UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
WASHINGTON, D.C. 20549

 

FORM 20-F

 

(Mark One)

REGISTRATION STATEMENT PURSUANT TO SECTION 12(B) OR 12(G)
OF THE SECURITIES EXCHANGE ACT OF 1934

 

OR

 

ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(D)
OF THE SECURITIES EXCHANGE ACT OF 1934

 

For the fiscal year endedDecember 31, 20192020

 

OR

 

TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(D) OF THE SECURITIES EXCHANGE ACT OF 1934

 

For the transition period from ____________ to __________

OR

 

SHELL COMPANY REPORT PURSUANT TO SECTION 13 OR 15(D) OF THE SECURITIES EXCHANGE ACT OF 1934

 

Date of event requiring this shell company report

Commission File Number: 001-39171

 

BROOGE ENERGY LIMITED
(Exact name of Registrant as specified in its charter)

 

Not applicable Cayman Islands
(Translation of Registrant’s name into English) (Jurisdiction of incorporation or organization)

 

c/o Brooge Petroleum and Gas Investment Company FZE


P.O. Box 50170


Fujairah, United Arab Emirates


+971 9 201 6666


(Address of Principal Executive Offices)

 

Nicolaas L. Paardenkooper


P.O. Box 50170


Fujairah, United Arab Emirates


+971 9 201 6666


nico.paardenkooper@bpgic.com


(Name, Telephone, Email and/or Facsimile number and Address of Company Contact Person)

 

Securities registered or to be registered pursuant to Section 12(b) of the Act:

 

Title of each class Trading Symbol(s) Name of each exchange on which registered
Ordinary shares, $0.0001 par value per share BROG The Nasdaq Stock Market LLC
Warrants to purchase ordinary shares BROGW The Nasdaq Stock Market LLC

 

Securities registered or to be registered pursuant to Section 12(g) of the Act: None

 

Securities for which there is a reporting obligation pursuant to Section 15(d) of the Act: None

 

 

Indicate the number of outstanding shares of each of the issuer’s classes of capital or common stock as of the close of the period covered by the annual report: 109,587,754 ordinary shares

 

Indicate by check mark if the registrant is a well-known seasoned issuer, as defined in Rule 405 of the Securities Act. Yes No

 

If this report is an annual or transition report, indicate by check mark if the registrant is not required to file reports pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934. Yes No

Note – Checking the box above will not relieve any registrant required to file reports pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934 from their obligations under those Sections.

 

Indicate by check mark whether the registrant: (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days. Yes No

 

Indicate by check mark whether the registrant has submitted electronically and posted on its corporate Web site, if any, every Interactive Data File required to be submitted and posted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit and post such files). Yes No

 

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, or an emerging growth company. See definition of “accelerated filer, large” “large accelerated filer, and emerging“emerging growth company” in Rule 12b-2 of the Exchange Act.

 

Large accelerated filer    Accelerated filer    Non-accelerated filer    Emerging growth company

 

If an emerging growth company that prepares its financial statements in accordance with U.S. GAAP, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards†standards provided pursuant to Section 13(a) of the Exchange Act.

Indicate by check mark whether the registrant has filed a report on and attestation to its management’s assessment of the effectiveness of its internal control over financial reporting under Section 404(b) of the Sarbanes-Oxley Act (15 U.S.C. 7262(b)) by the registered public accounting firm that prepared or issued its audit report.

 

Indicate by check mark which basis of accounting the registrant has used to prepare the financial statements included in this filing:

 

USU.S. GAAP  International Financial Reporting Standards as issued by the International Accounting Standards Board  Other

 

If “Other” has been checked in response to the previous question indicate by check mark which financial statement item the registrant has elected to follow. Item 17 Item 18

 

If this is an annual report, indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act). Yes No

 

 

 

 

BROOGE ENERGY LIMITED

TABLE OF CONTENTS

 

  Page
Reliance on Conditional Exemption from Filing DeadlineIntroductionii
Cautionary Note Regarding Forward-Looking Statementsiii
Explanatory NoteIndustry and Market Dataiv
Implications of being an Emerging Growth Companyv
Frequently Used Termsv
  
PART I  
   
Item 1.Identity of Directors, Senior Management and AdvisorsAdvisers1
Item 2.Offer Statistics and Expected Timetable1
Item 3.Key Information1
Item 4.Information on the Company2926
Item 4A.Unresolved Staff Comments5849
Item 5.Operating and Financial Review and Prospects5849
Item 6.Directors, Senior Management and Employees10276
Item 7.Major Shareholders and Related Party Transactions10982
Item 8.Financial Information11687
Item 9.The Offer and Listing11887
Item 10.Additional Information11987
Item 11.Quantitative and Qualitative Disclosures About Market Risk145107
Item 12.Description of Securities Other than Equity Securities147109
   
PART II  
   
Item 13Defaults, Dividend Arrearages and Delinquencies148110
Item 14Material Modifications to the Rights of Security Holders and Use of Proceeds150111
Item 15Controls and Procedures150111
Item 16AAudit committee financial expert151113
Item 16BCode of Ethics151113
Item 16CPrincipal Accountant Fees and Services151113
Item 16DExemptions from the Listing Standards for Audit Committees152114
Item 16EPurchases of Equity Securities by the Issuer and Affiliated Purchasers152114
Item 16FChange in Registrant’s Certifying Accountant152114
Item 16GCorporate Governance152114
Item 16HMine Safety Disclosure153114
   
PART III  
   
Item 17.Financial Statements154115
Item 18.Financial Statements154115
Item 19.Exhibits154115

 

-i-

-i-

 

RELIANCE ON CONDITIONAL EXEMPTION FROM FILING DEADLINEINTRODUCTION

 

Brooge Energy Limited (the “Company”) was incorporated under the laws of the Cayman Islands as an exempted company on April 12, 2019, under the name Brooge Holdings Limited. On April 7, 2020, the Company changed its name to Brooge Energy Limited. The Company was incorporated for the purpose of effectuating the Business Combination (as defined below) and to hold Brooge Petroleum and Gas Investment Company FZE, a company formed under the laws of the Fujairah Free Zone, United Arab Emirates (“BPGIC”). Prior to the Business Combination, the Company owned no material assets and did not operate any business.

On December 20, 2019, pursuant to a business combination agreement (the “Business Combination Agreement”) among the Company, Twelve Seas Investment Company (now known as BPGIC International), a Cayman Islands exempted company (“Twelve Seas”), Brooge Merger Sub Limited, the Company’s wholly-owned subsidiary (“Merger Sub”), BPGIC, BPGIC Holdings Limited, a Cayman Islands exempted company (“BPGIC Holdings”), among other things:

(i)Twelve Seas merged with and into Merger Sub, with Twelve Seas continuing as the surviving entity and a wholly-owned subsidiary of the Company (under the name BPGIC International (“BPGIC International”)), with the holders of Twelve Seas’ securities receiving substantially equivalent securities of the Company; and

(ii)the Company acquired all of the issued and outstanding ordinary shares of BPGIC from BPGIC Holdings in exchange for 98,718,035 Ordinary Shares of the Company and cash in the amount of $13,225,827.22, with BPGIC becoming a wholly-owned subsidiary of the Company.

The foregoing transaction is filingreferred to in this Annual Report on Form 20-F (the(thisAnnual Report”) foras the fiscal year ended December 31, 2019, afterBusiness Combination”.

Upon consummation of the April 30, 2020 deadline applicableBusiness Combination, the Company’s Ordinary Shares and warrants to purchase Ordinary Shares became listed on the Nasdaq Capital Market.

Unless otherwise indicated, the “Company,” the “Group,” “we,” “us,” “our,” and similar terminology refers to Brooge Energy Limited together with its subsidiaries subsequent to the Company for the filing of its Annual Report in reliance on the Order of the Securities and Exchange Commission (the “SEC”), issued on March 25, 2020, pursuant to Section 36 of the Securities Exchange Act of 1934 (the “Exchange Act”), granting conditional exemptions from specified provisions of the Exchange Act and certain rules thereunder (Release No. 34-88465) (the “Order”), which permit a delay in filing of up to forty-five days due to circumstances related to the COVID-19 outbreak.Business Combination.

 

As previously disclosed on Form 6-K furnished by the Company on April 29, 2020, although the COVID-19 global pandemic caused little interruption to the operation of the Company’s oil storage facilities due to its highly automated and high-tech designs, it disrupted the operations of its management and corporate staff. In addition to voluntary measures the Company has taken to protect its staff, government authorities have at various recent times implemented lockdown or other measures restricting the movement of people, including staff, vendors and professionals. This has impacted the Company’s ability to efficiently perform work related to the financial statements and related materials necessary for the audit and, as a result, has delayed the completion of the audited consolidated financial statements and other information required to be included in the Annual Report.

On June 15, 2020, the Company filed a “Notification of Late Filing” on Form 12b-25 pursuant to Rule 12b-25 of the Exchange Act to further delay by 15 days the filing of the Company’s Annual Report for the year ended December 31, 2019. As previously disclosed on a Form 12b-25, the Annual Report for the year ended December 31, 2019 could not be filed without unreasonable effort and expense. The Company required additional time to compile, review and prepare certain information in its financial statements following delays resulting from the COVID-19 pandemic. As required by Form 12b-25, the Company has filed this Annual Report on Form 20-F on or prior to June 30, 2020.

-ii-

-ii-

 

CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS

 

This Annual Report on Form 20-F (including information incorporated by reference herein, this “Report”)herein) contains or may contain forward-looking statements as defined in Section 27A of the Securities Act, and Section 21E of the Exchange Act that involve significant risks and uncertainties. All statements other than statements of historical facts are forward-looking statements. These forward-looking statements include information about our possible or assumed future results of operations or our performance. Words such as “expects,” “intends,” “plans,” “believes,” “anticipates,” “estimates,” and variations of such words and similar expressions are intended to identify some, but not all, the forward-looking statements. The risk factors and cautionary language referred to or incorporated by reference in this Report provide examples of risks, uncertainties and events that may cause actual results to differ materially from the expectations described in or implied by our forward-looking statements, including among other things, the items identified in theItem 3.D Risk Factors section of this Report.”.

 

Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date of this Report. Although we believe that the expectations reflected in such forward-looking statements are reasonable, there can be no assurance that such expectations will prove to be correct. These statements involve known and unknown risks and are based upon a number of assumptions and estimates which are inherently subject to significant uncertainties and contingencies, many of which are beyond our control. Actual results may differ materially from those expressed or implied by such forward-looking statements. We undertake no obligation to publicly update or revise any forward-looking statements contained in this Report, or the documents to which we refer readers in this Report, to reflect any change in our expectations with respect to such statements or any change in events, conditions or circumstances upon which any statement is based.

 

-iii-

-iii-

 

INDUSTRY AND MARKET DATA

In this Report, the Company relies on and refers to industry data, information and statistics regarding the markets in which it competes from research as well as from publicly available information, industry and general publications and research and studies conducted by third parties. The Company has supplemented this information where necessary with its own internal estimates and information obtained from discussions with its customers, taking into account publicly available information about other industry participants and Company management’s best view as to information that is not publicly available. The Company has taken such care as it considers reasonable in the extraction and reproduction of information from such data from third-party sources.

Industry publications, research, studies and forecasts generally state that the information they contain has been obtained from sources believed to be reliable, but that the accuracy and completeness of such information is not guaranteed. Forecasts and other forward-looking information obtained from these sources are subject to the same qualifications and uncertainties as the other forward-looking statements in this Report. These forecasts and forward-looking information are subject to uncertainty and risk due to a variety of factors, including those described under “Item 3.D Risk Factors”. These and other factors could cause results to differ materially from those expressed in the forecasts or estimates from independent third parties and us.

-iv-

IMPLICATIONS OF BEING AN EMERGING GROWTH COMPANY

We are an “emerging growth company” as defined in the JOBS Act. An “emerging growth company” may take advantage of reduced reporting requirements that are otherwise applicable to public companies. In particular, as an emerging growth company, we:

are not required to provide a detailed narrative disclosure discussing our compensation principles, objectives and elements and analyzing how those elements fit with our principles and objectives, which is commonly referred to as “compensation discussion and analysis”;

are not required to obtain an attestation and report from our auditors on our internal control over financial reporting pursuant to the Sarbanes-Oxley Act of 2002 (“Sarbanes-Oxley Act”);

are not required to obtain a non-binding advisory vote from our shareholders on executive compensation or golden parachute arrangements (commonly referred to as the “say-on-pay,” “say-on frequency” and “say-on-golden-parachute” votes); and

are exempt from certain executive compensation disclosure provisions requiring a pay-for-performance graph and chief executive officer pay ratio disclosure.

We have taken, and intend to continue to take, advantage of all of these reduced reporting requirements and exemptions. Accordingly, the information we provide to you may be different than you might get from other public companies in which you hold securities.

Under the JOBS Act, we may take advantage of the above-described reduced reporting requirements and other exemptions available to emerging growth companies until we no longer meet the definition of an emerging growth company. The JOBS Act provides that we would cease to be an “emerging growth company” at the end of the fiscal year in which the fifth anniversary of our initial sale of common equity pursuant to a registration statement declared effective under the Securities Act occurred, if we have more than $1.07 billion in annual revenue, have more than $700 million in market value of our Ordinary Shares held by non-affiliates, or issue more than $1 billion in principal amount of non-convertible debt over a three-year period.

 

EXPLANATORY NOTESFREQUENTLY USED TERMS

 

On April 15, 2019, (i) Twelve Seas“$,” “USD,” “US$” and “US dollar” each refer to the United States dollar.

“A&T” means A&T Offshore FZC.

“AED,” refers to the Arab Emirate Dirham, the official currency of the United Arab Emirates.

“Amended and Restated Memorandum and Articles of Association” means the amended and restated memorandum and articles of association of Brooge Energy Limited.

“ASMA Capital” means ASMA Capital Partners B.S.C.(c).

“Audex” means Audex Fujairah LL FZC.

“b/d” means barrels per day.

“BIA” means Al Brooge International Advisory LLC.

“BIA Refinery” means a refinery with a capacity of 25,000 b/d to be installed by BIA at the BPGIC Terminal.

“Bond Financing Facility” means five-year senior secured bonds issued by BPGIC pursuant to Bond Terms dated September 22, 2020 and amended October 23, 2020, by and between BPGIC and the Bond Trustee, with maximum issue size of $250 million and initial issuance of $200 million.

“Bond Trustee” means Nordic Trustee AS, as bond trustee under the Bond Financing Facility.

“BPGIC” means Brooge Petroleum and Gas Investment Company (now known as FZE.

BPGIC International), a Cayman Islands exempted company (“Twelve Seas”), (ii) Brooge Energy Limited (f/k/a Brooge Holdings Limited), a Cayman Islands exempted company (the “Company”), (iii) Brooge Merger Sub Limited, a Cayman Islands exempted company, and a wholly-owned subsidiary of the Company (“Merger Sub”), and (iv)III” means Brooge Petroleum Andand Gas Investment Company Phase III FZE, a company formed under the laws of the Fujairah Free Zone, United Arab Emirates (“BPGIC”), entered into that certain Business Combination Agreement, pursuant to which Emirates.

BPGIC Holdings Limited (“Management” means Brooge Petroleum and Gas Management Company Ltd.

BPGIC Holdings”), a Cayman Islands exempted company also become a party thereafter pursuant to the Assignment and Joinder to Business Combination Agreement dated as of November 19, 2019 (as assignee ofPLC” means Brooge Petroleum and Gas Investment Company (BPGIC) PLC, a company formed under the laws of England and Wales, which became a partyWales.

“BPGIC Terminal” means the terminal that the Company is developing on two plots of land located in close proximity to the Port of Fujairah’s berth connection points.

-v-

Business Combination Agreement pursuant to a Joinder to Business Combination Agreement dated as of May 10, 2019) (as amended prior to the date of Closing, including by the foregoing joinders and by the First Amendment to Business Combination Agreement, dated as of September 16, 2019, the “Business Combination Agreement”), pursuant to which, subject to the terms and conditions thereof, upon the consummation ofCombination” means the transactions contemplated thereby on December 20, 2019 (the “Closing”), among other matters,whereby (a) Twelve Seas merged with and into Merger Sub, with Twelve Seas continuing as the surviving entity with the name BPGIC International, (“BPGIC International”), and as a wholly-owned subsidiary of the Company and with holders of the Twelve Seas’ securities receiving substantially equivalent securities of the Company, and (b) the Company acquired all of the issued and outstanding ordinary shares of BPGIC from BPGIC Holdings in exchange for Ordinary Shares of the Company, subject to the withholding of the escrow shares being deposited in the escrow account in accordance with the terms and conditions of the Business Combination Agreement and the escrow agreement, and with BPGIC becoming a wholly-owned subsidiary of the Company, (suchand other transactions contemplated by the Business Combination Agreement, collectively, the “Business Combination”).Agreement.

 

Upon consummation“Business Combination Agreement” means the Business Combination Agreement, dated as of April 15, 2019, as amended, by and among the Company, BPGIC, Twelve Seas, Merger Sub, and BPGIC Holdings pursuant to which the Business Combination was consummated.

“Closing” means the closing of the Business Combination pursuant to the terms of the Business Combination Agreement, the Company’s Ordinary Shares and warrants to purchase Ordinary Shares became listed on The Nasdaq Stock Market.December 20, 2019.

 

Unless otherwise indicated, “we,” “us,” “our,” “the Company,” “the Group”“Commercial Storage Agreements” means, collectively, (i) the Synergy Storage Agreement, (ii) the Commercial Storage Agreement between BPGIC and similar terminology refers to Brooge Energy Limited, a company organized underJayKay dated November 10, 2020, (iii) the lawsCommercial Storage Agreement between BPGIC and A&T dated November 19, 2020, (iv) the Commercial Storage Agreement between BPGIC and A&T dated November 26, 2020, (v) the Commercial Storage Agreement between BPGIC and JayKay dated December 6, 2020, (vi) the NuFuel Storage Agreement, (vii) the SAA Storage Agreement, (viii) the Commercial Storage Agreement between BPGIC and A&T dated March 4, 2020, and (ix) the Valor Storage Agreement.

“Companies Law” means the Companies Law (2020 Revision) of the Cayman Islands, and its subsidiaries subsequent to the Business Combination.

-iv-

IMPLICATIONS OF BEING AN EMERGING GROWTH COMPANYIslands.

 

As a“Construction Funding Account” means the account with Offshore Account Bank with $85 million on deposit from the Bond Financing Facility to be set aside for payment of Phase II construction, with $45 million to be paid at the time of disbursement and $5 million payable monthly for eight months.

“Continental” means Continental Stock Transfer & Trust Company.

“Debt Service Retention Account” means the account with Offshore Account Bank into which one-sixth of the amortization and interest payment payable on the next interest payment date of Bond Financing Facility shall be transferred monthly.

“Early Bird Capital” means EarlyBirdCapital, Inc.

“EIBOR” means the Emirates Interbank Offered Rate.

“EPC” means engineering, procurement and construction.

“Exchange Act” means the Securities Exchange Act of 1934, as amended.

“FAB” means First Abu Dhabi Bank PJSC.

“Financing Facilities” means, collectively, the Phase I Financing Facilities and the Phase II Financing Facility.

“FOIZ” means the Fujairah Oil Industry Zone.

“Fujairah Municipality” means the local government organization in Fujairah, UAE specializing in municipal urban and rural municipal affairs.

“IFRS” refers to International Financial Reporting Standards as issued by the International Accounting Standards Board (IASB).

“Initial Phase I End User” means the international energy trading company with less than $1.07 billion in revenue during our last fiscal year, we qualify as an “emerging growth company” as defined inthat entered into the Phase I End User Agreement.

“Jaykay” means Jaykay Trading Company FZE.

“JOBS Act” means the Jumpstart Our Business Startups Act of 2012 (the 2012.

JOBS Act”). An emerging growth company may avail itselfJune 15 Phase I Construction Facilities Amendment” means the agreement entered into by BPGIC and FAB on June 15, 2020, to amend the Phase I Construction Facilities.

“Land Leases” means, collectively, the Phase I & II Land Lease and the Phase III Land Lease.

-vi-

“Liquidity Account” means the bank account established by BPGIC as part of certain exemptions from various reporting requirements that are applicableBond Financing Facility with the Offshore Account Bank to other public companies that are not emerging growth companies. For example, we have electedmaintain $8,500,000, which amount is equal to relythe interest payment due on an exemption from the auditor attestation requirementsfirst interest payment date.

“MENA” means Middle East and North Africa.

“Merger Sub” means Brooge Merger Sub Limited, a Cayman Islands exempted company.

“MUC” means MUC Oil & Gas Engineering Consultancy, LLC.

“NASDAQ” means the NASDAQ Stock Market LLC.

“NuFuel” means NuFuel Trading FZE.

“NuFuel Storage Agreement” means the commercial storage agreement between BPGIC and NuFuel dated January 13, 2021.

“Offshore Account Bank” means HSBC Bank Plc.

“Ordinary Resolution” means a resolution passed by the affirmative vote of Section 404a simple majority of the Sarbanes Oxleyshareholders of the Company as, being entitled to do so, vote in person or, where proxies are allowed, by proxy at a meeting.

“Ordinary Shares” means the ordinary shares, par value $0.0001 per share, of Brooge Energy Limited, unless otherwise specified.

“Phase I” means the first phase of the BPGIC Terminal consisting of 14 oil storage tanks with an aggregate geometric oil storage capacity of approximately 0.399 million m3 and related infrastructure located on the Phase I & II Land.

“Phase I & II Land” means the plot of land of approximately 153,917 m2 in the Port of Fujairah where BPGIC has located its Phase I facility and is locating its Phase II facility.

“Phase I & II Land Lease” means the land lease dated as of March 10, 2013, by and between Fujairah Municipality and BPGIC, as amended by the novation agreement, dated September 1, 2014, by and among Fujairah Municipality, BPGIC and FOIZ pursuant to which BPGIC leases the Phase I & II Land.

“Phase I Admin Building Facility” means the secured Shari’a compliant financing arrangement of $11.1 million entered into by BPGIC with FAB to fund a portion of the construction costs of Phase I.

“Phase I Construction Facilities” means, collectively, the Phase I Admin Building Facility and the Phase I Construction Facility.

“Phase I Construction Facility” means the secured Shari’a compliant financing arrangement of $84.6 million entered into by BPGIC with FAB to fund a portion of the construction costs of Phase I.

“Phase I Customer Agreement” means the four-year lease and offtake agreement for the Phase I facility with BIA.

“Phase I End User Agreement” means the five-year lease and service agreement, dated December 12, 2017, originally by and between BPGIC and the Initial Phase I End User.

“Phase I Financing Facilities” means, collectively, the Phase I Admin Building Facility, the Phase I Construction Facility and the Phase I Short Term Financing Facility.

“Phase I Internal Manifold” means the internal manifold that connects the 14 oil storage tanks of Phase I.

-vii-

“Phase I Short Term Financing Facility” means the Shari’a compliant financing arrangement of $3.5 million entered into by BPGIC with FAB to settle certain amounts due under the Phase I Construction Facilities.

“Phase II” means the second phase of the BPGIC Terminal which is expected to consist of eight oil storage tanks with an aggregate geometric oil storage capacity of approximately 0.601 million m3 and related infrastructure located on the Phase I & II Land.

“Phase II Customer Agreement” means the five-year lease and offtake agreement for the Phase II facility with BIA.

“Phase II End User” means the international commodities trading company which is expected to occupy the Phase II facility upon its completion as a sublessee of BIA.

“Phase II End User Agreement” means the five-year lease and service agreement, originally by and between BPGIC and the Phase II End User, and as novated, by and between BIA and the Phase II End User to lease all eight oil storage tanks in Phase II.

“Phase II Financing Facility” means the secured Shari’a compliant financing arrangement of $95.3 million entered into by BPGIC with FAB to fund a portion of the capital expenditures in respect of Phase II.

“Phase II Internal Manifold” means the internal manifold that will connect the eight oil storage tanks of Phase II.

“Phase III” means the third phase of the Company’s development in the Port of Fujairah to the located on the Phase III Land.

“Phase III Land” means the plot of land of approximately 450,000 m2 in the Port of Fujairah near the Phase I & II Land where the Company expects to locate its Phase III facilities.

“Phase III Land Lease” means the land lease agreement, dated as of February 2, 2020, by and between BPGIC and FOIZ, which was novated by BPGIC to BPGIC III on October 1, 2020, whereby BPGIC III leases the Phase III Land.

“Port of Fujairah” or “Port” means the port of Fujairah.

“Refinery Agreement” means the agreement by and between BPGIC and BIA which provides that the parties will use their best efforts to finalize the technical and design feasibility studies for the BIA Refinery, a refinery with a capacity of 25,000 b/d to be located at the BPGIC Terminal.

“Refinery Operations Agreement” means a sublease agreement and joint venture agreement to be entered by and between BPGIC and BIA to govern the terms on which (i) BPGIC will sublease land to BIA to locate, (ii) BIA will construct, and (iii) BPGIC will operate the BIA Refinery.

“SAA” means S A A Trading Refined Oil Products Abroad.

“SAA Storage Agreement” means the Commercial Storage Agreement between BPGIC and SAA dated February 14, 2021.

“Sahara” means Sahara Energy Resources DMCC, a company incorporated under the laws of the United Arab Emirates.

“SEC” means the U.S. Securities and Exchange Commission.

“Securities Act” means the Securities Act of 2002 (the “Sarbanes Oxley Act”) relating to internal control over financial reporting, and we will not provide such an attestation from our auditors.1933, as amended.

 

We will remain an emerging growth company until“Senior Management” and “Senior Managers” refer to those persons named as officers in “Item 6.A Directors, Senior Management and Employees — Directors and Executive Officers”.

“Special Resolution” means a resolution passed by the earliestaffirmative vote of a majority of at least two-thirds of the following:

the end of the first fiscal year in which the market value of our Ordinary Shares that are held by non- affiliates is at least $700 million as of the end of the second quarter of such fiscal year;

the end of the first fiscal year in which we have total annual gross revenues of at least $1.07 billion;

the date on which we have issued more than $1 billion in non-convertible debt securities in any rolling three year period; or

December 31, 2024.

Once we cease to be an emerging growth company, we will not beshareholders of the Company as, being entitled to do so, vote in person or, where proxies are allowed, by proxy at a meeting, of which notice specifying the exemptions provided for byintention to propose the JOBS Act emptions provided for by the JOBS Act.resolution as a “special resolution” has been duly given.

 

-v-

-viii-

 

“Storage Customers” means, collectively, A&T, Synergy, Jaykay, SAA, NuFuel and Valor.

“Strait of Hormuz” means the strait of Hormuz.

“Super Major” means Totsa Total Oil Trading SA.

“Super Major Agreement” means the six month agreement, by and between BPGIC and the Super Major to lease 129,000 m3 of storage capacity of the Phase I facility, which was terminated in November 2020.

“Synergy” means Synergy Petrochem L.L.C.

“Synergy Storage Agreement” means the commercial storage agreement between BPGIC and Synergy dated November 11, 2020.

“Twelve Seas” means Twelve Seas Investment Company (now known as BPGIC International), a Cayman Islands exempted company.

“Twelve Seas Sponsor” means Twelve Seas Sponsors I LLC, a Delaware limited liability company.

“US,” “U.S.” or “United States” means the United States of America.

“U.S. GAAP” means United States generally accepted accounting principles.

“UAE” means the United Arab Emirates.

“Valor” means Valor International FZC.

“Valor Storage Agreement” means the Commercial Storage Agreement between BPGIC and Valor dated March 30, 2021.

“VLCC” means very large crude carrier.

“Warrants” means the warrants to purchase one Ordinary Share of the Company at an exercise price of $11.50 per Ordinary Share.

“Warrant Agreement” means the agreement signed on June 19, 2018 and the amended agreement signed on December 20, 2019.

-ix-

PART I

 

ITEM 1. IDENTITY OF DIRECTORS, SENIOR MANAGEMENT AND ADVISERS

 

Not Applicable.

 

ITEM 2. OFFER STATISTICS AND EXPECTED TIMETABLE

 

Not Applicable.

 

ITEM 3. KEY INFORMATION

 

A. Selected Financial Data

 

The Company was formed solely to effectuate the Business Combination and to hold BPGIC. Following and as a result of the Business Combination, all of the Company’s business is currently conducted through BPGIC.BPGIC and once phase III is ready through BPGIC and BPGIC III. The financial statements of the Company, BPGIC, BPGIC III, BPGIC Management and BPGIC International have been prepared in United States Dollars (“$dollars, and in accordance with IFRS, which differ in certain respects from the principles that would have been followed had such financial statements been prepared in accordance with U.S. GAAP. The selected financial data set forth below should be read in conjunction with our consolidated financial statements and related notes, as well as the information set forth under the heading “Item 5. Operating and Financial Review and Prospects). Our historical results are not necessarily indicative of the results that may be expected in the future.

 

Selected Financial Information

 

Consolidated Statements of Comprehensive Income for the years ended December 31, 2019, 2018 and 2017.

 2019  2018 2017  2020 2019 2018 2017 
 $  $  $  $ (Restated)$ $ $ 
                
Revenue  44,085,374   35,839,268   89,593   41,831,537   44,085,374   35,839,268   89,593 
            
Direct costs  (10,202,465)  (9,607,360)  (2,295,809)  (12,944,760)  (10,202,465)  (9,607,360)  (2,295,809)
            
GROSS PROFIT  33,882,909   26,231,908   (2,206,216)
            
GROSS PROFIT (LOSS)  28,886,777   33,882,909   26,231,908   (2,206,216)
Listing expenses  (101,773,877)  -   -   -   (101,773,877)  -   - 
General and administrative expenses  (2,608,984)  (2,029,260)  (574,266)  (6,456,884)  (2,608,984)  (2,029,260)  (574,266)
Finance costs  (5,730,535)  (6,951,923)  (966,926)  (8,306,150)  (5,730,535)  (6,951,923)  (966,926)
Change in estimated fair value of derivative warrant liabilities  2,547,542   1,273,740   -   - 
Changes in fair value of derivative financial instruments  (328,176)  (1,190,073)  -   (340,504)  (328,176)  (1,190,073)  - 
            
(LOSS) PROFIT AND TOTAL COMPREHENSIVE INCOME FOR THE YEAR  (76,558,663)  16,060,652   (3,747,408)
Other Income  828,332   -   -   - 
PROFIT (LOSS) AND TOTAL COMPREHENSIVE INCOME (LOSS) FOR THE YEAR  17,159,113   (75,284,923)  16,060,652   (3,747,408)
(Loss) / Earnings per share                            
-Basic and diluted  (0.95)  0.20   (0.04)  0.19   (0.94)  0.20   (0.05)
                            
Selected Non-IFRS Financial Data                            
            
Adjusted EBITDA*  37,059,670   29,918,711   (2,087,954)
            
Adjusted EBITDA Margin  84.06%  83.48%  - 
Adjusted EBITDA(1)  29,057,248   37,059,670   29,918,711   (2,087,954)
Adjusted EBITDA Margin(1)  69.46   84.06   83.48   - 

 

*(1)See “— Non-IFRS Financial Measures” for how we define and calculate Adjusted EBITDA is defined as profit (loss) before finance costs, income tax expense (currently not applicable inand Adjusted EBITDA Margin, a reconciliation of these non-IFRS measures to their most directly comparable IFRS measures, and a discussion of the UAE but included here for reference purposes), depreciation, listing expenses and net change in the valuelimitations of derivativethese non-IFRS financial instrumentsmeasures.

 


1

Consolidated statements of financial position as of December 31, 2019 and 2018

Balance Sheet Data

 

 2019  2018  2020 2019  2018 
 $  $     (Restated) $  $ 
            
ASSETS                 
        
Non-current assets  284,893,352   197,629,114   392,221,590   284,893,352   197,629,114 
        
Current assets  22,359,108   2,307,518   40,401,956   22,359,108   2,307,518 
        
TOTAL ASSETS  307,252,460   199,936,632   432,623,546   307,252,460   199,936,632 
        
Equity  125,125,875   60,977,933   128,618,677   109,416,415   60,977,933 
        
Non-current liabilities  102,799,150   28,115,068   260,218,070   102,799,150   28,115,068 
        
Current liabilities  79,327,435   110,843,631   43,786,799   95,036,895   110,843,631 
        
TOTAL EQUITY AND LIABILITIES  307,252,460   199,936,632   432,623,546   307,252,460   199,936,632 

 

B. Capitalization and Indebtedness

 

Not applicable.

 

C. Reasons for the Offer and Use of Proceeds

 

Not applicable.

 

D. Risk Factors

 

An investment in our Company involves a high degree of risk. Before deciding whether to invest in our Company, you should consider carefully the risks described below, together with all of the other information set forth in this Report, including the information set forth under the heading “Item 5. Operating and Financial Review and Prospects,” and our consolidated financial statements and related notes. If any of these risks actually occurs, our business, financial condition, results of operations or cash flow could be materially and adversely affected, which could cause the trading price of our securities to decline, resulting in a loss of all or part of your investment. The risks described below and elsewhere in this Report are not the only ones that we face. Additional risks not presently known to us or that we currently deem immaterial may also affect our business. You should only consider investing in our Company if you can bear the risk of loss of your entire investment.

Summary of Risk Factors

The following is a summary of the principal risks that could adversely affect our business, financial condition, results of operations and cash flow.

Risks Related to BPGIC

We have a limited operating history.

BPGIC is currently reliant on BIA and the Company’s storage customers for the majority of its revenues.

The Phase I users’ usage of our ancillary services has an impact on our profitability.

In the event that the Commercial Storage Agreements or the Phase I Customer Agreement expire or otherwise terminate, we may have difficulty locating replacements due to competition.

We may be subject to significant risks and expenses in connection with the construction of Phase II.

2

We will become reliant on BIA for all of our BIA Refinery revenues, all of our Phase II revenues, and a substantial majority of our total revenues.

The scarcity of available land in the Fujairah oil zone region could limit our ability to expand our facilities in Fujairah beyond Phase III.

Accidents involving the handling of oil products at the BPGIC Terminal could disrupt our business operations and/or subject us to environmental and other liabilities.

The BIA Refinery will face operating hazards, which could expose us to potentially significant liability costs.

When the BIA Refinery is completed, our financial results will be affected by volatile refining margins.

Our competitive position and prospects depend on the expertise and experience of our Senior Management.

In connection with the preparation of our financial statements, two material weaknesses in our internal control over financial reporting were identified.

We are subject to a wide variety of regulations.

Any material reduction in the quality or availability of the Port of Fujairah’s facilities could have a material adverse effect on us.

BPGIC is subject to restrictive covenants in the Bond Financing Facility.

The fixed cost nature of our operations could result in lower profit margins if certain costs were to increase and we are unable to offset such costs.

We are dependent on our IT and operational systems, which may fail or be subject to disruption.

Beyond Phase II, expansion of our business may require substantial capital investment.

Risks Related to the Company’s Structure and Capitalization

We may not pay cash dividends in the foreseeable future.

The escrow release provisions of the Escrow Agreement may affect management decisions and incentives.

We may issue additional Ordinary Shares or other equity securities without your approval, which would dilute your ownership interests and may depress the market price of our Ordinary Shares.

Fluctuation of the exercise price of our Warrants could result in material dilution of our then existing shareholders.

Because we are a Cayman Islands exempted company, you could have less protection of your shareholder rights than you would under U.S. law.

Provisions of our Amended and Restated Memorandum and Articles of Association may inhibit a takeover of the Company.

As a “foreign private issuer” and an “emerging growth company,” we are subject to certain reduced reporting requirements and other exemptions, which limits the information you might otherwise receive and could make our Ordinary Shares less attractive to investors.

Our controlling shareholder has substantial influence over us.

3

Risks Related to Doing Business in Countries in Which the Company Operates

We are subject to political and economic conditions in Fujairah, the UAE, and the region in which we operate.

Our business operations could be adversely affected by terrorist attacks, natural disasters or other catastrophic events beyond our control.

Climate change-related legislation or regulations could result in increased operating and capital costs and reduced demand for our storage services.

We may incur significant costs to maintain compliance with, or address liabilities under, environmental, health and safety regulation applicable to our business.

We could be adversely affected by violations of anti-corruption laws or economic sanctions programs.

Tax liabilities associated with indirect taxes on the oil products we service could result in losses.

Changes to VAT law in the UAE may have an adverse effect on us.

Our business may be adversely affected if the US dollar/UAE dirham-tied exchange rate were to be removed or adjusted.

Our business may be materially adversely affected by unlawful or arbitrary governmental action.

Legal and regulatory systems may create an uncertain environment for investment and business activities.

The grant and future exercise of registration rights, or sales of a substantial number of our securities in the public market, could adversely affect the market price of our Ordinary Shares.

NASDAQ may delist our securities.

General Risk Factors

Fluctuations in our operating results, quarter-to-quarter earnings and other factors, may result in significant decreases in the price of our securities.

The market for our securities may not be sustained, which would adversely affect the liquidity and price of our securities.

The price of our Ordinary Shares may be volatile.

Reports published by analysts could adversely affect the price and trading volume of our Ordinary Shares.

Risks Related to BPGIC

The Company has a limited operating history, which makes it particularly difficult for a potential investor to evaluate the Company’s financial performance and predict its future prospects.

BPGIC commenced operations of Phase I in late Fourth Quarter 2017 and began operating it at full capacity on April 1, 2018. As a result, although the Company’s Senior Management and site teams have up to 30 years of relevant international and industry experience, the Company has only limited operating results to demonstrate its ability to operate its business on which a potential investor may rely to evaluate the Company’s business and prospects. Accordingly, the financial information included in this Report may be of limited use in assessing the Company’s business. The Company is also subject to the business risks and uncertainties associated with any new business, including the risk that it will not achieve its operating objectives and business strategy. The Company’s limited operating history increases the risks and uncertainties that potential investors face in making an investment in our securities and the lack of historic information may make it particularly difficult for a potential investor to evaluate the Company’s financial performance and forecast reliable long-term trends.

4

 

BPGIC is currently reliant on Al Brooge International Advisory LLCBIA and the Company’s storage customers for the majority of its revenues and any material non-payment or non-performance by Al Brooge International Advisory LLCBIA would have a material adverse effect on BPGIC’sthe Company’s business, financial condition and results of operations.

Phase I of the BPGIC Terminal consists of 14 oil storage tanks with an aggregate geometric oil storage capacity of approximately 0.399 million m3 and related infrastructure (“Phase I”).infrastructure. On December 12, 2017, BPGIC entered into the Phase I End User Agreement, a five-year lease and service agreement (the “Phase I End User Agreement”) with an international energy trading company (the “the Initial Phase I End User”).User. BPGIC’s revenues historically depended solely on the fees it received pursuant to the Phase I End User Agreement which were comprised of (i) a monthly fixed fee to lease BPGIC’s Phase I storage capacity (regardless of whether the Initial Phase I End User used any storage capacity) and (ii) monthly variable fees based on the Initial Phase I End User’s usage of the following ancillary services: throughput, blending, heating and inter-tank transfers.

 


In August 2019, with the approval of the Initial Phase I End User, BPGIC restructured its relationship with the Initial Phase I End User by entering into the Phase I Customer Agreement, a four-year lease and offtake agreement (the “Phase I Customer Agreement”) with Al Brooge International Advisory LLC (“BIA,”), for the Phase I facility. After entering the Phase I Customer Agreement, BIA assumed BPGIC’s rights and obligations under the Phase I End User Agreement. Subsequently, in April and May 2020, BIA agreed to release an aggregate of 129,000 m3 of the Phase I capacity amountingback to approximately one thirdBPGIC, until November 8, 2020, subject to extension of the totalterm for an additional six months upon the mutual agreement of the parties. On November 1, 2020, the parties mutually agreed to such extension of the term for an additional six months. On December 1, 2020 and December 7, 2020, BIA agreed to release additional 43,000 mand 61,072 m3, respectively, of the Phase I capacity back to BPGIC. BPGIC leased this capacity to, Totsa Total Oil Trading SA (the “Super Major”), for a 6 month period (the “Super Major Agreement”)respective six-month periods ending in June 2021, in each case, subject to renewalextension for an additional 6 month period withsix months upon the mutual agreement of the parties. On December 9, 2020, February 8, 2021 and February 10, 2021, BIA agreed to release additional 41,563 m3, 41,563 m3 and 83,126 m3, respectively, of the Phase I capacity back to BPGIC for respective six-month periods ending in June 2021 and August 2021, as applicable, in each case, subject to extension for an additional six months upon the mutual agreement of the parties. As such, as of the date of this Report, BIA has released Phase I’s total capacity of 0.399 million m3 back to BPGIC. BPGIC currently leases this capacity to the existing Storage Customers.

 

Accordingly, a majority of the BPGIC’s revenues for the immediate future are expected to consist of (i) the fees it receives from storage customers and (ii) the fees it receives pursuant to the Phase I Customer Agreement which are comprised of (i) a monthly fixed fee to lease approximately two thirds of BPGIC’s Phase I storage capacity (regardless of whether BIA uses any storage capacity) and (ii) monthly variable fees based on BIA’s, or its sublessees’, usage of the following ancillary services: throughput, blending, heating and inter-tank transfers.Agreement.

 

The terms of the Phase I Customer Agreement allow BIA to sublease, subject to BPGIC’s prior approval, the use of Phase I’s facilities. In 2020, BIA subleased the use of the Phase I facility to multiple international and regional end users. Under the Phase I Customer Agreement,However, BIA still retains the obligation to pay any outstanding amounts due, including if a sublessee were to fail to make any payments owed to it. There can be no assurance that in the event of a non-payment by one or more of the Phase I end users of amounts owed to BIA, that BIA would honor its obligation to pay any outstanding amounts due to BPGIC.

 

We are susceptible to general economic conditions, natural catastrophic events and public health crises, which could adversely affect our operating results.

Our results of operations could be adversely affected by general conditions in the global economy, including conditions that are outside of our control, such as the impact of health and safety concerns from the current outbreak of COVID-19. Governments in affected countries, including the United Arab Emirates,UAE, have imposed travel bans, quarantines and other emergency public health measures. Those measures, though temporary in nature, may continue and increase depending on developments in the COVID-19’s outbreak. Though our oil storage and services operations have not been significantly impacted by the COVID-19 pandemic, the activities of our executives and corporate staff have been, and may continue to be, disrupted and delayed. Many of the vendors and professionals with whom we work have also experienced disruptions. Our executives and corporate staff have been, and may continue to be, focused on mitigating the effects of COVID-19, which may delay other value-add initiatives.

 

In particular, COVID-19 has resulted in, and may continue to result in, a delay in negotiations with counterparties, including BIA with respect to the BIA Refinery, that could be material to our business. Further, we and our contractors have been, and may continue to be, delayed or unable to procure essential equipment, supplies or materials for the construction of Phase II in adequate quantities and at acceptable prices.

 

In addition, the COVID-19 pandemic has significantly increased economic uncertainty. It is likely that the current outbreak or continued spread of COVID-19 has or will cause an economic slowdown, and it is possible that it could cause a global recession. Such adverse impact on the global economy may negatively impact the availability of debt and equity financing on commercially reasonable terms, which, in turn, may adversely affect our ability to successfully execute our business strategies and initiatives, such as the funding of capital expenditures.

 

The extent, if any, to which the coronavirus impacts our results will depend on future developments, which are highly uncertain and will include emerging information concerning the severity of the coronavirus and the actions taken by governments and private businesses to attempt to contain the coronavirus.

 


5

The Phase I users’ usage of BPGIC’sthe Company’s ancillary services has an impact on BPGIC’sthe Company’s profitability. The demand for such ancillary services can be influenced by a number of factors including current or expected prices and market demand for refined petroleum products, each of which can be volatile.

With respect to the Phase I Customer Agreement and the Super Major Agreement,Commercial Storage Agreements currently in effect, the total monthly storage fees are fixed and the total monthly fees for BPGIC’sthe Company’s ancillary services are subject to variation based on BIA’s or its sublessees’ and the Super Major’s,customers’ usage of BPGIC’sthe Company’s ancillary services. BPGICThe Company expects its revenue from the ancillary services offered in Phase I to vary based on the orders received from the Super MajorStorage Customers and the ordersthat BIA receives from its end users, which in turn, vary based on the orders the Super Major and the Phase I end users receive from their customers.users. The needs of the Super Major’sStorage Customers’ and the Phase I end users’ customers, and consequently, the Super Major’sStorage Customers’ and BIA’s usage of BPGIC’sthe Company’s ancillary services, tend to vary based on a number of factors including current or expected refined petroleum product prices and trading activity. Factors that could lead to a decrease in the demand for BPGIC’sthe Company’s ancillary services include:

 

changes in expectations for future prices of refined petroleum products;

the level of worldwide oil and gas production and any disruption of those supplies;

a decline in global trade volumes, economic growth, or access to markets;

higher fuel taxes or other governmental or regulatory actions that increase, directly or indirectly, the cost of gasoline and diesel; and

changes to applicable regulations or new regulations affecting the refined petroleum products serviced by BPGIC.the Company.

 

Any of the factors referred to above, either alone or in combination, may result in the Super Major’sStorage Customers’ and/or the Phase I end users’ reduced usage of BPGIC’sthe Company’s ancillary services, which would ultimately have a material adverse effect on BPGIC’sthe Company’s business, financial condition and results of operations.

 

In the event that the Super Major AgreementCommercial Storage Agreements or the Phase I Customer Agreement expire or otherwise terminate, BPGICthe Company may have difficulty locating a replacement for the Super Major or BIAreplacements due to competition with other oil storage companies in the Port of Fujairah and at other ports.

BPGICIn November 2020, the Super Major Agreement was not renewed by mutual agreement. On January 15, 2021, the Synergy Storage Agreement was ended. The Commercial Storage Agreements currently in effect have terms ranging from two months to six months, subject to renewals for an additional term ranging from two months to six months. There can be no assurance that any of the Commercial Storage Agreements currently in effect will be renewed or that any of such agreements will not be terminated prior to expiration of its term or that we will find adequate replacements upon non-renewal or earlier termination of such agreements.

The Company may have to compete with other oil storage companies in the Port of Fujairah (the “Port of Fujairah” or the “Port”) to secure a third party to contract for BPGIC’sthe Company’s services in the event that any of the Super Major AgreementCommercial Storage Agreements currently in effect or the Phase I Customer Agreement expire or otherwise terminate. Such third parties may not only consider competitors in the Port of Fujairah but may also consider companies located at other ports. Although BPGICthe Company believes that it has a best-in-class technically designed terminal in Fujairah and there is a scarcity of land in Fujairah available for expansion by competitors, BPGIC’sthe Company’s ability to competecould be harmed by factors it cannot control, including:

 

BPGIC’sthe Company’s competitors’ construction of new assets or conversion of existing terminals in a manner that would result in more intense competition in the Port of Fujairah;

BPGIC’sthe Company’s competitors, which currently provide services to their own businesses (i.e., captive storage), seeking to provide their services to third parties, including third-party oil companies and oil traders;

BPGIC’sthe Company’s competitors making significant investments to upgrade or convert their facilities in a manner that, while limiting their capacity in the short term, would eventually enable them to meet or exceed BPGIC’sthe Company’s capabilities;

the perception that another company or port may provide better service; and

the availability of alternative heating and blending facilities located closer to users’ operations.

6

 

Any combination of these factors could result in third parties entering into long-term contracts to utilize the services of BPGIC’sthe Company’s competitors instead of BPGIC’sthe Company’s services, or BPGICthe Company being required to lower its prices or increase its costs to attract such parties or retain its existing customers, either of which could adversely affect BPGIC’sthe Company’s business, financial condition and results of operations.

 

In addition, in the event that BIA’s agreements with its sublessees expire or otherwise terminate, BIA would have similar risks and may face similar difficulties locating replacements for its sublessees due to competition with other oil storage companies in the Port of Fujairah and at other ports.sublessees. If BIA is unable to contract with new end users, or the new end users do not use ancillary services to the same extent as the existing sublessees, the ancillary services used by BIA would be reduced and BIA’s ability to satisfy its payment obligations to BPGICthe Company under the Phase I Customer Agreement would be impaired, each of which could adversely affect BPGIC’sthe Company’s business, financial condition and results of operations.

 


BPGICThe Company may be subject to significant risks and expenses when constructing Phase II, which could adversely affect BPGIC’sthe Company’s business, financial condition and results of operations.

The construction of Phase II, the second phase of the terminal that BPGICthe Company is developing on land located in close proximity to the Port of Fujairah’s berth connection points (such land, the “Phase I & II Land,”) which is expected to consist of 8 oil storage tanks with an aggregate geometric oil storage capacity of approximately 0.601 million mand related infrastructure (“Phase II”) is subject to a number of risks, including:

 

delays by the Phase II contractor, Audex, Fujairah LL FZC (“Audex”), in constructing Phase II;

a shortage of building materials, equipment or labor;

poor performance in project execution on the part of Audex;

difficulty procuring supplies and arranging global shipping due to the COVID-19 lockdowns;

COVID-19 cases amongstamong construction labor;

default by or financial difficulties faced by Audex or other third-party service and goods providers or failure by Audex or other providers to meet their contractual obligations;

BPGIC’sthe Company’s inability to find a suitable replacement contractor in the event of a default by Audex; and

cost overruns that require BPGICthe Company to obtain additional financing becausein which case there can be no assurance such additional financing would be available at all or upon commercially acceptable terms by BPGIC.terms.

 

Any of the factors referred to above, either alone or in combination, could materially delay the completion of Phase II or materially increase the costs associated with the construction of Phase II, and therefore materially adversely affect BPGIC’sthe Company’s future financial condition. Any failure to complete construction according to specifications may also result in liabilities, reduced efficiency and lower financial returns than anticipated, which may result in BPGICthe Company having to enter into restructuring negotiations with its creditors. Delays in one part of Phase II may cause delays to other parts and to the overall Phase II completion timetable.

 

BPGICThe Company will become reliant on BIA for all of its BIA Refinery revenues, and the termination of the Refinery Agreement would have a material adverse effect on BPGIC’sthe Company’s business, financial condition and results of operations.

In February 2020, BPGIC and Sahara Energy Resources DMCC (“Sahara”) mutually agreed to discontinue their joint development discussions to install a modular oil refinery at BPGIC’s terminal. Shortly thereafter, BPGIC entered into a new agreementthe Refinery Agreement with BIA, (the “Refinery Agreement”) which provides that the parties will use their best efforts to finalize the technical and design feasibility studies for the BIA Refinery, a refinery with a capacity of 25,000 bpd (the “BIA Refinery”).b/d. The parties further agreed to negotiate, within 30 days, the Refinery Operations Agreement, a sublease agreement and a joint venture agreement (such sublease agreement and joint venture agreement, collectively, the “Refinery Operations Agreement”) to govern the terms on which (i) BPGIC will sublease land to BIA to locate, (ii) BIA will construct, and (iii) BPGIC will operate the BIA Refinery. Due to the COVID-19 pandemic, the parties agreed to extend the period for their negotiations until August 4, 2020.the Second Quarter of 2021. As illustrated by the discontinuance of the prior agreement with Sahara, there can be no assurance that BPGIC and BIA will be able to reach agreement on the terms of a sublease and a joint venture agreement to govern the location, construction and operation of the BIA Refinery.

 

Upon completion of the BIA Refinery, BPGICthe Company will become reliant on BIA for another significant portion of its revenues. If the Refinery Agreement is terminated, there can be no assurance that BPGICthe Company will be able to find a new partner to install a modular refinery at the terminal that BPGIC is developing on two plots of land located in close proximity to the Port of Fujairah’s berth connection points (the “BPGIC Terminal,”), or enter into a comparable agreement to provide refinery, storage and ancillary services at comparable or more favorable pricing and/or terms. Additionally, BPGICthe Company may incur substantial cost if it suffers delays in locating a third party or if modifications or installation of a new refinery are required by a new agreement. The occurrence of any one or more of these events could have a material adverse effect on BPGIC’sthe Company’s business, financial condition and results of operations.

 

7

BPGICThe Company will become reliant on BIA for all of its Phase II revenues, and the termination of the Phase II Customer Agreement and the failure to find a replacement for BIA would have a material adverse effect on BPGIC’sthe Company’s business, financial condition and results of operations.

In connection with Phase II, BPGIC entered into the Phase II End User Agreement, a five-year lease and service agreement (the “with the Phase II End User, Agreement”) with an international commodities trading company, (the “Phase II End User”), which extends automatically for an additional five years.years unless either party delivers to the other party a written termination notice not less than six months prior to the expiration date of the agreement. Pursuant to the Phase II End User Agreement, the Phase II End User has agreed to lease all eight oil storage tanks in Phase II once Phase II becomes operational, which is expected to occur during 2020.in the Third Quarter of 2021.

 


In September 2019, with the approval of the Phase II End User, BPGIC restructured its relationship with the Phase II End User by entering into the Phase II Customer Agreement, a five-year lease and offtake agreement (the “Phase II Customer Agreement”) for the Phase II facility with BIA. In connection with the Phase II Customer Agreement, BIA assumed BPGIC’s rights and obligations under the Phase II End User Agreement.

 

When Phase II becomes operational, BPGICthe Company will become reliant on BIA for another significant portion of its revenues. In the event that insolvency proceedings are commenced against BIA, BPGIC would have the option to terminate the Phase II Customer Agreement. Upon the termination of the Phase II Customer Agreement, BPGIC would be able to enter into lease and service agreements with one or more third parties. However, in that event, there can be no assurance that BPGIC would be able to locate one or more third parties to enter into lease and service agreements with BPGIC and/or that BPGIC would be able to obtain agreements for a comparable amount of utilization of Phase II’s oil storage and ancillary services at comparable or more favorable pricing and/or terms. Additionally, BPGIC may incur substantial costs if it suffers delays in locating a third party or if modifications to Phase II are required by a new agreement. The occurrence of any one or more of these events would have a material adverse effect on BPGIC’sthe Company’s business, financial condition and results of operations.

 

The terms of the Phase II Customer Agreement allow BIA to sublease, subject to BPGIC’s prior approval, the use of Phase II’s facilities, and by assuming the Phase II End User Agreement, BIA subleased the use of the Phase II facility to the Phase II End User. Under the Phase II Customer Agreement, BIA still retains the obligation to pay any outstanding amounts due, including if a sublessee were to fail to make any payments owed to BIA. There can be no assurance that in the event of a non-payment by the Phase II End User, or another sublessee, of amounts owed to BIA, that BIA would honor its obligation to pay any outstanding amounts due to BPGIC in the event of a non-payment by a sublessee.

BPGIC will become further reliant on BIA for a substantial majority of its revenues, and any material non-payment or non-performance by BIA would have a material adverse effect on BPGIC’s business, financial condition and results of operations.

Upon completion of Phase II and the BIA Refinery, BIA will be BPGIC’s customer with respect to a substantial majority of the capacity of the Phase I facility, and will be BPGIC’s sole customer with respect to the Phase II facility and the BIA Refinery.

The terms of both the Phase I Customer Agreement and the Phase II Customer Agreement allow BIA to sublease the corresponding facilities, subject to BPGIC’s prior approval. BIA has subleased the Phase I capacity that it still leases to certain end users. By assuming the Phase II End User Agreement, BIA has subleased the Phase II facility to the Phase II End User. Under both the Phase I Customer Agreement, and the Phase II Customer Agreement, BIA remains obligated to pay any outstanding amounts due to BPGIC, even if a sublessee fails to make any payment owed to BIA as sublessor. There can be no assurance that BIA would honor its obligation to pay any outstanding amounts due to BPGIC.

 

BIA’s inability or failure to meet its obligations under the Phase I Customer Agreement, the Phase II Customer Agreement, or both, would have a material adverse effect on BPGIC’s business, financial condition and results of operations. If BIA fails to honor its obligations under either agreement, BPGIC is entitled to terminate such agreement and BIA remains liable to pay certain termination fees. However, in that event, there can be no assurance that BPGIC would be able to locate one or more third parties to enter into lease and service agreements with BPGIC and/or that BPGIC would be able to obtain agreements for a comparable amount of utilization of such facility and ancillary services at comparable or more favorable pricing and/or terms. Additionally, BPGIC may incur substantial costs if it suffers delays in locating a third party or if modifications to such facility are required by a new agreement. The occurrence of any one or more of these events would have a material adverse effect on BPGIC’s business, financial condition and results of operations.

8

 


The scarcity of available land in the Fujairah oil zone region could subject BPGICthe Company to competition for additional land, unfavorable lease terms for that land and limit BPGIC’sthe Company’s ability to expand its facilities in Fujairah beyond Phase III.

As discussed further in “Item 4.B Information on the Company¾Business Overview — Strategy” and “Item 4.A History and Development of the Company — Proposed Phase III”, BPGIC has entered into the Phase III Land Lease, a land lease agreement, dated as of February 2, 2020, (the “Phase III Land Lease Agreement”), by and between BPGIC and the Fujairah Oil Industry Zone (“FOIZ,”) to lease the Phase III Land, for an additional plot of land that has a total area of approximately 450,000 m2 (the “. On October 1, 2020, BPGIC, FOIZ and BPGIC III, entered into a novation agreement, whereby BPGIC novated the Phase III Land”). Lease to BPGIC III. The Company intends to use the relevant land to expand its crude oil storage and service and refinery capacity (“Phase III”).capacity.

 

However, all land in the Fujairah oil zone region is owned and controlled by FOIZ. The Fujairah oil zone region currently has limited available land to lease. As a result, BPGIC’sthe Company’s ability to further expand its facilities if it wishes to expand in Fujairah beyond Phase III is limited. This could subject BPGICthe Company to enhanced competition both in terms of price and lease terms for any land that becomes available to lease.

 

If BPGICthe Company is able to lease additional land, there can be no assurance that it would be able to do so on terms that are as favorable as or more favorable than the terms of the land lease that BPGIC entered into in connection with Phases I and II, dated as of March 10, 2013, by and between Fujairah Municipality and BPGIC, as amended by the novation agreement, dated September 1, 2014, by and among Fujairah Municipality, BPGIC and FOIZ (the “Phase I & II Land Lease” and together with the Phase III Land Lease Agreement, the “Land Leases”) or the Phase III Land Lease, Agreement, or that would allow BPGICthe Company to use the land as intended. BPGIC’sThe Company’s inability to secure new land from FOIZ in the Fujairah oil zone region could substantially impair BPGIC’sthe Company’s regional growth prospects in Fujairah beyond Phase III, leading to fewer remaining options for its expansion in Fujairah, other than the acquisition of an existing third-party owned oil storage terminal in Fujairah.

 

Accidents involving the handling of oil products at the BPGIC Terminal could disrupt BPGIC’sthe Company’s business operations and/or subject it to environmental and other liabilities.

Accidents in the handling of oil products (hazardous or otherwise) at the BPGIC Terminal could disrupt BPGIC’sthe Company’s business operations during any repair or clean-up period, which could negatively affect its business operations. The BPGIC Terminal which has received multiple international awards since it began operations, was designed to minimize the risk of oil leakage and has state-of-the-art control facilities. In addition, pursuant to the Fujairah Municipality environmental regulations, BPGIC installed impermeable lining over the ground soil throughout its tank farm area in the Phase I & II Land and any other area where oil leakage could occur and potentially reach the ground soil. BPGICThe Company intends to take similar steps to minimize the risk of oil leakage in connection with Phase III. Nevertheless, there is a risk that oil leakages or fires could occur at the terminal and, in the event of an oil leakage, there can be no assurance that the installed lining will prevent any oil products from reaching the ground soil. Although BPGICthe Company believes that it has adequate insurance in place to insure against the occurrence of any of the foregoing events, any such leakages or fires could disrupt terminal operations and result in material remediation costs. Any such damage or contamination could reduce gross throughput and/or subject BPGICthe Company to liability in connection with environmental damage, any or all of which could have a material adverse effect on its business, financial condition and results of operations.

 

The BIA Refinery, once completed, will face operating hazards, and the potential limits on insurance coverage could expose us to potentially significant liability costs.

Once completed, the BIA Refinery will be subject to certain operating hazards, and our cash flow from its operations could decline if it experiences a major accident, pipeline rupture or spill, explosion or fire, is damaged by severe weather or other natural disaster, or otherwise is forced to curtail its operations or shut down. These operating hazards could result in substantial losses due to personal injury and/or loss of life, severe damage to and destruction of property and equipment and pollution or other environmental damage and may result in significant curtailment or suspension of our related operations.

 

Although we intend to maintain insurance policies, including personal and property damage and business interruption insurance for each of our facilities, we cannot ensureassure you that this insurance will be adequate to protect us from all material expenses related to potential future claims for personal and property damage or significant interruption of operations.

 

Furthermore, we may be unable to maintain or obtain insurance of the type and amount we desire at reasonable rates. If we were to incur a significant liability for which we were not fully insured, it could affect our financial condition and diminish our ability to make distributions to our shareholders.

 


When the BIA Refinery is completed, our financial results will be affected by volatile refining margins, which are dependent upon factors beyond our control, including the price of crude oil, to the extent such volatility reduces customer demand of ancillary services.

When the BIA Refinery is operational, our financial results will be affected by the relationship, or margin, between refined petroleum product prices and the prices for crude oil and other feedstocks to the extent decreases in refining margins reduce BIA ‘sBIA’s use of the BIA Refinery and our ancillary services. Historically, refining margins have been volatile, and we believe they will continue to be volatile in the future. BIA’s costs to acquire feedstocks and the price at which it can ultimately sell refined petroleum products depend upon several factors beyond its, and our, control, including regional and global supply of and demand for crude oil, gasoline, diesel, and other feedstocks and refined petroleum products. These in turn depend on, among other things, the availability and quantity of imports, production levels, levels of refined petroleum product inventories, productivity and growth (or the lack thereof) of global economies, international relations, political affairs, and the extent of governmental regulation. Some of these factors can vary by region and may change quickly, adding to market volatility, while others may have longer-term effects. The longer-term effects of these and other factors on refining and marketing margins are uncertain. Decreased refining margins could have a significant effect on the extent to which BIA uses the BIA Refinery and our ancillary services which, in turn, could have a significant effect on our financial results.

9

BPGIC’sOur competitive position and prospects depend on the expertise and experience of senior managementSenior Management and BPGIC’sour ability to continue to attract, retain and motivate qualified personnel.

BPGIC’sOur business is dependent on retaining the services of, or in due course promptly obtaining equally qualified replacements for senior management, those persons named as senior managers inItem 6. Directors, Senior Management and Employees¾A. Directors and Senior Management.Management. Competition in the UAE for personnel with relevant expertise is intense and it could lead to challenges in locating qualified individuals with suitable practical experience in the oil storage industry. Although BPGICthe Company has employment agreements with all of the members of senior management,Senior Management, the retention of their services cannot be guaranteed. Should they decide to leave BPGIC,the Company, it may be difficult to replace them promptly with other managers of sufficient expertise and experience or at all. To mitigate this risk, BPGICthe Company intends to enter into long termlong-term incentive plans with members of senior managementSenior Management in due course. In the event of any increase in the levels of competition in the oil storage industry or general price levels in the Fujairah region, BPGICthe Company may experience challenges in retaining members of the senior managementSenior Management team or recruiting replacements with the appropriate skills. Should BPGICthe Company lose any of the members of senior managementSenior Management without prompt and equivalent replacement or if BPGICthe Company is otherwise unable to attract or retain such qualified personnel for BPGIC’sthe Company’s requirements, this could have a material adverse effect on itsthe Company’s business, financial condition and results of operations. For more information regarding senior management,Senior Management, seeItem 6.6.A Directors, Senior Management and Employees¾A. Directors and Senior ManagementExecutive Officers.

 

In connection with the preparation of the Company’s consolidated financial statements as of and for the years ended December 31, 2017, 2018, 2019 and 2019,2020, the Company and its independent registered public accounting firm identified two material weaknesses in the Company’s internal control over financial reporting, one related to lack of sufficient skilled personnel and one related to lack of sufficient entity level and financial reporting policies and procedures.

 

Prior to the consummation of the Business Combination, the Company was neither a publicly listed company, nor an affiliate or a consolidated subsidiary of, a publicly listed company, and it has had limited accounting personnel and other resources with which to address its internal controls and procedures. Effective internal control over financial reporting is necessary for itthe Company to provide reliable financial reports and, together with adequate disclosure controls and procedures, are designed to prevent fraud.

 

In connection with the preparation and external audit of the Company’s financial statements as of and for the years ended December 31, 2017, 2018, 2019 and December 31, 2018,2020, the Company and our auditors, noted material weaknesses in the Company’s internal control over financial reporting. The Public Company Accounting Oversight Board has definedSEC defines a material weakness as a deficiency, or a combination of deficiencies, in internal control over financial reporting, such that there is a reasonable possibility that a material misstatement of the Company’s financial statements will not be prevented or detected on a timely basis.

 


The material weaknesses identified were (1)(i) a lack of sufficient skilled personnel with requisite IFRS and SEC reporting knowledge and experience and (2)(ii) a lack of sufficient entity level and financial reporting policies and procedures that are commensurate with IFRS and SEC reporting requirements. TheseDuring the year 2020, the Company took the steps below to minimize the effects of both these material weaknesses remain as of December 31, 2019.weaknesses:

 

The Company appointed a new chief financial officer and other finance personnel with relevant public reporting experience and also conducted trainings for new employees with respect to IFRS and SEC reporting requirements; and

The Company appointed a third party consultant to prepare the processes of financial reporting and help the Company to implement them, and the consultant is in the final stages of finalizing the processes.

In this regard, the Company was not requiredhas, and will need to perform an evaluationcontinue to, dedicate internal resources, recruit more personnel with public reporting experience, potentially engage additional outside consultants and adopt a detailed work plan to assess and document the adequacy of its internal control over financial reporting. This has, and may continue to, include taking steps to improve control processes as appropriate, validating that controls are functioning as documented and implementing a continuous reporting as of December 31, 2019, December 31, 2018 or December 31, 2017 in accordance with the provisions of the Sarbanes-Oxley Act. Had such an evaluation been performed, additionaland improvement process for internal control deficiencies may have been identified by the Company’s management, and those control deficiencies could have also represented one or more material weaknesses.over financial reporting. 

 

The Company’s auditors did not undertake an audit of the effectiveness of its internal controlscontrol over financial reporting. The Company’s independent registered public accounting firm will not be required to report on the effectiveness of their respectivethe Company’s internal controlscontrol over financial reporting pursuant to Section 404(b) of the Sarbanes-Oxley Act of 2002 until the Company’s first annual reportAnnual Report on Form 20-F following the date on which it ceases to qualify as an “emerging growth company,” which may be up to five full fiscal years following the date of the Closing.Company’s initial sale of common equity pursuant to a registration statement declared effective under the Securities Act. The process of assessing the effectiveness of the Company’s internal control over financial reporting may require the investment of substantial time and resources, including by members of the Company’s senior management. As a result, this process may divert internal resources and take a significant amount of time and effort to complete. In addition, the Company cannot predict the outcome of this determination and whether the Company will need to implement remedial actions in order to implement effective control over financial reporting. If in subsequent years the Company is unable to assert that the Company’s internal control over financial reporting is effective, or if the Company’s auditors express an opinion that the Company’s internal control over financial reporting is ineffective, the Company could lose investor confidence in the accuracy and completeness of theirits financial reports, which could have a material adverse effect on the price of the Company’s securities.

For more information regarding our controls and procedures, see “Item 15. Controls and Procedures”.

10

The Company will start implementinghas hired new management personnel and has implemented a number of measures from second half yearcorporate governance and financial reporting procedures and other policies, processes, systems and controls which have a limited operating history. The effectiveness of FY 2020these policies, processes systems and controls are impaired by material weaknesses related to lack of sufficient skilled personnel and lack of sufficient entity level and financial reporting policies and procedures.

The Company has hired new management personnel, including a new chief financial officer, and implemented a number of corporate governance and financial reporting procedures and other policies, processes, systems and controls to comply with the requirements for a foreign private issuer on NASDAQ. The Company does not have a long track record on which it can assess the performance and effectiveness of these policies, processes, systems and controls or the analysis of their outputs.

The Company and its independent registered public accounting firm have identified two material weaknesses in internal control over financial reporting related to lack of sufficient skilled personnel and lack of sufficient entity level and financial reporting policies and procedures. Any material inadequacies, weaknesses or failures in the Company’s policies, processes, systems and controls could have a material adverse effect on the Company’s business, financial condition and results of operations.

The Company has implemented measures to address the material weaknesses, including (i) hiring personnel with relevant public reporting experience, (ii) conducting training for Company personnel with respect to IFRS and SEC financial reporting requirements and (iii) documenting and evaluatingengaging a third party to prepare standard operating procedures for the controls over financial reporting.Company. In this regard, the Company has, and will need to continue to, dedicate internal resources, recruit personnel with public reporting experience, potentially engage additional outside consultants and adopt a detailed work plan to assess and document the adequacy of their internal control over financial reporting. This has, and may continue to, include taking steps to improve control processes as appropriate, validating that controls are functioning as documented and implementing a continuous reporting and improvement process for internal control over financial reporting.

 


Our auditor’s report includes a going concern paragraph.

As of 31 December 2018, the Group had not paid USD 3.7 million of principal and accrued interest that was due under the Group’s Phase I Financing Facilities. Also, as of 31 December 2018, the Group was not in compliance with its debt covenants, including the debt service coverage ratio contained in the Group’s Phase I Financing Facilities. Even though the lender did not declare an event of default under the loan agreements, these breaches constituted events of default and could have resulted in the lender requiring immediate repayment of the loans. Accordingly, as of 31 December 2018, the Group has classified its debt balance of USD 94.8 million as a current liability.

On 10 September 2019 and again on 30 December 2019 the Group entered into agreements with its lender to amend the Phase 1 Financing Facility such that on 31 December 2019 the Group was in compliance with the amended facility agreement. At 31 December 2019, the Group’s current liabilities exceeded its current assets by USD 57 million.

Subsequent to the year end, the Group defaulted on its commitments under its term loans and the Group was not in compliance with its debt covenants, including the debt service coverage ratio contained in the Group’s loan agreement. Even though the lender did not declare an event of default under the loan agreements, these breaches constituted events of default and could have resulted in the lender requiring immediate repayment of the loans.

On 15 June 2020, the Group entered into an agreement with its lender to amend its Phase I Financing Facilities (note15). The Group will have to pay principal and accrued interest of USD 8.8 million in 2020 which represents the cumulative instalments including interest outstanding from periods prior to this amended agreement and an amendment fee of USD 136,000. Term loan (1) and Term loan (2) is now payable in 46 and 16 instalments respectively starting 30 June 2020 with final maturity on 31 July 2030 and 31 July 2023, respectively.

During 2018, the Group signed a sales agreement for phase 2 to provide storage and ancillary services to an international commodity trading company, which was novated to a new party during the year. Phase 2 operations are scheduled to start in fourth quarter of 2020 and management expects this will generate significant operating cash flows. The Group is in receipt of a loan facility letter date 15 October 2018 from a lender. The Group intends to draw down from this facility to finance the payments due to the contractor in respect of Phase 2 construction in the third quarter of 2020. The ability of the Group to draw down on this facility is contingent upon a number of conditions agreed in the facility letter which will need to be assessed and approved by the bank prior to the disbursement of funds.

Based on the above noted, management has considered the going concern status of the Group and believes there to be a material uncertainty that casts significant doubt upon the Group’s ability to continue as a going concern. Based on management’s forecasts the capital expenditure requirements for phase 2 and debt servicing as described above will be funded by cash generated through the ongoing operations and further drawdowns from approved loan facilities. The Group’s management acknowledge that there is a risk that the quantum and timing of cash flows may not be achievable in line with the twelve months forecasts from the date of approval of the Group’s financial statements. Accordingly, there is significant doubt that the Group will be able to pay its obligations as they fall due and this significant doubt is not alleviated by management’s plans.

The financial statements have been prepared assuming that the Group will continue as a going concern. Accordingly, the consolidated financial statements do not include any adjustments relating to the recoverability and classification of recorded asset amounts, the amounts and classification of liabilities, or any other adjustments that might result in the event the Group is unable to continue as a going concern.


BPGIC has a limited operating history and this Report contains limited financial information, which makes it particularly difficult for a potential investor to evaluate BPGIC’s financial performance and predict its future prospects.

BPGIC commenced operations of Phase I in late Fourth Quarter 2017 and began operating it at full capacity on April 1, 2018. As a result, although BPGIC’s senior management and site teams have up to thirty years of relevant international and industry experience, BPGIC has only limited operating results to demonstrate its ability to operate its business on which a potential investor may rely to evaluate BPGIC’s business and prospects. Accordingly, the financial information included in this Report may be of limited use in assessing the business. BPGIC is also subject to the business risks and uncertainties associated with any new business, including the risk that it will not achieve its operating objectives and business strategy. BPGIC’s limited operating history increases the risks and uncertainties that potential investors face in making an investment in the Ordinary Shares and warrants and the lack of historic information may make it particularly difficult for a potential investor to evaluate BPGIC’s financial performance and forecast reliable long-term trends.

If BPGICthe Company is unable to make acquisitions on economically acceptable terms, its future growth would be limited, and any acquisitions it makes could adversely affect its business, financial condition and results of operations.

As discussed further in “Item 4.B Information on the Company¾Business Overview¾Strategy”, one of BPGIC’sthe Company’s medium to long termlong-term strategies is to potentially grow its business through the acquisition and development of oil storage terminals globally. BPGIC’sThe Company’s strategy to grow its business is dependent on its ability to make acquisitions that improve its financial condition. If BPGICthe Company is unable to make acquisitions from third parties because it is unable to identify attractive acquisition candidates or negotiate acceptable purchase contracts, it is unable to obtain financing for these acquisitions on economically acceptable terms or it is outbid by competitors, its future growth will be limited. Furthermore, even if BPGIC does consummatethe Company consummates acquisitions that it believes will be accretive, they may in fact harm its business, financial condition and results of operations. Any acquisition involves potential risks, some of which are beyond BPGIC’sthe Company’s control, including, among other things:

 

inaccurate assumptions about revenues and costs, including synergies;

an inability to successfully integrate the various business functions of the businesses BPGICthe Company acquires;

an inability to hire, train or retain qualified personnel to manage and operate BPGIC’sthe Company’s business and newly acquired assets;

an inability to comply with current or future applicable regulatory requirements;

the assumption of unknown liabilities;

limitations on rights to indemnity from the seller;

inaccurate assumptions about the overall costs of equity or debt;

the diversion of management’s attention from other business concerns;

unforeseen difficulties operating in new product areas or new geographic areas; and

customer or key employee losses at the acquired businesses.

 

11

If BPGICthe Company consummates any future acquisitions, its business, financial condition and results of operations may change significantly, and holders of Ordinary Shares willthe Company’s securities may not have the opportunity to evaluate the economic, financial and other relevant information that BPGICthe Company will consider in determining the application of these funds and other resources.making such acquisitions.

 


BPGICThe Company is subject to a wide variety of regulations and may face substantial liability if it fails to comply with existing or future regulations applicable to its businesses or obtain necessary permits and licenses pursuant to such regulations.

BPGIC’sThe Company’s operations are subject to extensive international, national and local laws and regulations governing, amongstamong other things, the loading, unloading and storage of hazardous materials, environmental protection and health and safety. BPGIC’sThe Company’s ability to operate its business is contingent on its ability to comply with these laws and regulations and to obtain, maintain and renew as necessary related approvals, permits and licenses from governmental agencies and authorities in Fujairah and the UAE. Because of the complexities involved in ensuring compliance with different and sometimes inconsistent national and international regulatory regimes, BPGICthe Company cannot assure investors that it will remain in compliance with all of the regulatory and licensing requirements imposed on it by each relevant jurisdiction. BPGIC’sThe Company’s failure to comply with all applicable regulations and obtain and maintain requisite certifications, approvals, permits and licenses, whether intentional or unintentional, could lead to substantial penalties, including criminal or administrative penalties or other punitive measures, result in revocation of its licenses and/or increased regulatory scrutiny, impair its reputation, subject it to liability for damages, or invalidate or increase the cost of the insurance that it maintains for its business. Additionally, BPGIC’sthe Company’s failure to comply with regulations that affect its staff, such as health and safety regulations, could affect its ability to attract and retain staff. BPGICThe Company could also incur civil liabilities such as abatement and compensation for loss in amounts in excess of, or that are not covered by, its insurance. For the most serious violations, BPGICthe Company could also be forced to suspend operations until it obtains such approvals, certifications, permits or licenses or otherwise brings its operations into compliance.

 

In addition, changes to existing regulations or tariffs or the introduction of new regulations or licensing requirements are beyond BPGIC’sthe Company’s control and may be influenced by political or commercial considerations not aligned with itsthe Company’s interests. Any such changes to regulations, tariffs or licensing requirements could adversely affect BPGIC’sthe Company’s business by reducing its revenue, increasing its operating costs or both and BPGICthe Company may be unable to mitigate the impact of such changes.

 

Finally, any expansion of the scope of the regulations governing BPGIC’sthe Company’s environmental obligations, in particular, would likely involve substantial additional costs, including costs relating to maintenance and inspection, development and implementation of emergency procedures and insurance coverage or other financial assurance of BPGIC’sthe Company’s ability to address environmental incidents or external threats. If BPGICthe Company is unable to control the costs involved in complying with these and other laws and regulations, or pass the impact of these costs on to users through pricing, BPGIC’sthe Company’s business, financial condition and results of operations could be adversely affected.

 

Any material reduction in the quality or availability of the Port of Fujairah’s facilities could have a material adverse effect on BPGIC’sthe Company’s business, financial condition and results of operations.

BPGICThe Company is dependent on the Port of Fujairah to operate and maintain the Port’s facilities at an appropriate standard and BPGICthe Company is dependent on such facilities, including the berths, the very large crude carrier (“VLCC”) jetty and the associated pipelines, to operate its business. Any interruptions or reduction in the capabilities or availability of these facilities would result in reduced volumes being transported through the BPGIC Terminal. Reductions of this nature are beyond BPGIC’sthe Company’s control. If the utilization or the costs to BPGICthe Company or users to deliver oil products through these facilities were to significantly increase, BPGIC’sthe Company’s profitability could be reduced. The Port of Fujairah’s facilities are subject to deterioration or damage, due to potential declines in the physical condition of its facilities and ship collisions, among other things. Any failure of the Port of Fujairah to carry out necessary repairs, maintenance and expansions of its facilities and any resulting interruptions for access to its facilities could adversely affect BPGIC’sthe Company’s business volumes, cause delays in the arrival and departure of oil tankers or disruptions to BPGIC’sthe Company’s operations, in part or in whole, may subject BPGICthe Company to liability or impact its brand and reputation and may otherwise hinder the normal operation of the BPGIC Terminal, which could have a material adverse effect on its business, financial condition and results of operations.

 

BPGIC is subject to restrictive covenants in itsthe Bond Financing FacilitiesFacility that may limit its operating flexibility and, if it defaults under its covenants, it may not be able to meet its payment obligations.

BPGIC entered into secured Shari’a compliant Istisna’ and Murabaha financing arrangementsthe Bond Financing Facility of $84.6$200.00 million (the “Phase I Construction Facility”) and of $11.1 million (the “Phase I Admin Building Facility” and together with the Phase I Construction Facility, the “Phase I Construction Facilities”) to fund a portion of the construction costs of Phase I, of $3.5 million (the “Phase I Short Term Financing Facility” and together with the Phase I Construction Facilities, the “Phase I Financing Facilities”) to settle certain amounts due under the Phase I Construction Facilities and of $95.3 million (the “Phase II Financing Facility” and together withrepay the Phase I Financing Facilities, fund capital projects for Phase II, repay the Financing Facilities”)promissory note payable to fund a portionEarly Bird Capital, pre-fund the Liquidity Account and for general corporate purposes. The proceeds of the capital expenditure in respect of Phase II.bonds were drawn down during November 2020 and outstanding term loans were fully settled. The Bond Financing Facilities containFacility contains covenants limiting BPGIC’s ability to incur indebtedness, grant liens, engage in transactions with affiliates and make distributions on or redeem or repurchase ordinary shares.

12

The Phase IBond Financing Facilities containFacility contains covenants requiring BPGIC (including its subsidiaries) and the Company to maintain certain financial ratios, including a facility service coverage ratio of greater than 1.50:1. Similarly, the Phase II Financing Facility also contains restrictive financial covenants, including, (i) a minimum facility service coverage ratio of 1.25:1, (ii) a participations to value ratio not exceeding 1.50:1 at all times, (iii) a participations to cost ratio not exceeding 57% at any date, and (iv) an amount equivalent to one instalment including interest in a facility service reserve account at all times or in the event of an initial public offering, an amount equivalent to the next two instalments including interest.following covenants:

 


On December 30, 2019, BPGIC and FAB agreed to amend the Phase I Construction Facility to defer the installments due thereunder to later dates. The key changes resulting from the amendment were as follows:1. Financial Covenants

 

1.i.an amountMinimum Liquidity: Maintain $8.5 million in the Liquidity Account.
ii.Leverage Ratio: Not to exceed: (A) 5.5x at December 31, 2020; (B) 3.5x at December 31, 2021; and (C) 3.0x anytime thereafter.
iii.Working Capital: Maintain a positive working capital.
iv.Brooge Energy Limited to maintain a minimum equity ratio of $5,729,417.50 which was due on November 30, 2019 will now be repayable on February 28, 2020;

2.an amount of $1,765,553.50 which was due on January 31, 2020 will now be payable in two installments: $882,776.75 on January 31, 2020 and $882,776.75 on February 28, 2020; and

3.the Debt Service Reserve Account to be created by February 28, 2020; and

4.testing of the Debt Service Coverage Ratio covenant to start on February 28, 2020 and to be conducted on each subsequent due date.25%.

 

BPGIC did not comply with the terms of the Phase I Construction Facilities as amended on December 30, 2019. A payment of principal and interest of $6.6 Million for the Phase I Construction Facility due on February 28, 2020 was not paid. Payments of principal and interest totaling $2.2 Million for the Phase I Construction Facility and the Phase I Admin Building Facility due on April 30, 2020 were not made. The Debt Service Reserve2. Account did not maintain a balance in an amount equivalent to one quarterly instalment including interest by February 28, 2020. BPGIC did not maintain a minimum Debt Service Coverage Ratio of 150% beginning on February 28, 2020. These non-payments and failures to comply with covenants were events of default, but, as in the past, the lender did not declare an event of default.

On June 15, 2020, BPGIC entered into an agreement with its lender to amend the Phase I Construction Facilities (the “June 15 Phase I Construction Facilities Amendment”).

Pursuant to the June 15 Phase I Construction Facilities Amendment, BPGIC and the lender agreed to a revised payment schedule for the Phase I Construction Facility that requires BPGIC to make the following payments from June 30, 2020 through December 31, 2020:Maintenance Covenants

 

Datei.BPGIC to maintain a Construction Funding Account.
 Amount
June 30, 2020ii.BPGIC to maintain Debt Service Retention Account.
 $2.99 Million
July 31, 2020iii.$3.62 Million
August 31, 2020$0.14 Million
September 30, 2020$0.14 Million
October 31, 2020$1.01 Million
November 30, 2020$0.14 Million
December 31, 2020$3.87 Million
Total$11.9 Million by end of 2020BPGIC to maintain Liquidity Account.

 


Thereafter, beginning on January 31, 2021 and ending on July 30, 2030, BPGIC will make quarterly payments of approximately $1.77 Million

Pursuant to the June 15 Phase I Construction Facilities Amendment, BPGIC and the lender also agreed to a revised payment schedule for the Phase I Admin Building Facility that requires BPGIC to make the following payments from August 31, 2020 through December 21, 2020:3. Other Covenants

 

Datei.BPGIC is subject to the following restrictions on distributions:
 Amount
August 31, 2020 $0.14 Milliona.no distributions for one year from the Phase II facility completion date.
September 30, 2020 $0.14 Million
October 31, 2020 $0.41 Millionb.distributions cannot exceed in the aggregate 50% of BPGIC’s net profit after tax based on the audited annual financial statements for the previous financial year.
November 30, 2020 $0.14 Million
December 31, 2020 $0.80 Millionc.any distribution shall only be released out of BPGIC and its subsidiaries in the form of a group company loan to the Phase III company.
Total $1.63 Million by end
d.BPGIC must be in compliance with the financial covenants (on the last reporting date).
e.no event of 2020default is continuing or would arise from such distribution.

 

Thereafter, beginning on January 31, 2021 and ending on July 31, 2023, BPGIC will make quarterly payments of approximately $0.54 Million.

Testing of the Debt Service Ratio Covenant will start on December 31, 2020 and will be conducted on each subsequent payment date. A Debt Service Reserve Account containing at least 1 quarter of debt service amounts must be maintained with the lender by October 31, 2020 and at all times thereafter through the term of the Phase I Construction Facility or until BPGIC repays all liabilities owed under the Phase I Construction Facilities. BPGIC pledged the account to the lender as security for the Phase I Construction Facilities. BPGIC, The Company and BPGIC Holdings undertook to have no other bank accounts except for the one that is the Debt Service Reserve Account until the Phase I Construction Facilities are repaid and to route all funds through the Debt Service Reserve Account. BPGIC further granted the lender a non-possessory mortgage over the Phase I Customer Agreement as security for the Phase I Construction Facilities.

Also pursuant to the June 15 Phase I Construction Facilities Amendment, BPGIC negotiated revised pricing terms as follows:

 

oii.BPGIC (including its subsidiaries) cannot invest and/or undertake any capital expenditure obligation that exceeds an aggregate of $10.0 million during the term of the Bond Financing Facility, except for the remaining capital expenditure obligation under the construction contract for Phase II, any maintenance capital expenditure and/or enhancements relating to Phase I Construction Facility: Enhancedand/or Phase II in its ordinary course of business.
iii.BPGIC, during construction of Phase II, upon the occurrence of a cost overrun:
a.must give written notice thereof to 6M EIBOR + 4% per annum [Minimum 5%] and to be further enhanced to 6M EIBOR + 4.5% per annum [Minimum 5%] beginning on January 1, 2021;the Bond Trustee promptly after becoming aware of the cost overrun, and

oPhase I Admin Building Facility: Enhanced to 3M EIBOR + 4% per annum [Minimum 5%]
b.promptly, and to be further enhanced to 3M EIBOR + 4.5% per annum [Minimum 5%] beginning on January 1, 2021.no later than 20 business days after becoming aware of the cost overrun, obtain additional cash funding in an amount not less than the amount of the cost overrun, in the form of new equity capital, intercompany loans or subordinated loans.

There is no change in the final maturity of Phase I Construction Facility which is July 30, 2030 and Phase I Admin Building Facility which is July 31, 2023. BPGIC will pay FAB a transaction service fee of $0.14 million in connection with the June 15, 2020 amendment.

 

BPGIC’s ability to comply with these restrictions and covenants may be affected by events beyond its control, including prevailing economic, financial and industry conditions. If BPGIC is unable to comply with these restrictions and covenants, a significant portion of the indebtedness under the Bond Financing FacilitiesFacility may become immediately due and payable. BPGIC might not have, or be able to obtain, sufficient funds to make these accelerated payments. In addition, BPGIC’s obligations under the Bond Financing FacilitiesFacility are secured by substantially all of BPGIC’s assets, and if BPGIC is unable to repay the indebtedness under the Bond Financing Facilities,Facility, the lendersBond Trustee, on behalf of the bondholders, could seek to foreclose on such assets, which would adversely affect BPGIC’s business, financial condition and results of operations. The Bond Financing FacilitiesFacility also havehas cross-default provisions that apply to any other material indebtedness that BPGIC may have. For more information regarding the Bond Financing Facilities,Facility, see the section entitled ““— Item 5. OperatingManagement’s Discussion and Analysis of Financial ReviewCondition and Prospects—Results of Operations — Liquidity and Capital Resources — Debt Sources of Liquidity.Liquidity

The Company and BPGIC have and will hire, new management personnel and have implemented a number of corporate governance and financial reporting procedures and other policies, processes, systems and controls which have a limited operating history.

The Company and BPGIC has hired new management personnel, including a new chief financial officer, and implemented a number of corporate governance and financial reporting procedures and other policies, processes, systems and controls to comply with the requirements for a foreign private issuer on The Nasdaq Capital Market (“Nasdaq”). While the Company believes it is in full compliance with these requirements, it does not have a long track record on which it can assess the performance and effectiveness of these policies, processes, systems and controls or the analysis of their outputs. Any material inadequacies, weaknesses or failures in BPGIC’s policies, processes, systems and controls could have a material adverse effect on BPGIC’s business, financial condition and results of operations.

 


13

The fixed cost nature of BPGIC’sthe Company’s operations could result in lower profit margins if certain costs were to increase and BPGIC werethe Company was not able to offset such costs with sufficient increases in its storage or ancillary service fees or its customers’ utilization of BPGIC’sthe Company’s ancillary services.

BPGIC’sThe Company’s fixed costs for Phase I, Phase II and the BIA Refinery are, or will be, paid for with the fixed storage fees it receives or will receive, as the case may be, from BIA and the Super Major. BPGICCompany’s existing and future storage customers. The Company expects that a large portion of its future expenses related to the operation of the BPGIC Terminal will be relatively fixed because the costs for full-time employees, rent in connection with the Land Leases, maintenance, depreciation, utilities and insurance generally do not vary significantly with changes in users’ needs. However, BPGICthe Company expects that its profit margins could change if its costs change.

 

In particular, if wages in the region’s oil storage industry were to increase, BPGICthe Company may need to increase the levels of its employee compensation more rapidly than in the past to remain competitive or keep up with increases in general price levels or inflation in the UAE and in Fujairah. If wage costs were to increase at a greater rate than our customers’ utilization of BPGIC’sthe Company’s ancillary services, then such increased wage costs may reduce BPGIC’sthe Company’s profit margins.

 

The Phase I Customer Agreement provides that every two years, BPGIC may elect to review and seek to amend its storage and ancillary services fees with BIA. The Phase I Customer Agreement provides that the outcome of this review can result only in either an increase in rates or no change. As such, if wages were to increase, BPGIC may yield lower margins for a period of time before it is able to review and amend its storage and ancillary service fees. Furthermore, if BIA does not agree to increase the storage and ancillary service fees, or if the increase is insufficient, then BPGIC may not be able to maintain its profit margins.

 

The pricing terms for the Refinery Operations Agreement remain subject to negotiation with BIA. If BPGIC is unable to negotiate for periodic price review and increases or if any such increase is insufficient, then BPGIC may not be able to maintain its profit margins.

 

The Phase II Customer Agreement provides that every two years, BPGIC may elect to seek to amend its storage fee to the applicable market price. The Phase II Customer Agreement provides that the outcome of this amendment can result only in either an increase in rate or no change from the contracted floor price. As such, if wages were to increase, BPGIC may yield lower margins for a period of time before it is able to amend its storage fees. Furthermore, if the increase is insufficient, or BIA does not agree to increase the fees, then BPGIC may not be able to maintain its profit margins.

 

BPGIC III expects that its fixed costs for Phase III will be paid for with the fixed storage fees it will receive from the Phase III customer(s). BPGIC III expects that a large portion of its future expenses related to the operation of Phase III will be relatively fixed because the costs for full-time employees, rent in connection with the Phase III Land Lease, Agreement, maintenance, depreciation, utilities and insurance generally do not vary significantly with changes in users’ needs. However, as with its fixed costs for Phase I and Phase II, BPGIC III expects that its profit margins could change if its costs, in particular wage costs, change.

 

If BPGICthe Company is unable to maintain its margins, it could have a material adverse effect on its business, financial condition and results of operations.

 

BPGICThe Company is dependent on its IT and operational systems, which may fail or be subject to disruption.

BPGICThe Company relies on the proper functioning of its information technology, including the information technology systems in BPGIC’sthe Company’s operation control room, databases, computer systems, telecommunication networks and other infrastructure in its day-to-day operations. BPGIC’sThe Company’s business continuity procedures and measures may not anticipate, prevent or mitigate a network failure or disruption and may not protect against an incident in the limited event that there is no alternative system or backed-up data in place. The nature of BPGIC’sthe Company’s operations and the variety of systems in place to support its business can also present challenges to the efficiency of its information technology networks. BPGIC’sThe Company’s systems are vulnerable to interruptions or damage from a number of factors, including power loss, network and telecommunications failures, data corruption, computer viruses, security breaches, natural disasters, theft, vandalism or other acts, although the BPGIC Terminal’s operational system has limited vulnerability to computer viruses or security breaches because the systems are fully isolated. BPGICThe Company is reliant on third party vendors to supply and maintain much of its information technology. In particular, as is the case for many of BPGIC’sthe Company’s competitors, a significant percentage of its core operations currently use information and technology systems provided by ABB Group and Intelex Technologies, Inc., which BPGICthe Company relies on for related support and upgrades. BPGICThe Company may experience delay or failure in finding a suitable replacement in the event that one or more of the third-party vendors ceases operations or becomes otherwise unable or unwilling to meet BPGIC’sthe Company’s needs.

 


14

There have been an increasing number of cyber security incidents affecting companies around the world, which have caused operational failures or compromised sensitive or confidential corporate data. Although we do not believe our systems are at a greater risk of cyber security incidents than other similar organizations, such cyber security incidents may result in the loss or compromise of customer, financial, or operational data; loss of assets; disruption of billing, collections, or normal operating activities; disruption of electronic monitoring and control of operational systems; and delays in financial reporting and other management functions. Possible impacts associated with cyber security incidents (which generally are increasing in both frequency and sophistication) may include, among others, remediation costs related to lost, stolen, or compromised data; repairs to data processing systems; increased cyber security protection costs; reputational damage; lawsuits seeking damages; regulatory actions; and adverse effects on our compliance with applicable privacy and other laws and regulations. Such occurrences could have an adverse effect on our business, operating results, and financial condition.

 

Although the BPGIC Terminal, based on the nature of BPGIC’sthe Company’s business, is configured to keep its systems operational under abnormal conditions, including with respect to business processes and procedures, any failure or breakdown in these systems could interrupt BPGIC’sthe Company’s normal business operations and result in a significant slowdown in operational and management efficiency for the duration of such failure or breakdown. Any prolonged failure or breakdown could dramatically affect BPGIC’sthe Company’s ability to offer services to users, which could have a material adverse effect on BPGIC’sthe Company’s business, financial condition and results of operations.

 

Beyond Phase II, expansion of BPGIC’sthe Company’s business may require substantial capital investment, and BPGICthe Company may not have sufficient capital to make future capital expenditures and other investments as it deems necessary or desirable.

BPGICThe Company operates in a capital-intensive industry that requires a substantial amount of capital and other long-term expenditures, including those relating to the expansion of existing terminal facilities and the development and acquisition of new terminal facilities. BPGICThe Company has several plans for expansion beyond Phase II, including Phase III, that may require significant capital investment. For example, BPGICthe Company plans to establish an external connection to the local power grid in due course, which would provide the BPGIC Terminal with an additional source of power if necessary.

 

In addition, as discussed further in “Item 4.B Information on the Company¾4B Business Overview — Strategy”, in 2020, BPGIC entered into the Phase III Land Lease Agreement with FOIZ to lease the Phase III Land a plot of land that has a total area of approximately 450,000 m2 on which it would build a new oil storage facility.facility, and novated the Phase III Land Lease to BPGIC III. The Company has engaged MUC, OIL & Gas Engineering Consultancy, LLC (“MUC”), the same advisor that designed the BPGIC Terminal, to create several proposals for the design of Phase III. If BPGICthe Company decides to construct a new facility, it would require substantial capital investment, and BPGICthe Company may not have sufficient capital to make the capital expenditures and other investments as it deems necessary or desirable.

 

To meet the financing requirements for such capital investments, BPGICthe Company may have to utilize a combination of internally generated cash and external borrowings, including banking and capital markets transactions. BPGICThe Company may also seek, in the event that further material expansion opportunities arise in the future, to obtain additional funding from the capital markets to further enhance its funding position. BPGIC’sThe Company’s ability to arrange external financing and the cost of such financing is dependent on numerous factors, including its future financial condition, the terms of any restrictive covenants under then existing credit facilities, general economic and capital market conditions, interest rates, credit availability from banks or other lenders, investor confidence in BPGIC,the Company, applicable provisions of tax and securities laws and political and economic conditions in any relevant jurisdiction. Moreover, the decline in global credit markets and reduced liquidity may affect BPGIC’sthe Company’s ability to secure financing on commercially reasonable terms, if at all. BPGICThe Company cannot provide any assurance that it will be able to arrange any such external financing on commercially reasonable terms, if at all, and it may be required to secure any such financing with a lien over its assets or agree to contractual limitations on its business. If BPGICthe Company is unable to generate or obtain funds sufficient to make necessary or desirable capital expenditure and other investments, it may be unable to grow its business, which may have a material adverse effect on its business, financial condition and results of operations.

 

Beyond Phase II, the aforementioned projects and the projects described in “Item 4.B Business Overview — Strategy”, BPGICherein, the Company may consider additional projects in the future, which would be subject to the same risks mentioned above.

 


Increases in interest rates, to the extent BPGIC has not hedged its interest rate exposure, could adversely affect BPGIC’s business, financial condition and results of operations and its ability to issue equity or incur debt for acquisitions or other purposes.

Interest rates may increase in the future. As a result, BPGIC’s floating interest rates on its Financing Facilities or future credit facilities and debt offerings could be higher than current levels, causing BPGIC’s financing costs to generally increase to the extent BPGIC has not fully hedged its interest rate risk exposure. Although BPGIC has entered into a contractual arrangement with First Abu Dhabi Bank PJSC (“FAB”) to hedge the interest rates for BPGIC’s interest payments coming due from June 28, 2019 to June 30, 2023 under the Phase I Financing Facilities, to the extent BPGIC does not hedge its interest rate exposure resulting from other borrowings, including the Phase II Financing Facility, or such hedging arrangements prove ineffective, a rising interest rate environment could have an adverse effect on BPGIC’s business, financial condition and results of operations and its ability to issue equity or incur debt for acquisitions or other purposes.

Risks Related to the Company’s BusinessStructure and OperationsCapitalization

 

The value of your investment in the Company areis subject to the significant risks affecting the Company and BPGIC and inherent in the industry in which BPGICthe Company operates. You should carefully consider the risks and uncertainties described above and below and other information included in this Report. If any of the events described above or below occur, the Company’s business and financial results could be adversely affected in a material way. This could cause the trading price of the ordinary shares, par value $0.0001 per share, of the Company (the “Ordinary Shares”)Company’s securities to decline, perhaps significantly, and you therefore may lose all or part of your investment. As used in the risks described in this subsection, references to “we,” “us” and “our” are intended to refer to BPGIC unless the context clearly indicates otherwise.

15

 

The Company’s only significant asset is its ownership of BPGIC and BPGIC III and such ownership may not be sufficient to pay dividends or make distributions or obtain loans to enable the Company to pay any dividends on its Ordinary Shares or satisfy other financial obligations.

The Company is a holding company and does not directly own any operating assets other than its ownership of interests in BPGIC.BPGIC and BPGIC III. The Company depends on BPGIC and BPGIC III for distributions, loans and other payments to generate the funds necessary to meet its financial obligations, including its expenses as a publicly traded company and to pay any dividends. The earnings from, or other available assets of, BPGIC and BPGIC III may not be sufficient to make distributions or pay dividends, pay expenses or satisfy the Company’s other financial obligations.

 

Fluctuations in operating results, quarter to quarter earnings and other factors, including incidents involving BPGIC’s customers and negative media coverage, may result in significant decreases in the price of the Company’s securities.

The stock markets experience volatility that is often unrelated to operating performance. These broad market fluctuations may adversely affect the trading price of the Company’s securities and, as a result, there may be significant volatility in the market price of the Company’s securities. If BPGIC is unable to operate profitably as investors expect, the market price of the Company securities will likely decline when it becomes apparent that the market expectations may not be realized. In addition to operating results, many economic and seasonal factors outside of the Company’s or BPGIC’s control could have an adverse effect on the price of the Company’s securities and increase fluctuations in its quarterly earnings. These factors include certain of the risks discussed herein, operating results of other companies in the same industry, changes in financial estimates or recommendations of securities analysts, speculation in the press or investment community, negative media coverage or risk of proceedings or government investigation, the possible effects of war, terrorist and other hostilities, pandemics, adverse weather conditions, changes in general conditions in the economy or the financial markets or other developments affecting the oil and gas storage industry.


The Company incurs higher costs as a result of being a public company.

The Company has and will continue to incur significant additional legal, accounting, insurance and other expenses, including costs associated with public company reporting requirements. The Company will incur higher costs associated with complying with the requirements of the Sarbanes-Oxley Act, the Dodd-Frank Wall Street Reform and Consumer Protection Act, and related rules implemented by the SEC and Nasdaq.NASDAQ. The expenses incurred by public companies generally for reporting and corporate governance purposes have been increasing. These laws and regulations increase the Company’s legal and financial compliance costs and render some activities more time-consuming and costly. The Company may need to hire more employees or engage outside consultants to comply with these requirements, which will increase its costs and expenses. These laws and regulations could make it more difficult or costly for the Company to obtain certain types of insurance, including director and officer liability insurance, and the Company may be forced to accept reduced policy limits and coverage or incur substantially higher costs to obtain the same or similar coverage. These laws and regulations could also make it more difficult for us to attract and retain qualified persons to serve on the Company’s board of directors, board committees or as executive officers. Furthermore, if the Company is unable to satisfy its obligations as a public company, it could be subject to delisting of its Ordinary Shares and/or warrants,Warrants, fines, sanctions and other regulatory action and potentially civil litigation.

 

The escrow release provisions of the Escrow Agreement may affect management decisions and incentives.

Under thean Escrow Agreement dated as of May 10, 2019, by and among the Company, Continental, Stock Transfer and Trust (“Continental”), as escrow agent, and BPGIC Holdings (as assignee of Brooge Petroleum and Gas Investment Company (BPGIC) PLC) as amended by the First Amendment to the Escrow Agreement, dated December 20, 2019, by and among BPGIC Holdings, Continental and the Company (as amended, the “Seller Escrow Agreement”), up to 20 million20,000,000 additional Ordinary Shares that were placed in escrow at Closing will be released to BPGIC Holdings in the event that the Company meets certain Annualized EBITDA (as defined in the Seller Escrow Agreement) or share price targets during the period commencing from the Closing until the end of the twentieth (2020th) fiscal quarter after the commencement date of the first full fiscal quarter beginning after the Closing (the “Seller Escrow Period”). As a result, the Company’s management may focus on increasing the Annualized EBITDA of the Company and its subsidiaries including BPGIC, for quarters within the Seller Escrow Period rather than on increasing net income during such quarters. Additionally, the share price target can be achieved at any time during the Seller Escrow Period, and the share price targets could be achieved early in the Seller Escrow Period which would trigger release of the escrow shares even if the share price fell later in the Seller Escrow Period. See “Item 10.C Material Contracts – Seller Escrow Agreement”.

 

The Company may or may not pay cash dividends in the foreseeable future.

Although the Company announced in the Fourth Quarter of 2019 that it intends to pay a $0.25 quarterly dividend to its public shareholders beginning in the First Quarter of 2020, the Company has not paid such dividend, and has not committed to pay a cash dividend on such terms and in such amount with respect to its Ordinary Shares, and the Company may not pay cash dividends with respect to its Ordinary Shares at all. In light of the economic impact of the COVID-19 pandemic, the Company’s board of directors subsequently determined that, notwithstanding its prior announcement, it was in the best interests of the Company as a precautionary measure and to prudently preserve cash, to delay issuance of dividends. No assurance can be given that the Company will ultimately pay any dividend to its shareholders. Any decision to declare and pay dividends in the future will be made at the discretion of the board of directors of the Company and will depend on, among other things, applicable law, regulations, restrictions, the Company’s and BPGIC’s respective results of operations, financial condition, cash requirements, contractual restrictions, the Company’s and BPGIC’s future projects and plans and other factors that the Company’s board of directors may deem relevant. In addition, the Company’s ability to pay dividends depends significantly on the extent to which it receives dividends from BPGIC and BPGIC III and there can be no assurance that BPGIC and/or BPGIC III will pay dividends. As a result, capital appreciation, if any, of the Company’s Ordinary Shares willmay be a shareholder’s sole source of gain for the foreseeable future.


The market for the Company’s securities may not be sustained, which would adversely affect the liquidity and price of the Company’s securities.

The price of the Company’s securities may vary significantly due to general market or economic conditions. Furthermore, an active trading market for the Company’s securities may not be sustained. You may be unable to sell your securities unless a market can be sustained.

The price of the Company’s Ordinary Shares may be volatile.

The price of the Company’s Ordinary Shares may fluctuate due to a variety of factors, including but not limited to:

actual or anticipated fluctuations in our quarterly and annual results and those of other public companies in the industry;

mergers and strategic alliances in the oil and gas industries;

market prices and conditions in the oil and gas markets;

changes in government regulation;

potential or actual military conflicts or acts of terrorism;

existing or future global or regional health crises;

the failure of securities analysts to publish research about us, or shortfalls in our operating results compared to levels forecast by securities analysts;

announcements concerning us or our competitors; and

the general state of the securities markets.

These market and industry factors may materially reduce the market price of our Ordinary Shares, regardless of our operating performance. Volatility in the price of our Ordinary Shares may increase volatility in the price of our warrants.


Reports published by analysts, including projections in those reports that differ from our actual results, could adversely affect the price and trading volume of our Ordinary Shares.

We currently expect that securities research analysts will establish and publish their own periodic projections for our business. These projections may vary widely and may not accurately predict the results we actually achieve. Our share price may decline if our actual results do not match the projections of these securities research analysts. Similarly, if one or more of the analysts who write reports on us downgrades our shares or publishes inaccurate or unfavorable research about our business, our share price could decline. If one or more of these analysts ceases coverage of us or fails to publish reports on us regularly, our share price or trading volume could decline. While we expect research analyst coverage, if no analysts commence coverage of us, the trading price and volume for our Ordinary Shares could be adversely affected.

 

The Company may issue additional Ordinary Shares or other equity securities without your approval, which would dilute your ownership interests and may depress the market price of the Company’s Ordinary Shares.

The Company may issue additional Ordinary Shares or other equity securities of equal or senior rank in the future in connection with, among other things, future acquisitions, repayment of outstanding indebtedness or our equity incentive plan, without shareholder approval, in a number of circumstances.

 

16

The Company’s issuance of additional Ordinary Shares or other equity securities of equal or senior rank would have the following effects:

 

the Company’s existing shareholders’ proportionate ownership interest in the Company will decrease;

the amount of cash available per share, including for payment of dividends in the future, may decrease;

the relative voting strength of each previously outstanding Ordinary share may be diminished; and

the market price of the Company’s Ordinary Shares may decline.

 

The exercise price of the Company’s warrantsWarrants can fluctuate under certain circumstances which, if triggered, can result in potentially material dilution of the Company’s then existing shareholders.

Currently, there are outstanding a total of 21,228,900 warrantsWarrants each to purchase one Ordinary Share at an exercise price of $11.50. The price at which such Ordinary Shares may be purchased upon exercise of the warrantsWarrants may be adjusted in certain circumstances, including, but not limited to, when (i) the Company undertakes certain share capitalizations, share sub-divisions, rights offerings or other similar events, or (ii) the Company pays certain dividends or makes certain distributions in cash, securities or other assets to the holders of Ordinary Shares on account of such Ordinary Shares. These adjustments are intended to provide the investors in the Company’s warrantsWarrants with partial protection from the effects of actions that dilute their interests in the Company on a fully-exercised basis. In addition, the Company may, in its sole discretion, temporarily lower the exercise price of the Company’s warrantsWarrants provided it lowers the price for not less than twenty (20)20 business days, provides at least twenty (20)20 days prior notice to the registered holders of such warrantsWarrants and applies such decrease consistently to all warrants.Warrants. These provisions could result in substantial dilution to investors in the Company’s Ordinary Shares.

 


The Company is a Cayman Islands exempted company and, because judicial precedent regarding the rights of shareholders is different under Cayman Islands law than under U.S. law, you could have less protection of your shareholder rights than you would under U.S. law.

The Company’s corporate affairs are governed by its Amended and Restated Memorandum and Articles of Association, the Cayman Islands Companies Law, (2020 Revision) (the “Companies Law”), and the common law of the Cayman Islands. The rights of shareholders to take action against the directors, actions by non-controlling shareholders and the fiduciary responsibilities of the Company’s directors to the Company under Cayman Islands law are to a large extent governed by the common law of the Cayman Islands. The common law of the Cayman Islands is derived in part from comparatively limited judicial precedent in the Cayman Islands as well as from English common law, which has persuasive, but not binding, authority on a court in the Cayman Islands. Your rights as a shareholdersshareholder and the fiduciary responsibilities of the Company’s directors under Cayman Islands law are different from under statutes or judicial precedent in some jurisdictions in the United States. In particular, the Cayman Islands has a different body of securities laws from the United States and may provide significantly less protection to investors. In addition, some U.S. states, such as Delaware, have different bodies of corporate law than the Cayman Islands.

 

The Company has been advised by its Cayman Islands legal counsel, Maples and Calder, that the courts of the Cayman Islands are unlikely (i) to recognize or enforce against the Company judgments of courts of the United States predicated upon the civil liability provisions of the securities laws of the United States or any U.S. State and (ii) in original actions brought in the Cayman Islands, to impose liabilities against the Company predicated upon the civil liability provisions of the securities laws of the United States or any U.S. State, so far as the liabilities imposed by those provisions are penal in nature. In those circumstances, although there is no statutory enforcement in the Cayman Islands of judgments obtained in the United States, the courts of the Cayman Islands will recognize and enforce a foreign money judgment of a foreign court of competent jurisdiction without retrial on the merits based on the principle that a judgment of a competent foreign court imposes upon the judgment debtor an obligation to pay the sum for which judgment has been given provided certain conditions are met. For a foreign judgment to be enforced in the Cayman Islands, such judgment must be final and conclusive and for a liquidated sum, and must not be in respect of taxes or a fine or penalty, inconsistent with a Cayman Islands judgment in respect of the same matter, impeachable on the grounds of fraud or obtained in a manner, and/or be of a kind the enforcement of which is, contrary to natural justice or the public policy of the Cayman Islands (awards of punitive or multiple damages may well be held to be contrary to public policy). A Cayman Islands Court may stay enforcement proceedings if concurrent proceedings are being brought elsewhere. There is recent Privy Council authority (which is binding on the Cayman Islands Court) in the context of a reorganization plan approved by the New York Bankruptcy Court which suggests that due to the universal nature of bankruptcy/insolvency proceedings, foreign money judgments obtained in foreign bankruptcy/insolvency proceedings may be enforced without applying the principles outlined above. However, a more recent English Supreme Court authority (which is highly persuasive but not binding on the Cayman Islands Court), has expressly rejected that approach in the context of a default judgment obtained in an adversary proceeding brought in the New York Bankruptcy Court by the receivers of the bankruptcy debtor against a third party, and which would not have been enforceable upon the application of the traditional common law principles summarized above and held that foreign money judgments obtained in bankruptcy/insolvency proceedings should be enforced by applying the principles set out above, and not by the simple exercise of the Courts’ discretion. Those cases have now been considered by the Cayman Islands Court. The Cayman Islands Court was not asked to consider the specific question of whether a judgment of a bankruptcy court in an adversary proceeding would be enforceable in the Cayman Islands, but it did endorse the need for active assistance of overseas bankruptcy proceedings. The Company understands that the Cayman Islands Court’s decision in that case has been appealed and it remains the case that the law regarding the enforcement of bankruptcy/insolvency related judgments is still in a state of uncertainty.

 

17

You have limited ability to bring an action against the Company or against its directors and officers, or to enforce a judgment against the Company or them, because the Company is incorporated in the Cayman Islands, because the Company conducts all of its operations in the United Arab EmiratesUAE and because all of the Company’s directors and officers reside outside the United States.

The Company is incorporated in the Cayman Islands and currently conducts all of its operations through its subsidiary, BPGIC, and once phase III is ready, will conduct all of its operations through its subsidiaries, BPGIC and BPGIC III, in the United Arab Emirates.UAE. All of the Company’s assets are located outside the United States. The Company’s officers and directors reside outside the United States and a substantial portion of the assets of those persons are located outside of the United States. As a result, it could be difficult or impossible for you to bring an action against the Company or against these individuals in the United States in the event that you believe that your rights have been infringed under the applicable securities laws or otherwise. Even if you are successful in bringing an action of this kind, the laws of the Cayman Islands and of the United Arab EmiratesUAE could render you unable to enforce a judgment against the Company’s assets or the assets of the Company’s directors and officers.

 


Shareholders of Cayman Islands exempted companies such as the Company have no general rights under Cayman Islands law to inspect corporate records and accounts or to obtain copies of lists of shareholders of these companies. The Company’s directors have discretion under Cayman Islands law to determine whether or not, and under what conditions, the Company’s corporate records could be inspected by the Company’s shareholders, but are not obliged to make them available to the Company’s shareholders. This could make it more difficult for you to obtain the information needed to establish any facts necessary for a shareholder motion or to solicit proxies from other shareholders in connection with a proxy contest.

 

As a result of all of the above, the Company’s shareholders might have more difficulty in protecting their interests in the face of actions taken by management, members of the board of directors or controlling shareholders than they would as public shareholders of a U.S. company.

 

Provisions in the Company’s Amended and Restated Memorandum and Articles of Association may inhibit a takeover of us,the Company, which could limit the price investors might be willing to pay in the future for the Company’s securities and could entrench management.

The Company’s Amended and Restated Memorandum and Articles of Association contain provisions that may discourage unsolicited takeover proposals that shareholders of the Company may consider to be in their best interests. Among other provisions, the ability of the Company’s board of directors to issue preferred shares with preferences and voting rights determined by the board without shareholder approval may make it more difficult for the Company’s shareholders to remove incumbent management and accordingly discourage transactions that otherwise could involve payment of a premium over prevailing market prices for the Company’s securities. Other anti-takeover provisions in the Company’s Amended and Restated Memorandum and Articles of Association include the indemnification of the Company’s officers and directors, the requirement that directors may only be removed from the Company’s board of directors for cause and the requirement for a Special Resolution to amend provisions therein that affect shareholder rights. These provisions could also make it difficult for the Company’s shareholders to take certain actions and limit the price investors might be willing to pay for the Company’s securities.

 

As a “foreign private issuer” under the rules and regulations of the SEC, the Company is permitted to, does, and will, file less or different information with the SEC than a company incorporated in the United States or otherwise subject to these rules, and will follow certain home-country corporate governance practices in lieu of certain NasdaqNASDAQ requirements applicable to U.S. issuers.

The Company is considered a “foreign private issuer” under the Exchange Act and is therefore exempt from certain rules under the Exchange Act, including the proxy rules, which impose certain disclosure and procedural requirements for proxy solicitations for U.S. and other issuers. Moreover, the Company is not required to file periodic reports and financial statements with the SEC as frequently or within the same time frames as U.S. companies with securities registered under the Exchange Act. The Company currently prepares its financial statements in accordance with IFRS. The Company will not be required to file financial statements prepared in accordance with or reconciled to U.S. GAAP so long as its financial statements are prepared in accordance with IFRS as issued by the International Accounting Standards Board.IFRS. The Company is not required to comply with Regulation FD, which imposes restrictions on the selective disclosure of material information to shareholders. In addition, the Company’s officers, directors and principal shareholders are exempt from the reporting and short-swing profit recovery provisions of Section 16 of the Exchange Act and the rules under the Exchange Actpromulgated thereunder with respect to their purchases and sales of the Company’s securities.shares.

 

In addition, as a “foreign private issuer” whose Ordinary Sharessecurities are listed on Nasdaq,NASDAQ, the Company is permitted to follow certain home-country corporate governance practices in lieu of certain Nasdaq requirements.NASDAQ requirements, except for certain matters including the composition and responsibilities of the audit committee and the independence of its members. A foreign private issuer must disclose in its Annual Reportsannual reports filed with the SEC each NASDAQ requirement with which it does not comply followed by a description of its applicable home country practice. The Company currently follows some, but not all of the corporate governance requirements of Nasdaq.NASDAQ. With respect to the corporate governance requirements of NASDAQ that the Company that it does follow,follows, the Company cannot make any assurances that it will continue to follow such corporate governance requirements in the future, and may therefore in the future, rely on available NasdaqNASDAQ exemptions that would allow the Company to follow its home country practice. Unlike the requirements

18

The Company follows home country practice in lieu of Nasdaq, theNASDAQ corporate governance practice and requirements inwith respect to the Cayman Islands do not require the Company, and the Company has not established, and currently does not intend to establish, a nominations committee; and do not require the Company, and the Company currently does not intend, to seek shareholder approval for certain security issuances specified in Nasdaqfollowing NASDAQ requirements:

Executive Sessions. We are not required to and, in reliance on home country practice, we may not, comply with certain NASDAQ rules requiring the Company’s independent directors to meet in regularly scheduled executive sessions at which only independent directors are present. The Company follows Cayman Islands practice which does not require independent directors to meet regularly in executive sessions separate from the full board of directors.
Nomination of Directors. The Company’s director nominees may not be selected or recommended for the board of director’s selection by either (i) independent directors constituting a majority of the board’s independent directors in a vote in which only independent directors participate, or (ii)a nominations committee comprised solely of independent directors, as required under NASDAQ rules. The Company follows Cayman Islands practice which does not require director nominations to be made or recommended solely by independent directors. Further, the Company does not have a formal written charter or board resolution addressing the director nominations process. The Company follows Cayman Islands practice which does not require the Company to have a formal written charter or board resolution addressing the director nominations process.
Proxy Statements. We are not required to and, in reliance on home country practice, we may not, comply with certain NASDAQ rules regarding the provision of proxy statements for general meetings of shareholders. The Company will follow Cayman Islands practice which does not impose a regulatory regime for the solicitation of proxies.
Shareholder Approval. The Company is not required to and, in reliance on home country practice, it does not intend to, comply with certain NASDAQ rules regarding shareholder approval for certain issuances of securities under NASDAQ Rule 5635. In accordance with the provisions of the Company’s Amended and Restated Memorandum and Articles of Association, the Company’s board of directors is authorized to issue securities, including Ordinary Shares, preferred shares, warrants and convertible notes, without shareholder approval.

Such Cayman Islands home country practices may afford less protection to holders of the Company’s Ordinary Shares. For additional information regarding the home country practices the Company intends to follow in lieu of Nasdaq requirements, see “Item 16G. Corporate Governance”.securities.

 


The Company would lose its status as a “foreign private issuer” under current SEC rules and regulations if more than 50% of the Company’s outstanding voting securities become directly or indirectly held of record by U.S. holders and one of the following is true: (i) the majority of the Company’s directors or executive officers are U.S. citizens or residents; (ii) more than 50% of the Company’s assets are located in the United States; or (iii) the Company’s business is administered principally in the United States. If the Company loses its status as a foreign private issuer in the future, it will no longer be exempt from the rules described above and, among other things, will be required to file periodic reports and annual and quarterly financial statements as if it were a company incorporated in the United States. If this were to happen, the Company would likely incur substantial costs in fulfilling these additional regulatory requirements and members of the Company’s management would likely have to divert time and resources from other responsibilities to ensuring these additional regulatory requirements are fulfilled.

 

The Company is an “emerging growth company,” and any decision on the Company’s part to comply with certain reduced disclosure requirements applicable to emerging growth companies could make its Ordinary Shares less attractive to investors.

The Company is an “emerging growth company,” as defined in the JOBS Act and, for as long as it continues to be an emerging growth company, it may choose to take advantage of certain exemptions from various reporting requirements applicable to other public companies including, but not limited to: not being required to have its internal control over financial reporting audited by its independent registered public accounting firm pursuant to Section 404 of the Sarbanes-Oxley Act for a specified time period; reduced disclosure obligations regarding executive compensation in its periodic reports and proxy statements;reports; and exemptions from the requirements to hold a nonbinding advisory vote on executive compensation and to obtain shareholder approval of any golden parachute payments not previously approved. ItThe Company has taken, and may continue to take, advantage of these provisions for up to five yearssome or all of such earlierexemptions until such time that itas the Company is no longer an “emerging growth company.”company”. The Company will remain an “emerging growth company” for up to five years, although, it would cease to be an “emerging growth company” upon the earliest of: the first fiscal year following the fifth anniversary of its initial sale of common equity pursuant to a registration statement declared effective under the consummation of the Closing;Securities Act; the first fiscal year after its annual gross revenue is $1.07 billion or more; the date on which it has, during the previous three-year period, issued more than $1 billion in non-convertible debt securities; or the date on which it is deemed to be a “large accelerated filer” as defined in the Exchange Act. To the extent the Company takes advantage of any of these reduced reporting burdens in this annual report or in futureits filings, the information that it provides to its security holders may be different than you might get from other public companies in which you hold equity interests.securities. The Company cannot predict if investors find, or will find, its Ordinary Sharessecurities less attractive because it may relyof the Company’s reliance on these exemptions. If some investors find the Company’s Ordinary Sharessecurities less attractive as a result, there may be a less active trading market for itsthe Company’s Ordinary Shares and its share price may be more volatile.

19

 

The Company’s controlling shareholder has substantial influence over the Company and its interests may not be aligned with the interests of the Company’s other shareholders.

BPGIC Holdings holds approximately 85.7%85.6% of the Company’s voting equity. Each of BPGIC Holdings, Nicolaas Paardenkooper as the Chief Executive Officer of BPGIC Holdings, BPGIC PLC and the majority shareholder of BPGIC HoldingsPLC have substantial influence over our business, including decisions regarding mergers, consolidations, the sale of all or substantially all of our assets, election of directors, declaration of dividends and other significant corporate actions. As the controlling shareholder, BPGIC Holdings may take actions that are not in the best interests of the Company’s other shareholders. These actions may be taken in many cases even if they are opposed by the Company’s other shareholders. In addition, this concentration of ownership may discourage, delay or prevent a change in control which could deprive you of an opportunity to receive a premium for your Ordinary Shares as part of a sale of the Company.

 


Risks Related to Doing Business in Countries in Which BPGICthe Company Operates

 

BPGICThe Company is subject to political and economic conditions in Fujairah and the UAE.

All of BPGIC’sthe Company’s operations are located in the UAE. BPGIC’sThe Company’s operations in Fujairah are located near an area of strategic economic and military importance for the entire region. As such, BPGIC’sthe Company’s future business may be affected by the financial, political and general economic conditions prevailing from time to time in the region and the UAE.

 

Although economic growth rates in the UAE remain above those of many more developed, as well as regional, markets, the UAE has experienced slower economic growth in recent years, following the downturn experienced as a result of the global financial crisis in 2008 and the sharp decline in oil prices in recent years, which remain volatile and below historic highs. There can be no assurance that economic growth or performance in Fujairah or the UAE, in general, will be sustained. The UAE’s wealth remains largely based on oil and gas. Despite the UAE being viewed as being less vulnerable than some of its Gulf Cooperation Council (“GCC”) neighbors, due to the growth in the non-oil sector and the sizeable wealth of the government of Abu Dhabi, fluctuations in energy prices have an important bearing on economic growth. To the extent that economic growth or performance in the UAE subsequently declines, BPGIC’sthe Company’s business, financial condition and results of operations may be adversely affected. In addition, the implementation by the governments of the UAE of restrictive fiscal or monetary policies or regulations, including in respect of interest rates, or new legal interpretations of existing regulations and the introduction of taxation or exchange controls could have a material adverse effect on BPGIC’sthe Company’s business, financial condition, results of operations and prospects.

 

While the UAE enjoys domestic political stability and generally healthy international relations, since early 2011 there has been political unrest in a range of countries in the Middle East and North Africa (“MENA”) region, including Algeria, Bahrain, Egypt, Iraq, Libya, Morocco, Oman, Saudi Arabia, Syria, Tunisia and Yemen. This unrest has ranged from public demonstrations to, in extreme cases, armed conflict and civil war and has given rise to a number of regime changes and increased political uncertainty across the region. The MENA region is currently subject to a number of armed conflicts including those in Yemen (in which the UAE armed forces, along with a number of other Arab states, are involved), Syria and Iraq as well as the multinational conflict with Islamic State.

 

It is not possible to predict the occurrence of events or circumstances such as terrorism, war or hostilities, or more generally the financial, political and economic conditions prevailing from time to time, or the impact of such occurrences or conditions, and no assurance can be given that BPGICthe Company would be able to sustain its current profit levels if adverse financial, political or economic events or circumstances were to occur. A general downturn or instability in certain sectors of the UAE or the regional economy, or political upheaval therein, could have an adverse effect on BPGIC’sthe Company’s business, results of operations and financial condition. Investors should also note that BPGIC’sthe Company’s business and financial performance could be adversely affected by political, economic or related developments both within and outside the MENA region because of interrelationships within the global financial markets.

 

On June 5, 2017, three GCC countries, Saudi Arabia, the UAE and Bahrain, as well as Egypt and Yemen, severed diplomatic ties with Qatar, cut trade and transport links and imposed sanctions on Qatar. The stated rationale for such actions was Qatar’s support of terrorist and extremist organisations and Qatar’s interference in the internal affairs of other countries. There can be no assurance as to whenHowever, these diplomatic relations will be restored or air, land and sea connections reopened with Qatar. It is also not currently possible to predictare restoring, as UAE ended all measures taken against Qatar following the outcomesigning of this dispute, and any significant escalation or continuation of the current situation for an extended period could negatively affect Fujairah and the UAE.AlUla agreement between GCC countries on January 5, 2021.

 

In the past, political conflicts have resulted in attacks on vessels, mining of waterways and other efforts to disrupt shipping. Continuing conflicts, instability and other recent developments in the Middle East and elsewhere, including relatively recent attacks involving vessels and vessel seizures in the Strait of Hormuz, and the presence of U.S. or other armed forces in Afghanistan and Syria, may lead to additional acts of terrorism or armed conflict around the world, and our customer’s vessels may face higher risks of being attacked or detained. BPGIC’sThe Company’s business and financial performance would be adversely affected by any reduction in use of the Port of Fujairah as a result of such tensions or conflict.

 


20

Prospective investors should also be aware that investments in emerging markets, such as the UAE, are subject to greater risks than those in more developed markets. The economy of the UAE, like those of many emerging markets, has been characterized by significant government involvement through direct ownership of enterprises and extensive regulation of market conditions, including foreign investment, foreign trade and financial services. While the policies of the local and central governments of the UAE generally resulted in improved economic performance in previous years, there can be no assurance that these levels of performance can be sustained.

 

RecentRelatively recent geopolitical developments have increased the risk that the region in which BPGICthe Company operates could be involved in an escalating conflict that could have a material adverse effect on our business, financial condition and results of operations.

On September 14, 2019, certain attacks on an oil processing plant and an oil field in Saudi Arabia took place, which, according to preliminary reports, significantly disrupted the oil production capacity of Saudi Arabia, and could cause short and/or long term geopolitical strife. The government of Saudi Arabia and the United States have reported their belief that the attacks were conducted by Iran or its proxy (possibly Yemen). Whether or not these reports are accurate, rising tensions in the region could significantly place the extraction, production and delivery of oil produced in the region at risk. Further, because the UAE is also involved in the conflict in Yemen, it is possible that the perpetrators of the attacks may seek to launch a similar attack against the UAE. Should such an attack occur, or should rising tension in the region cause a conflict, the ports, pipelines and terminal facilities of the UAE could be at risk and BPGIC’sthe Company’s operations could be materially and adversely affected.

 

BPGIC’sThe Company’s business operations could be adversely affected by terrorist attacks, natural disasters or other catastrophic events beyond its control.

BPGIC’sThe Company’s business operations could be adversely affected or disrupted by terrorist attacks, natural disasters (such as floods, fires or significant storms) or other catastrophic or otherwise disruptive events, including changes to predominant natural weather, sea and climatic patterns, piracy, sabotage, insurrection, military conflict or war, riots or civil disturbance, radioactive or other material environmental contamination, an outbreak of a contagious disease, or changes to sea levels, which may adversely affect global or regional trade volumes or user demand for oil products transported to or from affected areas, and denial of the use of any railway, port, airport, shipping service or other means of transport and disrupt users’ logistics chains. In addition, BPGICthe Company may be exposed to extreme weather conditions such as severe heat, flooding, rain or wind conditions, which could disrupt activities at the BPGIC Terminal and the Port of Fujairah. Several of BPGIC’sthe Company’s competitors in the Fujairah oil zone region have experienced issues with flooding in the past due to the region’s close proximity to the Al Hajar mountainous region, where floods sometimes occur when a significant amount of rain mixes with the dirt from the mountains and subsequently clogs the region’s drainage system. Although the BPGIC Terminal has been designed with sufficient drainage capabilities to handle certain flooding scenarios and the Phase I oil storage tanks have been constructed to withstand high levels of radiation and fire in accordance with National Fire Protection Association (“NFPA”) standards, if the flooding, radiation or fire is significantly severe, there can be no assurance BPGIC’sthe Company’s business operations would be unaffected by it.

 

The occurrence of any of these events at the BPGIC Terminal or in Fujairah may reduce BPGIC’sthe Company’s business volumes, cause delays in the arrival and departure of oil tankers or disruptions to its operations, in part or in whole, may increase the costs associated with storage, heating or blending activities, may subject BPGICthe Company to liability or impact its brand and reputation and may otherwise hinder the normal operation of the BPGIC Terminal, which could substantially impair BPGIC’sthe Company’s growth prospects and could have a material adverse effect on its business, financial condition and results of operations. Although BPGICthe Company has insurance in place to cover certain of these events if they occur at the BPGIC Terminal, including sabotage and terrorism insurance, there can be no assurance that such insurance will be sufficient to cover all costs and lost business volumes associated with such events.

 

Climate change legislation or regulations restricting emissions of greenhouse gases could result in increased operating and capital costs and reduced demand for BPGIC’sthe Company’s storage services.

There is a growing belief that emissions of greenhouse gases (“GHGs”), such as carbon dioxide and methane, may be linked to climate change. Climate change and the costs that may be associated with its impacts and the regulation of GHGs have the potential to affect BPGIC’sthe Company’s business and the businesses of users in many ways, including negatively impacting the costs BPGICthe Company incurs in providing its services and the demand for its services (due to change in both costs and weather patterns).

 


In February 2005, the Kyoto Protocol to the United Nations Framework Convention on Climate Change, or the Kyoto Protocol, entered into force. The UAE ratified the Kyoto Protocol in 2005. The first commitment period of the Kyoto Protocol ended in 2012, but it was nominally extended past its expiration date with a requirement for a new legal construct to be put into place by 2015. To that end, in December 2015, over 190 countries, including the UAE, reached an agreement to reduce global greenhouse gas emissions. From the time BPGICthe Company completed construction of Phase I on November 19, 2017, its facilities have been in full compliance with the latest requirements. The Paris Agreement which enters into force in 2020, will requirerequires governments to take legislative and regulatory measures to reduce emissions that are thought to be contributing to climate change. While BPGICthe Company has already taken certain measures to reduce emissions of volatile organic compounds, additional measures might become necessary, which could increase operating costs. Moreover, BPGIC’sthe Company’s business might be impacted by changes in demand of the oil products that it stores to the extent users are impacted by such regulations.

 

21

Although it is not possible at this time to accurately estimate how potential future laws or regulations addressing GHG emissions would impact BPGIC’sthe Company’s business, any future local, national, international or federal laws or implementing regulations that may be adopted to address GHG emissions could possibly require BPGICthe Company to incur increased operating costs and could adversely affect demand for the oil or oil products it stores. The potential increase in the costs of BPGIC’sthe Company’s operations resulting from any legislation or regulation to restrict emissions of GHGs could include new or increased costs to operate and maintain its facilities, install new emission controls on its facilities, acquire allowances to authorize its greenhouse gas emissions, pay any taxes related to its GHG emissions and administer and manage a GHG emissions program. Moreover, incentives to conserve energy or use alternative energy sources could reduce demand for BPGIC’sthe Company’s services. BPGICThe Company cannot predict with any certainty at this time how these possibilities may affect its operations. Many scientists have concluded that increasing concentrations of GHGs in the Earth’s atmosphere may produce climate change that could have significant physical effects, such as increased frequency and severity of storms, droughts, and floods and other climatic events; if such effects were to occur, they could have an adverse effect on BPGIC’sthe Company’s business, financial condition and results of operations.

BPGICThe Company may incur significant costs to maintain compliance with, or address liabilities under, environmental, health and safety regulation applicable to its business.

BPGIC’sThe Company’s business operations are subject to UAE, national, state and local environmental laws and regulations concerning, among other things, the management of hazardous substances, the storage and handling of hazardous waste, the control of the emission of vapor into the air and water discharges, the remediation of contaminated sites and employee health and safety. These laws and regulations are complex and subject to change. BPGICThe Company could incur unexpected costs, penalties and other civil and criminal liability if it fails to comply with applicable environmental or health and safety laws. Although BPGICthe Company has installed impermeable lining over the ground soil throughout the Phase I & II Land’s tank farm area and any other area where oil leakage could occur and potentially reach the ground soil, and intends to take similar preventative measures for the Phase III Land, there can be no assurance in the unlikely event of an accidental leak, release or spill of oil products or other products at the BPGIC Terminal site, that BPGICthe Company will not experience operational disruptions or incur costs related to cleaning and disposing waste and oil products, remediating ground soil or groundwater contamination, paying for government penalties, addressing natural resource damage, compensating for human exposure or property damage, or a combination of these measures. Although BPGICthe Company believes it has adequate insurance in place to insure against the occurrence of any of the foregoing events, there can be no assurance that BPGIC’sthe Company’s insurance would be sufficient to cover all potential costs. Therefore, the occurrence of any of the foregoing events could have a material adverse effect on BPGIC’sthe Company’s business, financial condition and results of operations.

 

Furthermore, although BPGICthe Company monitors the exposure of its employees, neighbors and others to risks connected with its operations, future health claims of its employees or other such persons, caused by past, present or future exposure cannot be excluded. BPGICThe Company could be subject to claims by government authorities, individuals and other third parties seeking damages for alleged personal injury or property damage resulting from hazardous substance contamination or exposure caused by its operations, facilities or products, and BPGIC’sthe Company’s insurance may not be sufficient to cover these claims.

 

In addition, compliance with future environmental or health and safety laws and regulations may require significant capital or operational expenditures or changes to BPGIC’sthe Company’s operations.

 


BPGICThe Company could be adversely affected by violations of anti-corruption laws or economic sanctions programs.

Currently, all of BPGIC’sthe Company’s operations are conducted in the UAE. BPGICThe Company is committed to doing business in accordance with all applicable laws and its own code of ethics. BPGICThe Company is subject, however, to the risk that customers, end users, BPGICthe Company, its subsidiaries or their respective officers, directors, employees and agents may take actions determined to be in violation of anti-corruption laws. In addition, as a result of the Business Combination, BPGICthe Company is subject to the U.S. Foreign Corrupt Practices Act. Any violations of applicable anti-corruption laws could result in substantial civil and criminal penalties, and could have a damaging effect on BPGIC’sthe Company’s reputation and business relationships. Furthermore, BPGICthe Company is subject to economic sanctions programs, including those administered by the United Nations Security Council, the United Arab EmiratesUAE and the United States. Although the Company has policies and procedures designed to ensure compliance with applicable sanctions programs, there can be no assurance that such policies and procedures are or will be sufficient or that customers, users, BPGIC, the Company or their respective officers, directors, employees and agents will not take actions in violation of the Company’s policies and procedures (or otherwise in violation of the relevant sanctions regulations) for which they, the Company or BPGIC may ultimately be held responsible.

 

Tax liabilities associated with indirect taxes on the oil products BPGICthe Company services could result in losses to it.

In Fujairah, the oil products that BPGICthe Company stores and blends for BIA and the Super MajorStorage Customers in the Phase I facility are subject to numerous duties or taxes that are not based on income, sometimes referred to as “indirect taxes”, including import duties, excise duties, environmental levies and value-added taxes. Once the BIA Refinery and Phase II become operational, the oil products that BPGIC handlesthe Company will handle for BIA in connection with the BIA Refinery and the Phase II facility will likely be subject to similar “indirect taxes”. Under the terms and conditions of the respective customer agreements, BPGICthe Company is, or expects to be, entitled to pass on such indirect taxes to its customers.

22

 

However, changes to existing regulations for indirect taxes or the introduction of new regulations are beyond BPGIC’sthe Company’s control and may be influenced by political or commercial considerations not aligned with its interests. Any such regulations could adversely affect BPGIC’sthe Company’s business by increasing its costs to the extent it is unable to pass on such indirect taxes to BIA and the Storage Customers, and as a result, adversely affect its business, financial condition and results of operations.

 

Changes to VAT law in the UAE may have an adverse effect on BPGIC’sthe Company’s business, financial condition and results of operations.

On August 23, 2017, the government of the UAE published Federal Decree-Law No. 8 of 2017 (the “VAT Law”) on value added tax (“VAT”) which came into effect on January 1, 2018. Cabinet Decision No. 52 of 2017 on the executive regulations of the VAT Law, issued on November 26, 2017, and Cabinet Decision No. 59 of 2017 on designated zones for the purposes of the VAT Law, issued on December 28, 2017, provide that certain designated zones in the UAE are subject to special VAT treatment. Subject to it continuing to meet the conditions set out in the executive regulations to the VAT Law, the area in which BPGICthe Company operates is a designated zone for the purposes of the VAT Law and therefore BPGICthe Company benefits from certain exemptions under the VAT Law. There is no guarantee that the free zone in which BPGICthe Company operates will remain a designated zone in the future. If the area in which BPGICthe Company operates loses its designation as a designated zone or any change is made to the applicable rate on the supply of services for the area in which BPGICthe Company operates, BPGIC’sthe Company’s business, financial condition and results of operations may be adversely affected.

 


BPGIC’sThe Company’s business may be materially adversely affected if the US dollar/UAE dirham-tied exchange rate were to be removed or adjusted.

All of BPGIC’sthe Company’s current revenues are received in US dollars and all of its operating costs are incurred in UAE dirhams. All of BPGIC’sthe Company’s current revenues and operating costs derive from its operations in the UAE. Although the US dollar/UAE dirham exchange rate is currently fixed, there can be no assurance that the government of the UAE will not de-peg the UAE dirham from the US dollar in the future. Alternatively, the existing fixed rate may be adjusted in a manner that increases the costs of certain equipment used in BPGIC’sthe Company’s business or decreases BPGIC’sthe Company’s receipt of payments from users. Any adjustment of the fixed rate or de-pegging of the UAE dirham from the US dollar in the future could cause BPGIC’sthe Company’s operations and reported results of operations and financial condition to fluctuate due to currency translation effects, which could have a material adverse effect on its business, financial condition and results of operations.

 

BPGIC’sThe Company’s business may be materially adversely affected by unlawful or arbitrary governmental action.

Governmental authorities in the UAE have a high degree of discretion and, at times, act selectively or arbitrarily, without hearing or prior notice, and sometimes in a manner that is contrary to law or influenced by political or commercial considerations. Such governmental action could include, among other things, the expropriation of property without adequate compensation or the forcing of business acquisitions, combinations or sales. Any such action taken may have a material adverse effect on BPGIC’sthe Company’s business, financial condition and results of operations.

 

Legal and regulatory systems may create an uncertain environment for investment and business activities.

The UAE’s institutions and legal and regulatory systems are not yet as fully matured and as established as those of Western Europe and the United States. Existing laws and regulations may be applied inconsistently with anomalies in their interpretation or implementation. Such anomalies could affect BPGIC’sthe Company’s ability to enforce its rights under its contracts or to defend its business against claims by others. Changes in the UAE legal and regulatory environment, including in relation to foreign ownership restrictions, labor, welfare or benefit policies or in tax regulations could have a material impact on BPGIC’sthe Company’s business, financial condition and results of operations.

 

The grant and future exercise of registration rights may adversely affect the market price of Ordinary Shares of the Company.

Pursuant to the existing registration rights agreement with Twelve Seas Sponsors I LLC (“Twelve Seas Sponsor”) and the registration rights agreement entered into in connection with the Business Combination and which are described elsewhere in this Report, Twelve Seas’ Sponsor and BPGIC Holdings can demand that the Company register their registrable securities under certain circumstances and will also have piggyback registration rights for these securities in connection with certain registrations of securities that the Company undertakes.

 

The registration of these securities will permit the public resale of such securities. The registration and availability of such a significant number of securities for trading in the public market may have an adverse effect on the market price of the Company’s Ordinary Shares.

 

23

Sales of a substantial number of the Company’s securities in the public market could adversely affect the market price of its Ordinary Shares.

As of the Closingclosing of the Business Combination, Twelve Seas Sponsor)Sponsor and certain officers and directors of Twelve Seas (the “Initial Twelve Seas Shareholders”) held 4,721,900 Ordinary Shares and 529,000 warrants. Such Company securities areWarrants. 2,587,500 of such Ordinary Shares were subject to a one year lock up restriction following the Closing, subjectClosing. On December 20, 2020, such shares were released from their lock up restriction and, except with respect to the possible early release of 50%1,552,500 of such shares currently held in the event the closing price of the Ordinary Shares exceeds $12.50 for 20 trading days during any 30 trading day period. After the lock-up period expires, these Ordinary Shares will becomeescrow, are eligible for future sale in the public market. The 1,552,500 of such Ordinary Shares are held in escrow andare subject to release and forfeiture on the terms and conditions of the Initial Shareholder Escrow Agreement (defined below). As and if the milestones in the Initial Shareholder Escrow Agreement are satisfied, portions of thesuch escrowed shares will be released to the Twelve Seas Sponsor and will become eligible for future sale in the public market. Sales of a significant number of these Ordinary Shares of the Company in the public market, or the perception that such sales could occur, could reduce the market price of Ordinary Shares of the Company.

 


NasdaqNASDAQ may not continue to listdelist the Company’s securities on its exchange, and delisting could limit investors’ ability to make transactions in the Company’s securities and subject the Company to additional trading restrictions.

The Company’s securities are currently listed on Nasdaq.NASDAQ. The Company may be unable to maintain the listing of its securities in the future. If the Company is unable to maintain the listing of its securities on Nasdaq,NASDAQ, the Company could face significant material adverse consequences, including:

 

a limited availability of market quotations for its securities;

a less liquid market for its securities;

a limited amount of news and analyst coverage for the company;Company; and

a decreased ability to issue additional securities or obtain additional financing in the future.

General Risk Factors

Fluctuations in operating results, quarter-to-quarter earnings and other factors, including incidents involving customers and negative media coverage, may result in significant decreases in the price of the Company’s securities.

The stock markets experience volatility that is often unrelated to operating performance. These broad market fluctuations may adversely affect the trading price of the Company’s securities and, as a result, there may be significant volatility in the market price of the Company’s securities. If the Company is unable to operate profitably as investors expect, the market price of the Company’s securities will likely decline when it becomes apparent that the market expectations may not be realized. In addition to operating results, many economic and seasonal factors outside of the Company’s control could have an adverse effect on the price of the Company’s securities and increase fluctuations in its periodic earnings. These factors include certain of the risks discussed herein, operating results of other companies in the same industry, changes in financial estimates or recommendations of securities analysts, speculation in the press or investment community, negative media coverage or risk of proceedings or government investigation, the possible effects of war, terrorist and other hostilities, pandemics, adverse weather conditions, changes in general conditions in the economy or the financial markets or other developments affecting the oil and gas storage industry.

The market for the Company’s securities may not be sustained, which would adversely affect the liquidity and price of the Company’s securities.

The price of the Company’s securities may vary significantly due to general market or economic conditions. Furthermore, an active trading market for the Company’s securities may not be sustained. You may be unable to sell your securities unless a market can be sustained.

The price of the Company’s Ordinary Shares may be volatile.

The price of the Company’s Ordinary Shares may fluctuate due to a variety of factors, including but not limited to:

actual or anticipated fluctuations in our periodic financial results and those of other public companies in the industry;
mergers and strategic alliances in the oil and gas industries;

24

market prices and conditions in the oil and gas markets;
changes in government regulation;
potential or actual military conflicts or acts of terrorism;
existing or future global or regional health crises;
the failure of securities analysts to publish research about us, or shortfalls in our operating results compared to levels forecast by securities analysts;
announcements concerning us or our competitors; and
the general state of the securities markets.

These market and industry factors may materially reduce the market price of our Ordinary Shares, regardless of our operating performance. Volatility in the price of our Ordinary Shares may increase volatility in the price of our Warrants.

Reports published by analysts, including projections in those reports that differ from our actual results, could adversely affect the price and trading volume of our Ordinary Shares.

We currently expect that securities research analysts will establish and publish, or will continue to publish, their own periodic projections for our business. These projections may vary widely and may not accurately predict the results we actually achieve. Our share price may decline if our actual results do not match the projections of these securities research analysts. Similarly, if one or more of the analysts who write reports on us downgrades our shares or publishes inaccurate or unfavorable research about our business, our share price could decline. If one or more of these analysts ceases coverage of us or fails to publish reports on us regularly, our share price or trading volume could decline. While we expect continued research analyst coverage, if no analysts cover us, the trading price and volume for our Ordinary Shares could be adversely affected.

25

 

ITEM 4. INFORMATION ON THE COMPANY

 

A. History and development of the Company

 

The Company’s legal and commercial name is Brooge Energy Limited. Until April 7, 2020, the Company’s legal and commercial name was Brooge Holdings Limited. The Company was incorporated for the purpose of effectuating the Business Combination and to hold BPGIC. The Company was incorporated under the laws of the Cayman Islands as an exempted company on April 12, 2019. Prior to the Business Combination, the Company owned no material assets and did not operate any business. The name and mailing address of the Company’s agent and registered office is Maples Corporate Services Limited, P.O. Box 309, Ugland House, Grand Cayman KY1-1104, Cayman Islands. Its principal executive office is that of BPGIC, located at P.O. Box 50170, Fujairah, United Arab Emirates and its telephone number is+971 +971 9 201 6666.6666. The Company’s agent for service of process in the United States is Puglisi & Associates, located at 850 Library Avenue, Suite 204, Newark, Delaware 19711.

 

In accordance with the terms and conditions of the Business Combination Agreement, upon the closing of the Business Combination on December 20, 2019, (i) Twelve Seas merged with Merger Sub and holders of Twelve Seas securities received substantially similar securities of the Company, andwith Twelve Seas continued as the surviving entity and a wholly-owned subsidiary of the Company under the name BPGIC International, with holders of Twelve Seas securities receiving substantially similar securities of the Company, and (i) the Company acquired all of the issued and outstanding ordinary shares of BPGIC from BPGIC Holdings in exchange for Ordinary Shares of the Company and BPGIC became a wholly-owned subsidiary of the Company. Upon consummation of the Business Combination, the Company’s Ordinary Shares and Warrants became listed on the Nasdaq Capital Market.

All of the Company’s operations are currently conducted through BPGIC.BPGIC and once Phase III is ready through BPGIC and BPGIC III.

 


History and Development

 

The following timeline sets forth BPGIC’s major milestones.

 

 

BPGIC was incorporated in 2013 in the Fujairah Free Zone, UAE, to provide oil storage, heating and blending services. On February 10, 2013, the Fujairah Free Zone Authority provided BPGIC with a license to engage in the following activities: (i) trading and storing all varieties of oil products and gas, including crude and fuel oils; (ii) building, managing and investing in refineries and all other types of investments; and (iii) exploring and extracting crude oil and gas in both onshore and offshore fields.

 

On March 10, 2013, BPGIC entered into the 60-year Phase I &II l Land Lease with the Fujairah Municipality, a local government organization specializing in municipal urban and rural municipal affairs, for a parcel of land to build and operate the BPGIC Terminal, which is in the Port of Fujairah. On September 1, 2014, the Phase I & II Land Lease was novated from the Fujairah Municipality to FOIZ. For more information regarding the Phase I & II Land Lease, see “Item 10.C Material Contracts4.D Property, plants and equipment — The BPGIC Terminal — Phase I & II Land Lease”.

26

 

On March 31, 2016, BPGIC entered into a Port Facilities Agreement with the Port of Fujairah. For more information regarding the Port Facilities Agreement, see “Item 10.C Material Contracts4.D Property, plants and equipment — The BPGIC Terminal — Phase I & II Land Lease”. After several years of planning and design, BPGIC finalized plans for Phase I during the First Quarter of 2015. BPGIC signed an EPC agreement for Phase I (the “Phase I EPC Agreement”) on April 2, 2015 with Audex and commenced work in accordance with the Phase I EPC Agreement. Audex completed Phase I works on November 19, 2017 and between 2014 and 2017, BPGIC incurred a total cost of $170 million in connection with its construction. On December 12, 2017, BPGIC entered into the Phase I End User Agreement with the Initial Phase I End User. BPGIC began testing operations on December 20, 2017 and commenced limited operations on January 18, 2018. From the time BPGIC began its operations on December 20, 2017 to February 28, 2018, BPGIC limited the availability of its Phase I storage capacity to 40 percent, allowing its management team to test all systems and make any necessary adjustments. BPGIC increased the availability of its Phase I storage capacity to approximately 70 percent on March 1, 2018 and to 100 percent on April 1, 2018.

As Phase I neared completion, BPGIC finalized plans for Phase II in the Third Quarter of 2017. In February 2017, BPGIC finalized and issued a front-end engineering document, which sets out the qualifications, specifications, drawings and designs of Phase II, to Audex. Phase II work commenced in September 2018 and is expected to be completed by the end of the Second Quarter of 2021. On September 3, 2018, BPGIC signed the Phase II Project Management Agreement with MUC to engage MUC to manage the construction plan of Phase II. For more information on Phase II, see “Item 4.B Business - Business Overview — Overview” and Item 4.B — Business Overview — BIA Refinery — Proposed Phase II

As was the case with Phase I, in order to de-risk the start-up of operations of Phase II, on June 27, 2018, BPGIC entered into the Phase II End User Agreement with the Phase II End User, pursuant to which, the Phase II End User has agreed to lease all eight oil storage tanks in Phase II and will become the end-user with respect to Phase II once Phase II becomes operational.

On October15, 2018, BPGIC entered into the Phase II Financing Facility, which was a $95.3 million secured Shari’a compliant Istisna’ financing arrangement coordinated by FAB, to fund a portion of the capital expenditure in respect of Phase II.

As part of Phase II, the Company intends to follow a similar approach to Phase I by investing in high-grade, long-life materials for the construction and development of its facilities. The expected capital expenditure in respect of Phase II is $161.7 million, which is comprised of construction costs of $150.0 million and capitalised interest and land lease and consultancy charges of $11.7 million. The expected capital expenditure of $160.6 million in respect of Phase II will be funded by:

drawings of $85 million under the Bond Financing Facility; and
Shareholders’ contributions, proceeds of the Business Combination, and internally generated cash flow in the aggregate amount of $76.7 million.

Of the $161.7 million expected capital expenditure in respect of Phase II, $39.2 million was paid in the year ended December 31, 2019, $81.2 million was paid in the year ended December 31, 2020, and the balance is expected to be paid out before the end of the first half of 2021. See “Item 3.D Risk Factors — Risks related to BPGIC and BPGIC III — The Company may be subject to significant risks and expenses when constructing Phase II, which could adversely affect the Company’s business, financial condition and results of operations”.

In March 2019, BPGIC partnered with Sahara to develop and operate a modular refinery within the BPGIC Terminal with minimal capital expenditure by BPGIC. In February 2020, BPGIC and Sahara mutually agreed to discontinue their joint development project to install the modular refinery. Shortly thereafter, BPGIC entered into the Refinery Agreement with BIA, which provides that the parties will use their best efforts to finalize the technical and design feasibility studies for the BIA Refinery. For more information regarding the Refinery Agreement, see “Item 10.C — Material Contracts — Refinery Agreement”. For more information regarding the BIA Refinery, see “Item 4.B — Business Overview — BIA Refinery”.

 

In August 2019, with the approval of the Initial Phase I End User, BPGIC entered into the Phase I Customer Agreement with BIA to restructure its relationship with the Initial Phase I End User. UnderFor more information regarding the Phase I End User Agreement and the Phase I Customer Agreement, BPGIC leased the Phase I facilities to BIA, and in connection therewith, BIA assumed the rights and obligations of BPGIC under thesee “Item 10.C Material Contracts— Phase I End User Agreement. Agreement, Phase I Customer Agreement, Super Major Agreement, and Commercial Storage Agreements”.

In 2020, BIA notified BPGIC that it had entered sublease arrangements for partsSeptember 2019, with the approval of the Phase I storage capacity with additional end users. In May 2020, BIA agreed to release 129,000 m3 ofII End User, BPGIC entered into the Phase I capacity, amountingII Customer Agreement with BIA to approximately one third ofrestructure its relationship with the total Phase I capacity, back to BPGIC.II End User. For more information regarding the Phase II End User Agreement and the Phase II Customer Agreement, see “Item 10.C Material Contracts — Phase II End User Agreement and Phase II Customer Agreement”.

 


27

Following the restructuring, BIA’s agreements with other end users and BIA’s release of approximately one third of the capacity of the Phase I facility, BPGIC leases approximately two thirds of the capacity of the Phase I facility to BIA, and BIA subleases the capacity to its end users. BIA’s obligations to pay BPGIC for the storage and ancillary services provided at the Phase I facility are independent of the Phase I end users’ actual payments to BIA. Pursuant to the Super Major Agreement, BPGIC leases the remaining one third of the capacity of Phase I to the Super Major for a 6 month period subject to renewal for an additional 6 month period with the mutual agreement of the parties.

 

As of December 31, 2019, BPGICthe Company had funded the construction of Phase I, Phase II and all of its other cash requirements with funds from the Phase I Financing Facilities, and net equity contributions (other than share capital) since 2014 of $71.01 million from shareholders. For additional information regarding the Phase I Financing Facilities, see “Item 5. Operating and Financial Review and Prospects — Debt Sources of Liquidity”.

 

As Phase I neared completion, BPGIC finalized plans for Phase II inIn August 2020, the Third Quarter of 2017. On June 27, 2018, BPGIC entered into the Phase II End User Agreement with the Phase II End User. On September 3, 2018, BPGIC signed the Phase II EPC Agreement with Audex. Phase II workCompany commenced in September 2018 and according to the schedule in the Phase II EPC Agreement, it is expected to be completed in 2020. The expected capital expenditure in respect of Phase II is $160.6 million (comprised of construction costs of $150.0 million and capitalised interest and land lease and consultancy charges of $10.6 million). On September 3, 2018, BPGIC signed a project management agreement (the “Phase II Project Management Agreement”) with MUC, the same advisor that designed the BPGIC Terminal, so that MUC could manage the construction plan of Phase II.

On October15, 2018, BPGIC entered into the Phase II Financing Facility, which is a $95.3 million secured Shari’a compliant Istisna’ financing arrangement coordinated by FAB, to fund a portion of the capital expenditure in respect of Phase II.

In September 2019, with the approvalhydrotesting of the Phase II End User,facility.

During September 2020, as part of the Bond Financing Facility, BPGIC entered intoissued bonds of $200 million to private investors with a face value of $1 and an issue price of $0.95. The issuance has a maximum size of $250.00 million, which includes the option for a tap issue of an additional $50.00 million subject to certain conditions. The proceeds of the Bond Financing Facility were used to repay Phase I Financing Facilities, fund capital project for Phase II, Customer Agreement with BIArepay the promissory note payable to restructure its relationshipEarly Bird Capital, pre-fund the Liquidity Account and for general corporate purposes. The proceeds of the bonds were drawn down during November 2020 and outstanding term loans were fully settled. The principal repayment of the Bond Financing Facility will be semi-annual payments of $7 million starting in September 2021 until March 2025, and one bullet repayment of $144 million in September 2025. The bonds bear interest at 8.5% per annum, payable along with the Phase II End User. Under the Phase II Customer Agreement, BPGIC leased the Phase II facilities to BIA, and in connection therewith, BIA assumed the rights and obligations of BPGIC under the Phase II End User Contract. Following this restructuring, BPGIC leases the Phase II facility to BIA, and BIA subleases the facility to the Phase II End User. BIA’s obligations to pay BPGIC for the storage and ancillary services provided at the Phase II facility are independent of the Phase II End User’s actual payments to BIA.

Phase II is expected to focus its operations primarily on the storage and blending of crude oil. Phase II willinvolve the construction of eight additional oil storage tanks with an aggregate geometric oil storage capacity of approximately 0.601 million m3, which will increase BPGIC’s aggregate geometric oil storage capacity to approximately 1 million m3. In February 2017, BPGIC finalized and issued a front end engineering document, which sets out the qualifications, specifications, drawings and designs of Phase II, to Audex. On September 3, 2018, BPGIC signed the EPC agreement with Audex for the development of Phase II, (the “Phase II EPC Agreement”). As part of Phase II, BPGIC intends to follow a similar approach to Phase I by investing in high-grade, long-life materials for the construction and development of its facilities. Audex commenced construction of Phase II in September 2018 and plans to complete construction in 2020. Phase II is being constructed adjacent to Phase I. The expected capital expenditure in respect of Phase II is $160.6 million which is comprised of construction costs of $150.0 million and capitalised interest and land lease and consultancy charges of $10.6 million. The expected capital expenditure of $160.6 million in respect of Phase II will be funded by:

drawings of $90.6 million under the Phase II Financing Facility; and

shareholders contributions, proceeds of the Business Combination, and internally generated cashflow in the aggregate amount of $70.0 million.


Of the $160.6 million expected capital expenditure in respect of Phase II, $39.2 million was paid in the year ended December 31, 2019. During 2020, $24.8 million was paid through June 2020 and balance is expected to be paid out before the end of the year. See “Item 3.D Risk Factors — Risks relating to BPGIC — BPGIC may be subject to significant risks and expenses when constructing Phase II, which could adversely affect BPGIC’s business, financial condition and results of operations.

As was the case with Phase I, in order to de-risk the start-up of operations of Phase II, on June 27, 2018, BPGIC entered into the Phase II End User Agreement with the Phase II End User, an international commodities trading company. Pursuant to the Phase II End User Agreement, the Phase II End User has agreed to lease all eight oil storage tanks in Phase II and will become the end-user with respect to Phase II once Phase II becomes operational, which is expected to occur during the Fourth Quarter of 2020. In September 2019, with the approval of the Phase II End User, BPGIC entered into the Phase II Customer Agreement with BIA to restructure its relationship with the Phase II End User. Under the Phase II Customer Agreement, BPGIC leased the Phase II facilities to BIA, and in connection therewith, BIA assumed the rights and obligations of BPGIC under the Phase II End User Agreement.

principal installments. For more information regarding the Phase II End User Agreement, see “Item 10.C Material Contracts — Phase II End User Agreement and Phase II Customer Agreement”.

For more information regarding Phase II, see the sections entitled “Item 4.B Information on the Company¾Business Overview — Proposed Phase II” andBond Financing Facility, seeItem 5. Operating andAnd Financial Review and Prospects — Management’s Discussion and Analysis of Financial Condition and Results of Operations — Liquidity and Capital Resources — Debt Sources of Liquidity”. In March 2019, BPGIC partnered with Sahara to develop and operate a modular refinery within the BPGIC Terminal with minimal capital expenditure by BPGIC. Under the terms of the parties agreement, Sahara would finance and arrange the development, construction and commissioning of a modular refinery capable of supplying IMO 2020 compliant 0.5% sulphur content shipping fuel with initial production capacity of 24,000 b/d.

 

In FebruaryFrom November 2020 BPGIC and Sahara mutually agreed to discontinue their joint development project to install a modular oil refinery at BPGIC’s terminal. Shortly thereafter, BPGICtill March 2021, the Company entered into nine commercial storage agreements with certain storage customers, eight of which commercial storage agreements are still in effect. For more information about the RefineryCompany’s commercial storage agreements, see Item 10.C Material Contracts— Phase I End User Agreement, a new agreement with BIA which provides that the parties will use their best efforts to finalize the technicalPhase I Customer Agreement, Super Major Agreement, and design feasibility studies for the BIA Refinery, a refinery with a capacity of 25,000 bpd operated by BPGIC. The parties further agreed to negotiate, within 30 days, the Refinery Operations Agreement, a sublease agreement and a joint venture agreement to govern the terms on which (i) BPGIC will sublease land to BIA to locate, (ii) BIA will construct, and (iii) BPGIC will operate the refinery. Due to the COVID-19 pandemic, the parties agreed to extend the period for their negotiations until August 4, 2020 and negotiations remain ongoing.Commercial Storage Agreements”.

 

BPGICThe Company is in the advanced stages of planning Phase III, a major expansion in the Port of Fujairah. In February 2020, BPGIC entered into the Phase III Land Lease Agreement to secure the Phase III Land, a new plot of land of approximately 450,000 m2 near its existing facilities. BPGIC believes that the Phase III Land can house additional storage capacity of up to 3,500,000 m3. s of the date of this Report, BPGICThe Company does not yet have any planned capital expenditures in connection with Phase III, other than the cost of a FEED study for storage capacity of up to 3.5 million3,500,000 m3 and a 180,000 bblb/d refinery.

Where to Find Additional Information

 

The SEC maintains an Internet site that contains reports, proxy and information statements, and other information regarding issuers that file electronically with the SEC, which is accessible at http://www.sec.gov. Since we are a “foreign private issuer,” we are exempt from the rules and regulations under the Exchange Act prescribing the furnishing and content of proxy statements, and our officers, directors and principal shareholders are exempt from the reporting and “short-swing” profit recovery provisions contained in Section 16 of the Exchange Act, with respect to their purchase and sale of our shares. In addition, we are not required to file reports and financial statements with the SEC as frequently or as promptly as U.S. companies whose securities are registered under the Exchange Act. However, we are required to file with the SEC an Annual Report on Form 20-F containing financial statements audited by an independent accounting firm. The Company’s website is https://www.broogeholdings.com/.The information contained in, or accessible through, our website is not a part of this Report.

 


B. Business Overview

 

In this section, references to “the Company,” “we,” “us,” “BPGIC” and “our” are intended to refer to Brooge Energy Limited and its subsidiaries, unless the context clearly indicates otherwise.

 

This section contains forward-looking statements about the business and operations of the Company and BPGIC.Company. The actual results of the Company and BPGIC may differ materially from those currently anticipated as a result of many factors, including those described under “Risk Factors”Item 3.D Risk Factors and elsewhere in this prospectus.Report. See “Cautionary Note Regarding Forward LookingForward-Looking Statements”.

 

Overview

 

BPGIC is an oil storage and service provider strategically located in the Port of Fujairah in the emirate of Fujairah in the UAE. BPGIC’s vision is to develop an oil storage business that differentiates itself from competitors by providing its customers with fast order processing times, excellent customer service and high accuracy blending services with low oil losses. BPGIC has a 60-year lease of land, consisting of an initial 30-year lease and a 30-year renewal lease, for its operations located in close proximity to the Port of Fujairah’s berth connection points. BPGIC is initially developing its terminal’s storage capacity in two phases, Phase I, which is already operational, and Phase II, which is under construction, and simultaneously considering and planning to operate the modular refinery being constructed by BIA. Phase I commenced operations in December 2017, Phase II is under construction, the terms of development of the BIA Refinery are currently being negotiated, and Phase III is in the FEED studies stage. BPGIC is led by an experienced management team with over 30 years of experience in the oil storage terminal industry.

 

28

The Port of Fujairah is the main bunkering location in the MENA region and the second largest bunkering hub in the world. The Port of Fujairah has witnessed increased growth in port traffic in recent years with oil and oil product volumes increasing at a compound annual growth rate of 15 percent over the eight-year period from 2010 (34 million MT) to 2017 (90 million MT). Located just outside the Strait of Hormuz, the Port of Fujairah allows ships transporting oil and oil products to bypass the Strait of Hormuz, one of world’s most vulnerable chokepoints given that approximately 35 percent of the world’s seaborne oil and oil products passes through it each year. There is an increasing preference among companies to avoid sending their vessels through the Strait of Hormuz due to geopolitical risk, higher transportation costs due to increased insurance costs as well as congestion and queuing times at ports inside the Arabian Gulf. The Port of Fujairah’s geographic position outside the Strait of Hormuz allows vessels transporting oil and oil products to bypass the Strait of Hormuz and avoid incurring such additional costs and delays.

On March 10, 2013, we entered into the 60-year Phase I & II Land Lease for a parcel of land to build and operate the Phase I and Phase II facilities, which is in the Port of Fujairah. For more information regarding the Phase I & II Land Lease, see “Item 4.D Property, plants and equipment — The BPGIC Terminal — Phase I & II Land Lease”.

 

Phase I comprises 14 oil storage tanks with an aggregate geometric oil storage capacity of approximately 0.399 million m3 and related infrastructure. The operations of Phase I are focused primarily on the storage, heating and blending of fuel oil and clean petroleum products, including aviation fuel, gas oil, gasoline, marine gas oil and naphtha. BPGIC designed Phase I to focus its operations on servicing such products after assessing the historical and expected demand for such services in the Port of Fujairah region and the evolution and availability of associated infrastructure. As described below, BPGIC designed Phase I with several key features that enable it to provide users with high accuracy blending services with low oil losses. In addition, due to the relatively long term of the Phase I & II Land Lease which has a total period of 60 years, when compared to similar land leases for oil storage terminals located in the Port of Fujairah, BPGIC constructed Phase I with materials, including pumps, valves and steel structures, that have longer expected life spans than comparable materials utilized by other oil storage terminals. As a result, BPGICthe Company believes Phase I will benefit from annual maintenance costs over the period of the Phase I & II Land Lease that are lower than the average for comparable oil storage terminals. In addition, all 14 oil storage tanks in

The key features of Phase I have been designed to permit conversions from storing one clean petroleum product to another at an average speed of 48 hours and from storing fuel oil to gas oil at an average speed of 14 days, which BPGIC believes compares favorably to BPGIC’s competitors in the UAE region, allowing BPGIC to swiftly adjust its services to meet changing market demands. BPGIC can perform up to 11 simultaneous operations in Phase I, including tank-to-tank transfers, recirculations, blending, heating, loading and discharging, permitting BPGIC to service multiple user orders during the same time period. Phase I has a fully segregated internal manifold, high oil transfer flow rates and an indirect connection to all the Port of Fujairah berths, including certain underutilized berths that are in close proximity to the BPGIC Terminal, to allow users to benefit from lower contamination risks and faster vessel turnaround times and permitting greater access to the BPGIC Terminal. include:

all 14 oil storage tanks are inter-connected via the Phase I Internal Manifold, the fully segregated internal manifold that connects the 14 oil storage tanks of Phase I (the “Phase I Internal Manifold”);
the pumping and stripping systems of the Phase I Internal Manifold are equipped with a fine stripping system, minimizing energy costs, lowering loss ratios and permitting a high degree of stripping to be achieved;
the ability to more efficiently perform required maintenance activities and prepare pipelines for oil transfers;
lower loss ratios and contamination risks;
recirculation of oil products to assist with the blending process;
the ability to simultaneously perform up to 11 operations including: tank-to-tank transfers, recirculations, blending, heating, loading and discharging, permitting the Company to service multiple user orders during the same time period;
all 14 oil storage tanks have been designed to permit conversions from storing one clean petroleum product to another and from storing fuel oil to gas oil at a speed which is favorable compared to that of competitors in the UAE region, allowing the Company to adjust its services to meet changing market demands;
high oil transfer flow rates; and
an indirect connection to all the Port of Fujairah berths, including certain underutilized berths that are in close proximity to the BPGIC Terminal, to allow users to benefit from lower contamination risks and faster vessel turnaround times and permitting greater access to the BPGIC Terminal.

29

As is common in the oil storage industry, BPGIC commenced operations of Phase I on a staggered basis to ensure a safe and efficient start-up of operations. From the time BPGIC began its operations in December 2017 to March 2018 (testing(the testing period), BPGIC limited the availability of its Phase I storage capacity to 40 percent, allowing its management team to test all systems and make any necessary adjustments. BPGIC increased the availability of its Phase I storage capacity to approximately 70 percent on March 1, 2018, and to 100 percent on April 1, 2018.

 


Since it began operations, BPGIC has won four awards and been shortlisted for several others. In 2020, BPGIC won the “Emerging Port / Terminal of the year 2020” award by Global Ports and Terminal Industry. In 2019, BPGIC was named the winner of the “Outstanding Port/Terminal Design of the Year 2019” award by The Global Ports Forum, and of the “Excellence in Terminal Optimisation Award” by Tank Storage Magazine’s Global Tank Storage Awards.Awards, and the “Logistics Service Provider of the Year Award 2019” by Energy Middle East. In March 2018, BPGIC was short-listed by Tank Storage magazine, despite its relatively short track record, for the “Most Efficient Storage Terminal” global award for best throughput rates and most effective operations. In March 2019, BPGIC was once again, short-listed by Tank Storage magazine for the “Most Efficient Storage Terminal” global award, as well as the “Safety Excellence in Bulk Liquid Storage” and “Biggest Commitment to Environmental Protection” global awards.

 

In order to de-risk the start-up of operations of Phase I, on December 12, 2017, BPGIC entered into the Phase I End User Agreement with the Initial Phase I End User. Pursuant to the Phase I End User Agreement, the Initial Phase I End User leased all 14 oil storage tanks in Phase I for an initial period of five years, which extends automatically for an additional five years unless terminated prior to the scheduled expiration date. In August 2019, with the approval of the Initial Phase I End User, BPGIC entered into the Phase I Customer Agreement with BIA to restructure its relationship with the Initial Phase I End User. Under the Phase I Customer Agreement, BPGIC leased the Phase I facilities to BIA, and in connection therewith, BIA assumed the rights and obligations of BPGIC under the Phase I End User Agreement. In 2020, BIA notified BPGIC that it had entered sublease arrangements for parts of the Phase I storage capacity with additional end users. For more information regarding the Phase I End User Agreement and Phase I Customer Agreement, see “Item 10.C Material Contracts — Phase I End User Agreement, Phase I Customer Agreement and Super Major Agreement”.

As Phase I neared completion, BPGIC finalized plans for Phase II in the Third Quarter of 2017. On June 27, 2018, BPGIC entered into the Phase II End User Agreement with the Phase II End User. On September 3, 2018, BPGIC signed the Phase II EPC Agreement with Audex. Phase II work commenced in September 2018 and according to the schedule in the Phase II EPC Agreement, it is expected to be completed in 2020. The expected capital expenditure in respect of Phase II is $160.6 million (comprised of construction costs of $150.0 million and capitalised interest and land lease and consultancy charges of $10.6 million). On September 3, 2018, BPGIC signed the Phase II Project Management Agreement with MUC to engage MUC to manage the construction plan of Phase II.

On October 15, 2018, BPGIC entered into the Phase II Financing Facility, which is a $95.3 million secured Shari’a compliant Istisna’ financing arrangement coordinated by FAB, to fund a portion of the capital expenditure in respect of Phase II.

In September 2019, with the approval of the Phase II End User, BPGIC entered into the Phase II Customer Agreement with BIA to restructure its relationship with the Phase II End User. Under the Phase II Customer Agreement, BPGIC leased the Phase II facilities to BIA, and in connection therewith, BIA assumed the rights and obligations of BPGIC under the Phase II End User Contract. Following this restructuring, BPGIC leases the Phase II facility to BIA, and BIA subleases the facility to the Phase II End User. BIA’s obligations to pay BPGIC for the storage and ancillary services provided at the Phase II facility are independent of the Phase II End User’s actual payments to BIA.


Phase II is expected to focus its operations primarily on the storage and blending of crude oil. Phase II involves the construction of eight additional oil storage tanks with an aggregate geometric oil storage capacity of approximately 0.601 million m3, which will increase BPGIC’sthe Company’s aggregate geometric oil storage capacity to approximately 1 million m3. In February 2017, BPGIC finalized and issued a front end engineering document, which sets out the qualifications, specifications, drawings and designs of Phase II, to Audex. On September 3, 2018, BPGIC signed Phase II EPC Agreement. As part of Phase II, BPGIC has followed a similar approach to Phase I by investing in high-grade, long-life materials for the construction and development of its facilities. The Phase II contractor, Audex, commenced construction of Phase II in September 2018 and plans to complete construction in 2020. Phase II is being constructed adjacent to Phase I. The expected capital expenditure in respect2018. Construction of Phase II is $160.6 million which is comprised of construction costs of $150.0 million and capitalised interest and land lease and consultancy charges of $10.6 million. The expected capital expenditure of $160.6 million in respect of Phase II willto be funded by:

drawings of $90.6 million under the Phase II Financing Facility; and

shareholders contributions, proceeds of the Business Combination, and internally generated cashflow in the aggregate amount of $70.0 million.

Of the $160.6 million expected capital expenditure in respect of Phase II, $39.20 million was paidcompleted by the end of fiscal year 2019. During 2020, $24.8 million was paid through June 2020 and balance is expected to be paid out before the endSecond Quarter of the year. See “Item 3.D Risk Factors — Risks relating to BPGIC — BPGIC may be subject to significant risks and expenses when constructing Phase II, which could adversely affect BPGIC’s business, financial condition and results of operations.2021.

 

As was the case with Phase I, in order to de-risk the start-up of operationsThe key features of Phase II on June 27, 2018, BPGIC entered into the Phase II End User Agreement with the Phase II End User, an international commodities trading company. Pursuant to the Phase II End User Agreement, the Phase II End User has agreed to lease all eight oil storage tanks in Phase II and will become the end-user with respect to Phase II once Phase II becomes operational, which isare expected to occur during the Fourth Quarter of 2020. In September 2019, with the approval of the Phase II End User, BPGIC entered into the Phase II Customer Agreement with BIA to restructure its relationship with the Phase II End User. Under the Phase II Customer Agreement, BPGIC leased the Phase II facilities to BIA, and in connection therewith, BIA assumed the rights and obligations of BPGIC under the Phase II End User Agreement.include:

all eight oil storage tanks will be inter-connected via the Phase II Internal Manifold;
the pumping and stripping systems of the Phase II Internal Manifold will be equipped with fine stripping systems to minimize energy costs, lower loss ratios and remote changes on product contaminations;
the cranes of the Phase II Internal Manifold will allow the Company to more efficiently perform required maintenance activities and prepare pipelines for oil transfers;
each of the two piggable crude oil jetty pipelines will be directly connected between the Phase II Internal Manifold and Matrix Manifold 2, lowering loss ratios and contamination risks;
the Company will be able to perform up to six simultaneous operations in Phase II, including tank-to-tank transfers, recirculations, blending, heating, loading and discharging, which would permit the Company to service multiple user orders during the same time period; and
four of the oil storage tanks will be constructed to permit conversion between crude oil and fuel oil products, allowing the Company to adjust its services to meet changing market demands.

 

In Maythe First Quarter of 2020, BIA agreed to release 129,000 m3 of the Phase I capacity, amounting to approximately one third of the total Phase I capacity, back to BPGIC. Pursuant to the Super Major Agreement, BPGIC leased this capacity to the Super Major for a 6 month period subject to renewal for an additional 6 month period with the mutual agreement of the parties. For more information regarding the Super Major Agreement, see “Item 10.C Material Contracts — Phase I End User Agreement, Phase I Customer Agreement and Super Major Agreement”.

In March 2019, BPGIC partnered with Sahara to develop and operate a modular refinery within the BPGIC Terminal with minimal capital expenditure by BPGIC. Under the terms of the parties agreement, Sahara would finance and arrange the development, construction and commissioning of a modular refinery capable of supplying IMO 2020 compliant 0.5% sulphur content shipping fuel with initial production capacity of 25,000 b/d.

In February 2020, BPGIC and Sahara mutually agreed to discontinue their joint development project to install a modular oil refinery at BPGIC’s terminal. Shortly thereafter, BPGIC entered into the Refinery Agreement, a new agreement with BIA (Al Brooge International Advisory LLC) which provides that the parties will use their best efforts to finalize the technical and design feasibility studies for the BIA Refinery, a refinery with a capacity of 25,000 bpdb/d to be operated by BPGIC on land leased by BPGIC. The parties further agreed to negotiate, within 30 days, the Refinery Operations Agreement, a sublease agreement and a joint venture agreement to govern the terms on which BPGIC will sublease land to BIA to locate, BIA will construct, and BPGIC will operate the refinery. Due to the COVID-19 pandemic, the parties agreed to extend the period for their negotiations until August 2020andthe Second Quarter of 2021 and negotiations remain ongoing.

 

BPGICThe Company is in advanced stages of planning Phase III, a further major expansion in the Port of Fujairah. In February 2020, BPGIC entered into the Phase III Land Lease Agreement to secure the Phase III Land, a new plot of land of approximately 450,000 m2m2 near its existing Phase I and Phase II facilities. On October 1, 2020, BPGIC novated the Phase III Land Lease to BPGIC III. The Company believes that the Phase III Land can house additional storage capacity and refinery of up to 3,500,000 m3. Them3 and additional refinery capacity of up to 180,000 b/d. A FEED study for the Phase III Land iswas completed in 2020, and preconstruction work, including commencement of a Soil Investigation and an Environmental Impact Assessment (EIA) report, commenced in October 2020. Currently, the subject of ongoing FEED studies, which, in parallel with prospective end-user discussions, will enable BPGIC to determine the optimal layout and product mix. Currently, BPGICCompany plans to use the Phase III Land to further increase its crude oil storage and refinery services capacity. See “Item 3.D Risk Factors — Risks relating to BPGIC — The scarcity of available land in the Fujairah oil zone region could subject BPGIC to competition for additional land, unfavorable lease terms for that land and limit BPGIC’s ability to expand its facilities in Fujairah beyond Phase III.

30

 

For the year ended December 31, 2019,2020, the Company generated revenue from operations of $44.0$41.8 million, a lossprofit and total comprehensive lossincome of $76.5$17.2 million and an Adjusted EBITDA of $37.1$29.1 million. As at December 31, 2019,2020, the Company had total assets of $307.3$432.6 million. For more information regarding BPGIC’sthe Company’s financial condition and results of operations, see “Item 5. Operating and Financial Review and Prospects”.

 


Competitive Strengths

 

Strategic location of the BPGIC Terminal.

 

The BPGIC Terminal is strategically located in the Port of Fujairah, which is the main bunkering location in the MENA region and the second largest bunkering hub in the world. The Port of Fujairah has witnessed increased growth in port traffic in recent years with oil and oil product volumes increasing at a compound annual growth rate of 15 percent over the eight-year period from 2010 (34 million MT) to 2017 (90 million MT). Located just outside the Port of Fujairah, the Strait of Hormuz is one of world’s most vulnerable chokepoints for the transportation of oil and oil products as approximately 35 percent of the world’s yearly average seaborne oil and oil products passes through it each year. There is an increasing preference among companies to avoid sending their vessels through the Strait of Hormuz due to the continued geopolitical uncertainty from Iran and the higher transportation costs due to increased insurance costs as well as congestion and queuing times at ports inside the Arabian Gulf. The Port of Fujairah’s geographic position outside the Strait of Hormuz allows vessels transporting oil and oil products to bypass the Strait of Hormuz and avoid incurring such additional costs and delays.

 

In addition, the BPGIC Terminal is strategically positioned in a prime location within the Port of Fujairah. BPGIC benefits from the BPGIC Terminal’s close proximately to berths 8 and 9 due to the shorter travel distances required for oil product transfers, which in effect lowers contamination risks and leads to faster vessel turnaround times.

Best-in-class facility with low costs.

 

BPGICThe Company operates the BPGIC Terminal under atwo 60-year lease,leases, which has allowed, BPGICand will continue to allow, the Company to design and build a terminal for long term use by using materials that have longer expected life spans than comparable materials utilized by other oil storage terminals in the MENA region, which the Company believes enabled it to build a best-in-class facility. As of the date of this Report, the BPGIC Terminal has been inspected by five of the top six global oil majors, all of the top five global oil traders, the top three regional oil traders and three of the five local and regional state oil companies. As is common in the oil storage industry, BPGICthe Company did not receive any notifications from such companies as to whether the BPGIC Terminal was approved for use by such companies; however, in each case, BPGICthe Company believes the BPGIC Terminal was approved.

 

Phase I was constructed by Audex, an EPC contractor that has a strong track record in building terminals and over 20 years of experience in the industry. All 14 oil storage tanks in Phase I have been designed to permit conversions from storing one clean petroleum product to another at an average speed of 48 hours and from storing fuel oil to gas oil at an average speed of 14 days, which BPGICthe Company believes compares favorably to BPGIC’sthe Company’s competitors in the UAE region, allowing BPGICthe Company to adjust its services to meet changing market demands. BPGICThe Company can perform up to 11 simultaneous operations in Phase I, including tank-to-tank transfers, recirculations, blending, heating, loading and discharging, permitting BPGICthe Company to service multiple user orders during the same time period. Phase I has a fully segregated internal manifold, high oil transfer flow rates and an indirect connection to all the Port of Fujairah berths, including certain underutilized berths that are in close proximity to the BPGIC Terminal, to allow users to benefit from lower contamination risks and faster vessel turnaround times while permitting greater access to the BPGIC Terminal. A fine stripping system has been installed, to minimize energy costs, lowering loss ratios and enabling a higher degree of stripping.

 

In addition, maintenanceMaintenance costs for the BPGIC Terminal are relatively low. Furthermore, as the BPGIC Terminal is located in a free-zone, BPGICthe Company is currently not required to pay any taxes and both the Phase I Customer Agreement and the Phase II Customer Agreement specify that any port fees charged by the Port of Fujairah in connection with BIA’s activities, or those of BIA’s sublessees, are to be paid by BIA. Similarly, all of the Super Major Agreement specifiesexisting Commercial Storage Agreements specify that any port fees charged by the Port of Fujairah related to the Super Major’sexisting Storage Customers’ activities are to be paid by the Super Major.existing Storage Customers.

 


As discussed below in the sections entitled “Item 4.B Business Overview — Strategy — Expand the scale of existing operations by completing Phase II and operating the BIA Refinery”, “Item 4.B Business Overview — The BPGIC Terminal — Proposed BIA Refinery”, and “Item 4.B Business Overview — The BPGIC Terminal — Proposed Phase II”, BPGICthe Company is currently partnering with BIA in connection with the development of the modular BIA Refinery, and undertaking Phase II construction, which will expand the terminal’s oil storage capacity and enable it to provide services for crude oil. As was the case for Phase I, high-grade, long-life materials will be utilized in the construction and development of these facilities. Phase II will also benefit from the fine stripping system utilized in Phase I. Furthermore, the Phase II Customer Agreement specifies that any port fees charged by the Port of Fujairah in connection with BIA’s activities are to be paid by BIA.

31

Stable and predictable revenue stream for storage services.

 

BPGICThe Company generates stable and predictable cash flows for its storage services by providing fee-based, take-or-pay storage services to BIA, under a long-term agreement. BPGIC’sThe Company’s storage business is not subject to seasonal fluctuations.

 

BPGIC entered into the Phase I End User Agreement on December 12, 2017, pursuant to which the Initial Phase I End User paid a monthly fixed storage fee to lease all of Phase I’s storage capacity (irrespective of whether the Initial Phase I End User used any storage capacity). The Phase I End User Agreement is for an initial period of five years, with a remaining period of approximately threetwo and a half years, and is renewable for an additional five year period. For the year ended December 31, 2017, BPGIC generated 100 percent of its total revenue from monthly fees for storage services For the year ended December 31, 2018, BPGIC generated 57.9 percent of its total revenue from monthly fees for storage services. For the year ended December 31, 2019, BPGICthe Company generated 54.3 percent of its total revenue from monthly fees for storage services. For the year ended December 31, 2020, the Company generated 60.6 percent of its total revenue from monthly fees for storage services.

 

In August 2019, BPGIC entered into the Phase I Customer Agreement to restructure its relationship with the Initial Phase I End User. Pursuant to the Phase I Customer Agreement, BPGIC leased the Phase I facility to BIA on identical price terms and otherwise on substantially the same terms as those of the Phase I End User Agreement, and in connection therewith, BIA assumed BPGIC’s rights and obligations under the Phase I End User Agreement. Like the Initial Phase I End User, BIA is required to pay a monthly fixed storage fee to lease Phase I’s storage capacity. In 2020, BIA notified BPGIC that it had entered sublease arrangements for parts of the Phase I storage capacity with additional end users. BIA is required to satisfy any amounts due for the monthly fixed storage fee in advance for each applicable month. Although BIA subleases the Phase I facility to the Initial Phase I End User pursuant to the novated Phase I End User Agreement,and others, BIA’s obligation to pay the monthly fixed storage fee to BPGIC is independent of BIA’s obligation to pay, and actual payment to, BIA. The Phase I Customer Agreement is for an initial period of four years with a renewal period of five years.years unless either party delivers to the other party a written termination notice not less than six months prior to the expiration date of the agreement. The level of the fixed storage fee for Phase I is more than sufficient to cover all of BPGIC’s Phase I operating costs (other than the variable costs associated with ancillary services), including operating costs, wages, depreciation and interest costs. See “Item 10.C Material Contracts— Phase I End User Agreement, and Phase I Customer Agreement, and Super Major Agreement—Agreement, and Commercial Storage Agreements — Storage Fee”.

In May 2020, BIA agreed to release 129,000 m3 of the Phase I capacity, amounting to approximately one third of the total Phase I capacity, back to BPGIC. Pursuant to the Super Major Agreement, BPGIC leased this capacity to the Super Major. The Super Major is required to pay a monthly fixed storage fee to lease its storage capacity at Phase I. The Super Major paid the storage fee for the initial six month term of the Super Major Agreement up front. The Super Major Agreement is renewable for an additional six months with the mutual agreement of the parties. See “Item 10.C Material Contracts — Phase I End User Agreement, Phase I Customer Agreement and Super Major Agreement — Storage Fee”.

 

The Phase I Customer Agreement also provides that every two years, BPGIC may elect to review and seek to amend the storage fee. The Phase I Customer Agreement providesfee, and that the outcome of thissuch review can result only in either an increase in rates or no change.

In April and May 2020, BIA agreed to release an aggregate of 129,000 m3 of the Phase I capacity back to BPGIC, until November 8, 2020, subject to extension of the term for an additional six months upon the mutual agreement of the parties. On November 1, 2020, the parties mutually agreed to such extension of the term for an additional six months. On December 1, 2020 and December 7, 2020, BIA agreed to release additional 43,000 m3 and 61,072 m3, respectively, of the Phase I capacity back to BPGIC for respective six-month periods ending in June 2021, in each case, subject to extension for an additional six months upon the mutual agreement of the parties. On December 9, 2020, February 8, 2021 and February 10, 2021, BIA agreed to release additional 41,563 m3, 41,563 m3 and 83,126 m3, respectively, of the Phase I capacity back to BPGIC for respective six-month periods ending in June 2021 and August 2021, as applicable, in each case, subject to extension for an additional six months upon the mutual agreement of the parties.

Pursuant to the Super Major Agreement, BPGIC leased the initial 129,000 m3 capacity released back to it to the Super Major for a six month period subject to renewal for an additional six month period with the mutual agreement of the parties. In November 2020, the Super Major Agreement was not renewed by mutual agreement.

From November 2020 till March 2021, the Company entered into the nine Commercial Storage Agreements with the Storage Customers, eight of which agreements are still in effect. Four of these eight Commercial Storage Agreements each have a six months term, subject to an additional six month renewal, one agreement has a six months term, subject to an additional three months renewal, another agreement has a five months term, subject to an additional three months renewal, another agreement has a three months term, subject to an additional three months renewal, and the remaining agreement has a two months term, subject to additional two months renewal. These eight agreements are spread tank wise within a total of five reputed customers as compared to one single customer in previous periods.

These Commercial Storage Agreements have much higher monthly, fixed storage fees compared to the Super Major Agreement, which will increase the Company’s fixed revenues by 40% to 45%. See “Item 10.C Material Contracts— Phase I End User Agreement, Phase I Customer Agreement, Super Major Agreement, and Commercial Storage Agreements”.

 

BPGIC and BIA are still negotiating the Refinery Operations Agreement, however, BPGIC expects that upon the commencement of the BIA Refinery’s operations, which is currently projected to occur during the Third Quarter of 2021, BIA will pay a monthly fixed fee for storage leased in connection with the BIA Refinery. See “Item 10.C Material Contracts — Refinery Agreement”.

BPGIC entered into the Phase II End User Agreement on June 27, 2018, pursuant to which the Phase II End User is required to pay a monthly fixed storage fee to lease all of Phase II’s storage capacity (regardless of whether the Phase II End User uses any storage capacity) once the facility is operational. The Phase II End User Agreement is for an initial period of five years from January 1, 2020 (subject to adjustment ifbecause the facility iswas not operational on that date), and is renewable for an additional five year period.

 


32

In September 2019, BPGIC entered into the Phase II Customer Agreement to restructure its relationship with the Phase II End User. Pursuant to the Phase II Customer Agreement, BPGIC agreed to lease the Phase II facility to BIA, once operational, on identical price terms and otherwise on substantially the same terms as those of the Phase II End User Agreement, and in connection therewith, BIA assumed BPGIC’s rights and obligations under the Phase II End User Agreement. Like the Phase II End User, BIA is required to pay a monthly fixed storage fee to lease all of Phase II’s storage capacity. BIA is required to satisfy any amounts due for the monthly fixed storage fee in advance for each applicable month. Although BIA subleases the Phase II facility to the Phase II End User pursuant to the Phase II End User Agreement, BIA’s obligation to pay the monthly fixed storage fee to BPGIC is independent of the Phase II End User’s obligation to pay, and actual payment to, BIA. The Phase II Customer Agreement is for an initial period of five years with a renewal period of five years. See “Item 10.C Material Contracts— Phase II End User Agreement and Phase II Customer Agreement — Storage Fee”.

Suite of ancillary services, which provide additional revenue streams.

 

Under the Phase I End User Agreement, BPGIC was able to increase its revenue beyond the monthly fixed storage fee by providing the Initial Phase I End User with ancillary services. These ancillary services included throughput, blending, heating and inter-tank transfers and earned BPGIC additional revenue in accordance with the type and quantity of ancillary services the Initial Phase I End User requested.

 

The Initial Phase I End User primarily acts as an intermediary in the oil products and services supply chain by obtaining purchase or service orders for certain oil products (including fuel oil and refined petroleum products) from oil companies and then working with service providers such as BPGIC to fulfil such orders. The year ended December 31, 2017, ancillary services did not generate any contribution towards revenue. For the year ended December 31, 2018, BPGIC generated 42.1 percent of its total revenue from monthly fees for ancillary services. For the year ended December 31, 2019, BPGIC generated 45.7 percent of its total revenue from monthly fees forancillary services. For the year ended December 31, 2020, BPGIC generated 39.4 percent of its total revenue from ancillary services. BPGIC expects its revenues from ancillary services to be a significant driver of value for BPGICthe Company going forward. See “Item 10.C Material Contracts —Contracts— Phase I End User Agreement, Phase I Customer Agreement, and Super Major Agreement, and Commercial Storage Agreements — Ancillary Services”.

 

Similarly, under the Phase I Customer Agreement and the Super Major Agreement, BPGICexisting Commercial Storage Agreements, the Company is able to supplement its revenue by providing BIA or its sublessees, and the Super Major,existing Storage Customers, ancillary services including throughput, blending, heating and inter-tank transfers. To provide these ancillary services, BPGIC charges a fee, that varies by service, equal to a contractual rate per m3 per month. As a result, BPGICthe Company earns additional revenue in accordance with the type and quantity of ancillary services used by BIA or its sublessees, and the Super Major, use.existing Storage Customers. BPGIC’s ability to provide ancillary services is enhanced due to the design of Phase I, which was designed, among other things, to provide high accuracy blending services with low oil losses, high oil transfer flow rates and the ability to perform up to 11 simultaneous operations, which contributes to Phase I’s attractiveness as a one-stop location for extensive product customization. Because all of BPGIC’s fixed operating costs for the Phase I facility are covered by the storage fee, revenues from ancillary services (less any associated variable costs) are a significant driver of profitability for BPGIC. BPGIC’sthe Company. The Company’s monthly revenue for ancillary services will depend on the extent to which BIA’s sublessees, existing Storage Customers and the Super Major,any future storage customers, utilize the ancillary services. Although BPGIC’s ancillary services revenue is partially dependent on the Phase I sublessees, BIA’s obligation to pay for the ancillary services used by it or the Initial Phase I End User (or other sublessee) is independent of the sublessees’ obligation to pay, and actual payment to, BIA.

 

The Phase I Customer Agreement also provides that every two years, BPGIC may elect to review and seek to amend the ancillary services fees. The Phase I Customer Agreement providesfees, and that the outcome of thissuch review can result only in either an increase in rates or no change.

 

Although BPGIC and BIA are still negotiating the Refinery Operations Agreement, BPGIC expects that BIA will pay ancillary service fees in connection with any ancillary services that it uses. Although such use may be greater or lesser than, and the fees generated by such use may be greater or lesser than, the fees currently received from BIA based on the usage of its end users, we believe the BIA Refinery will provide an operating financial benefit to BPGIC.

 

The ancillary service terms of the Phase II Customer Agreement are similar to the ancillary service terms of the Phase I Customer Agreement. Upon the commencement of Phase II’s operations, which is expected to occur during the second half of 2020, BPGICCompany expects that the ancillary service operations of Phase II will be substantially similar to the ancillary service operations of Phase I.

Experienced senior management team.

 

BPGICThe Company is led by the members of senior management,Senior Management, who have over 30 years of experience collectively in the oil storage terminal, infrastructure sectors and related markets. As a result, members of senior managementSenior Management will be able to leverage their significant experience while implementing and executing BPGIC’sthe Company’s business plan and to achieve certain growth milestones. Members of senior managementSenior Management also have experience with overseeing the construction of oil storage terminals as a result of the Phase I construction process, which is expected to facilitate their management and execution of the Phase II and Phase III construction process and other future projects.

 

38

33

Industry and Market Data

The Company and BPGIC rely on and refer to industry data, information and statistics regarding the markets in which it competes from research as well as from publicly available information and industry and general publications. The Company and BPGIC have supplemented this information where necessary with their own internal estimates and information obtained from discussions with BPGIC customers, taking into account publicly available information about other industry participants and management’s best view as to information that is not publicly available. The Company has taken such care as it considers reasonable in the extraction and reproduction of information from such data from third-party sources.

Industry publications, research, studies and forecasts generally state that the information they contain has been obtained from sources believed to be reliable, but that the accuracy and completeness of such information is not guaranteed. Forecasts and other forward-looking information obtained from these sources are subject to the same qualifications and uncertainties as the other forward-looking statements in this Report. These forecasts and forward-looking information are subject to uncertainty and risk due to a variety of factors, including those described under “Item 3.D Risk Factors.” These and other factors could cause results to differ materially from those expressed in the forecasts or estimates from independent third parties and us.

 

Strategy

 

BPGIC’sThe Company’s vision is to develop an oil storage business that differentiates itself from competitors by providing its customers with fast order processing times, excellent customer service and high accuracy blending services with low oil losses. In this pursuit, the key components of BPGIC’sthe Company’s business strategy are as follows:

Expand the scale of existing operations by completing Phase II and operating the BIA Refinery.

 

BPGICThe Company plans to leverage its experience from building and operating Phase I while building and ramping up operations for Phase II. Phase II involvesis expected to increase the construction of eight additional oil storage tanks with an aggregate geometric oil storage capacity of approximately 0.601 million m3, which will increase BPGIC’sCompany’s aggregate geometric oil storage capacity to approximately 1.0 million m3. This would lead to the BPGIC Terminal becoming one of the largest oil storage terminals by storage capacity in the Port of Fujairah. On September 3, 2018, BPGIC signed the an EPC agreement for Phase II (the “Phase II EPC Agreement”) with Audex. Phase II work commenced in September 2018 and according to the schedule in the Phase II EPC Agreement, it is expected to be completed in 2020. The expected capital expenditure in respectby the end of Phase II is $160.6 million (comprisedthe Second Quarter of construction costs2021. In August 2020, the Company commenced hydrotesting of $150.0 million and capitalized interest and land lease and consultancy charges of $10.6 million). The expected capital expenditure in respect of Phase II will be partially funded by drawings of $90.6 million under the Phase II Financing Facility. For details offacility and the remaining expected capital expenditure, see “Item 4.B Business Overview— Overview”.


BPGICCompany expects Phase II operations to commence duringin the second halfThird Quarter of 2020. BPGIC2021.

The Company plans to focus Phase II’s operations primarily on the storage and blending of crude oil and thereby capitalize on the demand for crude oil storage. On June 27, 2018, BPGIC entered into the Phase II End User Agreement with the Phase II End User, an international commodities trading company. Pursuant to the Phase II End User Agreement, the Phase II End User agreed to lease all eight oil storage tanks in Phase II once Phase II becomes operational. In September 2019, BPGIC entered into the Phase II Customer Agreement to restructure its relationship with the Phase II End User. Pursuant to the Phase II Customer Agreement, BPGIC agreed to lease the Phase II facility, once operational, to BIA on identical price terms and otherwise substantially similar terms as those of the Phase II End User Agreement, and in connection therewith, BIA assumed BPGIC’s rights and obligations under the Phase II End User Agreement. BPGIC expects to generate additional revenues and expenses in connection with Phase II’s operations. Similar to the commencement of operations for Phase I, BPGICthe Company may initially commence operations of Phase II in accordance with certain required safety measures and ramp up utilization of its storage capacity and ancillary services over time to mitigate any potential operational risks. This would impact the amount of storage and ancillary service fees BPGICthe Company would earn during the first quarter of operations under the Phase II Customer Agreement. For more information regarding the terms of the Phase II Customer Agreement, see “Item 10.C Material Contracts — Phase II End User Agreement and Phase II Customer Agreement”.

 

BPGIC is in discussion with BIA to finance, develop, construct and commission the BIA Refinery at minimal capital cost to BPGIC.the Company. The Refinery Operations Agreement is still under negotiation, but BPGIC expects that the BIA Refinery will have an initial production capacity of 25,000 b/d and be capable of producing IMO 2020 compliant 0.5% sulphur content shipping fuel. Upon completion, the BIA Refinery is expected to be one of the first refineries in the MENA region producing IMO 2020 compliant 0.5% sulphur content shipping fuel. BPGICThe Company currently expects the BIA Refinery to be developed, constructed, installed and installedoperative by the SecondFirst Quarter of 2021 and for operations to commence during the Third Quarter of 2021.2022. For more information regarding the Refinery Agreement, see “Item 10.C Material Contracts — Refinery Agreement”.

Growth Throughthrough Expansion of BPGIC’s Facilities and Geography

 

BPGICThe Company intends to leverage senior management’sSenior Management’s long-standing industry expertise in the oil and gas and storage sector, initially within the Gulf region and, ultimately more broadly geographically, to ensure BPGICthe Company continues to enhance its competitiveness, expand its solution offerings to customers and increase shareholder value. As a result, BPGICthe Company is continuously looking at numerous expansion opportunities beyondfor Phase III.III and beyond. Our ordinary course of business includes discussions with various potential parties, regarding different types of business opportunities, and in a variety of different geographic markets. None of these ongoing various discussions have yet reached the stage of definitive agreements and there can be no assurance that they ever will.

 

The business opportunities available vary widely from traditional customer contracts with global industry participants to various partnerships, ranging from operating or acquiring existing facilities to building new facilities. Some potential partnership opportunities have included partial or full financing commitments from the prospective partner for the existing or new facilities, while some opportunities are traditional acquisitions by the Company of existing facilities. The Company carefully evaluates all growth opportunities to ensure its business remains focused on its high-end market positioning and value creation for existing shareholders.

 

For instance, within the Fujairah market, BPGICthe Company is now in the FEED stage for the furthera major expansion near its existing facilities, which it refers to as Phase III. In February 2020, BPGIC executed the Phase III Land Lease, Agreement, a lease agreementand on October 1 2020, novated the Phase III Land Lease to secure a new plot of land of approximately 450,000 m2, near its existing facilities. BPGIC III. The Company currently intends to use such land to further increase its capacity for crude oil storage and services by an additional capacity.services. We expect that Phase III alone could be three-and-a-half (3.5) times the size of the Company’s projected operations post-Phase II. Concurrently, BPGICthe Company is in discussions with top global oil majors, which have expressed interest in securing portions of the capacity of a Phase III facility. As of the date of this Report, BPGICthe Company does not yet have any planned capital expenditures in connection with Phase III, other than the cost of a FEED study for storage capacity of up to 3.5 million m3 and a 180,000 bblb/d refinery. For more information regarding Phase III, see the section entitled “Item 4.A History and Development of the Company— Proposed Phase IIIIII”.

34

 

In addition to this specific land for Phase III, BPGICthe Company will continue to pursue additional projects within the Fujairah market, either through partnerships with parties who have land leases or through efforts to secure additional land itself in Fujairah.

 

Preliminary discussions with existing and potential customers regarding geographic expansion opportunities outside of BPGIC’sthe Company’s current market by acquiring certain of their existing facilities as part of long-term service contracts are ongoing. For instance, BPGICthe Company has entered into preliminary agreements with a global commodity trading firm to evaluate acquisitions of that firm’s interests in oil storage terminals in Africa and Europe. We believe both terminals are well located and provide strategic opportunities for our expansion into those markets, including available land to expand with new state-of-the-art facilities such as we have in Fujairah. We are in the preliminary due diligence phase with respect to these opportunities, and there is no assurance we will decide to pursue them.

 


For related risks, see “Item 3.D Risk Factors — Risks relatingrelated to BPGIC and BPGIC III — Beyond Phase II, expansion of BPGIC’sthe Company’s business may require substantial capital investment, and it may not have sufficient capital to make future capital expenditures and other investments as it deems necessary or desirable”.

Continue to build relationships with potential customers.

 

BPGICThe Company is focused on diversifying its potential customer base over the medium to long-term. Due to Phase I’s strong performance track record to date, and BPGIC’sthe Company’s reputation and business development efforts, including through inspections from potential users, BPGICthe Company believes that it has developed strong relationships with several oil traders that could potentially utilize the services of Phase I and II. The familiarity that potential users have gained through their inspections and that oil traders have developed through their experience with BPGIC’sthe Company’s Phase I facility represent a valuable marketing opportunity for BPGIC: giventhe Company. Given the nature of the industry, positive word-of-mouth feedback by these groups can help to establish BPGIC’sthe Company’s industry reputation and thereby help drive potential customer business in the future. Moreover, by continuing to build upon BPGIC’sthe Company’s performance track record during Phase II (after it commences operations) and business developments efforts, BPGICthe Company would be able to expand its base of potential customers for future contracts for oil storage or ancillary services. Similarly, the BIA Refinery, once operational, will expand the scope of services that BPGICthe Company can offer, diversifying the types of industry participants that it can service.

Phase I

 

Phase I went into operation in December 2017 and between 2014 and 2017, BPGIC incurred a total cost of $170 million in connection with its construction. BPGIC began development of the BPGIC Terminal after several years of planning and discussions with industry participants. BPGIC’s aim in developing the BPGIC Terminal was to create a new standard for oil storage tank terminals by designing a terminal that would reduce user oil losses and achieve better blending results than existing oil storage tank terminals. As described below, BPGIC designed Phase I with several key features that enable it to provide users with high-accuracy blending services with low oil losses. In addition, due to the relatively long term of the Phase I & II Land Lease, when compared to comparable land leases for oil storage terminals located in the Port of Fujairah, BPGIC constructed Phase I with materials that have longer expected life spans than comparable materials utilized by other oil storage terminals in the area. As a result, BPGICthe Company believes Phase I will benefit from annual maintenance costs over the period of the Phase I & II Land Lease that are lower than average for comparable oil storage terminals.

 

The key features of Phase I include:

 

all 14 oil storage tanks are inter-connected via the internal manifold that connects the 14 oil storage tanks of Phase I (the “Phase I Internal Manifold”);Manifold;

 

the pumping and stripping systems of the Phase I Internal Manifold are equipped with a fine stripping system, minimizing energy costs, lowering loss ratios and permitting a high degree of stripping to be achieved;

 

the ability to more efficiently perform required maintenance activities and prepare pipelines for oil transfers;

 

lower loss ratios and contamination risks;

 

recirculation of oil products to assist with the blending process;

 

the ability to simultaneously perform several Phase I operations, permitting BPGIC to service multiple user orders during the same time period; and

 

all 14 oil storage tanks have been designed to permit conversions from storing one clean petroleum product to another and from storing fuel oil to gas oil at a speed which is favorable compared to that of competitors in the UAE region, allowing BPGIC to adjust its services to meet changing market demands.

Tanks

 

Phase I has 14 oil storage tanks, which are capable of storing gas oil, marine gas oil, fuel oil, naphtha, aviation fuel, gasoline, pygas, reformate, cutter stock and methyl tert-butyl ether. Each of the oil storage tanks has been designed to allow fast and efficient cleaning, which permits efficient conversions from storing one product to another. The 14 oil storage tanks are also equipped with the following features:

 

accurate product level measurements: a real-time electronic measuring system that monitors product levels in each oil storage tank;

an efficient, high-quality blending system which improves the quality and speed of blends;

 

35

effective drainage systems leading to lower product contamination risks and allowing for a faster product change process;

automated fire-fighting systems: an automated fire system that activates automatically in the event of a fire;

41

a well-designed pipeline connection: a pipeline connection to the Phase I Internal Manifold that allows any oil storage tank to be connected to the stripping systems and to any other oil storage tank or berth in the Port of Fujairah connected to Matrix Manifold 1 or Matrix Manifold 2; and

heating services: eight of the oil storage tanks have heating coils installed. Currently, only four of the oil storage tanks are connected to the heating system.

 

The following table displays the key attributes of the 14 oil storage tanks of Phase I:

 

Tank No. Capable of 
Servicing(1)
 Diameter (m) x
Height (m)
 Blending
Capability
 Roof Type(2) Tank Heating
Capability
 Geometric
Capacity (m3)
 Max
Capacity (m3)
 Capable of
Servicing(1)
 Diameter (m) x
Height (m)
 Blending
Capability
 Roof Type(2) Tank Heating
Capability
 Geometric
Capacity (m3)
 Max
Capacity (m3)
101 GO/ FO 42 x 30 Yes AGDR Yes 41,563 40,207 GO/ FO 42 x 30 Yes AGDR Yes 41,563 40,207
102 GO/ FO 42 x 30 Yes AGDR Yes 41,563 40,207 GO/ FO 42 x 30 Yes AGDR Yes 41,563 40,207
103 GO/ FO 42 x 30 Yes AGDR Yes 41,563 40,207 GO/ FO 42 x 30 Yes AGDR Yes 41,563 40,207
104 GO/ FO 42 x 30 Yes AGDR Yes 41,563 40,207 GO/ FO 42 x 30 Yes AGDR Yes 41,563 40,207
105 Gasoline/ AF/ GO/ MGO/ Naphtha/ Pygas/ Reformate 36 x 30 Yes AGDR with IFR Yes, but not currently enabled 30,536 29,031 Gasoline/ AF/ GO/ MGO/ Naphtha/ Pygas/ Reformate 36 x 30 Yes AGDR with IFR Yes, but not currently enabled 30,536 29,031
106 Gasoline/ AF/ GO/ MGO/ Naphtha/ Pygas/ Reformate 36 x 30 Yes AGDR with IFR Yes, but not currently enabled 30,536 29,031 Gasoline/ AF/ GO/ MGO/ Naphtha/ Pygas/ Reformate 36 x 30 Yes AGDR with IFR Yes, but not currently enabled 30,536 29,031
107 Gasoline/ AF/ GO/ MGO/ Naphtha/ Pygas/ Reformate 36 x 30 Yes AGDR with IFR Yes, but not currently enabled 30,536 29,031 Gasoline/ AF/ GO/ MGO/ Naphtha/ Pygas/ Reformate 36 x 30 Yes AGDR with IFR Yes, but not currently enabled 30,536 29,031
108 Gasoline/ AF/ GO/ MGO/ Naphtha/ Pygas/ Reformate 36 x 30 Yes AGDR with IFR Yes, but not currently enabled 30,536 29,031 Gasoline/ AF/ GO/ MGO/ Naphtha/ Pygas/ Reformate 36 x 30 Yes AGDR with IFR Yes, but not currently enabled 30,536 29,031
109 Gasoline/ AF/ GO/ MGO/ Naphtha/ Pygas/ Reformate 36 x 30 Yes AGDR with IFR No 30,536 29,031 Gasoline/ AF/ GO/ MGO/ Naphtha/ Pygas/ Reformate 36 x 30 Yes AGDR with IFR No 30,536 29,031
110 Gasoline/ AF/ GO/ MGO/ Naphtha/ Pygas/ Reformate 36 x 30 Yes AGDR with IFR No 30,536 29,031 Gasoline/ AF/ GO/ MGO/ Naphtha/ Pygas/ Reformate 36 x 30 Yes AGDR with IFR No 30,536 29,031
111 Gasoline/ AF/ GO/ Naphtha/ Pygas/ Reformate/ CS 23 x 30 Yes AGDR No 12,464 11,850 Gasoline/ AF/ GO/ Naphtha/ Pygas/ Reformate/ CS 23 x 30 Yes AGDR No 12,464 11,850
112 Gasoline/ AF/ GO/ Naphtha/ Pygas/ Reformate/ CS 23 x 30 Yes AGDR No 12,464 11,850 Gasoline/ AF/ GO/ Naphtha/ Pygas/ Reformate/ CS 23 x 30 Yes AGDR No 12,464 11,850
113 MTBE/ Gasoline/ AF/ GO/ Naphtha/ Pygas/ Reformate 23 x 30 Yes AGDR with IFR No 12,464 11,850 MTBE/ Gasoline/ AF/ GO/ Naphtha/ Pygas/ Reformate 23 x 30 Yes AGDR with IFR No 12,464 11,850
114 MTBE / Gasoline/ AF/ GO/ Naphtha/ Pygas/ Reformate 23 x 30 Yes AGDR with IFR No 12,464 11,850 MTBE / Gasoline/ AF/ GO/ Naphtha/ Pygas/ Reformate 23 x 30 Yes AGDR with IFR No 12,464 11,850
Total Storage Capacity (m3)Total Storage Capacity (m3) 399,324 382,400Total Storage Capacity (m3) 399,324 382,400

 

____________
(1)All the oil storage tanks are convertible and can be cleaned and converted to service other oil products; “GO” means Gas Oil; “FO” means Fuel Oil; “AF” means Aviation Fuel; “MGO” means Marine Gas Oil; “CS” means Cutter Stock; “MTBE” means Methyl Tertiary-Butyl Ether.

(2)“AGDR” means Aluminium Geodesic Dome Roof; “AGDR with IFR” means Aluminium Geodesic Dome Roof with Internal Floating Roof.

 


36

BPGIC transports oil products from the BPGIC Terminal to the Port of Fujairah’s berths through the use of pumps and four piggable jetty pipelines. The pumps facilitate on-loading operations from the Phase I Internal Manifold by pumping oil products through one or more of the four piggable jetty pipelines to Matrix Manifold 2, and then through the Port of Fujairah’s pipelines, to ships located at berths 8 and 9 or to ships located at berths 2-7 via Matrix Manifold 1. BPGIC has seven pumps that it can use to on-load oil products to Matrix Manifold 2. Four of the pumps are capable of transporting gas oil/gasoline at an individual flow rate of 1,250 m3/hr and at a combined flow rate of 5,000 m3/hr. Three of the pumps are capable of transporting fuel oil at an individual flow rate of 1,500 m3/hr and at a combined flow rate of 4,500 m3/hr. BPGIC also utilizes these pumps to facilitate inter-tank transfers, blending and other transfers throughout the BPGIC Terminal.

 

The users utilize their ship pumps to transport oil products from the relevant berths in the Port of Fujairah via Matrix Manifold 2 to the Phase I Internal Manifold, and following the construction and commencement of operations of Phase II, to the proposed internal manifold that will connect the 8eight oil storage tanks of Phase II (the “Phase II Internal Manifold”).

 

The Phase I Internal Manifold is equipped with a general stripping system that removes any excess oil products left in the pipelines following any oil product transfers and adds it back to appropriate batches, and a fine stripping system that removes any excess oil products left in the general stripping system and adds it back to appropriate batches. The two levels of stripping permit a high degree of stripping to be achieved. All oil products transferred from any oil storage tank to the stripping systems flows downhill, minimizing energy costs. The Phase I Internal Manifold is also equipped with cranes to perform required maintenance activities and prepare pipelines for oil transfers.

 

As part of Phase II, BPGIC is currently constructing the Phase II Internal Manifold, an additional internal manifold system to enable crude oil operations. The Phase II Internal Manifold is being constructed adjacent to the Phase I Internal Manifold on the remaining land available under the Phase I & II Land Lease.

Direct Connection to Matrix Manifold 2

 

The Phase I Internal Manifold is directly connected to the Port of Fujairah’s Matrix Manifold 2, which is approximately 500 meters away. The Matrix Manifold 2 is directly connected to berths 8 and 9, which are in close proximity to the BPGIC Terminal. The terminal benefits from its close proximately to berths 8 and 9 due to the shorter travel distances required for oil product transfers, which in effect lowers contamination risks and leads to faster vessel turnaround times. Berths 8 and 9 can accommodate vessels with a maximum overall length of 330 meters and a minimum overall length of 75 meters. As part of Phase II, BPGIC plans to directly connect the Phase II Internal Manifold to the Port of Fujairah’s Matrix Manifold 2.

 

The Matrix Manifold 2 is also connected to the Port of Fujairah’s Matrix Manifold 1, which is in turn connected to berths 1-7 of the Port of Fujairah, providing users with broad access to the BPGIC Terminal.

Generators

 

Four electricity generators were installed as part of the construction of Phase I. The generators, developed by Cummins Generator Technologies, are diesel-powered and can produce up to 6,000 kWh of power, which BPGICthe Company believes will be sufficient to provide for the needs of Phase I, Phase II and the BIA Refinery. As BPGIC’s diesel fuel needs currently vary each month based on the Phase I sublessees’ and the Super Major’sexisting Storage Customers’ activity levels, BPGIC entered into an arrangement with a local diesel fuel provider, pursuant to which it can order diesel fuel on a monthly or as-needed basis. At the beginning of each month, the local diesel fuel provider will send BPGIC a quote for the price of diesel fuel, and subject to any potential price negotiation, BPGIC will place orders based on its projected needs for the applicable month.

43

Blending

 

BPGIC believes that Phase I benefits from state-of-the-art blending capabilities, allowing high levels of accuracy in meeting customer blending specifications. BPGIC’s blending services are designed to accommodate a variety of mixing specifications and to prevent any evaporation or leakage. The stripping systems and oil storage tanks are designed to prevent losses, contamination and residue accumulation, enabling BPGIC to produce blends that precisely meet customer specifications and the volume/mass requested.

 

All Phase I oil storage tanks are connected via the Phase I Internal Manifold and have blending capabilities, which permits BPGIC to utilize any available oil storage tank for blending purposes, leads to higher tank availability for processing user orders and allows BPGIC to perform mixtures within short timeframes.

37

 

Each of the oil storage tanks is equipped with some of the latest technology blending equipment and a real-time electronic measuring system that monitors product levels, resulting in faster blending times and more consistent blends. In connection with a standard blending request, BPGIC takes the specified quantity of oil products to be blended and adds them into a single oil storage tank. A part of the mixture is then withdrawn from and added back to the oil storage tank at high velocity. This typically causes the surrounding liquid to create a circulation path within the oil storage tank, which mixes the oil products and continues until the specified blend requirements are achieved. Generally, the purpose of blending fuel oil is to modify its viscosity or thickness to meet customer specifications and the purpose of blending gasoline is to modify its octane number to meet customer specifications.

Heating

 

As part of Phase I, BPGIC constructed a heating system, comprised of a boiler and direct pipeline connections to certain oil storage tanks that have heating coils installed. Generally, in connection with a heating request, BPGIC heats special purpose heating oil in the boiler and then circulates the heating oil via a pipeline connection to the heating coils located at the bottom of an applicable oil storage tank. The heating oil is then recirculated between the boiler and through the heating coils of the applicable oil storage tank until the oil product in the oil storage tank reaches the specified temperature.

 

Currently, eight of the Phase I oil storage tanks have heating coils installed, but due to current business needs, only four are connected to the heating system. As the heating needs of Phase I increase, BPGIC plans to connect additional oil storage tanks to the heating system. Each new connection will require BPGIC to establish a new pipeline connection between the boiler and the applicable oil storage tank. BPGIC also plans to construct four additional oil storage tanks with heating capacity in connection with Phase II. BPGIC believes that the current heating system will be sufficient to meet the heating needs of the eight oil storage tanks in Phase I that have, and the four oil storage tanks in Phase II that will have, heating capacity.

Customer Ordering Process

 

BPGIC is committed to providing excellent customer service. BPGIC has allocated a customer service officer (a “CSO”) to BIA with respect to Phase I and tested an online ordering system which will bewas rolled out within Q3in the Third Quarter of 2020, which enables BIA and the Super Majorexisting Storage Customers to place storage, heating and blending orders and track order statuses in real-time. As an alternative, BIA can also place service orders by calling its CSO. When placing orders, BIA and the Super Majorexisting Storage Customers must provide the relevant order details, including the requested services, oil product specifications and desired timing. Following the submission of a service order, the CSO responsible for reviewing the service order will correspond with BIA or the Super Major,Storage Customer, as applicable, provide a cost estimate for the proposed services, coordinate logistics for discharging operations, including berth reservations through the Port of Fujairah’s reservation system and payment of Port fees on BIA’s or the Super Major’sStorage Customer’s behalf, as applicable, and liaise with operational staff to facilitate and process the service order. Upon the completion of the requested services, the CSO will notify BIA or the Super Major,Storage Customer, as applicable, of the completion status, coordinate with surveyors to provide any required samples, organize logistics for on-loading operations and send an itemized invoice to BIA or the Super Major,Storage Customer, as applicable, for the services provided. In the future, if and when BPGIC engages with any additional users, BPGIC intends to designate a CSO to each additional user but may also expand the scope of the current CSO’s responsibilities to cover any such additional user.

44

BIA Refinery

 

BPGIC is in discussion with BIA to develop and operate the BIA Refinery at minimal cost to BPGIC. BPGIC and BIA are still negotiating the Refinery Operations Agreement, however BPGIC expects that BIA will finance and arrange the development, construction and commissioning of a modular refinery on a parcel of BPGIC’s land. BPGIC anticipates that BIA will engage an EPC Contractorcontractor to design and procure construction and commission of the BIA Refinery. The parties have extended their deadline to negotiate the Refinery Operations Agreement to August 4, 2020.the Second Quarter of 2021. BPGIC currently projects that the BIA Refinery will be completed by the SecondFirst Quarter of 2021, and will commence operations in the Third Quarter of 2021.2022. The BIA Refinery is expected to be amongstamong the first refineries in the MENA region capable of supplying IMO 2020 compliant 0.5% sulphur content shipping fuel. The facility is initially expected to have an initial production capacity of 25,000 b/d.

Capital Expenditure

 

The expected capital expenditure by BPGIC in connection with the BIA Refinery is minimal.

Key Features and Components

 

The key proposed features of the BIA Refinery:

 

will be capable of producing IMO 2020 compliant 0.5% sulphur shipping fuel; and

modular design will permit future expansion.

 

38

Proposed Phase II

Scope

 

Phase II is currently being constructed adjacent to Phase I on the remaining land available under the Phase I & II Land Lease. BPGIC had a soil investigation report completed for the land, which determined that the land was adequate for the purposes of construction and the operation of the facilities. Phase II involves the construction of (i) four crude oil storage tanks with a projected aggregate geometric storage capacity of 0.431 million m3; (ii) four crude/fuel oil storage tanks with a projected aggregate geometric storage capacity of 0.171 million m3; (iii) the Phase II Internal Manifold to service only crude oil; and (iv) the associated infrastructure and facilities, including two new crude oil pipelines and four new pumps to carry crude oil between the Phase II Internal Manifold and Matrix Manifold 2. Portions of the infrastructure to support the two new crude oil pipelines and the Phase II Internal Manifold were developed during Phase I. Each of the four crude/fuel oil storage tanks is expected to be capable of storing crude and fuel oils; however, BPGIC, BIA and the Phase II End User currently intend to use this storage capacity primarily to store and blend crude oil. BPGIC considered Phase II when developing its plan for Phase I, and constructed infrastructure to accommodate the needs of Phase II and will not need to substantially reconfigure its facilities or install additional generators in order to construct and operate the proposed facilities.

Capital Expenditure

 

The expected capital expenditure in respect of Phase II is $160.6$161.7 million, which is comprisedconsisting of construction costs of $150.0 million and capitalised interest and land lease and consultancy charges of $10.6$11.7 million. The expected capital expenditure of $160.6 million in respect of Phase II will be funded by:

 

drawings of $90.6$85 million under the Phase IIBond Financing Facility; and

shareholders contributions, proceeds of the Business Combination, and internally generated cashflowcash flow in the aggregate amount of $70.0$76.7 million.

 


Of the $160.6$161.7 million expected capital expenditure in respect of Phase II, $39.20$39.2 million was paid byin the end of fiscal year 2019. During 2020, $24.8ended December 31, 2019, $81.2 million was paid through Junein the year ended December 31, 2020, and the balance is expected to be paid out before the end of the year. See “Item 3.D Risk Factors — Risks relating to BPGIC — BPGIC may be subject to significant risks and expenses when constructing Phase II, which could adversely affect BPGIC’s business, financial condition and resultsfirst half of operations.2021.

Key Features and Components

 

The key proposed features of Phase II include:

 

all eight oil storage tanks will be inter-connected via the Phase II Internal Manifold;

the pumping and stripping systems of the Phase II Internal Manifold will be equipped with fine stripping systems to minimize energy costs, lower loss ratios and remote changes on product contaminations;
   
the cranes of the Phase II Internal Manifold will allow BPGICthe Company to more efficiently perform required maintenance activities and prepare pipelines for oil transfers;

each of the two piggable crude oil jetty pipelines will be directly connected between the Phase II Internal Manifold and Matrix Manifold 2, lowering loss ratios and contamination risks;
   
BPGICthe Company will be able to perform up to six simultaneous operations in Phase II, including tank-to-tank transfers, recirculations, blending, heating, loading and discharging, which would permit BPGICthe Company to service multiple user orders during the same time period; and
   
four of the oil storage tanks will be constructed to permit conversion between crude oil and fuel oil products, allowing BPGICthe Company to adjust its services to meet changing market demands.

39

 

Proposed Tanks

 

As part of Phase II, BPGIC is currently constructing eight oil storage tanks. The proposed oil storage tanks are expected to be equipped with the following features:

 

accurate product level measurements: a real-time electronic measuring system that will monitor product levels in each oil storage tank;

effective drainage systems leading to lower product contamination risks and higher cleanliness levels;

automated fire-fighting systems that will activate automatically in the event of a fire;

an efficient, high quality blending system for faster crude oil blending times and more consistent blends; and

a well-designed pipeline connection: a pipeline connection to the Phase II Internal Manifold and a fine stripping system.

 


The following table displays the expected key attributes of the proposed eight oil storage tanks of Phase II:

 

Tank No. Service Diameter (m) x
Height (m)
 Blending
Capability
 Roof Type(1) Tank Heating Geometric
Capacity (m3)
 Max
Capacity (m3)
 Service Diameter (m) x
Height (m)
 Blending
Capability
 Roof Type(1) Tank Heating Geometric
Capacity (m3)
 Max
Capacity (m3)
201 Crude Oil 70 x 28 Yes EFRT No 107,756 101,900 Crude Oil 70 x 28 Yes EFRT No 107,756 101,900
202 Crude Oil 70 x 28 Yes EFRT No 107,756 101,900 Crude Oil 70 x 28 Yes EFRT No 107,756 101,900
203 Crude Oil 70 x 28 Yes EFRT No 107,756 101,900 Crude Oil 70 x 28 Yes EFRT No 107,756 101,900
204 Crude Oil 70 x 28 Yes EFRT No 107,756 101,900 Crude Oil 70 x 28 Yes EFRT No 107,756 101,900
205 Crude Oil/Fuel Oil 42 x 30 Yes AGDR/ With CS IFR Yes 42,558 40,600 Crude Oil/Fuel Oil 42 x 30 Yes AGDR/ With CS IFR Yes 42,558 40,600
206 Crude Oil/Fuel Oil 42 x 30 Yes AGDR/ With CS IFR Yes 42,558 40,600 Crude Oil/Fuel Oil 42 x 30 Yes AGDR/ With CS IFR Yes 42,558 40,600
207 Crude Oil/Fuel Oil 42 x 30 Yes AGDR/ With CS IFR Yes 42,558 40,600 Crude Oil/Fuel Oil 42 x 30 Yes AGDR/ With CS IFR Yes 42,558 40,600
208 Crude Oil/Fuel Oil 42 x 30 Yes AGDR/ With CS IFR Yes 42,558 40,600 Crude Oil/Fuel Oil 42 x 30 Yes AGDR/ With CS IFR Yes 42,558 40,600
Total Storage Capacity (m3)Total Storage Capacity (m3) 601,261 570,000Total Storage Capacity (m3) 601,261 570,000

 

(1)EFRT” means External Floating Roof Tank; “AGDR/ With CS IFR” means Aluminium Geodesic Dome Roof with Carbon Steel Internal Floating Roof.

47

Proposed Phase II Internal Manifold

 

As a part of the construction of the Phase II Internal Manifold, BPGICthe Company plans to install two piggable jetty pipelines and four pumps to transport crude oil from the BPGIC Terminal to the Port of Fujairah’s berths. The infrastructure to support the pipelines was built during Phase I. The four proposed pumps are expected to facilitate on-loading operations from the Phase II Internal Manifold by pumping crude oil through one or more of the two proposed piggable crude oil jetty pipelines to Matrix Manifold 2. Each of the four pumps is expected to be capable of transporting product at a flow rate of 4,000 m3/hr and at a combined flow rate of 16,000 m3/hr. BPGICThe Company plans to also utilize these pumps to facilitate inter-tank transfers, blending and other transfers throughout the terminal.

 

Similar to the Phase I Internal Manifold, the Phase II Internal Manifold is expected to have general and fine stripping systems.

Proposed Blending of Crude Oil

 

Phase II is expected to have state-of-the-art blending capabilities, similar to Phase I, which would allow it to achieve high levels of accuracy in meeting customer blending specifications.

 

BPGICThe Company plans to blend various grades of crude oil to achieve customer specifications, including to attain specified properties for vapor pressure, viscosity, sulfur content and salt content.

40

Development and Implementation

 

In an effort to de-risk the construction of Phase II, BPGIC entered the Phase II EPC Agreement with Audex for the construction of Phase II (including all its component parts and associated infrastructure) on a fixed price lump sum basis. The Phase II EPC Agreement also includes a clause for liquidated damages if the contractor fails to complete the work within the schedule in the Phase II EPC Agreement. Phase II work commenced in September 2018 and according to the schedule in the Phase II EPC Agreement, it is expected to be completed inby the Fourthend of the Second Quarter of 2020.2021. The expected capital expenditure in respectCompany commenced hydrotesting of Phase II is $160.6 million. The expected capital expenditure in respect of Phase II will be partially funded by drawings of $90.6 million under the Phase II Financing Facility. For details of the remaining expected capital expenditure see “Item 4.B— Proposed Phase II — Capital Expenditure”.facility in August 2020. BPGIC also entered into the Phase II Project Management Agreement with MUC, the same advisor that designed the facilities for the Port of Fujairah and the BPGIC Terminal, so that MUC could manage the construction plan of Phase II. For more information regarding

The description of the proposed funding of Phase II see “Item 5. OperatingEPC Agreement does not purport to summarize all of the provisions of the agreement and Financial Reviewis qualified in its entirety by reference to the full text of the agreement, a copy of which is attached hereto and Prospects — Liquidity and Capital Resources — Indebtedness”.incorporated by reference herein as Exhibit 4.54.

Off-take and Sales Arrangements

 

On June 27, 2018, BPGIC entered into the Phase II End User Agreement with the Phase II End User, an international commodities trading company.User. The Phase II End User agreed to lease all eight oil storage tanks in Phase II once Phase II becomes operational, which is expected to occur in the Fourth Quarter of 2020.operational.

 

In September 2019, with the consent of the Phase II End User, BPGIC entered into the Phase II Customer Agreement to restructure its relationship with the Phase II End User. Pursuant to the Phase II Customer Agreement, BPGIC agreed to lease the Phase II facility, once operational, to BIA on identical price terms and otherwise substantially similar terms as those of the Phase II End User Agreement, and in connection therewith, BIA assumed BPGIC’s rights and obligations under the Phase II End User Agreement. Once Phase II becomes operational, BIA is required to pay (i) a monthly fixed storage fee to lease all of Phase II’s storage capacity and (ii) monthly variable ancillary service fees for the following ancillary services: throughput, blending, heating and inter-tank transfers. BIA is required to satisfy any amounts due for the monthly fixed storage fee in advance for each applicable month. Because BIA subleases the facility to the Phase II End User, BPGIC’s monthly revenue for ancillary services will depend on the extent to which the Phase II End User utilizes the ancillary services. Notwithstanding the sublease, BIA’s obligation to pay both the monthly fixed storage fee and the ancillary services fees to BPGIC is independent of the Phase II End User’s obligation to pay, and actual payment to, BIA. For more information regarding the Phase II Customer Agreement, see “Item 10.C Material Contract — Contracts—Phase II End User Agreement and Phase II Customer Agreement”.

48

Proposed Phase III

 

BPGICThe Company is in the advanced stages of planning Phase III, a further major expansion in the Port of Fujairah. In February 2020, BPGIC entered into the Phase III Land Lease Agreement to secure the Phase III Land, a new plot of land of approximately 450,000 m2 near its existing facilities. On October 1 2020, BPGIC, FOIZ and BPGIC III, entered into a novation agreement, whereby BPGIC novated the Phase III Land Lease to BPGIC III. The Company believes that the Phase III Land can house additional storage capacity of up to 3,500,000 m3. and additional refinery capacity of 180,000 b/d.

 

Security and Business Resilience

 

The BPGIC Terminal has a high degree of security. It has security cameras in various strategic locations inside and outside of the terminal. Fire alarm and detection systems are installed in all facilities and oil storage tanks. The terminal has firefighters on-site and conducts a fire drill every three months. The lighting system covers all areas of the facility on a 24-hour, seven day a week basis. The majority of the lights are solar powered and use LED lighting, reducing energy costs. The BPGIC Terminal is operational 24 hours a day and is pass-card protected. There are also multiple levels of clearance for employees and contractors.

 

BPGICThe Company is committed to improving its security on an ongoing basis, while assuring quality service and continued customer satisfaction. BPGIC’sThe Company’s corporate security policy is designed to protect BPGIC’sthe Company’s personnel, assets, reputation and customers’ interests by employing the highest corporate, ethical and operational standards to meet BPGIC’sthe Company’s vision of excellence.

 

BPGIC’sThe Company’s security and business resilience objectives are met through the implementation of a planned set of security standards initiatives and internal programs. These are consistent with the relevant international security legislation and appropriately recognized and accredited quality management systems. All Phase I oil storage tanks are certified to the relevant NFPA, and API industryAmerican Petroleum Industry and international standards. In accordance with NFPA standards, all Phase I oil storage tanks have been constructed to withstand high levels of radiation.

 

41

Environmental and Safety and Maintenance Matters

Regulations of the Company

 

BPGICThe Company’s operations are subject to various laws, standards and regulations relating to the oil and gas industry. The Company’s operations are extensively regulated by national and local authorities in the UAE, including with respect to labor, health, safety, environment and licensing requirements. Additional requirements may also be imposed on the Company in connection with new or existing operations, including as a result of different or more stringent interpretation or enforcement of existing laws and regulations or a change in the laws and regulations. These additional requirements may not be anticipated by us. As a consequence, the Company may need to change its operations significantly or incur increased costs in order to comply with such requirements. Compliance with any additional environmental requirements may be costly and time-consuming. In addition, violations of any new or existing requirements could result in substantial fines or liabilities; delays in securing, or the inability to secure and maintain, permits, authorizations or licenses necessary for the Company’s business; injunctions; reputational damage; and other negative consequences, which may result in lost revenue and reputational damage.

The Company is subject to laws and regulations relating to the protection of the environment and natural resources including, among other things, the management of hazardous substances, the storage and handling of hazardous waste, the control of air emissions and water discharges and the remediation of contaminated sites. BPGICNon-compliance with environmental regulations could result in severe fines, increased costs, and suspension or permanent shut down of activities. The Company’s operations are subject to the environmental risks inherent in the oil and gas sector. The Company’s operations are or may become subject to laws and regulations, including applicable international conventions, controlling the discharge of materials into the environment, pollution, contamination and hazardous waste disposal or otherwise relating to the protection of the environment.

Specifically, the Company is subject to environmental laws and regulations in the UAE. Environmental laws and regulations applicable to the Company’s business activities, or which may become applicable, could impose significant liability on the Company for damages, clean-up costs, fines and penalties in the event of oil spills or similar discharges of pollutants or contaminants into the environment or improper disposal of hazardous waste generated in the course of operations. To date, such laws and regulations have not had a material adverse effect on the Company’s operating results, and the Company has not experienced an accident that has exposed it to material liability arising out of or relating to discharges of pollutants into the environment. However, there can be no assurance that such accidents will not occur in the future. Legislative, judicial and regulatory responses to such an incident could substantially increase the Company’s and/or the Company’s clients’ liabilities. In addition to potential increased liabilities, such legislative, judicial or regulatory action could impose increased financial, insurance or other requirements that may adversely impact the entire oil industry.

The legal frameworks in the UAE for environmental protection are under continual development and, in time, relevant legislative bodies may impose stricter environmental regulations or apply existing regulations more strictly, including regulations regarding discharges into air and water, the handling and disposal of solid and hazardous waste, land use and reclamation and remediation of contamination. Compliance with environmental laws, regulations and standards, where applicable, may require the Company to make significant capital expenditures, such as the installation of costly equipment or operational changes. These costs could have a material adverse effect on the Company’s business, financial position, results of operation and prospects. Any failure to comply with applicable laws and regulations may result in reputational damage to us, administrative and civil penalties, criminal sanctions or the suspension or termination of the Company’s operations. Failure to comply with these statutes and regulations may subject the Company to civil or criminal enforcement action, which may not be covered by contractual indemnification or insurance and could have a material adverse effect on the Company’s financial position, operating results and cash flows. New laws and government regulations or changes to existing laws and government regulations may add to costs, limit the Company’s operations or reduce demand for the Company’s services.

Environmental, Health and Safety, and Maintenance Matters

The Company is subject to laws and regulations relating to the protection of the environment and natural resources including, among other things, the management of hazardous substances, the storage and handling of hazardous waste, the control of air emissions and water discharges and the remediation of contaminated sites. The Company is also subject to health and safety regulations in the UAE, including, among other things, noise, workplace health and safety and regulations governing the handling, transport and packing of hazardous materials. Compliance with these laws and regulations may require the attainment of permits to conduct regulated activities; restrict the type, quantities and concentration of pollutants that may be emitted or discharged into or onto to the land, air and water; restrict the handling and disposal of solid and hazardous wastes; apply specific health and safety criteria addressing worker protection; and require remedial measures to mitigate pollution from former and on-going operations. WhileThese laws and regulations are subject to change by regulatory authorities, and continued or future compliance with such laws and regulations, or changes in the interpretation of such laws and regulations, may require the Company to incur expenditures. Failure to comply with these laws and regulations may result in the assessment of administrative, civil and criminal penalties, the imposition of remedial obligations, and the issuance of injunctions that may limit or prohibit some or all of the Company’s operations. These impacts could directly and indirectly affect BPGIC’s maintenance capital expendituresthe Company’s business, and net income, BPGIC believes it does not affecthave an adverse impact on its competitivefinancial position, as theresults of operations of its competitors are similarly affected.and liquidity.

 

42

BPGIC’s

The Company’s facilities are in substantial compliance with applicable environmental and other laws and regulations, including security and safety at work laws. However, these laws and regulations are subject to change by regulatory authorities, and continued or future compliance with such laws and regulations, or changes in the interpretation of such laws and regulations, may require BPGICthe Company to incur expenditures. Failure to comply with these laws and regulations may result in the assessment of administrative, civil and criminal penalties, the imposition of remedial obligations, and the issuance of injunctions that may limit or prohibit some or all of BPGIC’sthe Company’s operations. Additionally, a discharge of hazardous waste into the environment could, to the extent that the event is not fully insured, subject BPGICthe Company to substantial expenses, including costs to comply with applicable laws and regulations and to resolve claims made by third parties for claims for personal injury and property damage. These impacts could directly and indirectly affect BPGIC’sthe Company’s business, and have an adverse impact on its financial position, results of operations and liquidity. See “Item 3.D RiskFactors — Risks relatingrelated to BPGIC and BPGIC III BPGICThe Company may incur significant costs to maintain compliance with, or address liabilities under, environmental, health and safety regulation applicable to its business.

 


BPGICThe Company has a corporate health and safety program to govern the way it conducts its operations at its facilities. Each of theits employees and consultants is required to understand and follow the health and safety plan and have the necessary training for certain tasks performed at the facilities. BPGICThe Company performs preventive and normal maintenance on all of its oil storage tanks and systems and makes repairs and replacements when necessary or appropriate. BPGICThe Company also conducts routine and required inspections of such assets in accordance with applicable regulation. Most of the oil storage tanks are equipped with internal floating roofs in accordance with industry requirements to minimize regulated emissions and prevent potentially flammable vapor accumulation. The soil surrounding the oil storage tanks is capable of resisting oil penetration and has an oil leakage detection system in place, which is intended to minimize the effects of any oil leakage and potential oil pollution. The terminal facilities also have response plans, spill prevention and control plans, and other programs in place to respond to emergencies.

 

Information Technology and Operating Systems

 

The BPGIC Terminal’s IT systems, including the IT systems in BPGIC’sthe Company’s operational control room, are configured to remain in operation, including under abnormal conditions. Appropriate manual backup procedures and automatic processes have been devised to support the terminal’s operations in case of any unexpected system downtime or failure. The terminal’s four physical servers have redundant power supply sources and there is an on-site standby server to accommodate for a server shutdown. The majority of BPGIC’sthe Company’s IT systems have been provided by the ABB Group and Intelex Technologies, Inc.

 

In order to prevent both a disruption of BPGIC’sthe Company’s operations as well as to safeguard users’ data, automatic and manual data back-up procedures and recovery plans are in place to save and restore data and systems. System data and network device configurations are saved on external hard-disk drives and secured by third-party cloud service providers. The IT operations are maintained on a 24/7 basis, with automatic monitoring of all systems, emergency and standby duties, and third-party support and maintenance agreements in place where needed. The network infrastructure is periodically tested to ensure compliance with applicable security and performance requirements and appropriate tests are performed to ensure system security and performance are not compromised in connection with any updates to the IT infrastructure.

 

Any system interruptions caused by telecommunications failures, computer viruses, software errors, third party services, cloud computing providers, cyberattack or other attempts to harm our systems can result in the unavailability or slowdown of our IT systems.

 

In order to ensure a high degree of IT security, BPGICthe Company has procedures in place to prevent external threats to the IT systems. All files and emails exchanged over BPGIC’sthe Company’s network are scanned. A web filtering policy in the firewall prevents access to websites with vulnerabilities. A centrally managed anti-virus software with daily reporting of threats and vulnerabilities is installed in all user machines and servers at the BPGIC Terminal. In addition, the network is logically segmented between users, employees and network guests and provides different levels of access to different users. For more information regarding the risks associated with BPGIC’sthe Company’s information technology and operating systems, see “Item 3.D Risk Factors — Risks relatingrelated to BPGIC and BPGIC III BPGICThe Company is dependent on its IT and operational systems, which may fail or be subject to disruption.

 

BPGICThe Company installed an online ordering system, which enableswill enable users to place storage, heating and blending orders and track order statuses in real-time. For more information regarding the customer ordering process, see “Item 4.B— The BPGIC Terminal — Phase I — Customer Ordering Process.

 

Employees

 

BPGIC is led byAs at December 31, 2018, the senior management team which has extensive technical, operationalCompany employed 15 employees and management experience in the oil storage terminal industry.48 contractors. As at December 31, 2019, BPGIC hadthe Company employed 16 employees and 47 contractors. BPGIC commenced hiringAs at December 31, 2020, the Company employed 20 employees and 50 contractors. As of its experienced operational staff inDecember 31, 2020, the second half of 2017, so that it would have a full complement of staff ready when Phase I operations commenced in December 2017. The 4750 contractors arewere engaged under third-party outsourcing contracts and the 1620 employees arewere engaged under individual employment contracts.

All 47 of See “Item 6.D Directors, Senior Management and Employees — Employees” for additional information regarding the contractors are contracted through Flowi Facility Management LLC (“Flowi”), a subsidiary of MUC. The 47 contractors serve in various roles in several of BPGIC’s departments, including operations, information technology and health and safety. Pursuant to BPGIC’s contract with Flowi, dated April 1, 2017, as extended, (the “Flowi Agreement”), Flowi is contractually obligated to release all 47 contractors from its employment and transfer them to BPGIC’s employment after contract completion. BPGIC management is currently considering whether to extend the Flowi Agreement for another year.Company’s employees.

 


43

In addition to the BPGIC Terminal Office Building, BPGIC also has a small administrative office in the emirate of Abu Dhabi.

BPGIC believes that the material terms of its third-party sourcing contracts and employment agreements are customary for the UAE and the oil storage industry and that it has a good relationship with its employees and contractors.

The following table sets out the number of employees and contractors employed by BPGIC at December 31, 2019 by main location.

Location         
  As at December 31,  As at December 31, 
  2017  2018  2019 
Fujairah  6   55   56 
Abu Dhabi  3   8   7 
Total  9   63   63 

 

Insurance

 

BPGIC’sThe Company’s operations and assets are insured under an insurance program administered by Lockton Insurance Brokers — Dubai, an insurance broker. The program covers the Phase I facilities and related assets, and the liabilities of the Phase I operations and BPGIC.the Company. The major elements of this program are property damage, business interruption, terrorism and political violence, worker’s compensation, environmental liability, employer liability, directors’ and officers’ liability insurance, personal injury and third-party liability, including that of terminal operators. BPGICThe Company additionally maintains local insurance, including healthcare and other insurance required by BPGIC’sthe Company’s jurisdiction.

 

Premiums are allocated based on the insured values, history of claims and type of risk. BPGICThe Company believes that the amount of coverage provided is comprehensive and appropriate for its business.

 

Legal Proceedings

 

From time to time, we may be involved in legal proceedings in the ordinary course of our business. We are currently not a party to any material legal or administrative proceedings.

 

Regulations of BPGIC

BPGIC’s operations are subject to various laws, standards and regulations relating to the oil and gas industry. BPGIC’s operations are extensively regulated by national and local authorities in the United Arab Emirates, including with respect to labor, health, safety, environment and licensing requirements. Additional requirements may also be imposed on BPGIC in connection with new or existing operations, including as a result of different or more stringent interpretation or enforcement of existing laws and regulations or a change in the laws and regulations. These additional requirements may not be anticipated by us. As a consequence, BPGIC may need to change its operations significantly or incur increased costs in order to comply with such requirements. Compliance with any additional environmental requirements may be costly and time-consuming. In addition, violations of any new or existing requirements could result in substantial fines or liabilities; delays in securing, or the inability to secure and maintain, permits, authorizations or licenses necessary for BPGIC’s business; injunctions; reputational damage; and other negative consequences, which may result in lost revenue and reputational damage.


BPGIC is subject to laws and regulations relating to the protection of the environment and natural resources including, among other things, the management of hazardous substances, the storage and handling of hazardous waste, the control of air emissions and water discharges and the remediation of contaminated sites. Non-compliance with environmental regulations could result in severe fines, increased costs, and suspension or permanent shut down of activities. BPGIC’s operations are subject to the environmental risks inherent in the oil and gas sector. BPGIC’s operations are or may become subject to laws and regulations, including applicable international conventions, controlling the discharge of materials into the environment, pollution, contamination and hazardous waste disposal or otherwise relating to the protection of the environment.

Specifically, BPGIC is subject to environmental laws and regulations in the United Arab Emirates. Environmental laws and regulations applicable to BPGIC’s business activities, or which may become applicable, could impose significant liability on BPGIC for damages, clean-up costs, fines and penalties in the event of oil spills or similar discharges of pollutants or contaminants into the environment or improper disposal of hazardous waste generated in the course of operations. To date, such laws and regulations have not had a material adverse effect on BPGIC’s operating results, and BPGIC has not experienced an accident that has exposed it to material liability arising out of or relating to discharges of pollutants into the environment. However, there can be no assurance that such accidents will not occur in the future. Legislative, judicial and regulatory responses to such an incident could substantially increase BPGIC’s and/or BPGIC’s clients’ liabilities. In addition to potential increased liabilities, such legislative, judicial or regulatory action could impose increased financial, insurance or other requirements that may adversely impact the entire oil industry.

The legal frameworks in the United Arab Emirates for environmental protection are under continual development and, in time, relevant legislative bodies may impose stricter environmental regulations or apply existing regulations more strictly, including regulations regarding discharges into air and water, the handling and disposal of solid and hazardous waste, land use and reclamation and remediation of contamination. Compliance with environmental laws, regulations and standards, where applicable, may require BPGIC to make significant capital expenditures, such as the installation of costly equipment or operational changes. These costs could have a material adverse effect on BPGIC’s business, financial position, results of operation and prospects. Any failure to comply with applicable laws and regulations may result in reputational damage to us, administrative and civil penalties, criminal sanctions or the suspension or termination of BPGIC’s operations. Failure to comply with these statutes and regulations may subject BPGIC to civil or criminal enforcement action, which may not be covered by contractual indemnification or insurance and could have a material adverse effect on BPGIC’s financial position, operating results and cash flows. New laws and government regulations or changes to existing laws and government regulations may add to costs, limit BPGIC’s operations or reduce demand for BPGIC’s services.

Health and safety standards

BPGIC is subject to health and safety regulations in the United Arab Emirates including, among other things, noise, workplace health and safety and regulations governing the handling, transport and packing of hazardous materials. Compliance with these laws and regulations may require the attainment of permits to conduct regulated activities; restrict the handling and disposal of solid and hazardous wastes; and apply specific health and safety criteria addressing worker protection. These laws and regulations are subject to change by regulatory authorities, and continued or future compliance with such laws and regulations, or changes in the interpretation of such laws and regulations, may require BPGIC to incur expenditures. Failure to comply with these laws and regulations may result in the assessment of administrative, civil and criminal penalties, the imposition of remedial obligations, and the issuance of injunctions that may limit or prohibit some or all of BPGIC’s operations. These impacts could directly and indirectly affect BPGIC’s business, and have an adverse impact on its financial position, results of operations and liquidity.

C. Organizational structure

 

Brooge Energy HoldingsLimited is a holding company with twosix direct and indirect wholly-owned subsidiaries:

 

Brooge Petroleum and Gas Investment Company FZE, incorporated in 2013 in the Fujairah Free Zone, UAE, to provide oil storage, heating and blending services; and

Brooge Petroleum and Gas Investment Company FZE, incorporated in 2013 in the Fujairah Free Zone, UAE, to provide oil storage, heating and blending services;

 


BPGIC International (f/k/a Twelve Seas Investment Company), a Cayman Islands exempted company, a former special purpose acquisition company, incorporated in 2017 in the Cayman Islands;

BPGIC International (f/k/a Twelve Seas Investment Company), a Cayman Islands exempted company, a former special purpose acquisition company, incorporated in 2017 in the Cayman Islands.

Brooge Petroleum and Gas Investment Company Phase III FZE, incorporated in 2020 in the Fujairah Free Zone, UAE to provide oil storage, heating and blending services;

Brooge Petroleum and Gas Management Company Ltd, incorporated in 2020 in the Dubai International Financial Centre; and

BPGIC Phase 3 Limited, an offshore company incorporated in 2020 in Jebel Ali Free Zone Authority.

Brooge Petroleum and Gas Investment Company FZE - Branch of Abu Dhabi 1 incorporated in 2018 in the Abu Dhabi, UAE.

 

The Company’s current organizational chart is set forth below.

 

All of the Company’s business is currently conducted through BPGIC.BPGIC and once Phase III is ready through BPGIC and BPGIC III.

 

44

 

D. Property, plants and equipment

 

The Company has its headquarters in Fujairah, United Arab Emirates. The table below summarizes its facilities as of December 31, 2019 and [June [12], 2020].2020.

 

    Gross Area
(square
   Lease period 
Country Location meter) Use Start End 
UAE Port of Fujairah 153,916.93 Site of oil storage tanks and administrative building On or around 3/10/2013 

On or around

3/31/2073(1)

 
UAE Port of Fujairah 450,074.7 3450,074.73 Intended site of additional oil storage tanks and refinery On or around 2/2/2020 

On or around

2/2/2080(2)

 

 

(1)The lease ends on or around 3/31/2073 after giving effect to an automatic 30 year extension after the initial 30 year term ends on or around 3/31/2043.

(2)The lease ends on or around 2/2/2080 after giving effect to an automatic 30 year extension after the initial 30 year term ends on or around 2/2/2040.

All of the Company’s business is currently conducted through BPGIC.

53

 

The BPGIC Terminal

 

BPGIC began development of the BPGIC Terminal after several years of planning and discussions with industry participants. During this time, BPGIC engaged an industry consultant to conduct a market assessment of the oil storage industry in the Port of Fujairah region and to identify and assess business opportunities and strategies. BPGIC also engaged MUC, the same advisor that designed the facilities for the Port of Fujairah, to design the BPGIC Terminal. During the design stage, BPGIC assessed various challenges faced by other oil storage terminals, including preventing oil losses and precisely meeting customer blending requirements, and incorporated solutions to such challenges into the design of the terminal. BPGIC’s aim in developing the BPGIC Terminal was to create a new standard for oil storage tank terminals by designing a terminal that would reduce oil losses and achieve better blending results than existing oil storage tank terminals. As described below, BPGIC designed the BPGIC Terminal with several key features that enable it to provide users with high-accuracy blending services with low oil losses. In addition, due to the relatively long-term period of the Phase I & II Land Lease when compared to similar land leases for oil storage terminals located in the Port of Fujairah, BPGIC constructed Phase I with materials, including pumps, valves and steel structures, that have longer expected life spans than comparable materials utilized by other oil storage terminals. As a result, BPGIC believes Phase I will benefit from annual maintenance costs over the period of the Phase I & II Land Lease that are lower than the average for comparable oil storage terminals. See “Item 4.B — Competitive Strengths — Design and Features of the BPGIC Terminal”. As part of Phase II, BPGIC is following a similar approach as that followed in Phase I by investing in high-grade, long-life materials for the construction and development of its facilities.

Location

 

45

 

The BPGIC Terminal is located in the Port of Fujairah in the emirate of Fujairah in the UAE. The Port of Fujairah is a gateway between the Indian Ocean and the Arabian Gulf, and is strategically situated in one of the world’s major oil markets for fuel oil, crude oil and refined oil products. In addition to the Port of Fujairah’s close access to major markets in the Middle East, it also serves as an outlet to East Africa and South Asia and serves as a consolidation point for fuel oil outlets and the regional fuel oil markets, reducing the need for ships to cross through the Strait of Hormuz.

 


The Strait of Hormuz has been a strategic geographic chokepoint for many years, and as such, it has often been a site of international military conflict and military exercises. Such events have caused safety concerns and travel delays for ships crossing through the Strait of Hormuz. The Strait of Hormuz has also been subject to repeated threats of closure and blockage by Iran. In 2012, Iran threatened to close the Strait of Hormuz due to international pressures to stop its nuclear program and an Iranian oil embargo that was enacted by the European Union in late January 2012. On September 14, 2019, an attack on Saudi Arabia’s oil facilities and fields, largely blamed on Iran or its proxies, significantly increased tensions in the area, and heightened the distinct possibility that similar attacks by Iran on strategic oil facilities and ports in the UAE or a regional conflict may result. Despite these recent and past threats, the Strait of Hormuz has never been closed. See “Item 3.D Risk Factors — Risks relating to BPGIC — Any material reduction in the quality or availability of the Port of Fujairah’s facilities could have a material adverse effect on BPGIC’s business, financial condition and results of operations”; “Item 3.D Risk Factors — Risks Related to Doing Business in Countries in Which BPGIC Operates — Recent geopolitical developments have increased the risk that the region in which BPGIC operates could be involved in an escalating conflict that could have a material adverse effect on our business, financial condition and results of operations.”

 

The Habshan-Fujairah oil pipeline, which is a crude oil pipeline that runs between the emirate of Abu Dhabi and the Port of Fujairah, enables ships to obtain crude oil produced in Abu Dhabi without having to cross the Strait of Hormuz. The crude oil pipeline currently has the capacity to transport 1.5 million barrels a day, which is approximately half of the daily average amount of crude oil that was produced in the UAE in 2017. There is increasing focus in the UAE region on using the crude oil pipeline, as the government of Abu Dhabi has publicly stated that it intends to ensure that approximately 75 percent of the crude oil designated for export in Abu Dhabi goes through the pipeline and to Fujairah.

 

The Port of Fujairah is the largest multi-purpose port on the Eastern seaboard of the UAE, approximately 70 nautical miles from the Strait of Hormuz. Initial construction of the Port of Fujairah started in 1978 as part of the economic development of the UAE. Full operations commenced in 1983. Since then, the Port of Fujairah has embarked on a continuing process of enhancement to both its facilities and its comprehensive range of functions.

 

The Port of Fujairah initially developed oil terminal 1 (“OT1”) comprising three marine loading berths (berths 1, 2 and 3), oil terminal 2 (“OT2”) comprising four marine loading berths (berths 4, 5, 6 and 7), and a matrix manifold connecting OT1 and OT2 to certain existing oil tank terminals (“Matrix Manifold 1”). To cater to the increasing demand arising from the growing storage capacity in Fujairah, the Port of Fujairah began developing the second phase of OT2, adding two new berths (berths 8 and 9) and a second matrix manifold (“Matrix Manifold 2”). The project, completed in 2014, raised the overall throughput capacity of the Port of Fujairah and contributed to the growth of Fujairah as the largest oil hub in the region. Matrix Manifold 2 is connected directly to berths 8 and 9 and, through a connection to Matrix Manifold 1, is connected indirectly to the remaining Port of Fujairah berths. The BPGIC Terminal is connected to Matrix Manifold 2, which gives it direct access to underutilized berths 8 and 9. Berth 1 is currently unavailable for BPGIC’s use as the Port of Fujairah granted exclusive access and use of berth 1 to four other parties, who have since installed pipelines and marine loading arms on the berth.

 

To further cater to the increasing demand arising from the growing storage capacity in Fujairah, the Port of Fujairah has developed a VLCC jetty in the Indian Ocean, which allows the Port of Fujairah to accommodate vessels with a maximum overall length of 344 meters and a minimum overall length of 240 meters. The Port of Fujairah completed construction of the VLCC jetty in June 2016 and the jetty went into operation on August 24, 2016.

 

The Port of Fujairah imposes certain requirements on the companies and oil tankers utilizing its port, including requirements for flow rate capacity and ground soil lining. The current minimum required flow rates vary based on berth location and vessel size and range between 460 m3/hr and 3,900 m3/hr, and although the Port of Fujairah has already increased the flow rate requirements in the past, it is possible that the Port of Fujairah could increase them again in the future. BPGIC is well positioned to satisfy any future increases for minimum required flow rates as the pumps in Phase I are capable of transporting gas oil/gasoline at a combined flow rate of 5,000 m3/hr and fuel oil at a combined flow rate of 4,500 m3/hr, which is more than the current minimum required flow rate and exceeds the combined flow rates of many of the other oil storage terminals that are subject to the Port of Fujairah’s requirements. The Port of Fujairah also requires each oil storage terminal to install impermeable lining throughout its tank farm area and any other area where oil leakage could occur and potentially reach the ground soil. In connection with the construction of Phase I, BPGIC installed the required lining at the Phase I & II Land and is one of only a few oil storage terminals that has been able to satisfy this requirement.

 

The Port of Fujairah requires oil tankers to use the Port’s reservation system to reserve berths and imposes certain charges on such users, including fees, marine and administrative charges. For information regarding BPGIC’s customer ordering process and coordination of reservations, see “Item 4.B — Phase I — Customer Ordering Process”.

 

55

46

 

Phase I & II Land Lease

 

On March 10, 2013, BPGIC entered into the Phase I & II Land Lease, as amended by the Novation Agreement dated September 1, 2014. The amended agreement binds BPGIC and FOIZ for a total term of 60 years. The Phase I & II Land has a total area of 153,916.93 m2. BPGIC used this land to build Phase I and is currently using the remaining portion of the site to build Phase II. Upon mutual agreement of the parties, the term of the Phase I & II Land Lease can be renewed or extended for a further period, the term of which is unspecified and therefore subject to agreement between the parties.

 

BPGIC began paying rent under the Phase I & II Land Lease in 2014. The rent for 20192020 was $2,313,323$2,359,589.56 and rent increases by 2 percent per annum. Payments are required to be made in advance (the time period of which is unspecified) in four equal quarterly instalments. BPGIC is required to pay all taxes imposed by the federal government of the UAE or FOIZ; however, the leased premises are in a free zone and BPGIC is entitled to all benefits applying to free zone entities, including benefits in respect of taxes.

 

The Phase I & II Land Lease required BPGIC to enter into the Port Facilities Agreement, which grants it certain usage and access rights in connection with the Port’s facilities. The initial term of the Port Facilities Agreement, which BPGIC entered into on March 31, 2016, is 25 years and it automatically renews for another 25 years at the end of its initial term. The Port Facilities Agreement requires BPGIC to pay certain fees in connection with the use of the Port of Fujairah’s facilities; however, the Phase I Customer Agreement and the Super Major Agreementexisting Commercial Storage Agreements provide that any fees charged by the Port of Fujairah in respect of services provided to BIA or the Super Major,existing Storage Customers, including transportation, loading, unloading, use of berths, marine charges, administration charges, penalties and/or use of any of the Port of Fujairah’s facilities, shall be paid by BIA or the Super Major,existing Storage Customers, respectively. Currently, the Phase I sublessees send BIA any such amounts to be paid, BIA delivers any such amounts to BPGIC, and BPGIC then sends such amounts to the Port. Once the BIA Refinery and Phase II become operational, BPGIC expects to follow a similar approach with BIA and the Phase II End User. The Super Major deliversexisting Storage Customers deliver any amounts payable to the Port of Fujairah to BPGIC, which passes the payments on to the Port. Pursuant to the Port Facilities Agreement, BPGIC is required to pay such amounts and is responsible for such amounts irrespective of whether the Super Major,existing Storage Customers, the Phase I end users,sublessees, the Phase II End User, or BIA pay such fees.

 

BPGIC is required to obtain the FOIZ’s prior permission in order to use the leased premises for any purpose other than in connection with Phase I and Phase II, or the BIA Refinery. The Phase I & II Land Lease contains representations and warranties, dispute resolution and indemnification clauses that are customary for the UAE and the oil storage industry. FOIZ can cancel the agreement if BPGIC fails to make certain required rental payments or fails to perform or meet in any material respect any material term, condition, covenant, agreement or obligation under the agreement.

BPGIC Terminal Office Building

 

In connection with Phase I, BPGIC built a five-story office building with an area of 3,388 m2 (the “BPGIC Terminal Office Building”) adjacent to the 14 oil storage tanks. Audex completed construction for the BPGIC Terminal Office Building in November 2017 and BPGIC incurred a total cost of $28.0 million in connection with its construction. BPGIC partially funded the construction of the BPGIC Terminal Office Building with funds obtained from the Phase I Construction Facilities. BPGIC owns the BPGIC Terminal Office Building. The BPGIC Terminal Office Building accommodates all terminal and office staff and contains the operational control room for the BPGIC Terminal, where BPGIC facilitates the performance of its services. BPGIC believes that the BPGIC Terminal Office Building will have sufficient capacity to cater to the operations of the BIA Refinery and Phase II. For additional information regarding the Phase I Construction Facilities, see “Item 5. Operating and Financial Review and Prospects — Liquidity and Capital Resources — Debt Sources of Liquidity”.

 


Phase III

 

InPhase III Land Lease

On February 2, 2020, BPGIC entered into the Phase III Land Lease Agreement, a land lease agreement to leasesecure the Phase III Land, a new plot of land in the Port of Fujairah that has a total area of approximately 450,000 m2. near its existing facilities. On October 1, 2020, BPGIC, FOIZ and BPGIC III, entered into a novation agreement, whereby BPGIC novated the Phase III Land Lease to BPGIC III. The agreement provides for an initial 30 year term with an automatic 30 year renewal. Upon mutual agreement of the parties, the term of the Phase I & IIIII Land Lease can be renewed or extended for a further period, the term of which is unspecified and therefore subject to agreement between the parties. BPGIC will begin paying rent under the Phase III Land Lease Agreement on the earlier of the date that is 18 months from the date of the Phase III Land Lease Agreement and the commissioning of the Phase III facility. The initial annual rent will be $6,126,467 and rent increases by 2 percent per annum. All amounts in respect of rent for each quarter shall be invoiced by and paid to FOIZ in DirhamsAED by immediately available funds due net thirty (30)30 days after receipt of invoice. BPGIC is required to pay all taxes imposed by the federal government of the UAE or FOIZ; however, the leased premises are in a free zone and BPGIC is entitled to all benefits applying to free zone entities, including benefits in respect of taxes.

 

Scope

BPGIC is in the FEED stageThe description of planning Phase III, a further major expansion in the Port of Fujairah. In February 2020, BPGIC entered into the Phase III Land Lease Agreementdoes not purport to summarize all of the provisions of the agreement and securedis qualified in its entirety by reference to the Phase III Land,full text of the agreement, a plotcopy of landwhich is attached hereto and incorporated by reference herein as Exhibit 4.84 and the novation agreement relating thereto, a copy of approximately 450,000 m2 near its existing facilities. BPGICwhich is attached hereto and incorporated by reference herein as Exhibit 4.95.

47

The Company believes that the Phase III Land can house additional storage capacity of up to 3,500,000 m3. and additional refinery capacity of 180,000 b/d. A FEED study for Phase III was completed in 2020 and preconstruction work, including commencement of a Soil Investigation and an Environmental Impact Assessment (EIA) report, commenced in October 2020. Currently, the Company plans to use the Phase III Land to further increase its crude oil storage and refinery services capacity.

 

BPGIC 

Scope

The Company is in the FEED stage of planning Phase III. The Company believes that the Phase III Land can house additional storage capacity of up to 3,500,000 m3 and additional refinery capacity of up to 180,000 b/d. The Company had an initial technical design with different layout options completed for the Phase III Land.

Capital Expenditure

 

As BPGICthe Company is in FEEDthe preconstruction stages of Phase III, it is not possible to reliably estimate the related capital expenditures. However, BPGICthe Company anticipates the cost per m3 of Phase III to be approximately equal to the cost per m3 of Phase I and Phase II. As of the date of this Report, BPGICthe Company does not yet have any planned capital expenditures in connection with Phase III, other than the costs of the ongoing FEED studies. BPGIC expects to be able to start projecting Phase III capital expenditures after it receives the results of therecently completed FEED studies inand the Third Quarter of 2020. See “Item 3.D Risk Factors — Risks relating to BPGIC — BPGIC may be subject to significant riskspreconstruction cost, being the soil investigation and expenses when constructing Phase II, which could adversely affect BPGIC’s business, financial condition and results of operations”.Environmental Impact Assessment activities.


Design

 

TheA FEED study for the Phase III Land is the subject of ongoingwas recently completed. The FEED studies, which,study, in parallel with prospective end-user discussions, will enable BPGICthe Company to determine the optimal layout and product mix. Currently, BPGICthe Company plans to use the Phase III Land to further increase its crude oil storage and services and refinery capacity.

 

 

 

Note: Illustrative Phase III plan may vary. Blueprint subject to change based on FEED results which are expected in the Third Quarter of 2020.currently under evaluation.

 

BPGICThe Company engaged MUC for the FEED process, the same advisor that designed the facilities for the Port of Fujairah, Phase I and the BPGIC Terminal,Phase II, to create proposals for the design of Phase IIIIII.

48

 

ITEM 4A. UNRESOLVED STAFF COMMENTS

 

None.

 

ITEM 5. OPERATING AND FINANCIAL REVIEW AND PROSPECTS

58

 

BROOGE ENERGY LIMITED MANAGEMENT’S DISCUSSION AND ANALYSIS OF
FINANCIAL CONDITION AND RESULTS OF OPERATIONS

You should read the following discussion together with our financial statements and the related notes included elsewhere in this Annual Report. This discussion contains forward lookingforward-looking statements about our business and operations. Our actual results may differ materially from those we currently anticipate as a result of many factors, including those we describedescribed under “Risk Factors”Item 3.D Risk Factors and elsewhere in this Annual Report. See “Cautionary Note Regarding Forward Looking Statements.”Forward-Looking Statements”.

In this section, references to the “Company,” “we,” “us,” and “our” are intended to refer to Brooge Energy Limited, unless the context clearly indicates otherwise.

 

Our Management’s Discussion and Analysis of Financial Condition and Results of Operations is presented below in eight sections:nine sections, as follows:

 

Overview

 

Key Factors Affecting the Historical and FutureOur Results of Operations

Business Combination and NasdaqNASDAQ Listing
Transactions

Operating Results of Operations

Liquidity and Capital Resources

Trend Information

Related Party Transactions
Tabular Disclosure of Contractual Obligations

Other Risk DisclosuresOff Balance Sheet Commitments and Arrangements

 

59

Critical Accounting Policies and Critical Accounting Estimates

 

OVERVIEW

 

The Company (Brooge Energy Limited) formerly known as Brooge Holdings Limited, is a company with limited liability registered as an exempted company in the Cayman Islands. The companyCompany was incorporated on April 12, 2019 for the sole purpose of consummating the business combination described further below.Business Combination. On April 15, 2019, BPGIC (Brooge Petroleum and Gas Investment Company FZE) entered into a business combination agreementthe Business Combination Agreement with Twelve Seas, (Twelve Seas Investment Company), a company then listed on Nasdaq,NASDAQ, the Company and BPGIC FZE’s shareholders.

 

The business combination was accounted for as a reverse acquisition in accordance with the International Financial Reporting Standards (“IFRS”) as issued by the International Accounting Standards Board (“IASB”).IFRS. Under this method of accounting, the Company and Twelve Seas are treated as the “acquired” company. This determination was primarily based on BPGIC FZE comprising the ongoing operations of the combined company, BPGIC FZE’s senior management comprising the senior management of the combined company, and BPGIC FZE’s stockholdersshareholders having a majority of the voting power of the combined company. For accounting purposes, BPGIC FZE is deemed to be the accounting acquirer in the transaction and, consequently, the transaction is treated as a recapitalization of BPGIC FZE. Accordingly, the consolidated assets, liabilities and results of operations of BPGIC are the historical financial statements of the combined company, and the Company’s and Twelve Seas’ assets, liabilities and results of operations are consolidated with BPGIC beginning on the acquisition date.

 

As a result of the above transaction,Business Combination, the Company became the ultimate parent of BPGIC and Twelve Seas on the acquisition date, December 20, 2019. The Company’s common stockOrdinary Shares and warrantsWarrants are traded on the NASDAQNasdaq Capital Market under the ticker symbols BROG“BROG” and BROGW,“BROGW,” respectively.

49

 

Following the Business Combination, the Company became an independent oil storage and service provider, through its wholly-owned subsidiary, BPGIC, strategically located in the Port of Fujairah in the emirate of Fujairah in the UAE.BPGIC. Unless otherwise indicated, for the purposes of this Item 5. Operating and Financial Review and Prospects, we collectively evaluate the business as “group” business consisting of the Company, Twelve Seas and BPGIC (the “Group”).

 

The Group’s vision is to develop an oil storage business that differentiates itself from competitors by providing its customers with fast order processing times, excellent customer service and high accuracy blending services with low oil losses. BPGIC has a 60-year lease of land for its operations located in close proximity to the Port of Fujairah’s berth connection points. The Group is initially developing the BPGIC Terminal’s storage capacity in two phases, Phase I, which is already operational, and Phase II, which is under construction, and simultaneously with BIA, is working on developing the BIA Refinery, a modular refinery. Phase I commenced operations in December 2017 and Phase II is currently under construction. BIA and BPGIC are currently negotiating the terms of the Refinery Operations Agreement and BPGIC expectshave agreed to finalizeextend the period for their agreement in August 2020.negotiations until the Second Quarter of 2021.

 

Tank storage facilities play a vital role in the business of refined petroleum products, crude oil and liquid chemicals. They serve as a critical logistical midstream link between the upstream (exploration and production) and the downstream (refining) segments of the refined petroleum product and crude oil industry. They are used to store primary, intermediate and end products and facilitate a continuous supply of the required feedstock to refineries and chemical plants in the processing industry on the one hand and absorb fluctuations in sales volumes on the other.

 

Note on Restatement of Audited Consolidated Financial Statements as of and for the Period Ended December 31, 2019

60

 

Key Factors Affecting Our ResultsOn November 16, 2020, the audit committee of Operationsthe Company’s board of directors, in consultation with the Company’s management, concluded that the Company’s previously issued audited consolidated financial statements as of and for the period ended December 31, 2019 should no longer be relied upon because the Company had concluded that the warrants issued by it should have been accounted for as a derivative liability rather than equity.

On November 18, 2020, the Company announced that the adjustments required to correct this error would reduce equity by $15,709,460 and increase current liabilities by $15,709,460 after taking into account non-cash income of $1,273,740 related to changes in the estimated fair value of derivative warrant liability.

On November 27, 2020, the Company issued restated audited consolidated financial statements as of and for the period ended December 31, 2019.

KEY FACTORS AFFECTING OUR RESULTS OF OPERATIONS

 

The following factors can affect the results of our operations:

End Users versus Customers

 

Commencing in August 2019, BPGIC’s sole contractual customer changed although the end-user of its facilities remained the same. In August 2019, BPGIC entered into a contract with BIA which became the direct customer of BPGIC. In turn, BIA subleased group’s facilities to the existing end user.

 

Pursuant to the Phase I End User Agreement, the Initial Phase I End User was the sole revenue generating customer of the Company until July 2019. From August 2019 forward, the Initial Phase I End User remained the sole end user of the Phase I facilities, but BIA became the sole customer of Group.

 

In August 2019, the Group executed the Phase I Customer Agreement, covering the Phase I facility and containing identical price terms and otherwise substantially the same terms as the Phase I End User Agreement with the Initial Phase I End User. The Phase I End User Agreement was novated to BIA.

 

In 2020, BIA notified BPGIC that it had entered sublease arrangements for parts of the Phase I storage capacity with additional end users. In April 2020, BPGIC entered into the Super Major Agreement, a storage contract until November 8, 2020 with the Super Major for storage agreement of 61,072 m3 as on April 28, 2020 with additional 67,928 m3 starting May 8, 2020 resulting into total committed capacity of 129,000 m3. This was done with approval from BIA which has an option to lease back the capacity upon termination of the Super Major Agreement. In November 2020, the Super Major Agreement was not renewed by mutual agreement.

50

However, from November 2020 till March 2021, the Company entered into the nine Commercial Storage Agreements with the Storage Customers, eight of which agreements are still in effect. Four of the eight Commercial Storage Agreements each have a six months term, subject to an additional six month renewal, one agreement has a six months term, subject to an additional three months renewal, another agreement has a five months term, subject to an additional three months renewal, another agreement has a three months term, subject to an additional three months renewal, and the remaining agreement has a two months term, subject to additional two months renewal. These eight agreements are spread tank wise within a total of five reputed customers.

These Commercial Storage Agreements have much higher monthly, fixed storage fees compared to the Super Major Agreement, which will increase the Company’s fixed revenues by 40% to 45%.

 

In September 2019, the Group executed the Phase II Customer Agreement with BIA, covering the Phase II facility and containing identical price terms and otherwise substantially the same terms as the Phase II End User Agreement with the Phase II End User. Immediately upon entering the Phase II Customer Agreement, BIA subleased the BPGIC’s Phase II facility back to the existing Phase II End User on terms substantially similar to the original terms.

 

Pursuant to the Phase II End User Agreement, the Phase II End User is not expected to begin occupying the Phase II facility or using BPGIC’s services until the Phase II facility is operational which is currently estimated to occur in the FourthThird Quarter of 2020.2021. Once the Phase II facility is operational, the Phase II End User will utilize the facility as the sub-lessee of BIA who will be the direct customer of BPGIC.

 

The operational commencement of the BIA Refinery is currently anticipated to occur in the ThirdFirst Quarter of 20212022.

61

Customer Concentration

 

Until April 2020, BIA was the Group’s only customer and the Group was reliant on it for all of its revenues. For the yearsyear ended December 31, 2017 and December 31, 2018, the Initial Phase I End User accounted for 100 percent of the Group’s revenues. For the year ended December 31, 2019, the Initial Phase I End User and BIA collectively accounted for 100 percent of the Group’s revenues. In April and May 2020, BIA agreed to release 129,000 m3 of the Phase I capacity, amounting to approximately one third of the total Phase I capacity, back to BPGIC. This release expires in May 2021. In December 2020 and February 2021, BIA agreed to release an additional aggregate of 270,324, being the remainder of the total Phase I capacity, back to BPGIC. These releases end on dates ranging from June 2021 to August 2021, subject to an additional extension for six months in each case.

Pursuant to the Super Major Agreement, BPGIC leased thisthe 129,000 m3 capacity to the Super Major. The Super Major is required to pay a monthly fixed storage fee to lease its storage capacity at Phase I. The Super Major paid the storage fee for the initial six month term of the Super Major Agreement up front. The Super Major Agreement iswas renewable for an additional six months with the mutual agreement of the parties. See “Item 10.C Material Contracts — Phase I End User Agreement, Phase I Customer Agreement andIn November 2020, the Super Major Agreement — Storage Fee”.was not renewed by mutual agreement.

 

From November 2020 till March 2021, the Company entered into the nine Commercial Storage Agreements with the Storage Customers, eight of which agreements are still in effect. The Company has leased the entirety of the Phase I capacity released back to it to the existing Storage Customers pursuant to the eight Commercial Storage Agreements. These eight Commercial Storage Agreements have much higher monthly fixed storage fees compared to the Super Major Agreement, which will increase the Company’s fixed revenues by 40% to 45% and at the same time mitigate the risk of concentration. In addition, the Company has recently received extensivefurther enquiries for storage, as oil prices have fallen dramatically. The Companyand has been evaluating thesuch enquiries and that will seek to eliminatewith a view towards further mitigating or eliminating its customer concentration risk further.at the end of renewed tenors.

 

Currently, the Group’s monthly revenue is primarily driven by the monthly fixed storage fee it charges BIA and the Super Majorexisting Storage Customers to use all of Phase I’s storage capacity, which remains the same each month irrespective of whether they utilize any storage capacity. The fixed storage fee, which is billed monthly in advance, represents the lease of storage capacity and the service provided to the customer for handling an agreed level of throughput of fuel oil and clean products. The fixed storage fee is allocated to the lease and service components based on their relative stand-alone selling price, which is based on an analysis of lease-related and service-related costs for the contract, adjusted for representative profit margins. The lease component is recognized on a straight-line basis over the term of the initial lease and the service component is recognized over time as the customer simultaneously receives and consumes the benefits provided by the Group’s performance. The Group’s monthly revenue is impacted by the monthly variable ancillary service fees it charges BIA, which would vary each month based on BIA’s usage of the following ancillary services: throughput, blending, heating and inter-tank transfers. BPGIC’s monthly revenue ultimately varies based on BIA’s end users’ and Super Major’sthe existing Storage Customers’ usage of the ancillary services.

 

In March 2019, BPGIC entered into an agreement with Sahara to operate a modular refinery to be developed, installed and owned by Sahara, or a wholly owned subsidiary of Sahara, at the BPGIC Terminal. In February 2020, BPGIC and Sahara mutually agreed to discontinue their joint development discussions. On February 23, 2020, BPGIC entered into the Refinery Agreement with BIA, a new agreement which provides that the parties will use their best efforts to finalize the technical and design feasibility studies for the BIA Refinery, a refinery with a capacity of 25,000 bpd.Refinery. The parties agreed to negotiate the Refinery Operations Agreement, consisting of a sublease agreement and a joint venture agreement, to govern the terms on which (i) BPGIC will sublease land to BIA to locate, (ii) BIA will construct, and (iii) BPGIC will operate the BIA Refinery. The terms of the Refinery Operations Agreement are still under negotiation and the parties aimhave agreed to finalizeextend the period for their agreement in August 2020.negotiations until the Second Quarter of 2021. The Group expects the BIA Refinery to commence operations and BIA’s payment obligations under the Refinery Operations Agreement to begin in the ThirdFirst Quarter of 2021,2022, at which time the BIA Refinery will begin generating revenue.

 

Other thanIncluding BIA and the existing Storage Customers, the Company has diversified its customer base compared to prior to November 2020 when BIA was the sole major customer along with the Super Major, BIA is expected be the sole customer for Phase I,Major. For Phase II and the BIA Refinery, howeverBIA will continue to be the sole customer wherein BIA is expected to sublease the facilities to multiple end users.

62

51

 

Group’s Cost Structure and Margins

 

The Group’s cost structure and margins are derived from the Group’s revenues which currently come, and are expected to continue to come, from two types of fees, fixed fees for storage and variable fees for ancillary services. Once the BIA Refinery is operational, the Group’s revenues are expected to come from three types of fees, refinery operations fees, fixed fees for storage and variable fees for ancillary services. The mix of these fees affects revenues, operating margins and net income. In particular, the relatively high fixed price nature of the Group’s operations could result in lower profit margins if certain costs were to increase and the Group was not able to offset the increase in costs with sufficient increases in its storage or ancillary service fees or the end users’ utilization of BPGIC’s ancillary services.

 

The Group’s direct costs, which are comprised principally of employee costs with related benefits and depreciation along with indirect cost of land lease rentals generally remain stable across broad ranges of activity levels at the terminal and, as discussed above, its storage fee revenues are fixed or will be fixed, as the case may be, pursuant to the Phase I Customer Agreement, the Super Major Agreement,existing Commercial Storage Agreements, the Phase II Customer Agreement and the Refinery Operations Agreement. Accordingly, changes in the Group’s operating margins are largely driven by the amount of ancillary services provided and the fees the group earns for such services. For more information regarding the related risks, see “Risk Factors — Risks relating to BPGIC — The fixed cost nature of BPGIC’s operations could result in lower profit margins if certain costs were to increase and BPGIC were not able to offset such costs with sufficient increases in its storage or ancillary service fees or our customers’ utilization of BPGIC’s ancillary services.”

During the year ended December 31, 2019, the Group incurred cash expenses of $3.2 million as expenses incurred in connection with Brooge Energy Limited’s listing on Nasdaq.NASDAQ. In addition, the Group, in accordance with the requirements of IFRS, has recorded a non-cash expense as listing expenses to the extent of $98.6 million which is the difference between the fair value of the 10.9 million Ordinary Shares (including 1.6 million Ordinary Shares held in escrow) issued to Twelve Seas’ shareholders in the Business Combination and the fair value of the net assets of Twelve Seas acquired at the time of Business Combination which had a significant impact on the current year’sfiscal year 2019’s profitability. The listing expenses also include the fair value of 21.2 million warrants which were valued at a fair value of $0.8 per warrant amounting to $16.9 million. However, these costs, which total $101.8 million, are of a one-off non-recurring nature and pertain only to

During the year ended December 31, 2019.These costs will be added back to the profits in the computation2020 there was no impact on account of Adjusted EBITDA.

such listing expenses as there were no combination activities, unlike 2019. Once the BIA Refinery and Phase II facility are operational, our mix of relatively fixed revenue and variable revenue will also depend on ancillary service requirements for the BIA Refinery and the Phase II End User as the sub-lessee of the Phase II facility.

 

63

National and International Expansion

 

The Group’s future revenue growth and results of operations will depend on its ability to secure additional land and develop additional facilities or acquire existing facilities on commercially favorable terms both nationallyin the UAE and internationally.outside the UAE. The Group operates in a capital-intensive industry that requires a substantial amount of capital and other long-term expenditures, including those relating to the expansion of existing terminal facilities and the development and acquisition of new terminal facilities. Accordingly, the Group’s successful expansion also depends on its ability to generate or obtain funds sufficient to make significant capital expenditures.

Oil Market Pricing Structure

 

Increases or decreases in the price of crude oil has some impact on end-user demand for our ancillary services, unlike demand for storage which is fully contractually committed at fixed rates. For instance, when the expected future price for an oil product is believed to be higher than the current market price for that product, it is said to be in a “contango market.”market”. In such a market, oil traders are more likely to store the product and put a hold on processing the product via ancillary services, until there is an upward revision in prices. Vice versa if the expected future price for an oil product is believed to be lower than the current market price for that product, it is said to be in a “backwardation market.”market”. In such a market, oil traders are more likely to process the product via ancillary services in order to sell at the current market price, rather than store the product when future prices are expected to be lower. However, there is no reduction in ancillary services billing andin the last quarter billing. However, we expect the same to beincrease in line with previous periods. This is mainly because our end users have long term contracts of supply of certain types of products with ultimate end users. This requires ongoing ancillary services of circulation, blending, heating etc. The groupGroup is continuously monitoring the market and is in constant touch with phasethe Phase I and Phase II end userusers for the same.

Phase III & RefineryII

The group is in the early stages of pursuing a further major expansion near its existing facilities, which it refers to as Phase III. In July 2019, BPGIC executed an initial lease agreement to secure a new plot of land of approximately 450,000 m2 near its existing facilities. On February 2, 2020 BPGIC signed a formal land lease agreement with FOIZ for construction of storage facility of approximately up to 3.5 million m3 and refinery production of up to 180,000 bpd. Phase III alone could be three (3) times the size of the Company’s projected operations post-Phase II and post-the initial refinery phase. Concurrently, BPGIC is in discussions with top global oil majors, which have expressed interest in securing portions of the capacity of a Phase III facility. As on date, the group does not yet have any planned capital expenditures in connection with Phase III. The only recognized expenses here is the FOIZ rental which as per the agreement would be AED 50 m2 for 450,075 m2 per annum with 2% annual increase. However this rent will accrue only after the end of 18 months from the agreement date or first commissioning of the plant whichever happens earlier.


In addition to this specific land for Phase III, BPGIC will continue to pursue additional projects within the Fujairah market, either through joint cooperation with parties who have land leases or through efforts to secure additional land itself in Fujairah. The group already has in place contracts with existing customers and is working towards enhancing the relationship for additional ancillary and other services.

Recent Developments

BIA Refinery

In March 2019, BPGIC partnered with Sahara to develop and operate a modular refinery within the BPGIC Terminal with minimal capital expenditure by BPGIC. Under the terms of the parties agreement, Sahara would finance and arrange the development, construction and commissioning of a modular refinery capable of supplying IMO 2020 compliant 0.5% sulphur content shipping fuel with initial production capacity of 24,000 b/d.

In February 2020, BPGIC and Sahara mutually agreed to discontinue their joint development project to install a modular oil refinery at BPGIC’s terminal. Shortly thereafter, BPGIC entered into the Refinery Agreement, a new agreement with BIA which provides that the parties will use their best efforts to finalize the technical and design feasibility studies for the BIA Refinery, a refinery with a capacity of 25,000 bpd operated by BPGIC. The parties further agreed to negotiate, within 30 days, the Refinery Operations Agreement, a sublease agreement and a joint venture agreement to govern the terms on which (i) BPGIC will sublease land to BIA to locate, (ii) BIA will construct, and (iii) BPGIC will operate the refinery. Due to the COVID-19 pandemic, the parties agreed to extend the period for their negotiations until August 4, 2020 and negotiations remain ongoing.

Phase II

 

In September 2019, BPGIC entered into the Phase II End User Agreement, a five-year lease and service agreement, with BIABIA. Pursuant to the Phase II End User Agreement, the term and the payment and performance obligations thereunder will commence upon the completion of Phase II facilities. Fees under the Phase II End User Agreement are comprised of (i) a monthly fixed fee to use BPGIC’s Phase II storage capacity (regardless of whether the Phase II End User uses any storage capacity) and (ii) monthly variable fees based on the Phase II End User’s usage of ancillary services comprising throughput, blending, heating and inter-tank transfers.

 

52

BIA Refinery

On February 23, 2020, BPGIC entered into the Refinery Agreement with BIA, which provides that the parties will use their best efforts to finalize the technical and design feasibility studies for the BIA Refinery. The parties further agreed to negotiate, within 30 days, the Refinery Operations Agreement, a sublease agreement and a joint venture agreement to govern the terms on which (i) BPGIC will sublease land to BIA to locate, (ii) BIA will construct, and (iii) BPGIC will operate the refinery. Due to the COVID-19 pandemic, the parties agreed to extend the period for their negotiations until the Second Quarter of 2021 and negotiations remain ongoing.

Phase III & Refinery

The Group is in the early stages of pursuing a further major expansion near its existing facilities, which it refers to as Phase III. Phase III alone could be three times the size of the Company’s projected operations post-Phase II and post-the initial refinery phase. Concurrently, the Group is in discussions with top global oil majors, which have expressed interest in securing portions of the capacity of a Phase III facility. As of the date of this Report, the group does not yet have any planned capital expenditures in connection with Phase III. The only recognized expenses in Phase III is the FOIZ rental which, as per the agreement, would be AED 50 m2 for 450,075 m2 per annum with 2% annual increase. However, this rent started to accrue from 2020 but the first rental payment will only be after the end of 18 months from the agreement date or first commissioning of the plant whichever happens earlier.

In addition to Phase III, the Group will continue to pursue additional projects within the Fujairah market, either through joint cooperation with parties who have land leases or through efforts to secure additional land itself in Fujairah. The Group already has in place contracts with existing customers and is working towards enhancing the relationship for additional ancillary and other services.

BUSINESS COMBINATION andAND NASDAQ LISTING TRANSACTIONS

 

On April 15,December 20, 2019, (i) Twelve Seas Investment Company (now known as BPGIC International), (ii) Brooge Energy Limited (f/k/a Brooge Holdings Limited), (iii) Brooge Merger Sub Limited, and a wholly-owned subsidiary of the Company, and (iv) Brooge Petroleum And Gas Investment Company FZE, entered into that certain Business Combination Agreement, pursuant to which BPGIC Holdings Limited also become a party thereafter pursuant to the Assignment and Joinder to Business Combination Agreement dated as of November 19, 2019 (as assignee of Brooge Petroleum and Gas Investment Company (BPGIC) PLC, which became a party to the Business Combination Agreement, pursuant to a Joinder to Business Combination Agreement dated as of May 10, 2019), as the same was amended prior to the date of Closing, including by the foregoing joinders and by the First Amendment to Business Combination Agreement, dated as of September 16, 2019. Pursuant to the Business Combination Agreement, subject to the terms and conditions thereof and upon the consummation of the transactions contemplated thereby upon Closing, among other matters:things:

 

(a)(i)Twelve Seas merged with and into Merger Sub, was to merge with Twelve Seas, with Twelve Seas continuing as the surviving entity and a wholly-owned subsidiary of the Company (under the name BPGIC International), with the holders of Twelve SeasSeas’ securities receiving substantially equivalent securities of Brooge Energy Limited, which will become a new public companythe Company (the “Merger”),; and

 

(b)(ii)Brooge Energy Limited was to acquirethe Company acquired all of the issued and outstanding capitalordinary shares of BPGIC (the “Purchased Shares”) from BPGIC Holdings in exchange for its Ordinary Shares of the Company, with BPGIC becoming a wholly-owned subsidiary of Brooge Energy Limitedthe Company (the “Acquisition”).

Twelve Seas was incorporated under the laws of the Cayman Islands on November 30, 2017. It was listed on NASDAQthe Nasdaq Capital Market and was a blank check company formed in order to effect a merger, capital stock exchange, asset acquisition or other similar business combination with one or more businesses or entities.

 

Merger Sub was incorporated in April 2019 solely to effectuate the Business Combination described herein.Combination. From its formation through the Closing, Merger Sub owned no material assets and did not operate any business. Upon Closing, Merger Sub merged with and into Twelve Seas and ceased to exist as a separate entity.

 

The Merger and the Acquisition occurred simultaneously and their execution is interconnected, i.e.that is, the Acquisition could not occur without the Merger and vice versa, we consider the Merger and the Acquisition as one transaction.

 

On December 20, 2019, the Group announced the consummation of the Business Combination. Pursuant to the Business Combination AgreementAgreement:

 

(i)each outstanding ordinary share of Twelve Seas was exchanged for one (1) Ordinary Share of Brooge Energy Limited.
Limited;

(ii)each outstanding warrant of Twelve Seas was exchanged for one warrant of Brooge Energy Limited.
Limited;

(iii)each outstanding right of Twelve Seas was converted into one-tenth of an Ordinary Share of Brooge Energy Limited, rounded down to the nearest whole share per shareholder.
shareholder; and

(iv)each outstanding unit of Twelve Seas was separated into its component parts and then exchanged for one (1) Ordinary Share of Brooge Energy Limited, one (1) warrant of Brooge Energy Limited and one-tenth of an Ordinary Share of Brooge Energy Limited.

 

53

Pursuant to the Business Combination Agreement, BPGIC Holdings had the right, at the sole election of BPGIC (the “Cash Election”), to receive a portion of the consideration for the Purchased Shares at the Closing as cash in lieu of receiving Brooge Energy Limited Ordinary Shares in an amount not to exceed 40% of the Closing Net Cash (with the “Closing Net Cash” being the aggregate cash and cash equivalents of Twelve Seas and Brooge Energy Limited as of the Closing, including remaining funds in the Twelve Seas’ trust account after giving effect to the redemption and the proceeds of any potential private placement financing, less unpaid expenses and liabilities of Twelve Seas and the Company as of the Closing, prior to giving effect to any Cash Election).

 

Upon Closing, Twelve Seas became a wholly owned subsidiary of the Company and changed its name from “Twelve Seas Investment Company” to “BPGIC International”. In connection with the closing of the Business Combination, holders of 16,997,181 ordinary shares of Twelve Seas sold in Twelve Sea’s initial public offering (“IPO”) exercised their right to redeem such shares at a price of $10.31684239 per share, for an aggregate redemption amount of approximately $175.36 million. In addition, 1,035,000 ordinary shares of Twelve Seas were forfeited by certain pre-IPO shareholders. Effective December 23, 2019, Twelve Sea’s ordinary shares, warrants, rights and units ceased trading, and were replaced by Brooge Energy Limited’ ordinary sharesLimited’s Ordinary Shares and warrantsWarrants on Thethe Nasdaq StockCapital Market under the symbols “BROG” and “BROGW,” respectively.

 


The total consideration paid by the Company to BPGIC Holdings for the purchased shares was 98,718,035 Ordinary Shares after reductionand cash in the amount of 1,281,965 shares due to the 40% cash election exercised by BPGIC Holdings. Twenty Million (20,000,000)$13,225,827.22. 20,000,000 of the Company’s Ordinary Shares otherwise issuable to BPGIC Holdings at the Closing (together with any equity securities paid as dividends or distributions with respect to such shares or into which such shares are exchanged or converted, the “Seller Escrow Shares”) were instead issued to BPGIC Holdings in escrow, and are held by Continental, as escrow agent for the benefit of BPGIC Holdings, to be held and controlled, along with any other Escrow Property (as defined in the Seller Escrow Agreement and together with the Seller Escrow Shares, the “Seller Escrow Property”) by Continental in a separate segregated escrow account (the “Seller Escrow Account”), and released in accordance with the Seller Escrow Agreement.

 

The Seller Escrow Property will only become vested and not subject to forfeiture, and released to BPGIC Holdings, in the event that the Company meets the following performance or milestone requirements during the Seller Escrow Period, the period commencing from the Closing until the end of the twentieth (20th) fiscal quarter after the commencement date of the first full fiscal quarter beginning after the Closing:

 

(i)One-half (½) of the Seller Escrow Property shall become vested and no longer subject to forfeiture, and be released to BPGIC Holdings, in the event that either: (a) the Annualized EBITDA (as defined in the Seller Escrow Agreement) for any full fiscal quarter during the Seller Escrow Period (beginning with the first full fiscal quarter beginning after the Closing) (an “Seller Escrow Quarter”) equals or exceeds $175,000,000 or (b) at any time during the Seller Escrow Period, the closing price of the Company Ordinary Shares equals or exceeds $12.50 per share (subject to equitable adjustment) for any ten (10) Trading Days (as defined in the Seller Escrow Agreement) within any twenty (20) Trading Day period during the Seller Escrow Period.

 

(ii)All Seller Escrow Property remaining in the Seller Escrow Account shall become vested and no longer subject to forfeiture, and be released to BPGIC Holdings, in the event that either: (a) the Annualized EBITDA for any Seller Escrow Quarter equals or exceeds $250,000,000 or (b) at any time during the Seller Escrow Period, the closing price of the Company Ordinary Shares equals or exceeds $14.00 per share (subject to equitable adjustment) for any ten (10) Trading Days within any twenty (20) Trading Day period during the Seller Escrow Period.

 

While the Seller Escrow Property is held in the Seller Escrow Account, BPGIC Holdings shall have all voting, consent and other rights (other than the rights to dividends, distributions or other income paid or accruing to the Seller Escrow Property). The Seller Escrow Agreement provides, however, that after the Closing, BPGIC Holdings shall be permitted to (i) pledge or otherwise encumber the Seller Escrow Property as collateral security for documented loans entered into by BPGIC Holdings, the Company or its subsidiaries, including BPGIC, after the Closing or (ii) transfer its rights to the Seller Escrow Property to a third party, provided, that (a) in each case of clauses (i) and (ii), that the lender’s or transferee’s rights to any such pledged or transferred Seller Escrow Property shall be subject to the provisions of the Seller Escrow Agreement and the sections of the Business Combination Agreement pertaining to the escrow, including the forfeiture provisions contained therein, and (b) in the event of a pledge or encumbrance of the Seller Escrow Property under clause (i) above, BPGIC Holdings may transfer the Seller Escrow Property to another escrow agent selected by BPGIC Holdings and reasonably acceptable to the Company.

 


Twelve Seas’ Initial Shareholders beneficially owned and were entitled to vote an aggregate of 5,175,000 ordinary shares that were issued prior to Twelve Seas’ IPO. Simultaneously with the execution of the Business Combination Agreement, the Initial Twelve Seas Shareholders entered into a letter agreement with Twelve Seas, the Company and BPGIC (the “Founder Share Letter”), pursuant to which the Initial Twelve Seas Shareholders agreed, effective upon the Closing, on a pro-rata basis amongstamong the Initial Twelve Seas Shareholders based on the number of Founder Shares owned by each of them, to (i) forfeit 20% of the Founder Shares owned by the Initial Twelve Seas Shareholders at the Closing and (ii) subject 30% of the Founder Shares owned by the Initial Twelve Seas Shareholders at the Closing (including any Ordinary Shares issued in exchange therefor in the Merger) to escrow and vesting and potential forfeiture obligations that are substantially identical to those that apply to the Seller Escrow Property as described above.

 

54

Upon completion of the Business Combination, the officers and directors of Twelve Seas resigned. The directors of Brooge Energy Limited are designated by BPGIC. The current officers of BPGIC remain to be the officers of BPGIC and became officers of Brooge Energy Limited, holding the equivalent positions as those held with BPGIC.

OPERATING RESULTS

 

RESULTS OF OPERATIONS

Disclaimer:The consolidated financial statements are prepared as a continuation of the financial statements of BPGIC, the accounting acquirer, and retroactively adjusted to reflect the legal capital of the legal parent/acquiree (the Company, Brooge Energy Limited). The comparative financial years included herein are derived from the consolidated financial statements of BPGIC as adjusted to reflect the legal capital of the legal parent/acquiree (the Company, Brooge Energy Limited).

Description of Operations

 

We conduct our operations through a dedicated operation team at the BPGIC Terminal. Our operations are categorized into two reported business services;services: Storage and Ancillary services.

Storage.We own terminal and storage facilities in United Arab Emiratesthe UAE in the emirate of Fujairah, currently with 399,324 m3 storage capacity for storage of clean oil.oil and fuel oil. Upon completion of Phase II, a crude oil storage facility, the capacity of the BPGIC Terminal will be expanded by approximately 600,000 m3 increasing the total capacity of the BPGIC Terminal to approximately 1,000,000 m3. Phase III is projected to have a capacity of approximately 3,500,000 m3. BPGIC entered into the Phase III Land Lease Agreement with FOIZ for the Phase III Land, however, the FEED (Front End Engineering Design) studies that are necessary for the Company to better understand its options with respect to the Phase III Land are still in progress. From December 2017 when BPGIC began its operations to February 28, 2018, BPGIC limited the availability of its storage capacity to 40 percent to allow management to test all systems and make any necessary adjustments. On March 1, 2018, BPGIC increased the availability of its storage capacity to approximately 70 percent, and on April 1, 2018, to 100 percent, which is now currently at 100%.remains the current storage capacity.

Ancillary Services.Ancillary services are further classified into 4four sub streams, Throughput, Blending & Circulation, Heating, Throughput and Intertank Transfer. We began offering ancillary services in April 2018 after management had completed its initial tests of the facility.facility.

 


BPGIC charges BIA and the Super Majorexisting Storage Customers variable fees based on usage for the following ancillary services:

 

Throughput Fees. Pursuant to the Phase I Customer Agreement and the Super Major Agreement,existing Commercial Storage Agreements, BIA and the Super Major,Storage Customers, respectively, are required to pay BPGIC a monthly fee based upon the total volume of oil products delivered from the BPGIC Terminal to the Port of Fujairah’s berths or from the berths to the BPGIC Terminal during an applicable month at the contracted rate per m3. Each month BIA and the Super Majorexisting Storage Customers are each allocated an initial amount of throughput volume at no charge that corresponds with the storage capacity that they each lease. For BIA this amount is approximately 270,000 m3 each month and for the Super Major this amount is approximately 129,000 m3. Both BIA and the Super MajorStorage Customers are required to pay BPGIC throughput fees on throughput volume to the extent the aggregate amount of throughput volume provided by BPGIC exceeds such initial amount. The revenue BPGIC generates from such service fees varies based upon, among other factors, the volume of oil products exiting the BPGIC Terminal. As BIA’s sublessees and the Super Major,existing Storage Customers utilize the ancillary services, which involves sending and receiving oil products to and from the BPGIC Terminal, it will lead to corresponding increases in the throughput volumes delivered to the extent BPGIC sends oil products to the Port of Fujairah’s berths. Upon mutual agreement, BPGIC could charge a supplementary fee to the extent BIA or the Super Majorexisting Storage Customers exceed an agreed amount of throughput volume.

Blending & Circulation Fees.Pursuant to the Phase I Customer Agreement and the Super Major Agreement,existing Commercial Storage Agreements, BIA and the Super Major,existing Storage Customers, respectively, are required to pay BPGIC a monthly fee based upon the total volume of oil products blended during the blending processes performed during an applicable month at the contracted rate per m3. BIA and the Super Majorexisting Storage Customers are responsible for providing BPGIC with blend specifications, the component oil products and any additives in connection with any blend request. The revenue BPGIC generates from such service fees varies based upon the activity levels of BIA’s sublessees, and the Super Major.
existing Storage Customers.

55

Heating Fees.Pursuant to the Phase I Customer Agreement, BIA is required to pay BPGIC a monthly fee based upon the total volume of oil products heated during an applicable month at the contracted rate per m3. The revenue BPGIC generates from such service fees varies based upon the activity levels of BIA’s sublessees. The Super Major doesexisting Storage Customers do not contract for heating services.

 

Inter-Tank Transfer Fees. Pursuant to the Phase I Customer Agreement and the Super Major Agreement,existing Commercial Storage Agreements, BIA and the Super Majorexisting Storage Customers are required to pay BPGIC a monthly fee based upon the total volume of oil products that they transferred between oil storage tanks during an applicable month at the contracted rate per m3. The revenue BPGIC generates from such service fees varies based upon the activity levels of BIA’s sublessees and the Super Major.existing Storage Customers.

 


Summary Financial Results

In $ For the year Ended December 31, 
 2017  2018  2019 
Revenue  89,593   35,839,268   44,085,374 
Direct costs  (2,295,809)  (9,607,360)  (10,202,465)
GROSS (LOSS) PROFIT  (2,206,216)  26,231,908   33,882,909 
Listing Expenses  -   -   (101,773,877)
General and administrative expenses  (574,266)  (2,029,260)  (2,608,984)
Finance costs  (966,926)  (6,951,923)  (5,730,535)
Changes in fair value of derivative financial instruments  -   (1,190,073)  (328,176)
(LOSS) PROFIT FOR THE PERIOD  (3,747,408)  16,060,652   (76,558,663)
(LOSS) PROFIT % to Revenue  -   45%  (174)%

In the Fourth Quarter of 2017, we began testing operations of the Phase I facilities. In the First Quarter of 2018, we began commercial operations of Phase I facilities at reduced storage capacity with no ancillary services to further test systems and make necessary adjustments. In the Second Quarter of 2018, we began operating at full storage capacity with complete ancillary services.

In $ For the year Ended December 31, 
  2018  2019
(Restated)
  2020 
Revenue  35,839,268   44,085,374   41,831,537 
Direct costs  (9,607,360)  (10,202,465)  (12,944,760)
GROSS PROFIT  26,231,908   33,882,909   28,886,777 
Listing Expenses  -   (101,773,877)  - 
General and administrative expenses  (2,029,260)  (2,608,984)  (6,456,884)
Finance costs  (6,951,923)  (5,730,535)  (8,306,150)
Change in estimated fair value of derivative warrant liabilities  -   1,273,740   2,547,542 
Changes in fair value of derivative financial instruments  (1,190,073)  (328,176)  (340,504)
Other Income  -   -   828,332 
PROFIT(LOSS) FOR THE PERIOD  16,060,652   (75,284,923)  17,159,113 
PROFIT(LOSS) % to Revenue  45%  (171)%  41%

 

In the First Quarter of 2018, we began commercial operations of Phase I facilities at reduced storage capacity with no ancillary services to further test systems and make necessary adjustments. In the Second Quarter of 2018, we began operating at full storage capacity with complete ancillary services which resulted intoin an increase in Revenuerevenue by $8,246,106$8.2 million and also corresponding Direct Costsincrease in direct costs by $595,105.$0.6 million. This resulted in an overall Gross Profitgross profit increase of $7,651,001$7.7 million for the year 2019 when compared to the year 2018.

 

As a consequence of the accounting for the Business Combination, described above, there was a decrease in Netnet profit from $16,060,652 (45% of Revenue)$16.1 million in 2018 to a net loss of $76,558,663$75.3 million in 2019. This is primarily attributable to a non-cash expense of $98.6 million being the difference between the fair value of Ordinary Shares issued to Twelve Seas’ shareholders in the Business Combination plus fair value of warrants and the Cashcash consideration received from Twelve Seas as a part of the Business Combination. This is in addition to the $3.2 million actual expenses incurred in connection with the Company’s listing on NasdaqNASDAQ in 2019.

The Company’s gross profit reduced to $28.9 million in 2020 from $33.9 million in 2019 mainly due to a decrease in ancillary revenues and increase in direct costs attributable to cost of operations. In 2020 there was a net profit of $17.2 million as against a net loss of $75.3 million in 2019, as there was a business combination exercise in 2019 resulting in a one time extraordinary non-cash expense of $98.6 million, being the difference between the fair value of Ordinary Shares and warrants issued over cash consideration received as part of that Business Combination.

If that one time expense were disregarded, the Company would have made a net profit of $23.3 million in 2019, based on which our management has concluded a reduction in net profits by $5.4 million. This is again mainly due to a decrease in revenues of ancillary business which was still short in spite of increase in storage fees due to new contracts with the Supermajor and other oil storage customers.

Revenue

 

  For the Year Ended December 31, 
Revenue Breakup 2017  2018  2019 
Fixed consideration – leasing component  62,995   14,586,315   16,846,481 
Fixed consideration – service component  26,598   6,158,667   7,112,959 
Ancillary services  -   15,094,286   20,125,934 
Total Revenue  89,593   35,839,268   44,085,374 
Revenue Break Up %            
Storage fee  100%  58%  54%
Ancillary Services fee  -   42%  46%

70

  For the Year Ended December 31, 
Revenue Breakup 2018  2019  2020 
Fixed consideration – leasing component  14,586,315   16,846,481   5,614,495 
Fixed consideration – service component  6,158,667   7,112,959   19,716,671 
Ancillary services  15,094,286   20,125,934   16,500,371 
Total Revenue  35,839,268   44,085,374   41,831,537 
Revenue Break Up %            
Storage fee  58%  54%  61%
Ancillary Services fee  42%  46%  39%

 

56

Year Ended December 31, 2017 Compared to Year Ended December 31, 2018

Our revenue increased from $0.1 million in 2017 to $35.8 million in 2018 as a result of Phase I facilities becoming commercially operational in the First Quarter of 2018.

Our storage fee revenue increased from $0.1 million in 2017 to $20.7 million in 2018 as a result of Phase I’s storage capacity becoming commercially operational in the First Quarter of 2018.

Our ancillary services fee revenue increased from nil in 2017 to $15.1 million in 2018 as a result of Phase I’s ancillary services becoming commercially operational in the Second Quarter of 2018.

For 2017, storage fees comprised 100% of our total revenue. For 2018, storage fees comprised 58% of our total revenue and ancillary services fees comprised 42% of our total revenue as a result of Phase I’s ancillary services becoming commercially operational in the Second Quarter of 2018.

Year Ended December 31, 2018 Compared to Year Ended December 31, 2019

 

Our revenue increased from $35.8 million in 2018 to $44.1 million in 2019 primarily because we operated Phase I at full storage capacity for/for the year ended December 31, 2019 whereas we operated Phase I at reduced storage capacity and without ancillary services in the First Quarter of 2018.

 

Our storage fee revenue increased from $20.7 million in 2018 to $23.9 million in 2019. This is primarily attributable to our operating of Phase I at full storage capacity the full year 2019 while capacity was reduced during the First Quarter of 2018.

 

Our ancillary services fee revenue increased from $15.1 million in 2018 to $20.1 million in 2019 primarily because we offered ancillary services for the full year 2019, but we operated Phase I without ancillary services in the First Quarter of 2020.

 

For the year ended December 31, 2019, storage fees comprised 54% of total revenue and ancillary service fees comprisecomprised 46% of total revenue while for the year ended December 31, 2018, storage fees comprised 58% of our total revenue and ancillary services fees comprised 42% of our total revenue. This change in revenue mix is primarily driven by the fact that only storage revenue was generated in the First Quarter of 2018 whereas both storage and ancillary services revenue were generated in the First Quarter of 2019.

Year ended December 31, 2019 Compared to Year ended December 31, 2020

71

 

During the year 2020, there was a reduction in revenues of $3.8 million to $41.8 million in 2020 from $44.1 million in 2019 due to ancillary revenue for the year 2020 decreasing by $5.1 million to $14.9 million from $20.1 million in 2019. The reason for the decrease in ancillary revenues is when the Company with an intention to address the customer concentration risk from 2019, five new customers were taken on board by end of 2020 as against one in 2019. However, the new customers had no or minimal requirement of ancillary services as compared to BIA.

The decrease of $5.1 million was offset by $1.3 million from new contracts with new customers with higher storage rates and terms of agreement as compared with BIA. Ancillary services revenue also includes port charges of $1.6 million that are paid by the Company to the port authority and recharged to the customers.

Direct Costs

 

The consolidated entities direct costs pertain only to BPGIC because there is no revenue generated at the Brooge Energy Limited level. Direct costs are comprised principally of employee costs and related benefits, depreciation and, to a lesser extent, insurance and certain other miscellaneous operating costs.

 

Employee costs and related benefits consist of compensation to employees who provide customer support and services and external contractor costs.

 

Depreciation expenses consist of depreciation on Phase I’s oil storage tanks, administrative buildings and installations. The Company depreciates these assets using the straight-line depreciation method assuming an average useful life of 50 years for the tanks and 20 to 25 years for the buildings and installations. The Company expects its depreciation expenses will increase following the completion of Phase II and to remain a significant non-cash expense in the future, given the capital-intensive nature of its business.

 

  For the year Ended December 31, 
Direct Costs $ for 2017  2018  2019 
Employee costs & benefits  1,518,794   2,808,702   3,074,727 
Depreciation  692.528   5,716,063   5,785,745 
Spares and consumables  50,891   592,471   788,792 
Insurance  31,304   377,053   323,702 
Other expenses  2,292   113,071   229,499 
Total Direct Costs  2,295,809   9,607,360   10,202,465 

Year ended December 31, 2017 Compared to Year ended December 31, 2018

  For the year Ended December 31, 
Direct Costs $ for 2018  2019  2020 
Employee costs & benefits  2,808,702   3,074,727   3,482,431 
Depreciation  5,716,063   5,785,745   5,799,023 
Port expenses  -   -   1,558,887 
Spares and consumables  592,471   788,792   657,916 
Insurance  377,053   323,702   397,976 
Other expenses  113,071   229,499   1,048,527 
Total Direct Costs  9,607,360   10,202,465   12,944,760 

 

Direct costs increased by 318.5% from $2.3 million in 2017 to $9.6 million in 2018 as a result of Phase I facilities becoming commercially operational in the First Quarter of 2018.

57

 

The most significant component of direct costs is depreciation which increased from $0.7 million in 2017 to $5.7 million because construction of Phase I facilities was completed in the Fourth Quarter of 2017 and thus depreciation for the facilities was only recorded for 43 days in 2017 but for was recorded for the full year in 2018.

Employee costs & related benefits increased by 84.9% from $1.5 million in 2017 to $2.8 million in 2018 due to, amongst other things, additional employees associated with the commencement of Phase I operations in 2018 as compared to 2017 when the plant was under construction for the first 11 months of the year, though the operations staff was mobilized beginning in June 2017 for training etc. so that there would not be any loss of hours and to ensure enhanced productivity once Phase I went operational.

Year ended December 31, 2018 Compared to Year ended December 31, 2019

 

Direct costs increased by 6.2% from $9.6 million in 2018 to $10.2 million in 2019 primarily because we operated Phase I at full storage capacity for the year ended December 31, 2019 whereas we operated Phase I at reduced storage capacity and without ancillary services in the First Quarter of 2018.

 

Though the total direct costs were consistent with just 6.2% increase, at individual expense category level, Employeeemployee costs & related benefits increased by 9.5% from $2.8 million in 2018 to $3.1 million in 2019 due to, amongstamong other things, an increase in number of staff and also an increase in the charges firfor outsourced staff.

 

As depreciation is on a straight-line basis, it remained almost the same with a minor increase of 1.2% and that was primarily due to the purchase of some furniture and other assets that were capitalized in 2019. Spares and Consumablesconsumables increased by 33.1% from $0.59 million in 2018 to $0.79 million in 2019 and other expenses which mainly consist of maintenance contracts and various plant related licenses increased by 103% from $0.11 million in 2018 to $0.23 million in 2019. Both of these increases are primarily due to the Phase I facility operating at full capacity throughout the year in 2019 plus also a petty component of cost increase.

Gross (Loss) Profit

Year ended December 31, 20172019 Compared to Year ended December 31, 20182020

 

Following a gross lossThere was an increase of $2.2total direct costs by $2.7 million from $10.2 million in 2017, BPGIC had a gross profit of $26.22019 to $12.9 million in 2018.2020, representing a 27% over the previous year 2019. The transition from gross loss to gross profit is primarily attributable tomajor reasons for the Phase I facility becoming operational from the First Quarter of 2018.increase are:

 


1.$0.4 million increase in employee cost & benefits is mainly due to an increase in the cost of outsourced staff at the Fujairah plant in 2020 when compared to 2019.

2.$0.8 million increase in other expenses is mainly attributable to a charge of $0.6 million being charged by FOIZ for the first time as disaster management charges based on the cover of the entire site a share of which is attributed to BPGIC based on the its current production capacity.

3.Port charges of $1.6 million are shown which were netted off in previous years, the same amount has been billed to the customers as per the agreement.

Gross Profit

Year ended December 31, 2018 Compared to Year ended December 31, 2019

 

Following a gross profit of $26.2 million in 2018, BPGIC had a gross profit of $33.9 million in 2019. Revenue increased by $8,246,106$8.2 million and Direct Costsdirect costs increased by $595,105$0.6 million resulting in an overall increase in Gross Profitgross profit of $7,651,001$7.7 million for 2019 over 2018. The increase is primarily attributable to the fact that in the First Quarter of 2018, we began commercial operations of Phase I facilities at reduced storage capacity with no ancillary services to further test systems and make necessary adjustments. In the Second Quarter of 2018, we began operating at full storage capacity with complete ancillary services.

Year ended December 31, 2019 Compared to Year ended December 31, 2020

The Company’s gross profit decreased to $28.9 million in 2020 from $33.9 million in 2019 and this is mainly due to a decrease in ancillary revenues by $5.1 million, which is offset by an increase in storage revenues by $1.3 million and an increase in direct costs attributable to cost of production by $1.1 million as explained above.

Listing Expenses

 

The Company’s listing expenses are of a one-time non-recurring nature and will only impactimpacts the 2019 financial statements as the Company listed on NasdaqNASDAQ in 2019.

 

  For the year
Ended
December 31,
 
Listing Expenses $ 2019 
Fair value of 10,869,719 Ordinary Shares (including 1,552,500 Founder Escrow Shares) Issued to Twelve Seas at $10.49 per share  114,023,352 
Fair value of 21,229,000 warrants at $0.80 per Warrant  16,983,200 
Net Liability of Twelve Seas at Business Combination  680,081 
Total Value of Consideration  131,686,633 
Less    
Proceeds received Post Merger Twelve Assets (Cash)  (33,064,615)
Listing Expenses Total (Non – Cash) – IFRS 2  98,622,01998,622,018 
Listing Expenses Total (Cash)*  3,151,8583,151,859 
Total Listing Expenses  101,773,877 

 

*Listing Expenses Total (Cash) represents promissory note of USD 1.5$1.5 million, fees paid to legal advisors, consultants, and other necessary expenses incurred in relation to the Group’s listing on the US market.
58

 

As per IFRS 2, the Ordinary Shares distributed at the time of Business Combination are valued at the fair value which was $10.49 as on December 19, 2019 and the fair value of the warrants is calculated at $0.80 per warrant. The difference between the fair value of the Ordinary Shares and warrants issued and the fair value of the net assets received amounting $98.62 million have been recognized as a listing expense. This is the primary reason for the substantial increase in indirect expenses and corresponding reduction in net profits resulting intoin a net loss of $76.6$75.2 million duringin 2019.

There was no listing expense during 2020 as it was a one time expense accounted due to Business Combination that occurred in 2019.

General and Administrative Expenses

 

The Company’s general and administrative expenses include costs not directly attributable to the operations of the BPGIC Terminal and consist primarily of compensation costs for its executive, financial, human resources, and administrative functions. Other significant expenses include outside legal counsel, independent auditors and other outside consultants, recruiting, travel, rent and advertising.


  For the year Ended December 31, 
General & Administrative Expenses $ 2017  2018  2019 
Employee costs  287,481   1,178,919   1,471,974 
Consultancy expenses  54,529   337,491   535,275 
Recruitment expenses  53,912   33,362   1,360 
Travel and related expenses  16,544   11,515   52,506 
Short-term leases  43,380   22,325   10,346 
Advertisement, subscriptions & Committee Expenses  37,223   116,495   131,494 
Printing and stationery  12,636   22,713   25,954 
License costs  22,872   19,249   15,502 
Communication expenses  9,379   19,773   35,465 
Other expenses  36,310   267,418   326,108 
Total G&A Expenses  574,266   2,029,260   2,608,984 

Year ended December 31, 2017 Compared to Year ended December 31, 2018

 

General and administrative expenses increased by 253.4% from $0.6 million in 2017 to $2.0 million in 2018. The increased expenses consisted primarily of $1.2 million in employee costs and related benefits, with the balance of the increase attributable to consultancy, recruitment and other working capital expenses. Employee costs increased in 2018 because of an increased headcount including appointments of a CFO, Finance Manager, Legal Secretary, FP&A Manager.

  For the year Ended December 31, 
General & Administrative Expenses $ 2018  2019  2020 
Employee costs  1,178,919   1,471,974   2,001,934 
Consultancy expenses  337,491   535,275   2,501,525 
Insurance Charges  -   -   639,345 
Committee expenses  -   -   354,169 
Recruitment expenses  33,362   1,360   12,924 
Travel and related expenses  11,515   52,506   154,336 
Short-term leases  22,325   10,346   177,850 
Advertisement, subscriptions & Committee Expenses  116,495   131,494   211,704 
Printing and stationery  22,713   25,954   21,367 
License costs  19,249   18,502   89,552 
Communication expenses  19,773   35,465   49,105 
Other expenses  267,418   326,108   243,073 
Total G&A Expenses  2,029,260   2,608,984   6,456,884 

 

Year ended December 31, 2018 Compared to Year ended December 31, 2019

 

General and administrative expenses increased by 28.6% from $2.0 million in 2018 to $2.6 million in 2019. The increased expenses consisted primarily of a 24.9% jump in employee costs and related benefits had a jump by 24.9% from $1.2 million in 2018 to $1.5 Millionmillion in 2019. This was mainly due to increase in salaries of various staff in addition to bonus to some staff. Further, during 2019, there was some employee turnover that resulted in some employees with higher compensation than prior staff.

 

There was an increase in consultancy expenses by 58.6% from $0.34 million in 2018 to $0.54 million in 2019. This was mainly attributable to increase in Statutory Auditstatutory audit fees and lawyers’ fees pertaining to drafting of an offtake agreement with BIA plus other professional fees in terms of legal opinions in the normal course of business.

 

There iswas also an increase of 21.9% in other expenses from $0.27 million in 2018 to $0.32$0.33 million in 2019. This increase relates to committee expenses paid for or provided to board members of $0.07 million in 2019 which was nil in 2018.

Year ended December 31, 2019 Compared to Year ended December 31, 2020

General and administrative expenses increased by $3.8 million or 147% from $2.6 million in 2019 to $6.5 million in 2020. The major reasons for this increase are:

1.Increase in salaries and addition of new staff towards the mid of 2019 which resulted into an increase of $0.5 million in 2020 compared to 2019.

2.There was an increase of $1.9 million in consultancy charges, which comprises of legal charges of lawyers and investor relations which were for a partial period in 2019 as compared to full year in 2020. This also includes an increase in audit charges during 2020 when compared to 2019.

3.During the year 2020, the Company opted for an insurance cover of directors and key management liability for $0.6 million which was not taken in 2019 resulting in a straight increase. Also during the year 2020, board member fees of $0.4 million was accounted which was not there in 2019.

4.In April 2020, the Company also leased an office for a period of one year with a rent of $0.2 million annually having an impact of $0.16 million in 2020.

5.There was an increase in travel and subscriptions to the extent of $0.2 million during 2020 when compared to the year 2019.

59

Finance Costs

 

The Company’s finance costs consist of amortization of lease liability interest and interest expense under itsthe Company’s Financing Facilities (as defined below).Facilities.

 

The Phase I & II Land Lease entered into in March 2013 has an initial term of 30 years, which is extendable for another 30 years. The Company has concluded that it has the right to use of the land and, accordingly, recorded a lease liability in accordance with IFRS 16. Given the Company’s use of the land, it is reasonably certain that it will continue to lease the land until the end of lease period (i.e. 60 years) and, accordingly, the lease rental amounts cover a period up to 60 years and are discounted at the rate of 9.5% as the incremental borrowing rate of the Company over 60 years.

 


  For the year Ended December 31, 
Finance Cost ($) for 2017  2018  2019 
Interest on lease liability  318,957   1,387,612   1,412,796 
Finance costs on term loan & Bank Charges  647,969   5,564,311   4,317,739 
Total Finance Cost  966,926   6,951,923   5,730,535 

Year ended December 31, 2017 ComparedThe Phase III Land Lease entered into in February 2020 has an initial term of 30 years, which is extendable for another 30 years. The Company has concluded that it has the right to Year ended December 31, 2018use of the land and, accordingly, recorded a lease liability in accordance with IFRS 16. Given the Company’s use of the land, it is reasonably certain that it will continue to lease the land until the end of lease period (i.e. 60 years) and, accordingly, the lease rental amounts cover a period up to 60 years and are discounted at the rate of 13% as the incremental borrowing rate of the Company over 60 years.

 

Finance costs increased from $1.0 million in 2017 to $7.0 million in 2018. In 2018, finance costs consisted almost entirely of $5.6 million in finance costs on term loans under the Phase I Financing Facilities and $1.4 million in interest on lease liability.

  For the year Ended December 31, 
Finance Cost $ for 2018  2019  2020 
Interest on lease liability  1,387,612   1,412,796   2,041,006 
Penalty Charges  -   -   706,643 
Asset retirement obligation - accretion expense  -   -   79,555 
Finance costs on Borrowings & Bank Charges  5,564,311   4,317,739   5,478,946 
Total Finance Cost  6,951,923   5,730,535   8,306,150 

 

During 2017, the interest on lease liability and interest on term loans during the repayment period were capitalized and added to the cost of construction of the Phase I facility and, as a result, the finance costs recorded within the Company’s statement of comprehensive income for the year ended December 31, 2017 were only for the period from November 19, 2017, the date on which Phase I was ready for its intended use, through December 31, 2017. For the year ended December 31, 2018, the majority of finance costs accrued over the period were recorded within the statement of comprehensive income resulting in the high variance between finance costs for the year ended December 31, 2018 as compared to the year ended December 31, 2017.

Year ended December 31, 2018 Compared to Year ended December 31, 2019.

 

Finance costs reduceddecreased by 17.6% from $7.0 Millionmillion in 2018 to $5.7 Millionmillion in 2019. In 2018, finance costs consisted almost entirely of $5.6 million in finance costs on term loans under the Phase I Financing Facilities which haswas reduced to $4 Million$4.0 million in 2019. This is mainly because during the period July 2018 there was a decrease in bank borrowing rates to EIBOR + 3% on loans from earlier EIBOR + 3.5% with minimum 5.5%. Also with payment of principal there iswas a reduction in Principalprincipal which results intoresulted in a decrease of interest amount on loans. There is $1.4 million in interest on lease liability that is almost same in both the years 2018 and 2019.

 


Net Profit

Year ended December 31, 20172019 Compared to Year ended December 31, 20182020

 

Following a net loss of $3.7During the year 2020, there was an increase in finance cost by 45% in 2020 as compared to 2019 from $5.7 million in 2017, BPGIC had a net profit of $16.12019 to $8.3 million in 2018.2020. The transitionmain reasons for the increase in finance cost are:

1.An increase in finance costs on borrowings & bank charges includes balance of prepaid documentation fees on Phase 1 term loan of around $0.5 million, which was expensed out in 2020 in full as the loan was settled in the month of November 2020, which contributed as a direct increase in 2020 as against 2019.

2.The finance costs on borrowings & bank charges also includes an amount of $1.6 million, being interest for the year 2020 on the new $200 million Bond Financing Facility which was not there in 2019.

3.Penalty charges for $0.7 million are the pre-settlement charges paid towards settlement of the Phase 1 loan in 2020.

4.Accretion expense on asset retirement obligation relating to Phase I has been recognized of $0.07 million.

5.There is an increase in interest on lease liability on account of Phase III land lease recognised as per IFRS 16. Interest on lease liability for Phase III amounting to $0.6 million was accounted for one month of December 2020 based on the lease commencement date assessed by management.

6.The Company signed the Phase III Land Lease during the year 2020. As per the Phase III Land Lease, there is a rental free period for first 18 months until July 2021. However, as per IFRS 16, land lease interest and depreciation had to be accounted for one month of December 2020 even though the rental free period had not expired and there was no actual outflow of cash towards lease rentals. This reduced the overall net profit by $0.64 million in 2020.

60

Change in estimated fair value of derivative warrant liabilities

Year ended December 31, 2018 Compared to Year ended December 31, 2019.

The gain of $1.3 million results from net lossthe change in fair value of warrants issued by the Company on December 20, 2019.

Year ended December 31, 2019 Compared to net profitYear ended December 31, 2020

The gain of $2.5 million results from the change in fair value of warrants issued by the Company on December 20, 2019. The fair value of the warrants on December 31, 2019 was $0.74, which is primarily attributablefurther decreased on December 31, 2020 to the Phase I facility becoming operational$0.62, which resulted in the First Quartera gain of 2018.$2.5 million on 21,228,900 warrants.

Net Profit (Loss)

Year ended December 31, 2018 Compared to Year ended December 31, 2019

 

As a consequence of the accounting for the Business Combination, described above, there was a decrease in Netnet profit from $16,060,652 (45% of Revenue)$16.1 million in 2018 to a net loss of $76,558,663$75.3 million in 2019. This is primarily attributable to a non-cash expense of $98.6 million being the difference between the fair value of Ordinary Shares issued to Twelve Seas’ shareholders in the Business Combination plus fair value of warrants and the Cashcash consideration received from Twelve Seas as a part of the Business Combination. This is in addition to the $3.2 million actual expenses incurred in connection with the Company’s listing on NasdaqNASDAQ in 2019.

Year ended December 31, 2019 Compared to Year ended December 31, 2020

During the year 2020, the Company generated net profit of $17.2 million, as against net loss of $75.3 million in 2019. As explained above, the loss in 2019 was primarily due to a non-cash expense of $98.6 million being the difference between the fair value of Ordinary Shares issued to Twelve Seas’ shareholders in the Business Combination plus fair value of warrants and the cash consideration received from Twelve Seas as a part of the Business Combination.

Ideally, the Company operates at a net profit ratio of roughly 55% to 60% but since there was a decline in sales revenue of ancillary business and an increase in expenses on account of pre-settlement charges and penalty on account of finance cost, the net profit ratio reduced to 41% in 2020.

Non-IFRS Financial Measures

Adjusted EBITDA

 

We define Adjusted EBITDA as profit (loss) before finance costs, income tax expense (currently not applicable in the UAE but included here for reference purposes), depreciation, listing expenses and net change in the value of derivative financial instruments.instruments and derivative warrant liabilities. In addition to non-cash items, we have selected items for adjustment to EBITDA which management feels decrease the comparability of our results among periods. These items are identified as those which are generally outside of the results of day-to-day operations of the business. Except for listing expenses, these items are not considered non-recurring, infrequent or unusual, but do erode comparability among periods in which they occur with periods in which they do not occur or occur to a greater or lesser degree.

Note About Non-IFRS Financial MeasuresAdjusted EBITDA Margin

 

Our Adjusted EBITDA improved from negative $2.1 million forMargin is calculated as net income add or subtract anomalies such as below or above market rents paid to related parties, below or above market compensation paid to employees, one-time expenses or revenue and then add personal expenses deducted by the year ended December 31, 2017 to $29.9 million for the year ended December 31, 2018 becausebusiness paid on behalf of operations during the year 2018.its owners subtract interest expense, income taxes, depreciation, and amortization. Divided by gross revenue.

Discussion and Reconciliation

 

Our Adjusted EBITDA improved from $29.9 million (83.48% of revenue) for the year ended December 31, 2018 to $37.1 million (84.1% of revenue) for the year ended December 31, 2019 and as explained earlier we have added back the one-time listing expenses of $101.8 million, $0.3 million of net changes in fair value of derivative financial instruments and fair value gain of $1.3 million being the change in estimated fair value of derivative warrant liability to net loss to provide what we believe is a better comparison and evaluation of Adjusted EBITDA.

61

Our Adjusted EBITDA declined by $8.0 million in 2020 when compared to 2019 from $37.1 million (84.1% of revenue) for the year ended December 31, 2019 to $29.1 million (69.5% of revenue) for the year ended December 31, 2020. The main reasons for decline of Adjusted EBITDA in 2020 are:

1.There was a net decline in revenue of $2.2 million in 2020. This $2.2 million was due to a decrease in ancillary business to the extent of $5.2 million during the last quarter of 2020 with an increase of $1.3 million in storage rental fixed revenues due to BIA releasing additional capacity of 124,854 m3 over and above the 129,000 m3 released earlier for the Super Major. And, also showing the port charges in 2020 as compared to netting of in previous years.

2.Also, as explained in direct costs and general and administrative sections above, there is an increase of total direct costs by $2.7 million from $10.2 million in 2019 to $12.9 million in 2020 which is around 27% over the previous year 2019. Also, general and administrative expenses increased by 147% or $ 3.8 million from $2.6 million in 2019 to $6.4 million in 2020.

3.This decline in revenue by $3.9 million and increase in expenses by $6.5 million contributed to the decrease in Adjusted EBITDA.

 

Adjusted EBITDA is not a financial measure presented in accordance with IFRS. Adjusted EBITDA should not be considered in isolation or as a substitute for or superior to analysis of our results, including net income, prepared in accordance with IFRS. Because Adjusted EBITDA is a non-IFRS measure, it may be defined differently by other companies in our industry, ourindustry. Our definition of this Non-IFRS financial measure may not be comparable to similarly titled measures of other companies, thereby diminishing the utility. We encourage investors and others to review our financial information in its entirety and not rely on a single financial measure.

 

We present Adjusted EBITDA as a supplemental performance measure because we believe that the presentation of this non-IFRS financial measure will provide useful information to investors in assessing our financial condition and results of operations. Profit (loss) is the IFRS measure most directly comparable to Adjusted EBITDA. Adjusted EBITDA has important limitationsas an analytical tool because it excludes some, but not all, items that affect net income. Some limitations of Adjusted EBITDA are:

 

Adjusted EBITDA does reflect finance costs of, or the cash requirements necessary to service interest on our debts; and

 

Adjusted EBITDA excludes depreciation and although these are non-cash charges, the assets being depreciated may have to be replaced in the future.

Management compensatescompensates for the limitations of Adjusted EBITDA as an analytical tool by reviewing the comparable IFRS measure, understanding the difference between Adjusted EBITDA and profit (loss) and incorporating this knowledge into its decision-making processes. We believe that investors benefit from having access to the same financial measures that our management uses in evaluating our operating results.

 

The following table presents a reconciliation of net income to Adjusted EBITDA, the most directly comparable IFRS financial measure for the variousindicated periods:

  For the Year Ended December 31, 
$ 2017  2018  2019 
Profit (loss) for the year/ period  (3,747,408)  16,060,652   (76,558,663)
Adjustments for            
 Depreciation charge  692,528   5,716,063   5,785,745 
 Finance costs  966,926   6,951,923   5,730,535 
Listing Expenses  -   -   101,773,877 
Net changes in fair value of derivative financial instruments  -   1,190,073   328,176 
Total Adjustments  1,659,454   13,858,059   113,618,333 
Adjusted EBITDA  (2,087,954)  29,918,711   37,059,670 
Revenues  89,593   35,839,268   44,085,374 
Adjusted EBITDA % of Revenues  -   83.48%  84.06%

  For the Year Ended December 31, 
$ 2018  2019  2020 
Profit (loss) for the year/ period  16,060,652   (75,284,923)  17,159,113 
Adjustments for:            
Depreciation charge  5,716,063   5,785,745   5,799,023 
Finance costs  6,951,923   5,730,535   8,306,150 
Listing Expenses  -   101,773,877   - 
Net changes in estimated fair value of derivative warrant liabilities  -   (1,273,740)  (2,547,542)
Net changes in fair value of derivative financial instruments  1,190,073   328,176   340,504 
Total Adjustments  13,858,059   112,344,593   11,898,135 
Adjusted EBITDA  29,918,711   37,059,670   29,057,248 
Revenues  35,839,268   44,085,374   41,831,537 
Adjusted EBITDA % of Revenues  83.48%  84.06%  69.46%

Inflation

Inflation in the UAE has not materially affected our results of operations in recent years. Although we have not been affected by inflation in the past, we may be affected if any of the countries in which we do business now, or in the future, experience high rates of inflation.

62

 

LIQUIDITY AND CAPITAL RESOURCES

Overview

 

Our capital requirements have primarily been for capital expenditures related to the development of Phase I and Phase II, debt service, operating expenses, and shareholder distributions. Historically, we have funded our capital requirements through the Financing Facilities and equity contributions. We anticipate funding our future capital requirements and debt service payments with cash generated from our operations, funds received through the business combinationequity raises and future borrowings. To the extent we choose to seek additional financing in the future (whether for development, acquisition opportunities as they arise or the refinancing of the Bond Financing FacilitiesFacility when due at more favorable terms), we expect to fund such activities through cash generated from operations and through securing further debt financing from banks and the capital markets.

 

On December 31, 2018, we had a bank overdraft position due to ongoing discussions with our bank regarding the restructuring of our loan facilities, and on December 31, 2019, we had cash and cash equivalents of $19.8 million and on December 31, 2020 we had cash and cash equivalents of $20.9 million. As of December 31, 2019, we had (i) the Phase I Financing Facility, a term loan facility for an aggregate amount of $84.6 million which we primarily used to fund a portion of the construction cost of the Phase I facility, (ii) the Phase I Admin Building Facility, a term loan facility for an aggregate of $11.1 million which we primarily used to fund a portion of the construction cost of an administrative building in Fujairah, (iii) the Phase I Short Term Financing Facility, a term loan facility for an aggregate of $3.5 million which we primarily used to settle certain accrued interest on the Phase I Financing Facility, and (iv) the Phase II Financing Facility, a term loan facility for up to an aggregate of $95.3 million. Each facility iswas a Sharia compliant financing arrangement. As of December 31, 2019, we had $78.4 million outstanding under the Phase I Financing Facility ($82.2 Millionmillion as on December 31, 2018), $8.0 million outstanding under the Phase I Admin Building Facility ($10.1 million as on December 31, 2018), Nilnil outstanding under the Phase I Short Term Financing Facility as this was completely paid out and settled during 2019 ($2.4 Millionmillion as on December 31, 2018) and no borrowings outstanding under the Phase II Financing Facility.

 


In addition to the above, as a part of the business combination agreement as on December 31, 2019 with Twelve SeasBusiness Combination Agreement, an amount of $1.5 Million ismillion was due to Early Bird Capital Inc. at the end of one year from the date of the combination i.e.Business Combination (i.e. December 20, 20202020), and an amount of $0.77 Millionmillion was payable to Sponsors of Twelve Seas Sponsor in two parts, $0.27 Millionmillion by January 31, 2020 (already paid as on date of this document) and $0.5 Millionmillion by June 30,2020.30, 2020, both of which have been paid. This amount iswas non-interest bearing and non-collateral. These 2two amounts totaling to $2.27 million (Nil(nil as on December 31, 2018) is shown as short term debt commitment at Consolidated Entityconsolidated entity level in addition to the above term loan facilities from bank.

On November 16, 2020, we received proceeds of $186 million (net of issuance discount and arranger fees) in connection with the Bond Financing Facility. We used an aggregate of $87.1 million to repay in full outstanding amounts owed on the Phase I Financing Facility, Phase I Admin Building Facility (including the hedging facility), $85.00 million allocated for Phase II construction in construction funding account, $1.50 million to repay a promissory note to Early Bird Capital, $8.5 million to fund the Liquidity Account and the remaining balance was used for general corporate purposes.

 

Cash Flows for the Years Ended

 

The following table summarizes our cash flows fromprovided by (used in) operating, investing and financing activities in $.

 

 2017  2018  2019  2018  2019  2020 
Operating Activities  (2,252,917)  27,896,721   53,414,352   27,896,721   53,414,352   36,850,165 
Investing Activities  (21,924,553)  (271,403)  (60,355,262)  (271,403)  (60,355,262)  (124,115,454)
Financing Activities  24,319,059   (31,617,070)  30,479,378   (31,617,070)  30,479,378   88,424,488 
NET INCREASE (DECREASE) IN CASH  141,589   (3,991,752)  23,538,468 
Net Increase (Decrease) in Cash  (3,991,752)  23,538,468   1,159,199 

Operating Activities

Net cash provided by operating activities for the year ended December 31, 2018 of $27.9 million compared to net cash used in operating activities of $2.3 million for the year ended December 31, 2017, primarily due to operating cash flow from the Phase I facility which became commercially operational in 2018.

 

Net cash provided by operating activities for the year ended December 31, 2019 was $53.4 million compared to net cash provided inby operating activities of $27.9 million for the year ended December 31, 2018. There was a net loss reported for $76.6$75.2 million in 2019, this was due to a listing expense of $101.8 million. This includes non-cash listing expense of $98.6 million, and a promissory note of $1.5 million which were added back to net loss for computation of cash flow from Operating Activities’.operating activities. The increased operating income is primarily attributable to our operation of Phase I at full storage capacity for the year ended December 31, 2019 whereas we operated Phase I at reduced storage capacity and without ancillary services in the First Quarter of 2018.

In addition to the above, the increase in Tradetrade receivables were in line with 2018, howeverthe increase in accruals and payables is due to the construction of Phase II.

 

Investing Activities

63

 

Net cash used in investinggenerated from operating activities for the year ended December 31, 2018 decreased to $0.32020 was $36.8 million, from $21.9 million for the year ended December 31, 2017,which is primarily due to the completion of the Phase I facility in early 2018 without a ramp-up in cash used for Phase II during the year. Net cash used in 2017 consisted primarily of $22.5 million relating to the construction of the Phase I facility which was completed on November 19, 2017.following reasons:

1.There was a decline in revenues to the extent of $2.3 million with an increase in operating expenses of $6.6 million, which resulted into a net profit margin of 41% amounting to $17.2 million as against profit margin of $23.3 million pending adjustment of one-time listing expenses of $98.6 million in 2019.

2.The Company adopted the practice of utilizing the proceeds from the Bond Financing Facility to settle maximum of outstanding payables in addition to utilizing current year revenue proceeds.

Investing Activities

 

Net cash used in investing activities for the year ended December 31, 2019 increased to $60.4 million from $0.3 million for the year ended December 31, 2018, primarily due to the construction of Phase II facility in 2019. Net cash used in investing activities in 2019 consisted primarily of $21.7 million being the balance from the advance paid to contractor of Phase II and remaining $39.0 million relating to the construction of the Phase II facility.

Net cash used in investing activities in 2020 pertains to construction of the Phase II facility for which is expectedadditions were made towards work in progress to be completed by the Fourth Quarterextent of 2020.$102 million, and from this, adjusting an advance of $5.2 million, resulting in net additions of $97 million compared to $60.3 million in 2019 which included the unadjusted advance payment of $21 million. And, $26.9 million paid in the restricted bank account as per the bond terms.


During 2020, the Company made net payments of $81.2 million to contractor towards the Phase II construction, $28.8 million out of which went from the Company’s operating cash flow and the balance of $52.4 million out of the proceeds of the Bond Financing Facility.

Financing Activities

 

Net cash used ingenerated by financing activities for the year ended December 31, 20182019 was $31.6$30.5 million as compared to net cash provided byused in financing activities of $24.3$31.6 million for the year ended December 31, 2017,2018. This was primarily due to an increase in distributions to shareholders, increasecapital from the Business Combination in paymentsthe amount of $33.1 million, and $23.3 million injected by related parties of the consolidated entity. An amount of $8.4 million was used for repayment of principal on the Financing Facilities and $1.5 million towards payment of interest and principal, andon the Financing Facilities. Further, an amount of $13.6 million was paid to certain pre-Business Combination shareholders as a reductionportion of additional borrowings.the 40% Cash Election, resulting in a net cash position from financing of $30.5 million. For the year ended December 31, 2018, net cash used in financing activities consisted primarily of $25.0 million in distributions to shareholders, $7.2 million in interest payments, and $3.5 million in principal repayments, partially offset by $4$4.0 million in proceeds from term loans. For the year ended December 31, 2017, net cash provided by financing activities consisted primarily of $16.7 million in proceeds from term loans and $11.2 million in proceeds from shareholder contributions, partially offset by payments of $3.4 million of interest and $0.1 million of financing transaction costs.

 

Net cash generated by financing activities for the year ended December 31, 20192020 was $30.5$88.4 million as compared to net cash used for financing activities of $31.6$30.5 million for the year ended December 31, 2018. This was primarily due to an increase in capital from2019. In 2019 the proceeds were on account of the Business Combination, however, in 2020, the Company entered into the Bond Financing Facility wherein the Company received net proceeds of $186 million, which were used to settle Phase 1 loans to the extent of $89.3 million, with Twelve Seas in the amount of $33.1approximately $8.3 million going towards interest and $23.3 million injected by related parties of the consolidated entity. An amount of $8.4 million was used for repayment of principal on Financing Facilities and $1.5 million towards payment of interest on Financing Facilities. Further, an amount of $13.6 million was paid to certain pre-Business Combination shareholders as a portion of 40% Cash Electionderivatives, resulting in a net cash position from Financingprovided by investing activities of $30.5 Million.$88.4 million.

 

Working Capital

Year Ended December 31, 2019

 

As of December 31, 2019, BPGIC had negative working capital of $57.0 million Compared to a negative $108.5 million in 2018. This was due to the following:

a.During the year 2019 there was a capital accrual in the amount of $31.6 million calculated based on the percentage of completion of the Phase II Terminal as of December 31, 2019. There was an advance paid to contractors in the amount of $21.7 million which was classified as a non current asset under Advances to contractors and hence does not form a part of working capital computation.
b.There is an amount of $17.1 million payable to the contractor and project manager as of December 31, 2019 contributing to an increase in Accounts payable.
c.The cash position also decreased to the extent of $13.6 million as a result of cash election clause in the business combination agreement paid to certain pre-Business Combination shareholders of BPGIC wherein they had an option to opt either for shares or cash and wherein they opted for cash. This reduced the bank balance having direct impact on the cash in hand position with reduction in Current assets.

Year Ended December 31, 2018

Under the Phase I Financing Facilities, BPGIC was subject to certain covenants requiring amongst other things, the maintenance of:

(i)a minimum debt service coverage ratio (“DSCR”) of 150% at all times and if the ratio decreases to 120% or less, it results in an event of default; and
(ii)an amount equivalent to one quarterly instalment including interest in a debt service reserve account (“DSRA”) at all times.

As of December 31, 2018, BPGIC had negative working capital of $108.5 million. This was due to the following:

a.During the year there was a net cash outflow of $25.0 million to the shareholders from its operating cash flow and another $10.7 million cash outflow for loan repayment.
b.In 2018, BPGIC was in discussions with the lender to restructure the Phase I Financing Facilities on more favorable terms in line with the current market rates and lending criteria. As of December 31, 2018, discussions were still in progress, and a payment in the amount of $3.8 million was due to the bank as an installment payment consisting of $2.7 million in principal repayment and $1.0 million in interest. As discussions were ongoing, the payment was processed from BPGIC’s bank account creating an overdraft in its current bank account, which was reflected as the bank overdraft in the December 31, 2018 statement of financial position.

In addition to the circumstances described in subparagraph b above, BPGIC did not comply with the first and second covenant listed above. Even though the lender did not declare an event of default under the Phase I Financing Facilities, the lender could have done so as a result of the breach of the covenants described above and could have required immediate repayment of the amounts outstanding. Accordingly, the December 31, 2018 statement of financial position classifies all of the Company’s bank loans as current liabilities. The Company’s lender has not requested any immediate repayment of these loans and the loan agreements have been amended on September 10, 2019 and subsequently on December 30, 2019 and June 15, 2020, including revised repayment schedules. (Please refer to note 13 of BPGIC’s financial statements as of December 31, 2017 and 2018 for further information).

Year Ended December 31, 2017

As of December 31, 2017, the Company had negative working capital of $100.5$3.4 million, compared to negative working capital of $72.7 as of December 31, 2019 and negative working capital of $108.5 as of December 31, 2018. As of December 31, 2020, the Company had cash and bank balance of $47.9 million. This was dueManagement forecasts that the Company’s existing cash balance, as well as cash generated from the Company’s ongoing operations, will provide sufficient liquidity to the following:Company to continue in operations for the foreseeable future.

 

a.During the year 2017, BPGIC had no operating income which is a primary requirement for computing DSCR. Further, the Phase I Construction Facilities were not fully drawn which is a primary requirement for determining the amount of one quarterly installment including interest to be placed in the DSRA. As such, BPGIC did not comply with the DSCR and DSRA covenants.
b.These breaches constituted an event of default and could have resulted in the lender requiring immediate repayment of the amounts outstanding. Accordingly, the Company has classified the entire amount outstanding of $94.2 million as of December 31, 2017 as a current liability based on the non-compliance.

80

Capital Expenditures

 

In 2019, we made capital expenditures of $87.3 million ($2 Millionmillion in 2018) including an advance paid to Audex, the Phase II contractor, and this is primarily in connection with construction of the Phase II.II facility. These expenditures were financed by cash from operations and cash injected by the shareholders.

 

During the year 2020, the Company’s net expenditure towards capital expenses amounted to $97.2 million. During the year 2020, the Company made net payments of $81.2 million towards the Phase II construction, $28.8 million out of which went from the Company’s operating cash flow and the balance of $52.4 million out of the proceeds of the Bond Financing Facility.

Our additional capital expenditures during 20202021 are expected to be approximately $79.3$33.1 million, which we expect to fund primarily through cash from operations shareholder contributions,and from the remainder of the proceeds offrom the Business Combination, and drawdowns on the Phase IIBond Financing Facility. These planned capital expenditures will consist primarily of expenditures related to the construction of the Phase II facility.

64

Debt Sources of Liquidity

Current ($) Terms Due Dec-17  Dec-18  Dec-19  Terms Due Dec-17  Dec-18  Dec-19  Dec-20 
Bond Financing Facility 8.5% per annum 2021  -   -   -   7,000,000 
Term loan (1) - Phase I Loan 3 month EIBOR + 3% margin 2020  83,424,947   82,245,595   10,135,939  3 month EIBOR + 3% margin 2021  83,424,947   82,245,595   10,135,939   - 
Term loan (2) - Admin Building Loan 3 month EIBOR + 3% margin 2020  10,738,804   10,165,703   2,138,248  3 month EIBOR + 3% margin 2021  10,738,804   10,165,703   2,138,248   - 
Term loan (3) - Short Term Loan 2 month EIBOR + 2% margin 2020  -   2,380,790   -  2 month EIBOR + 2% margin 2021  -   2,380,790   -   - 
Term loan (4) - Promissory Note Early Bird Inc. Non-Interest Bearing 2020  -   -   1,500,000 
Term loan (4) - Promissory Note Early Bird Capital Non-Interest Bearing 2020  -   -   1,500,000   - 
Term Loan (5) - Promissory Note Twelve Seas Sponsors Non-Interest Bearing 2020  -   -   765,000  Non-Interest Bearing 2020  -   -   765,000   - 
    94,163,751   94,792,088   14,539,187    94,163,751   94,792,088   14,539,187   7,000,000 
Non Current ($)                              
Bond Financing Facility 8.5% per annum Sep-25  -   -   -   180,014,715 
Term loan (1) 3 month EIBOR + 3% margin Jul-30  -   -   68,271,743  3 month EIBOR + 3% margin Jul-30  -   -   68,271,743     
Term loan (2) 3 month EIBOR + 3% margin Jul-23  -   -   5,889,207  3 month EIBOR + 3% margin Jul-23  -   -   5,889,207     
    -   -   74,160,950                   
Total Loan as on    94,163,751   94,792,088   88,700,137    94,163,751   94,792,088   88,700,137   187,014,715 

 


As of December 31, 2019, BPGIC2020, the Company was in compliance with the terms of itsthe Financing Facilities. However, BPGIC was not in compliance with its debt covenants, including the debt service coverage ratio contained in the Company’s Phase I Financing Facilities at all times during the year ended December 31, 2019.  Even though the lender did not declare an event of default under the loan agreements, these breaches constituted events of default and could have resulted in the lender requiring immediate repayment of the loans.

On September 10, 2019,November 16 2020, the Company entered into an agreement withpaid off the entire outstanding principal, interest and fees for all of its lender to amend the Phase I Construction Facility. The principal and accrued interest of $5,494,063 outstanding under this facility as of July 31, 2019 as per the original repayment schedule became due on November 30, 2019. The Phase I Construction Facility became payable in 45 instalments starting October 31, 2019 with final maturity on July 30, 2030. The Phase I Admin Building Financing Facility and the Phase I Short Term Financing Facility were not amended as part of the September 10, 2019 agreement to amend the Phase I Construction Facility. Subsequent to December 31, 2018 the Company had repaid $5,646,206 due under the Phase I Admin Building Facility and the Phase I Short Term Financing Facility. As such, all instalments related to Phase I Admin Building Facility and the Phase I Short Term Financing Facility due under the original repayment schedules up to September 10, 2019 were repaid. In addition, the Company agreed to assign to the lender all proceeds from the operation of the tanks and to pre-settle by December 31, 2019 AED 100,000,000 (($27,225,701) translated using the exchange rate as of December 31, 2019) of principal under the Phase I Construction Facilitiesterm loans from the proceeds received from the Business Combination. A payment of principal and interest due on October 31, 2019 under the Phase I Financing Facilities was not paid in full as a result of recent discussions between the Company and the lender pertaining to more favorable financing terms. This partial non-payment was an event of default, but, as in the past, the lender did not declare an event of default.A payment of principal and interest due on November 30, 2019 under the Phase I Financing Facilities was not paid as a result of recent discussions between BPGIC and FAB pertaining to more favorable financing terms. 

On December 30, 2019, BPGIC and FAB agreed to amend the Phase I Construction Facility to defer the installments due thereunder to later dates. The key changes resulting from the amendment were as follows:

1.an amount of $5,729,417.50 which was due on November 30, 2019 would be repayable on February 28, 2020;

2.an amount of $1,765,553.50 which was due on January 31, 2020 would be payable in two installments: $882,776.75 on January 31, 2020 and $882,776.75 on February 28, 2020; and

3.the Debt Service Reserve Account to be created by February 28, 2020; and

4.testing of the Debt Service Coverage Ratio covenant to start on February 28, 2020 and to be conducted on each subsequent due date.


The terms of the Phase I Admin BuildingBond Financing Facility remained unchanged.

Note on Breach of Covenant for 2017 & 2018:

Under the Phase I Financing Facilities, the Company is subject to certain covenants requiring amongst other things, the maintenance of:

(i)a minimum debt service coverage ratio of 150% at all times and if the ratio decreases to 120% or less, it results in an event of default; and
(ii)an amount equivalent to one quarterly instalment including interest in a debt service reserve account at all times.

Facility. As of December 31, 2018:

The Company did not maintain a DSRA account and was not in compliance with2020, only the minimum debt service coverage ratio resulting in a breach of debt covenants requirement described above. Even though the lender did not declare an event of default under the loan agreement, these breaches constituted an event of default and could have resulted in the lender requiring immediate repayment of the loan. As a result of this non-compliance and in accordance with guidance related to the classification of obligations that are callable by the lender, the December 31, 2018 statement of financial position classifies all of the Company’s bank loans as current liabilities. The Company’s lender has not requested any immediate repayment of these loans and the loan agreements have been amended on September 10, 2019 and subsequently, on December 30, 2019 and June 15, 2020, including revised repayment schedules.

As December 31, 2017:

During the year 2017, BPGIC had no operating income which is a primary requirement for computing DSCR. Further, the Phase I Construction Facilities were not fully drawn which is a primary requirement for determining the amount of one quarterly installment including interest to be placed in the DSRA. As such, BPGIC did not comply with the DSCR and DSRA covenants. These breaches constituted an event of default and could have resulted in the lender requiring immediate repayment of the amountsBond Financing Facility remained outstanding.

 

Phase I Construction Facility

 

In 2014, the Company obtained the Phase I Construction Facility, a secured Sharia compliant financing arrangement, in an aggregate amount of $84.6 million from FAB (as successor to National Bank of Abu Dhabi PJSC) to partially finance construction of Phase I. The loan hashad a notional amount of $84.6 million. During the year ended December 31, 2018, the Company drew down an additional $0.6 million from this facility. The loan was originally repayable in 48 quarterly instalments beginning 27 months after start of construction with final maturity not later than March 31, 2028 and is stated net of prepaid finance cost of $0.6 million.

 

In 2018, the Company entered into an agreement to amend the Phase I Construction Facility to provide that the facility iswould now to be repayable in 48 quarterly installments starting October 2018 with final maturity in July 2030. As amended, the facility hashad an interest rate equal to 3 month EIBOR + 3% as compared to interest at 6 month EIBOR + 3.5% previously.

 


On September 10, 2019, the Company entered into a restructuring agreement with FAB to amend the Phase I Construction Facility. As a result of the September 10th amendment, the Phase I Construction Facility became payable in 45 instalments starting October 31, 2019, with final maturity on July 30, 2030. One of the instalments of the Phase I Construction Facility included a one-time lump sum repayment of $5.7 million, which represented the cumulative instalments including interest outstanding from periods prior to this amendment of $5.5 million and an amendment fee of $0.2 million. All securities and covenants under the original Phase I Financing Facilities remained in effect under the amended agreements. Under the amended agreements, the Phase I Construction Facilities are also secured by assignment of the proceeds from operation of the tanks. In addition, theThe pre-Business Combination owners of BPGIC committed to partially pre-settle by December 31, 2019, AED 100 million ($27.2(approximately $27.2 million, — translated usingbased the exchange rate as of December 31, 2019) of the Phase I Construction Facilities from the proceeds of the Business Combination.

 

65

On December 30, 2019, BPGIC and FAB agreed to amend the Phase I Construction Facility (as defined in the Form F-4) to defer the installments due thereunder to later dates. The key changes resulting from the amendment were as follows:

 

 1.(i)an amount of $5,729,417.50 which was due on November 30, 2019 will now bebecame repayable on February 28, 2020;

 2.
(ii)an amount of $1,765,553.50 which was due on January 31, 2020 will now bebecame payable in two installments: $882,776.75 on January 31, 2020 and $882,776.75 on February 28, 2020; and

 3.
(iii)the Debt Service Reserve Accountdebt service reserve account was to be created by February 28, 2020; and

 4.
(iv)testing of the Debt Service Coverage Ratiodebt service coverage ratio covenant was to start on February 28, 2020 and was to be conducted on each subsequent due date.

 

BPGIC did not comply with the terms of the Phase I Construction Facilities, as amended, on December 30, 2019. A payment of principal and interest of $6.6 Million for the Phase I Construction Facilitymillion due on February 28, 2020 was not paid. Payments of principal and interest totaling $2.2 million for the Phase I Construction Facility due on April 30, 2020 were not made. The Debt Service Reserve Accountdebt service reserve account did not maintain a balance in an amount equivalent to one quarterly instalment including interest by February 28, 2020. BPGIC did not maintain a minimum Debt Service Coverage Ratiodebt service coverage ratio of 150% beginning on February 28, 2020. These non-payments and failures to comply with covenants were events of default, but as in the past, the lender did not declare an event of default.

 

On June 15, 2020, BPGIC entered into the June 15 Phase I Construction Facilities Amendment an agreement with its lender to amend the Phase I Construction Facilities.

Pursuant to the June 15 Phase I Construction Facilities Amendment, BPGIC and the lender agreed to a revised payment schedule for the Phase I Construction Facility that requiresrequired BPGIC to make the following payments from June 30, 2020 through December 31, 2020:

 

Date Amount
June 30, 2020 $2.99 Millionmillion
July 31, 2020 $3.62 Millionmillion
August 31, 2020 $0.14 Millionmillion
September 30, 2020 $0.14 Millionmillion
October 31, 2020 $1.01 Millionmillion
November 30, 2020 $0.14 Millionmillion
December 31, 2020 $3.87 Millionmillion
Total $11.9Million million by end of 2020

 


Thereafter, beginning on January 31, 2021 and ending on July 30, 2030, BPGIC willwas to make quarterly payments of approximately $1.77 Million

million. Testing of the Debt Service Ratio Covenant willdebt service ratio covenant was to start on December 31, 2020 and willwas to be conducted on each subsequent payment date. A Debt Service Reserve Accountdebt service reserve account containing at least 1one quarter of debt service amounts mustwas to be maintained with the lender by October 31, 2020 and at all times thereafter through the term of the Phase I Construction Facility or until BPGIC repaysrepaid all liabilities owed under the Phase I Construction Facilities. BPGIC pledged the account to the lender as security for the Phase I Construction Facilities. BPGIC, The Company and BPGIC Holdings undertook to have no other bank accounts except for the one that is the Debt Service Reserve Account until the Phase I Construction Facilities are repaid and to route all funds through the Debt Service Reserve Account. BPGIC further granted the lender a non-possessory mortgage over the Phase I Customer Agreement as security for the Phase I Construction Facilities.

Also pursuant to the June 15 Phase I Construction Facilities Amendment, BPGIC negotiated revised pricing terms as follows:

oPhase I Construction Facility: Enhanced to 6M EIBOR + 4% per annum [Minimum 5%] and to be further enhanced to 6M EIBOR + 4.5% per annum [Minimum 5%] beginning on January 1, 2021;

There iswas no change in the final maturity of Phase I Construction Facility, which iswas July 30, 2030. BPGIC willwas to pay FAB a transaction service fee of $0.14 million in connection with the June 15 Phase I Construction Facilities Amendment,.

The security granted also includes the Phase I oil storage tanks, pledges over the earnings, an assignment of contracts, and a commercial mortgage over equipment of BPGIC including oil storage tanks. The financiers are entitled to enforce their security if there is an event of default under the financing documents which is continuing.Amendment. The facility containscontained customary covenants and events of default, including covenants that may limitlimited BPGIC’s ability to incur additional indebtedness and create liens, and covenants that limitlimited BPGIC’s ability to consolidate, merge or dispose of all or substantially all of its assets.

 

On November 16 2020, the Company paid off the entire outstanding principal, interest and fees for the Phase I Construction Facility from the proceeds of the Bond Financing Facility.

66

Phase I Admin Building Facility

 

In 2017, the Company obtained the Phase I Admin Building Facility, a secured Shari’a compliant financing arrangement, in an aggregate total commitment amount of $11.1 million from FAB for the construction of an administrative building in Fujairah. The loan hashad a notional amount of AED 40.8 million. The Company drew down a total of $10.8 million on this facility during 2017. The loan was originally repayable over a maximum of 20 quarterly instalments starting after a 6six months’ grace period commencing in April 2017 and is stated net of prepaid finance cost of $0.1 million. The loan was drawn down in AED.

 

In 2018, the Company entered into an agreement to amend the Phase I Admin Building Facility. The facility is nowbecame repayable in over a maximum of 20 quarterly installments starting in October 2018 with final maturity in July 2023.As amended, the facility hashad an interest rate equal to 3 month EIBOR + 3% as compared to interest at 3 month EIBOR + 3.5% previously.

 

BPGIC did not comply with the terms of the Phase I Admin Building Facility as amended on December 30, 2019. A payment of principal and interest totaling $0.5 million for the Phase I Admin Building Facility due on April 30, 2020 was not made. The Debt Service Reserve Accountdebt service reserve account did not maintain a balance in an amount equivalent to one quarterly instalment including interest by February 28, 2020. BPGIC did not maintain a minimum Debt Service Coverage Ratiodebt service coverage ratio of 150% beginning on February 28, 2020. These non-payments and failures to comply with covenants were events of default, but as in the past, the lender did not declare an event of default.

 


On June 15, 2020, BPGIC entered into the June 15 Phase I Construction Facilities Amendment to amend the Phase I Admin Building Facilities.

 

Pursuant to the June 15 Phase I Construction Facilities Amendment, BPGIC and the lender agreed to a revised payment schedule for the Phase I Admin Building Facility that requiresrequired BPGIC to make the following payments from August 31, 2020 through December 21, 2020:

 

Date Amount
August 31, 2020 $0.14 Millionmillion
September 30, 2020 $0.14 Millionmillion
October 31, 2020 $0.41 Millionmillion
November 30, 2020 $0.14 Millionmillion
December 31, 2020 $0.80 Millionmillion
Total $1.63Million million by end of 2020

 

Thereafter, beginning on January 31, 2021 and ending on July 31, 2023, BPGIC willwas to make quarterly payments of approximately $0.54 Million.

Also pursuant to the June 15 Phase I Construction Facilities Amendment, BPGIC negotiated revised pricing terms as follows:

oPhase I Admin Building Facility: Enhanced to 3M EIBOR + 4% per annum [Minimum 5%] and to be further enhanced to 3M EIBOR + 4.5% per annum [Minimum 5%] beginning on January 1, 2021.

million. There iswas no change in the final maturity of Phase I Admin Building Facility, which iswas July 31, 2023. BPGIC willwas to pay FAB a transaction service fee of $0.14 million in connection with the June 15 Phase I Construction Facilities Amendment.

The security granted also includes the Phase I oil storage tanks and the administrative building, an assignment of rental income generated from our administrative building in Fujairah, an advance payment guarantee and a performance guarantee. The financiers are entitled to enforce their security if there is an event of default under the financing documents which is continuing. The facility containscontained customary covenants and events of default, including covenants that limitlimited BPGIC’s ability to incur additional indebtedness and create liens, and covenants that limitlimited BPGIC’s ability to consolidate, merge or dispose of all or substantially all of its assets and enter into transactions with affiliates.

 

On November 16 2020, the Company paid off the entire outstanding principal, interest and fees for the Phase I Admin Building Facility from the proceeds of the Bond Financing Facility.

Phase I Short Term Financing Facility

 

In 2018, the Company obtained the Phase I Short Term Financing Facility, a secured Shari’a compliant financing arrangement, with the bankFAB to settle accrued interest on the Phase I Construction Facility in an aggregate amount of $3.5 million. The loan iswas denominated in UAE currency and iswas notionally AED 13.0 million in amount. The new LME Murabaha facility carriescarried interest at 1 month EIBOR + 2% margin and iswas repayable in 15 equal monthly installments commencing from date of disbursement. The security granted includes the security granted for the Phase I Construction Facility, the Phase I Admin Building Facility. The financiers are entitled to enforce their security if there is an event of default under the financing documents which is continuing. The facility containscontained customary covenants and events of default, including covenants that limitlimited BPGIC’s ability to incur additional indebtedness and create liens, and covenants that limitlimited BPGIC’s ability to consolidate, merge or dispose of all or substantially all of its assets and enter into transactions with affiliates. This facility was fully paid as of December 31, 2019.

 

86

67

 

Phase II Financing Facility

During the year 2018, the Company obtained the Phase II Financing Facility, a secured facility from a commercial bank in the UAE amounting to $95.3 million (AED 350.0 million) to partially finance the construction of Phase II. The new facility carried interest at 3 month EIBOR + 3% margin.

Under the Phase II Financing Facility, the Company was subject to certain covenants requiring, among other things, the maintenance of (i) a minimum facility service coverage ratio of 1.25:1, (ii) a participations to value ratio not exceeding 1.50:1 at all times, (iii) a participations to cost ratio not exceeding 57% at any date, and (iv) an amount equivalent to one instalment including interest in a facility service reserve account at all times or, in the event of an initial public offering, an amount equivalent to the next two instalments including interest.

The Company did not make any drawdowns on the Phase II Financing Facility and cancelled the facility in 2020, subsequent to the issuance of bonds under the Bond Financing Facility.

Bond Financing Facility

During September 2020, as part of the Bond Financing Facility, BPGIC issued bonds of $200 million to private investors with a face value of $1 and an issue price of $0.95. The issuance has a maximum size of $250.00 million, which includes the option for a tap issue of an additional $50.00 million subject to certain conditions. The proceeds of the Bond Financing Facility were used to repay the Phase I Financing Facilities, fund capital project for Phase II, repay the promissory note payable to Early Bird Capital, pre-fund the Liquidity Account and for general corporate purposes. As of December 31, 2020, the Bond Financing Facility is the only outstanding financial debt in the Company’s books.

The principal repayment of the Bond Financing Facility will be semi-annual payments of $7 million starting in September 2021 until March 2025, and one bullet repayment of $144 million in September 2025. The bonds bear interest at 8.5% per annum, payable along with the principal installments.

The financial covenants stipulated by the Bond Financing Facility documents are as follows:

(i)

Minimum Liquidity of $8,500,000 in the Liquidity Account at BPGIC FZE level.

(ii)Leverage Ratio to be maintained at (x) less than or equal to 5.5 times at December 31, 2020, (y) less than or equal to 3.5 times at December 31, 2021, and (z) 3.0 times thereafter at BPGIC FZE level.

(iii)Positive Working Capital at BPGIC FZE level.

(iv)Minimum Equity Ratio of 25% at Group level.

As at December 31, 2020, the Company maintained liquidity at $8.5 million and its leverage ratio was 4.9 times, as compared to upper limit of 5.5 times. As at December 31, 2020, the Company had a positive working capital of $29.6 million and the Company’s equity ratio was 29.7%, as against required 25%. Accordingly, as at December 31, 2020, the Company was in compliance with all of the above-listed financial covenants.

Note on Going ConcernBreach of Covenants for 2018

Under the Phase I Financing Facilities, the Company was subject to certain covenants requiring among other things, the maintenance of (i) a minimum debt service coverage ratio of 150% at all times, with a decrease of the ratio to 120% or less constituting an event of default, and (ii) an amount equivalent to one quarterly instalment including interest in a debt service reserve account at all times.

 

As of December 31, 2018, the Company did not maintain a debt service reserve account and was not in compliance with the minimum debt service coverage ratio resulting in a breach of the debt covenants requirement described above. Even though the lender did not declare an event of default, these breaches constituted an event of default and could have resulted in the lender requiring immediate repayment of the loans. As a result of this non-compliance, and in accordance with guidance related to the classification of obligations that are callable by the lender, the December 31, 2018 statement of financial position classifies all of the Company’s bank loans as current liabilities.

68

Note on Going Concern

Year Ended December 31, 2019

As of December 31, 2018, the Group had not paid USD 3.7$3.7 million of principal and accrued interest that was due under the Group’s Phase I Financing Facilities. Also, as of December 31, December 2018, the Group was not in compliance with its debt covenants, including the debt service coverage ratio contained in the Group’s Phase I Financing Facilities. Even though the lender did not declare an event of default under the loan agreements, these breaches constituted events of default and could have resulted in the lender requiring immediate repayment of the loans. Accordingly, as of December 31, December 2018, the Group has classified its debt balance of USD 94.8$94.8 million as a current liability.

 

On September 10, September 2019 and again on December 30, December 2019, the Group entered into agreements with its lender to amend the Phase 1 Financing Facility such that on December 31, December 2019, the Group was in compliance with the amended facility agreement. At December 31, December 2019, the Group’s current liabilities exceeded its current assets by USD 57$72.7 million.

 

Subsequent to the year end,December 31, 2019, the Group defaulted on its commitments under its term loans and the Group was not in compliance with its debt covenants, including the debt service coverage ratio contained in the Group’s loan agreement. Even though the lender did not declare an event of default under the loan agreements, these breaches constituted events of default and could have resulted in the lender requiring immediate repayment of the loans.

 

On 15 June 2020, the Group entered into an agreement with its lender to amend its Phase I Financing Facilities (note 15).Facilities. The Group will havewas to pay principal and accrued interest of USD 8.8$8.8 million in 2020 which representsrepresented the cumulative instalments including interest outstanding from periods prior to this amended agreement and an amendment fee of USD 136,000. Term loan (1)$136,000. The Phase I Construction Facility and Term loan (2) is nowPhase I Admin Building Facility became payable in 46 and 16 instalments, respectively, starting 30 June 2020 with final maturity on 31 July 2030 and 31 July 2023, respectively.

 

During 2018, the Group signed a sales agreement for phase 2Phase II to provide storage and ancillary services to an international commodity trading company, which was novated to a new party during the year. Phase 2II operations arewere scheduled to start in fourth quarter of 2020 and management expectsexpected that this will generate significant operating cash flows. On October 15, 2018, the Group entered into the Phase II Financing Facility to fund a portion of the capital expenditure in respect of Phase II. The Group is in receipt of a loan facility letter date 15 October 2018 from a lender. The Group intendsexpected to draw down from this facilitythe Phase II Financing Facility to finance the payments due to the Phase II contractor in respect of Phase 2 construction in the third quarterThird Quarter of 2020. The Group’s ability of the Group to draw down on this facility isthe Phase II Financing Facility was contingent upon a number of conditions agreed in the facility letter which will need to be assessed and approved by the bank prior to the disbursement of funds.conditions.

 

Based on the above, noted, management has considered the going concern status of the Group and believesbelieved there to be a material uncertainty that castscast significant doubt upon the Group’s ability to continue as a going concern. Based on management’s forecasts the capital expenditure requirements for phase 2Phase II and debt servicing as described above willwas to be funded by cash generated through the ongoing operations and further drawdowns from approved loan facilities. The Group’s management acknowledgeManagement acknowledged that there is a risk that the quantum and timing of cash flows may not be achievable in line with the twelve months forecasts from the date of approval of the Group’s financial statements. Accordingly, there iswas significant doubt that the Group willwould be able to pay its obligations as they fallbecame due and this significant doubt iswas not alleviated by management’s plans.

 

Year Ended December 31, 2020

During the year ended December 31, 2020, the Group earned a net profit of $17.2 million and generated positive cash flows of $28.1 million. Further, as at that date, and it had cash balances of $47.9 million.

In September 2020, BPGIC issued bonds under the Bond Financing Facility. The Group settled its outstanding term loans using the proceeds of the Bond Financing Facility, and will utilize the remainder of the proceeds of the Bond Financing Facility to fund Phase II construction and for general corporate purposes. Management forecasts that the existing cash balances as well as cash generated from ongoing operations provide sufficient liquidity to the Group to continue in operations for the foreseeable future. Management is currently evaluating various options regarding funding of its Phase III construction.

In view of the above, management has prepared the consolidated financial statements have been prepared assuming that the Group will continue as a going concern. Accordingly, the consolidated financial statements do not include any adjustments relating to the recoverability and classification of recorded asset amounts, the amounts and classification of liabilities, or any other adjustments that might result in the event the Group is unable to continue as a going concern.

 

87

69

Phase II Financing Facility

During the year 2018, the Company obtained a new facility, the Phase II Financing Facility, from a commercial bank in the UAE amounting to $95.3 million (AED 350.0 million) to partially finance the construction of Phase II. The new facility carries interest at 3 month EIBOR + 3% margin.

The Phase II Financing Facility is secured by a mortgage on the Phase II storage tanks, step-in right to the leased land and assignment of the proceeds from operation of the tanks and insurance policies. The term loan is also secured by guarantees from Al Brooge Capital providing for Oil and Gas LLC and Emirates Investment LLC FZC.

Under the Phase II Financing Facility, the Company is subject to certain covenants requiring amongst other things, the maintenance of (i) a minimum facility service coverage ratio of 1.25:1, (ii) a participations to value ratio not exceeding 1.50:1 at all times, (iii) a participations to cost ratio not exceeding 57% at any date, and (iv) an amount equivalent to one instalment including interest in a facility service reserve account at all times or in the event of an initial public offering, the amount should be equivalent to the next two instalments including interest. The facility service coverage ratio is calculated as revenues minus expenses from the Phase II storage tanks divided by the current debt commitments on the Phase II Financing Facility including interest. The participations to value ratio at any date is calculated as total debt commitments on the Phase II Financing Facility as of that date divided by the most recent valuation of the Phase II storage tanks. The participations to cost ratio at any date is calculated as the total debt commitments on the Phase II Financing Facility as of that date as a percentage of the sum of actual constructions costs plus project expenses paid as of that date on the Phase II storage tanks.

The Phase II Financing Facility includes an initial condition precedent that requires evidence of initial equity contribution by the Company towards the Phase II storage tanks before the loan facility can be utilized. The Company has not made any drawings on the Phase II Financing Facility as of the date of issuance of these financial statements.

 

TREND INFORMATION

 

StableStability of Revenue &and Margins

 

The Company began operation of the Phase I facility in December 2017 at reduced capacity while management undertook tests of the facility. As a result, the Phase I facility did not begin operating at full capacity or performing ancillary services until April 2018. Since the Phase I facility became fully operational, BPGIC’sthe Company’s revenue, and revenue split between storage fees and ancillary services fees, have been relatively stable. This stability is largely attributable to the fixed storage fees, and relatively stable usage history we have experienced from our Initial Phase I End User. As a result, since commencing full operations from April 2018 through December 2019,2020, the companyCompany has operated at fairly stable margins, averaging around 50.0%37.3% net margin in absence of onetime Non-cashone-time non-cash listing expenses.

 

Management expects the Company’s operating margins to remain stable until the commencement of operations byat the proposed BIA Refinery and the Phase II facility. In both cases, management anticipates margins will increase over a short period and then remain stable again at the higher levels.

 

DiversifyDiversification of Operations and ReduceReduction of Customer Concentration

Until April 2020, BIA was the Group’s only customer, and the Group was reliant on it for all of its revenues. For the year ended December 31, 2018, the Initial Phase I End User accounted for 100 percent of the Group’s revenues. For the year ended December 31, 2019, the Initial Phase I End User and BIA collectively accounted for 100 percent of the Group’s revenues.

 

In March 2019, BPGIC partnered with Sahara to developApril and operate a modular refinery within the BPGIC Terminal with minimal capital expenditure by BPGIC. Under the terms of the parties agreement, Sahara would finance and arrange the development, construction and commissioning of a modular refinery capable of supplying IMO 2020 compliant 0.5% sulphur content shipping fuel with initial production capacity of 24,000 b/d.


In February 2020, BPGIC and Sahara mutually agreed to discontinue their joint development project to install a modular oil refinery at BPGIC’s terminal. Shortly thereafter, BPGIC entered into the Refinery Agreement, a new agreement with BIA which provides that the parties will use their best efforts to finalize the technical and design feasibility studies for the BIA Refinery, a refinery with a capacity of 25,000 bpd operated by BPGIC. The parties further agreed to negotiate, within 30 days, the Refinery Operations Agreement, a sublease agreement and a joint venture agreement to govern the terms on which (i) BPGIC will sublease land to BIA to locate, (ii) BIA will construct, and (iii) BPGIC will operate the refinery. The parties subsequently agreed to extend the deadline for their negotiation of the Refinery Operations Agreement to August 4, 2020. Once operational, the BIA Refinery will diversify operations.

In May 2020, BIA agreed to release an aggregate of 129,000 m3 of the Phase I capacity, amounting to approximately one third of the total Phase I capacity, back to BPGIC. This release expires in May 2021. In December 2020 and February 2021, BIA agreed to release an additional aggregate of 270,324, being the remainder of the total Phase I capacity, back to BPGIC. These releases end on dates ranging from June 2021 to August 2021, subject to an additional extension for six months in each case.

Pursuant to the Super Major Agreement, BPGIC leased thisthe 129,000 m3 capacity to the Super Major. The Super Major is required to pay a monthly fixed storage fee to lease its storage capacity at Phase I. The Super Major paid the storage fee for the initial six month term of the Super Major Agreement up front. The Super Major Agreement iswas renewable for an additional six months with the mutual agreement of the parties. TheIn November 2020, the Super Major Agreement was not renewed by mutual agreement. From November 2020 till March 2021, the Company entered into the nine Commercial Storage Agreements with the Storage Customers, eight of which agreements are still in effect. The Company has reduced someleased the entirety of the Phase I capacity released back to it to the existing Storage Customers pursuant to the eight Commercial Storage Agreements. These eight Commercial Storage Agreements have much higher monthly fixed storage fees compared to the Super Major Agreement, which will increase the Company’s fixed revenues by 40% to 45% and at the same time mitigate the risk of concentration. In addition, the Company has recently received further enquiries for storage, and has been evaluating such enquiries with a view towards further mitigating or eliminating its customer concentration risk andat the Company will look to further diversify its customer base going forwardend of renewed tenors.

 

While the terms of the Refinery Operations Agreement are still under negotiation, the Group currently expects the BIA Refinery to commence operations in the First Quarter of 2022. The Group expects that the BIA Refinery, once operational, will diversify the operations.

Completion of Phase II

 

The Company expects the construction of Phase II to be completed in 2020.by the end of the Second Quarter of 2021. The Company plans to focus Phase II’s operations primarily on the storage and blending of crude oil and thereby capitalize on the demand for crude oil storage. The Company expects to generate additional revenues and expenses in connection with Phase II’s operations. Similar to the commencement of operations for Phase I, the Company may initially commence operations of Phase II in accordance with certain required safety measures and ramp up utilization of its storage capacity and ancillary services over time to mitigate any potential operational risks. This would impact the amount of storage and ancillary service fees the Company would earn during the first quarter of operations under the Phase II Customer Agreement.operations.

 

Contractual Obligations

As of December 31, 2019 Total  <1 year  1-3 years  3-5 years  >5 years 
Contractual Obligations  -   -   -   -   - 
Term Loans  89,257,873   14,542,038   18,432,856   15,732,897   40,550,082 
Lease Payments  225,749,200   2,359,590   4,861,699   5,058,111   213,469,800 
Total  312,741,809   14,636,364   23,294,555   20,791,008   254,019,882 

Off Balance Sheet Commitments and Arrangements

The Company does not have any off balance sheet commitments and arrangements.

Inflation

Inflation in the UAE has not materially affected our results of operations in recent years. Although we have not been affected by inflation in the past, we may be affected if any of the countries in which we do business now, or in the future, experience high rates of inflation.

Environmental, Health and Safety

 

OurThe Company’s operations are subject to extensive international, federal, state and local environmental laws and regulations, in the UAE, including those relating to the discharge of materials into the environment, waste management, remediation, the characteristics and composition of fuels, climate change and greenhouse gases. OurThe Company’s operations are also subject to extensive health, safety and security laws and regulations, including those relating to worker and pipeline safety, pipeline and storage tank integrity and operations security. Because more stringent environmental and safety laws and regulations are continuously being enacted or proposed, the level of expenditures required for environmental, health and safety matters is expected to increase in the future.

The Company doesdid not have any exposure to environmental matters as of and for the years ended December 31, 2020, 2019 and December 31, 2018

89

Contingencies

We2018. However, because more stringent environmental and safety laws and regulations are not subjectcontinuously being enacted or proposed, the Company expects the level of expenditures required for environmental, health and safety matters to any loss contingencies as we do not have any claims or any ongoing disputes or legal suits with any ofincrease in the parties. Hence we believe that there would not be any material adverse effect on our results of operations, financial position or liquidity of the company as on any of the period ends in discussion nor in future.

 

RELATED PARTY TRANSACTIONS

70

 

Upon consummation of the Business Combination, the board of directors adopted a code of ethics and business conduct that requires it, and its directors, officers and employees to avoid conflicts of interest, such as related party transactions, unless specifically authorized. The board of directors also adopted a related party transaction policy to govern the procedures for evaluation and authorization of related party transactions. Related party transactions, which require approval of the audit committee, are defined as any transaction, arrangement or relationship, or any series of similar transactions, arrangements or relationships, in which (i) the Group is or will be a participant, (ii) the aggregate amount involved will or may be expected to exceed $120,000 in any fiscal year, and (iii) any related party has or will have a direct or indirect interest. This also includes any material amendment or modification to an existing related party transaction.

The audit committee is responsible for reviewing and approving related party transactions to the extent the Company contemplates engaging in such a transaction. The audit committee will review all of the relevant facts and circumstances of all related party transactions that require its approval and either approve or disapprove of the entry into the related party transaction. The audit committee will approve the related party transaction only if it determines in good faith that, under all of the circumstances, the transaction is in the best interests of the Company and its shareholders. The audit committee, in its sole discretion, will impose such conditions as it deems appropriate on the Company or the related party in connection with the approval of the related party transaction. No director will be permitted to participate in the discussions or approval of a transaction in which he or she is a related party, but that director will be required to provide all material information concerning the related party transaction to the audit committee.

Transactions with related parties

Movements in shareholders’ account are as follows

  2019  2018 
  USD  USD 
       
Contributions by the shareholders  77,090,648   951,539 
         
Amounts paid on behalf of the Group by the shareholders*  1,135,484   7,850,431 
         
Amounts paid by the Group on behalf of the shareholders  (1,647,064)  (2,296,354)
         
Distributions to shareholders  (53,279,016)  (29,209,289)
         
   23,300,052   (22,703,673)

These amounts are repayable at the discretion of the Board of Directors of the Group and are interest free, therefore classified as part of equity.

*These include expenses paid on behalf of the Group which includes other operational expenses paid by the shareholders on behalf of the Group.


Changes in shareholders’ account is as follows:

  2019  2018 
  USD  USD 
       
At 1 January  47,717,763   70,421,436 
Net  contributions (distributions) during the year  23,300,052   (22,703,673)
         
At 31 December  71,017,815   47,717,763 

Movements in Other related parties are as follows:

  2019  2018 
  USD  USD 
       
Expenses paid on behalf of related parties (note 10)  57,550   - 

Due from related parties:

 HBS Investments LP (shareholder)13,388-
  H Capital International LP (shareholder)11,056-
  O2 Investments Limited as GP (shareholder)6,181-
  SBD International LP (shareholder)13,760-
  SD Holding Limited as GP (shareholder)6,984-
  Gyan Investments Ltd (shareholder)6,181-
57,550-

Key management remuneration for the year ended 31 December 2019 amounted to USD 1,160,293 (2018: USD 677,291), charged to consolidated statement of comprehensive income (within profit and loss). The full amount of the key management remuneration relates to short term employment benefits.

See the section titled “Item 7. Major Shareholders and Related Party Transactions¾Certain Relationships And Related Party Transactions — BPGIC Related Person Transactions and Policies” for information concerning other related party transactions in which BPGIC has participated.


OTHER RISK DISCLOSURES

A.Market Risk Disclosures

The main risks arising from the Company’s financial instruments are capital risk, interest rate risk, credit risk, currency risk and liquidity risk. The Senior Management team reviews and agrees policies for managing each of these risks which are summarized below.

B.Capital Risk

The Company’s objective when managing capital is to safeguard its ability to continue as a going concern in order to provide returns for holders of Ordinary Shares and benefits for other stakeholders and to maintain an optimal capital structure to reduce the cost of capital.

The Company’s capital structure consists of shareholders’ equity and debt, which as disclosed in the audited financial information for the period ended December 31, 2019 includes the borrowings under the Financing Facilities while excluding derivative financial liabilities.

Consistent with others in the industry, the Company monitors its debt levels including covenants contained within the Financing Facilities.

C.Interest Rate Risk

Interest rate risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because of changes in market interest rates.

The Group’s exposure to the risk of changes in market interest rates relates primarily to the Group’s balances with banks and interest bearing loans and borrowings at variable rates.TABULAR DISCLOSURE OF CONTRACTUAL OBLIGATIONS

 

The following table demonstrates the sensitivity to a reasonably possible change in interest rates, with other variables held constant,sets forth our contractual obligations as of the Group’s profit for one year corresponding to the impact of the floating rate borrowings for one year. The effect of the interest rate swap has been excluded from the sensitivity as the Group does not apply hedge accounting.December 31, 2020:

 

Effect on
profit
USD
2019
+40 increase in basis points347,971
-40 decrease in basis points(347,971)
2018
+40 increase in basis points(381,713)
-40 decrease in basis points381,713


D.Credit Risk

  Payments Due By Period 
  Total  <1 year  1-3 years  3-5 years  >5 years 
Contractual Obligations                    
Term Loans / Bonds  274,290,000   24,000,000   86,752,500   163,537,500   - 
Lease Payments  904,627,665   10,708,721   17,582,591   18,292,928   858,043,425 
Total  

1,178,917,665

   34,708,721   104,335,091   181,830,428   858,043,425 

 

Credit risk is the risk that one party to a financial instrument will fail to discharge an obligation and cause the other party to incur a financial loss. The Group is exposed to credit risk on bank balances and receivables as reflected in the consolidated statement of financial position, with a maximum exposure equal to the carrying amount of these instruments. The expected credit loss on trade and other receivables are considered insignificant for 2019 and 2018.

The Group has a low credit risk exposure on its trade receivables based on established policy, procedures and controls relating to customer credit risk management. Credit quality of the customer is assessed as part of contract negotiations. Outstanding receivables are regularly monitored. The Group has only one customer as at 31 December 2019 (31 December 2018: one customer).

E.Currency RiskOFF BALANCE SHEET COMMITMENTS AND ARRANGEMENTS

 

The Company does not have any significant exposure to currency risk as most of its contracts, cash activitiesoff balance sheet commitments and financing arrangements are denominated in $ or AED, which is the currency of the UAE and pegged to the $.arrangements.

CRITICAL ACCOUNTING POLICIES AND CRITICAL ACCOUNTING ESTIMATES

 

F.Liquidity Risk

The Group monitors its risk to a shortage of funds using a recurring liquidity planning tool. This tool considers projected financing requirements of the Group during the construction phase and cash projections from operations with outstanding bank facilities and outstanding bank commitments as defined under the finance documents.

The Group manages its liquidity risk in relation to term loans to ensure compliance with all covenants for each specific facility. Refer note 2.2 for further details.


The table below summarizes the maturity profile of the Group’s financial liabilities at 31 December 2019 and 31 December 2018 based on contractual undiscounted payments.

  On  Less than  3 months  1 to 5       
  demand  3 months  to 1 year  years  > 5 years  Total 
  USD  USD  USD  USD  USD  USD 
                   
31 December 2019                  
                   
Term loans (including accrued interest)  -   8,101,006   9,178,414   34,165,752   40,550,347   91,995,519 
                         
Lease liability  -   2,359,590   -   9,919,810   213,469,799   225,749,199 
                         
Derivative financial instruments  -   -   1,518,249   -   -   1,518,249 
                        
Accounts payable, accruals and other payables (excluding accrued interest)  -   26,350,143   31,469,596   -   -   57,819,739 
                         
Total  -   36,810,739   42,166,259   44,085,562   254,020,146   377,082,706 
                         
31 December 2018                        
                         
Bank overdraft  3,745,048   -   -   -   -   3,745,048 
                         
Term loans (including accrued interest)  95,702,779   -   -   -   -   95,702,779 
                         
Lease liability  -   2,313,323   -   9,725,304   216,023,896   228,062,523 
                         
Derivative financial instruments  -   -   1,190,073   -   -   1,190,073 
                         
Accounts payable, accruals and other payables (excluding accrued interest)  -   2,120,877   5,972,230   -   -   8,093,107 
                         
Total  99,447,827   4,434,200   7,162,303   9,725,304   216,023,896   336,793,530 

Refer to section on Going Concern for further details on Company’s loan arrangements


G.Operations Risk

The Company’s operations and assets are insured under an insurance program administered by Lockton Insurance Brokers - Dubai, an insurance broker. The program covers the Phase I facilities and related assets, and the liabilities of the Phase I operations and the Company. The major elements of this program are property damage, business interruption, terrorism and political violence, worker’s compensation, environmental liability, employer liability, directors’ and officers’ liability insurance, personal injury and third-party liability, including that of terminal operators. The Company additionally maintains local insurance, including healthcare and other insurance required by the Company’s jurisdiction.

Premiums are allocated based on the insured values, history of claims and type of risk. Management believes that the amount of coverage provided is comprehensive and appropriate for the Company’s type of business and meets the standard requirements to comply with all statutory requirements.

Critical Accounting Policies

 

Management’s discussion and analysis of our results of operations and liquidity and capital resources are based on our audited financial information. Our audited financial statements have been prepared in accordance with IFRS. We describe our significant accounting policies in Note 22.6 - Significant Accounting Policies,Estimates and Judgements, of the Notesnotes to Financial Statementsthe financial statements included in this report.Report. Of particular significance are the following policies:

 

Business combinations

 

A ‘reverse acquisition’ is a business combination in which the legal acquirer - i.e. the entity that issues the securities (i.e. listed entity) becomes the acquiree for accounting purposes and the legal acquiree becomes the acquirer for accounting purposes. It is the application in accordance with IFRS 3 Business Combinations on identifying the acquirer, which results in the identification of the legal acquiree as the accounting acquirer in a reverse acquisition. Application in accordance with IFRS 3 Business Combinations on identifying the acquirer may result in identifying the listed entity as the accounting acquiree and the unlisted entity as the accounting acquirer.

 


In this case, if the listed entity is:

 

A business, IFRS 3 Business Combinations applies;

 

Not a business, IFRS 2 Share-based Payment applies to the transaction once the acquirer has been identified following the principles in accordance with IFRS 3 Business Combinations.

 

As the reverse acquisition of the Company did not constitute a business combination, the transaction was accounted for as an asset acquisition by the issuance of shares of the Company, for the net assets of the CompanyTwelve Seas and its public listing. Accordingly, the transaction had been accounted for at the fair value of the equity instruments granted to the shareholders and warrant holders of the Company.Twelve Seas.

 

Management applied the following primary judgments in accounting for the reverse acquisition:

 

1.(i)BPGIC was assessed as the accounting acquirer due to majority shareholding and representatives on the board of directors.

 

2.(ii)The accounting acquiree is not a business and not in scope of IFRS 3.

 

3.(iii)The acquisition has been accounted for in terms of IFRS 2, which is aligned to guidance issued by the IFRIC. The difference between the fair value of the consideration paid and the fair value of the net assets acquired.acquired has been recognised in profit and loss. Refer to note 2.52.6 (iii) of Financial Statements.the financial statements included in this Report.

 

4.(iv)Fair value of ordinary shares issued: Refer to note 2526 of Financial Statements.the financial statements included in this Report.

 

5.(v)The fair value of the shares in escrow is not materially different from that of the shares which are not in escrow as the rights of these shares are similar to those of “normal ordinary shares”. Fair value of the shares in escrow: Refer to note 2526 of Financial Statements.the financial statements included in this Report.

 

6.(vi)Fair value of warrants issued: Refer to note 1314 of Financial Statements.the financial statements included in this Report.

 

7.(vii)Deemed share issue has been presented in the financing activities in the Statement of Cash Flows.

 

71

Revenue recognition

 

The Company generates revenue by charging feesRevenue from contracts with customers is recognized when control of the goods or services are transferred to the customer at an amount that reflects the consideration to which the Group expects to be entitled in exchange for thethose services or goods. Revenues excludes amounts collected on behalf of third parties and are net of discounts and value added taxes. Monthly storage throughputrates and handling of fuel oil and clean products for its sole customer. Additional revenue is generated by charging feesprices for other ancillary services (excess throughput, heating, blendingare contractually agreed before the services are rendered and other services).do not contain material variable components. When it is probable that the future economic benefits will flow to the Group, the recognition in the consolidated statement of income is in proportion to the stage of the rendered performance as at the end of the reporting period. The Group has a right to a consideration from a customer in an amount that corresponds directly with the value to the customer of the entity’s services completed to date.

 

The contract contains a lease and a service component. The lease component is accounted for under IFRS 16 and the service component is accounted for under IFRS 15. The contract has aTank storage rentals, including minimum fixed monthly payment for both the lease and non-lease service components. The fixed consideration is allocated to the lease and service components based on their relative stand-alone selling price, which is based on an analysis of lease-related and service-related costs for the contract, adjusted for representative profit margins. The lease component isguaranteed throughputs, are recognized on a straight-line basis over the term ofcontractual period during which the initialservices are rendered. Revenues from excess throughputs, heating/cooling, homogenization, product movements and other services are recognized when these services are rendered. Customers simultaneously consume and benefit from the services at the moment that these are rendered, resulting in a situation where revenue is recognized over time. Where substantially the entire storage capacity is leased to a single customer, the contract contains a lease and the service componententire storage revenue is recognized over timepresented as the customer simultaneously receives and consumes the benefits provided by the Company’s performance. The contract also contains variable elementslease revenue.

Storage fees are mostly invoiced upfront in the form ofmonth preceding the month to which the storage fees relate. Handling and other ancillary services. Revenue from the variable element of the contract is recognizedservices are generally invoiced afterwards, based on the actual volumes transported, stored and processed in the period in which the services are provided. These servicesusage. Invoices are generally billedpaid by customers at relatively short notice in agreement with the month afterpayment terms of the services are performed.contracts.

96

Borrowing costs

 

Borrowing costs directly attributable to the acquisition, construction or production of qualifying assets, which are assets that necessarily take a substantial period of time to get ready for their intended use or sale, are added to the cost of those assets, until such time as the assets are substantially ready for their intended use or sale.

 

Investment income earned on the temporary investment of specific borrowings pending their expenditure on qualifying assets is deducted from the borrowing costs eligible for capitalization.

 

All other borrowing costs are recognized in the statement of comprehensive income (within profit and loss) in the period during which they are incurred.

Property, plant and equipment

 

Property, plant and equipment are stated at cost less accumulated depreciation and accumulated impairment losses, if any. Capital work under progress is stated at cost and subsequently transferred to assets when it is available for use. Cost of an item of property plant and equipment comprises its acquisition cost including borrowing cost and all directly attributable costs of bringing the asset to working condition for its intended use. Such cost includes the cost of replacing part of the plant and equipment when that cost is incurred, if the recognition criteria are met. Likewise, when a major inspection is performed, its cost is recognized in the carrying amount of the plant and equipment as a replacement if the recognition criteria are satisfied. All other repair and maintenance costs are recognized in the statement of comprehensive income (within profit and loss) as incurred. Depreciation is computed using the straight-line method based on the estimated useful lives of assets as follows:

 

Buildings 25 years
Tanks 50 years
Installation (Pipeline, pumps and other equipment) 20 – 25 years
Other equipment 5 years
Right-of-use asset – Land 60 years

 

72

The assets’ residual values and useful lives are reviewed and adjusted if appropriate, at each financial year end to determine whether there is an indication of impairment. If any such indication exists, an impairment loss is recognized in the statement of comprehensive income (within profit and loss). For the purpose of assessing impairment, assets are grouped at the lowest levels for which there are separately identifiable cash flows (cash generating units).

 

The carrying amounts are reviewed at each reporting date to assess whether they are recorded in excess of their recoverable amounts, and where carrying values exceed this estimated recoverable amount, assets are written down to their recoverable amount, being the higher of their fair value less costs to sell and their value in use.

 

An item of property, plant and equipment is derecognized upon disposal or when no future economic benefits are expected from its use or disposal. Any gain or loss arising on derecognition of the asset (calculated as the difference between the net disposal proceeds and the carrying amount of the asset) is included in the statement of comprehensive income (within profit and loss) in the year the asset is derecognized.

97

Leasing

 

At inception of a contract, the Company assesses whether the contract is, or contains, a lease. A contract is, or contains, a lease if the contract conveys the right to control the use of an identified asset for a period of time in exchange for consideration.

 

For a contract that is, or contains, a lease, the Company accounts for each lease component within the contract as a lease separately from non-lease components of the contract.

 

The Company determines the lease term as the non-cancellable period of a lease, together with both:

 

a)(i)periods covered by an option to extend the lease if the lessee is reasonably certain to exercise that option; and

 

b)(ii)periods covered by an option to terminate the lease if the lessee is reasonably certain not to exercise that option.

 

In assessing whether a lessee is reasonably certain to exercise an option to extend a lease, or not to exercise an option to terminate a lease, the Company considers all relevant facts and circumstances that create an economic incentive for the lessee to exercise the option to extend the lease, or not to exercise the option to terminate the lease. The Company revises the lease term if there is a change in the non-cancellable period of a lease.

 

Company as a lessor

 

Leases where the Company does not transfer substantially all the risks and benefits of ownership of the asset are classified as operating leases. Initial direct costs incurred in negotiating an operating lease are added to the carrying amount of the leased asset and recognized over the lease term on the same bases as rental income. Contingent rents are recognized as revenue in the period in which they are earned.

 

Company as a lessee

 

For a contract that contains a lease component and one or more additional lease or non-lease components, the Company allocates the consideration in the contract to each lease component on the basis of the relative stand-alone price of the lease component and the aggregate stand-alone price of the non-lease components.

 

The relative stand-alone price of lease and non-lease components is determined on the basis of the price the lessor, or a similar supplier, would charge an entity for that component, or a similar component, separately. If an observable stand-alone price is not readily available, the Company estimates the stand-alone price, maximising the use of observable information.

 

For determination of the lease term, the Company reassesses whether it is reasonably certain to exercise an extension option, or not to exercise a termination option, upon the occurrence of either a significant event or a significant change in circumstances that:

 

a)(i)is within the control of the Company; and

 

b)(ii)affects whether the Company is reasonably certain to exercise an option not previously included in its determination of the lease term, or not to exercise an option previously included in its determination of the lease term.

 

At the commencement date, the Company recognises a right-of-use asset classified within property, plant and equipment and a lease liability classified separately on the statement of financial position.

 


73

Short-term leases and leases of low-value assets

 

The Company has elected not to recognise right-of-use assets and lease liabilities for short-term leases that have a lease of 12 months or less and leases of low-value assets of $5,000 or less when new. The Company recognises the lease payments associated with these leases as an expense on a straight-line basis over the lease term.

 

Right-of-use assets

 

The right-of-use asset is initially recognized at cost comprising of:

 

a)(i)the amount of the initial measurement of the lease liability;

 

b)(ii)any lease payments made at or before the commencement date, less any lease incentives received;

 

c)(iii)any initial direct costs incurred by the Company; and

 

d)(iv)an estimate of costs to be incurred by the Company in dismantling and removing the underlying asset, restoring the site on which it is located or restoring the underlying asset to the condition required by the terms and conditions of the lease. These costs are recognized as part of the cost of the right-of-use asset when the Company incurs an obligation for these costs. The obligation for these costs is incurred either at the commencement date or as a consequence of having used the underlying asset during a particular period.

 

After initial recognition, the Company amortises the right-of-use asset over the term of the lease. In addition, the right of use asset is periodically reduced by impairment losses, if any, and adjusted for certain re-measurements of the lease liability.

 

Lease liability

 

The lease liability is initially recognized at the present value of the lease payments that are not paid at the commencement date. The lease payments are discounted using the interest rate implicit in the lease, if that rate can be readily determined. If that rate cannot be readily determined, the Company uses its incremental borrowing rate.

 


After initial recognition, the lease liability is measured by (a)(i) increasing the carrying amount to reflect interest on the lease liability; (b)(ii) reducing the carrying amount to reflect the lease payments made; and (c)(iii) remeasuring the carrying amount to reflect any reassessment or lease modifications or to reflect revised in-substance fixed lease payments.

 

Where, (a)(i) there is a change in the lease term as a result of the reassessment of certainty to exercise an option, or not to exercise a termination option as discussed above; or (b)(ii) there is a change in the assessment of an option to purchase the underlying asset, assessed considering the events and circumstances in the context of a purchase option, the Company remeasures the lease liabilities to reflect changes to lease payments by discounting the revised lease payments using a revised discount rate. The Company determines the revised discount rate as the interest rate implicit in the lease for the remainder of the lease term, if that rate can be readily determined, or its incremental borrowing rate at the date of reassessment, if the interest rate implicit in the lease cannot be readily determined.

 

Where, (a)(i) there is a change in the amounts expected to be payable under a residual value guarantee; or (b)(ii) there is a change in future lease payments resulting from a change in an index or a rate used to determine those payments, including a change to reflect changes in market rental rates following a market rent review, the Company remeasures the lease liabilities by discounting the revised lease payments using an unchanged discount rate, unless the change in lease payments results from a change in floating interest rates. In such case, the Company uses a revised discount rate that reflects changes in the interest rate.

 

The Company recognises the amount of the re-measurement of the lease liability as an adjustment to the right-of-use asset. Where the carrying amount of the right-of-use asset is reduced to zero and there is a further reduction in the measurement of the lease liability, the Company recognises any remaining amount of the re-measurement in the statement of comprehensive income (within profit and loss).

 


The Company accounts for a lease modification as a separate lease if both:

 

a)(i)the modification increases the scope of the lease by adding the right to use one or more underlying assets; and

 

b)(ii)the consideration for the lease increases by an amount commensurate with the stand-alone price for the increase in scope and any appropriate adjustments to that stand-alone price to reflect the circumstances of the particular contract.

 

74

Critical Accounting Estimates

 

Certain of our accounting policies require that management apply significant judgments in defining the appropriate assumptions integral to financial estimates. On an ongoing basis, management reviews the accounting policies, assumptions, estimates and judgments to ensure that our financial statements are presented fairly and in accordance with IFRS. Judgments are based on historical experience, terms of existing contracts, industry trends and information available from outside sources, as appropriate. However, by their nature, judgments are subject to an inherent degree of uncertainty, and, therefore, actual results could differ from our estimates. We describe our significant accounting policies in Note 2.5 — significant accounting estimatesSignificant Accounting Estimates and judgements,Judgements, of the Notes to Brooge Energy Limited’s Financial Statements as of December 31, 2017, 2018 and 2019financial statements included in this report.Report. Of particular significance are the following estimates:

Useful lives of property, plant and equipment

 

The Company’s management determines the estimated useful lives of itsthe Company’s property, plant and equipment for calculating depreciation. This estimate is determined after considering the expected usage of the asset or physical wear and tear and the impact of expected residual value. Management reviews the useful lives annually and the future depreciation charge would be adjusted where management believes that the useful lives differ from previous estimates. The depreciation period of the right-of-use asset has been determined to be over the lease term on the basis that the land is expected to be used for the whole period of the lease considering the existing assets and future expansion on the land.

Discount rate used for initial measurement ofOperating lease liabilitycommitments – Group as a lessee

 

The Company,Group has entered into a land lease agreement, the Phase III Land Lease, dated as of February 2, 2020 (the “lease inception date”), for a lessee, measuresrent of UAE Dirhams 50 ($13.61) per square meter per annum with an escalation of 2% per annum. Rental payments commence from the lease liability at the present valuebeginning of the unpaid lease payments at the commencement date. The lease payments are discounted using the interest rate implicit in the lease, if that rate can be readily determined. If that rate cannot be readily determined, the Company on initial recognitioneighteenth month of the lease usesinception date. The Group intends to use the Phase III Land to expand its incremental borrowing rate. Incremental borrowing rate iscrude oil storage and service and refinery capacity. Management has exercised judgment in assessing the rate of interest thatlease commencement date in the Company would have to pay to borrow over a similar term, and with a similar security, the funds necessary to obtain an asset of a similar value to the right-of-use assets in similar economic environment. The Company determined its incremental borrowing rate at 9.5% in respectinitial cancellable period of the lease liability.and recognized the lease on the consolidated statement of financial position from December 1, 2020.

101

Decommissioning liabilitiesAsset retirement obligation

 

As part of the land lease agreement between FOIZfor Phase I and Phase II, the Company, the CompanyGroup has a legal obligation to remove the facilitiesplant at the end of its lease term. The CompanyGroup initially records a provision for asset retirement obligations at the best estimate of the present value of the expenditure required to settle the obligation at the time a legal (or constructive) obligation is incurred, if the liability can be reliably estimated. When the provision is initially recorded, the carrying amount of the related asset is increased by the amount of the liability. Provisions are adjusted at each balance sheet date to reflect the current best estimate. The unwinding of the discount is recognized as finance cost. The Company’sGroup’s operating assets generally consist of storage tanks and related facilities. These assets can be used for an extended period of time as long as they are properly maintained and/or upgraded. It is the Company’sGroup’s current intent to maintain its assets and continue making improvements to those assets based on technological advances. There

The calculation of provision related to asset retirement obligation is no data or information that can be derived from past practice, industry practice or the Company’s intentions that could be usedmost sensitive to make a reliable estimate of the decommissioning cost. Accordingly, the Company has not recorded a liability or corresponding asset as the amounts of such potential future costs are not reliably determinable.following judgements and assumptions:

Discount rate of 3.24% based on inflation-adjusted long-term risk-free rate; and
Inflation rate of 0.8% used to extrapolate cash flows.

75

 

ITEM 6. DIRECTORS, SENIOR MANAGEMENT AND EMPLOYEES

 

A. Directors and Executive Officers

 

The board of directors of the Company is comprised of sixseven directors. Unless otherwise noted, the business address of each director and executive officer is c/o Brooge Petroleum and Gas Investment Company FZE, P.O. Box 50170, Fujairah, United Arab Emirates.

 

The Company’s Amended and Restated Memorandum and Articles of Association provide that persons standing for election as directors at a duly constituted general meeting with requisite quorum shall be elected by an Ordinary Resolution as a matter of Cayman Islands law.

 

The following sets forth certain information concerning the persons who serve as the Company’s directors and the Company’s BPGIC’s and BPGIC International’sits subsidiaries’ executive officers as of June 26, 2020March 1, 2021:

 

Directors and Executive Officers Age Position/Title
Dr. Yousef AlassafAl Assaf 5960 Chairman
Abu Bakar Chowdhury 5354 Director
Nicolaas Paardenkooper 5758 Chief Executive Officer and Director
Saleh Yammout 31Director
Sa’eb El-Zein6132 Director
Dr. Simon Madgwick 5253Director
Bryant Edwards65 Director
Lina S. Saheb 36 Chief Strategy Officer and Director
Faisal Selim 45 Chief Marketing Officer
Syed Masood Ali 44 Chief Financial Officer

 

Biographical information concerning the directors and executive officers listed above is set forth below.

 

102

Dr. Yousef AlassafAl Assaf

 

Dr. Yousef AlassafAl Assaf is the Chairman of theour board of directors. Dr. AlassafAl Assaf joined the parent company of BPGIC in October 2018. Dr. AlassafAl Assaf is also the President of the Rochester Institute of Technology (Dubai). Prior to this, Dr. AlassafAl Assaf held a range of other academic positions over the last 30 years, most recently as the Dean of the College of Engineering at the American University of Sharjah (from 2006 to 2013), which he joined as an Associate Professor in 1991. Dr. AlassafAl Assaf started his academic career as a Research and Teaching Assistant at Oxford University from 1985 to 1987. Dr. AlassafAl Assaf holds a BSc from Sussex University in Electrical Engineering, a PhD from Oxford University and completed the Executive Leadership Certificate Program from Cornell University in 2008.

 

Abu Bakar Chowdhury

 

Mr. Chowdhury is thea Managing Director and Chief Financial Officer at ASMA Capital Partners B.S.C.(c) (“ASMA Capital”).Capital. He is a member of the Management Committee and is responsible for the finance function at ASMA Capital. He is also a member of the Boardboard of Directorsdirectors of a number of investee companies of the fund. Previously, Mr. Chowdhury was a Managing Partner at EMP Bahrain and was responsible for managing IDBIF I. Prior to EMP Bahrain, Mr. Chowdhury was with Credit Suisse and Deutsche Bank where he was responsible for managing and structuring Infrastructure and Asset-Backed Investments.

 

76

Nicolaas Paardenkooper

 

Nicolaas Paardenkooper is the Chief Executive Officer of BPGICthe Company and holds the same position with the Company.its subsidiaries. Mr. Paardenkooper is also the Chief Executive Officer of BPGIC Holdings. Mr. Paardenkooper joined BPGIC in May 2017. Mr. Paardenkooper has over 30 years of experience in the oil and gas mid and downstream sector. Prior to joining the Company, he was Terminal Manager at Oiltanking Odfjell Terminal, Oman beginning in October 2014. Prior to that, Mr. Paardenkooper worked in various positions at Emirates National Oil Company from 2010 to 2014 (including as Manager Terminal UAE and Operations Manager) and worked for 21 years at Royal Vopak N.V. (“Vopak” is, a leading independent tank storage company headquartered in Rotterdam, the Netherlands, and listed on the Euronext Amsterdam stock exchange)exchange, in various roles. During his time at Vopak, Mr. Paardenkooper was part of the team that developed, implemented and supported a global terminal operations system. Mr. Paardenkooper has a nautical and maritime educational background. His nautical education began at the Hogere Zeevaartschool in Rotterdam and was continued at Koninklijke Onderwijs Fonds in the Netherlands. After completing his nautical education, he started his career working on board of several types of vessels, mainly tankers, and held various positions, including officer roles before joining a predecessor of Vopak, Van Ommeren Tank Terminals, in 1989. In connection with his role at Van Ommeren Tank Terminals, Mr. Paardenkooper completed a 3-year terminal education program to become a fully-qualified terminal operating engineer. That program included all aspects of a terminal such as operations, maintenance, health, safety, environment, fire-fighting, first aid, and ship & shore interface activities. Thereafter, Mr. Paardenkooper underwent training for industrial fire-fighters and a program for certification as a Process Operator (Vapro B). Mr. Paardenkooper has also completed a situational leadership program, a three-part change management program, a technical project management course related to, amongstamong other things, terminal expansion and refurbishment projects, a budget and finance training, a jet fuel operations program, and several training programs in customer handling. Mr. Paardenkooper’s extensive education and training prepared him to become a fully-qualified general manager or terminal manager of a terminal.

103

 

Saleh Yammout

 

Saleh Yammout is the former Chief Financial Officer of BPGIC and the Company. Mr. Yammout joined BPGIC in October 2018. Mr. Yammout served as the Vice President (Finance & Administration) at the Rochester Institute of Technology (Dubai), having joined in 2014. Prior to this, he was a Senior Consultant at PwC from 2012 to 2014, and an Analyst at Al Hilal Bank from 2011 to 2012. Mr. Yammout holds a BSc in Economics with a concentration on International Relations from the Rochester Institute of Technology in New York.

Saeb El-Zein

Saeb El-Zein is an independent director of the Company and chairman of the audit committee. Mr. El-Zein joined the parent company of BPGIC in October 2018. He is also currently an independent investor in the emerging markets and an advisor and Board Member of Spinnaker Global Emerging Markets Fund. From 2008 to 2019 he was the Managing Partner for Spinnaker Capital (Middle East). From 1994 to 2008, he worked at Credit Suisse (London 1994-2007 and Dubai 2007-2008), becoming a Managing Director in the Investment Banking and Capital Markets divisions. Prior to this, he was a Director at Deutsche Bank AG (London) in the capital Markets Division from 1988 to 1994 and worked as a portfolio manager at Arab International Finance (London) from 1982 to 1988. Mr. El-Zein started his career as an Analyst at the Central Bank of Lebanon. Mr. El-Zein holds a BBA and an MBA from the American University of Beirut. Saeb has served on the board of a number of companies including Credit Suisse (Lebanon), BLOM Bank, Blominvest and Spinnaker Capital (Middle East). He also served as a member of various board committees including risk, strategy, audit and remuneration.

 

Dr. Simon Madgwick

 

Dr. Simon Madgwick is an independent director of the Company and a member of the audit and compensation committees. Dr. Madgwick joined the parent company of BPGIC in October 2018. Dr. Madgwick is also a partner of Portinate Consulting since 2017 and managing director of Protank Ltd since 2014. Prior to joining the Company, Dr. Madgwick was the Group Director of Strategy at LBC Tank Terminals Group until 2014, before which he was the Director of Asset Management at the Challenger Infrastructure Fund, a Principal in the London-based private equity team of Nikko Principal Investments Ltd and a Senior Manager at Celerant Consulting. Dr. Madgwick started his career at Pall Europe as an Engineer and Manager between 1990 and 1998. Dr. Madgwick holds a Bachelor of Engineering in Manufacturing Systems Engineering from the University of Portsmouth and a PhD in Change Management from Cranfield University. He also holds a qualification in corporate finance regulation from the Securities and Investment Institute.

 

Bryant Edwards

Bryant Edwards is an independent director of the Company. He is currently Chief Executive Officer and Director of Global SPAC Partners, a recently formed blank check company. From 2018 to 2019, Mr. Edwards was the Chief Operating Officer and a Director of Twelve Seas, a blank check company that combined with the Company in December 2019. Mr. Edwards retired as a partner from Latham & Watkins, a global law firm, in 2017, after a 35-year legal career. Mr. Edwards helped lead Latham & Watkins’ expansion in Europe from 2000 to 2008, in the Middle East from 2008 to 2012 and in East Asia from 2012 to 2017. Mr. Edwards was Chair of the European High Yield Association (EHYA) from 2004 to 2008, was on the Steering Committee of the Gulf Bond & Sukuk Association (GBSA) from 2008 to 2012 and was Vice-Chair of the Credit Markets Committee of the Asia Securities & Financial Markets Association from 2012 to 2016. Mr. Edwards holds a JD from the University of Chicago Law School.

Lina Saheb

 

Lina Saheb is the Chief Strategy Officer for BPGIC holds the same position withCompany and its subsidiaries and a director of the Company. Ms. Saheb joined BPGIC in 2013. Prior to joining BPGIC, Ms. Saheb worked with the initial shareholders of BPGIC on many different ventures including the establishment of BPGIC in Fujairah in 2010. Ms. Saheb has a Bachelor’s degree in Software Engineering from Mansour University, and finished a course in Banking and Finance from Emirates College of Technology.

 

Faisal Selim

 

Faisal Selim is the Chief Marketing Officer for BPGICthe Company and the Company.its subsidiaries. Mr. Selim joined BPGIC and the Company in December 2019. Mr. Selim holds a Bachelor of Commerce from Al Shams University and is a Certified Public Accountant. From 2011 to 2019, he served as a CFO Consultant for Mega Group LLC. Prior to this, he worked for Al Brooge Securities as a Finance Manager from 2006 to 2010 and as a Documentation Control Manager-Credit Administration for Abu Dhabi Commercial Bank from 2004 to 2006. Mr. Selim served as a Credit Policy Supervisor at First Gulf Bank from 2000 to 2004 and at Oriflame from 1999 to 2000.

 

77

Syed Masood Ali

 

Syed Masood Ali is the Chief Financial Officer for BPGICthe Company and the Company.its subsidiaries. Mr. Syed joined BPGICthe Company in April 2020. Prior to joining BPGIC and the Company, Mr. Syed worked with various local & regional banks and has extensive experience in Corporate & Institutional Banking. He has experience in leading and managing independent Treasury & Banking functions in the Middle East, Africa and Europe. Mr. Syed holds an MBA degree with a major in MIS from Newport University.

 

104

Family Relationships

 

There are no family relationships between any of theour executive officers and directors.

 

Independence of Directors

 

The Company adheres to the rules of NASDAQ in determining whether a director is independent. The board of directors of the Company has consulted, and will consult, with its counsel to ensure that the board’s determinations are consistent with those rules and all relevant securities and other laws and regulations regarding the independence of directors. The NasdaqNASDAQ listing standards define an “independent director” as a person, other than an executive officer of a company or any other individual having a relationship which, in the opinion of the issuer’s board of directors, would interfere with the exercise of independent judgment in carrying out the responsibilities of a director.

 

B. Compensation

 

BPGIC Executive Officer and Director Compensation

 

In the year ended December 31, 2019, $803,6102020, $1,040,695 was paid as remuneration to the Senior Managers in their capacity as executive officers.

 

Name Fees/basic
salary
($)
  Bonus
($)
  Benefits
($)
  Total
($)
 
Executive Officers            
Nicolaas Paardenkooper  261,367   78,410   10,346   350,123 
Lina S. Saheb  217,806   ¾   57,011   274,816 
Saleh Yammout  123,877   ¾   6,354   130,231 
Faisal Selim  45,376   ¾   3,064   48,440 
Name Fees/basic
salary
($)
  Bonus
($)
  Benefits
($)
  Total
($)
 
Executive Officers                
Nicolaas Paardenkooper - Chief Executive Officer  303,294   78,410   8,621   390,325 
Lina S. Saheb - Chief Strategy Officer  245,031   -   49,006   294,037 
Saleh Yammout - Former Chief Financial Officer(1)  106,180   -   5,447   111,627 
Syed Masood – Chief Financial Officer  165,330   -   25,810   191,140 
Faisal Selim - Chief Marketing Officer  53,090   -   476   53,566 

During the year, $78,410 bonus was paid to CEO as per the contractual terms.

 

In the year ended December 31, 2019 $302,3262020, $376,571 was paid as remuneration to members of the Board Directorsboard of directors in their capacity as directors.

 

Name Fees/basic
salary
($)
  Bonus
($)
  Benefits
($)
  Total
($)
  Fees/basic
salary
($)
  Bonus
($)
  Benefits
($)
  Total
($)
 
Board of Directors                         
Dr. Yousef Alassaf  83,800   ¾   ¾   83,800 

Dr. Yousef Al Assaf

  93,312   -   -   93,312 
Nicolaas Paardenkooper(3)      ¾   ¾       -   -   -   - 
Saleh Yammout(1)  62,903   ¾   ¾   62,903   62,550   -   -   62,550 
Abu Bakar Chowdhury  17,138   ¾   ¾   17,138   82,375   -   -   82,375 
Saeb El-Zein(2)  70,907   ¾   ¾   70,907   47,984   -   -   47,984 
Dr. Simon Madgwick  67,577   ¾   ¾   67,577   90,350   -   -   90,350 
Lina S. Saheb(3)  -   -   -   - 
Bryant Edwards(3)  -   -   -   - 

(1)Mr. Yammout resigned his role as Chief Financial Officer effective as of April 27, 2020. The Company’s current Chief Financial Officer is Syed Masood Ali.
(2)Effective as of July 28, 2020, Saeb El-Zein resigned from all board committee and his position as director.
(3)Mr. Paardenkooper does not receive separate compensation for serving as our director. His compensation is disclosed in the compensation table for executive officers above. Ms. Saheb and Mr. Edwards were elected to our board of directors on December 18, 2020 and did not receive compensation for serving as directors from the date of their appointment to December 31, 2020.

 

Other than end of service gratuity amounts required to be set aside pursuant to UAE labor laws, at December 31, 20192020 for senior managers, no amounts were set aside or accrued by BPGICthe Company to provide pension, retirement or othersimilar benefits to the directors or the senior managers.

 

105

78

 

Company Executive Officer and Director Compensation Following the Business Combination

 

The policies of the Company with respect to the compensation of its executive officers are administered by the Company’s board of directors in consultation with its compensation committee. The compensation policies followed by the Company are intended to provide for compensation that is sufficient to attract, motivate and retain executives of the Company and BPGICits subsidiaries as well as potential other individuals and to establish an appropriate relationship between executive compensation and the creation of shareholder value. To meet these goals, the compensation committee is charged with recommending executive compensation packages to the Company’s board of directors.

 

It is anticipated that performance-based and equity-based compensation will be an important foundation in executive compensation packages as the Company believes it is important to maintain a strong link between executive incentives and the creation of shareholder value. The Company believes that performance and equity-based compensation can be an important component of the total executive compensation package for maximizing shareholder value while, at the same time, attracting, motivating and retaining high-quality executives. The Company plans to adopt a long-term incentive plan which will reflect what the Company believes is a focus on performance- and equity-based compensation. As the Company’s compensation committee was not formed until after the completion of the Business Combination, itThe Company has not yet adopted any formal guidelines for allocating total compensation between equity compensation and cash compensation for executives hired in the future.

 

The Company intends to be competitive with other similarly situated companies in its industry.

 

The compensation decisions regarding the Company’s executives will be based on the Company’s need to attract individuals with the skills necessary for the Company to achieve its business plan, to reward those individuals fairly over time, and to retain those individuals who continue to perform at or above the Company’s expectations.

 

Since the Company’s compensation committee was not formed until consummation of the Business Combination, theThe Company has not yet adopted any formal or informal policies or guidelines for allocating compensation between long-term and currently paid out compensation, between cash and non-cash compensation, or among different forms of compensation.

 

In addition to the guidance provided by its compensation committee, the Company has utilized and may continue to utilize the services of third parties from time to time in connection with the hiring and compensation awarded to executive employees. This could include subscriptions to executive compensation surveys and other databases. In particular, to ensure that the Company’s intended compensation is in line with the compensation offered by other similarly situated companies in its industry, the Company hired Tuscan Middle East, who conducted a comprehensive study on compensation levels. The compensation committee, and then the Board,board of directors, have discussed the results of the study in detail.

 

The Company’s compensation committee is charged with performing an annual review of the Company’s executive officers’ cash compensation and equity holdings to determine whether they provide adequate incentives and motivation to executive officers and whether they adequately compensate the executive officers relative to comparable officers in other companies.

Compensation Components

Base Salary. The Company intends to preserve the cash compensation of its executive officers, until the recently formed compensation committee has adequate opportunity to fully assess its executive’s compensation. The Company will seek to maintain base salary amounts at or near the industry norms, while avoiding paying amounts in excess of what it believes is necessary to motivate executives to meet corporate goals. It is anticipated that base salaries will generally be reviewed annually, subject to terms of employment agreements, and that the compensation committee and board of directors will seek to adjust base salary amounts to realign such salaries with industry norms after taking into account individual responsibilities, performance and experience.

106

Annual Bonuses. The Company intends to utilize cash incentive bonuses for executives to focus them on achieving key operational and financial objectives within a yearly time horizon. Near the beginning of each year, the board of directors, upon the recommendation of the compensation committee and subject to any applicable employment agreements, will determine performance parameters for appropriate executives. At the end of each year, the board of directors and compensation committee will determine the level of achievement for each corporate goal.

Equity Awards. ��  The Company intends to establish an equity incentive plan to incentivize its employees.

Severance Benefit. The Company currently has no severance benefits plan. The Company may consider the adoption of a severance plan for executive officers and other employees in the future.

Director Compensation.The Company has a compensation plan for its directors. The Company, working with the compensation committee, has set director compensation at a level comparable with those directors with similar positions at comparable companies. Each non-executive director receives an annual cash retainer of £45,000. The Chairman of the Boardboard of directors receives an additional £15,000 per year, each director that serves as the chairman of a committee receives an additional £10,000 per year and each other member of a committee receives an additional £5,000 per year per committee.

 

79

C. Board Practices

 

Board Leadership Structure and Role in Risk Oversight

 

Dr. Yousef AlassafAl Assaf is the Chairman of the Boardboard of directors and Nicolaas Paardenkooper is the Chief Executive Officer of the Company. The Company has determined that this structure, with separate Chairman and CEO roles, is in the best interests of the Company at this time. A number of factors support this leadership structure, including, among others:

 

The separation of the Chairman and CEO roles allows the CEO to focus his time and energy on operating and managing the Company and BPGICits subsidiaries and to leverage the experience and perspectives of the Chairman.

The Chairman serves as a liaison between the board and senior management but having an independent chairmanChairman also enables non-management directors to raise issues and concerns for board consideration without immediately involving management.

The Chairman sets the agenda for, and presides over, board meetings and independent sessions and coordinates the work of the committees of our Board,board of directors, providing independent oversight and streamlining the CEO’s duties.

 

The Company also believes in the importance of independent oversight. The Company looks to ensure that this oversight is truly independent and effective through a variety of means.

 

Terms of Office

 

Each director’s service on the Boardboard of directors began on December 20, 2019 upon the consummation of the Business Combination.18, 2020. Each director shall serve until he or she resigns or is removed. The Company intends to have its directors stand for reelectionre-election each year.

 


Directors’ Service Contracts

 

Each director who is not an employee of the Company or its subsidiaries provides their services pursuant to a Non-Executive Director Appointment Letter. Pursuant to each appointment letter, each non-executive director receives an annual cash retainer of £45,000.£45,000 (approximately $62,391). The Chairman receives an additional £15,000 (approximately $20,798) per year, each director that serves as the chairman of a committee receives an additional £10,000 (approximately $13,865) per year and each other member of a committee receives an additional £5,000 (approximately $6,932) per year per committee. The terms of our directors’ appointment letters do not provide our directors with benefits upon termination

 

Meetings and Committees of the Board of Directors

 

The Company has established separately a standing audit committee and a compensation committee.

 

Audit Committee Information

 

Effective upon consummationAs of March 1, 2021, the Business Combination, the Company established an audit committee comprised of independent directors. The audit committee consists of Saeb El-Zein,Abu Bakar Chowdhury, Dr. Simon Madgwick and Abu Bakar Chowdhury.Dr. Yousef Al Assaf. Each of the members of the audit committee is independent under the applicable NasdaqNASDAQ listing standards. The audit committee has a written charter. The purpose of the audit committee is, among other things, to appoint, retain, set compensation of, and supervise the Company’s independent accountants, review the results and scope of the audit and other accounting related services and review the Company’s accounting practices and systems of internal accounting and disclosure controls. The chairman of the audit committee is Abu Bakar Chowdhury.

Financial Experts on Audit Committee

 

The audit committee is, and will at all times be, composed exclusively of “independent directors,” as defined for audit committee members under the NasdaqNASDAQ listing standards and the rules and regulations of the SEC, who are “financially literate,” as defined under Nasdaq’sNASDAQ listing standards. Nasdaq’sNASDAQ listing standards define “financially literate” as being able to read and understand fundamental financial statements, including a company’s balance sheet, income statement and cash flow statement. In addition, the Company is required to certify to NasdaqNASDAQ that the committee has, and will continue to have, at least one member who has past employment experience in finance or accounting, requisite professional certification in accounting, or other comparable experience or background that results in the individual’s financial sophistication.

 

Mr. Abu Bakar Chowdhury serves as a financial expert on the audit committee.

 

80

Compensation Committee Information

 

Effective upon consummationThe compensation committee has a written charter. The compensation committee charter provides that the compensation committee should consist of the Business Combination, the boardat least three members. As of directors ofMarch 1, 2021, the Company established a compensation committee. The compensation committee consists of three independent directors, being Dr. Yousef Alassaf,Al Assaf, Dr. Simon Madgwick and Abu Bakar Chowdhury. The chairman of the compensation committee has written charter. is Dr. Simon Madgwick.

The purpose of the compensation committee is to review and approve compensation paid to the Company’s officers and directors and to administer the Company’s incentive compensation plans, including authority to make and modify awards under such plans.

 

The compensation committee assists the Boardboard of directors in determining its responsibilities in relation to remuneration, including, amongstamong other matters, making recommendations to the Boardboard of directors on the Company’s policy on executive compensation, determining the individual remuneration and benefits package of each of the executive directors and recommending and monitoring the remuneration of senior management below board level.

 

The Compensation Committee Charter provides that the compensation committee should consist of at least three members.

The membership of the compensation committee includes three independent directors (Dr. Simon Madgwick, Dr. Yousef Alassaf and Abu Bakar Chowdhury). The chairman of the compensation committee is Dr. Simon Madgwick.

The compensation committee meets formally three times a year and otherwise as required.

 


D. Employees

Employees

As at December 31, 2018, the Company employed 15 employees and 48 contractors. As at December 31, 2019, the Company employed 16 employees and 47 contractors. As at December 31, 2020, the Company employed 20 employees and 50 contractors. As of December 31, 2020, the 50 contractors were engaged under third-party outsourcing contracts and the 20 employees were engaged under individual employment contracts.

All 50 of the contractors are contracted through Flowi Facility Management LLC (“Flowi”), a subsidiary of MUC. The 50 contractors serve in various roles in several of BPGIC’s departments, including operations, information technology and health and safety. Pursuant to BPGIC’s contract with Flowi, dated April 1, 2017, as extended, (the “Flowi Agreement”), Flowi is contractually obligated to release all 50 contractors from its employment and transfer them to BPGIC’s employment after contract completion. The term of the Flowi Agreement expires on August 31, 2021.

The Company believes that the material terms of its third-party sourcing contracts and employment agreements are customary for the UAE and the oil storage industry and that it has a good relationship with its employees and contractors.

 

The following table sets out the number of employees and contractors employed by BPGICthe Company at December 31, 2020, 2019 and 2018 by main location.

 

Location              
       
 As at December 31,  As at December 31, 
 2017  2018  2019  2018  2019  2020 
Fujairah Employees  6   7   9   7   9   11 
Fujairah Contractors  0   48   47   48   47   50 
Abu Dhabi Employees  3   8   7   8   7   9 
Abu Dhabi Contractors  0   0   0   0   0   0 
Total  9   63   63   63   63   70 

 

E. Share Ownership

 

Ownership of the Company’s shares by its executive officers and directors as of June 8, 2020March 1, 2021 is set forth in Item 7.A of this Report.

81

 

ITEM 7. MAJOR SHAREHOLDERS AND RELATED PARTY TRANSACTIONS

 

A. Major Shareholders

 

The following table sets forth information regarding the beneficial ownership, based on 109,587,854as of March 1, 2021, of our Ordinary Shares outstanding as of June 8, 2020 based on information obtained from the persons named below, with respect to the beneficial ownership of our shares by:

 

each person known by us to be the beneficial owner of more than 5% of our outstanding shares;Ordinary Shares;

each of our officers and directors; and

all our officers and directors as a group.

 


The percentage of shares beneficially owned is based on 109,587,854 Ordinary Shares outstanding on March 1, 2021.

Except as indicated byin the footnotes below, we believe that the persons named below have shared voting and dispositive power with respect to all shares that they beneficially own. The shares owned by the persons named below do not have voting rights different from the shares owned by other holders. We believe that none of the persons named below own shares of record in the United States of America.

 

Name and Address of Beneficial Owner Number
of Shares
Beneficially
Owned
  % of
Class(16)
 
Name of Beneficial Owner Number
of Shares
Beneficially
Owned
  % of
Class(16)
 
Directors and Executive Officers of the Company             
Dr. Yousef Alassaf      
Dr. Yousef Al Assaf      
Abu Bakar Chowdhury  8,333,333(17)  7.6%  8,333,333(17)  7.6%
Nicolaas Paardenkooper  94,052,044(1)  85.8%  93,834,357(1)  85.6%
Saleh Yammout            
Sa’eb El-Zein      
Dr. Simon Madgwick            
Lina S. Saheb            
Bryant Edwards      
Faisal Selim            
Syed Masood        
All executive officers and directors as a group (8 individuals)  94,052,044   85.8%
Syed Masood Ali      
All executive officers and directors as a group (9 individuals)  93,834,357   85.6%
                
Five Percent Holders                
BPGIC Holdings Limited(2)  94,052,044   85.8%  93,834,357   85.6%
Brooge Petroleum and Gas Investment Company (BPGIC) PLC(3)  94,052,044   85.8%  93,834,357   85.6%
SBD International LP(4)  53,536,634   48.9%  53,318,947   48.7%
SD Holding Limited(5)  53,536,634   48.9%  53,318,947   48.7%
Salman Dawood Salman Al-Ameri(6)  63,161,001   57.6%  62,943,314   57.4%
HBS Investments LP(7)  9,624,367   8.8%  9,624,367   8.8%
O2 Investments Limited(8)  9,624,367   8.8%  9,624,367   8.8%
H Capital International LP(9)  8,991,043   8.2%  8,991,043   8.2%
Gyan Investments Limited(10)  8,991,043   8.2%  8,991,043   8.2%
Hind Mohammed Muktar Ahmed(11)  8,991,043   8.2%  8,991,043   8.2%
His Highness Sheikh Mohammad bin Khalifa bin Zayed Al Nayhan(12)  21,900,000   20.0%  21,900,000   20.0%
MENA Energy Services Holdings Limited(13)  8,333,333   7.6%  8,333,333   7.6%
IDB Infrastructure Fund II B.S.C(c)(14)  8,333,333   7.6%  8,333,333   7.6%
ASMA Capital B.S.C.(c).(15)  8,333,333   7.6%
ASMA Capital Partners B.S.C.(c). (15)  8,333,333   7.6%

 

(1)Represents the shares held by BPGIC Holdings Limited.Holdings. Mr. Paardenkooper is the CEO of BPGIC Holdings, consequently, he may be deemed to be the beneficial owner of 100% of the shares held by BPGIC Holdings. Mr. Paardenkooper disclaims beneficial ownership of any shares other than to the extent he may have a pecuniary interest therein.

 

82

(2)20,000,000 Ordinary Shares beneficially owned by BPGIC Holdings are held in escrow and subject to forfeiture until the Company satisfies certain milestones. MENA Energy Services Holdings Limited (“MENA Energy”) holds convertible securities in BPGIC Holdings that entitle it to convert its securities in BPGIC Holdings into 8,333,333 of the Ordinary Shares of the Company owned by BPGIC Holdings. Accordingly, BPGIC Holdings has placed 8,333,333 Ordinary Shares into escrow for release to MENA Energy in the event it converts its securities in BPGIC Holdings. 1,500,000 Ordinary Shares beneficially owned by BPGIC Holdings have been placed in escrow as collateral for a guaranty by one of its shareholders, HBS Investments LP.


(3)Represents the shares held by BPGIC Holdings. Brooge Petroleum and Gas Investment Company (BPGIC) PLC is the sole shareholder of BPGIC Holdings, consequently, it may be deemed to be the beneficial owner of 100% of the shares held by BPGIC Holdings. MENA Energy holds convertible securities in BPGIC Holdings that entitle it to convert its securities in BPGIC Holdings into 8,333,333 of the Ordinary Shares of the Company owned by BPGIC Holdings. Accordingly, BPGIC Holdings has placed 8,333,333 Ordinary Shares into escrow for release to MENA Energy in the event it converts its securities in BPGIC Holdings. 1,500,000 Ordinary Shares beneficially owned by BPGIC Holdings have been placed in escrow as collateral for a guaranty by one of its shareholders, HBS Investments LP. Brooge Petroleum and Gas Investment Company (BPGIC) PLC disclaims beneficial ownership of any Ordinary Shares other than to the extent it may have a pecuniary interest therein.

(4)SBD International LP holds a controlling interest in Brooge Petroleum and Gas Investment Company (BPGIC) PLC which is the sole shareholder of BPGIC Holdings. Its pro ratabeneficial ownership of the Company’s Ordinary Shares held by BPGIC Holdings is 53,536,63453,318,947 Ordinary Shares. SBD International LP’s pro rata portion of the Ordinary Shares held in escrow and subject to forfeiture until the Company satisfies certain milestones is 58.9%. SBD International LP disclaims beneficial ownership of any Ordinary Shares other than to the extent it may have a pecuniary interest therein.

(5)Represents the interests of SBD International LP, as a shareholder of Brooge Petroleum and Gas Investment Company (BPGIC) PLC, in the Ordinary Shares held by BPGIC Holdings. SD Holding Limited is the general partner of SBD International LP, consequently, it may be deemed the beneficial owner of 53,536,63453,318,947 Ordinary Shares held by BPGIC Holdings Limited. SD Holding Limited disclaims beneficial ownership of any Ordinary Shares other than to the extent it may have a pecuniary interest therein.

(6)Represents the interest of SBD International LP and HBS Investments LP, as shareholders of Brooge Petroleum and Gas Investment Company (BPGIC) PLC, in the Ordinary Shares held by BPGIC Holdings. Salman Dawood Salman Al-Ameri is the sole shareholder of SD Holding Limited (the general partner of SBD International LP) and the sole shareholder of O2 Investments Limited (the general partner of HBS Investments LP). Consequently, Mr. Al-Ameri may be deemed the beneficial owner of 63,161,00162,943,314 of the Ordinary Shares held by BPGIC Holdings. Mr. Al-Ameri disclaims beneficial ownership of any Ordinary Shares other than to the extent he may have a pecuniary interest therein. 1,500,000 Ordinary Shares that may be deemed to be beneficially owned by Mr. Al-Ameri as the sole shareholder of O2 Investments Limited (the general partner of HBS Investments LP) have been placed in escrow as collateral for a guaranty by HBS Investments LP.

(7)Represents the interests of HBS Investments LP, as a shareholder of Brooge Petroleum and Gas Investment Company (BPGIC) PLC, in the Ordinary Shares held by BPGIC Holdings. HBS Investments LP’s pro rata portion of the Ordinary Shares held in escrow is 9.8%. HBS Investments LP disclaims beneficial ownership of any Ordinary Shares other than to the extent it may have a pecuniary interest therein. 1,500,000 Ordinary Shares that may be deemed to be beneficially owned by HBS Investments LP have been placed in escrow as collateral for a guaranty by HBS Investments LP.

(8)Represents the interests of HBS Investments LP, as a shareholder of Brooge Petroleum and Gas Investment Company (BPGIC) PLC, in the Ordinary Shares held by BPGIC Holdings. O2 Investments Limited is the general partner of HBS Investments LP, consequently, it may be deemed the beneficial owner of 9,624,367 of the Ordinary sharesShares held by BPGIC Holdings. O2 Investments Limited disclaims beneficial ownership of any Ordinary Shares other than to the extent it may have a pecuniary interest therein. 1,500,000 Ordinary Shares that may be deemed to be beneficially owned by O2 Investments Limited as the general partner of HBS Investments LP have been placed in escrow as collateral for a guaranty by HBS Investments LP.

(9)Represents the interests of H Capital International LP, as a shareholder of Brooge Petroleum and Gas Investment Company (BPGIC) PLC, in the Ordinary Shares held by BPGIC Holdings. H Capital International LP’s pro rata portion of the Ordinary Shares held in escrow is 9.1%. H Capital International LP disclaims beneficial ownership of any Ordinary Shares other than to the extent it may have a pecuniary interest therein.


(10)Represents the interests of H Capital International LP, as a shareholder of Brooge Petroleum and Gas Investment Company (BPGIC) PLC, in the Ordinary Shares held by BPGIC Holdings. Gyan Investments Limited is the general partner of H Capital International LP, consequently, it may be deemed the beneficial owner of 8,991,043, of the Ordinary Shares held by BPGIC Holdings. Gyan Investments Limited disclaims beneficial ownership of any Ordinary Shares other than to the extent it may have a pecuniary interest therein.

 

83

(11)Represents the interest of H Capital International LP, as a shareholder of Brooge Petroleum and Gas Investment Company (BPGIC) PLC, in the shares held by BPGIC Holdings. Mrs. Hind Mohammed Muktar Ahmed is the sole shareholder of Gyan Holdings Limited, the general partner of H Capital International LP, consequently, she may be deemed the beneficial owner of 8,991,043 of the Ordinary Shares held by BPGIC Holdings. Mrs. Hind Mohammed Muktar Ahmed disclaims beneficial ownership of any Ordinary Shares other than to the extent she may have a pecuniary interest therein.

(12)Represents the interests of Mohammad Bin Khalifa bin Zayed Al Nahyan, as a shareholder of Brooge Petroleum and Gas Investment Company (BPGIC) PLC, in the Ordinary Shares held by BPGIC Holdings. Mohammad bin Khalifa bin Zayed Al Nahyan’s pro rata portion of the Ordinary Shares held in escrow is 22.2%.

(13)MENA Energy holds convertible securities in BPGIC Holdings that entitle it to convert its securities in BPGIC Holdings Limited into 8,333,333 of the Ordinary Shares of the Company owned by BPGIC Holdings. MENA Energy disclaims beneficial ownership of any Ordinary Shares other than to the extent it may have a pecuniary interest therein.

(14)Represents the interest of MENA Energy in the Ordinary Shares held by BPGIC Holdings. IDB Infrastructure Fund II B.S.C(c) is the sole shareholder of MENA Energy, consequently it may be deemed the beneficial owner of the 8,333,333 Ordinary Shares of the Company that MENA Energy would receive upon conversion of its securities in BPGIC Holdings. IDB Infrastructure Fund II B.S.C(c) disclaims beneficial ownership of any Ordinary Shares other than to the extent it may have a pecuniary interest therein.

(15)Represents the interest of MENA Energy in the Ordinary Shares held by BPGIC Holdings. ASMA Capital holds 99% of the equity of IDB Infrastructure Fund II B.S.C(c), the sole shareholder of MENA Energy, consequently it may be deemed the beneficial owner of the 8,333,333 Ordinary Shares of the Company that MENA Energy would receive upon conversion of its securities in BPGIC Holdings. ASMA Capital disclaims beneficial ownership of any Ordinary Shares other than to the extent it may have a pecuniary interest therein.

(16)Based on 109,587,854 Ordinary Shares outstanding as of June 8,July 31, 2020. Does not reflect the 21,228,900 Ordinary Shares issuable upon exercise of the outstanding warrantsWarrants issued in exchange for Twelve Seas warrants.

(17)Represents the interest of MENA Energy in the shares held by BPGIC Holdings. Mr. Chowdhury is thea Managing Director and Chief Financial Officer of ASMA Capital which holds 99% of the equity of IDB Infrastructure Fund II B.S.C(c), the sole shareholder of MENA Energy, consequently he may be deemed the beneficial owner of the 8,333,333 Ordinary Shares of the Company that MENA Energy would receive upon conversion of its securities in BPGIC Holdings. Mr. Chowdhury disclaims beneficial ownership of any Ordinary Shares other than to the extent he may have a pecuniary interest therein.

 

112

Pursuant to certain letters from SBD International LP to nine individuals, BPGIC Holdings has undertaken to transfertransferred an aggregate of 4,833,678 Ordinary Shares to such individuals in consideration of the valuable contributions they have made to the success of BPGIC. As SBD International LP and BPGIC Holdings have committed to complete this transaction, the beneficial ownerships reported above reflect the holdings of each beneficial owner after giving effect to these pending transactions.

 

As set forth above, BPGIC Holdings is the majority shareholder of the Company and holds 94,052,04493,834,357 Ordinary Shares which is approximately 85.7%85.6% of the outstanding Ordinary Shares of the Company. BPGIC Holdings is wholly-owned by Brooge Petroleum and Gas Investment Company (BPGIC) PLC. SBD International LP is the majority owner of Brooge Petroleum and Gas Investment Company (BPGIC) PLC. As the Chief Executive Officer of BPGIC Holdings and Brooge Petroleum and Gas Investment Company (BPGIC) PLC, the Chief Executive Officer of the Company, Nicolaas L. Paardenkooper may be deemed to have beneficial ownership of the 94,052,04493,834,357 Ordinary Shares owned by BPGIC Holdings.

 

The Company is not aware of any existing arrangements that may result in a change of control of the Company.

 

B. Related Party Transactions

 

BPGIC Related Party Transactions and Policies

Related Party Transactions

 

BIA was partially owned by Mrs. Hind Muktar. Mrs. Hind Muktar who is also a limited partner of H Capital International LP and the sole shareholder of Gyan Investments Limited, the general partner of H Capital International LP.

84

 

The Phase I Customer Agreement provides for BIA to lease approximately two thirds of the total storage capacity of the Phase I facility for a fixed fee per cubic meter per month payable in advance on a monthly basis. The Phase I Customer Agreement also provides that BIA shall pay BPGIC a fixed fee per cubic meter per month for product throughput with a supplementary fee per metric ton of throughput in excess of agreed volume per year, a fixed blending fee per cubic meter per month, a fixed inter tank transfer fee per cubic meter per month, and a fixed heating fee per cubic meter per month. Further, BPGIC is entitled to pass through any tariffs, additional charges or fees imposed by the Port of Fujairah. BPGIC is entitled to review and seek to amend the fees every two years. This adjustment can result only in the fees remaining constant or increasing. The Company believes that the terms of this agreement are no less favorable to BPGIC than would result from a similar transaction with an unaffiliated third party. BIA is only allowed to sublease the Phase I storage tanks with BPGIC’s prior approval. H Capital International LP is a minority shareholder in the Company, and following the sale of Mrs. Muktar’s shares in BIA, BIA is no longer a related party.

The Phase II Customer Agreement provides for BIA to lease all eight Phase II storage tanks for a fixed fee per cubic meter per month payable in advance on a monthly basis. The Phase II Customer Agreement also provides that BIA shall pay BPGIC a fixed fee per cubic meter per month for product throughput in excess of agreed volume, a fixed blending fee per cubic meter per month, a fixed inter tank transfer fee per cubic meter per month, and a fixed heating fee per cubic meter per month. Further, BPGIC is entitled to pass through any tariffs, additional charges or fees imposed by the Port of Fujairah. BPGIC is entitled to review and seek to amend the fees every two years. This adjustment can result only in the fees remaining constant or increasing. The Company and BPGIC believe that the terms of this agreement are no less favorable to BPGIC than would result from a similar transaction with an unaffiliated third party. BIA is only allowed to sublease the Phase I storage tanks with BPGIC’s prior approval. H Capital International LP is a minority stakeholder in BPGIC and after sale of Mrs. Muktar’s shares in BIA, BIA is no longer a related party.


The Phase II Customer Agreement provides for BIA to lease all eight Phase II storage tanks for a fixed fee per cubic meter per month payable in advance on a monthly basis. The Phase II Customer Agreement also provides that BIA shall pay BPGIC a fixed fee per cubic meter per month for product throughput with a supplementary fee per metric ton of throughput in excess of agreed volume, a fixed blending fee per cubic meter per month, a fixed inter tank transfer fee per cubic meter per month, and a fixed heating fee per cubic meter per month. Further, BPGIC is entitled to pass through any tariffs, additional charges or fees imposed by the Port of Fujairah. BPGIC is entitled to review and seek to amend the fees every two years. This adjustment can result only in the fees remaining constant or increasing. The Company and BPGIC believebelieves that the terms of this agreement are no less favorable to BPGIC than would result from a similar transaction with an unaffiliated third party. BIA is only allowed to sublease the Phase II storage tanks with BPGIC’s prior approval. H Capital International LP is a minority stakeholdershareholder in BPGICthe Company, and afterfollowing the sale of Mrs. Muktar’s shares in BIA, BIA is no longer a related party.

 

The Refinery Agreement provides that BIA and BPGIC will use their best efforts to finalize the technical and design feasibility studies for the BIA Refinery, a refinery with a capacity of 25,000 bpd.b/d. The parties further agreed to negotiate, within 30 days, the Refinery Operations Agreement, a sublease agreement and a joint venture agreement to govern the terms on which BPGIC will sublease land to BIA to locate, BIA will construct, and BPGIC will operate the refinery. Due to the COVID-19 pandemic, theThe parties have agreed to extend the period for their negotiations until August 4, 2020.the Second Quarter of 2021. BPGIC and BIA are still negotiating the Refinery Operations Agreement, however BPGIC expects that BIA will finance and arrange the development, construction and commissioning of a modular refinery on a parcel of BPGIC’s remaining unutilized land and will pay an ancillary service fee in connection with any ancillary services it uses. The Company and BPGIC believesbelieve that the terms of this agreement will be no less favorable to BPGIC than would result from a similar transaction with an unaffiliated third party. H Capital International LP is a minority stakeholdershareholder in BPGIC, and following a plannedthe sale of Mrs. Muktar’s shares in BIA, BIA is no longer be a related party.

 

During the year ended December 31, 2019, the shareholders of the Company transferred their ownership in the Company to BPGIC PLC, a company incorporated under the laws of England and Wales andwhich is owned by the same shareholders that previously owned the Company and in the same ownership proportion. Upon the change of ownership, the Company changed its name from Brooge Petroleum and Gas Investment Company FZC to Brooge Petroleum and Gas Investment Company FZE. As a result of the above, BPGIC PLC became the parent of the Company. The owners made net cash contributions to the extent of $32.6 million.

 

Subsequently, as part of a reorganization, BPGIC PLC transferred 100% of the issued and outstanding ordinary shares of BPGIC to BPGIC Holdings. As a result, BPGIC Holdings became the parent of the Company.

 

Movements in shareholders’ account are as followsfollows:

 

 Year ended December 31, 
 2019  2018  2020 2019 2018 
 USD  USD  USD  USD  USD 
             
Contributions by the shareholders  77,090,648   951,539   2,041,928   77,090,648   951,539 
        
Amounts paid on behalf of the Group by the shareholders*  1,135,484   7,850,431   -   1,135,484   7,850,431 
        
Amounts paid by the Group on behalf of the shareholders  (1,647,064)  (2,296,354)  -   (1,647,064)  (2,296,354)
        
Distributions to shareholders  (53,279,016)  (29,209,289)  -   (53,279,016)  (29,209,289)
                    
  23,300,052   (22,703,673)  2,041,928   23,300,052   (22,703,673)

 

These amounts are repayable at the discretion of the Boardboard of Directorsdirectors of the Group and are interest free, therefore classified as part of equity.

 

*These include expenses paid on behalf of the Group, which includes other operational expenses paid by the shareholders on behalf of the Group.

 


85

Changes in shareholders’ account isare as follows:

 

  2019  2018 
  USD  USD 
       
At 1 January  47,717,763   70,421,436 
Net contributions (distributions) during the year  23,300,052   (22,703,673)
         
At 31 December  71,017,815   47,717,763 
  Year ended December 31, 
  2020  2019  2018 
  USD  USD  USD 
          
At beginning of period  71,017,815   47,717,763   70,421,436 
Net contributions (distributions) during the year  2,041,928   23,300,052   (22,703,673)
             
At end of period  73,059,743   71,017,815   47,717,763 

 

Movements in other related parties are as follows:

 

  2019  2018 
  USD  USD 
       
Expenses paid on behalf of related parties (note 10)  57,550   - 
  Year ended December 31, 
  2020  2019  2018 
  USD  USD  USD 
             
Expenses paid on behalf of related parties  279,281   57,550   - 

 

In addition to the above, funds amounting to $2,425,904 were received and repaid to shareholders during the year.

Due from related parties:

 

HBS Investments LP (shareholder)13,388-
H Capital International LP (shareholder)11,056-
O2 Investments Limited as GP (shareholder)6,181-
SBD International LP (shareholder)13,760-
SD Holding Limited as GP (shareholder)6,984-
Gyan Investments Ltd (shareholder)6,181-
57,550-
  Year ended December 31, 
  2020  2019  2018 
  USD  USD  USD 
          
HBS Investments LP (shareholder)  17,479   13,388   - 
BPGIC Holdings (Shareholder)  255,818   -   - 
H Capital International LP (shareholder)  16,975   11,056   - 
O2 Investments Limited as GP (shareholder)  9,303   6,181   - 
SBD International LP (shareholder)  17,851   13,760   - 
SD Holding Limited as GP (shareholder)  9,850   6,984   - 
Gyan Investments Ltd (shareholder)  9,555   6,181   - 
             
   336,831   57,550   - 

 

Key management remuneration for the year ended December 31, December 20192020 amounted to USD 1,160,293 (2018: USD 677,291)$1,417,266 (2019: $1,160,293; 2018: $677,291), charged to consolidated statement of comprehensive income (within profit and loss). The full amount of the key management remuneration relates to short term employment benefits.

 

Related Party Transaction Policies

 

Upon consummation of the Business Combination, theOur board of directors has adopted a code of ethics and business conduct that requires it, and itsthe Company’s directors, officers and employees to avoid conflicts of interest, such as related party transactions, unless specifically authorized. TheOur board of directors also adopted a related party transaction policy to govern the procedures for evaluation and authorization of related party transactions. Related party transactions, which require approval of the audit committee, are defined as any transaction, arrangement or relationship, or any series of similar transactions, arrangements or relationships, in which (i) the Group is or will be a participant, (ii) the aggregate amount involved will or may be expected to exceed $120,000 in any fiscal year, and (iii) any related party has or will have a direct or indirect interest. This also includes any material amendment or modification to an existing related party transaction.

 


The audit committee is responsible for reviewing and approving related party transactions to the extent the Company contemplates engaging in such a transaction. The audit committee will review all of the relevant facts and circumstances of all related party transactions that require its approval and either approve or disapprove of the entry into the related party transaction. The audit committee will approve the related party transaction only if it determines in good faith that, under all of the circumstances, the transaction is in the best interests of the Company and its shareholders. The audit committee, in its sole discretion, will impose such conditions as it deems appropriate on the Company or the related party in connection with the approval of the related party transaction. No director will be permitted to participate in the discussions or approval of a transaction in which he or she is a related party, but that director will be required to provide all material information concerning the related party transaction to the audit committee.

 

C. Interests of Experts and Counsel

 

Not Applicable.

86

 

ITEM 8. FINANCIAL INFORMATION

 

A. Consolidated Statements and Other Financial Information

 

See Item 18 of this Report.

 

B. Significant Changes

 

BPGIC did not comply with the terms of the Phase I Construction Facilities as amended on December 30, 2019. A payment of principal and interest of $6.6 Million for the Phase I Construction Facility due on February 28, 2020 was not paid. Payments of principal and interest totaling $2.2 Million for the Phase I Construction Facility and the Phase I Admin Building Facility due on April 30, 2020 were not made. The Debt Service Reserve Account did not maintain a balance in an amount equivalent to one quarterly instalment including interest by February 28, 2020. BPGIC did not maintain a minimum Debt Service Coverage Ratio of 150% beginning on February 28, 2020. These non-payments and failures to comply with covenants were events of default, but, as in the past, the lender did not declare an event of default.None.

On June 15, 2020, BPGIC entered into an agreement with its lender to amend the Phase I Construction Facilities.

BPGIC and the lender agreed to a revised payment schedule for the Phase I Construction Facility that requires BPGIC to make the following payments from June 30, 2020 through December 31, 2020:

DateAmount
June 30, 2020$2.99 Million
July 31, 2020$3.62 Million
August 31, 2020$0.14 Million
September 30, 2020$0.14 Million
October 31, 2020$1.01 Million
November 30, 2020$0.14 Million
December 31, 2020$3.87 Million
Total$11.9 Million by end of 2020

Thereafter, beginning on January 31, 2021 and ending on July 30, 2030, BPGIC will make quarterly payments of approximately $1.77 Million


BPGIC and the lender also agreed to a revised payment schedule for the Phase I Admin Building Facility that requires BPGIC to make the following payments from August 31, 2020 through December 21, 2020:

DateAmount
August 31, 2020$0.14 Million
September 30, 2020$0.14 Million
October 31, 2020$0.41 Million
November 30, 2020$0.14 Million
December 31, 2020$0.80 Million
Total$1.63 Million by end of 2020

Thereafter, beginning on January 31, 2021 and ending on July 31, 2021, BPGIC will make quarterly payments of approximately $0.54 Million.

Testing of the Debt Service Ratio Covenant will start on December 31, 2020 and will be conducted on each subsequent payment date. A Debt Service Reserve Account containing at least 1 quarter of debt service amounts must be maintained with the lender by October 31, 2020 and at all times thereafter through the term of the Phase I Construction Facility or until BPGIC repays all liabilities owed under the Phase I Construction Facilities. BPGIC pledged the account to the lender as security for the Phase I Construction Facilities. BPGIC, The Company and BPGIC Holdings undertook to have no other bank accounts except for the one that is the Debt Service Reserve Account until the Phase I Construction Facilities are repaid and to route all funds through the Debt Service Reserve Account. BPGIC further granted the lender a non-possessory mortgage over the Phase I Customer Agreement as security for the Phase I Construction Facilities.

Also pursuant to this amendment, BPGIC negotiated revised pricing terms as follows:

oPhase I Construction Facility: Enhanced to 6M EIBOR + 4% per annum [Minimum 5%] and to be further enhanced to 6M EIBOR + 4.5% per annum [Minimum 5%] beginning on January 1, 2021; and

oPhase I Admin Building Facility: Enhanced to 3M EIBOR + 4% per annum [Minimum 5%] and to be further enhanced to 3M EIBOR + 4.5% per annum [Minimum 5%] beginning on January 1, 2021.

There is no change in the final maturity of Phase I Construction Facility which is July 30, 2030 and Phase I Admin Building Facility which is July 31, 2023.


In March 2019, BPGIC partnered with Sahara to develop and operate a modular refinery within the BPGIC Terminal with minimal capital expenditure by BPGIC. Under the terms of the parties agreement, Sahara would finance and arrange the development, construction and commissioning of a modular refinery capable of supplying IMO 2020 compliant 0.5% sulphur content shipping fuel with initial production capacity of 24,000 b/d.

In February 2020, BPGIC and Sahara mutually agreed to discontinue their joint development project to install a modular oil refinery at BPGIC’s terminal. Shortly thereafter, BPGIC entered into the Refinery Agreement, a new agreement with BIA which provides that the parties will use their best efforts to finalize the technical and design feasibility studies for the BIA Refinery, a refinery with a capacity of 25,000 bpd operated by BPGIC. The parties further agreed to negotiate, within 30 days, the Refinery Operations Agreement, a sublease agreement and a joint venture agreement to govern the terms on which BPGIC will sublease land to BIA to locate, BIA will construct, and BPGIC will operate the refinery. Due to the COVID-19 pandemic, the parties agreed to extend the period for their negotiations until August 4, 2020 and negotiations remain ongoing.

BPGIC is in the FEED stage of Phase III, a major expansion in the Port of Fujairah. In February 2020, BPGIC entered into the Phase III Land Lease Agreement securing the Phase III Land, a plot of land of approximately 450,000 m2 near its existing facilities. BPGIC believes that the Phase III Land can house additional storage capacity of up to 3,500,000 m3. BPGIC had an initial technical design with different layout options completed for the Phase III Land.

As BPGIC is in FEED stages of Phase III, it is not possible to reliably estimate the related capital expenditures. However, BPGIC anticipates the cost per m3 of Phase III to be approximately equal to the cost per m3 of Phase I and Phase II. As of the date of this Report, BPGIC does not yet have any planned capital expenditures in connection with Phase III, other than the costs of the ongoing FEED studies. BPGIC expects to be able to start projecting Phase III capital expenditures after it receives the results of the FEED studies in the Third Quarter of 2020. See “Item 3.D Risk Factors — Risks relating to BPGIC — BPGIC may be subject to significant risks and expenses when constructing Phase II, which could adversely affect BPGIC’s business, financial condition and results of operations.”

 

ITEM 9. THE OFFER AND LISTING

 

A. Offer and Listing Details

 

Our Ordinary Shares and warrantsWarrants are listed on the Nasdaq Capital Market under the symbols BROG“BROG” and BROGW,“BROGW,” respectively. Holders of our Ordinary Shares and warrantsWarrants should obtain current market quotations for their securities.

 

B. Plan of Distribution

 

Not applicable.

 


C. Markets

 

Our Ordinary Shares and warrantsWarrants are listed on the Nasdaq Capital Market under the symbols BROG“BROG” and BROGW,“BROGW,” respectively.

 

D. Selling Shareholders

 

Not applicable.

 

E. Dilution

 

Not applicable.

 

F. Expenses of the Issue

 

Not applicable.

 

ITEM 10. ADDITIONAL INFORMATION

 

A. Share Capital

 

Not Applicable

 

B. Memorandum and Articles of Association

 

The Company was incorporated under the laws of the Cayman Islands as an exempted company. The Company’s objects are unrestricted and the Company shall have full power and authority to carry out any object not prohibited by the laws of the Cayman Islands. The Company’s objects can be found in paragraph number 3 of the Amended and Restated Memorandum of Association of the Company.

 

A director is free to vote in respect of any contract or transaction in which he or she is interested provided that the nature of the interest of such director in any such contract or transaction shall be disclosed by him or her at or prior to its consideration and any vote thereon. A director may give a general notice that he or she is a shareholder, director, officer or employee of any specified firm or company and is to be regarded as interested in any transaction with such firm or company. Such general notice is sufficient disclosure for the purposes of voting on a resolution in respect of a contract or transaction in which such director has an interest, and after such general notice, such director does not need to give special notice relating to any particular transaction. The directors’ power to vote compensation to be paid to themselves or any members of their body in the absence of an independent quorum is not restricted. The directors may exercise all the powers of the Company to borrow money and to mortgage or charge its undertaking, property and assets (present and future) and uncalled capital or any part thereof and to issue debentures, debenture shares, mortgages, bonds and other such securities whether outright or as security for any debt, liability or obligation of the Company or of any third party. Such borrowing powers can be varied by an amendment to the Articles of Association. There is no age at which directors are required to retire. A person is not required to hold shares of the Company to serve as a director.

 

87

Ordinary shares

 

The holders of Ordinary Shares are entitled to one vote for each Ordinary Share held of record on all matters to be voted on by shareholders. There is no cumulative voting with respect to the election of directors, with the result that the holders of more than 50% of the shares voted for the election of directors can elect all of the directors. Holders of the Company’s Ordinary Shares do not have any conversion, preemptive or other subscription rights and there are no sinking fund or redemption provisions applicable to the Ordinary Shares.

 


Preferred Shares

 

The Amended and Restated Memorandum and Articles of Association of the Company authorize the issuance of up to 50,000,000 blank check preferred shares with such designations, rights and preferences as may be determined from time to time by the Company’s board of directors. Accordingly, the Company’s board of directors is empowered, without shareholder approval, to issue preferred shares with dividend, liquidation, conversion, voting or other rights which could adversely affect the voting power or other rights of the holders of Ordinary Shares. In addition, the preferred shares could be utilized as a method of discouraging, delaying or preventing a change in control of the Company.

 

Variation of Rights of Shareholders

 

If at any time the share capital of the Company is divided into different classes of shares, all or any of the rights attached to any class (unless otherwise provided by the terms of issue of the shares of that class) may, whether or not the Company is being wound up, be varied without the consent of the holders of the issued shares of that class where such variation is considered by the directors not to have a material adverse effect upon such rights. In all other cases, variations shall be made only with the consent in writing of the holders of not less than two thirds of the issued shares of that class, or with the approval of a resolution passed by a majority of not less than two thirds of the votes cast at a separate meeting of the holders of the shares of that class. For the purposes of a separate class meeting, the directors may treat two or more or all the classes of shares as forming one class of shares if the directors consider that such class of shares would be affected in the same way by the proposals under consideration. The rights conferred upon the holders of the shares of any class issued with preferred or other rights shall not, unless otherwise expressly provided by the terms of issue of the shares of that class, be deemed to be varied by the creation or issue of further shares ranking pari passu therewith.

 

Meetings of Shareholders

 

The Company may, but shall not (unless required by Cayman Islands law) be obliged to, in each year hold a general meeting as its annual general meeting, and shall specify the meeting as such in the notices calling it. Any annual general meeting shall be held at such time and place as the directors shall appoint. At these meetings the report of the directors (if any) shall be presented. The directors may call general meetings. The directors are required to convene an extraordinary general meeting upon a requisition deposited by not less than twenty percent of par value of the issued shares which at that date carry the right to vote at general meetings. The requisition must state the objects of the meeting and must be signed by the depositing shareholders. Shareholders seeking to bring business before the annual general meeting or to nominate candidates for election as directors at the annual general meeting must deliver notice to the principal executive offices of the Company not later than the close of business on the 90th day nor earlier than the close of business on the 120th day prior to the scheduled date of the annual general meeting.

 

At least five clear days’ notice shall be given of any general meeting. Every notice shall specify the place, the day and the hour of the meeting and the general nature of the business to be conducted at the general meeting and shall be given in the manner hereinafter mentioned or in such other manner if any as may be prescribed by the Company, provided that a general meeting of the Company shall, whether or not the required notice has been given and whether or not the provisions of the Amended and Restated Memorandum and Articles of Association regarding general meetings have been complied with, be deemed to have been duly convened if it is so agreed: (i) in the case of an annual general meeting, by all of the shareholders entitled to attend and vote thereat; and (ii) in the case of an extraordinary general meeting, by a majority in number of the shareholders having a right to attend and vote at the meeting, together holding not less than ninety-five per cent in par value of the shares giving that right. The accidental omission to give notice of a general meeting to, or the non-receipt of notice of a general meeting by, any person entitled to receive such notice shall not invalidate the proceedings of that general meeting.

 


88

No business shall be transacted at any general meeting unless a quorum is present. The holders of a majority of the shares being individuals present in person or by proxy or if a corporation or other non-natural person by its duly authorized representative or proxy shall be a quorum. A person may participate at a general meeting by conference telephone or other communications equipment by means of which all the persons participating in the meeting can communicate with each other. Participation by a person in a general meeting in this manner is treated as presence in person at that meeting. If a quorum is not present within half an hour from the time appointed for the meeting to commence or if during such a meeting a quorum ceases to be present, the meeting, if convened upon a shareholders’ requisition, shall be dissolved and in any other case it shall stand adjourned to the same day in the next week at the same time and/or place or to such other day, time and/or place as the directors may determine, and if at the adjourned meeting a quorum is not present within half an hour from the time appointed for the meeting to commence, the shareholders present shall be a quorum.

 

The chairman of the meeting may, with the consent of a meeting at which a quorum is present (and shall if so directed by the meeting) adjourn the meeting from time to time and from place to place, but no business shall be transacted at any adjourned meeting other than the business left unfinished at the meeting from which the adjournment took place. When a general meeting is adjourned for thirty days or more, notice of the adjourned meeting shall be given as in the case of an original meeting. Otherwise it shall not be necessary to give any such notice of an adjourned meeting.

 

A resolution put to the vote of the meeting shall be decided on a poll. A poll shall be taken as the chairman of the meeting directs, and the result of the poll shall be deemed to be the resolution of the general meeting at which the poll was demanded. A poll demanded on the election of a chairman or on a question of adjournment shall be taken forthwith. A poll demanded on any other question shall be taken at such date, time and place as the chairman of the general meeting directs, and any business other than that upon which a poll has been demanded or is contingent thereon may proceed pending the taking of the poll. In the case of an equality of votes the chairman shall be entitled to a second or casting vote.

 

Limitations on Rights to Own Securities

 

There are no limitations on the rights to own securities in the Company.

 

Anti-Takeover Provisions

 

Certain provisions in the Amended and Restated Memorandum and Articles of Association of the Company, such as the super majority voting requirements for amendments thereto, may discourage unsolicited takeover proposals that the Company’s shareholders may consider to be in their best interest and may make the removal of the Company’s incumbent management more difficult. Other anti-takeover provisions under the Amended and Restated Memorandum and Articles of Association of the Company include:

 

Undesignated Preferred Shares. The Company’s board of directors has the ability to designate and issue preferred shares with voting or other rights or preferences that could deter hostile takeovers or delay changes in its control or management.

 

Directors Removed Only for Cause.The Company’s Amended and Restated Memorandum and Articles of Association provides that shareholders may remove directors only for cause.

 

For discussions on risks associated with the above anti-takeover provisions, please see “Item 3.D Risk Factors — Provisions in the Company’s amended and restated memorandum and articles of association may inhibit a takeover of us, which could limit the price investors might be willing to pay in the future for the Company’s securities and could entrench management.

 

Bylaw Provision regarding Ownership Disclosure

 

There is no bylaw provision requiring shareholder ownership to be disclosed above a certain threshold.

 


Certain Differences of Cayman Islands Law

 

The Company’s corporate affairs are governed by its Amended and Restated Memorandum and Articles of Association, the Companies Law, and the common law of the Cayman Islands. The rights of shareholders to take action against the directors, actions by non-controlling shareholders and the fiduciary responsibilities of the Company’s directors to the Company under Cayman Islands law are to a large extent governed by the common law of the Cayman Islands. The common law of the Cayman Islands is derived in part from comparatively limited judicial precedent in the Cayman Islands as well as from English common law, which has persuasive, but not binding, authority on a court in the Cayman Islands. Your rights as a shareholders and the fiduciary responsibilities of the Company’s directors under Cayman Islands law are different from under statutes or judicial precedent in some jurisdictions in the United States. In particular, the Cayman Islands has a different body of securities laws from the United States and may provide significantly less protection to investors. In addition, some U.S. states, such as Delaware, have different bodies of corporate law than the Cayman Islands.

89

 

The Company has been advised by its Cayman Islands legal counsel, Maples and Calder, that the courts of the Cayman Islands are unlikely (i) to recognize or enforce against the Company judgments of courts of the United States predicated upon the civil liability provisions of the securities laws of the United States or any State and (ii) in original actions brought in the Cayman Islands, to impose liabilities against the Company predicated upon the civil liability provisions of the securities laws of the United States or any State, so far as the liabilities imposed by those provisions are penal in nature. In those circumstances, although there is no statutory enforcement in the Cayman Islands of judgments obtained in the United States, the courts of the Cayman Islands will recognize and enforce a foreign money judgment of a foreign court of competent jurisdiction without retrial on the merits based on the principle that a judgment of a competent foreign court imposes upon the judgment debtor an obligation to pay the sum for which judgment has been given provided certain conditions are met. For a foreign judgment to be enforced in the Cayman Islands, such judgment must be final and conclusive and for a liquidated sum, and must not be in respect of taxes or a fine or penalty, inconsistent with a Cayman Islands judgment in respect of the same matter, impeachable on the grounds of fraud or obtained in a manner, and/or be of a kind the enforcement of which is, contrary to natural justice or the public policy of the Cayman Islands (awards of punitive or multiple damages may well be held to be contrary to public policy). A Cayman Islands Court may stay enforcement proceedings if concurrent proceedings are being brought elsewhere. There is recent Privy Council authority (which is binding on the Cayman Islands Court) in the context of a reorganization plan approved by the New York Bankruptcy Court which suggests that due to the universal nature of bankruptcy/insolvency proceedings, foreign money judgments obtained in foreign bankruptcy/insolvency proceedings may be enforced without applying the principles outlined above. However, a more recent English Supreme Court authority (which is highly persuasive but not binding on the Cayman Islands Court), has expressly rejected that approach in the context of a default judgment obtained in an adversary proceeding brought in the New York Bankruptcy Court by the receivers of the bankruptcy debtor against a third party, and which would not have been enforceable upon the application of the traditional common law principles summarized above and held that foreign money judgments obtained in bankruptcy/insolvency proceedings should be enforced by applying the principles set out above, and not by the simple exercise of the Courts’ discretion. Those cases have now been considered by the Cayman Islands Court. The Cayman Islands Court was not asked to consider the specific question of whether a judgment of a bankruptcy court in an adversary proceeding would be enforceable in the Cayman Islands, but it did endorse the need for active assistance of overseas bankruptcy proceedings. The Company understands that the Cayman Islands Court’s decision in that case has been appealed and it remains the case that the law regarding the enforcement of bankruptcy/insolvency related judgments is still in a state of uncertainty.

 

The Company is incorporated in the Cayman Islands and following the Business Combination, will initially conduct all of its operations are currently conducted through its subsidiary, BPGIC, and once phase III is ready, will be conducted through the Company’s subsidiaries, BPGIC and BPGIC III, in the United Arab Emirates.UAE. All of the Company’s assets are located outside the United States. The Company’s officers and directors are expected to reside outside the United States and a substantial portion of the assets of those persons are located outside of the United States. As a result, it could be difficult or impossible for you to bring an action against the Company or against these individuals in the United States in the event that you believe that your rights have been infringed under the applicable securities laws or otherwise. Even if you are successful in bringing an action of this kind, the laws of the Cayman Islands and of the United Arab EmiratesUAE could render you unable to enforce a judgment against the Company’s assets or the assets of the Company’s directors and officers.

 

Shareholders of Cayman Islands exempted companies such as the Company have no general rights under Cayman Islands law to inspect corporate records and accounts or to obtain copies of lists of shareholders of these companies. The Company’s directors have discretion under Cayman Islands law to determine whether or not, and under what conditions, the Company’s corporate records could be inspected by the Company’s shareholders, but are not obliged to make them available to the Company’s shareholders. This could make it more difficult for you to obtain the information needed to establish any facts necessary for a shareholder motion or to solicit proxies from other shareholders in connection with a proxy contest.

 


As a result of all of the above, the Company shareholders might have more difficulty in protecting their interests in the face of actions taken by management, members of the board of directors or controlling shareholders than they would as public shareholders of a U.S. company.Company.

 

C. Material Contracts

 

Phase I & II Land Lease

On March 10, 2013, BPGIC entered into the Phase I & II Land Lease, as amended by the Novation Agreement dated September 1, 2014. The amended agreement binds BPGIC and FOIZ for a total term of 60 years. The leased land has a total area of 153,916.93 m2. BPGIC used this land to build Phase I and is currently using the remaining portion of the site to build Phase II. Upon mutual agreement of the parties, the term of the Phase I & II Land Lease can be renewed or extended for a further period, the term of which is unspecified and therefore subject to agreement between the parties.

BPGIC began paying rent under the Phase I & II Land Lease in 2014. The rent for 2019 was $2,313,323 and rent increases by 2 percent per annum. Payments are required to be made in advance (the time period of which is unspecified) in four equal quarterly instalments. BPGIC is required to pay all taxes imposed by the federal government of the UAE or FOIZ; however, the leased premises are in a free zone and BPGIC is entitled to all benefits applying to free zone entities, including benefits in respect of taxes.

The Phase I & II Land Lease required BPGIC to enter into the Port Facilities Agreement, which grants it certain usage and access rights in connection with the Port’s facilities. The term of the Port Facilities Agreement, which BPGIC entered into on March 31, 2016, is 25 years and it automatically renews for another 25 years at the end of its term. The Port Facilities Agreement requires BPGIC to pay certain fees in connection with the use of the Port of Fujairah’s facilities; however, the Phase I Customer Agreement and the Super Major Agreement provide that any fees charged by the Port of Fujairah in respect of services provided to BIA or the Super Major, including transportation, loading, unloading, use of berths, marine charges, administration charges, penalties and/or use of any of the Port of Fujairah’s facilities, shall be paid by BIA or the Super Major, respectively. Currently, the Phase I sublessees send BIA any such amounts to be paid, BIA delivers any such amounts to BPGIC, and BPGIC then sends such amounts to the Port. Once the BIA Refinery and Phase II become operational, BPGIC expects to follow a similar approach with BIA and the Phase II End User. The Super Major delivers any amounts payable to the Port of Fujairah to BPGIC, which passes the payments on to the Port. Pursuant to the Port Facilities Agreement, BPGIC is required to pay such amounts and is responsible for such amounts irrespective of whether the Super Major, the Phase I end users, the Phase II End User, or BIA pay such fees.

BPGIC is required to obtain the FOIZ’s prior permission in order to use the leased premises for any purpose other than in connection with Phase I and Phase II, or the BIA Refinery. The Phase I & II Land Lease contains representations and warranties, dispute resolution and indemnification clauses that are customary for the UAE and the oil storage industry. FOIZ can cancel the agreement if BPGIC fails to make certain required rental payments or fails to perform or meet in any material respect any material term, condition, covenant, agreement or obligation under the agreement.

The description of the Phase I & II Land Lease does not purport to summarize all of the provisions of the agreement as novated, and is qualified in its entirety by reference to the full text of such agreements, copies of which are attached hereto and incorporated by reference herein as Exhibits 4.17 and 4.18.


Phase I End User Agreement, Phase I Customer Agreement, and Super Major Agreement, and Commercial Storage Agreements

 

In an effort to de-risk the start-up of operations of Phase I, BPGIC entered into the Phase I End User Agreement. The Phase I End User Agreement, which went into effect on December 12, 2017. Pursuant to the Phase I End User Agreement, the Initial Phase I End User leased all 14 oil storage tanks in Phase I from BPGIC. The Phase I End User Agreement provided that the Initial Phase I End User would pay BPGIC (i) a monthly fixed storage fee to lease all of Phase I’s storage capacity (irrespective of whether the Initial Phase I End User utilized any storage capacity) and (ii) monthly variable ancillary service fees based on the Initial Phase I End User’s usage of the following ancillary services: throughput, blending, heating and inter-tank transfers. The Initial Phase I End User accounted for 100 percent of BPGIC’s revenue for the year ended December 31, 2018.

90

 

The Initial Phase I End User is an international energy trading company. Its activities include trading, financing, hedging, sourcing, storing, processing and transporting crude oil, fuel oil and clean petroleum products, including gas oil, gasoline and naphtha. Its goals are to provide quality services to its business partners, to leverage synergies with other companies and to identify and take advantage of new developments in its marketplace. The Initial Phase I End User primarily acts as an intermediary in the oil products and services supply chain by obtaining purchase or service orders for certain oil products (including fuel oil and refined petroleum products) from oil companies and then working with service providers like BPGIC to fulfil such orders.

 

In August 2019, BPGIC entered into the Phase I Customer Agreement to restructure its relationship with the Initial Phase I End User. Pursuant to the Phase I Customer Agreement, BPGIC leased the Phase I facility to BIA on identical price terms and otherwise substantially similar terms as those of the Phase I End User Agreement, and in connection therewith, BIA assumed BPGIC’s rights and obligations under the Phase I End User Agreement. In 2020, BIA notified BPGIC that it had entered sublease arrangements for parts of the Phase I storage capacity with additional end users.

 

In April and May 2020, BIA agreed to release an aggregate of 129,000 m3 of the Phase I capacity, amounting to approximately one thirdone-third of the total Phase I capacity, back to BPGIC. BPGIC, until November 8, 2020, subject to extension of the term for an additional six months upon the mutual agreement of the parties. On November 1, 2020, the parties mutually agreed to such extension of the term for an additional six months. On December 1, 2020 and December 7, 2020, BIA agreed to release additional 43,000 m3 and 61,072 m3, respectively, of the Phase I capacity back to BPGIC for respective six-month periods ending in June 2021, in each case, subject to extension for an additional six months upon the mutual agreement of the parties. On December 9, 2020, February 8, 2021 and February 10, 2021, BIA agreed to release additional 41,563 m3, 41,563 m3 and 83,126 m3, respectively, of the Phase I capacity back to BPGIC for respective six-month periods ending in June 2021 and August 2021, as applicable, in each case, subject to extension for an additional six months upon the mutual agreement of the parties.

As a result of the strong demand for storage both globally and in Fujairah, BPGIC was able to lease thisthe 129,000 m3 Phase I capacity initially released to it to the Super Major for a 6six month period pursuant to the Super Major Agreement subject to renewal for an additional 6six month period with the mutual agreement of the parties.

 

BIA is, and the Super Major arewas, required to pay (i) a monthly fixed storage fee to lease Phase I’s storage capacity and (ii) monthly variable ancillary service fees for the following ancillary services: throughput, blending, heating (BIA only) and inter-tank transfers. BIA is required to satisfy any amounts due for the monthly fixed storage fee in advance for each applicable month, and the Super Major paid for the storage fees for the full 6 monthsix-month term in advance. Because BIA subleases its storage capacity, BPGIC’s monthly revenue for ancillary services depends on the extent to which the Phase I sublessees and the Super Major utilize the ancillary services. Notwithstanding the sublease, BIA’s obligation to pay both the monthly fixed storage fee and the ancillary services fees to BPGIC is independent of is sublessees’ obligation to pay, and actual payment to, BIA. In November 2020, the Super Major Agreement was not renewed by mutual agreement.

From November 2020 till March 2021, the Company entered into nine Commercial Storage Agreements with the Storage Customers, eight of which agreements are still in effect. Four of these eight Commercial Storage Agreements each have a six months term, subject to an additional six month renewal, one agreement has a six months term, subject to an additional three months renewal, another agreement has a five months term, subject to an additional three months renewal, another agreement has a three months term, subject to an additional three months renewal, and the remaining agreement has a two months term, subject to additional two months renewal. These eight agreements are spread tank wise within a total of five reputed customers as compared to one single customer in previous periods.

Storage Fee

 

For the yearyears ended December 31, 2017,2018, December 31, 20182019 and December 31, 2019,2020, BPGIC respectively generated, 100 percent,respectively, 57.9 percent, 54.3 percent and 54.360.6 percent of its revenue from monthly fees for storage services, which the Initial Phase I End User and BIA paid to reserve all the storage space in the 14 oil storage tanks of Phase I. The Initial Phase I End User was, and BIA is, required to pay BPGIC the contracted rate per m3 per month. These fees were, and are, owed to BPGIC regardless of the storage capacity actually used. Further, BIA is obligated to pay the storage fees to BPGIC whether or not BIA receives payment, in turn, from the Initial Phase I End User.User or its other sublessees. As discussed in “Item 4.B4.A Information on the Company — History and Development of the Company”Development”, from the time BPGIC began its operations in December 2017 through February 28, 2018, BPGIC limited the availability of its Phase I storage capacity to 40 percentpercent. BPGIC then increased the availability of its Phase I storage capacity to approximately 70 percent on March 1, 2018 and to 100 percent on April 1, 2018. As a result of these limitations on the availability of storage capacity, BPGIC agreed with the Initial Phase I End User to pro-rate the monthly fixed storage fees to correspond with the amount of available storage capacity during each month prior to April 2018.

124

91

 

Ancillary Services

 

BPGIC charges BIA and the Super Majorall customers variable fees based on usage for the following ancillary services:

 

Throughput Fees.Pursuant to the Phase I Customer Agreement and the Super Major Agreement,existing Commercial Storage Agreements, BIA is and the Super Major,existing Storage Customers are, respectively, are required to pay BPGIC a monthly fee based upon the total volume of oil products delivered from the BPGIC Terminal to the Port of Fujairah’s berths or from the berths to the BPGIC Terminal during an applicable month at the contracted rate per m3. Each month BIA and the Super Majorexisting Storage Customers are each allocated an initial amount of throughput volume at no charge that corresponds with the storage capacity that they each lease. For BIA this amount is approximately 270,000 m3 each month and for the Super Major this amount is approximately 129,000 m3. Both BIA and the Super Majorexisting Storage Customers are required to pay BPGIC throughput fees on throughput volume to the extent the aggregate amount of throughput volume provided by BPGIC exceeds such initial amount. The revenue BPGIC generates from such service fees varies based upon, among other factors, the volume of oil products exiting the BPGIC Terminal. As BIA’s sublessees and the Super Major,existing Storage Customers utilize the ancillary services, which involves sending and receiving oil products to and from the BPGIC Terminal, it will lead to corresponding increases in the throughput volumes delivered to the extent BPGIC sends oil products to the Port of Fujairah’s berths. Upon mutual agreement, BPGIC could charge a supplementary fee to the extent BIA or the Super Major exceedany Storage Customer exceeds an agreed amount of throughput volume.

Blending Fees. Pursuant to the Phase I Customer Agreement and the Super Major Agreement,existing Commercial Storage Agreements, BIA and the Super Major,each existing Storage Customer is, respectively, are required to pay BPGIC a monthly fee based upon the total volume of oil products blended during the blending processes performed during an applicable month at the contracted rate per m3. BIA and the Super Major areeach existing Storage Customer is responsible for providing BPGIC with blend specifications, the component oil products and any additives in connection with any blend request. The revenue BPGIC generates from such service fees varies based upon the activity levels of BIA’s sublessees, and the Super Major.existing Storage Customers.

Heating Fees. Pursuant to the Phase I Customer Agreement, BIA is required to pay BPGIC a monthly fee based upon the total volume of oil products heated during an applicable month at the contracted rate per m3. The revenue BPGIC generates from such service fees varies based upon the activity levels of BIA’s sublessees. The Super Major doesexisting Storage Customers do not contract for heating services.

Inter-Tank Transfer Fees. Pursuant to the Phase I Customer Agreement and the Super Major Agreement,existing Commercial Storage Agreements, BIA is and the Super Majorexisting Storage Customers are required to pay BPGIC a monthly fee based upon the total volume of oil products that they transferred between oil storage tanks during an applicable month at the contracted rate per m3. The revenue BPGIC generates from such service fees varies based upon the activity levels of BIA’s sublessees and the Super Major.existing Storage Customers.


The term of the Super Major Agreement is six months and is renewable for an additional six months with the mutual agreement of the parties. Pursuant to the Super Major Agreement, following the Super Major’s failure to cure a default for non-payment or the commencement of insolvency proceedings against it (amongst other events of default), BPGIC could terminate the agreement. Following a termination for default, the Super Major would be required to pay BPGIC the equivalent of total storage fees that would have been charged to the Super Major had the agreement not been terminated.

 

The term of the Phase I Customer Agreement is four years and renews automatically for another five years, unless either party delivers to the other party a written termination notice not less than six months prior to the expiration date of the agreement. Pursuant to the Phase I Customer Agreement, following BIA’s failure to cure a default for non-payment or the commencement of insolvency proceedings against it, BPGIC could terminate the agreement, and exercise any other remedies available at law or equity. Following a termination for default, BIA would be required to pay BPGIC the one-year equivalent of total service fees that would have been charged to BIA had the agreement not been terminated.

 

The Phase I Customer Agreement and the Super Major Agreement bothexisting Commercial Storage Agreements provide that any fees charged by the Port of Fujairah in respect of BIA (or its sublessees) or the Super Major,existing Storage Customers, as applicable, including transportation, loading, unloading, use of berths, marine charges, administration charges, penalties and/or use of any of the Port of Fujairah’s facilities, shall be paid by BIA or the Super Major,existing Storage Customers, as applicable.

 

Every two years, BPGIC may elect to review and seek to amend the fees charged under the Phase I Customer Agreement to the fair market rate of the relevant services at such time. As a result of such review, the rates shall equal either (i) the then-current rates or (ii) the market rates agreed between the parties, but only if such rates are higher than the then-current rates.

92

Sublessees

 

The Phase I Customer Agreement contemplates that BIA, subject to BPGIC’s prior approval, may enter into sublease agreements from time to time to assign its rights under the Phase I Customer Agreement to sublessees. In connection with the Phase I Customer Agreement, BIA assumed the rights and obligations of BPGIC under the Phase I End User Agreement and thereby sublet the Phase I facility. In 2020, BIA notified BPGIC that it had entered sublease arrangements for parts of the Phase I storage capacity with additional end users. Notwithstanding the sublease to the Phase I end users, BIA is responsible for both the storage fee and the ancillary service feefees without regard to whether BIA receives payment from the Phase I end users. Similarly, the Super Major Agreement permits the Super Major, subject to BPGIC’s prior approval, to enter into sublease agreements from time to time to assign its rights under the Super Major Agreement to sublessees.

 

The fees under any such sublease agreements are generally expected to mirror the fees of the Phase I Customer Agreement and the Super Major Agreement, but may be higher in the event of increased demand for storage. Under the Phase I Customer Agreement, sublessees may engage directly with BPGIC such that BPGIC delivers services to them and they pay applicable fees to BPGIC for such services. BIA’s sublessees may also interface directly with BPGIC to file complaints and to arrange any surveyor inspections.

 

Prior to doing any business with BPGIC, BPGIC expects that each potential sublessee will perform an intensive inspection of the BPGIC Terminal. The inspections generally entail an examination of various components of the terminal, including the oil storage tanks, jetty pipelines, internal manifold and operational control room, and various aspects of the operations, including flow rates, contamination rates, oil losses and process documentation.

 


BPGIC plans to perform a background check on all potential sublessees prior to accepting them as sublessees. BPGIC also plans to coordinate with a third party to perform such background checks and, among other things, confirm that any potential sublessee is not a sanctioned entity.

 

Pursuant to the Phase I Customer Agreement, the product specifications of the sublessees’ oil products must be approved by BPGIC before any sublessees can deliver any oil products to the BPGIC Terminal. Such oil products must also be in compliance with the Port of Fujairah’s environmental standards, the relevant tank specifications, and must not be considered “hazardous”. BPGIC also retains the right pursuant to the Phase I Customer Agreement to refuse any oil products that are proven to be sanctioned, poor quality or hazardous. Similarly, under the Super Major Agreement,existing Commercial Storage Agreements, BPGIC has the right to refuse any oil products that do not conform with the description of the products provided by the Super Major,existing Storage Customers, that may result in danger or damage to persons, goods, the BPGIC Terminal or property generally, that may cause environmental damage or that violate Port regulations or applicable laws.

 

The description of the Phase I Customer Agreement does not purport to summarize all of the provisions of the agreement and is qualified in its entirety by reference to the full text of such agreement, a copy of which is attached hereto and incorporated by reference herein as Exhibit 4.66.

 

The descriptiondescriptions of the Super Major Agreement doesCommercial Storage Agreements do not purport to summarize all of the provisions of the agreementagreements and isare qualified in itstheir entirety by reference to the full text of each such agreement, a copycopies of which isare attached hereto and incorporated by reference herein as Exhibit 4.90.Exhibits 4.96 through 4.103.

 

Refinery Agreement

 

In February 2020, BPGIC and Sahara mutually agreed to discontinue their joint development discussions to install a modular oil refinery at BPGIC’s terminal. Shortly thereafter, BPGIC entered into the Refinery Agreement with BIA which provides that the parties will use their best efforts to finalize the technical and design feasibility studies for the BIA Refinery, a refinery with a capacity of 25,000 bpd.b/d. The parties further agreed to negotiate, within 30 days, the Refinery Operations Agreement, a sublease agreement and a joint venture agreement to govern the terms on which (i) BPGIC will sublease land to BIA to locate, (ii) BIA will construct, and (iii) BPGIC will operate the BIA Refinery. Due to the COVID-19 pandemic, theThe parties have agreed to extend the period for their negotiations until August 4, 2020.the Second Quarter of 2021.

 

BPGIC is in discussion with BIA to develop and operate the BIA Refinery at minimal cost to BPGIC. BPGIC and BIA are still negotiating the Refinery Operations Agreement, however BPGIC expects that BIA will finance and arrange the development, construction and commissioning of a modular refinery on a parcel of BPGIC’s remaining unutilized land. BPGIC anticipates that BIA will engage an EPC Contractorcontractor to design and procure construction and commission of the BIA Refinery. BPGIC currently projects that the BIA Refinery will be completed by the Secondend of the First Quarter of 2021, and will commence operations in the Third Quarter of 2021.2022. The BIA Refinery is expected to be amongstamong the first refineries in the MENA region capable of supplying IMO 2020 compliant 0.5% sulphur content shipping fuel. The facility is initially expected to have an initial production capacity of 25,000 b/d.

 

The description of the Refinery Agreement does not purport to summarize all of the provisions of the agreement and is qualified in its entirety by reference to the full text of such agreement and the letter agreements related thereto, copies of which are attached hereto and incorporated by reference herein as Exhibits 4.85, 4.86, 4.87, 4.94, 4.104 and 4.88.4.111.

93

 

Phase II End User Agreement and Phase II Customer Agreement

 

As was the case with Phase I, in order to de-risk the start-up of operations of Phase II, on June 27, 2018, BPGIC entered into the Phase II End User Agreement with the Phase II End User, an international commodities trading company. The Phase II End User agreed to lease all eight oil storage tanks in Phase II. The Phase II End User Agreement provides that the Phase II End User will pay (i) a monthly fixed storage fee to lease all of Phase II’s storage capacity (irrespective of whether the Phase II End User uses any storage capacity) and (ii) monthly variable ancillary service fees based on the Phase II End User’s usage of the following ancillary services: throughput, blending, heating and inter-tank transfers.

 

The Phase II End User is an international commodities trading company. Its activities include sourcing, marketing, trading and distributing crude oil and oil products. Generally, its goals are to continue to maintain its long-term business relationships, apply innovative trading solutions and help smooth worldwide energy markets. The Phase II End User primarily acts as an intermediary in the oil products and services supply chain by obtaining purchase or service orders for certain oil products (including crude oil) from oil companies and then working with service providers like BPGIC to fulfil such orders. BPGIC expects the Phase II End User to utilize BPGIC’s storage and ancillary services to fulfil the needs of its customers. BPGIC expects its revenue for its ancillary services to vary based on the orders the Phase II End User receives from its customers.

 


In September 2019, with the consent of the Phase II End User, BPGIC entered into the Phase II Customer Agreement to restructure its relationship with the Phase II End User. Pursuant to the Phase II Customer Agreement, BPGIC has agreed to lease the Phase II facility, once operational, to BIA on identical price terms and otherwise substantially similar terms as those of the Phase II End User Agreement, and in connection therewith, BIA assumed BPGIC’s rights and obligations under the Phase II End User Agreement. BIA will become BPGIC’s customer with respect to Phase II once it becomes operational, which is expectedoperational. In August 2020, BPGIC commenced hydrotesting of the Phase II facility and BPGIC expects Phase II operations to occurcommence during second halfthe Third Quarter of 2020.2021. Like the Phase II End User, BIA will be required to pay (i) a monthly fixed storage fee to lease all of Phase II’s storage capacity and (ii) monthly variable ancillary service fees for the following ancillary services: throughput, blending, heating and inter-tank transfers. BIA is required to satisfy any amounts due for the monthly fixed storage fee in advance for each applicable month. Because BIA agreed to sublease the facility to the Phase II End User, BPGIC’s monthly revenue for ancillary services depends on the extent to which the Phase II End User utilizes the ancillary services. Notwithstanding the sublease, BIA’s obligation to pay both the monthly fixed storage fee and the ancillary services fees to BPGIC is independent of the Phase II End User’s obligation to pay, and actual payment to, BIA. Similar to the commencement of operations for Phase I, BPGIC may initially commence operations of Phase II in accordance with certain required safety measures and ramp up utilization of its storage capacity and ancillary services over time to mitigate any potential operational risks. This would impact the amount of storage and ancillary service fees BPGIC would earn during the first quarter of operations under the Phase II Customer Agreement.

Storage Fee

 

Upon the commencement of the Phase II Customer Agreement, BIA will be required to pay the contracted rate per m3 per month. Every two years, BPGIC will have the option to seek to adjust the storage fee to the applicable market price, as determined by mutual agreement. In connection with such determinations, BPGIC plans to consider various factors, including the availability of storage capacity in the Fujairah region and the storage rate charged by other crude oil storage companies in the region. BPGIC also plans to act reasonably and to provide BIA with supporting documentation to justify any proposed rate changes. Following an adjustment to the storage fee, BIA will then be required to pay the higher of: (i) the contracted floor price per m3 and (ii) the agreed market price for storage. These fees will be owed to BPGIC regardless of the storage capacity actually used by BIA.

Ancillary Services

 

Upon the commencement of the Phase II Customer Agreement, BPGIC will charge BIA variable fees based on usage for the following ancillary services:

Throughput Fees. Pursuant to the Phase II Customer Agreement, BIA will be required to pay BPGIC a monthly fee based upon the total volume of oil products delivered from the BPGIC Terminal to the Port of Fujairah’s berths and the VLCC jetty, or from the berths and the VLCC jetty to the BPGIC Terminal, as applicable, during an applicable month at the contracted rate per m3. Each month BIA will be allocated an initial amount of throughput volume at no charge that corresponds with the monthly storage capacity leased by it. As BIA will lease all the storage capacity of Phase II, the amount is approximately 601,261 m3 eachper month. BIA will be required to pay BPGIC throughput fees on throughput volume to the extent the aggregate amount of throughput volume provided by BPGIC exceeds such initial amount. The revenue BPGIC generates from such service fees will vary based upon, among other factors, the volume of oil products exiting the BPGIC Terminal. As BIA’s sublessee, the Phase II End User, utilizes the ancillary services, which involves sending and receiving oil products to and from Phase II, it will lead to corresponding increases in the throughput volumes delivered to the extent BPGIC sends oil products to the Port of Fujairah’s berths and the VLCC jetty, as applicable.

94

Blending Fees. Pursuant to the Phase II Customer Agreement, BIA will be required to pay BPGIC a monthly fee based upon the total volume of oil products blended during the blending processes performed during an applicable month at the contracted rate per m3. BIA is responsible for providing BPGIC with blend specifications, the component oil products and any additives in connection with any blend request. The revenue BPGIC generates from such service fees will vary based upon the activity levels of BIA’s sublessee, the Phase II End User.

Heating Fees. Pursuant to the Phase II Customer Agreement, BIA will be required to pay BPGIC a monthly fee based upon the total volume of oil products heated during an applicable month at the contracted rate per m3. The revenue BPGIC generates from such service fees will vary based upon the activity levels of BIA’s sublessee, the Phase II End User.

128

Inter-Tank Transfer Fees. Pursuant to the Phase II Customer Agreement, BIA is required to pay BPGIC a monthly fee based upon the total volume of oil products transferred between oil storage tanks during an applicable month at the contracted rate per m3.m3. The revenue BPGIC generates from such service fees will vary based upon the activity levels of BIA’s sublessee, the Phase II End User.

 

The term of the Phase II Customer Agreement, which will commence seven calendar days after BPGIC notifies BIA in writing that Phase II is ready to commence operations, is five years and renews automatically for another five years. Pursuant to the Phase II Customer Agreement, following BIA’s failure to cure a default for non-payment or the commencement of insolvency proceedings against it, BPGIC could terminate the agreement, prevent BIA from discharging any oil products from the oil storage tanks and exercise any other remedies available at law or equity. Following a termination for default, BIA would be required to pay BPGIC a termination fee equal to the aggregate amount that would have become due over the following year. In the event that insolvency proceedings are commenced against BPGIC or the expected completion time for the construction of Phase II is exceeded by Audex and BPGIC fails to provide BIA with regular updates on the readiness of Phase II well in advance of the expected construction completion time, BIA would have the option to terminate the Phase II Customer Agreement. Any delays in or failures of performance by either party will not constitute a default or give rise to liability to the extent that such delays or failures are caused by events or circumstances that would be considered a “force majeure” event under the Phase II Customer Agreement. Force majeure events include events that are not within the reasonable control of the parties and that the parties may be unable to foresee or prevent, including acts of war, terrorism and certain natural disasters.

 

The Phase II Customer Agreement provides that any fees charged by the Port of Fujairah in respect of BIA, including transportation, loading, unloading, use of berths, marine charges, administration charges, penalties and/or use of any of the Port of Fujairah’s facilities, shall be paid by BIA.

Sublessees

 

The Phase II Customer Agreement contemplates that BIA, subject to BPGIC’s prior approval, may enter into sublease agreements from time to time to assign its rights under the Phase II Customer Agreement to sublessees. By assuming BPGIC’s rights and obligations under the Phase II End User Agreement, BIA subleased the Phase II facility to the Phase II End User. Notwithstanding the sublease to the Phase II End User, BIA is responsible for both the storage fee and the ancillary service fee without regard to whether BIA receives payment from the Phase II End User.

 

The fees under any such sublease agreements are generally expected to mirror the fees of the Phase II Customer Agreement. Sublessees may engage directly with BPGIC such that BPGIC delivers services to them and they pay applicable fees to BPGIC for such services. Sublessees may also interface directly with BPGIC to file complaints and to arrange any surveyor inspections.

 

Prior to doing any business with BPGIC, BPGIC expects that each potential sublessee will perform an intensive inspection of the BPGIC Terminal. The inspections generally entail an examination of various components of the BPGIC Terminal, including the oil storage tanks, jetty pipelines, internal manifold and operational control room, and various aspects of the operations, including flow rates, contamination rates, oil losses and process documentation.

 

BPGIC plans to perform a background check on all potential sublessees prior to accepting them as sublessees. BPGIC also plans to coordinate with a third party to perform such background checks and, among other things, confirm that any potential sublessee is not a sanctioned entity.

 

Pursuant to the Phase II Customer Agreement, the product specifications of the sublessee’s oil products must be approved by BPGIC before any sublessees can deliver any oil products to the BPGIC Terminal. Such oil products must also be in compliance with the Port of Fujairah’s environmental standards, the relevant tank specifications, and must not be considered “hazardous”. BPGIC also retains the right pursuant to the Phase II Customer Agreement to refuse any oil products that are proven to be sanctioned, poor quality or hazardous.

 

The description of the Phase II Customer Agreement does not purport to summarize all of the provisions of the agreement and is qualified in its entirety by reference to the full text of such agreement, a copy of which is attached hereto and incorporated by reference herein as Exhibit 4.70.4.69.

 


95

Commercial Storage Agreements

On November 11, 2020, BPGIC entered into the Synergy Storage Agreement with Synergy, pursuant to which BPGIC leased 43,000 m3 of storage capacity of the Phase I facility to Synergy for a period of fifteen days subject to renewal for an additional fifteen days with the mutual agreement of the parties. On January 15, 2021 the Synergy Storage Agreement was terminated.

On November 19, 2020, BPGIC entered into a commercial storage agreement with A&T, pursuant to which BPGIC leased 24,928 m3 of storage capacity of the Phase I facility to A&T for a period of six months subject to renewal for an additional six month period with the mutual agreement of the parties. On November 26, 2020, BPGIC and A&T entered into another commercial storage agreement whereby BPGIC leased an additional 43,000 m3 of storage capacity of the Phase I facility to A&T for a period of six months subject to renewal for an additional six month period with the mutual agreement of the parties.

On November 19, 2020 and December 6, 2020, BPGIC entered into a commercial storage agreement with Jaykay, pursuant to which BPGIC leased 61,072 m3 of storage capacity of the Phase I facility to Jaykay for a period of six months subject to renewal for an additional six month period with the mutual agreement of the parties. On December 6, 2020, BPGIC and Jaykay entered into another commercial storage agreement whereby BPGIC leased an additional 61,072 m3 of storage capacity of the Phase I facility to Jaykay for a period of six months subject to renewal for an additional six month period with the mutual agreement of the parties.

On January 15, 2021, BPGIC entered into the NuFuel Storage Agreement with NuFuel, pursuant to which BPGIC leased 41,563 m3 of storage capacity of the Phase I facility to NuFuel for a period of three months subject to renewal for an additional three month period with the mutual agreement of the parties.

On February 14, 2021, BPGIC entered into the SAA Storage Agreement with SAA, pursuant to which BPGIC leased 41,563 m3 of storage capacity of the Phase I facility to SAA for a period of two months subject to renewal for an additional two month period with the mutual agreement of the parties.

On March 04, 2021, BPGIC entered into the A&T Storage Agreement with A&T, pursuant to which BPGIC leased 83,126 m3 of storage capacity of the Phase I facility to SAA for a period of six months subject to renewal for an additional three month period with the mutual agreement of the parties.

On March 30, 2021, BPGIC with mutual agreement with A&T novated the agreement entered on March 04, 2021 to the new customer Valor with effect from April 8, 2021 for the same quantity leased to A&T of 83,126 m3.

The descriptions of the Commercial Storage Agreements do not purport to summarize all of the provisions of the agreements and are qualified in their entirety by reference to the full text of each such agreement, copies of which are attached hereto and incorporated by reference herein as Exhibits 4.96 through 4.103.

Business Combination Agreement

 

On April 15, 2019, (i) Twelve Seas (now known as BPGIC International), (ii) the Company (f/k/a Brooge Holdings Limited), (iii) Merger Sub, and (iv) BPGIC, entered into the Business Combination Agreement, pursuant to which BPGIC Holdings also become a party thereafter pursuant to the Assignment and Joinder to Business Combination Agreement dated as of November 19, 2019 (as assignee of Brooge Petroleum and Gas Investment Company (BPGIC) PLC, which became a party to the Business Combination Agreement pursuant to a Joinder to Business Combination Agreement dated as of May 10, 2019) pursuant to which, subject to the terms and conditions thereof, upon the consummation of the transactions contemplated thereby upon the Closing, among other matters, (a) Twelve Seas merged with and into Merger Sub, with Twelve Seas continuing as the surviving entity with the name BPGIC International, and as a wholly-owned subsidiary of the Company and with holders of the Twelve Seas’ securities receiving substantially equivalent securities of the Company, and (b) the Company acquired all of the issued and outstanding Ordinary Shares of BPGIC from BPGIC Holdings in exchange for 98,718,035 Ordinary Shares of the Company, subject to the withholding of the Seller Escrow Shares being deposited in the Seller Escrow Account in accordance with the terms and conditionsAgreement. A summary of the Business Combination Agreement and the Seller EscrowBusiness Combination is provided in “Introduction” and “Item 5. Operating and Financial Review and Prospects — Brooge Energy Limited Management’s Discussion and Analysis of Financial Condition and Results of Operations — Business Combination and NASDAQ Listing Transactions” in this Report.

On December 20, 2019, pursuant to a Business Combination Agreement, and $13,225,827.22, and with BPGIC becoming a wholly-owned subsidiary of the Company.among other matters:

(i)Twelve Seas merged with and into Merger Sub, with Twelve Seas continuing as the surviving entity and a wholly-owned subsidiary of the Company (under the name BPGIC International), with the holders of Twelve Seas’ securities receiving substantially equivalent securities of the Company; and

(ii)the Company acquired all of the issued and outstanding ordinary shares of BPGIC from BPGIC Holdings in exchange for 98,718,035 Ordinary Shares of the Company and cash in the amount of $13,225,827.22, with BPGIC becoming a wholly-owned subsidiary of the Company.

96

 

Upon consummation of the Business Combination, pursuant to the terms of the Business Combination Agreement, the Company’s Ordinary Shares and warrants to purchase Ordinary Shares became listed on Thethe Nasdaq StockCapital Market.

 

The description of the Business Combination Agreement does not purport to summarize all of the provisions of the agreement and is qualified in its entirety by reference to the full text of such agreement, a copy of which is attached hereto and incorporated by reference herein as Exhibit 4.58.4.61.

 

Amended Founders’ Share Escrow Agreement

 

On June 19, 2018, Twelve Seas entered into thea Share Escrow Agreement, by and among Twelve Seas, the Initial Twelve Seas Shareholders and Continental, as escrow agent (the “Founders’ Share Escrow Agreement”). On December 20, 2019, the Company entered into the Share Escrow Agreement Amendment, by and among the Company, Twelve Seas, the Initial Twelve Seas Shareholders and Continental, as escrow agent (the Founders’ Share Escrow Agreement as amended by the Share Escrow Agreement Amendment, the “Amended Founders’ Share Escrow Agreement”).

 

The Amended Founders’ Share Escrow Agreement providesprovided that 2,587,500 shares held by Twelve Seas Sponsor, (the “Founders’ Lock-Up Shares”) willwere be held in escrow, withto be released one year after the date of the Closing, provided that 50% of such Founders’ Lock-Up Shares were subject to possibleearlier release from escrow upon certain milestones being met prior to one year after the date of Closing, but in any event, all Founders’ Lock-Up Shares to be released one year after the date of the Closing. Further, the Founders’ Lock-Up Shares may also be released prior to one year after the date of Closing, if, subsequent to the Closing, the Company consummates a liquidation, merger, share exchange or other similar transaction which results in all of its shareholders having the right to exchange their Ordinary Shares for cash, securities or other property. During the Escrow Period (as defined in the Amended Founders’ Share Escrow Agreement), the only permitted transfers of the Founders’ Lock-Up Shares will be (i) for transfers to the Company’s officers, directors or their respective affiliates (including, where an Initial Twelve Seas Shareholder is an entity, as a distribution to partners, members or shareholders of such Initial Twelve Seas Shareholder upon its liquidation and dissolution) (ii) by bona fide gift to a member of the Initial Twelve Seas Shareholder’s immediate family or to a trust, the beneficiary of which is the Initial Twelve Seas Shareholder or a member of the Initial Twelve Seas Shareholder’s immediate family for estate planning purposes, (iii) by virtue of the laws of descent and distribution upon death of the Initial Twelve Seas Shareholder, (iv) pursuant to a qualified domestic relations order, (v) by certain pledges to secure obligations incurred in connection with purchases of the Company’s securities, (vi) by private sales made at or prior to the consummation of the transactions under the Business Combination Agreement at prices no greater than the price at whichOn December 20, 2020, the Founders’ Lock-Up Shares were originally purchased or (vii) to the Company for cancellation or in connection with the consummation of the transactions under the Business Combination, in each case, except for clause (vii) or with the Company’s prior consent, on the condition that such transfers may be implemented only upon the respective transferee’s written agreement (in a form reasonably acceptable to the Company) to be bound,inter alia, by the terms and conditions of the Amended Founders’ Share Escrow Agreement.released from their lock up restriction.

 

The description of the Amended Founders’ Share Escrow Agreement does not purport to summarize all of the provisions of the agreement and is qualified in its entirety by reference to both the full text of such agreement, a copy of which was filed by Twelve Seas as Exhibit 10.3 to the Current Report on Form 8-K, filed by Twelve Seas with the SEC on June 25, 2018 and is incorporated by reference herein as Exhibit 4.7,4.9, and by reference to the full text of the amendment to such agreement, a copy of which is attached hereto and incorporated by reference herein as Exhibit 4.75.4.74.

 


A&R Founders’ Registration Rights Agreement

 

The Company entered into the Amended and Restated Founders’ Registration Rights Agreement (the “A&R Founders’ Registration Rights Agreement”), dated as of December 20, 2019, by and among the Company, Twelve Seas, EarlyBirdCapital, Inc. (“EBC”)Early Bird Capital and the Initial Twelve Seas Shareholders (the Initial Twelve Seas Shareholders and EBC,Early Bird Capital, collectively, the “Twelve Seas Insiders” and the securities held by the Twelve Seas Insiders the “Twelve Seas Insider Securities”).

 

Pursuant to the A&R Founders’ Registration Rights Agreement, the holders of a majority-in-interest of the Twelve Seas Insider Securities are entitled to make demands that the Company register such securities, however the Company is not obligated to effect more than an aggregate of two such demand registrations. With respect to such Twelve Seas Insider Securities which arewere subject to escrow under the Amended Founders’ Share Escrow Agreement, the holders of the majority-in-interest of the Twelve Seas Insider Securities canwere entitled to elect to exercise their registration rights at any time commencing two months prior to the date on which such securities arewere to be released from escrow under the Amended Founders’ Share Escrow Agreement.escrow. With respect to such Twelve Seas Insider Securities which are subject to escrow under the Initial Shareholder Escrow Agreement, the holders of the majority-in-interest of the Twelve Seas Insider Securities can elect to exercise their registration rights when such securities are released from escrow under the Initial Shareholder Escrow Agreement. With respect to such Twelve Seas Insider Securities which are not subject to any escrow, the registration rights may be exercised at any time on or after the date of Closing. Subject to certain exceptions, if the Company proposes to file a registration statement under the Securities Act with respect to the registration of or an offering of equity securities, under the A&R Founders’ Registration Rights Agreement, the Company shallmust give notice to the Twelve Seas Insiders and all other holders of Registrable Securities (as defined in the A&R Founders’ Registration Rights Agreement) as to the proposed filing and offer them an opportunity to register the sale of such number of Registrable Securities as requested by the holders in writing, subject to customary cut-backs. In addition, the A&R Founders’ Registration Rights Agreement provides that subject to certain exceptions, the holders of Registrable Securities shall be entitled under the A&R Founders’ Registration Rights Agreement to request in writing that the Company register the resale of any or all of such Registrable Securities on Form F-3 or S-3 and any similar short-form registration that may be available at such time. Under the A&R Founders’ Registration Rights Agreement, the Company agreesagreed to indemnify the holders of Registrable Securities and certain persons or entities related to them such as their officers, directors, employees, agents and representatives, against any losses or damages resulting from any untrue statement of a material fact or omission of a material fact in any registration statement or prospectus pursuant to which they sell such Registrable Securities, unless such liability arose from the Company’s reliance upon and conformity with information furnished in writing by such holder (or certain persons or entities related to them), for use in such documents. The holders of Registrable Securities will indemnify the Company and certain persons or entities related to the Company, such as its officers and directors and underwriters, against any losses that arise out of or are based upon such untrue statement of a material fact or omission to state a material fact, in any registration statement or prospectus pursuant to which they sell their Registrable Securities, where they were made (or not made) by the Company in reliance upon and in conformity with information furnished in writing to it by such holder.

 

The description of the A&R Founders’ Registration Rights Agreement does not purport to summarize all of the provisions of the agreement and is qualified in its entirety by reference to the full text of such agreement, a copy of which is attached hereto and incorporated by reference herein as Exhibit 4.74.4.73.

 


97

Seller Escrow Agreement

 

As contemplated by the Business Combination Agreement, at the Closing, the Seller Escrow Shares which are Twenty Million (20,000,000) of the Company’s Ordinary Shares otherwise issuable to BPGIC Holdings at the Closing together with any equity securities paid as dividends or distributions with respect to such shares or into which such shares are exchanged or converted, were instead issued to BPGIC Holdings in escrow, and are held by Continental, as escrow agent for the benefit of BPGIC Holdings, to be held and controlled, along with any other Seller Escrow Property by Continental in a separate segregated escrow account (the “Seller Escrow Account”), and released in accordance with the Seller Escrow Agreement.

 

While the Seller Escrow Property is held in the Seller Escrow Account, BPGIC Holdings shall have all voting, consent and other rights (other than the rights to dividends, distributions or other income paid or accruing to the Seller Escrow Property). The Seller Escrow Agreement provides, however, that after the Closing, BPGIC Holdings shall be permitted to (i) pledge or otherwise encumber the Seller Escrow Property as collateral security for documented loans entered into by BPGIC Holdings, the Company or its subsidiaries, including BPGIC, after the Closing or (ii) transfer its rights to the Seller Escrow Property to a third party, provided, that (a) in each case of clauses (i) and (ii), that the lender’s or transferee’s rights to any such pledged or transferred Seller Escrow Property shall be subject to the provisions of the Seller Escrow Agreement and the sections of the Business Combination Agreement pertaining to the escrow, including the forfeiture provisions contained therein, and (b) in the event of a pledge or encumbrance of the Seller Escrow Property under clause (i) above, BPGIC Holdings may transfer the Seller Escrow Property to another escrow agent selected by BPGIC Holdings and reasonably acceptable to the Company.

 

The Seller Escrow Property will only become vested and not subject to forfeiture, and released to BPGIC Holdings, in the event that the Company meets the following performance or milestone requirements during the Seller Escrow Period, the period commencing from the Closing until the end of the twentieth (2020th) fiscal quarter after the commencement date of the first full fiscal quarter beginning after the Closing:

 

(i) One-half (½) of the Seller Escrow Property shall become vested and no longer subject to forfeiture, and be released to BPGIC Holdings, in the event that either: (a) the Annualized EBITDA (as defined in the Seller Escrow Agreement) for any full fiscal quarter during the Seller Escrow Period beginning with the first Seller Escrow Quarter equals or exceeds $175,000,000 or (b) at any time during the Seller Escrow Period, the closing price of the Company Ordinary Shares equals or exceeds $12.50 per share (subject to equitable adjustment) for any ten (10)10 Trading Days (as defined in the Seller Escrow Agreement) within any twenty (20)20 Trading Day period during the Seller Escrow Period.

 

(ii) All Seller Escrow Property remaining in the Seller Escrow Account shall become vested and no longer subject to forfeiture, and be released to BPGIC Holdings, in the event that either: (a) the Annualized EBITDA for any Seller Escrow Quarter equals or exceeds $250,000,000 or (b) at any time during the Seller Escrow Period, the closing price of the Company Ordinary Shares equals or exceeds $14.00 per share (subject to equitable adjustment) for any ten (10)10 Trading Days within any twenty (20)20 Trading Day period during the Seller Escrow Period.

 


The Annualized EBITDA for each fiscal quarter is equal to four times the earnings before interest, income taxes, depreciation and amortization of the Company and its subsidiaries, on a consolidated basis, for such fiscal quarter, as determined in accordance with IFRS, consistently applied, but subject to certain adjustments set forth on Exhibit A toin the Seller Escrow Agreement.

 

At the end of the Seller Escrow Period, if there is any Seller Escrow Property which has not vested and that BPGIC Holdings is not entitled to receive in accordance with the Seller Escrow Agreement and the Business Combination Agreement, such Seller Escrow Property will be forfeited and automatically surrendered by BPGIC Holdings and distributed to the Company from the Seller Escrow Account, for cancellation by the Company. All actions or determinations on behalf of the Company under the Seller Escrow Agreement after the Closing (other than certain reports to be delivered by the Company’s chief financial officer) will be exclusively made and determined by a majority of the independent directors then serving on the Company’s board of directors that are disinterested in the Seller Escrow Property.

 

The description of the Seller Escrow Agreement does not purport to summarize all of the provisions of the agreement and is qualified in its entirety by reference to both the full text of such agreement, a copy of which was filed by Twelve Seas as Exhibit 10.1 to the Current Report on Form 8-K, filed by Twelve Seas with the SEC on May 13, 2019 and is incorporated by reference herein as Exhibit 4.59,4.62, and by reference to the full text of the First Amendment to such agreement, a copy of which is attached hereto and incorporated by reference herein as Exhibit 4.72.4.71.

98

 

Initial Shareholder Escrow Agreement

 

As contemplated by the Business Combination Agreement, at the Closing, One Million Five Hundred Fifty-Two Thousand Five Hundred (1,552,500)1,552,500 of the Company’s Ordinary Shares otherwise issuable to the Initial Twelve Seas Shareholders at the Closing (together with any equity securities paid as dividends or distributions with respect to such Ordinary Shares or into which such Ordinary Shares are exchanged or converted, the “Founders’ Earn-Out Escrow Shares” and together with the Founders’ Lock-Up Shares, the “Founders’ Shares”) were instead issued to the Initial Twelve Seas Shareholders in escrow and are held by Continental, as escrow agent for the benefit of the Initial Twelve Seas Shareholders to be held and controlled, along with any other Founder Escrow Property (as defined in the Initial Shareholder Earn-Out Escrow Agreement and together with the Founders’ Earn-Out Escrow Shares, the “Founders’ Earn-Out Escrow Property”) by Continental in a separate segregated escrow account (the “Founders’ Earn-Out Escrow Account”), and released in accordance with the Escrow Agreement, dated December 20, 2019 by and among the Initial Twelve Seas Shareholders, Continental and the Company (the “Initial Shareholder Escrow Agreement”).

 

While the Founders’ Earn-Out Escrow Property is held in the Founders’ Earn-Out Escrow Account, the Initial Twelve Seas Shareholders shall have all voting, consent and other rights (other than the rights to dividends, distributions or other income paid or accruing to the Founders’ Earn-Out Escrow Property). The Initial Shareholder Escrow Agreement provides, however, that each Initial Twelve Seas Shareholder shall be permitted to (i) pledge or otherwise encumber such Initial Twelve Seas Shareholder’s portion of the Founders’ Earn-Out Escrow Property as collateral security for documented loans entered into by such Initial Twelve Seas Shareholder, the Company or its subsidiaries, including BPGIC, after the Closing or (ii) transfer its rights to the Founders’ Earn-Out Escrow Property to a third party, provided, that (a) in each case of clauses (i) and (ii), that the lender’s or transferee’s rights to any such pledged or transferred Founders’ Earn-Out Escrow Property shall be subject to the provisions of the Initial Shareholder Escrow Agreement, the Voting Agreement (as applicable) and the Founder Share Letter (as defined in the Initial Shareholder Escrow Agreement), including the forfeiture provisions contained therein, and (b) in the event of a pledge or encumbrance of the Founders’ Earn-Out Escrow Property under clause (i) above, such Initial Twelve Seas Shareholder may transfer such Initial Twelve Seas Shareholder’s portion of the Founders’ Earn-Out Escrow Property to another escrow agent selected by such Initial Twelve Seas Shareholder and reasonably acceptable to the Company.

 


The Founders’ Earn-Out Escrow Property will only become vested and not subject to forfeiture, and released to the Initial Twelve Seas Shareholders (on the same proportional basis) upon the same events and milestones triggering, and at the same time as, the release of the Seller Escrow Property.

 

At the end of the Seller Escrow Period, if there is any Founders’ Earn-Out Escrow Property which has not vested and that the Initial Twelve Seas Shareholders are not entitled to receive in accordance with the Founder Share Letter and the Initial Shareholder Escrow Agreement (which will occur upon a determination being made under the Seller Escrow Agreement and the Business Combination Agreement that forfeitures shall be made with respect to the Seller Escrow Property), such Founders’ Earn-Out Escrow Property will be forfeited and automatically surrendered by the Initial Twelve Seas Shareholders and distributed to the Company from the Founders’ Earn-Out Escrow Account, for cancellation by the Company.

 

In connection with an agreement between Twelve Seas Sponsor and Magnetar Financial LLC and certain of its affiliates (collectively, “Magnetar”) whereby Twelve Seas Sponsor pledged,inter alia, among other things, its Founders’ Earn-Out Escrow Shares to Magnetar as collateral, the Company agreed that, if the other pledged collateral is not sufficient to cover Twelve Seas Sponsor’s obligations to Magnetar, the Company will waive the escrow release conditions and release up to 100% of Twelve Seas Sponsor’s Founders’ Earn-Out Escrow Shares, as necessary, to cover the remainder of Twelve Seas’ Sponsor’s obligations to Magnetar (such agreement the “Limited Waiver”).

 

The description of the Initial Shareholder Escrow Agreement does not purport to summarize all of the provisions of the agreement and is qualified in its entirety by reference to both the full text of such agreement, a copy of which is attached hereto and incorporated by reference herein as Exhibit 4.774.76 and the Limited Waiver of such agreement, a copy of which is attached hereto and incorporated by reference herein as Exhibit 4.83.4.82.

 

The description of the Limited Waiver does not purport to summarize all of the provisions of the Limited Waiver and is qualified in its entirety by reference to the full text thereof, a copy of which is attached hereto and incorporated by reference herein as Exhibit 4.83.4.82.

99

 

Seller Registration Rights Agreement

 

Pursuant to the Business Combination Agreement, the Company and BPGIC Holdings have entered into thea registration rights agreement, dated December 20, 2019 (the “Seller Registration Rights Agreement”), which became effective upon the Closing, with respect to the Ordinary Shares of the Company received by BPGIC Holdings at the Closing (the “Seller Shares”). Under the Seller Registration Rights Agreement, BPGIC Holdings has registration rights that obligate the Company to register for resale under the Securities Act all or any portion of the Seller Shares (together with any securities issued as a dividend or distribution with respect thereto or in exchange therefor, the “Seller Registrable Securities”), except that the Company is not obligated to register Seller Registrable Securities subject to the Seller Escrow Agreement until they are released from the Seller Escrow Account. The holders of a majority-in-interest of the Seller Registrable Securities are entitled under the Seller Registration Rights Agreement to make written demands for registration under the Securities Act of all or part of their Seller Registrable Securities (provided, however, that the Company is not obligated to effect more than four (4) of such written demands), and the other holders of Seller Registrable Securities will be entitled to join in such demand registration. Subject to certain exceptions, if the Company proposes to file a registration statement under the Securities Act with respect to the registration of or an offering of equity securities, under the Seller Registration Rights Agreement, the Company shallmust give notice to BPGIC Holdings and all other holders of Seller Registrable Securities as to the proposed filing and offer them an opportunity to register the sale of such number of Registrable Securities as requested by the holders in writing, subject to customary cut-backs. In addition, the Seller Registration Rights Agreement provides that subject to certain exceptions, the holders of Seller Registrable Securities shall be entitled under the Seller Registration Rights Agreement to request in writing that the Company register the resale of any or all of such Seller Registrable Securities on Form F-3 or S-3 and any similar short-form registration that may be available at such time. Under the Seller Registration Rights Agreement, the Company agreesagreed to indemnify the holders of Seller Registrable Securities and certain persons or entities related to them, such as their officers, directors, employees, agents and representatives, against any losses or damages resulting from any untrue statement of a material fact or omission of a material fact in any registration statement or prospectus pursuant to which they sell Seller Registrable Securities, unless such liability arose from the Company’s reliance upon and conformity with information furnished in writing by such holder (or certain persons or entities related to them), for use in such documents. The holders of Seller Registrable Securities will indemnify the Company and certain persons or entities related to the Company, such as its officers and directors and underwriters, against any losses that arise out of or are based upon such untrue statement of a material fact or omission to state to material fact, in any registration statement or prospectus pursuant to which they sell their Seller Registrable Securities, where they were made (or not made) by the Company in reliance upon and in conformity with information furnished in writing to it by such holder.

  


In connection with a number of transfers of Ordinary Shares by BPGIC Holdings to certain individual shareholders from July 2020 to September 2020, the Company entered into Joinders to the Seller Registration Rights Agreement with such transferees. As a result, such transferees hold Seller Registrable Securities and have the same rights, and are subject to the same obligations as BPGIC Holdings.

The description of the Seller Registration Rights Agreement does not purport to summarize all of the provisions of the agreement and is qualified in its entirety by reference to the full text of such agreement, a copy of which is attached hereto and incorporated by reference herein as Exhibit 4.76.4.75.

The description of the Joinders to Seller Registration Rights Agreement does not purport to summarize all of the provisions of the agreement and is qualified in its entirety by reference to the full text of such agreement, a copy of the form of which is attached hereto and incorporated by reference herein as Exhibit 4.1.

 

Amendment to Warrant Agreement and Rights Agreement

 

On June 19, 2018, Twelve Seas entered into both the Warrant Agreement and the Rights Agreement with Continental, pursuant to which Continental agreed to act as Twelve Seas’ warrant agent with respect to the issuance, registration, transfer, exchange, redemption and exercise of Twelve Seas’ warrants, and to act as Twelve Seas’ rights agent with respect to the issuance, registration, transfer and exchange of Twelve Seas’ rights.

 

On December 20, 2019, the Company, Twelve Seas and Continental entered into the Amendment to Warrant Agreement and Rights Agreement pursuant to which the Company became party to each of the Warrant Agreement and the Rights Agreement and the parties revised the terms of such agreements in order to, amongstamong other things, reflect the conversion of each Twelve Seas warrant into a warrantWarrant of the Company having substantially the same terms and conditions as such original Twelve Seas warrant, and each Twelve Seas right converted into 1/10th of one Ordinary Share of the Company.

 

The description of the Amendment to Warrant Agreement and Rights Agreement does not purport to summarize all of the provisions of the agreements and is qualified in its entirety by reference to the full text of (i) the Warrant Agreement, a copy of which was filed by Twelve Seas as Exhibit 4.1 to the Current Report on Form 8-K, filed by Twelve Seas with the SEC on June 25, 2018 and is incorporated by reference herein as Exhibit 2.3, (ii) the Rights Agreement, a copy of which was filed by Twelve Seas as Exhibit 4.2 to the Current Report on Form 8-K, filed by Twelve Seas with the SEC on June 25, 2018 and is incorporated by reference herein as Exhibit 2.4, and (iii) the Amendment to Warrant Agreement and Rights Agreement, a copy of which is attached hereto and incorporated by reference herein as Exhibit 2.5.

 

100

Business Combination Marketing Agreement Fee Amendment

 

Twelve Seas engaged EBCEarly Bird Capital to assist it in connection with Twelve Seas’ initial business combination. Pursuant to this arrangement, EBCEarly Bird Capital assisted Twelve Seas in holding meetings with Twelve Seas shareholders to discuss the Business Combination and BPGIC’s business attributes, introduced Twelve Seas to potential investors that may have been interested in purchasing Twelve Seas’ securities in connection with the Business Combination, assisted Twelve Seas in obtaining shareholder approval for the Business Combination and assisted Twelve Seas with its press releases and certain public filings in connection with the Business Combination. Pursuant to the original agreement, Twelve Seas agreed to pay EBCEarly Bird Capital a cash fee equal to 3.5% of the gross proceeds received in its initial public offering for such services upon the consummation of its initial business combination (exclusive of any applicable finders’ fees which might become payable); provided that up to 1.0% of the gross proceeds of initial public offering could be allocated at Twelve Seas’ sole discretion to one or more advisors that assisted Twelve Seas in identifying and consummating an initial business combination. Twelve Seas also agreed to reimburse EBCEarly Bird Capital for up to $20,000 of its reasonable costs and expenses incurred by it (including reasonable fees and disbursements of counsel) in connection with the performance of its services pursuant to the agreement; provided, however, all expenses in excess of $5,000 in the aggregate required Twelve Seas’ prior written approval, which approval would not be unreasonably withheld.

 


Pursuant to the Business Combination Agreement, on December 20, 2019, Twelve Seas, EBC,Early Bird Capital, and the Company entered into the Business Combination Marketing Agreement Fee Amendment (the “BCMA Fee Amendment”) whereby the Company became party to the Business Combination Marketing Agreement solely with respect to the provision relating to EBC’sEarly Bird Capital’s fees and EBC’sEarly Bird Capital’s fees were amended. Pursuant to the Business Combination Marketing Agreement, as amended by the BCMA Fee Amendment, EBCEarly Bird Capital received as full payment for any and all fees under the Business Combination Marketing Agreement, a cash fee equal to $3 million and a $1.5 million non-interest bearing promissory note of the Company due and payable on the earlier of (i) the first anniversary of the Closing and (ii) the consummation by the Company of a follow-on securities offering. After an event of default, the promissory note wouldwas to bear interest at the rate of 10% per annum.

The promissory note was repaid with proceeds from the Bond Financing Facility.

 

The description of the BCMA Fee Amendment does not purport to summarize all of the provisions of the agreement and is qualified in its entirety by reference to the full text of (i) the Business Combination Marketing Agreement, a copy of the form of which was filed by Twelve Seas as Exhibit 1.2 to the Registration Statement on Form S-1/A (File No. 001-225352), filed with the SEC on June 14, 2018 and is incorporated by reference herein as Exhibit 4.13,4.15, (ii) the BCMA Fee Amendment, a copy of which is attached hereto and incorporated by reference herein as Exhibit 4.78,4.77, and (iii) the $1,500,000 Promissory Note issued to EBC,Early Bird Capital, a copy of which is attached hereto and incorporated by reference herein as Exhibit 4.79.4.78.

 

Voting Agreement

 

Pursuant to the Business Combination Agreement, BPGIC Holdings and the Initial Twelve Seas Shareholders entered into the Voting Agreement, dated December 20, 2019 in favor of BPGIC Holdings (the “Voting Agreement”). The Voting Agreement applies to the Ordinary Shares and other voting securities of the Company issued to the Initial Twelve Seas Shareholders upon the consummation of the Business Combination (including upon the conversion, exercise, exchange of their securities in Twelve Seas) as well as other securities the Initial Twelve Seas Shareholders acquired or agreed to acquire up to and including the time of Closing (collectively, the “Subject Shares”). The Voting Agreement provides that from and after the Closing until the Voting Agreement terminates with respect to each Initial Twelve Seas Shareholder, at each meeting of the shareholders of the Company and in each written consent or resolutions of the Company shareholders in which an Initial Twelve Seas Shareholder is entitled to vote, consent or approve, such Initial Twelve Seas Shareholder unconditionally and irrevocably agrees to be present for such meeting and vote its Subject Shares (in person or by proxy), as directed by BPGIC Holdings, or consent to any action by written consent or resolution with respect to all such matters, as directed by BPGIC Holdings. The Voting Agreement terminates upon the earlier to occur of (i) the mutual written consent of BPGIC Holdings and the Initial Twelve Seas Shareholders and (ii) with respect to any Initial Twelve Seas Shareholder, automatically on the date such Initial Twelve Seas Shareholder no longer holds any Subject Shares.

 

The description of the Voting Agreement does not purport to summarize all of the provisions of the agreement and is qualified in its entirety by reference to the full text of such agreement, a copy of which is attached hereto and incorporated by reference herein as Exhibit 4.73.4.72.

101

Transferee Voting Agreement

BPGIC Holdings is party a voting agreement with certain persons (each, an “Individual Transferee”) in favor of BPGIC Holdings (each a “Transferee Voting Agreement” and collectively, the “Transferee Voting Agreements”). The Transferee Voting Agreements apply to certain Ordinary Shares transferred to the Individual Transferees (collectively, the “Transferee Subject Shares”). Each Transferee Voting Agreement provides until such Transferee Voting Agreement terminates, at each meeting of the shareholders of the Company and in each written consent or resolutions of the Company’s shareholders in which an Individual Transferee is entitled to vote, consent or approve, such Individual Transferee unconditionally and irrevocably agrees to be present for such meeting and vote its Transferee Subject Shares (in person or by proxy), as directed by BPGIC Holdings, or consent to any action by written consent or resolution with respect to all such matters, as directed by BPGIC Holdings. Each Transferee Voting Agreement terminates upon the earlier to occur of (i) the mutual written consent of BPGIC Holdings and the subject Individual Transferee and (ii) with respect to an Individual Transferee, automatically on the date such Individual Transferee no longer holds any Transferee Subject Shares.

The description of the Transferee Voting Agreements does not purport to summarize all of the provisions of the agreement and is qualified in its entirety by reference to the full text of such agreement, a copy of the form of which is attached hereto and incorporated by reference herein as Exhibit 4.2.

 

Dividend Waivers

 

Prior to the Closing, BPGIC Holdings, MENA Energy, the Twelve Seas Insiders and certain assignees of EBCEarly Bird Capital (collectively the “Waiving Holders”) signed and delivered to the Companyexecuted dividend waivers pursuant to which such Waiving Holders waived, for a period of two years from the date of Closing (the “Waiver Term”), their rights to any dividends with respect to (i) the Ordinary Shares received by BPGIC Holdings in exchange for the outstanding equity of BPGIC, (ii) the Founders’ Shares, and (iii) the ordinary shares issued to EBCEarly Bird Capital and its affiliates in connection with Twelve Seas’ initial public offering. Each dividend waiver terminates upon the earliest to occur of (i) the expiration of the Waiver Term, and (ii) with respect to the Twelve Seas Insiders and EBC,Early Bird Capital, if the Company and/or BPGIC Holdings or MENA Energy modify their waiver of their rights to dividends in any way.

 


The description of the Dividend Waiver does not purport to summarize all of the provisions thereof and is qualified in its entirety by reference to the full text of such waiver, a copy of the form of which is attached hereto and incorporated by reference herein as Exhibit 4.80.4.79.

Bond Offering Documents

During September 2020, as part of the Bond Financing Facility, BPGIC issued bonds of $200 million to private investors with a face value of $1 and an issue price of $0.95. The issuance has a maximum size of $250.00 million, which includes the option for a tap issue of an additional $50.00 million subject to certain conditions. The proceeds of the Bond Financing Facility were used to repay the Phase I Financing Facilities, fund capital project for Phase II, repay the promissory note payable to Early Bird Capital, pre-fund the Liquidity Account and for general corporate purposes. The proceeds of the bonds were drawn down during November 2020 and outstanding term loans were fully settled.

The principal repayment of the Bond Financing Facility will be semi-annual payments of $7 million starting in September 2021 until March 2025, and one bullet repayment of $144 million in September 2025. The bonds bear interest at 8.5% per annum, payable along with the principal installments.

The description of the Bond Financing Facility does not purport to summarize all of the provisions of the Bond Financing Facility and is qualified in its entirety by reference to the full text of the Bond Terms dated September 22, 2020, and Amendment No. 1 to the Bond Terms dated October 23, 2020, copies of which are attached hereto and incorporated by reference herein as Exhibits 2.7 and 2.8.

 

Amendment to Phase I Construction Facilities Letter

 

On December 30, 2019, BPGIC and FAB agreed to amend the Phase I Construction FacilitiesFacility to defer the installments due thereunder to later dates. The key changes resulting from the amendment were as follows:

 

1.an amount of $5,729,417.50 which was due on November 30, 2019 will now be repayablebecame payable on February 28, 2020;

 

2.an amount of $1,765,553.50 which was due on January 31, 2020 will now bebecame payable in two installments: $882,776.75 on January 31, 2020 and $882,776.75 on February 28, 2020; and

 

3.the Debt Service Reserve Accountdebt service reserve account was to be created by February 28, 2020; and

 

4.testing of the Debt Service Coverage Ratiodebt service coverage ratio covenant was to start on February 28, 2020 and was to be conducted on each subsequent due date.

102

 

The description of the December 30, 2019 amendment to the Phase I Construction Facilities does not purport to summarize all of the provisions of the agreement and is qualified in its entirety by reference to the full text of such agreement, a copy of which is attached hereto and incorporated by reference herein as Exhibit 4.82.

BPGIC did not comply with the terms of the Phase I Construction Facilities as amended on December 30, 2019. A payment of principal and interest of $6.6 Million for the Phase I Construction Facility due on February 28, 2020 was not paid. Payments of principal and interest totaling $2.2 Million for the Phase I Construction Facility and the Phase I Admin Building Facility due on April 30, 2020 were not made. The Debt Service Reserve Account did not maintain a balance in an amount equivalent to one quarterly instalment including interest by February 28, 2020. BPGIC did not maintain a minimum Debt Service Coverage Ratio of 150% beginning on February 28, 2020. These non-payments and failures to comply with covenants were events of default, but, as in the past, the lender did not declare an event of default.4.81.

 

On June 15, 2020, BPGIC entered into the June 15 Phase I Construction Facilities Amendment with its lender to amend the Phase I Construction Facilities.

 


Pursuant to the June 15 Phase I Construction Facilities Amendment, BPGIC and the lender agreed to a revised payment schedule for the Phase I Construction Facility that requiresrequired BPGIC to make the following payments from June 30, 2020 through December 31, 2020:

 

Date Amount
June 30, 2020 $2.99 Millionmillion
July 31, 2020 $3.62 Millionmillion
August 31, 2020 $0.14 Millionmillion
September 30, 2020 $0.14 Millionmillion
October 31, 2020 $1.01 Millionmillion
November 30, 2020 $0.14 Millionmillion
December 31, 2020 $3.87 Millionmillion
Total $11.9 Millionmillion by end of 2020

 

Thereafter, beginning on January 31, 2021 and ending on July 30, 2030, BPGIC willwas to make quarterly payments of approximately $1.77 Millionmillion.

 

Pursuant to the June 15, Phase I Construction Facilities Amendment, BPGIC and the lender also agreed to a revised payment schedule for the Phase I Admin Building Facility that requiresrequired BPGIC to make the following payments from August 31, 2020 through December 21, 2020:

 

Date Amount
August 31, 2020 $0.14 Millionmillion
September 30, 2020 $0.14 Millionmillion
October 31, 2020 $0.41 Millionmillion
November 30, 2020 $0.14 Millionmillion
December 31, 2020 $0.80 Millionmillion
Total $1.63 Millionmillion by end of 2020

 

Thereafter, beginning on January 31, 2021 and ending on July 31, 2021, BPGIC willwas to make quarterly payments of approximately $0.54 Million.million.

 

Testing of the Debt Service Ratio Covenant willdebt service ratio covenant was to start on December 31, 2020 and willwas to be conducted on each subsequent payment date. A Debt Service Reserve Accountdebt service reserve account containing at least 1 quarter of debt service amounts mustwas to be maintained with the lender by October 31, 2020 and at all times thereafter through the term of the Phase I Construction Facility or until BPGIC repaysrepaid all liabilities owed under the Phase I Construction Facilities. BPGIC pledged the account to the lender as security for the Phase I Construction Facilities. BPGIC, The Company and BPGIC Holdings undertook to have no other bank accounts except for the one that is the Debt Service Reserve Account until the Phase I Construction Facilities are repaid and to route all funds through the Debt Service Reserve Account. BPGIC further granted the lender a non-possessory mortgage over the Phase I Customer Agreement as security for the Phase I Construction Facilities.

 


Also pursuant to this amendment, BPGIC negotiated revised pricing terms as follows:

 

oPhase I Construction Facility: Enhanced to 6M EIBOR + 4% per annum [Minimum 5%] and, to be further enhanced to 6M EIBOR + 4.5% per annum [Minimum 5%] beginning on January 1, 2021; and

 

oPhase I Admin Building Facility: Enhanced to 3M EIBOR + 4% per annum [Minimum 5%] and, to be further enhanced to 3M EIBOR + 4.5% per annum [Minimum 5%] beginning on January 1, 2021.

 

There is no change inOn November 16 2020, the final maturity ofCompany paid off the entire outstanding principal, interest and fees for all its term loans (including the Phase I Construction Facility which is July 30, 2030 and Phase I Admin Building Facility which is July 31, 2023. BPGICFacilities) from the proceeds of the Bond Financing Facility.

 

The description of the Amendment to Phase I Construction Facilities Letter, does not purport to summarize all of the provisions thereof and is qualified in its entirety by reference to the full text of such agreement, the Movable Asset Mortgage, dated as of June 15, 2020, by and between BPGIC and FAB and the Account Pledge (First Party), dated as of June 15, 2020, by and between BPGIC and FAB, copies of which are attached hereto and incorporated by reference herein as Exhibits 4.91, 4.92 and 4.93, 4.94 and 4.95, respectively.

103

 

Phase III Land Lease

 

On February 2, 2020, BPGIC entered into the Phase III Land Lease Agreement to secure the Phase III Land. On October 1, 2020, BPGIC, FOIZ and BPGIC III, entered into a novation agreement, whereby BPGIC novated the Phase III Land a new plot of land of approximately 450,000 m2 near its existing facilities.Lease to BPGIC III. The agreement provides for an initial 30 year term with an automatic 30 year renewal. Upon mutual agreement of the parties, the term of the Phase I & IIIII Land Lease can be renewed or extended for a further period, the term of which is unspecified and therefore subject to agreement between the parties. BPGIC will begin paying rent under the Phase III Land Lease Agreement on the earlier of the date that is 18 months from the date of the Phase III Land Lease Agreement and the commissioning of the Phase III facility. The initial annual rent will be $6,126,467 and rent increases by 2 percent per annum. All amounts in respect of rent for each quarter shall be invoiced by and paid to FOIZ in Dirhams by immediately available funds due net thirty (30)30 days after receipt of invoice. BPGIC is required to pay all taxes imposed by the federal government of the UAE or FOIZ; however, the leased premises are in a free zone and BPGIC is entitled to all benefits applying to free zone entities, including benefits in respect of taxes.

 

BPGIC believes that the Phase III Land can house additional storage capacity and refinery of up to 3,500,000 m3. The Phase III Land is the subject of ongoing FEED studies, which, in parallel with prospective end-user discussions, will enable BPGIC to determine the optimal layout and product mix. Currently, BPGIC plans to use the Phase III Land to further increase its crude oil storage and refinery services capacity.

The description of the Phase III Land Lease Agreement does not purport to summarize all of the provisions of the agreement and is qualified in its entirety by reference to the full text of suchthe agreement, a copy of which is attached hereto and incorporated by reference herein as Exhibit 4.85.4.84 and the novation agreement relating thereto, a copy of which is attached hereto and incorporated by reference herein as Exhibit 4.95.

 


D. Exchange Controls and Other Limitations Affecting Security Holders

 

Under the laws of the Cayman Islands, there are currently no restrictions on the export or import of capital, including foreign exchange controls or restrictions that affect the remittance of dividends, interest or other payments to nonresident holders of our Ordinary Shares.

 

E. Taxation

 

The following description is not intended to constitute a complete analysis of all tax consequences relating to the ownership and disposition of our securities. You should consult your own tax advisor concerning the tax consequences of your particular situation, as well as any tax consequences that may arise under the laws of any state, local, foreign or other taxing jurisdiction.

 

United States of America

 

This section is addressed to U.S. Holders of ordinary shares of the Company. Unless otherwise indicated, “ordinary shares” refers to ordinary shares of the Company.

 

Taxation of Dividends and Other Distributions on Ordinary Shares

 

Subject to the passive foreign investment company rules discussed below, the gross amount of distributions made by the Company to you with respect to its ordinary shares (including the amount of any taxes withheld therefrom) will generally be includable in your gross income as dividend income on the date of receipt by you, but only to the extent that the distribution is paid out of the Company’s current or accumulated earnings and profits (as determined under U.S. federal income tax principles). With respect to corporate U.S. Holders, the dividends will generally not be eligible for the dividends-received deduction allowed to corporations in respect of dividends received from other U.S. corporations.

 

With respect to non-corporate U.S. Holders, including individual U.S. Holders, dividends will be taxed at the lower capital gains rate applicable to qualified dividend income, provided that (1) our ordinary shares are readily tradable on an established securities market in the United States, or the Company is eligible for the benefits of an approved qualifying income tax treaty with the United States that includes an exchange of information program, (2) the Company is not a passive foreign investment company (as discussed below) for either the taxable year in which the dividend is paid or the preceding taxable year, and (3) certain holding period requirements are met. You are urged to consult your tax advisors regarding the availability of the lower rate for dividends paid with respect to the Company’s ordinary shares.

 

To the extent that the amount of the distribution exceeds the Company’s current and accumulated earnings and profits (as determined under U.S. federal income tax principles), it will be treated first as a tax-free return of your tax basis in your ordinary shares, and to the extent the amount of the distribution exceeds your tax basis, the excess will be taxed as capital gain. We do not intend to calculate the Company’s earnings and profits under U.S. federal income tax principles.

 

Therefore, a U.S. Holder should expect that a distribution will be treated as a dividend even if that distribution would otherwise be treated as a non-taxable return of capital or as capital gain under the rules described above.

 


104

Taxation of Dispositions of the Company’s Ordinary Shares

 

Subject to the passive foreign investment company rules discussed below, you will recognize taxable gain or loss on any sale, exchange or other taxable disposition of a Company ordinary share equal to the difference between the amount realized (in U.S.US dollars) for the ordinary share and your tax basis (in U.S.US dollars) in the ordinary share. The gain or loss will be capital gain or loss. If you are a non-corporate U.S. Holder, including an individual U.S. Holder, who has held the ordinary shares for more than one year, you may be eligible for reduced tax rates on any such capital gains. The deductibility of capital losses is subject to limitations.

 

Passive Foreign Investment Company

 

A foreign (i.e., non-U.S.) corporation will be a PFIC for U.S. tax purposes if at least 75% of its gross income in a taxable year of such foreign corporation, including its pro rata share of the gross income of any corporation in which it is considered to own at least 25% of the shares by value, is passive income. Alternatively, a foreign corporation will be a PFIC if at least 50% of its assets in a taxable year, ordinarily determined based on fair market value and averaged quarterly over the year, including its pro rata share of the assets of any corporation in which it is considered to own at least 25% of the shares by value, are held for the production of, or produce, passive income. Passive income generally includes dividends, interest, rents and royalties (other than certain rents or royalties derived from the active conduct of a trade or business) and gains from the disposition of passive assets. In determining the value and composition of its assets for purposes of the PFIC asset test, (1) the cash the Company owns at any time will generally be considered to be held for the production of passive income and (2) the value of the Company’s assets must be determined based on the market value of its ordinary shares from time to time, which could cause the value of its non-passive assets to be less than 50% of the value of all of its assets (including cash) on any particular quarterly testing date for purposes of the asset test.

 

A determination as to whether the Company is a PFIC with respect to any particular tax year will be made following the end of such tax year. If the Company is a PFIC for any year during which you hold the Company’s ordinary shares, it will continue to be treated as a PFIC for all succeeding years during which you hold ordinary shares. However, if the Company ceases to be a PFIC and you did not previously make a timely “mark-to-market” election as described below, you may avoid some of the adverse effects of the PFIC regime by making a “purging election” (as described below) with respect to the ordinary shares.

 


If the Company is determined to be a PFIC for any taxable year (or portion thereof) that is included in the holding period of a U.S. Holder of the Company securities and, in the case of the ordinary shares, the U.S. Holder did not make a timely “mark-to-market” election, as described below, such holder generally will be subject to special rules for regular U.S. federal income tax purposes with respect to:

 

any gain recognized by the U.S. Holder on the sale or other disposition of the Company securities; and

 

any “excess distribution” made to the U.S. Holder (generally, any distributions to such U.S. Holder during a taxable year of the U.S. Holder that are greater than 125% of the average annual distributions received by such U.S. Holder in respect of the Company securities during the three preceding taxable years of such U.S. Holder or, if shorter, such U.S. Holder’s holding period for such securities).

 

Under these rules,

 

the U.S. Holder’s gain or excess distribution will be allocated ratably over the U.S. Holder’s holding period for such securities;

 

the amount allocated to the U.S. Holder’s taxable year in which the U.S. Holder recognized the gain or received the excess distribution, or to the period in the U.S. Holder’s holding period before the first day of the Company’s first taxable year in which it is a PFIC, will be taxed as ordinary income;

 

the amount allocated to other taxable years (or portions thereof) of the U.S. Holder and included in its holding period will be taxed at the highest tax rate in effect for that year and applicable to the U.S. Holder; and

 

the interest charge generally applicable to underpayments of tax will be imposed in respect of the tax attributable to each such other taxable year(s) of the U.S. Holder.

 


If a U.S. Holder, at the close of its taxable year, owns (or is deemed to own) shares in a PFIC that are treated as marketable shares, the U.S. Holder may make a “mark-to-market” election with respect to such shares for such taxable year. If the U.S. Holder makes a valid mark-to-market election for the first taxable year of the U.S. Holder in which the U.S. Holder holds (or is deemed to hold) Company ordinary shares and for which the Company is determined to be a PFIC, such holder generally will not be subject to the PFIC rules described above in respect to its ordinary shares as long as such shares continue to be treated as marketable shares. Instead, in general, the U.S. Holder will include as ordinary income each year that the Company is treated as a PFIC the excess, if any, of the fair market value of such U.S. Holder’s ordinary shares at the end of its taxable year over the adjusted basis in its ordinary shares. The U.S. Holder also will be allowed to take an ordinary loss in respect of the excess, if any, of the adjusted basis of its Ordinary Shares over the fair market value of such shares at the end of the U.S. Holder’s taxable year (but only to the extent of the net amount of previously included income as a result of the mark-to-market election). The U.S. Holder’s adjusted tax basis in its ordinary shares will be adjusted to reflect any such income or loss amounts, and any further gain recognized on a sale or other taxable disposition of the shares in a taxable year in which the Company is treated as a PFIC will be treated as ordinary income. Special tax rules may also apply if a U.S. Holder makes a mark-to-market election for a taxable year after the first taxable year in which the U.S. Holder holds (or is deemed to hold) ordinary shares and for which the Company is treated as a PFIC.

 

105

The mark-to-market election is available only for stock that is regularly traded on a national securities exchange that is registered with the Securities and Exchange Commission, including the Nasdaq Capital Market, or on a foreign exchange or market that the IRS determines has rules sufficient to ensure that the market price represents a legitimate and sound fair market value. U.S. Holders should consult their own tax advisors regarding the availability and tax consequences of a mark-to-market election in respect to the Company’s ordinary shares under their particular circumstances.

 

Alternatively, a U.S. Holder of stock in a PFIC may make a “qualified electing fund” election with respect to such PFIC to elect out of the tax treatment discussed above. A U.S. Holder who makes a valid qualified electing fund election with respect to a PFIC will generally include in gross income for a taxable year such holder’s pro rata share of the corporation’s earnings and profits for the taxable year. However, the qualified electing fund election is available only if such PFIC provides such U.S. Holder with certain information regarding its earnings and profits as required under applicable U.S. Treasury regulations. The Company does not currently intend to prepare or provide the information that would enable you to make a qualified electing fund election. If you hold ordinary shares in any taxable year in which the Company is a PFIC, you will be required to file U.S. Internal Revenue Service Form 8621 in each such year and provide certain annual information regarding such ordinary shares, including regarding distributions received on the ordinary shares and any gain realized on the disposition of the ordinary shares.

 

If you do not make a timely “mark-to-market” election (as described above), and if the Company were a PFIC at any time during the period you hold its ordinary shares, then such ordinary shares will continue to be treated as stock of a PFIC with respect to you even if the Company ceases to be a PFIC in a future year, unless you make a “purging election” for the year we cease to be a PFIC. A “purging election” creates a deemed sale of such ordinary shares at their fair market value on the last day of the last year in which the Company is treated as a PFIC. The gain recognized by the purging election will be subject to the special tax and interest charge rules treating the gain as an excess distribution, as described above. As a result of the purging election, you will have a new basis (equal to the fair market value of the ordinary shares on the last day of the last year in which the Company is treated as a PFIC) and holding period (which new holding period will begin the day after such last day) in your ordinary shares for tax purposes.

 

The rules dealing with PFICs and with the QEF and mark-to-market elections are very complex and are affected by various factors in addition to those described above. Accordingly, you are urged to consult your tax advisors regarding the application of the PFIC rules to your investment in the Company’s ordinary shares and the elections discussed above.

 


Information Reporting and Backup Withholding

 

Certain U.S. Holders are required to report information to the IRS relating to an interest in “specified foreign financial assets,” including shares issued by a non-U.S. corporation, for any year in which the aggregate value of all specified foreign financial assets exceeds US$50,000 (or a higher dollar amount prescribed by the IRS), subject to certain exceptions (including an exception for shares held in custodial accounts maintained with a United States financial institution). These rules also impose penalties if a U.S. Holder is required to submit such information to the IRS and fails to do so.

 

Dividend payments with respect to the Company’s ordinary shares and proceeds from the sale, exchange or redemption of the Company’s ordinary shares may be subject to information reporting to the IRS and possible U.S. backup withholding at a current rate of 24%. Backup withholding will not apply, however, to a U.S. Holder who furnishes a correct taxpayer identification number and makes any other required certification on IRS Form W-9 or who is otherwise exempt from backup withholding. U.S. Holders who are required to establish their exempt status generally must provide such certification on IRS Form W-9. U.S. Holders are urged to consult their tax advisors regarding the application of the U.S. information reporting and backup withholding rules.

 

Backup withholding is not an additional tax. Amounts withheld as backup withholding may be credited against your U.S. federal income tax liability, and you may obtain a refund of any excess amounts withheld under the backup withholding rules by timely filing the appropriate claim for refund with the IRS and timely furnishing any required information. Transactions effected through certain brokers or other intermediaries may be subject to withholding taxes (including backup withholding), and such brokers or intermediaries may be required by law to withhold such taxes.

 

F. Dividends and Paying Agents

 

Not Applicable

 

G. Statement by Experts

 

Not Applicable.

 

H. Documents on Display

 

We are subject to certain of the informational filing requirements of the Exchange Act. Since we are a “foreign private issuer,” we are exempt from the rules and regulations under the Exchange Act prescribing the furnishing and content of proxy statements, and our officers, directors and principal shareholders are exempt from the reporting and “short-swing” profit recovery provisions contained in Section 16 of the Exchange Act, with respect to their purchase and sale of our shares. In addition, we are not required to file reports and financial statements with the SEC as frequently or as promptly as U.S. companies whose securities are registered under the Exchange Act. However, we are required to file with the SEC an Annual Report on Form 20-F containing financial statements audited by an independent accounting firm. The SEC also maintains a website at http://www.sec.gov that contains reports and other information that we file with or furnish electronically with the SEC. You may read and copy any report or document we file, including the exhibits, at the SEC’s public reference room located at 100 F Street, N.E., Washington, D.C. 20549. Please call the SEC at 1-800-SEC-0330 for further information on the public reference room.

 

I. Subsidiary Information

 

Not applicable.


106

ITEM 11. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISKSRISK

 

A.Market Risk Disclosures

A.Market Risk Disclosures

 

The main risks arising from the Company’s financial instruments are price risk, capital risk, interest rate risk, credit risk, currency risk and liquidity risk. The Senior Management team reviews and agrees on policies for managing each of these risks, which are summarized below. The Company’s instruments are entered into for purposes other than trading purposes.

 

B.Capital Risk

B.Price Risk

The Company’s activities expose it to the financial risks of changes in interest rates and price risk of the Warrants. As the Warrants are recognised at fair value on the consolidated statement of financial position of the Company, the Company’s exposure to market risks results from the volatility of the Warrants price. The Warrants are publicly traded on the Nasdaq Capital Market.

C.Capital Risk

 

The Company’s objective when managing capital is to safeguard its ability to continue as a going concern in order to provide returns for holders of Ordinary Shares and benefits for other stakeholders and to maintain an optimal capital structure to reduce the cost of capital.

 

The Company’s capital structure consists of shareholders’ equity and debt, which as disclosed in the audited financial information for the period ended December 31, 20192020, includes the borrowings under the Financing Facilities while excluding derivative financial liabilities.

 

Consistent with others in the industry, the Company monitors its debt levels including covenants contained within the Financing Facilities.its financing facilities.

 

C.Interest Rate Risk

D.Interest Rate Risk

 

Interest rate risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because of changes in market interest rates.

 

The Group’s exposure to the risk of changes in market interest rates relates primarily to the Group’s balances with banks and interest bearing loans and borrowings at variable rates. However, currently, our bonds are not linked to any fluctuating rates and hence we do not anticipate a change in the rates. Also, the bonds currency is in US dollars and our expenses are in local AED currency. But since the currencies are pegged, we do not expect any major exchange rate fluctuations as well.

 

The following table demonstrates the sensitivity to a reasonably possible change in interest rates, with other variables held constant, of the Group’s profit for one year corresponding to the impact of the floating rate borrowings for one year. The effect of the interest rate swap has been excluded from the sensitivity as the Group does not apply hedge accounting.

 

  Effect on
profit
USD
 
2020    
2019+40 increase in basis points  Not Applicable 
-40 decrease in basis pointsNot Applicable
2019    
+40 increase in basis points  347,971 
-40 decrease in basis points  (347,971)
2018
+40 increase in basis points(381,713)
-40 decrease in basis points381,713

 


D.Credit Risk107

E.Credit Risk

 

Credit risk is the risk that one party to a financial instrument will fail to discharge an obligation and cause the other party to incur a financial loss. The Group is exposed to credit risk on bank balances and receivables as reflected in the consolidated statement of financial position, with a maximum exposure equal to the carrying amount of these instruments. The expected credit loss on trade and other receivables are considered insignificant for 2019 and 2018.2020.

 

The Group has a low credit risk exposure on its trade receivables based on established policy, procedures and controls relating to customer credit risk management. Credit quality of the customer is assessed as part of contract negotiations. Outstanding receivables are regularly monitored. The Group hashad only one customerfive customers as at December 31, December 2019 (31 December 2018:2020 (December 31, 2019: one customer).

 

E.Currency Risk

F.Currency Risk

 

The Company does not have any significant exposure to currency risk as most of its contracts, cash activities and financing arrangements are denominated in $US dollars or AED, which is the currency of the UAE and pegged to the $.US dollar.

 

F.Liquidity Risk

G.Liquidity Risk

 

The Group monitors its risk to a shortage of funds using a recurring liquidity planning tool. This tool considers projected financing requirements of the Group during the construction phase and cash projections from operations with outstanding bank facilities and outstanding bank commitments as defined under the finance documents.

 

The Group manages its liquidity risk in relation to term loans to ensure compliance with all covenants for each specific facility. Refer note 2.2 for further details.

 


The table below summarizes the maturity profile of the Group’s financial liabilities at December 31, December 2019 and 31 December 20182020 based on contractual undiscounted payments.

 On
demand
USD
  Less than
3 months
USD
  3 months
to 1 year
USD
  1 to 5
years
USD
  > 5 years
USD
  Total
USD
  On
demand
USD
 Less than
3 months
USD
 3 months
to 1 year
USD
 1 to 5
years
USD
 > 5 years
USD
 Total
USD
 
                        
31 December 2019             
December 31, 2020              
Term loans / bonds (including accrued interest) - 8,500,000 15,500,000 250,290,000 -  274,290,000 
Lease liability   3,979,956 6,728,765 35,875,519 858,043,425  904,627,665 
Accounts payable, accruals and other payables (excluding accrued interest)   4,110,754 4,453,830 - -  8,564,584 
Total   16,590,710 26,682,595 286,165,519 858,043,425  1,187,482,249 
                           
December 31, 2019           
Term loans (including accrued interest)  -   8,101,006   9,178,414   34,165,752   40,550,347   91,995,519  - 8,101,006 9,178,414 34,165,752 40,550,347  91,995,519 
Lease liability - 2,359,590 - 9,919,810 213,469,799  225,749,199 
Derivative financial instruments - - 1,518,249 - -  1,518,249 
Accounts payable, accruals and other payables (excluding accrued interest)  -  26,350,143  31,469,596  -  -  57,819,739 
Total  -  36,810,739  42,166,259  44,085,562  254,020,146  377,082,706 
                         ��   
December 31, 2018   
Bank overdraft 3,745,048 - - - -  3,745,048 
Term loans (including accrued interest) 95,702,779 - - - -  95,702,779 
Lease liability  -   2,359,590   -   9,919,810   213,469,799   225,749,199  - 2,313,323 - 9,725,304 216,023,896  228,062,523 
                        
Derivative financial instruments  -   -   1,518,249   -   -   1,518,249  - - 1,190,073 - -  1,190,073 
                        
Accounts payable, accruals and other payables (excluding accrued interest)  -   26,350,143   31,469,596   -   -   57,819,739   -  2,120,877  5,972,230  -  -  8,093,107 
                           
Total  -   36,810,739   42,166,259   44,085,562   254,020,146   377,082,706   99,447,827  4,434,200  7,162,303  9,725,304  216,023,896  336,793,530 
                        
31 December 2018                        
                        
Bank overdraft  3,745,048   -   -   -   -   3,745,048 
                        
Term loans (including accrued interest)  95,702,779   -   -   -   -   95,702,779 
                        
Lease liability  -   2,313,323   -   9,725,304   216,023,896   228,062,523 
                        
Derivative financial instruments  -   -   1,190,073   -   -   1,190,073 
                        
Accounts payable, accruals and other payables (excluding accrued interest)  -   2,120,877   5,972,230   -   -   8,093,107 
                        
Total  99,447,827   4,434,200   7,162,303   9,725,304   216,023,896   336,793,530 

 

The derivative warrant liabilities have not been included in the table above as there is no requirement to settle the Warrants in cash.

G.Operations Risk108

H.Operations Risk

 

The Company’s operations and assets are insured under an insurance program administered by Lockton Insurance Brokers - Dubai, an insurance broker. The program covers the Phase I facilities and related assets, and the liabilities of the Phase I operations and the Company. The major elements of this program are property damage, business interruption, terrorism and political violence, worker’s compensation, environmental liability, employer liability, directors’ and officers’ liability insurance, personal injury and third-party liability, including that of terminal operators. The Company additionally maintains local insurance, including healthcare and other insurance required by the Company’s jurisdiction.

 

Premiums are allocated based on the insured values, history of claims and type of risk. Management believes that the amount of coverage provided is comprehensive and appropriate for the Company’s type of business and meets the standard requirements to comply with all statutory requirements.

 

ITEM 12. DESCRIPTION OF SECURITIES OTHER THAN EQUITY SECURITIES

 

Not applicable.

 


109

PART II

 

ITEM 13. DEFAULTS, DIVIDEND ARREARAGES AND DELINQUENCIES

 

As of December 31, 2018, the Company had not paid $$3,747,537$3,747,537 of principal and accrued interest that was due under the Company’s Phase I Financing Facilities. Also, as of December 31, 2018, the Company was not in compliance with its debt covenants, including the debt service coverage ratio contained in the Company’s Phase I Financing Facilities. Even though the lender did not declare an event of default under the loan agreements, these breaches constituted events of default and could have resulted in the lender requiring immediate repayment of the loans. Accordingly, as of December 31, 2018, the Company has classified its debt balance of $94,792,088 as a current liability. As of December 31, 2018, the Company’s current liabilities exceeded its current assets by $108,536,113, respectively.$108,536,113.

 

On September 10, 2019, the Company entered into an agreement with its lender to amend the Phase I Construction Facility. The principal and accrued interest of $5,494,063 outstanding under this facility as of July 31, 2019 as per the original repayment schedule would bebecame due on November 30, 2019. The Phase I Construction Facility was payable in 45 instalments starting October 31, 2019 with final maturity on July 30, 2030. The Phase I Admin Building Financing Facility and the Phase I Short Term Financing Facility were not amended as part of the September 10, 2019 agreement to amend the Phase I Construction Facility. Subsequent to the period end, the Company had repaid $5,646,206 due under the Phase I Admin Building Facility and the Phase I Short Term Financing Facility. As such, all instalments related to Phase I Admin Building Facility and the Phase I Short Term Financing Facility due under the original repayment schedules up to September 10, 2019 were repaid. In addition, the Company agreed to assign to the lender all proceeds from the operation of the tanks and to pre-settle by December 31, 2019 AED 100,000,000 (($27,225,701) translated using the exchange rate as of December 31, 2019) of principal under the Phase I Construction Facilities from the proceeds received from the Business Combination.

Payment of principal and interest due on October 31, 2019 under the Phase I Financing Facilities was not paid in full as a result of recent discussions between the Company and the lender pertaining to more favorable financing terms. This partial non-payment was an event of default, but as in the past, the lender did not declareddeclare an event of default. A payment of principal and interest due on November 30, 2019 under the Phase I Financing Facilities was not paid as a result of recent discussions between BPGIC and lender pertaining to more favorable financing terms.

 

On December 30, 2019, BPGIC and lender agreed to amend the Phase I Construction Facilities to defer the installments due thereunder to later dates. The key changes resulting from the amendment were as follows:

 

1.an amount of $5,729,417.50 which was due on November 30, 2019 will now bebecame repayable on February 28, 2020;

 

2.an amount of $1,765,553.50 which was due on January 31, 2020 will now bebecame payable in two installments: $882,776.75 on January 31, 2020 and $882,776.75 on February 28, 2020; and

 

3.the Debt Service Reserve Accountdebt service reserve account was to be created by February 28, 2020; and

 

4.testing of the Debt Service Coverage Ratiodebt service coverage ratio covenant was to start on February 28, 2020 and was to be conducted on each subsequent due date.

 


BPGIC did not comply with the terms of the Phase I Construction Facilities as amended on December 30, 2019. A payment of principal and interest of $6.6 Millionmillion for the Phase I Construction Facility due on February 28, 2020 was not paid. Payments of principal and interest totaling $2.2 Millionmillion for the Phase I Construction Facility and the Phase I Admin Building Facility due on April 30, 2020 were not made. The Debt Service Reserve Accountdebt service reserve account did not maintain a balance in an amount equivalent to one quarterly instalment including interest by February 28, 2020. BPGIC did not maintain a minimum Debt Service Coverage Ratiodebt service coverage ratio of 150% beginning on February 28, 2020. These non-payments and failures to comply with covenants were events of default, but, as in the past, the lender did not declare an event of default.

 

On June 15, 2020, BPGIC entered into an agreement with its lender to amend the Phase I Construction Facilities.

 

BPGIC and the lender agreed to a revised payment schedule for the Phase I Construction Facility that requiresrequired BPGIC to make the following payments from June 30, 2020 through December 31, 2020:

 

Date Amount
June 30, 2020 $2.99 Millionmillion
July 31, 2020 $3.62 Millionmillion
August 31, 2020 $0.14 Millionmillion
September 30, 2020 $0.14 Millionmillion
October 31, 2020 $1.01 Millionmillion
November 30, 2020 $0.14 Millionmillion
December 31, 2020 $3.87 Millionmillion
Total $11.9 Millionmillion by end of 2020

 

Thereafter, beginning on January 31, 2021 and ending on July 30, 2030, BPGIC willwas to make quarterly payments of approximately $1.77 Millionmillion.

110

 

BPGIC and the lender also agreed to a revised payment schedule for the Phase I Admin Building Facility that requiresrequired BPGIC to make the following payments from August 31, 2020 through December 21, 2020:

 

Date Amount
August 31, 2020 $0.14 Millionmillion
September 30, 2020 $0.14 Millionmillion
October 31, 2020 $0.41 Millionmillion
November 30, 2020 $0.14 Millionmillion
December 31, 2020 $0.80 Millionmillion
Total $1.63 Millionmillion by end of 2020

 

Thereafter, beginning on January 31, 2021 and ending on July 31, 2021, BPGIC willwas to make quarterly payments of approximately $0.54 Million.million.

 


Testing of the Debt Service Ratio Covenant willdebt service ratio covenant was to start on December 31, 2020 and willwas to be conducted on each subsequent payment date. A Debt Service Reserve Accountdebt service reserve account containing at least 1one quarter of debt service amounts mustwas to be maintained with the lender by October 31, 2020 and at all times thereafter through the term of the Phase I Construction Facility or until BPGIC repaysrepaid all liabilities owed under the Phase I Construction Facilities. BPGIC pledged the account to the lender as security for the Phase I Construction Facilities. BPGIC, The Company and BPGIC Holdings undertook to have no other bank accounts except for the one that is the Debt Service Reserve Account until the Phase I Construction Facilities are repaid and to route all funds through the Debt Service Reserve Account. BPGIC further granted the lender a non-possessory mortgage over the Phase I Customer Agreement as security for the Phase I Construction Facilities.

 

Also pursuant to this amendment, BPGIC negotiated revised pricing terms as follows:

 

oPhase I Construction Facility: Enhanced to 6M EIBOR + 4% per annum [Minimum 5%] and, to be further enhanced to 6M EIBOR + 4.5% per annum [Minimum 5%] beginning on January 1, 2021; and

 

oPhase I Admin Building Facility: Enhanced to 3M EIBOR + 4% per annum [Minimum 5%] and, to be further enhanced to 3M EIBOR + 4.5% per annum [Minimum 5%] beginning on January 1, 2021.

 

There is no change inOn November 16 2020, the final maturityCompany paid off the entire outstanding principal, interest and fees for all of Phase I Construction Facility which is July 30, 2030 and Phase I Admin Building Facility which is July 31, 2023.its term loans from the proceeds of the Bond Financing Facility.

 

ITEM 14. MATERIAL MODIFICATIONS TO THE RIGHTS OF SECURITY HOLDERS AND USE OF PROCEEDS

 

None

 

ITEM 15. CONTROLS AND PROCEDURES

 

(a) Disclosure Controls and Procedures

 

We maintain disclosure controls and procedures that are designed to provide reasonable assurance that material information required to be disclosed in our reports that we file or submit under the Exchange Act, is recorded, processed, summarized and reported within the time periods specified in the SEC’s rules and forms, and that such information is accumulated and communicated to our management, including our Chief Executive Officer and Chief Financial Officer, as appropriate, to allow timely decisions regarding required financial disclosure. In designing and evaluating the disclosure controls and procedures, management recognized that a control system, no matter how well designed and operated, can provide only reasonable, not absolute, assurance that the objectives of the control system are met. Because of the inherent limitations in all control systems, no evaluation of controls can provide absolute assurance that all control issues and instances of fraud, if any, with a company have been detected. Based on their evaluation, our Chief Executive Officer and Chief Financial Officer have concluded that our disclosure controls and procedures (as defined in rules 13(a)-15(e)13a-15(e) and 15(d)-15(e)15d-15(e) under the Securities Exchange Act of 1934, as amended)Act), were not effective to provide reasonable assurance described above as of the end of the period covered by this Annual ReportDecember 31, 2020 due to the material weaknesses in our internal control over financial reporting described below:below in Management’s annual report on internal control over financial reporting.

111

(b) Management’s annual report on internal control over financial reporting

 

In connection withOur management is responsible for establishing and maintaining adequate internal control over financial reporting. Internal control over financial reporting, as defined in Rule 13a-15(f) and Rule 15d-15(f) under the Exchange Act, is a process designed by, or under the supervision of, our Chief Executive Officer and Chief Financial Officer and effected by our board of directors, management and other personnel, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with generally accepted accounting principles. Internal control over financial reporting includes those policies and external auditprocedures that:

pertain to the maintenance of records that in reasonable detail accurately and fairly reflect the transactions and dispositions of our assets;

provide reasonable assurance that transactions are recorded as necessary to permit preparation of financial statements in accordance with generally accepted accounting principles, and that our receipts and expenditures are being made only in accordance with authorizations of our management and our board of directors; and

provide reasonable assurance regarding prevention or timely detection of unauthorized acquisition, use or disposition of our assets that could have a material effect on our financial statements.

Internal control over financial reporting cannot provide absolute assurance of achieving financial reporting objectives because of its inherent limitations. Internal control over financial reporting is a process that involves human diligence and compliance and is subject to lapses in judgment and breakdowns resulting from human failures. Internal control over financial reporting can also be circumvented by collusion or improper override. Because of such limitations, there is a risk that material misstatements may not be prevented or detected on a timely basis by internal control over financial reporting. However, these inherent limitations are known features of the Company’s consolidated financial statementsreporting process, and it is possible to design into the process safeguards to reduce, though not eliminate, this risk.

Our management assessed the effectiveness of our internal control over financial reporting as of and for the years ended December 31, 2017, 2018 and 2019,2020. In making its assessment, management used the Company and Ernst and Young, independent registered public accounting firm, noted acriteria described in Internal Control-Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). Based on its assessment, management has concluded that our internal control over financial reporting was ineffective as of December 31, 2020 based on the material weakness described below.

There are material weaknesses in the Company’s internal control over financial reporting.reporting as of December 31, 2020. A material weakness is a deficiency, or a combination of deficiencies, in internal control over financial reporting, such that there is a reasonable possibility that a material misstatement of our annual or interim financial statements will not be prevented or detected on a timely basis. The material weaknesses identified were (1)(i) a lack of sufficient skilled personnel with requisite IFRS and SEC reporting knowledge and experience and (2)(ii) a lack of sufficient entity level and financial reporting policies and procedures that are commensurate with IFRS and SEC reporting requirements. These material weaknessweaknesses could allow errors to go undetected and resulted in corrected and uncorrected audit misstatements.

 

As a result of the identification of these material weakness, the Company will start implementing a number of measures from the second half year of 2020Remediation Activities

In order to address the material weaknesses related to sufficient skilled personnel and internal controls over financial reporting. However, we can give no assurance that our planned remediation will be properly implemented or will be sufficient to eliminate such material weakness or that material weaknesses or significant deficiencies in our internal control over financial reporting described above, management has begun the process of developing a remediation plan to start addressing the material weaknesses, including (i) hiring personnel with relevant public reporting experience, (ii) conducting training for Company personnel with respect to IFRS and SEC financial reporting requirements and (iii) engaging a third party to prepare standard operating procedures for the Company. The material weaknesses will not be identified inconsidered remediated, however, until the future. Our failure to implementapplicable controls operate for a sufficient period of time and maintain effective internalmanagement has concluded, through testing, that these controls over financial reporting could result in errors in our financial statements that could result in a restatement of our financial statements, cause us to fail to meet our reporting obligations and cause investors to lose confidence in our reported financial information, which may result in volatility in and a decline in the market price of our securities.are operating effectively.

 


(b) Management’s annual report on internal control over financial reportingand(c) Attestation report of the registered public accounting firm.

 

This annual report does not include a report of management’s assessment regarding internal control over financial reporting or an attestation report of the company’sour registered public accounting firm due to a transition periodan exemption established by the rules of the Securities and Exchange CommissionSEC for newly publicemerging growth companies.

 

(d) Changes in internal control over financial reporting

 

There was no change in our internal control over financial reporting that occurred during the period covered by this annual reportReport that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.

112

 

ITEM 16A. AUDIT COMMITTEE FINANCIAL EXPERT

 

The BoardOur board of Directorsdirectors has determined that Abu Bakar Chowdhury qualifies as an “audit committee financial expert,” as that term is defined in Item 16A of Form 20-F and is independent. See “Item 6.A¾Directors, Senior Management and Employees¾Employees—Directors and Senior ManagementExecutive Officers” for Mr. Chowdhury’s experience and qualifications.

 

ITEM 16B. CODE OF ETHICS

 

The Company has a Code of Ethics and Business Conduct, which establishes the practices that apply to all of our executive officers, directors and employees. The Code of Ethics and Business Conduct codifies the business and ethical principles that will govern all aspects of the Company’s business. A copy of the Company’s Code of Ethics and Business Conduct is filed herewith as an exhibit.

 

ITEM 16C. PRINCIPAL ACCOUNTANT FEES AND SERVICES

 

TheOur audit committee has reviewed and discussed with management the audited financial statements for the year ended December 31, 2019. The2020. Our audit committee also discussed all the matters required by professional auditing standards to be discussed with the Company’sour independent registered public accounting firm, Ernst & Young,PricewaterhouseCoopers LLP, the matters required to be discussed by the applicable requirements of the Public Company Accounting Oversight Board and the Securities and Exchange Commission.SEC. In addition, the audit committee has received from theour independent registered public accounting firm written disclosure required by the Public Company Accounting Oversight Board Ethics and Independence Rule 3526, and has discussed with theour independent registered public accounting firm its independence from the Company and its management. Based on its review and discussions, including discussions without management or members of the independent registered public accounting firm present, theour audit committee recommended to the Boardour board of Directorsdirectors, and our board of the Company, and the Boarddirectors has approved, that the audited financial statements be included in the Company’sour Annual Report on Form 20-F for the year ended December 31, 2020.

The following table shows total fees for services rendered to the Group by its independent registered public accounting firms for the years ended December 31, 2020 and 2019.

 

Audit Fees: Brooge Energy – $0.24 million

Audit-Related Fees: Nil.

Tax Fees: Nil.

All Other Fees: Nil.

  2020  2019 
Audit Fees $523,000  240,000 
Audit-Related Fees  -   - 
Tax Fees  -   - 
All Other Fees  -   - 

 

Pre-approval Policy

 

To safeguard the continued independence of the Company’s independent registered public accounting firm, theour audit committee has established a policy which requires all audit and non-audit services, subject to a de minimis exception pursuant to SEC Regulation S-X Rule 2-01(c)(7)(i)(C), of Regulation S-X, to be performed by the Company’s independent registered public accounting firm, to be pre-approved by the audit committee prior to such services being performed. The policy also prohibits the Company’s independent registered public accounting firm from providing any services which would impair the accounting firm’s independence. The audit committee does not delegate to management its responsibilities to pre-approve services.

 

All audit services performed by the Company’s independent registered public accounting firm during the year ended December 31, 20192020 were approved by the Boardour board of Directorsdirectors following recommendation of such approval by the audit committee.

 


113

ITEM 16D. EXEMPTIONEXEMPTIONS FROM THE LISTING STANDARDS FOR AUDIT COMMITTEES

 

Not applicable.

 

ITEM 16E. PURCHASES OF EQUITY SECURITIES BY THE ISSUER AND AFFILIATED PURCHASERS

 

Not applicable.

 

ITEM 16F. CHANGE IN REGISTRANT’S CERTIFYING ACCOUNTANT

 

In connection with the Business Combination, UHY LLP resigned as the independent registered public accounting firm of BPGIC International (f/k/a Twelve Seas Investment Company) effective as of January 8, 2020.Previously reported.

 

The reports of UHY LLP with respect to the audit of the financial statements of BPGIC International (f/k/a Twelve Seas Investment Company) as of December 31, 2018 and for the period from November 30, 2017 (inception) through December 31, 2018, did not contain an adverse opinion or a disclaimer of opinion, nor was such report qualified or modified as to uncertainty, audit scope or accounting principles, except for an explanatory paragraph describing the uncertainty as to BPGIC International’s ability to continue as a going concern.

During the period from November 30, 2017 (inception) through December 31, 2018 and the subsequent period through January 8, 2020, the date that UHY LLP resigned as the independent registered public accounting firm of BPGIC International, we did not have any disagreement with UHY LLP on any matter of accounting principles or practices, financial statement disclosure, or auditing scope or procedure.

During that time, there were no “reportable events” as set forth in Item 304(a)(1) of Regulation S-K adopted by the Securities and Exchange Commission.

We have provided UHY LLP with a copy of this Item 16.F prior to its filing with the Securities and Exchange Commission. UHY LLP has provided a letter to us, dated June 30, 2020 and addressed to the Securities and Exchange Commission, which is attached hereto as Exhibit 15.3 and is hereby incorporated herein by reference.

ITEM 16G. CORPORATE GOVERNANCE

 

As a foreign private issuer, the Company may generally follow home country practice with respect to certain matters of corporate governance in lieu of the comparable governance provisions of the NasdaqNASDAQ Listing Rules, except for certain matters including the composition and responsibilities of the audit committee and the independence of its members within the meaning of the rules and regulations of the SEC.

 


The Company follows home country practice in lieu of NasdaqNASDAQ corporate governance requirements with respect to the following Nasdaqfollowing NASDAQ requirements:

 

Executive Sessions. We are not required to and, in reliance on home country practice, we may not, comply with certain NasdaqNASDAQ rules requiring the Company’s independent directors to meet in regularly scheduled executive sessions at which only independent directors are present. The Company follows Cayman Islands practice which does not require independent directors to meet regularly in executive sessions separate from the full board of directors.

 

Nomination of Directors. The Company’s director nominees may not be selected or recommended for the board of director’s selection by either (i) independent directors constituting a majority of the board’s independent directors in a vote in which only independent directors participate, or (ii) a nominations committee comprised solely of independent directors, as required under NasdaqNASDAQ rules. The Company follows Cayman Islands practice which does not require director nominations to be made or recommended solely by independent directors. Further, the Company does not have a formal written charter or board resolution addressing the director nominations process. The Company follows Cayman Islands practice which does not require the Company to have a formal written charter or board resolution addressing the director nominations process.

 

Proxy Statements. We are not required to and, in reliance on home country practice, we may not, comply with certain NasdaqNASDAQ rules regarding the provision of proxy statements for general meetings of shareholders. The Company will follow Cayman Islands practice which does not impose a regulatory regime for the solicitation of proxies.

 

Shareholder Approval. The Company is not required to and, in reliance on home country practice, it does not intend to, comply with certain NasdaqNASDAQ rules regarding shareholder approval for certain issuances of securities under NasdaqNASDAQ Rule 5635. In accordance with the provisions of the Company’s Amended and Restated Memorandum and Articles of Association, the Company’s board of directors is authorized to issue securities, including Ordinary Shares, warrants and convertible notes.

 

ITEM 16H. MINE SAFETY DISCLOSURE

 

Not applicable.

 


114

PART III

 

ITEM 17. FINANCIAL STATEMENTS

 

See Item 18.

 

ITEM 18. FINANCIAL STATEMENTS

 

The consolidated financial statements of the Company, together with the report of the independent registered public accounting firm are included as the “F” pages to this annual report.Report.

 

ITEM 19. EXHIBITS

 

EXHIBIT INDEX

 

Exhibit
No.
 Description
1.1*1.1 Amended and Restated Memorandum and Articles of Association of Brooge Energy Limited.Limited (incorporated by reference to Exhibit 1.1 of Brooge Energy Limited’s Annual Report on Form 20-F (File No. 001-39171), filed with the SEC on June 30, 2020).
2.1*
2.1 Specimen Ordinary Share Certificate of Brooge Energy Limited.Limited (incorporated by reference to Exhibit 2.1 of Brooge Energy Limited’s Annual Report on Form 20-F (File No. 001-39171), filed with the SEC on June 30, 2020).
2.2*
2.2 Specimen Warrant Certificate of Brooge Energy Limited.Limited (incorporated by reference to Exhibit 2.2 of Brooge Energy Limited’s Annual Report on Form 20-F (File No. 001-39171), filed with the SEC on June 30, 2020).
2.3 Warrant Agreement, dated June 19, 2018, between Continental Stock Transfer & Trust Company and Twelve Seas Investment Company (incorporated by reference to Exhibit 4.1 of Twelve Seas Investment Company’s Form 8-K (File No. 001-38540), filed with the SEC on June 25, 2018).
2.4 Rights Agreement, dated June 19, 2018, between Twelve Seas Investment Company and Continental Stock Transfer & Trust Company (incorporated by reference to Exhibit 4.2 of Twelve Seas Investment Company’s Form 8-K (File No. 001-38540), filed with the SEC on June 25, 2018).
2.5 Amendment to Warrant Agreement and Rights Agreement, dated as of December 20, 2019, by and among Continental Stock Transfer & Trust Company, Twelve Seas Investment Company, and Brooge Holdings Limited. (incorporated by reference to Exhibit 2.5 of Brooge Energy Limited’s Shell Company Report on Form 20-F (File No. 001-39171), filed with the SEC on December 30, 2019).
2.6* 

2.6Description of the Registrant’s Securities.Securities (incorporated by reference to Exhibit 2.6 of Brooge Energy Limited’s Annual Report on Form 20-F (File No. 001-39171), filed with the SEC on June 30, 2020).

2.7Bond Terms, dated September 22, 2020, between Brooge Petroleum and Gas Investment Company FZE and Nordic Trustee AS (incorporated by reference to Exhibit 4.7 of Brooge Energy Limited’s Post-Effective Amendment No. 1 to Registration Statement on Form F-1 (File No. 333-248068) filed with the SEC on February 4, 2021).
2.8Amendment Agreement No. 1, dated October 23, 2020 to Bond Terms between Brooge Petroleum and Gas Investment Company FZE and Nordic Trustee AS (incorporated by reference to Exhibit 4.8 of Brooge Energy Limited’s Post-Effective Amendment No. 1 to Registration Statement on Form F-1 (File No. 333-248068) filed with the SEC on February 4, 2021).
4.1Form of Joinder to Seller Registration Rights Agreement (incorporated by reference to Exhibit 10.111 of Brooge Energy Limited’s Post-Effective Amendment No. 1 to Registration Statement on Form F-1 (File No. 333-248068) filed with the SEC on February 4, 2021).
4.2Form of Transferee Voting Agreement (incorporated by reference to Exhibit 10.112 of Brooge Energy Limited’s Post-Effective Amendment No. 1 to Registration Statement on Form F-1 (File No. 333-248068) filed with the SEC on February 4, 2021).
4.3 Letter Agreement, dated June 19, 2018, by and between Twelve Seas and Twelve Seas Sponsors I LLC (incorporated by reference to Exhibit 10.5 of Twelve Seas’ Form 8-K (File No. 001-38540), filed with the SEC on June 25, 2018).
4.2
4.4 Letter Agreement, dated June 19, 2018, by and between Twelve Seas and Dimitri Elkin (incorporated by reference to Exhibit 10.6 of Twelve Seas’ Form 8-K (File No. 001-38540), filed with the SEC on June 25, 2018).
4.3
4.5 Letter Agreement, dated June 19, 2018, by and between Twelve Seas, Gregory A. Stoupnitzky and Suneel G. Kaji (incorporated by reference to Exhibit 10.7 of Twelve Seas’ Form 8-K (File No. 001-38540), filed with the SEC on June 25, 2018).
4.4
4.6 Letter Agreement, dated June 19, 2018, by and between Twelve Seas, Neil Richardson, Stephen A. Vogel, Bryant B. Edwards and Stephen N. Cannon (incorporated by reference to Exhibit 10.8 of Twelve Seas’ Form 8-K (File No. 001-38540), filed with the SEC on June 25, 2018).
4.5
4.7 Investment Management Trust Account Agreement, dated June 19, 2018, between Continental Stock Transfer & Trust Company and Twelve Seas (incorporated by reference to Exhibit 10.1 of Twelve Seas’ Form 8-K (File No. 001-38540), filed with the SEC on June 25, 2018).


4.6
4.8 Registration Rights Agreement, dated June 19, 2018, among Twelve Seas, Twelve Seas Sponsors I LLC, Gregory Stoupnitzky, Suneel G. Kaji and EarlyBirdCapital, Inc. (incorporated by reference to Exhibit 10.2 of Twelve Seas’ Form 8-K (File No. 001-38540), filed with the SEC on June 25, 2018).

4.7115

4.9 Share Escrow Agreement, dated June 19, 2018, by and among Twelve Seas, Twelve Seas Sponsors I LLC, Gregory Stoupnitzky, Suneel G. Kaji and Continental Stock Transfer & Trust Company (incorporated by reference to Exhibit 10.3 of Twelve Seas’ Form 8-K (File No. 001-38540), filed with the SEC on June 25, 2018).
4.8
4.10 Rights Agreement, dated June 19, 2018, between Twelve Seas and Continental Stock Transfer & Trust Company (incorporated by reference to Exhibit 4.2 of Twelve Seas’ Form 8-K (File No. 001-38540), filed with the SEC on June 25, 2018).
4.9
4.11 Securities Subscription Agreement, dated December 11, 2017, between Twelve Seas and Twelve Seas Sponsors I LLC (incorporated by reference to Exhibit 10.5 of Twelve Seas’ Form S-1 (File No. 333-225352), filed with the SEC on June 1, 2018).
4.10
4.12 Amended and Restated Unit Subscription Agreement, dated June 19, 2018, by and between the Registrant and the Initial Shareholders for founders’ units (incorporated by reference to Exhibit 10.4 of Twelve Seas’ Form 8-K (File No. 001-38540), filed with the SEC on June 25, 2018).
4.11
4.13 Form of Indemnity Agreement (incorporated by reference to Exhibit 10.9 of Twelve Seas’ Form S-1/A (File No. 333-225352), filed with the SEC on June 14, 2018).
4.12
4.14 Administrative Services Agreement, dated June 19, 2018, between Twelve Seas and Twelve Seas Capital, Inc. (incorporated by reference to Exhibit 10.9 of Twelve Seas’ Form 8-K (File No. 001-38540), filed with the SEC on June 25, 2018).
4.13 
4.15

Form of Business Combination Marketing Agreement between Twelve Seas and EarlyBirdCapital, Inc. (incorporated by reference to Exhibit 1.2 of Twelve Seas’ Form S-1/A (File No. 001-225352), filed with the SEC on June 14, 2018).

4.14
4.16 Letter Agreement, dated as of April 15, 2019, by and among Twelve Seas Investment Company, Brooge Petroleum And Gas Investment Company FZE, Twelve Seas Sponsors I LLC, Suneel G. Kaji and Gregory Stoupnitzky (incorporated by reference to Exhibit 10.1 of Twelve Seas’ Form 8-K (File No. 001-38540), filed with the SEC on April 19, 2019).
4.15
4.17 Sponsor Promissory Note, dated December 11, 2017 (incorporated by reference to Exhibit 10.7 of Twelve Seas’ Form S-1 (File No. 333-225352), filed with the SEC on June 1, 2018).
4.16
4.18 Sponsor Promissory Note, dated April 4, 2019 (incorporated by reference to Exhibit 10.1 of Twelve Seas’ Form 8-K (File No. 001-38540), filed with the SEC on April 5, 2019).
4.194.17 Land Lease Agreement, dated March 10, 2013, by and between Fujairah Municipality and Brooge Petroleum & Gas Investment Company FZC (incorporated by reference to Exhibit 10.20 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.204.18 Novation Agreement, dated September 1, 2014, by and among Fujairah Municipality, Fujairah Oil Industry Zone, and Brooge Petroleum & Gas Investment Company FZC (incorporated by reference to Exhibit 10.21 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.214.19 Access to and Use of Port Facilities Agreement, undated, by and between Port of Fujairah and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.22 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.20# 
4.22*Offer Letter, dated April 6, 2014, by and between National Bank of Abu Dhabi, PJSC-Islamic Banking Division and BPGIC (incorporated by reference to Exhibit 10.23 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.21 
4.23Offer Letter (Addendum), dated July 24, 2014, by and between National Bank of Abu Dhabi, PJSC-Islamic Banking Division and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.24 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.22 
4.24Offer Letter (Addendum), dated November 13, 2014, by and between National Bank of Abu Dhabi, PJSC-Islamic Banking Division and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.25 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).


4.23 
4.25Offer Letter (Addendum), dated December 31, 2014, by and between National Bank of Abu Dhabi, PJSC-Islamic Banking Division and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.26 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.24# 
4.26*No Objection Letter in Respect of the Oil Storage Terminal Project, dated April 13, 2015, by and between Fujairah Oil Industry Zone and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.27 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).

4.25116

4.27 Offer Letter (Addendum), dated June 24, 2015, by and between National Bank of Abu Dhabi, PJSC-Islamic Banking Division and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.28 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.284.26 Master Istisna’ Agreement, dated June 29, 2015, by and between National Bank of Abu Dhabi, PJSC-Islamic Banking Division and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.29 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.27# 
4.29*Offer Letter, dated June 29, 2015 by and between National Bank of Abu Dhabi, PJSC-Islamic Banking Division and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.30 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.304.28 Master Forward Lease Agreement, dated June 29, 2015, by and between National Bank of Abu Dhabi, PJSC-Islamic Banking Division and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.31 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.314.29 Forward Lease, dated June 29, 2015, by and between National Bank of Abu Dhabi, PJSC-Islamic Banking Division and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.32 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.32*4.30#† Common Terms Agreement, dated June 29, 2015, by and between National Bank of Abu Dhabi, PJSC-Islamic Banking Division and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.33 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.334.31 Commercial Mortgage, dated June 29, 2015, by and between National Bank of Abu Dhabi, PJSC-Islamic Banking Division and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.34 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.344.32 Assignment of Contracts, dated June 29, 2015, by and between National Bank of Abu Dhabi, PJSC-Islamic Banking Division and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.35 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.35*4.33#† Investment Agency Agreement, dated June 29, 2015, by and between National Bank of Abu Dhabi, PJSC-Islamic Banking Division and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.36 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.34 
4.36Service Agency Agreement, dated June 29, 2015, by and between National Bank of Abu Dhabi, PJSC-Islamic Banking Division and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.37 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.374.35 Purchase Undertaking, dated June 29, 2015, by and between National Bank of Abu Dhabi, PJSC-Islamic Banking Division and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.38 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.384.36 Sale Undertaking, dated June 29, 2015, by and between National Bank of Abu Dhabi, PJSC-Islamic Banking Division and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.39 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).


4.394.37 Seller Option Deed, dated June 29, 2015, by and between National Bank of Abu Dhabi, PJSC-Islamic Banking Division and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.40 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.38# 
4.40*Account Pledge and Assignment, dated June 29, 2015, by and between National Bank of Abu Dhabi, PJSC-Islamic Banking Division and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.41 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.39 
4.41Conditional Waiver Letter, dated June 29, 2015 by and between National Bank of Abu Dhabi, PJSC-Islamic Banking Division and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.42 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.40# 
4.42*Common User Pipe Rack 3 Concession Agreement, dated March 31, 2016, by and between Port of Fujairah and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.43 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).

117

4.43*4.41#† The Service Agreement, dated April 1, 2017, by and between Brooge Petroleum and Gas Investment Company and Flowi Facility Management LLC (incorporated by reference to Exhibit 10.44 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.42# 
4.44*Facility Offer Letter, dated April 9, 2017, by and between National Bank of Abu Dhabi, PJSC-Islamic Banking Division and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.45 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.43 
4.45Addendum to Forward Lease, dated April 26, 2017, by and between National Bank of Abu Dhabi, PJSC-Islamic Banking Division and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.46 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.44 
4.46Agreement, dated April 27, 2017, by and between National Bank of Abu Dhabi, PJSC-Islamic Banking Division and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.47 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.45 
4.47Employment Agreement, dated May 21, 2017, by and between Nicolaas Paardenkooper and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.48 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.46 
4.48Employment Agreement Annexure, dated January 8, 2018, by and between Brooge Petroleum and Gas Investment Company FZC and Nicolaas Paardenkooper (incorporated by reference to Exhibit 10.49 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.47# 
4.49*Facility Offer Letter, dated June 4, 2018, by and between First Abu Dhabi Bank, PJSC-Islamic Banking Division and Brooge Petroleum and Gas Investment Company (incorporated by reference to Exhibit 10.50 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.504.48 Murabaha Agreement for the Sale and Purchase of Commodities, undated, by and between First Abu Dhabi Bank, PJSC-Islamic Banking Division and Brooge Petroleum and Gas Investment Company (incorporated by reference to Exhibit 10.51 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.48 
4.51Letter of Condition Waiver, dated June 21, 2018, by and between First Abu Dhabi Bank and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.52 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.49 
4.52Letter Agreement for Renewal of Service Agreement, dated July 1, 2018, by and between Flowi Facility Management LLC and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.53 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.534.50 Contract for the Provision of Project Management Consultancy (PMC) Services Agreement, dated July 26, 2018, by and between MUC Oil & Gas Engineering Consultancy and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.54 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.54*4.51#† The Contract Agreement, dated September 3, 2018, by and between Audex Fujairah LL FZE and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.55 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).


4.554.52 Master Istisna’ Agreement, dated October 15, 2018, by and between First Abu Dhabi Bank PJSC and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.56 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.564.53 Master Forward Lease Agreement, dated October 15, 2018, by and between First Abu Dhabi Bank PJSC and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.57 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.57*4.54#† Common Terms Agreement, dated October 15, 2018, by and between First Abu Dhabi Bank PJSC and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.58 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.55 
4.58Title Agency Agreement, dated October 15, 2018, by and between First Abu Dhabi Bank PJSC and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.59 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).

4.56118

4.59 Indemnity Undertaking, dated October 15, 2018, by and between First Abu Dhabi Bank PJSC and Brooge Petroleum and Gas Investment Company FZC (incorporated by reference to Exhibit 10.60 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.57# 
4.60

Refinery and ServicesForm of Non-Executive Director Agreement dated March 13, 2019 by and between Sahara Energy Resources DMCC and Brooge Petroleum and Gas Investment Company FZE (incorporated by reference to Exhibit 10.6110.96 of Brooge HoldingsEnergy Limited’s Registration Statement on Form F-4/AF-1 (File No. 333-233964),333-248068) filed with the SEC on November 21, 2019)August 17, 2020).

4.614.58 

Business Combination Agreement, dated April 15, 2019, by and among Twelve Seas, the Company, Merger Sub, BPGIC, and BPGIC Holdings, entered into that certain Business Combination Agreement, pursuant to which BPGIC Holdings Limited (as assignee of Brooge Petroleum and Gas Investment Company (BPGIC) PLC), as amended (incorporated by reference to Exhibit 2.1 of Brooge Holdings Limited’sLimited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).

4.59
4.62 Escrow Agreement, dated as of May 10, 2019, by and among Brooge Holdings Limited, BPGIC Holdings Limited (as assignee of Brooge Petroleum and Gas Investment Company (BPGIC) PLC), and Continental Stock Transfer and Trust Company (incorporated by reference to Exhibit 10.1 of Twelve Seas’ Form 8-K (File No. 001-38540), filed with the SEC on May 13, 2019).
4.60 Joint Development Agreement, dated May 14, 2019, by and between Brooge Petroleum and Gas Investment Company FZE and Sahara Energy Resources DMCC (incorporated by reference to Exhibit 10.62 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.61

4.63

 Chief Financial Officer Employment Offer Letter, dated May 27, 2019, by and between Brooge Petroleum and Gas Investment Company FZE and Saleh Mohamed Yammout (incorporated by reference to Exhibit 10.65 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.62 Addendum to Joint Development Agreement, dated June 1, 2019, by and between Brooge Petroleum and Gas Investment Company FZE and Sahara Energy Resources DMCC (incorporated by reference to Exhibit 10.63 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.63

4.64

 Second Addendum to Joint Development Agreement, dated July 2019, by and between Brooge Petroleum and Gas Investment Company FZE and Sahara Energy Resources DMCC (incorporated by reference to Exhibit 10.64 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.64Land Lease Initial Agreement, dated July 14, 2019 by and between Fujairah Oil Industry Zone and Brooge Petroleum & Gas Investment Company FZE (incorporated by reference to Exhibit 10.66 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.65 

4.65

Employment Agreement, dated May 1, 2019, by and between Brooge Petroleum and Gas Investment Company FZE and Lina Saheb (incorporated by reference to Exhibit 10.67 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.66# 
4.66*Main Terminal Lease and Offtake Agreement - Phase I, dated August 1, 2019, by and between Brooge Petroleum and Gas Investment Company and Al Brooge International Advisory LLC (incorporated by reference to Exhibit 10.69 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.67 

4.67

Chief Marketing Officer Employment Offer Letter, dated August 28, 2019, by and between Brooge Petroleum and Gas Investment Company FZE and Faisal Elsaied Selim Hussain (incorporated by reference to Exhibit 10.70 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).


4.68 Third Addendum to Joint Development Agreement, dated September 6, 2019, by and between Brooge Petroleum and Investment Company FZE and Sahara Energy Resources DMCC (incorporated by reference to Exhibit 10.68 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.69

4.68

 Amendment to Facility Letter, dated September 10, 2019, by and between Brooge Petroleum and Gas Investment Company FZE and First Abu Dhabi Bank PJSC (incorporated by reference to Exhibit 10.71 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.70# 
4.69*Main Terminal and Lease Offtake Agreement - Phase II, September 20, 2019, by and between by and between Brooge Petroleum and Gas Investment Company and Al Brooge International Advisory LLC (incorporated by reference to Exhibit 10.72 of Brooge Holdings Limited’s Form F-4/A (File No. 333-233964), filed with the SEC on November 21, 2019).
4.71 

4.70

Promissory Note, dated October 21, 2019, issued to Twelve Seas Sponsors I LLC (incorporated by reference to Exhibit 10.1 of Twelve Seas Investment Company’s Form 10-Q (File No. 001-38540), filed with the SEC on October 25, 2019).

4.72†119

4.71 First Amendment to Escrow Agreement, dated as of December 20, 2019, by and among Brooge Holdings Limited, BPGIC Holdings Limited (as assignee of Brooge Petroleum and Gas Investment Company (BPGIC) PLC), and Continental Stock Transfer and Trust Company (incorporated by reference to Exhibit 4.72 of Brooge Energy Limited’s Shell Company Report on Form 20-F (File No. 001-39171), filed with the SEC on December 30, 2019).
4.73 
4.72Voting Agreement, dated as of December 20, 2019, by and among BPGIC Holdings Limited, Twelve Seas Sponsors I LLC, Gregory Stoupnitzky and Suneel G. Kaji (incorporated by reference to Exhibit 4.73 of Brooge Energy Limited’s Shell Company Report on Form 20-F (File No. 001-39171), filed with the SEC on December 30, 2019).
4.74† 

4.73

Amended and Restated Founders’ Registration Rights Agreement, dated as of December 20, 2019, by and among Brooge Holdings Limited, Twelve Seas Sponsors I LLC, EarlyBirdCapital, Inc., Gregory Stoupnitzky and Suneel Kaji (incorporated by reference to Exhibit 4.74 of Brooge Energy Limited’s Shell Company Report on Form 20-F (File No. 001-39171), filed with the SEC on December 30, 2019).
4.75 
4.74Amendment to Share Escrow Agreement, dated as of December 20, 2019, by and among Brooge Holdings Limited, Twelve Seas Investment Company, Twelve Seas Sponsors I LLC, Suneel G. Kaji and Gregory Stoupnitzky (incorporated by reference to Exhibit 4.75 of Brooge Energy Limited’s Shell Company Report on Form 20-F (File No. 001-39171), filed with the SEC on December 30, 2019).
4.76 

4.75

BPGIC Registration Rights Agreement, dated as of December 20, 2019, by and between Brooge Holdings Limited and BPGIC Holdings Limited (incorporated by reference to Exhibit 4.76 of Brooge Energy Limited’s Shell Company Report on Form 20-F (File No. 001-39171), filed with the SEC on December 30, 2019).
4.77† 
4.76Initial Shareholder Escrow Agreement, dated as of December 20, 2019, by and between Brooge Holdings Limited, Twelve Seas Sponsors I LLC, Suneel G. Kaji and Gregory Stoupnitzky (incorporated by reference to Exhibit 4.77 of Brooge Energy Limited’s Shell Company Report on Form 20-F (File No. 001-39171), filed with the SEC on December 30, 2019).


4.78 

4.77

Business Combination Marketing Agreement Fee Amendment, dated as of December 20, 2019, by and among Brooge Holdings Limited, Twelve Seas Investment Company and EarlyBirdCapital, IncInc. (incorporated by reference to Exhibit 4.78 of Brooge Energy Limited’s Shell Company Report on Form 20-F (File No. 001-39171), filed with the SEC on December 30, 2019).
4.79 

4.78

$1,500,000 Promissory Note issued to EarlyBirdCapital, Inc., dated as of December 20, 2019 (incorporated by reference to Exhibit 4.79 of Brooge Energy Limited’s Shell Company Report on Form 20-F (File No. 001-39171), filed with the SEC on December 30, 2019).
4.80 

4.79

Form of Dividend Waiver (incorporated by reference to Exhibit 4.80 of Brooge Energy Limited’s Shell Company Report on Form 20-F (File No. 001-39171), filed with the SEC on December 30, 2019).
4.81 
4.80Amendment to Promissory Notes dated October 21, 2019 and April 4, 2019, issued to Twelve Seas Sponsors I LLC (incorporated by reference to Exhibit 4.81 of Brooge Energy Limited’s Shell Company Report on Form 20-F (File No. 001-39171), filed with the SEC on December 30, 2019).
4.82 

4.81

Amendment to Phase I Construction Facilities Letter, dated December 30, 2019, by and between Brooge Petroleum and Gas Investment Company FZE and First Abu Dhabi Bank PJSC (incorporated by reference to Exhibit 4.82 of Brooge Energy Limited’s Shell Company Report on Form 20-F (File No. 001-39171), filed with the SEC on December 30, 2019).
4.83
4.82 Limited Waiver of Initial Shareholder Escrow Agreement Earn-Out Conditions, dated as of December 17, 2019, by and between Twelve Seas Sponsors I LLC and Brooge Holdings Limited (incorporated by reference to Exhibit 4.83 of Brooge Energy Limited’s Shell Company Report on Form 20-F (File No. 001-39171), filed with the SEC on December 30, 2019).
4.84 
4.83Amendment to the Master Forward Lease Agreement, dated as of December 29, 2019, by and between Brooge Petroleum and Gas Investment Company FZE and First Abu Dhabi Bank PJSC (incorporated by reference to Exhibit 4.84 of Brooge Energy Limited’s Shell Company Report on Form 20-F (File No. 001-39171), filed with the SEC on December 30, 2019).
4.85*#
4.84 Land Lease Agreement, dated as of February 2, 2020, by and between Fujairah Oil Industry Zone and Brooge Petroleum and Gas Investment Company FZE.FZE (incorporated by reference to Exhibit 15.3 of Brooge Energy Limited’s Annual Report on Form 20-F (File No. 001-39171), filed with the SEC on June 30, 2020).
4.86*
4.85 Refinery Agreement, dated as of February 23, 2020, by and between Al Brooge International Advisory LLC and Brooge Petroleum and Gas Investment Company FZE (incorporated by reference to Exhibit 4.86 of Brooge Energy Limited’s Annual Report on Form 20-F (File No. 001-39171), filed with the SEC on June 30, 2020).
4.87*
4.86 Extension of Refinery Agreement, dated April 2020, by and between Al Brooge International Advisory LLC and Brooge Petroleum and Gas Investment Company FZE.FZE (incorporated by reference to Exhibit 4.87 of Brooge Energy Limited’s Annual Report on Form 20-F (File No. 001-39171), filed with the SEC on June 30, 2020).
4.88*
4.87 Extension of Refinery Agreement, dated June 2, 2020, by and between Al Brooge International Advisory LLC and Brooge Petroleum and Gas Investment Company FZE.FZE (incorporated by reference to Exhibit 4.88 of Brooge Energy Limited’s Annual Report on Form 20-F (File No. 001-39171), filed with the SEC on June 30, 2020).

4.89*120

4.88 Deed of Agreement, dated as of April 21, 2020, by and between Al Brooge International Advisory LLC and Brooge Petroleum and Gas Investment Company FZE.FZE(incorporated by reference to Exhibit 4.89 of Brooge Energy Limited’s Annual Report on Form 20-F (File No. 001-39171), filed with the SEC on June 30, 2020).
4.90*# Commercial Storage Agreement, dated as of April 22, 2020, by and between Totsa Total Oil Trading SA and Brooge Petroleum and Gas Investment Company FZE.
4.91*#4.89 Proposal for Front End Engineering Design (FEED), dated April 20, 2020, by and between MUC Oil & Gas Engineering Consultancy and Brooge Petroleum and Gas Investment Company.Company (incorporated by reference to Exhibit 4.91 of Brooge Energy Limited’s Annual Report on Form 20-F (File No. 001-39171), filed with the SEC on June 30, 2020).
4.92* 

4.90Chief Financial Officer Offer Letter, dated as of April 27, 2020, by and between Brooge Petroleum and Gas Investment Company FZE and Syed Masood Ali.Ali (incorporated by reference to Exhibit 15.3 of Brooge Energy Limited’s Annual Report on Form 20-F (File No. 001-39171), filed with the SEC on June 30, 2020) (incorporated by reference to Exhibit 4.92 of Brooge Energy Limited’s Annual Report on Form 20-F (File No. 001-39171), filed with the SEC on June 30, 2020).

4.93* 

4.91Amendment to Phase I Construction Facilities Letter, dated June 15, 2020, by and between Brooge Petroleum and Gas Investment Company FZE and First Abu Dhabi Bank PJSC.PJSC (incorporated by reference to Exhibit 4.93 of Brooge Energy Limited’s Annual Report on Form 20-F (File No. 001-39171), filed with the SEC on June 30, 2020).

4.94* 

4.92Movable Asset Mortgage, dated as of June 15, 2020, by and between Brooge Petroleum and Gas Investment Company FZE and First Abu Dhabi Bank PJSC.PJSC (incorporated by reference to Exhibit 4.94 of Brooge Energy Limited’s Annual Report on Form 20-F (File No. 001-39171), filed with the SEC on June 30, 2020).

4.95* 

4.93Account Pledge (First Party), dated as of June 15, 2020, by and between by and between Brooge Petroleum and Gas Investment Company FZE and First Abu Dhabi Bank PJSC.PJSC (incorporated by reference to Exhibit 4.95 of Brooge Energy Limited’s Annual Report on Form 20-F (File No. 001-39171), filed with the SEC on June 30, 2020).
4.94Extension of Refinery Agreement, dated August 4, 2020, by and between Al Brooge International Advisory LLC and Brooge Petroleum and Gas Investment Company FZE (incorporated by reference to Exhibit 10.97 of Brooge Energy Limited’s Registration Statement on Form F-1 (File No. 333-248068) filed with the SEC on August 17, 2020).
4.95†Novation Agreement, dated October 1, 2020, by and among Fujairah Oil Industry Zone, Brooge Petroleum & Gas Investment Company FZE and Brooge Petroleum & Gas Investment Company Phase III FZE (incorporated by reference to Exhibit 10.98 of Brooge Energy Limited’s Post-Effective Amendment No. 1 to Registration Statement on Form F-1 (File No. 333-248068) filed with the SEC on February 4, 2021).
4.96*Commercial Storage Agreement dated November 10, 2020, between Brooge Petroleum and Gas Investment Company FZE and JayKay Trading Company FZE.
4.97*Commercial Storage Agreement dated December 6, 2020, between Brooge Petroleum and Gas Investment Company FZE and JayKay Trading Company FZE.
4.98*Commercial Storage Agreement dated November 19, 2020, between Brooge Petroleum and Gas Investment Company FZE and A&T Offshore FZC.
4.99*Commercial Storage Agreement dated November 26, 2020, between Brooge Petroleum and Gas Investment Company FZE and A&T Offshore FZC.
4.100*Commercial Storage Agreement dated March 4, 2021, between Brooge Petroleum and Gas Investment Company FZE and A&T Offshore FZC.
4.101*Commercial Storage Agreement dated January 13, 2021, between Brooge Petroleum and Gas Investment Company FZE and NuFuel Trading FZE.
4.102*

Commercial Storage Agreement dated February 14, 2021, between Brooge Petroleum and Gas Investment Company FZE and S A A Trading Refined Oil Products Abroad.

4.103*

Commercial Storage Agreement dated March 30, 2021, between Brooge Petroleum and Gas Investment Company FZE and Valor International FZC.

4.104Extension of Refinery Agreement, dated October 8, 2020, between Al Brooge International Advisory LLC and Brooge Petroleum and Gas Investment Company FZE (incorporated by reference to Exhibit 10.106 of Brooge Energy Limited’s Post-Effective Amendment No. 1 to Registration Statement on Form F-1 (File No. 333-248068) filed with the SEC on February 4, 2021).
4.1058.1*Deed of Agreement, dated as of December 1, 2020, between Al Brooge International Advisory LLC and Brooge Petroleum and Gas Investment Company FZE (incorporated by reference to Exhibit 10.107 of Brooge Energy Limited’s Post-Effective Amendment No. 1 to Registration Statement on Form F-1 (File No. 333-248068) filed with the SEC on February 4, 2021).

121

4.106Deed of Agreement, dated as of December 7, 2020, between Al Brooge International Advisory LLC and Brooge Petroleum and Gas Investment Company FZE (incorporated by reference to Exhibit 10.108 of Brooge Energy Limited’s Post-Effective Amendment No. 1 to Registration Statement on Form F-1 (File No. 333-248068) filed with the SEC on February 4, 2021).
4.107Extension of Deed of Agreement dated November 1, 2020, between Al Brooge International Advisory LLC and Brooge Petroleum and Gas Investment Company FZE (incorporated by reference to Exhibit 10.109 of Brooge Energy Limited’s Post-Effective Amendment No. 1 to Registration Statement on Form F-1 (File No. 333-248068) filed with the SEC on February 4, 2021).
4.108 Deed of Agreement, dated as of December 9, 2020, between Al Brooge International Advisory LLC and Brooge Petroleum and Gas Investment Company FZE.
4.109Deed of Agreement, dated as of February 8, 2021, between Al Brooge International Advisory LLC and Brooge Petroleum and Gas Investment Company FZE.
4.110Deed of Agreement, dated as of February 10, 2021, between Al Brooge International Advisory LLC and Brooge Petroleum and Gas Investment Company FZE.
4.111Extension of Refinery Agreement, dated January 6, 2021, between Al Brooge International Advisory LLC and Brooge Petroleum and Gas Investment Company FZE (incorporated by reference to Exhibit 10.110 of Brooge Energy Limited’s Post-Effective Amendment No. 1 to Registration Statement on Form F-1 (File No. 333-248068) filed with the SEC on February 4, 2021).
8.1

List of Subsidiaries of the Company (incorporated by reference to Exhibit 21.1 of Brooge Energy Limited’s Post-Effective Amendment No. 1 to Registration Statement on Form F-1 (File No. 333-248068) filed with the SEC on February 4, 2021).

11.1 Code of Ethics and Business Conduct (incorporated by reference to Exhibit 11.1 of Brooge Energy Limited’s Shell Company Report on Form 20-F (File No. 001-39171), filed with the SEC on December 30, 2019).


12.1*
12.1 Certification of the Principal Executive Officer pursuant to Rule 13a-14(a) of the Securities Exchange Act of 1934.
12.2*
12.2 Certification of the Principal Financial Officer pursuant to Rule 13a-14(a) of the Securities Exchange Act of 1934.
13.1*
13.1 Certification of the Principal Executive Officer pursuant to 18 U.S.C. 1350.
13.2*
13.2 Certification of the Principal Financial Officer pursuant to 18 U.S.C. 1350.
15.1 Audit Committee Charter (incorporated by reference to Exhibit 15.1 of Brooge Energy Limited’s Shell Company Report on Form 20-F (File No. 001-39171), filed with the SEC on December 30, 2019).
15.2 Compensation Committee Charter incorporated by reference to Exhibit 15.2 of Brooge Energy Limited’s Shell Company Report on Form 20-F (File No. 001-39171), filed with the SEC on December 30, 2019).
15.3*Letter from UHY LLP.
   
101.INS XBRL Instance Document
101.SCH XBRL Taxonomy Extension Schema Document
101.CAL XBRL Taxonomy Extension Calculation Linkbase Document
101.DEF XBRL Taxonomy Extension Definition Linkbase Document
101.LAB XBRL Taxonomy Extension Label Linkbase Document
101.PRE XBRL Taxonomy Extension Presentation Linkbase Document

 

*Filed Herewith

#Certain information has been redacted from this exhibit pursuant to Item 4 of the Instructions As Toas to Exhibits of Form 20-F because it is both not material and would likely cause competitive harm tois the type that the registrant if publicly disclosed.treats as private or confidential. The Registrantregistrant hereby agrees to furnish an unredacted copy of the exhibit and its materiality and competitive harmprivacy or confidentiality analyses to the CommissionSEC upon request.

Schedules to this exhibit have been omitted pursuant to the Instructions As Toas to Exhibits of Form 20-F. The Registrantregistrant hereby agrees to furnish a copy of any omitted schedules to the CommissionSEC upon request.

 

+The certifications attached as Exhibits 13.1 and 13.2 that accompany this Form 20-F are not deemed filed with the Securities and Exchange Commission and are not to be incorporated by reference into any filing of Brooge Energy Limited under the Securities Act or the Exchange Act, whether made before or after the date of this Form 20-F, irrespective of any general incorporation language contained in such filing.122

SIGNATURES

 

The registrant hereby certifies that it meets all of the requirements for filing on Form 20-F and that it has duly caused and authorized the undersigned to sign this annual report on its behalf.

 

 BROOGE ENERGY LIMITED
  
June 30, 2020April 5, 2021By:/s/Nicolaas L. Paardenkooper
  Name:Nicolaas L. Paardenkooper
  Title:Chief Executive Officer

 


123

 

Brooge Energy Limited

(Formerly Brooge Holdings LimitedLimited))

 

CONSOLIDATED FINANCIAL STATEMENTS

 

31 DECEMBER 2020

BROOGE ENERGY LIMITED

INDEX TO CONSOLIDATED FINANCIAL STATEMENTS

Page
Consolidated Financial Statements
Report of Independent Registered Public Accounting FirmF-2 - F-3
Consolidated Statement of Comprehensive Income as of December 31, 2020, 2019 and 2018F-4
Consolidated Statement of Financial Position as of December 31, 2020 and 2019F-5
Consolidated Statement of Changes in Stockholders’ Equity (Restated) for the years ended December 31, 2020, 2019 and 2018F-6
Consolidated Statement of Cash Flows for the years ended December 31, 2020, 2019 and 2018F-7
Notes to the Consolidated Financial StatementsF-8

Report of Independent Registered Public Accounting Firm

 

To Board of Directors and Shareholders of Brooge Energy Limited

Opinion on the Financial Statements

We have audited the accompanying consolidated statement of financial position of Brooge Energy Limited and its subsidiaries (the “Company”) as of December 31, 2020, and the related consolidated statements of comprehensive income, changes in equity and cash flows for the year then ended, including the related notes (collectively referred to as the “consolidated financial statements”). In our opinion, the consolidated financial statements present fairly, in all material respects, the financial position of the Company as of December 31, 2020, and the results of its operations and its cash flows for the year then ended in conformity with International Financial Reporting Standards as issued by the International Accounting Standards Board.

Basis for Opinion

These consolidated financial statements are the responsibility of the Company’s management. Our responsibility is to express an opinion on the Company’s consolidated financial statements based on our audit. We are a public accounting firm registered with the Public Company Accounting Oversight Board (United States) (PCAOB) and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.

We conducted our audit of these consolidated financial statements in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the consolidated financial statements are free of material misstatement, whether due to error or fraud. The Company is not required to have, nor were we engaged to perform, an audit of its internal control over financial reporting. As part of our audit we are required to obtain an understanding of internal control over financial reporting but not for the purpose of expressing an opinion on the effectiveness of the Company's internal control over financial reporting. Accordingly, we express no such opinion.

Our audit included performing procedures to assess the risks of material misstatement of the consolidated financial statements, whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis, evidence regarding the amounts and disclosures in the consolidated financial statements. Our audit also included evaluating the accounting principles used and significant estimates made by management, as well as evaluating the overall presentation of the consolidated financial statements. We believe that our audit provides a reasonable basis for our opinion.

/s/ PricewaterhouseCoopers LLP 

Dubai, United Arab Emirates

April 5, 2021

We have served as the Company's auditor since 2020.


Report of Independent Registered Public Accounting Firm

To the Shareholders and the Board of Directors of Brooge Energy Limited

 

Opinion on the Financial Statements

 

We have audited the accompanying consolidated statementsstatement of financial position of Brooge Energy Limited (the “Company”) as of 31 December 2019, and 2018, the related consolidated statements of comprehensive income, changes in equity and cash flows for each of the threetwo years in the period ended 31 December 2019, and the related notes (collectively referred to as the “consolidated financial statements”). In our opinion, the consolidated financial statements present fairly, in all material respects, the financial position of the Company at 31 December 2019, and 2018, and the results of its operations and its cash flows for each of the threetwo years in the period ended 31 December 2019, in conformity with International Financial Reporting Standards (IFRS) as issued by the International Accounting Standards Board.

 

The Company’s Ability to Continue as a Going Concern

 

The accompanying 31 December 2019 consolidated financial statements have been prepared assuming that the Company will continue as a going concern. As discussed in note 2.2 to the consolidated financial statements included in its 2019 Annual Report on Form 20-F/A (the “2019 Annual Report”), the Company hashad a working capital deficiency and may have not bebeen able to repay debt instalments and capital expenditure requirements from projected financial resources. These conditions raiseraised substantial doubt about the Company’s ability to continue as a going concern. Management’s evaluation of the events and conditions and management’s plans regarding these matters also arewere described in note 2.2.2.2 to the 2019 Annual Report. The 31 December 2019 consolidated financial statements dodid not include any adjustments that might result from the outcome of this uncertainty.

Restatement of 2019 Consolidated Financial Statements

As discussed in note 2.1 to the consolidated financial statements, the 2019 consolidated financial statements were restated to correct a misstatement related to the classification of warrants.

 

Basis for Opinion

 

These financial statements are the responsibility of the Company's management. Our responsibility is to express an opinion on the Company’s financial statements based on our audits. We are a public accounting firm registered with the Public Company Accounting Oversight Board (United States) (PCAOB) and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.

 

We conducted our audits in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement, whether due to error or fraud. The Company is not required to have, nor were we engaged to perform, an audit of its internal control over financial reporting. As part of our audits we are required to obtain an understanding of internal control over financial reporting but not for the purpose of expressing an opinion on the effectiveness of the Company's internal control over financial reporting. Accordingly, we express no such opinion.

 

Our audits included performing procedures to assess the risks of material misstatement of the financial statements, whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis, evidence regarding the amounts and disclosures in the financial statements. Our audits also included evaluating the accounting principles used and significant estimates made by management, as well as evaluating the overall presentation of the financial statements. We believe that our audits provide a reasonable basis for our opinion.

 

/s/ Ernst & Young

 

We have served as the Company’s auditor since 2018.from 2018 to 2020.

 

Abu Dhabi, United Arab Emirates

 

30 June 2020,

except for note 2.1, as to which the date is 27 November 2020.


Brooge Energy Limited

CONSOLIDATED STATEMENT OF COMPREHENSIVE INCOME

For the year ended 31 December 20192020

 

   2019  2018 2017 
 Notes USD  USD USD  Notes  2020
USD
  (Restated)
2019
USD
 2018
USD
 
                  
Revenue 3  44,085,374   35,839,268   89,593   3   41,831,537   44,085,374   35,839,268 
Direct costs 4  (10,202,465)  (9,607,360)  (2,295,809)  4   (12,944,760)  (10,202,465)  (9,607,360)
                              
GROSS PROFIT / (LOSS)    33,882,909   26,231,908   (2,206,216)
GROSS PROFIT      28,886,777   33,882,909   26,231,908 
                              
Listing expenses 5  (101,773,877)  -   -   5   -   (101,773,877)  - 
General and administrative expenses 6  (2,608,984)  (2,029,260)  (574,266)  6   (6,456,884)  (2,608,984)  (2,029,260)
Finance costs 7  (5,730,535)  (6,951,923)  (966,926)  7   (8,306,150)  (5,730,535)  (6,951,923)
Changes in fair value of derivative financial instruments 18  (328,176)  (1,190,073)  - 
Other income  8   828,332   -   - 
Change in fair value of derivative warrant liability  14   2,547,542   1,273,740   - 
Change in fair value of derivative financial instruments  19   (340,504)  (328,176)  (1,190,073)
                              
(LOSS) PROFIT AND TOTAL COMPREHENSIVE (LOSS) INCOME FOR THE YEAR    (76,558,663)  16,060,652   (3,747,408)
NET PROFIT/(LOSS)      17,159,113   (75,284,923)  16,060,652 
                              
Basic and diluted (loss) / earnings per share 21  (0.95)  0.20   (0.05)
Other comprehensive income      -   -   - 
                
PROFIT/(LOSS) AND TOTAL COMPREHENSIVE INCOME/(LOSS) FOR THE YEAR      17,159,113   (75,284,923)  16,060,652 
                
Earnings per share attributable to ordinary shareholders of the Group                
                
Basic and diluted earnings per share (cents)  22   0.19   (0.94)  0.20 

 

The attachedaccompanying notes 1 to 26 form27 are an integral part of these consolidated financial statements.


Brooge Energy Limited

CONSOLIDATED STATEMENT OF FINANCIAL POSITION

As at 31 December 20192020

 

     (Restated) 
   2019  2018 
 Notes USD  USD  Notes  2020
USD
  (Restated)
2019
USD
 
              
ASSETS                      
Non-current assets                      
Property, plant and equipment 8  263,228,588   197,629,114   9   367,303,525   263,228,588 
Advances to contractors 10  21,664,764   - 
Capital advances  11   16,418,065   21,664,764 
Restricted bank balance  12   8,500,000   - 
                      
    284,893,352   197,629,114       392,221,590   284,893,352 
                      
Current assets                      
Inventories 9  179,644   147,090   10   321,789   179,644 
Trade and other receivables 10  2,348,693   2,123,077   11   690,232   2,348,693 
Bank balances and cash 11  19,830,771   37,351   12   39,389,935   19,830,771 
                      
    22,359,108   2,307,518       40,401,956   22,359,108 
                      
TOTAL ASSETS    307,252,460   199,936,632       432,623,546   307,252,460 
                      
EQUITY AND LIABILITIES                      
Equity                      
Share capital 12  8,804   8,000   13   8,801   8,804 
Share premium 12  101,775,834   1,353,285   13   101,777,058   101,775,834 
Warrants 13  16,983,200   - 
Shareholders’ accounts 20  71,017,815   47,717,763 
Shareholders’ account  21   73,059,743   71,017,815 
General reserve 14  680,643   680,643   15   680,643   680,643 
(Accumulated losses) retained earnings    (65,340,421)  11,218,242 
Accumulated losses      (46,907,568)  (64,066,681)
                      
Total equity    125,125,875   60,977,933       128,618,677   109,416,415 
                      
Non-current liabilities                      
Term loans 15  74,160,950   - 
Borrowings  16   180,014,715   74,160,950 
Lease liability 16  28,624,259   28,108,801   17   79,289,507   28,624,259 
Provisions 17  13,941   6,267   18   913,848   13,941 
                      
    102,799,150   28,115,068       260,218,070   102,799,150 
                      
Current liabilities                      
Bank overdraft 11  -   3,745,048 
Term loans 15  14,539,187   94,792,088 
Derivative warrant liability  14   13,161,844   15,709,460 
Borrowings  16   7,000,000   14,539,187 
Accounts payable, accruals and other payables 19  61,115,121   9,003,798   20   13,829,897   61,115,121 
Derivative financial instruments 18  1,518,249   1,190,073   19   -   1,518,249 
Lease liability 16  2,154,878   2,112,624   17   9,795,058   2,154,878 
                      
    79,327,435   110,843,631       43,786,799   95,036,895 
                      
Total liabilities    182,126,585   138,958,699       304,004,869   197,836,045 
                      
TOTAL EQUITY AND LIABILITIES    307,252,460   199,936,632       432,623,546   307,252,460 

 

The attachedaccompanying notes 1 to 2627 form an integral part of these consolidated financial statements.


Brooge Energy Limited

CONSOLIDATED STATEMENT OF CHANGES IN EQUITY

For the year ended 31 December 20192020

 

                 Accumulated    
                 

(losses)/

    
  Share  Share     Shareholders’  Statutory  retained    
  capital  premium  Warrants  account  reserves  earnings  Total 
  USD  USD  USD  USD  USD  USD  USD 
                      
Balance at 1 January 2017  1,361,285   -   -   57,039,100   -   (414,359)  57,986,026 
Reverse acquisition re-nomination with exchange ratio 800,000:1  8,000   (8,000)  -   -   -   -   - 
Elimination of capital stock of BPGIC FZE  (1,361,285)  1,361,285   -  -   -   -   - 
Net contribution from the shareholders (note 18)  -   -   -   13,382,336   -   -   13,382,336 
Loss for the year  -   -   -   -   -   (3,747,408)  (3,747,408)
                             
Balance at 31 December 2017 (restated)  8,000   1,353,285   -   70,421,436   -   (4,161,767)  67,620,954 
                             
At 1 January 2018 (restated)  8,000   1,353,285   -   70,421,436   -   (4,161,767)  67,620,954 
Transfer to statutory reserve  -   -   -   -   680,643   (680,643)  - 
Net distribution to the shareholders (note 20)  -   -   -   (22,703,673)  -   -   (22,703,673)
Profit for the year  -   -   -   -   -   16,060,652   16,060,652 
                             
Balance at 31 December 2018 (restated)  8,000   1,353,285   -   47,717,763   680,643   11,218,242   60,977,933 
                            
Balance at 1 January 2019 (restated)  8,000   1,353,285   -   47,717,763   680,643   11,218,242   60,977,933 
Shares issuance in connection with a merger (note 25)  932   114,022,421   -   -   -   -   114,023,353 
Cash election in lieu of shares (note 25)  (128)  (13,599,872)  -   -   -   -   (13,600,000)
Issuance of warrants in connection with merger
(note 25)
  -   -   16,983,200   -   -   -   16,983,200 
Net Contribution by the shareholders (note 20)  -   -   -   23,300,052   -   -   23,300,052 
Loss for the year  -   -   -   -   -   (76,558,663)  (76,558,663)
                             
Balance at 31 December 2019  8,804   101,775,834   16,983,200   71,017,815   680,643   (65,340,421)  125,125,875 
  Share
capital
USD
  Share
premium
USD
  Shareholders’
account
USD
  General
reserves
USD
  Accumulated
(losses)/
retained
earnings
USD
  Total
USD
 
                   
At 1 January 2018  8,000   1,353,285   70,421,436   -   (4,161,767)  67,620,954 
Transfer to general reserve  -   -   -   680,643   (680,643)  - 
                         
Net distribution to the shareholders (note 21)  -   -   (22,703,673)  -   -   (22,703,673)
Profit for the year  -   -   -   -   16,060,652   16,060,652 
                         
Balance at 31 December 2018 (restated)  8,000   1,353,285   47,717,763   680,643   11,218,242   60,977,933 
                         
Balance at 1 January 2019  8,000   1,353,285   47,717,763   680,643   11,218,242   60,977,933 
Share issuance in connection with a merger (note 26)  932   114,022,421   -   -   -   114,023,353 
Cash election in lieu of shares (note 26)  (128)  (13,599,872)  -   -   -   (13,600,000)
Net contribution by the shareholders (note 21)  -   -   23,300,052   -   -   23,300,052 
Loss for the year  -   -   -   -   (75,284,923)  (75,284,923)
                         
Balance at 31 December 2019 (restated)  8,804   101,775,834   71,017,815   680,643   (64,066,681)  109,416,415 
                         
Balance at 1 January 2020  8,804   101,775,834   71,017,815   680,643   (64,066,681)  109,416,415 
Share issuance in connection with a merger  (3)  -   -   -   -   (3)
Exercise of 100 warrants in 100 ordinary shares  0.01   1,224   -   -   -   1,224 
Net contribution by the shareholders (note 21)  -   -   2,041,928   -   -   2,041,928 
Profit for the year  -   -   -   -   17,159,113   17,159,113 
                         
Balance at 31 December 2020  8,801   101,777,058   73,059,743   680,643   (46,907,568)  128,618,677 

 

The attachedaccompanying notes 1 to 2627 form an integral part of these consolidated financial statements.


Brooge Energy Limited

CONSOLIDATED STATEMENT OF CASH FLOWS

For the year ended 31 December 20192020

 

   2019  2018 2017 
 Notes USD  USD USD  Notes  2020
USD
  (Restated)
2019
USD
 2018
USD
 
                         
OPERATING ACTIVITIES                         
(Loss)/Profit for the year    (76,558,663)  16,060,652   (3,747,408)
(Loss)/profit for the year      17,159,113   (75,284,923)  16,060,652 
                              
Adjustments to reconcile net (loss)/profit to net cash provided by (used in) operating activities:                              
Listing expenses 5  100,122,019   -   -   5   -   100,122,019   - 
Depreciation charge 4  5,785,745   5,716,063   692,528   4   5,799,023   5,785,745   5,716,063 
Finance costs 7  5,730,535   6,951,923   966,926   7   8,226,595   5,730,535   6,951,923 
Write back of accrued interest not settled  8   (754,929)  -   - 
Change in estimated fair value of derivative warrant liability  14   (2,547,542)  (1,273,740)  - 
Asset retirement obligation - accretion expense  18   79,555         
Net changes in fair value of derivative financial instruments 18  328,176   1,190,073   -   19   340,504   328,176   1,190,073 
                              
    35,407,812   29,918,711   (2,087,954)      28,302,319   35,407,812   29,918,711 
Working capital changes:                              
(Increase) decrease in inventories    (32,554)  29,561   (176,651)      (142,145)  (32,554)  29,561 
Increase in trade and other receivables    (225,616)  (2,123,077)  (618,700)
Decrease (increase) in trade and other receivables      1,658,461   (225,616)  (2,123,077)
Increase in provisions    7,674   5,616   365       26,573   7,674   5,616 
Increase in accounts payable, accruals and other payables 19 18,257,036   65,910   630,023 
(Decrease) increase in accounts payable, accruals and other payables  20   7,004,957   18,257,036   65,910 
                              
Net cash flows from (used in) operating activities    53,414,352   27,896,721   (2,252,917)
Net cash flows (used in) from operating activities      36,850,165   53,414,352   27,896,721 
                              
INVESTING ACTIVITIES                              
Advances paid to contractors    (21,664,764)  -   -       -   (21,664,764)  - 
Purchase of property, plant and equipment    (38,690,498)  (271,403)  (21,924,553)
Amount deposited in restricted bank account  12   (26,899,965)  -   - 
Payments for additions in property, plant and equipment      (97,215,489)  (38,690,498)  (271,403)
                              
Net cash flow used in investing activities    (60,355,262)  (271,403)  (21,924,553)
Net cash used in investing activities      (124,115,454)  (60,355,262)  (271,403)
                              
FINANCING ACTIVITIES                              
Proceeds from term loans 15  -   4,038,024   16,700,441 
Repayment of term loans 15  (8,435,416)  (3,487,876)  - 
Proceeds from borrowings  16   186,000,000   -   4,038,024 
Repayment of term borrowings  16   (89,257,873)  (8,435,416)  (3,487,876)
Interest paid on term loans    (1,536,503)  (7,195,581)  (3,429,143)      (7,715,548)  (1,536,503)  (7,195,581)
Proceeds from exercise of warrants  14   1,150         
Proceeds from issuance of ordinary shares    33,064,568   -   -       -   33,064,568   - 
Cash election by shareholders    (13,600,000)  -   -       -   (13,600,000)  - 
Payment of lease liability    (2,313,323)  -   -       (786,416)  (2,313,323)  - 
Payment of transaction costs on loans    -   -   (111,081)
Payment of derivative financial instrument  19   (1,858,753)  -   - 
Net contribution from (distributions to) the shareholders 20  23,300,052   (24,971,637)  11,158,842   21   2,041,928   23,300,052   (24,971,637)
                              
Net cash flows from (used in) financing activities    30,479,378   (31,617,070)  24,319,059       88,424,488   30,479,378   (31,617,070)
                              
NET INCREASE (DECREASE) IN CASH AND CASH EQUIVALENTS    23,538,468   (3,991,752)  141,589       1,159,199   23,538,468   (3,991,752)
                              
Cash and cash equivalents at 1 January    (3,707,697)  284,055   142,466       19,830,771   (3,707,697)  284,055 
                              
CASH AND CASH EQUIVALENTS AT 31 DECEMBER 11  19,830,771   (3,707,697)  284,055   12   20,989,970   19,830,771   (3,707,697)

 

The attachedaccompanying notes 1 to 2627 form an integral part of these consolidated financial statements.


Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL CONSOLIDATED STATEMENTS

For the year ended 31 December 20192020

 

1ACTIVITIES

 

Brooge Energy Limited (the “Company” and together with its subsidiaries the “Group”) formerly known as Brooge Holdings Limited, is a company with limited liability registered as an exempted company in the Cayman Islands. The Company and its subsidiaries are collectively referred to as the “Group”. The registered office of the Company is at P.O Box 309, Ugland House, Grand Cayman, KY1-1104, Cayman Islands. The Company’s principal executive office is located at P.O Box 50170, Al-Sodah, Khorr Fakkan Road, Fujairah, United Arab Emirates (“UAE”).

 

Subsequent to year end, onOn 07 April 2020, the Company changed its name from Brooge Holdings Limited to Brooge Energy Limited.

 

The Group provides oil storage and related services at the Port of Fujairah in the emirateEmirate of Fujairah in the UAE. The Group currently operates phase 1, comprising 14 tanks of total capacity of 399,324 cbm,cubic meters (“cbm”), fully operational for storage and other ancillary processes of clean oil. The Group’s phase 2 is under construction, which will comprise 8 tanks of total capacity of 600,000 cbm for storage and other ancillary services of crude oil. The Group’s has commenced preconstruction work for its phase 3. The Group intends to construct additional storage and refinery facility as part of the phase 3.

 

Brooge Energy Limited was incorporated on 12 April 2019 for the sole purpose of consummating the business combinationreverse acquisition transaction described further below. On 15 April 2019, Brooge Petroleum and Gas Investment Company FZE (“BPGIC FZE”), now a subsidiary, entered into a business combination agreementBusiness Combination Agreement with Twelve Seas Investment Company (“Twelve Seas”), a company listed on National Association of Securities Dealers Automated Quotations (“NASDAQ”), the Company and BPGIC FZE’s shareholders. On 10 May 2019, BPGIC plcPLC became party to the business combination agreementBusiness Combination Agreement by execution of a joinder thereto.

 

The business combinationtransaction was accounted for as a reverse acquisition in accordance with the International Financial Reporting Standards (“IFRSs”) as issued by the International Accounting Standards Board (“IASB”) as disclosed in note 25.26. Under this method of accounting, Brooge Energy and Twelve Seas are treated as the “acquired” company.companies. This determination was primarily based on BPGIC FZE comprising the ongoing operations of the combined company, BPGIC FZE’s senior management comprising the senior management of the combined company, and BPGIC FZE’s stockholders having a majority of the voting power of the combined company. For accounting purposes, BPGIC FZE is deemed to be the accounting acquirer in the transaction and, consequently, the transaction is treated as a recapitalization of BPGIC FZE. Accordingly, the consolidated assets, liabilities and results of operations of BPGIC FZE are the historical financial statements of the combined company, and Brooge Energy and Twelve Sea’s assets, liabilities and results of operations are consolidated with BPGIC FZE beginning on the acquisition date.

 

As a result of the above transaction, the Company became the ultimate parent of BPGIC FZE and Twelve Seas on 20 December 2019, being the acquisition date. The Company’s common stock and warrants are traded on the NASDAQ Capital Market under the ticker symbols BROG and BROGW, respectively. Upon the closing of business combination,the transaction, Twelve seas changed its name to ‘BPGIC International’.

 

The consolidated financial statements areof the Group for the year ended 31 December 2019 were prepared as a continuation of the financial statements of BPGIC FZE, the acquirer, and retroactively adjusted to reflect the legal capital of the legal parent/acquiree (Brooge Energy Limited). The comparative financial years included herein are derived from the consolidated financial statements of BPGIC FZE as adjusted to reflect the legal capital of the legal parent/acquiree (Brooge Energy Limited).

 

The consolidated financial statements of the Group for the year ended 31 December 2020 were authorised for issue by the Board of Directors on June 30, 2020.5 April, 2021.


Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

For the year ended 31 December 2020

 

2.1RESTATEMENT OF PRIOR PERIOD COMPARATIVES FOR CORRECTION OF ACCOUNTING FOR WARRANTS

As described in Note 26, the reverse acquisition transaction completed on 20 December 2019 resulted in the issuance of warrants, exercisable for a period of five years from the date of the transaction at an exercise price of USD 11.5 per warrant. The warrant holders may elect, in lieu of exercising the warrants for cash, a cashless exercise option to receive common shares if there is no effective registration statement registering the warrant shares on the 90th day after the completion of the Group’s initial reverse acquisition transaction, and during any other period when the Group shall fail to have maintained an effective registration statement covering the ordinary shares issuable upon exercise of the warrants. The Group shall issue to the warrant holders the number of warrant shares determined as follows:

X = Y [(A-B)/A]

where:

X = the number of warrant shares to be issued to the Holder.

Y = the number of warrant shares with respect to which this warrant is being exercised. 

A = the fair market value of one ordinary share.

B = the warrant price.

If the warrant holders exercise this option, there will be variability in the number of shares issued per warrant.

Subsequent to the issuance of the Group’s 2019 consolidated financial statements, management have reassessed the accounting treatment of the issued warrants. Previously, these warrants were accounted for as equity in the consolidated statement of financial position.

The Group has reassessed that the maintenance of an effective registration statement is a matter not wholly within the control of the Group and therefore the warrants contain a feature that may lead to the issuance of a variable number of shares. In accordance with IAS 32, a contract to issue a variable number of shares fails to meet the definition of equity and must instead be classified as a derivative liability and measured at fair value with changes in fair value recognised in the consolidated statement of comprehensive income at each reporting date. The derivative liability will ultimately be converted in the Group’s equity (ordinary shares) when the warrants are exercised or will be extinguished upon the expiry of the outstanding warrants and will not result in the outlay of any cash by the Group.

In the original accounting determination, the estimated fair value of the warrants was recorded in equity at USD 16,983,200. At initial recognition, the Group should have recorded the estimated fair value of the warrants as a derivative warrant liability at the same amount. In addition, at 31 December 2019, based on the trading price of the warrants at that time, the Group should have adjusted the estimated fair value of the derivative warrant liability to USD 15,709,460, resulting in a gain on revaluation of derivative warrant liability in “Changes in fair value of derivative warrant liability” of USD 1,273,740.

The above reassessment has resulted in a revision of prior period comparatives for restatement of our previous accounting for warrants.

The warrants have been reclassified from equity to liabilities. The correction of this error resulted in a decrease in equity by USD 16,983,200 and increase in liabilities with the same amount.

On 31 December 2019, a fair value gain of USD 1,273,740 was also recognised in the consolidated statement of comprehensive income in the restated consolidated financial statements with a consequent decrease in the amount of the accumulated losses in equity. Basic and diluted earnings per share for the prior year were also restated. The amount of the correction for basic and diluted earnings per share was a decrease of USD 0.01 per share respectively.


Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

For the year ended 31 December 2020

2.1RESTATEMENT OF PRIOR PERIOD COMPARATIVES FOR CORRECTION OF ACCOUNTING FOR WARRANTS continued

There was no impact on cash from operating, financing or investing activities in the consolidated statement of cashflows for the year ended 31 December 2019 and 31 December 2020.

  As previously
reported
31 December
2019
USD
  Restatement
adjustments
31 December
2019
USD
  Restated
31 December
2019
USD
 
CONSOLIDATED STATEMENT OF FINANCIAL POSITION         
          
Warrants  16,983,20 0   (16,983,200)  - 
Accumulated losses  (65,340,421)  1,273,740   (64,066,681)
             
Total equity  125,125,875   (15,709,460)  109,416,415 
             
Derivative warrant liability  -   15,709,460   15,709,460 
             
Current liabilities  79,327,435   15,709,460   95,036,895 
             
Total liabilities  182,126,585   15,709,460   197,836,045 

2.2BASIS OF PREPARATION

 

The consolidated financial statements have been prepared in accordance with International Financial Reporting Standards as issued by the International Accounting Standards Board “IASB”.

 

These consolidated financial statements are presented in United States dollars (“USD”) which is the functional and presentation currency of the Group. All financial information presented in USD has been rounded to the nearest thousand, unless otherwise stated.

 

The consolidated financial statements are prepared under the historical cost convention, except for re-measurement at fair value of derivative financial instruments.


Brooge Energy Limited

NOTES TO THE FINANCIAL CONSOLIDATED STATEMENTS

31 December 2019instruments and warrant liability.

 

2.32.2FUNDAMENTAL ACCOUNTING CONCEPTGOING CONCERN

 

As ofDuring the year ended 31 December 2018,2020, the Group earned a profit of USD 17.1 million and generated positive cash flows of USD 36.8 million. Further, as at that date, the Group had not paid USD 3.7 million of principalcash and accrued interest that was due under the Group’s Phase I Financing Facilities. Also, as of 31 December 2018, the Group was not in compliance with its debt covenants, including the debt service coverage ratio contained in the Group’s Phase I Financing Facilities. Even though the lender did not declare an event of default under the loan agreements, these breaches constituted events of default and could have resulted in the lender requiring immediate repayment of the loans. Accordingly, as of 31 December 2018, the Group has classified its debt balancebank balances of USD 94.8 million as a current liability.

On 10 September 2019 and again on 30 December 2019 the Group entered into agreements with its lender to amend the Phase 1 Financing Facility such that on 31 December 2019 the Group was in compliance with the amended facility agreement. At 31 December 2019, the Group’s current liabilities exceeded its current assets by USD 5747.9 million.

 

SubsequentIn September 2020, BPGIC FZE issued bonds of USD 200 million to private investors with a face value of USD 1 with an issue price of USD 0.95. The bonds bear interest at 8.5% per annum to be paid along with the year end, theinstallments. The Group defaulted onsettled its commitments under itsoutstanding term loans andusing the Group was not in compliance with its debt covenants, including the debt service coverage ratio contained in the Group’s loan agreement. Even though the lender did not declare an event of default under the loan agreements, these breaches constituted events of default and could have resulted in the lender requiring immediate repaymentproceeds of the loans.

On 15 June 2020,bonds and will utilize the Group entered into an agreement with its lenderbalance of the proceeds to amend its Phase I Financing Facilities (note15). The Group will havefund phase II construction and working capital requirements. Management forecasts that the existing cash balances as well as cash generated from ongoing operations provide sufficient liquidity to pay principal and accrued interest of USD 8.8 million in 2020 which represents the cumulative instalments including interest outstanding from periods prior to this amended agreement and an amendment fee of USD 136,000. Term loan (1) and Term loan (2) is now payable in 46 and 16 instalments respectively starting 30 June 2020 with final maturity on 31 July 2030 and 31 July 2023, respectively.

During 2018, the Group signed a sales agreement for phase 2 to provide storage and ancillary services to an international commodity trading company, which was novated to a new party during the year. Phase 2 operations are scheduled to start in fourth quarter of 2020 and management expects this will generate significant operating cash flows. The Group is in receipt of a loan facility letter date 15 October 2018 from a lender. The Group intends to draw down from this facility to to finance the payments due to the contractor in respect of Phase 2 construction in the third quarter of 2020. The ability of the Group to draw down on this facilitycontinue in operations for the foreseeable future. Management is contingent upon a numbercurrently evaluating various options regarding funding of conditions agreed in the facility letter which will need to be assessed and approved by the bank prior to the disbursement of funds.its phase III construction.

 

Based onIn view of the above, noted, management has consideredprepared the going concern status of the Group and believes there to be a material uncertainty that casts significant doubt upon the Group’s ability to continue as a going concern. Based on management’s forecasts the capital expenditure requirements for phase 2 and debt servicing as described above will be funded by cash generated through the ongoing operations and further drawdowns from loan facilities.  The Group’s management acknowledge that there is a risk that the quantum and timing of cash flows may not be achievable in line with the twelve months forecasts from the date of approval of the Group’sconsolidated financial statements. Accordingly, there is significant doubt that the Group will be able to pay its obligations as they fall due and this significant doubt is not alleviated by management’s plans.

The financial statements have been prepared assuming that the Group will continue as a going concern. Accordingly, the consolidated financial statements do not include any adjustments relating to the recoverability and classification of recorded asset amounts, the amounts and classification of liabilities, or any other adjustments that might result in the event the Group is unable to continue as a going concern.


Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

For the year ended 31 December 2020

 

2.32.4CHANGES IN ACCOUNTING POLICIES AND DISCLOSURES

 

New and amended standards and interpretations adopted by the Group

The Group has applied certain standards, interpretations and amendments for the first time, whichthat are effective for annual periods beginning on or after 1 January 2019. Except for IFRS 16, which was early adopted during the year ended 31 December 2016, the Group has not early adopted any other standard, interpretation or amendment that has been issued but is not yet effective.2020.

 

IFRIC Interpretation 23 Uncertainty over Income Tax Treatments;
Amendments to IFRS 3: Definition of a Business;
Amendments to IFRS 7, IFRS 9 Prepayment Features with Negative Compensation;and IAS 39 Interest Rate Benchmark Reform;
Amendments to IAS 19 Plan Amendment, Curtailment or Settlement;1 and IAS 8 Definition of Material;

Revised Conceptual Framework for Financial Reporting; and

Amendments to IAS 28 Long-term Interests in Associates and Joint Ventures.


Brooge Energy Limited

NOTES TO THE FINANCIAL CONSOLIDATED STATEMENTS

31 December 2019

2.3CHANGES IN ACCOUNTING POLICIES AND DISCLOSUREScontinued

Annual Improvements 2015-2017 Cycle

IFRS 3 Business Combinations;
IFRS 11 Joint Arrangements;
IAS 12 Income Taxes; and
IAS 23 Borrowing Costs.16 Covid-19 Related Rent Concessions.

 

The adoption of the above standards and amendments did not have any significant impact on the consolidated financial statements of the Group except the amendments in IAS 23. These amendments clarify that an entity treats as part of general borrowings any borrowing originally made to develop a qualifying asset when substantially all of the activities necessary to prepare that asset for its intended use or sale are complete. The entity applies the amendments to borrowing costs incurred on or after the beginning of the annual reporting period in which the entity first applies those amendments. An entity applies those amendments for annual reporting periods beginning on or after 1 January 2019. The implementation of the amendments resulted in USD 1,546,108 capitalisation of borrowing cost to Property, plant and equipment.Group.

 

2.42.5SIGNIFICANT ACCOUNTING ESTIMATES AND JUDGEMENTS

 

The preparation of the Group’s consolidated financial statements requires management to make judgements, estimates and assumptions that affect the reported amounts of expenses, assets and liabilities, and the disclosure of contingent liabilities, at the reporting date. However, uncertainty about these assumptions and estimates could result in outcomes that could require a material adjustment to the carrying amount of the asset or liability affected in the future.

 

Estimation and assumptions

The key assumptions concerning the future and other key sources of estimation uncertainty at the reporting date, that may have a significant risk of causing a material adjustment to the carrying amounts of assets and liabilities within the next financial year are discussed below:

 

Useful lives of property, plant and equipment

The Group’s management determines the estimated useful lives of its property, plant and equipment for calculating depreciation. This estimate is determined after considering the expected usage of the asset or physical wear and tear and the impact of expected residual value. Management reviews the useful lives annually and the future depreciation charge would be adjusted where management believes that the useful lives differ from previous estimates. The depreciation period of the right-of-use asset has been determined to be over the lease term on the basis that the land is expected to be used for the whole period of the lease considering the existing assets and future expansion on the land.

 

Asset retirement obligation

As part of the land lease agreement between Fujairah Municipality and the Group, the Group has a legal obligation to remove the plant at the end of its lease term. The Group initially records a provision for asset retirement obligations at the best estimate of the present value of the expenditure required to settle the obligation at the time a legal (or constructive) obligation is incurred, if the liability can be reliably estimated. When the provision is initially recorded, the carrying amount of the related asset is increased by the amount of the liability. Provisions are adjusted at each balance sheet date to reflect the current best estimate. The unwinding of the discount is recognisedrecognized as finance cost. The Group’s operating assets generally consist of storage tanks and related facilities. These assets can be used for an extended period of time as long as they are properly maintained and/or upgraded. It is the Group’s current intent to maintain its assets and continue making improvements to those assets based on technological advances. There is no data or information that can be derived from past practice, industry practice or the Group’s intentions that could be used to make a reliable estimate of the decommissioning cost. Accordingly, the Group has not recorded a liability or corresponding asset as the amounts of such potential future costs are not reliably determinable.

 


Brooge Energy Limited

NOTES TO THE FINANCIAL CONSOLIDATED STATEMENTS

31 December 2019The calculation of provision related to asset retirement obligation is most sensitive to following judgements and assumptions:

 

2.4Discount rate of 3.24% based on inflation-adjusted long-term risk-free rate; and
SIGNIFICANT ACCOUNTING ESTIMATES AND JUDGEMENTScontinued
Inflation rate of 0.8% used to extrapolate cash flows.

Estimation and assumptionscontinued

Discount rate used for initial measurement of lease liability

The Group, as a lessee, measures the lease liability at the present value of the unpaid lease payments at the commencement date. The lease payments are discounted using the interest rate implicit in the lease, if that rate can be readily determined. If that rate cannot be readily determined, the Group on initial recognition of the lease uses its incremental borrowing rate. Incremental borrowing rate is the rate of interest that the Group would have to pay to borrow over a similar term, and with a similar security, the funds necessary to obtain an asset of a similar value to the right-of-use assets in similar economic environment. The Group determined its incremental borrowing rate at 9.5% (2018: 9.5%) in respect of the lease liability (note 16).

 

Impairment of trade receivables

The Group uses the simplified approach under IFRS 9 to assess impairment of its trade receivables and calculates expected credit losses (ECLs) based on lifetime expected credit losses. The Group calculates the ECL based on Group historical credit loss experience, adjusted for forward-looking factors specific to the customer and the economic environment.


Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

For the year ended 31 December 2020

 

Valuation of derivative financial instruments

The Group has entered into derivative financial instruments (interest rate swaps) with a financial institution with investment grade credit rating. Interest rate swaps are valued using valuation techniques, which employ the use of market observable inputs. The most frequently applied valuation techniques include swap models using present value calculations. The models incorporate various inputs including the credit quality of counterparties and interest rate curves. The changes in counterparty credit risk had no material effect on the derivative financial instruments recognised at fair value.

2.5SIGNIFICANT ACCOUNTING ESTIMATES AND JUDGEMENTS continued

 

Judgements

In the process of applying the Group’s accounting policies, management has made the following judgements which have the most significant effect on the amounts recognisedrecognized in the consolidated financial statements:

 

Operating lease commitments – Group as a lessee

The Group has entered into a land lease agreement (the “Phase III Land Lease Agreement”), dated as of 2 February 2020 (the “lease inception date”), by and between the Group and the Fujairah Oil Industry Zone (“FOIZ”) to lease an additional plot of land that has a total area of approximately 450,000 square meters (the “Phase III Land”) for a rent of UAE Dirhams 50 (USD 13.61) per square meter per annum with an escalation of 2% per annum. Rental payments commence from the beginning of the eighteenth month of the lease inception date. The Group intends to use the Phase III Land to expand its crude oil storage and service and refinery capacity (“Phase III”). Management has exercised judgment in assessing the lease commencement date in the initial cancellable period of the lease and recognized the lease on the consolidated statement of financial position from 1 December 2020.

Classification of warrants

In connection with the completion of the reverse acquisition transaction in 2019 as described in note 1, note 2.5, note 14 and note 26 the Group issued warrants. The warrants agreement requires the Group to issue a fixed number of shares for a fixed amount of cash, however it contains a clause that allows for cashless exercise (in the event that no effective registration is maintained), which may lead to the issuance of a variable number of shares. Management assessed that the maintenance of an effective registration statement is a matter not wholly within the control of the Group and as such classified the warrants as a financial liability at fair value through profit or loss.

Business combination (reverse acquisition)

As the reverse acquisition of Brooge Energythe Company concluded in the prior year did not constitute a business combination, the transaction was accounted for as an asset acquisition by the issuance of shares of the Company, for the net assets of Twelve Seas and its public listing. Accordingly, the transaction had beenwas accounted for at the fair value of the equity instruments granted to the shareholders and warrant holders of Twelve Seas.

 

Management applied the following primary judgments in accounting for the reverse acquisition:

 

1.BPGIC was assessed as the accounting acquirer due to majority shareholding and representatives on the board of directors.
2.The accounting acquiree iswas not a business and not in scope of IFRS 3.
3.The acquisition has beenwas accounted for in terms of IFRS 2 which is aligned to guidance issued by the IFRIC. The difference between the fair value of the consideration paid and the fair value of the net assets acquired has been recognisedacquired. was recognized in profit and loss. Refer to note 2.52.6 (iii).
4.Fair value of ordinary shares issued: Refer to note 25.26
5.The fair value of the shares in escrow iswas not materially different from that of the shares which arewere not in escrow as the rights of these shares are similar to those of “normal ordinary shares”. Fair value of the shares in escrow: Refer to note 25.26
6.Fair value of Warrantswarrants issued: Refer to note 13.14
7.Deemed share issue has beenwere presented in the financing activities in the Consolidated Statement of Cash Flows.


Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL CONSOLIDATED STATEMENTS

For the year ended 31 December 20192020

 

2.4SIGNIFICANT ACCOUNTING ESTIMATES AND JUDGEMENTScontinued

Judgements continued

Operating lease commitments – Group as a lessor

The Group has entered into a five year storage rental agreement with a customer. Under the agreement, the Group has rented its full storage facility and receives fixed rental against the available storage capacity. The Group has determined the agreement to be a lease in accordance with IFRS 16 (Leases) and, based on the contractual arrangements in place, that it retains the principal risks and rewards of ownership of the storage facility and so accounts for the agreement as an operating lease.

2.52.6SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES

 

Basis of consolidation

(i)Subsidiaries

The consolidated financial statements comprise the financial statements of the Company and its subsidiaries as at 31 December 2019.2020. Control is achieved when the Group is exposed, or has rights, to variable returns from its involvement with the investee and has the ability to affect those returns through its power over the investee.

 

Specifically, the Group controls an investee if and only if the Group has:

 

Powerpower over the investee (i.e. existing rights that give it the current ability to direct the relevant activities of the investee);
Exposure,exposure, or rights, to variable returns from its involvement with the investee; and
Thethe ability to use its power over the investee to affect its returns.

 

When the Group has less than a majority of the voting or similar rights of an investee, the Group considers all relevant facts and circumstances in assessing whether it has power over an investee, including:

 

The contractual arrangement with the other vote holders of the investee;
Rights arising from other contractual arrangements; and
The Group’s voting rights and potential voting rights.

 

The Group re-assesses whether or not it controls an investee if facts and circumstances indicate that there are changes to one or more of the three elements of control. Consolidation of a subsidiary begins when the Group obtains control over the subsidiary and ceases when the Group loses control. Assets, liabilities, income and expenses of a subsidiary acquired or disposed offof during the year are included in the consolidated statement of comprehensive income from the date the Group gains control until the date the Group ceases to control the subsidiary.

 

A change in the ownership interest of a subsidiary, without a loss of control, is accounted for as an equity transaction. If the Group loses control over a subsidiary, it:

 

Derecognisesderecognizes the assets (including goodwill) and liabilities of the subsidiary
Derecognisesderecognizes the carrying amount of any non-controlling interests
Derecognisesderecognizes the cumulative translation differences recorded in equity
Recognisesrecognizes the fair value of the consideration received
Recognisesrecognizes the fair value of any investment retained
Recognisesrecognizes any surplus or deficit in profit or loss
Reclassifiesreclassifies the parent’s share of components previously recognisedrecognized in OCI to profit or loss or retained earnings, as appropriate, as would be required if the Group had directly disposed of the related assets or liabilities

 

Details of subsidiaries as at 31 December 2020 and 31 December 2019 were as follows:

Legal name Country of incorporation Percentage of ownership
    2020 2019
       
Brooge Petroleum and Gas Investment Company FZE United Arab Emirates 100% 100%
Brooge Petroleum and Gas Investment Company Phase III FZE United Arab Emirates 100% -
       
BPGIC International (formerly known as Twelve Seas) Cayman Islands 100% 100%
Brooge Petroleum and Gas Management Company Ltd United Arab Emirates 100% -
BPGIC Phase 3 Limited (Jebel Ali Free Zone Authority - Dubai) United Arab Emirates 100% -

Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL CONSOLIDATED STATEMENTS

For the year ended 31 December 20192020

 

2.52.6SUMMARY OF SIGNIFICANT ACCOUNTING POLICIEScontinued

 

Basis of consolidationcontinued

(i)Subsidiariescontinued

Details of subsidiaries as at 31 December 2019 and 31 December 2018 were as follows:

    Percentage of ownership 
Legal name Country of incorporation 2019  2018 
         
Brooge Petroleum and Gas Investment Company FZE United Arab Emirates  100%  - 
BPGIC International (formerly known as Twelve Seas) * Cayman Islands  100%  - 

*indirectly held

 

The financial statements of the subsidiarysubsidiaries are prepared for the same reporting year as the Group. Consolidated financial statements are prepared using uniform accounting policies for like transactions and other events in similar circumstances.

 

The carrying amount of the Company’s investment in the subsidiarysubsidiaries and the equity of the subsidiary issubsidiaries are eliminated on consolidation. All significant intra-group balances, and income and expenses arising from intra-group transactions are also eliminated on consolidation.

 

(ii)Non-controlling interests (“NCI”)

NCI are measured at their proportionate share of the acquiree’s identifiable net assets at the date of acquisition. Changes in the Group’s interest in a subsidiary that do not result in a loss of control are accounted for as equity transactions.

 

(iii)Business combinations

Business combinations are accounted for using the acquisition method. The cost of an acquisition is measured as the aggregate of the consideration transferred measured at acquisition date fair value and the amount of any non-controlling interests in the acquiree. For each business combination, the Group elects whether to measure the non-controlling interests in the acquiree at fair value or at the proportionate share of the acquiree’s identifiable net assets. Acquisition-related costs are expensed as incurred and included in administrative expenses.

 

When the Group acquires a business, it assesses the financial assets and liabilities assumed for appropriate classification and designation in accordance with the contractual terms, economic circumstances and pertinent conditions as at the acquisition date. This includes the separation of embedded derivatives in host contracts by the acquiree.

 

If the business combination is achieved in stages, any previously held equity interest is re-measured at its acquisition date fair value and any resulting gain or loss is recognisedrecognized in profit or loss. It is then considered in the determination of goodwill.

 

Any contingent consideration to be transferred by the acquirer will be recognisedrecognized at fair value at the acquisition date. Contingent consideration classified as an asset or liability that is a financial instrument and within the scope of IFRS 9 Financial Instruments, is measured at fair value with changes in fair value recognisedrecognized either in profit or loss or as a change to other comprehensive income. Contingent consideration that is classified as equity is not re-measured and subsequent settlement is accounted for within equity.

 


Brooge Energy Limited

NOTES TO THE FINANCIAL CONSOLIDATED STATEMENTS

31 December 2019

2.5SUMMARY OF SIGNIFICANT ACCOUNTING POLICIEScontinued

Basis of consolidationcontinued

(iii)Business combinationscontinued

A ‘reverse acquisition’ is a business combination in which the legal acquirer - i.e. the entity that issues the securities (i.e. listed entity) becomes the acquiree for accounting purposes and the legal acquiree becomes the acquirer for accounting purposes. It is the application in accordance with IFRS 3 Business Combinations on identifying the acquirer, which results in the identification of the legal acquiree as the accounting acquirer in a reverse acquisition. Application in accordance with IFRS 3 Business Combinations on identifying the acquirer may result in identifying the listed entity as the accounting acquiree and the unlisted entity as the accounting acquirer. In this case, if the listed entity is:

 

Aa business, IFRS 3 Business Combinations applies;

Notnot a business, IFRS 2 Share-based Payment applies to the transaction once the acquirer has been identified following the principles in accordance with IFRS 3 Business Combinations. Under this approach, the difference between the fair value of the consideration paid less the fair value of the net assets acquired, is recognized as a listing expense in profit or loss.

Brooge Energy Limited

Revenue recognitionNOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

The Group elected to early adopt IFRS 15 ‘Revenue from Contracts with Customers’ and IFRS 16 ‘Leases’ forFor the year ended 31 December 2016 using the full retrospective method for both standards.2020

2.6SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES continued

Revenue recognition

 

Revenue from contracts with customers is recognized when control of the goods or services are transferred to the customer at an amount that reflects the consideration to which the Group expects to be entitled in exchange for those services or goods. Revenues excludes amounts collected on behalf of third parties and are net of discounts and value added taxes. Monthly storage rates and prices for other services are contractually agreed before the services are rendered and do not contain material variable components. When it is probable that the future economic benefits will flow to the Group, the recognition in the consolidated statement of income is in proportion to the stage of the rendered performance as at the end of the reporting period. The Group generates revenue by charging fees forhas a right to a consideration from a customer in an amount that corresponds directly with the storage, throughput and handlingvalue to the customer of fuel oil and clean products for its sole customer. Additional revenue is generated by charging fees for other ancillarythe entity’s services (excess throughput, heating, blending and other services).completed to date.

 

The contract contains a lease and a service component. The lease component is accounted for under IFRS 16 and the service component is accounted for under IFRS 15. The contract has aTank storage rentals, including minimum fixed monthly payment for both the lease and non-lease service components. The fixed consideration is allocated to the lease and service components based on their relative stand-alone selling price, which is based on an analysis of lease-related and service-related costs for the contract, adjusted for representative profit margins. The lease component is recognisedguaranteed throughputs, are recognized on a straight-line basis over the term ofcontractual period during which the initialservices are rendered. Revenues from excess throughputs, heating/cooling, homogenization, product movements and other services are recognized when these services are rendered. Customers simultaneously consume and benefit from the services at the moment that these are rendered, resulting in a situation where revenue is recognized over time. Where substantially the entire storage capacity is leased to a single customer, the contract contains a lease and the service componententire storage revenue is recognised over timepresented as the customer simultaneously receives and consumes the benefits provided by the Group’s performance. The fixed payment is billed monthly in advance.lease revenue.

 

The contract also contains variable elementsStorage fees are mostly invoiced upfront in the form ofmonth preceding the month to which the storage fees relate. Handling and other ancillary services. Revenue from the variable element of the contract is recognisedservices are generally invoiced afterwards, based on the actual volumes transported, stored and processed in the period in which the services are provided. These servicesusage. Invoices are generally billedpaid by customers at relatively short notice in agreement with the month afterpayment terms of the services are performed.contracts.

 

Borrowing costs

Borrowing

General and specific borrowing costs directly attributable to the acquisition, construction or production of qualifying assets, which are assets that necessarily take a substantial period of time to get ready for their intended use or sale, are added to the cost of those assets, until such time as the assets are substantially ready for their intended use or sale.

 

Investment income earned on the temporary investment of specific borrowings pending their expenditure on qualifying assets is deducted from the borrowing costs eligible for capitalisation.capitalization.

 

All other borrowing costs are recognisedrecognized in the consolidated statement of comprehensive income (within profit and loss) in the period during which they are incurred.

 


Brooge Energy Limited

NOTES TO THE FINANCIAL CONSOLIDATED STATEMENTS

31 December 2019

2.5SUMMARY OF SIGNIFICANT ACCOUNTING POLICIEScontinued

Property, plant and equipment

Property, plant and equipment are stated at cost less accumulated depreciation and accumulated impairment losses, if any. Capital work under progress is stated at cost and subsequently transferred to assets when it is available for use. Cost of an item of property, plant and equipment comprises its acquisition cost including borrowing cost and all directly attributable costs of bringing the asset to working condition for its intended use. Such cost includes the cost of replacing part of the plant and equipment when that cost is incurred, if the recognition criteria are met. Likewise, when a major inspection is performed, its cost is recognisedrecognized in the carrying amount of the plant and equipment as a replacement if the recognition criteria are satisfied. All other repair and maintenance costs are recognisedrecognized in the consolidated statement of comprehensive income (within profit and loss) as incurred. Depreciation is computed using the straight-line method based on the estimated useful lives of assets as follows:

 

Buildings25 years
Tanks50 years
Installations (pipeline, pumps and other equipment)20 - 25 years
Other equipment5 years
Right-of-use asset - Land60 years

 

The assets’ residual values and useful lives are reviewed and adjusted if appropriate, at each financial year end to determine whether there is an indication of impairment. If any such indication exists, an impairment loss is recognisedrecognized in the consolidated statement of comprehensive income (within profit and loss). For the purpose of assessing impairment, assets are grouped at the lowest levels for which there are separately identifiable cash flows (cash generating units).


Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

For the year ended 31 December 2020

2.6SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES continued

Property, plant and equipment continued

 

The carrying amounts are reviewed at each reporting date to assess whether they are recorded in excess of their recoverable amounts, and where carrying values exceed this estimated recoverable amount, assets are written down to their recoverable amount, being the higher of their fair value less costs to sell and their value in use.

 

An item of property, plant and equipment is derecognisedderecognized upon disposal or when no future economic benefits are expected from its use or disposal. Any gain or loss arising on derecognition of the asset (calculated as the difference between the net disposal proceeds and the carrying amount of the asset) is included in the consolidated statement of comprehensive income (within profit and loss) in the year the asset is derecognised.derecognized.

 

Capital work in progress

Capital work in progress is stated at cost, which represents costs for the design, development, procurement, construction and commissioning of the asset under development. Cost includes borrowing cost capitalisedcapitalized and depreciation of the right of useright-of-use asset during the construction phase. When the asset is in the location and condition necessary to operate in the manner intended by management, capital work in progress is transferred to the appropriate property, plant and equipment category and depreciated in accordance with the Group’s policies.

 

Impairment of non-financial assets

At each reporting date, the Group reviews the carrying amounts of its tangible assets to determine whether there is any indication that those assets have suffered an impairment loss. If any such indication exists, the recoverable amount of the asset is estimated in order to determine the extent of the impairment loss (if any). Where it is not possible to estimate the recoverable amount of an individual asset, the Group estimates the recoverable amount of the cash-generating unit to which the asset belongs. Where a reasonable and consistent basis of allocation can be identified, corporate assets are also allocated to individual cash-generating units, or otherwise they are allocated to the smallest cash-generating units for which a reasonable and consistent allocation basis can be identified.

 

Recoverable amount is the higher of fair value less costs of disposal and value in use. In assessing value in use, the estimated future cash flows are discounted to their present value using a discount rate that reflects current market assessments of the time value of money and the risks specific to the asset.

 


Brooge Energy Limited

NOTES TO THE FINANCIAL CONSOLIDATED STATEMENTS

31 December 2019

2.5SUMMARY OF SIGNIFICANT ACCOUNTING POLICIEScontinued

Impairment of non-financial assetscontinued

If the recoverable amount of an asset (or cash-generating unit) is estimated to be less than its carrying amount, the carrying amount of the asset (cash-generating unit) is reduced to its recoverable amount. An impairment loss is recognisedrecognized immediately in the consolidated statement of comprehensive income (within profit and loss).

 

Where an impairment loss subsequently reverses, the carrying amount of the asset (cash- generating unit) is increased to the revised estimate of its recoverable amount, such that the increased carrying amount does not exceed the carrying amount that would have been determined had no impairment loss been recognisedrecognized for the asset (cash-generating unit) in prior years.

 

Cash and cash equivalents

For the purpose of the consolidated statement of cash flows, cash and cash equivalents consist of cash in hand, bank balances and short-term deposits with original maturity of three months or less, net of bank overdraft.

 

Inventories

Inventories are valued at the lower of cost, determined on the basis of weighted average cost, and net realizable value. Costs are those expenses incurred in bringing each item to its present location and condition. Net realisable value is valued at selling prices net of selling costs.


Brooge Energy Limited

LeasingNOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

The Group had elected to early adopt IFRS 16 duringFor the year ended 31 December 2016, from its lease commencement dates using the full retrospective method.2020

2.6SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES continued

Leasing

 

At inception of a contract, the Group assesses whether the contract is, or contains, a lease. A contract is, or contains, a lease if the contract conveys the right to control the use of an identified asset for a period of time in exchange for consideration.

 

For a contract that is, or contains, a lease, the Group accounts for each lease component within the contract as a lease separately from non-lease components of the contract.

 

The Group determines the lease term as the non-cancellable period of a lease, together with both:

 

a)periods covered by an option to extend the lease if the lessee is reasonably certain to exercise that option; and
b)periods covered by an option to terminate the lease if the lessee is reasonably certain not to exercise that option.

 

In assessing whether a lessee is reasonably certain to exercise an option to extend a lease, or not to exercise an option to terminate a lease, the Group considers all relevant facts and circumstances that create an economic incentive for the lessee to exercise the option to extend the lease, or not to exercise the option to terminate the lease. The Group revises the lease term if there is a change in the non-cancellable period of a lease.

 

Group as a lessor

Leases where the Group does not transfer substantially all the risks and benefits of ownership of the asset are classified as operating leases. Initial direct costs incurred in negotiating an operating lease are added to the carrying amount of the leased asset and recognisedrecognized over the lease term on the same bases as rental income. Contingent rents are recognisedrecognized as revenue in the period in which they are earned.

 


Brooge Energy Limited

NOTES TO THE FINANCIAL CONSOLIDATED STATEMENTS

31 December 2019

2.5SUMMARY OF SIGNIFICANT ACCOUNTING POLICIEScontinued

Leasingcontinued

Group as a lessee

For a contract that contains a lease component and one or more additional lease or non-lease components, the Group allocates the consideration in the contract to each lease component on the basis of the relative stand-alone price of the lease component and the aggregate stand-alone price of the non-lease components.

 

The relative stand-alone price of lease and non-lease components is determined on the basis of the price the lessor, or a similar supplier, would charge an entity for that component, or a similar component, separately. If an observable stand-alone price is not readily available, the Group estimates the stand-alone price, maximising the use of observable information.

 

For determination of the lease term, the Group reassesses whether it is reasonably certain to exercise an extension option, or not to exercise a termination option, upon the occurrence of either a significant event or a significant change in circumstances that:

 

a)is within the control of the Group; and
b)affects whether the Group is reasonably certain to exercise an option not previously included in its determination of the lease term, or not to exercise an option previously included in its determination of the lease term.

 

At the commencement date, the Group recognisesrecognizes a right-of-use asset classified within property, plant and equipment and a lease liability classifiedpresented separately on the consolidated statement of financial position.


Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

For the year ended 31 December 2020

2.6SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES continued

Leasing continued

 

Short-term leases and leases of low-value assets

The Group has elected not to recogniserecognize right-of-use assets and lease liabilities for short-term leases that have a lease of 12 months or less and leases of low-value assets of USD 5,000 or less when new. The Group recognisesrecognizes the lease payments associated with these leases as an expense on a straight-line basis over the lease term.

Right-of-use assets

The right-of-use asset is initially recognisedrecognized at cost comprising of:

 

a)the amount of the initial measurement of the lease liability;
b)any lease payments made at or before the commencement date, less any lease incentives received;
c)any initial direct costs incurred by the Group; and
d)an estimate of costs to be incurred by the Group in dismantling and removing the underlying asset, restoring the site on which it is located or restoring the underlying asset to the condition required by the terms and conditions of the lease. These costs are recognisedrecognized as part of the cost of the right-of-use asset when the Group incurs an obligation for these costs. The obligation for these costs is incurred either at the commencement date or as a consequence of having used the underlying asset during a particular period.

 

After initial recognition, the Group amortises the right-of-use asset over the term of the lease. In addition the right of useright-of-use asset is periodically reduced by impairment losses, if any, and adjusted for certain re-measurements of the lease liability.

 

Lease liability

The lease liability is initially recognisedrecognized at the present value of the lease payments that are not paid at the commencement date. The lease payments are discounted using the interest rate implicit in the lease, if that rate can be readily determined. If that rate cannot be readily determined, the Group uses its incremental borrowing rate.

 

After initial recognition, the lease liability is measured by (a) increasing the carrying amount to reflect interest on the lease liability; (b) reducing the carrying amount to reflect the lease payments made; and (c) remeasuring the carrying amount to reflect any reassessment or lease modifications or to reflect revised in-substance fixed lease payments.

 


Brooge Energy Limited

NOTES TO THE FINANCIAL CONSOLIDATED STATEMENTS

31 December 2019

2.5SUMMARY OF SIGNIFICANT ACCOUNTING POLICIEScontinued

Leasingcontinued

Lease liabilitycontinued

Where, (a) there is a change in the lease term as a result of the reassessment of certainty to exercise an option, or not to exercise a termination option as discussed above; or (b) there is a change in the assessment of an option to purchase the underlying asset, assessed considering the events and circumstances in the context of a purchase option, the Group remeasures the lease liabilities to reflect changes to lease payments by discounting the revised lease payments using a revised discount rate. The Group determines the revised discount rate as the interest rate implicit in the lease for the remainder of the lease term, if that rate can be readily determined, or its incremental borrowing rate at the date of reassessment, if the interest rate implicit in the lease cannot be readily determined.

 

Where, (a) there is a change in the amounts expected to be payable under a residual value guarantee; or (b) there is a change in future lease payments resulting from a change in an index or a rate used to determine those payments, including a change to reflect changes in market rental rates following a market rent review, the Group remeasures the lease liabilities by discounting the revised lease payments using an unchanged discount rate, unless the change in lease payments results from a change in floating interest rates. In such case, the Group uses a revised discount rate that reflects changes in the interest rate.


Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

For the year ended 31 December 2020

2.6SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES continued

Leasing continued

Lease liability continued

The Group recognisesrecognizes the amount of the re-measurement of the lease liability as an adjustment to the right-of-use asset. Where the carrying amount of the right-of-use asset is reduced to zero and there is a further reduction in the measurement of the lease liability, the Group recognisesrecognizes any remaining amount of the re-measurement in the consolidated statement of comprehensive income (within profit and loss).

 

The Group accounts for a lease modification as a separate lease if both:

 

a)the modification increases the scope of the lease by adding the right to use one or more underlying assets; and
b)the consideration for the lease increases by an amount commensurate with the stand-alone price for the increase in scope and any appropriate adjustments to that stand-alone price to reflect the circumstances of the particular contract.

 

Financial assets

Classification and measurement

The Group initially measures a financial asset at its fair value plus, in the case of a financial asset not at fair value through profit or loss, transaction costs.

 

Under IFRS 9, debt financial instruments are subsequently measured at fair value through profit or loss (FVPL), amortisedamortized cost, or fair value through other comprehensive income (FVOCI). The classification is based on two criteria: the Group’s business model for managing the assets; and whether the instruments’ contractual cash flows represent ‘solely payments of principal and interest’ on the principal amount outstanding (the ‘SPPI criterion’).

 

The classification and measurement of the Group’s debt financial assets are, as follows:

Debt instruments at amortisedamortized cost for financial assets that are held within a business model with the objective to hold the financial assets in order to collect contractual cash flows that meet the SPPI criterion. This category includes the Group’s trade and other receivables.
Debt instruments at FVOCI, with gains or losses recycled to profit or loss on derecognition. Financial assets in this category that meet the SPPI criterion and are held within a business model both to collect cash flows and to sell.

 

Financial assets at amortisedamortized cost are subsequently measured using the effective interest (EIR) method and are subject to impairment. Gains and losses are recognisedrecognized in the consolidated statement of comprehensive income when the asset is derecognised,derecognized, modified or impaired. Other financial assets including derivative financial instruments are measured at FVPL.

 


Brooge Energy Limited

NOTES TO THE FINANCIAL CONSOLIDATED STATEMENTS

31 December 2019

2.5SUMMARY OF SIGNIFICANT ACCOUNTING POLICIEScontinued

Financial assetscontinued

Derecognition

A financial asset (or, where applicable a part of a financial asset or part of a Group of similar financial assets) is derecognisedderecognized when:

 

-

The rights to receive cash flows from the asset have expired, or

-The Group has transferred its rights to receive cash flows from the asset or has assumed an obligation to pay the received cash flows in full without material delay to a third party under a ‘pass-through’ arrangement; and either (a) the Group has transferred substantially all the risks and rewards of the asset, or (b) the Group has neither transferred nor retained substantially all the risks and rewards of the asset, but has transferred control of the asset.

 

When the Group has transferred its rights to receive cash flows from an asset or has entered into a pass-through arrangement, and has neither transferred nor retained substantially all the risks and rewards of the asset nor transferred control of the asset, the asset is recognisedrecognized to the extent of the Group’s continuing involvement in the asset. In that case, the Group also recognisesrecognizes an associated liability. The transferred asset and the associated liability are measured on a basis that reflects the rights and obligations that the Group has retained. Continuing involvement that takes the form of a guarantee over the transferred asset, is measured at the lower of the original carrying amount of the asset and the maximum amount of consideration that the Group could be required to repay.


Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

For the year ended 31 December 2020

2.6SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES continued

Financial assets continued

 

Impairment of financial assets

Under IFRS 9, the Group records an allowance for Expected Credit Loss (ECL) for all loans and debt financial assets not held at FVPL.

 

ECLs are based on the difference between the contractual cash flows due in accordance with the contract and all the cash flows that the Group expects to receive. The shortfall is then discounted at an approximation to the asset’s original effective interest rate.

 

For trade and other receivables, the Group has applied the standard’s simplified approach and has calculated ECLs based on lifetime expected credit losses. The Group calculates the ECL based on the Group’s historical credit loss experience, adjusted for forward-looking factors specific to the customer and the economic environment.

 

The Group considers a financial asset in default when contractual payments are 90 days past due. However, in certain cases, the Group may also consider a financial asset to be in default when internal or external information indicates that the Group is unlikely to receive the outstanding contractual amounts in full before taking into account any credit enhancements held by the Group.

 

Equity instruments

An equity instrument is any contract that evidences a residual interest in the assets of an entity after deducting all of its liabilities. Equity instruments issued by the Group comprising of share capital, share premium warrants and shareholders’ accounts are recorded at the proceeds received, net of direct issue costs.

 

Warrants are accounted for as equity instruments. The cost of warrants is determined by the fair value at the date of the transaction using either the quoted price or appropriate valuation model. The warrants issued as part of the Business Combination allow the holder to subscribe for the ordinary shares of the Company at 1:1 basis at an exercise price of USD 11.50. The warrants shall lapse and expire after five years from the closing of the Business Combination (note 25).

Escrow shares issued as part of the Business Combinationreverse acquisition are subject to meeting certain financial milestones during the vesting period as disclosed in note 25.26 The fair value of the shares in escrow is not materially different from that of the shares which are not in escrow as the rights of these shares are similar to those of “normal ordinary shares”.

 


Brooge Energy Limited

NOTES TO THE FINANCIAL CONSOLIDATED STATEMENTS

31 December 2019

2.5SUMMARY OF SIGNIFICANT ACCOUNTING POLICIEScontinued

Financial liabilities

Initial recognition

Financial liabilities within the scope of IFRS 9 are classified as financial liabilities at fair value through profit or loss, loans and borrowings, or as derivatives designated as hedging instruments in an effective hedge, as appropriate. The Group determines the classification of its financial liabilities at initial recognition.

 

Financial liabilities are recognisedrecognized initially at fair value and in the case of loans and borrowings fair value of the consideration received less directly attributable transaction costs.

 

The Group’s financial liabilities include trade and other payables, lease liability, warrants and term loans.borrowings.

 

Subsequent measurement

The measurement of financial liabilities depends on their classification as follows:

 

Accounts payable

Liabilities are recognisedrecognized for amounts to be paid in the future for goods and services received, whether billed by the supplier or not.

 

Loans and borrowings

All loans and borrowings are initially recognisedrecognized at the fair values less directly attributable transaction costs. After initial recognition, interest bearing loans and borrowings are subsequently measured at amortisedamortized cost using the effective interest method. Gains and losses are recognisedrecognized in the consolidated statement of comprehensive income (within profit and loss) when liabilities are derecognized.


Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

For the year ended 31 December 2020

2.6SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES continued

Financial liabilities continued

 

Derecognition

A financial liability is derecognisedderecognized when the obligation under the liability is discharged or cancelled or expires. When an existing financial liability is replaced by another from the same lender on substantially different terms, or the terms of an existing liability are substantially modified, such an exchange or modification is treated as a derecognition of the original liability and the recognition of a new liability, and the difference in the respective carrying amounts is recognisedrecognized in the consolidated statement of comprehensive income (within profit and loss).

 

A non-substantial modification to a financial liability is not treated as a derecognition of the original liability. The difference between the carrying amount and the net present value of the modified terms discounted using the original effective interest rate is recognisedrecognized in the consolidated statement of comprehensive income (within profit and loss)

 

Offsetting of financial instruments

Financial assets and financial liabilities are offset and the net amount reported in the consolidated statement of financial position if, and only if, there is a currently enforceable legal right to offset the recognisedrecognized amounts and there is an intention to settle on a net basis, or to realiserealize the assets and settle the liabilities simultaneously.

 

AmortisedAmortized cost of financial instruments

Amortised

Amortized cost is computed using the effective interest method less any allowance for impairment and principal repayment or reduction. The calculation takes into account any premium or discount on acquisition and includes transaction costs and fees that are an integral part of the effective interest rate.

 

Derivative financial instruments

The Group uses derivative financial instruments, interest rate swaps, to hedge its interest risks. Such derivative financial instruments are initially recognisedrecognized at fair value on the date on which a derivative contract is entered into and are subsequently remeasured at fair value. Derivatives are carried as financial assets when the fair value is positive and as financial liabilities when the fair value is negative.

 

Warrants are accounted for as derivative financial instruments (a financial liability) as they give the holder the right to obtain a variable number of common (ordinary) shares in case an effective registration statement is not maintained, which is not fully within the control of the Group.

Such derivative financial instruments are initially recognized at fair value on the date on which a derivative contract is entered into and are subsequently remeasured at fair value through profit or loss. The warrants shall lapse and expire after five years from the closing of the reverse acquisition transaction (note 26).

A derivative embedded in a hybrid contract, with a financial liability or non-financial host, is separated from the host and accounted for as a separate derivative if: the economic characteristics and risks are not closely related to the host; a separate instrument with the same terms as the embedded derivative would meet the definition of a derivative; and the hybrid contract is not measured at fair value through profit or loss. Embedded derivatives are measured at fair value with changes in fair value recognized in profit or loss. Reassessment only occurs if there is either a change in the terms of the contract that significantly modifies the cash flows that would otherwise be required or a reclassification of a financial asset out of the fair value through profit or loss category.

Any gains or losses arising from changes in the fair value of derivatives are taken directly to the consolidated statement of comprehensive income (within profit and loss) as the Group has not designated derivative financial instruments under hedging arrangements.


Brooge Energy Limited

NOTES TO THE FINANCIAL CONSOLIDATED STATEMENTS

31 December 2019

2.5SUMMARY OF SIGNIFICANT ACCOUNTING POLICIEScontinued

 

Provisions

Provisions are recognisedrecognized when the Group has a legal or constructive obligation as a result of a past event, it is probable that an outflow of resources will be required to settle the obligation, and the amount can be reliably estimated.

 

Provisions are measured at the present value of the expenditures expected to be required to settle the obligation at the end of the reporting period, using a rate that reflects current market assessments of the time value of money and the risks specific to the obligation.


Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

For the year ended 31 December 2020

2.6SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES continued

Provisions continued

 

When some or all of the economic benefits required to settle a provision are expected to be recovered from a third party, a receivable is recognisedrecognized as an asset if it is virtually certain that a reimbursement will be received and the amount of the receivable can be measured reliably.reliably

 

Decommissioning liabilities

As part of the land lease agreement between Fujairah Municipality and the Group, the Group has a legal obligation to remove the plant at the end of its lease term. The Group initially records a provision for asset retirement obligations at the best estimate of the present value of the expenditure required to settle the obligation at the time a legal (or constructive) obligation is incurred, if the liability can be reliably estimated. When the provision is initially recorded, the carrying amount of the related asset is increased by the amount of the liability. Provisions are adjusted at each balance sheet date to reflect the current best estimate. The unwinding of the discount is recognisedrecognized as finance cost. The Group’s operating assets generally consist of storage tanks and related facilities. These assets can be used for an extended period of time as long as they are properly maintained and/or upgraded. It is the Group’s current intent to maintain its assets and continue making improvements to those assets based on technological advances. There is no data or information that can be derived from past practice, industry practice or the Group’s intentions that could be used to make a reliable estimate of the decommissioning cost. Accordingly, the Group has not recorded a liability or corresponding asset as the amounts of such potential future costs are not reliably determinable.

 

Value added tax

Expenses and assets are recognisedrecognized net of the amount of value added tax, except:

 

Whenwhen the value added tax incurred on a purchase of assets or services is not recoverable from the taxation authority, in which case, the value added tax is recognisedrecognized as part of the cost of acquisition of the asset or as part of the expense item, as applicable
Whenwhen receivables and payables are stated with the amount of value added tax included

 

The net amount of value added tax recoverable from, or payable to, the taxation authority is included as part of receivables or payables in the consolidated statement of financial position.

 

Foreign currencies

Transactions in foreign currencies are recorded at the rate ruling at the date of the transaction. Monetary assets and liabilities denominated in foreign currencies are retranslated at the rate of exchange ruling at the reporting date. All differences are taken to the consolidated statement of comprehensive income (within profit and loss). Non-monetary items that are measured in terms of historical cost in a foreign currency are translated using the exchange rates as at the dates of the initial transactions. Non-monetary items measured at fair value in a foreign currency are translated using the exchange rates at the date when the fair value is determined.

 

Employees’ end of service benefits

The Group provides end of service benefits to its employees. The entitlement to these benefits is based upon the employees’ final salary and length of service, subject to the completion of a minimum service period. The expected costs of these benefits are accrued over the period of employment.


Brooge Energy Limited

NOTES TO THE FINANCIAL CONSOLIDATED STATEMENTS

31 December 2019

2.5SUMMARY OF SIGNIFICANT ACCOUNTING POLICIEScontinued

 

Fair value

Fair value is the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date. The fair value measurement is based on the presumption that the transaction to sell the asset or transfer the liability takes place either:

 

Inin the principal market for the asset or liability, or
Inin the absence of a principal market, in the most advantageous market for the asset or liability.

Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

For the year ended 31 December 2020

2.6SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES continued

Fair value continued

 

The principal or the most advantageous market must be accessible to the Group.

The fair value of an asset or a liability is measured using the assumptions that market participants would use when pricing the asset or liability, assuming that market participants act in their economic best interest.

A fair value measurement of a non-financial asset takes into account a market participant’s ability to generate economic benefits by using the asset in its highest and best use or by selling it to another market participant that would use the asset in its highest and best use.

 

The Group uses valuation techniques that are appropriate in the circumstances and for which sufficient data are available to measure fair value, maximisingmaximizing the use of relevant observable inputs and minimisingminimizing the use of unobservable inputs.

 

In addition, for financial reporting purposes, fair value measurements are categorisedcategorized into Level 1, 2 or 3 based on the degree to which the inputs to the fair value measurements are observable and the significance of the inputs to the fair value measurement in its entirety, which are described as follows:

 

Level 1 inputs are quoted prices (unadjusted) in active markets for identical assets or liabilities that the entity can access at the measurement date;
Level 2 inputs, other than quoted prices included within Level 1 that are observable for the asset or liability, either directly or indirectly; and
Level 3 inputs are unobservable inputs for the asset or liability.

 

Current versus non-current classification

The Group presents assets and liabilities in consolidated statement of financial position based on current/non-current classification. An asset is current when it is:

 

Expectedexpected to be realisedrealized or intended to be sold or consumed in a normal operating cycle
Heldheld primarily for the purpose of trading
Expectedexpected to be realisedrealized within twelve months after the reporting period,

or

Or
Cashcash or cash equivalent unless restricted from being exchanged or used to settle a liability for at least twelve months after the reporting period

 

All other assets are classified as non-current.

 

A liability is current when it is:

 

Expectedexpected to be settled in normal operating cycle

Heldheld primarily for the purpose of trading

Duedue to be settled within twelve months after the reporting period,

or

Or
Therethere is no unconditional right to defer the settlement of the liability for at least twelve months after the reporting period

 

The Group classifies all other liabilities as non-current.


Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL CONSOLIDATED STATEMENTS

For the year ended 31 December 20192020

 

2.62.7FUTURE CHANGES IN ACCOUNTING POLICIES – STANDARDS ISSUED BUT NOT YET EFFECTIVE

 

The standards and interpretations that are issued, but not yet effective, up to the date of issuance of the Group’s consolidated financial statements are disclosed below.

 

Amendments to References to the Conceptual Framework in IFRS Standards;17 Insurance contracts, IFRS 17 is effective for reporting periods beginning on or after 1 January 2023;
Amendments to IFRS 3: Definition of a Business;
Amendments to IFRS 9, IAS 39 and IFRS 7: Interest Rate Benchmark Reform;
Amendments to IAS 1 and IAS 8: Definition of Material;
Amendments to IAS 1 Presentation of Financial Statements:1: Classification of Liabilities as Current or Non-current;Non-current, the amendments are effective for annual reporting periods beginning on or after 1 January 2023;
Reference to the Conceptual Framework – Amendments to IFRS 3, the amendments are effective for annual reporting periods beginning on or after 1 January 2022;
Property, Plant and Equipment: Proceeds before Intended Use – Amendments to IAS 16, Property, plant and equipment: Proceeds before intended use;the amendment is effective for annual reporting periods beginning on or after 1 January 2022;
Onerous Contracts – Costs of Fulfilling a Contract – Amendments to IAS 37, Provisions, contingent liabilities and contingent assets – onerous contracts—cost of fulfilling a contract;the amendments are effective for annual reporting periods beginning on or after 1 January 2022;
Amendments to IFRS 3 Business combinations – References to the conceptual framework;
Amendments to IFRS 16 Leases -COVID-19 related rent concessions;
Amendments to IFRS 3 Business combinations – References to the conceptual framework;
The Conceptual Framework for Financial Reporting;
IFRS 17 Insurance Contracts;1 First-time Adoption of International Financial Reporting Standards – Subsidiary as a first-time adopter, the amendment is effective for annual reporting periods beginning on or after 1 January 2022;
IFRS 9 Financial Instruments – Fees in the ‘10 per cent’ test for derecognition of financial liabilities, the amendment is effective for annual reporting periods beginning on or after 1 January 2022; and
Annual Improvements Cycle - 2018-2020.IAS 41 Agriculture – Taxation in fair value measurements, the amendment is effective for annual reporting periods beginning on or after 1 January 2022.

 

The Group does not expect these new standards and amendments to have any significant impact on the consolidated financial statements, when implemented in future periods.

 


Brooge Energy Limited

NOTES TO THE FINANCIAL CONSOLIDATED STATEMENTS

31 December 2019

3REVENUE

 

 2019  2018 2017  2020  2019 2018 
 USD  USD USD  USD  USD USD 
       
Revenue recognised under IFRS 16       
Revenue recognized under IFRS 16       
Fixed consideration – leasing component  16,846,481   14,586,315   62,995   5,614,495   16,846,481   14,586,315 
                        
Revenue recognised under IFRS 15            
Revenue recognized under IFRS 15            
Fixed consideration – service component  7,112,959   6,158,667   26,598   19,716,671   7,112,959   6,158,667 
Ancillary services  20,125,934   15,094,286   -   16,500,371   20,125,934   15,094,286 
                        
  27,238,893   21,252,953   26,598   36,217,042   27,238,893   21,252,953 
                        
Total revenue  44,085,374   35,839,268   89,593   41,831,537   44,085,374   35,839,268 

 

The Group has only one segment at the reporting date. Revenue generation from leasing of storage capacity of tanks and other ancillary services started in December 2017. The Group hashad only one customer, Al Brooge International Advisory LLC (“BIA”), since the inception of the operations in 2017 and as such all revenues havehad been derived from one customer.

BIA till April 2020. In August 2019, a novated agreement was signed with a new party Al Brooge International Advisory LLC for four years in whichMay 2020, BIA agreed to release 129,000 m3 out of the lessor, the Group, consents to lease to the lessee its oil storagePhase I capacity of 399,324 cubic meters in orderm3, amounting to serveapproximately one third of the lessee’s oil trading activities.total Phase I capacity, back to BPGIC. BPGIC leased this capacity to Totsa Total Oil Trading SA (the “Super Major”), for a six-month period (the “Super Major Agreement”) subject to renewal for an additional six-month period with the mutual agreement of the parties. The Super Major Agreement was not renewed and BPGIC leased this capacity to new customers. In November and December 2020, BIA agreed to further release 145,635 m3 of the phase I capacity back to BPGIC which is leased to new customers for a six-month period shall be automatically extended bysubject to renewal for an additional six-month period with the mutual agreement of the parties. On expiration of the agreement, BPGIC has to return back 274,635 m3 to BIA. During the period when the substantially the entire capacity is not leased to a further 5 years unless either party notifiessingle customer, the other in writingarrangement does not less than six months priormeet the definition of a lease under IFRS 16. Accordingly, the revenue relating to any such expiry date of its intention. Other than the terms mentioned above, all the terms and conditions remain same in the new contract. Based on an assessment in accordance withthat period is classified under IFRS 15 the Group concluded that the only material change in theas service revenue.

The commercial arrangement was the additional extension of seven months for the leasecontracts with similar monthly rates (selling price) to those in previous periods. This has therefore, not resulted in a material changecustomers related to the Group’s revenue recognition profile sincePhase 1 and Phase 2 have been assigned as security against the extended period (1 January 2023 to 31 July 2023) will be accounted for as a separate contract.borrowing obtained in 2020 (note 16).

 

Group as lessor

Future storage fee income to be receivedAncillary services revenue includes port charges of USD 1,558,887 that are paid by the Group underto the sales agreement based on projected storage availability are as follows:

  2019  2018  2017 
  USD  USD  USD 
          
Within one year  23,959,440   23,959,440   23,869,847 
After one year but not more than 5 years  61,895,220   71,878,320   95,837,760 
             
   85,854,660   95,837,760   119,707,607 

port authority and recharged to the customers.

F-23 


Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL CONSOLIDATED STATEMENTS

For the year ended 31 December 20192020

3REVENUE continued

Cyclicality of operations

 

The revenues of the Group mainly comprise of fixed fees for storage and related services and variable fees for ancillary services provided under a contract with its customers. Accordingly, there is no cyclicality in the Group’s operations.

4DIRECT COSTS

 

 2019  2018 2017  2020  2019 2018 
 USD  USD USD  USD  USD USD 
              
Employee costs and related benefits  3,074,727   2,808,702   1,518,794   3,482,431   3,074,727   2,808,702 
Depreciation (note 8)  5,785,745   5,716,063   692,528   5,799,023   5,785,745   5,716,063 
Reimbursable port charges  1,558,887   -   - 
Spare parts and consumables used (note 9)  788,792   592,471   50,891   657,916   788,792   592,471 
Insurance  323,702   377,053   31,304   397,976   323,702   377,053 
Others  229,499   113,071   2,292   1,048,527   229,499   113,071 
                        
  10,202,465   9,607,360   2,295,809   12,944,760   10,202,465   9,607,360 

 

55LISTING EXPENSES

 

 2019  2018 2017  2020  2019 2018 
 USD  USD USD  USD  USD USD 
                   
IFRS 2 listing expenses (note 25)  98,622,019   -   - 
IFRS 2 listing expenses (note 27)  -   98,622,019   - 
Other listing expenses*  3,151,858   -   -   -   3,151,858   - 
                        
  101,773,877   -   -       101,773,877   - 

 

*Other listing expenses represents promissory note of USD 1.5 million, fees paid to legal advisors, consultants, and other necessary expenses incurred in relation to the Group’s listing on the US market.NASDAQ.

Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

For the year ended 31 December 2020

 

6GENERAL AND ADMINISTRATIVE EXPENSES

 

 2019  2018 2017  2020  2019 2018 
 USD  USD USD  USD  USD USD 
              
Employee costs and related benefits  1,471,974   1,178,919   287,481   2,001,934   1,471,974   1,178,919 
Consultancy expenses  535,275   337,491   54,529   2,501,525   535,275   337,491 
Professional liability insurance  639,345   -   - 
Board fees and expenses  354,169   -   - 
Rent on low value and short-term leases  177,850   10,346   22,325 
Advertisement and subscriptions  211,704   131,494   116,495 
Travel and related expenses  154,336   52,506   11,515 
License costs  89,552   18,502   19,249 
Communication expenses  49,105   35,465   19,773 
Recruitment expenses  1,360   33,362   53,912   12,924   1,360   33,362 
Travel and related expenses  52,506   11,515   16,544 
Rent on low value and short term leases  10,346   22,325   43,380 
Advertisement and subscriptions  131,494   116,495   37,223 
Printing and stationery  25,954   22,713   12,636   21,367   25,954   22,713 
Licence costs  18,502   19,249   22,872 
Communication expenses  35,465   19,773   9,379 
Other expenses  326,108   267,418   36,310   243,073   326,108   267,418 
                       
  2,608,984   2,029,260   574,266   6,456,884   2,608,984   2,029,260 

 

7FINANCE COSTS

 

  2019  2018  2017 
  USD  USD  USD 
          
Interest on lease liability (note 16)  1,412,796   1,387,612   318,957 
Finance costs on term loans  4,002,772   5,564,311   647,969 
Bank charges  314,967   -   - 
             
   5,730,535   6,951,923   966,926 
  2020  2019  2018 
  USD  USD  USD 
          
Interest on lease liability (note 17)  2,041,006   1,412,796   1,387,612 
Finance costs on borrowings  5,467,250   4,002,772   5,564,311 
Early settlement charges  706,643   -   - 
Asset retirement obligation - accretion expense (note 18)  79,555   -   - 
Bank charges  11,696   314,967   - 
             
   8,306,150   5,730,535   6,951,923 

8OTHER INCOME

   2020   2019   2018 
   USD   USD   USD 
             
Write-back of accrued interest not settled  754,929   -   - 
Gain on sale of scrap  73,403   -   - 
             
   828,332   -   - 

Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL CONSOLIDATED STATEMENTS

For the year ended 31 December 20192020

 

89PROPERTY, PLANT AND EQUIPMENT

 

            Capital                Capital    
        Other Right-of-use work in            Other Right-of-use work in    
 Buildings Tanks Installations equipment asset (land) progress Total  Buildings Tanks Installations equipment asset (land) progress Total 
 USD USD USD USD USD USD USD  USD USD USD USD USD USD USD 
               
2020                            
Cost:                            
At 1 January 2020  28,037,886   76,100,795   65,878,129   218,827   27,540,969   79,948,312   277,724,918 
Additions  -   118,203   24,997   49,916   56,359,642   53,631,490   110,184,248 
                            
At 31 December 2020  28,037,886   76,218,998   65,903,126   268,743   83,900,611   133,579,802   387,909,166 
                            
Depreciation:                            
At 1 January 2020  2,372,081   3,312,144   5,978,336   79,673   2,754,096   -   14,496,330 
Charge for the year  1,121,515   1,568,648   2,789,951   50,482   578,715   -   6,109,311 
                            
At 31 December 2020  3,493,596   4,880,792   8,768,287   130,155   3,332,811   -   20,605,641 
                            
Net carrying amount:                            
At 31 December 2020  24,544,290   71,338,206   57,134,839   138,588   80,567,800   133,579,802   367,303,525 
                                           
2019                                           
Cost:                                                        
At 1 January 2019  28,037,886   76,100,795   65,868,246   213,843   27,540,969   8,344,847   206,106,586   28,037,886   76,100,795   65,868,246   213,843   27,540,969   8,344,847   206,106,586 
Additions  -   -   9,883   4,984   -   71,603,465   71,618,332   -   -   9,883   4,984   -   71,603,465   71,618,332 
                                                        
At 31 December 2019  28,037,886   76,100,795   65,878,129   218,827   27,540,969   79,948,312   277,724,918   28,037,886   76,100,795   65,878,129   218,827   27,540,969   79,948,312   277,724,918 
                                                        
Depreciation:                                                        
At 1 January 2019  1,250,566   1,746,725   3,148,665   36,436   2,295,080   -   8,477,472   1,250,566   1,746,725   3,148,665   36,436   2,295,080   -   8,477,472 
Charge for the year  1,121,515   1,565,419   2,829,671   43,237   459,016   -   6,018,858   1,121,515   1,565,419   2,829,671   43,237   459,016   -   6,018,858 
                                                        
At 31 December 2019  2,372,081   3,312,144   5,978,336   79,673   2,754,096   -   14,496,330   2,372,081   3,312,144   5,978,336   79,673   2,754,096   -   14,496,330 
                            
Net carrying amount:                                                        
At 31 December 2019  25,665,805   72,788,651   59,899,793   139,154   24,786,873   79,948,312   263,228,588   25,665,805   72,788,651   59,899,793   139,154   24,786,873   79,948,312   263,228,588 
                            
2018                            
Cost:                            
At 1 January 2018  28,037,886   76,100,795   65,860,351   79,645   27,540,969   294,403   197,914,049 
Additions  -   -   7,895   134,198   -   8,050,444   8,192,537 
                            
At 31 December 2018  28,037,886   76,100,795   65,868,246   213,843   27,540,969   8,344,847   206,106,586 
                            
Depreciation:                            
At 1 January 2018  129,051   181,306   325,525   3,232   1,836,064   -   2,475,178 
Charge for the year  1,121,515   1,565,419   2,823,140   33,204   459,016   -   6,002,294 
                            
At 31 December 2018  1,250,566   1,746,725   3,148,665   36,436   2,295,080   -   8,477,472 
                            
Net carrying amount:                            
At 31 December 2018  26,787,320   74,354,070   62,719,581   177,407   25,245,889   8,344,847   197,629,114 

 

Capital work in progress at 31 December 20192020 includes total amount capitalisedof USD 133,255,464 capitalized relating to the construction of phase 2 and USD 324,340 of phase 3 and includes an amount of USD 1,458,0691,484,977 (2019: USD 1,458,069) related to finance charge on lease liability for phase 2 and an amount of USD 233,113 (2019: USD 233,113) for phase 2 and USD 77,175 (2019: nil) for phase 3 related to depreciation charge on right-of-use asset capitalised.

 

The capitalized borrowing costs of phase 2 amounting to USD 4,719,888 (2019: USD 1,546,108) have been included underin “additions” in the table above. These include general borrowing cost of USD 2,274,051 (2019: USD 1,546,108) and specific borrowing cost of USD 2,445,837 (2019: nil). The capitalisation ratecapitalization rates used to determine these financethe general borrowing costs waswere 7.35% (2019: 6.1%. (2018: Nil).) in respect of term loans and 10.1% (2019: nil) in respect of bonds per annum.

 

TanksLand lease agreement and relatedthe moveable assets with a carrying value of USD 158,493,403 (2018: USD 164,038,378)BPGIC FZE are mortgagedpledged as security against loansborrowing obtained in 2014 and 20172020 (note 15)16). Further, as security against the term loan (2), a step-in right to use the leased land, has been provided to the commercial bank.

 

The depreciation charge for the year is allocated to the consolidated statement of comprehensive income (within profit and loss) and capital work in progress as follows:

 

 2019  2018  2020  2019 
 USD  USD  USD  USD 
          
Direct costs (note 4)  5,785,745   5,716,063   5,799,023   5,785,745 
Property, plant and equipment  233,113   286,231   310,288   233,113 
                
  6,018,858   6,002,294   6,109,311   6,018,858 

Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL CONSOLIDATED STATEMENTS

For the year ended 31 December 20192020

 

910INVENTORIES

 

  2019  2018 
  USD  USD 
         
Spare parts and consumables  179,644   147,090 
  2020  2019 
  USD  USD 
         
Spare parts and consumables  321,789   179,644 

 

Cost of inventories recognisedrecognized as expense during the year amounted to USD 788,792 (2018:657,916 (2019: USD 592,471)788,792). No provision is required for inventories at 31 December 2019 (2018:2020 (2019: nil).

 

1011TRADE AND OTHER RECEIVABLES

 

 2019  2018  2020  2019 
 USD  USD  USD  USD 
          
Trade receivables  1,507,660   1,877,887   -   1,507,660 
Prepayments and other receivables  783,483   245,190   313,215   783,483 
Due from related parties (note 20)  57,550   - 
Advances to suppliers  40,186     
Due from related parties (note 21)  336,831   57,550 
                
  2,348,693   2,123,077   690,232   2,348,693 

 

At 31 December 2019, all trade receivables were neither past due nor impaired.

 

Receivables are due within 14 days of invoicing.

 

Unimpaired trade receivables are expected to be fully recoverable. It is not the practice of the Group to obtain collateral over receivables and the vast majority is, therefore, unsecured.

 

Furthermore, included in non-current assets in statement of financial position is an amountare capital advances of USD 21,664,764 million.16,418,065 (2019: USD 21,664,764). This amount relates toincludes USD 15,655,981 (2019: USD 21,664,764) of advances paid to a contractor (Audex) for future services in relation to construction of phase 2.2 and USD 762,000 (2019: nil) paid as an advance for the purchase of new office space.

12BANK BALANCES AND CASH

  2020  2019 
  USD  USD 
       
Bank balances and cash  47,889,935   19,830,771 
Less: restricted bank balance (non-current)  (8,500,000)  - 
Less: restricted bank balance (current)  (18,399,965)  - 
         
Cash and cash equivalents  20,989,970   19,830,771 

The cash and bank balances disclosed above and in the consolidated statement of cash flows include USD 41,899,965 which are held in restricted bank accounts under the Bond terms (note 1). These include USD 8,500,000 held in the Liquidity account, USD 24,999,963 is held in the Construction Funding account, and USD 8,400,000 held in the Debt Service Retention account. The amount in the Construction Funding account can be withdrawn up to a limit of USD 5,000,000 per month. Accordingly, USD 15,000,000 out of the balance in the Construction Funding account is considered as cash and cash equivalent.

A first priority pledge over the balances in the Earnings account, Liquidity account, Construction Funding account and Debt Service Retention account is held as security under the Bond terms (note 16).


Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

For the year ended 31 December 2020

 

1112CASH AND CASH EQUIVALENTScontinued

  2019  2018 
  USD  USD 
       
Bank balances and cash  19,830,771   37,351 
Bank overdraft  -   (3,745,048)
         
Cash and cash equivalents  19,830,771   (3,707,697)

The group has no restricted cash balances.

 

Significant non-cash transactions, which have been excluded from the consolidated statement of cash flows, are as follows:

 

  2019  2018 
  USD  USD 
       
Capital accruals  31,469,596   5,972,230 
         
Purchase of property, plant and equipment financed through  advances paid to contractors  8,335,236   231,571 
         

Listing expenses (note 5)

  100,122,019   - 
         
Lease payments made by shareholders  -   2,818,714 

Brooge Energy Limited

NOTES TO THE FINANCIAL CONSOLIDATED STATEMENTS

31 December 2019

  2020  2019 
  USD  USD 
       
Capital accruals  4,453,830   31,469,596 
         
Purchase of property, plant and equipment financed through advances paid to contractors  14,457,767   8,335,236 
         
Listing expenses (note 5)  -   100,122,019 
         
Short term rent payments made by shareholders  154,279   - 
         
Asset retirement obligation  793,779   - 

 

1213ISSUED CAPITAL AND RESERVES

 

 2019  2018  2020  2019 
 No. of shares  No. of shares  No. of shares  No. of shares 
          
Authorized             
Ordinary shares  450,000,000   450,000,000   450,000,000   450,000,000 

At BPGIC FZE        
         
  No. of shares  USD 
         
At 1 January 2019  100   1,361,285 
         
At Brooge Energy        
         
At inception  1   n.m.*
Conversion of 100 BPGIZ FZE ordinary shares at 1 for 1 million to the legal acquirer, Brooge Energy (note 26)  80,000,000**  8,000 
         
Cash election  (1,281,965)  (128)
Changes in share capital due to reverse acquisition transaction (note 26)  9,347,219**  932 
         
At 31 December 2019  88,065,254   8,804 
         
Changes in share capital due to reverse acquisition transaction  (30,000)  (3)
Conversion of 100 warrants into ordinary shares at 1 for 1  100   0.01 
         
At 31 December 2020  88,035,354   8,801 

 

At BPGIC FZE* not meaningful

 

  No. of shares  USD 
       
At 1 January 2018  100   1,361,285 
         
At Brooge Energy        
         
At inception  1   n.m.* 
Conversion of 100 BPGIZ FZE ordinary shares at 1 for 1 million to the legal acquirer, Brooge Energy (note 25)  80,000,000**  8,000 
         
At 31 December 2018  80,000,000   8,000 
         
Cash election  (1,281,965)  (128)
Changes in share capital due to business combination (note 25)  9,347,219**  932 
         
At 31 December 2019  88,065,254   8,804 

**Ordinary shares held in escrow (20,000,000 shares held by BPGIC and 1,552,500 shares held by the original founders of Twelve Seas) have been excluded from the share capital in the table above. Additional information on escrow shares are included in note 26.


Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

For the year ended 31 December 2020

 

*13not meaningfulISSUED CAPITAL AND RESERVES continued

 

**Ordinary shares held in escrow (20,000,000 shares held by BPGIC and 1,552,000 shares held by the original founders of Twelve Seas) have been excluded from the share capital in the table above. Additional information on escrow shares are included in note 25.

Share premium

  USD 
    
At 1 January 20182019  - 
Reverse acquisition transaction adjustment1,353,285
At 31 December 2018  1,353,285 
     
Ordinary shares issued on merger with Twelve Seas  114,022,421 
Cash election  (13,599,872)
     
At 31 December 2019  101,775,834 
Conversion of 100 warrants in ordinary shares at 1 for 11,224
At 31 December 2020101,777,058

 

1314WarrantsDERIVATIVE WARRANT LIABILITY

In accordance with IAS 32, a contract to issue a variable number of shares fails to meet the definition of equity and must instead be classified as a derivative liability and measured at fair value with changes in fair value recognized in the consolidated statement of comprehensive income at each reporting date. The derivative liabilities will ultimately be converted into the Group’s equity (ordinary shares) when the warrants are exercised, or will be extinguished on the expiry of the outstanding warrants, and will not result in the outlay of any cash by the Group in any case.

  No. of warrants  USD 
       
At 1 January 2020  21,229,000   15,709,460 
Conversion to equity (ordinary shares) upon exercise of warrants  (100)  (74)
Revaluation of derivative warrant liability  -   (2,547,542)
         
At 31 December 2020  21,228,900   13,161,844 

 

In connection with the completion of the business combinationreverse acquisition transaction on 20 December 2019, each of Twelve Sea’s 21,229,000 outstanding warrants were converted into the Group’s warrants at 1:1 ratio. The warrants allow the holder to subscribe for the ordinary shares of the Company at 1:1 basis at an exercise price of USD 11.50. The warrants shall lapse and expire after five years from the closing of the business combination.

As the exercise price and maximum number of ordinary shares from which the Warrants are converted into ordinary shares of the Company is a fixed ratio and will be gross settled, the Warrants are accounted for as equity instruments.

transaction. The Fair value has been determined using the quoted priceholders of the warrants onissued pursuant to the datetransaction may elect, if the Group does not have an effective registration statement or the prospectus contained therein is not available for the issuance of the business combination and amountedwarrant shares to USD 17.0 million. Thesethe holder, in lieu of exercising the warrants were accounted for as partcash, a cashless exercise option to receive a variable number of the consideration transferred under IFRS 2. Additional information is provided in note 25.common shares.

 

Between, the reporting date and the date of authorization of these financial statements,On 14 May 2020, holders of 100 warrants have exercised their rights through cash exercise and converted the warrants into ordinary shares.

At 31 December 2020, the Group recorded a derivative warrant liability of USD 13,161,844 (31 December 2019: USD 15,709,460) which resulted in a gain on revaluation of derivative warrant liability for the year ended 31 December 2020 of USD 2,547,542 (31 December 2019: USD 1,273,740).


Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL CONSOLIDATED STATEMENTS

For the year ended 31 December 20192020

 

1415GENERAL RESERVE

 

As required by theArticles of Association of BPGIC FZE, 10% of the profit for the year must be transferred to the general reserve. The subsidiary has resolved to discontinue such annual transfers as the reserve has reached 50% of the subsidiary’s issued share capital. The general reserve is not available for distribution to the shareholders.

 

1516TERM LOANSBORROWINGS

 

      2019  2018     2020  2019 
 Interest rate Maturity  USD  USD  Interest rate Maturity USD  USD 
                  
Non-current                     
Bonds 8.5% 2025  180,014,715   - 
Term loan (1) 3 month EIBOR + 3% margin  2030   68,271,743   -  6 month EIBOR + 4% margin [minimum 5%]   -   68,271,743 
Term loan (2) 3 month EIBOR + 3% margin  2023   5,889,207   -  3 month EIBOR + 4% margin [minimum 5%]   -   5,889,207 
                        
        74,160,950   -     180,014,715   74,160,950 
                        
Current                        
Bonds 8.5%   7,000,000   - 
Term loan (1) 3 month EIBOR + 3% margin  2020   10,135,939   82,245,595  6 month EIBOR + 4% margin [minimum 5%]   -   10,135,939 
Term loan (2) 3 month EIBOR + 3% margin  2020   2,138,248   10,165,703  3 month EIBOR + 4% margin [minimum 5%]   -   2,138,248 
Term loan (3) 1 month EIBOR + 2% margin  -   -   2,380,790 
Promissory notes    2020   2,265,000   -      -   2,265,000 
                        
        14,539,187   94,792,088      7,000,000   14,539,187 

Bonds

  Coupon  Effective        
  rate  interest rate  Maturity 2020  2019 
  %  %  date USD  USD 
                   
USD 200,000,000 bond net of transaction costs  8.5%   10.57%  September 2025  187,014,715   - 

On 24 September 2020, the Group issued long term fixed interest rate senior secured bonds of USD 200,000,000 to private investors with a face value of USD 1 at an issue price of USD 0.95. The Group can issue further bonds of up to USD 50,000,000 under identical terms except issue price that can be above or below the nominal amount, subject to certain conditions. The proceeds of the bonds of USD 186,000,000 net of USD 4,000,000 of transaction costs were drawn down during November 2020. In accordance with the terms of the bonds, the proceeds were used to settle the existing term loans and promissory notes. An amount of USD 85,000,000 were transferred to a Construction account to be used solely to fund the remaining phase 2 construction costs. The balance proceeds were used for general corporate purposes.

The bonds will be repaid in semi-annual payments of USD 7,000,000 starting September 2021 until March 2025, and one bullet repayment of USD 144,000,000 in September 2025. Interest will accrue at a coupon rate of 8.5% and will be payable semi-annually in March and September each year. The Group has the option to redeem the bonds in full or in part any time after 24 September 2023 (the “call option”). The call option represents an embedded derivative that has been separated from the host contract and separately valued. At 31 December 2020, management has assessed the value of the call option to be immaterial.


Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

For the year ended 31 December 2020

16BORROWINGS continued

Bonds continued

The bonds are secured by:

(i)pledge over all the existing and future shares of BPGIC FZE;
(ii)assignment of rights and pledge over the balance in the Earnings account;
(iii)pledge over the balance in the Liquidity account, the Debt Service Retention account and the Construction Funding account;
(iv)pledge over moveable assets of BPGIC FZE and its subsidiaries;\
(v)security assignment of commercial contracts related to phase I and phase II, land lease agreement, port facilities agreement and EPC construction contract;
(vi)security assignment over insurance contracts for phase I terminal, phase II terminal and admin building;
(vii)security assignment over group and intercompany loans; and
(viii)corporate guarantee from Brooge Energy Limited.

The bond agreement also restricts BPGIC FZE from making any distributions other than in the form of an inter-company loan for phase III construction.

Under the bond agreement, BPGIC FZE is subject to the following financial covenants during the term of the bonds:

(i)Minimum Liquidity: BPGIC to maintain $8.5 million in the Liquidity account;
(ii)Leverage Ratio: BPGIC and its subsidiaries’ leverage ratio not to exceed: (A) 5.5x at 31 December 2020; (B) 3.5x at 31 December 2021; and (C) 3.0x anytime thereafter; and
(iii)Working Capital: BPGIC and its subsidiaries to maintain a positive working capital.

The bond agreement requires the Group to comply with the following financial covenant:

(i)Brooge Energy Limited to maintain a minimum equity ratio of 25%.

As of 31 December 2020, BPGIC FZE and the Group was in compliance with its commitments under the bond agreement.

 

Term loan 1

In 2014, the Group obtained term loan facility (1) amounting to USD 84,595,154 (AED:(AED 310,718,000) from a commercial bank in the UAE to partially finance the construction of phase 1 (14 oil storage tanks in Fujairah). During the year 2019, the Group has not drawn down any amounts (2018: USD 550,445) from this facility. The loan was repayable in 48 quarterly instalments, commencing 27 months after the start of the construction with final maturity not exceeding 31 March 2028 and iswas stated net of prepaid finance cost of USD 499,158 (2018: USD 559,607).499,158. The interest iswas due on a quarterly basis from the loan drawdown date. The loan was drawn down in AED.

 

In 2018, the Group entered into an agreement to amend term loan facility (1). As a result of this amendment the loan was repayable in 48 quarterly instalments starting October 2018 with final maturity in July 2030. The loan carriescarried interest at 3 month EIBOR + 3% as compared to interest at 6 month EIBOR + 3.5% previously. As of 31 December 2018, the Group had not paid USD 3.7 million of principal and accrued interest that was due under the Phase I Financing Facilities. Also, as of 31 December 2018, the Group was not in compliance with its debt covenants, including the debt service coverage ratio contained in the Phase I Financing Facilities. Even though the lender did not declare an event of default under the loan agreements, these breaches constituted events of default and could have resulted in the lender requiring immediate repayment of the loans. Accordingly, as of 31 December 2018, the Group classified its debt balance of $94.8 million as a current liability.

 

On 10 September 2019, the Group entered into an agreement with the bank to again amend term loan facility (1). The loan was payable in 45 instalments starting 31 October 2019 with final maturity on 30 July 2030. One of the instalments included a one-time lump sum repayment of USD 5,729,418 which represented the cumulative instalments including interest outstanding from periods prior to this amended agreement of USD 5,494,063 and an amendment fee of USD 235,355.

 

On 30 December 2019, the Group entered into another amendment by revoking the previousan amendment for term loan facility (1). The loan is nowwas payable in 44 instalments starting 31 January 2020 with final maturity on 30 July 2030. One of the instalments includesincluded a one-time lump sum repayment of USD 6,612,194, which representsrepresented the cumulative instalments including interest outstanding from periods prior to this amended agreement of USD 6,520,130 and an amendment fee of USD 92,064. At 31 December 2019, the Group’s current liabilities exceeded its current assets by USD 72.7 million. Subsequent to the year end, the Group defaulted on its commitments under its term loans and the Group was not in compliance with its debt covenants, including the debt service coverage ratio contained in the Group’s loan agreements. Even though the lender did not declare an event of default under the loan agreements, these breaches constituted events of default and could have resulted in the lender requiring immediate repayment of the loans.


Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL CONSOLIDATED STATEMENTS

For the year ended 31 December 20192020

 

1516TERM LOANSBORROWINGS continued

 

Term loan 1 continued

On 15 June 2020, the Group entered into another amendment for term loan facility (1). The new payment terms comprised of 46 instalments starting 30 June 2020 with final maturity on 31 July 2030. The loan carried interest at 6 month EIBOR + 4% [minimum 5%] per annum to be further enhanced to 6 month EIBOR + 4.5% [minimum 5%] per annum starting from January 2021, compared to interest at 3 month EIBOR + 3% per annum previously. An amendment fee of USD 136,128 was paid.

In November 2020, the Group fully settled the term loan facility (1) using the proceeds of the Bond issue. The Group paid USD 74,082,548 in final settlement in addition to repayments of USD 4,824,291 during the year. The final settlement amount included USD USD 559,637 as a prepayment penalty.

Term loan 2

During 2017, the Group obtained an additional term loan facility (2) of USD 11,108,086 (AED 40,800,000) from a commercial bank in the UAE for the construction of an administrative building in Fujairah. The loan was repayable in 20 quarterly instalments starting after a 6six months grace period commencing in April 2017 and iswas stated net of prepaid finance cost of USD 58,578 (2018: USD 76,606).58,578. The interest iswas due on a quarterly basis from the loan drawdown date. The loan was drawn down in AED.

 

During the year 2018, the Group has entered in tointo an agreement to amend term loan facility (2). The loan was repayable in 20 quarterly instalments starting October 2018 with final maturity in July 2023.The2023. The loan carried interest at 3 month EIBOR + 3% as compared to interest at 3 month EIBOR + 3.5% previously.

Term loan (2) was not amended as part of the 10 September 2019 and 30 December agreement2019 agreements to amend loan (1). In 2019, the Group repaid all instalments due underin accordance with the repayment schedule.

 

TermOn 15 June 2020, the Group entered into another amendment by revoking the previous amendment for term loan facility (2). The loan was payable in 16 instalments starting 30 June 2020 with final maturity on 31 July 2030. The loan carried interest at 3 month EIBOR + 4% [minimum 5%] per annum to be further enhanced to 3 month EIBOR + 4.5% [minimum 5%] per annum starting from January 2021 as compared to interest at 3 month EIBOR + 3% per annum previously.

In November 2020, the Group fully settled the term loan facility (2) using the proceeds of the Bond issue. The Group paid USD 7,546,964 in final settlement in addition to repayments of USD 539,069 during the year. The final settlement amount included USD 147,006 as a prepayment penalty.

The term loans 1 and 2

The term loans are were secured by a mortgage on the tanks and the office/administration building, step-in right to the leased land and assignment of insurance policies.

Under The security was released upon the term loan facility agreements, the Group is subject to certain covenants requiring amongst other things, the maintenance of:

(i)a minimum debt service coverage ratio of 150% at all times and if the ratio decreases to 120% or less, it results in an event of default; the debt service coverage ratio (DSCR) is defined as net operating income divided by total debt service and;
(ii)an amount equivalent to one quarterly instalment including interest in a debt service reserve account at all times.

Under the amended agreement signed on 30 December 2019, the maintenancesettlement of above covenants is required to be complied from 28 February 2020. As of 31 December 2019, the Group was in compliance with its commitments under the loan agreements and has accordingly classified the balance between current and non-current liability based on the loan agreements in effect at 31 December 2019.loans.

Subsequent to year end, the Group has again defaulted on the instalments due under the loan agreements and are also in breach of the loan covenants. The lender has not declared an event of default under the loan agreement.

The Group negotiated another amendment to the term loan facilities (1) and (2) on 15 June 2020. Loans (1) and (2) are now payable in 46 and 16 instalments, respectively, with the first installment starting from 30 June 2020 with final maturity in 30 July 2030 and 31 July 2023, respectively. The loan 1 carries interest at 6 months EIBOR + 4% (minimum 5%) and to be further increased to 6 month EIBOR + 4.5% (minimum 5%) from January 2021 as compared to interest at 3 month EIBOR + 3% previously, and, the loan 2 carries interest at 3 months EIBOR + 4% (minimum 5%) and to be further increased to 3 month EIBOR + 4.5% (minimum 5%) as compared to interest at 3 month EIBOR + 3% previously The Group has to pay USD 8.8 million for term loan (1) and (2) in 2020 which represents the cumulative instalments including interest outstanding from periods prior to this amended agreement and an amendment fee of USD 136,000. All securities and covenants under the original agreements remain in effect under the amended agreement except debt service reserve account (DSRA) balance to be maintained from 31 October 2020 and debt service coverage ratio (DSCR) to be commenced from 31 December 2020. Under this agreement, term loans (1) and (2) are also secured by assignment of the proceeds from operation of the tanks of phase 1 and 2.

Term loan 3

In 2018, the Group has obtained a facility from a commercial bank in the UAE to settle accrued interest on term loan (1) amounting to USD 3,539,341(AED 13,000,000). The facility carried interest at 1 month EIBOR + 2% margin and was repayable in 15 equal monthly instalments commencing from date of disbursement. The loan was drawn down in AED. The facility has been fully settled during the year.


Brooge Energy Limited

NOTES TO THE FINANCIAL CONSOLIDATED STATEMENTS

31 December 2019

15TERM LOANScontinued

 

Term loan 4

In 2018, the Group obtained a new facility from a commercial bank in the UAE amounting to USD 95,290,000 (AED 350,000,000) to partially finance the construction of phase 2. The new facility carriescarried interest at 3 month EIBOR + 3% margin and iswas repayable in 17 bi-annual instalments commencing 6 months after the date of completion of phase 2.

 

The term loan facility (4) is secured by a mortgage on the phase 2 storage tanks, step-in right to the leased land and assignment of the proceeds from operation of the tanks and insurance policies.

Under the term loan facility agreement, the Group is subject to certain covenants requiring amongst other things, the maintenance of (i) a minimum facility service coverage ratio of 1.25:1, (ii) a participations to value ratiodid not exceeding 1.50:1 at all times, (iii) a participations to cost ratio not exceeding 57% at any date, and (iv) an amount equivalent to one instalment including interest in a facility service reserve account at all times or in the event of an initial public offering, the amount should be equivalent to the next two instalments including interest. The facility service coverage ratio is calculated as revenues minus expenses from the phase 2 storage tanks divided by the current debt commitments on term loan (4) including interest. The participations to value ratio at any date is calculated as total debt commitments on term loan facility (4) as of that date divided by the most recent valuation of the phase 2 storage tanks. The participations to cost ratio at any date is calculated as the total debt commitments on term loan facility (4) as of that date as a percentage of the sum of actual constructions costs plus project expenses paid as of that date on the phase 2 storage tanks.

The term loan facility (4) agreement includes an initial condition precedent that requires evidence of initial equity contribution by the Group towards the phase 2 storage tanks before the loan facility can be utilised. The Group has not mademake any drawdowns on the term loan facility (4) as. In 2020, the Group has cancelled the facility subsequent to the issuance of the date of issuance of these consolidated financial statements.bonds.

 

The term loansborrowings are repayable as follows:

 

 2019  2018  2020  2019 
 USD  USD  USD  USD 
          
Payable within 1 year  14,541,774   95,428,301   7,000,000   14,541,774 
Payable within 1 and 2 years  9,216,973   -   14,000,000   9,216,973 
Payable within 2 and 5 years  24,948,779   -   179,000,000   24,948,779 
Payable after 5 years  40,550,347   -   -   40,550,347 
          200,000,000   89,257,873 
  89,257,873   95,428,301 

Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

For the year ended 31 December 2020

16BORROWINGS continued

 

Promissory notes

Pursuant to the Business Combination Agreement, on December 20,in 2019, Twelve Seas, Early Bird Capital (EBC), and the Company entered into the Business Combination Marketing Agreement Fee Amendment (the “BCMA Fee Amendment”) whereby the Company became party to the Business Combination Marketing Agreement solely with respect to the provision relating to EBC’s fees and EBC’s fees were amended. Pursuant to the Business Combination Marketing Agreement, as amended by the BCMA Fee Amendment, EBC received as full payment for any and all fees under the Business Combination Marketing Agreement, a cash fee equal to USD 3,0 million3,000,000 and a USD 1.51,500,000 million non-interest bearing promissory note of the Company due and payable on the earlier of (i) the first anniversary of the Closing and (ii) the consummation by the Company of a follow-on securities offering. In case of default, the promissory note would bear interest at the rate of 10% per annum.

 

There iswas an additional promissory note of USD 0.8 million765,000 that was issued by Twelve Seas prior to the Business Combinationtransaction payable to Twelve Seas sponsors which was included in the net assets contributed by Twelve Seas as part of the Business Combination,transaction, further details disclosed in note 25.


Brooge Energy Limited

NOTES TO THE FINANCIAL CONSOLIDATED STATEMENTS

31 December 2019The Group has fully settled the promissory notes during the year.

 

15TERM LOANScontinued

Changes in liabilities arising from term loansborrowings and leases are as follows:

 

 1 January Cash flows Other* 31 December  1 January Cash flows Other* 31 December 
 USD USD USD USD  USD USD USD USD 
                  
2019         
2020         
         
Lease liability         
Current  94,792,088   (8,435,416)  (71,817,485)  14,539,187   2,154,878   (786,416)  8,426,596   9,795,058 
Non-current  -   -   74,160,950   74,160,950   28,624,259   -   50,665,248   79,289,507 
                                
Total  94,792,088   (8,435,416)  2,343,465   88,700,137   30,779,137   (786,416)  59,091,844   89,084,565 
                                
2018                
Borrowings                
Current  94,163,751   550,148   78,189   94,792,088   14,539,187   (14,539,187)  7,000,000   7,000,000 
Non-current  -   -   -   -   74,160,950   111,839,050   (5,985,285)  180,014,715 
                                
Total  94,163,751   550,148   78,189   94,792,088   88,700,137   97,299,863   1,014,715   187,014,715 
��               
2019                
                
Lease liability                
Current  2,112,624   (2,313,323)  2,355,577   2,154,878 
Non-current  28,108,801   -   515,458   28,624,259 
                
Total  30,221,425   (2,313,323)  2,871,035   30,779,137 
                
Borrowings                
Current  94,792,088   (8,435,416)  (71,817,485)  14,539,187 
Non-current  -   -   74,160,950   74,160,950 
                
Total  94,792,088   (8,435,416)  2,343,465   88,700,137 

 

*The ‘Other’ column includes the effect of amortisationamortization of prepaid finance costs on term loans,borrowings, promissory notes and reclassification between current and non-current portion. In respect of leases, the ‘Other’ column includes unwinding of interest and reclassification between current and non-current portion.


Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

For the year ended 31 December 2020

 

1617LEASE LIABILITY

 

During 2013, the Group entered into a land lease agreement with the Municipality of Fujairah for a period of 30 years, extendable for another 30 years at the option of the Group. The Group has concluded that they have the right-to-use of the asset and accordingly, recorded a lease liability as per the requirements of IFRS 16. Given the use of the land, it is reasonably certain that the Group will continue to lease the land till the end of the lease period (i.e. 60 years) and accordingly the below lease rentals cover a period up to 60 years discounted at the rate of 9.5% (2018:(2019: 9.5%) as an incremental borrowing rate for the Group. Annual lease rental is increased by 2% on an annual basis as per the agreement.

 

During the year, the Group entered into another land lease agreement in respect of its phase 3 project with the Fujairah Oil Industry Zone for a period of 30 years, extendable for another 30 years. Given the use of the land, it is reasonably certain that the Group will continue to lease the land till the end of the lease period (i.e. 60 years) and accordingly the below lease rentals cover a period up to 60 years discounted at the rate of 13% (2019:nil) as an incremental borrowing rate for the Group. Annual lease rental is increased by 2% on an annual basis and there is an initial rent free period of 18 months from the contract date.

Changes in the lease liability are as follows:

 

 2019  2018  2020  2019 
 USD  USD  USD  USD 
          
At 1 January  30,221,425   29,670,675   30,779,137   30,221,425 
Additions  55,565,863     
Interest charge  2,871,035   2,818,714   3,525,981   2,871,035 
Amount paid during the year  (2,313,323)  (2,267,964)  (786,416)  (2,313,323)
                
At 31 December  30,779,137   30,221,425   89,084,565   30,779,137 

 

The lease liability is classified in the consolidated statement of financial position as follows:

 

  2019  2018 
  USD  USD 
       
Current  2,154,878   2,112,624 
Non-current  28,624,259   28,108,801 
         
  30,779,137   30,221,425 


Brooge Energy Limited

NOTES TO THE FINANCIAL CONSOLIDATED STATEMENTS

31 December 2019

16LEASE LIABILITYcontinued
  2020  2019 
  USD  USD 
         
Current  9,795,058   2,154,878 
Non-current  79,289,507   28,624,259 
         
   89,084,565   30,779,137 

 

The maturity of the lease liability is as follows:

 

    Present value of 
 Lease payments Minimum lease payments  Lease payments  Present value of
minimum lease payments
 
 2019  2018  2019  2018  2020  2019  2020  2019 
 USD  USD  USD  USD  USD  USD  USD  USD 
                  
Not later than one year  2,359,590   2,313,323   2,154,877   2,112,624   10,708,720   2,359,590   9,795,058   2,154,877 
Later than one year and not later than five years  9,919,810   9,725,304   7,241,240   7,099,255   35,875,520   9,919,810   24,285,120   7,241,240 
Later than five years  213,469,800   216,023,896   21,383,020   21,009,546   858,043,425   213,469,800   55,004,387   21,383,020 
                                
  225,749,200   228,062,523   30,779,137   30,221,425   904,627,665   225,749,200   89,084,565   30,779,137 
Finance costs  (194,970,063)  (197,841,098)  -   -   (815,543,100)  (194,970,063)  -   - 
                                
Present value of minimum lease payments  30,779,137   30,221,425   30,779,137   30,221,425   89,084,565   30,779,137   89,084,565   30,779,137 

 

Additional information relating to the right of useright-of-use asset and Group’s lease is provided in notes 7 and 8note 9 to the consolidated financial statements.

 

Please refer to note 2.5 that explains significant management judgment exercised with respect to a new lease agreement entered into during the year.


Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

For the year ended 31 December 2020

1718PROVISIONS

 

  2019  2018 
  USD  USD 
         
Provision for employees’ end of service benefits  13,941   6,267 
  2020  2019 
  USD  USD 
Provision for employees’ end of service benefits  40,514   13,941 
Asset retirement obligation  873,334   - 
         
   913,848   13,941 

As part of the land lease agreement between the Fujairah Oil Industry Zone (“FOIZ”) and the Group, the Group has a legal obligation to remove the plant at the end of its useful life, or earlier, if the Group is unable to continue its operations, and restore the land. The Group has employed professional valuers to estimate the amount of liability. Refer (note 2.5) for significant assumptions made in the estimate.

 

1819DERIVATIVE FINANCIAL INSTRUMENTS

 

  2019  2018 
  USD  USD 
         
Interest rate swaps  1,518,249   1,190,073 
  2020  2019 
  USD  USD 
         
Interest rate swaps  -   1,518,249 

 

In 2018, the Group entered into an interest rate swap with a commercial bank exchanging variable interest for fixed interest at specified dates on its term loan 1 (note 15)16). The interest rate swap maturesswap’s maturity was in June 2023.

 

The Company iswas exposed to variability in future interest cash flows on terms loan and Islamic ijara loan which bearswere subject to interest at a variable rate.

 

In order to reduce its exposure to interest rates fluctuations onDuring the loans,year, the Group has entered into anfully settled the term loans as well as the interest rate arrangement with counter-party banks for a notional amount that mirrorsswaps. The Group have repaid USD 1,858,753 in settlement.


Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

For the draw down schedule of the loans, covering not less than 90% of the outstanding term loan. Atyear ended 31 December 2019 the fixed interest rates varied from 2.78% to 4.756% (2018: 2.78% to 4.756%). The floating interest rate is based on EIBOR. The notional amount outstanding at 31 December 2019 was USD 79.2 million (2018: USD 83.8 million). The interest rate swap match the terms of the fixed rate loan (i.e., notional amount, maturity, payment and reset dates).2020

19DERIVATIVE FINANCIAL INSTRUMENTS continued

 

The details of these derivative financial instruments are as follows:follows:

 

  Notional  Fair value  Fair value 
  Amount  asset  liability 
  USD  USD  USD 
          
31 December 2019            
Designated at FVTPL            
Interest rate swaps  79,253,015   -   1,518,249 
             
31 December 2018            
Designated at FVTPL            
Interest rate swaps  83,855,305   -   1,190,073 

Brooge Energy Limited

NOTES TO THE FINANCIAL CONSOLIDATED STATEMENTS

31 December 2019

  Notional  Fair value  Fair value 
  amount  asset  liability 
  USD  USD  USD 
          
31 December 2020         
Designated at FVTPL         
Interest rate swaps  -   -   - 
             
31 December 2019            
Designated at FVTPL            
Interest rate swaps  79,253,015   -   1,518,249 

 

1920ACCOUNTS PAYABLE, ACCRUALS AND OTHER PAYABLES

 

  2019  2018 
  USD  USD 
       
Accounts payable*  25,989,961   1,565,035 
Accrued interest on term loans  3,387,446   910,691 
Capital accruals**  31,469,596   5,972,230 
Accrued expenses  268,118   555,842 
         
   61,115,121   9,003,798 
  2020  2019 
  USD  USD 
       
Accounts payable  3,727,768   25,989,961 
Accrued interest on borrowings  4,250,000   3,387,446 
Capital accruals  4,453,830   31,469,596 
Advances from customer  1,015,313     
Accrued expenses  382,986   268,118 
         
   13,829,897   61,115,121 

Brooge Energy Limited

* Accounts payables primarily represent payables to Audex (Phase 2 contractor) amounting to USD 21.5 million.NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

** Capital accruals represents contractor’s capital accruals for Phase 2For the year ended 31 December 2020

 

2021RELATED PARTY TRANSACTIONS AND BALANCES

 

Upon consummationRelated parties include the shareholders of the Business Combination,Group and companies controlled, directly or indirectly, by the board ofshareholders or directors adopted a code of ethics and business conduct that requires it, and its directors, officers and employees to avoid conflicts of interest, such as related party transactions, unless specifically authorized. The board of directors also adopted a related party transaction policy to govern the procedures for evaluation and authorization of related party transactions. Related party transactions, which require approvalor associates of the audit committee, are defined as any transaction, arrangement or relationship, or any series of similar transactions, arrangements or relationships, in which (i) the Group is or will be a participant, (ii) the aggregate amount involved will or may be expected to exceed $120,000 in any fiscal year, and (iii) any related party has or will have a direct or indirect interest. This also includes any material amendment or modification to an existing related party transaction.key management personnel.

The audit committee is responsible for reviewing and approving related party transactions to the extent the Group contemplates engaging in such a transaction. The audit committee will review all of the relevant facts and circumstances of all related party transactions that require its approval and either approve or disapprove of the entry into the related party transaction. The audit committee will approve the related party transaction only if it determines in good faith that, under all of the circumstances, the transaction is in the best interests of the Group and its shareholders. The audit committee, in its sole discretion, will impose such conditions as it deems appropriate on the Group or the related party in connection with the approval of the related party transaction. No director will be permitted to participate in the discussions or approval of a transaction in which he or she is a related party, but that director will be required to provide all material information concerning the related party transaction to the audit committee.


Brooge Energy Limited

NOTES TO THE FINANCIAL CONSOLIDATED STATEMENTS

31 December 2019

20RELATED PARTY TRANSACTIONS AND BALANCES continued

 

Transactions with related parties

Movements in shareholders’ account are as followsfollows:

 

 2019  2018  2020  2019 
 USD  USD  USD  USD 
          
Contributions by the shareholders  77,090,648   951,539   2,041,928   77,090,648 
Amounts paid on behalf of the Group by the shareholders*  1,135,484   7,850,431   -   1,135,484 
Amounts paid by the Group on behalf of the shareholders  (1,647,064)  (2,296,354)  -   (1,647,064)
Distributions to shareholders  (53,279,016)  (29,209,289)  -   (53,279,016)
                
  23,300,052   (22,703,673)  2,041,928   23,300,052 

 

These amounts are repayable at the discretion of the Board of Directors of the Group and are interest free, therefore classified as part of equity.

 

* These include expenses paid on behalf of the Group which includes other operational expenses paid by the shareholders on behalf of the Group.

 

Changes in shareholders’ account is as follows:

 

  2019  2018 
  USD  USD 
       
At 1 January  47,717,763   70,421,436 
Net contributions (distributions) during the year  23,300,052   (22,703,673)
         
At 31 December  71,017,815   47,717,763 


Brooge Energy Limited

NOTES TO THE FINANCIAL CONSOLIDATED STATEMENTS

31 December 2019

20RELATED PARTY TRANSACTIONS AND BALANCES continued
  2020  2019 
  USD  USD 
       
At 1 January  71,017,815   47,717,763 
Net contributions (distributions) during the year  2,041,928   23,300,052 
         
At 31 December  73,059,743   71,017,815 

 

Transactions with related partiescontinuedNo distributions were made during the year.

Movements in other related partiesbalances with shareholders are as follows:

 

  2020  2019 
  USD  USD 
       
Expenses paid on behalf of shareholders*  433,560   57,550 
Expenses paid on behalf of the Group by a shareholder**  (154,279)  - 
         
   279,281   57,550 

*20192018
USDUSD
ExpensesThese include legal and corporate expenses paid on behalf of related parties (note 10)57,550-
Due from related parties:
HBS Investments LP (shareholder)13,388-
H Capital International LP (shareholder)11,056-
O2 Investments Limited as GP (shareholder)6,181-
SBD International LP (shareholder)13,760-
SD Holding Limited as GP (shareholder)6,984-
Gyan Investments Ltd (shareholder)6,181-
57,550-the shareholders.
**These include office rent paid by a shareholder on behalf of the Group.

In addition to the above, funds amounting to USD 2,425,904 were received and repaid to shareholders during the year.

Due from related parties:      
BPGIC Holdings (shareholder)  255,818   - 
HBS Investments LP (shareholder)  17,479   13,388 
H Capital International LP (shareholder)  16,975   11,056 
O2 Investments Limited as GP (shareholder)  9,303   6,181 
SBD International LP (shareholder)  17,851   13,760 
SD Holding Limited as GP (shareholder)  9,850   6,984 
Gyan Investments Ltd (shareholder)  9,555   6,181 
         
   336,831   57,550 

 

Key management remuneration for the year ended 31 December 20192020 amounted to USD 1,160,293 (2018:1,417,266 (2019: USD 677,291)1,160,293), charged to consolidated statement of comprehensive income (within profit and loss). The full amount of the key management remuneration relates to short term employment benefits.

F-38

Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

For the year ended 31 December 2020

 

2122EARNINGS PER SHARE

 

Basic EPS is calculated by dividing the profit/(loss) for the year attributable to ordinary equity holders of the parent by the weighted average number of ordinary shares outstanding during the year.

 

Diluted EPS is calculated by dividing the profit attributable to ordinary equity holders of the parent by the weighted average number of ordinary shares outstanding during the year plus the weighted average number of ordinary shares that would be issued on conversion of all the dilutive potential ordinary shares into ordinary shares.

 

The following table reflects the income and share data used in the basic and diluted EPS calculations:

 

  2019  2018  2017 
  USD  USD  USD 
             
(Loss) / Profit attributable to ordinary equity holders of the parent  (76,558,663)  16,060,652   (3,747,408)

  2019  2018  2017 
  No of shares  No of shares  No of shares 
     (Restated)  (Restated) 
             
Weighted average number of ordinary shares  80,264,186   80,000,000   80,000,000 
     (Restated)    
  2020  2019  2018 
  USD  USD  USD 
             
Profit/(loss) attributable to ordinary equity holders of the parent  17,159,113   (75,284,923)  16,060,652 
          
  2020  2019  2018 
  No of shares  No of shares  No of shares 
             
Weighted average number of ordinary shares  88,035,321   80,264,186   80,000,000 

 

As part of the business combinationreverse acquisition transaction (note 25)26) warrants and ordinary shares subjected to escrow has been issued. In the calculation of diluted earnings per shares, the warrants have been excluded as the average market price of ordinary shares during the period exceeded the exercise price of the warrants i.e they are not in the money.

 

The number of contingently issuable shares (escrow(21,552,000 escrow shares) to be included in the diluted earnings per shares calculation is based on the number of shares that would be issuable if the end of the period were the end of the contingency period.Escrow Period (note 26). No ordinary shares would have been issuable on 31 December 20192020 as the conditions attached to the escrow shares have not been met at reporting date. As a result, the escrow shares have been excluded from the calculation of diluted earnings per share for 31 December 20192020 and the weighted average number of ordinary shares for basic earnings per share and diluted earnings per shares are the same.

 

Between, the reporting date and the date of authorization of these financial statements,On 14 May 2020, holders of 100 (2019: nil) warrants have exercised their rights through cash exercise and converted the warrants into ordinary shares.

 


Brooge Energy Limited

NOTES TO THE FINANCIAL CONSOLIDATED STATEMENTS

31 December 2019 

2223COMMITMENTS

 

 2019  2018  2020  2019 
 USD  USD  USD  USD 
          
Capital commitments:                
Within one year  79,334,742   144,027,770   33,125,477   79,334,742 
More than 1 year and less than 5 years  -   16,534,876 
        
  79,334,742   160,562,646 

 

Capital commitments relate to construction of phase 2 which is expected to be completed by the end of lastthird quarter of 2020.2021


Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

For the year ended 31 December 2020

 

2324FAIR VALUE OF FINANCIAL INSTRUMENTS

 

Management considers that the fair value of financial assets and financial liabilities in the consolidated financial statements approximate their carrying amounts at the reporting date.date except the borrowings issued by the Group.

 

Fair value hierarchy

The following table provides an analysis of financial instruments that are measured subsequent to initial recognition at fair value, grouped into Levels 1 to 3 based on the degree to which the fair value is observable.

        Total         Total 
 Level 1 Level 2 Level 3 fair value  Level 1 Level 2 Level 3 fair value 
 USD USD USD USD  USD USD USD USD 
                  
Liabilities measured at fair value:                         
                         
31 December 2019                
Derivative financial instruments      -   1,518,249       -   1,518,249          
                         
31 December 2018                
Derivative financial instruments  -   1,190,073   -   1,190,073 
31 December 2020  13,161,844   -   -   13,161,844 
                
31 December 2019 (Restated)  15,709,460   1,518,249   -   17,227,709 
                
Borrowings                
                
31 December 2020  -   195,640,464   -   195,640,464 
                
31 December 2019  -   -   -   - 

 

The fair values of the financial liabilities measured at fair value included in the Level 1 and Level 2 category above, have been determined in accordance with quoted price and generally accepted pricing models based on a discounted cash flow analysis.analysis, respectively. The models incorporate various inputs including interest rate curves and forward rate curves of the underlying instruments.

 

During the yearyears ended 31 December 20192020 and 2018,2019, there were no transfers between Level 1 and Level 2 fair value measurements.

 

2425FINANCIAL RISK MANAGEMENT AND POLICIES

 

The main risks arising from the Group’s financial instruments are interest rate risk, credit risk, currency risk and liquidity risk. Management reviews and agrees policies for managing each of these risks which are summarized below.

 

Interest rate risk

Interest rate risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate because of changes in market interest rates.

 

The Group’sGroup’s exposure to the risk of changes in market interest rates relates primarily to the Group’s balances with banksbanks. The Group’s borrowings are issued at a fixed rate of interest.

Market risk

The Group’s activities expose it to the financial risks of changes in interest rates and interest bearing loans and borrowingsprice risk of the warrants. As the warrants are recognized at variable rates.

fair value on the consolidated statement of financial position of the Group, the Group’s exposure to market risks results from the volatility of the warrants price. The warrants are publicly traded at the NASDAQ Stock Exchange.


Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL CONSOLIDATED STATEMENTS

For the year ended 31 December 20192020

 

2425FINANCIAL RISK MANAGEMENT AND POLICIES continued

 

Interest rateMarket riskcontinued

 

Interest rate sensitivity

At the reporting date, the exposure to derivative warrant liability at fair value listed on the NASDAQ was USD 13,161,844 (2019: 15,709,460). The following table demonstratesGroup has determined that an increase/(decrease) of 10% on the sensitivity to a reasonably possible change in interest rates, with other variables held constant,NASDAQ could have an impact of approximately USD 1,316,184 (2019: USD 1,570,946) increase/(decrease) on the Group’s profit for one year correspondingincome and equity attributable to the impact of the floating rate borrowings for one year. The effect of the interest rate swap has been excluded from the sensitivity as the Group does not apply hedge accounting.Group.

Effect on
profit
USD
2019
+40 increase in basis points347,971
-40 decrease in basis points(347,971)
2018
+40 increase in basis points(381,713)
-40 decrease in basis points381,713

 

Currency risk

The Group does not have any significant exposure to currency risk as most of its assets and liabilities are denominated in USD or UAE Dirhams, which are pegged to the USD.

 

Credit risk

Credit risk is the risk that one party to a financial instrument will fail to discharge an obligation and cause the other party to incur a financial loss. The Group is exposed to credit risk on bank balances and receivables as reflected in the consolidated statement of financial position, with a maximum exposure equal to the carrying amount of these instruments. The expected credit loss on trade and other receivables are considered insignificant for 20192020 and 2018.2019.

 

The Group has a low credit risk exposure on its trade receivables based on established policy, procedures and controls relating to customer credit risk management. Credit quality of the customer is assessed as part of contract negotiations. Outstanding receivables are regularly monitored. The Group has only one customer as at 31 December 2019 (31 December 2018: one customer).

 

Liquidity risk

The Group monitors its risk to a shortage of funds using a recurring liquidity planning tool. This tool considers projected financing requirements of the Group during the construction phase and cash projections from operations with outstanding bank facilities and outstanding bank commitments as defined under the finance documents.

 

The Group manages its liquidity risk in relation to term loansborrowings to ensuremonitor compliance with all covenants for each specific facility. Refer note 2.2 for further details.


Brooge Energy Limited

NOTES TO THE FINANCIAL CONSOLIDATED STATEMENTS

31 December 2019

24FINANCIAL RISK MANAGEMENT AND POLICIES continued

Liquidity riskcontinuedborrowings.

 

The table below summarizes the maturity profile of the Group’s financial liabilities at 31 December 20192020 and 31 December 20182019 based on contractual undiscounted payments.

 

 On Less than 3 months 1 to 5       On Less than 3 months 1 to 5      
 demand 3 months to 1 year years > 5 years Total  demand 3 months to 1 year years > 5 years Total 
 USD USD USD USD USD USD  USD USD USD USD USD USD 
                          
31 December 2020             
Borrowings (including accrued interest)  -   8,500,000   15,500,000   250,290,000   -   274,290,000 
Lease liability  -   3,979,956   6,728,765   35,875,519   858,043,425   904,627,665 
Derivative financial instruments  -   -   -   -   -   - 
Accounts payable, accruals and other payables (excluding accrued interest and advance from customers)  -   4,110,754   4,453,830   -   -   8,564,584 
                        
Total  -   16,590,710   26,682,595   286,165,519   858,043,425   1,187,482,249 
                        
31 December 2019                                                
Term loans (including accrued interest)  -   8,101,006   9,178,414   34,165,752   40,550,347   91,995,519 
Borrowings (including accrued interest)  -   8,101,006   9,178,414   34,165,752   40,550,347   91,995,519 
Lease liability  -   2,359,590   -   9,919,810   213,469,799   225,749,199   -   2,359,590   -   9,919,810   213,469,799   225,749,199 
Derivative financial instruments  -   -   1,518,249   -   -   1,518,249   -   -   1,518,249   -   -   1,518,249 
Accounts payable, accruals and other payables (excluding accrued interest)  -   26,350,143   31,469,596   -   -   57,819,739   -   26,350,143   31,469,596   -   -   57,819,739 
                                                
Total  -   36,810,739   42,166,259   44,085,562   254,020,146   377,082,706 
                        
31 December 2018                        
Bank overdraft  3,745,048   -   -   -   -   3,745,048 
Term loans (including accrued interest)  95,702,779   -   -   -   -   95,702,779 
Lease liability  -   2,313,323   -   9,725,304   216,023,896   228,062,523 
Derivative financial instruments  -   -   1,190,073   -   -   1,190,073 
Accounts payable, accruals and other payables (excluding accrued interest)  -   2,120,877   5,972,230   -   -   8,093,107 
                        
Total  99,447,827   4,434,200   7,162,303   9,725,304   216,023,896   336,793,530 
Total (restated)  -   36,810,739   42,166,259   44,085,562   254,020,146   377,082,706 

The derivative warrant liabilities have not been included in the table above as there is no requirement to settle the warrants in cash.


Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

For the year ended 31 December 2020

25FINANCIAL RISK MANAGEMENT AND POLICIES continued

 

Capital management

The primary objective of the Group’s capital management is to ensure that it maintains healthy capital ratios in order to support its business and maximize shareholder’sshareholders’ value and to meet its loanborrowings covenants.

 

The Group manages its capital structure and makes adjustments to it, in light of changes in economic conditions. To maintain or adjust the capital structure, the Group may adjust future distribution policy to shareholders, issue new shares or shareholders’ contributions.

 

The Group monitors capital using a gearing ratio, which is net debt divided by total capital plus net debt. The Group includes within net debt, the lease liability, term loans,borrowings, and trade and other payables, less cash and cash equivalents. Capital includes share capital, shareholders’ accounts, general reserve and (accumulated losses) retained earnings. Refer to note 15 for discussion on Group’s debt covenants.

 

  2019  2018 
  USD  USD 
       
Term loans  88,700,137   94,792,088 
Lease liability  30,779,137   30,221,425 
Less: cash and cash equivalents  (19,830,771)  3,707,697 
      ��  
Net debt  99,648,503   128,721,210 
         
Total capital  125,125,875   60,977,933 
         
Capital and net debt  224,774,378   189,699,143 
         
Gearing ratio  44%  68%

F-38 

Brooge Energy Limited

NOTES TO THE FINANCIAL CONSOLIDATED STATEMENTS

31 December 2019

  2020  2019 
  USD  USD 
       
Borrowings  187,014,715   88,700,137 
Lease liability  89,084,565   30,779,137 
Less: cash and cash equivalents  (20,989,970)  (19,830,771)
         
Net debt  255,109,310   99,648,503 
         
Total capital  128,618,677   109,416,415 
         
Capital and net debt  383,727,987   209,064,918 
         
Gearing ratio  66%  48%

 

2526BUSINESS COMBINATIONREVERSE ACQUISITION TRANSACTION

 

In connection with the Business Combinationreverse acquisition transaction as described in note 1, the following occurred:occurred in 2019:

 

Twelve Seas:

Each outstanding ordinary share of Twelve Seas has beenwas exchanged for one (1) ordinary share of Brooge Energy.

Each outstanding warrant of Twelve Seas has beenwas exchanged for one warrant of Brooge Energy.

As part of the Business Combination,reverse acquisition, 10,869,719 shares were issued to Twelve Seas which included 1.5 million Escrow shares subject to meeting certain financial milestones stated in this note below. Further, 21,229,000 warrants were issued to Twelve Seas in exchange ratio stated above and further details disclosed in note 13.above.

In connection with the closing of the Business Combination,reverse acquisition transaction, holders of 16,997,181 ordinary shares of Twelve Seas sold in Twelve Seas’s Initial Public Offering (“IPO”) exercised their right to redeem such shares at a price of $10.31 per share, for an aggregate redemption amount of approximately USD 175.36 million.

 

Brooge Petroleum and Gas Investment Company FZE:

Twelve Seas issued a total of 100 million shares (inclusive of 20 million of escrowed shares) to BPGIC in exchange for 100 ordinary shares of BPGIC. All 100 million shares were simultaneously replaced with Brooge Energy shares at the ratio of 1:1.

 

The fair value of the shares that were swapped between the parties above was based on the closing share price of Brooge Energy’s as traded on NASDAQ on 20 December 2019 which was USD 10.49 per share.


Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

For the year ended 31 December 2020

26REVERSE ACQUISITION TRANSACTION (continued)

  

The fair value of the warrants that were swapped between the parties above was based on the closing price of Brooge Energy’s warrant as traded on NASDAQ on 20 December 2019 which was USD 0.80 per warrant.

 

As part of the above-mentioned business combination,reverse acquisition transaction, Twelve Seas’ net assets of USD 32.4 million (see below) were assumed by the Company and the issuance of ordinary shares and warrants by the Company was recognized at fair value of USD 131.0 million, with the resulting difference amounting to USD 98.6 million representing the listing expense recognized on the transaction. In addition, the Group incurred other listing expenses such as lawyers and consultants fees of USD 3.1 million, resulting in a total listing expense of USD 101.9 million as reflected in the consolidated statement of comprehensive income.income for the year ended 31 December 2019.

 

The net assets of USD 32,383,588 were assumed on 20 December 2019 comprised of:

 

  USD 
    
Cash and cash equivalent  33,064,568 
Current assets  84,000 
Accounts payable  (765,000)

 

Shares issued to Twelve Seas as part of the Business Combinationreverse acquisition transaction included escrow shares of 1,552,000 being 30% of the founder shares which are subject to meeting certain financial milestones as mentioned below. The fair value of the shares in escrow is not materially different from that of the shares which are not in escrow as the rights of these shares are similar to those of “normal ordinary shares” since, management has a reasonable expectation that the subject financial milestones will be met.


Brooge Energy Limited

NOTES TO THE FINANCIAL CONSOLIDATED STATEMENTS

31 December 2019

25BUSINESS COMBINATIONcontinued

 

The total shares issued by Brooge Energy to BGPIC waswere 98,718,035 (inclusive of the 20 million shares in escrow) after reduction of 1,281,965 shares due to the 40% cash election exercised by BPGIC. 20,000,000 of the Exchange Shares (“Escrow Property”) otherwise issuable to BPGIC is set aside in escrow until released upon the satisfaction of certain financial milestones and share price targets below:

 

One-half (½) of the Escrow Property shall become vested and no longer subject to forfeiture, and be released to the seller, in the event that either: (a) the Annualized EBITDA (as defined in the Escrow Agreement) for any full fiscal quarter during the Escrow Period (beginning with the first full fiscal quarter beginning after the Closing) (an “Escrow Quarter”) equals or exceeds USD 175,000,000 or (b) at any time during the Escrow Period, the closing price of the Brooge Energy ordinary shares equals or exceeds $12.50 per share (subject to equitable adjustment) for any ten (10) Trading Days (as defined in the Escrow Agreement) within any twenty (20) Trading Day period during the Escrow Period.

 

All Escrow Property remaining in the Escrow Account shall become vested and no longer subject to forfeiture, and be released to the seller, in the event that either: (a) the Annualized EBITDA for any Escrow Quarter equals or exceeds $250,000,000 or (b) at any time during the Escrow Period, the closing price of the Brooge Energy ordinary shares equals or exceeds $14.00 per share (subject to equitable adjustment) for any ten (10) Trading Days within any twenty (20) Trading Day period during the Escrow Period. The Escrow Period represents the period commencing from the closing until the end of the twentieth (20th) fiscal quarter after the commencement date of the first full fiscal quarter beginning after the Closing:.

 

The same conditions mentioned above applied for the escrow founder shares.


Brooge Energy Limited

NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS

For the year ended 31 December 2020

 

2627SUBSEQUENT EVENTS

 

The outbreak of Novel Coronavirus (COVID 19) continues to progress and evolve. Therefore, it is challenging now, to predict the full extent and duration of its business and economic impact. The outbreak of Covid-19 has had an impact on demand for oil and petroleum products. Recent global developments in March 2020 have caused further volatility in commodity markets.

The extent and duration of such impacts remain uncertain and dependent on future developments that cannot be accurately predicted at this time, such as the transmission rate of the coronavirus and the extent and effectiveness of containment actions taken. Given the ongoing economic uncertainty, a reliable estimate of the impact cannot be made at the date of authorisation of these consolidated financial statements. These developments could impact our future financial results, cash flows and financial condition.

The Group has entered into a land lease agreement, dated as of 2 February 2020 (the “Phase III Land Lease Agreement”), by and between Group and the Fujairah Oil Industry Zone (“FOIZ”) to lease an additional plot of land that has a total area of approximately 450,000 m2 (the “Phase III Land”). Group intends to use the relevant land to expand its crude oil storage and service and refinery capacity (“Phase III”).

In February 2020, the Group and Sahara Energy Resources DMCC mutually agreed to discontinue their joint development discussions to install a modular oil refinery at Group’s terminal. Shortly thereafter, the Group entered into a new agreement with BIA (the “Refinery Agreement”) which provides that the parties will use their best efforts to finalize the technical and design feasibility studies for a refinery with a capacity of 25,000 bpd (the “BIA Refinery”).

On 07 April 2020, the Company changed its name from Brooge Holding Limited to Brooge Energy Limited.

In May 2020,January 2021, BIA agreed to release 129,000 m341,563 m3 of the Phase I capacity, amounting to approximately one thirdtenth of the total Phase I capacity, back to BPGIC. BPGIC leasedallocated this capacity to Totsa Total Oil Trading SA (the “Super Major”),the new customer for a 6three month period (the “Super Major Agreement”) subject to renewal for an additional 6three month period with the mutual agreement of the parties. On expiration of the agreement, BPGIC has to return back 129,000 m341,536 m3 to BIA.

 

The Group negotiated another amendmentIn February 2021, BIA agreed to release further 41,563 m3 of the Phase I capacity, amounting to approximately one tenth of the total Phase I capacity, back to BPGIC. BPGIC allocated this capacity to the term loan facilities (1) and (2) on 15 June 2020. Loans (1) and (2) are now payable in 46 and 16 instalments, respectively,new customer for a two month period subject to renewal for an additional two month period with the first installment starting from 30 June 2020 with final maturity in 30 July 2030 and 31 July 2023, respectively. The loan 1 carries interest at 6 months EIBOR + 4% (minimum 5%) and to be further enhanced to 6 month EIBOR + 4.5% (minimum 5%) from January 2021 as compared to interest at 3 month EIBOR + 3% previously, and,mutual agreement of the loan 2 carries interest at 3 months EIBOR + 4% (minimum 5%) and to be further enhanced to 3 month EIBOR + 4.5% (minimum 5%) as compared to interest at 3 month EIBOR + 3% previously The Groupparties. On expiration of the agreement, BPGIC has to pay USD 8.8 millionreturn back 41,536 m3 to BIA.

In March 2021, BIA agreed to release further 83,126 m3 of the Phase I capacity, amounting to approximately 20% of the total Phase I capacity, back to BPGIC. BPGIC allocated this capacity to the new customer for term loan (1) and (2) in 2020 which representsa six month period subject to renewal for an additional three month period with the cumulative instalments including interest outstanding from periods priormutual agreement of the parties. Subsequent to this amended agreement and an amendment feerelease of USD 136,000. All securities and covenants under the original agreements remain in effect under the amended agreement except debt service reserve account (DSRA) balance to be maintained from 31 October 2020 and debt service coverage ratio (DSCR) to be commenced from 31 December 2020. Under this agreement, term loans (1) and (2) are also secured by assignment of the proceeds from operation of the tankscapacity, BIA does not have any capacity of phase 1, and 2.although, on expiration of these agreements, BPGIC has to return back the same capacity to BIA.

 

In March 2021, the Group with the mutual agreement of the customer novated an agreement entered in March with the new customer for the same quantity of 83,126 m3 of the Phase I capacity, for a five month period subject to renewal for an additional three month period with the mutual agreement of the parties.

F-44