relating to SCE's nuclear facilities and wildfire-related claims, and to recover the costs of such insurance or, in the event liabilities exceed insured amounts, the ability to recover uninsured losses from customers or other parties;
actions, or inaction, of the state of Californiarisks associated with respect to achieving a timely and comprehensive solutionAB 1054 effectively mitigating the significant risk faced by California investor-owned utilities related to liability for damages arising from catastrophic wildfires where utility facilities are alleged to be a substantial cause;cause, including SCE's ability to maintain a valid safety certification, SCE's ability to recover uninsured wildfire-related costs from the Wildfire Insurance Fund, the longevity of the Wildfire Insurance Fund, and the CPUC's interpretation of and actions under AB 1054, including their interpretation of the new prudency standard established under AB 1054;
decisions and other actions by the CPUC, the FERC, the NRC and other regulatory and legislative authorities, including decisions and actions related to determinations of authorized rates of return or return on equity, the 2018 GRC, the GS&RP application, the 2019 WMP, the recoverability of wildfire-related and mudslide-related costs, issuance of SCE's wildfire safety certification, wildfire mitigation efforts, and delays in regulatory and legislative actions;
ability of Edison International or SCE to borrow funds and access the bank and capital markets on reasonable terms;
actions by credit rating agencies to downgrade Edison International or SCE's credit ratings or to place those ratings on negative watch or outlook;
risks associated with the decommissioning of San Onofre, including those related to public opposition, permitting, governmental approvals, on-site storage of spent nuclear fuel, delays, contractual disputes, and cost overruns;
pandemics, such as COVID-19, and other events that cause regional, statewide, national or global disruption, which could impact, among other things, Edison International's and SCE's business, operations, cash flows, liquidity and/or financial results;
extreme weather-related incidents and other natural disasters (including earthquakes and events caused, or exacerbated, by climate change, such as wildfires), which could cause, among other things, public safety issues, property damage and operational issues;
physical security of Edison International's and SCE's critical assets and personnel and the cybersecurity of Edison International's and SCE's critical information technology systems for grid control, and business, employee and customer data;
risks associated with cost allocation resulting in higher rates for utility bundled service customers because of possible customer bypass or departure for other electricity providers such as CCAs and Electric Service Providers;
risks inherent in SCE's transmission and distribution infrastructure investment program, including those related to project site identification, public opposition, environmental mitigation, construction, permitting, power curtailment costs (payments due under power contracts in the event there is insufficient transmission to enable acceptance of power delivery), changes in the CAISO's transmission plans, and governmental approvals;


risks associated with the operation of transmission and distribution assets and power generating facilities, including public and employee safety issues, the risk of utility assets causing or contributing to wildfires, failure, availability, efficiency, and output of equipment and facilities, and availability and cost of spare parts;
physical security of Edison International's and SCE's critical assets and personnel and the cybersecurity of Edison International's and SCE's critical information technology systems for grid control, and business, employee and customer data;
ability ofactions by credit rating agencies to downgrade Edison International or SCE's credit ratings or to develop competitive businesses, manage new business risks, and recover and earn a returnplace those ratings on its investment in newly developednegative watch or acquired businesses;outlook;
changes in tax laws and regulations, at both the state and federal levels, or changes in the application of those laws, that could affect recorded deferred tax assets and liabilities and effective tax rate;


changes in future taxable income, or changes in tax law, that would limit Edison International's and SCE's realization of expected net operating loss and tax credit carryover benefits prior to expiration;
changes in the fair value of investments and other assets;
changes in interest rates and rates of inflation, including escalation rates (which may be adjusted by public utility regulators);
governmental, statutory, regulatory, or administrative changes or initiatives affecting the electricity industry, including the market structure rules applicable to each market adopted by the NERC, CAISO, Western Electricity Council, and similar regulatory bodies in adjoining regions, and changes in California's environmental priorities that lessen the importance the state places on GHG reduction;
availability and creditworthiness of counterparties and the resulting effects on liquidity in the power and fuel markets and/or the ability of counterparties to pay amounts owed in excess of collateral provided in support of their obligations;
cost and availability of labor, equipment and materials;
potential for penalties or disallowance for non-compliance with applicable laws and regulations; and
cost of fuel for generating facilities and related transportation, which could be impacted by, among other things, disruption of natural gas storage facilities, to the extent not recovered through regulated rate cost escalation provisions or balancing accounts.accounts; and
ability of Edison International to develop competitive businesses, manage new business risks, and recover and earn a return on its investment in newly developed or acquired businesses.
Additional information about risks and uncertainties, including more detail about the factors described in this report, is contained throughout this report and in the 20182019 Form 10-K, including the "Risk Factors" section. Readers are urged to read this entire report, including information incorporated by reference, as well as the 20182019 Form 10-K, and carefully consider the risks, uncertainties, and other factors that affect Edison International's and SCE's businesses. Forward-looking statements speak only as of the date they are made and neither Edison International nor SCE are obligated to publicly update or revise forward-looking statements. Readers should review future reports filed by Edison International and SCE with the SEC.
Edison International and SCE post or provide direct links to (i) certain SCE and other parties' regulatory filings and documents with the CPUC and the FERC and certain agency rulings and notices in open proceedings at www.edisoninvestor.com (SCEin a section titled "SCE Regulatory Highlights) so that such filings, rulings and notices are available to all investors. Edison International and SCE post or provide direct links toHighlights," (ii) certain documents and information related to Southern California wildfires which may be of interest to investors at www.edisoninvestor.com (Southernin a section titled "Southern California Wildfires) in order to publicly disseminate such information. Edison InternationalWildfires," and SCE also routinely post or provide direct links to(iii) presentations, documents and other information that may be of interest to investors in a section titled "Events and Presentations" at www.edisoninvestor.com (Events and Presentations) in order to publicly disseminate such information. The information contained on, or connected to, the Edison investor website is not incorporated by reference into this report.
The MD&A for the three months ended March 31, 20192020 discusses material changes in the consolidated financial condition, results of operations and other developments of Edison International and SCE since December 31, 20182019 and as compared to the three months ended March 31, 2018.2019. This discussion presumes that the reader has read or has access to Edison International's and SCE's MD&A for the calendar year 20182019 (the "year-ended 2018"2019 MD&A"), which was included in the 2018 2019
Form 10-K.
Except when otherwise stated, references to each of Edison International, SCE, or Edison Energy Group mean each such company with its subsidiaries on a consolidated basis. References to "Edison International Parent and Other" mean Edison International Parent and its consolidated competitive subsidiaries and "Edison International Parent" mean Edison International on a stand-alone basis, not consolidated with its subsidiaries.







MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
MANAGEMENT OVERVIEW
Highlights of Operating Results
Edison International is the parent holding company of SCE and Edison Energy Group. SCE is an investor-owned public utility primarily engaged in the business of supplying and delivering electricity to an approximately 50,000 square mile area of southern California. Edison Energy Group is a holding company for Edison Energy which is engaged in the competitive business of providing energy services to commercial and industrial customers. Edison Energy's business activities are currently not material to report as a separate business segment. Except when otherwise stated, references to each of Edison International, SCE, or Edison Energy Group mean each such company with its subsidiaries on a consolidated basis. References to Edison International refer to the consolidated group of Edison International and its subsidiaries. References to Edison International Parent and Other refer to Edison International Parent and its competitive subsidiaries. Unless otherwise described, all the information contained in this report relates to both filers.
 Three months ended March 31,   Three months ended March 31,  
(in millions) 2019 2018 Change 2020 2019 Change
Net income (loss) attributable to Edison InternationalNet income (loss) attributable to Edison International    Net income (loss) attributable to Edison International    
Continuing operations      
SCE $293
 $286
 $7
 $219
 $293
 $(74)
Edison International Parent and Other (15) (68) 53
 (36) (15) (21)
Edison International 278
 218
 60
 183
 278
 (95)
Less: Non-core items            
SCE 72
 
 72
 (42) 72
 (114)
Edison International Parent and Other 
 (44) 44
 (3) 
 (3)
Total non-core items 72
 (44) 116
 (45) 72
 (117)
Core earnings (losses)            
SCE 221
 286
 (65) 261
 221
 40
Edison International Parent and Other (15) (24) 9
 (33) (15) (18)
Edison International $206
 $262
 $(56) $228
 $206
 $22
Edison International's earnings are prepared in accordance with GAAP. Management uses core earnings (losses) internally for financial planning and for analysis of performance. Core earnings (losses) are also used when communicating with investors and analysts regarding Edison International's earnings results to facilitate comparisons of the company's performance from period to period. Core earnings (losses) are a non-GAAP financial measure and may not be comparable to those of other companies. Core earnings (losses) are defined as earnings attributable to Edison International shareholders less non-core items. Non-core items include income or loss from discontinued operations and income or loss from significant discrete items that management does not consider representative of ongoing earnings, such as write downs, asset impairments and other gainsincome and lossesexpense related to certainchanges in law, outcomes in tax, regulatory or legal settlements or proceedings, and exit activities, including sale of certain assets and other activities that are no longer continuing.
Edison International's first quarter 20192020 earnings increased $60decreased $95 million from the first quarter of 2018,2019, resulting from a decrease in SCE's earnings of $74 million and an increase in Edison International Parent and Other's earningslosses of $53 million and an increase in$21 million. SCE's earnings of $7 million. SCE'slower earnings consisted of $72$114 million of higher non-core incomelosses and $65$40 million of lowerhigher core earnings. The decreaseincrease in core earnings was primarily due to wildfire mitigation expensestiming of the receipt of the 2018 GRC final decision in the second quarter of 2019 and higher net financing costs,FERC revenue, partially offset by a 2018 refund to customers for prior overcollections.higher operation and maintenance expenses primarily from higher vegetation management expenses.
Edison International Parent and Other's increase in earningslosses for the three months ended March 31, 20192020 was primarily due to lower core losses of $9 million and lower non-core losses of $44 million. The lower core losses were mainly due to lower corporate expenses and decreased losses at the competitive businesses under Edison Energy Group.higher interest expense.






Consolidated non-core items for the first quarterthree months ended March 31, 2020 and 2019 primarily included:
A charge of 2019$84 million ($60 million after-tax) recorded in 2020 from the amortization of SCE's contributions to the Wildfire Insurance Fund. See "Notes to Consolidated Financial Statements— Note 12. Commitments and 2018 primarily included:Contingencies" for further information.
An income tax benefit of $18 million and income tax expense of $3 million recorded in 2020 for SCE and Edison International Parent and Other, respectively, due to re-measurement of uncertain tax positions related to the 2010 – 2012 California state tax filings currently under audit.
Income tax benefits of $69 million recorded in 2019 for SCE related to changes in the allocation of deferred tax
re-measurement between customers and shareholders as a result of a CPUC resolution issued in February 2019.2019 to provide guidance on the implementation of Tax Reform. The resolution determined that customers are only entitled to excess deferred taxes which were included when setting rates and other deferred tax re-measurement belongs to shareholders.
An impairment charge of $66 million ($48 million after-tax) recorded in 2018 for Edison International Parent and Other resulting from an agreement to sell SoCore Energy.
2018 General Rate CaseCOVID-19
In February 2018, SCE updated its 2018 GRC application for the impact of Tax Reform resulting in a requested 2018 base rate revenue requirement of $5.534 billion, a decrease of $106 million over the 2017 GRC authorized revenue requirement.
In April 2019, the CPUC issued a 2018 GRC proposed decision, which if adopted, would result in a base rate revenue requirement of $5.102 billion in 2018, a decrease of $432 million from SCE's requested revenue requirement, primarily related to a reduction in authorized rate base, depreciation and operation and maintenance expenses. The proposed decision also identifies changes to certain balancing accounts, including the expansion of the TAMA to includeSouthern California began experiencing the impacts of all differences between forecast and recorded tax expense. The proposed decision would also disallow certain historical spending, largely related to certain infrastructure replacement programs and corporate real estate.
The CPUC did not issue a decision on the 2018 GRC application during 2018 or duringCOVID-19 pandemic in the first quarter of 2019, therefore SCE recognized revenue based2020. The total impacts of the pandemic are still emerging and will vary depending on the 2017 authorizedseverity of impacts on the society and economy of the US and California, but it may have a material impact on SCE's ability to execute its planned work, including wildfire mitigation and capital projects and on the liquidity, cash flows and results of operations of Edison International and SCE. Factors that may increase in severity or that may emerge to cause these impacts include lack of availability of company and contractor employees to perform their job functions, supply chain disruptions, stop-work orders and limitations on the ability to obtain permits for work from local governments, reduced electricity usage by commercial and industrial customers partially offset by increased electricity usage by residential customers, non-payment due to the economic impacts on the community served by SCE and restricted access to, or increased costs of accessing, banking and capital markets.
Decoupling revenue requirement, adjustedmechanisms allow for items SCE has determineddifferences in revenue resulting from actual and forecast volumetric electricity sales to be probablecollected from or refunded to ratepayers and therefore insulate SCE's short-term earnings from reductions in electricity usage.
The ongoing pandemic has already affected the operations of occurring, primarilyEdison International and SCE with all employees who, in the July 2017 costcompanies' assessment, can work remotely and perform their job functions effectively, directed to do so. Some employees and contract workers will continue to work at SCE facilities or in the field to maintain operations and perform critical work to protect public safety and reduce the risk of capital decisionwildfires.
In March 2020, to protect customers during the statewide emergency caused by the COVID-19 pandemic, SCE suspended disconnections for nonpayment and Tax Reform. The CPUC has approvedimplemented flexible payment plans for all residential and non-residential customers. For the establishmentquarter ending March 31, 2020, the COVID-19 pandemic caused an increase in the estimated allowance for uncollectible accounts of $8 million. Edison International and SCE anticipate a GRC memorandum accountheightened level of bad expense to continue as a result of the economic impact of the pandemic and the 2018 and 2019 revenue requirements ultimately adopted by the CPUC will be effective as of January 1, 2018 and January 1, 2019, respectively. The proposed decision, if adopted as drafted, would have a significant impact on SCE and Edison International’s reported results, including a non-core impairment of utility property, plant and equipment of up to $257 million ($185 million after-tax) related to disallowed historical capital expenditures and an increase to core earnings of approximately $130 million from application of the decision to revenue, depreciation and income tax expense retroactively for 2018 and the first quarter of 2019.
The proposed decision would allow a post-test year rate making mechanism that escalates capital additions by 2.49% for both 2019 and 2020. It would also allow operation and maintenance expenses to be escalated for 2019 and 2020 through the use of various escalation factors for labor, non-labor and medical expenses. The methodology set forthconsumer protections put in the proposed decision would, if adopted by the CPUC, result in a revenue requirement of $5.422 billion in 2019 and $5.823 billion in 2020.
SCE will file comments on the proposed decision in May 2019 and SCE cannot predict when a final decision will be issued. A final decision could result in material changes to the proposed decision.
Capital Program
Total capital expenditures (including accruals) were $856 million and $853 million for the first three months of 2019 and 2018, respectively.
SCE's capital expenditure forecast for 2020 has been updated since the filing of the 2018 Form 10-K to reflect planned CPUC jurisdictional spending as informed by the 2018 GRC proposed decision and spending associated with SCE's wildfire mitigation-related capital expenditures under the GS&RP and WMP. The table below includes $346 million and a range of $500 million to $700 million of capital expenditures related to wildfire mitigation for 2019 and 2020, respectively. The CPUC has authorized tracking of costs related to the GS&RP and WMP through memorandum accounts. SCE has also proposed a balancing account for its GS&RP spending. If SCE's proposed balancing account in its GS&RP application is approved, forecasted costs for the GS&RP will be included in rates with a subsequent reasonableness review through the annual ERRA proceeding. On April 29, 2018, the CPUC issued a proposed decision that, if adopted, would approve SCE's 2019 WMP and, among other things, would require SCE to meet certain reporting requirements. SCE continues to evaluate wildfire mitigation spending and anticipates that in 2019 the CPUC will issue decisions on the GS&RP and 2019 WMP.place. SCE expects to file itsrequest recovery of any 2020 WMP by early 2020. SCE anticipates that wildfire mitigation spending not addressed in balancing accounts will be addressed in future GRC applications or through other regulatory proceedings.


SCE forecasts capital expenditures for 2019 – 2020 to be approximately $8,896 million to $9,096 million. SCE's 2019 – 2020 forecast for major capital expenditures are set forth in the table below:
(in millions)20192020
Total
2019 – 2020
Distribution$3,219
$2,898
$6,117
Transmission701
786
1,487
Generation211
235
446
Subtotal4,131
3,919
8,050
Estimated wildfire mitigation-related capital expenditures346
500 – 700
846 – 1,046
Total estimated capital expenditures$4,477
$4,419 – $4,619
$8,896 – $9,096
SCE's authorized CPUC-jurisdictional rate base is determined through the GRC and other regulatory proceedings. Differences between actual and CPUC authorized capital expenditures are addressed in subsequent GRC or other regulatory proceedings. FERC-jurisdictional rate base is generally determined based on actual capital expenditures.
Reflected below is SCE's weighted average annual rate base for 2018 – 2020 assuming the CPUC capital expendituresbad debt expense above amounts authorized in the 2018 GRC proposed decisionas a result of the customer protection measures taken through a COVID-19 pandemic protections memorandum account, established in accordance with the April 2020 emergency authorization of the CPUC. Recoveries for uncollectible accounts are adoptedcalculated as drafteda percentage of revenue in rates; the 2018 GRC set the uncollectible factor as 0.211%. In 2019, SCE recovered $23 million of uncollectible accounts. For the quarter ending March 31, 2020, the uncollectible account expense was $17 million. It is likely that the level of uncollectible expense will exceed 2020 authorized levels in the second quarter of 2020.
A catastrophic event memorandum account has been established to track the costs associated with complying with governmental agency orders due to the COVID-19 pandemic and SCE expects to seek recovery of incremental costs incurred as a direct result of the COVID-19 pandemic through this or other regulatory mechanisms.
For further information see "Risk Factors."





Wildfire Mitigation and Wildfire Insurance Expenses
In response to the increase in wildfire activity, and faster progression of and increased damage from wildfires across SCE's service territory and throughout California, SCE is currently incurring wildfire mitigation and wildfire insurance related spending at levels significantly exceeding amounts authorized in its 2018 GRC. Several regulatory mechanisms, including but not limited to the GS&RP memorandum account, the FHPMA, the WMP memorandum account and the expected FERCWEMA, exist to allow SCE to track and seek recovery of these incremental costs. In accordance with the accounting standards applicable to rate-regulated enterprises, SCE defers costs as regulatory assets that are probable of future recovery from customers and has recorded regulatory assets for these incremental costs. For certain wildfire mitigation and wildfire insurance expenses SCE performs its assessment of future recovery after its year to date spending exceeds the amounts authorized for the full calendar year under its current revenue requirement. As of March 31, 2020, SCE has recognized $434 million of regulatory assets related to incremental wildfire mitigation expenses, including depreciation expense from $900 million of total incremental capital expenditures. The table below doesexpenditures, and $375 million of regulatory assets related to incremental wildfire insurance expenses in the WEMA. While SCE believes such costs are probable of future recovery, there is no assurance that SCE will collect all amounts currently deferred as regulatory assets. SCE has recorded a further $164 million of incremental expenses that will be subject to reasonableness reviews through the GS&RP and the 2021 GRC proceedings.
Grid Safety and Resiliency Program
In April 2020, the CPUC approved a settlement agreement between SCE and certain parties to SCE's GS&RP proceeding. Under the settlement, SCE is authorized to spend approximately $526 million ($407 million capital) in 2018 dollars between 2018 and 2020. SCE will include the authorized revenue requirement in rates and establish a balancing account to track the difference between actual GS&RP costs and amounts authorized. If spending is less than authorized, SCE will refund those amounts to customers. If spending is in excess of forecasted amounts, or in excess of 115% of forecasted amounts for certain activities, SCE will present those costs for reasonableness review in the 2021 GRC. Additionally, SCE's recovery of tree removal costs is capped at a specific average authorized unit cost and a total volume of trees.
Through March 31, 2020, SCE has incurred $466 million of capital expenditures, of which $21 million will be subject to a reasonableness review, and $49 million of operations and maintenance expenses.
2021 General Rate Case Wildfire Mitigation Memorandum Account Balances 
For purposes of evaluating SCE's recovery of 2018-2020 wildfire mitigation costs, the CPUC has incorporated additional tracks into the 2021 GRC proceeding. Under the adopted schedule, most incremental wildfire mitigation costs from 2018 and 2019 are to be reviewed in track 2 and incremental wildfire mitigation costs from 2020, and all GS&RP costs above settled amounts, are to be reviewed in track 3 of the 2021 GRC proceeding.
In March 2020, SCE made its 2021 GRC track 2 filing with the CPUC for review and approval of $302 million of capital expenditures and $509 million of operation and maintenance expenses incremental to amounts authorized in SCE's 2018 GRC and not reflect rate base associated with spendingSCE's GS&RP application. The GRC track 2 expenditures predominantly related to enhanced overhead inspections, an expanded vegetation management program and expert consultant contract labor costs supporting SCE's wildfire mitigation activities. The majority of these expenditures are associated with the WMP memorandum account and the FHPMA. The capital revenue requirement recorded in memorandum accounts mainly represents depreciation expense, taxes, and return. After flow through tax effects and excluding the revenue requirement associated with AB 1054 Excluded Capital Expenditures, the GRC track 2 filing resulted in an additional requested revenue requirement of $500 million.
The schedule for the GS&RP or other programs which have not yet been approved by the CPUC.
(in millions)201820192020
Rate base for expected capital expenditures$28,382
$30,682
$33,120
A final CPUC decision could result in material changes to theSCE's 2021 GRC includes proposed decision, including the weighted average annual rate base for 2018 – 2020 set forthdecisions on track 2 and track 3 in the table above.first quarters of 2021 and 2022, respectively.






Southern California Wildfires and Mudslides
Approximately 35% of SCE's service territory is in areas identified as high fire risk by SCE. Multiple factors have contributed to increased wildfires,wildfire activity, and faster progression of wildfires and the increased damage from wildfires across SCE's service territory and throughout California. These include the buildup of dry vegetation in areas severely impacted by years of historic drought, lack of adequate clearing of hazardous fuels by responsible parties, higher temperatures, lower humidity, and strong Santa Ana winds. At the same time that wildfire risk has been increasing in Southern California, residential and commercial development has occurred and is occurring in some of the highest-risk areas. Such factors can increase the likelihood and extent of wildfires. SCE has determined that approximately 27% of its service territory is in areas identified as high fire risk.
In December 2017 and November 2018,Over the past several years, wind-driven wildfires impacted portions of SCE's service territory, with wildfires in December 2017 and November 2018 causing loss of life, substantial damage to both residential and business properties, and service outages for SCE customers. In 2019, several wind-driven wildfires originated in Southern California. SCE does not expect any of these 2019 fires to have a material adverse effect on its financial condition, results of operations or cash flows.
2017/2018 Wildfire/Mudslide Events
The investigating government agencies, the VCFD and CAL FIRE, have determined that the largest of the 2017 fires originated on December 4, 2017, in the Anlauf Canyon area of Ventura County (the investigating agencies refer to this fire as the "Thomas Fire"), followed shortly thereafter by the Koenigstein Fire. While the progression of these two fires remains under review, the December 4, 2017 fires eventually burned substantial acreage in both Ventura and Santa Barbara Counties. The largest of the November 2018 fires, known as the Woolsey Fire, originated in Ventura County and burned acreage in both Ventura and Los Angeles Counties.
In March 2019, the VCFD and CAL FIRE jointly issued separate reports finding that the Thomas Fire and the Koenigstein Fire were each caused by SCE equipment. At this time, based on available information, SCE has not determined whether its equipment caused the Thomas Fire. Based on publicly available radar data showing a smoke plume in the Anlauf Canyon area emerging in advance of the start time of the Thomas Fire indicated in the Thomas Fire report, SCE believes that the Thomas Fire started at least 12 minutes prior to any issue involving SCE's system and at least 15 minutes prior to the start time indicated in the report. SCE has previously disclosed that SCE believed its equipment was associated with the ignition of the Koenigstein Fire. SCE is continuing to assess the progression of the Thomas and Koenigstein Fires and the extent of damages that may be attributable to each fire.
SCE has received a non-final redacted draft of a report from the VCFD subject to a protective order in the litigation related to the Woolsey fire and, other than the information disclosed in this Form 10-Q, is not authorized to release the report or its contents to the public at this time. The draft report states that the VCFD investigation team determined that electrical equipment owned and operated by SCE was the cause of the Woolsey Fire. Absent additional evidence, SCE believes that it is likely that its equipment was associated with the ignition of the Woolsey Fire.
Multiple lawsuits related to the Thomas and Koenigstein Fires and the Woolsey Fire have been initiated against SCE and Edison International. Some of the Thomas and Koenigstein Fires lawsuits claim that SCE and Edison International have responsibility for the damages caused by the Montecito Mudslides based on a theory alleging that SCE has responsibility for the


Thomas and/or Koenigstein Fires and that the Thomas and/or Koenigstein Fires proximately caused the Montecito Mudslides.
SCE's internal review into the facts and circumstances of each of the 2017/2018 Wildfire/Mudslide Events is ongoing, and SCE expects to obtain and review additional information and materials in the possession of third parties during the course ofits internal reviews and the litigation processes.Final determinations of liability for the Thomas Fire, the Koenigstein Fire, the Montecito Mudslides and the Woolsey Fire (each a "2017/2017/2018 Wildfire/Mudslide Event," and, collectively, the "2017/2018 Wildfire/Mudslide Events"),Events, including determinations of whether SCE was negligent, would only be made during lengthy and complex litigation processes.
Even when investigations are still pending or liability is disputed, an assessment of likely outcomes, including through future settlement of disputed claims, may require a liability to be accrued under accounting standards. Based on information available to SCE and consideration of the risks associated with litigation, Edison International and SCE expect to incur a material loss in connection with the 2017/2018 Wildfire/Mudslide EventsEvents.
At both March 31, 2020 and December 31, 2019, Edison International's and SCE's balance sheets include accrued a liabilityliabilities of $4.7$4.5 billion infor the fourth quarter of 2018. This2017/2018 Wildfire/Mudslide Events. The accrued liability corresponds to the lower end of the reasonably estimated range of expected potential losses that may be incurred in connection with the 2017/2018 Wildfire/Mudslide Events and is subject to change as additional information becomes available. Each reporting period, management reviews its loss estimates for remaining alleged and potential claims related to the 2017/2018 Wildfire/Mudslide Events. The process for estimating losses associated with wildfire litigation claims requires management to exercise significant judgment based on a number of assumptions and subjective factors, including, but not limited to: estimates of known and expected claims by third


parties based on currently available information, opinions of counsel regarding litigation risk, the status of and developments in the course of litigation, and prior experience litigating and settling wildfire litigation claims.
Edison International and SCE will seek to offset any actual losses realized in connection with the 2017/2018 Wildfire/Mudslide Events with recoveries from insurance policies in place at the time of the events and, to the extent actual losses exceed insurance, through electric rates. In the fourth quarterAs of 2018,March 31, 2020, Edison International and SCE also recordedhave remaining expected recoveries from insurance of $2.0$1.7 billion and expected recoveries through FERC electric rates of $135$113 million which ison their consolidated balance sheets related to the FERC portion of the $4.7 billion liability it accrued.2017/2018 Wildfire/Mudslide Events. SCE believes that, in light of the CPUC's decision in a cost recovery proceeding involving SDG&E arising from several 2007 wildfires in SDG&E's service area, there is substantial uncertainty regarding how the CPUC will interpret and apply its prudency standard to an investor-owned utility in future wildfire cost-recovery proceedings.proceedings for fires ignited prior to July 12, 2019. Accordingly, while the CPUC has not made a determination regarding SCE's prudency relative to any of the 2017/2018 Wildfire/Mudslide Events, SCE is unable to conclude, at this time, that uninsured CPUC-jurisdictional wildfire-related costs are probable of recovery through electric rates.
Edison International and SCE continue to pursue legislative, regulatory and legal strategies, and anticipate pursuing legislative strategies in the longer term, to address the application of a strict liability standard to wildfire-related property damages without the guaranteed ability to recover resulting costs in electric rates.
2019 Wildfire Legislation
In AprilJuly 2019, AB 1054 was signed by the Governor of California and became effective immediately. The summary of the wildfire legislation in this report is based on SCE's interpretation of the legislation and is qualified in its entirety by, and should be read together with, AB 1054 and companion Assembly Bill 111.
Wildfire Insurance Fund
AB 1054 provided for the Wildfire Insurance Fund to reimburse utilities for payment of third-party damage claims arising from certain wildfires that exceed, in aggregate in a strike force formedcalendar year, the greater of $1.0 billion or the utility's insurance coverage. The Wildfire Insurance Fund was established in September 2019 when both SCE and SDG&E made their initial contributions to the fund. The Wildfire Insurance Fund is available for claims related to wildfires ignited after July 12, 2019 that are determined to have been caused by a utility by the responsible government investigatory agency.
SCE and SDG&E have collectively made their initial contributions totaling approximately $2.7 billion to the Wildfire Insurance Fund. While PG&E has committed to make an initial contribution of approximately $4.8 billion to the Wildfire Insurance Fund upon emergence from bankruptcy, its participation in, and contributions to the fund are subject to it resolving its bankruptcy proceeding and meeting certain other conditions prior to June 30, 2020. SCE and SDG&E are also collectively expected to make aggregate contributions of approximately $1.1 billion to the Wildfire Insurance Fund through annual contributions to the fund over a 10-year period, of which SCE and SDG&E have made their initial annual contributions totaling approximately $107 million. If PG&E participates in the Wildfire Insurance Fund, it is expected to make aggregate contributions of approximately $1.9 billion to the fund through annual contributions over the same 10-year period. In addition to PG&E's, SCE's and SDG&E's contributions to the Wildfire Insurance Fund, PG&E, SCE and SDG&E are expected to collect $6.1 billion, $6.1 billion and $1.3 billion, respectively, from their ratepayers over a 15-year period through a dedicated rate component. Based on a decision adopted by the CPUC in October 2019 in the Order Instituting Rulemaking to Consider Authorization of a Non-Bypassable Charge to Support the Wildfire Insurance Fund, PG&E's ratepayers will not be required to contribute to the fund if PG&E does not participate in the Wildfire Insurance Fund. The amount collected from ratepayers may be directly contributed to the Wildfire Insurance Fund or used to support the issuance of up to $10.5 billion in bonds by the California Governor Gavin Newsom released a report entitled Wildfires and Climate Change: California's Energy Future,Department of Water Resources, the proceeds of which sets forth,would be contributed to the fund. In addition to funding contributions to the Wildfire Insurance Fund, the amount collected from utility ratepayers will pay for, among other things, guiding principlesany interest and financing costs related to any bonds that are issued by the California Department of Water Resources to support the contributions to the Wildfire Insurance Fund.
SCE made an initial contribution of approximately $2.4 billion to the Wildfire Insurance Fund in September 2019 and has committed to make ten annual contributions of approximately $95 million per year to the fund, by no later than January 1 of each year. SCE made its first annual contribution to the Wildfire Insurance Fund in December 2019. Edison International supported SCE's initial contribution to the Wildfire Insurance Fund by raising $1.2 billion from the issuance of Edison International equity. SCE raised the remaining $1.2 billion from the issuance of long-term debt. SCE's contributions to the Wildfire Insurance Fund will not be recoverable through electric rates and will be excluded from the measurement of SCE's CPUC-jurisdictional authorized capital structure. SCE will also not be entitled to cost recovery for potential reformany borrowing costs incurred in connection with its contributions to California policies regarding wildfire liability. While this report recommendedthe Wildfire Insurance Fund.


Participating investor-owned utilities will be reimbursed from the Wildfire Insurance Fund for eligible claims, subject to the fund administrator's review. SCE will reimburse the fund for any withdrawn amounts if SCE receives payment of such amounts under an indemnification agreement or from an insurance provider or other third-party. SCE will also be required to reimburse the fund for withdrawn amounts that the Commission on Catastrophic Wildfire CostCPUC disallows subject, in some instances, to the AB 1054 Liability Cap. A utility will not be eligible for the AB 1054 Liability Cap if it does not maintain a valid safety certification or its actions or inactions that resulted in the wildfire are found to constitute conscious or willful disregard of the rights and Recovery, the California legislature and the strike force continue working to develop a solution for consideration by the Governor and the legislature, Edison International andsafety of others. On July 25, 2019, SCE cannot predict whether or when thereobtained its initial safety certification that will be valid for twelve months. Based on SCE's 2020 rate base and assuming the equity portion of SCE's capital structure is 52% (SCE's CPUC authorized capital structure), SCE's requirement to reimburse the Wildfire Insurance Fund for eligible claims disallowed in 2020 would be capped at approximately $3.0 billion. SCE will not be allowed to recover borrowing costs incurred to reimburse the fund for amounts that the CPUC disallows. The Wildfire Insurance Fund and, consequently, the AB 1054 Liability Cap will terminate when the administrator determines that the fund has been exhausted.
AB 1054 Prudency Standard
As a comprehensive solution mitigatingresult of the significant risk faced by California investor-owned utilitiesestablishment of the Wildfire Insurance Fund, AB 1054 created a new standard that the CPUC must apply when assessing the prudency of a utility in connection with a request for recovery of wildfire costs for wildfires ignited after July 12, 2019. Under AB 1054, the CPUC is required to find a utility to be prudent if the utility's conduct related to wildfires.the ignition was consistent with actions that a reasonable utility would have undertaken under similar circumstances, at the relevant point in time, and based on the information available at that time. Utilities with a valid safety certification will be presumed to have acted prudently related to a wildfire ignition unless a party in the cost recovery proceeding creates serious doubt as to the reasonableness of the utility's conduct, at which time, the burden shifts back to the utility to prove its conduct was reasonable. If a utility does not have a valid safety certification, it will have the burden to prove, based on a preponderance of evidence, that its conduct was prudent. The new prudency standard will survive the termination of the Wildfire Insurance Fund.
In April 2019,Utilities participating in additionthe Wildfire Insurance Fund are not required to other requested increases in CPUC and FERC ROE, SCE requestedreimburse the fund for amounts withdrawn from boththe fund that the CPUC finds were prudently incurred and FERCcan recover such prudently incurred wildfire costs through electric rates if the fund has been exhausted.
Capital Expenditure Requirement
Under AB 1054, approximately $1.6 billion of spending by SCE on wildfire risk mitigation capital expenditures made after August 1, 2019 cannot be included in the equity portion of SCE's rate base. SCE can apply for an additional 6% ROEirrevocable order from the CPUC to compensate investors for current wildfire risk.finance these AB 1054 Excluded Capital Expenditures, including through the issuance of securitized bonds, and can recover any prudently incurred financing costs. SCE would seekexpects to reduce or removefinance this additional ROE if there is a material reduction in its wildfire cost recovery risk due to regulatory or legislative reform. For further details, see "Liquidity andcapital requirement by issuing securitized bonds. As of March 31, 2020, SCE has spent $601 million on AB 1054 Excluded Capital Resources—SCE—Regulatory Proceedings—2020 Cost of Capital Application" and "Liquidity and Capital Resources—SCE—Regulatory Proceedings—FERC Formula Rate—2019 FERC Formula Rate."Expenditures.
For further information, see in the 2019 Form 10-K "Notes to Consolidated Financial Statements—Note 1. Summary of Significant Accounting Policies—Initial and annual contributions to the wildfire insurance fund established pursuant to California Assembly Bill 1054" and in this report "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides" and "Legal Proceedings."


Capital Program
Total capital expenditures (including accruals) were $1.0 billion and $856 million for the first three months of 2020 and 2019, respectively. The 2020 actual capital spending may be affected by changes in regulatory, environmental and engineering design requirements, permitting and project delays, cost and availability of labor, equipment and materials and other factors. SCE's 2020 capital program has experienced delays due to the COVID-19 pandemic as a result of efforts to minimize outages for customers subject to stay home orders. SCE is currently assessing the impact of this and the broader potential impacts of the COVID-19 pandemic on its ability to execute the 2020 capital program as planned. For further information regarding the COVID-19 pandemic see "— COVID-19." For further information regarding the capital program see "Liquidity and Capital Resources—SCE—Capital Investment Plan."





RESULTS OF OPERATIONS
Southern California Edison CompanySCE
SCE's results of operations are derived mainly through two sources:
Earning activities – representing revenue authorized by the CPUC and FERC, which is intended to provide SCE a reasonable opportunity to recover its costs and earn a return on its net investment in generation, transmission and distribution assets. The annual revenue requirements are comprised of authorized operation and maintenance costs, depreciation, taxes and a return consistent with the capital structure. Also, included in earnings activities are revenue or penalties related to incentive mechanisms, other operating revenue, and regulatory charges or disallowances.
Cost-recovery activities – representing CPUC- and FERC- authorized balancing accounts, which allow for recovery of specific project or program costs, subject to reasonableness review or compliance with upfront standards. Cost-recovery activities include rates which provide recovery, subject to reasonableness review of, among other things, fuel costs, purchased power costs, public purpose related-program costs (including energy efficiency and demand-side management programs), and certain operation and maintenance expenses. SCE earns no return on these activities.
The following table is a summary of SCE's results of operations for the periods indicated.
Three months ended March 31, 20192020 versus March 31, 20182019
Three months ended March 31, 2019Three months ended March 31, 2018Three months ended March 31, 2020Three months ended March 31, 2019
(in millions)Earning
Activities
Cost-
Recovery
Activities
Total
Consolidated
Earning ActivitiesCost-Recovery ActivitiesTotal ConsolidatedEarning
Activities
Cost-
Recovery
Activities
Total
Consolidated
Earning
Activities
Cost-
Recovery
Activities
Total
Consolidated
Operating revenue$1,550
$1,266
$2,816
$1,513
$1,041
$2,554
$1,741
$1,039
$2,780
$1,550
$1,266
$2,816
Purchased power and fuel
1,005
1,005

926
926
2
926
928

1,005
1,005
Operation and maintenance589
280
869
509
142
651
717
142
859
589
280
869
Wildfire insurance fund expense84

84



Depreciation and amortization480

480
459

459
483

483
480

480
Property and other taxes109

109
105

105
110

110
109

109
Impairment and other(4)
(4)


Other operating income(1)
(1)(1)
(1)


(5)
(5)
Total operating expenses1,173
1,285
2,458
1,072
1,068
2,140
1,396
1,068
2,464
1,173
1,285
2,458
Operating income377
(19)358
441
(27)414
Operating income (loss)345
(29)316
377
(19)358
Interest expense(178)
(178)(155)
(155)(194)
(194)(178)
(178)
Other income and expense19
19
38
24
27
51
Other income23
29
52
19
19
38
Income before income taxes218

218
310

310
174

174
218

218
Income tax benefit(105)
(105)(6)
(6)(75)
(75)(105)
(105)
Net income323

323
316

316
249

249
323

323
Preferred and preference stock dividend requirements30

30
30

30
30

30
30

30
Net income available for common stock$293
$
$293
$286
$
$286
$219
$
$219
$293
$
$293
Net income available for common stock  $293
 $286
  $219
 $293
Less: Non-core earnings  72
 
Less: Non-core (expense)/income  (42) 72
Core earnings1
  $221
 $286
  $261
 $221
1 
See use of non-GAAP financial measures in "Management Overview—Highlights of Operating Results."







Earning Activities
Earning activities were primarily affected by the following:
Higher operating revenue of $37$191 million primarily due to the following:
An increase in CPUC-related revenue of $26$166 million primarily due the adoption of the 2018 GRC final decision. This increase is due to SCE recording revenue in CPUC2020 based on the 2018 GRC final decision in comparison to recording revenue primarily related to a $16 million refund to customers in 2018 for prior overcollections and $6 million related to the incremental returnfirst quarter of 2019 based on rate base recorded through the pole loading balancing account.2017 adjusted authorized revenue.
An increase in FERC-related revenue of $11$23 million in FERC revenue primarily due to favorable earnings from a higher proportion of equity in SCE's actual capital structure used in setting FERC rates, higher FERC rate base and higher operating costs subject to balancing account treatment (offset in operation and maintenance expenses and interest expense below).treatment.
Higher operation and maintenance costs of $80$128 million primarily due to:
Increased expenses of $66 million due to higher vegetation management costs and other wildfire mitigation costs, partially offset by lower inspection and preventative maintenance costs. Vegetation management costs were higher in 2020 due to higher prevailing wages required by California Senate Bill 247 and increased scope of work.
Higher wildfire insurance expenses of $20 million due to the authorization to recover certain 2018 wildfire insurance expenses reducing expenses in the first quarter of 2019.
Higher employee benefit expenses of $20 million resulting primarily from the payout of 2019 short-term incentive compensation.
Other increased expenses of $35 million primarily due to wildfire mitigationhigher expense from the allowance for doubtful accounts primarily due to the COVID-19 pandemic, higher workers' compensation costs including enhanced overhead inspections, and other preventative maintenance costs.expenses subject to balancing account treatment.
Higher depreciation and amortizationwildfire insurance fund expense of $21$84 million primarily relatedfor amortization of contributions to transmissionthe Wildfire Insurance Fund for insurance protection. See "Management Overview—Southern California Wildfires and distribution investments.Mudslides" for further information.
Higher interest expense of $23$16 million primarily due to increased borrowings and higher interest on balancing account overcollections.borrowings.
Lower other income and expensetax benefit of $5$30 million primarily due to lower AFUDC equity income.
Higher income tax benefitsthe absence of $99 million primarily due to higher non-core2019 income tax benefits of $69 million related to changes in the allocation of deferred tax re-measurement between customers and shareholders, partially offset by 2020 income tax benefits of $18 million due to re-measurement of uncertain tax positions related to the 2010 – 2012 California state tax filings currently under audit and lower pre-tax income, excluding non-core items.income.
Cost-Recovery Activities
Cost-recovery activities were primarily affected by the following:
HigherLower purchased power and fuel costs of $79 million primarily driven by higherlower power and gas prices, lower congestion revenue right creditsload related to energy efficiency and highercustomer departures to CCAs and lower charges from contract amendments, partially offset by lower load related to cooler weathercongestion revenue right credits. In addition, CAISO issued invoices that revised FERC tariffs for interest costs associated with scheduling coordinator activities. This resulted in a generation surcharge of $59 million reflected as an additional purchased power expense and higher realized gains on hedging activities.a transmission refund of $66 million as a reduction in operation and maintenance expense.
HigherLower operation and maintenance costs of $138 million primarily driven by the authorization to recover 2018 wildfire insurance costs that had been deferred as regulatory assets increasing expenses in 2019, the CAISO refund of $66 million mentioned above and higher spending on various public purpose programs andlower transmission access charges.
LowerHigher other income and expense of $8$10 million primarily driven by lowerhigher net periodic benefit income related to the non-service cost components for SCE's other post-retirement benefit plans. See "Notes to Consolidated Financial Statements—Note 9. Compensation and Benefit Plans" for further information.





Supplemental Operating Revenue Information
SCE's retail billed and unbilled revenue (excluding wholesale sales) was $2.6$2.5 billion and $2.4$2.6 billion for the three months ended March 31, 20192020 and 2018,2019 respectively.
The decrease for the three months ended March 31, 2020 compared to the same period in 2019 revenue increase is primarily relateddue to higher lower
cost-recovery activities related to 2018 wildfire insurance costs and higher purchased power and fuel costs driven by higher power and gas prices, lower congestion revenue right credits and higher charges from contract amendments,expenses, partially offset by lower load relatedhigher CPUC revenue due to cooler weather.the adoption of the 2018 GRC final decision. See "—Cost-Recovery Activities" and "—Earnings Activities" for further details.
As a result of the CPUC-authorized decoupling mechanism, SCE earnings are not affected by changes in retail electricity sales.


Income Taxes
SCE's income tax benefit increaseddecreased by $99$30 million for the three months ended March 31, 20192020 compared to the same period in 2018.2019.
The effective tax rates were (48.2)(43.1)% and (1.9)(48.2)% for the three months ended March 31, 20192020 and 2018,2019, respectively. SCE's effective tax rate is below the federal statutory rate of 21% primarily due to CPUC's ratemaking treatment for the current tax benefit arising from certain property-related and other temporary differences, which reverse over time. The accounting treatment for these temporary differences results in recording regulatory assets and liabilities for amounts that would otherwise be recorded to deferred income tax expense. The effective tax rate decreaseincrease for the three months ended March 31, 2020 is primarily due to absence of the change in the allocation of2019 excess deferred tax re-measurement between customers and shareholders that resulted from a CPUC resolution, partially offset by tax benefits from re-measurement of uncertain tax positions related to the 2010 – 2012 California state tax filings currently under audit and higher tax benefits on property-related items recorded in 2020 as a result of a CPUC resolution issued in February 2019.2018 GRC final decision.
See "Notes to Consolidated Financial Statements—Note 8. Income Taxes" for a reconciliation of the federal statutory rate to the effective income tax rates.
Edison International Parent and Other
Results of operations for Edison International Parent and Other include amounts from other Edison International subsidiaries that are not significant as a reportable segment, as well as intercompany eliminations.
IncomeLoss from Continuing Operations
The following table summarizes the results of Edison International Parent and Other:
 Three months ended March 31, Three months ended March 31,
(in millions) 2019 2018 2020 2019
Edison Energy Group and subsidiaries $(3) $(52) $(2) $(3)
Corporate expenses and other subsidiaries (12) (16) 34
 12
Total Edison International Parent and Other $(15) $(68) $(36) $(15)
The loss from continuing operations of Edison International Parent and Other decreased $53increased $21 million for the three months ended March 31, 20192020 compared to the same period in 20182019.
The increase for the three months ended March 31, 2020 is primarily driven by higher interest expense as a result of increased borrowings, higher corporate expenses and a charge of $3 million due to re-measurement of uncertain tax positions related to the absence of an after-tax impairment charge of $48 million resulting from an agreement to sell SoCore Energy and lower corporate expenses.2010 – 2012 California state tax filings currently under audit.





LIQUIDITY AND CAPITAL RESOURCES
SCE
SCE's ability to operate its business, fund capital expenditures, and implement its business strategy is dependent upon its cash flow and access to the bank and capital markets. SCE's overall cash flows fluctuate based on, among other things, its ability to recover its costs in a timely manner from its customers through regulated rates, changes in commodity prices and volumes, collateral requirements, interest obligations, dividend payments to and equity contributions from Edison International, obligations to preferred and preference shareholders, and the outcome of tax and regulatory matters.
The COVID-19 pandemic may cause restricted access to, or increased costs of accessing, bank and capital markets. As a precaution, in March and April 2020, SCE brought forward debt issuances that had been planned for later in the year to provide additional financing flexibility given possible future market uncertainty. For further details, see "Management Overview—COVID-19" and "—Available Liquidity."
In the next 12 months, SCE expects to fund its cash requirements through operating cash flows, capital market financings, and equity contributions from Edison International Parent, as needed. SCE also has availability under its credit facility to fund cash requirements.
SCE expects to finance the approximately $1.6 billion of AB 1054 Excluded Capital Expenditures by issuing securitized bonds. For further information, see "Management Overview—Southern California Wildfires and Mudslides." Prior to issuance of such bonds, other debt instruments are being used to temporarily finance the expenditures, including a term loan of $475 million and a 364-day revolving credit facility for $800 million entered into during the first quarter of 2020.
SCE's long-term issuer credit ratings remain at investment grade levels after downgrade actions taken by the major credit agencies in Marchthe first quarter of 2019. SCE's rating outlook has remained stable, after the passage of AB 1054 and the establishment of the Wildfire Insurance Fund, which provided the Liability Cap and the new standard that the CPUC must apply when assessing the prudency of a utility. For further information, see "Management Overview—Southern California Wildfires and Mudslides."
The following table summarizes SCE's current, long-term issuer credit ratings and outlook from the major credit rating agencies:
  Moody'sFitchS&P
Long-term Issuer Credit Rating Baa2BBB-BBB
Outlook NegativeStableWatch NegativeStableWatch NegativeStable
SCE's credit ratings may be further affected if, among other things, regulators fail to successfully implement AB 1054 in a consistent and credit supportive manner or the Wildfire Insurance Fund is depleted by the ultimate outcome of pending enforcement and litigation matters, including the outcomeclaims from catastrophic wildfires. The broad economic impacts of the uncertaintiesCOVID-19 pandemic may also affect SCE's credit rating. For further information see "Management Overview—COVID-19" and potential liabilities associated with the 2017/2018 Wildfire/Mudslide Events, and the reform of policies allocating liability to investor-owned utilities for damages caused by catastrophic wildfires substantially caused by utility equipment."Risk Factors." Credit rating downgrades increase the cost and may impact the availability of short-term and


long-term borrowings, including commercial paper, credit facilities, bond financings or other borrowings. In addition, some of SCE's power procurement contracts require SCE to pay related liabilities or post additional collateral if SCE's credit rating were to fall below investment grade rating from the major credit rating agencies. Incremental collateral requirements for power procurement contracts resulting from a potential downgrade of SCE's credit rating to below investment grade is $14are $39 million as of March 31, 2019.2020. In addition, if SCE's credit rating falls below investment grade, it may be required to post up to $50 million in collateral, in connection with its environmental remediation obligations, within 120 days of the end of the fiscal year in which the downgrade occurs. Furthermore, if SCE was downgraded below investment grade, counterparties may also institute new collateral requirements for future transactions. For further details, see "—Margin and Collateral Deposits."





Available Liquidity
At March 31, 2019,2020, SCE had approximately $2.8 billion available under its $3.0 billion credit facility.facility and cash on hand of $451 million. The credit facility is available for borrowing needs until May 20232024 and containsmay be extended for one additional year with the lenders' approval. The aggregate maximum principal amount under the SCE revolving credit facility may be increased up to $4.0 billion, provided that additional lender commitments are obtained.
In the first quarter of 2020, SCE entered into a 364-day revolving credit facility for $800 million. The credit facility is available for borrowing needs until March 2021 and may be extended for two 1-year extension options.364-day periods, at the lenders' discretion. The aggregate maximum principal amount under the revolving credit facility may be increased up to $1.1 billion, provided that additional lender commitments are obtained. At March 31, 2020, SCE had no borrowings under the facility. The facility is expected to fund future AB 1054 Excluded Capital Expenditures until an anticipated issuance of securitized bonds. In the first quarter of 2020, SCE also borrowed $750$475 million under a term loan agreement due in February 2019March 2021 to repay commercial paper borrowings temporarily used to fund AB 1054 Excluded Capital Expenditures.
In the first quarter of 2020, SCE issued a total of $1.7 billion of first and refunding mortgage bonds. The proceeds were used to repay SCE's commercial paper borrowings and repurchase tax-exempt pollution control bonds that were subject to re-marketing. SCE continues to hold the tax-exempt pollution control bonds and plans to re-market them subject to market conditions. In April 2020, SCE issued $1.1 billion$600 million of first and refunding mortgage bonds due in March 2019.2025. The proceeds from the term loan and the March 2019 bond issuances were used to repay commercial paper borrowings and for general corporate purposes.finance undercollections of revenues SCE is authorized to recover from customers through regulatory balancing accounts. For further details, see "Notes to Consolidated Financial Statements—Note 5. Debt and Credit Agreements."
In April 2019, Edison International contributed $750 million to SCE, which SCE used to repay its February 2019 term loan discussed above.
SCE may finance balancing account undercollections and working capital requirements to support operations and capital expenditures with commercial paper, its credit facilityfacilities or other borrowings, subject to availability in the bank and capital markets. As necessary, SCE will utilize its available liquidity, capital market financings, other borrowings or parent company contributions to SCE equity in order to meet its obligations as they become due, including any potential costs related to the 2017/2018 Wildfire/Mudslide Events (seeEvents. For further information, see "Management Overview—Southern California Wildfires and Mudslides" for further information).Mudslides."
Debt Covenant
A debt covenant in SCE's credit facility limits itsfacilities and term loan require a debt to total capitalization ratio toas defined in the applicable agreements of less than or equal to 0.65 to 1. At March 31, 2019,2020, SCE's debt to total capitalization ratio was 0.520.49 to 1.
At March 31, 2019,2020, SCE was in compliance with all other financial covenants that affect access to capital.
Capital Investment Plan
Major Transmission Projects
Eldorado-Lugo-Mohave UpgradeRiverside Transmission Reliability Project
In April 2019, SCE filed an amended application for a certificate of public convenience and necessity withOctober 2018, the CPUC which included totalissued an environmental report that identified a new route alternative, as the environmentally preferred project costsand proposed an additional underground section of $257 million,the proposed 220-kV power line. In March 2020, the alternative project with revised scope and an increase of $24 million to the previous estimate.
Regulatory Proceedings
2020 Cost of Capital Application
In April 2019, SCE filed its application with the CPUC for authority to establish its authorizedupdated cost of capital for utility operations for a three-year term, beginning January 1, 2020. In its application, SCE seeks a return on common equity of 10.60% for 2020 ("CPUC Base ROE"), compared to its current CPUC ROE of 10.30%. In addition to this CPUC Base ROE, SCE seeks an additional ROE of 6% to compensate investors for current wildfire risk ("CPUC Wildfire Risk ROE"). SCE would seek to reduce or remove this CPUC Wildfire Risk ROE if there is a material reduction in its wildfire cost recovery risk due to regulatory or legislative reform.
SCE also seeks to modify its current capital structure to increase the common equity component of its capital structure from its current authorized level of 48% to 52% in 2020 and correspondingly reduce its preferred equity from 9% to 5%. If this change is not$584 million was approved SCE seeks a higher CPUC Base ROE of 10.9% to account for the increased leverage. SCE does not propose to change its currently authorized level of long-term debt of 43%. In the application, SCE projects a cost of long-term debt of 4.74% and an embedded cost of preferred equity of 5.70% and requests that the CPUC authorize these costs for 2020. Based on the capital structure and cost factors discussed above, SCE proposes a weighted average return on rate base of 10.96% for 2020.


SCE proposes to maintain the current Cost of Capital Mechanism ("CCM"), which provides for an automatic modification of ROE, long-term debt and preferred equity costs in intervening years based on fluctuations in interest rates. In its application, SCE proposes to change the CCM so that it only applies to CPUC Base ROE, not to the CPUC Wildfire Risk ROE.
Assuming that the revenue requirement in SCE's pending 2018 GRC request, including the proposed post-test year ratemaking mechanism, is adopted, SCE's proposed cost of capital and capital structure will result in a projected revenue requirement increase in 2020 of approximately $1.2 billion from revenue currently included in electric rates of $11.1 billion.

FERC Formula Rate
2018 Formula Rate
by CPUC. The formula rate that SCE filed in 2017, with a January 1, 2018 effectivescheduled in-service date is still pending resolution and is currently in settlement discussions. As a result, SCE's 2018 FERC rates remain subject to refund.
2019 Formula Rate
In April 2019, SCE filed an application with FERC to amend the formula rate associated with its transmission facilities in 2019. In the revised formula rate, SCE seeks a base return on equity of 17.12% ("FERC Base ROE"), compared to its proposed base ROE of 10.30% for its 2018 formula rate. The requested FERC Base ROE reflects a conventional ROE of 11.12% and an additional ROE of 6% to compensate investors for current wildfire risk. SCE would seek to reduce or remove the additional wildfire risk ROE if there is a material reduction in its wildfire cost recovery risk due to regulatory or legislative reform. SCE's total ROE request, inclusive of project incentives and a 0.5% incentive for CAISO participation, is approximately 18.4%.
If the new formula rate is accepted by FERC, it will supersede the existing formula rate, including the 2019 annual update, and could become effective as early as 60 days from the filing date. FERC has the authority to, and may, suspend new rates for up to five months. If the new formula rate is suspended by FERC, the 2019 transmission revenue requirement rate established in the 2019 annual update will continue to be effective, subject to refund, from January 1, 2019 until the end of the suspension of the new formula rate. The new formula rate would likely be subjectproject has been extended from 2024 to refund from the end of the suspension until it is ultimately approved by FERC.
If the revised formula rate becomes effective on June 12, 2019 (the effective date requested by SCE), SCE's proposed revisions to its formula rate will result in a projected increase in its retail base transmission revenue requirement in 2019 of approximately $290 million from the currently effective retail base transmission revenue requirement of approximately $1 billion.2026.
SCE Dividends
CPUC holding company rules require that SCE's dividend policy be established by SCE's Board of Directors on the same basis as if SCE were a stand-alone utility company, and that the capital requirements of SCE, as deemed to be necessary to meet SCE's electricity service obligations, shall receive first priority from the Boards of Directors of both Edison
International and SCE. In addition, the CPUC regulates SCE's capital structure which limits the dividends it may pay to its shareholders. Under
Prior to January 1, 2020, under SCE's interpretation of CPUC regulations and capital structure decisions, the common equity component of SCE's capital structure mustwas required to remain at or above 48% on a weighted average basis over the 37-month period that SCE's capital structure iswas in effect for ratemaking purposes.
Under SCE's interpretation of the CPUC's capital structure decisions,purposes and SCE iswas required to file an application for a waiver of the 48% equity ratio condition discussed above if an adverse financial event reduces its spot equity ratio below 47%. OnEffective January 1, 2020, the common equity component of SCE's authorized capital structure was increased from 48% to 52% on a weighted average basis over the period that SCE's capital structure is in effect for ratemaking purposes. For further information, see "Management Overview—2020 Cost of Capital Application" in the 2019 MD&A. Under AB 1054,


the impact of SCE's contributions to the Wildfire Insurance Fund are excluded from the measurement of SCE's CPUC-jurisdictional authorized capital structure. For further information, see "Management Overview—Southern California Wildfires and Mudslides."
In February 28, 2019, SCE submitted an application to the CPUC for waiver of compliance with thisthe equity ratio
requirement applicable at that time, describing that while the initial $1.8 billion net charge accrued as of December 31, 2018 in connection with the 2017/2018 Wildfire/Mudslide Events caused its equity ratio to fall below 47% on a spot basis as of December 31, 2018, SCE remainsremained in compliance with the 48% equity ratio over the applicable 37-month average basis. In itsApril 2020, the CPUC issued a proposed decision on SCE's application that, if adopted, would allow SCE requested a limited waiver to exclude wildfire-related charges and wildfire-related debt issuances from its equity ratio calculations until(i) net charges accrued in connection with the 2017/2018 Wildfire/Mudslide Events and (ii) debt issued for the purpose of paying claims related to the 2017/2018 Wildfire/Mudslide Events up to an amount equal to the net charges accrued in connection with the 2017/2018 Wildfire/Mudslide Events. The temporary exclusion will lapse two years from the issuance of a final decision or when a determination regarding cost recovery for the 2017/2018 Wildfire/Mudslide Events is made. Undermade, whichever comes earlier. If the CPUC's rules,CPUC has not made a determination regarding cost recovery within two years of issuance of a final decision, SCE is permitted to file another application for a waiver of compliance with its equity ratio requirement. If the proposed decision is adopted, SCE will not be deemedrequired to be in violation ofnotify the CPUC if an adverse financial event reduces SCE's spot equity ratio requirement,by more than one percent from the level most recently filed with the CPUC in the proceeding. The last spot equity ratio SCE filed with the CPUC in the proceeding did not exclude the $1.8 billion net charge and therefore may continue to issue debt and dividends, while the waiver application is pending resolution.was 45.2% as of December 31, 2018. For further information, see "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides." At March 31, 2019, without excluding the $1.8 billion after-tax wildfire related charge incurred in 2018, SCE's 37-month average common equity component of total capitalization was 49.3% and the maximum additional dividend that SCE could pay to Edison International under this limitation was $356 million, resulting in a restriction on net assets of approximately $13.5 billion. If the waiver had been approved by CPUC at March 31,


2019, SCE's 37-month average common equity component of total capitalization would have been 49.7%. In its 2020 cost of capital application filed in April 2019, SCE seeks to modify its current capital structure to increase the common equity component of its capital structure from its current authorized level of 48% to 52% in 2020. For further details, see "—Regulatory Proceedings—2020 Cost of Capital Application" above.
As a California corporation, SCE's ability to pay dividends is also governed by the California General Corporation Law. California law requires that for a dividend to be declared: (a) retained earnings must equal or exceed the proposed dividend, or (b) immediately after the dividend is made, the value of the corporation's assets must exceed the value of its liabilities plus amounts required to be paid, if any, in order to liquidate stock senior to the shares receiving the dividend. Additionally, a California corporation may not declare a dividend if it is, or as a result of the dividend would be, likely to be unable to meet its liabilities as they mature. Prior to declaring dividends, SCE's Board of Directors evaluates available information, including when applicable, information pertaining to the 2017/2018 Wildfire/Mudslide Events, to ensure that the California law requirements for the declarations are met. On February 27, 2020, SCE declared a dividend to Edison International of $269 million.
The timing and amount of future dividends are also dependent on a number of other factors including SCE's requirements to fund other obligations and capital expenditures, and its ability to access the capital markets, and generate operating cash flows and earnings. If SCE incurs significant costs related to catastrophic wildfires, including the 2017/2018 Wildfire/Mudslide Events, and is unable to recover such costs through insurance, the Wildfire Insurance Fund (for fires after July 12, 2019), or from customers or access capital markets on reasonable terms, SCE may be limited in its ability to pay future dividends to Edison internationalInternational and its preferred and preference shareholders.
Margin and Collateral Deposits
Certain derivative instruments, power and energy procurement contracts and other contractual arrangements contain collateral requirements. In addition, certain environmental remediation obligations require financial assurance that may be in the form of collateral postings. Future collateral requirements may differ from the requirements at March 31, 20192020 due to the addition of incremental power and energy procurement contracts with collateral requirements, if any, and the impact of changes in wholesale power and natural gas prices on SCE's contractual obligations and the impact of SCE's credit ratings falling below investment grade.


The table below provides the amount of collateral posted by SCE to its counterparties as well as the potential collateral that would have been required as of March 31, 2019.2020 if SCE's credit rating had been downgraded to below investment grade as of that date. The table below also provides the potential collateral that could be required due to adverse changes in wholesale power and natural gas prices over the remaining lives of existing power and energy procurement contracts.
(in millions)  
Collateral posted1
 $222
Incremental collateral requirements for power procurement contracts resulting from a potential downgrade of SCE's credit rating to below investment grade2
 14
Incremental collateral requirements for power procurement contracts resulting from adverse market price movement3
 10
Posted and potential collateral requirements $246
1 Net collateral provided to counterparties and other brokers consisted of $211 million in letters of credit and surety bonds and $11 million of cash reflected in "Other current assets" on the consolidated balance sheets.
(in millions)  
Collateral posted as of March 31, 20201
 $228
Incremental collateral requirements for purchase power and fuel contracts resulting from a potential downgrade of SCE's credit rating to below investment grade2
 39
Incremental collateral requirements for purchase power and fuel contracts resulting from adverse market price movement3
 23
Posted and potential collateral requirements $290
2 1 
If SCE'sNet collateral provided to counterparties and other brokers consisted of $176 million in letters of credit rating falls below investment grade, itand surety bonds and $52 million of cash collateral, of which $30 million was offset against net derivative liabilities and $22 million was reflected in "Other current assets" on the consolidated balance sheets.
2
Power and fuel contract counterparties may also institute new collateral requirements, applicable to future transactions, at the time of a downgrade not reflected above. Furthermore, SCE may also be required to post up to $50 million in collateral in connection with its environmental remediation obligations, within 120 days of the end of the fiscal year in which the downgrade occurs.
3 
Incremental collateral requirements were based on potential changes in SCE's forward positions as of March 31, 20192020 due to adverse market price movements over the remaining lives of existing power contracts using a 95% confidence level.
Decommissioning of San Onofre
Due to the emergency circumstances involving the COVID-19 pandemic and related governmental orders restricting non-essential work activities, SCE has decided to delay commencing major decommissioning activities at San Onofre. SCE will assess the appropriate timing for commencing major decommissioning activities based in part on when governmental restrictions are relaxed. As of the date of this report, SCE is continuing fuel transfer operations and other critical work at San Onofre.
In March 2020, the CPUC approved disbursements from SCE's nuclear decommissioning trusts to cover forecasted 2020 decommissioning costs, of which SCE's share is $406 million.
Edison International Parent and Other
In the next 12 months, Edison International expects to fund its net cash requirements through cash on hand, dividends from SCE, and capital market and bank financings, including by issuing additional debt and equity, as needed.
In April 2019, Edison International registered additional shares ofmay finance its ongoing cash requirements, including common stock dividends, working capital requirements, payment of obligations, and capital investments, including capital contributions to subsidiaries, with short-term or other financings, subject to availability in the SEC.bank and capital markets.
The COVID-19 pandemic may cause restricted access to, or increased costs of accessing, bank and capital markets. As a precaution, in March and April 2020, Edison International anticipates issuing upbrought forward debt issuances that had been planned for later in the year to $1.5 billion of registered shares of common stock, including through designated broker-dealers at prevailingprovide additional financing flexibility given possible future market prices (an at-the-market offering), and anticipates using the proceeds for equity contributions to SCE and for general corporate and working capital purposes. Also, in April 2019, Edison International entered into a $1.0 billion term loan. Of the proceeds of the term loan, $750 million was contributed to SCE and the remainder of the proceeds will be used for general corporate and working capital purposes.uncertainty. For further details, see "Notes to Consolidated Financial Statements—Note 5. Debt and Credit Agreements."Management Overview—COVID-19." Edison International believes that these contributions will enable SCE to increase the


common equity component of its capital structure to 52% in 2020 as proposed in SCE's Cost of Capital application filed with the CPUC in April 2019.
Edison International also has availability under its credit facility. At March 31, 2019,2020, Edison International Parent had approximately $1.3 billion available underno borrowings on its $1.5 billion credit facility.facility and cash on hand of $886 million. The credit facility is available for borrowing needs until May 20232024, and contains two 1-year extension options.may be extended for one additional year with the lenders' approval. Under certain circumstances, the aggregate maximum principal amount under the Edison International Parent revolving credit facility may be increased up to $2.0 billion, provided that additional lender commitments are obtained.
In the first quarter 2020, Edison International Parent borrowed $800 million under a term loan agreement. The proceeds were used for general corporate purposes. In April 2020, Edison International Parent issued $400 million of senior notes due 2025. The proceeds were used to repay all $400 million of Edison International Parent's outstanding Senior Notes due 2020. For further details, see "Notes to Consolidated Financial Statements—Note 5. Debt and Credit Agreements."
Edison International Parent and Other's liquidity and its ability to pay operating expenses and pay dividends to common shareholders are dependent on access to the bank and capital markets, dividends from SCE, realization of tax benefits and its ability to meet California law requirements for the declaration of dividends. Prior to declaring dividends, Edison


International's Board of Directors evaluates available information, including when applicable, information pertaining to the 2017/2018 Wildfire/Mudslide Events, to ensure that the California law requirements for the declarations are met. For information on the California law requirements on the declaration of dividends, see "—SCE—SCE Dividends." Edison International intends to maintain its target payout ratio of 45% – 55% of SCE's core earnings, subject to the factors identified above.
Edison International may finance common stock dividends, working capital requirements, payment of obligations, and capital investments, includingParent expects to make further capital contributions to subsidiaries, with short-term or other financings, subjectSCE in 2020 to availabilityincrease the common equity component of its capital structure to 52% on a weighted average basis over the period that SCE's capital structure is in effect for ratemaking purposes, factoring in the bank and capital markets.CPUC waiver of compliance with the equity ratio requirement to the extent it is approved by the CPUC. For further information, see "—SCE—SCE Dividends."
A debt covenant in Edison International Parent's credit facility requiresand term loan require a consolidated debt to total capitalization ratio as defined in the credit agreementapplicable agreements of less than or equal to 0.70 to 1. At March 31, 2019,2020, Edison International Parent's consolidated debt to total capitalization ratio was 0.570.58 to 1.
At March 31, 2019,2020, Edison International Parent was in compliance with all financial covenants that affect access to capital.
Edison International Parent's long-term issuer credit ratings remain at investment grade levelslevels. Edison International Parent's rating outlook has remained stable, after downgrade actions taken by the major credit rating agencies in March 2019. passage of AB 1054 and the establishment of the Wildfire Insurance Fund, which provided the Liability Cap and the new standard that the CPUC must apply when assessing the prudency of a utility. For further information, see "Management Overview—Southern California Wildfires and Mudslides."
The following table summarizes Edison International Parent's current long-term issuer credit ratings and outlook from the major credit rating agencies:
  Moody'sFitchS&P
Long-term Issuer Credit Rating Baa3BBB-BBB
Outlook NegativeStableWatch NegativeStableWatch NegativeStable
Edison International Parent's credit ratings may be further affected if, among other things, regulators fail to successfully implement AB 1054 in a consistent and credit supportive manner or the Wildfire Insurance Fund is depleted by the ultimate outcome of pending enforcement and litigation matters, including the outcomeclaims from catastrophic wildfires. The broad economic impacts of the uncertaintiesCOVID-19 pandemic may also affect Edison International's credit rating. For further information see "Management Overview—COVID-19" and potential liabilities associated with the 2017/2018 Wildfire/Mudslide Events, and the reform of policies allocating liability to investor-owned utilities for damages caused by catastrophic wildfires substantially caused by utility equipment."Risk Factors." Credit rating downgrades increase the cost and may impact the availability of short-term and long-term borrowings, including commercial paper, credit facilities, note financings or other borrowings.
Historical Cash Flows
SCE
Three months ended March 31,Three months ended March 31,
(in millions)2019 20182020 2019
Net cash provided by operating activities$247
 $801
$334
 $247
Net cash provided by (used in) financing activities1,063
 (216)
Net cash provided by financing activities1,368
 1,063
Net cash used in investing activities(986) (1,085)(1,274) (986)
Net increase (decrease) in cash, cash equivalents and restricted cash$324
 $(500)
Net increase in cash, cash equivalents and restricted cash$428
 $324



Net Cash Provided by Operating Activities
The following table summarizes major categories of net cash provided by operating activities as provided in more detail in SCE's consolidated statements of cash flows for the three months ended March 31, 20192020 and 2018.2019.
Three months ended March 31, Change in cash flowsThree months ended March 31, Change in cash flows
(in millions)2019 2018 2019/20182020 2019 2020/2019
Net income$323
 $316
  $249
 $323
  
Non-cash items1
370
 465
  535
 370
  
Subtotal$693
 $781
 $(88)784
 693
 $91
Changes in cash flow resulting from working capital2
(271) (354) 83
(107) (271) 164
Regulatory assets and liabilities(96) 405
 (501)(372) (96) (276)
Other noncurrent assets and liabilities3
(79) (31) (48)29
 (79) 108
Net cash provided by operating activities$247
 $801
 $(554)$334
 $247
 $87
1 
Non-cash items include depreciation and amortization, allowance for equity during construction, impairment and other, deferred income taxes, and investment tax credits,Wildfire Insurance Fund amortization expenses and other.
2 
Changes in working capital items include receivables, inventory, prepaid expenses, accounts payable, tax receivables and payables, and other current assets and liabilities.
3 Includes the nuclear decommissioning trusts. See "Nuclear Decommissioning Activities" below for further information.
3
Includes changes in wildfire-related insurance receivables. Also includes nuclear decommissioning trusts. See "Nuclear Decommissioning Activities" below for further information.
Net cash provided by operating activities was impacted by the following:
Net income and non-cash items decreasedincreased in 20192020 by $88$91 million primarily due to wildfire mitigation expensestiming of the receipt of the 2018 GRC final decision in the second quarter of 2019, higher FERC revenue and higher net financing costs,changes in the non-cash adjustment of deferred income taxes of $(47) million and $(109) million in 2020 and 2019, respectively, partially offset by a 2018 refund to customers for prior overcollections.higher operation and maintenance expenses primarily from higher vegetation management expenses.
Net cash outflow for working capital was $(271)$107 million and $(354)$271 million during the three months ended March 31, 2020 and 2019, and 2018, respectively. Net cash outflow in 2020 is primarily due to timing of disbursements of $226 million. Net cash for working capital in 2019both periods was primarily impacted by insurance premium payments of $72 million and $413 million for wildfire-related coverage. The net cash for each period was also impactedcoverage in 2020 and 2019, respectively, partially offset by changesa change in receivables from customers of $70 million and $32 million in 2020 and $(222) million in 2019, and 2018, respectively.
Net cash provided byused in regulatory assets and liabilities, including changes in overcollectionsundercollections of balancing accounts was $(96)$(372) million and $405$(96) million during the three months ended March 31, 20192020 and 2018,2019, respectively. SCE has a number of balancing accounts, which impact cash flows based on differences between timing of collection of amounts through rates and accrual expenditures. Cash flows were primarily impacted by the following:
2020
Net undercollections of BRRBA were $101 million at March 31, 2020, compared to net overcollections of $328 million at December 31, 2019. Net undercollections increased by $429 million primarily due to refunds of prior overcollections (including incremental tax benefits and overcollections of distribution revenue that are being refunded over an 18-month period, starting in July 2019, as part of SCE's 2018 GRC final decision) and current year undercollections due to lower than forecasted sales volumes.
Additional undercollections of $79 million related to wildfire-related expenses that are probable of future recovery from customers, including wildfire risk mitigation costs, insurance premiums, service restoration and damage repair costs. See "Notes to Consolidated Financial Statements—Note 11. Regulatory Assets and Liabilities" for further information.
Higher cash due to $110 million of overcollections related to the timing of receiving GHG auction revenue and low carbon fuel standard credit sales, and the related refunds and rebates to eligible customers. SCE is accelerating the semi-annual payment of California climate credits to customers, normally made in the fourth quarter, into the second quarter of 2020 pursuant to an April 2020 CPUC decision.
Net undercollections for ERRA, PABA and the New System Generation Balancing Account decreased by $45 million primarily due to recovery of prior ERRA undercollections, partially offset by lower sales than forecasted in rates in ERRA, refunds of prior overcollections from the New System Generation Balancing Account and refund of 2019 and 2018


overcollections of generation revenue over an 18-month period, starting in July 2019, as part of SCE's 2018 GRC final decision.
2019
BRRBA overcollections decreased by $346 million primarily due to a $163 million reclassification from the pole loading balancing account to BRRBA to recover 2017 undercollections, authorization to recover $107 million of premiums related to a wildfire insurance policy purchased in 2017, lower sales than forecasted in rates and a refund of prior TAMA overcollections.
Net undercollections for ERRA and the new system generation program were $831 million and $741 million at March 31, 2019 and December 31, 2018, respectively. Net undercollections increased $90 million primarily due to higher than forecasted power and gas prices experienced in 2019, partially offset by an increase in cash due to recovery of prior ERRA undercollections.
Net overcollections for TAMA and pole loading balancing account were $128 million at March 31, 2019 compared to net undercollections of $28 million at December 31, 2018. Net overcollections increased by $156 million primarily due to a $163 million reclassification from the pole loading balancing account to BRRBA as discussed above.
Higher cash due to $104 million of overcollections for the public purpose and energy efficiency programs resulting from lower program spending.
Higher cash from increased regulatory liabilities of approximately $90 million primarily due to the delay in the 2018 GRC decision. Amounts billed to customers during first three months of 2019 were based on the 2017 authorized GRC revenue requirement, however, the amount of revenue recognized has been adjusted mainly for the July 2017 cost of capital decision and Tax Reform pending the outcome of the 2018 GRC and therefore, a regulatory liability has been established to record any associated adjustments.


2018
Higher cash due to $143 million of overcollections for the public purpose and energy efficiency programs resulting from lower program spending.
BRRBA overcollections increased by $122 million during the first three months of 2018 primarily due to the timing of revenue, partially offset by a refund of 2016 incremental tax benefits.
Higher cash of $42 million due to cash collected for San Onofre under the Prior San Onofre Settlement Agreement.
Higher cash reflected in regulatory liabilities of approximately $90 million primarily due to the delay in the 2018 GRC decision.
Cash flows used inprovided by (used in) other noncurrent assets and liabilities were primarily related to net earnings from nuclear decommissioning trust investments ($27 million in both 2020 and $30 million in 2019 and 2018, respectively)2019) and SCE's payments of decommissioning costs ($7343 million and $41$73 million in 20192020 and 2018,2019, respectively). See "Nuclear Decommissioning Activities" below for further discussion. Also includes wildfire related insurance recovery of $58 million in 2020.
Net Cash Provided by (Used in) Financing Activities
The following table summarizes cash provided by (used in) financing activities for the three months ended March 31, 20192020 and 2018.2019. Issuances of debt are discussed in "Notes to Consolidated Financial Statements—Note 5. Debt and Credit Agreements."
Three months ended March 31,Three months ended March 31,
(in millions)2019 20182020 2019
Issuances of first and refunding mortgage bonds, net of discount and issuance costs$1,087
 $1,239
$1,719
 $1,087
Issuance of term loan750
 
475
 750
Capital contribution from Edison International Parent269
 
Long-term debt matured(40) (40)(40) (40)
Short-term debt repayments, net of borrowings and discount(691) (1,168)(550) (691)
Payments of common stock dividends to Edison International
 (212)(469) 
Payments of preferred and preference stock dividends(36) (36)(36) (36)
Other(7) 1

 (7)
Net cash provided by (used in) financing activities$1,063
 $(216)
Net cash provided by financing activities$1,368
 $1,063
Net Cash Used in Investing Activities
Cash flows used in investing activities are primarily due to capital expenditures related to transmission and distribution investments ($1.11.3 billion and $1.1 billion for each of the three monththree-month periods ended March 31, 2020 and 2019, and 2018)respectively). In addition, SCE had a net (purchase) redemption of nuclear decommissioning trust investments of $73$(14) million and $24$73 million during the first three months ended March 31, 20192020 and 2018,2019, respectively. See "Nuclear Decommissioning Activities" below for further discussion.


Nuclear Decommissioning Activities
SCE's statement of cash flows includes nuclear decommissioning activities, which are reflected in the following line items:
Three months ended March 31,Three months ended March 31,
(in millions)2019 20182020 2019
Net cash used in operating activities:
Net earnings from nuclear decommissioning trust investments
$27
 $30
Net cash used in operating activities:   
Net earnings from nuclear decommissioning trust investments$27
 $27
SCE's decommissioning costs(73) (41)(43) (73)
Net cash provided by investing activities:
Proceeds from sale of investments
1,208
 931
Net cash provided by investing activities:   
Proceeds from sale of investments1,407
 1,208
Purchases of investments(1,135) (907)(1,421) (1,135)
Net cash impact$27
 $13
$(30) $27
Net cash used in operating activities relates to interest and dividends less administrative expenses, taxes and SCE's decommissioning costs. See "Notes to Consolidated Financial Statements—Note 10. Investments" for further information. Investing activities represent the purchase and sale of investments within the nuclear decommissioning trusts, including the


reinvestment of earnings from nuclear decommissioning trust investments. The net cash impact reflects timing of decommissioning payments ($7343 million and $41$73 million in 20192020 and 2018,2019, respectively) and reimbursements to SCE from the nuclear decommissioning trust ($10013 million and $54$100 million in 20192020 and 2018,2019, respectively).
Edison International Parent and Other
The table below sets forth condensed historical cash flow from operations for Edison International Parent and Other.Other, including intercompany eliminations.
 Three months ended March 31,
(in millions)2019 2018
Net cash (used in) provided by operating activities$(37) $58
Net cash used in financing activities(54) (529)
Net cash used in investing activities
 (12)
Net decrease in cash and cash equivalents$(91) $(483)
 Three months ended March 31,
(in millions)2020 2019
Net cash used in operating activities$(19) $(37)
Net cash provided by (used in) financing activities863
 (54)
Net cash used in investing activities(4) 
Net increase (decrease) in cash and cash equivalents$840
 $(91)
Net Cash (Used in) Provided byUsed in Operating Activities
Net cash (used in) provided byused in operating activities was impacted by the following:
$75 million cash inflow from income tax refunds in 2018.
$3719 million and $17$37 million cash outflow from operating activities in 20192020 and 2018,2019, respectively, primarily due to payments relating to interest and operating costs.
Net Cash Used inProvided by (Used in) Financing Activities
Net cash used inprovided by (used in) financing activities was as follows:
Three months ended March 31,Three months ended March 31,
(in millions)2019 20182020 2019
Dividends paid to Edison International common shareholders$(200) $(197)$(226) $(200)
Dividends received from SCE
 212
469
 
Payment for stock-based compensation, net of receipt from stock option exercises(7) (6)
Issuance of long-term debt, net of discount and issuance costs
 544
Short-term debt borrowings, net of (repayments) and discount153
 (1,093)
Capital contribution to SCE(269) 
Issuance of common stock74
 
Issuance of term loan800
 
Short-term debt borrowings, net of repayments and discount
 153
Other
 11
15
 (7)
Net cash used in financing activities$(54) $(529)
Net cash provided by (used in) financing activities$863
 $(54)





Contingencies
SCE has contingencies related to the 2017/2018 Wildfire/Mudslide Events,wildfire and mudslide events, wildfire insurance, Montecito Mudslides, Environmental Remediation, Nuclear Insuranceenvironmental remediation, nuclear insurance, spent nuclear fuel and Spent Nuclear Fuel,the Tehachapi Transmission Project, which are discussed in "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies."
MARKET RISK EXPOSURES
Edison International's and SCE's primary market risks are described in the 20182019 Form 10-K. For a further discussion of market risk exposures, including commodity price risk, credit risk, and interest rate risk, see "Notes to Consolidated Financial Statements—Note 4. Fair Value Measurements" and "—Note 6. Derivative Instruments."
Commodity Price Risk
SCE records derivative instruments on its consolidated balance sheets as either assets or liabilities measured at fair value unless otherwise exempted from derivative treatment as normal purchases or sales. The fair value of outstanding derivative instruments used to mitigate exposure to commodity price risk was reflected as a net asset of $110$33 million and $167$86 million on SCE's consolidated balance sheets at MarchMach 31, 20192020 and December 31, 2018,2019, respectively. For further discussion of fair value measurements and the fair value hierarchy, see "Notes to Consolidated Financial Statements—Note 4. Fair Value Measurements" and "— Note 6. Derivative Instruments."


Credit Risk
Credit risk exposure from counterparties for power and gas trading activities is measured as the sum of net accounts receivable (accounts receivable less accounts payable) and the current fair value of net derivative assets (derivative assets less derivative liabilities) reflected on the consolidated balance sheets. SCE enters into master agreements which typically provide for a right of setoff. Accordingly, SCE's credit risk exposure from counterparties is based on a net exposure under these arrangements. SCE manages the credit risk on the portfolio for both rated and non-ratedof counterparties based on credit ratings using published ratings of counterparties and other publicly disclosed information, such as financial statements, regulatory filings and press releases, to guide it in the process of setting credit levels, risk limits and contractual arrangements, including master netting agreements.
The amount Based on SCE's policies and risk exposures related to credit, SCE does not anticipate a material adverse effect on their financial statements as a result of balance sheetcounterparty nonperformance. At March 31, 2020, SCE's power and gas trading counterparty credit risk exposure as described above broken down bywas $53 million, which is associated with entities that have an investment grade rating of A or higher. SCE assigns a credit rating to counterparties based on the credit ratingslower of a counterparty's S&P or Moody's rating. At March 31, 2020 the majority of SCE's counterparties,power and gas trading counterparty credit risk exposure was to CAISO market participants. The broad economic impacts of the COVID-19 pandemic are still emerging and may increase credit risk across CAISO market participants, as follows:of March 31, 2020, no impacts had been noted.
For more information related to credit risks, see "Notes to Consolidated Financial Statements—Note 6. Derivative Instruments."
 March 31, 2019
(in millions)
Exposure2
 Collateral Net Exposure
S&P Credit Rating1
     
A or higher$98
 $
 $98
A-, BBB + and BBB12
 
 12
 $110

$

$110
1
SCE assigns a credit rating based on the lower of a counterparty's S&P or Moody's rating. For ease of reference, the above table uses the S&P classifications to summarize risk, but reflects the lower of the credit ratings from S&P or Moody's.
2
Exposure excludes amounts related to contracts classified as normal purchases and sales and non-derivative contractual commitments that are not recorded on the consolidated balance sheets, except for any related net accounts receivable.
CRITICAL ACCOUNTING ESTIMATES AND POLICIES
For a complete discussion onof Edison International's and SCE's critical accounting policies, see "Critical Accounting Estimates and Policies" in the year-ended 20182019 MD&A.
NEW ACCOUNTING GUIDANCE
New accounting guidance is discussed in "Notes to Consolidated Financial Statements—Note 1. Summary of Significant Accounting Policies—New Accounting Guidance."
QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
Information responding to this section is included in the MD&A under the heading "Market Risk Exposures" and is incorporated herein by reference.

























(This page has been left blank intentionally.)








FINANCIAL STATEMENTS
Consolidated Statements of IncomeEdison International 
Edison International 

 

 

 Three months ended March 31,
Three months ended March 31,
(in millions, except per-share amounts, unaudited) 2019 2018
2020 2019
Total operating revenue $2,824
 $2,564

$2,790
 $2,824
Purchased power and fuel 1,005
 926

928
 1,005
Operation and maintenance 882
 675

881
 882
Wildfire Insurance Fund expense 84
 
Depreciation and amortization 480
 462

484
 480
Property and other taxes 110
 107
 111
 110
Impairment and other (4) 66
Other operating income (1) (2)

 (5)
Total operating expenses 2,472

2,234

2,488
 2,472
Operating income 352

330

302
 352
Interest expense (194) (170)
(225) (194)
Other income and expense 38
 51
Income from continuing operations before income taxes 196
 211
Other income
52
 38
Income before taxes 129
 196
Income tax benefit (112) (31) (84) (112)
Income from continuing operations 308

242
Net income 308

242

213
 308
Preferred and preference stock dividend requirements of SCE 30
 30
 30
 30
Other noncontrolling interests 

(6)
Net income attributable to Edison International common shareholders $278

$218
Amounts attributable to Edison International common shareholders: 


Income from continuing operations, net of tax $278
 $218
Net income attributable to Edison International common shareholders $278

$218

$183
 $278
Basic earnings per share:  
 
   
Weighted-average shares of common stock outstanding 326
 326
Continuing operations $0.85
 $0.67
Weighted average shares of common stock outstanding
363
 326
Basic earnings per common share attributable to Edison International common shareholders $0.85

$0.67

$0.50
 $0.85
Diluted earnings per share:  
 
   
Weighted-average shares of common stock outstanding, including effect of dilutive securities 327
 327
Continuing operations $0.85
 $0.67
Weighted average shares of common stock outstanding, including effect of dilutive securities
364
 327
Diluted earnings per common share attributable to Edison International common shareholders $0.85

$0.67

$0.50
 $0.85


The accompanying notes are an integral part of these consolidated financial statements.


1822












Consolidated Statements of Comprehensive Income Edison International  Edison International 
        
 Three months ended March 31, Three months ended March 31,
(in millions, unaudited) 2019 2018 2020 2019
Net income $308
 $242
 $213
 $308
Other comprehensive income (loss), net of tax:    
Other comprehensive income, net of tax:    
Pension and postretirement benefits other than pensions:        
Amortization of net loss included in net income 2
 2
 2
 2
Other 
 (5)
Other comprehensive income (loss), net of tax 2
 (3)
Other comprehensive income, net of tax 2
 2
Comprehensive income 310
 239
 215
 310
Less: Comprehensive income attributable to noncontrolling interests 30
 24
 30
 30
Comprehensive income attributable to Edison International $280
 $215
 $185
 $280




The accompanying notes are an integral part of these consolidated financial statements.


1923











Consolidated Balance SheetsEdison International Edison International 











(in millions, unaudited)March 31,
2019

December 31,
2018
March 31,
2020

December 31,
2019
ASSETS 
  
 
Cash and cash equivalents$328

$144
$1,337

$68
Receivables, less allowances of $49 and $52 for uncollectible accounts at respective dates716

730
Receivables, less allowances of $60 and $50 for uncollectible accounts at respective dates795

788
Accrued unbilled revenue459

482
409

488
Inventory312

282
363

364
Income tax receivables192
 191
131
 118
Prepaid expenses465
 148
158
 214
Derivative assets101

171
51

81
Regulatory assets1,286

1,133
1,225

1,009
Wildfire Insurance Fund contributions323
 323
Other current assets140

78
119

107
Total current assets3,999

3,359
4,911

3,560
Nuclear decommissioning trusts4,291

4,120
4,267

4,562
Other investments76

63
74

64
Total investments4,367

4,183
4,341

4,626
Utility property, plant and equipment, less accumulated depreciation and amortization of $9,671 and $9,566 at respective dates41,678

41,269
Nonutility property, plant and equipment, less accumulated depreciation of $82 at both dates86

79
Utility property, plant and equipment, less accumulated depreciation and amortization of $10,147 and $9,958 at respective dates44,733

44,198
Nonutility property, plant and equipment, less accumulated depreciation of $88 and $86 at respective dates87

87
Total property, plant and equipment41,764

41,348
44,820

44,285
Regulatory assets5,268

5,380
6,294

6,088
Wildfire Insurance Fund contributions2,687
 2,767
Operating lease right-of-use assets933
 
683
 693
Other long-term assets2,462

2,445
2,290

2,363
Total long-term assets8,663

7,825
11,954

11,911
      
























































































      
      
      
Total assets$58,793

$56,715
$66,026

$64,382




The accompanying notes are an integral part of these consolidated financial statements.


2024











Consolidated Balance SheetsEdison International Edison International 

 
  
 
(in millions, except share amounts, unaudited)March 31,
2019

December 31,
2018
March 31,
2020

December 31,
2019
LIABILITIES AND EQUITY 
  
 
Short-term debt$932

$720
$1,275

$550
Current portion of long-term debt79

79
901

479
Accounts payable1,366

1,511
1,454

1,752
Accrued taxes104

21
Customer deposits303

299
298

302
Regulatory liabilities1,295

1,532
764

972
Current portion of operating lease liabilities157
 
74
 80
Other current liabilities1,139

1,233
1,482

1,388
Total current liabilities5,375

5,395
6,248

5,523
Long-term debt15,683

14,632
19,125

17,864
Deferred income taxes and credits4,685

4,576
5,173

5,078
Pensions and benefits869

869
664

674
Asset retirement obligations2,999

3,031
3,027

3,029
Regulatory liabilities8,588

8,329
8,113

8,385
Operating lease liabilities776
 
609
 613
Wildfire-related claims4,669
 4,669
4,568
 4,568
Other deferred credits and other long-term liabilities2,430

2,562
2,955

3,152
Total deferred credits and other liabilities25,016

24,036
25,109

25,499
Total liabilities46,074

44,063
50,482

48,886
Commitments and contingencies (Note 12)









Common stock, no par value (800,000,000 shares authorized; 325,811,206 shares issued and outstanding at respective dates)2,550

2,545
Common stock, no par value (800,000,000 shares authorized; 363,476,346 and 361,985,133 shares issued and outstanding at respective dates)5,085

4,990
Accumulated other comprehensive loss(58)
(50)(67)
(69)
Retained earnings8,034

7,964
8,333

8,382
Total Edison International's common shareholders' equity10,526

10,459
13,351

13,303
Noncontrolling interests preferred and preference stock of SCE
2,193

2,193
2,193

2,193
Total equity12,719

12,652
15,544

15,496
      
      

















   
      
   




   
   
   
   
Total liabilities and equity$58,793

$56,715
$66,026

$64,382




The accompanying notes are an integral part of these consolidated financial statements.


2125











Consolidated Statements of Cash Flows Edison International  Edison International 

 
 

 Three months ended March 31, Three months ended March 31,
(in millions, unaudited) 2019
2018 2020
2019
Cash flows from operating activities:  
   
 
Net income $308

$242
 $213

$308
Adjustments to reconcile to net cash provided by operating activities:  
   
 
Depreciation and amortization 498

479
 501

498
Allowance for equity during construction (17)
(22) (21)
(17)
Impairment and other (4)
66
Deferred income taxes and investment tax credits (114)
4
Deferred income taxes (58)
(114)
Wildfire Insurance Fund amortization expense 84
 
Other 5

17
 23

1
Nuclear decommissioning trusts (73) (24) 14
 (73)
Changes in operating assets and liabilities: 


    
Receivables 9

77
 (30)
9
Inventory (30)
(7) 1

(30)
Accounts payable 31

(216) (129)
31
Tax receivables and payables 82
 162
 31
 82
Other current assets and liabilities (381)
(277) 41

(381)
Regulatory assets and liabilities, net (96)
405
 (372)
(96)
Wildfire-related insurance receivable 58
 
Other noncurrent assets and liabilities (8)
(47) (41)
(8)
Net cash provided by operating activities 210

859
 315

210
Cash flows from financing activities:  
   
 
Long-term debt issued, net of discount and issuance costs of $13 and $17 for the respective periods 1,087

1,783
Long-term debt issued, net of premium, discount and issuance costs of $19 and $(13) for the respective periods 1,719

1,087
Long-term debt repaid (40) (40)
Term loan issued 750
 
 1,275

750
Long-term debt matured (40)
(41)
Common stock issued 74
 
Short-term debt financing, net (538)
(2,261) (550)
(538)
Payments for stock-based compensation (41) (10) (3) (41)
Receipts from stock option exercises 22
 2
 13
 22
Dividends to noncontrolling interests (36)
(36)
Dividends and distribution to noncontrolling interests (36)
(36)
Dividends paid (200)
(197) (226)
(200)
Other 5
 15
 5
 5
Net cash provided by (used in) financing activities 1,009

(745)
Net cash provided by financing activities 2,231

1,009
Cash flows from investing activities:  
   
 
Capital expenditures (1,074)
(1,137) (1,268)
(1,074)
Proceeds from sale of nuclear decommissioning trust investments 1,208

931
 1,407

1,208
Purchases of nuclear decommissioning trust investments (1,135)
(907) (1,421)
(1,135)
Other 15

16
 4

15
Net cash used in investing activities (986) (1,097) (1,278) (986)
Net increase (decrease) in cash, cash equivalents and restricted cash including cash held for sale 233
 (983)
Less: Net increase in cash held for sale 
 43
Net increase (decrease) in cash, cash equivalent and restricted cash 233
 (1,026)
Net increase in cash, cash equivalents and restricted cash 1,268
 233
Cash, cash equivalents and restricted cash at beginning of period 152
 1,132
 70
 152
Cash, cash equivalents and restricted cash at end of period $385
 $106
 $1,338
 $385


The accompanying notes are an integral part of these consolidated financial statements.


2226











Consolidated Statements of Income
Southern California Edison Company

 
Southern California Edison Company

 
   
Three months ended March 31, Three months ended March 31,
(in millions, unaudited)2019 2018 2020 2019
Operating revenue$2,816
 $2,554
 $2,780
 $2,816
Purchased power and fuel1,005
 926
 928
 1,005
Operation and maintenance869
 651
 859
 869
Wildfire Insurance Fund expense 84
 
Depreciation and amortization480
 459
 483
 480
Property and other taxes109
 105
 110
 109
Impairment and other(4) 
Other operating income(1) (1) 
 (5)
Total operating expenses2,458
 2,140
 2,464
 2,458
Operating income358
 414
 316
 358
Interest expense(178) (155) (194) (178)
Other income and expense38
 51
Income before income taxes218
 310
Other income 52
 38
Income before taxes 174
 218
Income tax benefit(105) (6) (75) (105)
Net income323
 316
 249
 323
Less: Preferred and preference stock dividend requirements30
 30
 30
 30
Net income available for common stock$293
 $286
 $219
 $293




Consolidated Statements of Comprehensive IncomeSouthern California Edison Company Southern California Edison Company 
        
 Three months ended March 31, Three months ended March 31,
(in millions, unaudited) 2019 2018 2020 2019
Net income $323
 $316
 $249
 $323
Other comprehensive income (loss), net of tax:    
Other comprehensive income, net of tax:    
Pension and postretirement benefits other than pensions:        
Amortization of net loss included in net income 1
 2
 2
 1
Other 
 (5)
Other comprehensive income (loss), net of tax 1
 (3)
Other comprehensive income, net of tax 2
 1
Comprehensive income $324
 $313
 $251
 $324




The accompanying notes are an integral part of these consolidated financial statements.


2327











Consolidated Balance SheetsSouthern California Edison Company
(in millions, unaudited)March 31,
2019
 December 31, 2018March 31,
2020
 December 31, 2019
ASSETS      
Cash and cash equivalents$297
 $21
$451
 $24
Receivables, less allowances of $49 and $51 for uncollectible accounts at respective dates702
 711
Receivables, less allowances of $60 and $49 for uncollectible accounts at respective dates785
 777
Accrued unbilled revenue459
 482
409
 488
Inventory312
 282
363
 364
Income tax receivables311
 312
158
 148
Prepaid expenses464
 144
158
 213
Derivative assets101
 171
51
 81
Regulatory assets1,286
 1,133
1,225
 1,009
Wildfire Insurance Fund contributions323
 323
Other current assets130
 69
114
 103
Total current assets4,062
 3,325
4,037
 3,530
Nuclear decommissioning trusts4,291
 4,120
4,267
 4,562
Other investments58
 45
55
 46
Total investments4,349
 4,165
4,322
 4,608
Utility property, plant and equipment, less accumulated depreciation and amortization of $9,671 and $9,566 at respective dates41,678
 41,269
Nonutility property, plant and equipment, less accumulated depreciation of $77 at both dates81
 75
Utility property, plant and equipment, less accumulated depreciation and amortization of $10,147 and $9,958 at respective dates44,733
 44,198
Nonutility property, plant and equipment, less accumulated depreciation of $81 and $80 at respective dates82
 83
Total property, plant and equipment41,759
 41,344
44,815
 44,281
Regulatory assets5,268
 5,380
6,294
 6,088
Wildfire Insurance Fund contributions2,687
 2,767
Operating lease right-of-use assets928
 
679
 689
Long-term insurance receivable due from affiliate1,000
 1,000
Long-term insurance receivables due from affiliate803
 803
Other long-term assets1,378
 1,360
1,434
 1,507
Total long-term assets8,574
 7,740
11,897
 11,854
      
      
      
      
      
      
      
      
      
      
Total assets$58,744
 $56,574
$65,071
 $64,273


The accompanying notes are an integral part of these consolidated financial statements.


2428











Consolidated Balance SheetsSouthern California Edison Company
(in millions, except share amounts, unaudited)March 31,
2019
 December 31, 2018March 31,
2020
 December 31, 2019
LIABILITIES AND EQUITY      
Short-term debt$779
 $720
$475
 $550
Current portion of long-term debt79
 79
901
 79
Accounts payable1,381
 1,519
1,454
 1,779
Accrued taxes105
 22
Customer deposits303
 299
298
 302
Regulatory liabilities1,295
 1,532
764
 972
Current portion of operating lease liabilities156
 
73
 79
Other current liabilities1,097
 975
1,193
 1,298
Total current liabilities5,195
 5,146
5,158
 5,059
Long-term debt13,942
 12,892
15,991
 15,132
Deferred income taxes and credits6,011
 5,898
6,559
 6,451
Pensions and benefits434
 433
228
 237
Asset retirement obligations2,999
 3,031
3,027
 3,029
Regulatory liabilities8,588
 8,329
8,113
 8,385
Operating lease liabilities772
 
606
 610
Wildfire-related claims4,669
 4,669
4,568
 4,568
Other deferred credits and other long-term liabilities2,264
 2,391
2,775
 2,975
Total deferred credits and other liabilities25,737
 24,751
25,876
 26,255
Total liabilities44,874
 42,789
47,025
 46,446
Commitments and contingencies (Note 12)

 



 


Preferred and preference stock2,245
 2,245
2,245
 2,245
Common stock, no par value (560,000,000 shares authorized; 434,888,104 shares issued and outstanding at respective dates)2,168
 2,168
2,168
 2,168
Additional paid-in capital683
 680
4,207
 3,939
Accumulated other comprehensive loss(27) (23)(37) (39)
Retained earnings8,801
 8,715
9,463
 9,514
Total equity13,870
 13,785
18,046
 17,827


 



 

      
      
      
      
      
   
   
   
Total liabilities and equity$58,744
 $56,574
$65,071
 $64,273




The accompanying notes are an integral part of these consolidated financial statements.


2529











Consolidated Statements of Cash FlowsSouthern California Edison Company
 Three months ended March 31, Three months ended March 31,
(in millions, unaudited) 2019 2018 2020 2019
Cash flows from operating activities:        
Net income $323
 $316
 $249
 $323
Adjustments to reconcile to net cash provided by operating activities:        
Depreciation and amortization 497
 475
 499
 497
Allowance for equity during construction (17) (22) (21) (17)
Impairment and other (4) 
Deferred income taxes and investment tax credits (109) (3)
Deferred income taxes (47) (109)
Wildfire Insurance Fund amortization expense 84
 
Other 3
 15
 20
 (1)
Nuclear decommissioning trusts (73) (24) 14
 (73)
Changes in operating assets and liabilities:        
Receivables 5
 70
 (30) 5
Inventory (30) (7) 1
 (30)
Accounts payable 37
 (230) (156) 37
Tax receivables and payables 83
 81
 35
 83
Other current assets and liabilities (366) (268) 43
 (366)
Regulatory assets and liabilities, net (96) 405
 (372) (96)
Wildfire-related insurance receivable 58
 
Other noncurrent assets and liabilities (6) (7) (43) (6)
Net cash provided by operating activities 247
 801
 334
 247
Cash flows from financing activities:        
Long-term debt issued, net of discount and issuance costs of $13 and $11 for the respective periods 1,087
 1,239
Long-term debt issued, net of premium, discount and issuance costs of $19 and $(13) for the respective periods 1,719
 1,087
Long-term debt repaid (40) (40)
Term loan issued 750
 
 475
 750
Long-term debt matured (40) (40)
Capital contributions from Edison International Parent 269
 
Short-term debt financing, net (691) (1,168) (550) (691)
Payments for stock-based compensation (26) (3) (5) (26)
Receipts from stock option exercises 14
 1
 
 14
Dividends paid (36) (248) (505) (36)
Other 5
 3
 5
 5
Net cash provided by (used in) financing activities 1,063
 (216)
Net cash provided by financing activities 1,368
 1,063
Cash flows from investing activities:        
Capital expenditures (1,074) (1,124) (1,267) (1,074)
Proceeds from sale of nuclear decommissioning trust investments 1,208
 931
 1,407
 1,208
Purchases of nuclear decommissioning trust investments (1,135) (907) (1,421) (1,135)
Other 15
 15
 7
 15
Net cash used in investing activities (986)
(1,085) (1,274)
(986)
Net increase (decrease) in cash, cash equivalents and restricted cash 324
 (500)
Net increase in cash, cash equivalents and restricted cash 428
 324
Cash, cash equivalents and restricted cash at beginning of period 22
 515
 24
 22
Cash, cash equivalents and restricted cash at end of period $346
 $15
 $452
 $346


The accompanying notes are an integral part of these consolidated financial statements.


2630











NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
(Unaudited)
Note 1.    Summary of Significant Accounting Policies
Organization and Basis of Presentation
Edison International is the parent holding company of Southern California Edison Company ("SCE") and Edison Energy Group, Inc. ("Edison Energy Group"). SCE is an investor-owned public utility primarily engaged in the business of supplying and delivering electricity to an approximately 50,000 square mile area of southern California. Edison Energy Group is a holding company for Edison Energy, LLC ("Edison Energy") which is engaged in the competitive business of providing energy services to commercial and industrial customers. Edison Energy's business activities are currently not material to report as a separate business segment. These combined notes to the consolidated financial statements apply to both Edison International and SCE unless otherwise described. Edison International's consolidated financial statements include the accounts of Edison International, SCE, and other wholly owned and controlled subsidiaries. References to Edison International refer to the consolidated group of Edison International and its subsidiaries. References to "Edison International Parent and Other" refer to Edison International Parent and its competitive subsidiaries and "Edison International Parent" refer to Edison International on a stand-alone basis, not consolidated with its subsidiaries. SCE's consolidated financial statements include the accounts of SCE and its wholly owned and controlled subsidiaries. All intercompany transactions have been eliminated from the consolidated financial statements.
Edison International's and SCE's significant accounting policies were described in the "Notes to Consolidated Financial Statements" included in Edison International's and SCE's combined Annual Report on Form 10-K for the year ended December 31, 20182019 (the "2018"2019 Form 10-K"). This quarterly report should be read in conjunction with the financial statements and notes included in the 20182019 Form 10-K.
In the opinion of management, all adjustments, consisting only of adjustments of a normal recurring accruals,nature, have been made that are necessary to fairly state the consolidated financial position, results of operations, and cash flows in accordance with accounting principles generally accepted in the United States ("GAAP") for the periods covered by this quarterly report on Form 10-Q. The results of operations for the three-month periodperiods ended March 31, 20192020 are not necessarily indicative of the operating results for the full year. Certain prior period amounts have been conformed to the current period's presentation.
The December 31, 20182019 financial statement data was derived from audited financial statements but does not include all disclosures required by GAAP.


Cash, Cash Equivalents and Restricted Cash
Cash equivalents include investments in money market funds. Generally, the carrying value of cash equivalents equals the fair value, as these investments have original maturities of three months or less. The cash equivalents were as follows:
  Edison International SCE
(in millions) March 31,
2020
 December 31, 2019 March 31,
2020
 December 31, 2019
Money market funds $1,305
 $31
 $427
 $
  Edison International SCE
(in millions) March 31,
2019
 December 31, 2018 March 31,
2019
 December 31, 2018
Money market funds $285
 $116
 $266
 $1

Cash is temporarily invested until required for check clearing. Checks issued, but not yet paid by the financial institution, are reclassified from cash to accounts payable at the end of each reporting period as follows:
  Edison International SCE
(in millions) March 31,
2020
 December 31, 2019 March 31,
2020
 December 31, 2019
Book balances reclassified to accounts payable $60
 $75
 $60
 $74
  Edison International SCE
(in millions) March 31,
2019
 December 31, 2018 March 31,
2019
 December 31, 2018
Book balances reclassified to accounts payable $38
 $65
 $37
 $65




The following table sets forth the cash, cash equivalents and restricted cash included in the consolidated statements of cash flows:
(in millions) March 31, 2019 December 31, 2018 March 31, 2020 December 31, 2019
Edison International:        
Cash and cash equivalents $328
 $144
 $1,337
 $68
Short-term restricted cash1
 57
 8
 1
 2
Total cash, cash equivalents, and restricted cash $385
 $152
 $1,338
 $70
SCE:        
Cash and cash equivalents $297
 $21
 $451
 $24
Short-term restricted cash1
 49
 1
 1
 
Total cash, cash equivalents, and restricted cash $346
 $22
 $452
 $24
1 
Reflected in "Other current assets" on Edison International's and SCE's consolidated balance sheets. Restricted cash at March 31, 2019 primarily relates to funds held by SCE that were used in April 2019 for nuclear decommissioning activities at San Onofre.
Revenue RecognitionAllowance for Uncollectible Accounts
Regulatory Proceedings
2018 General Rate Case
In February 2018,The allowance for uncollectible accounts is recorded based on SCE's estimate of expected credit losses and adjusted over the life of the receivables as needed. Since the customer base of SCE updated its 2018 General Rate Case ("GRC") applicationis concentrated in Southern California and exposes SCE to a homogeneous set of economic conditions, the allowance is measured on a collective basis on the historical amounts written-off, assessment of customer collectibility and current economic trends, including unemployment rates and any likelihood of recession for the impact of Tax Cuts and Jobs Act ("Tax Reform") resulting in a requested 2018 base rate revenue requirement of $5.534 billion, a decrease of $106 million overregion. At March 31, 2020, this included the 2017 GRC authorized revenue requirement.
In April 2019, the CPUC issued a 2018 GRC proposed decision, which if adopted, would result in a base rate revenue requirement of $5.102 billion in 2018, a decrease of $432 million from SCE's requested revenue requirement, primarily related to a reduction in authorized rate base, depreciation and operation and maintenance expenses. The proposed decision also identifies changes to certain balancing accounts, including the expansionestimated impacts of the TAMA to include the impacts of all differences between forecast and recorded tax expense. The proposed decision would also disallow certain historical spending, largely related to certain infrastructure replacement programs and corporate real estate.
The CPUC did not issue a decision on the 2018 GRC application during 2018 or during the first quarter of 2019, therefore SCE recognized revenue based on the 2017 authorized revenue requirement, adjusted for items SCE has determined to be probable of occurring, primarily the July 2017 cost of capital decision and Tax Reform. The CPUC has approved the establishment of a GRC memorandum account and the 2018 and 2019 revenue requirements ultimately adopted by the CPUC will be effective as of January 1, 2018 and January 1, 2019, respectively. See Note 11 for further details. The proposed decision, if adopted as drafted, would have a significant impact on SCE and Edison International’s reported results, including an impairment of utility property, plant and equipment of up to $257 million ($185 million after-tax) related to disallowed historical capital expenditures and an increase to earnings of approximately $130 million from application of the decision to revenue, depreciation and income tax expense retroactively for 2018 and the first quarter of 2019.
The proposed decision would allow a post-test year rate making mechanism that escalates capital additions by 2.49% for both 2019 and 2020. It would also allow operation and maintenance expenses to be escalated for 2019 and 2020 through the use of various escalation factors for labor, non-labor and medical expenses. The methodology set forth in the proposed decision would, if adopted by the CPUC, result in a revenue requirement of $5.422 billion in 2019 and $5.823 billion in 2020.
SCE will file comments on the proposed decision in May 2019 and SCE cannot predict when a final decision will be issued. A final decision could result in material changes to the proposed decision.
FERC Formula Rate
In October 2017, SCE filed its new formula rate with the FERC. In December 2017, the FERC issued an order setting the effective date of SCE's new FERC formula rate as of January 1, 2018, subject to settlement procedures and refund. In November 2018, SCE filed its 2019 annual update with the FERC with the proposed rates effective January 1, 2019, subject to settlement procedures and refund, and requested a decrease in transmission revenue requirement of $131 million, or 11% from amounts currently authorized in rates. Pending resolution of the FERC formula rate proceedings, SCE recognized


revenue in 2018 and during the first quarter of 2019 based on the FERC formula rate adjusted for the impact of Tax Reform and other adjustments.
In April 2019, SCE filed an application with FERC to amend the formula rate associated with its transmission facilities in 2019. In the revised formula rate, SCE seeks a base return on equity of 17.12% ("FERC Base ROE"), compared to its proposed base ROE of 10.30% for its 2018 formula rate. The requested FERC Base ROE reflects a conventional ROE of 11.12% and an additional ROE of 6% to compensate investors for current wildfire risk. SCE would seek to reduce or remove the additional wildfire risk ROE if there is a material reduction in its wildfire cost recovery risk due to regulatory or legislative reform. SCE's total ROE request, inclusive of project incentives and a 0.5% incentive for CAISO participation, is approximately 18.4%.
If the new formula rate is accepted by FERC, it will supersede the existing formula rate, including the 2019 annual update, and could become effective as early as 60 days from the filing date. FERC has the authority to, and may, suspend new rates for up to five months. If the new formula rate is suspended by FERC, the 2019 transmission revenue requirement rate established in the 2019 annual update will continue to be effective, subject to refund, from January 1, 2019 until the end of the suspension of the new formula rate. The new formula rate would likely be subject to refund from the end of the suspension until it is ultimately approved by FERC.
If the revised formula rate becomes effective on June 12, 2019 (the effective date requested by SCE), SCE's proposed revisions to its formula rate will result in a projected increase in its retail base transmission revenue requirement in 2019 of approximately $290 million from the currently effective retail base transmission revenue requirement of approximately $1 billion.
See Note 7 for further information on SCE's revenue.COVID-19 pandemic.
Earnings Per Share
Edison International computes earnings per common share ("EPS") using the two-class method, which is an earnings allocation formula that determines EPS for each class of common stock and participating security. Edison International's participating securities are stock-based compensation awards, payable in common shares, including restricted stock units, which earn dividend equivalents on an equal basis with common shares once the awards are vested. See Note 13 for further information.
EPS attributable to Edison International common shareholders was computed as follows:
  Three months ended March 31,
(in millions, except per-share amounts) 2020 2019
Basic earnings per share:    
Net income attributable to common shareholders $183
 $278
Participating securities dividends 
 
Net income available to common shareholders $183
 $278
Weighted average common shares outstanding 363
 326
Basic earnings per share $0.50
 $0.85
Diluted earnings per share:    
Net income attributable to common shareholders $183
 $278
Participating securities dividends 
 
Net income available to common shareholders $183
 $278
Income impact of assumed conversions 
 
Net income available to common shareholders and assumed conversions $183
 $278
Weighted average common shares outstanding 363
 326
Incremental shares from assumed conversions 1
 1
Adjusted weighted average shares – diluted 364
 327
Diluted earnings per share $0.50
 $0.85
  Three months ended March 31,
(in millions, except per-share amounts) 2019 2018
Basic earnings per share – continuing operations:    
Income from continuing operations attributable to common shareholders $278
 $218
Participating securities dividends 
 
Income from continuing operations available to common shareholders $278
 $218
Weighted average common shares outstanding 326
 326
Basic earnings per share – continuing operations $0.85
 $0.67
Diluted earnings per share – continuing operations:    
Income from continuing operations attributable to common shareholders $278
 $218
Participating securities dividends 
 
Income from continuing operations available to common shareholders $278
 $218
Income impact of assumed conversions 
 
Income from continuing operations available to common shareholders and assumed conversions $278
 $218
Weighted average common shares outstanding 326
 326
Incremental shares from assumed conversions 1
 1
Adjusted weighted average shares – diluted 327
 327
Diluted earnings per share – continuing operations $0.85
 $0.67




In addition to the participating securities discussed above, Edison International also may award stock options, which are payable in common shares and are included in the diluted earnings per share calculation. Stock option awards to purchase 7,719,3063,362,329 and 6,222,2947,719,306 shares of common stock for the three months ended March 31, 20192020 and 2018,2019, respectively, were outstanding, but were not included in the computation of diluted earnings per share because the effect would have been antidilutive.
New Accounting Guidance
Accounting Guidance Adopted
On January 1, 2019, Edison International and SCE adopted accounting standards updates that require lessees to recognize a lease onIn June 2016, the balance sheet as a right-of-useFinancial Accounting Standards Board ("ROU"FASB") asset and related lease liability and classify the lease as either operating or finance. Edison International and SCE adopted this guidance using the modified retrospective approach for leases that existed as of the adoption date and elected the optional transition method not to restate periods prior to the adoption date. Edison International and SCE also elected the package of practical expedients not to reassess prior conclusions related to contracts containing leases, lease classification and initial direct costs, and the practical expedient not to reassess existing land easements. Adoption of this standard increased ROU assets and lease liabilities on the consolidated balance sheets by $956 million and $951 million as of January 1, 2019 for Edison International and SCE, respectively. The standard did not materiality impact the consolidated statements of income for Edison International or SCE.
Based on accounting standards adopted at January 1, 2019, a lease is defined as a contract, or part of a contract, that conveys the right to control the use of identified assets for a period of time in exchange for consideration. This occurs when an entity has the right to obtain substantially all of the economic benefits from and has the right to direct the use of the identified asset. SCE determines if an arrangement is a lease at contract inception, and for all classes of assets, SCE includes both lease and non-lease components as a single component and accounts for it as a lease. Lease liabilities are recognized based on the present value of the lease payments over the lease term at the commencement date. Lease ROU assets are based on the liability, subject to adjustments, such as lease incentives. In measuring lease assets and liabilities, SCE excludes variable lease payments, other than those that depend on an index, a rate or are in substance fixed payments and includes lease payments made at or before the commencement date. SCE's lease terms include options to extend or terminate the lease when it is reasonably certain that such options will be exercised. Operating leases are included in operating lease ROU assets and operating lease liabilities on the consolidated balance sheets. Finance leases are included in property, plant and equipment and other liabilities on the consolidated balance sheets. See Note 13 for further information.
In February 2018, the FASB issued an accounting standards update to provide entities an election to reclassify stranded tax effects resulting from Tax Reform from accumulated other comprehensive income to retained earnings. Stranded tax effects originated in December 2017 when deferred taxes were re-measured atrequire the lower federal corporate tax rate with the impact included in operating income, while the tax effectsuse of items within accumulated other comprehensive income were not similarly adjusted. Edison International and SCE adopted this guidance on January 1, 2019 and reclassified stranded tax effects of $10 million and $5 million, respectively, from accumulated other comprehensive income to retained earnings. See Notes 2 and 14 for further information.
In August 2018, the FASB issued an accounting standards update to remove, modify, and add certain disclosure requirements related to fair value measurement. Edison International and SCE adopted this guidance effective January 1, 2019. The adoption of this guidance did not have a material impact on Edison International and SCE's disclosures. See Note 4 for further information.
Accounting Guidance Not Yet Adopted
The FASB issued an accounting standards update in June 2016, and further amended the guidance in November 2018, related to the impairment of financial instruments, effective January 1, 2020. The new guidance provides an impairment model, known as the current expected credit loss model which is based on expected credit losses rather than incurred losses over the remaining lifeto measure impairment of most financial assets measured at amortized cost, including trade and other receivables. The guidance also requiresreceivables, and the use of an allowance to record estimated credit losses on available-for-sale debt securities. Edison International and SCE are currently evaluatingadopted this guidance on January 1, 2020 using the prospective adoption approach to available-for-sale debt securities and the modified retrospective approach to all other financial assets. Edison International and SCE hold available-for-sale debt securities in nuclear decommissioning trusts and due to regulatory mechanisms, investment earnings and realized gains and losses have no impact on earnings. Unrealized gains and losses on decommissioning trust funds, including impairments, increase or decrease the trust assets and the related regulatory asset or liability and have no impact on electric utility revenue or decommissioning expense. Upon adoption of this new guidance, and do not expectSCE reviews each fixed income security for impairment on the last day of each month. If the fair value on the last day of the month is less than the amortized cost for that security, SCE impairs the disclosed amortized cost. See Note 10 for further information. The adoption of thethis guidance willdid not have a material impact on Edison InternationalInternational's and SCE.SCE's other financial assets including receivables.
In January 2017, the FASB issued an accounting standards update to simplify the accounting for goodwill impairment by changing the procedural steps to apply the goodwill impairment test. After the adoption ofEdison International adopted this accounting standards update,guidance on January 1, 2020 and any goodwill impairment will be measured as the amount by which a reporting unit's carrying value exceeds its fair value, not to exceed the carrying amount of goodwill. At March 31, 2020, Edison International will applyhas $34 million of goodwill related to its Edison Energy reporting unit. Adoption of this guidance to goodwill impairment tests beginning in 2020.


did not have an effect on Edison International's financial position or results of operating.
In August 2018, the FASB issued an accounting standards update which aligns the requirement for capitalizing implementation costs incurred in a hosting arrangement that is a service contract with the requirements for capitalizing costs incurred to develop or obtain internal-useinternal use software. The guidance also clarified presentation requirements for reporting implementation costs in the financial statements. The guidance is effective January 1, 2020 with early adoption permitted. Edison International and SCE are currently evaluatingadopted the standard on January 1, 2020 using the prospective adoption approach. The adoption of this guidance did not have a material impact on Edison International's and SCE's financial position or result of the guidance.operations.
Accounting Guidance Not Yet Adopted
In August 2018, the FASB issued an accounting standards update to remove, modify and add certain disclosure requirements related to employer-sponsored defined benefit pension or other postretirement plans. The guidance is effective January 1, 2021 with early adoption permitted. Edison International and SCE are currently evaluating the impact of the guidance and do not expect the adoption of this standard will materially affect disclosures.
In March 2020, the FASB issued an accounting standards update to provide optional expedients and exceptions for applying GAAP to contracts, hedging relationships, and other transactions that reference London Inter-Bank Offered Rate or another reference rate expected to be discontinued because of reference rate reform. The guidance may be adopted as of March 12, 2020 through December 31, 2022, and if elected, will apply to contract modifications made before December 31, 2022. SCE does not use hedge accounting for derivative transactions. Edison International and SCE are currently evaluating the remaining impact of the guidance.






Note 2.    Consolidated Statements of Changes in Equity
The following table provides Edison International's changes in equity for the three months ended March 31, 2020:
 Equity Attributable to Common Shareholders Noncontrolling Interests  
(in millions, except per share amounts)
Common
Stock
 Accumulated
Other
Comprehensive Loss
 
Retained
Earnings
 Subtotal 
Preferred
and
Preference
Stock
 
Total
Equity
Balance at December 31, 2019$4,990
 $(69) $8,382
 $13,303
 $2,193
 $15,496
Net income
 
 183
 183
 30
 213
Other comprehensive income
 2
 
 2
 
 2
Common stock issued, net of issuance cost88
 
 
 88
 
 88
Common stock dividends declared ($0.6375 per share)
 
 (232) (232) 
 (232)
Dividends to noncontrolling interests ($0.255 - $0.299 per share for preferred stock; $15.625 - $35.936 per share for preference stock)
 
 
 
 (30) (30)
Noncash stock-based compensation7
 
 
 7
 
 7
Balance at March 31, 2020$5,085
 $(67) $8,333
 $13,351
 $2,193
 $15,544

The following table provides Edison International's changes in equity for the three months ended March 31, 2019:
 Equity Attributable to Common Shareholders Noncontrolling Interests  
(in millions, except per share amounts)
Common
Stock
 Accumulated
Other
Comprehensive Loss
 
Retained
Earnings
 Subtotal 
Preferred
and
Preference
Stock
 
Total
Equity
Balance at December 31, 2018$2,545
 $(50) $7,964
 $10,459
 $2,193
 $12,652
Net income
 
 278
 278
 30
 308
Other comprehensive income
 2
 
 2
 
 2
Cumulative effect of accounting changes1

 (10) 10
 
 
 
Common stock dividends declared ($0.6125 per share)
 
 (200) (200) 
 (200)
Dividends to noncontrolling interests ($0.255 - $0.299 per share for preferred stock; $15.625 - $35.936 per share for preference stock)
 
 
 
 (30) (30)
Stock-based compensation
 
 (18) (18) 
 (18)
Noncash stock-based compensation5
 
 
 5
 
 5
Balance at March 31, 2019$2,550
 $(58) $8,034
 $10,526
 $2,193
 $12,719
 Equity Attributable to Common Shareholders Noncontrolling Interests  
(in millions, except per-share amounts)
Common
Stock
 Accumulated
Other
Comprehensive Loss
 
Retained
Earnings
 Subtotal 
Preferred
and
Preference
Stock
 
Total
Equity
Balance at December 31, 2018$2,545
 $(50) $7,964
 $10,459
 $2,193
 $12,652
Net income
 
 278
 278
 30
 308
Other comprehensive income
 2
 
 2
 
 2
Cumulative effect of accounting changes1

 (10) 10
 
 
 
Common stock dividends declared ($0.6125 per share)
 
 (200) (200) 
 (200)
Dividends to noncontrolling interests ($0.255 - $0.299 per share for preferred stock; $15.625 - $35.936 per share for preference stock)
 
 
 
 (30) (30)
Stock-based compensation
 
 (18) (18) 
 (18)
Noncash stock-based compensation5
 
 
 5
 
 5
Balance at March 31, 2019$2,550
 $(58) $8,034
 $10,526
 $2,193
 $12,719

1
Edison International recognized a cumulative effect adjustmentsadjustment to the opening balance of retained earnings and accumulated other comprehensive loss on January 1, 2019 related to the adoption of the accounting standards updatesupdate on the reclassification of stranded tax effects resulting from Tax Cuts and Jobs Act ("Tax Reform. See Note 1 for further information.")



The following table provides Edison International'sSCE's changes in equity for the three months ended March 31, 2018:2020:
 Equity Attributable to Common Shareholders Noncontrolling Interests  
(in millions, except per-share amounts)
Common
Stock
 Accumulated
Other
Comprehensive Loss
 
Retained
Earnings
 Subtotal Other 
Preferred
and
Preference
Stock
 
Total
Equity
Balance at December 31, 2017$2,526
 $(43) $9,188
 $11,671
 $2
 $2,193
 $13,866
Net income
 
 218
 218
 (3) 30
 245
Other comprehensive income
 2
 
 2
 
 
 2
Cumulative effect of accounting changes1

 (5) 10
 5
 
 
 5
Common stock dividends declared ($0.6050 per share)
 
 (197) (197) 
 
 (197)
Dividends to noncontrolling interests ($0.255 - $0.299 per share for preferred stock; $15.625 - $35.936 per share for preference stock)
 
 
 
 
 (30) (30)
Stock-based compensation
 
 (8) (8) 
 
 (8)
Noncash stock-based compensation5
 
 
 5
 
 
 5
Other
 
 
 
 1
 
 1
Balance at March 31, 2018$2,531
 $(46) $9,211
 $11,696
 $
 $2,193
 $13,889
(in millions, except per share amounts)Preferred
and
Preference
Stock
 Common
Stock
 Additional
Paid-in
Capital
 Accumulated
Other
Comprehensive
Loss
 Retained
Earnings
 Total
Equity
Balance at December 31, 2019$2,245
 $2,168
 $3,939
 $(39) $9,514
 $17,827
Net income
 
 
 
 249
 249
Other comprehensive income
 
 
 2
 
 2
Capital contribution from Edison International Parent
 
 269
 
 
 269
Dividends declared on common stock ($0.6185 per share)
 
 
 
 (269) (269)
Dividends declared on preferred stock ($0.255 - $0.299 per share) and preference stock ($15.625 - $35.936 per share)
 
 
 
 (30) (30)
Stock-based compensation 
 
 (5) 
 
 (5)
Noncash stock-based compensation
 
 4
 
 (1) 3
Balance at March 31, 2020$2,245
 $2,168
 $4,207
 $(37) $9,463
 $18,046
1

Edison International recognized a cumulative effect adjustment to the opening balance of retained earnings and accumulated other comprehensive loss on January 1, 2018 related to the adoption of the accounting standards update on revenue recognition and the measurement of financial instruments.
The following table provides SCE's changes in equity for the three months ended March 31, 2019:
(in millions, except per share amounts)Preferred
and
Preference
Stock
 Common
Stock
 Additional
Paid-in
Capital
 Accumulated
Other
Comprehensive
Loss
 Retained
Earnings
 Total
Equity
Balance at December 31, 2018$2,245
 $2,168
 $680
 $(23) $8,715
 $13,785
Net income
 
 
 
 323
 323
Other comprehensive income
 
 
 1
 
 1
Cumulative effect of accounting change1
      (5) 5
 
Dividends declared on common stock ($0.4599 per share)
 
 
 
 (200) (200)
Dividends declared on preferred stock ($0.255 - $0.299 per share) and preference stock ($15.625 - $35.936 per share)
 
 
 
 (30) (30)
Stock-based compensation 
 
 
 
 (12) (12)
Noncash stock-based compensation
 
 3
 
 
 3
Balance at March 31, 2019$2,245
 $2,168
 $683
 $(27) $8,801
 $13,870
(in millions)Preferred
and
Preference
Stock
 Common
Stock
 Additional
Paid-in
Capital
 Accumulated
Other
Comprehensive
Loss
 Retained
Earnings
 Total
Equity
Balance at December 31, 2018$2,245
 $2,168
 $680
 $(23) $8,715
 $13,785
Net income
 
 
 
 323
 323
Other comprehensive income
 
 
 1
 
 1
Cumulative effect of accounting change1

 
 
 (5) 5
 
Dividends declared on common stock ($0.4599 per share)
 
 
 
 (200) (200)
Dividends declared on preferred and preference stock ($0.255 - $0.299 per share for preferred stock; $15.625 - $35.936 per share for preference stock)
 
 
 
 (30) (30)
Stock-based compensation 
 
 
 
 (12) (12)
Noncash stock-based compensation
 
 3
 
 
 3
Balance at March 31, 2019$2,245
 $2,168
 $683
 $(27) $8,801
 $13,870

1 
SCE recognized a cumulative effect adjustment to the opening balance of retained earnings and accumulated other comprehensive loss on January 1, 2019 related to the adoption of the accounting standards update on the reclassification of stranded tax effects resulting from Tax Reform. See Note 1 for further information.


The following table provides SCE's changes in equity for the three months ended March 31, 2018:
(in millions)Preferred
and
Preference
Stock
 Common
Stock
 Additional
Paid-in
Capital
 Accumulated
Other
Comprehensive
Loss
 Retained
Earnings
 Total
Equity
Balance at December 31, 2017$2,245
 $2,168
 $671
 $(19) $9,607
 $14,672
Net income
 
 
 
 316
 316
Other comprehensive income
 
 
 2
 
 2
Cumulative effect of accounting change1
      (5) 5
 
Dividends declared on common stock ($0.4875 per share)
 
 
 
 (212) (212)
Dividends declared on preferred and preference stock ($0.255 - $0.299 per share for preferred stock; $15.625 - $35.936 per share for preference stock)
 
 
 
 (30) (30)
Stock-based compensation 
 
 
 
 (2) (2)
Noncash stock-based compensation
 
 2
 
 
 2
Balance at March 31, 2018$2,245
 $2,168
 $673
 $(22) $9,684
 $14,748
1
SCE recognized a cumulative effect adjustment to the opening balance of retained earnings and accumulated other comprehensive loss on January 1, 2018 related to the adoption of the accounting standards update on the measurement of financial instruments.





Note 3.    Variable Interest Entities
A variable interest entity ("VIE")VIE is defined as a legal entity that meets one of two conditions: (1) the equity owners do not have sufficient equity at risk, or (2) the holders of the equity investment at risk, as a group, lack any of the following three characteristics: decision-making rights, the obligation to absorb losses or the right to receive the expected residual returns of the entity. The primary beneficiary is identified as the variable interest holder that has both the power to direct the activities of the VIE that most significantly impact the entity's economic performance and the obligation to absorb losses or the right to receive benefits from the entity that could potentially be significant to the VIE. The primary beneficiary is required to consolidate the VIE. Commercial and operating activities are generally the factors that most significantly impact the economic performance of such VIEs. Commercial and operating activities include construction, operation and maintenance, fuel procurement, dispatch and compliance with regulatory and contractual requirements.
Variable Interest in VIEs that are not Consolidated
Power Purchase Agreements
SCE has power purchase agreements ("PPAs")PPAs that are classified as variable interests in VIEs, including tolling agreements through which SCE provides the natural gas to fuel the plants, contracts with qualifying facilities and combined heat and power facilities that contain variable pricing provisions based on the price of natural gas and fixed price contracts for renewable energy contracts through which SCE absorbs commodity price risk.energy. SCE has concluded that it is not the primary beneficiary of these VIEs since it does not control the commercial and operating activities of these entities. Since payments for capacity are the primary source of income, the most significant economic activity for these VIEs is the operation and maintenance of the power plants.
As of the balance sheet date, the carrying amount of assets and liabilities in SCE's consolidated balance sheet that relate to involvement with VIEs result from current amounts due under the PPAs. Under these contracts, SCE recovers the costs incurred through demonstration of compliance with its California Public Utilities Commission ("CPUC")-approvedCPUC-approved long-term power procurement plans. SCE has no residual interest in the entities and has not provided or guaranteed any debt or equity support, liquidity arrangements, performance guarantees, or other commitments associated with these contracts other than the purchase commitments described in Note 1112 of the 20182019 Form 10-K. As a result, there is no significant potential exposure to loss to SCE from its variable interest in these VIEs. The aggregate contracted capacity dedicated to SCE from these VIE projects was 4,722 MW4,996 megawatts ("MW") and 3,4544,722 MW at March 31, 20192020 and 2018,2019, respectively, and the amounts that SCE paid to these projects were $153$151 million and $143$153 million for the three months ended March 31, 20192020 and 2018,2019, respectively. These amounts are recoverable in customer rates, subject to reasonableness review.


Unconsolidated Trusts of SCE
SCE Trust II, Trust III, Trust IV, Trust V, and Trust VI were formed in 2013, 2014, 2015, 2016, and 2017, respectively, for the exclusive purpose of issuing the 5.10%, 5.75%, 5.375%, 5.45%, and 5.00% trust preference securities, respectively ("trust securities"). The trusts are VIEs. SCE has concluded that it is not the primary beneficiary of these VIEs as it does not have the obligation to absorb the expected losses or the right to receive the expected residual returns of the trusts. SCE Trust II, Trust III, Trust IV, Trust V and Trust VI issued to the public trust securities in the face amounts of $400 million, $275 million, $325 million, $300 million, and $475 million (cumulative, liquidation amounts of $25 per share), respectively, and $10,000 of common stock each to SCE. The trusts invested the proceeds of these trust securities in Series G, Series H, Series J, Series K, and Series L Preference Stock issued by SCE in the principal amounts of $400 million, $275 million, $325 million, $300 million, and $475 million (cumulative, $2,500 per share liquidation values), respectively, which have substantially the same payment terms as the respective trust securities.
The Series G, Series H, Series J, Series K, and Series L Preference Stock and the corresponding trust securities do not have a maturity date. Upon any redemption of any shares of the Series G, Series H, Series J, Series K, or Series L Preference Stock, a corresponding dollar amount of trust securities will be redeemed by the applicable trust. The applicable trust will make distributions at the same rate and on the same dates on the applicable series of trust securities if and when the SCE Board of Directors declares and makes dividend payments on the related Preference Stock. The applicable trust will use any dividends it receives on the related Preference Stock to make its corresponding distributions on the applicable series of trust securities. If SCE does not make a dividend payment to any of these trusts, SCE would be prohibited from paying dividends on its common stock. SCE has fully and unconditionally guaranteed the payment of the trust securities and trust distributions, if and when SCE pays dividends on the related Preference Stock.


The Trust II, Trust III, Trust IV, Trust V and Trust VI balance sheets as of March 31, 20192020 and DecemberMarch 31, 2018,2019, consisted of investments of $400 million, $275 million, $325 million, $300 million, and $475 million in the Series G, Series H, Series J, Series K and Series L Preference Stock, respectively, $400 million, $275 million, $325 million, $300 million, and $475 million of trust securities, respectively, and $10,000 each of common stock.
The following table provides a summary of the trusts' income statements:
  Three months ended March 31,
(in millions) Trust II Trust III Trust IV Trust V Trust VI
2020          
Dividend income $5
 $4
 $4
 $4
 $6
Dividend distributions 5
 4
 4
 4
 6
2019          
Dividend income $5
 $4
 $4
 $4
 $6
Dividend distributions 5
 4
 4
 4
 6
  Three months ended March 31,
(in millions) Trust II Trust III Trust IV Trust V Trust VI
2019          
Dividend income $5
 $4
 $4
 $4
 $6
Dividend distributions 5
 4
 4
 4
 6
2018          
Dividend income $5
 $4
 $4
 $4
 $6
Dividend distributions 5
 4
 4
 4
 6

Note 4.    Fair Value Measurements
Recurring Fair Value Measurements
Fair value is defined as the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date (referred to as an "exit price"). Fair value of an asset or liability considers assumptions that market participants would use in pricing the asset or liability, including assumptions about nonperformance risk. As of March 31, 20192020 and December 31, 2018,2019, nonperformance risk was not material for Edison International and SCE.
Assets and liabilities are categorized into a three-level fair value hierarchy based on valuation inputs used to determine fair value.
Level 1 – The fair value of Edison International's and SCE's Level 1 assets and liabilities is determined using unadjusted quoted prices in active markets that are available at the measurement date for identical assets and liabilities. This level includes exchange-traded equity securities, U.S. treasury securities, mutual funds, and money market funds.
Level 2 – Edison International's and SCE's Level 2 assets and liabilities include fixed income securities, primarily consisting of U.S. government and agency bonds, municipal bonds and corporate bonds, and over-the-counter derivatives. The fair value of fixed income securities is determined using a market approach by obtaining quoted prices for similar assets and liabilities in active markets and inputs that are observable, either directly or indirectly, for substantially the full term of the instrument.


The fair value of SCE's over-the-counter derivative contracts is determined using an income approach. SCE uses standard pricing models to determine the net present value of estimated future cash flows. Inputs to the pricing models include forward published or posted clearing prices from an exchange (Intercontinental Exchange) for similar instruments and discount rates. A primary price source that best represents trade activity for each market is used to develop observable forward market prices in determining the fair value of these positions. Broker quotes, prices from exchanges, or comparison to executed trades are used to validate and corroborate the primary price source. These price quotations reflect mid-market prices (average of bid and ask) and are obtained from sources believed to provide the most liquid market for the commodity.
Level 3 – The fair value of SCE's Level 3 assets and liabilities is determined using an income approach through various models and techniques that require significant unobservable inputs. This level includes derivative contracts that trade infrequently such as congestion revenue rights ("CRRs"). Edison International Parent and Other does not have any Level 3 assets and liabilities.
Assumptions are made in order to value derivative contracts in which observable inputs are not available. In circumstances where fair value cannot be verified with observable market transactions, it is possible that a different valuation model could produce a materially different estimate of fair value. Modeling methodologies, inputs, and techniques are reviewed and assessed as markets continue to develop and more pricing information becomes available and the fair value is adjusted when it is concluded that a change in inputs or techniques would result in a new valuation that better reflects the fair value of those derivative contracts. See Note 6 for a discussion of derivative instruments.


SCE
The following table sets forth assets and liabilities of SCE that were accounted for at fair value by level within the fair value hierarchy:
March 31, 2019March 31, 2020
(in millions)Level 1 Level 2 Level 3 
Netting
and
Collateral1
 TotalLevel 1 Level 2 Level 3 
Netting
and
Collateral1
 Total
Assets at fair value                  
Derivative contracts$
 $17
 $95
 $(1) $111
$
 $4
 $54
 $(6) $52
Money market funds and other275
 21
 
 
 296
431
 14
 
 
 445
Nuclear decommissioning trusts:                  
Stocks2
1,550
 
 
 
 1,550
1,393
 
 
 
 1,393
Fixed Income3
889
 1,724
 
 
 2,613
569
 2,209
 
 
 2,778
Short-term investments, primarily cash equivalents212
 35
 
 
 247
198
 2
 
 
 200
Subtotal of nuclear decommissioning trusts4
2,651
 1,759
 
 
 4,410
2,160
 2,211
 
 
 4,371
Total assets2,926
 1,797
 95
 (1) 4,817
2,591
 2,229
 54
 (6) 4,868
Liabilities at fair value                  
Derivative contracts
 2
 
 (1) 1

 53
 2
 (36) 19
Total liabilities
 2
 
 (1) 1

 53
 2
 (36) 19
Net assets$2,926
 $1,795
 $95
 $
 $4,816
$2,591
 $2,176
 $52
 $30
 $4,849
December 31, 2018December 31, 2019
(in millions)Level 1 Level 2 Level 3 
Netting
and
Collateral1
 TotalLevel 1 Level 2 Level 3 
Netting
and
Collateral1
 Total
Assets at fair value                  
Derivative contracts$
 $32
 $141
 $
 $173
$
 $19
 $83
 $(15) $87
Other9
 21
 
 
 30
Money market funds and other4
 14
 
 
 18
Nuclear decommissioning trusts:        
        
Stocks2
1,382
 
 
 
 1,382
1,765
 
 
 ���
 1,765
Fixed Income3
1,001
 1,665
 
 
 2,666
738
 2,024
 
 
 2,762
Short-term investments, primarily cash equivalents120
 95
 
 
 215
98
 48
 
 
 146
Subtotal of nuclear decommissioning trusts4
2,503
 1,760
 
 
 4,263
2,601
 2,072
 
 
 4,673
Total assets2,512
 1,813
 141
 
 4,466
2,605
 2,105
 83
 (15) 4,778
Liabilities at fair value                  
Derivative contracts
 13
 
 (7) 6

 11
 5
 (15) 1
Total liabilities
 13
 
 (7) 6

 11
 5
 (15) 1
Net assets$2,512
 $1,800
 $141
 $7
 $4,460
$2,605
 $2,094
 $78
 $
 $4,777
1 
Represents the netting of assets and liabilities under master netting agreements and cash collateral.
2 
Approximately 71%73% and 72% of SCE's equity investments were in companies located in the United States at both March 31, 20192020 and December 31, 2018.2019, respectively.
3 
Includes corporate bonds, which were diversified and includedby the inclusion of collateralized mortgage obligations and other asset backed securities, of $57$31 million and $67$46 million at March 31, 20192020 and December 31, 2018,2019, respectively.
4 
Excludes net payables of $119$104 million and $143$111 million at March 31, 20192020 and December 31, 2018,2019, respectively, which consist of interestpayables and dividend receivables as well as receivables and payables related to SCE's pending securities purchases and sales as well as interest and purchases.dividend receivables.


Edison International Parent and Other
Edison International Parent and Other assets measured at fair value and classified as Level 1 consisted of money market funds of $19$878 million and $115$31 million at March 31, 20192020 and December 31, 2018, respectively, classified as Level 1.2019, respectively.
SCE Fair Value of Level 3
The following table sets forth a summary of changes in SCE's fair value of Level 3 net derivative assets and liabilities:
  Three months ended March 31,
(in millions) 2020 2019
Fair value of net assets at beginning of period $78
 $141
Total realized/unrealized losses1
 (26) (46)
Fair value of net assets at end of period2
 52
 95
Change during the period in unrealized gains and losses related to assets and liabilities held at the end of the period $(6) $(2)
  Three months ended March 31,
(in millions) 2019 2018
Fair value of net assets at beginning of period $141
 $101
Total realized/unrealized losses1
 (46) (20)
Fair value of net assets at end of period2
 $95
 $81
Change during the period in unrealized gains and losses related to assets and liabilities held at the end of the period $(2) $5

1 
Due to regulatory mechanisms, SCE's realized and unrealized gains and losses are recorded as regulatory assets and liabilities.
2 
There were no material transfers into or out of Level 3during 20192020 and 2018.2019.


The following table sets forth SCE's valuation techniques and significant unobservable inputs used to determine fair value for significant Level 3 assets and liabilities:
 Fair Value (in millions)ValuationSignificant Weighted
 Assets LiabilitiesTechniqueUnobservable InputRangeAverage
Congestion revenue rights      
March 31, 2020$55
 $3
Auction pricesCAISO CRR auction prices$(3.59) - $16.30$1.71
December 31, 201983
 5
Auction pricesCAISO CRR auction prices(3.59) - 25.321.97
 Fair Value (in millions) SignificantRange
 Assets LiabilitiesValuation Technique(s)Unobservable Input(Weighted Average)
Congestion revenue rights     
March 31, 2019$95
 $
Auction pricesCAISO CRR auction prices$(7.02) - $41.52 ($1.43)
December 31, 2018141
 
Auction pricesCAISO CRR auction prices$(7.41) - $41.52 ($1.62)

Level 3 Fair Value Uncertainty
For CRRs, increases or decreases in CAISO auction priceprices would result in higher or lower fair value as of March 31, 2019,2020, respectively.
Nuclear Decommissioning Trusts
SCE's nuclear decommissioning trust investments include equity securities, U.S. treasury securities, and other fixed income securities. Equity and treasury securities are classified as Level 1 as fair value is determined by observable market prices in active or highly liquid and transparent markets. The remaining fixed income securities are classified as Level 2. The fair value of these financial instruments is based on evaluated prices that reflect significant observable market information such as reported trades, actual trade information of similar securities, benchmark yields, broker/dealer quotes, issuer spreads, bids, offers, and relevant credit information. There are no securities classified as Level 3 in the nuclear decommissioning trusts.


Fair Value of Debt Recorded at Carrying Value
The carrying value and fair value of Edison International's and SCE's long-term debt (including current portion of long-term debt) are as follows:
  March 31, 2020 December 31, 2019
(in millions) 
Carrying
Value1
 
Fair
Value2
 
Carrying
Value1
 
Fair
Value2
Edison International $20,026
 $21,169
 $18,343
 $20,137
SCE 16,892
 18,062
 15,211
 16,892
  March 31, 2019 December 31, 2018
(in millions) 
Carrying
Value1
 
Fair
Value2
 
Carrying
Value1
 
Fair
Value2
Edison International $15,762
 $16,068
 $14,711
 $14,844
SCE 14,021
 14,412
 12,971
 13,180

1  
Carrying value is net of debt issuance costs.
2 The fair value of Edison International's and SCE's short-term and long-term debt is classified as Level 2.
2
The fair value of Edison International's and SCE's short-term and long-term debt is classified as Level 2.
Note 5.    Debt and Credit Agreements
Long-Term Debt
In March 2019,January 2020, SCE issued $500$100 million of 4.20%2.85% first and refunding mortgage bonds due in 2029 and $600$500 million of 4.875%3.65% first and refunding mortgage bonds due in 2049. The proceeds were used to repay commercial paper borrowings and for general corporate purposes.
Credit Agreements and Short-Term Debt
In February 2019, SCE borrowed $750 million under a Term Loan Agreement due in February 2020, with a variable interest rate based on the London Interbank Offered Rate plus 70 basis points.2050. The proceeds were used to repay SCE's commercial paper borrowings and for general corporate purposes.
In April 2019, Edison InternationalMarch 2020, SCE issued $400 million of 2.25% first and refunding mortgage bonds due in 2030 and $700 million of 3.65% first and refunding mortgage bonds due in 2050. The proceeds were primarily used to repay SCE's commercial paper borrowings and for general corporate purposes, including the re-purchase of SCE tax exempt pollution control bonds.
Credit Agreements and Short-Term Debt
In March 2020, SCE borrowed $1.0 billion$475 million under a Term Loan Agreementterm loan agreement due in April 2020,March 2021, with a variable interest rate based on the London Interbank Offered Rate plus 9060 basis points. OfThe proceeds were used to repay commercial paper borrowings temporarily used to fund AB 1054 Excluded Capital Expenditures. Additionally, in March 2020, SCE entered into a revolving credit facility in an amount not to exceed $800 million with a variable interest rate based on the London Interbank Offered Rate plus 65 basis points on drawn funds. The credit facility is available for borrowing needs until March 2021, and may be extended for 2, 364-day periods, at the lenders' discretion. The aggregate maximum principal amount under the revolving credit facility may be increased up to $1.1 billion, provided that additional lender commitments are obtained. As of March 31, 2020, there were 0 amounts drawn against the revolving credit facility. SCE plans to use the proceeds of the term loan, $750 million was contributed to SCE and the remainder of the proceeds will be used for general corporate and working capital purposes. In April 2019, SCE used the $750 million Edison International contributed to SCE to repay its February 2019 Term Loan discussed above.finance future AB 1054 Excluded Capital Expenditures.


SCE and Edison International Parent have multi-year revolving credit facilities of $3.0 billion and $1.5 billion, respectively, both facilities maturing in May 20232024, with an option to extend for an additional year, which may be exercised upon agreement between SCE or Edison International Parent and have two 1-year extension options.their respective lenders. The aggregate maximum principal amount under the SCE and Edison International Parent revolving credit facilities may be increased up to $4.0 billion and $2.0 billion, respectively, provided that additional lender commitments are obtained. SCE's credit facility is generally used to support commercial paper borrowings and letters of credit issued for procurement-related collateral requirements, balancing account undercollections and for general corporate purposes, including working capital requirements to support operations and capital expenditures. Edison International Parent's credit facility is used to support commercial paper borrowings and for general corporate purposes.
At March 31, 2020, SCE had 0 outstanding commercial paper. At December 31, 2019, SCE'sSCE had $550 million outstanding commercial paper, net of discount, was $29 million at a weighted-average interest rate of 3.15%2.24%. At March 31, 2020 and December 31, 2019, letters of credit issued under SCE's credit facility aggregated $209$175 million and $152 million, respectively, substantially all of which are scheduled to expire in twelve months or less. At December 31, 2018, the outstanding commercial paper, net of discount, was $720 million at a weighted-average interest rate of 3.23%.
At March 31, 2019, Edison International Parent's outstanding commercial paper, net of discount, was $153 million at a weighted-average interest rate of 3.03%. At December 31, 2018, Edison International Parent had no outstanding commercial paper.paper at both March 31, 2020 and December 31, 2019.
In March 2020, Edison International Parent borrowed $800 million under a term loan agreement due in March 2021 with a variable interest rate based on the London Interbank Offered Rate plus 1.125%. The proceeds were used for general corporate purposes.


Financing Subsequent to March 31, 2020
In April 2020, SCE issued $600 million of 3.70% first and refunding mortgage bonds due in 2025. The proceeds were used to finance undercollections of revenues that SCE is authorized to recover from customers through regulatory balancing accounts.
In April 2020, SCE purchased $373 million of its tax-exempt pollution control bonds that were subject to re-marketing and also converted these bonds to a variable rate structure. SCE is the holder of these bonds and plans to re-market them subject to market conditions.
In April 2020, Edison International Parent issued $400 million of 4.95% senior notes due 2025. The proceeds were used to repay all $400 million of Edison International Parent's outstanding 2.125% Senior Notes due in 2020.
Note 6.    Derivative Instruments
Derivative financial instruments are used to manage exposure to commodity price risk. These risks are managed in part by entering into forward commodity transactions, including options, swaps and futures. To mitigate credit risk from counterparties in the event of nonperformance, master netting agreements are used whenever possible and counterparties may be required to pledge collateral depending on the creditworthiness of each counterparty and the risk associated with the transaction.
Commodity Price Risk
Commodity price risk represents the potential impact that can be caused by a change in the market value of a particular commodity. SCE's electricity price exposure arises from energy purchased from and sold to wholesale markets as a result of differences between SCE's load requirements and the amount of energy delivered from its generating facilities and PPAs. SCE's natural gas price exposure arises from natural gas purchased for the Mountainview power plant and peaker plants, QF contracts where pricing is based on a monthly natural gas index and PPAs in which SCE has agreed to provide the natural gas needed for generation, referred to as tolling arrangements.
Credit and Default Risk
Credit and default risk represent the potential impact that can be caused if a counterparty were to default on its contractual obligations and SCE would be exposed to spot markets for buying replacement power or selling excess power. In addition, SCE would be exposed to the risk of non-payment of accounts receivable, primarily related to the sales of excess power and realized gains on derivative instruments.
Certain power and gas contracts contain master netting agreements or similar agreements, which generally allow counterparties subject to the agreement to offset amounts when certain criteria are met, such as in the event of default. The objective of netting is to reduce credit exposure. Additionally, to reduce SCE's risk exposures counterparties may be required to pledge collateral depending on the creditworthiness of each counterparty and the risk associated with the transaction.
Certain power and gas contracts contain a provision that requires SCE to maintain an investment grade rating from each of the major credit rating agencies, referred to as a credit-risk-related contingent feature. If SCE's credit rating were to fall below investment grade, SCE may be required to post additional collateral to cover derivative liabilities and the related outstanding payables. The net fair value of all derivative liabilities with these credit-risk-related contingent features was $1$18 million and $4$1 million as of March 31, 20192020 and December 31, 2018,2019, respectively, for which SCE has posted no$25 million and 0 collateral and $17 million collateral at March 31, 2019 and December 31, 2018, respectively, to its counterparties for its derivative liabilities and related outstanding payables. If the credit-risk-related contingent features underlying these agreements were triggered on March 31, 2019,2020, SCE would be required to post $1$17 million of additional collateral.



Fair Value of Derivative Instruments
SCE presents its derivative assets and liabilities on a net basis on its consolidated balance sheets when subject to master netting agreements or similar agreements. Derivative positions are also offset against margin and cash collateral deposits. In addition, SCE has provided collateral in the form of letters of credit. Collateral requirements can vary depending upon the level of unsecured credit extended by counterparties, changes in market prices relative to contractual commitments and other factors. See Note 4 for a discussion of fair value of derivative instruments. The following table summarizes the gross and net fair values of SCE's commodity derivative instruments:
  March 31, 2020  
  Derivative Assets Derivative Liabilities Net
Assets
(in millions) Short-Term 
Long-Term1
 Subtotal 
Short-Term2
 Long-Term Subtotal 
Commodity derivative contracts              
Gross amounts recognized $57
 $1
 $58
 $55
 $
 $55
 $3
Gross amounts offset in the consolidated balance sheets (6) 
 (6) (6) 
 (6) 
Cash collateral posted3
 
 
 
 (30) 
 (30) 30
Net amounts presented in the consolidated balance sheets $51
 $1
 $52
 $19
 $
 $19
 $33
  March 31, 2019  
  Derivative Assets Derivative Liabilities Net
Assets
(in millions) Short-Term 
Long-Term1
 Subtotal 
Short-Term2
 Long-Term Subtotal 
Commodity derivative contracts              
Gross amounts recognized $102
 $10
 $112
 $2
 $
 $2
 $110
Gross amounts offset in the consolidated balance sheets (1) 
 (1) (1) 
 (1) 
Cash collateral posted3
 
 
 
 
 
 
 
Net amounts presented in the consolidated balance sheets $101
 $10
 $111
 $1
 $
 $1
 $110

  December 31, 2019  
  Derivative Assets Derivative Liabilities Net
Assets
(in millions) Short-Term 
Long-Term1
 Subtotal 
Short-Term2
 Long-Term Subtotal 
Commodity derivative contracts              
Gross amounts recognized $94
 $8
 $102
 $14
 $2
 $16
 $86
Gross amounts offset in the consolidated balance sheets (13) (2) (15) (13) (2) (15) 
Cash collateral posted3
 
 
 
 
 
 
 
Net amounts presented in the consolidated balance sheets $81
 $6
 $87
 $1
 $
 $1
 $86

  December 31, 2018  
  Derivative Assets Derivative Liabilities Net
Assets
(in millions) Short-Term 
Long-Term1
 Subtotal 
Short-Term2
 Long-Term Subtotal 
Commodity derivative contracts              
Gross amounts recognized $171
 $2
 $173
 $13
 $
 $13
 $160
Gross amounts offset in the consolidated balance sheets 
 
 
 
 
 
 
Cash collateral posted 
 
 
 (7) 
 (7) 7
Net amounts presented in the consolidated balance sheets $171
 $2
 $173
 $6
 $
 $6
 $167
1 Included in "Other long-term assets" on Edison International's and SCE's consolidated balance sheets.
2 Included in "Other current liabilities" on Edison International's and SCE's consolidated balance sheets.
3 At March 31, 2019, SCE posted $11 million of cash collateral that is not offset against derivative liabilities and is reflected in "Other current assets" on the consolidated balance sheets.
1
Included in "Other long-term assets" on Edison International's and SCE's consolidated balance sheets.
2
Included in "Other current liabilities" on Edison International's and SCE's consolidated balance sheets.
3
At March 31, 2020, SCE posted $52 million of cash, of which $30 million was offset against net derivative liabilities and $22 million was reflected in "Other current assets" on the consolidated balance sheets. At December 31, 2019, SCE posted $24 million of cash, which was not offset against net derivative liabilities and was reflected in "Other current assets" on the consolidated balance sheets.
Income Statement Impact of Derivative Instruments
SCE recognizes realized gains and losses on derivative instruments as purchased power expense and expects that such gains or losses will be part of the purchased power costs recovered from customers. As a result, realized gains and losses do not affect earnings, but may temporarily affect cash flows. Due to expected future recovery from customers, unrealized gains and losses are recorded as regulatory assets and liabilities and therefore also do not affect earnings. The remaining effects of derivative activities and related regulatory offsets are reported in cash flows from operating activities in the consolidated statements of cash flows.


The following table summarizes the components of SCE's economic hedging activity:
 Three months ended March 31, Three months ended March 31,
(in millions) 2019 2018 2020 2019
Realized gains (losses) $32
 $(12)
Realized (losses) gains $(44) $32
Unrealized losses (50) (14) (83) (50)
Notional Volumes of Derivative Instruments
The following table summarizes the notional volumes of derivatives used for SCESCE's economic hedging activities:
    Economic Hedges
Commodity Unit of Measure March 31, 2020 December 31, 2019
Electricity options, swaps and forwards GWh 4,469
 3,155
Natural gas options, swaps and forwards Bcf 50
 43
Congestion revenue rights GWh 40,736
 48,170
    Economic Hedges
Commodity Unit of Measure March 31, 2019 December 31, 2018
Electricity options, swaps and forwards GWh 2,515
 2,786
Natural gas options, swaps and forwards Bcf 4
 20
Congestion revenue rights GWh 39,401
 54,453

Note 7.    Revenue
SCE's revenue is disaggregated by two revenue sources:
Earning activities – representing revenue authorized by the CPUC and FERC, which is intended to provide SCE a reasonable opportunity to recover its costs and earn a return on its net investment in generation, transmission and distribution assets. The annual revenue requirements are comprised of authorized operation and maintenance costs, depreciation, taxes and a return consistent with the capital structure. Also, included in earnings activities are revenue or penalties related to incentive mechanisms, other operating revenue, and regulatory charges or disallowances.
Cost-recovery activities – representing CPUC- and FERC- authorized balancing accounts, which allow for recovery of specific project or program costs, subject to reasonableness review or compliance with upfront standards. Cost-recovery activities include rates which provide recovery, subject to reasonableness review of, among other things, fuel costs, purchased power costs, public purpose related-program costs (including energy efficiency and demand-side management programs), and certain operation and maintenance expenses. SCE earns no return on these activities.
The following table is a summary of SCE's revenue:
Three months ended March 31, 2019Three months ended March 31, 2018Three months ended March 31, 2020Three months ended March 31, 2019
(in millions)Earning
Activities
Cost-
Recovery
Activities
Total
Consolidated
Earning ActivitiesCost-Recovery ActivitiesTotal ConsolidatedEarning
Activities
Cost-
Recovery
Activities
Total
Consolidated
Earning ActivitiesCost-Recovery ActivitiesTotal Consolidated
Revenues from contracts with customers1,2,3
$1,502
$957
$2,459
$1,536
$1,192
$2,728
Alternative revenue programs and other operating revenue4
48
309
357
(23)(151)(174)
Revenues from contracts with customers1,2
$1,624
$718
$2,342
$1,502
$957
$2,459
Alternative revenue programs and other operating revenue3
117
321
438
48
309
357
Total operating revenue$1,550
$1,266
$2,816
$1,513
$1,041
$2,554
$1,741
$1,039
$2,780
$1,550
$1,266
$2,816
1 
In the absence of a 2018 GRC decision, SCE recognized CPUC revenue in 2018 and the three months ended March 31,first quarter of 2019 based on the 2017 authorized revenue requirement adjusted mainly for the July 2017 cost of capital decision and Tax Reform. In April 2019, the CPUC issued a proposed decision, which, if adopted would result in 2018 and 2019 base rate revenue requirements of $5.102 billion and $5.422 billion, respectively. For further information, see Note 1.
2 
At March 31, 20192020 and December 31, 2018,2019, SCE's receivables related to contracts from customers were $1.0 billion and $1.1 billion, respectively, which include accrued unbilled revenue of $459$409 million and $482$488 million, respectively.
3 
Includes SCE's franchise fees billed to customers of $28 million for both the three months ended March 31, 2019 and 2018.
4
Includes differences between amounts billed and authorized levels for both CPUC and FERC.







Note 8.    Income Taxes
Effective Tax Rate
The table below provides a reconciliation of income tax expense computed at the federal statutory income tax rate to the income tax provision:
 Edison International SCE
 Three months ended March 31,
(in millions)2020 2019 2020 2019
Income from operations before income taxes$129
 $196
 $174
 $218
Provision for income tax at federal statutory rate of 21%27
 41
 37
 46
Decrease in income tax from: 
      
State tax, net of federal benefit(13) (7) (12) (5)
Property-related(78) (69) (78) (69)
Change related to uncertain tax position1
(15) 
 (17) 
Deferred tax re-measurement2

 (69) 
 (69)
Other(5) (8) (5) (8)
Total income tax benefit$(84) $(112) $(75) $(105)
Effective tax rate(65.1)% (57.1)% (43.1)% (48.2)%
 Edison International SCE
 Three months ended March 31,
(in millions)2019 2018 2019 2018
Income from continuing operations before income taxes$196
 $211
 $218
 $310
Provision for income tax at federal statutory rate of 21% 
41
 44
 46
 65
Increase in income tax from: 
    
  
State tax, net of federal benefit(7) (5) (5) 1
Property-related(69) (69) (69) (69)
Shared-based compensation1
(2) 
 (2) 
Deferred tax re-measurement2
(69) 
 (69) 
Other(6) (1) (6) (3)
Total income tax benefit from continuing operations$(112) $(31) $(105) $(6)
Effective tax rate(57.1)% (14.7)% (48.2)% (1.9)%

1
IncludesPrimarily relates to the re-measurement of uncertain tax positions related to the 2010 – 2012 California state taxes of $1 million for the three months ended March 31, 2019 for both Edison International and SCE.tax filings currently under audit.
2
Relates to changes in the allocation of deferred tax re-measurement between customers and shareholders as a result of a CPUC resolution issued in February 2019.2019 to provide guidance on the implementation of Tax Reform. The resolution determined that customers are only entitled to excess deferred taxes which were included when setting rates, while other deferred tax re-measurement belongs to the shareholders.
The CPUC requires flow-through ratemaking treatment for the current tax benefit arising from certain property-related and other temporary differences which reverse over time. Flow-through items reduce current authorized revenue requirements in SCE's rate cases and result in a regulatory asset for recovery of deferred income taxes in future periods. The difference between the authorized amounts as determined in SCE's rate cases, adjusted for balancing and memorandum account activities, and the recorded flow-through items also result in increases or decreases in regulatory assets with a corresponding impact on the effective tax rate to the extent that recorded deferred amounts are expected to be recovered in future rates. For further information, see Note 11.
Tax Disputes
Tax years that remain open for examination by the Internal Revenue Service ("IRS")IRS and the California Franchise Tax Board are 2015201620172018 and 2010 – 2017,2018, respectively. Edison International has settled all open tax positions with the IRS for taxable years prior to 2013. 
In the fourth quarter of 2018, Edison International reached a settlement with the California Franchise Tax Board for tax years 1994 – 2006 and has updated its uncertain tax positions to reflect this settlement. As a result of the settlement, Edison International expects a $65 million refund of tax and interest from the California Franchise Tax Board in 2019. Tax years 2007 – 20092012 are currently under protest with the California Franchise Tax Board.







Note 9.    Compensation and Benefit Plans
Pension Plans
Net periodic pension expense components for continuing operations are:
  Three months ended March 31,
(in millions) 2020 2019
Edison International:    
Service cost $31
 $32
Non-service cost (benefit)    
Interest cost 31
 39
Expected return on plan assets (54) (52)
Amortization of net loss1
 3
 2
Regulatory adjustment 2
 (4)
Total non-service benefit2
 (18) (15)
Total expense recognized $13
 $17
SCE:    
Service cost $30
 $31
Non-service cost (benefit)    
Interest cost 28
 35
Expected return on plan assets (51) (49)
Amortization of net loss1
 2
 1
Regulatory adjustment 2
 (4)
Total non-service benefit2
 (19) (17)
Total expense recognized $11
 $14
 Edison International SCE
 Three months ended March 31,
(in millions)2019 2018 2019 2018
Service cost$32
 $32
 $31
 $31
Non-service cost       
Interest cost39
 35
 35
 32
Expected return on plan assets(52) (57) (49) (53)
Amortization of prior service cost
 1
 
 1
Amortization of net loss1
2
 2
 1
 1
Regulatory adjustment (deferred)(4) 2
 (4) 2
Total non-service benefit2
$(15) $(17) $(17) $(17)
Total expense recognized$17
 $15
 $14
 $14

1 
Includes the amount of net loss reclassified from other comprehensive loss of $2 million and $1 millionloss. The amount reclassified for Edison International and SCE was $3 million and $2 million respectively, for both the three months ended March 31, 20192020. The amount reclassified for Edison International and 2018.SCE was $2 million and $1 million, respectively, for the three months ended March 31, 2019.
2 Included in "Other income and expenses" on Edison International's and SCE's consolidated statement of income.
2
Included in "Other income" on Edison International's and SCE's consolidated statement of income.
Postretirement Benefits Other Than Pensions ("PBOP")
Net periodic PBOP expense components for continuing operationsEdison International and SCE are:
  Three months ended March 31,
(in millions) 2020 2019
Service cost $9
 $8
Non-service cost (benefit)    
Interest cost 17
 21
Expected return on plan assets (30) (28)
  Amortization of net gain (4) (1)
Regulatory adjustment 8
 6
Total non-service benefit1
 (9) (2)
Total expense $
 $6

 Edison International SCE
 Three months ended March 31,
(in millions)2019 2018 2019 2018
Service cost$8
 $9
 $8
 $9
Non-service cost       
Interest cost21
 21
 21
 21
Expected return on plan assets(28) (30) (28) (30)
   Amortization of net gain(1) 
 (1) 
 Regulatory adjustment (deferred)6
 
 6
 
Total non-service benefit1
$(2) $(9) $(2) $(9)
Total expense$6
 $
 $6
 $
1     Included in "Other income and expenses"income" on Edison International's and SCE's consolidated statement of income.







Note 10.    Investments
Nuclear Decommissioning Trusts
Future decommissioning costs related to SCE's nuclear assets are expected to be funded from independent decommissioning trusts.
The following table sets forth amortized cost and fair value of the trust investments (see Note 4 for a discussion of fair value of the trust investments):
 
Longest
Maturity
Dates
 Amortized Cost Fair Value
(in millions) March 31,
2020
 December 31,
2019
 March 31,
2020
 December 31, 2019
Stocks N/A
 N/A
 $1,393
 $1,765
Municipal bonds2057 $1,063
 $822
 1,214
 970
U.S. government and agency securities2067 745
 996
 928
 1,115
Corporate bonds2068 575
 597
 636
 679
Short-term investments and receivables/payables1
One-year 91
 32
 96
 33
Total  $2,474
 $2,447
 $4,267
 $4,562
 
Longest
Maturity
Dates
 Amortized Cost Fair Value
(in millions) March 31,
2019
 December 31,
2018
 March 31,
2019
 December 31, 2018
Stocks *
 *
 $1,550
 $1,381
Municipal bonds2057 662
 665
 785
 767
U.S. government and agency securities2067 1,116
 1,193
 1,224
 1,288
Corporate bonds2050 549
 573
 603
 611
Short-term investments and receivables/payables1
One-year 124
 70
 129
 73
Total  $2,451
 $2,501
 $4,291
 $4,120

*Equity investments are measured at fair value.
1 
Short-term investments include $35$56 million and $71$41 million of repurchase agreements payable by financial institutions which earn interest, are fully secured by U.S. Treasury securities and mature by April 1, 20192020 and January 2, 20192020 as of March 31, 20192020 and December 31, 2018,2019, respectively.
Trust fund earnings (based on specific identification) increase the trust fund balance and the asset retirement obligation ("ARO") regulatory liability. Unrealized holding gains, net of losses, were$1.6were $1.5 billion and $1.4$1.8 billion at March 31, 20192020 and December 31, 2018, respectively, and other-than-temporary impairments of $162 million and $170 million at the respective periods.2019, respectively.
Trust assets are used to pay income taxes arising from trust investing activity. Deferred tax liabilities related to net unrealized gains were $366$357 million and $323$449 million at March 31, 20192020 and December 31, 2018,2019, respectively. Accordingly, the fair value of trust assets available to pay future decommissioning costs, net of deferred income taxes, totaled $3.9 billion and $3.8$4.1 billion at March 31, 20192020 and December 31, 2018,2019, respectively.
The following table summarizes the gains and (losses)losses for the trust investments:
 Three months ended March 31,
(in millions)2020 2019
Gross realized gains$39
 $23
Gross realized loss2
 
Net unrealized (losses) gains for equity securities(376) 168
 Three months ended March 31,
(in millions)2019 2018
Gross realized gains$23
 $61
Gross realized loss
 8
Net unrealized gains (losses) for equity securities$168
 $(63)

Due to regulatory mechanisms, changes in assets of the trusts from income or loss items have no impact on operating revenue or earnings.







Note 11.    Regulatory Assets and Liabilities
Regulatory Assets
SCE's regulatory assets included on the consolidated balance sheets are:
(in millions)March 31,
2020
 December 31,
2019
Current:   
Regulatory balancing and memorandum accounts$993
 $798
Power contracts210
 189
Other22
 22
Total current1,225
 1,009
Long-term:   
Deferred income taxes, net of liabilities4,145
 4,026
Pensions and other postretirement benefits85
 87
Power contracts387
 434
Unamortized investments, net of accumulated amortization118
 119
Unamortized loss on reacquired debt139
 142
Regulatory balancing and memorandum accounts1,129
 981
Environmental remediation235
 237
Other56
 62
Total long-term6,294
 6,088
Total regulatory assets$7,519
 $7,097
(in millions)March 31,
2019
 December 31,
2018
Current:   
Regulatory balancing accounts$935
 $814
Power contracts
333
 305
Other18
 14
Total current1,286
 1,133
Long-term:   
Deferred income taxes, net of liabilities3,683
 3,589
Pensions and other postretirement benefits274
 271
Power contracts
597
 700
Unamortized investments, net of accumulated amortization117
 118
Unamortized loss on reacquired debt150
 153
Regulatory balancing accounts232
 360
Environmental remediation
135
 134
Other80
 55
Total long-term5,268
 5,380
Total regulatory assets$6,554
 $6,513



Regulatory Liabilities
SCE's regulatory liabilities included on the consolidated balance sheets are:
(in millions)March 31,
2020
 December 31,
2019
Current:   
Regulatory balancing and memorandum accounts$749
 $883
Energy derivatives3
 80
Other12
 9
Total current764
 972
Long-term:   
Cost of removal2,670
 2,674
Re-measurement of deferred taxes2,388
 2,424
Recoveries in excess of ARO liabilities1
1,245
 1,569
Regulatory balancing and memorandum accounts1,356
 1,261
Other postretirement benefits420
 416
Other34
 41
Total long-term8,113
 8,385
Total regulatory liabilities$8,877
 $9,357
(in millions)March 31,
2019
 December 31,
2018
Current:   
Regulatory balancing accounts$836
 $1,080
Energy derivatives100
 158
2018 GRC341
 274
Other18
 20
Total current1,295
 1,532
Long-term:   
Cost of removal2,808
 2,769
Re-measurement of deferred taxes1
2,650
 2,776
Recoveries in excess of ARO liabilities2
1,357
 1,130
Regulatory balancing accounts1,428
 1,344
Other postretirement benefits189
 185
Other156
 125
Total long-term8,588
 8,329
Total regulatory liabilities$9,883
 $9,861

1
SCE decreased its regulatory liability and recorded an income tax benefit of $69 million during the first quarter of 2019 related to changes in the allocation of deferred tax re-measurement between customers and shareholders. For further information, see Note 8.
2
Represents the cumulative differences between ARO expenses and amounts collected in rates primarily for the decommissioning of SCE's nuclear generation facilities. Decommissioning costs recovered through rates are primarily placed in nuclear decommissioning trusts. This regulatory liability also represents the deferral of realized and unrealized gains and losses on the nuclear decommissioning trust investments. See Note 10 for further discussion.


Net Regulatory Balancing and Memorandum Accounts
The following table summarizes the significant components of regulatory balancing and memorandum accounts included in the above tables of regulatory assets and liabilities:
(in millions)March 31,
2020
 December 31,
2019
Asset (liability)   
Energy resource recovery account$(120) $(23)
Portfolio allocation balancing account 
599
 537
New system generation balancing account75
 85
Public purpose programs and energy efficiency programs(1,330) (1,235)
Tax accounting memorandum account and pole loading balancing account(7) 17
Base revenue requirement balancing account101
 (328)
DOE litigation memorandum account(35) (35)
Greenhouse gas auction revenue and low carbon fuel standard revenue(234) (196)
FERC balancing accounts(58) (127)
Wildfire-related memorandum accounts1
947
 868
Other79
 72
Asset (liability)$17
 $(365)
(in millions)March 31,
2019
 December 31,
2018
Asset (liability)   
Energy resource recovery account$927
 $815
New system generation balancing account(96) (74)
Public purpose programs and energy efficiency programs(1,304) (1,200)
Tax accounting memorandum account and pole loading balancing account(128) 28
Base revenue requirement balancing account1
(282) (628)
DOE litigation memorandum account(69) (69)
Greenhouse gas auction revenue and low carbon fuel standard revenue(150) (81)
FERC balancing accounts(139) (180)
Catastrophic event memorandum account
95
 144
 Wildfire expense memorandum account

41
 128
Other8
 (133)
Liability$(1,097) $(1,250)

1 
The base revenue requirement balancing account at March 31, 2019 includeswildfire-related memorandum accounts regulatory assets represent wildfire-related costs that are probable of future recovery of $107 million of premiumsfrom customers, subject to a reasonableness review. The Fire Hazard Prevention Memorandum Account ("FHPMA") is used to track costs related to a 12-month, $300 millionfire safety and to implement fire prevention corrective action measures in extreme and very high fire threat areas. The Catastrophic Event Memorandum Account ("CEMA") is used to track costs related to restoring service and damage repair, upon declaration of disasters by state or federal authorities. The Wildfire Expense Memorandum Account ("WEMA") is used to track incremental wildfire insurance policy purchasedcosts and uninsured wildfire-related financing, legal and claims costs. During 2019, the CPUC approved a Wildfire Mitigation Plan memorandum account to track costs incurred to implement SCE's Wildfire Mitigation Plan that are not currently reflected in December 2017. See Note 12SCE's revenue requirements, a Grid Safety and Resiliency Program Memorandum Account ("GSRPMA") to track the costs of SCE's GS&RP that are incremental to costs approved for further discussion.recovery in SCE's 2018 GRC and a fire risk mitigation memorandum account to track costs related to the reduction of fire risk that are incremental to the amount in SCE's any other revenue requirement.


Note 12.    Commitments and Contingencies
Indemnities
Edison International and SCE have various financial and performance guarantees and indemnity agreements which are issued in the normal course of business.
Edison International and SCE have agreed to provide indemnifications through contracts entered into in the normal course of business. These are primarily indemnifications against adverse litigation outcomes in connection with underwriting agreements, and indemnities for specified environmental liabilities and income taxes with respect to assets sold.sold or other contractual arrangements. Edison International's and SCE's obligations under these agreements may or may not be limited in terms of time and/or amount, and in some instances Edison International and SCE may have recourse against third parties. Edison International and SCE have not recorded a liability related to these indemnities. The overall maximum amount of the obligations under these indemnifications cannot be reasonably estimated.
SCE has agreed to indemnify the City of Redlands, California in connection with the Mountainview power plant's California Energy Commission permit for cleanup or associated actions related to groundwater contaminated by perchlorate due to the disposal of filter cake at the City's solid waste landfill. The obligations under this agreement are not limited to a specific time period or subject to a maximum liability. As of March 31, 2019, there has been no groundwater contamination identified. Thus, SCE has not recorded a liability related to this indemnity.
Contingencies
In addition to the matters disclosed in these Notes, Edison International and SCE are involved in other legal, tax, and regulatory proceedings before various courts and governmental agencies regarding matters arising in the ordinary course of business. Edison International and SCE believe the outcome of these other proceedings will not, individually or in the aggregate, materially affect its financial position, results of operations and cash flows.


Southern California Wildfires and Mudslides
Approximately 35% of SCE's service territory is in areas identified as high fire risk by SCE. Multiple factors have contributed to increased wildfires,wildfire activity, and faster progression of wildfires and the increased damage from wildfires across SCE's service territory and throughout California. These include the buildup of dry vegetation in areas severely impacted by years of historic drought, lack of adequate clearing of hazardous fuels by responsible parties, higher temperatures, lower humidity, and strong Santa Ana winds. At the same time that wildfire risk has been increasing in Southern California, residential and commercial development has occurred and is occurring in some of the highest-risk areas. Such factors can increase the likelihood and extent of wildfires. SCE has determined that approximately 27% of its service territory is in areas identified as high fire risk.
In December 2017 and November 2018,Over the past several years, wind-driven wildfires impacted portions of SCE's service territory, with wildfires in December 2017 and November 2018 causing loss of life, substantial damage to both residential and business properties, and service outages for SCE customers. The investigating government agencies, the Ventura County Fire Department ("VCFD") and California Department of Forestry and Fire Protection ("CAL FIRE"), have determined that the largest of the 2017 fires originated on December 4, 2017, in the Anlauf Canyon area of Ventura County (the investigating agencies refer to this fire as the "Thomas Fire"), followed shortly thereafter by a second fire that originated near Koenigstein Road in the City of Santa Paula (the "Koenigstein Fire"). While the progression of these two fires remains under review, the December 4, 2017 fires eventually burned substantial acreage in both Ventura and Santa Barbara Counties. According to CAL FIRE, information, the Thomas and Koenigstein Fires, collectively, burned over 280,000 acres, destroyed or damaged an estimated 1,343 structures and resulted in two2 confirmed fatalities. The largest of the November 2018 fires, known as the Woolsey Fire,"Woolsey Fire", originated in Ventura County and burned acreage in both Ventura and Los Angeles Counties. According to CAL FIRE, information, the Woolsey Fire burned almost 100,000 acres, destroyed an estimated 1,643 structures, damaged an estimated 364 structures and resulted in three3 confirmed fatalities. NaN additional fatalities have been associated with the Woolsey Fire.
As described below, multiple lawsuits related to the Thomas and Koenigstein Fires and the Woolsey Fire have been initiated against SCE and Edison International. Some of the Thomas and Koenigstein Fires lawsuits claim that SCE and Edison International have responsibility for the damages caused by mudslides and flooding in Montecito and surrounding areas in January 2018 (the "Montecito Mudslides") based on a theory alleging that SCE has responsibility for the Thomas and/or Koenigstein Fires and that the Thomas and/or Koenigstein Fires proximately caused the Montecito Mudslides. According to Santa Barbara County initial reports, the Montecito Mudslides destroyed an estimated 135 structures, damaged an estimated 324 structures, and resulted in 21 confirmed fatalities, with two2 additional fatalities presumed.
In 2019, several wind-driven wildfires, including the "Saddle Ridge Fire," originated in Southern California (the "2019 Fires"). Based on currently available information and without considering insurance recoveries, it is reasonably possible that SCE will incur a material loss in connection with the Saddle Ridge Fire, but the range of possible losses that could be incurred cannot be estimated at this time. Edison International and SCE expect that any losses incurred will be covered by insurance, subject to a self-insured retention and co-insurance, and that the amount of any such loss after insurance recoveries will not be material. After expected insurance recoveries, SCE does not expect any of the 2019 Fires to have a material adverse effect on its financial condition, results of operations or cash flows. SCE has not recorded a charge for potential liabilities relating to the Saddle Ridge Fire because, based on currently available information, it has not determined that a loss is probable.
Liability Overview
The extent of liability for wildfire-related damages in actions against utilities depends on a number of factors, including whether SCEthe utility substantially caused or contributed to the damages and whether parties seeking recovery of damages will be


required to show negligence in addition to causation. California courts have previously found utilities to be strictly liable for property damage along with associated interest and attorneys' fees, regardless of fault, by applying the theory of inverse condemnation when a utility's facilities were determined to be a substantial cause of a wildfire that caused the property damage. If inverse condemnation is held to be inapplicable to SCE in connection with a wildfire, SCE still could be held liable for property damages and associated interest if the property damages were found to have been proximately caused by SCE's negligence. If SCE were to be found negligent, SCE could also be held liable for, among other things, fire suppression costs, business interruption losses, evacuation costs, clean-up costs, medical expenses, and personal injury/wrongful death claims. Additionally, SCE could potentially be subject to fines for alleged violations of CPUC rules and state laws in connection with the ignition of a wildfire.
Final determinations of liability for the Thomas Fire, the Koenigstein Fire, the Montecito Mudslides and the Woolsey Fire (each a "2017/2018 Wildfire/Mudslide Event," and, collectively, the "2017/2018 Wildfire/Mudslide Events"), including determinations of whether SCE was negligent, would only be made during lengthy and complex litigation processes. Even when investigations are still pending or liability is disputed, an assessment of likely outcomes, including through future


settlement of disputed claims, may require a liability to be accrued under accounting standards. Based on information available to SCE and consideration of the risks associated with litigation, Edison International and SCE expect to incur a material loss in connection with the 2017/2018 Wildfire/Mudslide Events and accrued a liabilityEvents.
As of $4.7 billion in the fourth quarter of 2018. In the fourth quarter of 2018,March 31, 2020, Edison International and SCE also recordedhave estimated liabilities of $4.5 billion, remaining expected recoveries from insurance of $2.0$1.7 billion and expected recoveries through FERC electric rates of $135 million.$113 million on their consolidated balance sheets related to the 2017/2018 Wildfire/Mudslide Events. The net charge to earnings recorded in the fourth quarter of 2018 was $1.8 billion after-tax. Theaccrued liability that was accrued corresponds to the lower end of the reasonably estimated range of expected potential losses that may be incurred in connection with the 2017/2018 Wildfire/Mudslide Events and is subject to change as additional information becomes available. Edison International and SCE will seek to offset any actual losses realized with recoveries from insurance policies in place at the time of the events and, to the extent actual losses exceed insurance, through electric rates. The CPUC and FERC may not allow SCE to recover uninsured losses through electric rates if it is determined that such losses were not reasonably or prudently incurred. See "—Loss"Loss Estimates for Third Party Claims and Potential Recoveries from Insurance and through Electric Rates" below for additional information.
External Investigations and Internal Review
The VCFD and CAL FIRE have jointly issued reports concerning their findings regarding the causes of the Thomas Fire and the Koenigstein Fire. The reports did not address the causes of the Montecito Mudslides. SCE has also received a non-final redacted draft of a report from the VCFD regarding Woolsey Fire (the "Redacted Woolsey Report"). SCE received the Redacted Woolsey Report subject to a protective order in the litigation related to the Woolsey fire and, other than the information disclosed in this Form 10-Q, is not authorized to release the report or its contents to the public at this time. Based on a filing made by Ventura County in the Woolsey Fire litigation, SCE previously anticipated that the VCFD would release the final non-redacted report from the VCFD regarding the Woolsey Fire on or about April 1, 2020. SCE is currently uncertain as to when the final non-redacted report will be released. The VCFD and CAL FIRE findings do not determine legal causation of or assign legal liability for the Thomas, Koenigstein or KoenigsteinWoolsey Fires; final determinations of legal causation and liability would only be made during lengthy and complex litigation. The reports did not address the causes of the Montecito Mudslides. SCE expects that the VCFD and CAL FIRE will ultimately also issue a report concerning the departments' findings of origin and cause of the Woolsey Fire but cannot predict when this report will be released.
The CPUC's Safety and Enforcement Division ("SED") is also conducting investigations to assess SCE's compliance with applicable rules and regulations in areas impacted by the fires.Thomas, Koenigstein and Woolsey Fires. SCE cannot predict when the SED's investigations will be completed.
Edison International and SCE understand that the California Attorney General's Office has completed its investigation of the Thomas Fire without pursuing criminal charges. Edison International and SCE are aware of an ongoing investigation by the California Attorney General's Office of the Woolsey Fire for the purpose of determining whether any criminal violations have occurred. SCE could be subject to material fines, penalties, or restitution if it is determined that it failed to comply with applicable laws and regulations. SCE is not aware of any basis for felony liability with regards to the Thomas Fire, the Koenigstein Fire or the Woolsey Fire.
SCE's internal review into the facts and circumstances of each of the 2017/2018 Wildfire/Mudslide Events is complex and time consuming. SCE expects to obtain and review additional information and materials in the possession of third parties during the course of its internal reviews and the litigation processes.
Thomas Fire
On March 13, 2019, the VCFD and CAL FIRE jointly issued a report concluding, after ruling out other possible causes, that the Thomas Fire was started by SCE power lines coming into contact during high winds, resulting in molten metal falling to the ground. However, the report does not state that their investigation found molten metal was found on the ground in that location during their investigation.ground. At this time, based on available information, SCE has not determined whether its equipment caused the Thomas Fire. Based on publicly available radar data showing a smoke plume in the Anlauf Canyon area emerging in advance of the report's indicated start time, SCE believes that the Thomas Fire started at least 12 minutes prior to any issue involving SCE's system and at least 15 minutes prior to the start time indicated in the report. SCE is continuing to assess the progression of the Thomas Fire and the extent of damages that may be attributable to that fire.
Koenigstein Fire
On March 20, 2019, the VCFD and CAL FIRE jointly issued a report finding that the Koenigstein Fire was caused when an energized SCE electrical wire separated and fell to the ground along with molten metal particles and ignited the dry vegetation below. SCE hasAs previously disclosed, that SCE believedbelieves that its equipment was associated with the ignition of the


Koenigstein Fire. SCE is continuing to assess the progression of the Koenigstein Fire and the extent of damages that may be attributable to that fire.


Montecito Mudslides
SCE's internal review includes inquiry into whether the Thomas and/or Koenigstein Fires proximately caused or contributed to the Montecito Mudslides, whether, and to what extent, the Thomas and/or Koenigstein Fires were responsible for the damages in the Montecito area and other factors that potentially contributed to the losses that resulted from the Montecito Mudslides. Many other factors, including, but not limited to, weather conditions and insufficiently or improperly designed and maintained debris basins, roads, bridges and other channel crossings, could have proximately caused, contributed to or exacerbated the losses that resulted from the Montecito Mudslides.
At this time, based on available information, SCE has not been able to determine whether the Thomas Fire or the Koenigstein Fire, or both, were responsible for the damages in the Montecito area. In the event that SCE is determined to have caused the fire that spread to the Montecito area, SCE cannot predict whether, if fully litigated, the courts would conclude that the Montecito Mudslides were caused or contributed to by the Thomas and/or Koenigstein Fires or that SCE would be liable for some or all of the damages caused by the Montecito Mudslides.
Woolsey Fire
SCE's internal review into the facts and circumstances of the Woolsey Fire is ongoing. SCE has reported to the CPUC that there was an outageon SCE's electric system in the vicinity of where the Woolsey Fire reportedly began on November 8, 2018. SCE is aware of witnesses who saw fire in the vicinity of SCE's equipment at the time the fire was first reported. While SCE did not find evidence of downed electrical wires on the ground in the suspected area of origin, it observed a pole support wire in proximity to an electrical wire that was energized prior to the outage. Whether
The Redacted Woolsey Report states that the November 8, 2018 outageVCFD investigation team determined that electrical equipment owned and operated by SCE was related to contact being made between the support wire andcause of the electrical wire has not been determined.Woolsey Fire. Absent additional evidence, SCE believes that it is likely that its equipment could be found to have beenwas associated with the ignition of the Woolsey Fire. SCE expects to obtain and review additional information and materials in the possession of CAL FIRE and others during the course of its internal review and the Woolsey Fire litigation process, including SCE equipment that has been retained by CAL FIRE.
Wildfire-related Litigation
Multiple lawsuits related to the 2017/2018 Wildfire/Mudslide Events naming SCE as a defendant have been filed.filed by three categories of plaintiffs: individual plaintiffs, subrogation plaintiffs and public entity plaintiffs. A number of the lawsuits also name Edison International as a defendant and some of the lawsuits were filed as purported class actions. The lawsuits, which have been filed in the superior courts of Ventura, Santa Barbara and Los Angeles Counties in the case of the Thomas and Koenigstein Fires and the Montecito Mudslides, and in Ventura and Los Angeles Counties in the case of the Woolsey Fire, allege, among other things, negligence, inverse condemnation, trespass, private nuisance, personal injury, wrongful death, and violations of the California Public Utilities and Health and Safety Codes. SCE expects to be the subject of additional lawsuits related to the 2017/2018 Wildfire/Mudslide Events. The litigation could take a number of years to be resolved because of the complexity of the matters and number of plaintiffs.
The Thomas and Koenigstein Fires and Montecito Mudslides lawsuits are being coordinated in the Los Angeles Superior Court. The Woolsey Fire lawsuits have also been coordinated in the Los Angeles Superior Court. On October 4, 2018, the Superior Court denied Edison International's and SCE's challenge to the application of inverse condemnation to SCE with respect to the Thomas and Koenigstein Fires and, on February 26, 2019, the California Supreme Court denied SCE's petition to review the Superior Court's decision. In January 2019, SCE filed a cross-complaint against certain governmentallocal public entities alleging that failures by these entities, such as failure to adequately plan for flood hazards and build and maintain adequate debris basins, roads, bridges and other channel crossings, among other things, caused, contributed to or exacerbated the losses that resulted from the Montecito Mudslides. These cross-claims in the Montecito Mudslides litigation were not released as part of the Local Public Entity Settlements (as defined below).
Additionally, in July 2018 and September 2018, two separatea derivative lawsuitslawsuit for breach of fiduciary duties and unjust enrichment werewas filed in the Los Angeles Superior Court against certain current and former members of the Boards of Directors of Edison International and SCE. Edison International and SCE are identified as nominal defendants in those actions.the action. The derivative lawsuitslawsuit generally allegealleges that the individual defendants violated their fiduciary duties by causing or allowing SCE to operate in an unsafe manner in violation of relevant regulations, resulting in substantial liability and damage from the Thomas and Koenigstein Fires and the Montecito Mudslides. The lawsuit is currently stayed.


In November 2018, a purported class action lawsuit alleging securities fraud and related claims was filed in the federal court against EIX,Edison International, SCE and certain current and former officers of Edison International and SCE. The plaintiff alleges that Edison International and SCE made false and/or misleading statements in filings with the Securities and Exchange Commission by failing to disclose that SCE had allegedly failed to maintain its electric transmission and distribution networks in compliance with safety regulations, and that those alleged safety violations led to fires that occurred in 2017 and 2018, including the Thomas Fire and the Woolsey Fire.


In January 2019, two2 separate derivative lawsuits alleging breach of fiduciary duties, securities fraud, misleading proxy statements, unjust enrichment, and related claims were filed in federal court against allcertain current and certain former members of the Boards of Directors and certain current and former officers of Edison International and SCE. Edison International and SCE are named as nominal defendants in those actions. The derivative lawsuits generally allege that the individual defendants breached their fiduciary duties and made misleading statements or allowed misleading statements to be made (i) between March 21, 2014 and August 10, 2015, with respect to certain ex parte communications between SCE and CPUC decision-makers concerning the settlement of the San Onofre Order Instituting Investigation proceeding (the "San Onofre OII") and (ii) from February 23, 2016 to the present, concerning compliance with applicable laws and regulations concerning electric system maintenance and operations related to wildfire risks. The lawsuits generally allege that these breaches of duty and misstatements led to substantial liability and damage resulting from the disclosure of SCE's ex parte communications in connection with the San Onofre OII settlement, and from the 2017/2018 Wildfire/Mudslide Events. For more information regarding
In the San Onofre OII, see Note 12 infourth quarter of 2019, SCE paid $360 million to a number of local public entities to resolve those parties' collective claims arising from the 2017/2018 Form 10-K.Wildfire/Mudslide Events (the "Local Public Entity Settlements").
Loss Estimates for Third Party Claims and Potential Recoveries from Insurance and through Electric Rates
At both March 31, 2020 and December 31, 2019, Edison International's and SCE's balance sheets include accrued liabilities (established at the lower end of the reasonably estimated range of expected losses) of $4.5 billion for the 2017/2018 Wildfire/Mudslide Events. In total, SCE has accrued estimated losses of $4.9 billion and paid $360 million in settlements and recovered $348 million from its insurance carriers through March 31, 2020 in relation to the 2017/2018 Wildfire/Mudslide Events.
Each reporting period, management reviews its loss estimates for remaining alleged and potential claims related to the 2017/2018 Wildfire/Mudslide Events. The process for estimating losses associated with wildfire litigation claims requires management to exercise significant judgment based on a number of assumptions and subjective factors, including, but not limited toto: estimates of known and expected claims by third parties based on currently available information, and assessments, opinions of counsel regarding litigation risk, the status of and developments in the course of litigation, and prior experience with litigating and settling other wildfire cases.litigation claims. As additional information becomes available, managementmanagement's estimates and assumptions regarding the causes and financial impact of the 2017/2018 Wildfire/Mudslide Events may change.change further. Such additional information is expected to become available from multiple external sources during the course of litigation and settlement discussions and from SCE's ongoing internal review, including, among other things, information regarding the extent of damages that may be attributable to any fire determined to have been substantially caused by SCE's equipment, information that may be obtained from the equipment in CAL FIRE's possession, and information pertaining to fire progression, suppression activities, damages alleged damagesby plaintiffs and insurance claims.claims made by third parties.
As described above, the $1.8 billion after-taxaccrued liability as of March 31, 2020 corresponds to the lower end of the reasonably estimated range of expected losses that may be incurred in connection with the 2017/2018 Wildfire/Mudslide Events and is subject to change as additional information becomes available. Edison International and SCE currently believe that it is reasonably possible that the amount of the actual loss will be greater than the amount accrued. However, Edison International and SCE are currently unable to reasonably estimate an upper end of the range of expected losses given the uncertainty as to the legal and factual determinations to be made during litigation, including uncertainty as to the contributing causes of the 2017/2018 Wildfire/Mudslide Events, the complexities associated with fires that merge, whether inverse condemnation will be held applicable to SCE with respect to damages caused by the Montecito Mudslides, and the preliminary nature of the litigation processes.


For events that occurred in 2017 and early 2018, principally the Thomas and Koenigstein Fires and Montecito Mudslides, SCE has $1had $1.0 billion of wildfire-specific insurance coverage, subject to a self-insured retention of $10 million per occurrence. SCE also had other general liability insurance coverage of approximately $450 million, but it is uncertain whether these other policies would apply to liabilities alleged to be related to the Montecito Mudslides. For the Woolsey Fire, SCE hashad an additional $1$1.0 billion of wildfire-specific insurance coverage, subject to a self-insured retention of $10 million per occurrence. Edison International and SCE record a receivable for insurance recoveries when recovery of a recorded loss is determined to be probable. At March 31, 2019, Edison International and SCE had recorded $2.0 billion forThe following table presents changes in expected insurance recoveries associated with the recorded lossestimated losses for the 2017/2018 Wildfire/Mudslide Events. Events since December 31, 2019:
(in millions) 
Balance at December 31, 2019$1,710
Insurance recoveries1
(58)
Balance at March 31, 2020$1,652
1 Additional insurance recoveries of $15 million were received in April 2020.
SCE will seek to recover uninsured costs resulting from the 2017/2018 Wildfire/Mudslide Events through electric rates. The amount of the receivable is subject to change based on additional information. Recovery of these costs is subject to approval by regulators. Under accounting standards for rate-regulated enterprises, SCE defers costs as regulatory assets when it concludes that such costs are probable of future recovery in electric rates. SCE utilizes objectively determinable evidence to form its view on probability of future recovery. The only directly comparable precedent in which a California investor-owned utility has sought recovery for uninsured wildfire-related costs is SDG&E's requests for cost recovery related to 2007 wildfire activity, where the FERC allowed recovery of all FERC-jurisdictional wildfire-related costs while the CPUC rejected recovery of all CPUC-jurisdictional wildfire-related costs based on a determination that SDG&E did not meet the CPUC's prudency standard. As a result, while SCE does not agree with the CPUC's decision, it believes that the CPUC's interpretation and application of the prudency standard to SDG&E creates substantial uncertainty regarding how that standard will be applied to an investor-owned utility in future wildfire cost-recovery proceedings.proceedings for fires ignited prior to July 12, 2019. SCE will continue to evaluate the probability of recovery based on available evidence, including guidance that may be issued by the Commission on Catastrophic Wildfire Cost and Recovery, and new judicial, legislative and regulatory decisions, including any CPUC decisions illustrating the interpretation and/or application of the prudency standard when making determinations regarding recovery of uninsured wildfire-related costs. While the CPUC has not made a determination regarding SCE's prudency relative to any of the 2017/2018 Wildfire/Mudslide Events, SCE is unable to conclude, at this time, that uninsured CPUC-jurisdictional wildfire-related costs are probable of recovery through electric rates. SCE would record a regulatory asset at the time it obtains sufficient information to support a


conclusion that recovery is probable. SCE will seek recovery of the CPUC portion of any uninsured wildfire-related costs through its WEMA.WEMA or its CEMA. In July 2019, SCE filed a CEMA application with the CPUC to seek recovery of, among other things, approximately $6 million in costs incurred to restore service to customers and to repair, replace and restore buildings and SCE's facilities damaged or destroyed as a result of the Thomas and Koenigstein Fires. SCE continues to incur costs for reconstructing its system and restoring service to structures that were damaged or destroyed by these two fires and plans to file additional applications with the CPUC to recover such costs. See "—Recovery"Recovery of Wildfire-Related Costs" below.
Through the operation of its FERC Formula Rate, and based upon the precedent established in SDG&E's recovery of FERC-jurisdictional wildfire-related costs, SCE believes it is probable it will recover its FERC-jurisdictional wildfire and mudslide related costs and has recorded atotal regulatory assetassets of $135$149 million within the FERC balancing account. This was the FERC portion of the $4.7 billion liabilityestimated losses accrued.
At As of March 31, 2019 and December 31, 2018,2020, collections have reduced the balance sheets include estimated losses (established atamount remaining in the lower end of the reasonably estimated range of expected losses) of $4.7 billion for the 2017/2018 Wildfire/Mudslide Events.FERC balancing account to $113 million.
Current Wildfire Insurance Coverage
SCE has approximately $1 billion of wildfire-specific insurance coverage, subject to a self-insured retention of $10 million per occurrence, for events (including the Woolsey fire) during the period June 30, 2018 through May 31, 2019. If the $1 billion of insurance coverage is exhausted as a result of liabilities related to the Woolsey Fire, SCE has approximately $735 million of wildfire-specific insurance coverage for wildfire events during the period February 1, 2019 through May 31, 2019, subject to a self-insured retention of $35 million per occurrence and up to $15 million of co-insurance, which results in net coverage of approximately $685 million. SCE has also obtained approximately $1.2 billion of wildfire-specific insurance coverage for events that may occur during the period June 1, 2019 through June 30, 2020, subject to up to $115 million of co-insurance and $50 million of self-insured retention, which results in net coverage of approximately $1$1.0 billion. SCE expects its coverage for this period to be subject to an initial self-insured retention of $10 million per occurrence, but, based on policies currently in place, SCE's coverage for the period is subject to a self-insurance retention of $50 million per occurrence. SCE may obtain additional wildfire-specific insurance for this time period in the future. Various coverage limitations within the policies that make up SCE's wildfire insurance coverage could result in additional material self-insured costs in the event of multiple wildfire occurrences during a policy period or with a single wildfire with damages in excess of the policy limits.
SCE is in the process of procuring wildfire-specific insurance coverage for the period that will begin on July 1, 2020. SCE's cost of obtaining wildfire insurance coverage has increased significantly as a result of, among other things, the number of recent and significant wildfire events throughout California and the application of inverse condemnation to investor-owned utilities. In addition, disruptions in the insurance or capital markets, resulting from COVID-19 or other causes, could result in


reduced insurance and reinsurance capacity, or constrain insurance companies from offering Edison International and/or SCE acceptable premiums and/or limits. As such, while SCE is required to maintain reasonable insurance coverage under AB 1054, SCE may not be able to obtain sufficienta reasonable amount of wildfire insurance, at a reasonable cost.cost, for the next policy period or future policy periods.
Based on policies currently in effect, SCE anticipates that its wildfire insurance expense, prior to any regulatory deferrals, will total approximately $399 million during 2019. Wildfire insurance expense will increase in 2019 if SCE obtains additional wildfire-specific insurance. In February 2019, the CPUC approved recovery of $107 million of the costs incurred by SCE to obtain a 12-month, $300 million wildfire insurance policy in December 2017. As a result of this decision, SCE will recover these insurance premiums during 2019. As of March 31, 2019,2020, SCE had regulatory assets of $148approximately $375 million related to wildfire insurance costs and believes that such amounts are probable of recovery. While SCE believes that amounts deferred are probable of recovery, there is no assurance that SCE will be allowed to recover costs that have been incurred, or costs incurred in the future for additional wildfire insurance, in electric rates.
SCE tracks insurance premium costs related to wildfire liability insurance policies as well as other wildfire-related costs in its WEMA. In July 2019, SCE filed a WEMA application with the CPUC to seek recovery of $478 million in wildfire insurance premium costs that have been incurred or will be incurred before July 1, 2020, in excess of premiums approved in the 2018 GRC. The application also seeks recovery of the corresponding financing costs.
Recovery of Wildfire-Related Costs
Pre-AB 1054 Cost Recovery
California courts have previously found investor-owned utilities to be strictly liable for property damage, regardless of fault, by applying the theory of inverse condemnation when a utility's facilities were determined to be a substantial cause of a wildfire that caused the property damage. The rationale stated by these courts for applying this theory to investor-owned utilities is that property damages resulting from a public improvement, such as the distribution of electricity, can be spread across the larger community that benefited from such improvement through recovery of uninsured wildfire-related costs in electric rates. However, in November 2017, the CPUC issued a decision denying SDG&E's request to include in its rates uninsured wildfire-related costs arising from several 2007 wildfires, finding that SDG&E did not meet the prudency standard because it did not prudently manage and operate its facilities prior to or at the outset of the 2007 wildfires. In July 2018, the CPUC denied both SDG&E's application for rehearing on its cost recovery request and a joint application for rehearing filed by SCE and PG&E limited to the applicability of inverse condemnation principles in the same proceeding. The California Court of Appeal, the California Supreme Court and the CaliforniaUnited States Supreme Court have denied SDG&E's petitions for review of the CPUC's denial of SDG&E's application.
In September 2018, California Senate Bill 901 ("SB 901") was signed by the Governor of California. Although SB 901 does not address the strict liability standard imposed by courts in inverse condemnation actions, the bill as enacted introduces a number of considerations the CPUC can apply to determine whether costs are recoverable in electric rates for wildfires occurring on or after January 1, 2019, including, among other things, the utility's actions, circumstances beyond the utility's control and the impact of extreme climate conditions. SB 901 requires investor-owned utilities to prepare annually, for CPUC approval, wildfire risk mitigation plans, and compliance with an approved plan is one of the factors that the CPUC can consider in addressing cost recovery. On February 6, 2019, in compliance with SB 901, SCE filed its wildfire mitigation plan


for 2019. While SCE takes the position in its wildfire mitigation plan that substantial compliance with the plan, once approved, will demonstrate that SCE prudently operated its system and met the CPUC's prudent manager standard regarding wildfire risk mitigation, the CPUC may not agree with SCE's position. Pursuant to the requirements of SB 901, a Commission on Catastrophic Wildfire Cost and Recovery was formed in January 2019 to examine, among other things, the socialization of catastrophic wildfire costs in an equitable manner. SB901 also provides an opportunity for utilities to securitize costs that are deemed just and reasonable by the CPUC for wildfires that occur after January 1, 2019 and, to the extent costs exceed the maximum amount the utility can pay without harming ratepayers or materially impacting the utility's ability to provide adequate and safe services, for wildfires that occurred in 2017. Based on events and information available to date, SCE believes it is unlikely that it will seek to use this mechanism to securitize costs incurred in connection with the 2017/2018 Wildfire/Mudslide Events.
Edison International and SCE continue to pursue legislative, regulatory and legal strategies, and anticipate pursuing legislative strategies in the longer term, to address the application of a strict liability standard to wildfire-related property damages without the guaranteed ability to recover resulting costs in electric rates.
2019 Wildfire Legislation
In AprilJuly 2019, a strike force formed by California Governor Gavin Newsom released a report entitled Wildfires and Climate Change: California's Energy Future that sets forth, among other things, guiding principles for potential reform of California policies regarding wildfire liability. While this report recommended that the Commission on Catastrophic Wildfire Cost and Recovery, the California legislature and the strike force continue working to develop a solution for considerationAB 1054 was signed by the Governor of California and became effective immediately. The summary of the legislature,wildfire legislation below is based on SCE's interpretation of AB 1054. A lawsuit challenging the validity of AB 1054 was filed in federal court on July 19, 2019. Edison International and SCE cannotare unable to predict whetherthe outcome of this lawsuit.
Wildfire Insurance Fund
AB 1054 provided for the Wildfire Insurance Fund to reimburse utilities for payment of third-party damage claims arising from certain wildfires that exceed, in aggregate in a calendar year, the greater of $1.0 billion or the utility's insurance coverage. The Wildfire Insurance Fund was established in September 2019 when thereboth SCE and SDG&E made their initial contributions to the fund. The Wildfire Insurance Fund is available for claims related to wildfires ignited after July 12, 2019 that are determined to have been caused by a utility by the responsible government investigatory agency.
SCE and SDG&E have collectively made their initial contributions totaling approximately $2.7 billion to the Wildfire Insurance Fund. While PG&E has committed to make an initial contribution of approximately $4.8 billion to the Wildfire Insurance Fund upon emergence from bankruptcy, its participation in, and contributions to, the fund are subject to it resolving its bankruptcy proceeding and meeting certain other conditions prior to June 30, 2020. SCE and SDG&E are also collectively expected to make aggregate contributions of approximately $1.1 billion to the Wildfire Insurance Fund through annual contributions to the fund over a 10-year period, of which SCE and SDG&E have made their initial annual contributions totaling approximately $107 million. If PG&E participates in the Wildfire Insurance Fund, it is expected to make aggregate contributions of approximately $1.9 billion to the fund through annual contributions over the same 10-year period. In addition to PG&E's, SCE's and SDG&E's contributions to the Wildfire Insurance Fund, PG&E, SCE and SDG&E are expected to collect $6.1 billion, $6.1 billion and $1.3 billion, respectively, from their ratepayers over a 15-year period through a dedicated rate component. Based on a decision adopted by the CPUC in October 2019 in the Order Instituting Rulemaking


to Consider Authorization of a Non-Bypassable Charge to Support the Wildfire Insurance Fund, PG&E's ratepayers will not be required to contribute to the fund if PG&E does not participate in the Wildfire Insurance Fund. The amount collected from ratepayers may be directly contributed to the Wildfire Insurance Fund or used to support the issuance of up to $10.5 billion in bonds by the California Department of Water Resources, the proceeds of which would be contributed to the fund. In addition to funding contributions to the Wildfire Insurance Fund, the amount collected from utility ratepayers will pay for, among other things, any interest and financing costs related to any bonds that are issued by the California Department of Water Resources to support the contributions to the Wildfire Insurance Fund.
SCE made an initial contribution of approximately $2.4 billion to the Wildfire Insurance Fund in September 2019 and has committed to make ten annual contributions of approximately $95 million per year to the fund, by no later than January 1 of each year. SCE made its first annual contribution to the Wildfire Insurance Fund in December 2019. Edison International supported SCE's initial contribution to the Wildfire Insurance Fund by raising $1.2 billion from the issuance of Edison International equity. SCE raised the remaining $1.2 billion from the issuance of long-term debt. SCE's contributions to the Wildfire Insurance Fund will not be recoverable through electric rates and will be a comprehensive solution mitigatingexcluded from the significant risk faced by Californiameasurement of SCE's CPUC-jurisdictional authorized capital structure. SCE will also not be entitled to cost recovery for any borrowing costs incurred in connection with its contributions to the Wildfire Insurance Fund.
Participating investor-owned utilities will be reimbursed from the Wildfire Insurance Fund for eligible claims, subject to the fund administrator's review. SCE will reimburse the fund for any withdrawn amounts if SCE receives payment of such amounts under an indemnification agreement or from an insurance provider or other third-party. SCE will also be required to reimburse the fund for withdrawn amounts that the CPUC disallows, subject, in some instances, to the AB 1054 Liability Cap (as defined below). If the utility has maintained a valid safety certification and its actions or inactions that resulted in the wildfire are not found to constitute conscious or willful disregard of the rights and safety of others, the aggregate requirement to reimburse the fund over a trailing three calendar year period is capped at 20% of the equity portion of the utility's transmission and distribution rate base in the year of the prudency determination ("AB 1054 Liability Cap"). Based on SCE's 2020 rate base and assuming the equity portion of SCE's capital structure is 52% (SCE's CPUC authorized capital structure), SCE's requirement to reimburse the Wildfire Insurance Fund for eligible claims disallowed in 2020 would be capped at approximately $3.0 billion.
SCE will not be allowed to recover borrowing costs incurred to reimburse the fund for amounts that the CPUC disallows. The Wildfire Insurance Fund, and consequently the AB 1054 Liability Cap, will terminate when the administrator determines that the fund has been exhausted.
AB 1054 Prudency Standard
As a result of the establishment of the Wildfire Insurance Fund, AB 1054 created a new standard that the CPUC must apply when assessing the prudency of a utility in connection with a request for recovery of wildfire costs for wildfires ignited after July 12, 2019. Under AB 1054, the CPUC is required to find a utility to be prudent if the utility's conduct related to wildfires.
In April 2019,the ignition was consistent with actions that a reasonable utility would have undertaken under similar circumstances, at the relevant point in additiontime, and based on the information available at that time. Prudent conduct under the AB 1054 standard is not limited to other requested increasesthe optimum practice, method, or act to its CPUCthe exclusion of others, but rather encompasses a spectrum of possible practices, methods, or acts consistent with utility system needs, the interest of the ratepayers, and FERC returns on common equity, SCE requested from boththe requirements of governmental agencies. AB 1054 also provides that the CPUC may determine that wildfire costs may be recoverable, in whole or in part, by taking into account factors within and FERC an additional 6% return on common equityoutside the utility's control, including humidity, temperature, and winds. Further, utilities with a valid safety certification will be presumed to compensate investors for currenthave acted prudently related to a wildfire risk. SCE would seek to reduce or remove this additional return on common equity if there isignition unless a material reductionparty in its wildfirethe cost recovery proceeding creates serious doubt as to the reasonableness of the utility's conduct, at which time, the burden shifts back to the utility to prove its conduct was reasonable. If a utility does not have a valid safety certification, it will have the burden to prove, based on a preponderance of evidence, that its conduct was prudent. The new prudency standard will survive the termination of the Wildfire Insurance Fund.
Utilities participating in the Wildfire Insurance Fund are not required to reimburse the fund for amounts withdrawn from the fund that the CPUC finds were prudently incurred and can recover such prudently incurred wildfire costs through electric rates if the fund has been exhausted.
Capital Expenditure Requirement
Under AB 1054, approximately $1.6 billion of spending by SCE on wildfire risk duemitigation capital expenditures made after August 1, 2019, cannot be included in the equity portion of SCE's rate base ("AB 1054 Excluded Capital Expenditures"). SCE can apply for an irrevocable order from the CPUC to regulatory or legislative reform.finance these AB 1054 Excluded Capital Expenditures, including through the issuance of securitized bonds, and can recover any prudently incurred financing costs. SCE expects to finance


this capital requirement by issuing securitized bonds. As of March 31, 2020, SCE has spent $601 million on AB 1054 Excluded Capital Expenditures.
Wildfire Mitigation Plan and Safety Certification
Under AB 1054, SCE is required to submit a wildfire mitigation plan to the CPUC annually for review and approval. Beginning in 2020, each such plan is required to cover at least a three-year period. SCE filed its 2020 Wildfire Mitigation Plan in February 2020.
Under AB 1054, SCE can obtain an annual safety certification upon the submission of certain required safety information, including an approved wildfire mitigation plan. On July 25, 2019, SCE obtained its initial safety certification that will be valid for twelve months. Notwithstanding its twelve month term, if SCE requests a new safety certification prior to the expiration of its initial safety certification, then its initial safety certification will remain valid until the CPUC acts on its request for a new safety certification.
Environmental Remediation
SCE records its environmental remediation liabilities when site assessments and/or remedial actions are probable and a range of reasonably likely cleanup costs can be estimated. SCE reviews its sites and measures the liability quarterly, by assessing a range of reasonably likely costs for each identified site using currently available information, including existing technology, presently enacted laws and regulations, experience gained at similar sites, and the probable level of involvement and financial condition of other potentially responsible parties. These estimates include costs for site investigations, remediation, operation and maintenance, monitoring, and site closure. Unless there is a single probable amount, SCE records the lower end of this reasonably likely range of costs (reflected in "Other long-term liabilities") at undiscounted amounts as timing of cash flows is uncertain.
At March 31, 2019,2020, SCE's recorded estimated minimum liability to remediate its 2123 identified material sites (sites with a liability balance at March 31, 2019,2020, in which the upper end of the range of the costs is at least $1 million) was $136$241 million, including $89$176 million related to San Onofre. In addition to these sites, SCE also has 1514 immaterial sites with a liability balance as of March 31, 2019,2020, for which the total minimum recorded liability was $4$3 million. Of the $140$244 million total environmental remediation liability for SCE, $135$235 million has been recorded as a regulatory asset. SCE expects to recover $43$40 million through an incentive mechanism that allows SCE to recover 90% of its environmental remediation costs at certain sites (SCE may request to include additional sites) and $92$195 million through a mechanism that allows SCE to recover 100% of the costs incurred at certain sites through customer rates. SCE's identified sites include several sites for which there is a lack of currently available information, including the nature and magnitude of contamination, and the extent, if any, that SCE may be held responsible for contributing to any costs incurred for remediating these sites. Thus, no reasonable estimate of cleanup costs can be made for these sites.
The ultimate costs to clean up SCE's identified sites may vary from its recorded liability due to numerous uncertainties inherent in the estimation process, such as: the extent and nature of contamination; the scarcity of reliable data for identified sites; the varying costs of alternative cleanup methods; developments resulting from investigatory studies; the possibility of identifying additional sites; and the time periods over which site remediation is expected to occur. SCE believes that, due to these uncertainties, it is reasonably possible that cleanup costs at the identified material sites and immaterial sites could exceed its recorded liability by up to $138$109 million and $7$8 million, respectively. The upper limit of this range of costs was estimated using assumptions least favorable to SCE among a range of reasonably possible outcomes.
SCE expects to clean up and mitigate its identified sites over a period of up to 30 years. Remediation costs for each of the next five years are expected to range from $7 million to $24$18 million. Costs incurred for both the three months ended March 31, 20192020 and 20182019 were $2 million and $4 million, respectively.


million.
Based upon the CPUC's regulatory treatment of environmental remediation costs incurred at SCE, SCE believes that costs ultimately recorded will not materially affect its results of operations, financial position, or cash flows. There can be no assurance, however, that future developments, including additional information about existing sites or the identification of new sites, will not require material revisions to estimates.
Nuclear Insurance
SCE is a member of NEIL,Nuclear Electric Insurance Limited ("NEIL"), a mutual insurance company owned by entities with nuclear facilities. NEIL provides insurance for nuclear property damage, including damages caused by acts of terrorism up to specified limits, and for accidental outages for active facilities. The amount of nuclear property damage insurance purchased for San Onofre and Palo Verde exceeds the minimum federal requirement of $50 million and $1.06$1.1 billion, respectively. If


NEIL losses at any nuclear facility covered by the arrangement were to exceed the accumulated funds for these insurance programs, SCE could be assessed retrospective premium adjustments of up to approximately $52 million per year.
Federal law limits public offsite liability claims for bodily injury and property damage from a nuclear incident to the amount of available financial protection, which is currently approximately $14.1$13.9 billion for Palo Verde and $560 million for San Onofre. SCE and other owners of San Onofre and Palo Verde have purchased the maximum private primary insurance available through a Facility Form issued by American Nuclear Insurers ("ANI").Insurers. SCE withdrew from participation in the secondary insurance pool for San Onofre for offsite liability insurance effective January 5, 2018. Based on its ownership interests in Palo Verde, SCE could be required to pay a maximum of approximately $65 million per nuclear incident for future incidents. However, it would have to pay no more than approximately $10 million per future incident in any one year. Based on its ownership interests in San Onofre and Palo Verde prior to January 5, 2018, SCE could be required to pay a maximum of approximately $255 million per nuclear incident and a maximum of $38 million per year per incident for liabilities arising from events prior to January 5, 2018, although SCE is not aware of any such events.
Spent Nuclear Fuel
Under federal law, the DOE is responsible for the selection and construction of a facility for the permanent disposal of spent nuclear fuel and high-level radioactive waste. The DOE has not met its contractual obligation to accept spent nuclear fuel. Extended delays by the DOE have led to the construction of costly alternatives and associated siting and environmental issues. Currently, both San Onofre and Palo Verde have interim storage for spent nuclear fuel on site sufficient for their current license period.
In June 2010, the United States Court of Federal Claims issued a decision granting SCE and the San Onofre co-owners damages of approximately $142 million (SCE's share $112 million) to recover costs incurred through December 31, 2005 for the DOE's failure to meet its obligation to begin accepting spent nuclear fuel from San Onofre. SCE received payment from the federal government in the amount of the damage award. In April 2016, SCE, as operating agent, settled a lawsuit on behalf of the San Onofre owners against the DOE for $162 million (SCE's share $124 million, which included reimbursement for approximately $2 million in legal and other costs), to compensate for damages caused by the DOE's failure to meet its obligation to begin accepting spent nuclear fuel for the period from January 1, 2006 to December 31, 2013. In August 2018, the CPUC approved SCE's proposal to return the SCE share of the award to customers based on the amount that customers actually contributed for fuel storage costs; resulting in approximately $105.6$106 million of the SCE share being returned to customers and the remaining $16.6$17 million being returned to shareholders. Of the $105.6$106 million, $71.6$72 million was applied against the remaining San Onofre Regulatory Asset in accordance with the Revised San Onofre Settlement Agreement.
The April 2016 settlement also provided for a claim submission/audit process for expenses incurred from 2014 – 2016, where SCE may submit a claim for damages caused by the DOE failure to accept spent nuclear fuel each year, followed by a government audit and payment of the claim. This process made additional legal action to recover damages incurred in 2014 –2016 unnecessary. The first such claim covering damages for 2014 – 2015 was filed on September 30, 2016 for approximately $56 million. In February 2017, the DOE reviewed the 2014 – 2015 claim submission and reduced the original request to approximately $43 million (SCE's share was approximately $34 million). SCE accepted the DOE's determination, and the government paid the 2014 – 2015 claim under the terms of the settlement. In October 2017, SCE filed a claim covering damages for 2016 for approximately $58 million. In May 2018, the DOE approved reimbursement of approximately $45 million (SCE's share was approximately $35 million) of SCE's 2016 damages, disallowing recovery of approximately $13 million. SCE accepted the DOE's determination, and the government paid the 2016 claim under the terms of the settlement. The damages awards are subject to CPUC review as to how the amounts will be refunded among customers, shareholders, or to offset other costs.
In November 2019, SCE filed a new complaint against the DOE to recover damages incurred from January 1, 2017 through July 31, 2018.
Tehachapi Transmission Project
The Tehachapi Transmission Project consists of new and upgraded electric transmission lines and substations between eastern Kern County and San Bernardino County and was undertaken to bring renewable resources in Kern County to energy consumers in the Los Angeles basin and the California energy grid. The project consists of eleven segments. Segments 1-3 were placed in service beginning in 2009 through 2013. Segments 4-11 were placed in service in December 2016.
In December 2019, the CPUC filed a protest alleging that $419 million of costs associated with the Tehachapi Transmission Project are imprudent and should be disallowed from SCE's FERC rate base because these costs exceeded the maximum reasonable cost identified by the CPUC when it granted the project's certificate of public convenience and necessity. The CPUC requested that FERC set this issue for hearings.







Note 13.    LeasesEquity
Leases as Lessee
In May 2019, Edison International filed a prospectus supplement and executed several distribution agreements with certain sales agents to establish an "at-the-market" ("ATM") program under which it may sell shares of its common stock having an aggregate sales price of up to $1.5 billion. During the quarter ended March 31, 2020, Edison International issued 0.4 million shares through the ATM program and received proceeds of $27 million, net of fees and offering expenses of $0.3 million. The proceeds from the sales were used for equity contributions to SCE has entered into various agreements to purchase power, electric capacity and other energy products that may be accounted for as leases as SCE has dispatch rights that determine whengeneral corporate and how a plant runs. Prior to January 1, 2019, a power purchase agreement contained a lease when SCE purchased substantially all of the output from a specific plant and did not otherwise meet a fixed price unit of output exception. SCE also leases property and equipment primarily related to vehicles, office space and other equipment. The terms of the contracts included in the table below are 5 to 20 years for PPA leases, 5 to 72 years for office leases, and 5 to 12 years for the remaining other operating leases.
The following table summarizes SCE's lease payments for operating and finance leases asworking capital purposes. As of March 31, 2019.2020, shares of common stock having an aggregate offering price of $1.3 billion remained available to be sold under the ATM program. Edison International has no obligation to sell the remaining available shares.
(in millions)
PPA Operating Leases1
 
Other Operating Leases2
 
PPA Finance Leases1
2019$118
 $32
 $1
2020124
 33
 1
2021103
 27
 1
202279
 22
 2
202347
 17
 2
Thereafter536
 101
 9
Total lease payments$1,007
 $232
 $16
Amount representing interest3
249
 62
 6
Lease liabilities$758
 $170
 $10
At December 31, 2018, SCE's future expected minimum lease commitments under non-cancellable leases were as follows:
(in millions)
PPA Operating Leases1
 
Other Operating Leases2
 
PPA Capital Leases1
2019$148
 $42
 $5
2020124
 31
 6
2021103
 27
 6
202279
 22
 6
202347
 17
 5
Thereafter536
 101
 66
Total lease payments$1,037
 $240
 $94
Amount representing executory costs    (25)
Amount representing interest    (33)
Net commitments4
    $36
1
Excludes expected purchases from most renewable energy contracts, which do not meet the definition of a lease payment since renewable power generation is contingent on external factors.
2
Excludes escalation clauses based on consumer price or other indices and residual value guarantees that are not considered probable at the commencement date of the lease.
3
Lease payments are discounted to their present value using SCE's incremental borrowing rates.
4
Includes two contracts with net commitments of $26 million that will commence in 2019.


Supplemental balance sheet information relatedEdison International continued to SCE's leases was as follows:
(in millions)March 31, 2019
Operating leases: 
Operating lease ROU assets$928
Current portion of operating lease liabilities156
Operating lease liabilities772
Total operating lease liabilities$928
  
Finance leases included in: 
Utility property, plant and equipment, gross$14
Accumulated depreciation(4)
Utility property, plant and equipment, net10
Other current liabilities1
Other long-term liabilities9
Total finance lease liabilities$10
The timingsettle its ongoing common stock requirements of SCE's recognitionvarious internal programs through issuance of the lease expense conforms to ratemaking treatment for SCE's recovery of the cost of electricity and is included in purchased power for operating leases and interest and amortization expense for finance leases. The following table summarizes the components of SCE's lease expense:
(in millions)Three months ended March 31, 2019
PPA leases: 
Operating lease cost$30
Variable lease cost372
Total PPA lease cost402
Other operating leases cost11
Total lease cost$413


Other information related to leases was as follows:
(in millions, except lease term and discount rate)Three months ended March 31, 2019
Cash paid for amounts included in the measurement of lease liabilities: 
Operating cash flows from operating leases 
PPA leases$30
Other leases11
  
ROU assets obtained in exchange for lease obligations: 
Other operating leases9
  
Weighted average remaining lease term (in years): 
Operating leases 
PPA leases12.85
Other leases12.54
PPA Finance leases12.14
  
Weighted average discount rate: 
Operating leases 
PPA leases4.24%
Other leases3.85%
PPA Finance leases8.70%
Leases as Lessor
SCE also enters into operating leases to rent certain land and facilities as a lessor. These leases primarily have terms that range from 15 to 65 years.new common stock. During the three monthsquarter ended March 31, 2019,2020, 0.7 million shares of common stock were purchased by employees through the 401(k) defined contribution savings plan for net cash receipts of $46 million, 0.3 million shares of common stock were issued as stock compensation awards for net cash receipts of $13 million and 0.1 million shares of new common stock were issued in lieu of distributing $4 million to shareholders opting to receive dividend payments in the form of additional common stock.
In February 2020, SCE recognized $5received a $269 million in lease income, which is included in operating revenue oncapital contribution from Edison International Parent to support SCE's capital program, maintain the consolidated statementsequity portion of income. At March 31, 2019, the undiscounted cash flow expected to be received from lease paymentsSCE's capital structure at authorized levels and for the remaining years is as follows:general corporate purposes.
(in millions) 
2019$11
202015
202110
202210
20239
Thereafter141
Total$196


Note 14.    Accumulated Other Comprehensive Loss
The changes in accumulated other comprehensive loss, net of tax, consist of:
 Edison International SCE
 Three months ended March 31,
(in millions)2020 2019 2020 2019
Beginning balance$(69) $(50) $(39) $(23)
Pension and PBOP – net loss:       
    Reclassified from accumulated other comprehensive loss1
2
 2
 2
 1
Other2

 (10) 
 (5)
Change2
 (8) 2
 (4)
Ending Balance$(67) $(58) $(37) $(27)
 Edison International SCE
 Three months ended March 31,
(in millions)2019 2018 2019 2018
Beginning balance$(50) $(43) $(23) $(19)
Pension and PBOP – net loss:       
    Reclassified from accumulated other comprehensive loss1
2
 2
 1
 2
Other2
(10) (5) (5) (5)
Change(8) (3) (4) (3)
Ending Balance$(58) $(46) $(27) $(22)

1 
These items are included in the computation of net periodic pension and PBOP Plan expense. See Note 9 for additional information.
2 
Edison International and SCE recognized cumulative effect adjustments to the opening balance of retained earnings and accumulated other comprehensive loss on January 1, 2019 and 2018 related to the adoption of the accounting standards update on the reclassification of stranded tax effects resulting from Tax Reform in 2019 and the measurement of financial instruments in 2018. See Note 1 for further information on the reclassification of stranded tax effects.Reform.





Note 15.    Other Income and Expenses
Other income andnet of expenses areis as follows:
  Three months ended March 31,
(in millions) 2020 2019
SCE other income (expense):    
Equity allowance for funds used during construction $21
 $17
Increase in cash surrender value of life insurance policies and life insurance benefits 10
 9
Interest income 9
 9
Net periodic benefit income – non-service components 28
 19
Civic, political and related activities and donations (11) (13)
Other (5) (3)
Total SCE other income 52
 38
Other income (expense) of Edison International Parent and Other:    
Net periodic benefit costs – non-service components (1) (2)
 Other 1
 2
Total Edison International other income $52
 $38

  Three months ended March 31,
(in millions) 2019 2018
SCE other income and (expenses):    
Equity allowance for funds used during construction $17
 $22
Increase in cash surrender value of life insurance policies and life insurance benefits 9
 8
Interest income 9
 4
Net periodic benefit income – non-service components 19
 26
Civic, political and related activities and donations (13) (4)
Other (3) (5)
Total SCE other income and (expenses) 38
 51
Other income and (expenses) of Edison International Parent and Other:    
Net periodic benefit costs – non-service components (2) 
 Other 2
 
Total Edison International other income and (expenses) $38
 $51


Note 16.    Supplemental Cash Flows Information
Supplemental cash flows information for continuing operations is:
 Edison International SCE
 Three months ended March 31,
(in millions)2020 2019 2020 2019
Cash payments:       
Interest, net of amounts capitalized$233
 $200
 $210
 $177
Income taxes, net
 
 
 
Non-cash financing and investing activities:       
Dividends declared but not paid:       
Common stock232
 200
 
 200
Preferred and preference stock
 1
 
 1
 Edison International SCE
 Three months ended March 31,
(in millions)2019 2018 2019 2018
Cash payments for interest and taxes:       
Interest, net of amounts capitalized$200
 $164
 $177
 $149
Tax refunds, net
 (93) 
 (18)
Non-cash financing and investing activities:       
Dividends declared but not paid:       
Common stock$200
 $197
 $200
 $212
Preferred and preference stock1
 1
 1
 1

SCE's accrued capital expenditures at March 31, 2020 and 2019 and 2018 were $392$451 million and $399$392 million, respectively. Accrued capital expenditures will be included as an investing activity in the consolidated statements of cash flow in the period paid.





Note 17. Related-Party Transactions
For the three months ended March 31, 2020, SCE did not purchase wildfire liability insurance from Edison Insurance Services, Inc. ("EIS"), a wholly-owned subsidiary of Edison International. For the three months ended March 31, 2019, SCE purchased wildfire liability insurance with premiums of $186 million from Edison Insurance Services, Inc. ("EIS"), a wholly-owned subsidiary of Edison International.EIS. The related-party transactions included in SCE's consolidated balance sheets for wildfire-related insurance purchased from EIS were as follows:
  March 31, December 31,
(in millions)

 2019 2018 March 31,
2020
 December 31, 2019
Long-term insurance receivable due from affiliate $1,000
 $1,000
 $803
 $803
Prepaid insurance1
 169
 13
 32
 10
Current payables due to affiliate2
 62
 4
1
Reflected in "Prepaid expenses" on SCE's consolidated balance sheets.
1Reflected in "Prepaid expenses" on SCE's consolidated balance sheets. The amortization expense for prepaidwildfire-related insurance premiums paid to EIS was $31$50 million and $36$31 million for the three months ended March 31, 2020 and 2019, and 2018, respectively.
2Reflected in "Accounts payable" on SCE's consolidated balance sheets.







CONTROLS AND PROCEDURES
Disclosure Controls and Procedures
The management of Edison International and SCE, under the supervision and with the participation of Edison International's and SCE's respective Chief Executive Officers and Chief Financial Officers, have evaluated the effectiveness of Edison International's and SCE's disclosure controls and procedures (as that term is defined in Rules 13a-15(e) or 15d-15(e) under the Securities Exchange Act of 1934, as amended), respectively, as of the end of the first quarter of 2019.2020. Based on that evaluation, Edison International's and SCE's respective Chief Executive Officers and Chief Financial Officers have each concluded that, as of the end of the period, Edison International's and SCE's disclosure controls and procedures, respectively, were effective.
Changes in Internal Control Over Financial Reporting
There were no changes in Edison International's or SCE's internal control over financial reporting, respectively, during the first quarter of 20192020 that have materially affected, or are reasonably likely to materially affect, Edison International's or SCE's internal control over financial reporting.
Jointly Owned Utility Plant
Edison International's and SCE's respective scope of evaluation of internal control over financial reporting includes their Jointly Owned Utility Projects as discussed in Notes to Consolidated Financial Statements—Note 2. Property, Plant and Equipment in the 20182019 Form 10-K.
LEGAL PROCEEDINGS
Thomas Fire and Koenigstein Fire Litigation
In December 2017, wind-driven wildfires impacted portions of SCE's service territory, causing loss of life, substantial damage to both residential and business properties, and service outages for SCE customers. The VCFD and CAL FIRE have determined that the largest of the 2017 fires originated on December 4, 2017, in the Anlauf Canyon area of Ventura County (the investigating agencies refer to this fire as the "Thomas Fire"), followed shortly thereafter by the Koenigstein Fire. According to CAL FIRE, information, the Thomas and Koenigstein Fires burned over 280,000 acres, destroyed or damages an estimated 1,343 structures and resulted in two fatalities.
As of April 26, 2019,27, 2020, SCE was aware of at least 151330 lawsuits, representing approximately 2,3005,000 plaintiffs, related to the Thomas and Koenigstein Fires naming SCE as a defendant. Seventy-eightOne hundred and forty-three of these lawsuits also name Edison International as a defendant based on its ownership and alleged control of SCE. At least four of the lawsuits were filed as purported class actions. The lawsuits, which have been filed in the superior courts of Ventura, Santa Barbara and Los Angeles Counties allege, among other things, negligence, inverse condemnation, trespass, private nuisance, and violations of the public utilities and health and safety codes. The lawsuits have been coordinated in the Los Angeles Superior Court. Three categories of plaintiffs have filed lawsuits against SCE and Edison International relating to the Thomas Fire, Koenigstein Fire and Montecito Mudslides: individual plaintiffs, subrogation plaintiffs and public entity plaintiffs. An initial jury trial for a limited number of plaintiffs, sometimes referred to as a bellwether jury trial, on certain fire only matters previously scheduled for June 15, 2020 was vacated due to the wide-spread disruption being caused by the COVID-19 pandemic and is expected to be rescheduled after the courtrooms in the Los Angeles Superior Court open for non-essential functions. The judge assigned to the litigation has suggested that the revised date for the initial bellwether trial could be as early as August 24, 2020.
In November 2019, SCE and Edison International reached a settlement with certain local public entity plaintiffs in the Thomas Fire, Koenigstein Fire and Montecito Mudslides litigation under which SCE paid those local public entity plaintiffs parties an aggregate of $150 million and, other than as set forth below, the plaintiffs released SCE and Edison International from all claims and potential claims in the Thomas Fire, Koenigstein Fire and Montecito Mudslides litigation and/or related to or arising from the Thomas Fire, Koenigstein Fire or Montecito Mudslides. Certain of the local public entity plaintiffs will retain the right to pursue certain indemnity claims against SCE and Edison International. Edison International and SCE did not admit liability as part of the settlement.
For further information, see "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides."





Montecito Mudslides Litigation
In January 2018, torrential rains in Santa Barbara County produced mudslides and flooding in Montecito and surrounding areas. According to Santa Barbara County initial reports, the Montecito Mudslides destroyed an estimated 135 structures, damaged an estimated 324 structures, and resulted in at least 21 fatalities, with two additional fatalities presumed.
Sixty-eightEighty-one of the 151330 lawsuits mentioned under "Thomas Fire and Koenigstein Fire Litigation" above allege that SCE has responsibility for the Thomas and/or Koenigstein Fires and that the Thomas and/or Koenigstein Fires proximately caused the Montecito Mudslides, resulting in the plaintiffs' claimed damages. Twenty-sevenForty of the 6881 Montecito Mudslides lawsuits also name Edison International as a defendant based on its ownership and alleged control of SCE. In addition to other causes of action, some of the Montecito Mudslides lawsuits also allege personal injury and wrongful death. The Thomas and Koenigstein Fires lawsuits and the Montecito Mudslides lawsuits have been coordinated in the Los Angeles Superior Court. Three categories of plaintiffs have filed lawsuits against SCE and Edison International relating to the Thomas Fire, Koenigstein Fire and Montecito Mudslides: individual plaintiffs, subrogation plaintiffs and public entity plaintiffs. An initial jury trial for a limited number of plaintiffs, sometimes referred to as a bellwether jury trial, previously scheduled for October 12, 2020 was vacated due to the wide-spread disruption being caused by the COVID-19 pandemic and is expected to be rescheduled after the courtrooms in the Los Angeles Superior Court open for non-essential functions.
In November 2019, SCE and Edison International reached a settlement with certain local public entity plaintiffs in the Thomas Fire, Koenigstein Fire and Montecito Mudslides litigation under which SCE paid those local public entity plaintiffs parties an aggregate of $150 million and, other than as set forth below, the plaintiffs released SCE and Edison International from all claims and potential claims in the Thomas Fire, Koenigstein Fire and Montecito Mudslides litigation and/or related to or arising from the Thomas Fire, Koenigstein Fire or Montecito Mudslides. SCE and Edison International did not release their cross-claims against the public entity plaintiffs in the Montecito Mudslides litigation, and certain of the public entity plaintiffs will retain the right to pursue certain indemnity claims against SCE and Edison International. Edison International and SCE did not admit liability as part of the settlement.
For further information, see "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides."


Woolsey Fire Litigation
In November 2018, wind-driven wildfires impacted portions of SCE's service territory and caused substantial damage to both residential and business properties and service outages for SCE customers. The largest of these fires, known as the Woolsey Fire, originated in Ventura County and burned acreage located in both Ventura and Los Angeles Counties. According to CAL FIRE, information, the Woolsey Fire burned almost 100,000 acres, destroyed an estimated 1,643 structures, damaged an estimated 364 structures and resulted in three fatalities. Two additional fatalities have also been associated with the Woolsey Fire.
As of April 26, 2019,27, 2020, SCE was aware of at least 72226 lawsuits, representing approximately 1,1004,400 plaintiffs, related to the Woolsey Fire naming SCE as a defendant. Fifty-eightOne hundred and forty five of these lawsuits also name Edison International as a defendant based on its ownership and alleged control of SCE. At least two of the lawsuits were filed as purported class actions. The lawsuits, which have been filed in the superior courts of Ventura and Los Angeles Counties allege, among other things, negligence, inverse condemnation, personal injury, wrongful death, trespass, private nuisance, and violations of the public utilities and health and safety codes. The Woolsey Fire lawsuits have been coordinated in the Los Angeles Superior Court. Three categories of plaintiffs have filed lawsuits against SCE and Edison International relating to the Woolsey Fire: individual plaintiffs, subrogation plaintiffs and public entity plaintiffs.
In November 2019, SCE and Edison International reached a settlement with certain local public entity plaintiffs in the Woolsey Fire litigation under which SCE paid the local public entity plaintiffs an aggregate of $210 million and those local public entity plaintiffs released SCE and Edison International from all claims and potential claims in the Woolsey Fire litigation and/or related to or arising from the Woolsey Fire. Edison International and SCE did not admit liability as part of the settlement.

For further information, see "Notes to Consolidated Financial Statements—Note 12. Commitments and Contingencies—Contingencies—Southern California Wildfires and Mudslides."
UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS





Environmental Proceedings
SCE performed 1.6 miles of access road grading and vegetation clearing in the Mission Canyon area of Santa Barbara County in December 2019, resulting in debris moving downslope into a creek bed and other impacts in the area. Several state and federal environmental agencies and the County and City of Santa Barbara are investigating the unpermitted grading and discharges to the creek, and SCE has received Notices of Violation from the Army Corps of Engineers, the County of Santa Barbara, the California Department of Fish & Wildlife and the Regional Water Quality Control Board. It is presently unknown whether any of these agencies will impose fines on SCE and, if so, in what amounts. SCE does not expect any fines that are imposed to be material.
PurchasesRISK FACTORS

Edison International's and SCE's financial condition and results of Equity Securitiesoperations could be materially impacted by events, like the COVID-19 pandemic, that cause significant disruption to economies, societies or workforces on a regional, statewide, national or global basis.
Edison International and Affiliated Purchasers
SCE could be materially and adversely impacted by events, such as the widespread outbreak of a communicable disease, that result in, among other things, significant disruption to economies, societies or workforces on a regional, statewide, national or global basis. The following table contains information about all purchasesglobal spread of COVID-19, which was declared a pandemic by the World Health Organization in March 2020, has created significant uncertainty, volatility and disruption globally and has impacted the operations of Edison International Common Stock made by orand SCE. The total impacts of the COVID-19 pandemic on behalf of Edison International and SCE are still emerging, and the extent to which the pandemic affects Edison International's and SCE's business, operations, cash flows, liquidity and financial results will depend on numerous evolving factors that Edison International and SCE are unable to accurately predict at this time, including, without limitation: the duration and scope of the pandemic; governmental, business and individual actions that have been and continue to be taken in response to the first quarterpandemic; the impact of 2019.
Period
(a) Total
Number of Shares
(or Units)
Purchased1
 
(b) Average
Price Paid per Share (or Unit)1
 
(c) Total
Number of Shares
(or Units)
Purchased
as Part of
Publicly
Announced
Plans or
Programs
 
(d) Maximum
Number (or
Approximate
Dollar Value)
of Shares
(or Units) that May
Yet Be Purchased
Under the Plans or
Programs
January 1, 2019 to January 31, 2019308,921
  $56.51
   
February 1, 2019 to February 28, 2019211,617
  $59.49
   
March 1, 2019 to March 31, 2019386,783
  $62.56
   
Total907,321
  $59.79
   
1 The shares were purchased by agents actingthe pandemic on economic activity; and the impact of the pandemic on Edison International's behalf for deliveryand SCE's employees, customers, contractors, insurers and service providers.
Many of the risks and uncertainties identified in the 2019 Form 10-K are, and will be, exacerbated by the impacts of the COVID-19 pandemic and the actions being taken by governmental entities, businesses, individuals and others in response to plan participantsthe pandemic. Some examples follow. Similar to fulfill requirementsother companies in connection with Edison International's: (i) 401(k) Savings Plan; (ii) Dividend Reinvestment and Direct Stock Purchase Plan; and (iii) long-term incentive compensation plans. The shares were purchased in open-market transactions pursuant to plan terms or participant elections. The shares were never registered inCalifornia, a large portion of Edison International's name and noneSCE's workforce, including employees of their contractors, may be unable to perform their job functions effectively due to illness, family illness, quarantine requirements, social-distancing, telework requirements and other impacts of the shares purchased were retiredCOVID-19 pandemic. In addition, as a result of actions being taken in response to the pandemic, SCE's supply chains are facing constraints and SCE is facing challenges from local permitting authorities. If a significant portion of SCE's workforce cannot effectively perform their job functions, SCE is unable to procure required materials, SCE does not timely obtain any required permits and/or local authorities prohibit SCE from conducting previously permitted work, SCE will likely be unable to effectively and timely complete planned work and projects, including its WMP and capital projects.
In addition, impacts of the COVID-19 pandemic on SCE's customers and third parties could also result in SCE facing, among other things, significant reductions in demand for electricity and payment delays and/or defaults from customers which could result in significant under-collections. Edison International and SCE could also face payment delays and/or defaults from insurers and other counter-parties. Furthermore, capital markets have been impacted by the pandemic and this has increased Edison International's and SCE's costs of accessing those markets. Edison International's and SCE's access to the bank and capital markets could also be constrained and/or the costs of accessing those markets could increase further as a result of the transactions.pandemic, including if Edison International's and/or SCE's credit ratings are downgraded, or placed on negative watch due to concerns about Edison International and/or SCE's financial health as a result of the impacts of the pandemic. SCE may also incur significant incremental costs as a result of actions it is taking in response to the pandemic, including costs being incurred to maintain its operations and assist its employees who are required to telework or are otherwise impacted by the pandemic. SCE could also face delays in important regulatory proceedings. These impacts, among others, could materially and adversely impact Edison International's and SCE's business, operations, cash flows, liquidity and financial results.
OTHER INFORMATION

On April, 26, 2019, Edison International entered into a Term Loan Agreement ("Term Loan Agreement") and borrowed the maximum amount available under the Term Loan Agreement. The Term Loan Agreement provides for a $1.0 billion term loan due in April 2020, with a variable interest rate based on the London Interbank Offered Rate plus 90 basis points. The term loan may be prepaid in whole or in part without any premium or penalty. Of the proceeds of the term loan, $750 million was contributed to SCE and the remainder of the proceeds will be used for general corporate and working capital purposes.
Certain of the investment banking firms that are a party to the Term Loan Agreement or their affiliates have in the past performed, and may in the future from time to time perform, investment banking, financial advisory, lending, commercial banking and/or similar services for Edison International and certain of its subsidiaries and affiliates, for which services they have in the past received, and may in the future receive, customary compensation and reimbursement of expenses.
The foregoing description is qualified in its entirety by reference to the full text of the Term Loan Agreement, filed as Exhibit 10. 1 hereto and incorporated by reference herein.




EXHIBITS
Exhibit
Number
 Description
   
   
10.1 
10.2
   
10.3**10.2 
10.3
   
10.4** 
   
31.1 
   
31.2 
   
32.1 
   
32.2 
   
101.1 Financial statements from the quarterly report on Form 10-Q of Edison International for the quarter ended March 31, 2019,2020, filed on April 30, 2019,2020, formatted in XBRL: (i) the Consolidated Statements of Income; (ii) the Consolidated Statements of Comprehensive Income; (iii) the Consolidated Balance Sheets; (iv) the Consolidated Statements of Cash Flows; and (v) the Notes to Consolidated Financial Statements
   
101.2 Financial statements from the quarterly report on Form 10-Q of Southern California Edison Company for the quarter ended March 31, 2019,2020, filed on April 30, 2019,2020, formatted in XBRL: (i) the Consolidated Statements of Income; (ii) the Consolidated Statements of Comprehensive Income; (iii) the Consolidated Balance Sheets; (iv) the Consolidated Statements of Cash Flows; and (v) the Notes to Consolidated Financial Statements
104The cover page of this report formatted in Inline XBRL (included as Exhibit 101)

*Incorporated by reference pursuant to Rule 12b-32.
**Indicates a management contract or compensatory plan or arrangement, as required by Item 15(a)(3).
* Incorporated by reference pursuant to Rule 12b-32.
** Indicates a management contract or compensatory plan or arrangement, as required by Item 15(a)(3).

Edison International and SCE will furnish a copy of any exhibit listed in the accompanying Exhibit Index upon written request and upon payment to Edison International or SCE of their reasonable expenses of furnishing such exhibit, which shall be limited to photocopying charges and, if mailed to the requesting party, the cost of first-class postage.









SIGNATURES
Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrants have duly caused this report to be signed on their behalf by the undersigned, thereunto duly authorized.
 EDISON INTERNATIONAL  SOUTHERN CALIFORNIA EDISON COMPANY
     
By:/s/ Aaron D. Moss By:/s/ Aaron D. Moss
 
Aaron D. Moss
Vice President and Controller
(Duly Authorized Officer and
Principal Accounting Officer)
  
Aaron D. Moss
Vice President and Controller
(Duly Authorized Officer and
Principal Accounting Officer)
     
Date:April 30, 20192020 Date:April 30, 20192020




6165