UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549

FORM 10-Q

x     QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d)
OF THE SECURITIES EXCHANGE ACT OF 1934

For the quarterly period ended JuneSeptember 30, 2010

OR

o    TRANSITION REPORT PURSUANT TO SECTION 13 OR
15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

For the transition period from                      to                    .


Commission File Number
Exact name of registrants as specified in their charters, states of incorporation, addresses of principal executive offices,
and telephone numbers
I.R.S. Employer Identification Number
 
pgn logo
 
   
1-15929
Progress Energy, Inc.
410 South Wilmington Street
Raleigh, North Carolina 27601-1748
Telephone:   (919) 546-6111
State of Incorporation: North Carolina
56-2155481
   
1-3382
Carolina Power & Light Company
d/b/a Progress Energy Carolinas, Inc.
410 South Wilmington Street
Raleigh, North Carolina  27601-1748
Telephone:   (919) 546-6111
State of Incorporation: North Carolina
56-0165465
   
1-3274
Florida Power Corporation
d/b/a Progress Energy Florida, Inc.
299 First Avenue North
St. Petersburg, Florida  33701
Telephone:   (727) 820-5151
State of Incorporation: Florida
59-0247770

NONE
(Former name, former address and former fiscal year, if changed since last report)

Indicate by check mark whether each registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrants were required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.

Progress Energy, Inc. (Progress Energy)YesxNoo
Carolina Power & Light Company (PEC)YesxNoo
Florida Power Corporation (PEF)YesoNox

 
 
 

 
 
Indicate by check mark whether each registrant has submitted electronically and posted to its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T during the preceding 12 months (or for such shorter period that the registrants were required to submit and post such files).

Progress EnergyYesxNoo
PECYesoNoo
PEFYesoNoo

Indicate by check mark whether each registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or a smaller reporting company. See definition of “large accelerated filer,” “accelerated filer” and “smaller reporting company” in Rule 12b-2 of the Exchange Act.

Progress EnergyLarge accelerated filerxAccelerated filero
 Non-accelerated fileroSmaller reporting companyo
     
PECLarge accelerated fileroAccelerated filero
 Non-accelerated filerxSmaller reporting companyo
     
PEFLarge accelerated fileroAccelerated filero
 Non-accelerated filerxSmaller reporting companyo

Indicate by check mark whether each registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).

Progress EnergyYesoNox
PECYesoNox
PEFYesoNox

At August November 2, 2010, each registrant had the following shares of common stock outstanding:

Registrant
Description
Shares
Progress EnergyCommon Stock (Without Par Value)292,581,000292,938,462
   
PECCommon Stock (Without Par Value)159,608,055 (all of which were held directly by Progress Energy, Inc.)
   
PEFCommon Stock (Without Par Value)100 (all of which were held indirectly by Progress Energy, Inc.)

This combined Form 10-Q is filed separately by three registrants: Progress Energy, PEC and PEF (collectively, the Progress Registrants). Information contained herein relating to any individual registrant is filed by such registrant solely on its own behalf. Each registrant makes no representation as to information relating exclusively to the other registrants.

PEF meets the conditions set forth in General Instruction H(1)(a) and (b) of Form 10-Q and is therefore filing this form with the reduced disclosure format.

 
 

 

TABLE OF CONTENTS
2
 
56
 
PART I.  FINANCIAL INFORMATION
 
ITEM 1.67
   
 Unaudited Condensed Interim Financial Statements:Statements 
   
 Progress Energy, Inc. (Progress Energy) 
 67
 78
 89
   
 Carolina Power & Light Company d/b/a Progress Energy Carolinas, Inc. (PEC) 
 910
 1011
 1112
   
 Florida Power Corporation d/b/a Progress Energy Florida, Inc. (PEF) 
 1213
 1314
 1415
   
 1516
   
ITEM 2.
6673
   
ITEM 3.109117
   
ITEM 4.113120
   
ITEM 4T.113120
   
PART II.  OTHER INFORMATION
 
ITEM 1.114121
   
ITEM 1A.114121
   
ITEM 2.114
ITEM 5.
OTHER INFORMATION
115121
   
ITEM 6.116123
   
117125

 
1

 

GLOSSARYOF TERMS

We use the words “Progress Energy,” “we,” “us” or “our” with respect to certain information to indicate that suchcertain information relates to Progress Energy, Inc. and its subsidiaries on a consolidated basis. When appropriate, the parent holding company or the subsidiaries of Progress Energy are specifically identified on an unconsolidated basis as we discuss their various business activities.
 
The following abbreviations, acronyms or initialisms are used by the Progress Registrants:
 
TERMDEFINITION
  
2009 Form 10-KProgress Registrants’ annual report on Form 10-K for the fiscal year ended December 31, 2009
401(k)Progress Energy 401(k) Savings & Stock Ownership Plan
AFUDCAllowance for funds used during construction
AROAsset retirement obligation
ASLBAtomic Safety and Licensing Board
the Asset Purchase AgreementAgreement by and among Global, Earthco and certain affiliates, and the Progress Affiliates as amended on August 23, 2000
ASCFASB Accounting Standards Codification
ASUAccounting Standards Update
Audit CommitteeAudit and Corporate Performance Committee of Progress Energy’s board of directors
BARTBest Available Retrofit Technology
Base RevenuesNon-GAAP measure defined as operating revenues excluding clause recoverable regulatory returns, miscellaneous revenues and fuel and other pass-through revenues
BrunswickPEC’s Brunswick Nuclear Plant
BtuBritish thermal unit
CAAClean Air Act
CAIRClean Air Interstate Rule
CAMRClean Air Mercury Rule
CAVRClean Air Visibility Rule
CCRCCapacity Cost-Recovery Clause
CERCLA or SuperfundComprehensive Environmental Response, Compensation and Liability Act of 1980, as amended
CeredoCeredo Synfuel LLC
CIGFURCarolina Industrial Group for Fair Utility Rates II
Clean Smokestacks ActNorth Carolina Clean Smokestacks Act
the CodeInternal Revenue Code
CO2
Carbon dioxide
COLCombined license
Corporate and OtherCorporate and Other segment primarily includes the Parent, Progress Energy Service Company and miscellaneous other nonregulated businesses
CR1 and CR2PEF’s Crystal River Units No. 1 and No. 2 coal-fired steam turbines
CR3PEF’s Crystal River Unit No. 3 Nuclear Plant
CR4 and CR5PEF’s Crystal River Units No. 4 and No. 5 coal-fired steam turbines
CUCACarolina Utility Customer Association
CVOContingent value obligation
D.C. Court of AppealsU.S. Court of Appeals for the District of Columbia Circuit
DOEUnited States Department of Energy
DSMDemand-side management
EarthcoFour coal-based solid synthetic fuels limited liability companies of which three were wholly owned
ECCREnergy Conservation Cost Recovery Clause
ECRCEnvironmental Cost Recovery Clause
 
 
2

 
 
EEEnergy efficiency
EIPEquity Incentive Plan
EPAUnited States Environmental Protection Agency
EPACTEnergy Policy Act of 2005
EPCEngineering, procurement and construction
ESOPEmployee Stock Ownership Plan
FASBFinancial Accounting Standards Board
FDEPFlorida Department of Environmental Protection
FERCFederal Energy Regulatory Commission
FGTFlorida Gas Transmission Company, LLC
FitchFitch Ratings
the Florida Global CaseU.S. Global, LLC v. Progress Energy, Inc. et alal.
Florida ProgressFlorida Progress Corporation
FPSCFlorida Public Service Commission
FRCCFlorida Reliability Coordinating Council
Funding Corp.Florida Progress Funding Corporation, a wholly owned subsidiary of Florida Progress
GAAPAccounting principles generally accepted in the United States of America
GHGGreenhouse gas
GlobalU.S. Global, LLC
GridSouthGridSouth Transco, LLC
GWhGigawatt-hours
H.R. 4173Wall Street Reform and Consumer Protection Act
HarrisPEC’s Shearon Harris Nuclear Plant
IPPProgress Energy Investor Plus Plan
the IRPPEC’s 15-year Integrated Resource Plan
kVKilovolt
kVAKilovolt-ampere
kWhKilowatt-hours
LevyPEF’s proposed nuclear plant in Levy County, Fla.
LIBORLondon Inter Bank Offered Rate
MACTMaximum achievable control technology
MD&AManagement’s Discussion and Analysis of Financial Condition and Results of Operations contained in PART I, Item 2 of this Form 10-Q
Medicare ActMedicare Prescription Drug, Improvement and Modernization Act of 2003
MGPManufactured gas plant
MWMegawatts
MWhMegawatt-hours
Moody’sMoody’s Investors Service, Inc.
NAAQSNational Ambient Air Quality Standards
NC REPSNorth Carolina Renewable Energy and Energy Efficiency Portfolio Standard
NCUCNorth Carolina Utilities Commission
NDTNuclear decommissioning trust
NEILNuclear Electric Insurance Limited
NERCNorth American Electric Reliability Corporation
North Carolina Global CaseProgress Synfuel Holdings, Inc. et al. v. U.S. Global, LLC
the Notes GuaranteeFlorida Progress’ full and unconditional guarantee of the Subordinated Notes
NOxNitrogen oxides
NRCUnited States Nuclear Regulatory Commission
O&MOperation and maintenance expense
OATTOpen Access Transmission Tariff
OCIOther comprehensive income
3

Ongoing EarningsNon-GAAP financial measure defined as GAAP net income attributable to controlling interests after excluding discontinued operations and the effects of certain identified gains and charges
OPCFlorida’s Office of Public Counsel
3

OPEBPostretirement benefits other than pensions
the ParentProgress Energy, Inc. holding company on an unconsolidated basis
PECCarolina Power & Light Company d/b/a Progress Energy Carolinas, Inc.
PEFFlorida Power Corporation d/b/a Progress Energy Florida, Inc.
PESCProgress Energy Service Company, LLC
Power AgencyNorth Carolina Eastern Municipal Power Agency
PPACAPatient Protection and Affordable Care Act and the related Health Care and Education Reconciliation Act
Preferred Securities7.10% Cumulative Quarterly Income Preferred Securities due 2039, Series A issued by the Trust
Preferred Securities GuaranteeFlorida Progress’ guarantee of all distributions related to the Preferred Securities
Progress AffiliatesFive affiliated coal-based solid synthetic fuels facilities
Progress EnergyProgress Energy, Inc. and subsidiaries on a consolidated basis
Progress RegistrantsThe reporting registrants within the Progress Energy consolidated group. Collectively, Progress Energy, Inc., PEC and PEF
Progress FuelsProgress Fuels Corporation, formerly Electric Fuels Corporation
PRPPotentially responsible party, as defined in CERCLA
PSSPPerformance Share Sub-Plan
PUHCA 2005Public Utility Holding Company Act of 2005
PVIProgress Energy Ventures, Inc., formerly referred to as Progress Ventures, Inc.
QFQualifying facility
RCARevolving credit agreement
ReagentsCommodities such as ammonia and limestone used in emissions control technologies
RECRenewable Energy Certificate
REPSRenewable energy portfolio standard
RDSRetiree Drug Subsidy related to benefits under Medicare Part D
RobinsonPEC’s Robinson Nuclear Plant
ROEReturn on equity
RSURestricted stock unit
RTORegional transmission organization
SCPSCPublic Service Commission of South Carolina
Section 29Section 29 of the Code
Section 29/45KGeneral business tax credits earned after December 31, 2005, for synthetic fuels production in accordance with Section 29
Section 45KSection 45K of the Code
Section 316(b)Section 316(b) of the Clean Water Act
(See Note/s “#”)For all sections, this is a cross-reference to the Combined Notes to the Financial Statements contained in PART I, Item I of this Form 10-Q
SERCSERC Reliability Corporation
S&PStandard & Poor’s Rating Services
SNGSouthern Natural Gas Company
SO2
Sulfur dioxide
Subordinated Notes7.10% Junior Subordinated Deferrable Interest Notes due 2039 issued by Funding Corp.
Synthetic FuelsFormer operations associated with the production of coal-based solid synthetic fuels
Tax AgreementIntercompany Income Tax Allocation Agreement
4

TerminalsCoal terminals and docks in West Virginia and Kentucky, which were sold on March 7, 2008
the TrustFPC Capital I
the UtilitiesCollectively, PEC and PEF
VIEVariable interest entity
WardWard Transformer site located in Raleigh, N.C.
Ward OU1Operable unit for stream segments downstream from the Ward site
Ward OU2Operable unit for further investigation at the Ward facility and certain adjacent areas


 
45

 

SAFE HARBORFOR FORWARD-LOOKING STATEMENTS
 
In this combined report, each of the Progress Registrants makes forward-looking statements within the meaning of the safe harbor provisions of the Private Securities Litigation Reform Act of 1995. The matters discussed throughout this combined Form 10-Q that are not historical facts are forward looking and, accordingly, involve estimates, projections, goals, forecasts, assumptions, risks and uncertainties that could cause actual results or outcomes to differ materially from those expressed in the forward-looking statements. Any forward-looking statement is based on information current as of the date of this report and speaks only as of the date on which such statement is made, and the Progress Registrants undertake no obligation to update any forward-looking statement or statements to reflect events or circumstances after the date on w hich such statement is made.
 
In addition, examples of forward-looking statements discussed in this Form 10-Q include, but are not limited to, statements made in “Management’s Discussion and Analysis of Financial Condition and Results of Operations” (MD&A) including, but not limited to, statements under the sub-headingsubheadings “Results of Operations” about trends and uncertainties; “Liquidity and Capital Resources” about operating cash flows, future liquidity requirements and estimated capital expendituresexpenditures; and “Other Matters” about goodwill, changes in the regulatory environment, meeting anticipated demand in our regulated service territories, potential nuclear construction, the effects of new environmental regulations, and our synthetic fuel tax credits.
 
Examples of factors that you should consider with respect to any forward-looking statements made throughout this document include, but are not limited to, the following: the impact of fluid and complex laws and regulations, including those relating to the environment and energy policy; our ability to recover eligible costs and earn an adequate return on investment through the regulatory process; the ability to successfully operate electric generating facilities and deliver electricity to customers; the impact on our facilities and businesses from a terrorist attack; the ability to meet the anticipated future need for additional baseload generation and associated transmission facilities in our regulated service territories and the accompanying regulatory and financial risks; our ability to meet current and future renewable energy requir ements; the inherent risks associated with the operation and potential construction of nuclear facilities, including environmental, health, safety, regulatory and financial risks; the financial resources and capital needed to comply with environmental laws and regulations; risks associated with climate change; weather and drought conditions that directly influence the production, delivery and demand for electricity; recurring seasonal fluctuations in demand for electricity; the ability to recover in a timely manner, if at all, costs associated with future significant weather events through the regulatory process; fluctuations in the price of energy commodities and purchased power and our ability to recover such costs through the regulatory process; the Progress Registrants’ ability to control costs, including operations and maintenance expense (O&M) and large construction projects; the ability of our subsidiaries to pay upstream dividends or distributions to Progress Energy, Inc. holding company (t he Parent); current economic conditions; the ability to successfully access capital markets on favorable terms; the stability of commercial credit markets and our access to short- and long-term credit; the impact that increases in leverage or reductions in cash flow may have on each of the Progress Registrants; the Progress Registrants’ ability to maintain their current credit ratings and the impacts in the event their credit ratings are downgraded; the investment performance of our nuclear decommissioning trust (NDT) funds; the investment performance of the assets of our pension and benefit plans and resulting impact on future funding requirements; the impact of potential goodwill impairments; our ability to fully utilize tax credits generated from the previous production and sale of qualifying synthetic fuels under Internal Revenue Code Section 29/45K (Section 29/45K); and the outcome of any ongoing or future litigation or similar disputes and the impact of any such outcome or related settlements. Ma ny of these risks similarly impact our nonreporting subsidiaries.
 
These and other risk factors are detailed from time to time in the Progress Registrants’ filings with the SEC. Many, but not all, of the factors that may impact actual results are discussed in the Risk Factors section in the Progress Registrants’ annual report on Form 10-K for the fiscal year ended December 31, 2009 (2009 Form 10-K), which was filed with the SEC on February 26, 2010, and is updated for material changes, if any, in this Form 10-Q and in our other SEC filings. Before purchasing securities of the Progress Registrants, you should carefully consider the risks and other information in the documents the Progress Registrants file with the SEC from time to time. Each of the described risks could result in a decrease in the value of the securities of the Progress Registrants and your investment therein.
 

 
56

 

PART I.  FINANCIAL INFORMATION

ITEM 1.FINANCIAL STATEMENTSITEM 1.                 FINANCIAL STATEMENTS
                
PROGRESS ENERGY, INC. 
UNAUDITED CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS 
June 30, 2010 
             
 
  Three months ended June 30,  Six months ended June 30, 
(in millions except per share data) 2010  2009  2010  2009 
Operating revenues $2,372  $2,312  $4,907  $4,754 
Operating expenses                
Fuel used in electric generation  743   826   1,639   1,780 
Purchased power  315   257   578   474 
Operation and maintenance  505   484   985   937 
Depreciation, amortization and accretion  233   226   479   506 
Taxes other than on income  133   130   287   273 
Other  3   10   5   12 
Total operating expenses  1,932   1,933   3,973   3,982 
Operating income  440   379   934   772 
Other income                
Interest income  1   2   3   6 
Allowance for equity funds used during construction  25   36   46   75 
Other, net  5   13   -   12 
Total other income, net  31   51   49   93 
Interest charges                
Interest charges  199   181   390   360 
Allowance for borrowed funds used during construction  (7)  (12)  (16)  (24)
Total interest charges, net  192   169   374   336 
Income from continuing operations before income tax  279   261   609   529 
Income tax expense  98   86   237   171 
Income from continuing operations before cumulative effect
  of change in accounting principle
  181   175   372   358 
Discontinued operations, net of tax  (1)  (1)  -   (1)
Cumulative effect of change in accounting principle, net of tax  -   -   (2)  - 
Net income  180   174   370   357 
Net income attributable to noncontrolling interests, net of tax  -   -   -��  (1)
Net income attributable to controlling interests $180  $174  $370  $356 
Average common shares outstanding – basic  290   280   287   278 
Basic and diluted earnings per common share                
Income from continuing operations attributable to controlling
  interests, net of tax
 $0.62  $0.62  $1.29  $1.28 
Discontinued operations attributable to controlling interests,
  net of tax
  -   -   -   - 
Net income attributable to controlling interests $0.62  $0.62  $1.29  $1.28 
Dividends declared per common share $0.620  $0.620  $1.240  $1.240 
Amounts attributable to controlling interests                
Income from continuing operations, net of tax $181  $175  $370  $357 
Discontinued operations, net of tax  (1)  (1)  -   (1)
Net income attributable to controlling interests $180  $174  $370  $356 
  
See Notes to Progress Energy, Inc. Unaudited Condensed Consolidated Interim Financial Statements. 

PROGRESS ENERGY, INC.
UNAUDITED CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS
September 30, 2010
 
UNAUDITED CONDENSED CONSOLIDATED STATEMENTS of INCOME
 
  Three months ended September 30  Nine months ended September 30 
(in millions except per share data) 2010  2009  2010  2009 
Operating revenues $2,962  $2,824  $7,869  $7,578 
Operating expenses                
Fuel used in electric generation  935   1,075   2,574   2,855 
Purchased power  418   125   996   599 
Operation and maintenance  474   423   1,459   1,360 
Depreciation, amortization and accretion  201   371   680   877 
Taxes other than on income  161   152   448   425 
Other  20   2   25   14 
Total operating expenses  2,209   2,148   6,182   6,130 
Operating income  753   676   1,687   1,448 
Other income (expense)                
Interest income  3   2   6   8 
Allowance for equity funds used during construction  22   20   68   95 
Other, net  (5)  1   (5)  13 
Total other income, net  20   23   69   116 
Interest charges                
Interest charges  197   174   587   534 
Allowance for borrowed funds used during construction  (8)  (6)  (24)  (30)
Total interest charges, net  189   168   563   504 
Income from continuing operations before income tax  584   531   1,193   1,060 
Income tax expense  219   181   456   352 
Income from continuing operations before cumulative effect
  of change in accounting principle
  365   350   737   708 
Discontinued operations, net of tax  (2)  (102)  (2)  (103)
Cumulative effect of change in accounting principle, net of tax  2   -   -   - 
Net income  365   248   735   605 
Net income attributable to noncontrolling interests, net of tax  (4)  (1)  (4)  (2)
Net income attributable to controlling interests $361  $247  $731  $603 
Average common shares outstanding – basic  294   280   289   279 
Basic and diluted earnings per common share                
Income from continuing operations attributable to controlling
  interests, net of tax
 $1.23  $1.24  $2.53  $2.53 
Discontinued operations attributable to controlling interests, 
  net of tax
  -   (0.36)  -   (0.37)
Net income attributable to controlling interests $1.23  $0.88  $2.53  $2.16 
Dividends declared per common share $0.620  $0.620  $1.860  $1.860 
Amounts attributable to controlling interests                
Income from continuing operations, net of tax $363  $349  $733  $706 
Discontinued operations, net of tax  (2)  (102)  (2)  (103)
Net income attributable to controlling interests $361  $247  $731  $603 
  
See Notes to Progress Energy, Inc. Unaudited Condensed Consolidated Interim Financial Statements. 
6


PROGRESS ENERGY, INC. 
 
(in millions) June 30, 2010  December 31, 2009 
ASSETS      
Utility plant      
Utility plant in service $29,728  $28,918 
Accumulated depreciation  (11,777)  (11,576)
Utility plant in service, net  17,951   17,342 
Held for future use  48   47 
Construction work in progress  1,914   1,790 
Nuclear fuel, net of amortization  599   554 
Total utility plant, net  20,512   19,733 
Current assets        
Cash and cash equivalents  690   725 
Receivables, net  999   800 
Inventory  1,237   1,325 
Regulatory assets  324   142 
Derivative collateral posted  194   146 
Income taxes receivable  21   145 
Prepayments and other current assets  195   248 
Total current assets  3,660   3,531 
Deferred debits and other assets        
Regulatory assets  2,211   2,179 
Nuclear decommissioning trust funds  1,341   1,367 
Miscellaneous other property and investments  437   438 
Goodwill  3,655   3,655 
Other assets and deferred debits  321   333 
Total deferred debits and other assets  7,965   7,972 
Total assets $32,137  $31,236 
CAPITALIZATION AND LIABILITIES        
Common stock equity        
Common stock without par value, 500 million shares authorized, 293
  million and 281 million shares issued and outstanding, respectively
 $7,304  $6,873 
Unearned ESOP shares (- and 1 million shares, respectively)  -   (12)
Accumulated other comprehensive loss  (131)  (87)
Retained earnings  2,684   2,675 
Total common stock equity  9,857   9,449 
Noncontrolling interests  2   6 
Total equity  9,859   9,455 
Preferred stock of subsidiaries  93   93 
Long-term debt, affiliate  272   272 
Long-term debt, net  11,664   11,779 
Total capitalization  21,888   21,599 
Current liabilities        
Current portion of long-term debt  705   406 
Short-term debt  -   140 
Accounts payable  954   835 
Interest accrued  209   206 
Dividends declared  182   175 
Customer deposits  316   300 
Derivative liabilities  250   190 
Accrued compensation and other benefits  100   167 
Other current liabilities  387   239 
Total current liabilities  3,103   2,658 
Deferred credits and other liabilities        
Noncurrent income tax liabilities  1,288   1,196 
Accumulated deferred investment tax credits  113   117 
Regulatory liabilities  2,479   2,510 
Asset retirement obligations  1,200   1,170 
Accrued pension and other benefits  1,330   1,339 
Derivative liabilities  324   240 
Other liabilities and deferred credits  412   407 
Total deferred credits and other liabilities  7,146   6,979 
Commitments and contingencies (Notes 12 and 13)        
Total capitalization and liabilities $32,137  $31,236 
   
See Notes to Progress Energy, Inc. Unaudited Condensed Consolidated Interim Financial Statements. 

 
7

 

PROGRESS ENERGY, INC. 
 
(in millions)      
Six months ended June 30 2010  2009 
Operating activities      
Net income $370  $357 
Adjustments to reconcile net income to net cash provided by operating activities        
Depreciation, amortization and accretion  555   576 
Deferred income taxes and investment tax credits, net  117   13 
Deferred fuel (credit) cost  (137)  129 
Allowance for equity funds used during construction  (46)  (75)
Other adjustments to net income  136   118 
Cash (used) provided by changes in operating assets and liabilities        
Receivables  (126)  (36)
Inventory  87   (118)
Derivative collateral posted  (40)  47 
Other assets  (13)  41 
Income taxes, net  152   110 
Accounts payable  110   (30)
Other liabilities  (6)  (37)
Net cash provided by operating activities  1,159   1,095 
Investing activities        
Gross property additions  (1,116)  (1,172)
Nuclear fuel additions  (119)  (60)
Purchases of available-for-sale securities and other investments  (3,815)  (982)
Proceeds from available-for-sale securities and other investments  3,792   960 
Other investing activities  14   (3)
Net cash used by investing activities  (1,244)  (1,257)
Financing activities        
Issuance of common stock, net  405   545 
Dividends paid on common stock  (354)  (347)
Payments of short-term debt with original maturities greater than 90 days  -   (129)
Net decrease in short-term debt  (140)  (521)
Proceeds from issuance of long-term debt, net  591   1,337 
Retirement of long-term debt  (400)  (400)
Other financing activities  (52)  (51)
Net cash provided by financing activities  50   434 
Net (decrease) increase in cash and cash equivalents  (35)  272 
Cash and cash equivalents at beginning of period  725   180 
Cash and cash equivalents at end of period $690  $452 
Supplemental disclosures        
Significant noncash transactions        
Accrued property additions $274  $301 
  
See Notes to Progress Energy, Inc. Unaudited Condensed Consolidated Interim Financial Statements. 
PROGRESS ENERGY, INC. 
UNAUDITED CONDENSED CONSOLIDATED BALANCE SHEETS
 
(in millions) September 30, 2010  December 31, 2009 
ASSETS      
Utility plant      
Utility plant in service $29,936  $28,918 
Accumulated depreciation  (11,892)  (11,576)
Utility plant in service, net  18,044   17,342 
Held for future use  48   47 
Construction work in progress  2,088   1,790 
Nuclear fuel, net of amortization  596   554 
Total utility plant, net  20,776   19,733 
Current assets        
Cash and cash equivalents  691   725 
Receivables, net  1,112   800 
Inventory  1,214   1,325 
Regulatory assets  220   142 
Derivative collateral posted  223   146 
Income taxes receivable  7   145 
Prepayments and other current assets  239   248 
Total current assets  3,706   3,531 
Deferred debits and other assets        
Regulatory assets  2,364   2,179 
Nuclear decommissioning trust funds  1,457   1,367 
Miscellaneous other property and investments  425   438 
Goodwill  3,655   3,655 
Other assets and deferred debits  323   333 
Total deferred debits and other assets  8,224   7,972 
Total assets $32,706  $31,236 
CAPITALIZATION AND LIABILITIES        
Common stock equity        
Common stock without par value, 500 million shares authorized, 293
  million and 281 million shares issued and outstanding, respectively
 $7,322  $6,873 
Unearned ESOP shares (- and 1 million shares, respectively)  -   (12)
Accumulated other comprehensive loss  (164)  (87)
Retained earnings  2,863   2,675 
Total common stock equity  10,021   9,449 
Noncontrolling interests  3   6 
Total equity  10,024   9,455 
Preferred stock of subsidiaries  93   93 
Long-term debt, affiliate  273   272 
Long-term debt, net  11,363   11,779 
Total capitalization  21,753   21,599 
Current liabilities        
Current portion of long-term debt  1,005   406 
Short-term debt  -   140 
Accounts payable  827   835 
Interest accrued  196   206 
Dividends declared  183   175 
Customer deposits  321   300 
Derivative liabilities  325   190 
Accrued compensation and other benefits  142   167 
Other current liabilities  475   239 
Total current liabilities  3,474   2,658 
Deferred credits and other liabilities        
Noncurrent income tax liabilities  1,474   1,196 
Accumulated deferred investment tax credits  111   117 
Regulatory liabilities  2,554   2,510 
Asset retirement obligations  1,220   1,170 
Accrued pension and other benefits  1,353   1,339 
Derivative liabilities  362   240 
Other liabilities and deferred credits  405   407 
Total deferred credits and other liabilities  7,479   6,979 
Commitments and contingencies (Notes 13 and 14)        
Total capitalization and liabilities $32,706  $31,236 
   
See Notes to Progress Energy, Inc. Unaudited Condensed Consolidated Interim Financial Statements. 

 
8

 

CAROLINA POWER & LIGHT COMPANY 
d/b/a PROGRESS ENERGY CAROLINAS, INC. 
UNAUDITED CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS 
June 30, 2010 
             
 
  Three months ended June 30,  Six months ended June 30, 
(in millions) 2010  2009  2010  2009 
Operating revenues $1,117  $1,076  $2,380  $2,254 
Operating expenses                
Fuel used in electric generation  375   383   858   825 
Purchased power  76   57   126   114 
Operation and maintenance  300   283   585   542 
Depreciation, amortization and accretion  120   118   238   235 
Taxes other than on income  51   51   111   105 
Other  (1)  2   -   2 
Total operating expenses  921   894   1,918   1,823 
Operating income  196   182   462   431 
Other income (expense)                
Interest income  1   1   2   3 
Allowance for equity funds used during construction  15   7   28   16 
Other, net  4   4   (3)  (3)
Total other income, net  20   12   27   16 
Interest charges                
Interest charges  53   52   103   109 
Allowance for borrowed funds used during construction  (5)  (3)  (9)  (6)
Total interest charges, net  48   49   94   103 
Income before income tax  168   145   395   344 
Income tax expense  57   51   146   122 
Income before cumulative effect of change in accounting
  principle
  111   94   249   222 
Cumulative effect of change in accounting principle, net of tax  -   -   (2)  - 
Net income  111   94   247   222 
Net loss attributable to noncontrolling interests, net of tax  1   1   3   1 
Net income attributable to controlling interests  112   95   250   223 
Preferred stock dividend requirement  -   -   (1)  (1)
Net income available to parent $112  $95  $249  $222 
  
See Notes to Progress Energy Carolinas, Inc. Unaudited Condensed Consolidated Interim Financial Statements. 
PROGRESS ENERGY, INC. 
UNAUDITED CONDENSED CONSOLIDATED STATEMENTS of CASH FLOWS
 
(in millions)      
Nine months ended September 30 2010  2009 
Operating activities      
Net income $735  $605 
Adjustments to reconcile net income to net cash provided by operating activities        
Depreciation, amortization and accretion  804   991 
Deferred income taxes and investment tax credits, net  263   50 
Deferred fuel (credit) cost  (37)  81 
Allowance for equity funds used during construction  (68)  (95)
Litigation expense (Note 14C)  -   115 
Other adjustments to net income  197   187 
Cash (used) provided by changes in operating assets and liabilities        
Receivables  (252)  (99)
Inventory  111   (118)
Derivative collateral posted  (83)  155 
Other assets  (25)  60 
Income taxes, net  213   190 
Accounts payable  45   (91)
Accrued pension and other benefits  (162)  (264)
Other liabilities  163   3 
Net cash provided by operating activities  1,904   1,770 
Investing activities        
Gross property additions  (1,643)  (1,644)
Nuclear fuel additions  (164)  (148)
Purchases of available-for-sale securities and other investments  (5,927)  (1,271)
Proceeds from available-for-sale securities and other investments  5,915   1,245 
Other investing activities  15   (5)
Net cash used by investing activities  (1,804)  (1,823)
Financing activities        
Issuance of common stock, net  419   557 
Dividends paid on common stock  (535)  (520)
Payments of short-term debt with original maturities greater than 90 days  -   (429)
Net decrease in short-term debt  (140)  (471)
Proceeds from issuance of long-term debt, net  591   1,337 
Retirement of long-term debt  (400)  (400)
Other financing activities  (69)  (46)
Net cash (used) provided by financing activities  (134)  28 
Net decrease in cash and cash equivalents  (34)  (25)
Cash and cash equivalents at beginning of period  725   180 
Cash and cash equivalents at end of period $691  $155 
Supplemental disclosures        
Significant noncash transactions        
Accrued property additions $255  $265 
  
See Notes to Progress Energy, Inc. Unaudited Condensed Consolidated Interim Financial Statements. 

 
9

 

CAROLINA POWER & LIGHT COMPANY d/b/a PROGRESS ENERGY CAROLINAS, INC. 
 
(in millions) June 30, 2010  December 31, 2009 
ASSETS      
Utility plant      
Utility plant in service $16,553  $16,297 
Accumulated depreciation  (7,631)  (7,520)
Utility plant in service, net  8,922   8,777 
Held for future use  12   11 
Construction work in progress  1,060   702 
Nuclear fuel, net of amortization  430   396 
Total utility plant, net  10,424   9,886 
Current assets        
Cash and cash equivalents  206   35 
Receivables, net  508   442 
Receivables from affiliated companies  15   33 
Notes receivable from affiliated companies  2   204 
Inventory  591   677 
Deferred fuel cost  101   88 
Income taxes receivable  26   38 
Prepayments and other current assets  61   61 
Total current assets  1,510   1,578 
Deferred debits and other assets        
Regulatory assets  894   873 
Nuclear decommissioning trust funds  859   871 
Miscellaneous other property and investments  187   199 
Other assets and deferred debits  92   95 
Total deferred debits and other assets  2,032   2,038 
Total assets $13,966  $13,502 
CAPITALIZATION AND LIABILITIES        
Common stock equity        
Common stock without par value, 200 million shares authorized, 160
  million shares issued and outstanding
 $2,125  $2,108 
Unearned ESOP shares  -   (12)
Accumulated other comprehensive loss  (41)  (27)
Retained earnings  2,785   2,588 
Total common stock equity  4,869   4,657 
Noncontrolling interests  -   3 
Total equity  4,869   4,660 
Preferred stock  59   59 
Long-term debt, net  3,688   3,703 
Total capitalization  8,616   8,422 
Current liabilities        
Current portion of long-term debt  6   6 
Accounts payable  426   355 
Payables to affiliated companies  87   72 
Interest accrued  72   70 
Customer deposits  101   95 
Derivative liabilities  48   29 
Accrued compensation and other benefits  53   86 
Other current liabilities  122   50 
Total current liabilities  915   763 
Deferred credits and other liabilities        
Noncurrent income tax liabilities  1,327   1,258 
Accumulated deferred investment tax credits  107   110 
Regulatory liabilities  1,307   1,293 
Asset retirement obligations  822   801 
Accrued pension and other benefits  703   708 
Other liabilities and deferred credits  169   147 
Total deferred credits and other liabilities  4,435   4,317 
Commitments and contingencies (Notes 12 and 13)        
Total capitalization and liabilities $13,966  $13,502 
   
See Notes to Progress Energy Carolinas, Inc. Unaudited Condensed Consolidated Interim Financial Statements. 
CAROLINA POWER & LIGHT COMPANY
d/b/a PROGRESS ENERGY CAROLINAS, INC.
UNAUDITED CONDENSED CONSOLIDATED INTERIM FINANCIAL STATEMENTS
September 30, 2010
UNAUDITED CONDENSED CONSOLIDATED STATEMENTS of INCOME
 
  Three months ended September 30  Nine months ended September 30 
(in millions) 2010  2009  2010  2009 
Operating revenues $1,414  $1,307  $3,794  $3,561 
Operating expenses                
Fuel used in electric generation  464   457   1,322   1,282 
Purchased power  109   82   235   196 
Operation and maintenance  256   225   841   767 
Depreciation, amortization and accretion  120   120   358   355 
Taxes other than on income  58   56   169   161 
Other  5   -   5   2 
Total operating expenses  1,012   940   2,930   2,763 
Operating income  402   367   864   798 
Other income (expense)                
Interest income  1   1   3   4 
Allowance for equity funds used during construction  17   7   45   23 
Other, net  (2)  (2)  (5)  (5)
Total other income, net  16   6   43   22 
Interest charges                
Interest charges  51   48   154   157 
Allowance for borrowed funds used during construction  (5)  (3) ��(14)  (9)
Total interest charges, net  46   45   140   148 
Income before income tax  372   328   767   672 
Income tax expense  138   120   284   242 
Income before cumulative effect of change in accounting
  principle
  234   208   483   430 
Cumulative effect of change in accounting principle, net of tax  2   -   -   - 
Net income  236   208   483   430 
Net (income) loss attributable to noncontrolling interests,
  net of tax
  (2)  -   1   1 
Net income attributable to controlling interests  234   208   484   431 
Preferred stock dividend requirement  (1)  (1)  (2)  (2)
Net income available to parent $233  $207  $482  $429 
  
See Notes to Progress Energy Carolinas, Inc. Unaudited Condensed Consolidated Interim Financial Statements. 

 
10

 

CAROLINA POWER & LIGHT COMPANY d/b/a PROGRESS ENERGY CAROLINAS, INC. 
 
(in millions)      
Six months ended June 30 2010  2009 
Operating activities      
Net income $247  $222 
Adjustments to reconcile net income to net cash provided by operating activities        
Depreciation, amortization and accretion  294   286 
Deferred income taxes and investment tax credits, net  55   10 
Deferred fuel cost  21   92 
Allowance for equity funds used during construction  (28)  (16)
Other adjustments to net income  47   52 
Cash (used) provided by changes in operating assets and liabilities        
Receivables  (39)  42 
Receivables from affiliated companies  18   13 
Inventory  85   (60)
Other assets  (18)  32 
Income taxes, net  12   63 
Accounts payable  20   (43)
Payables to affiliated companies  15   (24)
Other liabilities  (12)  (23)
Net cash provided by operating activities  717   646 
Investing activities        
Gross property additions  (580)  (402)
Nuclear fuel additions  (106)  (42)
Purchases of available-for-sale securities and other investments  (252)  (517)
Proceeds from available-for-sale securities and other investments  227   492 
Changes in advances to affiliated companies  202   (75)
Net cash used by investing activities  (509)  (544)
Financing activities        
Dividends paid on preferred stock  (1)  (1)
Dividends paid to parent  (50)  (200)
Net decrease in short-term debt  -   (110)
Proceeds from issuance of long-term debt, net  -   595 
Retirement of long-term debt  -   (400)
Contributions from parent  14   15 
Other financing activities  -   (1)
Net cash used by financing activities  (37)  (102)
Net increase in cash and cash equivalents  171   - 
Cash and cash equivalents at beginning of period  35   18 
Cash and cash equivalents at end of period $206  $18 
Supplemental disclosures        
Significant noncash transactions        
Accrued property additions $158  $128 
  
See Notes to Progress Energy Carolinas, Inc. Unaudited Condensed Consolidated Interim Financial Statements. 
CAROLINA POWER & LIGHT COMPANY d/b/a PROGRESS ENERGY CAROLINAS, INC. 
UNAUDITED CONDENSED CONSOLIDATED BALANCE SHEETS
 
(in millions) September 30, 2010  December 31, 2009 
ASSETS      
Utility plant      
Utility plant in service $16,698  $16,297 
Accumulated depreciation  (7,700)  (7,520)
Utility plant in service, net  8,998   8,777 
Held for future use  12   11 
Construction work in progress  1,184   702 
Nuclear fuel, net of amortization  408   396 
Total utility plant, net  10,602   9,886 
Current assets        
Cash and cash equivalents  292   35 
Receivables, net  529   442 
Receivables from affiliated companies  18   33 
Notes receivable from affiliated companies  5   204 
Inventory  556   677 
Deferred fuel cost  76   88 
Income taxes receivable  -   38 
Prepayments and other current assets  100   61 
Total current assets  1,576   1,578 
Deferred debits and other assets        
Regulatory assets  950   873 
Nuclear decommissioning trust funds  936   871 
Miscellaneous other property and investments  185   199 
Other assets and deferred debits  94   95 
Total deferred debits and other assets  2,165   2,038 
Total assets $14,343  $13,502 
CAPITALIZATION AND LIABILITIES        
Common stock equity        
Common stock without par value, 200 million shares authorized, 160
  million shares issued and outstanding
 $2,127  $2,108 
Unearned ESOP shares  -   (12)
Accumulated other comprehensive loss  (50)  (27)
Retained earnings  2,992   2,588 
Total common stock equity  5,069   4,657 
Noncontrolling interests  -   3 
Total equity  5,069   4,660 
Preferred stock  59   59 
Long-term debt, net  3,688   3,703 
Total capitalization  8,816   8,422 
Current liabilities        
Current portion of long-term debt  5   6 
Accounts payable  371   355 
Payables to affiliated companies  71   72 
Interest accrued  63   70 
Customer deposits  104   95 
Derivative liabilities  63   29 
Accrued compensation and other benefits  74   86 
Other current liabilities  165   50 
Total current liabilities  916   763 
Deferred credits and other liabilities        
Noncurrent income tax liabilities  1,412   1,258 
Accumulated deferred investment tax credits  106   110 
Regulatory liabilities  1,396   1,293 
Asset retirement obligations  838   801 
Accrued pension and other benefits  670   708 
Other liabilities and deferred credits  189   147 
Total deferred credits and other liabilities  4,611   4,317 
Commitments and contingencies (Notes 13 and 14)        
Total capitalization and liabilities $14,343  $13,502 
   
See Notes to Progress Energy Carolinas, Inc. Unaudited Condensed Consolidated Interim Financial Statements. 

 
11

 

FLORIDA POWER CORPORATION 
d/b/a PROGRESS ENERGY FLORIDA, INC. 
UNAUDITED CONDENSED INTERIM FINANCIAL STATEMENTS 
June 30, 2010 
             
 
  Three months ended June 30,  Six months ended June 30, 
(in millions) 2010  2009  2010  2009 
Operating revenues $1,252  $1,234  $2,522  $2,496 
Operating expenses                
Fuel used in electric generation  368   443   781   955 
Purchased power  239   200   452   360 
Operation and maintenance  208   204   413   406 
Depreciation, amortization and accretion  110   105   234   265 
Taxes other than on income  83   80   176   168 
Other  -   7   -   7 
Total operating expenses  1,008   1,039   2,056   2,161 
Operating income  244   195   466   335 
Other income                
Interest income  1   -   1   1 
Allowance for equity funds used during construction  10   29   18   59 
Other, net  1   7   3   7 
Total other income, net  12   36   22   67 
Interest charges                
Interest charges  70   64   134   131 
Allowance for borrowed funds used during construction  (2)  (9)  (7)  (18)
Total interest charges, net  68   55   127   113 
Income before income tax  188   176   361   289 
Income tax expense  69   57   140   81 
Net income  119   119   221   208 
Preferred stock dividend requirement  -   -   (1)  (1)
Net income available to parent $119  $119  $220  $207 
  
See Notes to Progress Energy Florida, Inc. Unaudited Condensed Interim Financial Statements. 
CAROLINA POWER & LIGHT COMPANY d/b/a PROGRESS ENERGY CAROLINAS, INC. 
UNAUDITED CONDENSED CONSOLIDATED STATEMENTS of CASH FLOWS
 
(in millions)      
Nine months ended September 30 2010  2009 
Operating activities      
Net income $483  $430 
Adjustments to reconcile net income to net cash provided by operating activities        
Depreciation, amortization and accretion  450   437 
Deferred income taxes and investment tax credits, net  123   41 
Deferred fuel cost  63   136 
Allowance for equity funds used during construction  (45)  (23)
Other adjustments to net income  68   76 
Cash (used) provided by changes in operating assets and liabilities        
Receivables  (89)  18 
Receivables from affiliated companies  15   15 
Inventory  120   (64)
Other assets  (41)  51 
Income taxes, net  59   122 
Accounts payable  (18)  (74)
Payables to affiliated companies  (1)  (17)
Accrued pension and other benefits  (103)  (179)
Other liabilities  65   (16)
Net cash provided by operating activities  1,149   953 
Investing activities        
Gross property additions  (867)  (575)
Nuclear fuel additions  (132)  (82)
Purchases of available-for-sale securities and other investments  (352)  (614)
Proceeds from available-for-sale securities and other investments  323   585 
Changes in advances to affiliated companies  199   (92)
Other investing activities  -   (1)
Net cash used by investing activities  (829)  (779)
Financing activities        
Dividends paid on preferred stock  (2)  (2)
Dividends paid to parent  (75)  (200)
Net decrease in short-term debt  -   (110)
Proceeds from issuance of long-term debt, net  -   595 
Retirement of long-term debt  -   (400)
Contributions from parent  14   15 
Other financing activities  -   (1)
Net cash used by financing activities  (63)  (103)
Net increase in cash and cash equivalents  257   71 
Cash and cash equivalents at beginning of period  35   18 
Cash and cash equivalents at end of period $292  $89 
Supplemental disclosures        
Significant noncash transactions        
Accrued property additions $160  $104 
  
See Notes to Progress Energy Carolinas, Inc. Unaudited Condensed Consolidated Interim Financial Statements. 

 
12

 

FLORIDA POWER CORPORATION d/b/a PROGRESS ENERGY FLORIDA, INC. 
 
(in millions) June 30, 2010  December 31, 2009 
ASSETS      
Utility plant      
Utility plant in service $12,993  $12,438 
Accumulated depreciation  (4,075)  (3,987)
Utility plant in service, net  8,918   8,451 
Held for future use  36   36 
Construction work in progress  854   1,088 
Nuclear fuel, net of amortization  169   158 
Total utility plant, net  9,977   9,733 
Current assets        
Cash and cash equivalents  113   17 
Receivables, net  488   356 
Receivables from affiliated companies  6   8 
Inventory  647   648 
Regulatory assets  223   54 
Derivative collateral posted  174   139 
Deferred tax assets  78   115 
Prepayments and other current assets  18   80 
Total current assets  1,747   1,417 
Deferred debits and other assets        
Regulatory assets  1,317   1,307 
Nuclear decommissioning trust funds  482   496 
Miscellaneous other property and investments  43   42 
Other assets and deferred debits  127   105 
Total deferred debits and other assets  1,969   1,950 
Total assets $13,693  $13,100 
CAPITALIZATION AND LIABILITIES        
Common stock equity        
Common stock without par value, 60 million shares authorized,
  100 shares issued and outstanding
 $1,747  $1,744 
Accumulated other comprehensive (loss) income  (7)  3 
Retained earnings  2,912   2,743 
Total common stock equity  4,652   4,490 
Preferred stock  34   34 
Long-term debt, net  4,481   3,883 
Total capitalization  9,167   8,407 
Current liabilities        
Current portion of long-term debt  -   300 
Notes payable to affiliated companies  7   221 
Accounts payable  509   451 
Payables to affiliated companies  56   62 
Interest accrued  76   72 
Customer deposits  215   205 
Derivative liabilities  179   161 
Accrued compensation and other benefits  29   53 
Other current liabilities  247   89 
Total current liabilities  1,318   1,614 
Deferred credits and other liabilities        
Noncurrent income tax liabilities  877   767 
Regulatory liabilities  1,060   1,103 
Asset retirement obligations  378   369 
Accrued pension and other benefits  389   395 
Capital lease obligations  204   208 
Derivative liabilities  223   174 
Other liabilities and deferred credits  77   63 
Total deferred credits and other liabilities  3,208   3,079 
Commitments and contingencies (Notes 12 and 13)        
Total capitalization and liabilities $13,693  $13,100 
   
See Notes to Progress Energy Florida, Inc. Unaudited Condensed Interim Financial Statements. 
FLORIDA POWER CORPORATION
d/b/a PROGRESS ENERGY FLORIDA, INC.
UNAUDITED CONDENSED INTERIM FINANCIAL STATEMENTS
September 30, 2010
UNAUDITED CONDENSED STATEMENTS of INCOME
 
  Three months ended September 30  Nine months ended September 30 
(in millions) 2010  2009  2010  2009 
Operating revenues $1,543  $1,516  $4,065  $4,012 
Operating expenses                
Fuel used in electric generation  471   618   1,252   1,573 
Purchased power  309   43   761   403 
Operation and maintenance  234   198   647   604 
Depreciation, amortization and accretion  77   247   311   512 
Taxes other than on income  102   96   278   264 
Other  6   -   6   7 
Total operating expenses  1,199   1,202   3,255   3,363 
Operating income  344   314   810   649 
Other income (expense)                
Interest income  -   -   1   1 
Allowance for equity funds used during construction  5   13   23   72 
Other, net  (3)  1   -   8 
Total other income, net  2   14   24   81 
Interest charges                
Interest charges  68   63   202   194 
Allowance for borrowed funds used during construction  (3)  (3)  (10)  (21)
Total interest charges, net  65   60   192   173 
Income before income tax  281   268   642   557 
Income tax expense  101   91   241   172 
Net income  180   177   401   385 
Preferred stock dividend requirement  -   -   (1)  (1)
Net income available to parent $180  $177  $400  $384 
  
See Notes to Progress Energy Florida, Inc. Unaudited Condensed Interim Financial Statements. 

 
13

 

FLORIDA POWER CORPORATION d/b/a PROGRESS ENERGY FLORIDA, INC. 
 
(in millions)      
Six months ended June 30 2010  2009 
Operating activities      
Net income $221  $208 
Adjustments to reconcile net income to net cash provided by operating activities        
Depreciation, amortization and accretion  244   280 
Deferred income taxes and investment tax credits, net  138   (41)
Deferred fuel (credit) cost  (158)  37 
Allowance for equity funds used during construction  (18)  (59)
Other adjustments to net income  62   47 
Cash (used) provided by changes in operating assets and liabilities        
Receivables  (87)  (76)
Receivables from affiliated companies  2   8 
Inventory  1   (58)
Derivative collateral posted  (27)  38 
Other assets  (10)  22 
Income taxes, net  122   16 
Accounts payable  98   16 
Payables to affiliated companies  (6)  (7)
Other liabilities  28   14 
Net cash provided by operating activities  610   445 
Investing activities        
Gross property additions  (543)  (770)
Nuclear fuel additions  (13)  (18)
Purchases of available-for-sale securities and other investments  (3,505)  (415)
Proceeds from available-for-sale securities and other investments  3,508   420 
Other investing activities  15   (4)
Net cash used by investing activities  (538)  (787)
Financing activities        
Dividends paid on preferred stock  (1)  (1)
Dividends paid to parent  (50)  - 
Net decrease in short-term debt  -   (371)
Proceeds from issuance of long-term debt, net  591   - 
Retirement of long-term debt  (300)  - 
Changes in advances from affiliated companies  (214)  406 
Contributions from parent  -   310 
Other financing activities  (2)  (2)
Net cash provided by financing activities  24   342 
Net increase in cash and cash equivalents  96   - 
Cash and cash equivalents at beginning of period  17   19 
Cash and cash equivalents at end of period $113  $19 
Supplemental disclosures        
Significant noncash transactions        
Accrued property additions $113  $172 
  
See Notes to Progress Energy Florida, Inc. Unaudited Condensed Interim Financial Statements. 
FLORIDA POWER CORPORATION d/b/a PROGRESS ENERGY FLORIDA, INC. 
UNAUDITED CONDENSED BALANCE SHEETS
 
(in millions) September 30, 2010  December 31, 2009 
ASSETS      
Utility plant      
Utility plant in service $13,055  $12,438 
Accumulated depreciation  (4,119)  (3,987)
Utility plant in service, net  8,936   8,451 
Held for future use  36   36 
Construction work in progress  904   1,088 
Nuclear fuel, net of amortization  188   158 
Total utility plant, net  10,064   9,733 
Current assets        
Cash and cash equivalents  145   17 
Receivables, net  571   356 
Receivables from affiliated companies  13   8 
Inventory  659   648 
Regulatory assets  144   54 
Derivative collateral posted  192   139 
Deferred tax assets  106   115 
Prepayments and other current assets  16   80 
Total current assets  1,846   1,417 
Deferred debits and other assets        
Regulatory assets  1,415   1,307 
Nuclear decommissioning trust funds  521   496 
Miscellaneous other property and investments  43   42 
Other assets and deferred debits  132   105 
Total deferred debits and other assets  2,111   1,950 
Total assets $14,021  $13,100 
CAPITALIZATION AND LIABILITIES        
Common stock equity        
Common stock without par value, 60 million shares authorized,
  100 shares issued and outstanding
 $1,749  $1,744 
Accumulated other comprehensive (loss) income  (13)  3 
Retained earnings  3,090   2,743 
Total common stock equity  4,826   4,490 
Preferred stock  34   34 
Long-term debt, net  4,182   3,883 
Total capitalization  9,042   8,407 
Current liabilities        
Current portion of long-term debt  300   300 
Notes payable to affiliated companies  8   221 
Accounts payable  438   451 
Payables to affiliated companies  44   62 
Interest accrued  87   72 
Customer deposits  217   205 
Derivative liabilities  224   161 
Accrued compensation and other benefits  44   53 
Other current liabilities  271   89 
Total current liabilities  1,633   1,614 
Deferred credits and other liabilities        
Noncurrent income tax liabilities  981   767 
Regulatory liabilities  1,048   1,103 
Asset retirement obligations  382   369 
Accrued pension and other benefits  435   395 
Capital lease obligations  199   208 
Derivative liabilities  231   174 
Other liabilities and deferred credits  70   63 
Total deferred credits and other liabilities  3,346   3,079 
Commitments and contingencies (Notes 13 and 14)        
Total capitalization and liabilities $14,021  $13,100 
   
See Notes to Progress Energy Florida, Inc. Unaudited Condensed Interim Financial Statements. 

 
14


FLORIDA POWER CORPORATION d/b/a PROGRESS ENERGY FLORIDA, INC. 
UNAUDITED CONDENSED STATEMENTS of CASH FLOWS
 
(in millions)      
Nine months ended September 30 2010  2009 
Operating activities      
Net income $401  $385 
Adjustments to reconcile net income to net cash provided by operating activities        
Depreciation, amortization and accretion  328   538 
Deferred income taxes and investment tax credits, net  211   (12)
Deferred fuel credit  (100)  (55)
Allowance for equity funds used during construction  (23)  (72)
Other adjustments to net income  89   93 
Cash (used) provided by changes in operating assets and liabilities        
Receivables  (155)  (115)
Receivables from affiliated companies  (5)  9 
Inventory  (11)  (54)
Derivative collateral posted  (59)  141 
Other assets  (20)  20 
Income taxes, net  117   71 
Accounts payable  70   (14)
Payables to affiliated companies  (18)  (7)
Accrued pension and other benefits  (51)  (74)
Other liabilities  121   61 
Net cash provided by operating activities  895   915 
Investing activities        
Gross property additions  (774)  (1,069)
Nuclear fuel additions  (32)  (66)
Purchases of available-for-sale securities and other investments  (5,456)  (591)
Proceeds from available-for-sale securities and other investments  5,460   596 
Other investing activities  16   (5)
Net cash used by investing activities  (786)  (1,135)
Financing activities        
Dividends paid on preferred stock  (1)  (1)
Dividends paid to parent  (50)  - 
Net decrease in short-term debt  -   (321)
Proceeds from issuance of long-term debt, net  591   - 
Retirement of long-term debt  (300)  - 
Changes in advances from affiliated companies  (213)  83 
Contributions from parent  -   465 
Other financing activities  (8)  (6)
Net cash provided by financing activities  19   220 
Net increase in cash and cash equivalents  128   - 
Cash and cash equivalents at beginning of period  17   19 
Cash and cash equivalents at end of period $145  $19 
Supplemental disclosures        
Significant noncash transactions        
Accrued property additions $92  $160 
Nuclear repairs insurance recovery  75   - 
  
See Notes to Progress Energy Florida, Inc. Unaudited Condensed Interim Financial Statements. 

15

 

PROGRESS ENERGY, INC.
CAROLINA POWER & LIGHT COMPANY d/b/a/ PROGRESS ENERGY CAROLINAS, INC.
FLORIDA POWER CORPORATION d/b/a PROGRESS ENERGY FLORIDA, INC.
COMBINED NOTES TO UNAUDITED CONDENSED INTERIM FINANCIAL STATEMENTS

INDEX TO APPLICABLE COMBINED NOTES TO UNAUDITED CONDENSED INTERIM FINANCIAL STATEMENTS BY REGISTRANT

Each of the following combined notes to the unaudited condensed interim financial statements of the Progress Registrants are applicable to Progress Energy, Inc. but not to each of PEC and PEF. The following table sets forth which notes are applicable to each of PEC and PEF. The notes that are not listed below for PEC or PEF are not, and shall not be deemed to be, part of PEC’s or PEF’s financial statements contained herein.
 
RegistrantApplicable Notes
  
PEC1, 2, 4 through 910 and 1112 through 1314
  
PEF1, 2, 4 through 910 and 1112 through 1314


 
1516

 

PROGRESS ENERGY, INC.
CAROLINA POWER & LIGHT COMPANY d/b/a PROGRESS ENERGY CAROLINAS, INC.
FLORIDA POWER CORPORATION d/b/a PROGRESS ENERGY FLORIDA, INC.
COMBINED NOTES TO UNAUDITED CONDENSED INTERIM FINANCIAL STATEMENTS
 
1.ORGANIZATION AND SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES

1.      ORGANIZATION AND SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES
 
A.A.      ORGANIZATION
 
In this report, Progress Energy, which includes Progress Energy, Inc. holding company (the Parent) and its regulated and nonregulated subsidiaries on a consolidated basis, is at times referred to as “we,” “us” or “our.” When discussing Progress Energy’s financial information, it necessarily includes the results of Carolina Power & Light Company d/b/a Progress Energy Carolinas, Inc. (PEC) and Florida Power Corporation d/b/a Progress Energy Florida, Inc. (PEF) (collectively, the Utilities). The term “Progress Registrants” refers to each of the three separate registrants: Progress Energy, PEC and PEF. The information in these combined notes relates to each of the Progress Registrants as noted in the Index to Applicable Combined Notes to Unaudited Condensed Interim Financial Stateme nts by Registrant. However, neither of the Utilities makes any representation as to information related solely to Progress Energy or the subsidiaries of Progress Energy other than itself.
 
PROGRESS ENERGY
 
The Parent is a holding company headquartered in Raleigh, N.C. As such, we are subject to regulation by the Federal Energy Regulatory Commission (FERC) under the regulatory provisions of the Public Utility Holding Company Act of 2005 (PUHCA 2005).
 
Our reportable segments are PEC and PEF, both of which are primarily engaged in the generation, transmission, distribution and sale of electricity. The Corporate and Other segment primarily includes amounts applicable to the activities of the Parent and Progress Energy Service Company, LLC (PESC) and other miscellaneous nonregulated businesses (Corporate and Other) that do not separately meet the quantitative disclosure requirements as a reportable business segment. See Note 1011 for further information about our segments.
 
PEC
 
PEC is a regulated public utility primarily engaged in the generation, transmission, distribution and sale of electricity in portions of North Carolina and South Carolina. PEC’s subsidiaries are involved in insignificant nonregulated business activities. PEC is subject to the regulatory jurisdiction of the North Carolina Utilities Commission (NCUC), Public Service Commission of South Carolina (SCPSC), the United States Nuclear Regulatory Commission (NRC) and the FERC.
 
PEF
 
PEF is a regulated public utility primarily engaged in the generation, transmission, distribution and sale of electricity in west central Florida. PEF is subject to the regulatory jurisdiction of the Florida Public Service Commission (FPSC), the NRC and the FERC.
 
B.B.      BASIS OF PRESENTATION
 
These financial statements have been prepared in accordance with accounting principles generally accepted in the United States of America (GAAP) for interim financial information and with the instructions to Form 10-Q and Regulation S-X. Accordingly, they do not include all of the information and footnotes required by GAAP for annual financial statements. The December 31, 2009 condensed balance sheet data was derived from audited financial statements but does not include all disclosures required by GAAP. Because the accompanying interim financial statements do not include all of the information and footnotes required by GAAP for annual financial statements, they should be read in conjunction with the audited financial statements and notes thereto included in the Progress Registrants’ annualan nual report on Form 10-K for the fiscal year ended December 31, 2009 (2009 Form 10-K).
 
 
1617

 
 
The Utilities collect from customers certain excise taxes levied by the state or local government upon the customers. The Utilities account for sales and use tax on a net basis and gross receipts tax, franchise taxes and other excise taxes on a gross basis.
 
The amount of gross receipts tax, franchise taxes and other excise taxes included in electric operating revenues and taxes other than on income in the statementsStatements of incomeIncome were as follows:
                        
 Three months ended June 30,  Six months ended June 30, Three months ended September 30 Nine months ended September 30 
(in millions) 2010  2009  2010  2009 2010 2009 2010 2009 
Progress Energy $81  $77  $164  $156  $101  $97  $265  $253 
PEC  27   26   57   52   34   31   91   83 
PEF  54   51   107   104   67   66   174   170 
                                
The amounts included in these financial statements are unaudited but, in the opinion of management, reflect all adjustments necessary to fairly present the Progress Registrants’ financial position and results of operations for the interim periods. Unless otherwise noted, all adjustments are normal and recurring in nature. Due to seasonal weather variations, the impact of regulatory orders received, and the timing of outages of electric generating units, especially nuclear-fueled units, the results of operations for interim periods are not necessarily indicative of amounts expected for the entire year or future periods.
 
In preparing financial statements that conform to GAAP, management must make estimates and assumptions that affect the reported amounts of assets and liabilities, the reported amounts of revenues and expenses and the disclosure of contingent assets and liabilities at the date of the financial statements. Actual results could differ from those estimates.
 
Certain amounts for 2009 have been reclassified to conform to the 2010 presentation.
 
C.
C.      CONSOLIDATION OF VARIABLE INTEREST ENTITIES
 
We consolidate all voting interest entities in which we own a majority voting interest and all variable interest entities (VIEs) for which we are the primary beneficiary. We determine whether we are the primary beneficiary of a VIE through a qualitative analysis that identifies which variable interest holder has the controlling financial interest in the VIE. The variable interest holder who has both of the following has the controlling financial interest and is the primary beneficiary: (1) the power to direct the activities of the VIE that most significantly impact the VIE’s economic performance and (2) the obligation to absorb losses of, or the right to receive benefits from, the VIE that could potentially be significant to the VIE. In performing our analysis, we consider all relevant facts and circumstances, including: the desi gn and activities of the VIE, the terms of the contracts the VIE has entered into, the nature of the VIE’s variable interests issued and how they were negotiated with or marketed to potential investors, and which parties participated significantly in the design or redesign of the entity.
 
In June 2009, the Financial Accounting Standards Board (FASB) issued new guidance whichthat made significant changes to the model for determining who should consolidate a VIE and addressed how often this assessment should be performed. The guidance was effective for us on January 1, 2010 (see(See Note 2). As a result of the adoption, we and PEC deconsolidated two limited partnerships that qualify for federal affordable housing and historic tax credits under Section 42 of the Internal Revenue Code (the Code) and recognizedrecorded a $(2) million cumulative effect adjustmentof change in accounting principle during the sixnine months ended JuneSeptember 30, 2010.
 
PROGRESS ENERGY
 
Progress Energy, through its subsidiary PEC, is the managing member, and primary beneficiary of, and consolidates a limited partnership whichthat qualifies for federal affordable housing and historic tax credits under Section 42 of the Code. Our variable interests are debt and equity investments in the VIE. There were no changes to our assessment of
18

the primary beneficiary during 2009 or for the period ended JuneSeptember 30, 2010. No financial or other support has been provided to the VIE during the periods presented.
17

 
The following table sets forth the carrying amount and classification of our investment in the partnership as reflected in the Consolidated Balance Sheets:
            
(in millions) June 30, 2010  December 31, 2009  September 30, 2010  December 31, 2009 
Miscellaneous other property and investments $15  $17  $15  $17 
Other assets and deferred debits  1   1   1   1 
Accounts payable  5   4   5   4 
                
The assets of the VIE are collateral for, and can only be used to settle, its obligations. The creditors of the VIE do not have recourse to our general credit or the general credit of PEC, and there are no other arrangements that could expose us to losses.
 
Progress Energy, through its subsidiary PEC, has interests in two entities resulting from capital lease agreements. Both entities are VIEs and were established to lease buildings to PEC. Our maximum exposure to loss due to these capital lease agreements is a $7.5 million mandatory fixed price purchase option for one of the buildings. Total lease payments to these counterparties under the lease agreements were $1 million and $2 million for each of the three and sixnine months ended JuneSeptember 30, 2010 and 2009.2009, respectively. We have requested the necessary information to consolidate these entities; both entities from which the necessary financial information was requested declined to provide the information to us, and, accordingly, we have applied the information scope exception provided by GAAP to the entities. We believe the effect of c onsolidatingconsolidating the entities would have an insignificant impact on our common stock equity, net earnings or cash flows. However, because we have not received any financial information from the counterparties, the impact cannot be determined at this time.
 
PEC
 
See discussion of PEC’s variable interests in VIEs within the Progress Energy section.
 
PEF
 
PEF has no significant variable interests in VIEs.
 
D.SIGNIFICANT ACCOUNTING POLICIES
 
With the exception of the adoption of an accounting policy related to federal grants (discussed below) and new guidance relating to VIEs (See Note 2), there have been no material changes to our significant accounting policies, as compared to the significant accounting policies described in our 2009 Form 10-K.
 
FEDERAL GRANT
 
The American Recovery and Reinvestment Act, signed into law in February 2009, contains provisions promoting energy efficiency (EE) and renewable energy. On April 28, 2010, we accepted a grant from the United States Department of Energy (DOE) for $200 million in federal matching infrastructure funds in support of our Smart Gridsmart grid initiatives. PEC and PEF each will receive up to $100 million over a three-year period as project work progresses. The DOE will provide reimbursement for 50 percent of allowable project costs, as incurred, up to the DOE’s maximum obligation of $200 million. Projects funded by the grant must be completed by April 2013.
 
In accounting for the federal grant, we have elected to reduce the cost basis of applicable Smart Gridsmart grid capital projects. Once these capital projects are placed into service, this election will reduce depreciation expense over the life of the assets. Other project costs incurred, which will be reimbursed by the DOE, are reflected in prepayments and other current assets on the Consolidated Balance Sheets.
 
We have incurred $60 million of allowable Smart Grid project costs through June 30, 2010. As of June 30, 2010, the reimbursable portion of these project costs are reflected in receivables, net and other current liabilities on the Consolidated Balance Sheets. On July 23, 2010, we submitted to the DOE our initial request for reimbursement of $30 million, which represents 50 percent of allowable Smart Grid project costs incurred.
 
1819

 

Through September 30, 2010, we have incurred $81 million of allowable, 50 percent reimbursable, smart grid  project costs, and have submitted to the DOE requests for reimbursement of $38 million, of which we have received $30 million reimbursement.
 
2.NEW ACCOUNTING STANDARDS

2.      NEW ACCOUNTING STANDARDS
 
CONSOLIDATIONS
 
In June 2009, the FASB issued SFAS No. 167, “Amendments to FASB Interpretation No. 46(R), Consolidation of Variable Interest Entities.” Subsequently, the FASB issued Accounting Standards Update (ASU) 2009-17, “Consolidations (Topic 810): Improvements to Financial Reporting by Enterprises Involved with Variable Interest Entities,” which codified SFAS No. 167 in the Accounting Standards Codification (ASC). This guidance made significant changes to the model for determining who should consolidate a VIE, addressed how often this assessment should be performed, required all existing arrangements with VIEs to be evaluated, and was adopted through a cumulative-effectcumulative effect of change in accounting principle adjustment. This guidance was effective for us on January 1, 2010. See Note 1C for information regarding our implementationimplem entation of ASU 2009-17 and its im pactimpact on our and the Utilities’ financial position and results of operations.
 
FAIR VALUE MEASUREMENT AND DISCLOSURES
 
In January 2010, the FASB issued ASU 2010-06, “Fair Value Measurements and Disclosures (Topic 820): Improving Disclosures about Fair Value Measurements,” which amends ASC 820 to clarify certain existing disclosure requirements and to require a number of additional disclosures, including amounts and reasons for significant transfers between the three levels of the fair value hierarchy, and presentation of certain information in the reconciliation of recurring Level 3 measurements on a gross basis. ASU 2010-06 was effective for us on January 1, 2010, with certain disclosures effective for periods beginning January 1, 2011. The initial adoption of ASU 2010-06 resulted in additional disclosure in the notes to the financial statements but did not have an impact on our or the Utilities’ financial position or results of oper ations.operations.
 

3.REGULATORY MATTERS
3.      DIVESTITURES
 
A.Included in discontinued operations, net of tax are amounts related to adjustments of our prior sales of diversified businesses. These adjustments are generally due to guarantees and indemnifications provided by Progress Fuels and Progress Energy for certain legal, tax and environmental matters (See Note 14B). The ultimate resolution of these matters could result in additional adjustments in future periods. During the three and nine months ended September 30, 2010, these adjustments resulted in a $2 million net of tax loss from discontinued operations attributable to controlling interests. During the three and nine months ended September 30, 2009, these adjustments resulted in a net of tax loss from discontinued operations attributable to controlling interests of $102 million and $103 million, respectively, which primarily related to o ur former operations associated with the production of coal-based solid synthetic fuels (Synthetic Fuels).
Prior to 2008, we had substantial Synthetic Fuels operations as defined under Section 29 of the Code (Section 29) and Section 45K of the Code (Section 45K). The production and sale of these products qualified for federal income tax credits so long as certain requirements were satisfied. As a result of the expiration of the tax credit program, all of our synthetic fuels businesses were abandoned and all operations ceased as of December 31, 2007. The accompanying consolidated statements of income reflect the abandoned operations of our Synthetic Fuels businesses as discontinued operations.
On October 21, 2009, a jury delivered a verdict in a lawsuit against Progress Energy and a number of our Synthetic Fuels subsidiaries and affiliates. As a result, during the three and nine months ended September 30, 2009, we recorded a charge of $101 million to discontinued operations, which was net of a previously recorded indemnification liability and estimated tax benefits of $14 million. The ultimate resolution of these matters could
20

result in further adjustments to Synthetic Fuels earnings from discontinued operations. See Note 14C for additional information.

4.      REGULATORY MATTERS
A.      PEC RETAIL RATE MATTERS
 
FUEL COST RECOVERY
 
On June 4, 2010, and subsequently updated on August 20, 2010, PEC filed with the NCUC for a $170 million decrease in the fuel rate charged to its North Carolina ratepayers. PEC is asking the NCUC to approve a $170 million decrease in the fuel rates. This decrease isratepayers, driven by declining fuel prices. If approved, the decrease would take effect December 1, 2010, and would reduce residential electric bills by $5.60 per 1,000 kWhkilowatt-hours (kWh) for fuel cost recovery. A hearing on the matter was held on September 21, 2010, and an order is expected in November 2010. As discussed under “Demand-side“Demand-Side Management and Energy-efficiencyEnergy-Efficiency Cost Recovery,” PEC also filed with the NCUC for an increase in the demand-side management (DSM) and energy-efficiency (EE)EE rate. Additionally on June 4, 2010, and subsequently updated on August 20, 2010, PEC filed for a decrease in the North Carolina Renewable Energy anda nd Energy Efficiency Portfolio Standard (NC REPS) rate, which if approved would take effect on December 1, 2010. If approved as filed, the net impact of th ethe three filings would result in an average reduction in residential electric bills of 3.9 percent. We cannot predict the outcome of these matters.
 
On June 23, 2010, the SCPSC approved PEC’s request for a $17 million decrease in the fuel rate charged to its South Carolina ratepayers. The $17 million decrease in fuel rates isratepayers, driven by declining fuel prices. The decrease was effective July 1, 2010, and decreased residential electric bills by $2.73 per 1,000 kWh for fuel cost recovery. PEC also filed with the SCPSC for an increase in the DSM and EE rate effective July 1, 2010, which was approved on a provisional basis on June 30, 2010, pending review by the South Carolina Office of Regulatory Staff. If approved as filed, theThe net impact of the two filings would resultresulted in an average reduction in residential electric bills of 1.7 percent. We cannot predict the outcome of these matters.this matter.
 
DEMAND-SIDE MANAGEMENT AND ENERGY-EFFICIENCY COST RECOVERY
 
PEC is allowed to recover the costs of DSM and EE programs in North Carolina and South Carolina through an annual DSM and EE clause in each jurisdiction. The cost-recovery rider application in South Carolina has been approved by the SCPSC on a provisional basis pending a review by the South Carolina Office of Regulatory Staff.
19

PEC is allowed to capitalize DSM and EE costs intended to produce future benefits. In addition, the NCUC and the SCPSC have approved other forms of financial incentives for DSM and EE programs, including the recovery of net lost revenues and a performance incentive. DSM programs include, but are not limited to, any program or initiative that shifts the timing of electricity use from peak to nonpeak periods and includes load management, electricity system and operating controls, direct load control, interruptible load and electric system equipment and operating controls. EE programs include any equipment, physical or program change implemented after January 1, 2007, that results in lessles s energy used to perform the same function. PEC has implemented a series of DSM and EE programs and will continue to pursue additional programs, which mus tmust be approved by the respective utility commissions. We cannot predict the outcome of DSM and EE filings currently pending approval or whether the implemented programs will produce the expected operational and economic results.
 
On June 4, 2010, PEC filed with the NCUC for an increase in the DSM and EE rate charged to its North Carolina ratepayers. PEC is asking the NCUC to approve a $31 million increase in the DSM and EE rates.rate. This filing was updated on August 20, 2010, and subsequently amended on September 17, 2010. If approved, the increase would take effect December 1, 2010, and would increase residential electric bills by $1.53$1.56 per 1,000 kWh for DSM and EE cost recovery. A hearing on this matter was held on September 22, 2010, and an order is expected in November 2010. We cannot predict the outcome of this matter.
 
21

RENEWABLE ENERGY PORTFOLIO STANDARDSSTANDARD COST RECOVERY
 
PEC isfiled its required to file an annual NC REPS compliance report with the NCUC demonstratingon May 18, 2010, which demonstrates the actions itPEC has taken to comply with the NC REPS requirement. Compliance with the NC REPS requirement is measured via renewable energy certificates (REC) earned after January 1, 2008. North Carolina electric power suppliers with a renewable energy compliance obligation, including PEC, are participating in the REC tracking system, which came online July 1, 2010.
 
OTHER MATTERS
 
On October 13, 2008, the NCUC issued a Certificate of Public Convenience and Necessity allowing PEC to proceed with plans to construct an approximately 600-MW600-megawatt (MW) combined cycle dual fuel-capable generating facility at its Richmond County generation site to provide additional generating and transmission capacity to meet the growing energy demands of southern and eastern North Carolina. PEC projects that the generating facility and related transmission will be in service by June 2011.
 
On October 22, 2009, the NCUC issued its order granting PEC a Certificate of Public Convenience and Necessity to construct a 950-MW combined cycle natural gas-fueled electric generating facility at a site in Wayne County, N.C. PEC projects that the generating facility will be in service by January 2013.
 
On December 1, 2009, PEC filed with the NCUC a plan to retire no later than December 31, 2017, all of its coal-fired generating facilities in North Carolina that do not have scrubbers. These facilities total approximately 1,500 MW at four sites. PEC intends to continue to depreciate these units using the current depreciation rates on file with the NCUC and the SCPSC until PEC completes and files a new depreciation study. On September 13, 2010, PEC filed its 15-year Integrated Resource Plan (the IRP) with the NCUC and SCPSC, which accelerated the expected retirement schedule of the four coal-fired generating facilities to no later than December 31, 2014.
 
On June 9, 2010, the NCUC issued its order granting PEC a Certificate of Public Convenience and Necessity to construct a 620-MW combined cycle natural gas-fueled electric generating facility at a site in New Hanover County, N.C., to replace the existing coal-fired generation at this site. PEC projects that the generating facility will be in service by late 2013 or early 2014.
 
B.B.      PEF RETAIL RATE MATTERS
 
BASE RATES
 
On January 11, 2010, the FPSC approved a base rate increase for PEF of $132 million effective January 1, 2010, which represents the annualized impact of the rate increase that was approved and effective July 2009 for the repowered Bartow Plant. The FPSC authorized PEF the opportunity to earn a return on equity (ROE) of 10.5 percent. Subsequently, PEF filed petitions for a motion for reconsideration of the rate case order and approval of an accounting order with the FPSC.
 
20

On June 1, 2010, the FPSC approved a settlement agreement between PEF and the interveners, with the exception of the Florida Association for Fairness in Ratemaking, to the 2009 rate case and to anthe accounting order petition filed by PEF in 2010.order. As part of the settlement, PEF withdrew its motion for reconsideration of the rate case order and its accounting order petition. Among other provisions, under the terms of the settlement agreement, PEF will maintain base rates at current levels through the last billing cycle of 2012. The settlement agreement also provides that PEF will have the discretion to
22

reduce depreciation expense (cost of removal component) by up to $150 million in 2010, up to $250 million in 2011, and up to any remaining balance in the cost of removal component of the depreciat iondepreciation reserve in 2012 until the earlier of (a) PEF’s applicable cost of removal reserve reaches zero, or (b) the expiration of the settlement agreement at the end of 2012. In the event PEF reduces depreciation expense by less than the annual amounts for 2010 or 2011, PEF may carry forward (i.e., increase the annual cap by) any unused cost of removal reserve amounts in subsequent years during the term of the agreement. The balance of the cost of removal reserve is impacted by accruals in accordance with PEF’s latest depreciation study, removal costs expended and reductions in depreciation expensee xpense as permitted by the settlement agreement. For the three and sixnine months ended JuneSeptember 30, 2010, PEF recognized a $10$50 million and a $60 million reduction in depreciation expense pursuant to the settlement agreement. PEF’s applicable cost of removal reserve of $516$466 million is recorded as a regulatory liability on its JuneSeptember 30, 2010 Balance Sheet. The settlement agreement also provi desprovides that if PEF’s actual retail base rate earnings fall below a 9.5 percent ROE on an adjusted or pro forma basis, as reported on a historical 12-month basis during the term of the agreement, PEF may seek general, limited or interim base rate relief, or any combination thereof. Prior to requesting any such relief, PEF must have reflected on its referenced surveillance report associated depreciation expense reductions of at least $150 million. The settlement agreement does not preclude PEF from requesting the FPSC to approve the recovery of costs (a) that are of a typet ype which traditionally and historically would be, have been or are presently recovered through cost-recovery clauses or surcharges, or (b) that are incremental costs not currently recovered in base rates, which the legislature or FPSC determines are clause recoverable, or (c) which are recoverable through base rates under the nuclear cost-recovery legislation or the FPSC’s nuclear cost-reco verycost-recovery rule. PEF also may, at its discretion, accelerate in whole or in part the amortization of certain regulatory assets over the term of the settlement agreement. Finally, PEF will be allowed to recover the costs of named storms on an expedited basis. Specifically, 60 days following the filing of a cost-recovery petition with the FPSC and based on a 12-month recovery period, PEF can begin recovery, subject to refund, through a surcharge of up to $4.00 per 1,000 kWh on monthly residential customer bills for storm costs. In the event the storm costs exceed that level, any excess additional costs will be deferred and recovered in a subsequent year or years as determined by the FPSC. Additionally, the order approving the settlement agreement allows PEF to use the surcharge to replenish the storm damage reserve to $136 million, the level as of June 1, 2010, after storm costs are fully recovered.
 
On March 25, 2010, the FPSC opened a docket to review PEF’s current allowance for funds used during construction (AFUDC) rate. On May 20, 2010, PEF filed with the FPSC prescribed schedules for the rolling twelve-month12-month period ended March 31, 2010, with an effective date of April 1, 2010, based on its updated authorized ROE and all adjustments approved on January 11, 2010, in PEF’s base rate case. On September 14, 2010, the FPSC approved a reduction to PEF’s AFUDC rate, from 8.848 percent to 7.44 percent. This new rate will be used for all purposes except for nuclear or certain other plant recoveries with original need petitions submitted on or before December 31, 2010, as permitted by FPSC regulations.
FUEL COST RECOVERY
On September 1, 2010, PEF filed a request with the FPSC to seek approval to decrease the total fuel cost-recovery by $83 million, reducing the residential rate by $3.28 per 1,000 kWh, or 2.6 percent effective January 1, 2011. This decrease is due to a decrease of $5.14 per 1,000 kWh for the projected recovery through the Capacity Cost-Recovery Clause (CCRC), partially offset by an increase of $1.86 per 1,000 kWh for the projected recovery of fuel costs. The decrease in the CCRC is primarily due to the refund of a prior period over-recovery as a result of higher than expected sales in 2010 and lower anticipated costs associated with PEF’s proposed Levy Units 1 and 2 nuclear power plants (Levy) in 2 011 (See “Levy Nuclear”). The increase in the projected recovery of fuel costs is due to under-recovery of 2010 fuel costs, partially offset by lower expected 2011 fuel costs. On November 2, 2010, the
23

FPSC approved PEF’s CCRC residential rate. Also on November 2, 2010, PEF agreed to file revised fuel projections with the FPSC on or before November 10, 2010, to reflect PEF's most up-to-date fuel forecast. In addition, the FPSC requested PEF file fuel recovery factors with scenarios varying the timing of recovering the Crystal River Unit No. 3 Nuclear Plant (CR3) extended outage (See “CR3 Outage”) replacement power costs through differing assumptions of the percentage to be collected in 2011 and thereafter. The FPSC is scheduledexpected to addressvote on these supplemental filings at the FPSC's November 30, 2010 Agenda Conference for implementation of new fuel factors in January 2011We cannot predict the outcome of this matter on August 31,matter.
On October 8, 2010, PEF filed a motion to establish a separate spin-off docket related to the outage and replacement fuel and power costs associated with an order expectedthe CR3 extended outage. On October 25, 2010, the FPSC approved PEF’s motion to establish the separate spin-off docket. This docket will allow the FPSC to evaluate PEF’s actions concerning the concrete delamination and review PEF’s resulting costs associated with the CR3 extended outage. PEF intends to file a petition in September 2010.January 2011. We cannot predict the outcome of this matter.
 
NUCLEAR COST RECOVERY
 
Levy Nuclear
 
In 2008, the FPSC granted PEF’s petition for an affirmative Determination of Need and related orders requesting cost-recovery under Florida’s nuclear cost-recovery rule for PEF’s proposed Levy, Units 1 and 2 nuclear power plants (Levy), together with the associated facilities, including transmission lines and substation facilities. Levy Units 1 and 2 are needed to maintain electric system reliability and integrity, provide fuel and generating diversity, and to allow PEF to continue to provide adequate electricity to its customers at a reasonable cost. The proposed Levy units will be advanced passive light water nuclear reactors, each with a generating capacity of approximately 1,100 MW. The petition included projections that Levy Unit 1 would be placed in service by June 2016 and Levy Unit 2 by June 2017. TheTh e filed, no nbindingnonbinding project cost estimate for Levy Units 1 and 2 was approximately $14 billion for generating facilities and approximately $3 billion for associated transmission facilities.
 
In PEF’s 2010 nuclear cost-recovery filing (See “Cost Recovery”), PEF identified a schedule shift in the Levy project that resulted from the NRC’s 2009 determination that certain schedule-critical work that PEF had proposed
21

to perform within the scope of its Limited Work Authorization request submitted with the combined operating license (COL) application will not be authorized until the NRC issues the COL. Consequently, excavation and foundation preparation work anticipated in the initial schedule cannot begin until the COL is issued, resulting in a project shift of at least 20 months. Since then, regulatory and economic conditions identified in the 2010 nuclear cost-recovery filing have changed such that major construction activitiesactivitie s on the Levy project are being postponed until after the NRC issues the COL, which is expected to be in late 2012 if the current licensing schedule remains on track. Taking into account cost, potential carbon regulation, fossil fuel price volatility and the benefits of fuel diversification, we consider Levy to be PEF’s preferred baseload generation option. Along with the FPSC’s annual prudence reviews, we will continue to evaluate the project on an ongoing basis based on certain criteria, including, but not limited to, public, regulatory and political support; adequate financial cost-recovery mechanisms; appropriate levels of joint owner participation; customer rate impacts; project feasibility, including comparison to other generation options,options; DSM and EE programs; and availability and terms of capital financing.
 
24

Crystal River Unit No. 3 Nuclear Plant Uprate
 
In 2007, the FPSC issued an order approving PEF’s Determination of Need petition related to a multi-stage uprate of its Crystal River Unit No. 3 Nuclear Plant (CR3)CR3 that will increase CR3’s gross output by approximately 180 MW by 2012. PEF implemented the first stage’sfirst-stage design modifications in 2008. PEF will apply for the required license amendment for the third stage’sthird-stage design modification.
 
Cost Recovery
 
In 2009, pursuant to the FPSC nuclear cost-recovery rule, PEF filed a petition to recover $446 million through the capacity cost-recovery clause (CCRC),CCRC, which primarily consisted of preconstruction and carrying costs incurred or anticipated to be incurred during 2009 and the projected 2010 costs associated with the Levy and CR3 uprate projects. In an effort to help mitigate the initial price impact on its customers, as part of its filing, PEF proposed collecting certain costs over a five-year period, with associated carrying costs on the unrecovered balance. The FPSC approved the alternate proposal allowing PEF to recover revenue requirements associated with the nuclear cost-recovery clause through the CCRC beginning with the first billing cycle of January 2010. The remainder, with minor adj ustments,adjustments, will also be recovered through the CCRC. In adopting PEF’s proposed rate management plan for 2010, the FPSC permitted PEF to annually reconsider changes to the recovery of deferred amounts to afford greater flexibility to manage future rate impacts. The rate management plan includesincluded the 2009 reclassification to the nuclear cost-recovery clause regulatory asset of $198 million of capacity revenues and the accelerated amortization of $76 million of preconstruction costs. The cumulative amount of $274 million was recorded as a nuclear cost-recovery regulatory asset at December 31, 2009, and is projected to be recovered by 2014.
 
On April 30, 2010, PEF filed its annual nuclear cost-recovery filing with the FPSC to recover $164 million, which includes recovery of pre-construction,preconstruction, carrying and CCRC recoverable operations and maintenance (O&M)CCRC-recoverable O&M costs incurred or anticipated to be incurred during 2011, recovery of $60 million of the 2009 deferral in 2011, as well as the estimated actual true-up of 2010 costs associated with the Levy and CR3 uprate projects. This results in an estimated decrease in the nuclear cost-recovery charge of $1.46 per 1,000 kWh for residential customers which if approved, would beginbeginning with the first January 2011 billing cycle. TheOn October 26, 2010, the FPSC has scheduled hearingsapproved PEF’s request for recovery of these costs in this matter for August 24-27, 2010, with2011 and deferred a decision expected in October 2010. We cannot p redictdetermination concerning the outcomeprudence of this matter.the 2009 CR3 uprate costs until the 2011 Nuclear Cost Recovery proceeding.
 
CR3 OUTAGE
 
In September 2009, CR3 began an outage for normal refueling and maintenance as well as its uprate project to increase its generating capability and to replace two steam generators. During preparations to replace the steam generators, workers discovered a delamination within the concrete of the outer wall of the containment structure, which has resulted in an extension of the outage. After a comprehensive analysis, PEF haswe have determined that the concrete delamination at CR3 was caused by redistribution of stresses on the containment wall that occurred when we created an opening to accommodate the replacement of the unit’s steam generators. We are pursuing a detailed repair plan that would achieve the unit’s return to service duringnear the end of the fourth quarter of 2010. The actual return to service date will be determined by a number of factors, including regulatory reviews with the NRC and other agencies as appropriate, emergent work, final engineering designs and testing, weather and other developments.
22

 
PEF maintains insurance coverage against incremental costs of replacement power resulting from prolonged accidental outages at CR3 through Nuclear Electric Insurance Limited (NEIL). This program provides insurance coverage, with a 12-week deductible period, for 52 weeks in the amount of $4.5 million per week. An additional 71 weeks of coverage is provided at 80 percent of the above weekly amount. PEF also maintains insurance coverage through an accidental property damage program, which provides insurance coverage with a $10 million deductible per claim. PEF notified NEIL of the claim related to the CR3 delamination event on October 15, 2009. NEIL has confirmed that the CR3 delamination event is a covered accident. PEF is continuing to work with NEIL for recovery of applicable repair costs an d associated replacement power costs.
 
25

On June 28,At September 30, 2010, PEF has recorded a $49 million receivable for insurance related to replacement power on its Balance Sheet, which represents $112 million in replacement power accrued subsequent to the end of the deductible period less $63 million of replacement power insurance proceeds received a payment of $42from NEIL. The $112 million from a periodic partial payment claim filed with NEIL, representing $15 million for repair costs and $27 millionaccrued for replacement power costs. The $27 million received for replacement power costs was recorded as a reduction toreduced the deferred fuel cost regulatory asset at June 30, 2010. At June 30, 2010, PEF’s deferred fuel cost regulatory asset included $139 million related to replacement power costs associated with the extension of the CR3 outage net of the $27to $125 million in insurance proceeds received to date.at September 30, 2010. PEF has incurred $79$117 million in repair costs through JuneSeptember 30, 2010. At JuneSeptember 30, 2010, PEF has recorded a $54$75 million net receivable for insur anceinsurance related to repair costs on its Balance Sheet, which represents the $79$117 million in repair costs less the $10 millionm illion deductible, and$18 million applicable repair cost insurance proceeds received to date.date from NEIL and costs not recoverable through insurance. Additional replacement power costs and repair and maintenance costs incurred until CR3 is returned to service could be material. PEF considers replacement power and capital costs in excess ofnot recoverable through insurance coverage to be recoverable through its fuel cost-recovery clause. clause or base rates. PEF requested, and the FPSC approved, the creation of a separate spin-off docket to review the prudence and costs related to the CR3 outage (See “Fuel Cost Recovery”).
We cannot predict the outcome of the recovery of replacement power costs in excess of insurance coverage.this matter.
 
DEMAND-SIDE MANAGEMENT COST RECOVERY
 
On December 30, 2009, the FPSC ordered PEF and other Florida utilities to adopt DSM goals based on enhanced measures, which will result in significantly higher conservation goals. Under the order, PEF’s aggregate conservation goals over the next ten10 years were: 1,183 Summer MW, 1,072 Winter MW, and 3,488 gigawatt-hours (GWh). PEF filed with the FPSC a motion for reconsideration to correct what we believed were oversights or errors. The FPSC subsequently revised the aggregate goals to 1,134 Summer MW, 1,058 Winter MW, and 3,205 GWh over the next ten10 years. On March 30, 2010, PEF filed a petition for approval of its proposed DSM plan and to authorize cost recovery through the Energy Conservation Cost Recovery Clause (ECCR). The estimated average annual program costs are approximately $48 4 million, which corresponds toOn September 14, 2010, the FPSC held an average annual residential customer electric bill impact of approximately $17 per 1,200 kWh. An agenda conference has been scheduledto approve PEF’s petition for the DSM plan. The FPSC ruled that while PEF’s proposed DSM plan met the cumulative, 10-year DSM goals set by the FPSC, the plan did not meet the annual DSM goals. On October 4, 2010, the FPSC denied PEF’s petition for August 31,the DSM plan, approved PEF’s solar pilot programs, and required PEF to file a revised proposed DSM plan that meets the annual goals set by the FPSC. PEF will file a revised proposed DSM plan by November 29, 2010. We cannot predict the outcome of this matter.
On November 1, 2010, the FPSC approved PEF's request to increase the ECCR residential rate by $0.29 per 1,000 kWh, or 0.2 percent of the total residential rate, effective January 1, 2011. The increase in the ECCR is primarily due to an increase in conservation program costs, including the costs associated with PEF’s solar pilot, partially offset by a refund of a prior period over-recovery as a result of higher than expected sales in 2010.
OTHER MATTERS
On November 1, 2010, the FPSC approved PEF's request to decrease the Environmental Cost Recovery Clause (ECRC) by $37 million, reducing the residential rate by $1.02 per 1,000 kWh, or 0.8 percent, effective January 1, 2011. The decrease in the ECRC is primarily due to the 2010 base rate decision, which reduced the clean air project depreciation and return rates, and the refund of a prior period over-recovery as a result of higher than expected sales in 2010.
26


5.      EQUITY AND COMPREHENSIVE INCOME
 
4.EQUITY AND COMPREHENSIVE INCOME
A.A.      EARNINGS PER COMMON SHARE
 
There are no material differences between our basic and diluted earnings per share amounts for the three and sixnine months ended JuneSeptember 30, 2010 and 2009. The effects of restricted stock unit awards, performance share awards and stock options outstanding on diluted earnings per share are immaterial.
 
23


B.B.      RECONCILIATION OF TOTAL EQUITY
 
PROGRESS ENERGY
 
The consolidated financial statements include the accounts of Progress Energythe Parent and its majority owned subsidiaries. Noncontrolling interests principally represent minority shareholders’ proportionate share of the equity of a subsidiary and a VIE (See Note 1C).
 
The following table presents changes in total equity for the year to date:
                  
(in millions)
 
Total Common
Stock Equity
  
Noncontrolling
Interests
  Total Equity  
Total Common
Stock Equity
  
Noncontrolling
Interests
  Total Equity 
Balance, December 31, 2009
 $9,449  $6  $9,455  $9,449  $6  $9,455 
Net income (loss)(a)
  370   (2)  368 
Cumulative effect of change in accounting
principle (See Note 2)
  -   (2)  (2)
Net income(a)
  731   1   732 
Other comprehensive loss
  (44)  -   (44)  (77)  -   (77)
Issuance of shares through offerings and stock-
based compensation plans (See Note 4D)
  443   -   443 
Issuance of shares through offerings and stock-
based compensation plans (See Note 5D)
  461   -   461 
Dividends declared
  (361)  -   (361)  (543)  -   (543)
Distributions to noncontrolling interests
  -   (2)  (2)  -   (2)  (2)
Balance, June 30, 2010
 $9,857  $2  $9,859 
Balance, September 30, 2010
 $10,021  $3  $10,024 
                        
Balance, December 31, 2008
 $8,687  $6  $8,693  $8,687  $6  $8,693 
Net income (loss)(a)
  356   (1)  355 
Net income(a)
  603   -   603 
Other comprehensive income
  20   -   20   17   -   17 
Issuance of shares through offerings and stock-
based compensation plans (See Note 4D)
  582   -   582 
Issuance of shares through offerings and stock-
based compensation plans (See Note 5D)
  603   -   603 
Dividends declared
  (356)  -   (356)  (529)  -   (529)
Distributions to noncontrolling interests
  -   (1)  (1)  -   (1)  (1)
Other
  -   2   2   -   1   1 
Balance, June 30, 2009
 $9,289  $6  $9,295 
Balance, September 30, 2009
 $9,381  $6  $9,387 
 
(a)For the sixnine months ended JuneSeptember 30, 2010, consolidated net income of $370$735 million includes $2$3 million attributable to preferred shareholders of subsidiaries, which is not a component of total equity and is excluded from the table above. For the sixnine months ended JuneSeptember 30, 2009, consolidated net income of $357$605 million includes $2 million attributable to preferred shareholders of subsidiaries, which is not a component of total equity and is excluded from the table above.


24


PEC
The consolidated financial statements include the accounts of PEC and its majority owned subsidiaries. Noncontrolling interests principally represent minority shareholders’ proportionate share of the equity of a VIE (see(See Note 1C).

27

 
The following table presents changes in total equity for the year to date:

(in millions) 
Total Common
Stock Equity
  
Noncontrolling
Interests
  Total Equity  
Total Common
Stock Equity
  
Noncontrolling
Interests
  Total Equity 
Balance, December 31, 2009 $4,657  $3  $4,660  $4,657  $3  $4,660 
Cumulative effect of change in accounting
principle (See Note 2)
  -   (2)  (2)
Net income (loss)  250   (3)  247   484   (1)  483 
Other comprehensive loss  (14)      (14)  (23)      (23)
Issuance of shares through stock-based
compensation plans
  29   -   29   31   -   31 
Dividends paid to parent  (50)  -   (50)  (75)  -   (75)
Preferred stock dividends at stated rate  (1)  -   (1)  (2)  -   (2)
Tax benefit dividend  (2)  -   (2)  (3)  -   (3)
Balance, June 30, 2010 $4,869  $-  $4,869 
Balance, September 30, 2010 $5,069  $-  $5,069 
                        
Balance, December 31, 2008 $4,301  $4  $4,305  $4,301  $4  $4,305 
Net income (loss)  223   (1)  222   431   (1)  430 
Other comprehensive income  4   -   4   4   -   4 
Issuance of shares through stock-based
compensation plans
  29   -   29   33   -   33 
Dividends paid to parent  (200)  -   (200)  (200)  -   (200)
Preferred stock dividends at stated rate  (1)  -   (1)  (2)  -   (2)
Tax benefit dividend  (2)  -   (2)  (3)  -   (3)
Balance, June 30, 2009 $4,354  $3  $4,357 
Balance, September 30, 2009 $4,564  $3  $4,567 

PEF
 
Interim disclosures of changes in equity are required if the reporting entity has less than wholly-ownedwholly owned subsidiaries, of which PEF has none. Therefore, an equity reconciliation for PEF has not been provided.
 
C.      COMPREHENSIVE INCOME
PROGRESS ENERGY   
 Three months ended September 30 
(in millions) 2010  2009 
Net income $365  $248 
Other comprehensive income (loss)        
Reclassification adjustments included in net income        
Change in cash flow hedges (net of tax expense of $1 and $1)  1   2 
Change in unrecognized items for pension and other postretirement benefits
  (net of tax expense of $- and $1)
  1   1 
Net unrealized losses on cash flow hedges (net of tax benefit of $19 and $4)  (30)  (6)
Net unrecognized items on pension and other postretirement benefits (net of
  tax benefit of $2 and $-)
  (4)  - 
Other (net of tax benefit of $- and $-)  (1)  - 
Other comprehensive loss  (33)  (3)
Comprehensive income  332   245 
Comprehensive income attributable to noncontrolling interests  (4)  (1)
Comprehensive income attributable to controlling interests $328  $244 

 
2528

 

 
C.COMPREHENSIVE INCOME
    
 Nine months ended September 30 
(in millions)  2010   2009 
Net income $735  $605 
Other comprehensive income (loss)        
Reclassification adjustments included in net income        
Change in cash flow hedges (net of tax expense of $3 and $3)  4   5 
Change in unrecognized items for pension and other postretirement benefits
  (net of tax expense of $1 and $2)
  3   3 
Net unrealized (losses) gains on cash flow hedges (net of tax benefit (expense)
  of $51 and $(5))
  (80)  8 
Net unrecognized items on pension and other postretirement benefits (net of
  tax benefit of $2 and $-)
  (4)  - 
Other (net of tax expense of $- and $1)  -   1 
Other comprehensive (loss) income  (77)  17 
Comprehensive income  658   622 
Comprehensive income attributable to noncontrolling interests  (4)  (2)
Comprehensive income attributable to controlling interests $654  $620 
 
PROGRESS ENERGY   
  Three months ended June 30, 
(in millions) 2010  2009 
Net income $180  $174 
Other comprehensive income (loss)        
Reclassification adjustments included in net income        
Change in cash flow hedges (net of tax expense of $1 and $1, respectively)  2   2 
Change in unrecognized items for pension and other postretirement benefits
  (net of tax expense of $- and $1, respectively)
  1   1 
Net unrealized (losses) gains on cash flow hedges (net of tax benefit (expense)
  of $28 and $(5), respectively)
  (44)  8 
Other (net of tax expense of $-)  1   - 
Other comprehensive (loss) income  (40)  11 
Comprehensive income  140   185 
Comprehensive income attributable to noncontrolling interests  -   - 
Comprehensive income attributable to controlling interests $140  $185 
         
    
  Six months ended June 30, 
(in millions)  2010   2009 
Net income $370  $357 
Other comprehensive income (loss)        
Reclassification adjustments included in net income        
Change in cash flow hedges (net of tax expense of $2 and $2, respectively)  3   3 
Change in unrecognized items for pension and other postretirement benefits
  (net of tax expense of $1 and $1, respectively)
  2   2 
Net unrealized (losses) gains on cash flow hedges (net of tax benefit (expense)
  of $32 and $(9), respectively)
  (50)  14 
Other (net of tax expense of $-)  1   1 
Other comprehensive (loss) income  (44)  20 
Comprehensive income  326   377 
Comprehensive income attributable to noncontrolling interests  -   (1)
Comprehensive income attributable to controlling interests $326  $376 
         

PEC   
 Three months ended September 30 
(in millions) 2010  2009 
Net income $236  $208 
Other comprehensive income (loss)        
Reclassification adjustments included in net income        
Change in cash flow hedges (net of tax expense of $1 and $1)  1   1 
Net unrealized losses on cash flow hedges (net of tax benefit of $7 and $1)  (10)  (1)
Other comprehensive loss  (9)  - 
Comprehensive income  227   208 
Comprehensive income attributable to noncontrolling interests  (2)  - 
Comprehensive income attributable to controlling interests $225  $208 
         
    
 Nine months ended September 30 
(in millions)  2010   2009 
Net income $483  $430 
Other comprehensive (loss) income        
Reclassification adjustments included in net income        
Change in cash flow hedges (net of tax expense of $2 and $2)  3   3 
Net unrealized (losses) gains on cash flow hedges (net of tax benefit (expense)
  of $17 and $(1))
  (26)  1 
Other comprehensive (loss) income  (23)  4 
Comprehensive income  460   434 
Comprehensive loss attributable to noncontrolling interests  1   1 
Comprehensive income attributable to controlling interests $461  $435 

 
2629

 


PEC   
  Three months ended June 30, 
(in millions) 2010  2009 
Net income $111  $94 
Other comprehensive income (loss)        
Reclassification adjustments included in net income        
Change in cash flow hedges (net of tax expense of $1 and $1, respectively)  1   2 
Net unrealized (losses) gains on cash flow hedges (net of tax benefit (expense)
  of $10 and $(2), respectively)
  (15)  2 
Other comprehensive (loss) income  (14)  4 
Comprehensive income  97   98 
Comprehensive loss attributable to noncontrolling interests  1   1 
Comprehensive income attributable to controlling interests $98  $99 
         
    
  Six months ended June 30, 
(in millions)  2010   2009 
Net income $247  $222 
Other comprehensive income (loss)        
Reclassification adjustments included in net income        
Change in cash flow hedges (net of tax expense of $1 and $1, respectively)  2   2 
Net unrealized (losses) gains on cash flow hedges (net of tax benefit (expense)
  of $10 and $(2), respectively)
  (16)  2 
Other comprehensive (loss) income  (14)  4 
Comprehensive income  233   226 
Comprehensive loss attributable to noncontrolling interests  3   1 
Comprehensive income attributable to controlling interests $236  $227 
         

PEF      
 Three months ended June 30, Three months ended September 30 
(in millions) 2010  2009  2010  2009 
Net income $119  $119  $180  $177 
Other comprehensive income (loss)        
Net unrealized (losses) gains on cash flow hedges (net of tax benefit (expense)
of $4 and $(2), respectively)
  (7)  3 
Other comprehensive (loss) income  (7)  3 
Other comprehensive loss        
Net unrealized losses on cash flow hedges (net of tax benefit of $3 and $1)  (6)  (1)
Other comprehensive loss  (6)  (1)
Comprehensive income $112  $122  $174  $176 
                
      
 Six months ended June 30, Nine months ended September 30 
(in millions)  2010   2009   2010   2009 
Net income $221  $208  $401  $385 
Other comprehensive income (loss)        
Net unrealized (losses) gains on cash flow hedges (net of tax benefit (expense)
of $7 and $(2), respectively)
  (10)  3 
Other comprehensive (loss) income        
Net unrealized (losses) gains on cash flow hedges (net of tax benefit (expense)
of $10 and $(1))
  (16)  2 
Other comprehensive (loss) income  (10)  3   (16)  2 
Comprehensive income $211  $211  $385  $387 
        
 
27

D.      COMMON STOCK
 
D.COMMON STOCK
At JuneSeptember 30, 2010 and December 31, 2009, we had 500 million shares of common stock authorized under our charter, of which 293 million shares and 281 million shares, respectively, were outstanding.outstanding, respectively. We periodically issue shares of common stock through the Progress Energy 401(k) Savings & Stock Ownership Plan (401(k)), the Progress Energy Investor Plus Plan (IPP) and for other benefit plans.
 
The following table presents information for our common stock issuances:
  
  Three months ended June 30, 
  2010  2009 
 (in millions)
 Shares  
Net
Proceeds
  Shares  
Net
Proceeds
 
 Total issuances
  5.4  $208   -  $- 
 Issuances through 401(k) and/or IPP
  5.4   208   -   - 
            
 Six months ended June 30,             
 2010  2009  2010  2009 
(in millions)
 Shares  
Net
Proceeds
  Shares  
Net
Proceeds
  Shares  Net Proceeds  Shares  Net Proceeds 
Three months ended September 30
            
Total issuances  0.3  $14   0.3  $12 
Issuances through 401(k) and/or IPP  0.3   13   0.3   12 
Nine months ended September 30
                
Total issuances
  11.5  $405   15.5  $545   11.8  $419   15.8  $557 
Issuances under an underwritten public offering(a)
  -   -   14.4   523   -   -   14.4   523 
Issuances through 401(k) and/or IPP
  10.7   405   0.6   22   11.0   418   0.9   34 
 
(a)The shares issued under an underwritten public offering were issued on January 12, 2009, at a public offering price of $37.50.
$37.50 per share.
5.PREFERRED STOCK OF SUBSIDIARIES

 
6.      PREFERRED STOCK OF SUBSIDIARIES
All of our preferred stock was issued by the Utilities. The preferred stock is considered temporary equity due to certain provisions that could require us to redeem the preferred stock for cash. In the event dividends payable on PEC or PEF preferred stock are in default for an amount equivalent to or exceeding four quarterly dividend payments, the holders of the preferred stock are entitled to elect a majority of PEC or PEF’s respective board of directors until all accrued and unpaid dividends are paid. All classes of preferred stock are entitled to cumulative dividends with preference to the common stock dividends, are redeemable by vote of the Utilities’ respective board of directors at any time, and do not have any preemptive rights. All classes of preferred stock have a liquidation
30

preference equal to $100 per share plu splus any accumulated unpaid dividends except for PEF’s 4.75%, $100 par value class, which does not have a liquidation preference. Each holder of PEC’s preferred stock is entitled to one vote. The holders of PEF’s preferred stock have no right to vote except for certain circumstances involving dividends payable on preferred stock that are in default or certain matters affecting the rights and preferences of the preferred stock.

6.DEBT AND CREDIT FACILITIES
7.      DEBT AND CREDIT FACILITIES
 
Material changes, if any, to Progress Energy’s, PEC’s and PEF’s debt and credit facilities and financing activities since December 31, 2009, are as follows.
 
On January 15, 2010, the Parent paid at maturity $100 million of its Series A Floating Rate Notes with a portion of the proceeds from the $950 million of Senior Notes issued in November 2009.
 
On March 25, 2010, PEF issued $250 million of 4.55% First Mortgage Bonds due 2020 and $350$350 million of 5.65% First Mortgage Bonds due 2040. Proceeds were used to repay the outstanding balance of PEF’s notes payable to
28

affiliated companies, to repay the maturity of PEF’s $300 million 4.50% First Mortgage Bonds due June 1, 2010, and for general corporate purposes.
 
On October 15, 2010, PEC and PEF each entered into new $750 million, three-year revolving credit agreements (RCAs) with a syndication of 22 financial institutions. The RCAs will be used to provide liquidity support for PEC’s and PEF’s issuances of commercial paper and other short-term obligations, and for general corporate purposes. The RCAs will expire on October 15, 2013. The new $750 million RCAs replaced PEC’s and PEF’s $450 million RCAs, which were set to expire on June 28, 2011 and March 28, 2011, respectively. Both $450 million RCAs were terminated effective October 15, 2010. Fees and interest rates under the new RCAs are to be determined based upon the respective credit ratings of PEC’s and PEF’s long-term unsecured senior noncredit-enhanced debt, as rated by Moody’s Investor Services, Inc. (Moody’s) and Standard and Poor’s Rating Services (S&P). Fees and interest rates under the new facilities are not expected to materially increase interest expense. The RCAs include defined maximum total debt to capital ratios of 65 percent and we are in compliance with these covenants. The RCAs also contain various cross-default and other acceleration provisions, including a cross-default provision for defaults of indebtedness in excess of $35 million. PEC’s and PEF’s cross-default provisions can be triggered only by defaults of indebtedness by PEC and its subsidiaries and PEF, respectively, not each other or other affiliates of PEC and PEF. The RCAs do not include material adverse change representations for borrowings or financial covenants for interest coverage.
Also on October 15, 2010, the Parent ratably reduced the size of its $1.130 billion credit facility to $500 million with the existing group of 15 financial institutions. We expect to renew the Parent’s credit facility prior to its May 2012 expiration. As a result of the changes made on October 15, 2010, our combined credit commitments total $2.000 billion, supported by 24 financial institutions.
31

The following tables summarize our RCAs and available capacity at October 15, 2010, September 30, 2010 and December 31, 2009:

 (in millions)
  Total  Outstanding  
Reserved(a)
  Available 
 October 15, 2010
            
 Parent
Five-year (expiring 5/3/12)(b)
 $500  $-  $32  $468 
 PEC
Three-year (expiring 10/15/13)  750   -   -   750 
 PEF
Three-year (expiring 10/15/13)  750   -   -   750 
Total credit facilities $2,000  $-  $32  $1,968 
                  
 September 30, 2010
                
 Parent
Five-year (expiring 5/3/12) $1,130  $-  $32  $1,098 
 PEC
Five-year (expiring 6/28/11)  450   -   -   450 
 PEF
Five-year (expiring 3/28/11)  450   -   -   450 
Total credit facilities $2,030  $-  $32  $1,998 
                  
 December 31, 2009
                
 Parent
Five-year (expiring 5/3/12) $1,130  $-  $177  $953 
 PEC
Five-year (expiring 6/28/11)  450   -   -   450 
 PEF
Five-year (expiring 3/28/11)  450   -   -   450 
Total credit facilities $2,030  $-  $177  $1,853 
7.(a)FAIR VALUE DISCLOSURESTo the extent amounts are reserved for commercial paper or letters of credit outstanding, they are not available for additional borrowings. At October 15, 2010, September 30, 2010 and December 31, 2009, the Parent had $32 million, $32 million and $37 million, respectively, of letters of credit issued, which were supported by the RCA. Additionally, on December 31, 2009, the Parent had $140 million of outstanding commercial paper supported by the RCA.
(b)Approximately $22 million of the $500 million will expire May 3, 2011.
A.DEBT AND INVESTMENTS

8.      FAIR VALUE DISCLOSURES
A.DEBT AND INVESTMENTS
 
PROGRESS ENERGY
 
DEBT
 
The carrying amount of our long-term debt, including current maturities, was $12.641 billion and $12.457 billion at JuneSeptember 30, 2010 and December 31, 2009, respectively. The estimated fair value of this debt, as obtained from quoted market prices for the same or similar issues, was $14.2$14.6 billion and $13.4 billion at JuneSeptember 30, 2010 and December 31, 2009, respectively.
 
INVESTMENTS
 
Certain investments in debt and equity securities that have readily determinable market values are accounted for as available-for-sale securities at fair value. Our available-for-sale securities include investments in stocks, bonds and cash equivalents held in trust funds, pursuant to NRC requirements, to fund certain costs of decommissioning the Utilities’ nuclear plants as discussed in Note 4C of the 2009 Form 10-K. NDT funds are presented on the Consolidated Balance Sheets at fair value. In addition to the NDT funds, we hold other debt investments classified as available-for-sale, which are included in miscellaneous other property and investments on the Consolidated Balance Sheets at fair value.
 
32

The following table summarizes our available-for-sale securities at JuneSeptember 30, 2010 and December 31, 2009:
          
(in millions) Fair Value  
Unrealized
Losses
  
Unrealized
Gains
 
June 30, 2010         
Common stock equity securities $785  $30  $242 
Preferred stock and other equity securities  17   -   6 
Corporate debt securities  95   -   6 
U.S. state and municipal debt securities  124   2   4 
U.S. and foreign government debt securities  256   1   13 
Money market funds and other securities  99   -   1 
Total $1,376  $33  $272 
             
December 31, 2009            
Common stock equity securities $839  $22  $301 
Preferred stock and other equity securities  16   -   5 
Corporate debt securities  71   1   5 
U.S. state and municipal debt securities  118   2   3 
U.S. and foreign government debt securities  197   1   8 
Money market funds and other securities  161   -   - 
Total $1,402  $26  $322 
             
          
(in millions) Fair Value  Unrealized Losses  Unrealized Gains 
September 30, 2010         
Common stock equity $892  $17  $323 
Preferred stock and other equity  24   -   8 
Corporate debt  90   -   8 
U.S. state and municipal debt  127   2   6 
U.S. and foreign government debt  280   -   14 
Money market funds and other  71   -   1 
Total $1,484  $19  $360 
             
December 31, 2009            
Common stock equity $839  $22  $301 
Preferred stock and other equity  16   -   5 
Corporate debt  71   1   5 
U.S. state and municipal debt  118   2   3 
U.S. and foreign government debt  197   1   8 
Money market funds and other  161   -   - 
Total $1,402  $26  $322 
             
The NDT funds and other available-for-sale debt investments held in certain benefit trusts are managed by third-party investment managers who have a right to sell securities without our authorization. Net unrealized gains and losses of the NDT funds that would be recorded in earnings or other comprehensive income by a nonregulated entity are recorded as regulatory assets and liabilities pursuant to ratemaking treatment. Therefore, the preceding tables include the unrealized gains and losses for the NDT funds based on the original cost of the trust investments. All of
29

the unrealized losses and unrealized gains for 2010 and 2009 relate to the NDT funds. There were no material unrealized losses and unrealized gains for the other available-for-sale debt securities held in benefit trusts at JuneSeptember 30, 2010 and December 31, 2009.
 
The aggregate fair value of investments that related to the JuneSeptember 30, 2010 and December 31, 2009 unrealized losses was $192$119 million and $209 million, respectively.
 
At JuneSeptember 30, 2010, the fair value of our available-for-sale debt securities by contractual maturity was:
      
(in millions)      
Due in one year or less $21  $43 
Due after one through five years  232   242 
Due after five through 10 years  141   110 
Due after 10 years  96   115 
Total $490  $510 
        

33

The following table presents selected information about our sales of available-for-sale securities. Realized gains and losses were determined on a specific identification basis.
                        
 Three months ended June 30,  Six months ended June 30,  Three months ended September 30  Nine months ended September 30 
(in millions) 2010  2009  2010  2009  2010  2009  2010  2009 
Proceeds $1,755  $222  $3,692  $903  $2,051  $275  $5,743  $1,162 
Realized gains  6   3   10   15   7   5   17   20 
Realized losses  10   22   16   74   5   8   20   82 
                                
Proceeds were primarily related to NDT funds. Losses for investments in the benefit investment trusts were not material. Other securities are evaluated on an individual basis to determine if a decline in fair value below the carrying value is other-than-temporary. At JuneSeptember 30, 2010 and December 31, 2009, our other securities had no investments in a continuous loss position for greater than 12 months.
 
PEC
 
DEBT
 
The carrying amount of PEC’s long-term debt, including current maturities, was $3.694$3.693 billion and $3.709 billion at JuneSeptember 30, 2010 and December 31, 2009, respectively. The estimated fair value of this debt, as obtained from quoted market prices for the same or similar issues, was $4.1$4.2 billion and $4.0 billion at JuneSeptember 30, 2010 and December 31, 2009, respectively.
 
INVESTMENTS
 
Certain investments in debt and equity securities that have readily determinable market values are accounted for as available-for-sale securities at fair value. PEC’s available-for-sale securities include investments in stocks, bonds and cash equivalents held in trust funds, pursuant to NRC requirements, to fund certain costs of decommissioning PEC’s nuclear plants as discussed in Note 4C of the 2009 Form 10-K. NDT funds are presented on the Consolidated Balance Sheets at fair value.

 
30


The following table summarizes PEC’s available-for-sale securities at JuneSeptember 30, 2010 and December 31, 2009:
          
(in millions) Fair Value  Unrealized Losses  Unrealized Gains 
June 30, 2010         
Common stock equity securities $504  $22  $149 
Preferred stock and other equity securities  11   -   4 
Corporate debt securities  70   -   5 
U.S. state and municipal debt securities  42   -   1 
U.S. and foreign government debt securities  212   1   12 
Money market funds and other securities  22   -   1 
Total $861  $23  $172 
             
December 31, 2009            
Common stock equity securities $545  $19  $186 
Preferred stock and other equity securities  10   -   3 
Corporate debt securities  67   1   4 
U.S. state and municipal debt securities  37   -   1 
U.S. and foreign government debt securities  177   1   8 
Money market funds and other securities  35   -   - 
Total $871  $21  $202 
             
          
(in millions) Fair Value  Unrealized Losses  Unrealized Gains 
September 30, 2010         
Common stock equity $578  $14  $202 
Preferred stock and other equity  12   -   5 
Corporate debt  72   -   7 
U.S. state and municipal debt  45   -   2 
U.S. and foreign government debt  210   -   13 
Money market funds and other  20   -   1 
 Total $937  $14  $230 

34


(in millions)Fair Value$Unrealized Losses$Unrealized Gains
December 31, 2009            
Common stock equity $545  $19  $186 
Preferred stock and other equity  10   -   3 
Corporate debt  67   1   4 
U.S. state and municipal debt  37   -   1 
U.S. and foreign government debt  177   1   8 
Money market funds and other  35   -   - 
 Total $871  $21  $202 

The NDT funds are managed by third-party investment managers who have a right to sell securities without our authorization. Net unrealized gains and losses of the NDT funds that would be recorded in earnings or other comprehensive income by a nonregulated entity are recorded as regulatory assets and liabilities pursuant to ratemaking treatment. Therefore, the preceding tables include the unrealized gains and losses for the NDT funds based on the original cost of the trust investments. All of the unrealized losses and gains for 2010 and 2009 relate to the NDT funds.
 
The aggregate fair value of investments that related to the JuneSeptember 30, 2010 and December 31, 2009 unrealized losses was $110$60 million and $121 million, respectively.
 
At JuneSeptember 30, 2010, the fair value of PEC’s available-for-sale debt securities by contractual maturity was:
      
(in millions)      
Due in one year or less $17  $18 
Due after one through five years  182   152 
Due after five through 10 years  85   74 
Due after 10 years  47   89 
Total $331  $333 
        

The following table presents selected information about PEC’s sales of available-for-sale securities. Realized gains and losses were determined on a specific identification basis.
             
  Three months ended June 30,  Six months ended June 30, 
(in millions) 2010  2009  2010  2009 
Proceeds $115  $83  $222  $477 
Realized gains  3   1   6   5 
Realized losses  7   9   12   30 
                 
31

             
  Three months ended September 30  Nine months ended September 30 
(in millions) 2010  2009  2010  2009 
Proceeds $88  $90  $310  $567 
Realized gains  3   2   9   7 
Realized losses  3   4   15   34 
                 
PEC’s proceeds were primarily related to NDT funds. Other securities are evaluated on an individual basis to determine if a decline in fair value below the carrying value is other-than-temporary. At JuneSeptember 30, 2010 and December 31, 2009, PEC did not have any other securities.
 
PEF
 
DEBT
 
The carrying amount of PEF’s long-term debt, including current maturities, was $4.481$4.482 billion and $4.183 billion at JuneSeptember 30, 2010 and December 31, 2009, respectively. The estimated fair value of this debt, as obtained from quoted market prices for the same or similar issues, was $5.1$5.2 billion and $4.5 billion at JuneSeptember 30, 2010 and December 31, 2009, respectively.

35

 
INVESTMENTS
 
Certain investments in debt and equity securities that have readily determinable market values are accounted for as available-for-sale securities at fair value. PEF’s available-for-sale securities include investments in stocks, bonds and cash equivalents held in trust funds, pursuant to NRC requirements, to fund certain costs of decommissioning PEF’s nuclear plant as discussed in Note 4C of the 2009 Form 10-K. The NDT funds are presented on the Balance Sheets at fair value.
 
The following table summarizes PEF’s available-for-sale securities at JuneSeptember 30, 2010 and December 31, 2009:
          
(in millions) Fair Value  
Unrealized
Losses
  
Unrealized
Gains
 
June 30, 2010         
Common stock equity securities $281  $8  $93 
Preferred stock and other equity securities  6   -   2 
Corporate debt securities  13   -   1 
U.S. state and municipal debt securities  81   2   3 
U.S. and foreign government debt securities  31   -   1 
Money market funds and other securities  67   -   - 
Total $479  $10  $100 
             
December 31, 2009            
Common stock equity securities $294  $3  $115 
Preferred stock and other equity securities  6   -   2 
Corporate debt securities  4   -   1 
U.S. state and municipal debt securities  80   2   2 
U.S. and foreign government debt securities  13   -   - 
Money market funds and other securities  99   -   - 
Total $496  $5  $120 
             
          
(in millions) Fair Value  Unrealized Losses  Unrealized Gains 
September 30, 2010      
Common stock equity $314  $3  $121 
Preferred stock and other equity  12   -   3 
Corporate debt  14   -   1 
U.S. state and municipal debt  82   2   4 
U.S. and foreign government debt  59   -   1 
Money market funds and other  44   -   - 
 Total $525  $5  $130 
             
December 31, 2009            
Common stock equity $294  $3  $115 
Preferred stock and other equity  6   -   2 
Corporate debt  4   -   1 
U.S. state and municipal debt  80   2   2 
U.S. and foreign government debt  13   -   - 
Money market funds and other  99   -   - 
 Total $496  $5  $120 
The NDT funds are managed by third-party investment managers who have a right to sell securities without our authorization. Net unrealized gains and losses of the NDT funds that would be recorded in earnings or other comprehensive income by a nonregulated entity are recorded as regulatory assets and liabilities pursuant to ratemaking treatment. Therefore, the preceding tables include unrealized gains and losses for the NDT funds based on the original cost of the trust investments. All of the unrealized losses and gains for 2010 and 2009 relate to the NDT funds.
 
The aggregate fair value of investments that related to the JuneSeptember 30, 2010 and December 31, 2009 unrealized losses was $78$55 million and $56 million, respectively.
 
32

At JuneSeptember 30, 2010, the fair value of PEF’s available-for-sale debt securities by contractual maturity was:
      
(in millions)      
Due in one year or less $4  $3 
Due after one through five years  46   90 
Due after five through 10 years  46   36 
Due after 10 years  30   26 
Total $126  $155 
    
36

The following table presents selected information about PEF’s sales of available-for-sale securities. Realized gains and losses were determined on a specific identification basis.
                        
 Three months ended June 30,  Six months ended June 30,  Three months ended September 30  Nine months ended September 30 
(in millions) 2010  2009  2010  2009  2010  2009  2010  2009 
Proceeds $1,624  $120  $3,414  $370  $1,891  $163  $5,305  $534 
Realized gains  3   2   4   9   3   3   7   12 
Realized losses  3   13   4   44   2   3   5   47 
                

PEF’s proceeds were related to NDT funds. Other securities are evaluated on an individual basis to determine if a decline in fair value below the carrying value is other-than-temporary. At JuneSeptember 30, 2010 and December 31, 2009, PEF did not have any other securities.
 
B.FAIR VALUE MEASUREMENTS
B.      FAIR VALUE MEASUREMENTS
 
GAAP defines fair value as the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date (i.e., an exit price). Fair value measurements require the use of market data or assumptions that market participants would use in pricing the asset or liability, including assumptions about risk and the risks inherent in the inputs to the valuation technique. These inputs can be readily observable, corroborated by market data, or generally unobservable. Valuation techniques are required to maximize the use of observable inputs and minimize the use of unobservable inputs. A midmarket pricing convention (the midpoint price between bid and ask prices) is permitted for use as a practical expedient.
 
GAAP also establishes a fair value hierarchy that prioritizes the inputs used to measure fair value, and requires fair value measurements to be categorized based on the observability of those inputs. The hierarchy gives the highest priority to unadjusted quoted prices in active markets for identical assets or liabilities (Level 1 inputs) and the lowest priority to unobservable inputs (Level 3 inputs). The three levels of the fair value hierarchy are as follows:
 
Level 1 – The pricing inputs are unadjusted quoted prices in active markets for identical assets or liabilities as of the reporting date. Active markets are those in which transactions for the asset or liability occur in sufficientufficient frequency and volume to provide pricing information on an ongoing basis. Level 1 primarily consists of financial instruments such as exchange-traded derivatives and listed equities.
 
Level 2 – The pricing inputs are inputs other than quoted prices included within Level 1 that are observable for the asset or liability, either directly or indirectly. Level 2 includes financial instruments that are valued using models or other valuation methodologies. These models are primarily industry-standard models that consider various assumptions, including quoted forward prices for commodities, time value, volatility factors, and current market and contractual prices for the underlying instruments, as well as other relevant economic measures. Substantially all of these assumptions are observable in the marketplace throughout the full term of the instrument, can be derived from observable data or are supported by observable levels at which transactions are executed in the marketplace. Instruments in this category include non-exchange-
33

tradednon-exchange-traded derivatives, such as over-the-counter forwards, swaps and options; certain marketable debt securities; and financial instruments traded in less than active markets.
 
Level 3 – The pricing inputs include significant inputs generally less observable from objective sources. These inputs may be used with internally developed methodologies that result in management’s best estimate of fair value. Level 3 instruments may include longer-term instruments that extend into periods wherein which quoted prices or other observable inputs are not available.
 
Certain assets and liabilities, including long-lived assets, were measured at fair value on a nonrecurring basis. There were no significant fair value measurement losses recognized for such assets and liabilities in the periods reported. These fair value measurements fall within Level 3 of the hierarchy discussed above.
37

The following tables set forth, by level within the fair value hierarchy, our and the Utilities’ financial assets and liabilities that were accounted for at fair value on a recurring basis as of JuneSeptember 30, 2010. Financial assets and liabilities are classified in their entirety based on the lowest level of input that is significant to the fair value measurement. Our assessment of the significance of a particular input to the fair value measurement requires judgment and may affect the valuation of fair value assets and liabilities and their placement within the fair value hierarchy levels.
            
PROGRESS ENERGY                        
(in millions) Level 1  Level 2  Level 3  Total  Level 1  Level 2  Level 3  Total 
Assets                        
Nuclear decommissioning trust funds                        
Common stock equity $785  $-  $-  $785  $892  $-  $-  $892 
Preferred stock and other equity  17   -   -   17   19   5   -   24 
Corporate debt  -   83   -   83   -   86   -   86 
U.S. state and municipal debt  -   124   -   124   -   127   -   127 
U.S. and foreign government debt  101   142   -   243   89   180   -   269 
Money market funds and other  2   87   -   89   1   58   -   59 
Total nuclear decommissioning trust funds  905   436   -   1,341   1,001   456   -   1,457 
Derivatives                                
Commodity forward contracts  -   14   -   14   -   11   -   11 
Interest rate contracts  -   1   -   1 
Other marketable securities                                
Corporate debt  -   12   -   12   -   4   -   4 
U.S. state and municipal debt  -   1   -   1 
U.S. and foreign government debt  1   12   -   13   -   11   -   11 
Money market funds and other  22   10   -   32   18   7   -   25 
Total assets $928  $486  $-  $1,414  $1,019  $489  $-  $1,508 
                
Liabilities                
Derivatives                
Commodity forward contracts $-  $444  $62  $506 
Interest rate contracts  -   63   -   63 
Contingent value obligations derivatives  -   15   -   15 
Total liabilities $-  $522  $62  $584 
                
             
Liabilities            
Derivatives            
Commodity forward contracts $-  $485  $85  $570 
Interest rate contracts  -   113   -   113 
Contingent value obligations derivatives  -   15   -   15 
Total liabilities $-  $613  $85  $698 
PEC            
(in millions) Level 1  Level 2  Level 3  Total 
Assets            
Nuclear decommissioning trust funds            
Common stock equity $578  $-  $-  $578 
Preferred stock and other equity  12   -   -   12 
Corporate debt  -   72   -   72 
U.S. state and municipal debt  -   45   -   45 
U.S. and foreign government debt  84   126   -   210 
Money market funds and other  1   18   -   19 
Total nuclear decommissioning trust funds  675   261   -   936 
Other marketable securities  3   -   -   3 
Total assets $678  $261  $-  $939 
                 
Liabilities                
Derivatives                
Commodity forward contracts $-  $81  $55  $136 
Interest rate contracts  -   35   -   35 
Total liabilities $-  $116  $55  $171 

 
3438

 


PEC            
(in millions) Level 1  Level 2  Level 3  Total 
Assets            
Nuclear decommissioning trust funds            
Common stock equity $504  $-  $-  $504 
Preferred stock and other equity  11   -   -   11 
Corporate debt  -   70   -   70 
U.S. state and municipal debt  -   43   -   43 
U.S. and foreign government debt  82   130   -   212 
Money market funds and other  1   18   -   19 
Total nuclear decommissioning trust funds  598   261   -   859 
Derivatives                
Interest rate contracts  -   1   -   1 
Other marketable securities  5   -   -   5 
Total assets $603  $262  $-  $865 
                 
Liabilities                
Derivatives                
Commodity forward contracts $-  $74  $42  $116 
Interest rate contracts  -   20   -   20 
Total liabilities $-  $94  $42  $136 
                 
 
PEF                            
(in millions) Level 1  Level 2  Level 3  Total  Level 1  Level 2  Level 3  Total 
Assets                            
Nuclear decommissioning trust funds                            
Common stock equity $281  $-  $-  $281  $314  $-  $-  $314 
Preferred stock and other equity  6   -   -   6   7   5   -   12 
Corporate debt  -   13   -   13   -   14   -   14 
U.S. state and municipal debt  -   81   -   81   -   82   -   82 
U.S. and foreign government debt  19   12   -   31   5   54   -   59 
Money market funds and other  1   69   -   70   -   40   -   40 
Total nuclear decommissioning trust funds  307   175   -   482   326   195   -   521 
Derivatives                                
Commodity forward contracts  -   14   -   14   -   11   -   11 
Other marketable securities  3   -   -   3   2   -   -   2 
Total assets $310  $189  $-  $499  $328  $206  $-  $534 
                                
Liabilities                                
Derivatives                                
Commodity forward contracts $-  $370  $20  $390  $-  $404  $30  $434 
Interest rate contracts  -   12   -   12   -   21   -   21 
Total liabilities $-  $382  $20  $402  $-  $425  $30  $455 
                
The determination of the fair values in the preceding tables incorporates various factors, including risks of nonperformance by us or our counterparties. Such risks consider not only the credit standing of the counterparties involved and the impact of credit enhancements (such as cash deposits or letters of credit), but also the impact of our and the Utilities’ credit risk on our liabilities.
 
Transfers in (out) of Levels 1, 2 or 3 represent existing assets or liabilities that were previously categorized as a higher level for which the inputs to the estimate became less observable or assets and liabilities that were previously
35

classified as Level 2 or 3 for which the lowest significant input became more observable during the period. There were no significant transfers in (out) of Levels 1, 2 and 3 during the period. Transfers into and out of each level are measured at the end of the period.
 
Commodity forward contract derivatives and interest rate contract derivatives reflect positions held by us and the Utilities. Most over-the-counter commodity forward contract derivatives and interest rate contract derivatives are valued using financial models which utilize observable inputs for similar instruments and are classified within Level 2. Other derivatives are valued utilizing inputs that are not observable for substantially the full term of the contract, or for which the impact of the unobservable period is significant to the fair value of the derivative. Such derivatives are classified within Level 3. See Note 910 for discussion of risk management activities and derivative transactions.
 
NDT funds reflect the assets of the Utilities’ nuclear decommissioning trusts. The assets of the trusts are invested primarily in exchange-traded equity securities (classified within Level 1) and marketable debt securities, most of which are valued using Level 1 inputs for similar instruments and are classified within Level 2.
 
Other marketable securities primarily represent available-for-sale debt securities used to fund certain employee benefit costs.
 
We issued Contingent Value Obligations (CVOs) in connection with the acquisition of Florida Progress, as discussed in Note 15 of the 2009 Form 10-K. The CVOs are derivatives recorded at fair value based on quoted prices from a less-than-active market and are classified as Level 2.
 
39

A reconciliation of changes in the fair value of our and the Utilities’ commodity derivative liabilities classified as Level 3 in the fair value hierarchy for the periods ended JuneSeptember 30 follows:
             
PROGRESS ENERGY 
  Three months ended June 30,  Six months ended June 30, 
(in millions) 2010  2009  2010  2009 
Derivatives, net at beginning of period $52  $43  $39  $41 
Total losses (gains), realized and unrealized                
deferred as regulatory assets and liabilities, net  10   (12)  23   (10)
Derivatives, net at end of period $62  $31  $62  $31 
                 
 
PEC 
PROGRESS ENERGYPROGRESS ENERGY 
 Three months ended June 30,  Six months ended June 30, Three months ended September 30 Nine months ended September 30 
(in millions) 2010  2009  2010  2009  2010  2009  2010  2009 
Derivatives, net at beginning of period $36  $23  $27  $22  $62  $31  $39  $41 
Total losses (gains), realized and unrealized                
deferred as regulatory assets and liabilities, net  6   (4)  15   (3)
Total losses, realized and unrealized
deferred as regulatory assets and liabilities, net
Total losses, realized and unrealized
deferred as regulatory assets and liabilities, net
 23   11    46    1 
Derivatives, net at end of period $42  $19  $42  $19  $85  $42  $85  $42 
                
 
PEF 
PECPEC 
 Three months ended June 30,  Six months ended June 30, Three months ended September 30 Nine months ended September 30 
(in millions) 2010  2009  2010  2009   2010   2009   2010   2009 
Derivatives, net at beginning of period $16  $20  $12  $19  $42  $19  $27  $23 
Total losses (gains), realized and unrealized                
deferred as regulatory assets and liabilities, net  4   (8)  8   (7)
Total losses, realized and unrealized
deferred as regulatory assets and liabilities, net
   13    5    28    1 
Derivatives, net at end of period $20  $12  $20  $12  $55  $24  $55  $24 
                
PEF 
  Three months ended September 30  Nine months ended September 30 
(in millions) 2010  2009  2010  2009 
Derivatives, net at beginning of period $20  $12  $12  $19 
Total losses, realized and unrealized
deferred as regulatory assets and liabilities, net
   10    7    18    - 
Derivatives, net at end of period $30  $19  $30  $19 
Substantially all unrealized gains and losses on derivatives are deferred as regulatory liabilities or assets consistent with ratemaking treatment. There were no Level 3 purchases, sales, issuances or settlements during the period.
 

36

8.BENEFIT PLANS
9.      BENEFIT PLANS
 
We have noncontributory defined benefit retirement plans that provide pension benefits for substantially all full-time employees. We also have supplementary defined benefit pension plans that provide benefits to higher-level employees. In addition to pension benefits, we provide contributory other postretirement benefits (OPEB), including certain health care and life insurance benefits, for retired employees who meet specified criteria.
 
40

The components of the net periodic benefit cost for the respective Progress Registrants for the three months ended JuneSeptember 30 were:
            
PROGRESS ENERGY
            
 Pension Benefits  Other Postretirement Benefits  Pension Benefits  
Other Postretirement
Benefits
 
(in millions)
 2010  2009  2010  2009  2010  2009  2010  2009 
Service cost
 $12  $10  $2  $2  $12  $11  $3  $1 
Interest cost
  35   34   8   9   35   36   13   6 
Expected return on plan assets
  (39)  (35)  (1)  (1)  (40)  (31)  (1)  - 
Amortization of actuarial loss(a)
  12   12   -   1 
Amortization of actuarial loss (gain)(a)
  13   16   6   (2)
Other amortization, net (a)
  2   2   1   1   2   2   1   1 
Net periodic cost before deferral(b)
 $22  $23  $10  $12  $22  $34  $22  $6 
 
(a)Adjusted to reflect PEF’s rate treatment. See Note 16B in the 2009 Form 10-K.
(b)PEF received permission from the FPSC to defer the retail portion of certain 2009 pension expense. The FPSC order did not change the total net periodic pension cost, but deferred a portion of the costs to be recovered in future periods. For the three months ended JuneSeptember 30, 2009, PEF deferred $16$10 million of net periodic pension costs as a regulatory asset. See Notes 7C and 16A in the 2009 Form 10-K.
 
PEC
            
 Pension Benefits  Other Postretirement Benefits  Pension Benefits  
Other Postretirement
Benefits
 
(in millions)
 2010  2009  2010  2009  2010  2009  2010  2009 
Service cost
 $5  $4  $1  $1  $5  $5  $1  $1 
Interest cost
  16   16   4   5   16   17   6   3 
Expected return on plan assets
  (19)  (17)  -   (1)  (20)  (15)  -   - 
Amortization of actuarial loss
  4   2   -   1 
Amortization of actuarial loss (gain)
  4   4   3   (1)
Other amortization, net
  1   1   -   -   1   1   -   - 
Net periodic cost $7  $6  $5  $6  $6  $12  $10  $3 
                

 
37



PEF
      
PEF
      
 Pension Benefits  Other Postretirement Benefits   Pension Benefits  
Other Postretirement
Benefits
 
(in millions)
 2010  2009  2010  2009 
(in millions)
 2010  2009  2010  2009 
Service cost
 $5  $5  $-  $1 
Service cost
 $6  $5  $1  $- 
Interest cost
  15   14   3   3 
Interest cost
  15   14   6   2 
Expected return on plan assets
  (17)  (15)  -   - 
Expected return on plan assets
  (17)  (13)  -   - 
Amortization of actuarial loss
  7   9   -   - 
Amortization of actuarial loss (gain)
Amortization of actuarial loss (gain)
  8   10   3   (1)
Other amortization, net
  -   -   1   1 
Other amortization, net
  -   -   1   1 
Net periodic cost before deferral(a)
 $10  $13  $4  $5 
Net periodic cost before deferral(a)
 $12  $16  $11  $2 
 
(a)PEF received permission from the FPSC to defer the retail portion of certain 2009 pension expense. The FPSC order did not change the total net periodic pension cost, but deferred a portion of the costs to be recovered in future periods. For the three months ended JuneSeptember 30, 2009, PEF deferred $16$10 million of net periodic pension costs as a regulatory asset. See Notes 7C and 16A in the 2009 Form 10-K.
41

The components of the net periodic benefit cost for the respective Progress Registrants for the sixnine months ended JuneSeptember 30 were:
            
PROGRESS ENERGY
            
 Pension Benefits  Other Postretirement Benefits  Pension Benefits  
Other Postretirement
Benefits
 
(in millions)
 2010  2009  2010  2009  2010  2009  2010  2009 
Service cost
 $23  $21  $4  $4  $36  $31  $7  $5 
Interest cost
  70   68   16   18   105   104   29   23 
Expected return on plan assets
  (78)  (69)  (2)  (3)  (119)  (100)  (3)  (3)
Amortization of actuarial loss(a)
  25   24   1   2   38   40   6   1 
Other amortization, net (a)
  3   3   2   3   5   5   4   4 
Net periodic cost before deferral(b)
 $43  $47  $21  $24  $65  $80  $43  $30 
 
(a)Adjusted to reflect PEF’s rate treatment. See Note 16B in the 2009 Form 10-K.
(b)PEF received permission from the FPSC to defer the retail portion of certain 2009 pension expense. The FPSC order did not change the total net periodic pension cost, but deferred a portion of the costs to be recovered in future periods. For the sixnine months ended JuneSeptember 30, 2009, PEF deferred $16$26 million of net periodic pension costs as a regulatory asset. See Notes 7C and 16A in the 2009 Form 10-K.
 
PEC
            
 Pension Benefits  Other Postretirement Benefits  Pension Benefits  
Other Postretirement
Benefits
 
(in millions)
 2010  2009  2010  2009  2010  2009  2010  2009 
Service cost
 $9  $8  $2  $3  $14  $13  $4  $3 
Interest cost
  32   31   8   9   48   48   14   12 
Expected return on plan assets
  (38)  (34)  (1)  (2)  (58)  (49)  (1)  (1)
Amortization of actuarial loss
  8   4   -   1   12   8   3   - 
Other amortization, net
  3   3   1   1   4   4   1   1 
Net periodic cost $14  $12  $10  $12  $20  $24  $21  $15 
                

38



PEF
            
 Pension Benefits  Other Postretirement Benefits  Pension Benefits  
Other Postretirement
Benefits
 
(in millions)
 2010  2009  2010  2009  2010  2009  2010  2009 
Service cost
 $10  $9  $1  $1  $16  $14  $2  $1 
Interest cost
  29   28   6   7   44   42   12   10 
Expected return on plan assets
  (34)  (29)  (1)  (1)  (51)  (42)  (1)  (1)
Amortization of actuarial loss
  15   18   -   1   23   29   3   - 
Other amortization, net
  -   -   2   2   -   -   3   3 
Net periodic cost before deferral(a)
 $20  $26  $8  $10  $32  $43  $19  $13 
 
(a)PEF received permission from the FPSC to defer the retail portion of certain 2009 pension expense. The FPSC order did not change the total net periodic pension cost, but deferred a portion of the costs to be recovered in future periods. For the sixnine months ended JuneSeptember 30, 2009, PEF deferred $16$26 million of net periodic pension costs as a regulatory asset. See Notes 7C and 16A in the 2009 Form 10-K.
In 2010, contributions directly to pension plan assets are expected to approximate $­­­129229 million for us, including $95$171 million for PEC and $34$57 million for PEF. We contributed $13$119 million during the sixnine months ended JuneSeptember 30, 2010, including $7$88 million for PEC and $6$31 million for PEF.
 
The Patient Protection and Affordable Care Act (PPACA) and the related Health Care and Education Reconciliation Act, which made various amendments to the PPACA, were enacted in March 2010. The PPACA contains a
42

provision that changes the tax treatment related to a federal subsidy available to sponsors of retiree health benefit plans that provide a prescription drug benefit that is at least actuarially equivalent to the benefits under Medicare Part D. The subsidy is known as the Retiree Drug Subsidy (RDS). Employers are not currently taxed on the RDS payments they receive. However, as a result of the PPACA as amended, RDS payments will effectively become taxable in tax years beginning after December 31, 2012, by requiring the amount of the subsidy received to be offset against the employer's deduction for health care expenses. Under GAAP, , changes in tax law are accounted for in the period of enactment. Accordingly, an additional tax expense of $22 million for us, including $12 million for PEC and $10 million for PEF, has been recognized during the sixnine months ended JuneSeptember 30, 2010.
 
We are still evaluatingThe PPACA, as amended, includes provisions for which additional detailed rules and regulations will be published. While we have reflected known impacts of the PPACA in our benefit obligations, we will continue to evaluate any additional impacts of the PPACA as amended; however,additional rules and regulations are published. However, we do not expect the changes to have a significant impact on the benefit obligations we have recorded.
 
In the third quarter of 2010, we received our final January 1, 2010 actuarial valuation of our benefit obligations. As a result, we recorded net increases in our benefit obligations of $117 million, including $44 million for PEC and $67 million for PEF. These net increases were offset by increases in regulatory assets of $111 million, including $44 million for PEC and $67 million for PEF, and accumulated other comprehensive loss of $6 million as of September 30, 2010.
9.RISK MANAGEMENT ACTIVITIES AND DERIVATIVE TRANSACTIONS

10.      RISK MANAGEMENT ACTIVITIES AND DERIVATIVE TRANSACTIONS
 
We are exposed to various risks related to changes in market conditions. We have a risk management committee that includes senior executives from various business groups. The risk management committee is responsible for administering risk management policies and monitoring compliance with those policies by all subsidiaries. Under our risk policy, we may use a variety of instruments, including swaps, options and forward contracts, to manage exposure to fluctuations in commodity prices and interest rates. Such instruments contain credit risk if the counterparty fails to perform under the contract. We minimize such risk by performing credit and financial reviews using a combination of financial analysis and publicly available credit ratings of such counterparties. Potential nonperformance by counterparties is not expected to have a materialmateri al effect on our financial posit ionposition or results of operations.
 
A.
A.      COMMODITY DERIVATIVES
 
GENERAL
 
Most of our physical commodity contracts are not derivatives or qualify as normal purchases or sales. Therefore, such contracts are not recorded at fair value.
 
39

ECONOMIC DERIVATIVES
 
Derivative products, primarily natural gas and oil contracts, may be entered into from time to time for economic hedging purposes. While management believes the economic hedges mitigate exposures to fluctuations in commodity prices, these instruments are not designated as hedges for accounting purposes and are monitored consistent with trading positions.
 
The Utilities have financial derivative instruments with settlement dates through 2015 related to their exposure to price fluctuations onin fuel oil and natural gas purchases. The majority of our financial hedge agreements will settle in 2010 and 2011. Substantially all of these instruments receive regulatory accounting treatment. Related unrealized gains and losses are recorded in regulatory liabilities and regulatory assets, respectively, on the Balance Sheets until the contracts are settled. After settlement of the derivatives and the fuel is consumed, any realized gains or losses are passed through the fuel cost-recovery clause.
 
Certain hedge agreements may result in the receipt of, or posting of, derivative collateral with our counterparties, depending on the daily derivative position. Fluctuations in commodity prices that lead to our return of collateral
43

received and/or our posting of collateral with our counterparties negatively impact our liquidity. We manage open positions with strict policies that limit our exposure to market risk and require daily reporting to management of potential financial exposures.
 
Certain counterparties have posted or held cash collateral in support of these instruments. Progress Energy had a cash collateral asset included in derivative collateral posted of $194$223 million and $146 million on the Progress Energy Consolidated Balance Sheets at JuneSeptember 30, 2010 and December 31, 2009, respectively. At JuneSeptember 30, 2010, Progress Energy had 244.0238.0 million MMBtu notional of natural gas and 32.322.7 million gallons notional of fuel oil related to outstanding commodity derivative swaps that were entered into to hedge forecasted fuel oil and natural gas purchases.
 
PEC had a cash collateral asset included in prepayments and other current assets of $20$31 million and $7 million on the PEC Consolidated Balance Sheets at JuneSeptember 30, 2010 and December 31, 2009, respectively. At JuneSeptember 30, 2010, PEC had 50.450.2 million MMBtu notional of natural gas related to outstanding commodity derivative swaps that were entered into to hedge forecasted natural gas purchases.
 
PEF’s cash collateral asset included in derivative collateral posted was $174$192 million and $139 million on the PEF Balance Sheets at JuneSeptember 30, 2010 and December 31, 2009, respectively. At JuneSeptember 30, 2010, PEF had 193.6187.8 million MMBtu notional of natural gas and 32.322.7 million gallons notional of fuel oil related to outstanding commodity derivative swaps that were entered into to hedge forecasted fuel oil and natural gas purchases.
 
B.      INTEREST RATE DERIVATIVES – FAIR VALUE OR CASH FLOW HEDGES
 
The Utilities designate a portion of commodity derivative instruments as cash flow hedges. From time to time we hedge exposure to market risk associated with fluctuations in the price of power for our forecasted sales. Realized gains and losses are recorded net in operating revenues. We also hedge exposure to market risk associated with fluctuations in the price of fuel for fleet vehicles. At June 30, 2010, we had 1.2 million gallons notional of gasoline, of which there was 0.6 million gallons each at PEC and PEF, and 1.2 million gallons notional of diesel, of which there was 0.6 million gallons each at PEC and PEF related to outstanding commodity derivative swaps that were entered into to hedge forecasted gasoline and diesel purchases. Realized gains and losses are recorded net as part of fleet vehicle fuel costs. At June 30, 2010 and December 31, 2009, neither we nor the Utilities had material outstanding positions in such contracts. The ineffective portion of commodity cash flow hedges was not material to our or the Utilities’ results of operations for the three and six months ended June 30, 2010 and 2009.
At June 30, 2010 and December 31, 2009, the amount recorded in our or the Utilities’ accumulated other comprehensive income related to commodity cash flow hedges was not material.
40

B.
INTEREST RATE DERIVATIVES FAIR VALUE OR CASH FLOW HEDGES
We use cash flow hedging strategies to reduce exposure to changes in cash flow due to fluctuating interest rates. We use fair value hedging strategies to reduce exposure to changes in fair value due to interest rate changes. Our cash flow hedging strategies are primarily accomplished through the use of forward starting swaps and our fair value hedging strategies are primarily accomplished through the use of fixed-to-floating swaps. The notional amounts of interest rate derivatives are not exchanged and do not represent exposure to credit loss. In the event of default by the counterparty, the exposure in these transactions is the cost of replacing the agreements at curren tcurrent market rates.
 
CASH FLOW HEDGES
 
At JuneSeptember 30, 2010, all open interest rate hedges will reach their mandatory termination dates within three and a half years. At JuneSeptember 30, 2010, including amounts related to terminated hedges, we had $81$110 million of after-tax losses, including $41$50 million and $7$13 million of after-tax losses at PEC and PEF, respectively, recorded in accumulated other comprehensive income related to forward starting swaps. It is expected that in the next twelve12 months losses of $7$7 million, net of tax, primarily related to terminated hedges, will be reclassified to interest expense at Progress Energy, including $4 million at PEC. The actual amounts that will be reclassified to earnings may vary from the expected amounts as a result of changes in interest rates, and changes in the timing of debt issuances at the Parent and the Utilities and changes in market value of currently open forward starting swaps.
 
At December 31, 2009, including amounts related to terminated hedges, we had $35 million of after-tax losses, including $27 million of after-tax losses at PEC and $3 million of after-tax gains at PEF, recorded in accumulated other comprehensive income related to forward starting swaps.
 
At December 31, 2009, Progress Energy had $325 million notional of open forward starting swaps, including $100 million at PEC and $75 million at PEF. At JuneSeptember 30, 2010, Progress Energy had $1.050 billion notional of open forward starting swaps, including $350 million at PEC and $200 million at PEF.
 
FAIR VALUE HEDGES
 
For interest rate fair value hedges, the change in the fair value of the hedging derivative is recorded in net interest charges and is offset by the change in the fair value of the hedged item. At JuneSeptember 30, 2010, and December 31, 2009, neither we nor the Utilities had any outstanding positions in such contracts.
 
C.
44

C.      CONTINGENT FEATURES
 
Certain of our commodity derivative instruments contain provisions defining fair value thresholds requiring the posting of collateral for hedges in a liability position greater than such threshold amounts. The thresholds are tiered and based on the individual company’s credit rating with Moody’s, Investors Service, Inc. (Moody’s), Standard & Poor’s Rating Services (S&P)S&P and Fitch Ratings (Fitch). Higher credit ratings have a higher threshold requiring a lower amount of the outstanding liability position to be covered by posted collateral. Conversely, lower credit ratings require a higher amount of the outstanding liability position to be covered by posted collateral. If our credit ratings were to be downgraded, we may have to post additional collateral on certain hedges in liability positions.
 
In addition, certain of our commodity derivative instruments contain provisions that require our debt to maintain an investment grade credit rating from Moody’s, S&P and Fitch. If our debt were to fall below investment grade, we would be in violation of these provisions, and the counterparties to the derivative instruments could request immediate payment or demand immediate and ongoing full overnight collateralization on derivative instruments in net liability positions.
 
The aggregate fair value of all commodity derivative instruments at Progress Energy with credit risk-related contingent features that are in a net liability position at JuneSeptember 30, 2010, is $492$511 million, for which Progress Energy has posted collateral of $194$223 million in the normal course of business. If the credit risk-related contingent features underlying these agreements werehad been triggered at JuneSeptember 30, 2010, Progress Energy would have been required to post an additional $298$288 million of collateral with its counterparties.
 
41

The aggregate fair value of all commodity derivative instruments at PEC with credit risk-related contingent features that are in a net liability position at JuneSeptember 30, 2010, is $116$131 million, for which PEC has posted collateral of $20$31 million in the normal course of business. If the credit risk-related contingent features underlying these agreements werehad been triggered at JuneSeptember 30, 2010, PEC would have been required to post an additional $96$100 million of collateral with its counterparties.
 
The aggregate fair value of all commodity derivative instruments at PEF with credit risk-related contingent features that are in a net liability position at JuneSeptember 30, 2010, is $376$380 million, for which PEF has posted collateral of $174$192 million in the normal course of business. If the credit risk-related contingent features underlying these agreements werehad been triggered on JuneSeptember 30, 2010, PEF would have been required to post an additional $202$188 million of collateral with its counterparties.
 
D.
45

D.      DERIVATIVE INSTRUMENT AND HEDGING ACTIVITY INFORMATION
 
PROGRESS ENERGY
 
 The following table presents the fair value of derivative instruments at September 30, 2010 and December 31, 2009:
The following table presents the fair value of derivative instruments at June 30, 2010 and December 31, 2009: 
                        
Instrument / Balance sheet location
 June 30, 2010  December 31, 2009  September 30, 2010  December 31, 2009 
(in millions)
 Asset  Liability  Asset  Liability  Asset  Liability  Asset  Liability 
Derivatives designated as hedging instrumentsDerivatives designated as hedging instruments Derivatives designated as hedging instruments 
Interest rate derivatives
                        
Prepayments and other current assets $-     $5     $-     $5    
Other assets and deferred debits  1      14      -      14    
Derivative liabilities, current     $32     -      $70      $- 
Derivative liabilities, long-term      31      -       43       - 
Total derivatives designated as hedging instruments  1   63   19  -   -   113   19   - 
                               
Derivatives not designated as hedging instrumentsDerivatives not designated as hedging instruments Derivatives not designated as hedging instruments 
Commodity derivatives(a)
                               
Prepayments and other current assets  9       11      7       11     
Other assets and deferred debits  5       9      4       9     
Derivative liabilities, current      217       189       254       189 
Derivative liabilities, long-term      289       236       316       236 
CVOs(b)
                                
Other liabilities and deferred credits      15       15       15       15 
Fair value of derivatives not designated as hedging instruments  14   521   20   440   11   585   20   440 
Fair value loss transition adjustment(c)
                                
Derivative liabilities, current      1       1       1       1 
Derivative liabilities, long-term      4       4       3       4 
Total derivatives not designated as hedging instruments  14   526   20   445   11   589   20   445 
Total derivatives $15  $589  $39  $445  $11  $702  $39  $445 
 
(a)Substantially all of these contracts receive regulatory treatment.
(b)As discussed in Note 15 of the 2009 Form 10-K, the Parent issued 98.6 million CVOs in connection with the acquisition of Florida Progress during 2000.
(c)In 2003, PEC recorded a $38 million pre-tax ($23 million after-tax) fair value loss transition adjustment pursuant to the adoption of new accounting guidance for derivatives. The related liability is being amortized to earnings over the term of the related contracts.


 
4246

 

The following tables present the effect of derivative instruments on other comprehensive income (OCI) (See Note 4C)5C) and the Consolidated Statements of Income for the three months ended JuneSeptember 30, 2010 and 2009:
Derivatives Designated as Hedging Instruments for the Three Months Ended June 30, 
 
Derivatives designated as hedging instruments for the three months ended September 30
Derivatives designated as hedging instruments for the three months ended September 30
 
Instrument
 
Amount of Gain or (Loss)
Recognized in OCI, Net of Tax
on Derivatives(a)
  
Amount of Gain or (Loss),
Net of Tax Reclassified from
Accumulated OCI into Income(a)
  
Amount of Pre-tax Gain or
(Loss) Recognized in Income
on Derivatives(b)
  
Amount of Gain or
(Loss) Recognized in
OCI, Net of Tax on
Derivatives(a)
  
Amount of Gain or
(Loss), Net of Tax
Reclassified from
Accumulated OCI into
Income(a)
  
Amount of Pre-tax
Gain or (Loss)
Recognized in Income
on Derivatives(b)
 
(in millions)
 2010  2009  2010  2009  2010  2009  2010  2009  2010  2009  2010  2009 
Interest rate derivatives(c) (d)
 $(44) $8  $(2) $(2) $-  $-  $(30) $(6) $(1) $(2) $-  $- 
 
(a)Effective portion.
(b)Related to ineffective portion and amount excluded from effectiveness testing.
(c)Amounts in accumulated OCI related to terminated hedges are reclassified to earnings as the interest expense is recorded. The effective portion of the hedges will be amortized to interest expense over the term of the related debt.
(d)Amounts recorded in the Consolidated Statements of Income are classified in interest charges.

Derivatives Not Designated as Hedging Instruments for the Three Months Ended June 30, 
Derivatives not designated as hedging instruments for the three months ended September 30Derivatives not designated as hedging instruments for the three months ended September 30 
Instrument
 
Realized Gain or (Loss)(a)
  
Unrealized Gain or (Loss)(b)
  
Realized Gain or (Loss)(a)
  
Unrealized Gain or (Loss)(b)
 
(in millions)
 2010  2009  2010  2009  2010  2009  2010  2009 
Commodity derivatives(a)
 $(91) $(185) $(2) $77  $(114) $(236) $(181) $(38)
 
(a)After settlement of the derivatives and the fuel is consumed, gains or losses are passed through the fuel cost-recovery clause.
(b)Amounts are recorded in regulatory liabilities and assets, respectively, on the Consolidated Balance Sheets until derivatives are settled.

Instrument
 
Amount of Gain or (Loss) Recognized in
Income on Derivatives
  
Amount of Gain or (Loss)
Recognized in Income on
Derivatives
 
(in millions)
 2010  2009  2010  2009 
Commodity derivatives(a)
 $1  $1  $-  $1 
Fair value loss transition adjustment(a)
  -   1   1   1 
CVOs(a)
  -   1   -   3 
Total $1  $3  $1  $5 
 
(a)Amounts recorded in the Consolidated Statements of Income are classified in other, net.


 
4347

 


The following tables present the effect of derivative instruments on OCI (See Note 4C)5C) and the Consolidated Statements of Income for the sixnine months ended JuneSeptember 30, 2010 and 2009:
Derivatives Designated as Hedging Instruments for the Six Months Ended June 30,
Derivatives designated as hedging instruments for the nine months ended September 30Derivatives designated as hedging instruments for the nine months ended September 30 
Instrument
 
Amount of Gain or (Loss)
Recognized in OCI, Net of Tax
on Derivatives(a)
  
Amount of Gain or (Loss),
Net of Tax Reclassified from
Accumulated OCI into Income(a)
  
Amount of Pre-tax Gain or
(Loss) Recognized in Income
on Derivatives(b)
  
Amount of Gain or
(Loss) Recognized in
OCI, Net of Tax on
Derivatives(a)
  
Amount of Gain or
(Loss), Net of Tax
Reclassified from
Accumulated OCI into
Income(a)
  
Amount of Pre-tax
Gain or (Loss)
Recognized in Income
on Derivatives(b)
 
(in millions)
 2010  2009  2010  2009  2010  2009  2010  2009  2010  2009  2010  2009 
Commodity cash flow derivatives
 $-  $1  $-  $-  $-  $-  $-  $1  $-  $-  $-  $- 
Interest rate derivatives(c) (d)
  (50)  13   (3)  (3)  -   (3)  (80)  7   (4)  (5)  -   (3)
Total $(50) $14  $(3) $(3) $-  $(3) $(80) $8  $(4) $(5) $-  $(3)
 
(a)Effective portion.
(b)Related to ineffective portion and amount excluded from effectiveness testing.
(c)Amounts in accumulated OCI related to terminated hedges are reclassified to earnings as the interest expense is recorded. The effective portion of the hedges will be amortized to interest expense over the term of the related debt.
(d)Amounts recorded in the Consolidated Statements of Income are classified in interest charges.
Derivatives Not Designated as Hedging Instruments for the Six Months Ended June 30,

Derivatives not designated as hedging instruments for the nine months ended September 30Derivatives not designated as hedging instruments for the nine months ended September 30 
Instrument
 
Realized Gain or (Loss)(a)
  
Unrealized Gain or (Loss)(b)
  
Realized Gain or (Loss)(a)
  
Unrealized Gain or (Loss)(b)
 
(in millions)
 2010  2009  2010  2009  2010  2009  2010  2009 
Commodity derivatives(a)
 $(150) $(312) $(236) $(264) $(264) $(548) $(417) $(302)
 
(a)After settlement of the derivatives and the fuel is consumed, gains or losses are passed through the fuel cost-recovery clause.
(b)Amounts are recorded in regulatory liabilities and assets, respectively, on the Consolidated Balance Sheets until derivatives are settled.

 
 
 
Instrument 
Amount of Gain or (Loss) Recognized in
Income on Derivatives
  
Amount of Gain or (Loss)
Recognized in Income on
Derivatives
 
(in millions)
 2010  2009  2010  2009 
Commodity derivatives(a)
 $-  $1 
Fair value loss transition adjustment(a)
 $-  $1   1   2 
CVOs(a)
  -   8   -   11 
Total $-  $9  $1  $14 
 
(a)Amounts recorded in the Consolidated Statements of Income are classified in other, net.


 
4448

 


PECPEC PEC 
                        
The following table presents the fair value of derivative instruments at June 30, 2010 and December 31, 2009: 
The following table presents the fair value of derivative instruments at September 30, 2010 and December 31, 2009:The following table presents the fair value of derivative instruments at September 30, 2010 and December 31, 2009: 
                        
Instrument / Balance sheet location
 June 30, 2010  December 31, 2009  September 30, 2010  December 31, 2009 
(in millions)
 Asset  Liability  Asset  Liability  Asset  Liability  Asset  Liability 
Derivatives designated as hedging instrumentsDerivatives designated as hedging instruments Derivatives designated as hedging instruments 
Interest rate derivatives
                        
Other assets and deferred debits $1     $8     $-     $8    
Derivative liabilities, current     $9      $-      $14      $- 
Other liabilities and deferred credits      11       -       21       - 
Total derivatives designated as hedging instruments  1   20   8   -   -   35   8   - 
                                
Derivatives not designated as hedging instrumentsDerivatives not designated as hedging instruments Derivatives not designated as hedging instruments 
Commodity derivatives(a)
                                
Derivative liabilities, current      38       28       48       28 
Other liabilities and deferred credits      78       62       88       62 
Fair value of derivatives not designated as hedging instruments  -   116   -   90   -   136   -   90 
Fair value loss transition adjustment(b)
                                
Derivative liabilities, current      1       1       1       1 
Other liabilities and deferred credits      4       4       3       4 
Total derivatives not designated as hedging instruments  -   121   -   95   -   140   -   95 
Total derivatives $1  $141  $8  $95  $-  $175  $8  $95 
 
(a)Substantially all of these contracts receive regulatory treatment.
(b)In 2003, PEC recorded a $38 million pre-tax ($23 million after-tax) fair value loss transition adjustment pursuant to the adoption of new accounting guidance for derivatives. The related liability is being amortized to earnings over the term of the related contracts.

The following tables present the effect of derivative instruments on OCI (See Note 5C) and the Consolidated Statements of Income for the three months ended September 30, 2010 and 2009:
The following tables present the effect of derivative instruments on OCI (See Note 4C) and the Consolidated Statements of Income for the three months ended June 30, 2010 and 2009:
                                    
Derivatives Designated as Hedging Instruments for the Three Months Ended June 30, 
Derivatives designated as hedging instruments for the three months ended September 30Derivatives designated as hedging instruments for the three months ended September 30 
Instrument
 
Amount of Gain or (Loss)
Recognized in OCI, Net of Tax
on Derivatives(a)
  
Amount of Gain or (Loss),
Net of Tax Reclassified from
Accumulated OCI into Income(a)
  
Amount of Pre-tax Gain or
(Loss) Recognized in Income
on Derivatives(b)
  
Amount of Gain or
(Loss) Recognized in
OCI, Net of Tax on
Derivatives(a)
  
Amount of Gain or
(Loss), Net of Tax
Reclassified from
Accumulated OCI into
Income(a)
  
Amount of Pre-tax
Gain or (Loss)
Recognized in Income
on Derivatives(b)
 
(in millions)
 2010  2009  2010  2009  2010  2009  2010  2009  2010  2009  2010  2009 
Interest rate derivatives(c) (d)
 $(15) $2  $(1) $(2) $-  $-  $(10) $(1) $(1) $(1) $-  $- 
 
(a)Effective portion.
(b)Related to ineffective portion and amount excluded from effectiveness testing.
(c)Amounts in accumulated OCI related to terminated hedges are reclassified to earnings as the interest expense is recorded. The effective portion of the hedges will be amortized to interest expense over the term of the related debt.
(d)Amounts recorded in the Consolidated Statements of Income are classified in interest charges.


 
4549

 


Derivatives not designated as hedging instruments for the three months ended September 30 
 Instrument
 
Realized Gain or (Loss)(a)
  
Unrealized Gain or (Loss)(b)
 
 (in millions)
 2010  2009  2010  2009 
 Commodity derivatives
 $(17) $(29) $(38) $(8)
 
Derivatives Not Designated as Hedging Instruments for the Three Months Ended June 30,
 Instrument
 
Realized Gain or (Loss)(a)
  
Unrealized Gain or (Loss)(b)
 
 (in millions)
 2010  2009  2010  2009 
 Commodity derivatives
 $(12) $(21) $(2) $7 
(a)After settlement of the derivatives and the fuel is consumed, gains or losses are passed through the fuel cost-recovery clause.
(b)Amounts are recorded in regulatory liabilities and assets, respectively, on the Consolidated Balance Sheets until derivatives are settled.
 
            
Instrument
 
Amount of Gain or (Loss) Recognized in
Income on Derivatives
  
Amount of Gain or (Loss)
Recognized in Income on
Derivatives
 
(in millions)
 2010  2009  2010  2009 
Commodity derivatives(a)
 $1  $1  $-  $1 
Fair value loss transition adjustment(a)
  -   1   1   1 
Total $1  $2  $1  $2 
        
(a)Amounts recorded in the Consolidated Statements of Income are classified in other, net.

 The following tables present the effect of derivative instruments on OCI (See Note 4C)5C) and the Consolidated Statements of Income for the sixnine months ended JuneSeptember 30, 2010 and 2009:
                                    
Derivatives Designated as Hedging Instruments for the Six Months Ended June 30, 
Derivatives designated as hedging instruments for the nine months ended September 30Derivatives designated as hedging instruments for the nine months ended September 30 
Instrument
 
Amount of Gain or (Loss)
Recognized in OCI, Net of Tax
on Derivatives(a)
  
Amount of Gain or (Loss),
Net of Tax Reclassified from
Accumulated OCI into Income(a)
  
Amount of Pre-tax Gain or
(Loss) Recognized in Income
on Derivatives(b)
  
Amount of Gain or
(Loss) Recognized in
OCI, Net of Tax on
Derivatives(a)
  
Amount of Gain or
(Loss), Net of Tax
Reclassified from
Accumulated OCI into
Income(a)
  
Amount of Pre-tax
Gain or (Loss)
Recognized in Income
on Derivatives(b)
 
(in millions)
 2010  2009  2010  2009  2010  2009  2010  2009  2010  2009  2010  2009 
Interest rate derivatives(c) (d)
 $(16) $2  $(2) $(2) $-  $(2) $(26) $1  $(3) $(3) $-  $(2)
                        
(a)Effective portion.
(b)Related to ineffective portion and amount excluded from effectiveness testing.
(c)Amounts in accumulated OCI related to terminated hedges are reclassified to earnings as the interest expense is recorded. The effective portion of the hedges will be amortized to interest expense over the term of the related debt.
(d)Amounts recorded in the Consolidated Statements of Income are classified in interest charges.
Derivatives Not Designated as Hedging Instruments for the Six Months Ended June 30,

Derivatives not designated as hedging instruments for the nine months ended September 30Derivatives not designated as hedging instruments for the nine months ended September 30 
Instrument
 
Realized Gain or (Loss)(a)
  
Unrealized Gain or (Loss)(b)
  
Realized Gain or (Loss)(a)
  
Unrealized Gain or (Loss)(b)
 
(in millions)
 2010  2009  2010  2009  2010  2009  2010  2009 
Commodity derivatives
 $(19) $(39) $(44) $(40) $(36) $(68) $(82) $(49)
 
(a)After settlement of the derivatives and the fuel is consumed, gains or losses are passed through the fuel cost-recovery clause.
(b)Amounts are recorded in regulatory liabilities and assets, respectively, on the Consolidated Balance Sheets until derivatives are settled.

 
4650

 


            
Instrument
 
Amount of Gain or (Loss) Recognized in
Income on Derivatives
  
Amount of Gain or (Loss)
Recognized in Income on
Derivatives
 
(in millions)
 2010  2009  2010  2009 
Commodity derivatives(a)
 $-  $1 
Fair value loss transition adjustment(a)
 $-  $1   1   2 
        
Total $1  $3 
(a)Amounts recorded in the Consolidated Statements of Income are classified in other, net.

 PEF
    
              
 The following table presents the fair value of derivative instruments at JuneSeptember 30, 2010 and December 31, 2009:
                        
Instrument / Balance sheet location
 June 30, 2010  December 31, 2009  September 30, 2010  December 31, 2009 
(in millions)
 Asset  Liability  Asset  Liability  Asset  Liability  Asset  Liability 
Derivatives designated as hedging instrumentsDerivatives designated as hedging instruments Derivatives designated as hedging instruments 
Interest rate derivatives
                        
Prepayments and other current assets $-     $5     $-     $5    
Derivative liabilities, current     $18      $- 
Derivative liabilities, long-term     $12      $-       3       - 
Total derivatives designated as hedging instruments  -   12   5   -   -   21   5   - 
                                
Derivatives not designated as hedging instrumentsDerivatives not designated as hedging instruments Derivatives not designated as hedging instruments 
Commodity derivatives(a)
                                
Prepayments and other current assets  9       11       7       11     
Other assets and deferred debits  5       9       4       9     
Derivative liabilities, current      179       161       206       161 
Derivative liabilities, long-term      211       174       228       174 
Total derivatives not designated as hedging instruments  14   390   20   335   11   434   20   335 
Total derivatives $14  $402  $25  $335  $11  $455  $25  $335 
                
(a)Substantially all of these contracts receive regulatory treatment.

 The following tables present the effect of derivative instruments on OCI (See Note 4C)5C) and the Statements of Income for the three months ended JuneSeptember 30, 2010 and 2009:
                                    
Derivatives Designated as Hedging Instruments for the Three Months Ended June 30, 
Derivatives designated as hedging instruments for the three months ended September 30Derivatives designated as hedging instruments for the three months ended September 30 
Instrument
 
Amount of Gain or (Loss)
Recognized in OCI, Net of Tax
on Derivatives(a)
  
Amount of Gain or (Loss),
Net of Tax Reclassified from
Accumulated OCI into Income(a)
  
Amount of Pre-tax Gain or
(Loss) Recognized in Income
on Derivatives(b)
  
Amount of Gain or
(Loss) Recognized in
OCI, Net of Tax on
Derivatives(a)
  
Amount of Gain or
(Loss), Net of Tax
Reclassified from
Accumulated OCI into
Income(a)
  
Amount of Pre-tax
Gain or (Loss)
Recognized in Income
on Derivatives(b)
 
(in millions)
 2010  2009  2010  2009  2010  2009  2010  2009  2010  2009  2010  2009 
Interest rate derivatives(c) (d)
 $(7) $3  $-  $-  $-  $-  $(6) $(1) $-  $-  $-  $- 
                        
(a)Effective portion.
(b)Related to ineffective portion and amount excluded from effectiveness testing.
(c)Amounts in accumulated OCI related to terminated hedges are reclassified to earnings as the interest expense is recorded. The effective portion of the hedges will be amortized to interest expense over the term of the related debt.
(d)Amounts recorded in the Statements of Income are classified in interest charges.
 
 
4751

 
 
Derivatives Not Designated as Hedging Instruments for the Three Months Ended June 30,
Derivatives not designated as hedging instruments for the three months ended September 30 
 Instrument
 
Realized Gain or (Loss)(a)
  
Unrealized Gain or (Loss)(b)
 
 (in millions)
 2010  2009  2010  2009 
 Commodity derivatives
 $(97) $(207) $(143) $(30)
 Instrument
 
Realized Gain or (Loss)(a)
  
Unrealized Gain or (Loss)(b)
 
 (in millions)
 2010  2009  2010  2009 
 Commodity derivatives
 $(79) $(164) $-  $70 
  
(a)After settlement of the derivatives and the fuel is consumed, gains or losses are passed through the fuel cost-recovery clause.
(b)
Amounts are recorded in regulatory liabilities and assets, respectively, on the Balance Sheets until derivatives are settled.

 The following tables present the effect of derivative instruments on OCI (See Note 4C)5C) and the Statements of Income for the sixnine months ended JuneSeptember 30, 2010 and 2009:
                                    
Derivatives Designated as Hedging Instruments for the Six Months Ended June 30, 
Derivatives designated as hedging instruments for the nine months ended September 30Derivatives designated as hedging instruments for the nine months ended September 30 
Instrument
 
Amount of Gain or (Loss)
Recognized in OCI, Net of Tax
on Derivatives(a)
  
Amount of Gain or (Loss),
Net of Tax Reclassified from
Accumulated OCI into Income(a)
  
Amount of Pre-tax Gain or
(Loss) Recognized in Income
on Derivatives(b)
  
Amount of Gain or
(Loss) Recognized in
OCI, Net of Tax on
Derivatives(a)
  
Amount of Gain or
(Loss), Net of Tax
Reclassified from
Accumulated OCI into
Income(a)
  
Amount of Pre-tax
Gain or (Loss)
Recognized in Income
on Derivatives(b)
 
(in millions)
 2010  2009  2010  2009  2010  2009  2010  2009  2010  2009  2010  2009 
Interest rate derivatives(c) (d)
 $(10) $3  $-  $-  $-  $-  $(16) $2  $-  $-  $-  $- 
                      
(a)Effective portion.
(b)Related to ineffective portion and amount excluded from effectiveness testing.
(c)Amounts in accumulated OCI related to terminated hedges are reclassified to earnings as the interest expense is recorded. The effective portion of the hedges will be amortized to interest expense over the term of the related debt.
(d)Amounts recorded in the Consolidated Statements of Income are classified in interest charges.
 
Derivatives Not Designated as Hedging Instruments for the Six Months Ended June 30,
Derivatives not designated as hedging instruments for the nine months ended September 30 
 Instrument
 
Realized Gain or (Loss)(a)
  
Unrealized Gain or (Loss)(b)
 
 (in millions)
 2010  2009  2010  2009 
 Commodity derivatives
 $(228) $(480) $(335) $(253)
 Instrument
 
Realized Gain or (Loss)(a)
  
Unrealized Gain or (Loss)(b)
 
 (in millions)
 2010  2009  2010  2009 
 Commodity derivatives
 $(131) $(273) $(192) $(224)
  
(a)After settlement of the derivatives and the fuel is consumed, gains or losses are passed through the fuel cost-recovery clause.
(b)Amounts are recorded in regulatory liabilities and assets, respectively, on the Balance Sheets until derivatives are settled.

48

10.FINANCIAL INFORMATION BY BUSINESS SEGMENT
11.      FINANCIAL INFORMATION BY BUSINESS SEGMENT
 
Our reportable segments are PEC and PEF, both of which are primarily engaged in the generation, transmission, distribution and sale of electricity in portions of North Carolina and South Carolina and in portions of Florida, respectively. These electric operations also distribute and sell electricity to other utilities, primarily on the east coastEast Coast of the United States.
 
In addition to the reportable operating segments, the Corporate and Other segment includes the operations of the Parent and PESC and other miscellaneous nonregulated businesses that do not separately meet the quantitative thresholds for disclosure as separate reportable business segments.
 
52

Products and services are sold between the various reportable segments. All intersegment transactions are at cost.
 
(in millions) PEC  PEF  
Corporate
and Other
  Eliminations  Totals  PEC  PEF  
Corporate
and Other
  Eliminations  Totals 
At and for the three months ended June 30, 2010          
At and for the three months ended September 30, 2010At and for the three months ended September 30, 2010          
Revenues                              
Unaffiliated $1,117  $1,252  $3  $-  $2,372  $1,414  $1,543  $5  $-  $2,962 
Intersegment  -   -   53   (53)  -   -   -   66   (66)  - 
Total revenues  1,117   1,252   56   (53)  2,372   1,414   1,543   71   (66)  2,962 
Ongoing Earnings (loss)  112   119   (50)  -   181 
Ongoing Earnings  233   177   (49)  -   361 
Assets  13,966   13,693   20,690   (16,212)  32,137   14,343   14,021   21,017   (16,675)  32,706 
                                        
For the three months ended June 30, 2009                
For the three months ended September 30, 2009For the three months ended September 30, 2009                
Revenues                                        
Unaffiliated $1,076  $1,234  $2  $-  $2,312  $1,307  $1,516  $1  $-  $2,824 
Intersegment  -   -   55   (55)  -   -   -   52   (52)  - 
Total revenues  1,076   1,234   57   (55)  2,312   1,307   1,516   53   (52)  2,824 
Ongoing Earnings (loss)  94   121   (34)  -   181 
Ongoing Earnings  212   170   (40)  -   342 
                      
At and for the six months ended June 30, 2010             
At and for the nine months ended September 30, 2010At and for the nine months ended September 30, 2010             
Revenues                                        
Unaffiliated $2,380  $2,522  $5  $-  $4,907  $3,794  $4,064  $11  $-  $7,869 
Intersegment  -   -   114   (114)  -   -   1   179   (180)  - 
Total revenues  2,380   2,522   119   (114)  4,907   3,794   4,065   190   (180)  7,869 
Ongoing Earnings (loss)  260   232   (97)  -   395 
Ongoing Earnings  493   409   (146)  -   756 
Assets  13,966   13,693   20,690   (16,212)  32,137   14,343   14,021   21,017   (16,675)  32,706 
                    
For the six months ended June 30, 2009                
Revenues                    
Unaffiliated $2,254  $2,496  $4  $-  $4,754 
Intersegment  -   -   120   (120)  - 
Total revenues  2,254   2,496   124   (120)  4,754 
Ongoing Earnings (loss)  223   212   (72)  -   363 
                    
                
For the nine months ended September 30, 2009             
Revenues               
Unaffiliated $3,561  $4,012  $5  $-  $7,578 
Intersegment  -   -   171   (171)  - 
Total revenues  3,561   4,012   176   (171)  7,578 
Ongoing Earnings  435   382   (113)  -   704 
                     
Management uses the non-GAAP financial measure “Ongoing Earnings” as a performance measure to evaluate the results of our segments and operations. Ongoing Earnings is computed as GAAP net income attributable to controlling interests after excluding discontinued operations and the effects of certain identified gains and charges, which are considered Ongoing Earnings adjustments. Some of the excluded gains and charges have occurred in more than one reporting period but are not considered representative of fundamental core earnings. Management has identified the following Ongoing Earnings adjustments: tax levelization, which increases or decreases the tax expense recorded in the reporting period to reflect the annual projected tax rate, because it has no impact on annual earnings; CVO mark-to-market adjustments because we are unable to predict changes in their fair value; and the
49

impact from changes in the tax treatment of the Medicare Part D subsidy because GAAP requires that the impact of the tax law change be accounted for in the period of enactment rather than the affected tax year. Additionally, management has determined thatdoes not consider impairments, charges (and subsequent adjustments, if any) recognized for the retirement of generating units prior to the end of their estimated useful lives and operating results of discontinued operations are notto be representative of our ongoing operations and should be excluded these items in computing Ongoing Earnings.
 
53

Reconciliations of consolidated Ongoing Earnings to net income attributable to controlling interests follow:

 For the three months ended June 30,  For the three months ended September 30 
(in millions) 2010  2009  2010  2009 
Ongoing Earnings $181  $181  $361  $342 
Tax levelization  -   (5)  4   7 
CVO mark-to-market (Note 9D)  -   1 
CVO mark-to-market (Note 10D)  -   3 
Impairment, net of tax benefit of $1  (1)  (2)  (2)  - 
Plant retirement adjustment, net of tax expense of $-  1   - 
Income from continuing operations before cumulative effect of change in
accounting principle
  181   175 
Discontinued operations, net of tax  (1)  (1)
Net income attributable to controlling interests $180  $174 
        
 For the six months ended June 30, 
(in millions)  2010   2009 
Ongoing Earnings $395  $363 
Tax levelization  (2)  (12)
CVO mark-to-market (Note 9D)  -   8 
Impairment, net of tax benefit of $1  (2)  (2)
Plant retirement adjustment, net of tax expense of $1  1   - 
Change in tax treatment of the Medicare Part D subsidy (Note 8)  (22)  - 
Plant retirement charge, net of tax benefit of $2  -   (3)
Continuing income attributable to noncontrolling interests, net of tax  2   1   2   1 
Income from continuing operations before cumulative effect of change in
accounting principle
  372   358   365   350 
Discontinued operations, net of tax  -   (1)  (2)  (102)
Cumulative effect of change in accounting principle, net of tax  (2)  -   2   - 
Net income attributable to noncontrolling interests, net of tax  -   (1)  (4)  (1)
Net income attributable to controlling interests $370  $356  $361  $247 
        
       
  For the nine months ended September 30 
(in millions) 2010  2009 
Ongoing Earnings $756  $704 
Tax levelization  3   (4)
CVO mark-to-market (Note 10D)  -   11 
Impairment, net of tax benefit of $3 and $1, respectively  (5)  (2)
Plant retirement adjustment (charge), net of tax (expense) benefit of $(1) and $2, respectively  1   (3)
Change in tax treatment of the Medicare Part D subsidy (Note 9)  (22)  - 
Continuing income attributable to noncontrolling interests, net of tax  4   2 
Income from continuing operations before cumulative effect of change in accounting principle  737   708 
Discontinued operations, net of tax  (2)  (103)
Net income attributable to noncontrolling interests, net of tax  (4)  (2)
Net income attributable to controlling interests $731  $603 
 
 
5054

 
12.      OTHER INCOME AND OTHER EXPENSE
11.OTHER INCOME AND OTHER EXPENSE

Other income and expense includes interest income and other income and expense items as discussed below. Nonregulated energy and delivery services include power protection services and mass market programs such as surge protection, appliance services and area light sales, and delivery, transmission and substation work for other utilities. The components of other, net as shown on the accompanying Statements of Income were as follows:
  
PROGRESS ENERGY       
 Three months ended June 30, Six months ended June 30, 
(in millions) 2010  2009  2010  2009 
Nonregulated energy and delivery services income, net $8  $8  $7  $9 
CVOs unrealized gain, net  -   1   -   8 
Donations  (2)  (2)  (6)  (5)
Other, net  (1)  6   (1)  - 
Other, net $5  $13  $-  $12 
                 
PEC         
 Three months ended June 30, Six months ended June 30, 
(in millions)  2010   2009   2010   2009 
Nonregulated energy and delivery services income, net $6  $6  $2  $4 
Donations  (1)  (2)  (3)  (3)
Other, net  (1)  -   (2)  (4)
Other, net $4  $4  $(3) $(3)
                 
PEF         
 Three months ended June 30, Six months ended June 30, 
(in millions)  2010   2009   2010   2009 
Nonregulated energy and delivery services income, net $2  $3  $5  $6 
Donations  (1)  (1)  (2)  (3)
Other, net  -   5   -   4 
Other, net $1  $7  $3  $7 
                 
PROGRESS ENERGY       
  Three months ended September 30  Nine months ended September 30 
(in millions) 2010  2009  2010  2009 
Nonregulated energy and delivery services (expense) income, net $(4) $(2) $3  $7 
CVOs unrealized gain, net (Note 10D)  -   3   -   11 
Investment gains, net  5   1   5   5 
Donations  (7)  (3)  (13)  (8)
Other, net  1   2   -   (2)
Other, net $(5) $1  $(5) $13 
 
PEC       
  Three months ended September 30  Nine months ended September 30 
(in millions) 2010  2009  2010  2009 
Nonregulated energy and delivery services expense, net $(7) $(4) $(5) $(1)
Investment gains (losses), net  4   (2)  2   (4)
Donations  (1)  (1)  (5)  (4)
Other, net  2   5   3   4 
Other, net $(2) $(2) $(5) $(5)
 
12.ENVIRONMENTAL MATTERS
PEF       
  Three months ended September 30  Nine months ended September 30 
(in millions) 2010  2009  2010  2009 
Nonregulated energy and delivery services income, net $3  $2  $8  $8 
Donations  (6)  (1)  (8)  (4)
Investment gains, net  -   1   2   6 
Other, net  -   (1)  (2)  (2)
Other, net $(3) $1  $-  $8 

13.      ENVIRONMENTAL MATTERS
 
We are subject to regulation by various federal, state and local authorities in the areas of air quality, water quality, control of toxic substances and hazardous and solid wastes, and other environmental matters. We believe that we are in substantial compliance with those environmental regulations currently applicable to our business and operations and believe we have all necessary permits to conduct such operations. Environmental laws and regulations frequently change and the ultimate costs of compliance cannot always be precisely estimated.
 
A.HAZARDOUS AND SOLID WASTE
A.HAZARDOUS AND SOLID WASTE
 
The provisions of the Comprehensive Environmental Response, Compensation and Liability Act of 1980, as amended (CERCLA), authorize the United States Environmental Protection Agency (EPA) to require the cleanup of hazardous waste sites. This statute imposes retroactive joint and several liabilities. Some states, including North Carolina, South Carolina and Florida, have similar types of statutes. We are periodically notified by regulators,
55

including the EPA and various state agencies, of our involvement or potential involvement in sites that may require investigation and/or remediation. There are presently several sites with respect to which we have been notified of

51


our potential liability by the EPA, the state of North Carolina, the state of Florida, or potentially responsible party (PRP) groups as described below in greater detail. Various organic materials associated with the production of manufactured gas, generally referred to as coal tar, are regulated under federal and state laws. PEC and PEF are each PRPs at several manufactured gas plant (MGP) sites. We are also currently in the process of assessing potential costs and exposures at other sites. These costs are eligible for regulatory recovery through either base rates or cost-recovery clauses. Both PEC and PEF evaluatee valuate potential claims against other PRPs and insurance carriers and plan to submit claims for cost recovery where appropriate. The outcome of potential and pending claims cannot be predicted. A discussion of sites by legal entity follows.
 
The EPA and a number of states are considering additional regulatory measures that may affect management, treatment, marketing and disposal of coal combustion residues, primarily ash, from each of the Utilities’ coal-fired plants. Revised or new laws or regulations under consideration may impose changes in solid waste classifications or groundwater protection environmental controls. On June 21, 2010, the EPA proposed two options for new rules to regulate coal combustion residues. The first option would create a comprehensive program of federally enforceable requirements for coal combustion residues management and disposal as hazardous waste. The other option would have the EPA set performance standards for coal combustion products management facilities and regulate disposal of coal combustion products as nonhazardous waste. The E PA did not identify a preferred option. Under both options, the EPA may leave in place a regulatory exemption for approved beneficial uses of coal combustion residuals that are recycled. A final rule is expected in 2011. Compliance plans and estimated costs to meet the requirements of new regulations will be determined when any new regulations are finalized. We are also evaluating the effect on groundwater quality from past and current operations, which may result in operational changes and additional measures under existing regulations. These issues are also under evaluation by state agencies. Certain regulated chemicals have been measured in wells near our ash ponds at levels above groundwater quality standards. Additional monitoring and investigation will be conducted. Detailed plans and cost estimates will be determined if these evaluations reveal that corrective actions are necessary. We cannot predict the outcome of this matter.
We measure our liability for environmental sites based on available evidence, including our experience in investigating and remediating environmentally impaired sites. The process often involves assessing and developing cost-sharing arrangements with other PRPs. For all sites, as assessments are developed and analyzed, we will accrue costs for the sites to the extent our liability is probable and the costs can be reasonably estimated. Because the extent of environmental impact, allocation among PRPs for all sites, remediation alternatives (which could involve either minimal or significant efforts), and concurrence of the regulatory authorities have not yet reached the stage where a reasonable estimate of the remediation costs can be made, we cannot determine the total costs that may be incurred in connection with the remediation of all sites at this time. It is probable that current estimates will change and additional losses, which could be material, may be incurred in the future.

56

The following tables contain information about accruals for probable and estimable costs related to various environmental sites, which were included in other current liabilities and other liabilities and deferred credits on the Balance Sheets:
         
PROGRESS ENERGY
                  
(in millions)
 
MGP and
Other Sites
  
Remediation
of Distribution
and Substation Transformers
  Total  
MGP and
Other Sites
  
Remediation
of Distribution
and Substation
Transformers
  Total 
Balance, December 31, 2009
 $22  $20  $42  $22  $20  $42 
Amount accrued for environmental loss contingencies(a)
  4   10   14   7   11   18 
Expenditures for environmental loss contingencies(b)
  (7)  (9)  (16)  (8)  (14)  (22)
Balance, June 30, 2010(c)
 $19  $21  $40 
Balance, September 30, 2010(c)
 $21  $17  $38 
                        
Balance, December 31, 2008
 $31  $22  $53  $31  $22  $53 
Amount accrued for environmental loss contingencies(a)
  4   2   6   3   11   14 
Expenditures for environmental loss contingencies(b)
  (6)  (7)  (13)  (8)  (11)  (19)
Balance, June 30, 2009(c)
 $29  $17  $46 
            
Balance, September 30, 2009(c)
 $26  $22  $48 
(a)Amounts accrued are for the sixnine months ended JuneSeptember 30, 2010 and 2009. For the three months ended JuneSeptember 30, 2010, we accrued $2our accruals were $3 million for the remediation of MGP and other sites and $8 millionwere not material for the remediation of distribution and substation transformers. For the three months ended JuneSeptember 30, 2009, our accruals for the remediation of MGP and other sites were not material and were $9 million for the remediation of distribution and substation transformers were not material.transformers.
(b)Expenditures are for the sixnine months ended JuneSeptember 30, 2010 and 2009. For the three months ended JuneSeptember 30, 2010, we spent $5 millionour expenditures were not material for the remediation of MGP and other sites and were $5 million for the remediation of distribution and substation transformers. For the three months ended JuneSeptember 30, 2009, our expenditures were not material for the remediation of MGP and other sites and were $4 million for the remediation of distribution and substation transformers were not material.transformers.
(c)Expected to be paid out over one to 15 years.

52

 PEC
   
 (in millions)
 
MGP and
Other Sites
 
 Balance, December 31, 2009
 $13 
 Amount accrued for environmental loss contingencies(a)
  3 
 Expenditures for environmental loss contingencies(b)
  (4)
 Balance, September 30, 2010(c)
 $12 
     
 Balance, December 31, 2008
 $16 
 Amount accrued for environmental loss contingencies(a)
  3 
 Expenditures for environmental loss contingencies(b)
  (6)
 Balance, September 30, 2009(c)
 $13 
 
PEC   
 (in millions)
 
MGP and
Other Sites
 
 Balance, December 31, 2009
 $13 
 Amount accrued for environmental loss contingencies(a)
  2 
 Expenditures for environmental loss contingencies(b)
  (3)
 Balance, June 30, 2010(c)
 $12 
     
 Balance, December 31, 2008
 $16 
 Amount accrued for environmental loss contingencies(a)
  4 
 Expenditures for environmental loss contingencies(b)
  (4)
 Balance, June 30, 2009(c)
 $16 
     
(a)Amounts accrued are for the sixnine months ended JuneSeptember 30, 2010 and 2009. For the three months ended JuneSeptember 30, 2010 and 2009, PEC's accruals for the remediation of MGP and other sites were not material.
(b)Expenditures are for the sixnine months ended JuneSeptember 30, 2010 and 2009. For the three months ended JuneSeptember 30, 2010 and 2009, PEC's expenditures for the remediation of MGP and other sites were not material.
(c)Expected to be paid out over one to five years.        

 PEF
         
 (in millions)
 
MGP and
Other Sites
  
Remediation
of Distribution
and Substation Transformers
  Total 
 Balance, December 31, 2009
 $9  $20  $29 
 Amount accrued for environmental loss contingencies(a)
  2   10   12 
 Expenditures for environmental loss contingencies(b)
  (4)  (9)  (13)
 Balance, June 30, 2010(c)
 $7  $21  $28 
             
 Balance, December 31, 2008
 $15  $22  $37 
 Amount accrued for environmental loss contingencies(a)
  -   2   2 
 Expenditures for environmental loss contingencies(b)
  (2)  (7)  (9)
 Balance, June 30, 2009(c)
 $13  $17  $30 
             
57

 PEF
         
 (in millions)
 
MGP and
Other Sites
  
Remediation
of Distribution
and Substation Transformers
  Total 
 Balance, December 31, 2009
 $9  $20  $29 
 Amount accrued for environmental loss contingencies(a)
  4   11   15 
 Expenditures for environmental loss contingencies(b)
  (4)  (14)  (18)
 Balance, September 30, 2010(c)
 $9  $17  $26 
             
 Balance, December 31, 2008
 $15  $22  $37 
 Amount accrued for environmental loss contingencies(a)
  -   11   11 
 Expenditures for environmental loss contingencies(b)
  (2)  (11)  (13)
 Balance, September 30, 2009(c)
 $13  $22  $35 
(a)Amounts accrued are for the sixnine months ended JuneSeptember 30, 2010 and 2009. For the three months ended JuneSeptember 30, 2010, PEF accrued $2 million for the remediation of MGP and other sites and $8 million for the remediation of distribution and substation transformers. For the three months ended June 30, 2009, PEF's accruals for the remediation of MGP and other sites and for the remediation of distribution and substation transformers were not material. For the three months ended September 30, 2009, PEF's accruals for the remediation of MGP and other sites were not material and were $9 million for the remediation of distribution and substation transformers.
(b)Expenditures are for the sixnine months ended JuneSeptember 30, 2010 and 2009. For the three months ended JuneSeptember 30, 2010, PEF spent $4 millionPEF's expenditures for the remediation of MGP and other sites were not material and were $5 million for the remediation of distribution and substation transformers. For the three months ended JuneSeptember 30, 2009, PEF's expenditures for the remediation of MGP and other sites were not material and were $4 million for the remediation of distribution and substation transformers were not material.transformers.
(c)Expected to be paid out over one to 15 years.        

PROGRESS ENERGY
 
In addition to PEC’s Ward Transformer site located in Raleigh, N.C. (Ward), PEF’s distribution and substation transformers sites, and the Utilities’ MGP sites discussed under “PEC” and “PEF” below, we incurred indemnity obligations related to certain pre-closing liabilities of divested subsidiaries, including certain environmental matters (See discussion under Guarantees in Note 13B)14B).
53

 
PEC
 
PEC has recorded a minimum estimated total remediation cost for all of its remaining MGP sites based upon its historical experience with remediation of several of its MGP sites. The maximum amount of the range for all the sites cannot be determined at this time. Actual experience may differ from current estimates, and it is probable that estimates will continue to change in the future.
 
In 2004, the EPA advised PEC that it had been identified as a PRP at the Ward site.Transformer site in Raleigh, N.C. (Ward). The EPA offered PEC and a number of other PRPs the opportunity to negotiate the removal action for the Ward site and reimbursement to the EPA for the EPA’s past expenditures in addressing conditions at the Ward site. Subsequently, PEC and other PRPs signed a settlement agreement, which requires the participating PRPs to remediate the Ward site. At JuneSeptember 30, 2010 and December 31, 2009, PEC’s recorded liability for the site was approximately $5 million and $4 million, respectively. In 2008 and 2009, PEC filed civil actions against PRPs seeking contribution for and recovery of costs incurred in remediating the Ward site, as well as a declaratory judgment that defendants are jointly and severally liable forfo r response costs at the site. PEC has set tledsettled with a number of the PRPs and is in active settlement negotiations with others. On March 24, 2010, the federal district court in which this matter is pending denied motions to dismiss filed by a number of defendants, but granted several other motions filed by state agencies and successor entities. The court also set a trial date for May 7, 2012. On June 15, 2010, the court entered a case management order and discovery is proceeding. The outcome of these matters cannot be predicted.
58

 
On September 30, 2008, the EPA issued a Record of Decision for the operable unit for stream segments downstream from the Ward site (Ward OU1) and advised 61 parties, including PEC, of their identification as PRPs for Ward OU1 and for the operable unit for further investigation at the Ward facility and certain adjacent areas (Ward OU2). The EPA’s estimate for the selected remedy for Ward OU1 is approximately $6 million. The EPA offered PEC and the other PRPs the opportunity to negotiate implementation of a response action for Ward OU1 and a remedial investigation and feasibility study for Ward OU2, as well as reimbursement to the EPA of approximately $1 million for the EPA’s past expenditures in addressing conditions at the site. On January 19, 2009, PEC and several of the other participating PRPs at the Ward site submi tted a letter containing a good faith response to the EPA’s special notice letter. Another group of PRPs separately submitted a good faith response, which the EPA advised would be used to negotiate implementation of the required actions. The other PRPs’ good faith response was subsequently withdrawn. Discussions among representatives of certain PRPs, including PEC, and the EPA are ongoing. Although a loss is considered probable, an agreement among the PRPs for these matters has not been reached; consequently, it is not possible at this time to reasonably estimate the total amount of PEC’s obligation, if any, for Ward OU1 and Ward OU2.
 
PEF
 
The accruals for PEF’s MGP and other sites relate to two former MGP sites and other sites associated with PEF that have required, or are anticipated to require, investigation and/or remediation. The maximum amount of the range for all the sites cannot be determined at this time. Actual experience may differ from current estimates, and it is probable that estimates will continue to change in the future.
 
PEF has received approval from the FPSC for recovery through the Environmental Cost Recovery Clause (ECRC)ECRC of the majority of costs associated with the remediation of distribution and substation transformers. Under agreements with the Florida Department of Environmental Protection (FDEP), PEF has reviewed all distribution transformer sites and all substation sites for mineral oil-impacted soil caused by equipment integrity issues. Should additional distribution transformer sites be identified outside of this population, the distribution O&M costs will not be recoverable through the ECRC. At JuneSeptember 30, 2010 and December 31, 2009, PEF has recorded a regulatory asset for the probable recovery of costs through the ECRC related to the sites included under the agreement with the FDEP.
 
54

B.AIR AND WATER QUALITY
 
B.AIR AND WATER QUALITY
At JuneSeptember 30, 2010 and December 31, 2009, we were subject to various current federal, state and local environmental compliance laws and regulations governing air and water quality, resulting in capital expenditures and increased O&M expenses. These compliance laws and regulations included the Clean Air Interstate Rule (CAIR), the Clean Air Visibility Rule (CAVR), the Clean Smokestacks Act and mercury regulation. PEC’s and PEF’s environmental compliance capital expenditures related to these regulations began in 2002 and 2005, respectively. PEC’s environmental compliance projects under the first phase of Clean Smokestacks Act emission reductions have been placed in service. PEF’s CAIR projects have been placed in service.
 
On July 11,In 2008, the U.S. Court of Appeals for the District of Columbia Circuit (D.C. Court of Appeals) issued its decision on multiple challenges to the CAIR, whichinitially vacated the CAIR in its entirety. On December 23, 2008, in response to petitions for rehearing filed by a number of parties, the D.C. Court of Appealsentirety and subsequently remanded the CAIRrule without vacating the ruleit for the EPA to conduct further proceedings consistent with the D.C. Court of Appeals’court’s prior opinion. On August 2, 2010, the EPA published the proposed Transport Rule, which is the regulatory program that will replace the CAIR when finalized. The proposed Transport Rule contains new emissions trading programs for nitrogen oxides (NOx) and sulfur dioxide (SO2) emissions as well as more stringent overall emi ssionsemissions targets. The EPA plans to finalize the Transport Rule in the spring of 2011. Due to significant investments in NOx and SO2 emissions controls and fleet modernization projects completed or underway,under way, we believe both PEC and PEF are well positioned to comply with the Transport Rule. The outcome of the EPA’s rulemaking cannot be predicted. Because the D.C. Court of Appeals’ December 23, 2008 decision remanded the CAIR, the current implementation of the CAIR continues to fulfill best available retrofit technology (BART) for NOx and SO2 for BART-affected units under the CAVR. Should this determination change as the Transport Rule is promulgated, CAVR compliance eventually may require consideration of NOx and SO2 emissions reductions in addition to particulate mat termatter emissions reductions for BART-eligible units.
59

 
On February 8,In 2008, the D.C. Court of Appeals vacated the delisting determination and the Clean Air Mercury Rule (CAMR). The U.S. Supreme Court declined to hear an appeal of the D.C. Court of Appeals’ decision in January 2009.decision. As a result, the EPA subsequently announced that it will develop a maximum achievable control technology (MACT) standard consistent with the agency’s original listing determination. In addition, North Carolina adopted a state specificstate-specific requirement. The North Carolina mercury rule contains a requirement that all coal-fired units in the state install mercury controls by December 31, 2017, and requires compliance plan applications to be submitted in 2013. We are currently evaluating the impact of these decisions. The outcome of these matters cannot be predicted.
 
To date, expenditures at PEF for CAIR regulation primarily relate to environmental compliance projects at Crystal River Units No. 4 and No. 5 (CR4 and CR5). The CR4 project was placed in service in May 2010 and the CR5 project was placed in service on December 2, 2009. Under an agreement with the FDEP, PEF will retire Crystal River Units No. 1 and No. 2 (CR1 and CR2) as coal-fired units and operate emission control equipment at CR4 and CR5. CR1 and CR2 will be retired after the second proposed nuclear unit at Levy completes its first fuel cycle, which was originally anticipated to be around 2020. As discussed in Note 3B,4B, PEF identified in its 2010 nuclear cost-recovery filing regulatory and economic conditions causing schedule shifts such that major construction activities are being postponed until after the NRC issues the Levy COL. As required, PEF has advised the FDEP of these developments that will delay the retirement of CR1 and CR2 beyond the originally anticipated completion date of the first fuel cycle for Levy Unit 2. We are currently evaluating the impacts of the Levy schedule on PEF’s compliance with environmental regulations. We cannot predict the outcome of this matter.
 
The EPA is continuing to record allowance allocations under the CAIR NOx trading program, in some cases for years beyond the estimated two-year period for promulgation of a replacement rule. The EPA’s continued recording of CAIR NOx allowance allocations does not guarantee that allowances will continue to be usable for compliance after a replacement rule is finalized or that they will continue to have value in the future. SO2 emission allowances will be utilized to comply with existing Clean Air Act requirements. PEF’s CAIR expenses, including NOx allowance inventory expense, are recoverable through the ECRC. Emission allowances are included on the Balance Sheets in inventory and in other assets and deferred debits and have not changed materially from what was reported in the 2009 Form 10-K.
 
55

The EPA and a number of states are considering additional regulatory measures that may affect management, treatment, marketing and disposal of coal combustion products, primarily ash, from each of the Utilities’ coal-fired plants. Revised or new laws or regulations under consideration may impose changes in solid waste classifications or groundwater protection environmental controls. On June 21, 2010, the EPA proposed two options for new rules to regulate coal combustion products. The first option would create a comprehensive program of federally-enforceable requirements for coal combustion products management and disposal as hazardous waste. The other option would have the EPA set performance standards for coal combustion products management facilities and regulate disposal of coal combustion products as non-hazardous waste. The EPA did not identify a preferred option. Under both options, the EPA may leave in place a regulatory exemption for approved beneficial uses of coal combustion residuals that are recycled. The 90-day public comment period ends on September 20, 2010, and a final rule is expected in 2011. Compliance plans and estimated costs to meet the requirements of new regulations will be determined when any new regulations are finalized. We are also evaluating the effect on groundwater quality from past and current operations, which may result in operational changes and additional measures under existing regulations. These issues are also under evaluation by state agencies. Certain regulated chemicals have been measured in wells near our ash ponds at levels above groundwater quality standards. Additional monitoring and investigation will be conducted. Detailed plans and cost estimates will be determined if these evaluations reveal that corrective actions are necessary. We cannot predict the outcome of this matter.
13.COMMITMENTS AND CONTINGENCIES
14.       COMMITMENTS AND CONTINGENCIES
 
Contingencies and significant changes to the commitments discussed in Note 22 in the 2009 Form 10-K are described below.
 
A.A.      PURCHASE OBLIGATIONS
 
As part of our ordinary course of business, we and the Utilities enter into various long- and short-term contracts for fuel requirements at our generating plants. Significant changes from the commitment amounts reported in Note 22A in the 2009 Form 10-K can result from new contracts, changes in existing contracts, along withand the impact of fluctuations in current estimates of future market prices for those contracts that are market price indexed. In most cases, these contracts contain provisions for price adjustments, minimum purchase levels and other financial commitments. Additional commitments for fuel and related transportation will be required to supply the Utilities’ future needs. At JuneSeptember 30, 2010, our and the Utilities’ contractual cash obligations and other commercial commitments have not changed materially from what wasw as reported in the 2009 Form 10-K except as follows.
 
PEC
 
In April 2010, PEC entered into a conditional agreement for firm pipeline transportation capacity to support PEC’s gas supply needs for the approximate period of June 2013 through May 2033. The total cost to PEC associated with this agreement is estimated to be approximately $477 million. The agreement is subject to several conditions precedent, including various state regulatory approvals, the completion and commencement of operation of necessary related intrastate natural gas pipeline system expansions and other contractual provisions. Due to the conditions of this agreement, the estimated costs are not currently considered a fuel commitment of PEC.

60


On October 1, 2010, PEC entered into long-term service agreements for its Richmond County, N.C., Wayne County, N.C., and New Hanover County, N.C., generating facilities discussed in Note 4A, covering projected maintenance events for each facility through 2033, 2028 and 2029, respectively. The total cost to PEC associated with these agreements is estimated to be approximately $379 million over the term of the agreements, including an immaterial amount, $13 million, $27 million and $339 million, respectively, for less than one year, one to three years, three to five years and more than five years from December 31, 2009.
 
PEF
 
PEF’s construction obligations included in Note 22A to the 2009 Form 10-K, which were primarily comprised of contractual obligations related to the Levy Engineering, Procurement, and Construction (EPC) agreement, totaled $1.455 billion, $2.981 billion, $2.818 billion and $1.543$1.543 billion, respectively, for less than one year, one to three years, three to five years and more than five years from December 31, 2009. We executed an amendment to the EPC agreement in 2010 because of schedule shifts in the Levy project (See Note 3B)4B), and will postpone major construction activities on the project until after the NRC issues the COL, which is expected to be in late 2012 if the licensing schedule remains on track. Therefore, we will defer substantially a llall expenditures under the EPC agreement until the COL is received. Because we have executed an amendment to the EPC agreement and anticipate negotiating additional amendments upon receipt of the COL, we cannot currently predict the timing of when those
56

obligations will be satisfied or the magnitude of any change. Additionally, in light of the schedule shifts, PEF may incur fees and charges related to the disposition of outstanding purchase orders on long lead time equipment for the Levy nuclear project, which could be material. In June 2010, PEF completed its long lead time equipment disposition analysis to minimize the impact associated with the schedule shift. As a result of the analysis, PEF will continue with selected components of the long lead time equipment. Work will be suspended on the remaining long lead time equipment items and PEF will be in suspension negotiations with the selected equipment vendors in the coming months. In its April 30, 2010 nuclear cost-recovery filing, PEF included for rate-making purposes a point estimate of potential Levy disposition fees and charge scharges of $50 million, subject to true-up. However, the amount of disposition fees and charges, if any, cannot be determined until suspension negotiations are completed. We cannot predict the outcome of this matter.
 
On June 30, 2010, PEF entered into a long-term service agreement for the Hines Energy Complex covering scheduled maintenance events through 2029. The total cost to PEF associated with this agreement is estimated to be approximately $390 million over the term of the agreement.agreement, including $7 million, $51 million, $39 million and $293 million, respectively, for less than one year, one to three years, three to five years and more than five years from December 31, 2009.
 
B.B.      GUARANTEES
 
As a part of normal business, we enter into various agreements providing future financial or performance assurances to third parties. Such agreements include guarantees, standby letters of credit and surety bonds. At JuneSeptember 30, 2010, we do not believe conditions are likely for significant performance under these guarantees. To the extent liabilities are incurred as a result of the activities covered by the guarantees, such liabilities are included in the accompanying Balance Sheets.
 
At JuneSeptember 30, 2010, we have issued guarantees and indemnifications of and for certain asset performance, legal, tax and environmental matters to third parties, including indemnifications made in connection with sales of businesses. At JuneSeptember 30, 2010, our estimated maximum exposure for guarantees and indemnifications for which a maximum exposure is determinable was $308$307 million, including $32$31 million at PEF. Related to the sales of businesses, the latest specified notice period extends until 2013 for the majority of legal, tax and environmental matters provided for in the indemnification provisions. Indemnifications for the performance of assets extend to 2016. For certain matters for which we receive timely notice, our indemnity obligations may extend beyond the notice period. Certain indemnifi cationsindemnifications have no limitations as to timet ime or maximum potential future payments. At JuneSeptember 30, 2010 and December 31, 2009, we had recorded liabilities related to guarantees and indemnifications to third parties of approximately $33$32 million and $34 million, respectively. These amounts included $7 million for PEF at JuneSeptember 30, 2010 and December 31, 2009. During the sixnine months ended JuneSeptember 30, 2010, our and the Utilities’
61

PEF’s accruals and expenditures related to guarantees and indemnifications were not material. As current estimates change, it is possible that additional losses related to guarantees and indemnifications to third parties, which could be material, may be recorded in the future.
 
In addition, the Parent has issued $300 million in guarantees for certain payments of two wholly owned indirect subsidiaries (See Note 14)15).
 
C.OTHER COMMITMENTS AND CONTINGENCIES
 
SPENT NUCLEAR FUEL MATTERS
 
Pursuant to the Nuclear Waste Policy Act of 1982, the Utilities entered into contracts with the DOE under which the DOE agreed to begin taking spent nuclear fuel by no later than January 31, 1998. All similarly situated utilities were required to sign the same standard contract.

The DOE failed to begin taking spent nuclear fuel by January 31, 1998. In January 2004, the Utilities filed a complaint in the United States Court of Federal Claims against the DOE, claiming that the DOE breached the Standard Contract for Disposal of Spent Nuclear Fuel by failing to accept spent nuclear fuel from our various facilities on or before January 31, 1998. Approximately 60 cases involving the government’s actions in connection with spent nuclear fuel are currently pending in the Court of Federal Claims. The Utilities have asserted nearly $91
57

million in damages incurred between January 31, 1998, and December 31, 2005, the time period set by the court for damages in this case. The Utilities may file subsequent damage claims as they incur additional costs.
 
In 2008, the Utilities received a ruling from the United States Court of Federal Claims awarding $83 million in the claim against the DOE for failure to abide by a contract for federal disposition of spent nuclear fuel. A request for reconsideration filed by the United States Department of Justice resulted in an immaterial reduction of the award. On August 15, 2008, the Department of Justice appealed the United States Court of Federal Claims ruling to the D.C. Court of Appeals. On July 21, 2009, the D.C. Court of Appeals vacated and remanded the calculation of damages back to the TrialUnited States Court of Federal Claims but affirmed the portion of damages awarded that were directed to overhead costs and other indirect expenses. The Department of Justice requestedre quested a rehearing en banc but the D.C. Court of Appeals denied the motion on November 3, 2009. In the event that the Utilities recover damages in this matter, such recovery is not expected to have a material impact on the Utilities’ results of operations given the anticipated regulatory and accounting treatment. However, the Utilities cannot predict the outcome of this matter.
 
SYNTHETIC FUELS MATTERS
 
On October 21, 2009, a jury delivered a verdict in a lawsuit against Progress Energy and a number of our subsidiaries and affiliates arising out of an Asset Purchase Agreement dated as of October 19, 1999, and amended as of August 23, 2000 (the Asset Purchase Agreement) by and among U.S. Global, LLC (Global); Earthco; certain affiliates of Earthco; EFC Synfuel LLC (which was owned indirectly by Progress Energy, Inc.) and certain of its affiliates, including Solid Energy LLC; Solid Fuel LLC; Ceredo Synfuel LLC; Gulf Coast Synfuel LLC (renamed Sandy River Synfuel LLC) (collectively, the Progress Affiliates), as amended by an amendment to the Asset Purchase Agreement. In a case filed in the Circuit Court for Broward County, Fla., in March 2003 (the Florida Global Case), Global had requested an unspecified amount of compensatory damages, as wellwe ll as declaratory relief. Global asserted (1) that pursuant to the Asset Purchase Agreement, it was entitled to an interest in two synthetic fuels facilities previously owned by the Progress Affiliates and an option to purchase additional interests in the two synthetic fuels facilities and (2) that it was entitled to damages because the Progress Affiliates prohibited it from procuring purchasers for the synthetic fuels facilities. As a result of the expiration of the Section 2929/45K tax credit program on December 31, 2007, all of our synthetic fuels businesses were abandoned and we reclassified our synthetic fuels businesses as discontinued operations.

The jury awarded Global $78 million. On October 23, 2009, Global filed a motion to assess prejudgment interest on the award. On November 20, 2009, the court granted the motion and assessed $55 million in prejudgment interest and entered judgment in favor of Global in a total amount of $133 million. During the year ended December 31, 2009, we recorded an after-tax charge of $74 million to discontinued operations. In December 2009, we made a $154
62

$154 million payment, which represents payment of the total judgment and a required premium equivalent to two years of interest, to the Broward County Clerk of Court bond account. On December 16, 2009, we filed notice of appeal.appeal and our initial appellate brief will be due before December 31, 2010. We are continuing to pursue the appellate process, but cannot predict the outcome of this matter.
 
In a second suit filed in the Superior Court for Wake County, N.C., Progress Synfuel Holdings, Inc. et al. v. U.S. Global, LLC (the North Carolina Global Case), the Progress Affiliates seek declaratory relief consistent with our interpretation of the Asset Purchase Agreement. Global was served with the North Carolina Global Case on April 17, 2003.
 
On May 15, 2003, Global moved to dismiss the North Carolina Global Case for lack of personal jurisdiction over Global. In the alternative, Global requested that the court decline to exercise its discretion to hear the Progress Affiliates’ declaratory judgment action. On August 7, 2003, the Wake County Superior Court denied Global’s motion to dismiss, but stayed the North Carolina Global Case, pending the outcome of the Florida Global Case. The Progress Affiliates appealed the superior court’s order staying the case. By order dated September 7, 2004, the North Carolina Court of Appeals dismissed the Progress Affiliates’ appeal. Based upon the verdict in the Florida Global Case, we anticipate dismissal of the North Carolina Global Case.
 
58

NOTICE OF VIOLATION
 
On April 29, 2009, the EPA issued a notice of violation and opportunity to show cause with respect to a 16,000-gallon oil spill at one of PEC’s substations in 2007. The notice of violation did not include specified sanctions sought. Subsequently, the EPA notified PEC that the agency is seeking monetary sanctions that are de minimus to our and PEC’s results of operations or financial condition. PEC has entered into consent agreements with the EPA on two of the three issues. Discussions between PEC and the EPA to resolve the remaining issue are ongoing. We cannot predict the outcome of this matter.
 
FLORIDA NUCLEAR COST RECOVERY
 
On February 8, 2010, a lawsuit was filed against PEF in state circuit court in Sumter County, Fla., alleging that the Florida nuclear cost-recovery statute (Section 366.93, Florida Statutes) violates the Florida Constitution, and seeking a refund of all monies collected by PEF pursuant to that statute with interest. The complaint also requests that the court grant class action status to the plaintiffs. On April 6, 2010, PEF filed a motion to dismiss the complaint. The trial judge issued an order on May 3, 2010, dismissing the complaint. The plaintiffs filed an amended complaint on June 1, 2010.2010, and PEF believes the lawsuit is without merit and filed a motion to dismiss the amended complaint on July 12, 2010. The trial court granted PEF’s motion dismissing the plaintiffs’ case, with prejudice, on August 31, 2010. The plaintiffs filed a notice of appeal to the Fifth District Court of Appeals on September 24, 2010. We cannot predict the outcome of this matter .matter.
 
OTHER LITIGATION MATTERS

We and our subsidiaries are involved in various litigation matters in the ordinary course of business, some of which involve substantial amounts. Where appropriate, we have made accruals and disclosures to provide for such matters. In the opinion of management, the final disposition of pending litigation would not have a material adverse effect on our consolidated results of operations or financial position.
 
 
14.CONDENSED CONSOLIDATING STATEMENTS
15.      CONDENSED CONSOLIDATING STATEMENTS
 
As discussed in Note 23 in the 2009 Form 10-K, we have guaranteed certain payments of two wholly100 percent owned indirect subsidiaries, FPC Capital I (the Trust) and Florida Progress Funding Corporation (Funding Corp.). Our guarantees are joint and several, full and unconditional and are in addition to the joint and several, full and unconditional guarantees issued to the Trust and Funding Corp. by Florida Progress. Our subsidiaries have provisions restricting the payment of dividends to the Parent in certain limited circumstances, and as disclosed in Note 11B in the 2009 Form 10-K, there were no restrictions on PEC’s or PEF’s retained earnings.
63

 
The Trust is a VIE of which we are not the primary beneficiary. Separate financial statements and other disclosures concerning the Trust have not been presented because we believe that such information is not material to investors.
 
Presented below are the condensed consolidating Statements of Income, Balance Sheets and Cash Flows as required by Rule 3-10 of Regulation S-X. In these condensed consolidating statements, the Parent column includes the financial results of the parent holding company only. The Subsidiary Guarantor column includes the consolidated financial results of Florida Progress only, which is primarily comprised of its wholly owned subsidiary PEF. The Non-guarantor Subsidiaries column includes the consolidated financial results of all non-guarantor subsidiaries, which is primarily comprised of our wholly owned subsidiary PEC. The Other column includes elimination entries for all intercompany transactions and other consolidation adjustments. Financial statements for PEC and PEF are separately presented elsewhere in this Form 10-Q. All applicable c orporate expenses have been allocated appropriately among the guarantor and non-guarantor subsidiaries. The financial information may not necessarily be indicative of results of operations or financial position had the Subsidiary Guarantor or other non-guarantor subsidiaries operated as independent entities.

59



Condensed Consolidating Statement of Income 
Three months ended June 30, 2010 
(in millions) Parent  
Subsidiary
Guarantor
  
Non-
Guarantor
Subsidiaries
  Other  
Progress
Energy,
Inc.
 
Operating revenues               
Operating revenues $-  $1,255  $1,117  $-  $2,372 
Affiliate revenues  -   -   52   (52)  - 
Total operating revenues  -   1,255   1,169   (52)  2,372 
Operating expenses                    
Fuel used in electric generation  -   368   375   -   743 
Purchased power  -   239   76   -   315 
Operation and maintenance  -   208   347   (50)  505 
Depreciation, amortization and accretion  -   110   123   -   233 
Taxes other than on income  -   83   51   (1)  133 
Other  -   3   -   -   3 
Total operating expenses  -   1,011   972   (51)  1,932 
Operating income (loss)  -   244   197   (1)  440 
Other income (expense)                    
Interest income  2   -   2   (3)  1 
Allowance for equity funds used during construction  -   10   15   -   25 
Other, net  -   -   3   2   5 
Total other income (expense), net  2   10   20   (1)  31 
Interest charges                    
Interest charges  72   75   54   (2)  199 
Allowance for borrowed funds used during
  construction
  -   (2)  (5)  -   (7)
Total interest charges, net  72   73   49   (2)  192 
(Loss) income from continuing operations before
  income tax and equity in earnings of consolidated
  subsidiaries
  (70)  181   168   -   279 
Income tax (benefit) expense  (28)  67   57   2   98 
Equity in earnings of consolidated subsidiaries  222   -   -   (222)  - 
Income (loss) from continuing operations  180   114   111   (224)  181 
Discontinued operations, net of tax  -   -   (1)  -   (1)
Net income (loss)  180   114   110   (224)  180 
Net (income) loss attributable to noncontrolling
  interests, net of tax
  -   (1)  1   -   - 
Net income (loss) attributable to controlling interests $180  $113  $111  $(224) $180 
                     

60



Condensed Consolidating Statement of Income 
Three months ended June 30, 2009 
(in millions) Parent  
Subsidiary
Guarantor
  
Non-
Guarantor
Subsidiaries
  Other  
Progress
Energy,
Inc.
 
Operating revenues               
Operating revenues $-  $1,236  $1,076  $-  $2,312 
Affiliate revenues  -   -   54   (54)  - 
Total operating revenues  -   1,236   1,130   (54)  2,312 
Operating expenses                    
Fuel used in electric generation  -   443   383   -   826 
Purchased power  -   200   57   -   257 
Operation and maintenance  2   204   331   (53)  484 
Depreciation, amortization and accretion  -   105   121   -   226 
Taxes other than on income  -   80   51   (1)  130 
Other  -   8   2   -   10 
Total operating expenses  2   1,040   945   (54)  1,933 
Operating (loss) income  (2)  196   185   -   379 
Other income (expense)                    
Interest income  3   1   1   (3)  2 
Allowance for equity funds used during construction  -   29   7   -   36 
Other, net  1   6   5   1   13 
Total other income (expense), net  4   36   13   (2)  51 
Interest charges                    
Interest charges  58   71   54   (2)  181 
Allowance for borrowed funds used during
  construction
  -   (9)  (3)  -   (12)
Total interest charges, net  58   62   51   (2)  169 
(Loss) income from continuing operations before
  income tax and equity in earnings of consolidated
  subsidiaries
  (56)  170   147   -   261 
Income tax (benefit) expense  (26)  55   53   4   86 
Equity in earnings of consolidated subsidiaries  204   -   -   (204)  - 
Income (loss) from continuing operations  174   115   94   (208)  175 
Discontinued operations, net of tax  -   -   (1)  -   (1)
Net income (loss)  174   115   93   (208)  174 
Net (income) loss attributable to noncontrolling
  interests, net of tax
  -   -   1   (1)  - 
Net income (loss) attributable to controlling interests $174  $115  $94  $(209) $174 
                     

61



Condensed Consolidating Statement of Income 
Six months ended June 30, 2010 
(in millions) Parent  
Subsidiary
Guarantor
  
Non-
Guarantor
Subsidiaries
  Other  
Progress
Energy,
Inc.
 
 
Operating revenues               
Operating revenues $-  $2,527  $2,380  $-  $4,907 
Affiliate revenues  -   -   113   (113)  - 
Total operating revenues  -   2,527   2,493   (113)  4,907 
Operating expenses                    
Fuel used in electric generation  -   781   858   -   1,639 
Purchased power  -   452   126   -   578 
Operation and maintenance  3   413   676   (107)  985 
Depreciation, amortization and accretion  -   234   245   -   479 
Taxes other than on income  -   176   115   (4)  287 
Other  -   5   -   -   5 
Total operating expenses  3   2,061   2,020   (111)  3,973 
Operating (loss) income  (3)  466   473   (2)  934 
Other income (expense)                    
Interest income  4   -   3   (4)  3 
Allowance for equity funds used during construction  -   18   28   -   46 
Other, net  (1)  3   (4)  2   - 
Total other income (expense), net  3   21   27   (2)  49 
Interest charges                    
Interest charges  143   145   106   (4)  390 
Allowance for borrowed funds used during
  construction
  -   (7)  (9)  -   (16)
Total interest charges, net  143   138   97   (4)  374 
(Loss) income from continuing operations before
  income tax and equity in earnings of consolidated
  subsidiaries
  (143)  349   403   -   609 
Income tax (benefit) expense  (58)  136   154   5   237 
Equity in earnings of consolidated subsidiaries  455   -   -   (455)  - 
Income (loss) from continuing operations before
  cumulative effect of change in accounting principle
  370   213   249   (460)  372 
Discontinued operations, net of tax  -   1   (1)  -   - 
Cumulative effect of change in accounting principle,
  net of tax
  -   -   (2)  -   (2)
Net income (loss)  370   214   246   (460)  370 
Net (income) loss attributable to noncontrolling
  interests, net of tax
  -   (2)  3   (1)  - 
Net income (loss) attributable to controlling interests $370  $212  $249  $(461) $370 
                     

62



Condensed Consolidating Statement of Income 
Six months ended June 30, 2009 
(in millions) Parent  
Subsidiary
Guarantor
  
Non-
Guarantor
Subsidiaries
  Other  
Progress
Energy,
Inc.
 
Operating revenues               
Operating revenues $-  $2,500  $2,254  $-  $4,754 
Affiliate revenues  -   -   119   (119)  - 
Total operating revenues  -   2,500   2,373   (119)  4,754 
Operating expenses                    
Fuel used in electric generation  -   955   825   -   1,780 
Purchased power  -   360   114   -   474 
Operation and maintenance  3   406   642   (114)  937 
Depreciation, amortization and accretion  -   265   241   -   506 
Taxes other than on income  -   168   109   (4)  273 
Other  -   10   2   -   12 
Total operating expenses  3   2,164   1,933   (118)  3,982 
Operating (loss) income  (3)  336   440   (1)  772 
Other income (expense)                    
Interest income  6   2   4   (6)  6 
Allowance for equity funds used during construction  -   59   16   -   75 
Other, net  8   6   (2)  -   12 
Total other income (expense), net  14   67   18   (6)  93 
Interest charges                    
Interest charges  110   143   113   (6)  360 
Allowance for borrowed funds used during
  construction
  -   (18)  (6)  -   (24)
Total interest charges, net  110   125   107   (6)  336 
(Loss) income from continuing operations before
  income tax and equity in earnings of consolidated
  subsidiaries
  (99)  278   351   (1)  529 
Income tax (benefit) expense  (39)  76   129   5   171 
Equity in earnings of consolidated subsidiaries  415   -   -   (415)  - 
Income (loss) from continuing operations  355   202   222   (421)  358 
Discontinued operations, net of tax  1   (1)  (1)  -   (1)
Net income (loss)  356   201   221   (421)  357 
Net (income) loss attributable to noncontrolling
  interests, net of tax
  -   (1)  1   (1)  (1)
Net income (loss) attributable to controlling interests $356  $200  $222  $(422) $356 
                     

63



Condensed Consolidating Balance Sheet 
June 30, 2010 
  Parent  
Subsidiary
Guarantor
  
Non-
Guarantor
Subsidiaries
  Other  
Progress
Energy,
Inc.
 
(in millions)
ASSETS               
Utility plant, net $-  $9,977  $10,424  $111  $20,512 
Current assets                    
Cash and cash equivalents  366   116   208   -   690 
Notes receivable from affiliated companies  133   51   9   (193)  - 
Regulatory assets  -   223   101   -   324 
Derivative collateral posted  -   174   20   -   194 
Income taxes receivable  15   6   33   (33)  21 
Prepayments and other current assets  19   1,248   1,334   (170)  2,431 
Total current assets  533   1,818   1,705   (396)  3,660 
Deferred debits and other assets                    
Investment in consolidated subsidiaries  13,669   -   -   (13,669)  - 
Regulatory assets  -   1,317   894   -   2,211 
Goodwill  -   -   -   3,655   3,655 
Nuclear decommissioning trust funds  -   482   859   -   1,341 
Other assets and deferred debits  165   225   918   (550)  758 
Total deferred debits and other assets  13,834   2,024   2,671   (10,564)  7,965 
Total assets $14,367  $13,819  $14,800  $(10,849) $32,137 
CAPITALIZATION AND LIABILITIES                    
Equity                    
Common stock equity $9,857  $4,727  $5,270  $(9,997) $9,857 
Noncontrolling interests  -   2   -   -   2 
Total equity  9,857   4,729   5,270   (9,997)  9,859 
Preferred stock of subsidiaries  -   34   59   -   93 
Long-term debt, affiliate  -   309   115   (152)  272 
Long-term debt, net  3,494   4,481   3,688   1   11,664 
Total capitalization  13,351   9,553   9,132   (10,148)  21,888 
Current liabilities                    
Current portion of long-term debt  700   -   6   (1)  705 
Notes payable to affiliated companies  -   166   27   (193)  - 
Derivative liabilities  23   179   48   -   250 
Other current liabilities  259   1,147   943   (201)  2,148 
Total current liabilities  982   1,492   1,024   (395)  3,103 
Deferred credits and other liabilities                    
Noncurrent income tax liabilities  -   371   1,327   (410)  1,288 
Regulatory liabilities  -   1,060   1,307   112   2,479 
Other liabilities and deferred credits  34   1,343   2,010   (8)  3,379 
Total deferred credits and other liabilities  34   2,774   4,644   (306)  7,146 
Total capitalization and liabilities $14,367  $13,819  $14,800  $(10,849) $32,137 

 
64

 


Condensed Consolidating Balance Sheet 
December 31, 2009 
  Parent  
Subsidiary
Guarantor
  
Non-
Guarantor
Subsidiaries
  Other  
Progress
Energy,
Inc.
 
(in millions)
ASSETS               
Utility plant, net $-  $9,733  $9,886  $114  $19,733 
Current assets                    
Cash and cash equivalents  606   72   47   -   725 
Notes receivable from affiliated companies  30   46   303   (379)  - 
Regulatory assets  -   54   88   -   142 
Derivative collateral posted  -   139   7   -   146 
Income taxes receivable  5   97   50   (7)  145 
Prepayments and other current assets  14   1,158   1,377   (176)  2,373 
Total current assets  655   1,566   1,872   (562)  3,531 
Deferred debits and other assets                    
Investment in consolidated subsidiaries  13,348   -   -   (13,348)  - 
Regulatory assets  -   1,307   873   (1)  2,179 
Goodwill  -   -   -   3,655   3,655 
Nuclear decommissioning trust funds  -   496   871   -   1,367 
Other assets and deferred debits  166   202   923   (520)  771 
Total deferred debits and other assets  13,514   2,005   2,667   (10,214)  7,972 
Total assets $14,169  $13,304  $14,425  $(10,662) $31,236 
CAPITALIZATION AND LIABILITIES                    
Equity                    
Common stock equity $9,449  $4,590  $5,085  $(9,675) $9,449 
Noncontrolling interests  -   3   3   -   6 
Total equity  9,449   4,593   5,088   (9,675)  9,455 
Preferred stock of subsidiaries  -   34   59   -   93 
Long-term debt, affiliate  -   309   115   (152)  272 
Long-term debt, net  4,193   3,883   3,703   -   11,779 
Total capitalization  13,642   8,819   8,965   (9,827)  21,599 
Current liabilities                    
Current portion of long-term debt  100   300   6   -   406 
Short-term debt  140   -   -   -   140 
Notes payable to affiliated companies  -   376   3   (379)  - 
Derivative liabilities  -   161   29   -   190 
Other current liabilities  261   941   902   (182)  1,922 
Total current liabilities  501   1,778   940   (561)  2,658 
Deferred credits and other liabilities                    
Noncurrent income tax liabilities  -   320   1,258   (382)  1,196 
Regulatory liabilities  -   1,103   1,293   114   2,510 
Other liabilities and deferred credits  26   1,284   1,969   (6)  3,273 
Total deferred credits and other liabilities  26   2,707   4,520   (274)  6,979 
Total capitalization and liabilities $14,169  $13,304  $14,425  $(10,662) $31,236 
Condensed Consolidating Statement of Income 
Three months ended September 30, 2010 
(in millions) Parent  
Subsidiary
Guarantor
  
Non-
Guarantor
Subsidiaries
  Other  
Progress
Energy,
Inc.
 
Operating revenues               
Operating revenues $-  $1,548  $1,414  $-  $2,962 
Affiliate revenues  -   -   66   (66)  - 
Total operating revenues  -   1,548   1,480   (66)  2,962 
Operating expenses                    
Fuel used in electric generation  -   471   464   -   935 
Purchased power  -   309   109   -   418 
Operation and maintenance  2   234   301   (63)  474 
Depreciation, amortization and accretion  -   77   124   -   201 
Taxes other than on income  -   102   60   (1)  161 
Other  -   10   10   -   20 
Total operating expenses  2   1,203   1,068   (64)  2,209 
Operating (loss) income  (2)  345   412   (2)  753 
Other income (expense)                    
Interest income  2   1   2   (2)  3 
Allowance for equity funds used during construction  -   5   17   -   22 
Other, net  -   (3)  (3)  1   (5)
Total other income (expense), net  2   3   16   (1)  20 
Interest charges                    
Interest charges  71   74   53   (1)  197 
Allowance for borrowed funds used during construction  -   (3)  (5)  -   (8)
Total interest charges, net  71   71   48   (1)  189 
(Loss) income from continuing operations before income
  tax and equity in earnings of consolidated subsidiaries
  (71)  277   380   (2)  584 
Income tax (benefit) expense  (25)  99   147   (2)  219 
Equity in earnings of consolidated subsidiaries  406   -   -   (406)  - 
Income (loss) from continuing operations before
  cumulative effect of change in accounting principle
  360   178   233   (406)  365 
Discontinued operations, net of tax  1   (1)  (2)  -   (2)
Cumulative effect of change in accounting principle, net of tax  -   -   2   -   2 
Net income (loss)  361   177   233   (406)  365 
Net (income) loss attributable to noncontrolling interests, net of tax  -   (1)  (2)  (1)  (4)
Net income (loss) attributable to controlling interests $361  $176  $231  $(407) $361 

 
65

 

Condensed Consolidating Statement of Income 
Three months ended September 30, 2009 
(in millions) Parent  
Subsidiary
Guarantor
  
Non-
Guarantor
Subsidiaries
  Other  
Progress
Energy,
Inc.
 
Operating revenues               
Operating revenues $-  $1,517  $1,307  $-  $2,824 
Affiliate revenues  -   -   52   (52)  - 
Total operating revenues  -   1,517   1,359   (52)  2,824 
Operating expenses                    
Fuel used in electric generation  -   618   457   -   1,075 
Purchased power  -   43   82   -   125 
Operation and maintenance  2   198   271   (48)  423 
Depreciation, amortization and accretion  -   247   124   -   371 
Taxes other than on income  -   96   57   (1)  152 
Other  -   2   -   -   2 
Total operating expenses  2   1,204   991   (49)  2,148 
Operating (loss) income  (2)  313   368   (3)  676 
Other income (expense)                    
Interest income  2   -   2   (2)  2 
Allowance for equity funds used during construction  -   13   7   -   20 
Other, net  3   2   (5)  1   1 
Total other income (expense), net  5   15   4   (1)  23 
Interest charges                    
Interest charges  59   68   50   (3)  174 
Allowance for borrowed funds used during construction  -   (3)  (3)  -   (6)
Total interest charges, net  59   65   47   (3)  168 
(Loss) income from continuing operations before income
  tax and equity in earnings of consolidated subsidiaries
  (56)  263   325   (1)  531 
Income tax (benefit) expense  (25)  89   117   -   181 
Equity in earnings of consolidated subsidiaries  278   -   -   (278)  - 
Income (loss) from continuing operations  247   174   208   (279)  350 
Discontinued operations, net of tax  -   (52)  -   (50)  (102)
Net income (loss)  247   122   208   (329)  248 
Net (income) loss attributable to noncontrolling interests, net of tax  -   (1)  1   (1)  (1)
Net income (loss) attributable to controlling interests $247  $121  $209  $(330) $247 

Condensed Consolidating Statement of Cash Flows 
Six months ended June 30, 2010 
(in millions) Parent  
Subsidiary
Guarantor
  
Non-
Guarantor
Subsidiaries
  Other  
Progress
Energy,
Inc.
 
Net cash provided (used) by operating activities $54  $582  $694  $(171) $1,159 
Investing activities                    
Gross property additions  -   (543)  (598)  25   (1,116)
Nuclear fuel additions  -   (13)  (106)  -   (119)
Purchases of available-for-sale securities and other
  investments
  -   (3,507)  (308)  -   (3,815)
Proceeds from available-for-sale securities and other
  investments
  -   3,509   283   -   3,792 
Changes in advances to affiliated companies  (103)  (5)  294   (186)  - 
Return of investment in consolidated subsidiaries  54   -   -   (54)  - 
Contributions to consolidated subsidiaries  (56)  -   -   56   - 
Other investing activities  -   14   -   -   14 
Net cash used by investing activities  (105)  (545)  (435)  (159)  (1,244)
Financing activities                    
Issuance of common stock, net  405   -   -   -   405 
Dividends paid on common stock  (354)  -   -   -   (354)
Dividends paid to parent  -   (102)  (50)  152   - 
Dividends paid to parent in excess of retained earnings  -   -   (54)  54   - 
Net decrease in short-term debt  (140)  -   -   -   (140)
Proceeds from issuance of long-term debt, net  -   591   -   -   591 
Retirement of long-term debt  (100)  (300)  -   -   (400)
Changes in advances from affiliated companies  -   (210)  24   186   - 
Contributions from parent  -   33   37   (70)  - 
Other financing activities  -   (6)  (54)  8   (52)
Net cash (used) provided by financing activities  (189)  6   (97)  330   50 
Net (decrease) increase in cash and cash equivalents  (240)  43   162   -   (35)
Cash and cash equivalents at beginning of period  606   72   47   -   725 
Cash and cash equivalents at end of period $366  $115  $209  $-  $690 

 
66

 

Condensed Consolidating Statement of Income 
Nine months ended September 30, 2010 
(in millions) Parent  
Subsidiary
Guarantor
  
Non-
Guarantor
Subsidiaries
  Other  
Progress
Energy,
Inc.
 
Operating revenues               
Operating revenues $-  $4,075  $3,794  $-  $7,869 
Affiliate revenues  -   -   179   (179)  - 
Total operating revenues  -   4,075   3,973   (179)  7,869 
Operating expenses                    
Fuel used in electric generation  -   1,252   1,322   -   2,574 
Purchased power  -   761   235   -   996 
Operation and maintenance  5   647   977   (170)  1,459 
Depreciation, amortization and accretion  -   311   369   -   680 
Taxes other than on income  -   278   175   (5)  448 
Other  -   15   10   -   25 
Total operating expenses  5   3,264   3,088   (175)  6,182 
Operating (loss) income  (5)  811   885   (4)  1,687 
Other income (expense)                    
Interest income  6   1   5   (6)  6 
Allowance for equity funds used during construction  -   23   45   -   68 
Other, net  (1)  -   (7)  3   (5)
Total other income (expense), net  5   24   43   (3)  69 
Interest charges                    
Interest charges  214   219   159   (5)  587 
Allowance for borrowed funds used during construction  -   (10)  (14)  -   (24)
Total interest charges, net  214   209   145   (5)  563 
(Loss) income from continuing operations before income
  tax and equity in earnings of consolidated subsidiaries
  (214)  626   783   (2)  1,193 
Income tax (benefit) expense  (83)  235   301   3   456 
Equity in earnings of consolidated subsidiaries  861   -   -   (861)  - 
Income (loss) from continuing operations  730   391   482   (866)  737 
Discontinued operations, net of tax  1   -   (3)  -   (2)
Net income (loss)  731   391   479   (866)  735 
Net (income) loss attributable to noncontrolling interests, net of tax  -   (3)  1   (2)  (4)
Net income (loss) attributable to controlling interests $731  $388  $480  $(868) $731 

Condensed Consolidating Statement of Cash Flows 
Six months ended June 30, 2009 
(in millions) Parent  
Subsidiary
Guarantor
  
Non-
Guarantor
Subsidiaries
  Other  
Progress
Energy,
Inc.
 
Net cash provided (used) by operating activities $169  $454  $670  $(198) $1,095 
Investing activities                    
Gross property additions  -   (770)  (411)  9   (1,172)
Nuclear fuel additions  -   (18)  (42)  -   (60)
Proceeds from sales of assets to affiliated companies  -   -   7   (7)  - 
Purchases of available-for-sale securities and other
  investments
  -   (420)  (562)  -   (982)
Proceeds from available-for-sale securities and other
  investments
  -   423   537   -   960 
Changes in advances to affiliated companies  (329)  (56)  (43)  428   - 
Return of investment in consolidated subsidiaries  12   -   -   (12)  - 
Contributions to consolidated subsidiaries  (347)  -   -   347   - 
Other investing activities  -   (1)  (1)  (1)   (3)
Net cash (used) provided by investing activities  (664)  (842)  (515)  764   (1,257)
Financing activities                    
Issuance of common stock, net  545   -   -   -   545 
Dividends paid on common stock  (347)  -   -   -   (347)
Dividends paid to parent  -   (1)  (200)  201   - 
Dividends paid to parent in excess of retained earnings  -   -   (12)  12   - 
Payments of short-term debt with original maturities
  greater than 90 days
  (129)  -   -   -   (129)
Net decrease in short-term debt  (40)  (371)  (110)  -   (521)
Proceeds from issuance of long-term debt, net  742   -   595   -   1,337 
Retirement of long-term debt  -   -   (400)  -   (400)
Changes in advances from affiliated companies  -   417   11   (428)  - 
Contributions from parent  -   343   17   (360)  - 
Other financing activities  1   (5)  (56)  9   (51)
Net cash provided (used) by financing activities  772   383   (155)  (566)  434 
Net increase (decrease) in cash and cash equivalents  277   (5)  -   -   272 
Cash and cash equivalents at beginning of period  88   73   19   -   180 
Cash and cash equivalents at end of period $365  $68  $19  $-  $452 

 
67

 

Condensed Consolidating Statement of Income 
Nine months ended September 30, 2009 
(in millions) Parent  
Subsidiary
Guarantor
  
Non-
Guarantor
Subsidiaries
  Other  
Progress
Energy,
Inc.
 
Operating revenues               
Operating revenues $-  $4,017  $3,561  $-  $7,578 
Affiliate revenues  -   -   171   (171)  - 
Total operating revenues  -   4,017   3,732   (171)  7,578 
Operating expenses                    
Fuel used in electric generation  -   1,573   1,282   -   2,855 
Purchased power  -   403   196   -   599 
Operation and maintenance  5   604   913   (162)  1,360 
Depreciation, amortization and accretion  -   512   365   -   877 
Taxes other than on income  -   264   166   (5)  425 
Other  -   12   2   -   14 
Total operating expenses  5   3,368   2,924   (167)  6,130 
Operating (loss) income  (5)  649   808   (4)  1,448 
Other income (expense)                    
Interest income  8   2   6   (8)  8 
Allowance for equity funds used during construction  -   72   23   -   95 
Other, net  11   8   (7)  1   13 
Total other income (expense), net  19   82   22   (7)  116 
Interest charges                    
Interest charges  169   211   163   (9)  534 
Allowance for borrowed funds used during construction  -   (21)  (9)  -   (30)
Total interest charges, net  169   190   154   (9)  504 
(Loss) income from continuing operations before income
  tax and equity in earnings of consolidated subsidiaries
  (155)  541   676   (2)  1,060 
Income tax (benefit) expense  (64)  165   246   5   352 
Equity in earnings of consolidated subsidiaries  693   -   -   (693)  - 
Income (loss) from continuing operations  602   376   430   (700)  708 
Discontinued operations, net of tax  1   (53)  (1)  (50)  (103)
Net income (loss)  603   323   429   (750)  605 
Net (income) loss attributable to noncontrolling interests, net of tax  -   (2)  2   (2)  (2)
Net income (loss) attributable to controlling interests $603  $321  $431  $(752) $603 

 
ITEM 2.                 MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
68


Condensed Consolidating Balance Sheet
September 30, 2010
(in millions) Parent  
Subsidiary
Guarantor
  
Non-
Guarantor
Subsidiaries
  Other  
Progress
Energy,
Inc.
 
ASSETS               
Utility plant, net $-  $10,064  $10,602  $110  $20,776 
Current assets                    
Cash and cash equivalents  247   151   293   -   691 
Receivables, net  -   573   539   -   1,112 
Notes receivable from affiliated companies  54   59   61   (174)  - 
Regulatory assets  -   144   76   -   220 
Derivative collateral posted  -   192   31   -   223 
Income taxes receivable  8   1   -   (2)  7 
Prepayments and other current assets  26   803   771   (147)  1,453 
Total current assets  335   1,923   1,771   (323)  3,706 
Deferred debits and other assets                    
Investment in consolidated subsidiaries  14,037   -   -   (14,037)  - 
Regulatory assets  -   1,415   950   (1)  2,364 
Goodwill  -   -   -   3,655   3,655 
Nuclear decommissioning trust funds  -   521   936   -   1,457 
Other assets and deferred debits  168   229   906   (555)  748 
Total deferred debits and other assets  14,205   2,165   2,792   (10,938)  8,224 
Total assets $14,540  $14,152  $15,165  $(11,151) $32,706 
CAPITALIZATION AND LIABILITIES                    
Equity                    
Common stock equity $10,021  $4,895  $5,466  $(10,361) $10,021 
Noncontrolling interests  -   3   -   -   3 
Total equity  10,021   4,898   5,466   (10,361)  10,024 
Preferred stock of subsidiaries  -   34   59   -   93 
Long-term debt, affiliate  -   309   115   (151)  273 
Long-term debt, net  3,494   4,182   3,688   (1)  11,363 
Total capitalization  13,515   9,423   9,328   (10,513)  21,753 
Current liabilities                    
Current portion of long-term debt  700   300   5   -   1,005 
Notes payable to affiliated companies  -   171   3   (174)  - 
Derivative liabilities  38   224   63   -   325 
Other current liabilities  242   1,115   940   (153)  2,144 
Total current liabilities  980   1,810   1,011   (327)  3,474 
Deferred credits and other liabilities                    
Noncurrent income tax liabilities  -   477   1,412   (415)  1,474 
Regulatory liabilities  -   1,048   1,396   110   2,554 
Other liabilities and deferred credits  45   1,394   2,018   (6)  3,451 
Total deferred credits and other liabilities  45   2,919   4,826   (311)  7,479 
Total capitalization and liabilities $14,540  $14,152  $15,165  $(11,151) $32,706 

69


Condensed Consolidating Balance Sheet 
December 31, 2009 
(in millions) Parent  
Subsidiary
Guarantor
  
Non-
Guarantor
Subsidiaries
  Other  
Progress
Energy,
Inc.
 
ASSETS               
Utility plant, net $-  $9,733  $9,886  $114  $19,733 
Current assets                    
Cash and cash equivalents  606   72   47   -   725 
    Receivables, net  -   358   442   -   800 
Notes receivable from affiliated companies  30   46   303   (379)  - 
Regulatory assets  -   54   88   -   142 
Derivative collateral posted  -   139   7   -   146 
Income taxes receivable  5   97   50   (7)  145 
Prepayments and other current assets  14   800   935   (176)  1,573 
Total current assets  655   1,566   1,872   (562)  3,531 
Deferred debits and other assets                    
Investment in consolidated subsidiaries  13,348   -   -   (13,348)  - 
    Regulatory assets  -   1,307   873   (1)  2,179 
Goodwill  -   -   -   3,655   3,655 
Nuclear decommissioning trust funds  -   496   871   -   1,367 
Other assets and deferred debits  166   202   923   (520)  771 
Total deferred debits and other assets  13,514   2,005   2,667   (10,214)  7,972 
Total assets $14,169  $13,304  $14,425  $(10,662) $31,236 
CAPITALIZATION AND LIABILITIES                    
Equity                    
Common stock equity $9,449  $4,590  $5,085  $(9,675) $9,449 
Noncontrolling interests  -   3   3   -   6 
Total equity  9,449   4,593   5,088   (9,675)  9,455 
Preferred stock of subsidiaries  -   34   59   -   93 
Long-term debt, affiliate  -   309   115   (152)  272 
Long-term debt, net  4,193   3,883   3,703   -   11,779 
Total capitalization  13,642   8,819   8,965   (9,827)  21,599 
Current liabilities                    
Current portion of long-term debt  100   300   6   -   406 
Short-term debt  140   -   -   -   140 
Notes payable to affiliated companies  -   376   3   (379)  - 
Derivative liabilities  -   161   29   -   190 
Other current liabilities  261   941   902   (182)  1,922 
Total current liabilities  501   1,778   940   (561)  2,658 
Deferred credits and other liabilities                    
Noncurrent income tax liabilities  -   320   1,258   (382)  1,196 
Regulatory liabilities  -   1,103   1,293   114   2,510 
Other liabilities and deferred credits  26   1,284   1,969   (6)  3,273 
Total deferred credits and other liabilities  26   2,707   4,520   (274)  6,979 
Total capitalization and liabilities $14,169  $13,304  $14,425  $(10,662) $31,236 

70


Condensed Consolidating Statement of Cash Flows 
Nine months ended September 30, 2010 
(in millions) Parent  
Subsidiary
Guarantor
  
Non-
Guarantor
Subsidiaries
  Other  
Progress
Energy,
Inc.
 
Net cash provided (used) by operating activities $23  $872  $1,205  $(196) $1,904 
Investing activities                    
Gross property additions  -   (775)  (893)  25   (1,643)
Nuclear fuel additions  -   (32)  (132)  -   (164)
Purchases of available-for-sale securities and other investments  -   (5,461)  (466)  -   (5,927)
Proceeds from available-for-sale securities and other investments  -   5,464   451   -   5,915 
Changes in advances to affiliated companies  (24)  (13)  242   (205)  - 
Return of investment in consolidated subsidiaries  54   -   -   (54)  - 
Contributions to consolidated subsidiaries  (56)  -   -   56   - 
Other investing activities  -   16   -   (1)  15 
Net cash used by investing activities  (26)  (801)  (798)  (179)  (1,804)
Financing activities                    
Issuance of common stock, net  419   -   -   -   419 
Dividends paid on common stock  (535)  -   -   -   (535)
Dividends paid to parent  -   (102)  (75)  177   - 
Dividends paid to parent in excess of retained earnings  -   -   (54)  54   - 
Net decrease in short-term debt  (140)  -   -   -   (140)
Proceeds from issuance of long-term debt, net  -   591   -   -   591 
Retirement of long-term debt  (100)  (300)  -   -   (400)
Changes in advances from affiliated companies  -   (205)  -   205   - 
Contributions from parent  -   33   37   (70)  - 
Other financing activities  -   (9)  (69)  9   (69)
Net cash (used) provided by financing activities  (356)  8   (161)  375   (134)
Net (decrease) increase in cash and cash equivalents  (359)  79   246   -   (34)
Cash and cash equivalents at beginning of period  606   72   47   -   725 
Cash and cash equivalents at end of period $247  $151  $293  $-  $691 

71


Condensed Consolidating Statement of Cash Flows 
Nine months ended September 30, 2009 
(in millions) Parent  
Subsidiary
Guarantor
  
Non-
Guarantor
Subsidiaries
  Other  
Progress
Energy,
Inc.
 
Net cash provided (used) by operating activities $76  $913  $979  $(198) $1,770 
Investing activities                    
Gross property additions  -   (1,069)  (588)  13   (1,644)
Nuclear fuel additions  -   (66)  (82)  -   (148)
Proceeds from sales of assets to affiliated companies  -   -   11   (11)  - 
Purchases of available-for-sale securities and other investments  -   (597)  (674)  -   (1,271)
Proceeds from available-for-sale securities and other investments  -   600   645   -   1,245 
Changes in advances to affiliated companies  16   (54)  (61)  99   - 
Return of investment in consolidated subsidiaries  12   -   -   (12)  - 
Contributions to consolidated subsidiaries  (502)  -   -   502   - 
Other investing activities  -   (2)  (3)  -   (5)
Net cash (used) provided by investing activities  (474)  (1,188)  (752)  591   (1,823)
Financing activities                    
Issuance of common stock, net  557   -   -   -   557 
Dividends paid on common stock  (520)  -   -   -   (520)
Dividends paid to parent  -   (1)  (200)  201   - 
Dividends paid to parent in excess of retained earnings  -   -   (12)  12   - 
Payments of short-term debt with original maturities
  greater than 90 days
  (429)  -   -   -   (429)
Net decrease in short-term debt  (40)  (321)  (110)  -   (471)
Proceeds from issuance of long-term debt, net  742   -   595   -   1,337 
Retirement of long-term debt  -   -   (400)  -   (400)
Changes in advances from affiliated companies  -   100   -   (100)  - 
Contributions from parent  -   498   17   (515)  - 
Other financing activities  -   (10)  (45)  9   (46)
Net cash provided (used) by financing activities  310   266   (155)  (393)  28 
Net increase (decrease) in cash and cash equivalents  (88)  (9)  72   -   (25)
Cash and cash equivalents at beginning of period  88   73   19   -   180 
Cash and cash equivalents at end of period $-  $64  $91  $-  $155 

72


ITEM 2.
MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS
 
The following combined Management’s Discussion and Analysis of Financial Condition and Results of Operations (MD&A) is separately filed by Progress Energy, Inc. (Progress Energy), Carolina Power & Light Company d/b/a Progress Energy Carolinas, Inc. (PEC) and Florida Power Corporation d/b/a Progress Energy Florida, Inc. (PEF). As used in this report, Progress Energy, which includes Progress Energy, Inc. holding company (the Parent) and its regulated and nonregulated subsidiaries on a consolidated basis, is at times referred to as “we,” “us” or “our.” When discussing Progress Energy’s financial information, it necessarily includes the results of PEC and PEF (collectively, the Utilities). The term “Progress Registrants” refers to each of the three separate registrants: Progress Energy, PEC and PEF. Information contained herein relating to PEC and PEF individually is filed by such company on its own behalf. Neither of the Utilities makes any representation as to information related solely to Progress Energy or the subsidiaries of Progress Energy other than itself.
 
The following MD&A contains forward-looking statements that involve estimates, projections, goals, forecasts, assumptions, risks and uncertainties that could cause actual results or outcomes to differ materially from those expressed in the forward-looking statements. Please review “Safe Harbor for Forward-Looking Statements” and Item 1A, “Risk Factors” found within Part II of this Form 10-Q and Item 1A, “Risk Factors” to the Progress Registrant’s annual report on Form 10-K for the fiscal year ended December 31, 2009 (2009 Form 10-K) for a discussion of the factors that may impact any such forward-looking statements made herein.
 
Amounts reported in the interim statements of income are not necessarily indicative of amounts expected for the respective annual or future periods due to the effects of weather variations and the timing and scope of outages of electric generating units, especially nuclear-fueled units, among other factors.
 
MD&A includes financial information prepared in accordance with accounting principles generally accepted in the United States of America (GAAP), as well as certain non-GAAP financial measures, “Ongoing Earnings” and “Base Revenues,” discussed below. Generally, a non-GAAP financial measure is a numerical measure of financial performance, financial position or cash flows that excludes (or includes) amounts that are included in (or excluded from) the most directly comparable measure calculated and presented in accordance with GAAP. The non-GAAP financial measures should be viewed as a supplement to, and not a substitute for, financial measures presented in accordance with GAAP. Non-GAAP measures as presented herein may not be comparable to similarly titled measures used by other companies.
 
This discussion should be read in conjunction with the accompanying financial statements found elsewhere in this report and in conjunction with the 2009 Form 10-K.
 
PROGRESS ENERGY
 
RESULTS OF OPERATIONS
 
In this section, we provide analysis and discussion of earnings and the factors affecting earnings on both a GAAP and non-GAAP basis. We introduce our results of operations in an overview section followed by a more detailed analysis and discussion by business segment.
 
We compute our non-GAAP financial measurement “Ongoing Earnings” as GAAP net income attributable to controlling interests after excluding discontinued operations and the effects of certain identified gains and charges, which are considered Ongoing Earnings adjustments. Some of the excluded gains and charges have occurred in more than one reporting period but are not considered representative of fundamental core earnings. Ongoing Earnings is not a measure calculated in accordance with GAAP, and should be viewed as a supplement to, and not a substitute for, our results of operations presented in accordance with GAAP.
 

 
6873

 


A reconciliation of Ongoing Earnings to GAAP net income attributable to controlling interests follows:
                              
(in millions except per share data)
 PEC  PEF  
Corporate
and Other
  Total  
Per
Share
  PEC  PEF  
Corporate
and Other
  Total  Per Share 
Three months ended June 30, 2010
               
Three months ended September 30, 2010
               
Ongoing Earnings
 $112  $119  $(50) $181  $0.63  $233  $177  $(49) $361  $1.23 
Tax levelization
  1   4   (1)  4   0.01 
Impairment, net of tax(a)
  (1)  -   -   (1)  (0.01)  (1)  (1)  -   (2)  (0.01)
Plant retirement adjustment, net of tax(a)
  1   -   -   1   - 
Discontinued operations attributable to
controlling interests, net of tax
  -   -   (1)  (1)  -   -   -   (2)  (2)  - 
Net income (loss) attributable to
controlling interests
 $112  $119  $(51) $180  $0.62 
Net income (loss) attributable to controlling interests(b)
 $233  $180  $(52) $361  $1.23 
                                        
Three months ended June 30, 2009
                    
Three months ended September 30, 2009
                    
Ongoing Earnings
 $212  $170  $(40) $342  $1.22 
Tax levelization
  (2)  7   2   7   0.02 
CVO mark-to-market
  -   -   3   3   0.01 
Plant retirement charge, net of tax(a)
  (3)  -   -   (3)  (0.01)
Discontinued operations attributable to controlling interests, net of tax
  -   -   (102)  (102)  (0.36)
Net income (loss) attributable to controlling interests(b)
 $207  $177  $(137) $247  $0.88 
                    
                    
Nine months ended September 30, 2010
                    
Ongoing Earnings
 $493  $409  $(146) $756  $2.61 
Tax levelization
  4   2   (3)  3   0.01 
Impairment, net of tax(a)
  (4)  (1)  -   (5)  (0.01)
Adjustment to plant retirement charge, net of tax(a)
  1   -   -   1   - 
Change in the tax treatment of the Medicare Part D subsidy
  (12)  (10)  -   (22)  (0.08)
Discontinued operations attributable to controlling interests, net of tax
  -   -   (2)  (2)  - 
Net income (loss) attributable to controlling interests(b)
 $482  $400  $(151) $731  $2.53 
                    
Nine months ended September 30, 2009
                    
Ongoing Earnings
 $94  $121  $(34) $181  $0.64  $435  $382  $(113) $704  $2.53 
Tax levelization
  1   (2)  (4)  (5)  (0.02)  (3)  2   (3)  (4)  (0.02)
CVO mark-to-market
  -   -   1   1   0.01   -   -   11   11   0.04 
Impairment, net of tax(a)
  -   -   (2)  (2)  (0.01)  -   -   (2)  (2)  (0.01)
Discontinued operations attributable to
controlling interests, net of tax
  -   -   (1)  (1)  - 
Net income (loss) attributable to
controlling interests
 $95  $119  $(40) $174  $0.62 
                    
                    
Six months ended June 30, 2010
                    
Ongoing Earnings
 $260  $232  $(97) $395  $1.37 
Tax levelization
  2   (2)  (2)  (2)  - 
Impairment, net of tax(a)
  (2)  -   -   (2)  - 
Plant retirement adjustment, net of tax(a)
  1   -   -   1     
Change in the tax treatment of the
Medicare Part D subsidy
  (12)  (10)  -   (22)  (0.08)
Net income (loss) attributable to
controlling interests(b)
 $249  $220  $(99) $370  $1.29 
                    
Six months ended June 30, 2009
                    
Ongoing Earnings
 $223  $212  $(72) $363  $1.30 
Tax levelization
  (1)  (5)  (6)  (12)  (0.04)
CVO mark-to-market
  -   -   8   8   0.03 
Impairment, net of tax(a)
  -   -   (2)  (2)  (0.01)
Plant retirement charge, net of tax(a)
  (3)  -   -   (3)  (0.01)
Discontinued operations attributable to
controlling interests, net of tax
  -   -   (1)  (1)  -   -   -   (103)  (103)  (0.37)
Net income (loss) attributable to
controlling interests(b)
 $222  $207  $(73) $356  $1.28  $429  $384  $(210) $603  $2.16 
                    
(a)Calculated using assumed tax rate of 40 percent.
(b)Net income attributable to controlling interests is shown net of preferred stock dividend requirement of $(1) million at both PEC for the three months ended September 30, 2010 and PEF.2009 and $(2) million for the nine months ended September 30, 2010 and 2009. Net income attributable to controlling interests is shown net of preferred stock dividend requirement of $(1) million at PEF for the nine months ended September 30, 2010 and 2009.
                
Management uses the non-GAAP financial measure Ongoing Earnings (i) as a measure of operating performance to assist in comparing performance from period to period on a consistent basis and to readily view operating trends; (ii) as a measure for planning and forecasting overall expectations and for evaluating actual results against such expectations; (iii) as a measure for determining levels of incentive compensation; and (iv) in communications with
69

our board of directors, employees, shareholders, analysts and investors concerning our financial performance. Management believes this non-GAAP measure is appropriate for understanding the business and assessing our potential future performance, because excluded items are limited to those that management believes are not representative of our fundamental core earnings (See Note 10)11).
 
OVERVIEW
 
For the three months ended JuneSeptember 30, 2010, our net income attributable to controlling interests was $180$361 million, or $0.62$1.23 per share, compared to net income attributable to controlling interests of $174$247 million, or $0.62$0.88 per
74

share, for the same period in 2009. For the nine months ended September 30, 2010, our net income attributable to controlling interests was $731 million, or $2.53 per share, compared to net income attributable to controlling interests of $603 million, or $2.16 per share, for the same period in 2009. The increaseincreases as compared to prior year waswere primarily due to:
 
·  favorable weather at the Utilities;
·  higher returns earned on nuclear cost-recovery and environmental cost recovery clause (ECRC) assets at PEF;lower loss from discontinued operations and
·  increased retail base ratesfavorable weather at PEF.the Utilities.

Offsetting these items were:was:
 
·  unfavorable allowance for funds used during construction (AFUDC) equity at PEF;
·  higher operation and maintenance (O&M) expenses at the Utilities; andUtilities.
·  lower wholesale base revenues at PEF.

For the six months ended June 30, 2010, our net income attributable to controlling interests was $370 million, or $1.29 per share, compared to net income attributable to controlling interests of $356 million, or $1.28 per share, for the same period in 2009. The increase as compared to prior year was primarily due to:
·  favorable weather at the Utilities;
·  higher returns earned on nuclear cost-recovery and ECRC assets at PEF;
·  increased retail base rates at PEF; and
·  favorable AFUDC equity at PEC.

Offsetting these items were:
·  unfavorable AFUDC equity at PEF;
·  higher O&M expenses at the Utilities;
·  lower wholesale base revenues at the Utilities; and
·  unfavorable change in the tax treatment of the Medicare Part D subsidy at the Utilities (Ongoing Earnings adjustment).

PROGRESS ENERGY CAROLINAS
 
PEC contributed net income available to parent totaling $112$233 million and $95$207 million for the three months ended JuneSeptember 30, 2010 and 2009, respectively. The increase in net income available to parent for the three months ended JuneSeptember 30, 2010, compared to the same period in 2009, was primarily due to the favorable impact of weather, favorable allowance for funds used during construction (AFUDC) equity and favorable retail customer growth and usage, partially offset by higher O&M expenses. PEC contributed Ongoing Earnings of $233 million and $212 million for the three months ended September 30, 2010 and 2009, respectively. The 2010 Ongoing Earnings adjustments to net income available to parent were due to PEC recording an impairment of other assets, net of tax of $1 million offset by a tax levelization benefit of $1 million. T he 2009 Ongoing Earnings adjustments to net income available to parent were due to PEC recording a plant retirement charge, net of tax of $3 million and a tax levelization charge of $2 million. Management does not consider these items to be representative of PEC’s fundamental core earnings and excluded these items in computing PEC’s Ongoing Earnings.
PEC contributed net income available to parent totaling $482 million and $429 million for the nine months ended September 30, 2010 and 2009, respectively. The increase in net income available to parent for the nine months ended September 30, 2010, compared to the same period in 2009, was primarily due to the favorable impact of weather, favorable AFUDC equity, favorable retail customer growth and usage and higher miscellaneous revenues, and lower other operating expenses, partially offset by higher O&M expenses. PEC contributed Ongoing Earnings of $112 million and $94 million for the three months ended June 30, 2010 and 2009, respectively. The 2010 Ongoing Earnings adjustments to net income available to parent were due to PEC recording an impairment of certain miscellaneous investments, net of tax of $1 million offset by a plant retirement adju stment, net of tax of $1 million. The 2009 Ongoing Earnings adjustment to net income available to parent was due to PEC recording a tax levelization benefit of $1 million. Management does not consider these items to be representative of PEC’s fundamental core earnings and excluded these items in computing PEC’s Ongoing Earnings.
70

PEC contributed net income available to parent totaling $249 million and $222 million for the six months ended June 30, 2010 and 2009, respectively. The increase in net income available to parent for the six months ended June 30, 2010, compared to the same period in 2009, was primarily due to the favorable impact of weather, favorable AFUDC equity, favorable retail customer growth and usage, higher miscellaneous revenues, lower interest expense and favorable tax levelization, partially offset by higher O&M expenses and the unfavorable change in the tax treatment of the Medicare Part D subsidy. PEC contributed Ongoing Earnings of $260$493 million and $223$435 million for the sixnine months ended JuneSeptember 30, 2010 and 2009, respectively. The 2010 Ongoing Earnings adjustments to net income available to parent were due to PEC recording a $12 million c hargecharge for the change in the tax treatmenttr eatment of the Medicare Part D subsidy and an impairment of certain miscellaneous investments,other assets, net of tax of $2$4 million, partially offset by a tax levelization benefit of $2$4 million and aan adjustment to plant retirement adjustment,charge, net of tax of $1 million. The 2009 Ongoing Earnings adjustmentadjustments to net income available to parent waswere due to PEC recording a tax levelization charge of $1$3 million and a plant retirement charge, net of tax of $3 million. Management does not consider these items to be representative of PEC’s fundamental core earnings and excluded these items in computing PEC’s Ongoing Earnings.
 
Three Months Ended JuneSeptember 30, 2010, Compared to Three Months Ended JuneSeptember 30, 2009
 
REVENUES
 
The revenue tables that follow present the total amount and percentage change of total operating revenues and its components. “Base Revenues" is a non-GAAP measure and is defined as operating revenues excluding clause recoverable regulatory returns, miscellaneous revenues and fuel and other pass-through revenues. We and PEC consider Base Revenues a useful measure to evaluate PEC’s electric operations because fuel and other pass-through revenues primarily represent the recovery of fuel, applicable portions of purchased power expenses and other pass-through expenses through cost-recovery clauses and, therefore, do not have a material impact on earnings. Clause recoverable regulatory returns include the return on asset component of demand-side management (DSM), energy-efficiency (EE) and renewable energy clause revenues. We an d PEC have included the reconciliation and analysis that follows as a complement to the financial information we provide in accordance with GAAP. This presentation may not be comparable to other companies’ presentation or more useful than the GAAP information provided elsewhere in this report.
 
75

A reconciliation of Base Revenues to GAAP operating revenues, including the percentage change by customer class, for the three months ended JuneSeptember 30 follows:
                        
(in millions)      
Customer Class 2010  Change  % Change  2009  2010  Change  % Change  2009 
Residential $237  $8   3.5  $229  $385  $45   13.2  $340 
Commercial  170   2   1.2   168   214   10   4.9   204 
Industrial  88   3   3.5   85   109   6   5.8   103 
Governmental  14   1   7.7   13   22   4   22.2   18 
Unbilled  43   6   -   37   (23)  (5)  -   (18)
Total retail base revenues  552   20   3.8   532   707   60   9.3   647 
Wholesale base revenues  69   (3)  (4.2)  72   84   6   7.7   78 
Total Base Revenues  621   17   2.8   604   791   66   9.1   725 
Clause recoverable regulatory returns  3   1   50.0   2   4   1   33.3   3 
Miscellaneous  30   4   15.4   26   37   7   23.3   30 
Fuel and other pass-through revenues  463   19   -   444   582   33   -   549 
Total operating revenues $1,117  $41   3.8  $1,076  $1,414  $107   8.2  $1,307 
                
PEC’s total Base Revenues were $621$791 million and $604$725 million for the three months ended JuneSeptember 30, 2010 and 2009, respectively. The $17$66 million increase in Base Revenues was due primarily to the $17$49 million favorable impact of weather and the $4$10 million favorable impact of retail customer growth and usage, partially offset by $3 million lower wholesale revenues.usage. The favorable impact of weather was driven by 2226 percent higher cooling degree days than 2009. Additionally, cooling degree days were 4428 percent higher than normal. The favorable impact of retail customer growth and usage was driven by an increase in the average usage per retail customer and a net 11,00010,000 increase in the average number of customers for 2010 compared to 2009.
 
71

PEC’s miscellaneous revenues increased $4$7 million in 2010 primarily due to higher transmission rates.

PEC’s electric energy sales in kilowatt-hours (kWh) and the percentage change by customer class for the three months ended JuneSeptember 30 were as follows:
                        
(in millions of kWh)                        
Customer Class 2010  Change  % Change  2009  2010  Change  % Change  2009 
Residential  3,707   116   3.2   3,591   5,500   676   14.0   4,824 
Commercial  3,337   47   1.4   3,290   4,164   241   6.1   3,923 
Industrial  2,674   112   4.4   2,562   2,939   150   5.4   2,789 
Governmental  369   12   3.4   357   460   23   5.3   437 
Unbilled  712   78   -   634   (511)  (114)  -   (397)
Total retail kWh sales  10,799   365   3.5   10,434   12,552   976   8.4   11,576 
Wholesale  3,157   (102)  (3.1)  3,259   3,797   190   5.3   3,607 
Total kWh sales  13,956   263   1.9   13,693   16,349   1,166   7.7   15,183 
                                
The increase in retail and wholesale kWh sales in 2010 was primarily due to favorable weather, as previously discussed. The decrease in wholesale kWh sales in 2010 was primarily due to lower excess generation sales driven by unfavorable market dynamics and favorable weather, which limited sales opportunities.
 
EXPENSES
 
Fuel and Purchased Power
 
Fuel and purchased power costs represent the costs of generation, which include fuel purchases for generation and energy purchased in the market to meet customer load. Fuel and a portion of purchased power expenses are recovered primarily through cost-recovery clauses, and as such, changes in these expenses do not have a material
76

impact on earnings. The difference between fuel and purchased power costs incurred and associated fuel revenues that are subject to recovery is deferred for future collection from or refund to customers.
 
Fuel and purchased power expenses were $451$573 million for the three months ended JuneSeptember 30, 2010, which represents an $11a $34 million increase compared to the same period in 2009. Purchased power expense increased $19$27 million to $76$109 million compared to the same period in 2009 primarily due to higher system requirements resulting from favorable weather. Fuel used in electric generation decreased $8increased $7 million to $375$464 million primarily due to $46 million lower deferred fuel expense, partially offset by the $30 million impact of a change in generation mix resulting from nuclear plant outages and the $8$55 million impact of higher system requirements resulting from favorable weather. The decrease in deferredweather and the impact of nuclear plant outages, partially offset by decreased current year fuel expense was primarily due to higher fuelcosts of $48 million driven by lower coal and purchased power expenses and lower fuel rates.gas prices.
 
Operation and Maintenance
 
O&M expense was $300$256 million for the three months ended JuneSeptember 30, 2010, which represents a $17$31 million increase compared to the same period in 2009. This increase was primarily due to $25$12 million higher nuclear plant outage and maintenance costs, $5 million higher employee benefits expense, $5 million reduction in a litigation judgment in the prior year, $2 million impact of changes to an environmental reserve and $2 million impairment of other assets, partially offset by $7the $5 million lower fossil steamprior-year plant outage and maintenance costs.retirement charge. The higher nuclear plant outage and maintenance costs are primarily due to the larger scope ofextended outages and more emergent work in 2010 as compared to 2009.
Other
Other operating expenses consisted of a gain of $1 million Management does not consider impairments and losses of $2 millioncharges recognized for the three months ended June 30, 2010 and 2009, respectively, primarily dueretirement of generating units prior to land sales.
72

the end of their estimated useful lives to be represent ative of PEC’s fundamental core earnings. Therefore, the impacts of these items are excluded in computing PEC’s Ongoing Earnings.
 
Total Other Income, Net
 
Total other income, net was $20$16 million for the three months ended JuneSeptember 30, 2010, which represents an $8a $10 million increase compared to the same period in 2009. This increase was primarily due to favorable AFUDC equity of $8$10 million resulting from increased eligible construction project costs.
 
Income Tax Expense
 
Income tax expense increased $6$18 million for the three months ended JuneSeptember 30, 2010, as compared to the same period in 2009, primarily due to the $9$18 million impact of higher pre-tax income and the $5 million impact of changes in tax estimates, partially offset by the $4 million impact of the favorable AFUDC equity discussed above and the $3 million impact of the increase in AFUDC equity discussed above.tax levelization. AFUDC equity is excluded from the calculation of income tax expense. PEC’s income tax expense was decreased by $1 million for the three months ended June 30, 2009, compared to no impact for the same period in 2010 related to the impact of tax levelization.levelization for the three months ended September 30, 2010, compared to an increase of $2 million for the same period in 2009. GAAP requires companies to apply a levelized effective income tax rate to interim periods that is consistent with the estimated annual effective tax rate. Fluctuations in estimated annual earnings and the timing of various permanent items of income or deduction can cause fluctuations in the effective tax rate for interim periods. Because this adjustment will vary each quarter, but will have no effect on net income for the year, management does not consider this adjustment to be representative of PEC’s fundamental core earnings. Therefore, the impact of tax levelization is excluded in computing PEC’s Ongoing Earnings.
 

Six
77

Nine Months Ended JuneSeptember 30, 2010, Compared to SixNine Months Ended JuneSeptember 30, 2009
 
REVENUES
 
A reconciliation of Base Revenues to GAAP operating revenues, including the percentage change by customer class, for the sixnine months ended JuneSeptember 30 follows:
                        
(in millions)      
Customer Class 2010  Change  % Change  2009  2010  Change  % Change  2009 
Residential $593  $41   7.4  $552  $978  $87   9.8  $891 
Commercial  343   2   0.6   341   556   11   2.0   545 
Industrial  168   1   0.6   167   278   8   3.0   270 
Governmental  28   1   3.7   27   50   5   11.1   45 
Unbilled  9   9   -   -   (14)  3   -   (17)
Total retail base revenues  1,141   54   5.0   1,087   1,848   114   6.6   1,734 
Wholesale base revenues  144   (14)  (8.9)  158   228   (8)  (3.4)  236 
Total Base Revenues  1,285   40   3.2   1,245   2,076   106   5.4   1,970 
Clause recoverable regulatory returns  4   -   -   4   8   1   14.3   7 
Miscellaneous  66   8   13.8   58   102   14   15.9   88 
Fuel and other pass-through revenues  1,025   78   -   947   1,608   112   -   1,496 
Total operating revenues $2,380  $126   5.6  $2,254  $3,794  $233   6.5  $3,561 
                                
PEC’s total Base Revenues were $1.285$2.076 billion and $1.245$1.970 billion for the sixnine months ended JuneSeptember 30, 2010 and 2009, respectively. The $40$106 million increase in Base Revenues was due primarily to the $47$94 million favorable impact of weather and the $11$20 million favorable impact of retail customer growth and usage, partially offset by $14$8 million lower wholesale base revenues. The favorable impact of weather was driven by 1923 percent higher cooling degree days and 1514 percent higher heating degree days than 2009. Additionally, cooling degree days were 4132 percent higher than normal and heating degree days were 1211 percent higher than normal. The favorable impact of retail customer growth and usage was driven by an increase in the average usage per retail customer and a net 12,00011,000 increase in the average number of customers for 2010 comparedcom pared to 2009. The lower wholesale base revenues were primarily due to lower energy rates with a major customer.
 
PEC’s miscellaneous revenues increased $8$14 million in 2010 primarily due to higher transmission rates.
73

 
PEC’s electric energy sales in kWh and the percentage change by customer class for the sixnine months ended JuneSeptember 30 were as follows:
                        
(in millions of kWh)                        
Customer Class 2010  Change  % Change  2009  2010  Change  % Change  2009 
Residential  9,595   866   9.9   8,729   15,095   1,542   11.4   13,553 
Commercial  6,758   153   2.3   6,605   10,921   393   3.7   10,528 
Industrial  5,119   137   2.7   4,982   8,059   288   3.7   7,771 
Governmental  744   44   6.3   700   1,204   67   5.9   1,137 
Unbilled  82   (88)  -   170   (428)  (201)  -   (227)
Total retail kWh sales  22,298   1,112   5.2   21,186   34,851   2,089   6.4   32,762 
Wholesale  6,969   34   0.5   6,935   10,766   224   2.1   10,542 
Total kWh sales  29,267   1,146   4.1   28,121   45,617   2,313   5.3   43,304 
                                
The increase in retail kWh sales in 2010 was primarily due to favorable weather, as previously discussed. The increase in wholesale kWh sales in 2010 was primarily due to favorable weather and a new peaking contract, partially offset by lower excess generation sales driven by unfavorable market dynamics and favorable weather, which limited sales opportunities.
 
78

EXPENSES
 
Fuel and Purchased Power
 
Fuel and purchased power expenses were $984 million$1.557 billion for the sixnine months ended JuneSeptember 30, 2010, which represents a $45$79 million increase compared to the same period in 2009. Fuel used in electric generation increased $33$40 million to $858 million$1.322 billion primarily due to the $65 million impact of a change in generation mix resulting from nuclear plant outages and the $39$218 million impact of higher system requirements resulting from favorable weather and the impact of nuclear plant outages, partially offset by $69$107 million decreased current year fuel costs driven by lower coal and gas prices and $70 million lower deferred fuel expense. The decrease in deferred fuel expense was primarily due to higher fuel and purchased power expenses and lower fuel rates. Purchased power expense increased $12$39 million to $126$235 million compared to the same period in 2009 primarily due to higher system requirements resulting from favorable weather.
 
Operation and Maintenance
 
O&M expense was $585$841 million for the sixnine months ended JuneSeptember 30, 2010, which represents a $43$74 million increase compared to the same period in 2009. This increase was primarily due to $30$42 million higher nuclear plant outage and maintenance costs, $9 million lower nuclear insurance refund, $6 million higher storm costs, and $5$6 million higher emission expense primarily due to sales of nitrogen oxides (NOx) emission allowances in the prior year. These unfavorable items areyear and the $2 million impairment of other assets, partially offset by $6the $5 million lower fossil steamprior-year plant outageretirement charge and maintenance costs.the $2 million adjustment to plant retirement charge. The higher nuclear plant outage and maintenance costs are primarily due to the larger scope ofextended outages and more emergent work in 2010 as compared to 2009. Management does not consider impairments and charges (and subsequent adjustment s) recognized for the retirement of generating units prior to the end of their estimated useful lives to be representative of PEC’s fundamental core earnings. Therefore, the impacts of these items are excluded in computing PEC’s Ongoing Earnings.
 
Taxes Other Than on Income
 
Taxes other than on income was $111$169 million for the sixnine months ended JuneSeptember 30, 2010, which represents a $6an $8 million increase compared to the same period in 2009. This increase was primarily due to a $5 millionan increase in gross receipts taxes due todriven by higher retail revenues, as previously discussed. Gross receipts taxes are collected from customers and recorded as revenues and then remitted to the applicable taxing authority. Therefore, these taxes have no material impact on earnings.
 
Other
 
Other operating expenses consisted of losses of $2was $5 million for the sixnine months ended JuneSeptember 30, 2009,2010, which represents a $3 million increase compared to the same period in 2009. This increase was primarily due to land sales.
74

the $4 million impairment of other assets. Management does not consider impairments to be representative of PEC’s fundamental core earnings. Therefore, the impacts of impairments are excluded in computing PEC’s Ongoing Earnings.
 
Total Other Income, Net
 
Total other income, net was $27$43 million for the sixnine months ended JuneSeptember 30, 2010, which represents an $11a $21 million increase compared to the same period in 2009. This increase was primarily due to favorable AFUDC equity of $12$22 million resulting from increased eligible construction project costs.
 
Total Interest Charges, net
 
Total interest charges, net was $94$140 million for the sixnine months ended JuneSeptember 30, 2010, which represents a $9an $8 million decrease compared to the same period in 2009. This decrease was primarily due to the $4 million impact of lower average debt outstanding, the $3 million impact of lower variable rates on pollution control bonds and $3$5 million favorable AFUDC debt related to increased eligible construction project costs.costs and $4 million impact of lower average debt outstanding.
 
79

Income Tax Expense
 
Income tax expense increased $24$42 million for the sixnine months ended JuneSeptember 30, 2010, as compared to the same period in 2009, primarily due to the $21$38 million impact of higher pre-tax income, the $12 million impact of the change in the tax treatment of the Medicare Part D subsidy resulting from recently enacted federal health care reform enacted earlier in 2010 (See Note 8)9), and the $5 million impact of the favorable prior yearprior-year tax benefit related to a deduction triggered by the transfer of previously funded amounts from nonqualified nuclear decommissioning trust (NDT) funds to qualified NDTs. These unfavorable items are partially offset by the $5$9 million impact of the increase infavorable AFUDC equity discussed above and the $3$7 million impact of tax levelization. AFUDC equity is excluded from the calculation of income tax expense. GAAP requires companies to applyapp ly a levelized effective in comeincome tax rate to interim periods that is consistent with the estimated annual effective tax rate. PEC’s income tax expense was decreased by $2$4 million for the sixnine months ended JuneSeptember 30, 2010, compared to an increase of $1$3 million for the sixnine months ended JuneSeptember 30, 2009, in order to maintain an effective tax rate consistent with the estimated annual rate. Fluctuations in estimated annual earnings and the timing of various permanent items of income or deduction can cause fluctuations in the effective tax rate for interim periods. Because this adjustment will vary each quarter, but will have no effect on net income for the year,As previously discussed, management does not consider this adjustment to be representative of PEC’s fundamental core earnings. Additionally, management does not consider the change in the tax treatment of the Medicare Part D subsidy to be representative of PEC’s fundamental core earnings. Accordingly, the impacts of tax levelization and the change in the tax treatment of the Medicare Part D subs idysubsidy are excluded in computing PEC’s Ongoing Earnings.
 
PROGRESS ENERGY FLORIDA
 
PEF contributed net income available to parent totaling $119 million for each of the three months ended June 30, 2010 and 2009. Net income available to parent for the three months ended June 30, 2010, compared to the same period in 2009, was increased by higher returns earned on nuclear and ECRC assets and increased retail base rates, offset by unfavorable AFUDC equity, lower wholesale base revenues and estimated Crystal River Unit No. 3 (CR3) joint owner replacement power costs in the current year. PEF contributed Ongoing Earnings of $119$180 million and $121$177 million for the three months ended June 30, 2010 and 2009, respectively. There were no 2010 Ongoing Earnings adjustments to net income available to parent. The 2009 Ongoing Earnings adjustment to net income available to parent was due to PEF recording a tax levelization charge of $2 million. Management does not consider this charge to be representative of PEF’s fundamental core earnings and excluded this charge in computing PEF’s Ongoing Earnings.
PEF contributed net income available to parent totaling $220 million and $207 million for the six months ended JuneSeptember 30, 2010 and 2009, respectively. The increase in net income available to parent for the sixthree months ended JuneSeptember 30, 2010, compared to the same period in 2009, was primarily due to higher returns earned on nuclear and ECRC assets, increased retail base rateslower depreciation expense and the favorable impact of weather, partially offset by unfavorable AFUDC equity,higher O&M expense, lower wholesale base revenues higher income tax expense due to the prior year benefit related to NDT funds and estimated CR3 joint owner replacement power costs in the current year.unfavorable AFUDC equity. PEF contributed Ongoing Earnings of $232$177 million and $212$170 million for the sixthree months ended JuneSeptember 30, 2010 and 2009, respectively. The 2010 Ongoing Earnings adjustments to net income available to parent were due to PEF recording a tax levelization chargebenefit of $2$4 million, partially offset by an impairment of investments and a $10 million charge for the change in theother assets, net of tax treatment of the Medicare Part D subsidy. The$1 million. Th e 2009
75

Ongoing Earnings adjustment to net income available to parent was due to PEF recording a tax levelization chargebenefit of $5$7 million. Management does not consider these chargesitems to be representative of PEF’s fundamental core earnings and excluded these chargesitems in computing PEF’s Ongoing Earnings.
PEF contributed net income available to parent totaling $400 million and $384 million for the nine months ended September 30, 2010 and 2009, respectively. The increase in net income available to parent for the nine months ended September 30, 2010, compared to the same period in 2009, was primarily due to the favorable impact of weather, higher clause recoverable regulatory returns, lower depreciation expense, increased retail base rates and higher miscellaneous revenues, partially offset by unfavorable AFUDC, higher O&M expense, lower wholesale base revenues, higher income tax expense due to the prior year benefit related to NDT funds and the unfavorable change in the tax treatment of the Medicare Part D subsidy, and Crystal River Unit No. 3 (CR3) joint owner replacement power costs in the current year. PEF contributed Ongoing Earn ings of $409 million and $382 million for the nine months ended September 30, 2010 and 2009, respectively. The 2010 Ongoing Earnings adjustments to net income available to parent were due to PEF recording a $10 million charge for the change in the tax treatment of the Medicare Part D subsidy and an impairment of investments and other assets, net of tax of $1 million, partially offset by a tax levelization benefit of $2 million. The 2009 Ongoing Earnings adjustment to net income available to parent was due to PEF recording a tax levelization benefit of $2 million. Management does not consider these items to be representative of PEF’s fundamental core earnings and excluded these items in computing PEF’s Ongoing Earnings.
 
Three Months Ended JuneSeptember 30, 2010, Compared to Three Months Ended JuneSeptember 30, 2009
 
REVENUES
 
The revenue table that follows presents the total amount and percentage change of total operating revenues and its components. “Base Revenues” is a non-GAAP measure and is defined as operating revenues excluding clause recoverable regulatory returns, miscellaneous revenues and fuel and other pass-through revenues. We and PEF
80

consider Base Revenues a useful measure to evaluate PEF’s electric operations because fuel and other pass-through revenues primarily represent the recovery of fuel, applicable portions of purchased power and other pass-through expenses through cost-recovery clauses and, therefore, do not have a material impact on earnings. Clause recoverable regulatory returns include the revenues associated with the return on asset component of nuclear cost-recovery and ECRCenvironmental cost recovery clause (ECRC) revenues. We and PEF have included the reconciliation and analysis that follows as a complement to the financial information we provide in accordance with GAAP. This presentation may not be comparable to other companies’ presentation or more useful than the GAAP information provided elsewhere in this report.
 
A reconciliation of Base Revenues to GAAP operating revenues, including the percentage change by year and by customer class, for the three months ended JuneSeptember 30 follows:
                        
(in millions)      
Customer Class 2010  Change  % Change  2009  2010  Change  % Change  2009 
Residential $236  $26   12.4  $210  $311  $14   4.7  $297 
Commercial  88   7   8.6   81   102   2   2.0   100 
Industrial  20   3   17.6   17   20   -   -   20 
Governmental  23   3   15.0   20   25   -   -   25 
Unbilled  28   (4)  -   32   (4)  (1)  -   (3)
Total retail base revenues  395   35   9.7   360   454   15   3.4   439 
Wholesale base revenues  38   (14)  (26.9)  52   41   (14)  (25.5)  55 
Total Base Revenues  433   21   5.1   412   495   1   0.2   494 
Clause recoverable regulatory returns  42   29   223.1   13   46   6   15.0   40 
Miscellaneous  53   7   15.2   46   60   10   20.0   50 
Fuel and other pass-through revenues  724   (39)  -   763   942   10   -   932 
Total operating revenues $1,252  $18   1.5  $1,234  $1,543  $27   1.8  $1,516 
                                
PEF’s total Base Revenues were $433$495 million and $412$494 million for the three months ended JuneSeptember 30, 2010 and 2009, respectively. The $21$1 million increase in Base Revenues was due primarily to the $26 million impact of increased retail base rates from the repowered Bartow Plant (See Note 3B) and the $12$19 million favorable impact of weather, partially offset by $14 million lower wholesale base revenues and the $3$4 million unfavorable impact of netdecreased retail customer growth and usage.base rates. The favorable impact of weather was driven by 98 percent higher cooling degree days than 2009. Additionally, cooling degree days were 159 percent higher than normal. The unfavorable impact of net retail customer growth and usage was driven by aPEF’s decrease in retail base rates was due to the average usage per retail customer, partially offset by a net 4,000expiration of the 2009 interim base rate increase that was in the average number of cu stomers for 2010 comparedeffect from July 1, 2009 to December 31, 2009. PEF’s wholesale base revenues were $38$41 million and $52$55 million for the three months ended JuneSeptember 30, 2010 and 2009, respectively. The $14 million decrease was due primarily to an amended contract with a major customer.
 
PEF’s clause recoverable regulatory returns were $42increased $6 million and $13in 2010 primarily due to $24 million for the three months ended June 30, 2010 and 2009, respectively. The $29 million higher revenues primarily relate to higher returns on ECRC assets due to placing a total of approximately $770 million$1 billion of Clean Air Interstate Rule (CAIR) projects into service in late 2009.2009 and May 2010, partially offset by $18 million lower returns on nuclear cost recovery. The lower returns on nuclear cost recovery are due to the prior-year recognition of higher returns on unrecovered costs as a result of the FPSC’s clarification related to recognition of nuclear cost deferrals. We anticipate this trend of higher clause recoverable regulatory returns towill continue throughout 2010.
 
PEF’s miscellaneous revenues increased $7$10 million in 2010 primarily due to higher transmissionright-of-use revenues driven by favorable weather.related to the use of easements and land.
Fuel and other pass-through revenues include $10 million and $2 million of revenues for the three months ended September 30, 2010 and 2009, respectively, related to revenue requirements for depreciation and property tax expenses for CAIR projects placed in service.
 
 
7681

 
 
PEF’s electric energy sales in kWh and the percentage change by customer class for the three months ended JuneSeptember 30 were as follows:
                        
(in millions of kWh)                        
Customer Class 2010  Change  % Change  2009  2010  Change  % Change  2009 
Residential  4,598   90   2.0   4,508   6,182   277   4.7   5,905 
Commercial  2,939   (9)  (0.3)  2,948   3,455   50   1.5   3,405 
Industrial  867   35   4.2   832   836   (27)  (3.1)  863 
Governmental  824   19   2.4   805   893   21   2.4   872 
Unbilled  800   97   -   703   (123)  (175)  -   52 
Total retail kWh sales  10,028   232   2.4   9,796   11,243   146   1.3   11,097 
Wholesale  1,031   71   7.4   960   1,182   86   7.8   1,096 
Total kWh sales  11,059   303   2.8   10,756   12,425   232   1.9   12,193 
                                
The increase in retail kWh sales in 2010 was primarily due to favorable weather, as previously discussed. Despite the slight decrease in commercialindustrial kWh sales in 2010 commercialprimarily due to lower sales to phosphate-mining customers, industrial revenues increasedwere unchanged primarily due to increased base rates.usage by other customers with higher rate plans.
 
Wholesale kWh sales have increased primarily due to favorable weather, which resulted in increased deliveries under a certain capacity contract that has high demand and low energy charges. Despite the increase in sales, wholesale base revenues have decreased primarily due to a contract amendment, as previously discussed.
 
TheRecent economic conditions and a general housing downturn in the United States hashave continued to contribute to a slowdown in customer growth and usage in PEF’s service territory. The impact of the general housing downturn was especially severe in several states, including Florida. Additionally, we believe the current economic conditions have impacted our wholesale customers’ usage. We cannot predict how long these economic conditions may last or the extent to which revenues may be impacted. In the future, PEF’s customer usage could be impacted by customer response to EE programs and to increased rates.
 
EXPENSES
 
Fuel and Purchased Power
 
Fuel and purchased power costs represent the costs of generation, which include fuel purchases for generation and energy purchased in the market to meet customer load. Fuel and the majority of purchased power expenses are recovered primarily through cost-recovery clauses and, as such, changes in these expenses do not have a material impact on earnings. The difference between fuel and purchased power costs incurred and associated fuel revenues that are subject to recovery is deferred for future collection from or refund to customers.
 
Fuel and purchased power expenses were $607$780 million for the three months ended JuneSeptember 30, 2010, which represents a $36$119 million decreaseincrease compared to the same period in 2009. Purchased power expense increased $266 million to $309 million primarily due to an increase in the recovery of deferred capacity costs of $201 million resulting from the prior-year reduction in capacity revenues due to PEF’s April 2009 election to defer the 2009 recovery of $198 million in nuclear pre-construction costs (See Note 4B). Additionally, purchased power expenses were impacted by increased purchases of $66 million primarily driven by higher system requirements resulting from favorable weather. Fuel used in electric generation decreased $75$147 million to $368$471 million compared to the same period in 2009. This decrease was primarily due to lower deferred fuel expense of $101$138 million resulting from lower fuelf uel rates in 2010 that assumed the 2009 plant outage at CR3 would be completed within its original schedule (See “Other Matters – Nuclear”), partially offset by increased current year fuel costs of $27 million primarily due to higher system requirements driven by favorable weather. Purchased power expense increased $39 million to $239 million compared to the same period in 2009. This increase was primarily due to an increase in the recovery of deferred capac ity costs of $28 million resulting from increased rates and increased purchases of $11 million primarily related to CR3 joint owner replacement power costs and increased capacity costs. In aggregate, fuel and purchased power expenses increased $13 million due to estimated CR3 joint owner replacement power costs based on PEF’s current expected return to service (See Note 3B).
 
Operation and Maintenance
 
O&M expense was $208$234 million for the three months ended JuneSeptember 30, 2010, which represents a $4$36 million increase compared to the same period in 2009. O&M expense increased primarily due to $10 million higher employee benefits expense, the $16$10 million prior yearprior-year pension deferral in accordance with a FPSC order, the $9 million prior-year impact of a change in the vacation benefits policy and the $2 million impairment of other assets. Management does not consider impairments to be representative of PEF’s fundamental core earnings. Therefore, the

 
7782

 

deferralimpacts of impairments are excluded in accordance with an FPSC order, partially offset by $10 million favorable ECRC costs due to lower nitrogen oxides (NOx) allowances used resulting from a scrubber placed in service in December 2009. The ECRC expenses are recovered through cost-recovery clauses and, therefore, have no material impact on earnings.computing PEF’s Ongoing Earnings. In aggregate, O&M expenses primarily recoverable through base rates increased $11$36 million compared to the same period in 2009.
 
Depreciation, Amortization and Accretion
 
Depreciation, amortization and accretion expense was $110$77 million for the three months ended JuneSeptember 30, 2010, which represents a $5$170 million increasedecrease compared to the same period in 2009. Depreciation, amortization and accretion expense increaseddecreased primarily due to $14$118 million higherlower nuclear cost-recovery amortization partially offset by a $10and the $50 million reduction in the cost of removal component of depreciation expense in accordance with the 2010 base rate settlement agreement (See Note 3B)4B). The nuclear cost-recovery amortization is recovered through a cost-recovery clause and, therefore, has no material impact on earnings. In aggregate, depreciation, amortization and accretion expenses recoverable through base rates and the ECRC decreased $7$52 million compared to the same period in 2009.
Other
Other operating expenses of $7 million for the three months ended June 30, 2009, is primarily due to the regulatory disallowance of fuel costs (See Note 7C in the 2009 Form 10-K).
 
Total Other Income, Net
 
Total other income, net was $12$2 million for the three months ended JuneSeptember 30, 2010, which represents a $24$12 million decrease compared to the same period in 2009. This decrease was primarily due to $19$8 million unfavorable AFUDC equity and a $5 million lower investment gainsdonation, which resulted in a 100 percent tax credit and, therefore, has no material impact on certain employee benefit trusts resulting from financial market conditions.earnings. The unfavorable AFUDC equity is related to lower eligible construction project costs with the repowered Bartow Plant and CAIR projects being placed in service in the secondlate 2009 and fourth quarters of 2009, respectively.May 2010.
 
Total Interest Charges, Net
 
Total interest charges, net was $68$65 million for the three months ended JuneSeptember 30, 2010, which represents a $13$5 million increase compared to the same period in 2009. This increase was primarily due to $7 million unfavorable AFUDC debt related to lower eligible construction project costs as discussed above and $6$5 million higher interest driven by higher average long-term debt outstanding.
 
Income Tax Expense
 
Income tax expense increased $12$10 million for the three months ended JuneSeptember 30, 2010, compared to the same period in 2009, primarily due to the $8 million impact of the unfavorable AFUDC equity discussed above and the $4$5 million tax impact of higher pre-tax income partially offset byand the $2$3 million impact of tax levelization. AFUDC equity is excluded from the calculation of income tax expense. PEF’s income tax expense was increaseddecreased by $2$4 million for the three months ended June 30, 2009, compared to no impact for the three months ended June 30, 2010 related to the impact of tax levelization.levelization for the three months ended September 30, 2010, compared to a decrease of $7 million for the same period in 2009. GAAP requires companies to apply a levelized effective income tax rate to interim periods that is consistent with the estimated annual effective tax rate. Fluctuations in estimated annual earnings and the timing of various permanent items of inc omeincome or deduction can cause fluctuations in the effective tax rate for interim periods. Because this adjustment will vary each quarter, but will have no effect on net income for the year, management does not consider this adjustment to be representative of PEF’s fundamental core earnings. Therefore, the impact of tax levelization is excluded in computing PEF’s Ongoing Earnings.

 
7883

 

Six
Nine Months Ended JuneSeptember 30, 2010, Compared to SixNine Months Ended JuneSeptember 30, 2009
 
REVENUES
 
A reconciliation of Base Revenues to GAAP operating revenues, including the percentage change by year and by customer class, for the sixnine months ended JuneSeptember 30 follows:
                        
(in millions)      
Customer Class 2010  Change  % Change  2009  2010  Change  % Change  2009 
Residential $497  $88   21.5  $409  $808  $102   14.4  $706 
Commercial  169   17   11.2   152   270   18   7.1   252 
Industrial  38   4   11.8   34   58   5   9.4   53 
Governmental  44   5   12.8   39   69   5   7.8   64 
Unbilled  27   (3)  -   30   24   (4)  -   28 
Total retail base revenues  775   111   16.7   664   1,229   126   11.4   1,103 
Wholesale base revenues  81   (32)  (28.3)  113   121   (47)  (28.0)  168 
Total Base Revenues  856   79   10.2   777   1,350   79   6.2   1,271 
Clause recoverable regulatory returns  80   60   300.0   20   126   66   110.0   60 
Miscellaneous  106   16   17.8   90   167   28   20.1   139 
Fuel and other pass-through revenues  1,480   (129)  -   1,609   2,422   (120)  -   2,542 
Total operating revenues $2,522  $26   1.0  $2,496  $4,065  $53   1.3  $4,012 
                                
PEF’s total Base Revenues were $856 million$1.350 billion and $777 million$1.271 billion for the sixnine months ended JuneSeptember 30, 2010 and 2009, respectively. The $79 million increase in Base Revenues was due primarily to the $59$67 million favorable impact of weather and the $55 million impact of increased retail base rates from the repowered Bartow Plant (See Note 3B)4B), the $47 million favorable impact of weather, and the $5 million favorable impact of net retail customer growth and usage, partially offset by $32$47 million lower wholesale base revenues. The favorable impact of weather was driven by 74 percent higher heating degree days than 2009. Additionally, heating degree days were 128127 percent higher than normal in 2010. The favorable impact of net retail customer growth and usage was driven by an increase in the average usage per retail customer and a net 1,000 increase in the average number of customers for 20 10 compared to 2009.normal. PEF’s wholesale base revenues were $81$121 million and $113$168 million for the sixnine months ended JuneSeptember 30, 2010 and 2009, respectively. The $32$47 million decrease was due primarily to an amended contract with a major customer and decreased revenues from a contract that expired in 2009. Given the current economic conditions, PEF does not believe it is likely to replace in 2010the near term wholesale contracts that expired in 2009.
 
PEF’s clause recoverable regulatory returns were $80increased $66 million and $20 million for the six months ended June 30,in 2010 and 2009, respectively. The $60 million higher revenues primarily relatedue to higher returns on ECRC assets due to placing a total of approximately $770 million$1 billion of CAIR projects into service in late 2009.2009 and May 2010.  We anticipate this trend of higher returns towill continue throughout 2010.
 
PEF’s miscellaneous revenues increased $16$28 million in 2010 primarily due to $17 million higher transmission revenues driven by favorable weather.weather and $8 million higher right-of-use revenues related to the use of easements and land.
 
Fuel and other pass-through revenues include $27 million and $2 million of revenues for the nine months ended September 30, 2010 and 2009, respectively, related to revenue requirements for depreciation and property tax expenses for CAIR projects placed in service.

 
7984

 

PEF’s electric energy sales in kWh and the percentage change by customer class for the sixnine months ended JuneSeptember 30 were as follows:
                        
(in millions of kWh)                        
Customer Class 2010  Change  % Change  2009  2010  Change  % Change  2009 
Residential  9,724   929   10.6   8,795   15,906   1,206   8.2   14,700 
Commercial  5,536   34   0.6   5,502   8,991   84   0.9   8,907 
Industrial  1,635   12   0.7   1,623   2,471   (15)  (0.6)  2,486 
Governmental  1,558   21   1.4   1,537   2,450   41   1.7   2,409 
Unbilled  730   42   -   688   608   (132)  -   740 
Total retail kWh sales  19,183   1,038   5.7   18,145   30,426   1,184   4.0   29,242 
Wholesale  2,034   22   1.1   2,012   3,217   109   3.5   3,108 
Total kWh sales  21,217   1,060   5.3   20,157   33,643   1,293   4.0   32,350 
                                
The increase in retail kWh sales in 2010 was primarily due to favorable weather as previously discussed.
 
Wholesale kWh sales have increased primarily due to favorable weather, which resulted in increased deliveries under a certain capacity contract that has high demand and low energy charges. Despite the increase in sales, wholesale base revenues have decreased primarily due to a contract amendment and a contract that expired in 2009, as previously discussed.
 
EXPENSES
 
Fuel and Purchased Power
 
Fuel and purchased power expenses were $1.233$2.013 billion for the sixnine months ended JuneSeptember 30, 2010, which represents a $82$37 million decreaseincrease compared to the same period in 2009. Purchased power expense increased $358 million to $761 million primarily due to an increase in the recovery of deferred capacity costs of $264 million resulting from the prior year reduction in capacity revenues due to PEF’s April 2009 election to defer the 2009 recovery of $198 million in nuclear preconstruction costs (See Note 4B) and increased rates. Additionally, purchased power expenses were impacted by increased purchases of $94 million driven by higher system requirements resulting from favorable weather. Fuel used in electric generation decreased $174$321 million to $781 million compared to the same period in 2009. This decrease was$1.252 billion primarily due to lower deferred fuel expense of $279$417 million resulting fromf rom lower fuel rates, as previously discussed, partially offset by increased current year fuel costs of $105$96 million. The increase in current year fuel costs was primarily due to higher system requirements driven by favorable weather. Purchased power expense increased $92 million to $452 million compared to the same period in 2009. This increase was primarily due to an increase in the recovery of deferred capacity costs of $64 million resulting from increased rates and incr eased purchases of $29 million driven by increased capacity costs and estimated CR3 joint owner replacement power costs. In aggregate, fuel and purchased power expenses increased $19$15 million due to estimated CR3 joint owner replacement power costs, based on PEF’s current expected return to service (See Note 3B)4B).
 
Operation and Maintenance
 
O&M expense was $413$647 million for the sixnine months ended JuneSeptember 30, 2010, which represents a $7$43 million increase compared to the same period in 2009. O&M expense increased primarily due to the $16$26 million prior yearprior-year pension deferral in accordance with ana FPSC order, and higher Energy Conservation Cost Recovery Clause (ECCR) costs of $10$15 million driven by higher rates, favorable weather and increased customer usage of load management programs and home improvement incentives, the $9 million prior-year impact of a change in vacation benefits policy, the $5 million impact of changes to an environmental reserve, $4 million higher employee benefits expense, and the $2 million impairment of other assets. These increases are partially offset by $16$22 million favorable ECRC costs due to lower NOx allowances used resulting from a scrubber placedpla ced in service in December 2009 and lower pension expense of $4$6 million driven by revised actuarial estimates. The ECCR and ECRC expenses are recovered through cost-recovery clauses and, therefore, have no material impact on earnings. Management does not consider impairments to be representative of PEF’s fundamental core earnings. Therefore, the impacts of impairments are excluded in computing PEF’s Ongoing Earnings. In aggregate, O&M expenses primarily recoverable through b asebase rates increased $15$52 million compared to the same period in 2009.
 
85

Depreciation, Amortization and Accretion
 
Depreciation, amortization and accretion expense was $234$311 million for the sixnine months ended JuneSeptember 30, 2010, which represents a $31$201 million decrease compared to the same period in 2009. Depreciation, amortization and accretion expense decreased primarily due to $29$147 million lower nuclear cost-recovery amortization, lower depreciation rate impact of $17 million and a reduction in the cost of removal component of depreciation expense of $10$60 million in
80

accordance with the FPSC2010 base rate settlement agreement (See Note 4B) and the lower depreciation rate impact of $26 million, partially offset by $29the $38 million impact of depreciable asset base increases. The nuclear cost-recovery amortization is recovered through a cost-recovery clause and, therefore, has no material impact on earnings. The lower depreciation rate resulted from a depreciation study in conjunction with the 2009 base ratera te case. In aggregate, depreciation, amortization and accretion expenses recoverable through base rates and ECRC decreased $4$54 million compared to the same period in 2009.
 
Taxes Other Than on Income
 
Taxes other than on income was $176$278 million for the sixnine months ended JuneSeptember 30, 2010, which represents a $8$14 million increase compared to the same period in 2009. This increase was primarily due to higher property taxes of $7$10 million resulting primarily from placing the repowered Bartow Plant in service in June 2009.
 
Other
Other operating expenses of $7 million for the six months ended June 30, 2009, is primarily due to the regulatory disallowance of fuel costs (See Note 7C in the 2009 Form 10-K).
Total Other Income, Net
 
Total other income, net was $22$24 million for the sixnine months ended JuneSeptember 30, 2010, which represents a $45$57 million decrease compared to the same period in 2009. This decrease was primarily due to $41$49 million unfavorable AFUDC equity related to lower eligible construction project costs with the repowered Bartow Plant and CAIR projects being placed in service in the secondmid- and fourth quarters oflate 2009, respectively.
 
Total Interest Charges, Net
 
Total interest charges, net was $127$192 million for the sixnine months ended JuneSeptember 30, 2010, which represents a $14$19 million increase compared to the same period in 2009. This increase was primarily due to $11 million unfavorable AFUDC debt related to lower eligible construction project costs as discussed above.above and $11 million higher interest driven by higher average long-term debt outstanding.
 
Income Tax Expense
 
Income tax expense increased $59$69 million for the sixnine months ended JuneSeptember 30, 2010, compared to the same period in 2009, primarily due to the $27$33 million tax impact of higher pre-tax income, the $16$19 million impact of the unfavorable AFUDC equity discussed above, the $11 million impact of the favorable prior yearprior-year tax benefit related to a deduction triggered by the transfer of previously funded amounts from the nonqualified NDT to the qualified NDT and the $10 million impact of the change in the tax treatment of the Medicare Part D subsidy resulting from recently enacted federal health care reform enacted earlier in 2010 (See Note 8)9). AFUDC equity is excluded from the calculation of income tax expense. PEF’s income tax expense was increaseddecreased by $2 million and $5 million for the sixnine months ended JuneSeptember 30, 2010, and 2009, respectively, related to the impact of t axtax levelization. Because this adjustment will vary each quarter, but will have no effect on net income for the year,As previously discussed, management does not consider this adjustment to be representative of PEF’s fundamental core earnings. Additionally, management does not consider the change in the tax treatment of the Medicare Part D subsidy to be representative of PEF’s fundamental core earnings. Accordingly, the impacts of tax levelization and the change in the tax treatment of the Medicare Part D subsidy are excluded in computing PEF’s Ongoing Earnings.
 
 
8186

 

CORPORATE AND OTHER
 
The Corporate and Other segment primarily includes the operations of the Parent, Progress Energy Service Company, LLC (PESC) and other miscellaneous nonregulated businesses (Corporate and Other) that do not separately meet the quantitative disclosure requirements as a reportable business segment. A discussion of the items excluded from Corporate and Other’s Ongoing Earnings is included in the detailed discussion and analysis below. Management believes the excluded items are not representative of our fundamental core earnings. The following table reconciles Corporate and Other’s Ongoing Earnings to GAAP net income attributable to controlling interests:
                        
 Three months ended June 30,  Six months ended June 30,  Three months ended September 30,  Nine months ended September 30, 
(in millions) 2010  2009  2010  2009  2010  2009  2010  2009 
Other interest expense $(77) $(64) $(153) $(119) $(75) $(62) $(225) $(177)
Other income tax benefit  27   28   51   38   30   25   88   70 
Other income  -   2   5   9 
Other expense  (4)  (3)  (9)  (6)
Ongoing Earnings  (50)  (34)  (97)  (72)  (49)  (40)  (146)  (113)
Tax levelization  -   (4)  (2)  (6)  (1)  2   (3)  (3)
CVO mark-to-market  -   1   -   8   -   3   -   11 
Impairment, net of tax  -   (2)  -   (2)  -   -   -   (2)
Discontinued operations attributable to
controlling interests, net of tax
  (1)  (1)  -   (1)  (2)  (102)  (2)  (103)
Net loss attributable to controlling interests $(51) $(40) $(99) $(73) $(52) $(137) $(151) $(210)
                                
OTHER INTEREST EXPENSE
 
Other interest expense increased $13 million and $34$48 million for the three and sixnine months ended JuneSeptember 30, 2010, respectively, compared to the same period in 2009, primarily due to higher average debt outstanding.
 
OTHER INCOME TAX BENEFIT
 
Other income tax benefit increased $13$5 million and $18 million for the sixthree and nine months ended JuneSeptember 30, 2010, respectively, compared to the same period in 2009, primarily due to the $15 million favorable tax impact of higher pre-tax loss.
 
ONGOING EARNINGS ADJUSTMENTS
 
Tax Levelization
 
GAAP requires companies to apply a levelized effective income tax rate to interim periods that is consistent with the estimated annual effective tax rate. Income tax expense was increaseddecreased by $4$2 million for the three months ended JuneSeptember 30, 2009, compared to no impactan increase of $1 million for the same period in 2010, and was increased by $2 million and $6$3 million for the sixnine months ended JuneSeptember 30, 2010 and 2009, respectively, in order to maintain an effective tax rate consistent with the estimated annual rate. Fluctuations in estimated annual earnings and the timing of various permanent items of income or deduction can cause fluctuations in the effective tax rate for interim periods. Because this adjustment will vary each quarter, but will have no effect on net income for the year, management does not consider this adjustment to be representative of our fundame ntalfundamen tal core earnings.
 
CVO Mark-to-Market
 
At JuneSeptember 30, 2010 and 2009, the contingent value obligations (CVOs) had fair values of approximately $15 million and $26$23 million, respectively. The unrealized gain/loss recognized due to changes in fair value is recorded in other, net on the Consolidated Statements of Income. Progress Energy recorded an unrealized gain of $1$3 million for the three months ended JuneSeptember 30, 2009, to record the changes in fair value of the CVOs, which had average unit prices of $0.16 and $0.27$0.24 at JuneSeptember 30, 2010 and 2009, respectively. There was no change in the fair value of the CVOs for the three months ended JuneSeptember 30, 2010. Progress Energy recorded an unrealized gain of $8$11 million
87

for the sixnine months ended JuneSeptember 30, 2009, to record the changes in fair value of the CVOs. There was no change in the fair value of the CVOs for the sixnine months ended JuneSeptember 30, 2010. See Note 15 in the 2009 Form 10-K for further information. Because Progress Energy is
82

unable to predict the changes in the fair value of the CVOs, management does not consider this adjustment to be representative of our fundamental core earnings.
 
Impairment, Net of Tax
 
We recorded a $2$3 million impairment of certain miscellaneous investments during the three and sixnine months ended JuneSeptember 30, 2009. The impairment was recorded in other, net on the Consolidated Statements of Income. Management does not consider impairments to be representative of our fundamental core earnings.
 
Discontinued Operations Attributable to Controlling Interests, Net of Tax
 
We completed our business strategy of divesting of nonregulated businesses to reduce our business riskrecognized $2 million and focus on core operations of the Utilities. We recognized $1$102 million of loss from discontinued operations attributable to controlling interests, net of tax, for the three months ended JuneSeptember 30, 2010 and 2009, respectively, and $2 million and $103 million for the sixnine months ended JuneSeptember 30, 2009.2010 and 2009, respectively. We recorded a charge of $101 million to discontinued operations during the three months ended September 30, 2009, as a result of a verdict in a lawsuit against Progress Energy and a number of our Synthetic Fuels subsidiaries and affiliates, which was net of a previously recorded indemnification liability and estimated tax impacts (See Notes 3 and 14C). Management does not consider operating results of discontinued operations to be representative of our fundamental core earnings.
 

LIQUIDITY AND CAPITAL RESOURCES
 
OVERVIEW
 
Our significant cash requirements arise primarily from the capital-intensive nature of the Utilities’ operations, including expenditures for environmental compliance. We rely upon our operating cash flow, substantially all of which is generated by the Utilities, commercial paper and bank facilities, and our ability to access the long-term debt and equity capital markets for sources of liquidity. As discussed in “Future Liquidity and Capital Resources” below, synthetic fuels tax credits provide an additional source of liquidity as those credits are realized.
 
The majority of our operating costs are related to the Utilities. Most of these costs are recovered from ratepayers in accordance with various rate plans. We are allowed to recover certain fuel, purchased power and other costs incurred by PEC and PEF through their respective recovery clauses. The types of costs recovered through clauses vary by jurisdiction. Fuel price volatility and plant performance can lead to over- or under-recovery of fuel costs, as changes in fuel expense are not immediately reflected in fuel surcharges due to regulatory lag in setting the surcharges. As a result, fuel price volatility and plant performance can be both a source of and a use of liquidity resources, depending on what phase of the cycle of price volatility we are experiencing and/or how our plants are performing. Changes in the Utilities’ fu el and purchased power costs may affect the timing of cash flows, but not materially affect net income.
 
As a registered holding company, our establishment of intercompany extensions of credit is subject to regulation by the Federal Energy Regulatory Commission (FERC) under regulatory provisions of the Public Utility Holding Company Act of 2005 (PUHCA 2005). Our subsidiaries participate in internal money pools, administered by PESC, to more effectively utilize cash resources and reduce external short-term borrowings. The utility money pool allows the Utilities to lend to and borrow from each other. A non-utility money pool allows our nonregulated operations to lend to and borrow from each other. The Parent can lend money to the utility and non-utility money pools but cannot borrow funds.
 
The Parent is a holding company and, as such, has no revenue-generating operations of its own. The primary cash needs at the Parent level are our common stock dividend, interest and principal payments on the Parent’s $4.2 billion of senior unsecured debt and potentially funding the Utilities’ capital expenditures through equity contributions. The Parent’s ability to meet these needs is typically funded with dividends from the Utilities generated from their earnings and cash flows, and to a lesser extent, dividends from other subsidiaries; repayment of funds due to the Parent by its subsidiaries; the Parent’s bank facility; and/or the Parent’s ability to access the short-term and long-term debt and equity capital markets. In recent years, rather than paying dividends to the
88

Parent, the Utilities, to a lar gelarge extent, have retained their free cash flow to fund their capital expenditures. During 2009, PEC paid a dividend of $200 million to the Parent and PEF received equity contributions of $620 million from the Parent. During the sixnine months ended JuneSeptember 30, 2010, PEC paid dividends of $75 million and PEF each paid dividends of $50 million to the Parent. There are a number of factors that impact the Utilities’ decision or ability to pay dividends to the Parent or to seek equity contributions from the Parent, including capital expenditure decisions and the timing of recovery of fuel and other pass-through costs. Therefore, we cannot predict the level of dividends or equity contributions
83

between the Utilities and the Parent from year to year. The Parent could change its existing common stock dividend policypol icy based upon these and other business factors.
 
Cash from operations, commercial paper issuance, borrowings under our credit facilities, long-term debt financings, and/or ongoing sales of common stock from our Progress Energy Investor Plus Plan (IPP) and equity incentive plans are expected to fund capital expenditures, long-term debt maturities and common stock dividends for 2010. For the fiscal year 2010, we plan, subject to market conditions, to realize up to $500 million from the sale of stock through ongoing equity sales, of which $405$419 million has been realized through JuneSeptember 30, 2010 (See “Financing Activities”).
 
We have 16 financial institutions that support ourAt September 30, 2010, we had combined commitments of $2.030 billion in our revolving credit facilities for the Parent, PEC and PEF thereby limiting our dependence on any one institution. The credit facilities servethat served as back-ups to our commercial paper programs. To the extent amounts arewere reserved for commercial paper or letters of credit outstanding, they arewere not available for additional borrowings. At JuneSeptember 30, 2010, the Parent had no outstanding borrowings under its credit facility, no outstanding commercial paper and had issued $38$32 million of letters of credit, which were supported by the revolving credit facility. At JuneSeptember 30, 2010, PEC and PEF had no outstanding borrowings under their respective credit facilities and no outstanding commercial paper. Based
On October 15, 2010, PEC and PEF each entered into new $750 million, three-year revolving credit agreements (RCAs) with a syndication of 22 financial institutions. The new $750 million RCAs replaced PEC’s and PEF’s $450 million RCAs, which were set to expire June 28, 2011 and March 28, 2011, respectively. Both $450 million RCAs were terminated effective October 15, 2010. Also on theseOctober 15, 2010, the Parent ratably reduced the size of its $1.13 billion credit facility to $500 million with the existing group of 15 financial institutions. As a result of the changes made on October 15, 2010, our combined credit commitments total $2.000 billion, supported by 24 institutions. At October 15, 2010, based on $32 million of outstanding amounts at June 30, 2010,letters of credit supported by the Parent’s RCA, there was a combined $1.992 bill ion available$1.968 billion availab le for additional borrowings.
See further discussion of these items in Note 7 and below in “Financing Activities.”

At JuneSeptember 30, 2010, PEC and PEF had limited counterparty mark-to-market exposure for financial commodity hedges (primarily gas and oil hedges) due to spreading our concentration risk over a number of counterparties. In the event of default by a counterparty, the exposure in the transaction is the cost of replacing the agreements at current market rates. At JuneSeptember 30, 2010, the majority of the Utilities’ open financial commodity hedges were in net mark-to-market liability positions. See Note 9A10A for additional information with regard to our commodity derivatives.
 
At JuneSeptember 30, 2010, we had limited mark-to-market exposure to certain financial institutions under pay-fixed forward starting swaps to hedge cash flow risk with regard to future financing transactions for the Parent, PEC and PEF. In the event of default by a counterparty, the exposure in the transaction is the cost of replacing the agreements at current market rates. At JuneSeptember 30, 2010, the sumsums of the Parent’s, PEC’s and PEF’s open pay-fixed forward starting swaps were each in a net mark-to-market liability position. See Note 9B10B for additional information with regard to our interest rate derivatives.
 
On July 21, 2010, the Wall Street Reform and Consumer Protection Act (H.R. 4173) was signed into law. Among other things, the law includes provisions related to the swaps and over-the-counter derivatives markets. Under the law, we expect to be exempt from mandatory clearing and exchange trading requirements for our commodity and interest rate hedges because we are an end user of these products. Capital and margin requirements for these hedges are expected to be determined over the next year as more detailed rules and regulations are published. At this time, we do not expect the law to have a material impact on our financial condition. However, we cannot determine the impact until the final regulations are issued.

89

Our pension and nuclear decommissioning trust funds are managed by a number of financial institutions, and the assets being managed are diversified in order to limit concentration risk in any one institution or business sector.
 
We believe our internal and external liquidity resources will be sufficient to fund our current business plans. We will continue to monitor the credit markets to maintain an appropriate level of liquidity. Our ability to access the capital markets on favorable terms may be negatively impacted by credit rating actions. Risk factors associated with the capital markets and credit ratings are discussed below and in Item 1A, “Risk Factors” to the 2009 Form 10-K.
 
The following discussion of our liquidity and capital resources is on a consolidated basis.
 
84


HISTORICAL FOR 2010 AS COMPARED TO 2009
 
CASH FLOWS FROM OPERATIONS
 
Net cash provided by operating activities increased $64$134 million for the sixnine months ended JuneSeptember 30, 2010, when compared to the same period in the prior year. The increase was primarily due to $205$229 million lower cash used for inventory, primarily due to a change in generation mix and higher coal consumption as a result of favorable weather that was fulfilled through 2010 usage of inventory from year-end 2009; and $1402009, a $136 million increase from accounts payable, primarily driven by the timing of payments to vendors for increased purchases of fuel and purchased power resulting from outages and favorable weather.weather, a $102 million reduction in pension plan funding compared to the prior year and a $60 million increase related to prior year payments to lock interest rates on 2009 debt issuances. These impacts were partially offset by a $266$238 mi llion use of cash to meet derivative collateral requirements and a $153 million decrease from the recovery of deferred fuel costsreceivables, primarily as a result of lower fuel rates and higher current year fuel expenses.driven by favorable weather.
 
INVESTING ACTIVITIES
 
Net cash used by investing activities decreased by $13$19 million for the sixnine months ended JuneSeptember 30, 2010, when compared to the same period in the prior year. This decrease was primarily due to $227$295 million lower capital expenditures at PEF primarily related to environmental compliance and nuclear projects and $15$18 million insurance proceeds fromfor repair costs related to the CR3 delamination project,event, partially offset by $178$292 million higher capital expenditures at PEC primarily related to the Wayne County Richmondand New Hanover County projects (See Note 4A) and Sutton generation sites and $59 million increase in nuclear fuel additions primarily related to PEC’s one additional refueling outage for 2010 compared to 2009.at our Harris generating station.
 
FINANCING ACTIVITIES
 
Net cash provided by financing activities decreased by $384$162 million for the sixnine months ended JuneSeptember 30, 2010, when compared to the same period in the prior year. The decrease was primarily due to a $746 million decrease in proceeds from long-term debt issuances, net primarily due to PEF’s $591 million proceeds from long-term debt issuances in 2010 compared to $1.337 billion proceeds from long-term debt issuances at the Parent and PEC in 2009; and a $140$138 million decrease in net issuance of common stock, primarily related to the Parent’s January 2009 common stock offering.offering and a $15 million increase in dividends paid on common stock. These impacts were partially offset by a $510$760 million decrease in repayments of short-term debt driven by commercial paper and revolving credit agreement repayments in 2009. A discussion of our 201020 10 financing activities follows.
 
On January 15, 2010, the Parent paid at maturity $100 million of its Series A Floating Rate Notes with a portion of the proceeds from the $950 million of Senior Notes issued in November 2009.
 
On March 25, 2010, PEF issued $250 million of 4.55% First Mortgage Bonds due 2020 and $350 million of 5.65% First Mortgage Bonds due 2040. Proceeds were used to repay the outstanding balance of PEF’s notes payable to affiliated companies, to repay the maturity of PEF’s $300 million 4.50% First Mortgage Bonds due June 1, 2010, and for general corporate purposes.
 
On October 15, 2010, PEC and PEF each entered into new $750 million, three-year RCAs with a syndication of 22 financial institutions. The RCAs will be used to provide liquidity support for PEC’s and PEF’s issuances of commercial paper and other short-term obligations, and for general corporate purposes. The RCAs will expire on October 15, 2013. The new $750 million RCAs replaced PEC’s and PEF’s $450 million RCAs, which were set to
90

expire June 28, 2011 and March 28, 2011, respectively. Both $450 million RCAs were terminated effective October 15, 2010. Fees and interest rates under the new RCAs are to be determined based upon the respective credit ratings of PEC’s and PEF’s long-term unsecured senior noncredit-enhanced debt, as rated by Moody’s Investor Services, Inc. (Moody’s) and Standard and Poor’s Rating Services (S&P). Fees and interest rates under the new facilities are not expected to materially increase interest expense. The RCAs include defined maximum total debt to capital ratios of 65 percent. We are currently in compliance and expect to continue to be in compliance with these covenants. The RCAs also contain various cross-default and other acceleration provisions, including a cross-default provision for defaults of ind ebtedness in excess of $35 million. PEC’s and PEF’s cross-default provisions can be triggered only by defaults of indebtedness by PEC and its subsidiaries and PEF, respectively, not each other or other affiliates of PEC and PEF. The RCAs do not include material adverse change representations for borrowings or financial covenants for interest coverage.
Also on October 15, 2010, the Parent ratably reduced the size of its $1.130 billion credit facility to $500 million with the existing group of 15 financial institutions. We expect to renew the Parent’s credit facility prior to its May 2012 expiration. As a result of the changes made on October 15, 2010, our combined credit commitments total $2.000 billion, supported by 24 financial institutions.
At December 31, 2009, we had 500 million shares of common stock authorized under our charter, of which 281 million shares were outstanding. For the three and sixnine months ended JuneSeptember 30, 2010, respectively, we issued approximately 5.40.3 million and 11.511.8 million shares of common stock through the IPP and equity incentive plans resulting in approximately $208$14 million and $405$419 million in net proceeds. For the three and nine months ended JuneSeptember 30, 2009, we issued an immaterial number of shares of common stock. For the six months ended June 30, 2009,respectively, we issued approximately 15.50.3 million and 15.8 million shares of common stock resulting in approximately $545$12 million and $557 million in net proceeds. Included in these amounts were 14.4 million shares issued in an underwritten public offering for net proceeds of approximately $523 million.
 
FUTURE LIQUIDITY AND CAPITAL RESOURCES
 
The Utilities produce substantially all of our consolidated cash from operations. We anticipate that the Utilities will continue to produce substantially all of the consolidated cash flows from operations over the next several years. Our discontinued synthetic fuels operations historically produced significant net earnings from the generation of tax credits (See “Other Matters – Synthetic Fuels Tax Credits”). A portion of these tax credits has yet to be realized in cash due to the difference in timing of when tax credits are recognized for financial reporting purposes and realized
85

for tax purposes. At JuneSeptember 30, 2010, we have carried forward $806$804 million of deferred tax credits. Realization of these tax credits is dependent upon our future taxable income, which is expected to be generated primarily by the Utilities.Utilities .
 
We expect to be able to meet our future liquidity needs through cash from operations, commercial paper issuance, availability under our credit facilities, long-term debt financings and equity offerings, including periodic ongoing sales of common stock from our IPP and employee benefit and stock option plans.
 
Credit rating downgrades could negatively impact our ability to access the capital markets and respond to major events such as hurricanes. Our cost of capital could also be higher, which could ultimately increase prices for our customers. The downgrade of PEF’s senior unsecured credit rating by Moody’s on April 9, 2010, resulted in increases in PEF’s RCA facility fees and an immaterial increase in PEF’s interest expense. It is important for us to maintain our credit ratings and have access to the capital markets in order to reliably serve customers, invest in capital improvements and prepare for our customer’scustomers’ future energy needs (See Item 1A, “Risk Factors” to 2009 Form 10-K).
 
We issue commercial paper to meet short-term liquidity needs. If liquidity conditions deteriorate and negatively impact the commercial paper market, we will need to evaluate other, potentially more expensive, options for meeting our short-term liquidity needs, which may include borrowing under our revolving credit agreements (RCAs),RCAs, issuing short-term notes, issuing long-term debt and/or issuing equity. There was an immaterial increase in PEF’s RCA facility fees as a result of the downgrade of PEF’s senior unsecured credit rating by Moody’s Investors Service, Inc. (Moody’s) on April 9, 2010.
 
The current RCAs for the Parent,On October 15, 2010, PEC and PEF entered into new three-year RCAs. The Parent’s RCA will expire in May 2012, June 2011 and March 2011, respectively.with the exception of approximately $22 million that will expire in May 2011. We expect to enter a new Parent
91

credit facilitiesfacility prior to the respective expirations of our current RCAs.its May 2012 expiration. In the event we enter into a new credit facilities,facility, we cannot predict the terms, prices, durationsduration or participants in such facilities.facility.
 
Progress Energy and its subsidiaries have approximately $12.641 billion in outstanding long-term debt, including the $705 million$1.005 billion current portion. Currently, approximately $860 million of the Utilities’ debt obligations, approximately $620 million at PEC and approximately $240 million at PEF, are tax-exempt auction rate securities insured by bond insurance. These tax-exempt bonds have experienced and continue to experience failed auctions. Assuming the failed auctions persist, future interest rate resets on our tax-exempt auction rate bond portfolio will be dependent on the volatility experienced in the indices that dictate our interest rate resets and/or rating agency actions that may lower our tax-exempt bond ratings. In the event of a one notch downgrade of PEC’s and/or PEF’s senior secured debt rating by S&P , the ratings of such utility’s tax-exempt bonds would be below A-, most likely resulting in higher future interest rate resets. In the event of a one notch downgrade by Moody’s, PEC’s and PEF’s tax-exempt bonds will continue to be rated at or above A3. We will continue to monitor this market and evaluate options to mitigate our exposure to future volatility.
 
The performance of the capital markets affects the values of the assets held in trust to satisfy future obligations under our defined benefit pension plans. Although a number of factors impact our pension funding requirements, a decline in the market value of these assets may significantly increase the future funding requirements of the obligations under our defined benefit pension plans. We expect to make at least $129$229 million of contributions directly to pension plan assets in 2010 and contributed $119 million during the nine months ended September 30, 2010 (See Note 8)9).
 
As discussed in “Liquidity and Capital Resources,” “Capital Expenditures,” and in “Other Matters – Environmental Matters,” over the long term, compliance with environmental regulations and meeting the anticipated load growth at the Utilities as described under “Other Matters – Energy Demand” will require the Utilities to make significant capital investments. These anticipated capital investments are expected to be funded through a combination of cash from operations and issuance of long-term debt, preferred stock and/or common equity, which are dependent on our ability to successfully access capital markets. We may pursue joint ventures or similar arrangements with third parties in order to share some of the financing and operational risks associated with new baseload generati on. As discussed in “Other Matters – Nuclear – Potential New Construction,” PEF expects its capital expenditures for the proposed nuclear plant in Levy County, Fla. (Levy) will be significantly less in the near term than previously planned in light of schedule shifts and other factors.
 
86

Certain of our hedge agreements may result in the receipt of, or posting of, derivative collateral with our counterparties, depending on the daily derivative position. Fluctuations in commodity prices that lead to our return of collateral received and/or our posting of collateral with our counterparties negatively impact our liquidity. Substantially all derivative commodity instrument positions are subject to retail regulatory treatment. After settlement of the derivatives and consumption of the fuel, any realized gains or losses are passed through the fuel cost-recovery clause. Changes in natural gas prices and settlements of financial hedge agreements since December 31, 2009, have impacted the amount of collateral posted with counterparties. At JuneSeptember 30, 2010, we had posted approximately $194$223 million of cash collateral compared to $14 6t o $146 million of cash collateral posted at December 31, 2009. The majority of our financial hedge agreements will settle in 2010 and 2011. Additional commodity market price decreases could result in significant increases in the derivative collateral that we are required to post with counterparties. We continually monitor our derivative positions in relation to market price activity. As discussed in Note 9C,10C, credit rating downgrades could also require us to post additional cash collateral for commodity hedges in a liability position as certain derivative instruments require us to post collateral on liability positions based on our credit ratings.
 
The amount and timing of future sales of debt and equity securities will depend on market conditions, operating cash flow and our specific liquidity needs. We may from time to time sell securities beyond the amount immediately needed to meet our capital or liquidity requirements in order to prefund our expected maturity schedule, to allow for the early redemption of long-term debt, the redemption of preferred stock, the reduction of short-term debt or for other corporate purposes.
92

 
At JuneSeptember 30, 2010, the current portion of our long-term debt was $705 million.$1.005 billion (including $300 million at PEF and $5 million at PEC). We expect to fund the Parent’s $700 million March 2011 long-term debt maturity with proceeds from long-term debt, issuances, including a portion of the remaining proceeds from the Parent’s November 2009 $950 million long-term debt issuance. We expect to fund the remaining current portion of long-term debt with a combination of cash from operations, commercial paper borrowings and/or long-term debt.
 
REGULATORY MATTERS AND RECOVERY OF COSTS
 
Regulatory matters, including nuclear cost recovery, as discussed in Note 34 and “Other Matters – Regulatory Environment,” and filings for recovery of environmental costs, as discussed in Note 1213 and in “Other Matters – Environmental Matters,” may impact our future liquidity and financing activities. The impacts of these matters, including the timing of recoveries from ratepayers, can be both a source of and a use of future liquidity resources. Regulatory developments expected to have a material impact on our liquidity are discussed below.
 
As discussed further in Note 34 and in “Other Matters – Regulatory Environment,” the North Carolina, South Carolina and Florida legislatures passed energy legislation that became law in recent years. These laws may impact our liquidity over the long term, including among others, provisions regarding cost recovery, mandated renewable portfolio standards, DSM and EE.
 
PEC Cost-Recovery Clause
 
On June 23, 2010, the SCPSCPublic Service Commission of South Carolina (SCPSC) approved PEC’s request for a decrease in the fuel rate charged to its South Carolina ratepayers. The $17 million decrease effective July 1, 2010, is driven by declining fuel prices.
 
On June 4, 2010, PEC filed with the NCUCNorth Carolina Utilities Commission (NCUC) for a decrease in the fuel rate charged to its North Carolina ratepayers. If approved, the $170 million decrease would be effective December 1, 2010. This decrease is also driven by declining fuel prices.
 
On June 4, 2010, PEC filed with the NCUC for an increase in the DSM and EE rate charges to its North Carolina ratepayers. If approved, the $31 million increase would be effective December 1, 2010. We cannot predict the outcome of this matter.
 
PEC Other Matters
 
On October 13, 2008, the NCUC issued a Certificate of Public Convenience and Necessity allowing PEC to proceed with plans to construct an approximately 600-MW600-megawatt (MW) combined cycle dual fuel-capable generating facility at its Richmond County generation site to provide additional generating and transmission capacity to meet the growing
87

energy demands of southern and eastern North Carolina. PEC projects that the generating facility and related transmission will be in service by June 2011.
 
On October 22, 2009, the NCUC issued its order granting PEC a Certificate of Public Convenience and Necessity to construct a 950-MW combined cycle natural gas-fueled electric generating facility at a site in Wayne County, N.C. PEC projects that the generating facility will be in service by January 2013.
 
On December 1, 2009, PEC filed with the NCUC a plan to retire no later than December 31, 2017, all of its coal-fired generating facilities in North Carolina that do not have scrubbers. These facilities total approximately 1,500 MW at four sites. PEC intends to continue to depreciate these units using the current depreciation rates on file with the NCUC and the SCPSC until PEC completes and files a new depreciation study. On September 13, 2010, PEC filed its 15-year Integrated Resource Plan (the IRP) with the NCUC and SCPSC, which accelerated the expected retirement schedule of the four coal-fired generating facilities to no later than December 31, 2014.
 
On June 9, 2010, the NCUC issued its order granting PEC a Certificate of Public Convenience and Necessity to construct a 620-MW combined cycle natural gas-fueled electric generating facility at a site in New Hanover County, N.C., to replace the existing coal-fired generation at this site. PEC projects that the generating facility wouldwill be in service by late 2013 or early 2014.
93

 
PEF Base Rates
 
On January 11, 2010, the FPSC approved a base rate increase for PEF of $132 million effective January 1, 2010, which represents the annualized impact of the rate increase that was approved and effective July 2009 for the repowered Bartow Plant. The FPSC authorized PEF the opportunity to earn a return on equity (ROE) of 10.5 percent. Subsequently, PEF filed petitions for a motion for reconsideration and approval of an accounting order with the FPSC.
 
On June 1, 2010, the FPSC approved a settlement agreement between PEF and the interveners, with the exception of the Florida Association for Fairness in Ratemaking, to the 2009 rate case and to anthe accounting order petition filed by PEF in 2010.order. As part of the settlement, PEF withdrew its motion for reconsideration of the rate case order and its accounting order petition. Among other provisions, under the terms of the settlement agreement, PEF will maintain base rates at current levels through the last billing cycle of 2012. The settlement agreement also provides that PEF will have the discretion to reduce depreciation expense (cost of removal component) by up to $150 million in 2010, up to $250 million in 2011, and up to any remaining balance in the cost of removal component of the depreciation reserve in 2012 until the earlier of (a) PEF’s applicable cost ofo f removal reserve reaches zero, or (b) the expiration of the settlement agreement at the end of 2012. In the event PEF reduces depreciation expense by less than the annual amounts for 2010 or 2011, PEF may carry forward (i.e., increase the annual cap by) any unused cost of removal reserve amounts in subsequent years during the term of the agreement. The balance of the cost of removal reserve is impacted by accruals in accordance with PEF’s latest depreciation study, removal costs expended and reductions in depreciation expense as permitted by the settlement agreement. For the three and sixnine months ended JuneSeptember 30, 2010, PEF recognized a $10$50 million and a $60 million reduction in depreciation expense pursuant to the settlement agreement. PEF’s applicable cost of removal reserve of $516$466 million is recorded as a regulatory liability on its JuneSeptember 30, 2010 Balance Sheet. The settlement agreement also provides that if PEF’s actual retail base rate earnings fall below a 9.5 percent ROE on a n adjusted or pro forma basis, as reported on a historical 12-month basis during the term of the agreement, PEF may seek general, limited or interim base rate relief, or any combination thereof. Prior to requesting any such relief, PEF must have reflected on its referenced surveillance report associated depreciation expense reductions of at least $150 million. The settlement agreement does not preclude PEF from requesting the FPSC to approve the recovery of costs (a) that are of a type which traditionally and historically would be, have been or are presently recovered through cost-recovery clauses or surcharges, or (b) that are incremental costs not currently recovered in base rates, which the legislature or FPSC determines are clause recoverable, or (c) which are recoverable through base rates under the nuclear cost-recovery legislation or the FPSC’s nuclear cost-recovery rule. PEF also may, at its discretion, accelerate in whole or in part the amortization of certain regulatory assets over the term ofo f the settlement agreement. Finally, PEF will be allowed to recover the costs of named storms on an expedited basis. Specifically, 60 days following the filing of a cost-recovery petition with the FPSC and based on a 12-month recovery period, PEF can begin recovery, subject to refund, through a surcharge of up to $4.00 per 1,000 kWh on monthly residential customer bills for storm costs. In the event the storm costs exceed that level, any excess additional costs will be deferred and recovered in a subsequent year or years as determined by the FPSC. Additionally, the order approving the settlement agreement allows PEF to use the surcharge to replenish the storm damage reserve to $136 million, the level as of June 1, 2010, after storm costs are fully recovered.
 
PEF Fuel Cost Recovery
On September 1, 2010, PEF filed a request with the FPSC to seek approval to decrease the total fuel cost-recovery by $83 million, reducing the residential rate by $3.28 per 1,000 kWh, or 2.6 percent effective January 1, 2011. This decrease is due to a decrease of $5.14 per 1,000 kWh for the projected recovery through the Capacity Cost-Recovery Clause (CCRC), partially offset by an increase of $1.86 per 1,000 kWh for the projected recovery of fuel costs. The decrease in the CCRC is primarily due to the refund of a prior period over-recovery as a result of higher than expected sales in 2010 and lower anticipated costs associated with PEF’s proposed Levy Units 1 and 2 nuclear power plants in 2011 (See “Other Matters - Nuclear - Potential New Construction”). The increase in the projected recovery of fuel costs is due to under-recovery of 2010 fuel costs, partially offset by lower expected 2011 fuel costs. On November 2, 2010, the FPSC approved PEF’s CCRC residential rate. Also on November 2, 2010, PEF agreed to file revised fuel projections with the FPSC on or before November 10, 2010, to reflect PEF’s most up-to-date fuel forecast. In addition, the FPSC requested PEF file fuel recovery factors with scenarios varying the timing of
 
8894

 
recovering the CR3 replacement power costs through differing assumptions of the percentage to be collected in 2011 and thereafter. The FPSC is expected to vote on these supplemental filings at the FPSC's November 30, 2010 Agenda Conference for implementation of new fuel factors in January 2011. We cannot predict the outcome of this matter.
PEF Nuclear Cost Recovery
 
PEF is allowed to recover prudently incurred site selection costs, preconstruction costs and the carrying cost on construction cost balances on an annual basis through the capacity cost-recovery clause (CCRC).CCRC. Such amounts will not be included in PEF’s rate base when the plant is placed in commercial operation. The nuclear cost-recovery rule also has a provision to recover costs should the project be abandoned after the utility receives a final order granting a Determination of Need. These costs include any unrecovered construction work in progress at the time of abandonment and any other prudent and reasonable exit costs. In addition, the rule requires the FPSC to conduct an annual prudence reviewrevi ew of the reasonableness and prudence of all such costs, including construction costs, and such determination shall not be subject to la terlater review except upon a finding of fraud, intentional misrepresentation or the intentional withholding of key information by the utility.
 
In 2009, pursuant to the FPSC nuclear cost-recovery rule, PEF filed a petition to recover $446 million through the CCRC, which primarily consisted of preconstruction and carrying costs incurred or anticipated to be incurred during 2009 and the projected 2010 costs associated with the Levy and CR3 uprate projects. In an effort to help mitigate the initial price impact on its customers, as part of its filing, PEF proposed collecting certain costs over a five-year period, with associated carrying costs on the unrecovered balance. The FPSC approved the alternate proposal allowing PEF to recover revenue requirements associated with the nuclear cost-recovery clause through the CCRC beginning with the first billing cycle of January 2010. The remainder, with minor adjustments, will also be recovered through the CCRC. In adopting PEF’s pr oposed rate management plan for 2010, the FPSC permitted PEF to annually reconsider changes to the recovery of deferred amounts to afford greater flexibility to manage future rate impacts. The rate management plan includesincluded the 2009 reclassification to the nuclear cost-recovery clause regulatory asset of $198 million of capacity revenues and the accelerated amortization of $76 million of preconstruction costs. The cumulative amount of $274 million was recorded as a nuclear cost-recovery regulatory asset at December 31, 2009, and is projected to be recovered by 2014.
 
On April 30, 2010, PEF filed its annual nuclear cost-recovery filing with the FPSC to recover $164 million, which includes recovery of pre-construction,preconstruction, carrying and CCRC recoverableCCRC-recoverable O&M costs incurred or anticipated to be incurred during 2011, recovery of $60 million of the 2009 deferral in 2011, as well as the estimated actual true-up of 2010 costs associated with the Levy and CR3 uprate projects. This results in an estimated decrease in the nuclear cost-recovery charge of $1.46 per 1,000 kWh for residential customers which if approved, would beginbeginning with the first January 2011 billing cycle. TheOn October 26, 2010, the FPSC approved PEF’s request for recovery of these costs in 2011 and deferred a determination concerning the prudence of the 2009 CR3 uprate costs&# 160;until the 2011 Nuclear Cost Recovery proceeding.
CR3 Outage
In September 2009, CR3 began an outage for normal refueling and maintenance as well as its uprate project to increase its generating capability and to replace two steam generators. During preparations to replace the steam generators, we discovered a delamination within the concrete of the outer wall of the containment structure, which has scheduled hearingsresulted in this matter for August 24-27, 2010,an extension of the outage.
PEF maintains insurance coverage against incremental costs of replacement power resulting from prolonged accidental outages at CR3 through Nuclear Electric Insurance Limited (NEIL). This program provides insurance coverage, with a decision expected12-week deductible period, for 52 weeks in the amount of $4.5 million per week. An additional 71 weeks of coverage is provided at 80 percent of the above weekly amount. PEF also maintains insurance coverage through an accidental property damage program, which provides insurance coverage with a $10 million deductible per claim. PEF notified NEIL of the claim related to the CR3 delamination event on October 15, 2009. NEIL has confirmed that the CR3 delamination event is a covered accident. PEF is continuing to work with NEIL for recovery of applicable repair costs and associated replacement power costs.
95

At September 30, 2010, PEF has recorded a $49 million receivable for insurance related to replacement power on its Balance Sheet, which represents $112 million in replacement power accrued subsequent to the end of the deductible period less $63 million of replacement power insurance proceeds received from NEIL. The $112 million accrued for replacement power reduced the deferred fuel cost regulatory asset related to the extension of the CR3 outage to $125 million at September 30, 2010. PEF has incurred $117 million in repair costs through September 30, 2010. At September 30, 2010, PEF has recorded a $75 million net receivable for insurance related to repair costs on its Balance Sheet, which represents the $117 million in repair costs less the $10 million deductible, $18 million applicable repair cost insurance proceeds received to date from NEIL and costs not recoverable through insurance. Additional replacement power costs and repair and maintenance costs incurred until CR3 is returned to service could be material. PEF considers replacement power and capital costs not recoverable through insurance to be recoverable through its fuel cost-recovery clause or base rates. PEF requested, and the FPSC approved, the creation of a separate spin-off docket to review the prudence and costs related to the CR3 outage (See Note 4B).
We cannot predict the outcome of this matter.
 
PEF Demand-Side Management Cost Recovery
 
On December 30, 2009, the FPSC ordered PEF and other Florida utilities to adopt DSM goals based on enhanced measures, which will result in significantly higher conservation goals. Under the order, PEF’s aggregate conservation goals over the next ten10 years were: 1,183 Summer MW, 1,072 Winter MW, and 3,488 gigawatt-hours (GWh) in the aggregate.. PEF filed with the FPSC a motion for reconsideration to correct what we believed were oversights or errors. The FPSC subsequently revised the aggregate goals to 1,134 Summer MW, 1,058 Winter MW, and 3,205 GWh over the next ten10 years. On March 30, 2010, PEF filed a petition for approval of its proposed DSM plan and to authorize cost recovery through the Energy Conservation Cost Recovery Clause (ECCR). The estimated average annual program costs are approximately $484 million, which corresponds toECCR. On September 14, 2010, the FPSC held an average annual residential customer electric bill impact of approximately $17 per 1,200 kWh. An agenda conference has been scheduledto approve PEF’s petition for the DSM plan. The FPSC ruled that while PEF’s proposed DSM plan met the cumulative, 10-year DSM goals set by the FPSC, the plan did not meet the annual DSM goals. On October 4, 2010, the FPSC denied PEF’s petition for August 31,the DSM plan, approved PEF’s solar pilot programs, and required PEF to file a revised proposed DSM plan that meets the annual goals set by the FPSC. PEF will file a revised proposed DSM plan by November 29, 2010. We cannot predict the outcome of this matter.
PEF Other Matters
On November 1, 2010, the FPSC approved PEF's request to decrease the ECRC by $37 million, reducing the residential rate by $1.02 per 1,000 kWh, or 0.8 percent, effective January 1, 2011. The decrease in the ECRC is primarily due to the 2010 base rate decision, which reduced the clean air project depreciation and return rates, and the refund of a prior period over-recovery as a result of higher than expected sales in 2010.

OFF-BALANCE SHEET ARRANGEMENTS AND CONTRACTUAL OBLIGATIONS
 
Our off-balance sheet arrangements and contractual obligations are described below.
 
GUARANTEES
 
At JuneSeptember 30, 2010, our guarantees have not changed materially from what was reported in the 2009 Form 10-K.

 
89


MARKET RISK AND DERIVATIVES
 
Under our risk management policy, we may use a variety of instruments, including swaps, options and forward contracts, to manage exposure to fluctuations in commodity prices and interest rates. See Note 910 and Item 3, “Quantitative and Qualitative Disclosures About Market Risk,” for a discussion of market risk and derivatives.
 
CONTRACTUAL OBLIGATIONS
 
As part of our ordinary course of business, we and the Utilities enter into various long- and short-term contracts for fuel requirements at our generating plants. Significant changes from the commitment amounts reported in Note 22A
96

in the 2009 Form 10-K can result from new contracts, changes in existing contracts, along withand the impact of fluctuations in current estimates of future market prices for those contracts that are market price indexed. In most cases, these contracts contain provisions for price adjustments, minimum purchase levels and other financial commitments. Additional commitments for fuel and related transportation will be required to supply the Utilities’ future needs. At JuneSeptember 30, 2010, our and the Utilities’ contractual cash obligations and other commercial commitments have not changed materially from what was reported in the 2009 Form 10-K except as discussed below.
 
PEC
 
In April 2010, PEC entered into a conditional agreement for firm pipeline transportation capacity to support PEC’s gas supply needs for the approximate period of June 2013 through May 2033. The total cost to PEC associated with this agreement is estimated to be approximately $477 million. The agreement is subject to several conditions precedent, including various state regulatory approvals, the completion and commencement of operation of necessary related intrastate natural gas pipeline system expansions and other contractual provisions. Due to the conditions of this agreement, the estimated costs are not currently considered a fuel commitment of PEC.
 
On October 1, 2010, PEC entered into long-term service agreements for its Richmond County, N.C., Wayne County, N.C., and New Hanover County, N.C., generating facilities discussed in Note 4A, covering projected maintenance events for each facility through 2033, 2028 and 2029, respectively. The total cost to PEC associated with these agreements is estimated to be approximately $379 million over the term of the agreements, including an immaterial amount, $13 million, $27 million and $339 million, respectively, for less than one year, one to three years, three to five years and more than five years from December 31, 2009.
PEF
 
PEF’s construction obligations included in Note 22A to the 2009 Form 10-K, which were primarily comprised of contractual obligations related to the Levy Engineering, Procurement, and Construction (EPC) agreement, totaled $1.455 billion, $2.981 billion, $2.818 billion and $1.543 billion, respectively, for less than one year, one to three years, three to five years and more than five years from December 31, 2009. As disclosed in “Other Matters – Nuclear – Potential New Construction”,Construction,” we executed an amendment to the Levy EPC agreement in 2010 because of the schedule shifts and will postpone major construction activities on the project until after the NRC issues the combined license (COL), which is expected to be in late 2012 if the licensing schedule remains on track. Therefore, we will defer substantially al l expenditures under the EPC agreement until the COL is received. Because we have executed an amendment to the EPC agreement and anticipate negotiating additional amendments upon receipt of the COL, we cannot currently predict the timing of when those obligations will be satisfied or the magnitude of any change. Additionally, in light of the schedule shifts in the Levy project, PEF may incur fees and charges related to the disposition of outstanding purchase orders on long lead time equipment for the Levy nuclear project, which could be material. In June 2010, PEF completed its long lead time equipment disposition analysis to minimize the impact associated with the schedule shift. As a result of the analysis, PEF will continue with selected components of the long lead time equipment. Work will be suspended on the remaining long lead time equipment items and PEF will be in suspension negotiations with the selected equipment vendors in the coming months. In its April 30, 2010 nuclear cost-recovery filing, PEF included for rate-making purposes a point estimate of potential Levy disposition fees and charges of $50 million, subject to true-up. However, the amount of disposition fees and charges, if any, cannot be determined until suspension negotiations are completed. We cannot predict the outcome of this matter.
 
On June 30, 2010, PEF entered into a long-term service agreement for the Hines Energy Complex covering scheduled maintenance events through 2029. The total cost to PEF associated with this agreement is estimated to be approximately $390 million over the term of the agreement.agreement, including $7 million, $51 million, $39 million and $293 million, respectively, for less than one year, one to three years, three to five years and more than five years from December 31, 2009.
 
 
9097

 

OTHER MATTERS
 
GOODWILL
 
Goodwill is required to be tested for impairment at least annually and more frequently when indicators of impairment exist. All of our goodwill is allocated to our utility segments and our goodwill impairment tests are performed at the utility segment level. The carrying amounts of goodwill at JuneSeptember 30, 2010 and December 31, 2009, for reportable segments PEC and PEF, were $1.922 billion and $1.733 billion, respectively. We perform our annual impairment tests as of April 1 each year. During the second quarter of 2010, we completed the required 2010 annual tests, which indicated the goodwill was not impaired. If the fair values of PEC and PEF had been lower by 10 percent, there still would be no impact on the reported value of their goodwill.
 
We calculate the fair value of our utility segments by considering various factors, including valuation studies based primarily on income and market approaches. More emphasis is applied to the income approach as substantially all of the utility segments’ cash flows are from rate-regulated operations. In such environments, revenue requirements are adjusted periodically by regulators based on factors including levels of costs, sales volumes and costs of capital. Accordingly, the utility segments operate to some degree with a buffer from the direct effects, positive or negative, of significant swings in market or economic conditions.
 
The income approach uses discounted cash flow analyses to determine the fair value of the utility segments. The estimated future cash flows from operations are based on the utility segments’ business plans, which reflect management’s assumptions related to customer usage based on internal data and economic data obtained from third-party sources. The business plans assume the occurrence of certain events in the future, such as the outcome of future rate filings, future approved rates of returns on equity, the timing of anticipated significant future capital investments, the anticipated earnings and returns related to such capital investments, continued recovery of cost of service and the renewal of certain contracts. Management also determines the appropriate discount rate for the utility segments based on the weighted avera ge cost of capital for each utility, which takes into account both the cost of equity and pre-tax cost of debt. As each utility segment has a different risk profile based on the nature of its operations, the discount rate for each reporting unit may differ.
 
The market approach uses implied market multiples derived from comparable peer utilities and market transactions to estimate the fair value of the utility segments. Peer utilities are evaluated based on percentage of revenues generated by regulated utility operations; percentage of revenues generated by electric operations; generation mix, including coal, gas, nuclear and other resources; market capitalization as of the valuation date; and geographic location. Comparable market transactions are evaluated based on the availability of financial transaction data and the nature and geographic location of the businesses or assets acquired, including whether the target company had a significant electric component. The selection of comparable peer utilities and market transactions, as well as the appropriate multiples from within a reasonable range, is a matter of professional judgment.
 
The calculations in both the income and market approaches are highly dependent on subjective factors such as management’s estimate of future cash flows, the selection of appropriate discount and growth rates from a marketplace participant’s perspective, and the selection of peer utilities and marketplace transactions for comparative valuation purposes. These underlying assumptions and estimates are made as of a point in time. If these assumptions change or should the actual outcome of some or all of these assumptions differ significantly from the current assumptions, the fair value of the utility segments could be significantly different in future periods, which could result in a future impairment charge to goodwill.
 
As an overall test of the reasonableness of the estimated fair values of the utility segments, we compared their combined fair value estimate to Progress Energy’s market capitalization as of April 1, 2010. The analysis confirmed that the fair values were reasonably representative of market views when applying a reasonable control premium to the market capitalization.
 
We monitor for events or circumstances, including financial market conditions and economic factors, that may indicate an interim goodwill impairment test is necessary. We would perform an interim impairment test should any
 
 
9198

 
events occur or circumstances change that would more likely than not reduce the fair value of a utility segment below its carrying value.
 
REGULATORY ENVIRONMENT
 
The Utilities’ operations in North Carolina, South Carolina and Florida are regulated by the NCUC, the SCPSC and the FPSC, respectively. The Utilities are also subject to regulation by the FERC, the NRC and other federal and state agencies common to the utility business. As a result of regulation, many of the fundamental business decisions, as well as the rate of return the Utilities are permitted to earn, are subject to the approval of one or more of these governmental agencies.
 
To our knowledge, there is currently no enacted or proposed legislation in North Carolina, South Carolina or Florida that would give retail ratepayers the right to choose their electricity provider or otherwise restructure or deregulate the electric industry. We cannot anticipate when, or if any of these states will move to increase retail competition in the electric industry.
 
Current retail rate matters affected by state regulatory authorities are discussed in Notes 3A4A and 3B.4B. This discussion identifies specific retail rate matters, the status of the issues and the associated effects on our consolidated financial statements.
 
The American Recovery and Reinvestment Act, signed into law in February 2009, contains provisions promoting energy efficiency and renewable energy, including $3.4 billion in Smart Gridsmart grid technology development grants, $615 million for Smart Gridsmart grid storage, monitoring and technology viability, $6.3 billion for energy efficiency and conservation grants and $2 billion in tax credits for the purchase of plug-in electric vehicles. On April 28, 2010, we accepted a grant from the United States Department of Energy (DOE) for $200 million in federal matching infrastructure funds. In addition to providing the Utilities real-time information about the state of their electric grids, the smart grid transition will enable customers to better understand and manage their energy use, and will provide for more efficient integration of renewable energy resou rces. PEC and PEF each will receive up to $100 million over a three-year period as project work progresses. Supplementing the DOE grant, the Utilities will invest more than $300 million in Smart Gridsmart grid projects, which include enhancements to distribution equipment, installation of 160,000 additional smart meters and additional public infrastructure for plug-in electric vehicles. Projects funded by the grant must be completed by April 2013.
 
WeThrough September 30, 2010, we have incurred $60$81 million of allowable, Smart Grid grant50 percent reimbursable, smart grid project costs through June 30, 2010. As of June 30, 2010, the reimbursable portion of these project costs are reflected in receivables, net, and other current liabilities on the Consolidated Balance Sheets. On July 23, 2010, wehave submitted to the DOE our initial requestrequests for reimbursement of $38 million, of which we have received $30 million which represents 50 percent of allowable Smart Grid project costs incurred.reimbursement.
 
On June 26, 2009, the U.S. House of Representatives passed the American Clean Energy and Security Act of 2009. This bill would establish a national cap-and-trade program to reduce greenhouse gas (GHG) emissions as well as a national renewable energy portfolio standard (REPS). The bill also calls for investment in the electric grid, more production and utilization of electric vehicles and improvements in energy efficiency in buildings and appliances. The full impact of the legislation, if enacted into law, cannot be determined at this time and will depend upon changes made to its provisions during the legislative process and the manner in which key provisions are implemented, including the regulation of carbon. The U.S. Senate is considering similar proposals. The full impact of final legislation, if enacted, and additional regulat ion resulting from these and other federal GHG initiatives cannot be determined at this time; however, we anticipate that it could result in significant cost increases over time, for which the Utilities would seek corresponding rate recovery. Also, the Obama administration has announced a goal of encouraging investment in transmission and promoting renewable resources while also pricing GHG emissions and setting a federal requirement for renewable energy.
 
The North Carolina Renewable Energy and Energy Efficiency Portfolio Standard (NC REPS) requires PEC to file an annual compliance report with the NCUC demonstrating the actions it has taken to comply with the NC REPS requirement. The rules measure compliance with the NC REPS requirement via renewable energy certificates (REC)
92

earned after January 1, 2008. North Carolina electric power suppliers with a renewable energy compliance obligation, including PEC, are participating in the REC tracking system, which came online July 1, 2010. North
99

Carolina law mandates that utilities achieve a targeted amount of energy from specified renewable energy resources or implementation of energy-efficiency measures beginning with a 3 percent requirement in 2012 escalating to 12.5 percent in 2021. PEC expects to be in compliance with this requirement.
 
Florida energy law enacted in 2008 includes provisions that would, among other things, (1) help enhance the ability to cost-effectively site transmission lines; (2) requirerequired the FPSC to develop a renewable portfolio standard that the FPSC would present to the legislature for ratification in 2009; (3)2009 and also includes provisions that direct the Florida Department of Environmental Protection (FDEP) to develop rules establishing a cap-and-trade program to regulate GHG emissions that the FDEP would present to the legislature no earlier than January 2010 for ratification by the legislature; and (4) establish a newlegislature. To date, the Florida Energy and Climate Commission as the principal governmental body to develop energy and climate policy for the state and to make recommendations to the governor and legislature on energy and climate issues. In complying with the provisions of the law, PEF w ould be able to recover its reasonable prudent compliance costs. However, untilhas not ratified or enacted any renewable portfolio standard or cap-and-trade rules or programs. Until these agency actions are finalized, we cannot predict the costs of complying with the law.
 
In 2007, the governor of Florida issued executive orders to address reduction of GHG emissions. The executive orders include adoption of a maximum allowable emissions level of GHGs for Florida utilities, which will require, at a minimum, the following three reduction milestones: by 2017, emissions not greater than Year 2000 utility sector emissions; by 2025, emissions not greater than Year 1990 utility sector emissions; and by 2050, emissions not greater than 20 percent of Year 1990 utility sector emissions. Rulemaking is expected to continue through 2010, and the rule requires legislative ratification before implementation.
 
The executive orders also requested that the FPSC initiate a rulemaking that would (1) require Florida utilities to produce at least 20 percent of their electricity from renewable sources; (2) reduce the cost of connecting solar and other renewable energy technologies to Florida’s power grid by adopting uniform statewide interconnection standards for all utilities; and (3) authorize a uniform, statewide method to enable residential and commercial customers who generate electricity from onsite renewable technologies of up to 1 MW in capacity to offset their consumption over a billing period by allowing their electric meters to turn backward when they generate electricity (net metering). In 2009, the FPSC approved a draft Florida renewable portfolio standard rule with a goal of 20 percent renewable energy production by 2020 and pro vided the draft standard rule to the Florida legislature. The legislature did not take action on the matter in the 2009 and 2010 sessions. We cannot predict the outcome of this matter.
 
We cannot predict the costs of complying with the laws and regulations that may ultimately result from these executive orders. Our balanced solution, as described in “Energy Demand,” includes greater investment in energy efficiency, renewable energy and state-of-the-art generation and demonstrates our commitment to environmental responsibility.
 
ENERGY DEMAND
 
Implementing state and federal energy policies, promoting environmental stewardship and providing reliable electricity to meet the anticipated long-term growth within the Utilities’ service territories will require a balanced approach. The three main elements of this balanced solution are: (1) expanding our DSM and EE programs; (2) investing in the development of alternative energy resources for the future; and (3) operating state-of-the-art plants that produce energy cleanly and efficiently by modernizing existing plants and pursuing options for building new plants and associated transmission facilities.
 
We are actively pursuing expansion of our DSM and EE programs because energy efficiency is one of the most effective ways to reduce energy costs, offset the need for new power plants and protect the environment. DSM programs include programs and initiatives that shift the timing of electricity use from peak to nonpeak periods, such as load management, electricity system and operating controls, direct load control, interruptible load, and electric system equipment and operating controls. Our previously discussed Smart Gridsmart grid projects will aid in these initiatives. EE programs include any equipment, physical or program change that results in less energy used to perform the same function. We provide our residential customers with home energy audits and offer EE programs that provide incentives for customers to implement measures that reduce energy use. For business customers, we also provide energy audits and other tools, including an interactive Internet Web siteWebsite with online calculators, programs and efficiency tips, to help them reduce their energy use.
 
 
93100

 
We are actively engaged in a variety of alternative energy projects to pursue the generation of electricity from swine waste and other plant or animal sources, biomass, solar, hydrogen and landfill-gas technologies. Among our projects, we have executed contracts to purchase approximately 250300 MW of electricity generated from biomass and up to 60biomass. This number includes 86 MW of electricity generated from municipal solid waste sources.biomass toward compliance with NC REPS. The majority of these projects should be online within the next five years. In addition, we have executed purchased power agreements for approximately 1011 MW of electricity generated from solar photovoltaic generation as part of the NC REPS. Approximately half of these projects are online and the remainder should be online by the end of 2010.2011. Additionally, customers across our service territory have connected approximately 4 MW of s olar photovoltaicsolar ph otovoltaic energy systems to our grid. In June 2009, we expanded our solar energy strategy to include a range of new solar incentives and programs, which are expected to increase our use of solar energy by more than 100 MW over the next decade.
 
In the coming years, we will continue to invest in existing nuclear plants and considerevaluate plans for building or co-owning new generating plants. Due to the anticipated long-term growth in our service territories, retirement of existing coal generation and potential changes in environmental regulations, we estimate that we will require new generation facilities in both Florida and the Carolinas towardin the endfirst half of the next decade, anddecade. In addition to nuclear generation, we are evaluating the best available options fornatural gas-fired plants, renewable generation resources, energy-efficiency initiatives and economic purchased power to meet this generation, including advanced design nuclear and gas technologies.increased need. At this time, no definitive decisions have been made to construct or when to construct our proposed new nuclear plants.plants (See “Nuclear – Potential New Construction”) or to acquire new generation from another utility’s regional nuclear project. In the near term, we will focus our efforts on modernizing the power system and pursuing otherall elements of a balanced portfolio while looking to new nuclear capacity as a critical part of the long-term mix.
 
In 2009, PEC announced a coal-to-gas modernization strategy whereby the 11 remaining coal-fired generating facilities in North Carolina that do not have scrubbers would be retired prior to the end of their useful lives and their approximately 1,500 MW of generating capacity replaced with new natural gas-fueled facilities. The original strategy called for the retirement of the coal-fired units will be retired by the end of 2017.2017; however, we currently expect the plants will be retired no later than the end of 2014. PEC has received approval from the NCUC for construction of a 950-MW natural gas-fueled generating facility at a site in Wayne County, N.C., to be placed in service in January 2013. PEC has also received approval from the NCUC to construct a 620-MW natural gas-fueled generating facility at a site in New Hanover County, N.C., to replace the existingex isting coal-fired generation at this site. The facility is projected to be placed in service in late 2013 or early 2014. Af ter 2017,After 2014, PEC will continue to operate its Roxboro, Mayo and Asheville coal-fired plants in North Carolina, which have state-of-the-art emission controls. Emissions of NOx, sulfur dioxide (SO2), mercury and other pollutants have been reduced significantly at these sites.
 
As authorized under the Energy Policy Act of 2005 (EPACT), on October 4, 2007, the DOE published final regulations for the disbursement of up to $13 billion in loan guarantees for clean-energy projects using innovative technologies. The guarantees, which will cover up to 100 percent of the amount of any loan for no more than 80 percent of the project cost, are expected to spur development of nuclear, clean-coal and ethanol projects.
 
In 2008, Congress authorized $38.5 billion in loan guarantee authority for innovative energy projects. Of the total provided, $18.5 billion is set aside for nuclear power facilities, $2 billion for advanced nuclear facilities for the "front-end" of the nuclear fuel cycle, $10 billion for renewable and/or energy-efficient systems and manufacturing and distributed energy generation/transmission and distribution, $6 billion for coal-based power generation and industrial gasification at retrofitted and new facilities that incorporate carbon capture and sequestration or other beneficial uses of carbon, and $2 billion for advanced coal gasification. In June 2008, the DOE announced solicitations for a total of up to $30.5 billion of the amount authorized by Congress in federal loan guarantees for projects that employ advanced energy technolog ies that avoid, reduce or sequester air pollutants or greenhouse gas emissions and advanced nuclear facilities for the “front-end” of the nuclear fuel cycle.
 
PEF submitted Part I of the Application for Federal Loan Guarantees for Nuclear Power Facilities on September 29, 2008, for Levy. PEF was one of 19 applicants that submitted Part I of the application. The program requires that the guarantee be in a first lien position on all assets of the project, which conflicts with PEF’s current mortgage. Obtaining the required approval to amend the current mortgage from 100 percent of PEF’s current bondholders would be unlikely, and current secured debt of approximately $4.0 billion would need to be refinanced with
101

unsecured debt to meet the requirements of the guarantee. In addition, the costs associated with obtaining the loan guarantee are unclear. PEF decided not to pursue the loan guarantee program and did not submit Part II of the application, which was due on December 19, 2008. H owever,However, this decision does not preclude PEF from revisiting
94

the program at a later date if there are changes to the program. We cannot predict if PEF will pursue this program further.
 
A new nuclear plant may be eligible for the federal production tax credits and risk insurance provided by EPACT. EPACT provides an annual tax credit of 1.8 cents per kWh for nuclear facilities for the first eight years of operation. The credit is limited to the first 6,000 MW of new nuclear generation in the United States and has an annual cap of $125 million per 1,000 MW of national MW capacity limitation allocated to the unit. In April 2006, the IRS provided interim guidance that the 6,000 MW of production tax credits generally will be allocated to new nuclear facilities that filed license applications with the NRC by December 31, 2008, had poured safety-related concrete prior to January 1, 2014, and were placed in service before January 1, 2021. There is no guarantee that the interim guidance will be incorporated into the final regu lations governing the allocation of production tax credits. Multiple utilities have announced plans to pursue new nuclear plants. There is no guarantee that any nuclear plant we construct would qualify for these or other incentives. We cannot predict the outcome of this matter.
NUCLEAR
 
Nuclear generating units are regulated by the NRC. In the event of noncompliance, the NRC has the authority to impose fines, set license conditions, shut down a nuclear unit or take some combination of these actions, depending upon its assessment of the severity of the situation, until compliance is achieved. Our nuclear units are periodically removed from service to accommodate normal refueling and maintenance outages, repairs, uprates and certain other modifications.
 
In September 2009, CR3 began an outage for normal refueling and maintenance as well as its uprate project to increase its generating capability and to replace two steam generators. During preparations to replace the steam generators, workerswe discovered a delamination within the concrete of the outer wall of the containment structure, which has resulted in an extension of the outage. After a comprehensive analysis, PEF haswe have determined that the concrete delamination at CR3 was caused by redistribution of stresses on the containment wall that occurred when we created an opening to accommodate the replacement of the unit’s steam generators. We are pursuing a detailed repair plan that would achieve the unit’s return to service duringnear the end of the fourth quarter of 2010. The actual return to service date will be determined by a number of f actors,factors, including regulatory reviews with the NRC and other agencies as appropriate, emergent work, final engineering designs and testing, weather and other developments.developments (See Note 3B.)4B).
 
The NRC operating licenses for PEC’s nuclear units are currently operating under renewed licenses that expire between 2030 and 2046. The NRC operating license held by PEF for CR3 currently expires in December 2016. On March 9, 2009, the NRC docketed, or accepted for review, PEF’s application for a 20-year renewal on the operating license for CR3, which would extend the operating license through 2036, if approved. Docketing the application does not preclude additional requests for information as the review proceeds, nor does it indicate whether the NRC will renew the license. The license renewal application for CR3 is currently under review by the NRC with a decision expected in 2011.
 
POTENTIAL NEW CONSTRUCTION
 
While we have not made a final determination on nuclear construction, we continue to take steps to keep open the option of building a plant or plants. During 2008, PEC and PEF filed COL applications to potentially construct new nuclear plants in North Carolina and Florida. The NRC estimates that it will take approximately three to four years to review and process the COL applications. We have focused on the potential construction in Florida given the need for more fuel diversity in Florida and anticipated federal and state policies to reduce GHG emissions as well as existing state legislative policy that is supportive of nuclear projects.
 
In 2006, we announced that PEF selected a greenfield site at Levy to evaluate for possible future nuclear expansion. We selected the Westinghouse Electric AP1000 reactor design as the technology upon which to base PEF’s application submission. In 2007, PEF completed the purchase of approximately 5,000 acres for Levy and associated transmission needs.
 
95

In 2008, the FPSC issued a final order granting PEF’s Petition for a Determination of Need for Levy. The petition included projections that Levy Unit 1 would be placed in service by June 2016 and Levy Unit 2 by June 2017. In 2009, the Power Plant Siting Board, comprised of the governor and the Cabinet, issued the Levy site certification that addresses permitting, land use and zoning, and property interests and replaces state and local permits. Certification grants approval for the location of the power plant and its associated facilities such as roadways and electrical transmission lines carrying power to the electrical grid, among others. Certification does not include licenses required by the federal government.
 
102

On July 30, 2008, PEF filed its COL application with the NRC for two reactors, which was docketed, or accepted for review, by the NRC on October 6, 2008. Docketing the application does not preclude additional requests for information as the review proceeds, nor does it indicate whether the NRC will issue the license. PEF also completed and submitted a Limited Work Authorization request for Levy concurrent with the COL application. On February 24, 2009, PEF received the NRC’s schedule for review and approval of the COL. One joint petition to intervene in the licensing proceeding was filed with the NRC within the 60-day notice period by the Green Party of Florida, the Nuclear Information and Resource Service and the Ecology Party of Florida. On April 20-21, 2009, the Atomic Safety Licensing Board (ASLB) heard oral arguments on wheth erwhet her any of the joint interveners’ proposed contentions will be admitted in the Levy COL proceeding. On July 8, 2009, the ASLB issued a decision accepting three of the 12 contentions submitted. The admitted contentions involved questions about the potential safety and environmental impact of storage of low-level radioactive waste, the potential impacts of plant construction and operation on the aquifer and surrounding waters and the potential impact of salt water drift from cooling tower operation. In April 2010, the ASLB dismissed the contention regarding the safety of storage of low-level radioactive waste; however, interveners have resubmitted their contention regarding the potential safety of storage of low-level waste, which is being considered by the ASLB. PEF’s appeal of the ASLB’s 2009 decision was denied and a hearing on the remaining contentions will be conducted in 2012. Other COL applicants have received similar petitions raising similar potential contentions. We cannot pred ict thepredict t he outcome of this matter.
 
PEF’s initial schedule anticipated performing certain site work pursuant to the Limited Work Authorization prior to COL receipt. However, in 2009, the NRC Staff determined that certain schedule-critical work that PEF had proposed to perform within the scope of the Limited Work Authorization will not be authorized until the NRC issues the COL. Consequently, excavation and foundation preparation work will be shifted until after COL issuance. This factor alone resulted in a minimum 20-month schedule shift later than the originally anticipated timeframe. Since then, regulatory and economic conditions have changed, resulting in additional schedule shifts. These conditions include the permitting and licensing process, national and state economic conditions, recent FPSC DSM goals and the resulting impact on ratepayers, and other FPSC dec isions.de cisions. Uncertainty regarding PEF’s access to capital on reasonable terms and increasing uncertainty surrounding carbon regulation and its costs could be other factors to affect the Levy schedule.
 
As disclosed in PEF’s 2010 nuclear cost-recovery filing discussed below, the schedule shifts will reduce the near-term capital expenditures for the project and also reduce the near-term impact on customer rates. PEF will postpone major construction activities on the project until after the NRC issues the COL, which is expected to be in late 2012 if the current licensing schedule remains on track. The schedule shifts will also allow more time for certainty around federal climate change policy, which is currently being debated. We believe that continuing, although at a slower pace than initially anticipated, is a reasonable and prudent course at this early stage of the project. Taking into account cost, potential carbon regulation, fossil fuel price volatility and the benefits of fuel diversification, we consider Levy to be PEFR 17;s preferred baseload generation option. Along with the FPSC’s annual prudence reviews, we will continue to evaluate the project on an ongoing basis based on certain criteria, including, but not limited to, public, regulatory and political support; adequate financial cost-recovery mechanisms; adequate levels of joint owner participation; customer rate impacts; project feasibility, including comparison to other generation options, DSM and EE programs; and availability and terms of capital financing. If the licensing schedule remains on track and if the decision to build is made, the first of the two proposed units could be in service in 2021. The second unit could be in service 18 months later.
 
96

PEF signed the EPC agreement on December 31, 2008, with Westinghouse Electric Company LLC and Stone & Webster, Inc. for two Westinghouse AP1000 nuclear units to be constructed at Levy. More than half of the approximate $7.650 billion contract price is fixed or firm with agreed upon escalation factors. The EPC agreement includes various incentives, warranties, performance guarantees, liquidated damage provisions and parent guarantees designed to incent the contractor to perform efficiently. For termination without cause, the EPC agreement contains exit provisions with termination fees, which may be significant, that vary based on the termination circumstances. We executed an amendment to the EPC agreement in 2010 due to the schedule shifts previ ouslypreviously discussed. Additionally, in light of the schedule shifts in the Levy nuclear project,p roject, PEF may incur fees and charges related to the disposition of outstanding purchase orders on long lead time equipment for the Levy nuclear project, which could be material. In June 2010, PEF completed its long lead time equipment disposition
103

analysis to minimize the impact associated with the schedule shift. As a result of the analysis, PEF will continue with selected components of the long lead time equipment. Work will be suspended on the remaining long lead time equipment items and PEF will be in suspension negotiations with the selected equipment vendors in the coming months. In its April 30, 2010 nuclear cost-recovery filing, PEF included for rate-making purposes a point estimate of potential Levy disposition fees and charges of $50 million, subject to true-up. However, the amount of disposition fees and charges, if any, cannot be determined until suspension negotiations are completed. We cannot predict the outcome of this matter.
 
The total escalated cost for the two generating units was estimated in PEF’s petition for the Determination of Need for Levy to be approximately $14 billion. This total cost estimate included land, plant components, financing costs, construction, labor, regulatory fees and the initial core for the two units. An additional $3 billion was estimated for the necessary transmission equipment and approximately 200 miles of transmission lines associated with the project. PEF’s 2010 nuclear cost-recovery filing included an updated analysis that demonstrated continued feasibility of the Levy project with PEF’s current estimated range of total escalated cost, including transmission, of $17.2 billion to $22.5 billion. The filed estimated cost range primarily reflects cost escalation resulting from the schedule shifts. There are many factors thatMany facto rs will affect the total cost of the project and once PEF receives the COL, it will further refine the project timeline and budget. As previously discussed, we continue to evaluate the Levy project on an ongoing basis.
 
Florida regulations allow investor-owned utilities such as PEF to recover prudently incurred site selection costs, preconstruction costs and the carrying cost on construction cost balance of a nuclear power plant prior to commercial operation. The costs are recovered on an annual basis through the CCRC. Such amounts will not be included in a utility’s rate base when the plant is placed in commercial operation. The nuclear cost-recovery rule also has a provision to recover costs should the project be abandoned after the utility receives a final order granting a Determination of Need. These costs include any unrecovered construction work in progress at the time of abandonment and any other prudent and reasonable exit costs. In addition, the rule requires the FPSC to conduct an annual prudence review of the reasonableness and pruden ce of all such costs, including construction costs, and such determination shall not be subject to later review except upon a finding of fraud, intentional misrepresentation or the intentional withholding of key information by the utility.
 
In 2008, PEF sought and received approval from the FPSC to recover Levy preconstruction and carrying charges of $357 million as well as site selection costs of $38 million through the 2009 CCRC. In 2009, PEF received approval to defer until 2010 the recovery of $198 million of these costs. On October 16, 2009, the FPSC approved the recovery of $201 million of preconstruction costs, carrying costs and incremental O&M incurred or anticipated to be incurred during 2009 and the projected 2010 costs associated with Levy as part of the total $207 million FPSC-approved recovery of nuclear costs through the 2010 CCRC (See Note 3B)4B). On April 30, 2010, PEF filed its annual nuclear cost-recovery filing with the FPSC to recover $164 million, which includes recovery of pre-construction,preconstruction, carrying and CCRC recoverable O&M costs incurred or ant icipated to be incurred during 2011, recovery of $60 million of the 2009 deferral in 2011, as well as the estimated actual true-up of 2010 costs associated with the Levy and CR3 uprate projects. This results in a decrease in the nuclear cost-recovery charge of $1.46 per 1,000 kWh for residential customers which if approved, would beginbeginning with the first January 2011 billing cycle. TheOn October 26, 2010, the FPSC has scheduled hearingsapproved PEF’s request for recovery of these costs in this matter for August 24-27, 2010, with2011 and deferred a decision expected in October 2010. We cannot predictdetermination concerning the outcomeprudence of this matter.the 2009 CR3 uprate costs until the 2011 Nuclear Cost Recovery proceeding.
 
97

In 2006, we announced that PEC selected a site at the Shearon Harris Nuclear Plant (Harris) to evaluate for possible future nuclear expansion. We selected the Westinghouse Electric AP1000 reactor design as the technology upon which to base PEC’s application submission. On February 19, 2008, PEC filed its COL application with the NRC for two additional reactors at Harris, which the NRC docketed on April 17, 2008. No petitions to intervene have been admitted in the Harris COL application. If we receive approval from the NRC and applicable state agencies, and if the decisions to build are made, a new plant would not be online until at least 2019the middle of the next decade (See “Energy Demand” above).
 
PEC’s jurisdictions also have laws encouraging nuclear baseload generation. South Carolina law includes provisions for cost-recovery mechanisms associated with nuclear baseload generation. North Carolina law authorizes the NCUC to allow annual prudence reviews of baseload generating plant construction costs and inclusion of
104

construction work in progress in rate base with corresponding rate adjustment in a general rate case while a baseload generating plant is under construction.
 
SPENT NUCLEAR FUEL MATTERS
 
Under federal law, the DOE is responsible for the selection and construction of a facility for the permanent disposal of spent nuclear fuel and high-level radioactive waste. We have a contract with the DOE for the future storage and disposal of our spent nuclear fuel. Delays have occurred in the DOE’s proposed permanent repository to be located at Yucca Mountain, Nev. The Obama administration has determined that Yucca Mountain, Nev., is not a workable option for a nuclear waste repository and will discontinue its program to construct a repository at this site in 2010. The administration will continue to explore alternatives. Debate surrounding any new strategy likely will address centralized interim storage, permanent storage at multiple sites and/or spent nuclear fuel reprocessing. We cannot predict the outcome of this matter.
 
The NRC has proposed revisions to its waste confidence findings that would remove the provisions stating that the NRC’s confidence in waste management, underlying the licensing of reactors, is based in part on a permanent repository being in operation by 2025. Instead, the NRC states that repository capacity will be available within 50 to 60 years beyond the licensed operation of all reactors, and that used fuel generated in any reactor can be safely stored on site without significant environmental impact for at least 60 years beyond the licensed operation of the reactor. We cannot predict the outcome of this matter.
 
On September 15, 2009, the NRC proposed licensing requirements for storage of spent nuclear fuel, which would clarify the term limits for specific licenses for independent spent fuel storage installations and for certificates of compliance for spent nuclear fuel storage casks. The agency proposal would formalize the site-by-site exemption the NRC has used for renewal applications requesting more than the current 20-year duration. The initial and renewal terms of a specific installation license would be effective for a period of up to 40 years. Similarly, the proposed rule would allow applicants for certificates of compliance to request initial and renewal terms of up to 40 years, provided they can demonstrate that all design requirements are satisfied for the requested term. We cannot predict the outcome of this matter.
 
With certain modifications and additional approvals by the NRC, including the installation and/or expansion of on-site dry cask storage facilities at PEC’s Robinson Nuclear Plant (Robinson), PEC’s Brunswick Nuclear Plant (Brunswick) and CR3, the Utilities’ spent nuclear fuel storage facilities will be sufficient to provide storage space for spent fuel generated by their respective systems through the expiration of the operating licenses, including any license renewals, for their nuclear generating units. Harris has sufficient storage capacity in its spent fuel pools through the expiration of its renewed operating license.
 
See Note 13C14C for information about the complaint filed by the Utilities in the United States Court of Federal Claims against the DOE for its failure to fulfill its contractual obligation to receive spent fuel from nuclear plants. Failure to open the Yucca Mountain or other facility would leave the DOE open to further claims by utilities.
 

98


ENVIRONMENTAL MATTERS
 
We are subject to regulation by various federal, state and local authorities in the areas of air quality, water quality, control of toxic substances and hazardous and solid wastes, and other environmental matters. We believe that we are in substantial compliance with those environmental regulations currently applicable to our business and operations and believe we have all necessary permits to conduct such operations. Environmental laws and regulations frequently change and the ultimate costs of compliance cannot always be precisely estimated.
 
HAZARDOUS AND SOLID WASTE MANAGEMENT
 
The provisions of the Comprehensive Environmental Response, Compensation and Liability Act of 1980, as amended (CERCLA), authorize the EPA to require the cleanup of hazardous waste sites. This statute imposes retroactive joint and several liability. Some states, including North Carolina, South Carolina and Florida, have similar types of statutes. We are periodically notified by regulators, including the EPA and various state agencies, of our involvement or potential involvement in sites that may require investigation and/or remediation.
105

There are presently several sites with respect to which we have been notified of our potential liability by the EPA, the state of North Carolina, the state of Florida or potentially responsible parties (PRP) groups. Various organic materials associated with the production of manufactured gas, generally referred to as coal tar, are regulated under federal and state laws. PEC and PEF are each PRPs at several manufactured gas plant (MGP) sites. We are also currently in the process of assessing potential costs and exposures at other sites. These costs are eligible for regulatory recovery through either base rates or cost-recovery clauses (See Notes 34 and 12)13). Both PEC and PEF evaluate potential claims against other PRPs and insurance carriers and plan to submit claims for cost recovery where appropriate. The outcome of potential and pendingpendin g claims cannot be predicted. Hazardous and solid waste management matters are discussed in detail in Note 12A.13A.
 
We accrue costs to the extent our liability is probable and the costs can be reasonably estimated. Because the extent of environmental impact, allocation among PRPs for all sites, remediation alternatives (which could involve either minimal or significant efforts), and concurrence of the regulatory authorities have not yet reached the stage where a reasonable estimate of the remediation costs can be made, we cannot determine the total costs that may be incurred in connection with the remediation of all sites at this time. It is probable that current estimates could change and additional losses, which could be material, may be incurred in the future.
 
In June 2009, the EPA evaluated information about ash impoundment dams nationwide and posted a listing of 44 utility ash impoundment dams that are considered to have “high hazard potential,” including two of PEC’s ash impoundment dams. A “high hazard potential” rating is not related to the stability of those ash ponds but to the potential for harm should the impoundment dam fail. All of the dams at PEC’s coal ash ponds have been subject to periodic third-party inspection for many years in accordance with prior applicable requirements. In September 2009, the EPA rated the 44 “high hazard potential” impoundments, as well as other impoundments, from “unsatisfactory” to “satisfactory” based on their structural integrity and associated documentation.
 
Only dams rated as “unsatisfactory” would be considered to pose an immediate safety threat, but none of the facilities received an “unsatisfactory” rating.rating from the EPA. In total, six of PEC’s ash pond dams, including one “high hazard potential” impoundment, were rated as “poor” based on the contract inspector’s desire to see additional documentation and their evaluations of vegetation management and minor erosion control. Inspectors applied the same criteria to both active and inactive ash ponds, despite the fact that most of the inactive ash impoundments no longer hold water and do not pose a risk of breaching and spilling. PEC has completed several of the EPA’s recommendations for the active ponds and other recommended actions are under way. One ash pond dam has been determineddetermi ned by engineers to need modifications to comply with current standards for an extra margin of safety for slope stability. Design and permitting efforts for that work have been initiated. PEC is working with the North Carolina Dam Safety program to evaluate the remaining recommendations. We do not expect mitigation of these issues to have a material impact on our results of operations.
 
As of January 1, 2010, dams at utility fossil-fired power plants in North Carolina, including dams for ash ponds, are subject to the North Carolina Dam Safety Act’s applicable provisions, including state inspection. Those provisions are under the purview of the North Carolina Division of Land Resources. The division has completed theirits initial inspections of all of PEC’s dams. No significant issues were found.
99

 
The EPA and a number of states are considering additional regulatory measures that may affect management, treatment, marketing and disposal of coal combustion products,residues, primarily ash, from each of the Utilities’ coal-fired plants. Revised or new laws or regulations under consideration may impose changes in solid waste classifications or groundwater protection environmental controls. On June 21, 2010, the EPA proposed two options for new rules to regulate coal combustion products.residues. The first option would create a comprehensive program of federally-enforceablefederally enforceable requirements for coal combustion productsresidue management and disposal as hazardous waste. The other option would have the EPA set performance standards for coal combustion products management facilities and regulate disposal of coal combustion products as non-hazardousnonhazardous waste. The EPAEP A did not identify a preferred option. Under both options, the EPA may leave in place a regulatory exemption for approved beneficial uses of coal combustion residuals that are recycled. The 90-day public comment period ends on September 20, 2010, and aA final rule is expected in 2011. Compliance plans and estimated costs to meet the requirements of new regulations will be determined when any new regulations are finalized. We are also evaluating the effect on groundwater quality from past and current operations, which may result in operational changes and
106

additional measures under existing regulations. These issues are also under evaluation by state agencies. Certain regulated chemicals have been measured in wells near our ash ponds at levels above groundwater quality standards. Additional monitoring and investigation will be conducted. Detailed plans and cost estimates will be determined if these evaluations reveal that corrective actions are necessary. We cannot predict the outcome of this matter.
 
AIR QUALITY AND WATER QUALITY
 
We are, or may ultimately be, subject to various current and proposed federal, state and local environmental compliance laws and regulations, which likely would result in increased capital expenditures and O&M expenses. Additionally, Congress is considering legislation that would require reductions in air emissions of NOx, SO2, carbon dioxide (CO2) and mercury. Some of these proposals establish nationwide caps and emission rates over an extended period of time. This national multipollutant approach to air pollution control could involve significant capital costs that could be material to our financial position or results of operations. Control equipment installed pursuant to the provisi ons of CAIR, Clean Air Visibility Rule (CAVR) and mercury regulations, which are discussed below, may address some of the issues outlined above.previously. PEC and PEF have been developing an integrated compliance strategy to meet the requirements of the CAIR, CAVR and mercury regulation (see discussion of the court decisions that impacted the CAIR, the delisting determination and the CAMR below). The CAVR requires the installation of best available retrofit technology (BART) on certain units. However, the outcome of these matters cannot be predicted.
 
Clean Smokestacks Act
 
In June 2002, the Clean Smokestacks Act was enacted in North Carolina requiring the state's electric utilities to reduce the emissions of NOx and SO2 from their North Carolina coal-fired power plants in phases by 2013. PEC currently has approximately 5,000 MW of coal-fired generation capacity in North Carolina that is affected by the Clean Smokestacks Act. PEC’s environmental compliance projects under the first phase of Clean Smokestacks Act emission reductions have been placed in service. As discussed in Note 7B of the 2009 Form 10-K, PEC plans to retire by 2014, but no later than December 31, 2017, its remaining coal-fired generating facilities in North Carolina totaling 1,500 MW that do not have scrubbers and replace the generation capacity with new natural gas-fuel edgas-fueled generating facilities, which will help the utility to comply with the final Clean Smokestacks Act SO2 emissions target that begins in 2013. We are continuing to evaluate various design, technology, generation and fuel options that could change expenditures required to maintain compliance with the Clean Smokestacks Act limits subsequent to 2013.
 
O&M expense increases with the operation of pollution control equipment due to the cost of reagents, additional personnel and general maintenance associated with the pollution control equipment. PEC is allowed to recover the cost of reagents and certain other costs under its fuel clause; the North Carolina retail portion of all other O&M expense is currently recoverable through base rates. On February 11, 2009, the SCPSC issued an order allowing PEC to begin deferring as a regulatory asset the depreciation expense that PEC incurs on its environmental compliance control facilities as well as the incremental O&M expenses that PEC incurs in connection with its environmental compliance control facilities.
 
100

Clean Air Interstate Rule
 
The CAIR, issued by the EPA on March 10,in 2005, required the District of Columbia and 28 states, including North Carolina, South Carolina and Florida, to reduce NOx and SO2 emissions. The CAIR set emission limits to be met in two phases beginning in 2009 and 2015, respectively, for NOx and beginning in 2010 and 2015, respectively, for SO2. States were required to adopt rules implementing the CAIR, and the EPA approved the North Carolina CAIR, the South Carolina CAIR and the Florida CAIR in 2007.
 
The air quality controls installed to comply with NOx requirements under certain sections of the Clean Air Act (CAA) and the Clean Smokestacks Act, as well as PEC’s plan to replace a portion of its coal-fired generation with natural gas-fueled generation, largely address the CAIR requirements for our North Carolina units at PEC. PEC and PEF met the 2009 phase I requirements for NOx and anticipate meeting the 2010 phase I requirements of CAIR for NOx and SO2 with a combination of emission reductions resulting from in-service emission control equipment and
107

emission allowances. PEF’s Crystal River Unit No. 4 (CR4) equipment was placed in service in May 2010 and PEF’s Crystal River Unit No. 5 (CR5) equipment was placed in service in 2009.
 
On July 11,In 2008, the U.S. Court of Appeals for the District of Columbia Circuit (D.C. Court of Appeals) issued its decision on multiple challenges to the CAIR, whichinitially vacated the CAIR in its entirety. On December 23, 2008, the D.C. Court of Appealsentirety and subsequently remanded the CAIR,rule without vacating the rule,it for the EPA to conduct further proceedings consistent with the D.C. Court of Appeals’court’s prior opinion. On August 2, 2010, the EPA published the proposed Transport Rule, which is the regulatory program that will replace the CAIR when finalized. The proposed Transport Rule contains new emissions trading programs for NOx and SO2 emissions as well as more stringent overall emissions targets. The EPA plans to finalize the new ruleTransport Rule in the spring of 2011. Due to significant i nvestmentsinvestments in NOx and SO2 emissions controlsc ontrols and fleet modernization projects completed or underway,under way, we believe both PEC and PEF are well positioned to comply with the Transport Rule. The outcome of the EPA’s rulemaking cannot be predicted. Because the D.C. Court of Appeals’ December 23, 2008 decision remanded the CAIR, the current implementation of the CAIR continues to fulfill BART for NOx and SO2 for BART-affected units under the CAVR. Should this determination change as the Transport Rule is promulgated, CAVR compliance eventually may require consideration of NOx and SO2 emissions reductions in addition to particulate matter emissions reductions for BART-eligible units.
 
Under an agreement with the FDEP, PEF will retire Crystal River Units No. 1 and No. 2 coal-fired steam turbines (CR1 and CR2) and operate emission control equipment at CR4 and CR5. CR1 and CR2 will be retired after the second proposed nuclear unit at Levy completes its first fuel cycle, which was originally anticipated to be around 2020. As required, PEF has advised the FDEP of developments that will delay the retirement of CR1 and CR2 beyond the originally anticipated completion date of the first fuel cycle for Levy Unit 2 as discussed in “Other Matters – Nuclear – Potential New Construction.” We are currently evaluating the impacts of the Levy schedule on PEF’s compliance with environmental regulations. We cannot predict the outcome of this matter.
 
Clean Air Mercury Rule
 
On March 15,In 2005, the EPA finalized two separate but related rules: the CAMR that set mercury emissions limits to be met in two phases beginning in 2010 and 2018, respectively, and encouraged a cap-and-trade approach to achieving those caps, and a delisting rule that eliminated any requirement to pursue a maximum achievable control technology (MACT) approach for limiting mercury emissions from coal-fired power plants. On February 8,In 2008, the D.C. Court of Appeals vacated the delisting determination and the CAMR. TheCAMR and, in 2009, the U.S. Supreme Court declined to hear an appeal of the D.C. Court of Appeals’ decision in January 2009.decision. As a result, the EPA subsequently announced that it will develop a MACT standard consistent with the agency’s original listing determination. The United States District Court for the District of Columbia has i ssuedissued an order requiring the EPA to issue a final MACT standard for power plants by November 16, 2011. In addition, North Carolina adopted a state specificstate-specific requirement. The North Carolina mercury rule contains a requirement that all coal-fired units in the state install mercury controls by December 31, 2017, and requires compliance plan applications to be submitted in 2013. We are currently evaluating the impact of these decisions. The outcome of this matter cannot be predicted.
 
101


Clean Air Visibility Rule
 
On June 15,In 2005, the EPA issued the final CAVR. The EPA’s rule requires states to identify facilities, including power plants, built between August 1962 and August 1977 with the potential to produce emissions that affect visibility in 156 specially protected areas, including national parks and wilderness areas, designated as Class I areas. To help restore visibility in those areas, states must require the identified facilities to install BART to control their emissions. PEC’s BART-eligible units are Asheville Units No. 1 and No. 2, Roxboro Units No. 1, No. 2 and No. 3, and Sutton Unit No. 3. PEF’s BART-eligible units are Anclote Units No. 1 and No. 2, CR1 and CR2. The reductions associated with BART begin in 2013. As discussed above,in Note 4A, Sutton Unit No. 3 is one of the coal-fired generating units that PEC plans to replace wi th combined cycle natural gas-fueled electric generation. As discussed previously, PEF and the FDEP announced an agreement under which PEF will retire CR1 and CR2 as c oal-firedcoal-fired units.
 
The CAVR included the EPA’s determination that compliance with the NOx and SO2 requirements of the CAIR could be used by states as a BART substitute to fulfill BART obligations, but the states could require the installation of additional air quality controls if they did not achieve reasonable progress in improving visibility. The D.C. Court
108

of Appeals’ December 23, 2008 decision remanding the CAIR maintained its implementation such that CAIR satisfies BART for NOx and SO2. Should this determination change as the Transport Rule is promulgated, CAVR compliance eventually may require consideration of NOx and SO2 emissions in addition to particulate matter emissions for BART-eligible units. We are assessing the potential impact of BART and its implications with respect to our plans and estimated costs to comply with the CAVR. On December 4,In 2007, the FDEP finalized a Regional Haze implementation rule that goes beyond BART by requiring sources significantly impacting visibility in Class I areas to install additionalad ditional controls by December 31, 2017. However, in the spring of 2010 the EPA indicated that the Reasonable Further Progress portion of the Regional Haze implementation rule is not approvable. In August 2010, the FDEP has not determinedamended the levelrule by removing the Reasonable Further Progress provision, including the December 31, 2017, deadline for installation of additional controls, PEF may needand instead will rely on current federal programs to implement.achieve improvement in visibility. The outcome of these matters cannot be predicted.
 
Compliance Strategy
 
Both PEC and PEF have been developing an integrated compliance strategy to meet the requirements of the CAIR, the CAVR, mercury regulation and related air quality regulations. The air quality controls installed to comply with NOx requirements under certain sections of the CAA and the Clean Smokestacks Act, as well as PEC’s plan to replace a portion of its coal-fired generation with natural gas-fueled generation, resulted in a reduction of the costs to meet PEC’s CAIR requirements.
 
PEC’s environmental compliance projects under the first phase of Clean Smokestacks Act emission reductions have been placed in service. PEF’s CR5 project was placed in service in 2009 and the CR4 project was placed in service in May 2010.
 
The FPSC approved PEF’s petition to develop and implement an Integrated Clean Air Compliance Plan to comply with the CAIR, CAMR and CAVR and for recovery of prudently incurred costs necessary to achieve this strategy through the ECRC (see discussion abovepreviously regarding the vacating of the CAMR and remanding of the CAIR and its potential impact on CAVR). PEF’s April 1, 2010 filing with the FPSC for true-up of final 2009 environmental costs included a review of the Integrated Clean Air Compliance Plan, which reconfirmed the efficacy of the recommended plan and included an estimated total project cost of approximately $1.1 billion to be spent through 2016, to plan, design, build and install pollution control equipment at the Anclote Plant, CR4 and CR5. The majority of the $1.1 billion estimated total project cost related to CR4 an dC R4 and CR5 projects, which have been placed in service. Additional costs may be incurred if pollution controls are required in order to comply with the requirements of the CAVR, as discussed above,previously, or to meet compliance requirements of the final Transport Rule. Subsequent rule interpretations, increases in the underlying material, labor and equipment costs, equipment availability, or the unexpected acceleration of compliance dates, among other things, could result in significant increases in our estimated costs to comply and acceleration of some projects. The outcome of this matter cannot be predicted.
 
Environmental Compliance Cost Estimates
 
Environmental compliance cost estimates are dependent upon a variety of factors and, as such, are highly uncertain and subject to change. Factors impacting our environmental compliance cost estimates include new and frequently changing laws and regulations; the impact of legal decisions on environmental laws and regulations; changes in the demand for, supply of and costs of labor and materials; changes in the scope and timing of projects; various design,
102


technology and new generation options; and projections of fuel sources, prices, availability and security. Costs to comply with environmental laws and regulations are eligible for regulatory recovery through either base rates or cost-recovery clauses. The outcome of future petitions for recovery cannot be predicted. Our estimates of capital expenditures to comply with environmental lawslaw s and regulations are subject to periodic review and revision and may vary significantly. PEC is continuing to evaluate various design, technology and new generation options that could change expenditures required to maintain compliance with the Clean Smokestacks Act limits subsequent to 2013. Additional compliance plans for PEC and PEF to meet the requirements of the Transport Rule will be determined upon finalization of the rule. As a result of the deci siondecision remanding the CAIR, compliance plans and costs to meet the requirements of the CAVR are being reassessed and we cannot predict the impact that the EPA’s further proceedings will have on our compliance with the CAVR requirements. Compliance plans to meet the requirements of a revised or new implementing rule for mercury will be determined upon finalization of the rule.
109

Compliance plans to meet the requirements of a revised or new implementing rule under Section 316(b) of the Clean Water Act, as discussed below, will be determined upon finalization of the rule. The timing and extent of the costs for future projects will depend upon final compliance strategies. However, we believe that future costs to comply with new or subsequent rule interpretations could be significant.
 
North Carolina Attorney General Petition under Section 126 of the Clean Air Act
 
In March 2004, the North Carolina attorney general filed a petition with the EPA, under Section 126 of the CAA, asking the federal government to force fossil fuel-fired power plants in 13 other states, including South Carolina, to reduce their NOx and SO2 emissions. The state of North Carolina contends these out-of-state emissions interfere with North Carolina’s ability to meet National Ambient Air Quality Standards (NAAQS) for ozone and particulate matter. In 2006, the EPA issued a final response denying the petition, and the North Carolina attorney general filed a petition in the D.C. Court of Appeals seeking a review of the agency’s denial. In 2009, the D.C. Court of Appeals remanded the EPA’s denial to the agency for reconsideration. The out come ofoutcome o f the remand proceeding cannot be predicted.
 
National Ambient Air Quality Standards
 
In 2006, the EPA announced changes to the NAAQS for particulate matter. The changes in particulate matter standards did not result in designation of any additional nonattainment areas in PEC’s or PEF’s service territories. Environmental groups and 13 states filed a joint petition with the D.C. Court of Appeals arguing that the EPA's particulate matter rule does not adequately restrict levels of particulate matter, especially with respect to the annual and secondary standards. On February 24, 2009, the D.C. Court of Appeals remanded the annual and secondary standards to the EPA for further review and consideration. The outcome of this matter cannot be predicted.
 
In 2008, the EPA revised the 8-hour primary and secondary standards for the NAAQS for ground-level ozone. Additional nonattainment areas may be designated in PEC’s and PEF’s service territories as a result of these revised standards. On May 27, 2008, a number of states, environmental groups and industry associations filed petitions against the revised NAAQS in the D.C. Court of Appeals. The EPA requested the D.C. Court of Appeals to suspend proceedings in the case while the EPA evaluates whether to maintain, modify or otherwise reconsider the revised NAAQS. In September 2009, the EPA announced that it is reconsidering the level of the ozone NAAQS. The EPA originally indicated plans to designate nonattainment areas for these standards by March 2010. However, the EPA announced that it will stay those designations until after its reconsideration has been completed.
 
On January 7, 2010, the EPA announced a proposed revision to the primary ozone NAAQS. In addition, the EPA proposed a cumulative seasonal secondary standard. The EPA plans to finalize the revisions by AugustDecember 31, 2010, and to designate nonattainment areas by August 2011. The proposed revisions are significantly more stringent than the current NAAQS. Should additional nonattainment areas be designated in our service territories, we may be required to install additional emission controls at some of our facilities. The outcome of this matter cannot be predicted.
 
On January 25, 2010, the EPA announced a revision to the primary NAAQS for nitrogen dioxide. Since 1971, when the first NAAQS were promulgated, the standard for nitrogen dioxide has been an annual average. The EPA has retained the annual standard and added a new 1-hour NAAQS. In conjunction with proposing changes to the
103

standard, the EPA is also requiring an increase in the coverage of the monitoring network, particularly near roadways where the highest concentrations are expected to occur due to traffic emissions. The EPA plans to designate nonattainment areas by January 2012. Currently, there are no monitors reporting violation of the new standard in PEC’s or PEF’s service territories, but the expanded monitoring network will provide additional data, which could result in additional nonattainment areas. The outcome of thisthi s matter cannot be predicted.
 
On June 22, 2010, the EPA published the final new 1-hour NAAQS for SO2, which sets the limit at 75 parts per billion. The primary NAAQS on a 24-hour average basis and annual average will be eliminated under the new rule. The new 1-hour standard is a significant increase in the stringency of the standard and increases the risk of nonattainment, especially near uncontrolled coal-fired facilities. In addition, for the first time the EPA plans to use air quality modeling along with monitoring data in determining whether areas are attaining the new standard, which is likely to expand the number of nonattainment areas. Should additional nonattainment areas be designated in our
110

service territories, we may be required to install additional emission control scontrols at some of our facilities. The outcome of this matter cannot be predicted.
 
Water Quality
 
1. General
 
As a result of the operation of certain pollution control equipment required to comply with the air quality issues outlined above, new sources of wastewater discharge will be generated at certain affected facilities. Integration of these new wastewater discharges into the existing wastewater treatment processes is currently ongoing and will result in permitting, construction and treatment requirements imposed on the Utilities now and into the future. The future costs of complying with these requirements could be material to our or the Utilities’ results of operations or financial position.
 
On September 15, 2009, the EPA concluded after a multi-year study of power plant wastewater discharges that current regulations have not kept pace with changes in the electric power industry since the regulations were issued in 1982, including addressing impacts to wastewater discharge from operation of air pollution control equipment. As a result, the EPA has announced that it plans to revise the regulations that govern wastewater discharge, which may result in operational changes and additional compliance costs in the future. The outcome of this matter cannot be predicted.
 
2. Section 316(b) of the Clean Water Act
 
Section 316(b) of the Clean Water Act (Section 316(b)) requires cooling water intake structures to reflect the best technology available for minimizing adverse environmental impacts. The EPA promulgated a rule implementing Section 316(b) in respect to existing power plants in July 2004.
 
A number of states, environmental groups and others sought judicial review of the July 2004 rule. In 2007, the U.S. Court of Appeals for the Second Circuit issued an opinion and order remanding many provisions of the rule to the EPA, and the EPA suspended the rule pending further rulemaking, with the exception of the requirement that permitted facilities must meet any requirements under Section 316(b) as determined by the permitting authorities on a case-by-case, best professional judgment basis. Several parties filed petitions for writ of certiorari to the U.S. Supreme Court. OnFollowing appeal, on April 1, 2009, the U.S. Supreme Court issued itsan opinion holding that the EPA, in selecting the “best technology” pursuant to Section 316(b), does have the authority to reject technology when its costs are “wholly disproportionate” to t hethe benefits expected. Also, the U.S. Supreme Court held that EPA’sEPA& #8217;s site-specific variance procedure (contained in the July 2004 rule) was permissible in that the procedure required testing to determine whether costs would be “significantly greater than” the benefits before a variance would be considered. As a result of these developments, our plans and associated estimated costs to comply with Section 316(b) will need to be reassessed and determined in accordance with any revised or new implementing rule after it is established by the EPA. Costs of compliance with a revised or new implementing rule are expected to be higher, and could be significantly higher, than estimated costs under the July 2004 rule. Our cost estimates to comply with the July 2004 rule were $60 million to $90 million, including $5 million to $10 million at PEC and $55 million to $80 million at PEF. The outcome of this matter cannot be predicted.
 
104

OTHER ENVIRONMENTAL MATTERS
 
Global Climate Change
 
Growing state, federal and international attention to global climate change may result in the regulation of CO2 and other GHGs. As discussed under “Other Matters – Regulatory Environment,” on June 26, 2009, the U.S. House of Representatives passed the American Clean Energy and Security Act of 2009. This bill would establish a national cap-and-trade program to reduce GHG emissions as well as a national REPS. The U.S. Senate is considering similar proposals. Final legislation will depend upon changes made during the legislative process to the provisions and the manner in which key provisions are implemented, including for the regulation of carbon. In addition, the Obama administration has begun the process of regulating GHG emissions through use o f the CAA. On April 2, 2007, the U.S. Supreme Court ruled that the EPA has the authority under the CAA to regulate CO2 emissions from new automobiles. On December 15, 2009, the EPA announced that six GHGs (CO2, methane, nitrous oxide,
111

hydrofluorocarbons, perfluorocarbons and sulfur hexafluoride) pose a threat to public health and welfare under the CAA. A number of parties have filed petitions for review of this finding in the D.C. Court of Appeals. The full impact of final legislation, if enacted, and additional regulation resulting from other federal GHG initiatives cannot be determined at this time; however, we anticipate that it could result in significant cost increases over time for which the Utilities would seek corresponding rate recovery. We are preparing for a carbon-constrained future and are actively engaged in helping shape effective policies to addre ssaddress the issue.
 
As discussed under “Other Matters – Regulatory Environment,” in 2008 the state of Florida passed comprehensive energy legislation, which includes a directive that the FDEP develop rules to establish a cap-and-trade program to regulate GHG emissions that would be presented to the legislature no earlier than January 2010. The FDEP is currently in the process of studying GHG policy options and the potential economic impacts, but it has not developed a regulation for the consideration of the legislature. As discussed under “Clean Smokestacks Act,” on July 31, 2009, the governor of North Carolina signed into law a bill that may impact PEC’s Clean Smokestacks Act compliance plans. While state-level study groups have been active in all three of our jurisdictions, we continue to believe that this issue requi resrequires a national policy framework – one that provides certainty and consistency. Our balanced solution as discussed in “Other Matters – Energy Demand” is a comprehensive plan to meet the anticipated demand in the Utilities’ service territories and provides a solid basis for slowing and reducing CO2 emissions by focusing on energy efficiency, alternative energy and state-of-the-art power generation.
 
There are ongoing efforts to reach a new international climate change treaty to succeed the Kyoto Protocol. The Kyoto Protocol was adopted in 1997 by the United Nations to address global climate change by reducing emissions of CO2 and other GHGs. Although the treaty went into effect on February 16, 2005, the United States has not adopted it. In December 2009, the United Nations Framework Convention on Climate Change convened the 15th Conference of the Parties to conduct further negotiations on GHG emissions reductions. At the conclusion of the conference, a number of the parties, including the United States, entered into a nonbinding accord calling upon the parties to submit emiss ion reduction targets for 2020 to the United Nations Framework Convention on Climate Change Secretariat by the end of January 2010. On January 28, 2010, President Obama submitted a proposal to reduce the U.S. GHG emissions in the range of 17 percent below 2005 levels by 2020, subject to future Congressionalcongressional action.
 
Reductions in CO2 emissions to the levels specified by the Kyoto Protocol, potential new international treaties or federal or state proposals could be materially adverse to our financial position or results of operations if associated costs of control or limitation cannot be recovered from ratepayers. The cost impact of legislation or regulation to address global climate change would depend on the specific legislation or regulation enacted and cannot be determined at this time.
 
On September 22, 2009, the EPA issued the final GHG emissions reporting rule, which establishes a national protocol for the reporting of annual GHG emissions. Facilities that emit greater than 25,000 metric tons per year of GHGs must report emissions by March 31 of each year beginning in 2011 for year 2010 emissions. Because the rule builds on current emission-reporting requirements, compliance with the requirements is not expected to have a material impact on the Utilities.
 
105

Prior to 2009, the EPA received waiver requests from a number of states to allow those states to set standards for CO2 emissions from new vehicles. The EPA denied those requests. On January 26, 2009, the Obama administration requested the EPA to review those denials of waiver requests. On June 30, 2009, the EPA granted California’s waiver request, enabling the state to enforce its GHG emissions standards for new motor vehicles, beginning with the current model year. Additional states proposed to set similar standards as a result of the decision. The federal government, states and automakers developed an agreement to establish GHG emissions standards for new light-duty vehicles at the national level. On April 1, 2010, the EPA and the National Highway Transp ortationTranspo rtation Safety Administration jointly announced the first regulation of GHG emissions from new vehicles. The EPA is regulating mobile source GHG emissions under Section 202 of the CAA, which according to the EPA also results in stationary sources, such as coal-fired power plants, being subject to regulation of GHG emissions under the CAA. On March 29, 2010, the EPA issued an interpretation that stationary source GHG emissions will be subject to regulation under the CAA beginning in January 2011. On May 13, 2010, the EPA issued the final “tailoring rule,” which establishes the thresholds for applicability of the Prevention of Significant Deterioration program permitting requirements for
112

GHG emissions from stationary sources such as power plants and manufacturing facilities. Prevention of significant deterioration is a construction air pollution permitting program designed to ensure air quality does not degrade beyond the NAAQS levels or beyond specified incremental amounts above a prescribed base linebaseline level. The tailoring rule initially raises the permitting applicability threshold to 75,000 tons per year. The EPA has stated that the permitting requirements for GHG emissions from stationary sources will begin on January 2, 2011. These developments are likely to require PEC and PEF to address GHG emissions in air quality permits. The impact of these developments cannot be predicted.
 
SYNTHETIC FUELS TAX CREDITS
 
Historically, we had substantial operations associated with the production of coal-based solid synthetic fuels as defined under Section 29 of the Internal Revenue Code (the Code) (Section 29) and as redesignated effective 2006 as Section 45K of the Code (Section 45K), as discussed below. The production and sale of these products qualified for federal income tax credits so long as certain requirements were satisfied. Qualifying synthetic fuels facilities entitled their owners to federal income tax credits based on the barrel of oil equivalent of the synthetic fuels produced and sold by these plants. The synthetic fuels tax credit program expired at the end of 2007, and the synthetic fuels businesses were abandoned and reclassified to discontinued operations.
 
Legislation enacted in 2005 redesignated the Section 29 tax credit as a general business credit under Section 45K of the Code effective January 1, 2006. The previous amount of Section 29 tax credits that we were allowed to claim in any calendar year through December 31, 2005, was limited by the amount of our regular federal income tax liability. Section 29 tax credit amounts allowed but not utilized are carried forward indefinitely as deferred alternative minimum tax credits. The redesignation of Section 29 tax credits as a Section 45K general business credit removed the regular federal income tax liability limit on synthetic fuels production and subjects the credits to a one-year carry back period and a 20-year carry forward period.
 
Total Section 29/45K credits generated under the synthetic fuels tax credit program (including those generated by Florida Progress prior to our acquisition) were $1.891 billion, of which $1.085$1.087 billion has been used through JuneSeptember 30, 2010, to offset regular federal income tax liability and $806$804 million is being carried forward as deferred tax credits.
 
See Note 13C14C and Item 1A, “Risk Factors,” to the 2009 Form 10-K for additional discussion related to our previous synthetic fuels operations.
106

DEEPWATER HORIZON OIL SPILL
Three of PEF’s four plants on the Gulf Coast have intake canals that bring water from the Gulf of Mexico to be used for cooling purposes and returned to the canal. We do not believe that our power plants are at risk of shutting down as a result of oil from the Deepwater Horizon oil spill interfering with the facilities’ intake structures. We are actively monitoring current models of the projected trajectory of the oil spill. We are in communication with the U.S. Coast Guard, local and state officials, BP, other utilities and our oil spill-response contractors daily. Our coastal power plants maintain a boom system for their intake canals, which protects from seaweed, debris and other materials that enter the canals from the Gulf of Mexico. We are also using boats, nets and absorbent materials to regularly check for oil. In t he event a small volume of oil passes through our protective boom system, we could clean and restore our equipment to ensure continued operation. We would only need to shut down our power plants if large volumes of oil passed our protective measures and clogged our intake structures, heat exchangers and other equipment to a point where we could no longer operate them.
 
LEGAL
 
We are subject to federal, state and local legislation and court orders. The specific issues, the status of the issues, accruals associated with issue resolutions and our associated exposures are discussed in detail in Note 13C.14C.
 
NEW ACCOUNTING STANDARDS
 
See Note 2 for a discussion of the impact of new accounting standards.
 

 
107113

 

PEC
 
The following MD&A and the information incorporated herein by reference contain forward-looking statements that involve estimates, projections, goals, forecasts, assumptions, risks and uncertainties that could cause actual results or outcomes to differ materially from those expressed in the forward-looking statements. Please review “Safe Harbor for Forward-Looking Statements” included within this Form 10-Q and Item 1A, “Risk Factors,” to the 2009 Form 10-K for a discussion of the factors that may impact any such forward-looking statements made herein.
 
RESULTS OF OPERATIONS
 
This information is incorporated herein by reference to “Results of Operations” in Progress Energy’s MD&A, insofar as it relates to PEC.
 
LIQUIDITY AND CAPITAL RESOURCES
 
This information is incorporated herein by reference to “Liquidity and Capital Resources” in Progress Energy’s MD&A, insofar as it relates to PEC.
 
Net cash provided by operating activities increased $71$196 million for the sixnine months ended JuneSeptember 30, 2010, when compared to the same period in the prior year. The increase was primarily due to $145$184 million lower cash used for inventory, primarily due to a change in generation mix and higher coal consumption as a result of favorable weather that was fulfilled through 2010 usage of inventory from year-end 2009, a $75 million reduction in pension plan funding compared to the prior year and a $63$56 million increase from accounts payable, primarily driven by the timing of payments to vendors for increased purchases of fuel and purchased power resulting from outages and favorable weather. These impacts were partially offset by an $81$107 million increasedecrease from receivables, primarily due to increased revenues driven by favorable weather, and a $71$38 million decrease from the recoveryuse of deferred fuel costs as a result of higher current year f uel expenses and lower fuel rates.cash to meet deri vative collateral requirements.
 
Net cash used by investing activities decreased $35increased $50 million for the sixnine months ended JuneSeptember 30, 2010, when compared to the same period in the prior year. The decreaseincrease was primarily due to a $277 million change in advances to affiliated companies, partially offset by a $178$292 million increase in capital expenditures primarily related to the Wayne County Richmondand New Hanover County projects (See Note 4A) and Sutton generation sitesat our Harris generating station and a $64$50 million increase in nuclear fuel additions primarily related to one additional refueling outage for 2010 compared to 2009.2009, partially offset by a $291 million change in advances to affiliated companies.
 
Net cash used by financing activities decreased $65$40 million for the sixnine months ended JuneSeptember 30, 2010, when compared to the same period in the prior year. The decrease was primarily due to the $400 million payment at maturity of PEC’s 5.95% Senior Notes in 2009, the $150$125 million lower dividend payments to the Parent in 2010 and the $110 million repayment of commercial paper outstanding in 2009. These payments were partially offset by proceeds from the $600 million issuance of long-term debt in 2009.
 
OFF-BALANCE SHEET ARRANGEMENTS AND CONTRACTUAL OBLIGATIONS
 
PEC’s off-balance sheet arrangements and contractual obligations are described below.
 
MARKET RISK AND DERIVATIVES
 
Under its risk management policy, PEC may use a variety of instruments, including swaps, options and forward contracts, to manage exposure to fluctuations in commodity prices and interest rates. See Note 910 and Item 3, “Quantitative and Qualitative Disclosures about Market Risk,” for a discussion of market risk and derivatives.
 
CONTRACTUAL OBLIGATIONS
 
This information is incorporated herein by reference to “Contractual Obligations” in Progress Energy’s MD&A, insofar as it relates to PEC.
 
 
108114

 
OTHER MATTERS
 
This information is incorporated herein by reference to “Other Matters” in Progress Energy’s MD&A, insofar as it relates to PEC.
 

 
109115

 

PEF
 
The following MD&A and the information incorporated herein by reference contain forward-looking statements that involve estimates, projections, goals, forecasts, assumptions, risks and uncertainties that could cause actual results or outcomes to differ materially from those expressed in the forward-looking statements. Please review “Safe Harbor for Forward-Looking Statements” included within this Form 10-Q and Item 1A, “Risk Factors,” to the 2009 Form 10-K for a discussion of the factors that may impact any such forward-looking statements made herein.
 
Other than as discussed below, the information called for by Item 2 is omitted pursuant to Instruction H(2)(c) to Form 10-Q (Omission of Information by Certain Wholly Owned Subsidiaries).
 
RESULTS OF OPERATIONS
 
This information is incorporated herein by reference to “Results of Operations” in Progress Energy’s MD&A, insofar as it relates to PEF.
 
LIQUIDITY AND CAPITAL RESOURCES
 
This information is incorporated herein by reference to “Liquidity and Capital Resources” in Progress Energy’s MD&A, insofar as it relates to PEF.
 
Net cash provided by operating activities increased $165decreased $20 million for the sixnine months ended June 30, 2010, when compared to the same period in the prior year. The increase was primarily due to a $226 million increase in income tax receipts, net; an $82 million increase from accounts payable driven by the timing of payments to vendors for increased purchases of fuel and purchased power resulting from outages and favorable weather; and $59 million lower cash used for inventory primarily due to higher coal consumption as a result of favorable weather and lower purchases as a result of decreased purchase requirements on long-term contracts. These impacts were partially offset by $195 million decrease from the recovery of deferred fuel costs as a result of lower fuel rates and higher current year fuel expenses and a $65 million increase in ca sh collateral posted with counterparties on derivative contracts as discussed under Progress Energy’s MD&A, “Liquidity and Capital Resources”.
Net cash used by investing activities decreased $249 million for the six months ended June 30, 2010, when compared to the same period in the prior year, primarily due to lower capital expenditures for environmental compliance and nuclear projects.
Net cash provided by financing activities decreased $318 million for the six months ended JuneSeptember 30, 2010, when compared to the same period in the prior year. The decrease was primarily due to a $620$200 million changeuse of cash to meet derivative collateral requirements. This was partially offset by a $168 million increase in advances from affiliatesincome tax receipts, net.
Net cash used by investing activities decreased $349 million for the nine months ended September 30, 2010, when compared to the same period in the prior year, primarily due to $295 million lower capital expenditures for environmental compliance and nuclear projects and $34 million and $18 million of lower nuclear fuel purchases and insurance proceeds for repair costs, respectively, related to the CR3 delamination event.
Net cash provided by financing activities decreased $201 million for the nine months ended September 30, 2010, when compared to the same period in the prior year. The decrease was primarily due to a $310$465 million contribution from the Parent in 2009. These impacts were2009, a $296 million change in advances from affiliated companies and a $50 million increase in dividends paid to parent, partially offset by thea $321 million repayment of commercial paper in 2009 and a $300 million net increase in first mortgage bonds outstanding in 2010 and the $371 million repayment of commercial paper outstanding in 2009.2010. PEF’s 2010 financing activities are further described under Progress Energy’s MD&A, “Liquidity and Capital Resources.”
 
OFF-BALANCE SHEET ARRANGEMENTS AND CONTRACTUAL OBLIGATIONS
 
PEF’s off-balance sheet arrangements and contractual obligations are described below.
 
MARKET RISK AND DERIVATIVES
 
Under its risk management policy, PEF may use a variety of instruments, including swaps, options and forward contracts, to manage exposure to fluctuations in commodity prices and interest rates. See Note 910 and Item 3, “Quantitative and Qualitative Disclosures about Market Risk,” for a discussion of market risk and derivatives.
 
CONTRACTUAL OBLIGATIONS
 
This information is incorporated herein by reference to “Contractual Obligations” in Progress Energy’s MD&A, insofar as it relates to PEF.
 
110

OTHER MATTERS
 
This information is incorporated herein by reference to “Other Matters” in Progress Energy’s MD&A, insofar as it relates to PEF.
 

 
111116

 

ITEM 3.                 QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
ITEM 3.QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK
 
We are exposed to various risks related to changes in market conditions. Market risk represents the potential loss arising from adverse changes in market rates and prices. We have a risk management committee that includes senior executives from various business groups. The risk management committee is responsible for administering risk management policies and monitoring compliance with those policies by all subsidiaries. Under our risk policy, we may use a variety of instruments, including swaps, options and forward contracts, to manage exposure to fluctuations in commodity prices and interest rates. Such instruments contain credit risk to the extent that the counterparty fails to perform under the contract. We minimize such risk by performing credit and financial reviews using a combination of financial analysis and publicly available credit ratings of such counterparties (See Note 9)10). Both PEC and PEF also have limited counterparty exposure for commodity hedges (primarily gas and oil hedges) by spreading concentration risk over a number of counterparties.
 
The following disclosures about market risk contain forward-looking statements that involve estimates, projections, goals, forecasts, assumptions, risks and uncertainties that could cause actual results or outcomes to differ materially from those expressed in the forward-looking statements. Please review Item 1A, “Risk Factors,” to the 2009 Form 10-K and “Safe Harbor for Forward-Looking Statements” for a discussion of the factors that may impact any such forward-looking statements made herein.
 
Certain market risks are inherent in our financial instruments, which arise from transactions entered into in the normal course of business. Our primary exposures are changes in interest rates with respect to our long-term debt and commercial paper, fluctuations in the return on marketable securities with respect to our NDT funds, changes in the market value of CVOs and changes in energy-related commodity prices.
 
These financial instruments are held for purposes other than trading. The risks discussed below do not include the price risks associated with nonfinancial instrument transactions and positions associated with our operations, such as purchase and sales commitments and inventory.
 
PROGRESS ENERGY
 
Other than described below, the various risks that we are exposed to have not materially changed since December 31, 2009.
 
INTEREST RATE RISK
 
Our debt portfolio and our exposure to changes in interest rates at JuneSeptember 30, 2010, have changed from December 31, 2009. The total notional amount of fixed rate long-term debt at JuneSeptember 30, 2010, was $11.529 billion, with an average interest rate of 6.11% and fair market value of $13.0$13.4 billion. The total notional amount of fixed rate long-term debt at December 31, 2009, was $11.245 billion, with an average interest rate of 6.12% and fair market value of $12.1 billion. The total notional amount of variable rate long-term debt at JuneSeptember 30, 2010, was $861 million, with an average interest rate of 0.55%0.51% and fair market value of $0.9 billion. The total notional amount of variable rate long-term debt at December 31, 2009, was $961 million, with an average interest rate of 0.48% and fair market value of $1.0 billion.
 
In addition to our variable rate long-term debt, we typically have commercial paper and/or loans outstanding under our RCA facilities, which are also exposed to floating interest rates. At JuneSeptember 30, 2010, we had no outstanding commercial paper and no loans outstanding under our RCA facilities. At December 31, 2009, we had $140 million of outstanding commercial paper and no loans outstanding under our RCA facilities. At JuneSeptember 30, 2010, and December 31, 2009, approximately 7 percent and 9 percent, respectively, of consolidated debt was in floating rate mode.
 
Based on our variable rate long-term debt balances at JuneSeptember 30, 2010, a 100 basis point change in interest rates would result in an annual pre-tax interest expense change of approximately $9 million.
 
 
112117

 
From time to time, we use interest rate derivative instruments to adjust the mix between fixed and floating rate debt in our debt portfolio, to mitigate our exposure to interest rate fluctuations associated with certain debt instruments and to hedge interest rates with regard to future fixed-rate debt issuances.
 
The notional amounts of interest rate derivatives are not exchanged and do not represent exposure to credit loss. In the event of default by a counterparty, the exposure in the transaction is the cost of replacing the agreements at current market rates.
 
We use a number of models and methods to determine interest rate risk exposure and fair value of derivative positions. For reporting purposes, fair values and exposures of derivative positions are determined as of the end of the reporting period using the Bloomberg Financial Markets system.
 
In accordance with GAAP, interest rate derivatives that qualify as hedges are separated into one of two categories: cash flow hedges or fair value hedges. Cash flow hedges are used to reduce exposure to changes in cash flow due to fluctuating interest rates. Fair value hedges are used to reduce exposure to changes in fair value due to interest rate changes.
 
The following table summarizes the terms, fair market values and exposures of our interest rate derivative instruments. All of the positions included in the table consist of forward starting swaps used to mitigate exposure to interest rate risk in anticipation of future debt issuances.
                             
Cash Flow Hedges (dollars in millions) 
Notional
Amount
 
Mandatory
Settlement
 Pay 
Receive (a)
 
Fair
Value
  
Exposure (b)
  Notional Amount  
Mandatory
Settlement
  Pay 
Receive (a)
 
Fair
Value
  
Exposure (b)
 
Parent                             
Risk hedged at June 30, 2010              
Risk hedged at September 30, 2010               
Anticipated 10-year debt issue $300 2011  4.15%3-month LIBOR $(23) $(7) $300   2011   4.15%3-month LIBOR $(38) $(7)
Anticipated 10-year debt issue  200 2012  4.20%3-month LIBOR  (8)  (5)  200   2012   4.20%3-month LIBOR  (19)  (5)
                                       
Risk hedged at December 31, 2009                                       
Anticipated 10-year debt issue $150 2011  4.03%3-month LIBOR $6  $(3) $150   2011   4.03%3-month LIBOR $6  $(3)
                                       
PEC                                       
Risk hedged at June 30, 2010                  
Risk hedged at September 30, 2010                     
Anticipated 10-year debt issue $100 2011  4.31%3-month LIBOR $(9) $(2) $100   2011   4.31%3-month LIBOR $(14) $(3)
Anticipated 10-year debt issue  200 2012  4.27%3-month LIBOR  (8)  (4)  200   2012   4.27%3-month LIBOR  (18)  (5)
Anticipated 10-year debt issue  50 2013  4.43%3-month LIBOR  (2)  (1)  50   2013   4.43%3-month LIBOR  (3)  (1)
                                       
Risk hedged at December 31, 2009                                       
Anticipated 10-year debt issue $100 2012  4.07%3-month LIBOR $8  $(2) $100   2012   4.07%3-month LIBOR $8  $(2)
                                       
PEF                                       
Risk hedged at June 30, 2010                  
Risk hedged at September 30, 2010                     
Anticipated 10-year debt issue $150 2011  4.18%3-month LIBOR $(10) $(4) $150   2011   4.18%3-month LIBOR $(18) $(4)
Anticipated 10-year debt issue  50 2013  4.30%3-month LIBOR  (2)  (1)  50   2013   4.30%3-month LIBOR  (3)  (1)
                                       
Risk hedged at December 31, 2009                                       
Anticipated 10-year debt issue $75 2010  3.48%3-month LIBOR $5  $(2) $75   2010   3.48%3-month LIBOR $5  $(2)
                                       

(a)
3-month LIBOR rate was 0.53%0.29% at JuneSeptember 30, 2010, and 0.25% at December 31, 2009.
(b)Exposure indicates change in value due to 25 basis point unfavorable shift in interest rates.
 
 
113118

 
MARKETABLE SECURITIES PRICE RISK
 
The Utilities maintain trust funds, pursuant to NRC requirements, to fund certain costs of decommissioning their nuclear plants. These funds are primarily invested in stocks, bonds and cash equivalents, which are exposed to price fluctuations in equity markets and to changes in interest rates. At JuneSeptember 30, 2010 and December 31, 2009, the fair value of these funds was $1.341$1.457 billion and $1.367 billion, respectively, including $859$936 million and $871 million, respectively, for PEC and $482$521 million and $496 million, respectively, for PEF. We actively monitor our portfolio by benchmarking the performance of our investments against certain indices and by maintaining, and periodically reviewing, target allocation percentages for various asset classes. The accounting for nuclear decommissioning recognizes that the Utilities’ regulated elec tricelectric rates provide for recovery of these costs net of any trust fund earnings, and, therefore, fluctuations in trust fund marketable security returns do not affect earnings.
 
CONTINGENT VALUE OBLIGATIONS MARKET VALUE RISK
 
CVOs are recorded at fair value, and unrealized gains and losses from changes in fair value are recognized in earnings. At JuneSeptember 30, 2010 and December 31, 2009, the fair value of CVOs was $15 million. We perform sensitivity analyses to estimate our exposure to the market risk of the CVOs. The sensitivity analyses performed on the CVOs uses quoted prices obtained from brokers or quote services to measure the potential loss in earnings from a hypothetical 10 percent adverse change in market prices over the next 12 months. A hypothetical 10 percent increase in the JuneSeptember 30, 2010 market price would result in a $2 million increase in the fair value of the CVOs and a corresponding increase in the CVO liability.
 
COMMODITY PRICE RISK
 
We are exposed to the effects of market fluctuations in the price of natural gas, coal, fuel oil, electricity and other energy-related products marketed and purchased as a result of our ownership of energy-related assets. Our exposure to these fluctuations is significantly limited by the cost-based regulation of the Utilities. Each state commission allows electric utilities to recover certain of these costs through various cost-recovery clauses to the extent the respective commission determines that such costs are prudent. Therefore, while there may be a delay in the timing between when these costs are incurred and when these costs are recovered from the ratepayers, changes from year to year have no material impact on operating results. In addition, most of our long-term power sales contracts shift substantially all fuel price risk to the purchaser.
 
Most of our physical commodity contracts are not derivatives or qualify as normal purchases or sales. Therefore, such contracts are not recorded at fair value. We perform sensitivity analyses to estimate our exposure to the market risk of our derivative commodity instruments that are not eligible for recovery from ratepayers. At JuneSeptember 30, 2010, substantially all derivative commodity instrument positions were subject to retail regulatory treatment.
 
See Note 910 for additional information with regard to our commodity contracts and use of economic and cash flow derivative financial instruments.
 
PEC
 
The information required by this item is incorporated herein by reference to the “Quantitative and Qualitative Disclosures about Market Risk” discussed above insofar as it relates to PEC.
 
PEC has certain market risks inherent in its financial instruments, which arise from transactions entered into in the normal course of business. PEC’s primary exposures are changes in interest rates with respect to long-term debt and commercial paper, fluctuations in the return on marketable securities with respect to its NDT funds and changes in energy-related commodity prices. Other than discussed above, PEC’s exposure to these risks has not materially changed since December 31, 2009.
 
PEF
 
Other than as discussed above, the information called for by Item 3 is omitted pursuant to Instruction H(2)(c) to Form 10-Q (Omission of Information by Certain Wholly Owned Subsidiaries).

 
114119

 

ITEM 4
ITEM 4.CONTROLS.CONTROLS AND PROCEDURES
 
PROGRESS ENERGY
 
Pursuant to the Securities Exchange Act of 1934, we carried out an evaluation, with the participation of management, including our Chairman, President and Chief Executive Officer and Chief Financial Officer, of the effectiveness of our disclosure controls and procedures (as defined under the Securities Exchange Act of 1934) as of the end of the period covered by this report. Based upon that evaluation, our Chief Executive Officer and Chief Financial Officer concluded that our disclosure controls and procedures are effective to ensure that information we are required to disclose in the reports that we file or submit under the Exchange Act, is recorded, processed, summarized and reported within the time periods specified in the SEC's rules and forms, and that such information is accumulated and communicated to management, including the C hief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure.
 
There has been no change in our internal control over financial reporting during the quarter ended JuneSeptember 30, 2010, that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.
 
ITEM 4T.CONTROLSCONTROLS AND PROCEDURES
 
PEC
 
Pursuant to the Securities Exchange Act of 1934, PEC carried out an evaluation, with the participation of its management, including PEC’s Chief Executive Officer and Chief Financial Officer, of the effectiveness of PEC’s disclosure controls and procedures (as defined under the Securities Exchange Act of 1934) as of the end of the period covered by this report. Based upon that evaluation, PEC’s Chief Executive Officer and Chief Financial Officer concluded that its disclosure controls and procedures are effective to ensure that information required to be disclosed by PEC in the reports that it files or submits under the Exchange Act, is recorded, processed, summarized and reported within the time periods specified in the SEC's rules and forms, and that such information is accumulated and communicated to PEC’s mana gement, including the Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure.
 
There has been no change in PEC’s internal control over financial reporting during the quarter ended JuneSeptember 30, 2010, that has materially affected, or is reasonably likely to materially affect, its internal control over financial reporting.
 
PEF
 
Pursuant to the Securities Exchange Act of 1934, PEF carried out an evaluation, with the participation of its management, including PEF’s Chief Executive Officer and Chief Financial Officer, of the effectiveness of PEF’s disclosure controls and procedures (as defined under the Securities Exchange Act of 1934) as of the end of the period covered by this report. Based upon that evaluation, PEF’s Chief Executive Officer and Chief Financial Officer concluded that its disclosure controls and procedures are effective to ensure that information required to be disclosed by PEF in the reports that it files or submits under the Exchange Act, is recorded, processed, summarized and reported within the time periods specified in the SEC's rules and forms, and that such information is accumulated and communicated to PEF’s mana gement, including the Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure.
 
There has been no change in PEF’s internal control over financial reporting during the quarter ended JuneSeptember 30, 2010, that has materially affected, or is reasonably likely to materially affect, its internal control over financial reporting.
 

 
115120

 

PART II.  OTHER INFORMATION
 
ITEM 1.LEGAL PROCEEDINGS
ITEM 1.LEGAL PROCEEDINGS
 
Legal aspects of certain matters are set forth in PART I, Item 1 (See Note 13C)14C).
 
ITEM 1A.             
ITEM 1A.RISK FACTORS
 
In addition to the other information set forth in this report, you should carefully consider the factors discussed in Part I, Item 1A, “Risk Factors,” to the 2009 Form 10-K, which could materially affect our business, financial condition or future results. The risks described in the 2009 Form 10-K are not the only risks facing us.
 
ITEM 2.UNREGISTEREDITEM 2.                 UNREGISTERED SALE OF EQUITY SECURITIES AND USE OF PROCEEDS
 
RESTRICTED STOCK UNIT AWARD PAYOUTS
 
(a)  
Securities Delivered.  On May 4, 2010, June 3, 2010, JuneJuly 9, 2010, August 10, 2010 and June 25,September 22, 2010, 1622,610 shares, 1,737 shares, 4192,654 shares, and 4591,929 shares, respectively, of our common stock were delivered to certain former employees pursuant to the terms of the Progress Energy 2002 and 2007 Equity Incentive Plans (individually and collectively, the “EIP”) which have been approved by Progress Energy’s shareholders.  Additionally, on May 26, 2010 and June 22, 2010, 106 shares, and 931 shares, respectively, of our common stock were delivered to certain current employees pursuant to the terms of the EIP. The shares of common stock delivered pursuant to the EIP were newly issued shares of Progress Energy.
 
(b)  
UnderwritersUnderwriters and Other Purchasers. No underwriters were used in connection with the delivery of our common stock described above.
 
(c)  
Consideration. The restricted stock unit awards were granted to provide an incentive to the former and current employees to exert their utmost efforts on Progress Energy’s behalf and thus enhance our performance while aligning the employees’ interest with those of our shareholders.
 
(d)  
Exemption from Registration Claimed. The common shares described in this Item were delivered pursuant to a broad-based involuntary, non-contributory employee benefit plan, and thus did not involve an offer to sell or sale of securities within the meaning of Section 2(3) of the Securities Act of 1933. Receipt of the shares of our common stock required no investment decision on the part of the recipient.
 
PERFORMANCE SHARE SUB-PLAN AWARD PAYOUTS
 
(a)  
Securities Delivered. On April 23,July 29, 2010, 742819 shares of our common stock were delivered to certain current and former employees pursuant to the terms of the EIP. On April 27, 2010 and May 7, 2010, 518 and 598 shares, respectively, of our common stock were delivered to a former employee pursuant to the terms of the EIP. The shares of common stock delivered pursuant to the EIP were newly issued shares of Progress Energy.
 
(b)  
Underwriters and Other Purchasers. No underwriters were used in connection with the delivery of our common stock described above.
 
(c)  
Consideration. The performance share awards were granted to provide an incentive to the current and former employeesemployee to exert theirhis utmost efforts on our behalf and thus enhance our performance while aligning the employees’ interests with those of our shareholders.
 
116


(d)  
Exemption from Registration Claimed. The common shares described in this Item were delivered pursuant to a broad-based involuntary, non-contributory employee benefit plan, and thus did not involve an offer to sell or sale of securities within the meaning of Section 2(3) of the Securities Act of 1933. Receipt of the shares of our common stock required no investment decision on the part of the recipient.
 

121


ISSUER PURCHASES OF EQUITY SECURITIES FOR SECONDTHIRD QUARTER OF 2010
 
             
Period 
(a)
Total
Number of
Shares
(or Units)
Purchased
(1)(2)(3)(4)
  
(b)
Average
Price
Paid
Per
Share
(or Unit)
  
(c)
Total Number of
Shares (or Units)
Purchased as Part
of Publicly
Announced Plans
or Programs
(1)
  
(d)
Maximum Number (or
Approximate Dollar Value)
of Shares (or Units)
that May Yet Be
Purchased Under the
Plans or Programs
(1)
 
April 1 – April 30  148,104  $39.1980   N/A   N/A 
May 1 – May 31  525,140   38.3875   N/A   N/A 
June 1 – June 30  308,825   39.3503   N/A   N/A 
Total  982,069   38.8125   N/A   N/A 
             
Period 
(a)
Total
Number of
Shares
(or Units)
Purchased
(1)(2)(3)(4)
  
(b)
Average
Price
Paid
Per
Share
(or Unit)
  
(c)
Total Number of
Shares (or Units)
Purchased as Part
of Publicly
Announced Plans
or Programs
(1)
  
(d)
Maximum Number (or
Approximate Dollar Value)
of Shares (or Units)
that May Yet Be
Purchased Under the
Plans or Programs
(1)
 
July 1 – July 31  271,271  $40.8733   N/A   N/A 
August 1 – August 31  172,503   42.3526   N/A   N/A 
September 1 – September 30  166,212   43.9597   N/A   N/A 
Total  609,986  42.1326   N/A   N/A 

(1)At JuneSeptember 30, 2010, Progress Energy does not have any publicly announced plans or programs to purchase shares of its common stock.
(2)The plan administrator purchased 653,479475,300 shares of our common stock in open-market transactions to meet share delivery obligations under the Progress Energy 401(k). Savings & Stock Ownership Plan.
(3)The plan administrator purchased 312,051132,243 shares of our common stock in open-market transactions to meet share delivery obligations under the Savings Plan for Employees of Florida Progress Corporation.
(4)Progress Energy withheld 15,2252,443 shares of our common stock during the secondthird quarter of 2010 to pay taxes due upon the payout of certain Restricted Stock awards, Restricted Stock Unit awards and Performance Share Sub-Plan awards pursuant to the terms of the Company’s 2002 and 2007 Equity Incentive Plans. Progress Energy withheld 9,171 shares of our common stock at an average price per share of $38.9835 during the first quarter of 2010 to pay taxes due upon the vesting of certain Restricted Stock awards, which are not reflected in the table above.

ITEM 5.                 OTHER INFORMATION
As allowed under the SEC’s implementation guidelines contained in the Interactive Data to Improve Financial Reporting Final Rule, we will furnish Exhibit 101 to our Quarterly Report on Form 10-Q for the quarterly period ended June 30, 2010 in Amendment No. 1 to our Quarterly Report on Form 10-Q for the quarterly period ended June 30, 2010, within the initial 30-day grace period following our filing date. No other changes or additions to the financial statements or disclosure provided in this Form 10-Q are expected in connection with the Amendment No. 1 to our Quarterly Report on Form 10-Q for the quarterly period ended June 30, 2010.

 
117122

 

ITEM 6.                 EXHIBITS
ITEM 6.EXHIBITS
 
(a)  Exhibits

Exhibit NumberDescription
Progress
Energy
PECPEF
     
10(a)*3b(1)Amended and Restated Management Incentive Compensation PlanBy-Laws of Progress Energy, Inc., effectiveFlorida Power Corporation, as ofamended on September 1,20, 2010 (filed as Exhibit 3.1 to the Current Report on Form 8-K, dated September 20, 2010, File No. 1-3274).XXX
     
10(b)*10b(1)Amended and Restated Management Deferred Compensation Plan of Progress Energy, Inc., effectiveCarolina Power & Light Company 3-Year $750,000,000 Credit Agreement, dated as of September 1,October 15, 2010 (filed as Exhibit 10.1 to the Current Report on Form 8-K, dated October 15, 2010, File No. 1-15929, 1-3382 and 1-3274).XX
*10b(2)Florida Power Corporation 3-Year $750,000,000 Credit Agreement, dated as of October 15, 2010 (filed as Exhibit 10.2 to the Current Report on Form 8-K, dated October 15, 2010, File No. 1-15929, 1-3382 and 1-3274).X
     
31(a)302 Certifications of Chief Executive OfficerX  
     
31(b)302 Certifications of Chief Financial OfficerX  
     
31(c)302 Certifications of Chief Executive Officer X 
     
31(d)302 Certifications of Chief Financial Officer X 
     
31(e)302 Certifications of Chief Executive Officer  X
     
31(f)302 Certifications of Chief Financial Officer  X
     
32(a)906 Certifications of Chief Executive OfficerX  
     
32(b)906 Certifications of Chief Financial OfficerX  
     
32(c)906 Certifications of Chief Executive Officer X 
     
32(d)906 Certifications of Chief Financial Officer X 
     
32(e)906 Certifications of Chief Executive Officer  X
     
32(f)906 Certifications of Chief Financial Officer  X
101.INSXBRL Instance Document**X
101.SCHXBRL Taxonomy Extension Schema DocumentX
101.CALXBRL Taxonomy Calculation Linkbase DocumentX

 
118123

 

101.LABXBRL Taxonomy Label Linkbase DocumentX
101.PREXBRL Taxonomy Presentation Linkbase DocumentX
* Incorporated herein by reference as indicated.
** Attached as Exhibit 101 are the following financial statements and notes thereto for Progress Energy from the Quarterly Report on Form 10-Q for the quarter ended September 30, 2010, formatted in Extensible Business Reporting Language (XBRL): (i) the Unaudited Condensed Consolidated Statements of Income, (ii) the Unaudited Condensed Consolidated Balance Sheets, (iii) the Unaudited Condensed Consolidated Statement of Cash Flows, and (iv) the Notes to Unaudited Condensed Interim Financial Statements.
In accordance with Rule 406T of Regulation S-T, the XBRL-related information in Exhibit 101 to this Quarterly Report on Form 10-Q is deemed not filed or part of a registration statement or prospectus for purposes of Section 11 or 12 of the Securities Act, is deemed not filed for purposes of Section 18 of the Exchange Act and otherwise is not subject to liability under these sections.

124

SIGNATURES
 
Pursuant to requirements of the Securities Exchange Act of 1934, the registrants have duly caused this report to be signed on their behalf by the undersigned thereunto duly authorized.
 
 PROGRESS ENERGY, INC.
 CAROLINA POWER & LIGHT COMPANY d/b/a PROGRESS ENERGY CAROLINAS, INC.
 FLORIDA POWER CORPORATION d/b/a PROGRESS ENERGY FLORIDA, INC.
Date: August 6,November 8, 2010(Registrants)
  
 By: /s/ Mark F. Mulhern
 Mark F. Mulhern
 Senior Vice President and Chief Financial Officer
  
 By: /s/ Jeffrey M. Stone
 Jeffrey M. Stone
 Chief Accounting Officer and Controller
 Progress Energy, Inc.
 Chief Accounting Officer
 Carolina Power & Light Company d/b/a Progress Energy Carolinas, Inc.
 Florida Power Corporation d/b/a Progress Energy Florida, Inc.



 
119125