Use these links to rapidly review the document
Table of Contents
APPENDIX A-FINANCIAL STATEMENTS

Table of Contents
As filed with the Securities and Exchange Commission on March 23, 202127, 2024
Registration No. 333-


UNITED STATES SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
_____________________
FORM S-4
REGISTRATION STATEMENT
UNDER
THE SECURITIES ACT OF 1933
_____________________
Oglethorpe Power Corporation
(An Electric Membership Corporation)
(Exact name of registrant as specified in its charter)

Georgia491158-1211925
Georgia
(State of incorporation)
4911
(Primary Standard Industrial

Classification Code Number)
58-1211925
(I.R.S. Employer

Identification Number)

2100 East Exchange Place
Tucker, Georgia 30084-5336
(770) 270-7600
(Address and telephone number of
registrant’s principal executive offices)
_____________________
Elizabeth B. Higgins
Executive Vice President and Chief Financial Officer
Oglethorpe Power Corporation
2100 East Exchange Place
Tucker, Georgia 30084-5336
(770) 270-7600
(Name, address and telephone number
of agent for service)
_____________________
Copies to:
Herbert J. Short, Jr.
Eversheds Sutherland (US) LLP
999 Peachtree St., NE, Suite 2300
Atlanta, Georgia 30309-3996
(404) 853-8000
Darryl F. Smith
Eversheds Sutherland (US) LLP
999 Peachtree St., NE, Suite 2300
Atlanta, Georgia 30309-3996
(404) 853-8000
_____________________
Approximate date of commencement of proposed sale of the securities to the public:
As soon as practicable after the registration statement becomes effective.

If the securities being registered on this Form are being offered in connection with the formation of a holding company and there is compliance with General Instruction G, check the following box. o
If this Form is filed to register additional securities for an offering pursuant to Rule 462(b) under the Securities Act, check the following box and list the Securities Act registration statement number of the earlier effective registration statement for the same offering. o
If this Form is a post-effective amendment filed pursuant to Rule 462(d) under the Securities Act, check the following box and list the Securities Act registration statement number of the earlier effective registration statement for the same offering. o

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company, or an emerging growth company. See the definitions of "large“large accelerated filer,""accelerated” “accelerated filer,""smaller” “smaller reporting company," and "emerging“emerging growth company"company” in Rule 12b-2 of the Exchange Act.

Large accelerated filero
Accelerated filero
Non-accelerated filer
Smaller reporting company
Emerging growth company

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 7(a)(2)(B) of the Securities Act.  ☐
If applicable, place an X in the box to designate the appropriate rule provision relied upon in conducting this transaction:
Exchange Act Rule 13e-4(i) (Cross-Border Tender Offer) ☐
Exchange Act Rule 14d-1(d) (Cross-Border Third-Party Tender Offer) ☐

CALCULATION OF REGISTRATION FEE


Title of Each Class of
Securities To Be Registered
Amount To Be
Registered
Proposed Maximum
Offering Price
Per Unit
Proposed Maximum
Aggregate
Offering Price
Amount of
Registration Fee(1)
3.75% First Mortgage Bonds, Series 2020A due 2050$450,000,000100%$450,000,000$49,095

(1) InThe registrant hereby amends this registration statement on such date or dates as may be necessary to delay its effective date until the registrant shall file a further amendment which specifically states that this registration statement shall thereafter become effective in accordance with Rule 457(f)(2) underSection 8(a) of the Securities Act the registration fee is based on the book value of the outstanding 3.75% First Mortgage Bonds, Series 2020A due 2050 of Oglethorpe Power Corporation to be cancelled in the exchange transaction described inor until this registration statement.statement shall become effective on such date as the Securities and Exchange Commission, acting pursuant to Section 8(a), may determine.

The registrant hereby amends this registration statement on such date or dates as may be necessary to delay its effective date until the registrant shall file a further amendment which specifically states that this registration statement shall thereafter become effective in accordance with Section 8(a) of the Securities Act or until this registration statement shall become effective on such date as the Securities and Exchange Commission, acting pursuant to Section 8(a), may determine.






The information in this prospectus is not complete and may be changed. We may not complete the exchange offer and issue these securities until the registration statement filed with the Securities and Exchange Commission is effective. This prospectus is not an offer to sell these securities and it is not soliciting an offer to buy these securities in any jurisdiction where the offer or sale is not permitted.
SUBJECT TO COMPLETION, DATED               , 20212024
PRELIMINARY PROSPECTUS

opc-20210323_g1.jpg

OglethorpeLogo1a.jpg
Offer To Exchange
$450,000,000400,000,000
Registered 3.75%6.20% First Mortgage Bonds, Series 2020A2023A due 20502053
for any and all
Unregistered 3.75%6.20% First Mortgage Bonds, Series 2020A2023A due 20502053
_________________________

We are offering to exchange up to $450,000,000$400,000,000 aggregate principal amount of our registered 3.75%6.20% First Mortgage Bonds, Series 2020A2023A due 2050,2053, which we refer to as the exchange bonds, for $450,000,000$400,000,000 aggregate principal amount of our outstanding unregistered 3.75%6.20% First Mortgage Bonds, Series 2020A2023A due 2050,2053, which we refer to as the original bonds.

The exchange offer is subject to customary closing conditions and will expire at 5:00 p.m., New York City time, on                  , 2021,2024, unless we extend the exchange offer in our sole discretion.

The Exchange Offer
All original bonds that are validly tendered, and not validly withdrawn, will be exchanged for an equal principal amount of exchange bonds. You should carefully review the procedures for tendering the original bonds beginning on page 97.101.
You may validly withdraw tenders of original bonds at any time before the expiration of the exchange offer.
The terms of the exchange bonds to be issued in the exchange offer are substantially identical to the original bonds, except that the exchange bonds will be registered under the Securities Act, and will not have any transfer restrictions, registration rights or additional interest provisions.
We issued the original bonds in a transaction not requiring registration under the Securities Act and, as a result, their transfer is restricted. We are making the exchange offer to satisfy your registration rights as a holder of the original bonds.
The exchange of the original bonds for the exchange bonds will not be a taxable transaction for United States federal income tax purposes, but you should see the discussion under "SUMMARY“SUMMARY OF MATERIAL U.S. FEDERAL INCOME TAX CONSEQUENCES"CONSEQUENCES” for more information.
We will not receive any proceeds from the exchange offer.
No public market currently exists for the exchange bonds. We do not intend to apply for listing of the exchange bonds on any national securities exchange or to arrange for the exchange bonds to be quoted on any automated quotation system, and, therefore, an active public market for the exchange bonds is not anticipated.

The exchange bonds will be secured by a first mortgage lien on substantially all of our owned tangible and certain of our intangible property equally and ratably with all our other obligations issued under the first mortgage indenture described in this prospectus, subject to certain exceptions and exclusions as described or referred to in this prospectus. See "SUMMARY“SUMMARY OF THE FIRST MORTGAGE INDENTURE—Security for Payment."

All untendered original bonds will remain outstanding and continue to be subject to the transfer restrictions set forth in the original bonds and in the indenture governing the original bonds. In general, the original bonds may not be offered or sold, unless registered under the Securities Act, except pursuant to an exemption from, or in a transaction not subject to, the registration requirements of the Securities Act and applicable state securities laws. Other than in connection with the exchange offer, we do not currently anticipate that we will register the original bonds under the Securities Act.

Each broker-dealer that receives exchange bonds for its own account in the exchange offer must acknowledge that it will deliver a prospectus meeting the requirements of the Securities Act in connection with any resale of those exchange bonds. The letter of transmittal accompanying this prospectus states that by so acknowledging and by delivering a prospectus, a broker-dealer will not be deemed to admit that it is an “underwriter” within the meaning of the Securities Act. This prospectus, as it may be amended or supplemented from time to time, may be used by a broker-dealer in connection with
resales of exchange bonds received in exchange for original bonds the broker-dealer acquired as a result of market-making activities or trading activities. We have agreed that we will make this prospectus available to any broker-dealer for use in connection with any such resale for a period of 180 days following the expiration date of the exchange offer or such time as such broker-dealers no longer own any original bonds. See "PLAN“PLAN OF DISTRIBUTION."
_________________________

See "RISK FACTORS" beginning on page 12 for a discussion of factors that you should consider before participating in the exchange offer.
_________________________

Neither the Securities and Exchange Commission nor any state securities commission has approved or disapproved of these securities or passed upon the adequacy or accuracy of this prospectus. Any representation to the contrary is a criminal offense.

The date of this prospectus is                    ______________, 2021.


2024.




We have not authorized any person to provide any information or to make any representation other than the information contained in this prospectus. If any person provides you any other information or makes any other representation, that information or representation must not be relied upon as having been authorized by us. If you receive any other information, you should not rely on it. We are not making the exchange offer to, nor will we accept surrenders for exchange from, holders of outstanding original bonds in any jurisdiction in which the exchange offer would not be in compliance with the securities or blue sky laws of such jurisdiction or where it is otherwise unlawful. This prospectus may only be used where it is legal to sell these securities. You should assume that the information contained in this prospectus is accurate only as of its date. Our business, financial condition, results of operations and prospects may have changed since that date.


i

Table of Contents

TABLE OF CONTENTS

Page
A-A-1
B-B-1

iii


CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION

This prospectus contains "forward-looking“forward-looking statements." All statements, other than statements of historical facts, that are included in this prospectus, that address activities, events or developments that we expect or anticipate to occur in the future, including matters such as the timing of various regulatory and other actions, future capital expenditures, business strategy, regulatory actions, and development, regulatory actions, construction or operation of facilities (often, but not always, identified through the use of words or phrases such as "will“will likely result,""are” “are expected to,""will” “will continue,""is” “is anticipated,""estimated,""projection,""target"” “estimated,” “projection,” “target” and "outlook"“outlook”), are forward-looking statements.

Although we believe that in making these forward-looking statements our expectations are based on reasonable assumptions, any forward-looking statement involves uncertainties and there are important factors that could cause actual results to differ materially from those expressed or implied by these forward-looking statements. Some of the risks, uncertainties and assumptions that may cause actual results to differ from these forward-looking statements are described under the heading "RISK FACTORS"“RISK FACTORS” and in other sections of this prospectus. In light of these risks, uncertainties and assumptions, the forward-looking events and circumstances discussed in this prospectus might not occur.

Any forward-looking statement speaks only as of the date on which it is made, and, except as required by law, we undertake no obligation to update any forward-looking statement to reflect events or circumstances after the date on which it is made or to reflect the occurrence of unanticipated events. New factors emerge from time to time, and it is not possible for us to predict all of them; nor can we assess the impact of each factor or the extent to which any factor, or combination of factors, may cause results to differ materially from those contained in any forward-looking statement. Factors that could cause actual results to differ materially from those indicated in any forward-looking statement include, but are not limited to:

cost increases and schedule delays with respect to our capital improvement and construction projects, in particular,such as the construction of two additional nuclear units at Plant Vogtle;
the duration and severity of the current coronavirus ("COVID-19") pandemic and resulting economic disruption and its impact on our business, financial condition, operations, construction projects, including the additional unitsUnit No. 4 at Plant Vogtle, the closure of coal ash ponds and our members and their service territories;
a decision by Georgia Power Company to cancel the additional Vogtle units or a decision by more than 10% of the co-owners of the additional Vogtle units not to proceed with the construction of the additional Vogtle units upon the occurrence of certain material adverse events;
decisions made by the Georgia Public Service Commission in the regulatory process related to the two additional units at Plant Vogtle;any future generation projects we undertake;
the impact of regulatory or legislative responses to climate change initiatives or efforts to reduce greenhouse gas emissions, including carbon dioxide;
costs associated with achieving and maintaining compliance with applicable environmental laws and regulations, including those related to air emissions, water and coal combustion byproducts;
legislative and regulatory compliance standards and our ability to comply with any applicable standards, including mandatory reliability standards, and potential penalties for non-compliance;
our access to capital, the cost to access capital, and the results of our financing and refinancing efforts, including availability of funds in the capital markets;
our ability to receive advances under the U.S. Department of Energy loan guarantee agreement for constructing two additional nuclear units at Plant Vogtle;
the occurrence of certain events that give the Department of Energy the option to require that we repay all amounts outstanding under the loan guarantee agreement with the Department of Energy over a five-year period and its decision to require such repayment;
the continued availability of funding from the Rural Utilities Service;
increasing debt caused by significant capital expenditures;
unanticipated changes in capital expenditures, operating expenses and liquidity needs;
iii

Table of Contents
actions by credit rating agencies;
commercial banking and financial market conditions;
the impact of load growth in our members’ service territories and any decisions regarding the development of additional generation resources to meet the additional demand;
our participation in any federal loan or grant programs for which we qualify and are selected and our ability to meet the applicable loan or grant conditions and requirements;
risks and regulatory requirements related to the ownership and construction of nuclear facilities;
ii


adequate funding of our nuclear and coal ash pond decommissioning trust funds including investment performance and projected decommissioning costs;
early retirement of one or more of our co-owned coal facilities;
continued efficient operation of our generation facilities by us and third-parties;
the availability of an adequate and economical supply of fuel, water and other materials;
reliance on third-parties to efficiently manage, distribute and deliver generated electricity;
acts of sabotage, warsthe direct or terrorist activities, includingindirect effect on our business resulting from cyber attacks;or physical attacks on us, our members or third-party service providers, vendors or contractors;
changes in technology available to and utilized by us, our competitors, or residential or commercial consumers in our members'members’ service territories, including from the development and deployment of distributed generation and energy storage technologies;
the inability of counterparties to meet their obligations to us, including failure to perform under agreements;
our members'members’ ability to perform their obligations to us;
our members'members’ ability to offer their residential, commercial and industrial customers competitive rates;
changes to protections granted by the Georgia Territorial Act that subject our members to increased competition;
decisions made by the Georgia Public Service Commission in the regulatory process related to the two additional units at Plant Vogtle;
a decision by Georgia Power Company to cancel Vogtle Unit No. 4 or a decision by more than 10% of the co-owners of Unit No. 4 not to proceed with the construction upon the occurrence of certain material adverse events;
the occurrence of certain events that give the Department of Energy the option to require that we repay all amounts outstanding under the loan guarantee agreement with the Department of Energy over a five-year period and its decision to require such repayment;
unanticipated variation in demand for electricity or load forecasts resulting from changes in population and business growth (and declines), consumer consumption, energy conservation and efficiency efforts and the general economy;
general economic conditions;
weather conditions and other natural phenomena;
litigation or legal and administrative proceedings and settlements;
unanticipated changes in interest rates or rates of inflation;
early retirement of our co-owned coal units;
significant changes in our relationship with our employees, including the availability of qualified personnel;
significant changes in critical accounting policies material to us;acts of sabotage, wars or terrorist activities, including cyber attacks;
hazards customary to the electric industry and the possibility that we may not have adequate insurance to cover losses resulting from these hazards;
catastrophic events such as fires, earthquakes, floods, droughts, hurricanes, explosions, pandemic health events such as influenza, or similar occurrences;
iii


significant changes in critical accounting policies material to us; and
other factors discussed elsewhere in this prospectus.

iv


PROSPECTUS SUMMARY
PROSPECTUS SUMMARY
This summary highlights selected information about us and the exchange offer appearing elsewhere in this prospectus. This summary is not complete and does not contain all of the information that may be important to you and that you should consider before participating in the exchange offer. For a more complete understanding of us and the exchange offer, you should carefully read this prospectus in its entirety.
OUR COMPANY
We are a Georgia electric membership corporation (an EMC) incorporated in 1974 and headquartered in metropolitan Atlanta. We are owned by our 38 retail electric distribution cooperative members. Our principal business is providing wholesale electric power to our members. As with cooperatives generally, we operate on a not-for-profit basis. We are one of the largest electric cooperatives in the United States in terms of revenues, assets, kilowatt-hour ("kWh") sales to members and, through our members, consumers served. We are also the second largest power supplier in the state of Georgia.
Our members are local consumer-owned distribution cooperatives providing retail electric service on a not-for-profit basis. In general, our members' customer base consists of residential, commercial and industrial consumers within specific geographic areas. Our members serve approximately 2.0 million electric consumers (meters) representing approximately 4.3 million people.
Our principal executive offices are located at 2100 East Exchange Place, Tucker, Georgia 30084-5336. Our telephone number is (770) 270-7600. We maintain a website at www.opc.com. Information contained on this website is not incorporated by reference into this prospectus and information contained on this website should not be considered to be part of this prospectus.
Cooperative Principles
We are organized and operate as a cooperative. A cooperative is a business organization owned by its members, which also are its customers. Cooperatives are created to provide goods or services to their members on a not-for-profit basis.
Power Supply Business
We provide wholesale electric service to our members for more than half of their aggregate requirements primarily from our fleet of generation assets but also with power purchased from other power suppliers. We provide this service pursuant to long-term, take-or-pay wholesale power contracts with each member. The wholesale power contracts, which extend beyond the final maturity date of the exchange bonds, obligate our members jointly and severally to pay rates sufficient for us to recover all the costs of owning and operating our power supply business, including the payment of principal and interest on our indebtedness and to yield a minimum 1.10 margins for interest ratio under our first mortgage indenture. See "OUR BUSINESS—Business Overview—Wholesale Power Contracts."
Our fleet of generating units total 7,862 megawatts of summer planning reserve capacity, which includes 737 megawatts of Smarr EMC assets that we manage but do not own. Our generation portfolio includes units powered by nuclear, gas, coal, oil and water.
In 2020, two of our members, Jackson EMC and Cobb EMC, accounted for 15% and 19% of our total revenues, respectively. Each of our other members accounted for less than 10% of our total revenues in 2020.

OUR COMPANY

We are a Georgia electric membership corporation (an EMC) incorporated in 1974 and headquartered in metropolitan Atlanta. We are owned by our 38 retail electric distribution cooperative members. Our principal business is providing wholesale electric power to our members. As with cooperatives generally, we operate on a not-for-profit basis. We are one of the largest electric cooperatives in the United States in terms of revenues, assets, kilowatt-hour (“kWh”) sales to members and, through our members, consumers served. We are also the second largest power supplier in the state of Georgia.
Our members are local consumer-owned distribution cooperatives providing retail electric service on a not-for-profit basis. In general, our members’ customer base consists of residential, commercial and industrial consumers within specific geographic areas. Our members serve approximately 2.1 million electric consumers (meters) representing approximately 4.5 million people.
Our principal executive offices are located at 2100 East Exchange Place, Tucker, Georgia 30084-5336. Our telephone number is (770) 270-7600. We maintain a website at www.opc.com. Information contained on this website is not incorporated by reference into this prospectus and information contained on this website should not be considered to be part of this prospectus.
Cooperative Principles
We are organized and operate as a cooperative. A cooperative is a business organization owned by its members, which also are its customers. Cooperatives are created to provide goods or services to their members on a not-for-profit basis.
Power Supply Business
We provide wholesale electric service to our members for a significant portion of their aggregate requirements primarily from our fleet of generation assets but also with power purchased from other power suppliers from time to time. In 2023, we supplied energy that accounted for approximately 68% of the retail energy requirements of our members. We provide this service pursuant to long-term, take-or-pay wholesale power contracts with each member. The wholesale power contracts, which extend beyond the final maturity date of the exchange bonds, obligate our members jointly and severally to pay rates sufficient for us to recover all the costs of owning and operating our power supply business, including the payment of principal and interest on our indebtedness and to yield a minimum 1.10 margins for interest ratio under our first mortgage indenture. Our members satisfy all of their power requirements above their purchase obligations to us with purchases from other suppliers. See “OUR BUSINESS—Business Overview—Wholesale Power Contracts.”
Our fleet of generating units total 8,525 megawatts of summer planning reserve capacity, which includes 733 megawatts of Smarr EMC assets that we manage but do not own. Our generation portfolio includes units powered by nuclear, gas, coal, oil and water. We also supply financial and management services to support Green Power EMC’s purchase of energy from 756 megawatts of renewable resources, including, low-impact hydroelectric, landfill gas, wood-waste biomass and solar facilities.
In 2023, two of our members, Jackson EMC and Cobb EMC, accounted for approximately 15% and 11% of our total revenues, respectively. Each of our other members accounted for less than 10% of our total revenues in 2023.
1


Agreements with Members
Agreements with Members
The wholesale power contracts we have with each member are substantially similar and extend through December 31, 2050 and continue thereafter until terminated by three years’ written notice by us or the respective member. Under the wholesale power contracts, each member is unconditionally obligated, on an express "take-or-pay"The wholesale power contracts we have with each member are substantially similar and extend through December 31, 2085 and continue thereafter until terminated by three years’ written notice by us or the respective member. Under the wholesale power contracts, each member is unconditionally obligated, on an express “take-or-pay” basis, for a fixed percentage of the capacity costs of each of our generation resources and purchased power resources with a term greater than one year. Each wholesale power contract specifically provides that the member must make payments whether or not power is delivered and whether or not a resource is completed, delayed, terminated, operable, operating, retired, sold, leased, transferred or is otherwise unavailable. We are obligated to use our reasonable best efforts to operate, maintain and manage our resources in accordance with prudent utility practices.
We have assigned fixed percentage capacity cost responsibilities to our members for all of our generation and purchased power resources, although not all members participate in all resources. For any future resource, we will assign fixed percentage capacity cost responsibilities only to members choosing to participate in that resource. The wholesale power contracts provide that each member is jointly and severally responsible for all costs and expenses of all existing generation and purchased power resources, as well as for approved future resources that are approved by 75% of the members of our board of directors, 75% of our members and members representing 75% of our patronage capital, whether or not that member has elected to participate in the resource. In the event a member defaults on all or a portion of its payment obligation, the default amount is shared first among the participating members in each resource in which the defaulting member participates. If all these participating members default, each non-participating member is expressly obligated to pay a proportionate share of the default
Under the wholesale power contracts, we are not obligated to provide all of our members’ capacity and energy requirements. Individual members must satisfy all of their requirements above their purchase obligations from us from other suppliers, unless we and our members agree that we will supply additional capacity and associated energy, subject to the approval requirements described above. In 2020, we supplied energy that accounted for approximately 57% of the retail energy requirements of our members.
Under the wholesale power contracts, each member must establish rates and conduct its business in a manner that will enable the member to pay (i) to us when due, all amounts payable by the member under its wholesale power contract and (ii) any and all other amounts payable from, or which might constitute a charge or a lien upon, the revenues and receipts derived from the member’s electric system, including all operation and maintenance expenses and the principal of, premium, if any, and interest on all indebtedness related to the member’s electric system.
We have an agreement with our members that requires member approval for us to undertake certain activities. It does not limit our ability to own, manage, control and operate our resources or perform our functions under the wholesale power contracts.
In this regard, we may not provide services unrelated to our resources or our functions under the wholesale power contracts if such services would require us to incur indebtedness, provide a guarantee or make any loan or investment, unless approved by 75% of the members of our board of directors, 75% of our members, and members representing 75% of our patronage capital. We may provide any other service to a member so long as: (i) doing so would not create a conflict of interest with respect to other members, (ii) such service is being provided to all members, or (iii) such service has received the three-part 75% approvals described above.

We have assigned fixed percentage capacity cost responsibilities to our members for all of our generation resources, although not all members participate in all resources. For any future generation or purchased power resources, we will assign fixed percentage capacity cost responsibilities only to members choosing to participate in that resource. The wholesale power contracts provide that each member is jointly and severally responsible for all costs and expenses of all existing generation and purchased power resources, as well as for approved future resources that are approved by 75% of the members of our board of directors, 75% of our members and members representing 75% of our patronage capital, whether or not that member has elected to participate in the resource. In the event a member defaults on all or a portion of its payment obligation, the default amount is shared first among the participating members in each resource in which the defaulting member participates. If all these participating members default, each non-participating member is expressly obligated to pay a proportionate share of the default.
Under the wholesale power contracts, we are not obligated to provide all of our members’ capacity and energy requirements. Individual members must satisfy all of their requirements above their purchase obligations from us from other suppliers, unless we and our members agree that we will supply additional capacity and associated energy, subject to the approval requirements described above.
Under the wholesale power contracts, each member must establish rates and conduct its business in a manner that will enable the member to pay (i) to us when due, all amounts payable by the member under its wholesale power contract and (ii) any and all other amounts payable from, or which might constitute a charge or a lien upon, the revenues and receipts derived from the member’s electric system, including all operation and maintenance expenses and the principal of, premium, if any, and interest on all indebtedness related to the member’s electric system.
We have an agreement with our members that requires member approval for us to undertake certain activities. It does not limit our ability to own, manage, control and operate our resources or perform our functions under the wholesale power contracts.
In this regard, we may not provide services unrelated to our resources or our functions under the wholesale power contracts if such services would require us to incur indebtedness, provide a guarantee or make any loan or investment, unless approved by 75% of the members of our board of directors, 75% of our members, and members representing 75% of our patronage capital. We may provide any other service to a member so long as: (i) doing so would not create a conflict of interest with respect to other members, (ii) such service is being provided to all members, or (iii) such service has received the three-part 75% approvals described above.
Electric Rates
Each member is required to pay us for capacity and energy we furnish under its wholesale power contract in accordance with rates we establish. We review our rates periodically but are required to do so at least once every year. We are required to revise our rates as necessary so that the revenues derived from our rates, together with our revenues from all other sources, will be sufficient to pay all of the costs of our system, including the payment of principal and interest on our indebtedness, to provide for reasonable reserves and to meet all financial requirements.
The formulary rate we established in the rate schedule to the wholesale power contracts employs a rate methodology under which all categories of costs are specifically separated as components of the formula to determine our revenue requirements. The rate schedule also implements the responsibility for fixed costs assigned to
2


each member based on each member’s fixed percentage capacity cost responsibilities for all of our generation resources. The monthly charges for capacity and other non-energy charges are based on our annual budget. These capacity and other non-energy charges may be adjusted by our board of directors, if necessary, during the year through an adjustment to the annual budget. Energy charges reflect the pass-through of actual energy costs, including fuel costs, variable operations and maintenance costs and purchased energy costs.
Electric Rates
Each member is required to pay us for capacity and energy we furnish under its wholesale power contract in accordance with rates we establish. We review our rates periodically but are required to do so at least once every year. We are required to revise our rates as necessary so that the revenues derived from our rates, together with our revenues from all other sources, will be sufficient to pay all of the costs of our system, including the payment of principal and interest on our indebtedness, to provide for reasonable reserves and to meet all financial requirements.
The formulary rate we established in the rate schedule to the wholesale power contracts employs a rate methodology under which all categories of costs are specifically separated as components of the formula to determine our revenue requirements. The rate schedule also implements the responsibility for fixed costs assigned to each member based on each member’s fixed percentage capacity cost responsibilities for all of our generation and purchased power resources. The monthly charges for capacity and other non-energy charges are based on our annual budget. These capacity and other non-energy charges may be adjusted by our board of directors, if necessary, during the year through an adjustment to the annual budget. Energy charges reflect the pass-through of actual energy costs, including fuel costs, variable operations and maintenance costs and purchased energy costs.
Under the first mortgage indenture, we are required, subject to any necessary regulatory approval, to establish and collect rates which are reasonably expected, together with our other revenues, to yield a margins for interest ratio (as defined herein) for each fiscal year equal to at least 1.10. The formulary rate is intended to provide for the collection of revenues which, together with revenues from all other sources, are equal to all costs and expenses we recorded, plus amounts necessary to achieve at least the minimum 1.10 margins for interest ratio. In the event we were to fall short of the minimum 1.10 margins for interest ratio at year end, the formulary rate is designed to recover the shortfall from our members in the following year without any additional action by our board of directors.
Under our loan agreements with each of the Rural Utilities Service and Department of Energy, changes to our rates resulting from adjustments in our annual budget are generally not subject to their approval. We must provide the Rural Utilities Service and Department of Energy with a notice of and opportunity to object to most changes to the formulary rate under the wholesale power contracts. Currently, our rates are not subject to the approval of any other federal or state agency or authority, including the Georgia Public Service Commission.
Our Members
Our members, listed on page 40 of this prospectus, include 38 of the 41 electric distribution cooperatives in the State of Georgia.
Our members serve approximately 2.0 million electric consumers (meters) representing approximately 4.3 million people. Our members serve a region covering approximately 38,000 square miles, which is approximately 65% of the land area in the State of Georgia, encompassing 151 of the State’s 159 counties. Sales by our members in 2020 amounted to approximately 39.2 million megawatt hours ("MWh"). Historically, our member’s sales by customer class have been approximately two-thirds to residential consumers and slightly less than one-third to commercial and industrial consumers. Our members are the principal suppliers for the power needs of rural Georgia. While our members do not serve any major cities, portions of their service territories are in close proximity to urban areas and have experienced substantial growth over the years due to the expansion of urban areas, including metropolitan Atlanta, into suburban areas and the growth of suburban areas into neighboring rural areas.

Under our loan agreements with each of the Rural Utilities Service and Department of Energy, changes to our rates resulting from adjustments in our annual budget are generally not subject to their approval. We must provide the Rural Utilities Service and Department of Energy with a notice of and opportunity to object to most changes to the formulary rate under the wholesale power contracts. Currently, our rates are not subject to the approval of any other federal or state agency or authority, including the Georgia Public Service Commission.
Our Members
Our members, listed on page 41 of this prospectus, include 38 of the 41 electric distribution cooperatives in the State of Georgia.
Our members serve approximately 2.1 million electric consumers (meters) representing approximately 4.5 million people. Our members serve a region covering approximately 38,000 square miles, which is approximately 65% of the land area in the State of Georgia, encompassing 151 of the State’s 159 counties. Sales by our members in 2023 amounted to approximately 41.4 million megawatt hours (“MWh”). Historically, our member’s sales by customer class have been approximately two-thirds to residential consumers and slightly less than one-third to commercial and industrial consumers. Our members are the principal suppliers for the power needs of rural Georgia. While our members do not serve any major cities, portions of their service territories are in close proximity to urban areas and have experienced substantial growth over the years due to the expansion of urban areas, including metropolitan Atlanta, into suburban areas and the growth of suburban areas into neighboring rural areas.
3

Table of Contents

SUMMARY OF THE EXCHANGE OFFER
On December 5, 2023, we completed a private offering of $400,000,000 aggregate principal amount of 6.20% First Mortgage Bonds, Series 2023A due 2053, which we refer to as the original bonds. As part of that offering, we entered into a registration rights agreement with the initial purchasers of those original bonds in which we agreed to use commercially reasonable efforts to complete an exchange offer for such original bonds in compliance with applicable securities laws. See “THE EXCHANGE OFFER—General; Purpose of the Exchange Offer.”
The following is a brief summary of certain terms of the exchange offer and the principal terms of the exchange bonds. It may not contain all the information that is important to you. For additional information regarding the exchange offer and the exchange bonds, see “THE EXCHANGE OFFER” and “DESCRIPTION OF THE EXCHANGE BONDS.”
SUMMARY OF THE EXCHANGE OFFEROriginal Bonds
On August 25, 2020, we completed a private offering of $450,000,000$400,000,000 aggregate principal amount of 3.75%6.20% First Mortgage Bonds, Series 2020A2023A due 2050, which we refer to as the original bonds. As part of that offering, we entered into a registration rights agreement with the initial purchasers of those original bonds in which we agreed to use our commercially reasonable efforts to complete an exchange offer for such original bonds in compliance with applicable securities laws. See "THE EXCHANGE OFFER—General; Purpose of the Exchange Offer."2053.
The following is a brief summary of certain terms of the exchange offer and the principal terms of the exchange bonds. It may not contain all the information that is important to you. For additional information regarding the exchange offer and the exchange bonds, see "THE EXCHANGE OFFER" and "DESCRIPTION OF THE EXCHANGE BONDS."Exchange Bonds
Original Bonds
$450,000,000400,000,000 aggregate principal amount of 3.75%6.20% First Mortgage Bonds, Series 2020A2023A due 2050.
Exchange Bonds
$450,000,000 aggregate principal amount of 3.75% First Mortgage Bonds, Series 2020A due 2050.2053.
The exchange bonds have been registered under the Securities Act.
The form and terms of the exchange bonds are identical in all material respects to those of the original bonds, except that the transfer restrictions, registration rights and additional interest provisions relating to the original bonds do not apply to the exchange bonds.

In addition, the exchange bonds will bear a different CUSIP number than the original bonds.
The Exchange Offer
We are offering to exchange up to $450,000,000$400,000,000 aggregate principal amount of original bonds for a like aggregate principal amount of the exchange bonds to satisfy certain of our obligations under the registration rights agreement that we entered into when we issued the original bonds in reliance upon exemptions from registration under the Securities Act.

The original bonds may only be tendered in minimum denominations of $2,000 or in integral multiples of $1,000 in excess thereof. See “THETHE EXCHANGE OFFER—Terms of the Exchange Offer.Offer.

In order to exchange the original bonds, you must follow the required procedures and we must accept the original bonds for exchange. We will exchange all original bonds validly tendered and not validly withdrawn prior to the expiration date of the exchange offer. See “THETHE EXCHANGE OFFER.OFFER.
Expiration Date
The exchange offer will expire at 5:00 p.m., New York City time, on                ________, 2021,2024, unless extended by us in our sole discretion.
Tenders
By tendering your original bonds, you represent to us that:
you are acquiring the exchange bonds in the ordinary course of your business;
you are not participating and have no arrangement or understanding with any person to participate in the distribution, as defined in the Securities Act, of the exchange bonds;
you are not our “affiliate,” as defined in Rule 405 under the Securities Act; and
4


if you are a broker-dealer that will receive exchange bonds for your own account in exchange for original bonds that were acquired as a result of market-making or other trading activities, you will deliver a prospectus (or, to the extent permitted by law, make available a prospectus to purchasers) in connection with any resale of such exchange bonds. For further information regarding resales of the exchange bonds by participating broker-dealers, see the discussion under the caption “PLANPLAN OF DISTRIBUTION.DISTRIBUTION.

4

Table of Contents
Conditions to the Exchange Offer
The exchange offer is subject to customary conditions, which we may waive. The exchange offer is not conditioned upon the tender of any minimum principal amount of outstanding original bonds. See “THETHE EXCHANGE OFFER—OFFERConditions to the Exchange Offer.Offer.
Procedures for Tendering
You must do one of the following on or prior to the expiration or termination of the exchange offer to participate in the exchange offer:

tender your original bonds by sending the certificates for your original bonds, in proper form for transfer, a properly completed and duly executed letter of transmittal, with any required signature guarantees, and all other documents required by the letter of transmittal, to U.S. Bank Trust Company, National Association, as exchange agent, at one of the addresses listed below under the caption “THETHE EXCHANGE OFFER—OFFERExchange Agent;Agent;” or
tender your original bonds using the book-entry transfer procedures described below and sending a properly completed and duly executed letter of transmittal, with any required signature guarantees, or causing to be delivered an agent’s message instead of the letter of transmittal, to the exchange agent. In order for a book-entry transfer to constitute a valid tender of your original bonds in the exchange offer, U.S. Bank Trust Company, as exchange agent, must receive a confirmation of book-entry transfer of your original bonds into the exchange agent’s account at The Depository Trust Company (DTC)(“DTC”) prior to the expiration or termination of the exchange offer. For more information regarding the use of book-entry transfer procedures, including a description of the required agent’s message, see the discussion below under “THETHE EXCHANGE OFFER—OFFERBook-Entry Transfers.Transfers.

For more information on the procedures for tendering the original bonds, see the discussion under the caption “THETHE EXCHANGE OFFER—OFFERProcedures for Tendering Original Bonds.Bonds.
Special Procedures for Beneficial Owners
If you are a beneficial owner whose original bonds are registered in the name of the broker, dealer, commercial bank, trust company or other nominee, and you wish to tender your original bonds in the exchange offer, you should promptly contact the person in whose name the original bonds are registered and instruct that person to tender on your behalf. Any registered holder that is a participant in DTC’s book-entry transfer facility system may make book-entry delivery of the original bonds by causing DTC to transfer the original bonds into the exchange agent’s account. If you wish to tender your original bonds in the exchange offer on your own behalf, prior to completing and executing the letter of transmittal and delivering your original bonds, you must either make appropriate arrangements to register ownership of the original bonds in your name with DTC or obtain a properly completed note power from the person in whose name the original bonds are registered.
5


Guaranteed Delivery Procedures
If you wish to tender your original bonds and your original bonds are not immediately available, or you cannot deliver your original bonds, the letter of transmittal or any other required documents, or you cannot comply with the procedures under DTC’s automated tender offer program for transfer of book-entry interests prior to the expiration date, you must tender your original bonds according to the guaranteed delivery procedures set forth in this prospectus under “THETHE EXCHANGE OFFER—OFFERGuaranteed Delivery Procedures.Procedures.
Use of Proceeds
We will not receive any cash proceeds from the exchange offer.


5

Table of Contents
Exchange Agent
U.S. Bank Trust Company, National Association is the exchange agent for the exchange offer. You can find the exchange agent’s address, telephone number and e-mail address under the caption “THETHE EXCHANGE OFFER—OFFERExchange Agent.Agent.” U.S. Bank Trust Company is also the trustee under the first mortgage indenture governing the original bonds and exchange bonds.
Resales
Based on interpretations by the SEC staff, as detailed in a series of no-action letters issued to third parties, we believe that the exchange bonds issued in the exchange offer pursuant to this prospectus may be offered for resale, resold or otherwise transferred by you without compliance with the registration and prospectus delivery requirements of the Securities Act, provided that:
any exchange bonds you receive will be acquired in the ordinary course of your business;
you are not participating and have no arrangement or understanding with any person to participate in the distribution, as defined in the Securities Act of the exchange bonds; and
you are not our “affiliate,” as defined in Rule 405 under the Securities Act.
We base our belief on interpretations by the SEC staff in no-action letters issued to other issuers making exchange offers similar to ours. We cannot guarantee the SEC would make a similar decision about our exchange offer. If our belief is wrong, you could incur liability under the Securities Act. We will not indemnify or otherwise protect you against any loss incurred as a result of this liability under the Securities Act.

If you are an “affiliate” of ours or are participating or have an arrangement or understanding with any person to participate in the distribution of the exchange bonds:

you cannot rely on the applicable interpretations of the SEC staff;
you will not be entitled to participate in the exchange offer; and
you must comply with the registration and prospectus delivery requirements of the Securities Act in connection with any resale transaction of the exchange bonds.

6


Broker-Dealer
Each broker or dealer that receives exchange bonds for its own account in exchange for original bonds that were acquired as a result of market-making or other trading activities must acknowledge that it will comply with the registration and prospectus delivery requirements of the Securities Act in connection with any offer to resell or other transfer of the exchange bonds issued in the exchange offer, including the delivery of a prospectus that contains information with respect to any selling holder required by the Securities Act in connection with any resale of the exchange bonds.

6

Table of Contents

Furthermore, any broker-dealer that acquired any of its original bonds directly from us:

may not rely on the applicable interpretation of the SEC staff’s position contained in Exxon Capital Holdings Corp., SEC no-action letter (April 13, 1988), Morgan, Stanley & Co. Inc., SEC no-action letter (June 5, 1991) and Shearman & Sterling, SEC no-action letter (July 2, 1993); and
must comply with the registration and prospectus delivery requirements of the Securities Act in connection with any resale transaction.

This prospectus, as it may be amended or supplemented from time to time, may be used by a broker-dealer in connection with resales of the exchange bonds received in exchange for the original bonds where such original bonds were acquired by such broker-dealer as a result of market-making activities or other trading activities. Under the registration rights agreement, we have agreed to make available a prospectus in conformity in all material respects with the requirements of the Securities Act, to any participating broker-dealer for use in connection with any resale of any exchange bonds acquired in the exchange offer for the period beginning when the exchange bonds are first issued in the exchange offer and ending upon the earlier of the expiration of the 180th day after the exchange offer has been completed or such time as such broker-dealers no longer own any original bonds. See “PLANPLAN OF DISTRIBUTION.DISTRIBUTION.
Registration Rights Agreement
When we issued the original bonds on August 25, 2020,December 5, 2023, we entered into a registration rights agreement with MUFG Securities Americas Inc., as representative of the initial purchasers, pursuant to which we agreed, for the benefit of the holders of the original bonds, at our cost, to:

file, not later than 220180 days after the issue date of the original bonds, a registration statement with respect to a registered offer to exchange the original bonds for the exchange bonds;
use commercially reasonable efforts to cause the exchange offer registration statement to be declared effective under the Securities Act within 310270 days after the issue date of the original bonds; and
complete the exchange offer within 60 business days from the date the exchange offer registration statement is declared effective.
If we do not meet the deadlines in the preceding sentence, or if we fail to meet certain other conditions described in the registration rights agreement, each, a “registration default,” from and including the date on which a registration default occurs, the interest rate borne by the original bonds will increase at a rate of 0.25% per annum for the first 90-days90-day period immediately following the occurrence of suchthe registration default period and at a rate of 0.50% per annum for remainderthe remaining portion of the registration default period to, but excluding, the date on which all registration defaults have been cured.default.
7


Under some circumstances set forth in the registration rights agreement, holders of the original bonds, including holders who are not permitted to participate in the exchange offer, may require us to file, and cause to become effective, a shelf registration statement covering resales of the original bonds by these holders.

A copy of the registration rights agreement is incorporated by reference as an exhibit to the registration statement of which this prospectus forms a part. See “THETHE EXCHANGE OFFER—OFFERGeneral; Purpose of the Exchange Offer.Offer.


7

Table of Contents

Consequences of Failure to Exchange
Original bonds that are not tendered or that are tendered but not accepted will, following the completion of the exchange offer, be returned to the tendering holder, remain outstanding and continue to be subject to their existing terms. See “RISK FACTORS”RISK FACTORS and “THETHE EXCHANGE OFFER—OFFER-Terms of the Exchange Offer.Offer.” Following the completion of the exchange offer, we will have no obligation to exchange original bonds for exchange bonds.

The trading market for original bonds not exchanged in the exchange offer may be more limited than it is at present. Therefore, if your original bonds are not tendered and accepted in the exchange offer, it may become more difficult for you to sell or transfer your unexchanged original bonds.
Material Tax Considerations
The exchange of original bonds for exchange bonds pursuant to the exchange offer generally will not be a taxable event for U.S. federal income tax purposes. You should consult your own tax advisor to determine the U.S. federal, state and other tax consequences of the exchange of the original bonds for the exchange bonds. See “SUMMARYSUMMARY OF MATERIAL U.S. FEDERAL INCOME TAX CONSEQUENCES.CONSEQUENCES.
Risk Factors
See “RISK FACTORS”RISK FACTORS for a discussion of factors that should be considered before exchanging the original bonds in the exchange offer.


8

Table of Contents
SUMMARY OF THE EXCHANGE BONDS
SUMMARY OF THE EXCHANGE BONDS
Issuer
Oglethorpe Power Corporation (An Electric Membership Corporation)
Securities Offered
$450,000,000400,000,000 aggregate principal amount of 3.75%6.20% First Mortgage Bonds, Series 2020A2023A due 2050.2053.
Maturity Date
AugustDecember 1, 20502053
Denominations
$2,000 minimum denominations and integral multiples of $1,000 in excess thereof.
Interest Payment Dates
Interest on the exchange bonds will accrue from the last date on which interest was paid on the original bonds surrendered in the exchange offer. We will pay interest on the exchange bonds semi-annually in arrears on FebruaryJune 1 and AugustDecember 1.
Optional Redemption
At any time or from time to time before FebruaryJune 1, 20502053 (the date that is six months prior to the maturity of the exchange bonds), we may redeem the exchange bonds, in whole or in part at a “make whole” redemption price equal to the greater of:

100% of the principal amount of the exchange bonds being redeemed; and
the sum of the present values of the remaining principal and interest payments on the exchange bonds being redeemed that would be due if such exchange bonds matured on FebruaryJune 1, 20502053 (excluding interest accrued and unpaid through the redemption date), discounted at a rate equal to the sum of (i) the yield to maturity of the U.S. Treasury security having a life (assuming for this purpose that the exchange bonds matured on FebruaryJune 1, 2050)2053) equal to, or the average yield to maturity of two U.S. Treasury securities closely corresponding to, the remaining average life of the exchange bonds being redeemed and trading in the secondary market at the price closest to par, and (ii) 4035 basis points.

plus, in each case, accrued and unpaid interest through the redemption date.

At any time or from time to time on or after FebruaryJune 1, 2050,2053, we may redeem the exchange bonds, in whole or in part at a redemption price equal to 100% of the principal amount of the exchange bonds being redeemed, plus accrued and unpaid interest thereon to, but excluding, the redemption date. See “DESCRIPTIONDESCRIPTION OF THE EXCHANGE BONDS—Redemption Provisions.Provisions.
First Mortgage Indenture
We will issue the exchange bonds under our Indenture dated March 1, 1997, made by Oglethorpe formerly known as Oglethorpe Power Corporation (An Electric Membership Generation & Transmission Corporation), to the predecessor of U.S. Bank Trust Company, National Association successor to SunTrust Bank, Atlanta, as trustee (the “Trustee”“trustee”), as amended and supplemented (the “first mortgage indenture”). The first mortgage indenture constitutes a first priority lien on substantially all of our owned tangible and certain of our intangible property equally and ratably with all other obligations issued under the first mortgage indenture. As of December 31, 2020,2023, we had approximately $10.6$12.1 billion of secured indebtedness outstanding under the first mortgage indenture. See “SUMMARYSUMMARY OF THE FIRST MORTGAGE INDENTURE.INDENTURE.


9

DTC Eligibility
The exchange bonds will be issued in fully registered form and will be represented by one or more global bonds, without coupons, deposited with DTC and registered in the name of Cede & Co., as its nominee. Beneficial interests in the global bonds will trade in DTC’s Same Day Funds Settlement System and secondary market trading activity in these beneficial interests will therefore settle in immediately available funds. Subject to some exceptions, beneficial interests in the exchange bonds will be shown on, and transfers will be effected only through, records maintained by DTC and its direct and indirect participants.
Market for Exchange Bonds
We do not intend to list the exchange bonds on any securities exchange or have them quoted on any automated quotation system. If issued, the exchange bonds generally will be freely transferable but will also be new securities for which there will not initially be a market. We cannot assure you that any trading market for the exchange bonds will develop upon completion of the exchange offer or, if such market does develop, that such market will be maintained or as to the liquidity of any market for the exchange bonds. As a result, there may not be a secondary market for the exchange bonds. See “PLANPLAN OF DISTRIBUTION.DISTRIBUTION.
Trustee
U.S. Bank Trust Company, National Association.
Governing Law
The first mortgage indenture and the exchange bonds will be governed by and construed in accordance with the laws of the State of Georgia.
Risk Factors
Certain risks could affect the payments to be made with respect to the exchange bonds or the market value of the exchange bonds. See “RISK FACTORS”RISK FACTORS beginning on page 12 of this prospectus for a discussion of such risks. Such discussion is not exhaustive, should be read in conjunction with all other parts of this prospectus and should not be considered as a complete description of all risks that could affect such payments or the market value of the exchange bonds. You should analyze carefully the information contained in this prospectus and additional information in the form of the complete documents summarized herein, copies of which are available as described in prospectus. See “AVAILABLE INFORMATION.AVAILABLE INFORMATION.



10

SUMMARY OF THE FIRST MORTGAGE INDENTURE
SUMMARY OF THE FIRST MORTGAGE INDENTURE
Security for the Exchange Bonds
The exchange bonds will be secured equally and ratably with all other obligations issued under the first mortgage indenture by a lien on substantially all of our owned tangible and certain of our intangible property, including property we acquire in the future. The mortgaged property includes our owned electric generating plants, the wholesale power contracts with our members and some of our contracts that relate to the ownership, operation or maintenance of electric generation facilities owned by us, but excluding excepted property and excludable property as set forth in the first mortgage indenture. See “SUMMARYSUMMARY OF THE FIRST MORTGAGE INDENTURE.INDENTURE.
Rate Covenant
The first mortgage indenture obligates us to establish and collect rates for the use or the sale of the output, capacity or service of our properties that produce money sufficient, together with other money available to us, to enable us to comply with all covenants under the first mortgage indenture and, subject to any necessary regulatory approvals, which are reasonably expected, together with our other revenues, to yield a margins for interest ratio (as defined herein) equal to at least 1.10 for each fiscal year. See “SUMMARYSUMMARY OF THE FIRST MORTGAGE INDENTURE—Covenants—Rate Covenant.Covenant.” For 2021,2024, our board of directors approved a budget to achieve a 1.14 margins for interest ratio, above the minimum 1.10 ratio required by the first mortgage indenture. As our capital requirements continue to evolve, our board of directors will continue to evaluate the level of margin coverage and may choose to change the targeted margins for interest ratio in the future.
Additional Obligations
As long as we are in compliance with the minimum margins for interest ratio required by the first mortgage indenture, we may issue additional obligations under the first mortgage indenture. The amount of obligations we may issue is based on the bondable value of specified property additions and retirements we have made, the aggregate principal amount of first mortgage indenture obligations we have retired or defeased, and deposits of cash and certain securities we have made with the trustee, among other things. See “SUMMARYSUMMARY OF THE FIRST MORTGAGE INDENTURE—Additional Obligations.Obligations.
Limitation on DistributionDistributions to Members
The first mortgage indenture prohibits us from making any distribution, payment or retirement of patronage capital to our members if, at the time thereof or after giving effect thereto:

an event of default exists under the first mortgage indenture;
our aggregate margins and equities as of the end of the most recent fiscal quarter would be less than 20% of our total long-term debt and equities at such time; or
the aggregate amount expended for the distribution, payment or retirement on or after the date on which our aggregate margins and equities first reach 20% of our total long-term debt and equities would exceed 35% of our aggregate net margins earned after that date.
The restrictions set forth in the second and third bullet points above, however, would not apply if, after giving effect to the distribution, payment or retirement, our aggregate margins and equities as of the end of the most recent fiscal quarter would not be less than 30% of our total long-term debt and equities. See “SUMMARYSUMMARY OF THE FIRST MORTGAGE INDENTURE—Covenants—INDENTURECovenantsLimitation on Distributions, Payments or Retirement of Patronage Capital.Capital.


11



RISK FACTORS


You should carefully consider the risk factors set forth below as well as the other information contained in this prospectus before deciding to tender your original bonds in the exchange offer. Any of theThe following describes material risks, could materially and adverselyin management’s view, that may affect our business and financial condition operating results or cash flow; however, the followingvalue of our debt securities. This discussion is not exhaustive, and there may be other risks that we face which are not our only risks.described below. Additional risks and uncertainties not currently known to us or those we currently view to be immaterial may also materially and adversely affect our business, financial condition, results of operations or cash flow. If any known or unknown risk materially affects our business, financial condition, results of operations or cash flow, the trading price of the exchange bonds could decline or we may not be able to make payments of interest and principal on the exchange bonds, and you may lose all or part of your original investment.

Facility Ownership, Operation and Construction Risk Factors
Our participation in the construction of Vogtle Units No. 3 and No. 4 could have a material impact on our financial condition and results of operations.
As described under "OUR BUSINESS—Business Overview—“OUR BUSINESS ― BUSINESS OVERVIEW ― Future Power Resources—Resources ― Vogtle Units No. 3 and No.4No. 4," we are participating in the construction of two additional nuclear units at Plant Vogtle and have committed significant capital expenditures to this endeavor. The construction of large, complex generating plants involves significant financial risk. We rely on Georgia Power Company and Southern Nuclear Operating Company, Inc. as our agents for the oversight of the construction of the additional units at Plant Vogtle and do not exercise direct control over the construction process. As of December 31, 2023, our total investment in the additional Vogtle units was approximately $8.2 billion. Vogtle Unit No. 3 entered commercial operation July 31, 2023.
Our current budget for our 30% ownership interest in Vogtle Units No. 3 and No. 4, is $7.5 billion, which includes capital costs and allowance for funds used during construction, our allocationis a range of the project-level contingency$8.3-8.35 billion and is based on a separate Oglethorpe-level contingency. As of December 31, 2020, our total investmentcommercial operation date in the additional Vogtle units was approximately $6.0 billion. The regulatory-approved in-service datessecond quarter of 2024 for Vogtle Unit No. 3 and4. Any schedule extension beyond June 2024 for Unit No. 4 are November 2021 and November 2022, respectively.
We and the other Co-owners are responsible for constructionis expected to increase our costs based on our ownership percentages. Factors that could lead to further cost increases and schedule delays or even the inability to complete this project include:
performance by Georgia Power as agent for the Co-owners and performance by Southern Nuclear as construction manager;
performance by Bechtel under the Bechtel Agreement as well as subcontractor and supplier performance, including compliance with the design specifications approved and quality standards set forth by the Nuclear Regulatory Commission;
the effects of the COVID-19 pandemic and related precautionary measures;
changes in labor costs, availability and productivity;
shortages, delays, increased costs or inconsistent quality of labor, equipment and materials;
performance by Westinghouse under the Services Agreement;
engineering or design problems;
challenges with start-up activities (including major equipment failure or system integration) and/or operational performance;
increases in our cost of debt financing as a result of changes in market interest rates or as a result of construction schedule delays;
operational readiness, including specialized operator training and required site safety programs;
delays or failure to receive necessary permits, approvals and other regulatory authorizations;
the outcome of any legal challenges to the project, including legal challenges to regulatory approvals;
erosion of public and policymaker support;
contract disputes;
changes in project design or scope;
impacts of new and existing laws and regulations, including environmental laws and regulations;
adverse weather conditions;
catastrophic events, natural disasters and future pandemic health events; and
work stoppages.
12

Table of Contents
approximately $20 million per month.
As part of its ongoing process, Southern Nuclear continues to evaluate cost and schedule forecasts on a regular basis to incorporate current information available, particularly in the areas of engineering support, commodity installation, system turnoversstart-up testing and related test results and workforce statistics. The project continuesengineering support.
On May 1, 2023, hot functional testing was completed at Unit No. 4. On July 20, 2023, Southern Nuclear announced that all Unit No. 4 inspections, tests, analyses, and acceptance criteria documentation had been submitted to face challenges including, but not limitedthe Nuclear Regulatory Commission, and, on July 28, 2023, the Nuclear Regulatory Commission published its 103(g) finding that the accepted criteria in the combined license for Unit No. 4 had been met, which allowed nuclear fuel to higher than expected absenteeism; overall constructionbe loaded and subcontractor labor productivity; system turnover andstart-up testing activities; and electrical equipment and commodity installation.
Theto begin. Fuel load was completed on August 2018 project-level budget included an $800 million construction contingency estimate, of which our 30% interest was $240 million. As of June 30, 2020, assignments of contingency exceeded the 2018 construction contingency estimate by $75 million (of which our 30% interest was $23 million) and19, 2023. On October 6, 2023, Georgia Power established $250 millionannounced that during start-up and pre-operational testing for Unit No. 4, Southern Nuclear had identified a motor fault in one of additional construction contingency (offour reactor coolant pumps, which our 30% interestwas replaced. With Unit No. 3’s four reactor coolant pumps operating as designed, Southern Nuclear has stated that it believes that the motor fault on the single Unit No. 4 reactor coolant pump is $75 million). Duringan isolated event. However, any findings on the third and fourth quartersroot cause of 2020, this construction contingency, plus an additional $10 million (of which our 30% interest was $3 million) was assignedthe motor fault on the affected pump could require engineering changes or remediation related to the base capital cost forecast. Assignment of contingency during 2020 addressed cost risks related to construction productivity, including the April 2020 reduction in workforce designed to mitigate impacts of the COVID-19 pandemic described below; other COVID-19 impacts; craft labor incentives; additional resources for supervision, field support, project management, initial test program, start-up, engineering support and operations and maintenance support; subcontracts; and procurement, among other factors. These factors continue to represent further potential cost risk to the project; therefore Georgia Power established $375 million of additional contingency as of December 31, 2020 (of which our 30% interest is $112.5 million). Georgia Power has stated its expectation to allocate the remainder of this project-level contingency by completion of the project. The project-level contingency is separate and in addition to our Oglethorpe-level contingency.
In mid-March 2020, Southern Nuclear began implementing policies and procedures designed to mitigate the risk of transmission of COVID-19 at the construction site, including worker distancing measures, isolating individuals who have tested positive for COVID-19, are showing symptoms consistent with COVID-19, are being tested for COVID-19, or have been in close contact with such persons, requiring self-quarantine, and adopting additional precautionary measures. In April 2020, Georgia Power, acting for itself and as agent for the other Co-owners, announced a reduction in workforce at Vogtle UnitsUnit No. 3 and Unit No. 4 and began reducing the then-existing site workforce by approximately 20%. This reduction in workforce was a mitigation action intended to address ongoing challenges with labor productivity that were exacerbated by the impact of the COVID-19 pandemic on the Vogtle Units No. 3 and No. 4 workforce and construction site by increasing productivity of the remaining workforce and reducing workforce fatigue and absenteeism. Further, it was also intended to allow for increased social distancing by the workforce and facilitate compliance with the recommendations from the Centers for Disease Control and Prevention. The April 2020 workforce reduction did reduce absenteeism, providing an improvement in operational efficiency and allowing for increased social distancing. Since April 2020, the number of active cases of COVID-19 at the site has fluctuated and continues to impact productivity levels and pace of activity completion.reactor coolant pumps.
From November 2020 through January 2021, the number of active COVID-19 cases at the site increased significantly, consistent with a national rise in cases, which further impacted productivity and the pace of activity completion. Although still present, this spike in cases has since abated intoOn February and early March. The incremental cost associated with COVID-19 mitigation actions and impacts on construction productivity is currently estimated by1, 2024, Georgia Power to be between $325announced that during start-up and $415 million (of which our 30% interest is $98 to $125 million) and is included in the project budget. As described previously, Georgia Power included estimated costs associated with near-term COVID-19 mitigation actions and related impacts on construction productivity in the additional project-level contingency established as of December 31, 2020. The continuing effects of the COVID-19 pandemic could further disrupt or delay construction,pre-operational testing supervisory, and support activities at Vogtle Units No. 3 and No. 4.
The project continues to face challenges, exacerbated by this recent rise in COVID-19 cases, including, but not limited to, higher than expected absenteeism; overall construction and subcontractor labor productivity; system turnover and testing activities; and electrical equipment and commodity installation.
As a result of these factors, overall production levels were not achieved at the levels anticipated, contributing to the December 31, 2020 allocation of construction contingency and increase in total project capital cost forecast described previously. Southern Nuclear has further extended certain milestone dates, including the start of hot functional testing and fuel load for Unit No. 3. The Unit No. 3 schedule is challenged, and while the ability to achieve the November 2021 regulatory in-service date remains a target for4, Southern Nuclear we believe a delay is likely which could add a month or more tohad identified, and remediated, vibrations associated with certain piping within the Unit No. 3 in-service date. As Unit No. 3 approaches hot functionalcooling system. Considering the remaining pre-operational testing, key factors impacting the schedule include both the pace of work package completion and system turnovers, and required construction remediation work.
13

Achievement of the November 2022 regulatoryGeorgia Power disclosed that it projects an in-service date for Unit 4 primarily depends on overall construction productivity and production levels significantly improving as well as appropriate levels of craft laborers, particularly electrical and pipefitter craft labor, being added and maintained. In the event that there is any schedule extension beyond the November 2021 and November 2022 regulatory in-service dates for Units No. 3 and No. 4 respectively,during the Oglethorpe-level contingency level in our current $7.5 billion budget is expected to be sufficient to withstand up to a 4-month delay forsecond quarter 2024. On February 14, 2024, Unit No. 34 achieved self-sustaining nuclear fission, commonly referred to as initial criticality, and a 3-month delayon March 1, 2024, the generator successfully synchronized to the power grid and generated electricity for Unit No. 4. Any further delays beyond these extended dates are expected to impact our cost by approximately $55 million per month for both units and approximately $25 million per monththe first time.
Meeting the projected in-service date for Unit No. 4 only, including financing costs.significantly depends on the progression of start-up and pre-operational testing, which may be impacted by equipment or other operational failures. As Unit No. 4 progresses
Pursuant to
12


further through testing, ongoing and potential future challenges may also include the Global Amendments, Georgia Power agreed to mitigate certain financial exposure for the other Co-owners. In the event that construction costs exceed the estimated cost at completion (EAC) in the nineteenth Vogtle construction monitoring (VCM) report by more than $800 million up to $2.1 billion, Georgia Power will be responsible for an increasing percentage of construction costs, subject to exceptions, up to a maximum of an additional $180 million, and each Co-owner would maintain its existing ownership interest. In the event that the EAC exceeds the EAC in the nineteenth VCM report by more than $2.1 billion, each of the Co-owners, other than Georgia Power, will have a one-time option to tender a portion of its ownership interest to Georgia Power in exchange for Georgia Power’s agreement to pay 100% of such Co-owner’s remaining share of construction costs in excess of the EAC in the nineteenth VCM report plus $2.1 billion. This option to tender a portion of our interest to Georgia Power upon such a budget increase would allow us to freeze our construction budget associated with the Vogtle project in exchange for a portion of our 30% ownership interest.
As construction, including subcontract work, continues and testing and system turnover activities increase, risks remain that challenges with management of contractors and vendors; subcontractor performance; supervisionvendors, the availability of craft labormaterials and related productivity, particularly in the installation of electrical, mechanical, and instrumentation and controls commodities, ability to attract and retain craft labor,parts, and/or related cost escalation; procurement, fabrication, delivery, assembly, installation, system turnover,the availability of supervisory and technical support resources; and the initialtimeframe and duration of pre-operational testing.
New challenges also may continue to arise as Unit No. 4 moves further into testing and start-up, including anywhich may result in required engineering changes or any remediation related thereto, ofto plant systems, structures or components (some of which are based on new technology that has only within the last fewseveral years began initial operation in the global nuclear industry at this scale), any of which may require additional labor and/or materials; or other issues could arise and further impact the projected schedule and estimated cost.
There have been technical and procedural. These challenges to the construction and licensing of Vogtle Units No. 3 and No. 4 at the federal and state level and additional challenges may arise. Processes are in place that are designed to assure compliance with the requirements specified in the Westinghouse Design Control Document and the combined construction and operating licenses, including inspections by Southern Nuclear and the Nuclear Regulatory Commission that occur throughout construction. Findings from such inspections could require additional remediation and/or further Nuclear Regulatory Commission oversight. In addition, certain license amendment requests have been filed and approved or are pending before the Nuclear Regulatory Commission. Various design and other licensing-based compliance matters, including the timely submittal by Southern Nuclear of the inspections, tests, analyses, and acceptance criteria documentation for each unit and the related reviews and approvals by the Nuclear Regulatory Commission necessary to support authorization to load fuel, may arise, which may result in additional license amendments further schedule delays and/or cost increases. Further delays into the summer months of 2024 could also require other resolution. If any license amendment requests or other licensing-based compliance issues, including inspections and inspections, tests, analyses, and acceptance criteria, are not resolved inthat our members acquire replacement power, potentially at a timely manner, there may be further delays in the project schedule that could result in increased costs to the Co-owners.
Pursuant to the Joint Ownership Agreements, the holders of at least 90% of the ownership interests in Vogtle Units No. 3 and No. 4 must vote to continue construction, or can vote to suspend construction, if certain adverse events occur, including: (i) the bankruptcy of Toshiba Corporation; (ii) termination or rejection in bankruptcy of certain agreements, including the Services Agreement, the Bechtel Agreement or the agency agreement with Southern Nuclear; (iii) Georgia Power publicly announces its intention not to submit for rate recovery any portion of its investment in Vogtle Units No. 3 and No. 4 (or associated financing costs) or the Georgia Public Service Commission determines that any of Georgia Power’s costs relating to the construction of Vogtle Units No. 3 and No. 4 will not be recovered in retail rates, excluding any additional amounts paid by Georgia Power on behalf of the other Co-owners pursuant to the Global Amendment provisions described above and the first 6% of costs during any six-month VCM reporting period that are disallowed by the Public Service Commission for recovery, or for which Georgia Power elects not to seekhigher cost, recovery, through retail rates or (iv) an incremental extension of one year or more over the most recently approved schedule.
The Global Amendments provide that Georgia Power may cancel the project at any time in its sole discretion. In the event that Georgia Power determines to cancel the project or fewer than 90% of the Co-owners vote to continue construction
14

upon the occurrence of a subsequent project adverse event, we and the other Co-owners would assess our options for the Vogtle project. If the investment werepower anticipated to be written off, we would seek regulatory accounting treatment to amortize the investment over a long-term period, which requires the approval of our board of directors, and we would submit the regulatory accounting treatment details to the Rural Utilities Service for its approval. Further, if Georgia Power or the Co-owners decided to cancel the project, the Department of Energy would have the discretion to require that we repay all amount outstanding under the loan guarantee agreement over a five-year period.available from Unit No. 4.
The ultimate outcome of these matters cannot be determined at this time; however, these risks could continue to impact the in-service dates and our cost of the additional units at Plantfor Vogtle Unit No. 4 which would increase the cost of electric service we provide to our members and, as a result, could affect their ability to perform their contractual obligations to us.
We are subject to construction risks for potential additional projects under consideration for our members to meet projected load growth in Georgia.
Georgia is projected to experience a significant increase in energy demand, including large loads, over the next several years, and we and our members are assessing the potential impact of this growth. Loads of 900 kilowatts or more in Georgia are subject to competition at initial operation, and our members may be selected to meet some of the additional large loads in their service territories. We and our members will use the best information we have available to us to appropriately plan for our members’ anticipated power needs. We expect that our members will request us to construct additional generation facilities to serve this load growth. We are also evaluating capacity commitments for new natural gas pipeline infrastructure to meet our anticipated fuel supply needs. If our members’ actual load growth is significantly lower than projected, costs related to any new facilities could increase the cost of electric service we provide to those members more than anticipated and could affect their ability to perform their contractual obligations to us.
Should we proceed with constructing generating facilities and securing additional natural gas pipeline capacity to serve these facilities, we will be exposed to construction risks. We will also be subject to construction risks related to capital expenditures related to environmental standards. Many factors could lead to cost increases and schedule delays for any of these projects, including:
the cost and availability of labor;
challenges related to contractors or vendors;
subcontractor performance;
timing and issuance of necessary permits or approvals (including required certificates from regulatory agencies);
shortages, delays, increased costs or inconsistent quality of materials and equipment;
performance under construction agreements and contract disputes;
the cost and availability of debt financing, including the availability of federal loan or grant programs, increased interest rates or increased funding costs as a result of construction schedule delays;
catastrophic events, natural disasters and future pandemic health events; and
weather conditions.
Failure to complete any construction project on schedule and on budget for any reason could increase the cost of electric service we provide to our members and, as a result, could affect their ability to perform their contractual obligations to us.
13


We own and are participating in the construction of nuclear facilities which give rise to environmental, regulatory, financial, operational and other risks.
We own a 30% undivided interest in each of the Plant Hatch and Plant Vogtle each of which is a two-unit nuclear generating facility, and which collectivelyfacilities. Collectively, our interests in the five operating nuclear units at these facilities account for approximately 17%20% of our total gross generating capacity and 43%produced 35% of our energy generated during 2020. 2023. We also own a 30% interest in a sixth nuclear unit, Vogtle No. 4, which is expected to reach commercial operation in the second quarter of 2024.
Our ownership interests in these facilities expose us to various risks, including:
potential liabilities relating to harmful effects on the environment and human health and safety resulting from the operation of these facilities and the on-site storage, handling and disposal of radioactive materials, including spent nuclear fuel;
uncertainties with respect to the technological and financial aspects of decommissioning these facilities at the end of their licensed lives and the ability to maintain and anticipate adequate capital reserves for decommissioning these facilities at the end of their operational lives;decommissioning;
significant capital expenditures relating to maintenance, operation, security and repair of these facilities, including repairs or modifications required by the Nuclear Regulatory Commission;
potential liabilities arising out of nuclear incidents caused by natural disasters, terrorist attacks, cyber security attacks or otherwise, including the payment of retrospective insurance premiums, whether at our own plants or the plants of other nuclear owners;
limitations on the amounts and types of insurance commercially available to cover losses that might arise in connection with nuclear operations; and
uncertainties with respect to the off-site storage and disposal of spent nuclear fuel in the event that on-site storage is not sufficient.
The Nuclear Regulatory Commission has broad authority under federal law to impose licensing and safety-related requirements for the operation of nuclear generating facilities. If our nuclear facilities were found to be out of compliance with applicable requirements, the Nuclear Regulatory Commission may impose fines or shut down one or more units of these facilities until compliance is achieved. Revised safety requirements issued by the Nuclear Regulatory Commission have, in the past, necessitated substantial capital expenditures at other nuclear generating facilities.
Further, a major incident at a nuclear facility anywhere in the world could cause the Nuclear Regulatory Commission to limit or prohibit the operation or licensing of any domestic nuclear unit. While we have no reason to expect a serious incident at either of our nuclear plants, if an incident did occur, it could result in substantial cost to us.
We maintain an internal fund and an external trust fund to pay for the estimated cost of decommissioning our existing nuclear facilities. We continue to collect and deposit additional funds into these funds. The internal and external funds are invested in a diversified mix of equity and debt securities, the internal fund.performance of which is subject to market performance risks. If the values of the investments in the funds significantly decrease or the anticipated decommissioning costs significantly increase, it is possible that the decommissioning costs could exceed the funds available and we would have to collect additional revenue from our members to pay the unfunded costs.
In addition to our ownership of existing nuclear units, we are participating with the other Co-owners of Plant Vogtle in the construction of two additional nuclear units at the Plant Vogtle site. See "OUR BUSINESS—Our Power Supply Resources—Future Power Resources—Plant Vogtle Units No. 3 and No. 4."
We could be adversely affected if we or third parties operating certain of our co-owned facilities are unable to continue to operate our facilities in a successful manner.
We rely on the successful operation of our generation facilities to provide our members’ energy needs. The operation of our generating facilities may be adversely impacted by various factors, including:
the effects of COVID-19 and related precautionary measures;
15

the risk of equipment and information technology failure or operator error;
14


operating limitations that may be imposed by environmental or other regulatory requirements;
interruptions or shortages in fuel, water or material supplies;
supply chain disruptions;
physical or cyber attacks against us or key suppliers or service providers;
interruptionstransmission constraints or shortages in fuel, water or material supplies;disruptions;
transmission constraints or disruptions;the impact of intermittent generation resources on our members' demand patterns;
compliance with electric reliability organizations’ mandatory reliability and record keeping standards, including mandatory cyber security standards;
the ability to maintain a qualified workforce;
an environmental event, such as a spill or release;
labor disputes; or
severe weather or catastrophic events such as fires, earthquakes, floods, droughts, hurricanes, explosions, pandemic health events, or similar occurrences.
We operate in a highly regulated industry that requires the continued operation of advanced information technology systems and network infrastructure. Our generation assets and information technology systems, or those of our co-owned plants, could be directly or indirectly affected by deliberate or unintentional cyber incidents. If our technology systems were to be breached or otherwise fail, we may be unable to fulfill critical business functions, including the operation of our generation assets and our ability to effectively maintain certain internal controls over financial reporting. Further, our generation assets rely on an integrated transmission system to deliver power to our members, and a disruption of this transmission system could negatively impact our ability to do so. In order to reduce the likelihood and severity of any cyber intrusion, we have comprehensive cyber security programs designed to protect and preserve the confidentiality, integrity and availability of data and systems. Despite these protections, a major cyber incident could result in significant business disruption and expenses to repair security breaches or system damage and could lead to litigation, regulatory action, including fines, and an adverse effect on our reputation.
A severe drought could reduce the availability of water and restrict or prevent the operation of certain generating facilities. Other negativeNegative events such as those discussed above could also interrupt or limit electric generation or increase the cost of operating our facilities, which could have the effect of increasing the cost of electric service we provide to our members and affect their ability to perform their contractual obligations to us.
Further, a significant percentage of our energy is generated at co-owned facilities that are operated by Georgia Power and Southern Nuclear. We rely on these third parties for the continued operation of these facilities to avoid potential interruptions in service from these facilities. If these third parties are unable to operate these facilities, the cost of electric service we provide to our members, or the cost of replacement electric service, may increase. See "OUR“OUR BUSINESS—Business Overview—BUSINESS OVERVIEW—Relationship with Georgia Power Company"Company” and "—Properties—“PROPERTIES—Co-Owners of Plants"Plants” and "“—Plant Agreements" Agreements” for discussions of our relationship with Georgia Power and our co-owned facilities.
If we wereare unable to obtain an adequate supply of fuel, our ability to operate our facilities could be limited.
We obtain our fuel supplies, including natural gas, coal and uranium, from a number of different suppliers. Any disruptions in our fuel supplies, including disruptions due to weather, environmental regulations, inadequate infrastructure, labor relations, workforce shortages, cyber security incident or other factors affecting our fuel suppliers, could result in us having insufficient levels of fuel supplies. For example,A number of commodities, including natural gas and coal, have recently been affected by broader supply chain challenges and commodity availability constraints. Natural gas supplies may be unavailable due to increased demand during periods of exceptionally cold weather and are also subject to disruption due to natural disasters and similar events or infrastructure failure. Further, a significant increase in liquefied natural gas (LNG) demand may constrain the supply of natural gas available to us. Over the past few years, we have also managed rail-related delays in connection with our coal supply. Additionally, there are only a few facilities that fabricate fuel for our nuclear units and if there was an interruption in production at one of those facilities, it could impact our ability to obtain fuel for our nuclear generating facilities on a timely basis. Natural gas supplies are also subject to disruption due to natural disasters and similar events, infrastructure failure or may be unavailable due to significantly increased demand caused by exceptionally cold weather. Any failure to maintain access to or an adequate inventory of fuel supplies could require us to operate other generating plants at a higher cost or require our members to purchase higher-cost energy from other sources and, as a result, affect our members’ ability to perform their contractual obligations to us.
We, the co-owners or the operating agent for our co-owned coal plants may retire one or more of our coal-fired generation units in advance of our currently assumed retirement dates which could result in rate recovery challenges.
We own or lease a 60% interest in Plant Scherer Units No. 1 and No. 2 and a 30% interest in Plant Wansley Units No. 1 and No. 2 which together constitute 22% of our total summer planning reserve capacity. The percentage of gross energy generated by coal-fired resources we sell to our members has decreased from 45% in 2008 to 5% in 2020. This decrease was largely driven by other generation resources being more economical and our acquisition of additional natural gas-fired
16

resources. Additional lower cost generation could further displace existing coal-fired generation which may make continued operation uneconomical.
In addition to these pressures, potential new environmental standards could require additional capital expenditures or operating costs that make continued operation of some of the units uneconomical. Some banking and insurance companies have also voluntarily implemented policies to limit lending to, investing in and insuring utilities that significantly rely on coal-fired generation assets. We are not aware that any of those policies have directly impacted us to date. Similar pressures on coal producers have also increased and could impact our price and supply of coal.
Early retirement of one or more coal units could require us to recover the undepreciated costs for the unit over a shorter period. The ultimate impact of any early retirement on us and our members would depend on several factors, including the proposed retirement date, our ability to recover costs after the retirement date, the price of any replacement energy and cannot be determined at this time. In order to mitigate the rate impact of any early retirement on our members, we would likely apply for regulatory accounting treatment to spread the early retirement costs over an extended period. These increased costs could affect our members’ ability to perform their contractual obligations to us.
Specifically, pursuant to the Ownership and Operating Agreements for Plant Wansley, Georgia Power is considering retiring Plant Wansley Units No. 1 and No. 2 as early as fall 2022. See "OUR BUSINESS—Properties—Co-Owners of Plants" and —Plant Agreements"." In 2020, Plant Wansley operated at a 0.5% capacity factor and such a retirement would not significantly affect the amount of energy we provide to our members. We expect that our members would replace the energy generated at Plant Wansley with energy from other power supply resources, including their power supply arrangements with third parties and other of our generation assets. Although this decision has not been finalized or filed with the Georgia Public Service Commission, we are preparing for a scenario in which a retirement occurs in 2022; including seeking authorization to defer a portion of the accelerated depreciation expense and recover the deferred costs over an extended period.
The operational life of some of our generating facilities exposes us to potential costs to continue to meet efficiency, reliability and environmental compliance standards.
Many of our generating facilities were constructed more than 3035 years ago and, even if maintained in accordance with good engineering practices, will require significant capital expenditures in order to maintain
15


efficient and reliable operation. Potential operational issues associated with the age of the plants may lead to unscheduled outages, a generating facility being out of service for an extended period of time, or other service-related interruptions. Further, maintaining facility availability and compliance with applicable efficiency, reliability and environmental standards may require significant capital expenditures or operating reductions at certain of our facilities, and we may determinedecide to reduce or cease operations at those facilities in order to avoid such capital expenditures or to meet such standards. These expenditures and service interruptions could have the effect of increasing the cost of electric service we provide to our members and, as a result, could affect our members’ ability to perform their contractual obligations to us.
We and the other co-owners may retire our remaining coal-fired generation units in advance of our currently assumed retirement dates which could result in rate recovery challenges.
We own or lease a 60% interest in Plant Scherer Units No. 1 and No. 2 which constitutes 12% of our total summer planning reserve capacity. The percentage of gross energy generated by coal-fired resources we sell to our members has decreased from 45% in 2008 to 10% in 2023. This decrease was largely driven by other generation resources being more economical, our acquisition of additional natural gas-fired resources and the retirement of Plant Wansley in August 2022. Although projected load growth in Georgia has lessened some of the near-term pressure on coal retirements, additional lower cost generation could further displace our remaining coal-fired generation which may make continued operation uneconomical.
In addition to these pressures, potential new environmental standards could require additional capital expenditures or operating costs that make continued operation of the remaining units uneconomical. Some banking and insurance companies have also voluntarily implemented policies to limit lending to, investing in and insuring utilities that significantly rely on coal-fired generation assets. We are not aware that any of those policies have directly impacted us to date. Similar pressures on coal producers have also increased and could impact our price and supply of coal.
Early retirement of our coal units could require us to recover the undepreciated costs for the unit over a shorter period. The ownership agreements for Plant Scherer, of which we own or lease 60% in each of Units No. 1 and No. 2, require the consent of participants owning at least 75% of the undivided ownership interest in that unit with respect to any decision to retire the unit. In February 2022, Georgia Power, who owns an 8.4% ownership interest in each of Scherer Units No. 1 and No. 2, as well as 75% of Unit No. 3, filed an integrated resource plan with the Georgia Public Service Commission that noted Georgia Power is evaluating the potential retirement of its Scherer units in 2028. In October 2023, Georgia Power filed an update to its integrated resource plan that indicated it was evaluating extending commercial operation of Scherer Unit No. 3 as a result of significant projected load growth in Georgia. We have not made a decision regarding the retirement of Plant Scherer Units No. 1 or No. 2 prior to the end of our estimated useful life for the units. We will continue to evaluate the reliability, economics and related environmental requirements of Scherer Units No. 1 and No. 2 in order to provide our members with a balanced, reliable and cost-effective generation portfolio.
The ultimate impact of an early retirement on us and our members would depend on several factors, including the proposed retirement date, our ability to recover costs after the retirement date, the price and availability of any replacement energy and cannot be determined at this time. In order to mitigate the rate impact of any early retirement on our members, we would likely apply for regulatory accounting treatment to spread the early retirement costs over an extended period. These increased costs could affect our members' ability to perform their contractual obligations to us.
16


Financial Risk Factors
Our access to, and cost of, capital could be adversely affected by various factors, including market conditions, limitations on the availability of federally-guaranteed loans and our credit ratings. Significant constraints on our access to, or increases in our cost of, capital may limit our ability to execute our business plan by impacting our ability to fund capital investments and could adversely affect our financial condition and results of operations.
We rely on access to external funding sources as a significant source of liquidity for capital expenditures and acquisitions not satisfied by cash flow generated from operations. Unlike most investor-owned utilities, electric cooperatives cannot issue equity securities and therefore rely almost entirely on debt financing.
In connection with our share of the cost to construct the additional units at Plant Vogtle, we have obtained an aggregate of $4.6 billion in loans from the Federal Financing Bank and a related loan guarantee from the Department of Energy.As of December 31, 2020, we had funded $3.6 We have fully drawn those loans to fund $4.6 billion of eligible project costs with these loans and have approximately $1.0 billion of remaining borrowing capacity.costs. Based on our current budget for Vogtle Units No. 3 and No. 4, which includes Oglethorpe and project-level contingency, and our ability to draw the remaining amount of the Department of Energy-guaranteed loans, we anticipate that we will needseeking $750 to raise up to $600$800 million of additional long-term funding in the capital markets through
17

2023, 2024, including approximately $300$400 to $500 million that will be needed to refinance Department of Energy-guaranteed loans that mature before the in-service date of Vogtle Unit No. 4.
Access to the committed funds under the remaining Department of Energy-guaranteed loan requires us to meet certain conditions related to our business and the Vogtle project and also requires certain third parties related to the Vogtle project to comply with certain laws. In addition, the occurrence of certain adverse events would give the Department of Energy discretion to require that we repay all amounts outstanding under the loan guarantee agreement over a five-year period. In the event that we are unable to draw the full amount of the remaining borrowing capacity or are required to repay amounts outstanding over a five year period, we expect that we would finance those project expenditures in the capital markets which would likely be at a higher cost. See Note 7a of Notes to Consolidated Financial Statements for additional information about the terms of the loan guarantee agreement and related conditions.
Historically, we relied on federal loan programs guaranteed by the Rural Utilities Service, a branch of the U.S. Department of Agriculture, in order to meet a significant portion of our long-term financing needs, typically at a cost that was lower than traditional capital markets financing. However, the availability and magnitude of Rural Utilities Service funding levels are subject to the annual federal budget appropriations process, and therefore are subject to uncertainty because of budgetary and political pressures faced by Congress. If the amount of this funding available to us in the future is decreased or eliminated, we would seek alternative sources of debt financing in the traditional capital markets which would likely be at a higher cost.
Our access to both short-term and long-term capital market funding remains an important factor in our existing financing plans particularlyand will be an important factor in light of the significant amount of projectedconnection with any new capital investment.investments. We have entered into multiple credit agreements that provide significant short-term and medium-term liquidity and have successfully accessed the capital markets in the past to satisfy our long-term borrowing needs. We believe that we will be able to maintain sufficient access to the short-term and long-term capital markets based on our current credit ratings. However, our credit ratings reflect the views of the rating agencies, which could change at any point in the future. If one or more rating agencies downgrade us and potential investors take a similar view, our borrowing costs would likely increase and our potential pool of investors, funding sources and liquidity could decrease. In addition, if our credit ratings are lowered below investment grade, collateral calls may be triggered under certain agreements and contracts which would decrease our available liquidity.
Our borrowing costs are also affected by prevailing interest rates. If interest rates have increased at the time we issue fixed rate debt or reset the interest rates on our variable rate debt, our interest costs will increase and our financial condition and future results of operations could be adversely affected.
In addition, market disruptions could constrain, at least temporarily, lenders’ willingness or ability to perform their obligations under existing credit agreements and our ability to access additional sources of capital on favorable terms or at all. These disruptions include:
economic downturns or uncertainty;
instability in domestic or foreign financial markets;
a tightening of lending and lending standards by banks and other credit providers;
the overall health of the energy and financial industries;
economic downturns or recessions;
future impacts of the COVID-19 pandemic or other pandemic health events;
negative events in the energy industry, such as the bankruptcy of an unrelated energy company or the occurrence of a significant natural disaster;
pandemic health events;
17


geopolitical instability, war or threat of war; and
terrorist attacksactual or threatened cyber or physical attacks on our facilities or the facilities of unrelated energy companies.
Further, an increasing number of lenders and investors are taking into account environmental, social and corporate governance criteria when making lending and investment decisions. Although we are not aware of any instances where our access to capital was limited due to these criteria, such considerations could potentially limit the number of lenders or investors who are willing to lend capital to us or other utility companies in the future.
If our ability to access capital becomes significantly constrained or more expensive for any of the reasons stated above or for any other reason, our ability to finance ongoing capital expenditures or future acquisitions could be limited and our financial condition and future results of operations could be adversely affected.
18

OurFuture capital expenditures particularly in relation to the additional units under construction at Plant Vogtle, are projected tomay be significant and will continue to increase our debt, which is constraininghas constrained certain of our financial metrics and may also adversely affect our credit ratings, which would likely increase our borrowing costs and could decrease our access to capital.
We are innearing the midstcompletion of a multi-year capital spending plan to fund our participation in the construction of Vogtle Units No. 3 and No. 4. Our current project budget for the additional Vogtle units is $7.5 billion,4 and our investment as of December 31, 20202023 was $6.0$8.2 billion. Since 2021, we have also acquired three natural gas resources and expect to acquire a fourth in the second quarter of 2024. We are also evaluating constructing additional generation assets to meet projected load growth in Georgia that would require significant additional capital expenditures. As we have financed generation assets in the past, we are relyingrely on external funding to finance this project.additional generation resources. As of December 31, 2020,2023, we had $10.6$12.1 billion of long-term debt outstanding, an increase of $6.4$7.9 billion since 2009, when construction of the new Vogtle units commenced. At the completion of the Vogtle expansion, we expect that the amount of our outstanding debt will be approximately $12.0$12.6 billion. In addition to the increase in absolute dollars, our debt has been increasing as a percentage of our total capitalization, which has constrained our equity ratio. Furthermore, our debt service payment obligations have increased, which has affected certain other financial metrics. Increased debt and the related impacts on our financial metrics could negatively impact our credit ratings. Any downgrade in our credit ratings would likely increase our borrowing costs and could decrease our access to the credit and capital markets.
In order to increase financial coverage during this period of generation expansion, our board of directors has approved budgets to achieve margins for interest ratios greater than the minimum 1.10 margins for interest ratio required under our first mortgage indenture. We have achieved the board-approved margins for interest ratio each year, and for 20212024 our board of directors again approved a margins for interest ratio of 1.14.
Changes in fuel prices could have an adverse effect on our cost of electric service.
We are exposed to the risk of changing prices for fuels, including natural gas, coal and uranium. For 2020, ourOur primary fuel price exposure wasis to natural gas asand, for 2023, natural gas expenses constituted 68%64% of our total fuel costs for the year.costs. We have taken steps to manage this exposure by entering into natural gas swap arrangements designed to manage potential fluctuations in our power rates due to changes in the price of natural gas. We have also entered into fixed or capped price contracts for some of our coal requirements. The operator of our nuclear plants manages price and supply risk through use of long-term fixed or capped price contracts with multiple vendors of uranium ore mining, conversion and enrichment services. However, these arrangements do not cover all of our and our members’ risk exposure to increases in the prices of fuels. Further, changes in the utilization of different generation resources may subject us to greater fuel price volatility. Despite the continued low prices for domesticHistorically, natural gas prices natural gas prices have historically been more volatile than other fuel sources and stable pricing cannot be assured. Further,sources. Geopolitical events or conflicts, the availability of shale gas and potential regulations affecting its accessibility and transport, and increasing natural gas demand from LNG terminals along the Gulf Coast may have a materialsignificant impact on the cost and supply of natural gas. Increases in fuel prices could significantly increase the cost of electric service we provide to our members and affect their ability to perform their contractual obligations to us.
18


Our ability to meet our financial obligations could be adversely affected if our members fail to perform their contractual obligations to us.
We depend primarily on revenue from our members under the wholesale power contracts to meet our financial obligations. Our members are our owners, and we do not control their operations or financial performance.
Under current Georgia law, our members generally have the exclusive right to provide retail electric service in their respective territories, subject to limited exceptions. Parties have unsuccessfully sought and will likely continue to seek to advance legislative proposals that will directly or indirectly affect the Georgia Territorial Act in order to allow increased retail competition in our members’ service territories which could affect our members’ financial performance. Further, our members must forecast their load growth and power supply needs.needs, including how to respond to the expected load growth in Georgia. If our members acquire more power supply resources than needed, whether from us or other suppliers, or fail to acquire sufficient resources, our members’ rates could increase excessively and affect their financial performance. Also, in times of weak economic conditions, sales by our members may not be sufficient to cover costs without rate increases, and our members may not collect all amounts billed to their consumers. Although each member has financial covenants to set rates to maintain certain margin levels and our members’ rates are not regulated by the Georgia Public Service Commission, pressure from their consumer members not to raise rates excessively could affect financial performance. Thus, we are exposed to the risk that one or more members could default in the performance of their obligations to us under the wholesale power contracts. Our ability to satisfy our financial obligations could be adversely affected if one or more of our members, particularly one of the larger members, defaulted on their payment obligations to us. Although the wholesale power contracts obligate non-defaulting members to pay the amount of
19

any payment default pursuant to a pro rata step-up formula, there can be no guarantee that the non-defaulting members would be able to fulfill this obligation.
Regulatory, Legislative and Legal Risk Factors
Legislative and regulatory actions intended to address climate change and to reduce greenhouse gas emissions, including carbon dioxide, may result in significant compliance costs or expenses.
Concerns regarding climate change continue to increase and the responses to those concerns by policymakers, regulators, investors, consumers and other stakeholders may affect us and our members in various ways. The costs associated with legislative or regulatory actions intended to reduce greenhouse gas emissions could be significant.
President Biden has signed a number of executive orders directing federal agencies to address climate change, environmental justice, and other environmental issues. President Biden also recommitted the United States to the Paris Climate Agreement effective in 2021. Also in 2021, under the Paris Climate Agreement’s format, the United States announced a nationally determined contribution for reducing economy-wide carbon dioxide emissions by 50-52% below 2005 levels by 2030. In order to meet the United States nationally determined contribution, analyses indicate that the power sector would have to reduce carbon dioxide emissions by about 80% below 2005 levels by 2030.
In May 2023, the Environmental Protection Agency, or EPA, published proposed rules to replace the Affordable Clean Energy rule that would limit greenhouse gas emissions from new, modified, reconstructed, and existing fossil-fuel power plants in a manner consistent with the United States’ nationally determined contribution. If finalized as proposed, the rules would likely adversely impact a portion of our coal and natural gas-fired generating units and have a significant impact on the U.S. power sector overall. EPA recently announced that it would address existing natural gas-fired facilities in a future rulemaking instead of the final rule. The ultimate impact of the proposed rules will depend on the final rules adopted by EPA and the results of any litigation challenging the rules and cannot be determined at this time.
Based on these developments, and trends more generally, we expect federal and state legislative and regulatory efforts to reduce the potential impacts of climate change and limit greenhouse gas emissions, including carbon dioxide, to continue. For example, the Inflation Reduction Act of 2022 includes significant financial incentives to accelerate the U.S. transition to a lower greenhouse gas emitting economy. Congress has also recently considered proposals that would mandate significant emissions reductions or increases in clean energy generation from the power sector. Passing new climate legislation, whether in the form of a carbon tax, a clean electricity standard or
19


another proposal, remains challenging in the near-term. The timing, cost and effect of any proposed or future laws or regulations attempting to address climate change and reduce greenhouse gas emissions are uncertain. If adopted, however, such laws or regulations could impose operational restrictions on affected generating facilities and impose substantial costs on our business.
Our costs of compliance with environmental laws and regulations are significant and have increased in recent years. Potential new or stricter environmental laws and regulations, including those designed to address air and water quality, greenhouse gas emissions, including carbon dioxide, coal combustion residuals and other matters, may result in significant increases in compliance costs or operational restrictions.
As with most electric utilities, we are subject to extensive federal, state and local environmental requirements which regulate, among other things, air pollutant emissions, wastewater discharges and the management of hazardous and solid wastes. Compliance with these requirements requires significant expenditures for the installation, maintenance and operation of pollution control equipment, monitoring systems and other equipment or facilities. Through 2020, we have spent approximately $1.1 billion on capital expenditures at our facilities or operating restrictions.
The EPA is expected to achieve and maintain compliance with Georgia’s “multi-pollutant rule” and Environmental Protection Agency's (EPA) Mercury and Air Toxics Standards (MATS), two air quality control regulations that have had a significant impact on our business to date. In addition, asfinalize several proposed rules over the course of December 31, 2020, we have spent approximately $242 million on capital expenditures related to coal ash handling, and expect to spend approximately $47 million more in the near future.
Upon coming into office, President Biden signed a number of executive orders directing federal agencies to address climate change, environmental justice, and other environmental issues. President Biden also recommitted the United States to the Paris Climate Agreement effective February 19, 2021. Under the agreement, the United States will submit nationally determined contributions (NDCs)2024, including for reducing global carbon dioxidegreenhouse gas emissions. As a result of these actions, future legislation or regulations at the federal level may emerge and create new requirements and operational hurdles. In addition, states continue to initiate stricter environmental and climate-related regulations. More stringent or new standards could require us to modify the design or operation of existing facilities and result in significant increases in the cost of electricity or decreases in the amount of energy (due to operational constraints) providedwe provide to our members. Examples of current and potential regulations are discussed below.
In July 2019, the EPA issued the final Affordable Clean Energy (ACE) rule to replace the Clean Power Plan. The ACE rule addresses carbon dioxide emissions from coal plants and requires states to develop unit-specific standards of performance based on six candidate technologies for heat rate improvements, plus best operation and maintenance practices. On January 19, 2021, the U.S. Court of Appeals for the D.C. Circuit vacated and remanded the ACE rule back to EPA. EPA is expected to undertake a new rulemaking that may place more stringent limitations on carbon dioxide emissions and existing power plants.
Because of these recent developments, and national trends generally, we expect that efforts to limit greenhouse gas emissions, including carbon dioxide, will continue. For example, the U.S. House of Representatives has developed a framework for legislation requiring the U.S. to achieve net-zero greenhouse gas emissions, including a 100% clean electricity standard, by 2050. Other proposals for federal legislation would impose a carbon tax to meet similar greenhouse gas reduction goals. Even with recent changes in the White House and Congress, passing new legislation in the form of a carbon tax or clean electricity standard remains challenging in the near-term, although some of the proposals could serve as the basis for future legislation. The timing, cost and effect of any future laws or regulations attempting to reduce greenhouse gas emissions are uncertain. If adopted, however, such laws or regulations could impose operational restrictions on affected generating facilities and impose substantial costs on our business, particularly our coal-fired units.
In April 2015, the EPA publishedissued a final rule to regulate coal combustion residuals from electric utilities as solid wastes. To comply with this rule, the ash ponds at Plants Wansley and Scherer ceased receiving new coal ash in early 2019We and Georgia Power has estimated closure activities for the ash ponds to be completed in 2026 and 2031, respectively. Currently, we and Georgia Power anticipate utilizing advanced engineering methods to close the existing ash ponds in place and have proposed such a planclosure plans for our co-owned coal ash ponds to the Georgia Environmental Protection Division. TheDivision (EPD). Georgia Power’s proposed closure plans are currently awaiting review. Ifhave been approved by the proposed plans are notGeorgia Public Service Commission but remain subject to EPD approval, and we cannot predict when they will be approved or statewhether either closure plan will require modifications. Costs associated with the closure of the ash ponds are reflected in the asset retirement obligations discussed below. If Georgia's requirements for coal ash disposal are subsequently revised and we andor the other co-owners of Plants Scherer and Wansleyproposed closure plans are instead required to construct lined coal ash disposal facilities,not approved, our estimated compliance costs wouldcould increase materially. In September 2015, the EPA also finalized a rule to revise the effluent limitations guidelines (ELG) that apply to certain wastewater discharges from nuclear and fossil fuel-fired steam electric power plants. ThisThe 2015 ELG rule was later revised in October 2020 for scrubber wastewater and bottom ash transport.2020. Then, in March 2023, EPA proposed a supplemental ELG rule that would increase the stringency of the current standards. We have already begun
20

are investing in facility upgrades to meet the coal combustion residuals rule and effluent limitations guidelines, and estimate our total capital cost for compliance at Plant Scherer to be approximately $289$230 million of which $242$170 million hashad been spent.spent as of December 31, 2023. Expenditures for the settlement of related asset retirement obligations at our operating and retired coal plants are approximately $400$600 million to $550$800 million (in year of expenditure dollars), approximately $11$50 million of which has alreadyhad been spent.spent as of December 31, 2023. We continue to review the ultimate cost of these rules on our co-owned coal facilities.facilities which may be affected by any revised rules or litigation challenging those rules and cannot be determined at this time.
Litigation relating to environmental issues, including claims of property damage, personal injury or common law nuisance caused by plant emissions, including greenhouse gases, wastewater discharges or solid waste disposal, including coal combustion residuals, is generally increasing throughout the U.S. Likewise, actions by private citizen groups to enforce environmental laws and regulations are also becoming increasingly prevalent.
While we will continue to exercise our best efforts to comply with all applicable regulations, there can be no assurance that we will always be in compliance with all current and future environmental requirements. Failure to comply with existing and future requirements, even if this failure is caused by factors beyond our control, could result in civil and criminal penalties and could cause the complete shutdown of individual generating units not in compliance with these regulations. Any additional federal or state environmental restrictions imposed on our operations could result in significant additional compliance costs, including capital expenditures. Such costs could affect future unit retirement and replacement decisions and may result in significant increases in the cost of electric service. The cost impact of future legislation, regulation, judicial interpretations of existing laws or regulations, or international obligations will depend upon the specific requirements thereof and cannot be determined at this time. For additional information regarding certain environmental regulations to which our business is subject, see "OUR“OUR BUSINESS —Regulation——REGULATION—Environmental.
20

"
General Business Risk Factors
WeTechnology and information systems utilized by us, our members and third parties with whom we do business are subject to risks related to the COVID-19 pandemic.
The World Health Organization and Centers for Disease Control and Prevention have declared a pandemic following the outbreakrisk of COVID-19, a respiratory disease caused by a new strainfailure, loss of coronavirus that is currently affecting many parts of the world, including the United States and Georgia. In response, most jurisdictions, including in the United States, have instituted restrictions on travel, public gatherings, and non-essential business operations. While some jurisdictions, including Georgia, have relaxed these restrictions, many of the restrictions remain in place and there is no guarantee that restrictions will not be reimposed and the availability and timing for distributing and administering vaccines to a significant population in Georgia is uncertain. For certain periods during 2020, these restrictions significantly disrupted economic activity across the United States, including Georgia, and caused volatility in capital markets as well as significant, although temporary, declines in the value of investment assets. Following the outbreak of COVID-19, our members were subject to an increased risk that their consumers may not be able to pay utility bills on timeaccess or may seek to enter into alternative payment plans.Despite the economic uncertainties experienced during 2020, our members have continued to pay all amounts due under the wholesale power contracts on a timely basis and we are not aware of a significant increase of bad debt with any of our members. The effects of the continued COVID-19 pandemic and related responsescybersecurity breaches which could include additional disruptions to capital markets, declines in the value of investment assets and extended disruptions to supply chains and a prolonged reduction in economic activity. These effects could have a variety of adverse impacts on us and our members, including continued reduced demand for energy in our members’ service territories, reduced cash flows and liquidity, reductions in investments recorded at fair value, and impairment ofaffect our ability to operate electricand expose us to litigation, regulatory action and reputational harm.
We operate in a highly regulated industry that requires the continued operation of advanced information technology systems and network infrastructure, which are part of broader interconnected systems. Because our generation facilities,resources are part of the nation’s energy infrastructure, we are at an increased risk of cyberattack.
Cyber actors, including those associated with foreign governments, have attacked and threatened to perform necessary corporateattack energy infrastructure. Various regulators have increasingly stressed that these attacks, including ransomware attacks, and attacks targeting utility systems and other critical infrastructure, are increasing in sophistication, magnitude, and frequency. In particular, certain actors, such as nation-state and state-sponsored actors, can deploy significant resources and employ sophisticated methods to plan and carry out attacks. Risk of these attacks may escalate during periods of heightened geopolitical tensions, such as those caused by the war in Ukraine and conflicts in the Middle East.
Our generation assets and information technology systems, and those of our co-owned plants, could be directly or indirectly affected by deliberate or unintentional cyber incidents. If our technology systems were to be breached or otherwise fail, we may be unable to fulfill critical business functions, including the operation of our generation assets and to access funds from financial institutions and capital markets.These economic disruptions could also adversely affect our members’ customers’ ability to pay for electric service.effectively maintain certain internal controls over financial reporting. We and our third party vendors have been subject to attempts to gain unauthorized access to our respective technology systems and confidential data and attempts to disrupt our operations. To date, none of the attempts on our systems have been successful; however, we cannot guarantee that our security efforts will prevent, detect or limit future attempts to breach or compromise our technology and information systems.
Further, as discussed above, COVID-19 may continueour generation assets rely on an integrated transmission system to deliver power to our members, and a disruption of this transmission system could negatively impact our ability to do so. In order to reduce the construction schedulelikelihood and project costs for Vogtle Units No. 3severity of any cyber incident, we have comprehensive cyber security programs designed to protect and No. 4.preserve the confidentiality, integrity and availability of data and systems. Despite these protections, a major cyber incident could result in significant business disruption and expenses to repair security breaches or system damage and could lead to litigation, regulatory action, including fines, and an adverse effect on our reputation.
Advances in power generation and energy storage technologies, including decreasing renewable energy costs and the broad adoption of distributed generation technologies, in our members’members' service territories could result in the cost of our electric service being less competitive.
Our business model is to provide our members with wholesale electric power at the lowest possible cost. A key element of this model is that generating power at central station power plants achieves economies of scale and produces power at a competitive cost. Renewable energy, distributed generation or energy storage technologies currently exist or are in development, such as large-scale batteries, fuel cells, micro turbines, windmills and solar cells, some of which are capable of
21

producing or storing electric power at costs that are comparable with, or lower than, our cost of generating power. Incentives for renewable energy generation to facilitate the transition to lower-carbon energy sources included in the Inflation Reduction Act could accelerate the adoption and deployment of such technologies. If these technologies were to develop sufficient economies of scale and be broadly adopted in our members’ service territories, it could adversely affect our ability to recover the fixed costs related to and the value of our generating facilities and significantly increase the cost of electric service we provide to our members and affect their ability to perform their contractual obligations to us.
We are subject to the risk that counterparties may fail to perform their contractual obligations which could adversely affect us.
We routinely execute transactions with counterparties in the energy and financial services industries. These transactions include credit facilities, facility construction, co-owner agreements, natural gas pipelines, contracts related to the market price and supply of natural gas and coal, and power sales and purchases. Many of these
21


transactions expose us to the risk that our counterparty may fail to perform its contractual obligations. If a defaulting counterparty is in poor financial condition, we may not be able to recover damages for any breach of contract.
In the context of facility construction, a counterparty’s failure to perform its contractual obligations under the applicable agreement could impact the project cost and schedule and potentially project completion.
Regardless of our financial condition, investors’ ability to trade our debt securities may be limited by the absence of an active trading market and there is no assurance that any trading market will develop or continue to remain active.
Our debt securities are not listed on any national securities exchange or quoted on any automated quotation system although certain series of our debt securities may be included in a fixed income index. Various dealers have made a market in certain of our debt securities and at times certain of our debt securities have an active trading market; however, other of our debt securities have no active trading market. Dealers or underwriters have no obligation to make a market in any of our debt securities and may terminate any market-making activities at any time, for any reason, without notice. Further, removal from any index may have an adverse effect on the liquidity of the trading market, if any, for our debt securities removed from that index. As a result, we cannot provide any assurance as to the liquidity of any trading market for our debt securities, the ability of holders to sell their debt securities or the price at which holders will be able to sell their debt securities.
Even in an active trading market, future prices of our debt securities will depend on several factors, including prevailing interest rates, the then-current ratings assigned to the debt securities, the number of holders of the debt securities, the amount of our debt securities outstanding, the market for similar securities and our financial and operating results.
Risks Related to the Exchange Offer and the Exchange Bonds Risk Factors
Any original bonds that are not exchanged will continue to be restricted securities and, following completion of the exchange offer, will have a less liquid trading market.
Original bonds that you do not tender or we do not accept will, following the exchange offer, continue to be subject to the restrictions on transfer applicable to the original bonds. The restrictions on transfer of your original bonds arise because we issued the original bonds under exemptions from, or in transactions not subject to, the registration requirements of the Securities Act and applicable state securities laws. In general, you may only offer or sell the original bonds if they are registered under the Securities Act and applicable state securities laws, or offered and sold under an exemption from these requirements. We do not plan to register the original bonds under the Securities Act. For further information regarding the consequences of tendering your original bonds in the exchange offer, see the discussion below under the caption "THE“THE EXCHANGE OFFER—Consequences of Failure to Exchange."
Because we anticipate that most holders of original bonds will elect to exchange their original bonds, we expect that the liquidity of the market for any original bonds remaining after the completion of the exchange offer will be substantially limited. Any original bonds tendered and exchanged in the exchange offer will reduce the aggregate principal amount of the original bonds outstanding. Following the exchange offer, if you do not tender your original bonds, you generally will not have any further registration rights, and your original bonds will continue to be subject to certain transfer restrictions. Accordingly, the liquidity of the market for the original bonds could be adversely affected by the exchange offer.
If an active trading market does not develop for the exchange bonds, you may be unable to sell the exchange bonds or to sell them at a price you deem sufficient.
The exchange bonds will be new securities for which there is no established trading market. We do not intend to apply for listing of the exchange bonds on any national securities exchange or to arrange for the exchange bonds to be quoted on any automated quotation system. As a result, we cannot provide any assurance as to:
the liquidity of any trading market that may develop for the exchange bonds;
the ability of holders to sell their exchange bonds; or
22


the price at which holders would be able to sell their exchange bonds.
Even if a trading market develops, the exchange bonds may trade at higher or lower prices than their principal amount or purchase price, depending on many factors, including:
prevailing interest rates;
the number of holders of the exchange bonds;
the interest of securities dealers in making a market for the exchange bonds; and
our operating results.
22


If a market for the exchange bonds does not develop, purchasers may be unable to resell the exchange bonds for an extended period of time. Consequently, a holder of exchange bonds may not be able to liquidate its investment readily, and the exchange bonds may not be readily accepted as collateral for loans. In addition, market-making activities will be subject to restrictions of the Securities Act and the Securities Exchange Act of 1934.
In addition, if a large number of the holders of original bonds do not tender original bonds or tender original bonds improperly, the limited amount of exchange bonds that would be issued or outstanding after we complete this exchange offer would adversely affect the development of a market for the exchange bonds.
You must comply with the exchange offer procedures in order to receive new, freely tradable exchange bonds.
Delivery of the exchange bonds in exchange for the original bonds tendered and accepted for exchange pursuant to the exchange offer will be made only after timely receipt by the exchange agent of the following:
certificates for original bonds or a book-entry confirmation of a book-entry transfer of original bonds into the exchange agent'sagent’s account at DTC, New York, New York as depository, including an agent'sagent’s message (as defined herein) if the tendering holder does not deliver a letter of transmittal;
a completed and signed letter of transmittal (or facsimile thereof), with any required signature guarantees, or an agent'sagent’s message in lieu of the letter of transmittal; and
any other documents required by the letter of transmittal.

Therefore, holders of original bonds who would like to tender original bonds in exchange for exchange bonds should allow enough time for the original bonds to be delivered on time. We are not required to notify you of defects or irregularities in tenders of the original bonds for exchange. The original bonds that are not tendered or that are tendered but we do not accept for exchange will, following consummation of the exchange Offer, continue to be subject to the existing transfer restrictions under the Securities Act and, upon consummation of the exchange Offer, certain registration and other rights under the registration rights agreement will terminate. See "THE“THE EXCHANGE OFFER—Procedures for Tendering Original Bonds"Bonds” and "THE“THE EXCHANGE OFFER—Consequences of Failure to Exchange."
Certain persons who participate in the exchange offer must deliver a prospectus in connection with resales of the exchange bonds.
Based on interpretations of the staff of the SEC contained in no-action letters to third parties, we believe that you may offer for resale, resell or otherwise transfer the exchange bonds without compliance with the registration and prospectus delivery requirements of the Securities Act. However, in some instances described in this prospectus under "PLAN“PLAN OF DISTRIBUTION," certain holders of exchange bonds will remain obligated to comply with the registration and prospectus delivery requirements of the Securities Act to transfer the exchange bonds. If a holder subject to the registration and prospectus delivery requirements of the Securities Act transfers any exchange bonds without delivering a prospectus meeting the requirements of the Securities Act or without an applicable exemption from registration under the Securities Act, that holder may incur liability under the Securities Act. We do not and will not assume or indemnify such a holder against this liability.
23


The market price of the exchange bonds will fluctuate.
Any material differences between our actual results and the historical results contained in our annual, quarterly and current reports filed with the SEC could have a significant adverse impact on the market price of the exchange bonds, assuming a market for the exchange bonds develops. In the event that a market develops, prevailing interest rates may cause the exchange bonds to trade at higher or lower prices than their principal amount or purchase price. In addition, any downgrade of our credit ratings could have a significant adverse impact on the market price of the exchange bonds, assuming a market develops.
2324


USE OF PROCEEDS

We will not receive any cash proceeds from the issuance of the exchange bonds pursuant to the exchange offer. In consideration for issuing the exchange bonds as contemplated in this prospectus, we will receive in exchange a like principal amount of original bonds. The original bonds surrendered in exchange for the exchange bonds will be retired and cancelled and cannot be reissued. Accordingly, the issuance of the exchange bonds will not result in any change in our capitalization.
2425

SELECTED FINANCIAL DATA
The summary financial data below present selected historical information relating to our financial condition and resultsstatistical data. The financial data presented as of operations asthe end of and for each ofyear in the yearsthree-year period ended December 31, 2020, 2019 and 2018. Summary financial data for the years ended December 31, 2020, 2019 and 2018 that are presented below were2023, has been derived from our audited consolidated financial statements. You should read the information contained in this table together with our financial statements, the related notes to the financial statements and the discussion of this information in this prospectus.
(dollars in thousands)
202020192018
STATEMENTS OF REVENUES AND EXPENSES DATA
Operating revenues:
Sales to Members$1,377,010 $1,429,852 $1,479,379 
Sales to non-Members608 440 734 
Operating expenses$1,159,909 $1,213,083 $1,255,137 
Other income, net$50,695 $64,189 $68,262 
Net interest charges$212,509 $226,937 $242,039 
Net margin$55,895 $54,461 $51,199 
BALANCE SHEET DATA
Assets:
Total electric plant$10,870,857 $9,855,856 $8,963,965 
Total assets$14,240,156 $12,990,113 $12,183,268 
Capitalization:
Patronage capital and membership fees$1,072,642 $1,016,747 $962,286 
Long-term debt and obligations under finance leases10,695,475 9,808,158 9,434,498 
Other26,861 25,196 21,428 
   Total long-term debt and equities$11,794,978 $10,850,101 $10,418,212 
Less: Long-term debt and finance leases due within one year208,649 217,440 522,289 
Less: Unamortized debt issuance costs and bond discounts119,565 111,222 103,331 
Total capitalization$11,466,764 $10,521,439 $9,792,592 
OTHER DATA
     Kilowatt hours sold to Members22,187,311 23,225,861 23,011,079 
     Member revenues per kWh sold6.21 ¢6.16 ¢6.43 ¢
     Equity Ratio(1)
9.1 %9.4 %9.2 %
     Margins for Interest Ratio(2)
1.141.141.14
Years Ended December 31,
202320222021
(in thousands)
Statement of Revenues and Expenses Data:
Operating revenues:
Sales to members$1,681,566 $1,974,683 $1,557,109 
Sales to non-members$58,619 $155,454 $47,754 
Operating expenses
$1,463,119 $1,936,086 $1,410,482 
Other income, net
$81,049 $72,244 $71,254 
Net interest charges
$292,325 $204,591 $207,854 
Net margin
$65,790 $61,704 $57,781 
As of December 31,
202320222021
(in thousands, except other selected data)
Balance Sheet Date:
Assets:
Total electric plant$12,680,395 $12,490,108 $11,757,327 
Total assets$16,524,851 $16,489,370 $15,707,026 
Capitalization:
Patronage capital and membership fees$1,257,917 $1,192,127 $1,130,423 
Long-term debt and obligations under finance leases12,149,489 12,001,694 10,983,930 
Obligation under Rocky Mountain transactions29,862 27,945 26,151 
Other5,152 2,256 1,550 
Total long-term debt and equities$13,442,420 $13,224,022 $12,142,054 
Less: Long-term debt and finance leases due within one year384,426 322,102 281,238 
Less: Unamortized debt issuance costs and bond discounts120,560 114,142 111,909 
Total capitalization
$12,937,434 $12,787,778 $11,748,907 
Other Selected Data:
Kilowatt hours sold to members (in thousands)28,289,147 25,634,984 24,727,585 
Member Revenues per Kilowatt hour5.94 ¢7.70 ¢6.30 ¢
Equity Ratio(1)
9.4 %9.0 %9.3 %
Margins for Interest Ratio(2)
1.14 1.14 1.14 
__________________
(1)For 2023, excludes test energy kilowatt-hours from Plant Vogtle Unit No. 3 supplied to members. Revenues and costs associated with test energy were capitalized.
(2)Our equity ratio is calculated, pursuant to our first mortgage indenture, by dividing patronage capital and membership fees by total capitalization plus unamortized debt issuance costs and bond discounts and long-term debt and finance leases due within one year ("(“Total long-term debt and equities"equities” in the table above). We have no financial covenant that requires us to maintain a minimum equity ratio; however, a covenant in the
first mortgage indenture restricts distributions of equity (patronage capital) to our members if our equity ratio is below 20%. We also have covenants in certain of our line of credit agreements that currently require us to maintain minimum total patronage capital of $750 million.
(2)(3)Our margins for interest ratio is calculated on an annual basis by dividing our margins for interest by interest charges, both as defined in our first mortgage indenture. The first mortgage indenture obligates us to establish and collect rates that, subject to any necessary regulatory approvals, are reasonably expected to yield a margins for interest ratio equal to at least 1.10 for each fiscal year. In addition, the first mortgage indenture requires us to demonstrate that we have met this requirement for certain historical periods as a condition to issuing additional obligations under the first mortgage indenture. See “SUMMARY OF THE FIRST MORTGAGE INDENTURE—Covenants.” For 2021,2024, our board of directors approved a budget to achieve a 1.14 margins for interest ratio, above the minimum 1.10 ratio required by the first mortgage indenture. As our capital requirements continue to evolve, our board of directors will continue to evaluate the level of margin coverage and may choose to change the targeted margins for interest ratio in the future, although not below 1.10.
2526

OUR BUSINESS

Business OverviewBUSINESS OVERVIEW
General
We are a Georgia electric membership corporation (an EMC) incorporated in 1974 and headquartered in metropolitan Atlanta. We are owned by our 38 retail electric distribution cooperative members. Our principal business is providing wholesale electric power to our members. As with cooperatives generally, we operate on a not-for-profit basis. We are one of the largest electric cooperatives in the United States in terms of revenues, assets, kilowatt-hour sales to members and, through our members, consumers served. We are also the second largest power supplier in the state of Georgia. We have 299337 employees.
Our members are local consumer-owned distribution cooperatives that provide retail electric service on a not-for-profit basis. In general, our members' customer base consists of residential, commercial and industrial consumers within specific geographic areas. Our members serve approximately 2.02.1 million electric consumers (meters) representing approximately 4.34.5 million people. See "—"OUR MEMBERS AND THEIR POWER SUPPLY RESOURCES."
Our Membersmailing address is 2100 East Exchange Place, Tucker, Georgia 30084-5336, and Their Power Supply Resources."telephone number is (770) 270-7600. We maintain a website at www.opc.com. Our annual reports on Form 10-K, quarterly reports on Form 10-Q, current reports on Form 8-K and amendments to those reports are made available on this website as soon as reasonably practicable after this material is filed with the Securities and Exchange Commission. Information contained on our website is not incorporated by reference into and should not be considered to be part of this annual report on Form 10-K.
Cooperative Principles
Cooperatives like Oglethorpe are business organizations owned by their members, which are also either their wholesale or retail customers. As not-for-profit organizations, cooperatives are intended to provide services to their members at the lowest possible cost, in part by eliminating the need to produce profits or a return on equity. Cooperatives may make sales to non-members, the effect of which is generally to reduce costs to members. Today, cooperatives operate throughout the United States in such diverse areas as utilities, agriculture, irrigation, insurance and banking.
All cooperatives are based on similar business principles and legal foundations. Generally, an electric cooperative designs its rates to recover its cost-of-service and to collect a reasonable amount of revenues in excess of expenses, which constitutes margins. The margins increase patronage capital, which is the equity component of a cooperative's capitalization. These margins are considered capital contributions (that is, equity) from the members and are held for the accounts of the members and returned to them when the board of directors of the cooperative deems it prudent to do so. The timing and amount of any actual return of capital to the members depends on the financial goals of the cooperative and the cooperative's loan and security agreements. See "—First Mortgage Indenture."
Power Supply Business
We provide wholesale electric service to our members for more than halfa significant portion of their aggregate power requirements primarily from our fleet of generation assets but also with power purchased from other power suppliers.suppliers from time to time. In 2023, we supplied energy that accounted for approximately 68% of the retail energy requirements of our members. We provide this service pursuant to long-term, take-or-pay wholesale power contracts. The wholesale power contracts obligate our members jointly and severally to pay rates sufficient for us to recover all the costs of owning and operating our power supply business, including the payment of principal and interest on our indebtedness and to yield a minimum 1.10 margins for interest ratio under our first mortgage indenture. Our members satisfy all of their power requirements above their purchase obligations to us with purchases from other suppliers. See "—Our Members And Their Power Supply Resources"OUR MEMBERS AND THEIR POWER SUPPLY RESOURCES – Member Power Supply Resources."
Our
27


As of December 31, 2023, our fleet of generating units total 7,8628,525 megawatts of summer planning reserve capacity, which includes 737733 megawatts of Smarr EMC assets that we manage but do not own. Our generation portfolio includes units powered by nuclear, gas, coal, oil and water. We also supply financial and management services to support Green Power EMC's purchase of energy from 320756 megawatts of renewable resources, including, low-impact hydroelectric, landfill gas, wood-waste biomass and solar facilities. See "—"– Relationship with Green Power EMC," "—Our Power Supply Resources,"OUR POWER SUPPLY RESOURCES," "—Our Members and Their Power Supply Resources"OUR MEMBERS AND THEIR POWER SUPPLY RESOURCES – Member Power Supply Resources" and "—Properties"PROPERTIES – Generating Facilities."
In 2020,2023, two of our members, Jackson EMC and Cobb EMC, accounted for approximately 15% and 13%11% of our total revenues, respectively. Each of our other members accounted for less than 10% of our total revenues in 2020.
26

Wholesale Power Contracts
TheWe have a wholesale power contracts we havecontract with each member arethat is substantially similarsimilar. On November 15, 2023, we and extend througheach of our members extended the term of the contracts from December 31, 2050 to December 31, 2085, and each contract will continue thereafter until terminated by three years' written notice by us or the respective member. Under the wholesale power contracts, each member is unconditionally obligated, on an express "take-or-pay" basis, for a fixed percentage of the capacity costs of each of our generation resources and purchased power resources with a term greater than one year. Each wholesale power contract specifically provides that the member must make payments whether or not power is delivered and whether or not a resource is completed, delayed, terminated, operable, operating, retired, sold, leased, transferred or is otherwise unavailable. We are obligated to use our reasonable best efforts to operate, maintain and manage our resources in accordance with prudent utility practices.
We have assigned fixed percentage capacity cost responsibilities to our members for all of our generation and purchased power resources, although not all members participate in all resources. For any future generation or purchased power resource, we will assign fixed percentage capacity cost responsibilities only to members choosing to participate in that resource. The wholesale power contracts provide that each member is jointly and severally responsible for all costs and expenses of all existing generation and purchased power resources, as well as for future resources, whether or not that member has elected to participate in the resource, that are approved by 75% of the members of our board of directors, 75% of our members and members representing 75% of our patronage capital. In the event a member defaults on all or a portion of its payment obligation, the default amount is shared first among the participating members in each resource in which the defaulting member participates. If all these participating members default, each non-participating member is expressly obligated to pay a proportionate share of the default.
Under the wholesale power contracts, we are not obligated to provide all of our members' capacity and energy requirements. Individual members must satisfy all of their requirements above their purchase obligations from us from other suppliers, unless we and our members agree that we will supply additional capacity and associated energy, subject to the approval requirements described above. In 2020, we supplied energy that accounted for approximately 57% of the retail energy requirements of our members. See "—Our Members and Their Power Supply Resources"OUR MEMBERS AND THEIR POWER SUPPLY RESOURCES – Member Power Supply Resources."
Under the wholesale power contracts, each member must establish rates and conduct its business in a manner that will enable the member to pay (i) to us when due, all amounts payable by the member under its wholesale power contract and (ii) any and all other amounts payable from, or which might constitute a charge or a lien upon, the revenues and receipts derived from the member's electric system, including all operation and maintenance expenses and the principal of, premium, if any, and interest on all indebtedness related to the member's electric system.
New Business Model Member Agreement
The New Business Model Member Agreement that we have with our members requires member approval for us to undertake certain activities. The agreement does not limit our ability to own, manage, control and operate our resources or perform our functions under the wholesale power contracts.
We may not provide services unrelated to our resources or our functions under the wholesale power contracts if these services would require us to incur indebtedness, provide a guarantee or make any loan or investment, unless approved by 75% of the members of our board of directors, 75% of our members, and members representing 75% of
28


our patronage capital. We may provide any other unrelated service to a member so long as (i) doing so would not create a conflict of interest with respect to other members, (ii) the service is being provided to all members or (iii) the service has received the three 75% approvals described above.
Electric Rates
Each member is required to pay us for capacity and energy we furnish under its wholesale power contract in accordance with rates we establish. We review our rates periodically but are required to do so at least once every year. We are required to revise our rates as necessary so that the revenues derived from our rates, together with our revenues from all other sources, will be sufficient to pay all of the costs of our system, including the payment of principal and interest on our indebtedness, to provide for reasonable reserves and to meet all financial requirements.
27

The formulary rate we established in the rate schedule to the wholesale power contracts employs a rate methodology under which all categories of costs are specifically separated as components of the formula to determine our revenue requirements. The rate schedule also implements the responsibility for fixed costs assigned to each member based on each member's fixed percentage capacity cost responsibilities for all of our generation and purchased power resources. The monthly charges for capacity and other non-energy charges are based on our annual budget. These capacity and other non-energy charges may be adjusted by our board of directors, if necessary, during the year through an adjustment to the annual budget. Energy charges reflect the pass-through of actual energy costs, including fuel costs, variable operations and maintenance costs and purchased energy costs. See "MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS – Summary of Cooperative Operations – Rate Regulation."
Under the first mortgage indenture, we are required, subject to any necessary regulatory approval, to establish and collect rates which are reasonably expected, together with our other revenues, to yield a margins for interest ratio for each fiscal year equal to at least 1.10. The formulary rate is intended to provide for the collection of revenues which, together with revenues from all other sources, are equal to all costs and expenses we recorded, plus amounts necessary to achieve at least the minimum 1.10 margins for interest ratio. In the event we were to fall short of the minimum 1.10 margins for interest ratio at year end, the formulary rate is designed to recover the shortfall from our members in the following year without any additional action by our board of directors.
Under our loan agreements with each of the Rural Utilities Service and Department of Energy, changes to our rates resulting from adjustments in our annual budget are generally not subject to their approval. We must provide the Rural Utilities Service and Department of Energy with a notice of and opportunity to object to most changes to the formulary rate under the wholesale power contracts. See "– Relationship with Federal Lenders." Currently, our rates are not subject to the approval of any other federal or state agency or authority, including the Georgia Public Service Commission.
First Mortgage Indenture
Our principal financial requirements are contained in the Indenture, dated as of March 1, 1997, from us to U.S. Bank Trust Company, National Association, as trustee (successor to SunTrust Bank)U.S. Bank National Association), as amended and supplemented, referred to herein as the first mortgage indenture. The first mortgage indenture constitutes a lien on substantially all of our owned tangible and certain of our intangible property, including property we acquire in the future. The mortgaged property includes our owned electric generating plants, the wholesale power contracts with our members and some of our contracts relating to the ownership, operation or maintenance of electric generation facilities owned by us.
Under our first mortgage indenture, we are required, subject to any necessary regulatory approval, to establish and collect rates which are reasonably expected, together with our other revenues, to yield a margins for interest ratio for each fiscal year equal to at least 1.10. The margins for interest ratio is determined by dividing margins for interest by total interest charges on debt secured under our first mortgage indenture. Margins for interest is the sum of:
our net margins (after certain defined adjustments), plus
29


interest charges on all indebtedness secured under our first mortgage indenture, plus
any amount included in net margins for accruals for federal or state income taxes.
Margins for interest takes into account any item of net margin, loss, gain or expenditure of any of our affiliates or subsidiaries only if we have received the net margins or gains as a dividend or other distribution from such affiliate or subsidiary or if we have made a payment with respect to the losses or expenditures. In addition, our margins include certain items that are excluded from the margins for interest ratio, such as non-cash capital credits allocation from Georgia Transmission Corporation.
Under our first mortgage indenture, we are prohibited from making any distribution of patronage capital to our members if, at the time of or after giving effect to the distribution, (i) an event of default exists under the first mortgage indenture, (ii) our equity as of the end of the immediately preceding fiscal quarter is less than 20% of our total long-term debt and equities, or (iii) the aggregate amount expended for distributions on or after the date on which our equity first reaches 20% of our total long-term debt and equities exceeds 35% of our aggregate net margins earned after such date. This last restriction, however, will not apply if, after giving effect to such distribution, our equity as of the end of the immediately preceding fiscal quarter is at least 30% of our total long-term debt and equities. As of December 31, 2020,2023, our equity ratio was 9.1%9.4%.
28

As of December 31, 2020,2023, we had approximately $10.6$12.1 billion of secured indebtedness outstanding under the first mortgage indenture. From time to time, we may issue additional first mortgage obligations ranking equally and ratably with the existing first mortgage indenture obligations. The aggregate principal amount of obligations that may be issued under the first mortgage indenture is not limited; however, our ability to issue additional obligations under the first mortgage indenture is subject to certain requirements related to the certified value of certain of our tangible property, repayment of obligations outstanding under the first mortgage indenture and payments made under certain pledged contracts relating to property to be acquired.
Relationship with Federal Lenders
Rural Utilities Service
Historically, federal loan programs administered by the Rural Utilities Service, an agency of the United States Department of Agriculture, have provided the principal source of financing for electric cooperatives. Loans guaranteed by the Rural Utilities Service and made by the Federal Financing Bank have been a major source of funding for us. However, Rural Utilities Service loan funds are subject to annual federal budget appropriations, and, due to budgetary and political pressures faced by Congress, the availability and magnitude of these loan funds cannot be assured. The budget for fiscal year 2021,2024, which began October 2020,2023, includes aan aggregate loan program level of $5.5 billion, the same as in recent years. The new Administration has not yet proposed a budget for fiscal year 2022.$6.5 billion. We cannot predict the amount or cost of Rural Utilities Service loans that may be available to us in the future.
We have a loan contract with the Rural Utilities Service. Under the loan contract, we may have to obtain approval from the Rural Utilities Service or provide the Rural Utilities Service with a notice and an opportunity to object before we take certain actions, including, without limitation,
significant additions to or dispositions of system assets,
significant power purchase and sale contracts,
changes to the wholesale power contracts and the formulary rate contained in the wholesale power contracts, and
changes to plant ownership and operating agreements.
As of December 31, 2020,2023, we had $2.4$2.7 billion of outstanding loans guaranteed by the Rural Utilities Service and secured under our first mortgage indenture.
30


Department of Energy
Pursuant to the loan guarantee program established under Title XVII of the Energy Policy Act of 2005, we entered into a loan guarantee agreement with the Department of Energy in 2014, pursuant to which the Department of Energy agreed to guarantee over $3.0 billion of our obligations under a multi-advance term loan facility with the Federal Financing Bank. Proceeds of advances made under the facility have been used to reimburse us for a portion of certain costs of construction relating to two additional nuclear units at Plant Vogtle that are eligible for financing under the Title XVII loan guarantee program.
On March 22, 2019, we and the Department of Energy executed an amended and restated loan guarantee agreement that added $1.6 billion to the loan guarantee. In connection with the increase of the loan guarantee, we entered into additional loan documents with the Federal Financing Bank to increase the aggregate amount available under the term loan facility. Proceeds of advances made under these facilities have been used to reimburse us for over $4.6 billion of costs of construction relating to two additional nuclear units at Plant Vogtle that are eligible for financing under the Title XVII loan guarantee program.
As of December 31, 2020, we hadWe have advanced $3.6 billion inall amounts available under the Department of Energy-guaranteed loans. In total, the Department of Energy-guaranteed2020, we began making principal payments on these loans will provide over $4.6and, at December 31, 2023, we had $4.2 billion of long-term financing at lower interest rates than our alternative sources of financings.outstanding. All advances received under this facility are secured under our first mortgage indenture.

29

Under the loan guarantee agreement, we may have to obtain approval from the Department of Energy or provide the Department of Energy with a notice and opportunity to object before we take certain actions, including, without limitation,
the transfer of our undivided ownership interest in Vogtle Units No. 3 and No. 4 prior to commercial operation of both units,
significant dispositions of assets pledged under our first mortgage indenture,
changes to the wholesale power contracts and the formulary rate contained in the wholesale power contracts,
certain changes to plant ownership and operating agreements relating to Vogtle Units No. 3 and No. 4, and
agreeing to the removal or replacement of Georgia Power Company or Southern Nuclear Operating Company, Inc. in their respective roles as agents for the Co-owners in connection with the additional Vogtle units.
For additional information regarding the terms of the loan guarantee agreement, including conditions to future advances and potential repayment over a five-year period, see Note 7a of Notes to Consolidated Financial Statements. For additional information on Vogtle Units No. 3 and No. 4, see "—Our Power Supply Resources"– OUR POWER SUPPLY RESOURCES – Future Power Resources – Vogtle Units No. 3 and No. 4."
Relationship with Georgia Transmission Corporation
We and our 38 members are members of Georgia Transmission Corporation (An Electric Membership Corporation), which was formed in 1997 to own and operate the transmission business we previously owned. Georgia Transmission provides transmission services to its members for delivery of its members' power purchases from us and other power suppliers. Georgia Transmission also provides transmission services to third parties. We have entered into an agreement with Georgia Transmission to provide transmission services for third party transactions and for service to our own facilities.
Georgia Transmission has rights in the integrated transmission system, which consists of transmission facilities owned by Georgia Transmission, Georgia Power Company, the Municipal Electric Authority of Georgia and the City of Dalton, Georgia. Through agreements, common access to the combined facilities that compose the integrated transmission system enables the owners to use their combined resources to make deliveries to or for their respective consumers, to provide transmission service to third parties and to make off-system purchases and sales. The integrated transmission system was established in order to obtain the benefits of a coordinated development of the parties' transmission facilities and to make it unnecessary for any party to construct duplicative facilities.
31


Relationship with Georgia System Operations Corporation
We, Georgia Transmission and our 38 members are members of Georgia System Operations Corporation, which was formed in 1997 to own and operate the system operations business we previously owned. Georgia System Operations operates the system control center and currently provides Georgia Transmission and us with system operations services and administrative support services. We have contracted with Georgia System Operations to schedule and dispatch our resources. We also purchase from Georgia System Operations services that it purchases from Georgia Power under the Control Area Compact, which we co-signed with Georgia System Operations. See "—Our Members and Their Power Supply Resources"OUR MEMBERS AND THEIR POWER SUPPLY RESOURCES – Members' Relationship with Georgia Transmission and Georgia System Operations." Georgia System Operations provides support services to us in the areas of accounts payable, payroll, auditing, human resources, campus services, telecommunications and information technology at cost.
As of December 31, 2020, we had approximately $11.5 million ofWe have made loans outstanding to Georgia System Operations primarily for the purpose of financing its capital expenditures. As of December 31, 2023, the balance of the loans outstanding was $10.3 million. Georgia System Operations has an additional $4.5 million that it can draw under one of its loans with us.
Georgia Transmission has contracted with Georgia System Operations to provide certain transmission system operation services including reliability monitoring, switching operations, and the real-time management of the transmission system.
30

Relationship with Georgia Power Company
Our relationship with Georgia Power is a significant factor in several aspects of our business. Except for the Rocky Mountain Pumped Storage Hydroelectric Facility, Georgia Power, on behalf of itself as a co-owner and as agent for the other co-owners, is responsible for the construction and operation of all our co-owned generating facilities, including the construction of Vogtle Units No. 3 and No. 4. For further information regarding the agreements between Georgia Power and us, see "—Properties"PROPERTIES – Fuel Supply," "– Co-Owners of Plants – Georgia Power Company" and "– The Plant Agreements." Georgia Power supplies services to us and Georgia System Operations to support the scheduling and dispatch of our resources, including off-system transactions. Georgia Power and our members are competitors in the State of Georgia for electric service to any new customer that has a choice of supplier under the Georgia Territorial Electric Service Act, which was enacted in 1973, commonly known as the Georgia Territorial Act (see "– Competition"). For further information regarding our members' relationships with Georgia Power, see "—Our Members and Their Power Supply Resources"OUR MEMBERS AND THEIR POWER SUPPLY RESOURCES – Service Area and Competition."
Relationship with Smarr EMC
Smarr EMC is a Georgia electric membership corporation owned by 35 of our 38 members. Smarr EMC owns two combustion turbine facilities with aggregate summer planning reserve capacity of 737733 megawatts. We provide operations, financial and management services forto Smarr EMC. See "—Our Members and Their Power Supply Resources"OUR MEMBERS AND THEIR POWER SUPPLY RESOURCES – Member Power Supply Resources."
As of December 31, 2020, we had $6.5 million loan available to Smarr EMC for the purpose of funding major maintenance expenditures. Currently, no amounts have been drawn under the loan.
Relationship with Green Power EMC
Green Power Electric Membership Corporation, owned by our 38 members, is a power supply cooperativeGeorgia electric membership corporation specializing in the purchase of renewable energy for its members. Green Power EMC currently manages 320purchases energy from 756 megawatts of renewable energy resources. By 2022,2025, the capacity is expected to increase by at least 26480 megawatts, bringing the total capacity to 584more than 836 megawatts. We supply financial and management services to Green Power EMC. For more information on the renewable resources of Green Power EMC, see "—Our Members and Their Power Supply Resources"OUR MEMBERS AND THEIR POWER SUPPLY RESOURCES – Member Power Supply Resources – Green Power EMC."
Competition
Under current Georgia law, our members generally have the exclusive right to provide retail electric service in their respective territories. However, the Georgia Territorial Act permits limited competition among electric utilities
32


located in Georgia for sales of electricity to certain large commercial or industrial customers. The owner of any new facility may receive electric service from the power supplier of its choice if the facility is located outside of municipal limits and has a connected load upon initial full operation of 900 kilowatts or more. Georgia is projected to experience significant load growth over the next several years. Our members are actively engaged in competition with other retail electric suppliers for thesea significant amount of new commercial and industrial loads. The number of commercial and industrial loads served by our members continues to increase annually. This limited competition has given our members the opportunity to develop resources and strategies to operate in a more competitive market.
Some states have implemented varying forms of retail competition among power suppliers. No legislation related to retail competition has yet been enacted in Georgia which would amend the Georgia Territorial Act or otherwise affect the exclusive right of our members to supply power to their current service territories. However, parties have unsuccessfully sought and will likely continue to seek to advance legislative proposals that will directly or indirectly affect the Georgia Territorial Act in order to allow increased retail competition in our members' service territories. The Georgia Public Service Commission does not have the authority under Georgia law to order retail competition or amend the Georgia Territorial Act.
We routinely consider, along with our members, a wide array of potential actions to meet future power supply needs, maintain competitive rates, adapt to technological innovations, including distributed generation and energy storage technologies, and respond to the evolving competitive and regulatory landscape. We cannot predict at this time the outcome of various developments that may lead to increased competition in the electric utility industry or the effect of any developments on us or our members.
31

Regulation of greenhouse gas emissions has the potential to affect energy suppliers, including us and our competitors, differently, depending on the relative greenhouse gas emissions from a supplier's sources and the nature of the regulation. Some of our generation sources emit greenhouse gases while others emit none. Comparatively, our competitors may rely on sources that emit proportionately more or less greenhouse gases than we do. Further, many of our members' third-party suppliers also rely on generation sources that emit greenhouse gases. The terms and conditions in the contracts with these third-party suppliers would determine the extent to which any greenhouse gas regulation of these suppliers affects our members. We believe our and our members' diverse portfolios of generation facilities, including the diversity of third-party suppliers, would mitigate impacts on our and our members' competitiveness resulting from any regulation. See "—Regulation"REGULATION – Environmental – Carbon Dioxide Emissions and Climate Change" and "RISK FACTORS."
Many members are also providing or considering proposals to provide non-traditional products and services such as natural gas, telecommunications (including broadband) and other services. The Georgia Public Service Commission can authorize member affiliates to market natural gas but is required to condition any authorization on terms designed to ensure that cross-subsidizations do not occur between the electricity services of a member and the gas activities of its gas affiliates. Among other conditions, for members providing broadband services through an affiliate, the Georgia Public Service Commission must approve a cost allocation manualallocations designed to ensure that cross-subsidizations do not occur between the broadband services and the electric and/or gas services of a member or its affiliates.

Further, a member's power supply planning may include consideration of assignment of its rights and obligations under its wholesale power contract to another member or a third party. We have existing provisions for wholesale power contract assignment, as well as provisions for a member to withdraw and concurrently to assign its rights and obligations under its wholesale power contract. Assignments upon withdrawal require the assignee to have certain published credit ratings and to assume all of the withdrawing member's obligations under its wholesale power contract with us, and must be approved by our board of directors. Assignments without withdrawal are governed by the wholesale power contract and must be approved by both our board of directors and the Rural Utilities Service.

From time to time, individual members may be approached by parties indicating an interest in purchasing their systems. A member generally must obtain our approval before it may consolidate or merge with any person or reorganize or change the form of its business organization from an electric membership corporation or sell, transfer, lease or otherwise dispose of all or substantially all of its assets to any person, whether in a single transaction or
33


series of transactions. A member may enter into such a transaction without our approval if specified conditions are satisfied, including, but not limited to, an agreement by the transferee, satisfactory to us, to assume the obligations of the member under the wholesale power contract, and certifications of accountants as to certain specified financial requirements of the transferee. The wholesale power contracts also provide that a member may not dissolve, liquidate or otherwise wind up its affairs without our approval.
Seasonal Variations
Our members' demand for energy is influenced by seasonal weather conditions. Historically, higher demand has occurred during summer and winter months than in spring and fall months. Even so, summer and winter demand historically has been lower when weather conditions are milder and higher when weather conditions are more extreme. A variety of factors affect our members' decisions whether to purchase their increased seasonal demand from us. See "MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATION – Results of Operations – Factors Affecting Results." While changing weather patterns, whether resulting from greenhouse gas emissions or otherwise, could, under certain circumstances, alter seasonal weather patterns, predictions of future changes in weather patterns are inherently speculative, and we cannot make accurate conclusions about seasonality related to changes in weather patterns. Our energy revenues recover energy costs as they are incurred and also fluctuate month to month. Capacity revenues are based upon budgeted expenditures and are generally recognized and billed to our members in substantially equal monthly installments over the course of the year. We may recognize capacity revenues that exceed our actual fixed costs and targeted margins in any given interim reporting period. At each interim reporting period, we assess our projected revenue requirements through year end and if required, we reduce our capacity revenues and recognize a refund liability to our members. See Note 1e of Notes to Consolidated Financial Statements for information regarding revenue recognition.
Human Capital

Our success depends on the people who are part of our company. We believe that in order to deliver superior performance and maximize the value of our members’ investment, we must attract and retain the most qualified workforce available. We further believe that a strong corporation requires initiative, commitment and talent from its employees and that exceptional results evolve from diversity, continuous improvement, personal development and the contributions of many
32

working toward common goals. We are focused on fostering innovation and leadership with our associates. We also place a strong emphasis on training because we know this ultimately leads to our associates’ professional success and the success of our company.

As of December 31, 2020,2023, we had 299337 employees. Substantially all of our associates are full-time employees and are located in Georgia. We have a formal Code of Conduct that, among other things, requires that we treat each other, and those outside our company with whom we do business, professionally and with fairness and respect. We must also conduct ourselves in a manner that promotes a favorable image of our company and a positive and professional workplace environment that promotes harmonious relationships among each other and our members.

We strive to provide fair and equitable compensation to each of our associates through a combination of competitive base pay, performance incentives, retirement plans and other benefits. The philosophy and objective of our compensation and benefits program is to establish and maintain competitive total compensation programs that will attract, motivate and retain the qualified skilled workforce necessary for our continued success. We set uniform performance goals at the corporate level. Those goals are the same for both executive officers and non-executive associates as achieving these performance incentives requires the effort and attention of associates across our business, see “EXECUTIVE COMPENSATION – Compensation Discussion and Analysis – Corporate Goals for Performance Pay.”

We are also committed to continuing efforts to enhance diversity, inclusion and equity. We are dedicated to creating and maintaining an environment that respects and values diversity, recognizes the rights of all individuals to mutual respect, and accepts others without biases based on differences of any kind.

Safety is a key concern of our management team. As an electric generation utility, we are committed to providing a safe work environment for all our associates. Our corporate goals, which are reflected in the
34


performance pay component of total compensation, reflect a commitment to provide comprehensive safety training and education and continue to find new ways to reduce workplace hazards.

Throughout the COVID-19 pandemic, we continued operating to provide electricity to our members and the populations they serve. To protect our associates, we implemented applicable business continuity plans, including working remotely where possible; increased cleaning frequency at business locations; and implemented applicable safety and health guidelines issued by federal and state officials. In June 2020, we began a phased reopening of our corporate offices with new safety protocols intended to reduce the risk of transmission of COVID-19. To date, these measures have been effective and we continue to keep in contact with state and federal regulators to ensure the safety of our associates and reliability of our generation facilities.

As an electric cooperative, we are also committed to being a positive influence in the communities we serve. To accomplish this goal, we support and encourage our associates to participate in a variety of initiatives and activities that help the communities where we and our members live and work.

Our Power Supply ResourcesOUR POWER SUPPLY RESOURCES
General
We supply capacity and energy to our members for a portion of their requirements from a combination of our fleet of generating assets and power purchased from other suppliers.assets. In 2020,2023, we supplied approximately 57%68% of the retail energy requirements of our members. Our members purchased the remaining 43%32% from a variety of suppliers, including Green Power EMC (renewable resources), Smarr EMC (gas-fired resources), Georgia Energy Cooperative (gas-fired resource), Southeastern Power Administration (hydroelectric power), and several power marketers and other wholesale suppliers. For more detailed information on these other purchases, see "—Our Members and Their Power Supply Resources"OUR MEMBERS AND THEIR POWER SUPPLY RESOURCES – Member Power Supply Resources."
Generating Plants
OurAs of December 31, 2023, our fleet of generating units total 7,8628,525 megawatts of summer planning reserve capacity, including 737733 megawatts of Smarr EMC assets, which we manage. Our generation portfolio includes interests in nuclear, coal, natural gas, oil and hydro units. Georgia Power, the Municipal Electric Authority of Georgia (MEAG) and the City of Dalton also have interests in nineseven of these units at Plants Hatch, Vogtle Wansley and Scherer. Georgia Power serves as operating agent for these nineseven units.
33

Georgia Power also has an interest in the three units at Rocky Mountain, which we operate. In addition to our 3133 generating units, we operate and manage six gas-fired generating units on behalf of Smarr EMC.
See "—Properties""PROPERTIES" for a description of our generating facilities, fuel supply and the co-ownership arrangements. For a description of Smarr EMC's assets, see "—Our Members and Their Power Supply Resources"OUR MEMBERS AND THEIR POWER SUPPLY RESOURCES – Member Power Supply Resources – Smarr EMC."
Power Purchase and Sale Arrangements
We currently have no material power purchase or sale agreements.
We supply financial and management services to support Green Power EMC's purchase of energy from 320756 megawatts of renewable resources, plus an additional 26480 megawatts under contract to be constructed. See "—Our Members and Their Power Supply Resources"OUR MEMBERS AND THEIR POWER SUPPLY RESOURCES – Member Power Supply Resources – Green Power EMC."
We have interchange, transmission and/or short-term capacity and energy purchase or sale agreements with a number of power marketers and other power suppliers. The agreements provide variously for the purchase and/or sale of capacity and energy and/or for the purchase of transmission service.
A recent filing atWe are a member of the FERC proposed a Southeast Energy Exchange Market (SEEM) that includeswhich began operating in 2022. SEEM, whose members include the traditional electric operating companies and many of the other electric service providers in the Southeast, including us. SEEM is an extension of the existing bilateral market wherein which participants would use an automated, intra-hour energy exchange to buy and sell power close tonear the time the energy is consumed, utilizing available unreserved transmission. If approved byOur participation in SEEM has had minimal impact on our business to date. On July 14, 2023, the FERC,U.S. Court of Appeals for the District of Columbia Circuit vacated certain Federal Electric Regulatory Commission orders related to SEEM is expectedand remanded the proceeding to begin service in early 2022.the Federal Electric Regulatory Commission. The ultimate outcome of this matter cannot be determined at this time.
35


Future Power Resources
Plant Vogtle Units No. 3 and No. 4
We, Georgia Power, the Municipal Electric Authority of Georgia (MEAG), and the City of Dalton, Georgia, acting by and through its Board of Water, Light and Sinking Fund Commissioners, doing business as Dalton Utilities (collectively, the Co-owners) are parties to an Ownership Participation Agreement that, along with other agreements, governs our participation in two additional nuclear units under construction at Plant Vogtle, Units No. 3 and No. 4. The Co-owners appointed Georgia Power to act as agent under this agreement. Our ownership interest and proportionate share of the cost to construct these units is 30%. Pursuant to this agreement, Georgia Power has designated Southern Nuclear Operating Company, Inc. as its agent for licensing, engineering, procurement, contract management, construction and pre-operation services.
In 2008, Georgia Power, acting for itself and as agent for the Co-owners, entered into an Engineering, Procurement and Construction Agreement (the EPC Agreement) with Westinghouse Electric Company LLC and Stone & Webster, Inc., which was subsequently acquired by Westinghouse and changed its name to WECTEC Global Project Services Inc. (collectively, Westinghouse). Pursuant to the EPC Agreement, Westinghouse agreed to design, engineer, procure, construct and test two 1,100 megawatt nuclear units using the Westinghouse AP1000 technology and related facilities at Plant Vogtle.
Until March 2017, construction on Units No. 3 and No. 4 continued under the substantially fixed price EPC Agreement. In March 2017, Westinghouse filed for bankruptcy protection under Chapter 11 of the United States Bankruptcy Code. Effective in July 2017, Georgia Power, acting for itself and as agent for the other Co-owners, and Westinghouse entered into a services agreement (the Services Agreement), pursuant to which Westinghouse is providing facility design and engineering services, procurement and technical support and staff augmentation on a time and materials cost basis. The Services Agreement provides that it will continue until the start-up and testing of Vogtle Units No. 3 and No. 4 is complete and electricity is generated and sold from both units. The Services Agreement is terminable by the Co-owners upon 30 days’ written notice.
In October 2017, Georgia Power, acting for itself and as agent for the other Co-owners, entered into a construction completion agreement with Bechtel Power Corporation, pursuant to which Bechtel serves as the primary contractor for the remaining construction activities for Vogtle Units No. 3 and No. 4 (the Bechtel Agreement). The Bechtel Agreement is a cost reimbursable plus fee arrangement, whereby Bechtel and is reimbursed for actual costs plus a base fee and an at-risk fee, which is subject to adjustment based on Bechtel’s performance against cost and schedule targets. Each Co-owner is severally, and not
34

jointly, liable for its proportionate share, based on its ownership interest, of all amounts owed to Bechtel under the Bechtel Agreement. The Co-owners may terminate the Bechtel Agreement at any time for their convenience, provided that the Co-owners will be required to pay amounts related to work performed prior to the termination (including the applicable portion of the base fee), certain termination-related costs and, at certain stages of the work, the applicable portion of the at-risk fee. Bechtel may terminate the Bechtel Agreement under certain circumstances, including certain Co-owner suspensions of work, certain breaches of the Bechtel Agreement by the Co-owners, Co-owner insolvency and certain other events.
On July 31, 2023, Georgia Power placed Unit No. 3 in service.
Cost and Schedule
Our current budget for our 30% ownership interest inand proportionate share of the cost to construct Vogtle Units No. 3 and No. 4 is $7.530%, representing approximately 660 megawatts. As of December 31, 2023, our actual costs related to the new Vogtle units were approximately $8.2 billion, net of $1.1 billion we received from Toshiba Corporation under a Guarantee Settlement Agreement and approximately $384 million we received from Georgia Power in connection with cost-sharing provisions of the Global Amendments and settlement agreement described below.
Our current budget, which includes capital costs and allowance for funds used during construction, is a range of $8.3-8.35 billion and is based on a commercial operation date in the second quarter of 2024 for Unit No. 4 and Georgia Power continuing to pay 66% of our allocation30% share of the project-level contingency and a separate Oglethorpe-level contingency. Asremaining cost of December 31, 2020,construction pursuant to the settlement agreement described below. Any schedule extension beyond June 2024 for Unit No. 4 is expected to increase our total investment in the additional Vogtle units wascosts by approximately $6.0 billion.$20 million per month. We and some of our members have implemented various rate management programs to lessen the impact on rates whenrelated to the additional Vogtle Units No. 3 and No. 4 reach commercial operation. The Georgia Public Service Commission approved in-service dates for Vogtle Units No. 3 and No. 4 are November 2021 and November 2022, respectively.units.
As part of its ongoing process,processes, Southern Nuclear continues to evaluate cost and schedule forecasts for Unit No. 4 on a regular basis to incorporate current information available, particularly in the areas of engineering support, commodity installation, system turnoversstart-up testing and related test results and workforce statistics.
The August 2018 project-level budget included an $800 million construction contingency estimate, of which our 30% interest was $240 million. As of June 30, 2020, assignments of contingency exceeded the 2018 construction contingency estimate by $75 million (of which our 30% interest was $23 million) and Georgia Power established $250 million of additional construction contingency (of which our 30% interest is $75 million). During the third and fourth quarters of 2020, this construction contingency, plus an additional $10 million (of which our 30% interest was $3 million) was assigned to the base capital cost forecast. Assignment of contingency during 2020 addressed cost risks related to construction productivity, including the April 2020 reduction in workforce designed to mitigate impacts of the COVID-19 pandemic described below; other COVID-19 impacts; craft labor incentives; additional resources for supervision, field support, project management, initial test program, start-up, engineering support and operations and maintenance support; subcontracts; and procurement, among other factors. These factors continue to represent further potential cost risk to the project; therefore Georgia Power established $375 million of additional contingency as of December 31, 2020 (of which our 30% interest is $112.5 million). Georgia Power has stated its expectation to allocate the remainder of this project-level contingency by completion of the project.
The project-level contingency is separate and in addition to our Oglethorpe-level contingency. The Oglethorpe-level contingency, which we have carried at various levels since the beginning of the project, was designed to cover potential cost, schedule, and financing risks associated with our share of the project which may not be covered by project-level contingencies. As construction progresses, the Oglethorpe-level contingency may continue to fluctuate as it represents the difference between known project-level costs and contingencies and our total budget of $7.5 billion. At the end of the project, if there is remaining Oglethorpe-level contingency, we will adjust our project budget to remove this contingency and bill our members based on the actual project costs. The table below shows our project budget and actual costs through December 31, 2020 for our 30% interest in the project.

support.
3536

(in millions)
Project BudgetActual Costs at December 31, 2020Remaining Project Budget
Construction Costs (1)
$5,559 $4,754 $805 
Financing Costs1,578 1,259 319 
   Total Costs$7,137 $6,013 $1,124 
Project-Level Contingency$113 $— $113 
Oglethorpe-Level Contingency250 — 250 
   Total Contingency$363 $— $363 
Totals$7,500 $6,013 $1,487 
(1) Construction costs are net of $1.1 billion received from Toshiba Corporation under a Guarantee Settlement Agreement.

In mid-March 2020,On May 1, 2023, hot functional testing was completed for Unit No. 4. On July 20, 2023, Southern Nuclear began implementing policiesannounced that all Unit No. 4 inspections, tests, analyses, and procedures designedacceptance criteria documentation had been submitted to mitigate the risk of transmission of COVID-19 atNuclear Regulatory Commission, and, on July 28, 2023, the construction site, including worker distancing measures, isolating individuals who have tested positiveNuclear Regulatory Commission published its 103(g) finding that the accepted criteria in the combined license for COVID-19, are showing symptoms consistent with COVID-19, are being tested for COVID-19, or haveUnit No. 4 had been in close contact with such persons, requiring self-quarantine,met, which allowed nuclear fuel to be loaded and adopting additional precautionary measures. In April 2020,start-up testing to begin. Fuel load was completed on August 19, 2023. On October 6, 2023, Georgia Power actingannounced that during start-up and pre-operational testing for itself andUnit No. 4, Southern Nuclear had identified a motor fault in one of four reactor coolant pumps, which was replaced. With Unit No. 3’s four reactor coolant pumps operating as agent fordesigned, Southern Nuclear has stated that it believes that the motor fault on the single Unit No. 4 reactor coolant pump is an isolated event. However, any findings related to the root cause analysis of the motor fault on the affected pump could require engineering changes or remediation related to the other Co-owners, announced a reduction in workforce at Vogtle UnitsUnit No. 3 and Unit No. 4 and began reducing the then-existing site workforce by approximately 20%. This reduction in workforce was a mitigation action intended to address ongoing challenges with labor productivity that were exacerbated by the impact of the COVID-19 pandemic on the Vogtle Units No. 3 and No. 4 workforce and construction site by increasing productivity of the remaining workforce and reducing workforce fatigue and absenteeism. Further, it was also intended to allow for increased social distancing by the workforce and facilitate compliance with the recommendations from the Centers for Disease Control and Prevention. The April 2020 workforce reduction did reduce absenteeism, providing an improvement in operational efficiency and allowing for increased social distancing. Since April 2020, the number of active cases of COVID-19 at the site has fluctuated and continues to impact productivity levels and pace of activity completion.reactor coolant pumps.
From November 2020 through January 2021, the number of active COVID-19 cases at the site increased significantly, consistent with a national rise in cases, which further impacted productivity and the pace of activity completion. Although still present, this spike in cases has since abated intoOn February and early March. The incremental cost associated with COVID-19 mitigation actions and impacts on construction productivity is currently estimated by1, 2024, Georgia Power to be between $325announced that during start-up and $415 million (of which our 30% interest is $98 to $125 million) and is included in the project budget. As described previously, Georgia Power included estimated costs associated with near-term COVID-19 mitigation actions and related impacts on construction productivity in the additional project-level contingency established as of December 31, 2020. The continuing effects of the COVID-19 pandemic could further disrupt or delay construction,pre-operational testing supervisory, and support activities at Vogtle Units No. 3 and No. 4.
The project continues to face challenges, exacerbated by this recent rise in COVID-19 cases, including, but not limited to, higher than expected absenteeism; overall construction and subcontractor labor productivity; system turnover and testing activities; and electrical equipment and commodity installation.
As a result of these factors, overall production levels were not achieved at the levels anticipated, contributing to the December 31, 2020 allocation of construction contingency and increase in total project capital cost forecast described previously. Southern Nuclear has further extended certain milestone dates, including the start of hot functional testing and fuel load for Unit No. 3. The4, Southern Nuclear had identified, and remediated, vibrations associated with certain piping within the cooling system. Considering the remaining pre-operational testing, Georgia Power disclosed that it projects Unit No. 3 schedule is challenged,4 will be placed in service during the second quarter 2024. On February 14, 2024, Unit No. 4 achieved self-sustaining nuclear fission, commonly referred to as initial criticality, and whileon March 1, 2024, the ability to achieve the November 2021 regulatory in-service date remains a target for Southern Nuclear, we believe a delay is likely which could add a month or moregenerator successfully synchronized to the Unit No. 3 in-service date. As Unit No. 3 approaches hot functional testing, key factors impactingpower grid and generated electricity for the schedule include bothfirst time.
Meeting the pace of work package completion and system turnovers, and required construction remediation work.
Achievement of the November 2022 regulatoryprojected in-service date for Unit No. 4 primarilysignificantly depends on overall construction productivitythe progression of start-up and production levels significantly improving as well as appropriate levels of craft laborers, particularly electrical and pipefitter craft labor, being added and maintained. In the event that there is any schedule extension beyond the November 2021 and November 2022 regulatory in-service dates for Units No. 3 and No. 4, respectively, the Oglethorpe-level contingency level in our current $7.5 billion budget is expected topre-operational testing, which may be sufficient to withstand up to a 4-month delay for Unit
36

No. 3 and a 3-month delay for Unit No. 4. Any further delays beyond these extended dates are expected to impact our costimpacted by approximately $55 million per month for both units and approximately $25 million per month forequipment or other operational failures. As Unit No. 4 only, including financing costs.
As construction, including subcontract work, continuesprogresses further through testing, ongoing and testing and system turnover activities increase, risks remain thatpotential future challenges withmay also include the management of contractors and vendors; subcontractor performance; supervisionvendors, the availability of craft labormaterials and related productivity, particularly in the installation of electrical, mechanical, and instrumentation and controls commodities, ability to attract and retain craft labor,parts, and/or related cost escalation; procurement, fabrication, delivery, assembly, installation, system turnover,the availability of supervisory and technical support resources; and the initialtimeframe and duration of pre-operational testing.
New challenges also may continue to arise as Unit No. 4 moves further into testing and start-up, including anywhich may result in required engineering changes or any remediation related thereto, ofto plant systems, structures or components (some of which are based on new technology that has only within the last fewseveral years began initial operation in the global nuclear industry at this scale), any. These challenges may result in further schedule delays and/or cost increases.
With the receipt of which may require additional labor and/or materials; or other issues could arise and further impact the projected schedule and estimated cost.
There have been technical and procedural challenges to the construction and licensing of VogtleNuclear Regulatory Commission’s 103(g) findings for Units No. 3 and No. 4 atin August 2022 and July 2023, respectively, the federal and state level and additional challenges may arise. Processes are in place that are designed to assure compliance with the requirements specified in the Westinghouse Design Control Document and the combined construction and operating licenses, including inspections by Southern Nuclear and the Nuclear Regulatory Commission that occur throughout construction. Findings from such inspections could require additional remediation and/or further Nuclear Regulatory Commission oversight. In addition, certain license amendment requests have been filed and approved or are pending before the Nuclear Regulatory Commission. On August 10, 2020, the Atomic Safety Licensing Board rejected the Blue Ridge Environmental Defense League’s May 11, 2020 petition challenging a license amendment request. The staff of the Nuclear Regulatory Commission has issued the requested amendment to the combined construction and operating license for Vogtle Unit No. 3. The Blue Ridge Environmental Defense League appealed the Atomic Safety Licensing Board’s decisionsite is subject to the Nuclear Regulatory Commission, which was denied on December 22, 2020. The Blue Ridge Environmental Defense League also filed a motion to reopen the proceedingCommission’s operating reactor oversight process and submitted an amended contention on December 7, 2020, which is pending before the Nuclear Regulatory Commission.
must meet applicable technical and operational requirements contained in its operating license. Various design and other licensing-based compliance matters including the timely submittal by Southern Nuclear of the inspections, tests, analyses, and acceptance criteria documentation for each unit and the related reviews and approvals by the Nuclear Regulatory Commission necessary to support authorization to load fuel, may arise, which may result in additional license amendmentsamendment requests or require other resolution. If any license amendment requests or other licensing-based compliance issues including inspections, tests, analyses, and acceptance criteria, are not resolved in a timely manner, there may be further delays in the project schedule that could result in increased costs to the Co-owners.costs.
The ultimate outcome of these matters cannot be determined at this time.
Co-Owner Contracts and Other Information
In November 2017, the Co-owners entered into an amendment to their joint ownership agreements for Vogtle Units No. 3 and No. 4 to provide for, among other conditions, additional Co-owner approval requirements. These joint ownership agreements, including the Co-owner approval requirements, were subsequently amended, effective August 31, 2018. As described below, certain provisions of the Joint Ownership Agreements were modified further onin September 26, 2018 by the Term Sheet that was memorialized onin February 18, 2019 when the Co-owners entered into certain amendments (the Global Amendments) to the Joint Ownership Agreements (as amended, the Joint Ownership Agreements).
On January 11, 2018, the Georgia Public Service Commission issued an order related to the construction of Vogtle Units No. 3 and No. 4. Among other actions, the Public Service Commission (i) accepted Georgia Power’s recommendation to continue construction of Vogtle Units No. 3 and No. 4, with Southern Nuclear serving as construction manager and Bechtel as primary contractor and (ii) approved the revised schedule placing Unit No. 3 in service in November 2021 and Unit No. 4 in service in November 2022. Third parties filed two petitions with the Fulton County Superior Court seeking judicial review of the Georgia Public Service Commission’s January 11, 2018 order. The petitions were dismissed by the Superior Court and later remanded by the Georgia Court of Appeals. The Fulton County Superior Court issued another order dismissing the petitions and, in August 2020, the petitioners withdrew their notice of appeal. This matter is now concluded.
As a result of an increase in the total project capital cost forecast and Georgia Power’s decision not to seek recovery of its allocation of the increase in the base capital costs and the increased construction budget in connection with Georgia Power’s 19th VCMnineteenth Vogtle construction monitoring report (VCM 19) in 2018, the holders of at least 90% of the ownership interests in Vogtle Units No. 3 and No. 4
37

were required to vote to continue construction. In September 2018, the Co-owners unanimously voted to continue construction of Vogtle Units No. 3 and No. 4.
37


In connection with the September 2018 vote to continue construction, Georgia Power entered into a binding term sheet with the other Co-owners and MEAG’s wholly-owned subsidiaries MEAG Power SPVJ, LLC, MEAG Power SPVM, LLC, and MEAG Power SPVP, LLC that mitigatedto mitigate certain financial exposure for the other Co-owners and offered to purchase production tax credits from each of the other Co-Owners, at that Co-owner’s option (the Term Sheet). OnIn February 18, 2019, the Co-owners entered into the Global Amendments to memorialize the provisions of the Term Sheet. Pursuant to the Global Amendments and consistent with the Term Sheet, the Joint Ownership Agreements provide that:
each Co-owner iswas obligated to pay its proportionate share of construction costs for Vogtle Units No. 3 and No. 4 based on its ownership interest up to (i) the estimated cost at completion (EAC) for Vogtle Units No. 3 and No. 4 which formed the basis of Georgia Power's forecast of $8.4 billion in Georgia Power's nineteenth VCM report19 filed with the Georgia Public Service Commission plus (ii) $ 800$800 million of additional construction costs.costs;
Georgia Power will bewas responsible for 55.7% of construction costs, subject to exceptions such as costs that are a result of a force majeure event, that exceed the EAC in the nineteenth VCM report19 by $800 million to $1.6 billion (resulting in up to $80 million of potential additional costs to Georgia Power which would save Oglethorpe up to $44 million), with the remaining Co-owners responsible for 44.3% of such costs pro rata in accordance with their respective ownership interests (equal to 24.5% for our 30% ownership interest); and
Georgia Power will bewas responsible for 65.7% of construction costs, subject to exceptions such as costs that are a result of a force majeure event, that exceed the EAC in the nineteenth VCM report19 by $1.6 billion to $2.1 billion (resulting in up to a further $100 million of potential additional costs to Georgia Power which would save Oglethorpe up to an additional $55 million), with the remaining Co-owners responsible for 34.3% of such costs pro rata in accordance with their respective ownership interests (equal to 19.0% for our 30% ownership interest).
If the EAC iswas revised and exceedsexceeded the EAC in the nineteenth VCM report19 by more than $2.1 billion, each of the Co-owners, other than Georgia Power, will havehad a one-time option at the time the project budget forecast is so revised to tender a portion of its ownership interest to Georgia Power in exchange for Georgia Power’s agreement to pay 100% of such Co-owner’s remaining share of construction costs actually incurred in excess of the EAC in the nineteenth VCM report19 plus $2.1 billion. In this event,
On October 5, 2023, we entered into a settlement agreement with Georgia Power to resolve the litigation regarding the proper interpretation of the cost-sharing and tender provisions of the Global Amendments. Under the terms of the agreement, among other items:
Georgia Power agreed that its total liability with respect to the cost-sharing bands was $99 million, plus $5 million of financing costs related to certain payments made under protest related to the cost-sharing bands. Georgia Power made $37.5 million of cost-sharing payments prior to the settlement date and paid us an additional $66.5 million at the time of the settlement agreement for the remaining balance.
Georgia Power will pay 66% of our 30% share of incremental costs of construction that exceed a total project budget of $19.2 billion as such costs are incurred and with no adjustment for costs related to COVID-19 or any other force majeure event. Based on the current project budget, Georgia Power would havepay a total of $346.3 million of our construction costs. Georgia Power paid us $241.2 million at the option of cancelling the project in lieu of purchasing a portiontime of the ownership interestsettlement agreement for construction costs previously paid by us and, based on the current project budget, would make $105.1 million in total payments after the settlement date for remaining construction costs. Georgia Power’s ultimate payments pursuant to this arrangement will depend on the final cost of any other Co-owner. If Georgia Power acceptsVogtle Units No. 3 and No. 4 and may be greater or less than the estimated payments based on the current project budget.
We retracted our tender offer to purchase a portion of another Co-owner’sand retained our full 30% ownership interest in Vogtle Units No. 3 and No. 4, the ownership interest to be conveyed from the tendering Co-owner to Georgia Power will be calculated based on the proportion of the cumulative amount of construction costs paid by each such tendering Co-owner and by Georgia Power as of the commercial operation date of Vogtle Unit No. 4. For purposes of this calculation, payments made by Georgia Power on behalf of another Co-owner in accordance with the second and third bullets above will be treated as payments made by the applicable Co-owner. This option to tender a portion of our interest to Georgia Power upon such a budget increase would allow us to freeze our construction budget associated with the Vogtle project in exchange for a portion of our 30% ownership interest.
Pursuant to the Global Amendments, the Co-owners will continue to retain a third party to independently consult, advise and report to the Co-owners on issues pertaining to (i) project management and controls, (ii) organizational controls, (iii) commercial management plans and (iv) interim project reports until released by 67% of the Co-owners.
Pursuant to the Joint Ownership Agreements, as amended by the Global Amendments, the holders of at least 90% of the ownership interests in Vogtle Units No. 3 and No. 4 must vote to continue construction, or can vote to suspend construction, if certain adverse events occur, including: (i) the bankruptcy of Toshiba Corporation; (ii) termination or rejection in bankruptcy of certain agreements, including the Services Agreement, the Bechtel
38


Agreement or the agency agreement with Southern Nuclear; (iii) Georgia Power publicly announces its intention not to submit for rate recovery any portion of its investment in Vogtle Units No. 3 and No. 4 (or associated financing costs) or the Georgia Public Service Commission determines that any of Georgia Power's costs relating to the construction of Vogtle Units No. 3 and No. 4 will not be recovered in retail rates, excluding any additional amounts paid by Georgia Power on behalf of the other Co-owners pursuant to the Global Amendment provisions described above and the first 6% of costs during any six-month VCM reporting period that are disallowed by the Georgia Public Service Commission for recovery, or for which Georgia Power elects not to seek cost recovery, through retail rates or (iv) an incremental extension of one year or more overfrom the most recently approved schedule. In addition, pursuant to the Joint Ownership Agreements, the required approvalseventeenth VCM report estimated in-service dates of holders of ownership interests in Vogtle
38

November 2021 and November 2022 for Units No. 3 and No. 4, isrespectively (each a Project Adverse Event). The schedule extensions, announced in February 2022, which reflected a cumulative delay of over a year for each unit from the schedules approved in the seventeenth VCM report, triggered the requirement for the holders of at least (i) 90% for a change of the primary construction contractor and (ii) 67% for material amendments to the Services Agreement or agreements with Southern Nuclear or the primary construction contractor, including the Bechtel Agreement.
The Global Amendments provide that Georgia Power may cancel the project at any time at its sole discretion. In the event that Georgia Power determines to cancel the project or fewer than 90% of the Co-ownersownership interests in Vogtle Units No. 3 and No. 4 to vote to continue construction, upon the occurrence of a subsequent project adverse event, we and the other Co-owners would assess our optionsunanimously voted to continue construction. On August 30, 2023, Georgia Power filed an application with the Georgia Public Service Commission, which included a public announcement that Georgia Power did not intend to submit for the Vogtle project. If the investment were to be written off, we would seek regulatory accounting treatment to amortize the investment over a long-termrate recovery an amount that is greater than 6% of costs during any VCM reporting period, which requirestriggered the approvalrequirement for a Co-owner vote to continue construction. All of our board of directors, and we would submit the regulatory accounting treatment details to the Rural Utilities Service for its approval. Further, if Georgia Power or the Co-owners decidedvoted to cancel the project, the Department of Energy would have the discretion to require that we repay all amounts outstanding under our loan guarantee agreement with the Department of Energy over a five-year period as discussed in Note 7 of Notes to Consolidated Financial Statements.continue construction.
The ultimate outcome of these matters cannot be determined at this time.
Financing
We have loans from the Federal Financing Bank guaranteed by the Department of Energy to fundprovide funding for over $4.6 billion of the cost to construct our 30% undivided interest in Vogtle Units No. 3 and No. 4. These loans began amortizing in 2020 and, in December 2022, we made the last advance under these loans. As of December 31, 2020, we have borrowed $3.62023, $4.2 billion under these guaranteed loans.of the loans remained outstanding. For additional information regarding terms of the loan and loan guarantee agreement with the Department of Energy, including conditions for future advances, potential repayment over a five-year period, covenants and events of default, see Note 7a of Notes to Consolidated Financial Statements.
We have alsoAs of December 31, 2023, we had financed $2.3$3.2 billion of the capital costs of the Vogtle units through capital market debt issuances. Combined withWe anticipate financing the $4.6 billion loan guaranteed byremaining costs of the Vogtle units and amounts amortized under the Department of Energy, we have arranged financing for more than 92% of our $7.5 billion budget. We anticipate financing any project costs not guaranteed by the Department of EnergyEnergy-guaranteed loan in the capital markets. For additional information regarding the financing of Vogtle Units No. 3 and No. 4, see “MANAGEMENT'S DISCUSSION OF AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS—Financial Condition—Financing Activities—Department of Energy-Guaranteed Loans.”
Under the Bipartisan Budget Act of 2018, we qualify for nuclear production tax credits related to Vogtle Units No. 3 and No. 4. We expectBeginning with the commercial operation of Unit No. 3, we began to receive these tax credits in accordance with our 30% ownership interest in the Vogtle Units. We estimate that the nominal value of our allocation of production tax credits will be approximatelyup to $700 million and will be earned for eight years post commercial operation. Pursuant to the Global Amendments, Georgia Power agreed to purchase our allocation of production tax credits at varying purchase prices dependent upon the actual cost to complete construction of Vogtle Units No. 3 and No. 4 as compared to the EAC included in the nineteenth VCM report.19. Based on the current project budget, the purchase price would beis 98% of face value. Any purchases will be at our option and would occur after suchWe sold all production tax credits are earned.earned in 2023 to Georgia Power and received an aggregate amount of $21.7 million and used the proceeds to offset operating costs for Unit No. 3. We willexpect to continue to analyze various options to monetize these credits with one or more third parties, including Georgia Power. In order to maximize the value of theseselling earned production tax credits we do not anticipate entering into any agreement to sell these production tax credits until one or both of the Vogtle Units reach commercial operation. We expectGeorgia Power and will continue to use the proceeds received from the sale of production tax credits to offset operating costs following commercial operation of the new Vogtle Units. Any amountsAmounts received from these sales will not affect our project budget.
The ultimate outcome of these matters cannot be determined at this time.

See “RISK FACTORS” for a discussion of certain risks associated with the licensing, construction, financing and operation of nuclear generating units.
EffinghamBaconton Power Facility
In May 2023, we acquired one generating unit at the Baconton Power Plant, a four-unit 188 megawatt natural gas-fired combustion turbine facility located near Baconton, Georgia, from Baconton Power, LLC. Our unit has an
39


aggregate summer planning reserve generation capacity of approximately 45 megawatts. Our unit also features dual-fuel capability and can run on diesel fuel that is stored on site.
Some of our members elected to take service (scheduling members) at the date of acquisition and some members have elected to defer (deferring members) their share of output until on or before January 2026. Prior to the deferring members’ use of Baconton, their share of output is being sold into the wholesale market. Revenues and costs of output associated with scheduling members are recognized in the current period. Residual net results of operations, including related interest costs of deferring members, are deferred as a regulatory asset. This regulatory asset will be amortized over the then remaining life of the plant, estimated to be 14 years at January 2026. If a deferring member elects to take service before January 2026, amortization of that member's share of the regulatory asset will begin upon taking service.
Walton County PowerPlant
On March 1, 2021,In August 2023, we entered intosigned a purchase and sale agreement with Southeast PowerGen,Mackinaw Power, LLC an affiliateto purchase Walton County Power, LLC, owner of the Carlyle Group Inc., to purchase EffinghamWalton County Power Plant. The Walton facility consists of three natural gas-fired combustion turbine electric generating units with a 511 megawatt natural gas combined cycle facilitynominal capacity of 465 megawatts located in Walton County, Georgia. ThisThe acquisition is subject to customary closing conditions including regulatory approvals, and is expected to close in the second quarter of 2021.2024.
Grid Resilience and Innovation Partnerships (GRIP) Program
39

TableIn October 2023, we, together with the Georgia Environmental Finance Authority, Georgia Transmission and Georgia System Operations, were selected for a $250 million grant under the Department of ContentsEnergy’s Grid Resilience and Innovation Partnerships (GRIP) Program. As part of the grant application, we applied for an aggregate of 75 megawatts of utility-scale battery storage which is estimated to utilize approximately $80 million of the total award. Receipt of any grant proceeds is subject to meeting program requirements and customary closing conditions and the ultimate projects financed with these funds may change from the initial application.
Other Future Power Resources
From time to time,Based on significant projected load growth in Georgia, we may assistand our members in investigatingare evaluating potential new power supply resources, after complianceto meet our members’ anticipated power supply needs and are evaluating potential funding opportunities through the Rural Utilities Service Empowering Rural America program. Before acquiring or constructing any generation resource, we must comply with the terms of the New Business Model Member Agreement. See "—Business Overview"OUR BUSINESS – New Business Model Member Agreement."
Our Members and Their Power Supply ResourcesOUR MEMBERS AND THEIR POWER SUPPLY RESOURCES
Member Demand and Energy Requirements
Our members are listed below and include 38 of the 41 electric distribution cooperatives in the State of Georgia.
Altamaha EMC
Amicalola EMC
Canoochee EMC
Carroll EMC
Central Georgia EMC
Coastal EMC (d/b/a Coastal Electric
Cooperative)
Cobb EMC
Colquitt EMC
Coweta Fayette EMC
Diverse Power Incorporated, 
an EMC
Excelsior EMC
Flint EMC (d/b/a Flint Energies)
Grady EMC
GreyStone Power Corporation,
an EMC
Habersham EMC
Hart EMC
Irwin EMC
Jackson EMC
Jefferson Energy Cooperative, an
EMC
Little Ocmulgee EMC
Middle Georgia EMC
Mitchell EMC
Ocmulgee EMC
Oconee EMC
Okefenoke Rural EMC
Planters EMC
Rayle EMC
Satilla Rural EMC
Sawnee EMC
Slash Pine EMC
Snapping Shoals EMC
Southern Rivers Energy, Inc.,
an EMC
Sumter EMC
Three Notch EMC
Tri-County EMC
Upson EMC
Walton EMC
Washington EMC
40


Our members serve approximately 2.02.1 million electric consumers (meters) representing approximately 4.34.5 million people. Our members serve a region covering approximately 38,000 square miles, which is approximately 65% of the land area in the State of Georgia, encompassing 151 of the State's 159 counties. Historically, our members' sales by customer class have been approximately two-thirds to residential consumers and slightly less than one-third to commercial and industrial consumers. Our members are the principal suppliers for the power needs of rural Georgia. While our members do not serve any major cities, portions of their service territories are in close proximity to urban areas and have experienced substantial growth over the years due to the expansion of urban areas, including metropolitan Atlanta, into suburban areas and the growth of suburban areas into neighboring rural areas. Each year we file an exhibit containing financial and statistical information for our 38 members for the most recent three year period with our first or second quarter Form 10-Q.
The following table shows the aggregate peak demand and energy requirements of our members for the years 20182021 through 2020,2023, and also shows the amount of their energy requirements that we supplied. From 20182021 through 2020,2023, peak demand of the members and their energy requirements have fluctuated based on various factors. We estimate that theIn August 2023, our member system hit a new summer peak demand of 10,088 megawatts. In December 2022, our member system hit its overall impactpeak demand of COVID-19 on10,810(4) megawatts, eclipsing our members' energy requirements to be a decreaseprior peak of approximately one percent.10,018 megawatts achieved in June 2022.
Member Energy Requirements (MWh)
Member Peak
Demand (MW)(1)
Total(2)
Supplied by Oglethorpe(3)
20209,47139,208,22422,187,311
20199,47640,385,81323,255,861
20188,85840,179,74323,011,079
Member Energy Requirements (MWh)
Member Peak Demand (MW)(1)
Total(2)
Supplied by Oglethorpe(3,5)
202310,088 41,370,456 28,289,147 
202210,810 (4)42,175,373 25,634,984 
20219,284 39,701,458 24,727,600 
__________________
(1)System peak hour demand of our members measured at our members' delivery points (net of system losses), adjusted to include requirements served by us and member resources, to the extent known by us, behind the delivery points. Also includes energy we supplied to our own facilities.
(2)Retail requirements served by our and member resources, adjusted to include requirements served by resources, to the extent known by us, behind the delivery points. See "– Member Power Supply Resources." Also includes energy we supplied to our own facilities.
(3)Includes energy supplied to members for resale at wholesale. Also includes energy we supplied to our own facilities.
40(4)System peak hour demand measured at our generating resources was 11,077 megawatts and system peak hour demand measured at our members' delivery points was 10,810 megawatts.

For 2023, excludes test energy megawatt-hours from Plant Vogtle Unit No. 3 supplied to members. Revenues and costs associated with test energy were capitalized.
Service Area and Competition
The Georgia Territorial Act regulates the service rights of all retail electric suppliers in the State of Georgia. Pursuant to the Georgia Territorial Act, the Georgia Public Service Commission assigned substantially all areas in the State to specified retail suppliers. With limited exceptions, our members have the exclusive right to provide retail electric service in their respective territories, which are predominately outside of the municipal limits existing at the time the Georgia Territorial Act was enacted in 1973. The principal exception to this rule of exclusivity is that electric suppliers may compete for most new retail loads of 900 kilowatts or greater. Parties have unsuccessfully sought and will likely continue to seek to advance legislative proposals that will directly or indirectly affect the Georgia Territorial Act in order to allow increased retail competition in our members' service territories.
The Georgia Public Service Commission may reassign territory only if it determines that an electric supplier has breached the tenets of public convenience and necessity. The Georgia Public Service Commission may transfer service for specific premises only if: (i) it determines, after joint application of electric suppliers and proper notice and hearing, that the public convenience and necessity require a transfer of service from one electric supplier to another; or (ii) it finds, after proper notice and hearing, that an electric supplier's service to the premises is not adequate or dependable or that its rates, charges, service rules and regulations unreasonably discriminate in favor of or against the consumer utilizing the premises and the electric utility is unwilling or unable to comply with an order from the Georgia Public Service Commission regarding the service.
41


The Georgia Territorial Act allows limited competition among electric utilities in Georgia by allowing the owner of any new facility located outside of municipal limits and having a connected load upon initial full operation of 900 kilowatts or greater to receive electric service from the retail supplier of its choice. Georgia is projected to experience significant load growth over the next several years. Our members, with our support, are actively engaged in competition with other retail electric suppliers for thesea significant amount of new commercial and industrial loads. The number of commercial and industrial loads served by our members continues to increase annually. This limited competition has given our members and us the opportunity to develop resources and strategies to operate in an increasingly competitive market.
For further information regarding members' competitive activities, see "—Business Overview"OUR BUSINESS – Competition."
Cooperative Structure
Our members are cooperatives that operate their systems on a not-for-profit basis. Accumulated margins derived after payment of operating expenses and provision for depreciation constitute patronage capital of the consumers of our members. Refunds of accumulated patronage capital to the individual consumers may be made from time to time subject to limitations contained in mortgages between the members and the Rural Utilities Service or loan documents with other lenders. The Rural Utilities Service mortgages generally prohibit these distributions unless (i) after any of these distributions, the member's total equity will equal at least 30% of its total assets or (ii) distributions do not exceed 25% of the margins and patronage capital received by the member in the preceding year and equity is at least 20% of total assets. See "– Members' Relationship with the Rural Utilities Service."
We are a membership corporation, and our members are not our subsidiaries. Except with respect to the obligations of our members under each member's wholesale power contract with us and our rights under these contracts to receive payment for power and energy supplied, we have no legal interest in (including through a pledge or otherwise), or obligations in respect of, any of the assets, liabilities, equity, revenues or margins of our members. See "—Business Overview"OGLETHORPE POWER CORPORATION – Wholesale Power Contracts." The assets and revenues of our members are, however, pledged under their respective mortgages with the Rural Utilities Service or loan documents with other lenders.
We depend on the revenue we receive from our members pursuant to the wholesale power contracts to cover the costs of operation of our power supply business and satisfy our debt service obligations.
Rate Regulation of Members
Through provisions in the loan documents securing loans to the members, the Rural Utilities Service exercises control and supervision over the rates for the sale of power of our members that borrow from it. The Rural Utilities Service mortgage indentures of these members require them to design rates with a view to maintaining an average times interest earned ratio and an average debt service coverage ratio of not less than 1.25 and an operating times interest earned ratio and an operating debt service coverage ratio of not less than 1.10, in each case for the two highest out of every three successive years.
41

Table of Contents
The Georgia Electric Membership Corporation Act, under which each of the members was formed, requires the members to operate on a not-for-profit basis and to set rates at levels that are sufficient to recover their costs and to provide for reasonable reserves. The setting of rates by the members is not subject to approval by any federal or state agency or authority other than the Rural Utilities Service, but the Georgia Territorial Act prohibits the members from unreasonable discrimination in the setting of rates, charges, service rules or regulations and requires the members to obtain Georgia Public Service Commission approval of long-term borrowings.
Cobb EMC, Diverse Power Incorporated, an EMC, Mitchell EMC, Oconee EMC, Okefenoke Rural EMC, Snapping Shoals EMC and Walton EMC have repaid all of their Rural Utilities Service indebtedness and are no longer Rural Utilities Service borrowers. Each of these members now has a rate covenant with its current lender. Other members may also pursue this option. To the extent a member that is not a Rural Utilities Service borrower engages in wholesale sales or sales of transmission service in interstate commerce, it would, in certain circumstances, be subject to regulation by the Federal Energy Regulatory Commission under the Federal Power Act.
42


Members' Relationship with the Rural Utilities Service
Through provisions in the loan documents securing loans to the members, the Rural Utilities Service also exercises control and supervision over the members that borrow from it in such areas as accounting, other borrowings, construction and acquisition of facilities, and the purchase and sale of power.
Historically, federal loan programs providing direct and guaranteed loans from the Rural Utilities Service to electric cooperatives have been a major source of funding for the members. Under the current Rural Utilities Service loan programs, electric distribution borrowers are eligible for loans made by the Federal Financing Bank or other lenders and guaranteed by the Rural Utilities Service. Certain borrowers with either low consumer density or higher than average rates and lower than average consumer income are eligible for special loans that bear interest at an annual rate of 5%. However, Rural Utilities Service loan funds are subject to annual federal budget appropriations, and, due to budgetary and political pressures faced by Congress, the availability and magnitude of these loan funds cannot be assured.
The budget for fiscal year 2021,2024, which began October 2020,2023, includes a loan program level of $5.5 billion, the same as in recent years. The new Administration has not yet proposed a budget for fiscal year 2022.$6.5 billion. We cannot predict the amount or cost of Rural Utilities Service loans that may be available to the members in the future. For additional information regarding the Rural Utilities Service, see "—Business Overview"OUR BUSINESS – Relationship with Federal Lenders – Rural Utilities Service."
Members' Relationships with Georgia Transmission and Georgia System Operations
Georgia Transmission provides transmission services to our members for delivery of our members' power purchases from us and other power suppliers. Georgia Transmission and the members have entered into member transmission service agreements under which Georgia Transmission provides transmission service to the members pursuant to a transmission tariff. The member transmission service agreements have a minimum term for network service until December 31, 2060. The members' transmission service agreements include certain elections for load growth above 1995 requirements, with notice to Georgia Transmission, to be served by others. These agreements also provide that if a member elects to purchase a part of its network service elsewhere, it must pay appropriate stranded costs to protect the other members from any rate increase that they would otherwise incur. Under the member transmission service agreements, members have the right to design, construct and own new distribution substations.
Georgia System Operations has contracts with each of its members, including Georgia Transmission and us, to provide to them the services that it in turn purchases from Georgia Power under the Control Area Compact, which we co-signed with Georgia System Operations. Georgia System Operations also provides operation services for the benefit of our members through agreements with us, including dispatch of our resources and other power supply resources owned by the members.
For information about our relationship with Georgia System Operations, see "—Business Overview"OUR BUSINESS – Relationship with Georgia System Operations Corporation."
42

Table of Contents
Member Power Supply Resources
Oglethorpe Power Corporation
In 2020,2023, we supplied approximately 57%68% of the retail energy requirements of our members. Pursuant to the wholesale power contracts, we supply each member energy from our generation resources based on its fixed percentage capacity cost responsibility, which are take-or-pay obligations. See "—Business Overview"OUR BUSINESS – Wholesale Power Contracts." Our members satisfy all of their requirements above their purchase obligations to us with purchases from other suppliers as described below.
Contracts with Southeastern Power Administration
Thirty-three of our members purchase hydroelectric power from the Southeastern Power Administration, or SEPA, under contracts that will continue until terminated by two years' written notice by SEPA or the respective member. At January 1, 2021,2024, the aggregate SEPA allocation of capacity to the members was 569570 megawatts plus
43


associated energy. The availability of energy under these contracts is significantly affected by hydrologic conditions, including lengthy droughts. Each member must schedule its energy allocation, and each member, other than Flint EMC, has designated us to perform this function. Pursuant to a separate agreement, we schedule, through Georgia System Operations, our members' SEPA power deliveries. Further, each member may be required, if certain conditions are met, to contribute funds for capital improvements for U.S. Army Corps of Engineers projects from which its allocation is derived in order to retain the allocation.
Smarr EMC
Smarr EMC is a Georgia electric membership corporation owned by 35 of our 38 members. Smarr EMC owns two combustion turbine facilities with aggregate capacity of 737733 megawatts. The 35 members participating in these two facilities purchase the output of those facilities pursuant to separate take-or-pay power purchase agreements that will continue until terminated by one year's written notice by Smarr EMC or the respective member.
Green Power EMC
Each of our members is also a member of Green Power Electric Membership Corporation, a power supply cooperative specializing in the purchase of renewable energy for its members. Green Power EMC currently purchases energy from 320756 megawatts of solar, low-impact hydroelectric, landfill gas and wood-waste biomass and solar facilities, with an additional 26480 megawatts under contract and under construction, with plans to purchase more in the future. Included in this total is energy purchased from Green Power Solar, a for-profit subsidiary of Green Power EMC, which has leased, with an option to purchase, tentwelve solar facilities with a total of approximately 10 megawatts.
Georgia Energy Cooperative
Fifteen of our members are members of Georgia Energy Cooperative, An Electric Membership Corporation, which owns a 100 megawatt gas turbine facility and also provides other services to its members.
Other Member Resources
Our members obtain their remaining power supply requirements from various sources. Thirty-oneAll members are parties to requirements contracts with third parties for some or all of their incremental power needs. The other members use a portfolio of short-term and long-term power purchase contracts tothat meet their incremental requirements. These requirements contracts and long-term power purchase contracts have remaining terms ranging from 2-212 to 17 years.
These other purchases include 314 megawatts of renewable energy resources including 309 megawatts from solar facilities under long-term contracts, with an additional 287 megawatts under construction.
We have not undertaken to obtain a comprehensive list of member power supply resources. Any of our members may have committed or may commit to additional power supply obligations not described above.
For information about members' activities relating to their power supply planning, see "—Our Business"OUR BUSINESS  – Competition" and "—Our Power Supply Resources"OUR POWER SUPPLY RESOURCES – Future Power Resources." In addition to future power supply resources that we may
43

Table of Contents
construct or acquire for our members, the members will likely also continue to acquire future resources from other suppliers, including suppliers that may be owned by members.
Regulation
Environmental
General
As an electric utility, we are subject to a wide range of federal, state and local environmental laws. Air emissions, solid waste disposal, effluent water discharges, and water usage are extensively controlled, closely monitored, and periodically reported. The manner in which various types of wastes can be stored, transported and disposed is also comprehensively regulated.
In general, environmental requirements applicable to the electric power sector are becoming increasingly prescriptive and stringent.stringent, and the Environmental Protection Agency, or EPA, intends to finalize a number of rules in 2024 that could impact our power plants. Although we have installed an extensive array of environmental control systems at our plants to ensure continued compliance with all existing applicable requirements, including systems to reduce emissions of sulfur dioxide, nitrogen oxides, mercury and other regulated air pollutants, at Plants Scherer and Wansley, new environmental regulatory requirements could be imposed. Such additional requirements, if adopted, could substantially increase the cost of electric service by requiring modifications in the design or operation of existing facilities.facilities and making new facilities more difficult to site and more expensive to build. Failure to comply with these requirements could result
44


in us becoming subject to enforcement actions and the assessment of civil and criminal penalties andpenalties. In extreme cases of non-compliance, such enforcement actions could even requireinclude the complete shutdown of individual generating units not in compliance in some cases.units. Certain of our debt instruments also require us to comply in all material respects with laws, rules, regulations and orders imposed by applicable governmental authorities, which include current and future environmental laws or regulations. Should we fail to comply with these requirements, it would constitute a default under those debt instruments. Although we intend to comply with all current and future regulations, we cannot guarantee that we will always be in full compliance with every applicable requirement.
Our capital expenditures and operating costs continue to reflect expenses necessary to comply with all applicable environmental standards.requirements and regulations. For further discussion of expected future capital expenditures to comply with environmental requirements and regulations, see "MANAGEMENT'S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS – Financial Condition – Capital Requirements – Capital Expenditures."
Air Quality
Environmental regulations adopted at the federal and state levels have had and will continue to have a significant impact on the electric utility industry. The most significant environmental regulations for us continue to be the air regulatory requirements imposed under the Clean Air Act. These requirements include stringent regulations for controlling emissions of sulfur dioxide, nitrogen oxides, particulate matter, mercury, greenhouse gases, and other air pollutants from affected electric utility units, including the coal-fired units at Plants Scherer and Wansley.units. The Environmental Protection Agency, or EPA has actively regulated emissions under the Clean Air Act and the following are the most significant ongoing Clean Air Act regulatory requirements that affect or may affect our business.
National AmbientControls for Meeting Air Quality Standards and Nonattainment Updates.Standards.    Pursuant to the Clean Air Act, EPA sets National Ambient Air Quality Standards (NAAQS) for the following six air pollutants: particulate matter, ground-level ozone, carbon monoxide, sulfur dioxide, nitrogen dioxide and lead. EPA is required to review the existing NAAQS every five years to determine whether anya tightening of these standards should be made more stringent. Pursuantis necessary to a review completed in 2015, EPA tightened the NAAQS for ground-level ozone. In response to EPA's adoption of the 2015 eight-hour ozone NAAQS, Georgia submitted proposed ozone air quality designations and recommend that eight counties in the Atlanta area be designated "nonattainment" and the other counties in Georgia be classified as "attainment or unclassifiable." Nonattainment is defined as having air quality that fails to meet the minimum levels established by the NAAQS. In 2018, the nonattainment designations for those eight counties in Georgia became effective.
In December 2018,protect public health. On February 6, 2024, EPA published a final rule that establishedlowered the requirementscurrent annual particulate matter (PM2.5) standard from 12 parts per billion (ppb) down to 9 ppb but retained the existing 24-hour standards for certain particulate matter. This more stringent standard is likely to place additional geographic regions into nonattainment and procedures that states must follow in implementingcould affect future siting decisions for new generation, as well as impose additional costs and potential operating restrictions. However, such regulatory determinations will not be made for several more years. We are reviewing the control measures and other applicable requirements necessaryfinal rule, but at this time, it is too early to achievedetermine the 2015 NAAQS ozone standard through State Implementation Plans (SIPs). For Georgia, the SIP will establish control measures and other requirementsextent to bring back into attainment the eight counties designated as nonattainment. The SIP measures will likely impose, among other things, additional nitrogen oxide and volatile organic compound emission reduction requirements on manywhich, if any, EPA’s proposed tightening of the major stationary sources located within the designated eight countiesPM2.5 standard, if adopted, might have on Plant Scherer and in surrounding counties if those emissions are deemed toour gas-fired generating units.
44

Table of Contents
contribute significantly to the nonattainment status of this Atlanta ozone nonattainment area. Georgia must submit its SIP to EPA by August 3, 2021.
Furthermore, Georgia may have to adopt additional emissions reductions to address the interstate transport of ozone air pollution that contributes significantly to attainment or interferes with the maintenance of the 2015 ozone NAAQS in neighboring states. At this time, no determination has been made regarding whether emissions sources in Georgia are significantly contributing to such an ozone nonattainment air quality problem.
WhileGenerally speaking, while our coal-fired power plantsunits at Plant Scherer have installedhad control systems installed to reduce emissions and achieve current ambient air quality standards, the new finalized or any future revised NAAQS could lead to additional emissions reduction requirements. The costsCosts of any additional or upgraded pollution control equipment or operating restrictions that could be required because of new or revisedmore stringent NAAQS cannot be determined at this time.time, neither can we determine such impacts on our coal or natural gas-fired generating units.
Air Quality Summary.  We believe that the emission control systems currently installed at PlantsPlant Scherer and Wansleyour natural gas-fired generating units are generally sufficient to meet the air quality requirements described above. However, the regulation of air emissions has been and is expected to continue to be fluid and additional emissions reduction requirements could be imposed on major sources within Georgia, including at our co-owned coal-firedpower plants, to remedy any local and interstate transport air quality problems for the 2015 eight-hour ozone standard.problems. Subsequent developments, including litigation and new implementation approaches adopted by EPA and Georgia could require significant capital expenditures and increased operating expenses at certain of our generating facilities, particularly Plants Scherer and Wansley.Plant Scherer.
Carbon Dioxide Emissions and Climate Change
Emissions of carbon dioxide from our fossil-fueled power plants totaled 7.59.9 million shortmetric tons in 2020. 2023. Compared to 2007,2005, our overall carbon dioxide emissions rate has declined by 43% through a combination of market factors, and our commitment to running highly efficient units.units with lower carbon dioxide emissions rates and retirement
45


of Plant Wansley in 2022. From coal alone, our carbon dioxide emissions in 20202023 declined by 83%67% compared to 2007.2005.
On July 8, 2019, the EPA issued the final Affordable Clean Energy (ACE) rule to repeal the Clean Power Plan and adopt a replacement rule for regulating carbon dioxide emissions from existing affected coal-fired electric generating units. The ACE rule establishes regulations to develop guidelines for reducing carbon dioxide from existing affected units and requires states to develop plans to implement the rule. On January 19, 2021,June 30, 2022, after the U.S. Court of Appeals for the D.C. Circuit vacated and remanded the ACE rule back to EPA, which is expectedthe U.S Supreme Court in West Virginia v. EPA reversed the D.C. Circuit ruling and, in so doing, limited EPA's authority to undertakeregulate greenhouse gas emissions as broadly as the Clean Power Plan. EPA has since initiated a new rulemaking to address carbon dioxidereplace the ACE rule.
In May 2023, EPA published proposed Clean Air Act section 111(b) and 111(d) rules to replace the Affordable Clean Energy rule. The proposed rules would limit greenhouse gas emissions from new, modified, reconstructed, and existing fossil-fuel power plants.plants in a manner consistent with the United States’ nationally determined contribution. If finalized as proposed, the rules would likely adversely impact a portion of our coal and natural gas-fired generating units and have a significant impact on the U.S. power sector overall. EPA recently announced that it would not include existing gas turbines in the final rule. Instead, EPA indicated that it would address existing gas turbines in a future rulemaking. The ultimate impact of the proposed rules, and a future rule related to existing gas turbines, will depend on the final rules adopted by EPA and the results of any such rulemakinglitigation challenging the rules and cannot be determined at this time and will depend on multiple factors, including the stringency of the rule, market factors relatedtime. EPA is expected to naturalrelease final rules, excluding existing gas and the timing and affordability of renewable energy and new technologies.turbines, in spring 2024.
Additional regulation of carbon dioxide could occur at the federal or state level and such costs could be significant.One example is potential federal legislation that would require stringent reductions in carbon dioxide emissions from all fossil-fueled electric generation facilities nationwide. Another example is related to the Paris Climate Agreement, to which President Biden recommitted the United States effective February 19, 2021. UnderThe United States subsequently announced a nationally determined contribution under the agreement for reducing domestic carbon dioxide emissions by 50-52% below 2005 economy-wide levels by 2030. In order to meet this target, analyses have indicated that the United States will submit itspower sector would have to reduce carbon dioxide emissions by about 80% below 2005 levels by 2030. These nationally determined contributions (NDCs) for reducing global carbon dioxide emissions. These NDCs could lead to a wide range of legislative and regulatory actions to supporthelp achieve the Paris Climate AgreementAgreement's goals. In addition, President Biden signed executive orders in January 2021 directingcontinues to direct federal agencies to address climate change, environmental justice, and other environmental issues. As a result, as discussed above, EPA could take additional regulatory actions to require more stringent control requirements to reduce carbon dioxide and other emissions under its existing legal authority.At this time, we cannot predict the outcome of any legislative or regulatory changes or the result of potential litigation challenging any of these actions.
Coal Combustion Residuals and Effluent Limitations Guidelines
In 2015, EPA established a comprehensive regulatory program to manage the disposal of coal combustion residuals (CCR) from electric utilitiescoal-fired power plants as non-hazardous material under the Resource Conservation and Recovery Act (RCRA). The 2015 CCR rule sets forth requirements for structural integrity assessments, groundwater monitoring, location siting, composite lining, inactive units, closure and post closure, beneficial use recycling, design and operating criteria, recordkeeping, notification, and internet posting for new and existing CCR landfills, CCR surface impoundments and lateral expansions of CCR disposal facilities. In 2022 and 2023, the EPA issued a number of proposed determinations on requests for extensions of time to close ash ponds. The proposed determinations could affect the Georgia Environmental Protection Division's (EPD) review of the proposed closure plans for the coal ash ponds at Plants Wansley and Scherer. EPA's proposed determinations subsequently were challenged in the U.S. Court of Appeals for the D.C. Circuit in April 2022, and a decision is expected in the near future. We are currently reviewing those proposed determinations to better understand how they may impact our closure plans. However, the ultimate impact of EPA's actions is unknown at this time and subject to the outcome of the litigation and any future EPA and Georgia regulatory actions.
In 2015, the EPA also finalized a rule to revise the effluent limitations guidelines (ELG) that applies to certain wastewater discharges from fossil fuel-fired steam electric power plants, including Plants Scherer and
45

Table of Contents
Wansley. Since adopting the CCR and ELG rules, EPA has adopted revisions to the compliance deadlines and substantive requirements of the two rules. However, on March 29, 2023, EPA issued a proposed supplemental ELG rule for
46


steam electric generating units that, if finalized, generally would increase the stringency of the current standards. The ultimate impact of the proposed rule will depend on the final rule adopted by EPA and the results of any litigation challenging the rule and cannot be determined at this time. EPA is expected to release a final ELG rule in spring 2024.
ELG Rule Changes. In 2017, EPA extended the ELG compliance deadlines set forth in the 2015 ELG rule to meet discharge limitations for scrubber wastewater and bottom ash transport water from affected coal-fired units, including Plants Scherer and Wansley to November 1, 2020. On November 22, 2019, EPA issued a proposed rule to moderate the discharge limitations on these two wastestreams and subsequently published a final ELG reconsideration rule on October 13, 2020.The ELG rule extends the applicability date for scrubber waste water and bottom ash transport water to December 31, 2025, and allows for various subcategories based on planned future operations, including the rule's voluntary incentives program, low utilization, and early retirement of affected units. Decisions on subcategorization must be made by October 13, 2021. BothUnits participating in any of the 2015subcategories were required to submit a notice of planned participation.
The notice for Plant Scherer indicated that units 1 and 20202 would comply with the ELG rulesrule under the voluntary incentives program. For Plant Wansley the notice indicated that affected units would comply under the early retirement subcategory. The ELG rule allows for transferring between subcategories consistent with certain regulatory requirements, and the notices reserved the right to transfer subcategories if circumstances change.
The ELG rule revisions are expected to increase capital and operating costs of affected units. The final rule is currently under assessment, including options to subcategorize affected units, and its impact is not fully known at this time. The impact of the 2020 ELG reconsideration rule also depends on the outcome of challenges to the rule that are currently in the U.S. Court of Appeals for the Fourth CircuitCircuit. However, the litigation is being held in abeyance as EPA undertakes the supplemental rulemaking mentioned above. A final rule could affect our compliance approach. However, the impact and any future revisions that EPA may make toultimate outcome of the rule.

ELG rule cannot be determined at this time.
CCR Rule Changes. In 2016, in response to EPA's CCR rulemaking, the Georgia Environmental Protection Division (EPD)EPD adopted new requirements to regulate CCR wastes. These new rules incorporated EPA's requirements as well as State-onlystate-only requirements for managing CCR wastes in Georgia. These Statestate requirements were implemented and are enforced through a permit system that was substantially approved by EPA onin December 16, 2019. Once CCR permits are issued by Georgia EPD, federal citizen suits under RCRA to enforce federal CCR requirements incorporated in the state permit will not beare generally no longer allowed and permit challenges will be handled through EPD's existing administrative process. Georgia's existing CCR regulations are not anticipated to have a material impact on our compliance obligations under the federal CCR rule. However, we cannot predict the impact of any changes to Georgia's CCR regulations including potential legislation or litigation initiatives.litigation.
On December 2, 2019, EPA issued a proposed rule to establish new deadlines by which unlined surface impoundments may no longer receive CCR waste and non-CCR wastestreams. EPA proposed additional revisions to the CCR rule in February 2020 that clarified circumstances under which alternative liners may be used, when coal ash may be used in the closure of landfills and impoundments, and that post-closure groundwater monitoring is required if coal ash is removed from a landfill or impoundment. In 2019, Georgia Power ceased sending CCR to the ash ponds at Plants Scherer and Wansley. Similarly, Georgia Power has installed a new wastewater treatment system that will receive and manage the non-CCR wastestreams at Scherer. As a result, these new closure deadlines arehave not expected to impactimpacted our operations. Although no litigation related to CCR regulations is now pending, we cannot predict whether there will be any future lawsuits on the requirements for closing these impoundments or remedying any impacts of the impoundments may be having on groundwater.
In 2018, Georgia Power applied for CCR permits to close the ash ponds at Plants Scherer and Wansley in place using advanced engineering methods. The permit applicationsHowever, in March 2022, Georgia Power filednotified the Georgia Public Service Commission of a revised closure proposal for Plant Wansley. Georgia Power’s modified closure plan at Plant Wansley recommends closure by removing the ash from the coal ash pond for several site-specific reasons, including available capacity at an existing on-site landfill due to the retirement of Plant Wansley in August 2022, beneficial use of the coal ash, and managing construction and operational risks of its current closure in place design. Georgia Power’s proposed closure plans and any future revisions are subject to the approval of the Georgia Public Service Commission and EPD. Costs associated with the closure of ash ponds are reflected in the asset retirement obligations discussed below and we routinely update our asset retirement obligations to reflect any future changes in compliance requirements or cost projections. Georgia EPD estimatedPower estimates closing activities to be completed in 20262032 for Plantboth Plants Wansley and 2031Scherer.
47


In January 2022, EPA issued a number of proposed determinations on requests for Plant Scherer.extensions of time to close ash ponds. The proposed determinations include the agency’s rationale and current position on closure standards, groundwater monitoring, and corrective action. EPA's actions subsequently were challenged at the U.S. Court of Appeals for the D.C. Circuit, and a decision is expected in the near future. EPA’s current position and the outcome of the pending litigation could affect EPD’s review of the proposed closure plans for Plants Wansley and Scherer under Georgia's CCR permit program, as well as require changes in the CCR regulations. The outcome of these matters and impact on compliance costs and operations cannot be determined at this time.
Associated CCR and ELG Compliance Costs. We continue to evaluate the requirements associated with existing and future CCR and ELG rules. Based on this ongoing evaluation, we expect to periodically update compliance methods, schedules, and costs. Our current estimates for capital expenditures at Plant Scherer to comply with the applicable CCR requirements and effluent discharge limitations are estimated to be approximately $289$230 million for conversion to dry ash handling, landfill construction, and wastewater treatment. This estimate includes $242$170 million that has already been spent. Additionally, our current estimated expenditures for the settlement of related asset retirement obligations at our operating and retired coal plants are approximately $400$600 million to $550$800 million (in year of expenditure dollars) for the closure and post-closure of existing coal ash ponds includingand the dry coal ash and gypsum storage areas. Approximately $11$50 million of this amount has already been incurred. See Note 1 of Notes to Consolidated Financial Statements. More definitive cost estimates will continue to be developed as the processes of rule evaluation, compliance approach and design and construction implementation proceed. The ultimate impacts associated with the federal and state CCR rules and the federal effluent discharge limitations, any revised regulation or legislation at the state or federal level and related litigation challenging such rules, or future legislation cannot be determined at this time. If the proposed closure plans are not approved or Georgia's requirements for coal ash disposal are subsequently revised and we and other co-owners at Plants Scherer and Wansleyor the proposed closure plans are instead required to construct lined coal ash facilities,not approved, our estimated compliance costs wouldcould increase materially.
46

Table of Contents
Water Use and Wastewater Issues
In 2015, the U.S. Court of Appeals for the Sixth Circuit stayed a final rule published jointly by EPA and the U.S. Army Corps of Engineers that revised the regulatory definition of waters of the U.S. for all Clean Water Act programs. The final rule would have significantly expanded the scope of federal jurisdiction under the Clean Water Act. Although the rule was not expected to have a substantial direct impact on our existing operations, it would likely have increased permitting and regulatory requirements and costs associated with the siting and permitting of new facilities. In July 2017, EPA and Army Corps of Engineers proposed a two-step process to address the stayed rule and followed that proposal with a supplemental proposed rule in June 2018. The first step replacesreplaced the 2015 regulations that defined waters of the U.S. with those that were in effect prior to the 2015 rule. In the second step, EPA proposed a rule in December 2018 replacing the 2015 definition with a revised definition that clarifies and narrows the scope of federal authority under the Clean Water Act. A final rule incorporating the proposed rules was issued on January 23, 2020. The EPA and Army Corps of Engineers subsequently revised the definition of waters of the U.S. in January 2023. However, in May 2023, the U.S. Supreme Court narrowed the definition of waters of the U.S., leading EPA and Army Corps of Engineers to issue a final rule on August 29, 2023, amending its definition to conform to the U.S. Supreme Court's decision. While there is minimal direct impact to our operations as a result of the finalcurrent rule, we cannot determine the ultimate impact of any change to that rule or any litigation challenging thatvarious iterations of the rule or any replacement rule at this time.
Other Environmental Matters
We are subject to other environmental statutes including, but not limited to, the Georgia Water Quality Control Act, the Georgia Hazardous Site Response Act, the Toxic Substances Control Act, the Endangered Species Act, the Comprehensive Environmental Response, Compensation and Liability Act, the Emergency Planning and Community Right to Know Act, and the regulations implementing these environmental statutes. We do not believe that our compliance obligations with these statutesstatutory and regulationsregulatory requirements will have a material impact on our financial condition or operation of our facilities. Changes to any of these laws, however, could affect many areas of our operations. Although compliance with new environmental legislation could have a significant impact on those operations, such impacts cannot be fully determined at this time and would depend in part on the final legislation and the development of implementing regulations.
48


As an owner, co-owner and/or operator of generating facilities, we are also subject, from time to time, to claims relating to operations and/or emissions, including actions by citizens to enforce environmental regulations and claims for personal injury due to such operations and/or emissions. Likewise, actions by private citizen groups to enforce environmental laws and regulations are becoming increasingly prevalent. We cannot predict the outcome of current or future actions, our responsibility for a share of any damages awarded, or any impact on facility operations. We do not believe, however, that current actions will have a material adverse effect on our financial position,condition or results of operations or cash flows.operations.
While we will continue to exercise our best efforts to comply with all applicable regulations, there can be no assurance that we will always be in full compliance with all applicable current and future environmental requirements. Failure to comply with existing and future requirements, even if this failure is caused by factors beyond our control, could result in civil and criminal penalties and could even force the complete shutdown of individual generating units not in compliance with these regulations in some cases. Any additional federal or state environmental restrictions imposed on our operations could result in significant additional compliance costs, including capital expenditures. Such costs could affect future unit retirement and replacement decisions and may result in significant increases in the cost of electric service. The cost impact of future legislation, regulation, judicial interpretations of existing laws or regulations, or international obligations will depend upon the specific requirements thereof and cannot be determined at this time.
Nuclear Regulation
We are subject to the provisions of the Atomic Energy Act of 1954 (the Atomic Energy Act), which vests jurisdiction in the Nuclear Regulatory Commission over the construction and operation of nuclear reactors, particularly with regard to certain public health, safety and antitrust matters. The National Environmental Policy Act has been construed to expand the jurisdiction of the Nuclear Regulatory Commission to consider the environmental impact of a facility licensed under the Atomic Energy Act. Plants Hatch and Vogtle are being operated under licenses issued by the Nuclear Regulatory Commission. All aspects of the construction, operation and maintenance of nuclear power plants are regulated by the Commission. From time to time, new Commission regulations require changes in the design, operation and maintenance of existing nuclear reactors. Operating licenses issued by the Commission are subject to revocation, suspension or modification, and the operation of a nuclear unit may be suspended if the Commission determines that the public interest, health or safety so requires. The operating licenses issued for each unit of PlantsPlant Hatch Units No. 1 and VogtleNo. 2 expire in 2034 and 2038, respectively, and for Plant Vogtle Units No. 1, No. 2, No. 3 and No. 4 expire in 2047, 2049, 2062 and 2049,2063, respectively.
47

Table Southern Nuclear has notified the Nuclear Regulatory Commission of Contents
its intent to seek to renew Plant Hatch Units No. 1 and No. 2 licenses for an additional 20 years, through 2054 and 2058, respectively.
The Nuclear Regulatory Commission issued combined construction permits and operating licenses that allow the completion of construction and operation of two additional units at Plant Vogtle. See "—Our Power Supply Resources"OUR POWER SUPPLY RESOURCES – Future Power Resources – Plant Vogtle Units No. 3 and No. 4."
Pursuant to the Nuclear Waste Policy Act of 1982, the federal government has the responsibility for the final disposal of commercially produced high-level radioactive waste materials, including spent nuclear fuel. This act requires the owner of nuclear facilities to enter into disposal contracts with the Department of Energy for such material.
Contracts with the Department of Energy have been executed to provide for the permanent disposal of spent nuclear fuel produced at Plants Hatch and Vogtle. The Department of Energy failed to begin disposing of spent fuel in 1998 as required by the contracts, and Georgia Power, as agent for the co-owners of the plants, has successfully pursued and continues to pursue legal remedies against the Department of Energy for breach of contract. See Note 1 of Notes to Consolidated Financial Statements for information regarding the status of this litigation.
In November 2013, the U.S. District Court for the District of Columbia ordered the Department of Energy to cease collecting spent fuel depositary fees from nuclear power plant operators until such time as the Department of Energy either complies with the Nuclear Waste Policy Act of 1982 or until the U.S. Congress enacts an alternative
49


waste management plan. We discontinued paying the fee of approximately $9.2 million annually, based on our ownership interests, in June 2014.
ExistingWe expect existing on-site dry storage facilities at Plants Hatch and Vogtle can be expanded to accommodate spent fuel through the expected life of each plant, including Vogtle Units No. 3 and No. 4.
For information concerning nuclear insurance, see Note 10 of Notes to Consolidated Financial Statements. For information regarding the Nuclear Regulatory Commission's regulation relating to decommissioning of nuclear facilities and regarding the Department of Energy's assessments pursuant to the Energy Policy Act for decontamination and decommissioning of nuclear fuel enrichment facilities, see Note 1 of Notes to Consolidated Financial Statements.
Federal Power Act
General
Pursuant to the Federal Power Act, the Federal Energy Regulatory Commission is the federal agency that regulates the nation's bulk power system. We are subject to certain rules and regulations under the Federal Power Act; however, as a borrower from the Rural Utilities Service, we are exempted from certain Federal Energy Regulatory Commission regulations, including rate regulation.
Rocky Mountain
We are subject to the hydropower licensing provisions of the Federal Power Act. Rocky Mountain is a hydroelectric project subject to licensing by the Federal Energy Regulatory Commission. The currently effective Federal Energy Regulatory Commission license to operate the Rocky Mountain project expires in 2026.2026, and we are currently in the process of relicensing the project. Consistent with Federal Energy Regulatory Commission regulations, we submitted a draft license application for stakeholder review in November 2023 and anticipate making a timely application for a new license for the Rocky Mountain project in 2024. See "—Properties"PROPERTIES – Generating Facilities" and " – The Plant Agreements – Rocky Mountain" for additional information.
UponAt this stage of the relicensing process, upon or after the expiration of the existing license, the United States Government, by act of Congress, maycould either take over the project or relicense the project to us. Additionally, the Federal Energy Regulatory Commission may relicense the project either to the original licensee or toCommission's grant of a new licensee. In the event of takeover or relicensinglicense to another, the original licensee is tous could be compensated in accordance with the provisions of the Federal Power Act, such compensation to reflect the net investment of the licensee in the project, not in excess of the fair value of the property taken, plus reasonable damages to other property of the licensee resulting from the severance therefrom of the property taken. The Federal Energy Regulatory Commission may grant relicenses subject to certain requirements that could result in additional costs. If the Federal Energy Regulatory Commission does not act on the new license application prior to the expiration of the existing license, the commission is required to issue annual licenses, under the same terms and conditions of the existing license, until a new license is issued.
We anticipate making a timely application for a new license for the Rocky Mountain project.
48

Table of Contents
Energy Policy Act of 2005
The Energy Policy Act of 2005 amended the Federal Power Act to authorize the Federal Energy Regulatory Commission to establish an electric reliability organization to develop and enforce mandatory reliability standards and to establish clear responsibility for the commission to prohibit manipulative energy trading practices. In 2006, the Federal Energy Regulatory Commission certified the North American Electric Reliability Corporation, or NERC, as the electric reliability organization. The mandatory reliability standards developed by NERC and approved by the Federal Energy Regulatory Commission impose certain operating, coordination, record-keeping and reporting requirements on us. NERC has delegated day-to-day enforcement of its responsibilities to regional entities and SERC Reliability Corporation is the regional entity to enforce reliability compliance in sixteen central and southeastern states, including Georgia. These entities have the authority to issue fines and penalties for violations of these standards.
As a generator owner and generator operator, we are subject to certain of these mandatory reliability standards. We have established a comprehensive formal compliance program to establish, monitor, maintain and enhance our commitment to electric reliability compliance. This program includes comprehensive cyber security elements designed to protect and preserve our critical information and energy infrastructure systems. Although we intend to comply with all currently effective and enforceable reliability standards, we cannot provide assurance that we will
50


always be in compliance. We are obligated to maintain and retain evidence of compliance with specific requirements. SERC Reliability Corporation also regularly monitors us for compliance with reliability standards. We expect that existing reliability standards will continue to be refined and that new reliability standards will be developed or adopted.
49

Table of Contents
PROPERTIES
Generating Facilities
The following table sets forth certain information with respect to our generating facilities that operated for all or a portion of which are in commercial operation.2023.
FacilitiesFacilitiesType of
Fuel
Percentage
Interest
Our Share of
Nameplate
Capacity
(megawatts)
Commercial
Operation
Date
License
Expiration
Date
FacilitiesType of FuelPercentage InterestOur Share of Nameplate Capacity (megawatts)Commercial Operation DateLicense Expiration Date
Plant Hatch (near Baxley, Ga.)Plant Hatch (near Baxley, Ga.)
Unit No. 1Unit No. 1Nuclear30 269.9 19752034
Unit No. 1
Unit No. 1
Unit No. 2Unit No. 2Nuclear30 268.8 19792038
Unit No. 2
Unit No. 2
Plant Vogtle (near Waynesboro, Ga.)
Plant Vogtle (near Waynesboro, Ga.)
Plant Vogtle (near Waynesboro, Ga.)Plant Vogtle (near Waynesboro, Ga.)
Unit No. 1Unit No. 1Nuclear30 348.0 19872047
Unit No. 2Nuclear30 348.0 19892049
Plant Wansley (near Carrollton, Ga.)
Unit No. 1
Unit No. 1Unit No. 1Coal30 259.5 1976N/A(1)
Unit No. 2Unit No. 2Coal30 259.5 1978N/A(1)
Combustion TurbineOil30 14.8 1980N/A(1)
Unit No. 2
Unit No. 2
Unit No. 3
Unit No. 3
Unit No. 3
Plant Scherer (near Forsyth, Ga.)
Plant Scherer (near Forsyth, Ga.)
Plant Scherer (near Forsyth, Ga.)Plant Scherer (near Forsyth, Ga.)
Unit No. 1Unit No. 1Coal60 490.8 1982N/A(1)
Unit No. 1
Unit No. 1Coal60 490.8 1982N/A(1)
Unit No. 2Unit No. 2Coal60 490.8 1984N/A(1)Unit No. 2Coal60 490.8 490.8 19841984N/A(1)
Rocky Mountain (near Rome, Ga.)Rocky Mountain (near Rome, Ga.)Pumped Storage Hydro74.61 632.5 19952026Rocky Mountain (near Rome, Ga.)Pumped Storage Hydro74.61 632.5 632.5 199519952026(2)
Doyle (near Monroe, Ga.)Doyle (near Monroe, Ga.)Gas100 325.0 2000N/A(1)Doyle (near Monroe, Ga.)Gas100 325.0 325.0 20002000N/A(1)
Talbot (near Columbus, Ga.)Talbot (near Columbus, Ga.)
Units No. 1-4Units No. 1-4Gas100 412.0 2002N/A(1)
Units No. 1-4
Units No. 1-4Gas100 412.0 2002N/A(1)
Units No. 5-6Units No. 5-6Gas-Oil100 206.0 2003N/A(1)Units No. 5-6Gas-Oil100 206.0 206.0 20032003N/A(1)
Chattahoochee (near Carrollton, Ga.)Chattahoochee (near Carrollton, Ga.)Gas100 468.0 2003N/A(1)Chattahoochee (near Carrollton, Ga.)Gas100 468.0 468.0 20032003N/A(1)
BC Smith (near Savannah, Ga)BC Smith (near Savannah, Ga)Gas100 597.0 2003N/A(1)
Washington County (near Sandersville, Ga)
Unit No. 2
Unit No. 2
Unit No. 2Gas100 198.9 2003N/A(1)
Unit No. 3Unit No. 3Gas100 198.9 2003N/A(1)
Hawk Road (near Franklin, Ga.)Hawk Road (near Franklin, Ga.)Gas100 500.0 2001N/A(1)Hawk Road (near Franklin, Ga.)Gas100 500.0 500.0 20012001N/A(1)
Hartwell (near Hartwell, Ga.)Hartwell (near Hartwell, Ga.)Gas-Oil100 300.0 1994N/A(1)Hartwell (near Hartwell, Ga.)Gas-Oil100 300.0 300.0 19941994N/A(1)
Smith (near Dalton, Ga.)
Baconton (near Baconton, Ga.)
Unit 500
Unit 500
Unit 500Gas-Oil100 58.9 2000N/A(1)
TA Smith (near Dalton, Ga.)
Unit No. 1
Unit No. 1
Unit No. 1Unit No. 1Gas100 630.0 2002N/A(1)Gas100 630.0 630.0 20022002N/A(1)
Unit No. 2Unit No. 2Gas100 620.0 2002N/A(1)Unit No. 2Gas100 620.0 620.0 20022002N/A(1)
__________________
(1)Fossil-fuel fired units do not operate under operating licenses similar to those granted to nuclear units by the Nuclear Regulatory Commission and to hydroelectric plants by the Federal Energy Regulatory Commission.
(2)We intend to submit an application to extend this license in 2024.
50
51

Table of Contents
Plant Performance
The following table sets forth certain operating performance information of each of our generating facilities:facilities operating as of December 31, 2023:
Summer
Planning
Reserve
Capacity(1)
(Megawatts)
Equivalent
Availability(2)
Capacity Factor(3)
Summer Planning Reserve Capacity(1) (Megawatts)
Summer Planning Reserve Capacity(1) (Megawatts)
Equivalent Availability(2)
Capacity Factor(3)
UnitUnit
Summer
Planning
Reserve
Capacity(1)
(Megawatts)
202020192018202020192018Unit202320222021202320222021
Plant HatchPlant Hatch
Unit No. 1Unit No. 1262.2 83 %98 %91 %83 %99 %91 %
Unit No. 1
Unit No. 1262.2 97 %90 %93 %98 %91 %94 %
Unit No. 2Unit No. 2264.3 97 82 95 97 82 96 
Plant VogtlePlant Vogtle
Unit No. 1Unit No. 1344.5 93 100 93 95 102 96 
Unit No. 2344.7 90 92 100 92 93 102 
Plant Wansley
Unit No. 1
Unit No. 1Unit No. 1261.6 98 75 90 14 
Unit No. 2Unit No. 2261.6 83 93 91 
Combustion Turbine(4)
62 61 62 
Unit No. 3(8)
Plant Scherer
Plant Scherer
Plant SchererPlant Scherer
Unit No. 1Unit No. 1515.0 98 81 84 16 13 39 
Unit No. 1
Unit No. 1
Unit No. 2Unit No. 2515.0 95 97 77 40 41 
Rocky Mountain(5)
Rocky Mountain(4)
Unit No. 1
Unit No. 1
Unit No. 1Unit No. 1272.3 90 88 78 18 16 13 
Unit No. 2Unit No. 2272.3 97 90 44 20 19 11 
Unit No. 3Unit No. 3272.3 87 93 82 15 17 
Doyle(5)
281.0 62 60 50 
Talbot(5)
682.3 74 79 75 
Doyle(4)
Talbot(4)
ChattahoocheeChattahoochee466.0 93 94 79 78 80 65 
Hawk Road(5)
486.9 63 54 68 13 11 11 
Hartwell(5)
305.5 81 84 75 13 
Smith
BC Smith(6)
Washington County(4,5)
Hawk Road(4)
Hawk Road(4)
Hawk Road(4)
0.0060.006
Hartwell(4)
Baconton(4,7)
TA Smith
TA Smith
TA Smith
Unit No. 1
Unit No. 1
Unit No. 1Unit No. 1658.6 82 75 43 59 53 29 
Unit No. 2Unit No. 2658.6 86 81 90 66 61 67 
TOTALTOTAL7,124.7 
__________________
(1)Summer Planning Reserve Capacity is the amount used for 20212024 capacity reserve planning.planning for the specified resources. For planning purposes, our aggregate Summer Planning Reserve Capacity for 2024 is 8,589 megawatts. This includes Vogtle Unit No. 4, which is expected to achieve commercial operation by end of the second quarter of 2024, and the Walton facility, which we expect to acquire in the second quarter of 2024.
(2)Equivalent Availability is a measure of the percentage of time that a unit wasis available to generate if called upon, adjusted for periods when the unit is derated from its rated capacity.
(3)Capacity Factor is a measure of the actual output of a unit as a percentage of its potential output.
(4)The Wansley combustion turbine is used primarily for emergency service and is rarely operated except for testing.
(5)Rocky Mountain, Doyle, Talbot, Hawk Road, Hartwell, Washington County and Hartwell,Baconton, primarily operate as peaking plants, which results in low capacity factors.
(5)Washington County was acquired in December 2022. This table only reflects operating performance following our acquisition. There was no generation during the month of December 2022. Washington County's reserve capacity of 326.0 megawatts is partly unavailable in 2024 due to a power purchase and sale agreement with Georgia Power which expires May 31, 2024.
(6)BC Smith was acquired in July 2021. This table only reflects operating performance following our acquisition.
(7)Baconton was acquired in May 2023. This table only reflects operating performance following our acquisition.
(8)Plant Vogtle Unit No. 3 was placed in service on July 31, 2023. Plant Vogtle Unit No.3's performance data has not been made available.
The nuclear refueling cycle for Plants Hatch and Vogtle exceeds twelve months. Therefore, in some calendar years the units at these plants are not taken out of service for refueling, resulting in higher levels of equivalent availability and capacity factor. Due to low natural gas prices relative to the cost of coal purchased for Plant Wansley, it has been dispatched at lower levels in recent years.
52


Fuel Supply
For information regarding the electricity generated with each fuel type and its cost, see "MANAGEMENT'S DISCUSSION & ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS – Results of Operations – Operating Expenses."
51

Table of Contents
Coal.    Coal for Plant Wansley is purchased in spot market transactions. As of February 28, 2021, we had a 61-day coal supply at Plant Wansley based on continuous operation. Plant Wansley burns bituminous coal purchased primarily from coal mines in the Illinois Basin.
Coal for Scherer Units No. 1 and No. 2 is purchased under term contracts and in spot market transactions. As of February 28, 2021,29, 2024, our coal stockpile at Plant Scherer contained a 53-day45-day supply based on continuous operation. Plant Scherer burns sub-bituminous coal purchased from coal mines in the Powder River Basin in Wyoming.
We separately dispatch Plants Wansley andour interest in Plant Scherer, but use Georgia Power as our agent for fuel procurement. We currently lease approximately 719713 railcars to transport coal. Over the past few years, we have managed rail-related delays in connection with our coal to these two facilities.supply.
Nuclear Fuel.    Georgia Power, as operating agent, has the responsibility to procure nuclear fuel for Plants Hatch and Vogtle. Georgia Power has contracted with Southern Nuclear to operate these plants, including nuclear fuel procurement. Southern Nuclear has contracted with multiple suppliers for uranium ore, conversion services, enrichment services and fuel fabrication to satisfy nuclear fuel requirements. Most contracts are short to medium-term. The nuclear fuel supply and related services are expected to be adequate to satisfy current and future nuclear generation requirements.
Natural Gas.    We purchase the natural gas, including transportation and other related services, needed to operate Doyle, Talbot, Chattahoochee, BC Smith, Washington County, Baconton, Hawk Road, Hartwell, and TA Smith. We purchase natural gas in the spot market and under agreements at indexed prices. We have entered into hedge agreements to manage a portion of our exposure to fluctuations in the market price of natural gas. We manage exposure to such risks only with respect to members that elect to receive such services. We have entered into long-term firm contracts for transportation of a significant percentage of our anticipated natural gas supply. We also purchase transportation under short-term firm and non-firm contracts. See "QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK – Commodity Price Risk."
Co-Owners of Plants
Plants Hatch, Vogtle, Wansley and Scherer Units No. 1 and No. 2 are co-owned by Georgia Power, MEAG, the City of Dalton and us, and Rocky Mountain is co-owned by Georgia Power and us. Each co-owner owns or leases undivided interests in the amounts shown in the following table, which excludes the Plant Wansley combustion turbine.table. We are the operating agent for Rocky Mountain. Georgia Power is the operating agent for each of the other plants.
NuclearCoal-FiredPumped
Storage
Plant Hatch
Plant Vogtle(2)
Plant WansleyPlant Scherer Units
No. 1 & No. 2
Rocky MountainTotal
%
MW(1)
%
MW(1)
%
MW(1)
%
MW(1)
%
MW(1)
MW(1)
Nuclear
Nuclear
Nuclear
Plant Hatch
Plant Hatch
Plant Hatch
Plant Vogtle(2)
Plant Scherer Units No. 1 & No. 2Rocky MountainTotal
%%
MW(1)
%
MW(1)
%
MW(1)
%
MW(1)
MW(1)
OglethorpeOglethorpe30.0 539 30.0 1,356 30.0 519 60.0 982 74.6 633 4,029 
Georgia PowerGeorgia Power50.1 900 45.7 2,066 53.5 926 8.4 137 25.4 215 4,244 
MEAGMEAG17.7 318 22.7 1,026 15.1 261 30.2 494 — — 2,099 
DaltonDalton2.2 39 1.6 72 1.4 24 1.4 23 — — 158 
TotalTotal100.0 1,796 100.0 4,520 100.0 1,730 100.0 1,636 100.0 848 10,530 
__________________
(1)Based on nameplate ratings.
(2)Excludes Plant Vogtle Units No. 3 andUnit No. 4, arewhich is currently under construction. Vogtle Unit No. 4 is expected to add 1,211 megawatts of nameplate capacity.
Georgia Power Company
Georgia Power is a wholly owned subsidiary of The Southern Company and is engaged primarily in the generation and purchase of electric energy and the transmission, distribution and sale of this energy. Georgia Power
53


distributes and sells energy within the State of Georgia at retail in over 600 communities, including Athens, Atlanta, Augusta, Columbus, Macon, Rome and Savannah, as well as in rural areas, and at wholesale to some of our members, MEAG and two municipalities. Georgia Power is the largest supplier of electric energy in the State of Georgia. See "OUR BUSINESS – Business Overview"BUSINESS OVERVIEW – Relationship with Georgia Power Company." Georgia Power is subject to the informational requirements of the Exchange Act, and, in accordance therewith, files reports and other information with the SEC.
52

Table of Contents
Municipal Electric Authority of Georgia
The Municipal Electric Authority of Georgia, also known as MEAG, is a state-chartered, municipal joint-action agency that provides capacity and energy to its membership of 49 municipal electric utilities, including 48 cities and one county in the State of Georgia. MEAG has wholesale take-or-pay power sales contracts with each of its 49 participants that extend to June 2054. MEAG is Georgia's third largest power supplier behind Georgia Power and us.
City of Dalton, Georgia
Dalton Utilities is a combined utility that provides electric, gas, water and wastewater services to the city of Dalton, located in northwest Georgia, and some of the surrounding communities.
The Plant Agreements
Plants Hatch, Wansley, Vogtle and Scherer
Our rights and obligations with respect to Plants Hatch, Wansley, Vogtle and Scherer are contained in a number of contracts between Georgia Power and us and, in some instances, MEAG and the City of Dalton. We are a party to fourthree Purchase and Ownership Participation Agreements (Ownership Agreements) under which we acquired from Georgia Power a 30% undivided interest in each of Plants Hatch Wansley and Vogtle Units No. 1 and No. 2, a 60% undivided interest in Scherer Units No. 1 and No. 2 and a 30% undivided interest in those facilities at Plant Scherer intended to be used in common by Scherer Units No. 1, No. 2, No. 3 and No. 4 (the Scherer Common Facilities). We have also entered into fourthree Operating Agreements (Operating Agreements) relating to the operation and maintenance of Plants Hatch, Wansley, Vogtle Units No. 1 and No. 2 and Scherer, respectively. The Ownership AgreementsAgreement and Operating AgreementsAgreement relating to PlantsPlant Hatch and Wansley areis a two-party agreementsagreement between Georgia Power and us. The Ownership Agreements and Operating Agreements relating to Plants Vogtle Units No. 1 and No. 2 and Scherer are agreements among Georgia Power, MEAG, the City of Dalton and us. The parties to each Ownership Agreement and Operating Agreement are referred to as "participants" with respect to each such agreement.
We have a 30% undivided interest in Vogtle Units No. 3 and No. 4. In conjunction with the development of these units, we, Georgia Power, MEAG and the City of Dalton entered into amendments to the Operating Agreement for Plant Vogtle and the Nuclear Managing Board Agreement, and entered into an Ownership Agreement that governs participation in Vogtle Units No. 3 and No. 4. Pursuant to this ownership agreement, Georgia Power has designated Southern Nuclear as its agent for licensing, engineering, procurement, contract management, construction and pre-operation services. See "OUR POWER SUPPLY RESOURCES – Future Power Resources – Plant Vogtle Units No. 3 and No. 4" for a discussion of our ownership agreements related to Vogtle Units No. 3 and No. 4.
In 1985, in four transactions, we sold our entire 60% undivided ownership interest in Scherer Unit No. 2 to four separate owner trusts established by investors and then leased back the 60% interest. We retained all of our rights and obligations as a participant under the Ownership and Operating Agreements relating to Scherer Unit No. 2 for the term of the leases. We have extended three of the leases to 2027 and the fourth lease to 2031. The leases provide for further lease renewal and also include fair market value purchase options at specified dates. See Note 6 of Notes to Consolidated Financial Statements. In the following discussion, references to participants "owning" a specified percentage of interests include our rights as a deemed owner with respect to our leased interests in Scherer Unit No. 2.
The Ownership Agreements appoint Georgia Power as agent with sole authority and responsibility for, among other things, the planning, licensing, design, construction, renewal, addition, modification and disposal of Plants Hatch, Vogtle Wansley and Scherer Units No. 1 and No. 2 and the facilities used in common at Plant Scherer. Each Operating
54


Agreement gives Georgia Power, as agent, sole authority and responsibility for the management, control, maintenance and operation of the plant to which it relates. Each Operating Agreement also provides for the use of power and energy from the plant and the sharing of the costs of the plant by the participants in accordance with their respective interests in the plant. In performing its responsibilities under the Ownership and Operating Agreements, Georgia Power is required to comply with prudent utility practices. Georgia Power's liabilities with respect to its duties under the Ownership and Operating Agreements are limited by the terms of these agreements.
Under the Ownership Agreements, we are obligated to pay a percentage of capital costs of the respective plants, as incurred, equal to the percentage interest which we own or lease at each plant. With respect to Scherer Units No. 1 and No. 2, the participants have certain limited rights to disapprove capital budgets proposed by Georgia Power and to substitute alternative capital budgets. With respect to Plants Hatch and Vogtle, any co-owner has the right to disapprove large discretionary capital improvements.
The Scherer Ownership Agreement requires the consent of participants owning at least an aggregate 75% undivided ownership interest in the applicable unit (effectively us and MEAG) for actions with respect to the retirement of all or any part of the applicable unit.
In 1993, the co-owners of Plants Hatch and Vogtle entered into the Amended and Restated Nuclear Managing Board Agreement, which provides for a managing board to coordinate the implementation and administration of the Plant Hatch and Plant Vogtle Ownership and Operating Agreements, provides for increased rights for the co-owners regarding certain decisions and allows Georgia Power to contract with a third party for the operation of the nuclear units. In 1997, Georgia Power designated Southern Nuclear as the operator of Plants Hatch and Vogtle, pursuant to the Nuclear Operating Agreement
53

Table of Contents
between Georgia Power and Southern Nuclear, which the co-owners had previously approved. In connection with the amendments to the Plant Scherer Ownership and Operating Agreements, the co-owners of Plant Scherer entered into the Plant Scherer Managing Board Agreement which provides for a managing board to coordinate the implementation and administration of the Plant Scherer Ownership and Operating Agreements and provides for increased rights for the co-owners regarding certain decisions, but does not alter Georgia Power's role as agent with respect to Plant Scherer.
The Operating Agreements provide that we are entitled to a percentage of the net capacity and net energy output of each plant or unit equal to our percentage undivided interest owned or leased in such plant or unit. Georgia Power, as agent, schedules and dispatches Plants Hatch and Vogtle. The Plant Scherer and Wansley ownership and operating agreements allowagreement allows each co-owner (i) to dispatch separately its respective ownership interest in conjunction with contracting separately for long-term coal purchases procured by Georgia Power and (ii) to procure separately long-term coal purchases. We separately dispatch our ownership share of Scherer Units No. 1 and No. 2 and of Plant Wansley.2.
For Plants Hatch and Vogtle, each participant is responsible for a percentage of operating costs (as defined in the Operating Agreements) and fuel costs of each plant or unit equal to the percentage of its undivided interest which is owned or leased in such plant or unit. For Scherer Units No. 1 and No. 2, and for Plant Wansley, each party is responsible for its fuel costs and for variable operating costs in proportion to the net energy output for its ownership interest, and is responsible for a percentage of fixed operating costs equal to the percentage of its undivided interest which is owned or leased in such plant or unit. Georgia Power is required to furnish budgets for operating costs, fuel plans and scheduled maintenance plans. In the case of Scherer Units No. 1 and No. 2, the participants have limited rights to disapprove such budgets proposed by Georgia Power and to substitute alternative budgets. The Ownership Agreements and Operating Agreements provide that, should a participant fail to make any payment when due, among other things, such nonpaying participant's rights to output of capacity and energy would be suspended.
The Operating Agreements for Plant Hatch and Plant Vogtle will remain in effect with respect to each unit for so long as a Nuclear Regulatory Commission operating license exists for such unit. See "OUR BUSINESS – Regulation"REGULATION – Nuclear Regulation." The Operating Agreement for Plant Wansley will remain in effect until 2041. The Operating Agreement for Scherer Units No. 1 and No. 2 will remain in effect with respectexpires on January 31, 2026 and automatically renews for additional two year terms subject to Scherer Units No. 1 and No. 2 until 2022 and 2024, respectively.notice of termination provisions. Upon termination of each Operating Agreement, following any extension agreed to by the parties, Georgia Power will retain such powers as are necessary in connection with the disposition of the property of the applicable plant, and the rights and obligations of the parties shall continue with respect to actions and expenses taken or incurred in connection with such disposition.
55

In conjunction with the development of additional units at Plant Vogtle, we, Georgia Power, MEAG and the City of Dalton entered into amendments to the Operating Agreement for Plant Vogtle and the Nuclear Managing Board Agreement, and entered into an Ownership Agreement that governs participation in Vogtle Units No. 3 and No. 4. Pursuant to this ownership agreement, Georgia Power has designated Southern Nuclear as its agent for licensing, engineering, procurement, contract management, construction and pre-operation services. See "OUR BUSINESS – Our Power Supply Resources – Future Power Resources –
Plant Vogtle Units No. 3 and No. 4" for a discussion of recent amendments to our ownership agreements related to Vogtle Units No. 3 and No. 4.
Rocky Mountain
The Rocky Mountain Pumped Storage Hydroelectric Ownership Participation Agreement, by and between us and Georgia Power (the Rocky Mountain Ownership Agreement), appoints us as agent with sole authority and responsibility for, among other things, the planning, licensing, design, construction, operation, maintenance and disposal of Rocky Mountain. The Rocky Mountain Pumped Storage Hydroelectric Project Operating Agreement (the Rocky Mountain Operating Agreement) gives us, as agent, sole authority and responsibility for the management, control, maintenance and operation of Rocky Mountain.
In general, each co-owner is responsible for payment of its respective ownership share of all operating costs and pumping energy costs as well as costs incurred as a result of any separate schedule or independent dispatch. A co-owner's share of net available capacity and net energy is the same as its respective ownership interest under the Rocky Mountain Ownership Agreement. We and Georgia Power have each elected to schedule separately our respective ownership interests. The Rocky Mountain Operating Agreement will terminate in 2035. The Rocky Mountain Ownership and Operating Agreements provide that, should a co-owner fail to make any payment when due, among other things, such non-paying co-owner's rights to output of capacity and energy or to exercise any other right of a co-owner would be suspended until all
54

Table of Contents
amounts due, with interest, had been paid. The capacity and energy of a non-paying co-owner may be purchased by a paying co-owner or sold to a third party.
Plant Wansley
In July 2022, the Georgia Public Service Commission approved Georgia Power’s 2022 integrated resource plan. This plan requested the decertification of coal-fired Plant Wansley by August 31, 2022. In accordance with the approved plan, Georgia Power retired Plant Wansley on August 31, 2022. Georgia Power continues to serve as our agent with sole authority for the retirement and decommissioning of Plant Wansley and the closure of the coal ash ponds. See "REGULATION – Coal Combustion Residuals and Effluent Limitations Guidelines". As set forth in the Wansley Ownership Agreement, we are responsible for a proportionate share of the plant retirement and decommissioning costs.
Employees
At December 31, 2023, we had 337 employees.
55
56

Table of Contents

LEGAL PROCEEDINGS

The ultimate outcome of pending litigation against us cannot be predicted at this time; however, we do not anticipate that the ultimate liabilities, if any, arising from such proceedings would have a material effect on our financial condition or results of operations. For information about loss contingencies, including litigation alleging personal injury and property damage from Plant Scherer, of which we are a co-owner, that could have an effect on us, see Note 12 of Notes to Consolidated Financial Statements.
5657

Table of Contents

MANAGEMENT'SMANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION
AND RESULTS OF OPERATIONS
Executive Overview
General
Our principal business is reliably providing wholesale electric service to our 38 members in a safe and cost-effective manner. Consequently, substantially all of our revenues and cash flow are derived from sales to our members pursuant to take-or-pay wholesale power contracts. In November 2023, we and each of our members extended the term of our wholesale power contracts that extend through 2050.from 2050 to 2085 which gives us greater flexibility to plan for and finance our resources. These contracts obligate our members jointly and severally to pay all of our costs and expenses associated with owning and operating our power supply business. To that end, our rate structure provides for a pass-through of actual energy costs. Charges for fixed costs, including capacity, other non-energy charges, debt service obligations and the margin required to meet our budgeted margins for interest ratio are carefully managed throughout the year to ensure that we collect sufficient capacity-related revenues. Our rate structure provides us with the ability to manage our revenues to assure full recovery of our costs and has enabled us consistently to meet our financial obligations since our formation in 1974.
20202023 Financial Results
Despite the challenges and uncertainty resulting from the COVID-19 pandemic, weWe had another successful year in 20202023 and continue to be well positioned, both financially and operationally, to fulfill our obligations to our members, bondholders and creditors. Our revenues were more than sufficient to recover all of our costs and to satisfy all of our debt service obligations and financial covenants. Specifically, we recorded a net margin of $55.9$65.8 million in 2020,2023, which achieved the 1.14 margins for interest ratio approved by our board of directors and exceeded the 1.10 margins for interest ratio required to meet the rate covenant under our first mortgage indenture. For 2021,2024, we are again targeting a margins for interest ratio of 1.14, effectively increasing our annual margins by 40% over the minimum required level. We anticipate that we will continue to target
As a 1.14 margins for interest ratioresult of expanding our portfolio of generation resources through the remainderconstruction of the Vogtle Units No. 3 and No. 4 construction period.
As a resultand the acquisition of expandingmultiple natural gas-fired generation resources and the upgrading of our generation capacity and upgrading our generation facilities, over the past decade, our total assets and total debt have significantly increased.increased over the past several years. At December 31, 2020,2023, our total assets were $14.2$16.5 billion and total long-term debt was $10.6$12.1 billion. During the remainder of the Vogtle construction period, we expect that our assets and long-term debt will continue to increase. However,Despite increased interest rates in 2023, strategic financing and refinancing of capital investments with long-term debt through the Department of Energy and Rural Utilities Service loan guarantee programs, taxable and tax-exempt capital markets offerings and a continued low interest rate environment enabled us to borrow long-term debt at our lowest interestrelatively low rates to date during 2020 and further decreased our weighted average interest cost on long-term debt from 5.41%was 3.89% per yearannum at December 31, 2009 to 3.73% per year at December 31, 2020.2023. We will continue to actively manage our debt portfolio and utilize advantageous borrowing programs available to us as our ability to borrow at lower costs ultimately benefits our members and their customers as interest savings are reflected in our pass-through rate structure.
In 2023, lower fuel costs allowed us to meet significantly more of our members’ energy needs in a more cost-effective manner. Vogtle Unit No. 3 also achieved commercial operation on July 31, 2023 which was reflected in rates starting in August. For the year ended December 31, 2023, our operating revenues were $1.7 billion, and we sold over 29.7 million megawatt hours compared to $2.1 billion in revenues and 27.3 million megawatt hours for the year ended December 31, 2022. Our cost-plus formulary rate structure ensures recovery of costs on a monthly basis and we remain focused on delivering cost-effective, reliable power to our members rather than on maximizing revenues. Our continued investment in new resources, including Vogtle Units No. 3 and No. 4, is intended to provide long-term cost-effective and reliable power that is less sensitive to market volatility.
Vogtle Units No. 3 and No. 4
The construction ofOn July 31, 2023, Vogtle UnitsUnit No. 3 andbecame the first new nuclear unit in the United States to achieve commercial operation in more than 30 years. Vogtle Unit No. 4 continuesis expected to achieve commercial operation in the second quarter of 2024. These units have been, and continue to be, a primary focus area. Our current budget for our 30% ownership interest in these units is $7.5 billion, which includes capital costs, allowance for funds used during construction, our allocation of the project-level contingency and a separate Oglethorpe-level contingency. As of December 31, 2020, 2023,
58


our total investment in the additional Vogtle units was $6.0approximately $8.2 billion. The Georgia Public Service Commission approved in-service datesOur current budget, which includes capital costs and allowance for Vogtle Units No. 3 and No. 4 are November 2021 and November 2022, respectively.funds used during construction, is a range of $8.3-8.35 billion.
Construction continues to make significant progress at the site and a number of important construction, system turnover and testing milestones were achieved during 2020. Southern Nuclear and Georgia Power continue to manage the construction at the site and maintained operations throughout 2020 while implementing comprehensive mitigation measures to manage the impactproject reached a number of COVID-19 at the site.Although construction activities continued, workforce disruptions caused by the COVID-19 pandemic exacerbated existing productivity challenges which have continued into 2021. As a result of these challenges, Southern Nuclear has further extended certain milestone dates, including the start of hot functional testingimportant milestones during 2023 and fuel load for Unit No. 3.The Unit No. 3 schedule is challenged, and while the ability to achieve the November 2021 regulatory in-service date remains a target for Southern Nuclear, we believe a delay is likely which could add a month or more to the Unit No. 3
57

Table of Contents
in-service date. As Unit No. 3 approaches hot functional testing, key factors impacting the schedule include both the pace of work package completion and system turnovers, and required construction remediation work.
Achievement of the November 2022 regulatory in-service date forearly 2024. Most recently, Vogtle Unit No. 4 primarily dependssynched to the power grid and generated electricity for the first time on overallMarch 1, 2024.
In October 2023, we settled litigation with Georgia Power regarding the interpretation of cost-protections under the Global Amendments. Pursuant to the settlement agreement, we received the full benefit of the cost-protections agreed to under the Global Amendments, retained our 30% interest in the additional Vogtle units and achieved additional cost-protections by which Georgia Power will pay 66% of our 30% share of incremental construction productivity and production levels significantly improving as well as appropriate levelscosts that exceed $19.2 billion.
We are pleased with the initial commercial operation of craft laborers, particularly electrical and pipefitter craft labor, being added and maintained. In the event that there is any schedule extension beyond the November 2021 and November 2022 regulatory in-service dates for Units No. 3 and No. 4, respectively, the Oglethorpe-level contingency level in our current $7.5 billion budget is expected to be sufficient to withstand up to a 4-month delay for Unit No. 3 and a 3-month delay forlook forward to the commercial operation of Unit No. 4.Any further delays beyond these extended dates are expected to impact our cost by approximately $55 million per month for both units and approximately $25 million per month for Unit No. 4 only, including financing costs.
Upon completion, Vogtle Units No. 3 and No. 4 will have an aggregate generating capacity of approximately 2,200 megawatts and our 30% undivided interest will entitle us to approximately 660 megawatts of carbon-free, baseload generating capacity. We expect our interest in these units to be valuable assets for us and our members over the next 60 to 80 years and to contribute to our diverse pool of generation resources. For additional information regarding Vogtle Units No. 3 and No. 4 and related financing activities, see “OUR BUSINESS – Our Power Supply ResourcesOUR POWER SUPPLY RESOURCES – Future Power Resources – Plant Vogtle Units No. 3 and No. 4,” “– Financial Condition – Financing ActivitiesDepartment of Energy-Guaranteed Loans” and “– Capital Requirements – Capital Expenditures” and Note 7a of Notes to Consolidated Financial Statements.
COVID-19
We were able to successfully navigate the challenges presented by the COVID-19 pandemic during 2020 and are proud of our associates’ response to the outbreak. As an electric utility, we are deemed part of the nation's critical infrastructure and continued operating during the pandemic to provide electricity to our members and the populations they serve. To protect our associates and the public and to maintain operating capabilities, we implemented applicable business continuity plans, including working remotely where possible; increased cleaning frequency at business locations; implemented applicable safety and health guidelines issued by federal and state officials; and established protocols to maintain generation reliability. In June, we began a phased reopening of our corporate offices with new safety protocols intended to reduce the risk of transmission of COVID-19. To date, these measures have been effective in maintaining our critical operations and we continue to keep in contact with state and federal regulators to ensure the safety of our associates and reliability of our generation facilities.
While there were temporary disruptions in the capital and equity markets over the course of the year, the COVID pandemic did not have a significant effect on our business operations or financial condition.For 2020, our analysis indicates that the impact of COVID-19 on our members’ sales was approximately one percent. The potential decrease in sales was mitigated by the fact that approximately two-thirds of our members' sales are to residential customers. Further, although our members were subject to an increased risk that their consumers may not be able to pay utility bills on time or may seek to enter into alternative payment plans, our members have continued to pay all amounts due under the wholesale power contracts on a timely basis and we are not aware of a significant increase of bad debt with any of our members. While we are encouraged by the increasing distribution of the COVID-19 vaccines, the ultimate impact of the pandemic on us and our members remains subject to many factors, including the timing of achieving a sufficient level of vaccinations and the remaining duration and severity of the COVID-19 pandemic and the resulting economic conditions.
Liquidity Position
Our strong liquidity position continues to be one of the most positive attributes contributing to our solid financial standing. This liquidity is comprised of a diversified, cost-effective mix of cash (including short-term investments), committed lines of credit and commercial paper. Our primary source of liquidity is a $1.2 billion unsecured credit facility that extends through December 2024 and supports our commercial paper program. We currently anticipate renewing this credit facility in the second quarter of 2024. Additionally, we have three other bank credit facilities which provide another $613$600 million in credit commitments, including a $363 million line of credit from J.P. Morgan Chase Bank, which we increased from $150 million in March 2020.commitments.
In addition to our strong liquidity, we have multiple sources of long-term financing available to meet our anticipated capital needs. These sources include Department of Energy andthe Rural Utilities Service federal loan programsprogram and the taxable
58

Table of Contents
and tax-exempt capital markets. We expect to continue utilizing each of these sources of capital to meet our long-term financing needs in the coming years. We also have $4.2 billion outstanding pursuant to borrowings under the Department of Energy loan program to finance the construction of the new Vogtle Units.
WithFollowing passage of the Inflation Reduction Act in 2022, we and our current sourcesmembers are evaluating new incentives available to us to further diversify our generation portfolio through the addition of committed short-termnew battery storage and long-termrenewable generation resources. In October 2023, we, together with the Georgia Environmental Finance Authority, Georgia Transmission and Georgia System Operations, were selected for a $250 million grant under the Department of Energy’s GRIP Program. As part of the grant application, we applied for an aggregate of 75 megawatts of utility-scale battery storage which is estimated to utilize approximately $80 million of the total award. Receipt of any grant proceeds remains subject to meeting program requirements and customary closing conditions. We are also evaluating additional new funding we anticipate that we will have sufficient liquidity to complete Vogtle Units No. 3 and No. 4.opportunities through the Rural Utilities Service Empowering Rural America program.
Environmental Regulations
Another of our key focus areas is maintaining compliance with all applicable environmental laws and regulatory standards. We own electric generation facilities powered by nuclear, natural gas, coal and hydro resources which presents substantial challenges for us and our members to comply with existing environmental regulations.Based on the new presidential administration’sPresident’s executive orders and on statements regarding reducing carbon dioxide emissions and decision to rejoin the Paris Climate Agreement,proposed rules from federal administrative agencies, we expect several existing environmental regulations to become more stringent. As an electric cooperative that operates on a not-for-profit basis, our compliance costs are ultimately borne by our members’ electricity consumers.
59


Greenhouse gas emissions, particularly carbon dioxide, are again the focus of increasedsome of the anticipated federal environmental regulations. Effective February 19, 2021, the United States rejoined the Paris Climate Agreement and, will developin accordance with the agreement, subsequently proposed reductions ineconomy-wide carbon dioxide which could leadreductions of 50-52% of 2005 levels by 2030. In order to legislative and regulatory actionsmeet this economy-wide goal, analyses indicate that the power sector would have to support those goals. Thereduce carbon dioxide emissions by approximately 80% below 2005 levels by 2030. To that end, the EPA is expected to undertakereleased a new rulemaking processrule in 2023 to address carbon dioxide emissions from existing coal and natural gas-fired power plants followingalthough it recently announced that it would address existing natural gas-fired plants in a future rulemaking. We believe that some of the U.S. Courtassumptions in the proposed rule, particularly regarding natural gas, hydrogen availability, carbon capture and sequestration and the pace of Appeals for the D.C. Circuit’s decisiontechnological advancements, continue to vacate and remand the Affordable Clean Energy (ACE) rule.be unrealistic. At this time, we cannot predict the outcome or potential cost of any legislative or regulatory changes on us or our members, but itsuch costs could be significant.
We also believe that we are well-situated to effectively manage such challenges and that our diverse asset base, along with our investment in additional carbon-free generation at Vogtle Units No. 3 and No. 4 and recent additions of natural gas generation resources, positions us well to continue to meet our members’ needs. Further, our members continue to pursue renewable generation opportunities and invest where they deem appropriate in order to further diversify their power supply resources to meet the demands of their member consumers and prepare for potential future limitations on greenhouse gas emissions.
In addition to greenhouse gases, we must also comply with several other environmental regulations. For example, in order to comply with federal and state coal combustion residual rules and effluent limitation guidelines, we are investing approximately $289$230 million in capital costs at Plant Scherer, of which $242$170 million has already been spent, in addition to $400the current projection of $600 million to $550$800 million (in year of expenditure dollars) associated with our corresponding asset retirement obligations.obligations at our operating and retired coal plants. If existing laws or regulations related to the disposal of CCRcoal combustion residuals and treatment of coal ash ponds were to change or we are otherwise required to revise our existing closure plans, our related obligations could increase materially.
Asset ManagementLoad Growth in Georgia
AnotherGeorgia is projected to experience a significant increase in energy demand over the next several years based on native load growth and large loads related to several new data centers and manufacturing facilities. We and our members are assessing the potential impact of this load growth on our primary focus areas continuesmembers’ power supply needs. Large loads in Georgia are subject to competition, and our members may be ensuring thatselected to meet some of the additional large loads. We and our owned and operated generation facilities perform in the most efficient and cost-effective manner possible and, in 2021, wemembers will continue to seek waysevaluate and plan for our members’ anticipated power needs, and we expect that our members will request us to improve the reliability of our generating facilities. Our Operational Excellence program strives to achieve safety, reliability and compliance in a cost effective manner. Many of theconstruct additional generation facilities to help them serve this load growth.
Focus on ESG
In November 2023, we operate rank in the top quartile of similar plants in one or more key performance indicators, including start reliability, peak season availabilityreleased our annual environmental, social and forced outages. Additionally,corporate governance (ESG) report highlighting our generation assets are built and designed to operate in extreme winter weather. Following the 2014 polar vortex, we implemented design improvements across our fleet of power plants to safeguard against subzero temperatures and ensure reliable generation resources for our members. Achieving operational excellence results in the most reliable, efficient and lowest cost power supply for our members; therefore, effective asset management will always be one of our top priorities.
As we assess the operation of our existing generation resources, a continued trend in the dispatch of our generation assets is the significant decrease in coal-fired generation. The percentage of energy from coal generation that we supply to our members has decreased from 45% in 2008 to 5% in 2020. The two primary drivers of this shift in generation were our acquisition of additional natural gas-fired resources and a significant fall in natural gas prices. As a result of this trend and capital expenditures to comply with environmental regulations, Georgia Power is evaluating whether to retire Plant Wansley Units No. 1 and No. 2 as early as fall 2022. As we look ahead, we continue to consider the role that coal-fired generation resources play in our overall portfolio and the ability to provide reliable and cost-effective generation for our members.
59

Table of Contents
In addition to our current assets, we continue to evaluate potential resources to meet our members’ needs at the lowest reasonable cost. On March 1, 2021, we entered into a purchase agreement to acquire Effingham County Power, a 511-megawatt natural gas-fired combined cycle peaking facility that is subject to customary closing termsefforts in these areas as well as several recent achievements. We and conditions.If completed, this acquisition would provide an additional efficient and economically priced generation resource to our members.
Rate Management Programs
Over the last five years, our average wholesale power rate to our members has been at or below the mid-six cents per kilowatt-hour range. Given the magnitude of the Vogtle project, we and some of our members have voluntarily implemented various rate management programsbeen working toward a cleaner energy path for many years. We are committed to smooth outmaking strides toward improving the impact on rates whenenvironment through reducing greenhouse gas emissions, including carbon. With respect to carbon, by 2025, after Vogtle Units No. 3 and No. 4 reach commercial operation.
Beginning in 2018,come on-line, we offeredare forecasting that the carbon intensity rate for the energy we generate for our members an optional rate management program allowing for an election of additional collections of future expenses for a five-year period which will then be applied to billings over the subsequent five-year period. For participating members, the additional collections will have the effect of gradually increasing their payments to us over the initial five year period, 2018 to 2022, in order to soften the impact of full integration of the new Vogtle units’ costs into rates. decrease by 47% from 2005 levels.
In 2023, to 2025, the first few full years after expected commercial operation of the Vogtle units, we will apply a portion of the additional amounts collected to participating members’ bills, which we expect to reduce the rate impact to those members by approximately one-half of a cent each year, from the mid-seven cents per kilowatt-hour range to around seven cents per kilowatt-hour. The impact of the program will gradually decrease through 2027, its final year. Further, because we only supply around 60%supplied nearly 70% of our members’ wholesale powerenergy requirements from our diverse portfolio of nuclear, gas, coal and hydro resources. Green Power EMC, owned by our members and supported by Oglethorpe employees, specializes in the ultimate rate impact onpurchase of renewable energy for the retail consumers may be further mitigatedmembers. Green Power currently purchases 756 megawatts of renewable energy resources and is expected to grow to more than 836 megawatts by 2025. Our members also contract directly with renewable suppliers, and by the end of 2024 we anticipate that the members’ total solar portfolio will exceed 1,700 megawatts.
We are also proud of our work in the social and governance areas of ESG. Electric cooperatives were created to bring electricity to underserved, rural areas and continue that mission today as our members serve many of the most economically disadvantaged areas of Georgia. As a not-for-profit cooperative, owned and governed by our
60


members, we have a unique perspective on ESG considerations. We were created by and exist to serve our members and our focus on members is part of who we are. More specifically, our members elect our board of directors and our equity is our members’ ratespatronage capital. The critical role our members play in our business is reflected in the seven pillars of cooperative organizations: (i) voluntary and open membership, (ii) democratic member control, (iii) members’ economic participation, (iv) autonomy and independence, (v) education, training and information, (vi) cooperation among cooperatives and (vii) concern for community.
We embrace diversity in the workplace. Of our executive level officers, over half are blendedwomen. Of our entire workforce, 21% are minorities and 20% are military veterans. We have established a culture of high ethical and safety standards for our workforce, along with their supplemental power supply sources, transmissionthe robust risk management and retail distribution costs.strategic planning processes to guide us through the transitioning energy landscape.
We are proud of our progress in a number of ESG-related areas and continue to push ourselves to improve in these areas. Our commitment to these goals goes beyond talking points. For several years, certain of the corporate goals that determine our executives’ performance pay have been, and continue to be, directly related to environmental, worker safety and corporate governance metrics.
Outlook for 20212024
As the electric utility industry across the country continues to experience change, we remain focused on providing reliable, safe, and cost-effective energy to our members and the 4.34.5 million people they serve andserve. We believe we are well positioned to do so. As discussed above, there are certain risks and challenges that we must continue to address, most notably related to Vogtle Units No. 3 and No. 4load growth in Georgia and anticipated environmental regulation. However, as we manage our risks, we intend to keep doing what we have done so successfully for the last 4750 years, including, among other things:
maintaining a balanced and diverse portfolio of generating resources, including nuclear, natural gas, coal and hydro and continuing the reliable, efficient and cost-effective operation of these resources;
maintaining strong liquidity to fulfill current obligations and to finance future capital expenditures; and
working with our members to explore existing and emerging opportunities to add value to our ultimate consumers.
Accounting Policies
Basis of Accounting
We follow generally accepted accounting principles in the United States and the practices prescribed in the Uniform System of Accounts of the Federal Energy Regulatory Commission as modified and adopted by the Rural Utilities Service.
Critical Accounting Policies
We have determined that the following accounting policies are critical to understanding and evaluating our financial condition and results of operations and requires our management to make estimates and assumptions about matters that were uncertain at the time of the preparation of our financial statements. Changes in these estimates and assumptions by our management could materially impact our results of operations and financial condition. Our management has discussed these critical accounting policies and the related estimates and assumptions with the audit committee of our board of directors.
Regulatory Accounting.    We are subject to the provisions of the Financial Accounting Standards Board (FASB) authoritative guidance issued regarding regulated operations. The guidance permits us to record regulatory assets and
60

Table of Contents
regulatory liabilities to reflect future cost recoveries or refunds, respectively, that we have a right to pass through to our members. At December 31, 2020,2023, our regulatory assets and regulatory liabilities totaled $731.4 million$1.1 billion and $566.4$706.3 million, respectively. While we do not currently foresee any events such as competition or other factors that would make it not probable that we will recover these costs from our members as future revenues through rates
61


under our wholesale power contracts, if such an event were to occur, we could no longer apply the provisions of accounting for regulated operations, which would require us to eliminate all regulatory assets and regulatory liabilities that had been recognized as a charge or credit to our statement of revenues and expenses and begin recognizing assets and liabilities in a manner similar to other businesses in general. In addition, we would be required to determine any impairment to other assets, including plants, and write-down those assets, if impaired, to their fair values.
Asset Retirement Obligations.    Accounting for asset retirement and environmental obligations requires legal obligations associated with the retirement of long-lived assets to be recognized at fair value when incurred and capitalized as part of the related long-lived asset. In the absence of quoted market prices, we estimate the fair value of our asset retirement obligations using present value techniques, in which estimates of future cash flows associated with retirement activities are discounted using a credit-adjusted risk-free rate. Estimating the amount and timing of future expenditures includes, among other things, making projections of when assets will be retired and ultimately decommissioned, the amount of decommissioning costs, and how costs will escalate with inflation.
A significant portion of our asset retirement obligations relates to our share of the future cost to decommission our operating nuclear units and the coal ash ponds at our coal-fired units. At December 31, 2020,2023, our nuclear decommissioning and coal ash related asset retirement obligations were $738.2$929.8 million and $346.6$464.0 million, respectively. Our asset retirement obligations represent an estimate of the present value of anticipated retirement costs. For additional detail regarding our asset retirement obligations, see Note 1h of Notes to Consolidated Financial Statements. These obligations represented 95% of our total asset retirement obligations.
Given its significance, we consider our nuclear decommissioning liabilities critical estimates. Approximately every three years, new decommissioning studies for Plants Hatch and Vogtle are performed. These studies provide us with periodic site-specific "base year" cost studies in order to estimate the nature, cost and timing of planned decommissioning activities for the plants. These cost studies are based on relevant information available at the time they are performed; however, estimates of the amount and timing of future cash flows for extended periods are by nature highly uncertain and may vary significantly from actual costs. In addition, these estimates are dependent on subjective factors, including the selection of cost escalation and discount rates, which we consider to be critical assumptions. Our current estimates are based upon studies that were performed in 2018.2020 and 2021. For ratemaking purposes, we record decommissioning costs over the expected service life of each unit. The impact on measurements of asset retirement obligations using different assumptions in the future may be significant.
We also consider our coal ash related decommissioning liabilities at Plants Scherer and Wansley to be critical estimates, in particular those for the coal ash ponds. Cost studies are periodically performed to provide site-specific "base year" estimates that determine the nature and timing of planned decommissioning costs. These cost studies are based on relevant information available at the time they are performed; however, estimates of the amount and timing of future cash flows for extended periods are by nature highly uncertain and may vary significantly from actual costs. Critical assumptions include coal ash pond closure strategy, including water treatment requirements, and the volume of coal ash in the ponds. In addition, these estimates are dependent on other subjective factors, such as estimates of costs to perform the decommissioning and post-closure activities, timing of expenditures, and the selection of cost escalation and discount rates. Our current estimates are based upon studies that were performed in 2019.2023. For ratemaking purposes, we are applying regulated operations accounting to the decommissioning costs and currently expect to recover ash pond closure costs over approximately 1213 years. The impact on measurements of asset retirement obligations using different assumptions in the future may be significant.
Recently issued or adopted accounting pronouncements
In March 2020, the Financial Accounting Standards Board (FASB) issued “Reference Rate Reform (Topic 848): Facilitation of the Effects of Reference Rate Reform on Financial Reporting”. The amendments in this update apply to all entities that have contracts, hedging relationships, and other transactions that reference London Interbank Offered Rate (LIBOR) or another reference rate expected to be discontinued because of reference rate reform. The amendments in this update provide optional expedients and exceptions for applying U.S. GAAP to transactions affected by reference rate reform if certain criteria are met. The expedients and exceptions provided by the amendments in this update do not apply to contract modifications made and hedging relationships entered into or evaluated after December 31, 2022, except for hedging
61

Table of Contents
relationships existing as of December 31, 2022, for which an entity has elected certain optional expedients that are retained through the end of the hedging relationship.
In January 2021, the FASB issued “Reference Rate Reform (Topic 848): Scope,” to further clarify the scope of the reference rate reform guidance in Topic 848. The amendments in this update refine the scope of Topic 848 to clarify that certain optional expedients and exceptions therein for contract modifications and hedge accounting apply to contracts that are affected by the discounting transition. Specifically, modifications related to reference rate reform would not be considered an event that requires reassessment of previous accounting conclusions. The amendments in this update also amend the expedients and exceptions in Topic 848 to capture the incremental consequences of the scope clarification and to tailor the existing guidance to derivative instruments affected by the discounting transition.
The amendments in these updates are effective for all entities as of March 12, 2020 through December 31, 2022. We are currently evaluating the future impact of this standard on our consolidated financial statements.
In June 2016, the FASB issued "Financial Instruments—Credit Losses (Topic 326): Measurement of Credit Losses on Financial Instruments." The standard was effective for us prospectively for annual reporting periods beginning after December 15, 2019, and interim periods therein. On January 1, 2020, we adopted this standard. The standard requires consideration of a broad range of information to estimate expected credit losses over the lifetime of financial assets measured at amortized cost. The new credit losses standard replaced the “incurred loss” methodology for recognizing credit losses that delayed recognition until it was probable a loss had been incurred. The financial assets we hold that are subject to the new standard are predominately accounts receivable and certain cash equivalents classified as held-to-maturity debt (e.g. commercial paper). Our receivables are generally due within thirty days or less with a significant portion related to billings to our members. See Notes 1e and 1f for information regarding our member receivables. Commercial paper issuances we invest in are rated as investment grade and backed by a credit facility. Given our historical experience, the short duration lifetime of these financial assets and the short time horizon over which to consider expectations of future economic conditions, we have assessed that non-collection of the cost basis of these financial assets is remote. The adoption of the standard did not materially impact our consolidated financial statements.
In August 2018, the FASB issued "Fair Value Measurement (Topic 820): Disclosure Framework - Changes to the Disclosure Requirements for Fair Value Measurement." This standard eliminated, added and modified certain disclosure requirements for fair value measurements as part of the FASB's disclosure framework project. Entities are no longer required to disclose the amount of and reasons for transfers between Level 1 and Level 2 of the fair value hierarchy, the policy for timing of transfers between levels and the valuation processes for Level 3 fair value measurements. However, public business entities are required to disclose the range and weighted average of significant unobservable inputs used to develop Level 3 fair value measurements. The amendments in this update were effective for all entities for fiscal years, and interim periods within those fiscal years, beginning after December 15, 2019. An entity was permitted to early adopt any removed or modified disclosures upon issuance of this update and delay adoption of the additional disclosures until their effective date. The adoption of the standard did not have a material impact on our consolidated financial statements.
In December 2019, the FASB issued “Income Taxes (Topic 740): Simplifying the Accounting for Income Taxes”, as part of its initiative to reduce complexity in the accounting standards. The amendments in the standard remove certain exceptions and also clarify and simplify various aspects of accounting for income taxes. The new standard is effective for us prospectively for annual reporting periods beginning after December 15, 2020, and interim periods therein. Early adoption is permitted, which we are not electing to do. The adoption of the standard on January 1, 2021 did not have a material impact on our consolidated financial statements.
Summary of Cooperative Operations
Sources of Revenues
We operate on a not-for-profit basis and, accordingly, seek only to generate revenues sufficient to recover our cost of service and to generate margins sufficient to establish reasonable reserves and meet certain financial coverage requirements. Our primary source of revenue is the sale of capacity and energy to our members for a portion of their energy requirements. We may also sell capacity and energy to non-members. Capacity revenues are the revenues we receive for providing electric service whether or not our generation and purchased power resources
62


are dispatched to produce electricity. Energy revenues are the revenues we receive by selling electricity that we generate or purchase.
62

Table of Contents
We have assigned fixed percentage capacity cost responsibilities to our members for all of our generation and purchased power resources. Each member has contractually agreed to pay us for the electric capacity assigned to it based on its individual fixed percentage capacity cost responsibility.
Each member is also contractually obligated to pay us for electric energy we provide to it based on individual usage. Energy sales to our members fluctuate from period to period based on several factors, including fuel costs, weather and other seasonal factors, load requirements in the service territories of our members, operating costs, availability of electric generation resources and our decisions of whether to dispatch our owned or purchased resources or member-owned resources over which we have dispatch rights. In addition, as we do not provide our members with all of their energy requirements, energy sales may also fluctuate based on our members' decisions of whether to purchase a portion of their hourly energy requirements from our resources or from other suppliers.
Formulary Rate
The rates we charge our members are designed to cover all of our costs plus a margin. This cost-plus rate structure is set forth as a formula in the rate schedule to the wholesale power contracts between us and each of our members. These contracts require us to design capacity and energy rates that generate revenues sufficient to recover all costs, including payments of principal and interest on our indebtedness, to establish and maintain reasonable margins and to meet the financial coverage requirements under the first mortgage indenture.
The formulary rate provides for the pass through of our fixed costs to members as capacity charges and our variable costs to members as energy charges. Fixed costs are assigned to members according to their individual fixed percentage capacity cost responsibility for each resource in which they participate. Variable costs are passed through to our members based on the amount of energy supplied to each member.
Capacity charges are based on an annual budget of fixed costs plus a targeted margin and are billed to members in equal monthly installments over the course of the year. Fixed costs include items such as depreciation, interest, fixed operations and maintenance expenses, administrative and general expenses. We monitor fixed cost budget variances to projected actual costs throughout the year, and with board approval, make budget adjustments when and as necessary to ensure that we generate revenues sufficient to recover all costs and to meet our targeted margin. Budget adjustments are typically made twice a year; once during the first quarter and again at year end. In contrast to the way we bill our members for capacity charges, which are billed based on a budget and trued up to actuals by the end of the year, energy charges are billed on a more real-time basis. Estimated energy charges are billed to members based on the amount of energy supplied to each member during the month, and are adjusted when actual costs are available, generally the following month. Energy charges, or variable costs, include fuel, purchased energy and variable operations and maintenance expenses. Each generating resource has a different variable cost profile, and members are billed based on the energy cost profile of the resources from which their energy is supplied.
Margins
Revenues in excess of current period costs in any year are designated as net margin in our statements of revenues and expenses, and we have generated a positive net margin every year since our formation in 1974. Under our first mortgage indenture, we are required, subject to any necessary regulatory approval, to establish and collect rates that are reasonably expected, together with our other revenues, to yield a margins for interest ratio for each fiscal year equal to at least 1.10. See "OUR BUSINESS"BUSINESS – Business OverviewOGLETHORPE POWER CORPORATION – First Mortgage Indenture" for a discussion of how we calculate our margins for interest ratio.
In the event we were to fall short of the minimum 1.10 margins for interest ratio at year end, the formulary rate is designed to recover the shortfall from our members in the following year without any additional action by our board of directors.
Prior to 2009, we budgeted and achieved annual margins for interest ratios of 1.10, the minimum required by the first mortgage indenture. To enhance margin coverage during a period of increased capital requirements, our
63


board of directors has approved budgets with margins for interest ratios that exceeded 1.10. Since 2010, we have achieved our board approved margins for interest ratio of 1.14, and our board has approved a margins for interest ratio of 1.14 for 2021.2024. As our capital requirements continue to evolve, our board will continue to evaluate the level of margin coverage and may choose to change the targeted margins for interest ratio in the future, although not below 1.10.
63

Table of Contents
Patronage Capital
Retained net margins are designated on our balance sheets as patronage capital. As a cooperative, patronage capital constitutes our principal equity. As of December 31, 2020,2023, we had $1.1$1.3 billion in patronage capital and membership fees. Our equity ratio, calculated pursuant to our first mortgage indenture as patronage capital and membership fees divided by total capitalization and long-term debt due within one year, was 9.1%9.4% and 9.4%9.0% at December 31, 20202023 and 2019,2022, respectively.
Patronage capital is allocated to each of our members on the basis of their fixed percentage capacity cost responsibilities in our generation resources. Any distribution of patronage capital is subject to the discretion of our board of directors and limitations under our first mortgage indenture. See "OUR BUSINESS – Business OverviewOGLETHORPE POWER CORPORATION – First Mortgage Indenture" for a discussion regarding limitations on distributions under our first mortgage indenture.
Rate Regulation
Under our loan agreements with each of the Rural Utilities Service and Department of Energy, changes to our rates resulting from adjustments in our annual budget are generally not subject to their approval. We must provide the Rural Utilities Service and Department of Energy with a notice of and opportunity to object to most changes to the formulary rate under the wholesale power contracts. See "OUR BUSINESS – Business OverviewOGLETHORPE POWER CORPORATION – Relationship with Federal Lenders." Currently, our rates are not subject to the approval of any other federal or state agency or authority, including the Georgia Public Service Commission.
Tax Status
While we are a not-for-profit membership corporation formed under the laws of Georgia, we are subject to federal and state income taxation. As a taxable cooperative, we are allowed to deduct patronage dividends that we allocate to our members for purposes of calculating our taxable income. We annually allocate income and deductions between patronage and non-patronage activities and substantially all of our income is from patronage-sourced activities, resulting in no current period income tax expense or current income tax liability. For further discussion of our taxable status, see Note 5 of Notes to Consolidated Financial Statements.
Results of Operations
Factors Affecting Results
Certain of our recent financial and operational results were affected both by the way in which we dispatch our power plants as well as by significant events or trends described below.
We haveThe types of generation assets we own include five nuclear units, three combined cycle natural gas-fired plants, several natural gas-fired simple cycle combustion turbine plants, a plant that burns sub-bituminous coal, and a pumped storage hydroelectric plant.
In 2023, we acquired one combustion turbine natural gas-fired unit at the Baconton Power Plant, adding to our already diverse mix of generation and fuel types among our power plants, allowing usplants. See Note 13 of Notes to serve the power needs of our members in a reliable, efficient and low-cost manner. The types of generation assets we own include several natural gas-fired simple cycle combustion turbine plants, two combined cycle natural gas-fired plants, a plant that burns bituminous coal, a plant that burns sub-bituminous coal, two nuclear plants and a pumped storage hydroelectric plant.Consolidated Financial Statements for additional information regarding this acquisition.
Decisions to dispatch our power plants and thus the amount of energy we generate and sell to our members are economically driven by supply and demand considerations. The primary supply considerations include (i) fuel prices and other marginal operating costs of the plant, which factor into a dispatch cost we calculate for each resource, (ii) plant availability, which is driven by factors such as outages for maintenance or refuelings and (iii) plant
64


efficiency, as determined by the heat rate which measures the amount of fuel required to generate one kilowatt hour of electricity. We prioritize the order in which we typically dispatch our plants such that we dispatch our available plants with the lowest dispatch cost first, and those with the highest dispatch cost last, when demand is highest.
The primary demand consideration that affects how we dispatch our plants is the amount of energy our members require from us. This is a function of weather, economic activity, residential use patterns and the relative cost and availability of our members' third party supply arrangements, which account for approximately a significant portionthird of the energy they purchase.
In 2020,2023 and 2022, weather was a significant factor. The 2023 summer experienced extremely hot weather during the last half of August that led to a new all-time summer peak demand for our members. As a result, the amount of energy generation(in megawatt-hours) we generated and member sales were down by approximately 5% whensold to members was higher than in 2022 and 2021, and led to higher utilization of our combined cycle generating facilities and our coal facilities compared to 2019. This decreasethe prior two years. While the amount of energy we sold to our members was higher, our members’ overall energy demand was lower in 2023 compared to 2022 primarily due to milder2023 being a mild weather year. December 2022 still holds the overall peak when we experienced extremely cold weather during the Christmas holiday weekend.
In addition to member demand, we sell power from some of our generating resources off-system, typically from assets we acquire in advance of some members needing the winter and summer, with only about 1% relatedcapacity or energy. These members elect to reduced demand as a resultdefer their portion of the COVID-19 pandemic.resource, and the output of the resource is sold to non-members which helps reduce deferred costs for these deferring members We dispatch the majority of the BC Smith combined cycle facility to serve non-member sales, and we plan to continue doing so through 2025. In 2023, we saw reduced market demand for these off-system sales compared with 2022; therefore, we generated and sold fewer megawatt-hours of off-system energy from BC Smith compared with 2022.
Since we pass through all of our costs to members, including fuelFuel cost which is one of our most significant operating costs,cost, and this greatly impacts the cost of our energy sales to our members as well as our member sales (in dollars) is significantly affected by fuel prices. The price of natural gas is the most
64

Table of Contents
significant variable in our cost of fuel and also affects how we dispatch our generation resources. NaturalIn 2023, natural gas prices decreased significantly compared with 2022 due to market alleviation on supply and demand pressures. This decrease in natural gas prices led to more generation and sales to our members and lower fuel cost compared to 2022. The commercial operation of Vogtle Unit No. 3, which began in July 2023, also contributed to the increase in megawatt-hour sales to the members in 2023. In 2022, natural gas prices were relatively lowsignificantly higher compared with each of the previous years due to market pressures on supply and demand. Coupled with the increase in 2018member sales (in megawatt-hours), the increased natural gas prices in 2022 resulted in higher cost of fuel and 2019, and continuedmember sales (in dollars). In 2022, due to trend downwardthe increase in 2020. natural gas prices, our coal units were also more economical resulting in more coal generated energy to sell to our members in 2022 than in 2021.
In addition to the prevailing market price, our average cost of natural gas per kilowatt hourkilowatt-hour generated is also affected by how efficiently our natural gas facilities burn the gas. Compared to our combustion turbine units, our combined cycle units our combustion turbine units are lessmore efficient and thus burn moreless gas per kilowatt hour of electricity generated. Consequently, our combustion turbine units have a higher dispatch cost than our combined cycle units and are typically used to generate energy only during periods of higher electricity demand, such as on hot summer days or colder winter days. In 2020,And although 2023 had milder weather overall, more extreme weather days in 2023 resulted in significantly higher generation from our combustion turbinecombined cycle units was lesscompared to 2022 and 2021 and this also contributed to higher member sales (in megawatt-hours) in 2023, than in 2019 due to the aforementioned mild weather.
As a result of the low natural gas price environment, our coal units have become less economical2022 and are generating less energy to sell to our members. In 2020, generation from our coal units was 5% of our gross total energy generation compared to 10% in 2019 and 16% in 2018.2021.
Our nuclear units require refueling on an 18 toor 24-month cycle and these refueling outages, which typically last several weeks, resulted in fluctuations in nuclear plant availability and generation in each of the last three years. These shutdowns and outages significantly reduced generation at the affected plants, reduced kilowatt-hour sales to and energy revenues from our members during the periods that the plants were not generating power.
Our energy sales to our members also fluctuate In 2023, generation from period to period based on weather. For 2020, the winter was very mild and summer was moderately milder when compared to the prior ten year average. The mild weather largely contributed toVogtle Unit No. 3 offset the decrease in energy sales in 2020 compared to 2019. However, in July our members experienced a peak just short ofgeneration from the all-time peak demand that occurred in August 2019. This was a result of warmer than normal weather in July combined with many of our members' residential customers working remotely from home and commercial loads returning to pre-COVID-19 levels.other nuclear plants.

We also continued to make significant capital expenditures over the past three years particularly for the new units under construction at Plant Vogtle and the BC Smith, Washington County, and Baconton acquisitions, which we have primarily financed with debt. These financings have increased our overall debt which has increased our interest expense and
65


our allowance for debt funds used during construction. Additionally, since our margin is calculated as a percentage of our secured interest expense, our net margin has generally increased. As discussed under "– Financial Condition – Capital Resources – Capital Expenditures," we expect significant capital expenditures to continue through the completion of the additional units at Plant Vogtle.Vogtle Unit No. 4.
Net Margin
Our net margin for the years ended December 31, 2020, 20192023, 2022 and 20182021 was $55.9$65.8 million, $54.5$61.7 million and $51.2$57.8 million, respectively. These amounts produced a margins for interest ratio of 1.14 in each of 2020, 20192023, 2022 and 2018.2021. For additional information on our margin requirement, see "– Summary of Cooperative Operations – Rate Regulation."
Operating Revenues
Sales to Members.members.    We generate revenues principally from the sale of electric capacity and energy to our members. Capacity revenues are the revenues we receive for electric service whether or not our generation and purchased power resources are dispatched to produce electricity. These revenues are designed to recover the fixed costs associated with our business, including fixed production expenses, depreciation and amortization expenses and interest charges, plus a targeted margin. Energy revenues are the sales of electricity generated or purchased for our members. Energy revenues recover the variable costs of our business, including fuel, purchased energy and variable operation and maintenance expense.
65

Table of Contents
The components of member revenues were as follows:
(in thousands)2020 vs. 20192019 vs. 2018
202020192018% Change
(in thousands)(in thousands)2023 vs. 20222022 vs. 2021
2023202320222021% Change
Capacity revenuesCapacity revenues$971,071 $942,057 $927,419 3.1 %1.6 %Capacity revenues$1,082 $$984 $$947 10.0 10.0 %3.9 %
Energy revenuesEnergy revenues405,939 487,795 551,960 (16.8)%(11.6)%Energy revenues599 991 991 610 610 (39.5)(39.5)%62.3 %
TotalTotal$1,377,010 $1,429,852 $1,479,379 (3.7)%(3.3)%Total$1,682 $$1,975 $$1,557 (14.8)(14.8)%26.8 %
kWh Sales22,187,311 23,225,861 23,011,079 (4.5)%0.9 %
kWh Sales to members(1)
kWh Sales to members(1)
kWh Sales to members(1)
28,289 25,635 24,728 10.4 %3.7 %
Cents/kWhCents/kWh6.21 6.16 6.43 0.9 %(4.2)%Cents/kWh5.94 7.70 7.70 6.30 6.30 (22.8)(22.8)%22.3 %
Member energy requirements suppliedMember energy requirements supplied57 %58 %57 %(1.7)%1.8 %Member energy requirements supplied68 %58 %62 %17.2 %(6.5)%
__________________
(1)For 2023, excludes test energy kilowatt-hours from Plant Vogtle Unit No. 3 supplied to members. Any revenues and costs associated with test energy were capitalized.
Capacity revenues increased in 20202023 compared to 20192022 primarily due to Plant Vogtle Unit No. 3 being placed in service on July 31, 2023 and the related recovery of net interest and depreciation expense. The increase in capacity revenues in 2022 compared to 2021 was due primarily to the recovery of higher fixed production maintenance costs. The slight increase in capacity revenues in 2019 compared to 2018 was due primarily due to the recovery of depreciation and accretion expenses. For a discussion of production costs and depreciation and accretion expense, see "– Operating Expenses."
The 16.8%39.5% decrease in energy revenues from members in 20202023 compared to 20192022 was primarily a result of a decrease in total fuel expense includingoffset by a decrease10.4% increase in generation for member sales. Energy revenues from members in 20192022 compared to 2018 decreased 11.6% due to2021 increased 62.3% primarily a decreaseresult of an increase in total fuel expense, offset byincluding a slight3.7% increase in generation for member sales. For a discussion of fuel expense, see "– Operating Expenses."
Sales to non-members.    In 2023 and 2022, energy revenues from non-members were primarily from the sale of the BC Smith deferring members' output into the wholesale market. Energy revenues from non-members decreased in 2023 from 2022 due to a decrease in megawatt-hours sold and a decrease in fuel costs for natural gas. In 2023 and 2022, we also recognized capacity revenues from non-members relating to our Washington County acquisition.
66


Sales to non-members were as follows:
(in thousands)
202320222021
Energy revenues$44,995 $155,372 $47,754 
Capacity revenues13,624 82 — 
Total$58,619 $155,454 $47,754 
kWh Sales to non-members1,415,042 1,690,454 1,039,957 
Cents/kWh4.14 9.19 4.59 
Operating Expenses
Our operating expenses decreased 4.4%24.4% in 20202023 compared to 20192022 primarily due to a decline insignificantly lower fuel costs and offset by an increase infor natural gas as well as decreased production costs. In 20192022 compared to 2018,2021, operating expenses decreased 3.4%increased primarily due to a decline insignificantly higher fuel costs offset by an increase in depreciation and accretion.

for natural gas as well as increased production costs.
The following table summarizes our fuel costs and net kilowatt-hour (kWh) generation and fuel costs by generating source.
CostGenerationCents per kWh
(dollars in thousands)(kWh in thousands)
CostCostGenerationCents per kWh
(dollars in thousands)
Fuel Source
Fuel Source
Fuel SourceFuel Source2020201920182020 vs.
2019
%
Change
2019 vs.
2018
%
Change
2020201920182020 vs.
2019
%
Change
2019 vs.
2018
%
Change
2020201920182020 vs.
2019
%
Change
2019 vs.
2018
%
Change
2023202220212023 vs.
2022
%
Change
2022 vs.
2021
%
Change
2023202220212023 vs.
2022
%
Change
2022 vs.
2021
%
Change
2023202220212023 vs.
2022
%
Change
2022 vs.
2021
%
Change
CoalCoal$40,222 $80,706 $119,459 (50.2)%(32.4)%1,137,027 2,592,023 4,062,982 (56.1)%(36.2)%3.54 3.11 2.94 13.6 %5.9 %Coal$124,638 $$107,207 $$86,289 16.3 16.3 %24.2 %3,166,368 2,856,494 2,856,494 2,559,235 2,559,235 10.8 10.8 %11.6 %3.94 3.75 3.75 3.37 3.37 4.9 4.9 %11.3 %
NuclearNuclear75,968 79,893 85,949 (4.9)%(7.0)%9,832,564 10,061,609 10,314,928 (2.3)%(2.5)%0.77 0.79 0.83 (2.7)%(4.8)%Nuclear84,192 73,871 73,871 77,366 77,366 14.0 14.0 %(4.5)%11,122,301 10,206,060 10,206,060 10,171,948 10,171,948 9.0 9.0 %0.3 %0.76 0.72 0.72 0.76 0.76 4.6 4.6 %(4.8)%
Natural Gas:Natural Gas:
Combined CycleCombined Cycle202,030 225,816 240,122 (10.5)%(6.0)%10,473,139 9,649,561 8,047,494 8.5 %19.9 %1.93 2.34 2.98 (17.6)%(21.5)%
Combined Cycle
Combined Cycle323,614 704,809 387,069 (54.1)%82.1 %14,804,306 13,100,271 12,722,401 13.0 %3.0 %2.19 5.38 3.04 (59.4)%76.8 %
Combustion TurbineCombustion Turbine42,034 53,799 57,374 (21.9)%(6.2)%1,386,569 1,562,895 1,271,542 (11.3)%22.9 %3.03 3.44 4.51 (11.9)%(23.7)%Combustion Turbine46,350 159,202 159,202 48,272 48,272 (70.9)(70.9)%229.8 %1,382,989 1,824,570 1,824,570 1,026,430 1,026,430 (24.2)(24.2)%77.8 %3.35 8.73 8.73 4.70 4.70 (61.6)(61.6)%85.5 %
$360,254 $440,214 $502,904 (18.2)%(12.5)%22,829,299 23,866,088 23,696,946 (4.3)%0.7 %1.58 1.84 2.12 (14.4)%(13.2)%
$$578,794 $1,045,089 $598,996 (44.6)%74.5 %30,475,964 27,987,395 26,480,014 8.9 %5.7 %1.90 3.73 2.26 (49.1)%65.1 %

Fuel
Total fuel expense decreased in 20202023 compared to 2019 primarily2022 as a result of a decrease in the average cost of fuel. The decrease in average fuel cost was primarily due to lower average natural gas prices which also contributed to a shiftin 2023. The overall increase in generation in 2023 compared to 2022 was due in part to an increase in sales to our members as a result of the commercial operation of Vogtle Unit No. 3 and our members obtaining more of their energy requirements from coal-fired plantsus rather than their third party suppliers due to more economical natural gas-fired plants. Includedrelative energy prices. In 2023 and 2022, we included $20.9 million and $115.0 million of net losses and net gains recognized, respectively, in total fuel expense were $20.3 million of losses in 2020 and $9.1 million of losses in 2019 incurred for the settlement of natural gas financial contracts we utilize to manage our exposure to fluctuations in market prices. Total generationfuel expense increased slightly in 20192022 compared to 2018.2021 primarily as a result of an increase in the average cost of fuel and an increase in generation for members and non-members. The increase in average fuel cost was primarily due to higher average natural gas prices in 2022. The overall increase in generation in 2022 compared to 2021 was largely due to increases in sales to our members as a result of weather events and sales to non-members from BC Smith which we acquired in July 2021.
Production
Production costs can vary due to the number and extent of outages in a given year. Production costs increased 4.3%decreased 11.8% in 20202023 compared to 20192022 and decreased 1.7%increased 14.1% in 20192022 compared to 2018.2021. The increasedecrease in 20202023 was due to less costly planned major maintenance outages at Plant Smith during the year.2023 compared to 2022. The decreaseincrease in 20192022 was due to more costly planned major maintenance outages and the result of deferring BC Smith's effects on net margin during 2022 compared to 2021.
Depreciation and amortization
Depreciation and amortization expense increased 16.4% in 2023 compared to 2022 primarily as a reductionresult of higher depreciation expense related to Plant Vogtle Unit No. 3 being placed in fixed and variable maintenance costs driven by outages during the prior year.service on July 31, 2023.
6667

Table
Depreciation and amortization expense increased in 2022 compared to 2021 primarily as a result of Contentshigher depreciation rates that went into effect in 2022, as well as the addition of BC Smith which was acquired in 2021.
Other Income
TotalThe 12.2% increase in other income decreased 21.0% in 20202023 compared to 20192022 was primarily due to higher interest income as a result of lower investment balances and lowerhigher interest rates. The 6.0% decreaserates in 2023 compared to 2022. Total other income was relatively unchanged in 20192022 compared to 2018 was2021.
Interest Charges
Interest expense increased in 2023 primarily due to losses realizedhigher interest rates on the retirement of certain leasehold improvements.
Interest Charges
Allowancecommercial paper which is used as interim financing for debt funds used during construction increased in 2020 and 2019 primarily due to increased borrowings orPlant Vogtle Units No. 3 and No. 4 construction expenditures.expenditures and plant acquisitions. Allowance for debt funds used during construction decreased in 2023 due to Plant Vogtle Unit No. 3 being placed in service on July 31, 2023. As a result of these factors, net interest charges increased 42.9% in 2023. Net interest charges were relatively flat in 2022 as the increased interest expense, which was largely due to increased borrowings for Plant Vogtle construction expenditures, was offset by a corresponding increase in allowance for debt funds used during construction.
Financial Condition
Overview
Consistent with our budgeted margin for 2020,2023, we achieved a 1.14 margins for interest ratio which produced a net margin of $55.9$65.8 million. This net margin increased our total patronage capital (our equity) and membership fees to $1.1$1.3 billion at December 31, 2020.2023. Our 20212024 budget again targets a 1.14 margins for interest ratio.
Our equity to total capitalization ratio, as defined in our first mortgage indenture, was 9.1% at December 31, 2020 and 9.4% at December 31, 2019.2023 and 9.0% at December 31, 2022. We anticipate that our equity ratio will remain around its current level during the remainder of the Vogtle construction period; however, the absolute level of patronage capital will continue to increase.
We had a strong liquidity position at December 31, 20202023 with $1.6$1.7 billion of unrestricted available liquidity, including $405.5$490.6 million of cash and cash equivalents. We issued commercial paper throughout the year to provide interim financing for the Plant Vogtle construction, the Washington County and Baconton acquisitions and for other purposes at a low cost.general purposes. The average cost of funds on the $383.5$607.9 million of commercial paper outstanding at December 31, 20202023 was 0.3%5.7%.
Our total assetsElectric plant in service increased to $14.2by approximately $4.8 billion at December 31, 2020 from $13.0 billion at December 31, 2019. For the past several years, our total assets have shown significant increases due to increaseswith a corresponding decrease in construction work in progress, primarily due to Plant Vogtle Unit No. 3 being placed in connection with the additional nuclear units under construction at Plant Vogtle.
Property additions during 2020 totaled $1.3 billion. Theseservice on July 31, 2023. The other capital additions include costs related to the construction of the new Vogtle units, environmental control facilities being installed at coal-fired Plants Scherer and Wansley,Baconton acquisition, normal additions and replacements to existing generation facilities and purchases of nuclear fuel. For the past several years, our total assets have significantly increased primarily due to the additional nuclear units under construction at Plant Vogtle.
There was a netNuclear decommissioning trust fund increased $100.5 million primarily due to the increase in the fair market value of investments due to the recovery in the stock market in 2023.
Restricted cash and short-term investments decreased by $104.1 million at December 31, 2023 compared to December 31, 2022. The decrease was due to the utilization of remaining funds on deposit with the Rural Utilities Service in the Cushion of Credit Account for Rural Utilities Service-guaranteed Federal Financing Bank debt service payments and return of all restricted cash posted by our counterparties under our natural gas swap agreements.
Short-term investments increased $82.2 million at December 31, 2023 compared to December 31, 2022 primarily due to $57.6 million of long-term investments reclassified to short-term investments as we expect to apply the proceeds from these maturing investments to members' bills during the next twelve months.
68


Prepayments and other current assets decreased $33.1 million at December 31, 2023 compared to December 31, 2022. The net decrease was primarily due to a $35.3 million decrease in fair value of our natural gas contracts that will settle within the next twelve months.
Regulatory assets decreased by $80.8 million at December 31, 2023 compared to December 31, 2022. The net decrease was primarily due to decreases in the deferrals associated with nuclear and coal ash pond asset retirement obligations. The decrease was also attributable to the amortization of accelerated depreciation associated with the early retirement of Plant Wansley in August 2022.
Long-term debt and long-term debt and finance leases of $887.3due within one year increased by $150.7 million at December 31, 20202023 compared to December 31, 2019.2022. The net increase was primarily a result of the issuance of $400.0 million of first mortgage bonds and $70.3 million in advances under a Rural Utilities Service-guaranteed loan. Offsetting these increases was $314.1 million in debt service payments. The weighted average interest rate on the $10.6$12.1 billion of long-term debt outstanding at December 31, 20202023 was 3.73%3.89%.
Asset retirement obligations increased $115.2 million at December 31, 2023 compared to December 31, 2022. The net increase was primarily due to $65.9 million in accretion expense, recognized nuclear asset retirement obligations of $62.8 million and change in cash flow estimates of $1.0 million for coal ash related decommissioning costs.
Regulatory liabilities decreased by $85.9 million at December 31, 2023 compared to December 31, 2022. The net decrease was primarily due to $118.4 million decrease in the liability associated with unrealized gains on our natural gas contracts and a $49.0 million decrease in the liability associated with one of our rate management programs. Offsetting these decreases was a $47.2 million increase associated with deferred nuclear asset retirement obligations that was primarily driven by an increase in unrealized gains associated with our nuclear decommissioning investments and a $46.0 million increase in collections for future major maintenance outages.
Sources of Capital and Liquidity
Sources of Capital.    We fund our capital requirements through a combination of funds generated from operations and short-term and long-term borrowings. See "– Capital RequirementsCapital Expenditures" for more detailed information regarding our estimated capital expenditures.
We have fully drawn $4.6 billion of loans from the Federal Financing Bank that are guaranteed by the Department of Energy. These loans provide funding forEnergy to fund a portion of our cost to construct our 30% interest in the two new nuclear units at Plant Vogtle. As of December 31, 2020,2023, we had $3.6$4.2 billion outstanding under these loans and may draw the remaining amounts through November 2023.

outstanding.
Historically, we have also obtained a substantial portion of our long-term financing from Rural Utilities Service-guaranteed loans funded by the Federal Financing Bank. We continue to utilize these loans for general and environmental improvements, and in 2022 we utilized these loans to provide a portion of the long-term financing for the BC Smith acquisition and related costs. We plan to utilize these loans to provide long-term financing for the Washington County and Baconton acquisitions and related costs. However, Rural Utilities Service funding levels for projects we may choose to undertake are uncertain and may be limited in the future due to budgetary and political pressures faced by Congress. Because of these factors, we cannot predict the amount or cost of Rural Utilities Service loans that may be available to us in the future.
67

Table of Contents
We have also issued a substantial amount of taxable and tax-exempt debt in the capital markets. If the Rural Utilities Service loan program were to be curtailed or eliminated, or if we are unable to draw the full amount of the Department of Energy-guaranteed loan, we believe we are well positioned to continue to access capital market financings. See "– Financing Activities" for more detailed information regarding our financing plans.
See Note 7 in Notes to Consolidated Financial Statements for additional information regarding these loans.
See "OUR BUSINESS – Business OverviewBUSINESS OVERVIEW – Relationship with Federal Lenders" for further discussion of our relationship with the Department of Energy and Rural Utilities Service.
69


Liquidity.    At December 31, 2020,2023, we had $1.6$1.7 billion of unrestricted available liquidity to meet short-term cash needs and liquidity requirements, consisting of $405.5$490.6 million of cash and cash equivalents and $1.2$1.20 billion of unused and available committed credit arrangements.
Net cash provided by operating activities was $511.4$194.5 million in 2020,2023, and averaged $450.8$433.8 million per year for the three-year period 20182021 through 2020.
We monitor our anticipated liquidity needs to ensure that our credit facility portfolio appropriately covers our anticipated needs. In March 2020, we amended our $150 million line of credit with J.P. Morgan Chase Bank to increase the commitment to $363 million, and used this line of credit, and subsequently commercial paper, to temporarily finance the purchase of $212.8 million of pollution control bonds that were subject to mandatory tender on April 1, 2020. In August 2020 we remarketed the pollution control bonds and used the proceeds to repay these borrowings. See "– Financing Activities Bond Financings" for more detailed information regarding these pollution control bonds.2023.
At December 31, 2020,2023, we had $1.8 billion of committed credit arrangements in place and $1.2$1.20 billion available under four separate credit facilities. These are reflected in the table below:
Committed Credit FacilitiesCommitted Credit FacilitiesCommitted Credit Facilities
(dollars in millions)
Authorized
Amount
Available
12/31/2020
Expiration
Date
(dollars in millions)
Authorized Amount
Authorized Amount
Authorized AmountAvailable 12/31/2023Expiration Date
Unsecured Facilities:Unsecured Facilities:
Syndicated Line among 12 banks led by CFC
Syndicated Line among 12 banks led by CFC
Syndicated Line among 12 banks led by CFCSyndicated Line among 12 banks led by CFC$1,210 $691 (1)December 2024$1,210 $$599 (1)(1)December 2024
CFC Line of Credit(2)
CFC Line of Credit(2)
110 110 December 2023
CFC Line of Credit(2)
110 110 110 December 2028December 2028
JPMorgan Chase Line of CreditJPMorgan Chase Line of Credit363 247 (3)October 2021JPMorgan Chase Line of Credit350 347 347 (3)(3)October 2024
Secured Facilities:Secured Facilities:
CFC Term Loan(2)
CFC Term Loan(2)
250 140 December 2023
CFC Term Loan(2)
CFC Term Loan(2)
250 140 December 2028
__________________
(1)OfThis facility is dedicated to support outstanding commercial paper and the portion of this facility that was unavailable represents outstanding commercial paper at December 31, 2020, $383 million was dedicated to support outstanding commercial paper and $136 million related to letters of credit issued to support variable rate demand bonds.2023.
(2)Any amounts drawn under the $110 million unsecured line of credit with CFC will reduce the amount that can be drawn under the $250 million secured term loan. Therefore, we reflect $140 million as the amount available under the term loan even though there are no amounts outstanding under that facility. Any amounts borrowed under the $250 million term loan would be secured under our first mortgage indenture, with a maturity no later than December 31, 2043.
(3)Of the portionAt December 31, 2023, $2.5 million of this facility that was unavailable at December 31, 2020, $114 million related toused for letters of credit issued to support variable rate demand bonds and $2 million related to letters of credit issued to post collateralprovide performance assurance to third parties. We amended this credit facility in March 2020 to increase the authorized amount from $150 million to $363 million, which is committed through the maturity of this facility in October 2021.

We have the flexibility to use the $1.2 billion syndicated line of credit for several purposes, including borrowing for general corporate purposes, issuing letters of credit and backing up commercial paper.
Under our commercial paper program, we are authorized to issue commercial paper in amounts that do not exceed the amount of anyour committed backup lines of credit, thereby providing 100% dedicated support for any commercial paper outstanding.
Under our unsecured committed lines of credit, we have the ability Due to issue letters of credit totaling $973 million in the aggregate, of which $721.6 million remained available at December 31, 2020. However, amounts related to issued letters of credit reduce the amount that would otherwise be available to draw for working capital needs. Also, due to thethis requirement, to
68

Table of Contents
have 100% dedicated backup for any commercial paper outstanding, any amounts drawn under our committed credit facilities for working capital or related to issued letters of creditwe issue will reduce the amountavailability under the $1.2 billion syndicated line of credit. At December 31, 2023, we had issued commercial paper that we can issue. The majority of our outstanding letters of credit are for the purpose of providing credit enhancement on variable rate demand bonds.
In addition to providing liquidity for various other purposes, including the temporary purchase of pollution control bonds from time to time, we issue commercial paperprimarily to provide interim financing of costsfunding for:
payments related to the construction of Vogtle UnitsUnit No. 34,
principal payments due under our Department of Energy-guaranteed loans, which began in February 2020 and which we intend to continue funding with commercial paper until Vogtle Unit No. 4 whichis placed in service, and
costs related to the Washington County and Baconton acquisitions.
We plan to refinance our commercial paper with long-term debt. We intend to issue first mortgage bonds to provide long-term financing of the construction costs for Vogtle Unit No. 4 that have been financed on an interim basis with commercial paper, refinancing of the principal payments we repay with the proceeds from long-term funding sources. Our loan guaranteed by theare currently paying under our Department of EnergyEnergy-guaranteed loans, and for certain other costs not financed through the Rural Utilities Service. Rural Utilities Service financing is our preferred source of long-term financing for eligible coststhe Washington County and Baconton acquisitions and, in February 2024, we received conditional commitments for Vogtle Units No. 3 and No. 4. See "– Financing Activities" and Note 7a in Notes to Consolidated Financial Statements for additional information regarding the Department of Energy-guaranteed loan. In August 2020, we used the proceeds from a $450 million issuance of first mortgage bonds to pay down commercial paper that was used for Vogtle construction.
In 2020, we borrowed $45.9 million under variousnew Rural Utilities Service-guaranteed loans for generalthese acquisitions.
Our unsecured committed lines of credit permit the issuance of up to $960 million in letters of credit on our behalf, of which $957 million remained available at December 31, 2023. This letter of credit issuance capacity
70


includes $500 million under our $1.2 billion syndicated line of credit, $350 million under our JPMorgan Chase line of credit, and environmental improvements.$110 million under our CFC line of credit.
Between projected cash on hand and the credit arrangements currently in place, we believe we have sufficient liquidity to cover normal operations and our interim financing needs, including interim financing for the new Vogtle units, until long-term financing is obtained.
Three of our line of credit facilities contain similar financial covenants that require us to maintain minimum patronage capital levels. Currently, we are required to maintain minimum patronage capital of $750 million. As of December 31, 2020,2023, our patronage capital balance was $1.1$1.3 billion. These agreements contain an additional covenant that limits our secured indebtedness and our unsecured indebtedness, both as defined in the credit agreements, to $14 billion and $4 billion, respectively. At December 31, 2020,2023, we had $10.6$12.1 billion of secured indebtedness outstanding and $383.5$607.9 million of unsecured indebtedness outstanding.
Under our power bill prepayment program, members can prepay their power bills from us at a discount for an agreed number of months in advance, after which point the funds are credited against the participating members' monthly power bills. At December 31, 2020,2023, we had nineseven members participating in the program and a balance of $144.2$78.5 million remaining to be applied against future power bills.
In addition to unrestricted available liquidity, at December 31, 2020 we had $487.6 million of restricted liquidity in connection with deposits made into a Rural Utilities Service Cushion of Credit Account. The Farm Bill passed by Congress in December 2018 modified the Cushion of Credit program. The program no longer accepts deposits and the interest rate earned on existing deposits will change over time. Existing deposits will continue to earn 4% until October 1, 2021, at which point deposits will earn the 1-year floating Treasury rate. Funds in the account, including interest thereon, can only be applied to debt service on Rural Utilities Service-guaranteed Federal Financing Bank notes. We will determine when to apply the remaining funds in the Cushion of Credit account.
Liquidity Covenants.    At December 31, 2020,2023, we had only one financial agreement in place containing a liquidity covenant. This covenant is in connection with the Rocky Mountain lease transaction and requires us to maintain minimum liquidity of $50 million at all times during the term of the lease. We had sufficient liquidity to meet this covenant in 20202023 and expect to have sufficient liquidity to meet this covenant in 2021.2024. For a discussion of the Rocky Mountain lease transaction, see Note 4 of Notes to Consolidated Financial Statements.
Financing Activities
First Mortgage Indenture.    At December 31, 2020,2023, we had $10.6$12.1 billion of outstanding debt secured equally and ratably under our first mortgage indenture, an increase of $893.4 million$0.2 billion from December 31, 2019.2022. From time to time, we may issue additional first mortgage obligations ranking equally and ratably with the existing first mortgage indenture obligations. The aggregate principal amount of obligations that may be issued under the first mortgage indenture is not limited; however, our ability to issue additional obligations under the first mortgage indenture is subject to certain requirements related to the certified value of certain of our tangible property, repayment of obligations outstanding under the first mortgage indenture and payments made under certain pledged contracts relating to property to be acquired. As of December 31, 2020,2023, the amount of certified bondable additions and retired or defeased first mortgage indenture obligations available for the issuance of additional first mortgage indenture obligations was approximately $2.0$3.1 billion. In addition, as of December 31, 2020,2023, we had
69

Table of Contents
over $662$780 million of property additions and certified progress payments under qualified engineering, procurement and construction contracts that, once certified in accordance with the first mortgage indenture, will be available for the issuance of additional first mortgage indenture obligations.

Department of Energy-Guaranteed Loans. We have loans from the Federal Financing Bank guaranteed by the Department of Energy to provide funding for over $4.6 billion of the cost to construct our 30% undivided share of Vogtle Units No. 3 and No. 4. At December 31, 2020, aggregateBy the end of 2022, we had fully advanced the $4.6 billion available under the Department of Energy-guaranteed borrowings totaled $3.6loans, and as of December 31, 2023, $4.2 billion including capitalized interest.under these loans was outstanding. All of the debt advanced under the loan guarantee agreement is secured ratably with all other debt under our first mortgage indenture. For additional information regarding these loans, see Note 7a of Notes to Consolidated Financial Statements.
Combined, this $4.6 billion and the $2.3In addition, we have raised $3.2 billion of debt we have raised in the capital markets represent long-term financing for more than 92% of our $7.5 billion project budget. Weand expect to raise long-term financing for the remaining amounts not funded by the Department of Energy-guaranteed loans in the capital markets.

In accordance with the related promissory notes, we began principal repayments of our Department of Energy-guaranteed loans in February 2020. As of December 31, 2020,2023, we had repaid $79.1$455.1 million under these loans. If we fully advance these loans and we expect to repay a total of approximately $300$486 million in principal on these loans by November 2022.April 2024. We plan to issue first mortgage bonds to refinance a portion of the principal repaid before the in-service date of Vogtle Unit No. 4.
71


Rural Utilities Service-Guaranteed Loans.    In July 2020,As of December 31, 2023, we advanced the remaining $5.8 million under a $448.3 million Rural Utilities Service-guaranteed loan that was funded through the Federal Financing Bank. We currently havehad one approved Rural Utilities Service-guaranteed loan totaling $630.3 million to fund general and environmental improvements. We began borrowing from thisimprovements that had $182.3 million remaining to be advanced. When advanced, the debt will be secured ratably under our first mortgage indenture. In September 2023, we received a conditional loan commitment for a new Rural Utilities Service-guaranteed loan totaling $755.2 million that we expect to begin advancing in January 2021.late 2024. In February 2024, we received two additional conditional commitments for new Rural Utilities Service-guaranteed loans totaling $87.9 million and $17.5 million, respectively, for the Washington County and Baconton acquisitions, and we expect to begin advancing on both loans in late 2024. As of December 31, 2020,2023, we had $2.4$2.7 billion of debt outstanding under various Rural Utilities Service-guaranteed loans, a decrease of $96.1$95.4 million from December 31, 2019.

2022. In 2023, we borrowed $70.3 million under various Rural Utilities Service-guaranteed loans for general and environmental improvements.
All of the approved Rural Utilities Service-guaranteed loans are funded through the Federal Financing Bank, and the debt is secured ratably with all other debt under our first mortgage indenture.
Bond Financings.   As a result of the market conditions brought about by the COVID-19 pandemic, on April 1, 2020,In December 2023, we purchased for our own account $212.8issued $400 million of 6.20% first mortgage bonds, Series 2013 term-rate pollution control revenue2023A, to provide long-term financing for expenditures related to the construction of Vogtle Units No. 3 and No. 4. The bonds that were issued onare due to mature in December 2053 and are secured under our behalf by the Development Authoritiesfirst mortgage indenture.
We plan to issue a total of Appling, Burke and Monroe counties which were subject to mandatory tender. We increased our JPMorgan Chase line of credit by $213 million and drew this amount to fund the purchase. We subsequently repaid this line of credit borrowing with commercial paper, and in August 2020, we remarketed these bonds and used the proceeds to repay the outstanding commercial paper that had financed the purchase of these bonds. In August 2020, we also issued $450approximately $750-$800 million of taxable first mortgage bonds before the end of 2024 to repay commercial paper issuedprovide long-term financing or refinancing of expenditures related to fund a portion of the cost of constructing Vogtle Units No. 3 and No. 4.4, including up to $350 million for the remaining long-term financing for the Vogtle units and approximately $400-$500 million to refinance principal payments on our Department of Energy-guaranteed loans that occur before the in-service date of Vogtle Unit No. 4, as described above.
Capital Requirements
Cash Requirements. Our cash requirements relate primarily to operating expenses, capital expenditures and debt service. As discussed under "Sources of Capital and Liquidity," we fund our cash requirements through a mix of funds generated from operations and short- and long-term borrowings. For additional information regarding our contractual commitments, see Note 11 of Notes to Consolidated Financial Statements.
Capital Expenditures.    As part of our ongoing capital planning, we forecast expenditures required for generating facilities and other capital projects. The table below details these forecasts for 20212024 through 2023.2026. Actual expenditures may vary from the estimates listed in the table because of factors such as changes in business conditions, design changes and
70

Table of Contents
rework required by regulatory bodies, delays in obtaining necessary regulatory approvals, construction delays, changing environmental requirements, and changes in cost of capital, equipment, material and labor.
Capital Expenditures(1)
Capital Expenditures(1)
Capital Expenditures(1)
(dollars in millions)(dollars in millions)(dollars in millions)
202120222023Total
2024202420252026Total
Future Generation(2)
Future Generation(2)
$973 $415 $— $1,388 
Existing Generation(3)
Existing Generation(3)
132 147 105 384 
Environmental Compliance(4)
Environmental Compliance(4)
23 36 
Nuclear Fuel(5)
Nuclear Fuel(5)
93 100 93 286 
General PlantGeneral Plant18 
TotalTotal$1,211 $676 $225 $2,112 
__________________
(1)Includes allowance for funds used during construction.
(2)Relates to construction of Vogtle Units No. 3 andUnit No. 4, excluding initial nuclear fuel, core.and our Walton acquisition. Forecasted Vogtle Unit No. 4’s expenditures are based on an assumed in-service datesdate of November 2020 for Vogtle Unit No. 3 and November 2021 for Vogtle Unit No. 4.April 2024.
(3)Normal additions and replacements to plant in-service.
(4)Pollution control equipment and facilities being installed at coal-fired Plant Scherer, including to comply with coal ash regulations.
(5)Includes nuclear fuel onfor existing nuclear units and initial nuclear fuel core for Vogtle Units No. 3 andUnit No. 4.
72


We are currently discussing the development of additional generation resources with our members to meet projected load growth that are not included in the table above. If our members approve one or more new generation resources, our projected capital expenditures could increase significantly.
For information regarding the Vogtle project, see "OUR BUSINESS – Our Power Supply ResourcesOUR POWER SUPPLY RESOURCES – Future Power Resources – Plant Vogtle Units No. 3 and No. 4" and "– Financing Activities."
We are currently subject to extensive environmental regulations and may be subject to future additional environmental regulations, including future implementation of existing laws and regulations. Since alternative legislative and regulatory environmental compliance programs continue to be debated on a state and national level, we cannot predict what capital costs may ultimately be required. Therefore, environmental expenditures included in the above table only include amounts related to budgeted projects to comply with existing and certain well-defined rules and regulations and do not include amounts related to compliance with other, less certain rules.
Depending on how we and the other co-owners of PlantsPlant Scherer and Wansley choose to comply with any future legislation or regulations, both capital expenditures and operating expenditures may be impacted. As required by the wholesale power contracts, we expect to be able to recover from our members all capital and operating expenditures made in complying with current and future environmental regulations.
For additional information regarding environmental regulation, see "OUR BUSINESS – RegulationREGULATION – Environmental."
Credit Rating Risk
The table below sets forth our current ratings from S&P Global Ratings, Moody's Investors Service and Fitch Ratings.
Our RatingsS&PMoody'sFitch
Long-term ratings:
Senior secured ratingBBB+Baa1BBB+BBB
Issuer/unsecured rating(1)
BBB+Baa2BBB+BBB
Rating outlookNegativeStableStableNegativePositive
Short-term rating:
Commercial paper ratingA-2P-2F1F2
__________________
(1)We currently have no long-term debt that is unsecured,unsecured; however, pricing of our $1.2 billion syndicated line of credit is determined based on our unsecured or issuer ratings.
We have financial and other contractual agreements in place containing provisions which, upon a credit rating downgrade below specified levels, may require the posting of collateral in the form of letters of credit or other acceptable
71

Table of Contents
collateral. Our primary exposure to potential collateral postings is at rating levels of BBB-/Baa3 or below. As of December 31, 2020,2023, our maximum potential collateral requirements were as follows:
At senior secured rating levels:
approximately $52$50 million at a senior secured level of BBB-/Baa3,
approximately $93$80 million at a senior secured level of BB+/Ba1 or below, and
At senior unsecured or issuer rating levels:
approximately $5.4 million at a senior unsecured or issuer level of BBB-/Baa3,
approximately $62$53 million at a senior unsecured or issuer rating level of BB+/Ba1 or below.
The Rural Utilities Service Loan Contract contains covenants that, upon a credit rating downgrade below investment grade by two rating agencies, could result in restrictions on issuing debt. Certain of credit agreements and pollution control bond agreements contain provisions based on our ratings that, upon a credit rating downgrade
73


below specified levels, could result in increased interest rates. Also, borrowing rates, letter of credit fees and commitment fees in two of our lines of credit agreements are based on credit ratings and could increase if our ratings are lowered. None of these covenants and provisions, however, would result in acceleration of any debt due to credit rating downgrades.
Given our current level of ratings, our management does not have any reason to expect a downgrade that would result in any material impacts to our business. However, our ratings reflect only the views of the rating agencies and we cannot give any assurance that our ratings will be maintained at current levels for any period of time.
7274

Table of Contents

QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

Due to our cost-based rate structure, we have limited exposure to market risks. However, changes in interest rates, equity prices, and commodity prices may result in fluctuations in member rates. We use derivatives only to manage this volatility and do not use derivatives for speculative purposes.
We have an executive risk management and compliance committee that provides general oversight over corporate compliance and all risk management activities, including, but not limited to, commodity trading, fuels management, insurance procurement, debt management, investment portfolio management, environmental compliance, and electric reliability compliance. This committee is comprised of our chief executive officer, chief operating officer, chief financial officer and the executive vice president, member and external relations. The risk management and compliance committee has implemented comprehensive risk management policies to manage and monitor credit, market price, and other corporate risks. These policies also specify controls and authorization levels related to various risk management activities. The committee frequently meets to review corporate exposures, risk management strategies, hedge positions, and compliance matters. The audit committee of our board of directors receives regular reports on corporate exposures, risk management and compliance activities and the actions of the risk management and compliance committee. For further discussion of our board of director's oversight of risk management and compliance, see "DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE – Board of Directors' Role in Risk Oversight."
Interest Rate Risk
We are exposed to the risk of changes in interest rates relating to a portion of our debt. We categorize our debt as variable rate, which is debt that is subject to a change in interest rates within the next year, intermediate-term fixed rate debt, which is debt that is not subject to a change in interest rates within the next year, but is subject to a change in interest rates within the next five years, or long-term fixed rate debt, which is debt that is not subject to a change in interest rates within the next five years. At December 31, 2020,2023, we had $751.7$799.3 million of variable rate debt, $412.5$312.8 million of intermediate-term fixed rate debt, and the remainder of our debt was long-term fixed rate debt. Our $751.7$799.3 million of variable rate debt at December 31, 2020,2023, included $383.5$607.9 million of commercial paper outstanding (which typically has maturities of between 1 and 90 days) and $368.2$191.4 million of pollution control bonds (including variable rate demand bonds and indexed(indexed variable rate bonds, which are both subject to repricing weekly). Our $412.5$312.8 million of intermediate-term fixed rate debt at December 31, 20202023 consisted of $99.8 million of term rate debt subject to remarketing and repricing in February 2023 and $312.8 million of term rate debt subject to remarketing and repricing in February 2025.

At December 31, 2020,2023, the weighted average interest rate on our variable rate debt was 0.4%5.5%. If, during 2021,2023, interest rates on this debt changed a hypothetical 100 basis points on the respective repricing dates and remained at that level for the remainder of the year, annual interest expense would change by approximately $7.3$7.7 million.
Our objective in managing interest rate risk is to maintain a balance of long-term fixed, intermediate-term fixed and variable rate debt that will lower our overall borrowing costs within reasonable risk parameters. At December 31, 2020,2023, we had 6.8%6.3% of our total debt, including commercial paper, classified as variable rate and 3.8%2.5% of our total debt classified as intermediate-term fixed rate. The remaining 89.4%91.2% of our debt was classified as long-term fixed rate.
The operative documents underlying the pollution control bond debt contain provisions that allow us to convert the debt that is not fixed to maturity to a variety of variable interest rate modes (such as daily, weekly, monthly, commercial paper, or term rate mode), or to convert the debt to a fixed rate of interest to maturity. Having these interest rate conversion options improves our ability to manage our exposure to variable interest rates.
In addition to interest rate risk on existing debt, we are exposed to the risk of rising interest rates due to the significant amount of new long-term debt we expect to incur in connection with anticipated capital expenditures particularlyand planned debt refinancings, such as for the constructionremaining issuance of long-term debt related to Vogtle Units No. 3 and No. 4, and for recent and upcoming acquisitions, as well as the short-term debt we are using for interim financing of this project.our various projects.
Equity Price Risk
75


Investment Risks
We maintain external trust funds (reflected as "Nuclear decommissioning trust fund" on the balance sheet) to fund our share of certain costs associated with the decommissioning of our nuclear plants as required by the Nuclear Regulatory Commission. We also maintain an internal reserve for decommissioning (included in "Long-term investments" on the balance
73

Table of Contents
sheet) from which funds can be transferred to the external trust fund, if necessary. For further discussion on our nuclear decommissioning trust funds, see Note 1 of Notes to Consolidated Financial Statements.
The allocation of equity and fixed income securities in both the external and internal funds is designed to provide returns to be used to fund decommissioning and to offset inflationary increases in decommissioning costs; however, the equity portion of these funds is exposed to price fluctuations in equity markets, and the values of fixed-rate, fixed-income securities are exposed to changes in interest rates. We actively monitor the investment performance of the funds and periodically review asset allocation in accordance with our nuclear decommissioning fund investment policy. Our investment policy establishes targeted and permissible investment allocation ranges for equity and fixed income securities. The targeted asset allocation is diversified among various asset classes and investment styles. Specific investment guidelines are established with each of the investment advisors that are selected to manage a particular asset class or subclass.
The investment guidelines for equity securities typically limit the type of securities that may be purchased and the concentration of equity holdings in any one issuer and within any one sector. With respect to fixed-income securities, the investment guidelines set forth limits for the type of bonds that may be purchased, state that investments be primarily in securities with an assigned investment grade rating of BBB- or above and establish that the average credit quality of the portfolio typically be A+/A1 or higher.
Changes in interest rates also affect the market value of fixed income investments and rising interest rates may adversely affect the market value of fixed income investments in our nuclear and coal ash pond decommissioning funds. While we generally intend to hold these investments to maturity, sale of fixed income investments could lead to realizing losses on certain investments. While increases in interest rates may decrease the market value of fixed income assets, it may increase the amount of interest received for newly purchased fixed income investments and for funds invested in variable interest rate assets.
A 10% decline in the value of the internal and external funds' equity and fixed income securities as of December 31, 20202023 would result in a loss of value to the funds of approximately $47.5$81.7 million.
We also maintain funds to finance our coal ash pond retirement obligations and for major maintenance expenses. We invest a portion of our coal ash decommissioning and major maintenance accounts in fixed income funds that are subject to changes in market value. A 10% decrease in the market value of these funds would be approximately $19.1 million.
Commodity Price Risk
We are also exposed to the risk of changing prices for fuels, including coal and natural gas.
Coal
We have interests in 1,501982 megawatts of coal-fired nameplate capacity at Plants Scherer and Wansley.Plant Scherer. We purchase coal under term contracts and in spot-market transactions. Some of our coal contracts provide volume flexibility and most have fixed or capped prices. Our existing contracts and coal stockpile are expected to provide fixed prices for up to 95%100% and 100%60% of our remaining 2021 forecasted coal requirements at Plants Schererfor 2024 and Wansley,2025, respectively.
The objective of our coal procurement strategy is to ensure reliable coal supply and some price stability for our members. Our strategy permits coal commitments for up to 7 years. The procurement guidelines provide for layering in fixed and/or capped prices by annually entering into coal contracts for a portion of projected coal need for up to 7 years.
76


Natural Gas
We own or operate eighteleven gas fired generation facilities totaling 4,170over 5,200 megawatts of nameplate capacity. See "—Properties"PROPERTIES – Generating Facilities" and "OUR BUSINESS"BUSINESS – Our Members and Their Power Supply ResourcesOUR MEMBERS AND THEIR POWER SUPPLY RESOURCES – Member Power Supply Resources – Smarr EMC."
We maintain a natural gas hedge program, which assists our participating members in managing potential fluctuations in our power rates to them due to changes in the market price of natural gas. Currently, 1819 of our members have elected to participate in our natural gas hedging program. This program layers in fixed prices for a portion of our forecasted natural gas requirements over a rolling time horizon of up to five and a half years. Natural gas swap arrangements are used for hedging under this program. Under our swap agreements, we pay the counterparty a fixed price for specified natural gas quantities and receive a payment for such quantities based on a market price index. These payment obligations are netted, such that if the market price index is lower than the fixed price, we will make a net payment, and if the market price index is higher than the fixed price, we will receive a net payment. The fair value of the swaps at December 31, 20202023 was a net liabilityasset of approximately $10.2$13.4 million, which represents the net amount we would have paidreceived if the swaps had been terminated as of that date. As of December 31, 2020,2023, approximately 30%27% of our 20212024 total system forecasted natural gas requirements were hedged under swap arrangements. A hypothetical 10% decline in the market price of natural gas would have resulted in a decrease of approximately $25.3$27.4 million to the fair value of our natural gas swap agreements. Additional members may elect to participate in our natural gas hedging program, and participating members may choose to discontinue their active participation in this program at any time.
7477

Table of Contents
Changes in Risk Exposure
Our exposure to changes in interest rates, the price of equity securities we hold, and commodity prices have not changed materially from the previous reporting period.
75

Table of Contents

DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE

Our Board of Directors
Structure of our Board of Directors
Our members elect our board of directors. Our board of directors consists of directors and general managers from our members, referred to as "member directors," and up to two outside directors. Our bylaws divide member director positions among the member scheduling groups specifically described in the bylaws, referred to as the "member groups." There are currently five member groups and, except for Group 5, each member group is represented by two member directors. Of each member group's two directors, one must be a general manager of a member in that member group and one must be a director of a member in that member group. Jackson Electric Membership Corporation is the only member in Group 5 and has only one director. The bylaws permit expansion of the number of member groups and changes in the composition of member groups. Formation of new member groups and changes in the composition of member groups are subject to certain required member approvals, and the requirement that the composition of the member groups at Oglethorpe, Georgia Transmission and Georgia System Operations be identical, except in cases where a member is no longer a member of one or more of Oglethorpe, Georgia Transmission or Georgia System Operations. The number of member director positions will change if additional member groups are formed or a member group ceases to exist. The bylaws also provide for three at-large member director positions which may only be filled by a director of one of our members.
In an effort to provide for equitable representation among the member groups across the boards of directors of Oglethorpe, Georgia Transmission and Georgia System Operations, the bylaws provide for certain limitations on the eligibility of directors of members of each member group to fill the three at-large member director positions. No more than one at-large member director position on our board of directors may be filled by a director of a member of any member group, no more than two directors from members of any member group may be serving in at-large member director positions on the boards of directors of Oglethorpe, Georgia Transmission and Georgia System Operations, and at least one at-large member director position on the boards of directors of Oglethorpe, Georgia Transmission or Georgia System Operations must be filled by a director of a member of each member group that has at least two members.
Pursuant to the bylaws, a member may not have both its general manager and one of its directors serve as a director of ours at the same time. Subject to a limited exception for Jackson Electric Membership Corporation, which is the sole member of one of the member groups, the bylaws prohibit any person from simultaneously serving as a director of Oglethorpe and either Georgia Transmission or Georgia System Operations.
Our bylaws require outside directors to have experience related to our business, including, without limitation, operations, marketing, finance or legal matters. No outside director may be one of our current or former officers, a current employee of ours or a former employee of ours receiving compensation for prior services. Outside directors cannot also be a director, officer or employee of Georgia Transmission, Georgia System Operations or any member. Additionally, no person who receives payment from us in any capacity other than as an outside director, including direct or indirect payments for goods and services, may serve as outside director.
The members of our board of directors serve staggered three-year terms.
Our board of directors currently has two vacancies. One of the vacancies is for an at-large member position and the other is for an outside director position. Our members did not fill either of thesethe two vacancies in 2020, and we do not anticipate thatat our members will elect directors to fill these vacancies during 2021.2024 annual member meeting.
Election of our Board of Directors
For a cooperative organization to maintain its status under federal tax law, it must abide by the cooperative principle of democratic control. The nomination and election of the members of our board of directors and the representation of our members by the elected directors is consistent with this principle.
78


Candidates for our board of directors must be nominated by the nominating committee. The nominating committee is comprised of one representative from each of our members. A majority vote of the nominating committee is required to nominate each candidate for the board of directors. Each member representative's nomination vote is weighted based on the
76

Table of Contents
number of retail customers served by the member. After the nominating committee nominates a candidate for a director position, the candidate must be elected by a majority vote of all of our member representatives, voting on an unweighted, one-member, one-vote basis. If the nominated candidate fails to receive a majority of the vote, the nominating committee must nominate another candidate and the member representatives will vote on the new candidate. Should that candidate also fail to receive a majority vote, this nomination and election process would be repeated until a nominated candidate is elected by a majority of the members.
Potential candidates for our board of directors must meet the requirements set forth in our bylaws, as discussed under "– Structure of our Board of Directors." Management does not have a direct role in the nomination or election of the members of our board of directors.
Neither we, the nominating committee, nor any of our members, to our knowledge, have a policy with regard to the consideration of diversity in identifying potential candidates for our board of directors.
Board of Directors Leadership Structure
Our principal executive officer and chairman of the board positions are separate and are held by different persons. The chairman of the board and any vice-chairman of the board are elected annually by a majority vote of the members of our board of directors. Our president and chief executive officer is appointed by our board of directors. None of our executive officers or other employees are members of our board of directors.
As a cooperative, our members are our owners. Our members believe that the most effective structure to efficiently provide for their current and future needs is to take a prominent role in the direction of our business. Member control over the board of directors, and the board of directors' independence from management is beneficial and provides for member input. Direct accountability to and separation from the board of directors helps ensure that management acts in the best interests of our members.
7779

Table of Contents
Executive Officer and Director Biographies
Our executive officers and directors are as follows:
NameAgePosition
Executive Officers:
Michael L. Smith6164President and Chief Executive Officer
MichaelElizabeth B. Higgins55Executive Vice President and Chief Financial Officer
David W. PriceSorrick60Executive Vice President and Chief Operating Officer
Elizabeth B. Higgins52Executive Vice President and Chief Financial Officer
William F. Ussery5659Executive Vice President, Member and External Relations
Annalisa M. Bloodworth4245Senior Vice President and General Counsel
Lori K. Holt5962Senior Vice President, Fuels & Co-owned Assets
James A. MessersmithJeffrey R. Swartz6861Senior Vice President, Plant Operations
Keith D. Russell59Senior Vice President, Capital Projects and Technical Services
Heather Teilhet4548Senior Vice President, External Affairs
Jami G. Reusch5861Vice President, Human Resources
Directors:
Bobby C. Smith, Jr.67Chairman and At-Large Director
Marshall S. Millwood7174Vice-ChairmanChairman and Member Group Director (Group 3)
James I. White78Vice-Chairman and Member Group Director (Group 1)
Jimmy G. Bailey7275At-Large Director
Horace H. Weathersby III64At-Large Director
George L. Weaver7376Member Group Director (Group 1)
James I. White75Member Group Director (Group 1)
Danny L. Nichols5659Member Group Director (Group 2)
Sammy G. Simonton7982Member Group Director (Group 2)
Randy Crenshaw6871Member Group Director (Group 3)
Fred A. McWhorter7477Member Group Director (Group 4)
Jeffrey W. Murphy5760Member Group Director (Group 4)
Ernest A. "Chip" Jakins III5154Member Group Director (Group 5)
Wm. Ronald Duffey7982Outside Director
Executive Officers
Overview
We are managed and operated under the direction of a president and chief executive officer who is appointed by our board of directors. Our president and chief executive officer selects the remainder of the executive officers. Certain of our executive officers have entered into an employment contract with us that provides for minimum annual base salary and performance pay. See "EXECUTIVE COMPENSATION – Compensation Discussion and Analysis – Employment Agreements" for further discussion of these agreements.
Executive Officer Biographies
Michael L. Smith is our President and Chief Executive Officer and has served in that capacity since November 2013. Prior to joining Oglethorpe, Mr. Smith served as Georgia Transmission's President and Chief Executive Officer from 2005 to 2013 after he joined Georgia Transmission as its Senior Vice President and Chief Financial Officer in 2003. From 2002 to 2003, Mr. Smith co-founded and served as the Executive Director of the Committee of Chief Risk Officers. From 1997 to 2002, Mr. Smith held multiple positions at Mirant Corporation, most recently as Vice President and Global Risk Officer. From 1994 to 1997, he was Manager of Planning and Evaluation for Vastar Resources and prior to that he worked at ARCO in various positions from 1983 to 1994. Mr. Smith has a Bachelor's degree in Business Law and a Masters of Business Administration in Finance from Louisiana State
80


University. Mr. Smith is on the board of directors for the Association of Edison Illuminating Companies, the Georgia Chamber of Commerce, the Georgia Energy and Industrial Construction Consortium and for ACES Power Marketing.
78

Table of Contents
Michael W. Price is our Executive Vice President and Chief Operating Officer and has served in that office since February 1, 2000. In October 2008, Mr. Price's title changed from Chief Operating Officer to his current title. Mr. Price was employed by Georgia System Operations from January 1999 to January 2000, first as Senior Vice President and then as Chief Operating Officer. He served as Vice President of System Planning and Construction of Georgia Transmission from May 1997 to December 1998. He served as a manager of system control of Georgia System Operations from January to May 1997. From 1986 to 1997, Mr. Price was employed by Oglethorpe in the areas of control room operations, system planning, construction and engineering, and energy management systems. Prior to joining Oglethorpe, he was a field test engineer with the Tennessee Valley Authority from 1983 to 1986. Mr. Price has a Bachelor of Science degree in Electrical Engineering from Auburn University. Mr. Price is on the board of directors for ACES Power Marketing.
Elizabeth B. Higgins is our Executive Vice President and Chief Financial Officer and has served in that office since July 2004. In October 2008, Ms. Higgins' title changed from Chief Financial Officer to her current title. Ms. Higgins served as Senior Vice President, Finance & Planning of Oglethorpe from July 2003 to July 2004. Ms. Higgins served as Vice President of Oglethorpe with various responsibilities including strategic planning, rates, analysis and member relations from September 2000 to July 2003. Ms. Higgins served as the Vice President and Assistant to the Chief Executive Officer of Oglethorpe from October 1999 to September 2000 and served in other capacities for Oglethorpe from April 1997 to September 1999. Prior to that, Ms. Higgins served as Project Manager at Southern Engineering from October 1995 to April 1997, as Senior Consultant at Deloitte & Touche, LLP from April 1995 to October 1995, and as Senior Consultant at Energy Management Associates from June 1991 to April 1995. Ms. Higgins has a Bachelor of Industrial Engineering degree from the Georgia Institute of Technology and a Master of Business Administration degree from Georgia State University. Ms. Higgins is a member of the Rotary Club of Atlanta, the International Women’s Forum and Leadership Atlanta. She serves on the board of directors for Voices for Georgia’s Children and represents Oglethorpe on the Metro Atlanta Chamber board of advisors. She also serves on the advisory board of FM Global, one of our property insurers, and the CFO Forum Atlanta. She has volunteered as a mentor with Pathbuilders, a development program for high potential women, since 2017.
David W. Sorrick is our Executive Vice President and Chief Operating Officer and has served in that capacity since February 2022. Mr. Sorrick has more than 30 years of energy generation experience. From March to December 2021, he was the Senior Vice President, Power Operations at New Fortress Energy and from March 2019 to March 2021 he was Director, Asset Management and Optimization for the Electric Power Research Institute. From January 2015 to October 2018, Mr. Sorrick was with the Tennessee Valley Authority and for the last two years acted as Senior Vice President, Power Operations with responsibility for its fleet of natural gas, hydropower and coal-fired generation resources. Prior to that, he held key positions with Duke Energy, Progress Energy, GE Power Systems and Florida Power Corp. Mr. Sorrick is a licensed professional engineer who holds a Masters of Business Administration degree from the University of South Florida and a Bachelor of Science degree in Electrical Engineering from the University of Tennessee at Chattanooga.
William F. Ussery is our Executive Vice President, Member and External Relations and has served in that office since October 2005. In October 2008, Mr. Ussery's title changed from Senior Vice President, Member and External Relations to his current title.Executive Vice President, Member and External Relations. In January 2020, Mr. Ussery’s title changed to Executive Vice President, Member Relations. Mr. Ussery previously served as Vice President and Assistant Chief Operating Officer of Oglethorpe from November 2003 to October 2005. Prior to joining Oglethorpe in 2001, Mr. Ussery held several key positions, including Chief Operating Officer, Vice President of Engineering and System Engineer at Sawnee Electric Membership Corporation. Mr. Ussery holds a Bachelor of Science degree in Electrical Engineering from Auburn University and an associate degree in Science from Middle Georgia College. Since March 2007, Mr. Ussery has served as a board member of the Council on Alcohol and Drugs, Inc. and is currently serving as its Chairman of the Board.
Annalisa M. Bloodworth is our Senior Vice President and General Counsel and has served in that capacity since January 2017. Ms. Bloodworth joined Oglethorpe in 2010 and served in various roles prior to taking her current position, most recently as Deputy General Counsel. Prior to joining Oglethorpe, Ms. Bloodworth was in private practice at Eversheds Sutherland (US) LLP. In addition to energy, her legal experience includes significant work in commercial development, dispute resolution, real estate, regulatory compliance, and construction contracting. Ms. Bloodworth is a graduate of Trinity University where she earned a Bachelor of Arts in Economics and Emory University School of Law where she earned her Juris Doctor degree. Ms. Bloodworth is a member of the International Women's Forum, Leadership Georgia, and presentlyLeadership Atlanta. She serves as PresidentTreasurer for the board of directors of Murphy-Harpst Children's Home, and is a Past-President of the Emory University School of Law Alumni Board and on the board of directors of Murphy-Harpst Children's Home.Board.
Lori K. Holt is our Senior Vice President, Fuels & Co-owned AssetsEnergy Supply and has served in that capacity since January 2017.September 2023. Prior to that, Ms. Holt was our Senior Vice President, Fuels & Co-owned Assets from 2017 to 2023. Ms. Holt joined us in 2009 as Vice President of Fuels and Energy. From 2002 to 2009, Ms. Holt was Managing Director of Business Development for ACES. Prior to joining ACES, she was involved with power plant
81


development for Panda Power Funds. Ms. Holt graduated from the University of Louisville with a Bachelor of Science in Business Administration degree.
James A. MessersmithJeffrey R. Swartz is our Senior Vice President, Plant Operations and has served in that capacity since 2007.September 2022. Prior to joining us, Mr. Messersmith joined us in 1991 as the Assistant Plant Manager at Rocky Mountain andSwartz was promotedVice President for Power Operations for New Fortress Energy from 2021 to Plant Manager in 1994. In 2001, Mr. Messersmith2022. Prior to that, he was promoted again to the position of DirectorVice President of Plant Generation Operations for Duke Energy Florida, LLC from 2012 to 2021 and began working for other subsidiaries of Duke Energy Corporation in 2002 he became our Vice President, Plant Operations, a position he held until 2007.2001. Mr. Messersmith started his career in facility operationsSwartz graduated from the United States Naval Academy with Public Service Indiana and continued his career at St. Johns River Power Park in Jacksonville, FL prior to joining us. Mr. Messersmith holds a Bachelor of Science in Mechanical Engineering degree and is a veteran of the U.S. Navy with engineering experience in Accounting from the University of Southern Indiana and a Master in Business Administration from the University of Evansville.nuclear power.
Heather H. Teilhet is our Senior Vice President, External Affairs and has served in that capacity since January 2020. Ms. Teilhet joined us in January 2017 as Vice President of Governmental Affairs. Prior to joining us, Ms. Teilhet served as Vice President of Government Relations for Georgia Electric Membership Corporation from 2010 to 2016, where she represented Georgia's 41 electric cooperatives before the Georgia General Assembly, the U.S. Congress and certain regulatory agencies. Prior to joining Georgia EMC, she served as a senior staff member for Georgia Governor Sonny Perdue
79

Table of Contents
and as a staff member for Georgia Governor Roy Barnes. Ms. Teilhet graduated from the University of Georgia and holds a Masters in Public Administration from Georgia State University.
Keith D. Russell is our Senior Vice President, Capital Projects and Technical Services and has served in that capacity since 2009. Prior to joining us, Mr. Russell spent 26 years with Southern Company Generation, a business unit of Southern Company. Mr. Russell holds a Master of Business Administration degree and a Bachelor of Science degree in Mechanical Engineering from University of Alabama Birmingham.
Jami G. Reusch is our Vice President, Human Resources and has served in that office since July 2004. Ms. Reusch served as Oglethorpe's Director of Human Resources and held several other management and staff positions in Human Resources prior to July 2004. Prior to joining Oglethorpe in 1994, Ms. Reusch was a senior officer in the banking industry in Georgia, where she held various leadership roles. Ms. Reusch has a Bachelor of Education degree and a Master of Human Resource Development degree from Georgia State University. She also holds several Senior Professional certificates in Human Resources Management.
Board of Directors
Director Qualifications
As required by our bylaws, all of the members of our board of directors, except for the outside director, are either directors or general managers of one of our members. This prerequisite helps to insure that the members of our board of directors have business experience related to electric membership corporations as well as an interest in the successful operation of our business. The members of our board of directors are elected solely by the vote of our members; we have no direct role in the nomination of the candidates or the election of members to our board of directors. Therefore, the following director biographies do not include a discussion of the specific experience, qualifications, attributes or skills that led our members to the conclusion that a person should serve as a director on our board of directors. For further discussion of our nomination and election process, see "– Our Board of Directors – Election of our Board of Directors."
Director Biographies
Jimmy G. Bailey is an at-large director. Mr. Bailey has served on our board of directors since September 2015 and his present term will expire in March 2022.2025. Mr. Bailey is a member of the compensation committee and the construction project committee. Mr. Bailey is a director of the Diverse Power Incorporated, an EMC, and served as the Chairman of Diverse Power board from 2018 to 2020. Mr. Bailey owned and operated a construction contracting business from 1970 to 2018. He also served as Chairman of Kudzu Networks Inc., a subsidiary of Diverse Power, and was President of the Georgia Directors Association in 2017 and 2018.
Randy Crenshaw is a member group director (group 3). Mr. Crenshaw has served on our board of directors since March 2016, and his present term will expire in March 2022.2025. He is a member of the audit committee. Mr. Crenshaw is President and Chief Executive Officer of Irwin Electric Membership Corporation and Middle Georgia Electric Membership Corporation. Mr. Crenshaw also serves on the board of directors for Georgia Electric Membership Corporation, Green Power EMC, and Smarr EMC and is chairman of the board of directors for GRESCO Utility Supply, Inc. He is the former President and Chief Executive Officer of Middle Georgia Electric Membership Corporation and is a former member of the Georgia SystemsSystem Operations board of directors and former chairman of the Georgia Cooperative Council board of directors. He is also the former President of the Irwin/Ocilla Chamber of Commerce.
82


Wm. Ronald Duffey is an outside director. Mr. Duffey has served on our board of directors since March 1997, and his present term will expire in March 2021.2027. He is the chairman of the audit committee and served as special liaison between senior management and the board during the search for a successor president and chief executive officer from June to November 2013. Mr. Duffey is the retired Chairman of the Board of Directors of Peachtree National Bank in Peachtree City, Georgia, a wholly owned subsidiary of Synovus Financial Corp. Prior to his employment in 1985 with Peachtree National Bank, Mr. Duffey served as Executive Vice President and a member of the board of directors for First National Bank in Newnan, Georgia. He holds a Bachelor of Business Administration degree from Georgia State College with a concentration in finance and has completed banking courses at the School of Banking of the South, Louisiana State University, the American Bankers Association School of Bank Investments, and The Stonier Graduate School of Banking, Rutgers University. Mr. Duffey is the immediate past Chair of the board of directors of Piedmont Healthcare, where he also served on the Executive Committee, Executive Performance and Compensation Committee and Governance, Nominating Committee
80

Table of Contents
and was past Chair of the Audit Committee. Mr. Duffey is also a former member of the Georgia Chamber of Commerce board of directors.
Ernest A. "Chip" Jakins III is a member group director (group 5). Mr. Jakins has served on our board of directors since 2014, and his present term will expire in March 2023.2026. Mr. Jakins is a memberchairman of the construction projectcompensation committee and also serves on the compensationconstruction project committee. Mr. Jakins is currently the President and Chief Executive Officer of Jackson Electric Membership Corporation and was previously President and Chief Executive Officer of Carroll Electric Membership Corporation. He also serves as a director for Georgia System Operations, where he is a member of the auditcompensation committee, for Georgia Electric Membership Corporation where he is a member of the ExecutiveEconomic Development Committee, and for Green Power EMC. He is also a member of the Georgia Chamber of Commerce.
Fred A. McWhorter is a member group director (group 4). Mr. McWhorter has served on our board of directors since September 2012, and his present term will expire in March 2022.2025. He is a member of the compensation committee and the construction project committee. Mr. McWhorter serves as Chairman of the Rayle Electric Membership Corporation board of directors. Mr. McWhorter also serves on the board of directors for Georgia Electric Cooperative. He is the owner of F.A. McWhorter Poultry Farms.
Marshall S. Millwood is the Vice-ChairmanChairman of the Board and a member group director (group 3). Mr. Millwood has served on our board of directors since March 2003, and his present term will expire in March 2023. He is the chairman of the compensation committee and a member of the construction project committee.2026. He has been the owner and operator of Marjomil Inc., a poultry and cattle farm in Forsyth County, Georgia, since 1998. He is a director of Sawnee Electric Membership Corporation.
Jeffrey W. Murphy is a member group director (group 4). Mr. Murphy has served on our board of directors since March 2004, and his present term will expire in March 2021.2027. He is a member of the audit committee. Mr. Murphy has been the President and Chief Executive Officer of Hart Electric Membership Corporation since May 2002. He is also the Secretary of Georgia Energy Cooperative.
Danny L. Nichols is a member group director (group 2). Mr. Nichols has served on our board of directors since March 2011, and his present term will expire in March 2023.2026. Mr. Nichols is the chairman of the construction project committee and also serves on the compensation committee. Mr. Nichols is the General ManagerPresident/Chief Executive Officer of Colquitt Electric Membership Corporation.
Sammy G. Simonton is a member group director (group 2). Mr. Simonton has served on our board of directors since October 2012, and his present term will expire in March 2021.2027. He is a member of the audit committee. Mr. Simonton is a director of Walton Electric Membership Corporation. Mr. Simonton is currently the owner of Simonton Farms and has previous business affiliations with Meridian Homes, Moreland Altobelli Associates, Inc. and the Georgia Department of Transportation.
Bobby C. Smith, Jr.Horace H. Weathersby III is the Chairman of the Board and an at-large director. Mr. SmithWeathersby has served on our board of directors since May 2008, acting as Chairman since September 2015,2022, and his present term will expire in March 2023. Mr. Smith is a farmer.2026. He is a member of the board of directorscompensation committee and the construction committee. Mr. Weathersby is a director of Planters Electric Membership Corporation. HeCorporation where he has served since 2006 and currently serves as Chairman. Mr. Weathersby is the owner of Millen Peanut Company and
83


Horace Weathersby Farms. Mr. Weathersby is also serves on the boarda director of directors for Georgia Electric Membership Corporation, Jenkins County Commission and is Chairman of the Board of the Screven County Development Authority and a member of the Sylvania Lions Club.South Jenkins Volunteer Fire Department.
George L. Weaver is a member group director (group 1). Mr. Weaver has served on our board of directors since March 2010, and his present term will expire in March 2022.2025. He is a member of the audit committee. Mr. Weaver has been employed by Central Georgia Electric Membership Corporation since 1970 and is currently serving as President and Chief Executive Officer. Mr. Weaver is currently a director of Southeastern DataMeridian Cooperative and is a former director of Federated Rural Electric Insurance Corporation.
James I. White is Vice-Chairman of the Board and a member group director (group 1). Mr. White has served on our board of directors since March 2012, and his present term will expire in March 2023.2026. He is a member of the audit committee. Mr. White has served as a director of Snapping Shoals Electric Membership Corporation since 1995. Mr. White is the owner and president of Realty South Inc. and the owner of T.K. White Real Estate Co. and is a member of the Metro South Association of Realtors and Georgia Association of Realtors. Mr. White is also a member of the Henry County Chamber of Commerce and was involved with the
81

Table of Contents
Henry County Development Authority for over 20 years. He was previously vice president at the First National Bank in Crestview, Florida.
Committees of the Board of Directors
Our board of directors has established an audit committee, a compensation committee and a construction project committee. The audit committee, the compensation committee and the construction project committee each operate pursuant to a committee charter and/or policy. We do not have a nominating and corporate governance committee; directors are nominated by representatives from each member whose weighted nomination is based on the number of retail customers served by each member, and after nomination, elected by a majority vote of the members, voting on a one-member, one-vote basis.
Audit Committee.    The audit committee is responsible for assisting the board of directors in its oversight of various aspects of our business, including all material aspects of our financial reporting functions as well as risk assessment and management. Its responsibilities related to financial reporting include selecting our independent accountants, reviewing the plans, scope and results of the audit engagement with our independent accountants, reviewing the independence of our independent accountants and reviewing the adequacy of our internal accounting controls. The audit committee also reviews our policy standards and guidelines for risk assessment and risk management as discussed further under "– Board of Directors' Role in Risk Oversight." TheAs of the date of this annual report, the members of the audit committee are currently Ronald Duffey, Randy Crenshaw, Jeffrey Murphy, Sam Simonton, George Weaver and James White. Mr. Duffey is the chairman of the audit committee. The board of directors has determined that Mr. Duffey qualifies as an independent audit committee financial expert.
Compensation Committee.    The compensation committee is responsible for monitoring adherence with our compensation programs and recommending changes to our compensation programs as needed. Currently,As of the date of this annual report, the members of the compensation committee are Marshall Millwood,Chip Jakins, Jimmy Bailey, Chip Jakins, Fred McWhorter, Danny Nichols and Danny Nichols.Horace Weathersby. Mr. MillwoodJakins is the chairman of the compensation committee.
Construction Project Committee.    The construction project committee is responsible for reviewing and making recommendations to our board of directors with regards to major actions or commitments relating to new power plant construction projects and certain existing plant modification projects. Its responsibilities include reviewing and recommending to our board of directors final plant sites, project budgets (including certain modifications to project budgets) and project construction plans, and a quarterly reviewing of and reporting on the status of projects. TheAs of the date of this annual report, the members of the construction project committee are currently Danny Nichols, Jimmy Bailey, Chip Jakins, Fred McWhorter and Marshall Millwood.Horace Weathersby. Mr. Nichols is the chairman of the construction project committee.
Board of Directors' Role in Risk Oversight
Our board of directors and the audit committee both actively oversee our exposure to risks in our business. Our board of directors has adopted corporate policies regarding management of risks related to financial management, capital investment and the use of derivatives. One of the primary risk oversight activities of the board of directors is
84


to hold an annual strategic planning session to review potentially material threats and opportunities to our business. To facilitate this review, management develops a comprehensive strategic issues matrix. The strategic issues matrix identifies, describes, assesses and classifies the potential impact or magnitude, and outlines corporate strategies for addressing potentially material threats and opportunities to our business. During this session, our board of directors reviews these analyses and affirms or assists management with developing strategies to address these strategic risks and opportunities. Additionally, management also develops and typically shares a corporate risk map with our audit committee. The corporate risk map depicts the probability of occurrence and the potential severity for each significant corporate risk.
At each regular meeting of the board of directors, management provides the board with reports on significant changes related to the top strategic risks and opportunities facing us and a revised version of the strategic issues matrix that highlights any revisions to the matrix. The audit committee chairman also provides the board of directors with updates on overall corporate risk exposure. Furthermore, the board of directors receives risk analysis reports that identify key risks that could create variances from our approved annual budget and long-range forecasts and discuss the potential likelihood and magnitude of changes to member rates related to these risks based on scenario modeling.
Our board of directors has delegated direct oversight of corporate risk management and compliance to the audit committee. Pursuant to its charter, the audit committee reviews our business risk management process, including the
82

Table of Contents
adequacy of our overall control environment, in selected areas that represent significant financial and business risks. The audit committee receives regular reports on the activities of the risk management and compliance committee, which are described below, as well as quarter-end reports, which include changes to derivative hedge positions and overall corporate risk exposure. Additionally, the audit committee provides oversight over corporate ethics and compliance matters and receives regular reports on compliance, which include, but are not limited to, the review of (i) significant compliance issues, (ii) significant audits/examinations by governmental or other regulatory agencies, and (iii) significant regulatory proceedings. The risk management and compliance committee, comprised of our chief executive officer, chief operating officer, chief financial officer, and the executive vice president of member and external relations, provides general oversight over all of our risk management and compliance activities, including but not limited to commodity trading, fuels management, insurance procurement, debt management, investment portfolio management, environmental and electric reliability compliance and cyber-security. The risk management and compliance committee has implemented comprehensive policies and procedures, consistent with current board policies, which govern our activities pertaining to market, compliance/regulatory and other risks. For further discussion about our risk management and compliance committee and its activities, see "QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK." For a discussion regarding our cybersecurity risk oversight, see "CYBERSECURITY".
Code of Ethics and Code of Conduct
We have adopted a Code of Conduct that applies to all our employees, including our principal executive, financial and accounting officers. Our Code of Conduct is available at our website, www.opc.com.
8385

Table of Contents

EXECUTIVE COMPENSATION

Compensation Discussion and Analysis
Executive Summary
The philosophy and objective of our compensation and benefits program is to establish and maintain competitive total compensation programs that will attract, motivate and retain the qualified and skilled workforce necessary for our continued success. The compensation committee of the board of directors has the primary responsibility for establishing, implementing and monitoring adherence with our compensation programs. To help align executive officers' interests with those of our members, we have designed a significant portion of our cash compensation program as a pay for performance based system that rewards executive officers based on our success in achieving the corporate goals discussed below. To remain competitive, we review our total compensation program against generally available market data to gain a general understanding of current compensation practices.
Components of Total Compensation
The compensation committee determined that compensation packages for the fiscal year ended December 31, 20202023 for our executive officers should be comprised of the following three primary components:
Annual base salary,
Performance pay, which consists of a cash award based on the achievement of corporate goals, and
Benefits, which consist primarily of health, welfare and retirement benefits.
Certain of our executive officers have an employment agreement that provides for minimum annual base salary and performance pay. See "– Employment Agreements."
Since we are an electric cooperative, we do not have any stock and as a result do not have equity-based compensation programs.
Base Salary.    Base salary is the primary component of our compensation program and it is set at a level to attract and retain executives who can lead us in meeting our corporate goals. Base salary levels are set based on several factors, including but not limited to the position's duties and responsibilities, the individual's value and contributions to the company, work experience and length of service.
Performance Pay.    Performance pay is designed to reward executive officers based on the achievement of certain strategic corporate goals. The corporate goals selected are designed to align the interests of our executive officers and employees with the interests of our members. The compensation committee believes it is appropriate to consider only corporate goal achievement when determining executive officers' performance pay because our corporate philosophy focuses on teamwork, and we believe that better results evolve from mutual work towards common goals. Furthermore, the compensation committee believes that our achievement of these corporate goals will correspond to high company performance, and our executive officers are responsible for directing the work and making the strategic decisions necessary to successfully meet these goals. Each executive officer is eligible to receive upperformance pay equal to 15%30% or 20%35% of his or her base salary, as a performance bonus based on position, multiplied by the achievementpercentage of corporate goals. Certain executive officers have an individual performance component to their performance pay.goals achieved.
Importantly, our executive officers cannot help us meet our goals and improve performance without the work of others. For this reason, the performance goals set at the corporate level are the same for both executive officers and non-executive employees.
Benefits.    The benefits program is designed to allow executive officers to choose the benefit options that best meet their needs. Our president and chief executive officer recommends changes to the benefits program or level of benefits that all executive officers, including our president and chief executive officer, receive to the compensation committee. The compensation committee then reviews and recommends changes to the board of directors for its approval. To meet the health
84

Table of Contents
and welfare needs of our executive officers at a reasonable cost, we pay for 80-85% of
86


an executive officer's health and welfare benefits. Our president and chief executive officer decides our exact cost sharing percentage. We also provide each executive officer with life insurance coverage of two times the officer's base salary, up to $800,000, as well as disability insurance at a level equal to 60% of the officer's base salary. The health, life and disability insurance coverage we provide to our executive officers is consistent with the coverage we provide to our employees generally.
We also provide retirement benefits that allow executive officers the opportunity to develop an investment strategy that best meets their retirement needs. We will contribute up to $0.75 of every dollar an executive officer contributes to his or her retirement plan, up to 6% of an executive officer's pay per period. In 2020,2023, we contributed an additional amount equal to 11% of an executive officer's pay per period. See "– Nonqualified Deferred Compensation" below for additional information regarding our contributions to our executive officers' retirement plans.
Perquisites.    We provide our executive officers with perquisites that we and the compensation committee believe are reasonable and consistent with our overall compensation program. The most significant perquisite provided to our executive officers is a monthly car allowance, the amount of which is based upon the executive officer's position. Our president and chief executive officer approves the executive officers eligible for car allowances and reports this information to the compensation committee. The car allowance for our president and chief executive officer is included in his employment agreement. The compensation committee periodically reviews the levels of perquisites provided to executive officers.
Bonuses.    Our practice has been to, on infrequent occasions, award cash bonuses to senior management related to exemplary performance. Our compensation committee may determine bonus criteria and may recommend discretionary bonuses for our president and chief executive officer to our board of directors for approval. Our president and chief executive officer may determine bonus criteria and issue discretionary bonuses to other members of senior management.
Establishing Compensation Levels
Role of the Compensation Committee.    The compensation committee annually reviews each of the components of our compensation program for our officers, directors and employees and recommends any changes to our board of directors for approval. To aid in this review, the compensation committee receives a comprehensive report on an annual basis regarding all facets of our compensation program. In order to have a compensation program that is internally consistent and equitable, the compensation committee considers several subjective and objective factors when determining the compensation program. The compensation committee also approves our performance pay program including, the corporate goals related to such program.
The compensation committee currently reviews and recommends to the board of directors for approval the compensation, including any bonus, for our president and chief executive officer. Some of the factors reviewed include the position's duties and responsibilities, the individual's job performance, experience, longevity of service and overall value provided for our members. Each year, the compensation committee reviews the employment agreement of our president and chief executive officer and makes a recommendation to our board of directors whether it should be extended.
The compensation committee operates pursuant to a statement of functions that sets forth the committee's objectives and responsibilities. The compensation committee's objective is to review and recommend to the board of directors for approval any changes to various compensation related matters, as well as any significant changes in benefits cost or level of benefits, for the members of the board of directors, the executive officers, and other employees. The compensation committee annually reviews its statement of functions and makes any necessary revisions to ensure its responsibilities are accurately stated.
Role of Management.    Our president and chief executive officer is the key member of management involved in our compensation process. He annually reviews the compensation of our other executive officers and in certain circumstances provides an adjustment to the executive officers' base salaries. Some of the factors the president and chief executive officer considers include the person's relative responsibilities and duties, experience, job performance, longevity of service and overall value provided for our members. Our president and chief executive
87


officer also reviews theany employment agreements with our executive officers' employment agreementsofficers on an annual basis and makes an affirmative decision whether each should be extended. Our president and chief executive officer reports the executive officers' salaries and determination whether to extend the employment agreements, if applicable, to the compensation committee and board of directors annually.
Our president and chief executive officer, together with the other executive officers, identifies corporate performance objectives that are used to determine performance pay amounts. He and our vice president, human resources present these
85

Table of Contents
goals to the compensation committee. The compensation committee then reviews and approves the goals and presents them to the board of directors for final approval.
Role of the Board of Directors.    Our board of directors must approve changes recommended by the compensation committee before the changes may take effect. These approvals include the compensation of our president and chief executive officer, the extension of the president and chief executive officer's employment agreement, and the components of our compensation program each year.
Role of Generally Available Market Data.    To confirm that our compensation remainslevels remain competitive, we review standardized surveys to compare our total compensation program against other companies in the utility industry of a similar size. We do not benchmark against such data; rather we utilize these surveys to gain a general understanding of current compensation practices and better understand and compare the components of our compensation program. The surveys we review are generally available and we have not hired a compensation consultant to provide us with information on executive compensation data. Executive compensation levels at other companies do not drive our compensation decisions,decisions. For our employees overall and we do not target a specific market percentile for our executive officerofficers, we review market compensation levels as a reference point in our overall compensation review process.
In order to supplement our internal review of generally available market data, we periodically hire a compensation consultant to provide us with supplemental market information to help us evaluate our compensation practices. In 2022 and 2023, we engaged an independent consultant to provide supplemental market data regarding the relative competitiveness of our compensation.
Corporate Goals for Performance Pay
We choose to tie performance compensation to selected corporate goals that most appropriately measure our achievement of our strategic objectives. For 2020,2023, our performance measures were divided into the following categories: (i) safety, (ii) operations, (iii) construction and project management, (iv) corporate compliance, (v) financial and (vi) quality. Targeted performance measures in these categories are designed to help us accomplish our corporate goals which will benefit our members, employees and promote responsible environmental stewardship.
For an executive officer to earn his or her maximum performance pay, 100% of the performance measures must be achieved. The performance measures are weighted to align with our current strategic focus. Goals are reviewed annually and may be adjusted in order to reflect any changes in our strategic focus. We also review and refine these goals annually and make adjustments as necessary to ensure that we are consistently stretching our expectations and performance. Although some performance measures may stay the same, the applicable threshold may become more difficult. For example, in 2020, we adjusted some of the performance thresholds for our operations goals. The following provides an overview of the purposes of each category of our corporate goals:
Safety.    Our safety goals provide employees a financial incentive to focus on a safe workplace environment, which increases employee morale and minimizes lost work time. Our safety performance goals focused on the number of lost time incidents,serious injuries and fatalities, safety training and meetings, enhancing our safety program and procedures and reducing workplace hazards for both our employees and contractors.
Operations.    The operations goals measure how well each of our operating plants responds to system requirements. In order to optimize generation for system load requirements, we generally dispatch the most efficient and economical generation resources first. If the preferred generation resource is not available when called upon, we must resort to a more expensive alternative. Most of the performance measures in this category, including successful starts and peak season availability, are measured against industry averages and the applicable thresholds are set above average. To meet these standards, we or the operator of certain co-owned facilities must operate and maintain these facilities in a manner that minimizes long-term maintenance and replacement energy costs. Our achieving
88


operational excellence at the corporate level results in the most reliable, efficient and lowest cost power supply for our members.
Construction and Project Management.    Our construction and project management goals measure our involvement and management regarding construction at our owned and co-owned generating facilities. Our most significant project is the construction of Vogtle Units No. 3 and No. 4. One of the goals measures how well we are managing the project in our role as a Co-owner. Performance is based on our participation on the Project Management Board, the degree and effectiveness of oversight involvement, understanding of the project status and project issues, and timeliness and usefulness of project communications to our members and our board of directors. Our president and chief executive officer will assign a score based on his assessment of the overall effectiveness of our management of the project and submit the score to the construction committee of our board of directors for approval. Other components measure (i) construction progress meeting scheduled milestone dates at the Vogtle project and (ii) performance against construction budgets and schedules foras well as construction projects that we directly oversee.oversee, and we measure performance based on successful project completion in a timely manner and within project budget.
86

Table of Contents
Corporate Compliance.    Our corporate compliance goals are divided into two categories – environmental and electric reliability standards. The environmental goals promote our commitment to responsible environmental stewardship while providing reliable and affordable energy. We measure our performance by the number of environmental incidents, such as spills, which not only increase costs for our members but may cause environmental damage. Electric reliability standards compliance is measured by reviewing our performance as determined by standards set by the electric reliability organizations related to protection of our critical and non-critical infrastructure.
Financial.    Our financial goals provide direct benefits to our members by lowering power costs. One goal is tied to specific financial performance while others focus on emphasizing importance of appropriate and effective internal controls. For example, the cost savings goal is designed to encourage staff to identify and implement strategies that result in cost savings or cost reductions in either the current year or on a long-term basis. Any cost savings included in this goal must be over and above what would generally be expected. For 2020,2023, we may earn up to an additional 5% of performance pay by identifying cost savings or reduction strategies above the initial $50 million goal. Two other financial goals focus on our internal controls over financial reporting.
Quality.    Quality is a subjective goal that is intended to measure the satisfaction of our members with our efforts, initiatives, responsiveness and other intangibles that are not readily quantified. Performance on this goal is based on semi-annual surveys submitted by the members of the board of directors who, except for our outside director, are general managers or directors of our members. The results of the surveys are averaged to determine the total quality result. In order to achieve the maximum award, we must receive a 100% rating from every member of the board of directors on both surveys, an extremely high standard that has yet to be achieved.
Calculation of Performance Pay Earned
Performance pay earned by our executive officers is based on our success in achieving each of our corporate goals. Annually, our board of directors approves a weighted system for determining performance pay whereby we assign a percentage to each of the goals, as noted below. Based on the achievement of each performance metric, a percentage of the weighted goal is available as performance pay to our executive officers. Each performance metric has a minimum threshold level that must be achieved before any performance pay is earned. If the actual performance for that metric meets the applicable threshold, then a pre-determined percentage of the percentage pay for that metric will be awarded. The percentage awarded will increase up to a maximum of 100% of the weighted goal if the maximum performance level of the performance metric is achieved. Threshold and maximum levels are reviewed annually and generally reset as necessary to demand ever improving corporate performance. Meeting the applicable thresholds is not guaranteed and requires diligence and hard work. Exceptional performance is required to reach the maximum goals.
CertainFor 2023, we multiplied 30% or 35%, based on position, of each executive officers' performance pay is based on the achievement of corporate goals and other executive officers' performance pay is based 75% on the achievement of corporate goals and 25% on individual performance. For executive officers whose performance pay is based entirely on corporate goal achievement, we multiply 20% of his or her base salary by the corporate goal achievement percentage to determine his or her performance bonus. For executive officers whose performance pay is based on corporate goals and individual performance, we multiply 15% of his or her base salary by the corporate goal achievement percentage and multiply 5% of his or her base salary by an individual performance ranking that ranges from 0% to 200%.
8789

Table of Contents
Assessment of Performance of 20202023 Corporate Goals
The specific corporate performance measures, thresholds, maximums and results for our executive officers' 20202023 performance pay were the following:
Performance
Category/ Description
Performance
Category/ Description
Performance MeasureThresholdMaximum2020
Result
WeightWeighted
Goal
Achieved
Performance Category/ DescriptionPerformance MeasureThresholdMaximum2023 ResultWeightWeighted Goal Achieved
SafetySafety
Incident RateIncident RateLost Work Time Incidents1 (if not OSHA)3.0 %0.00 %
Incident Rate
Incident RateSerious Injuries and Fatalities03.0 %3.00 %
Safety Program(1)
Safety Program(1)
Training and Meetings100.0 %100.0 %100.0 %1.0 %1.00 %
Safety Program(1)
Safety Training and Meetings100.0 %100.0 %100.0 %1.0 %1.00 %
Safety Observations150/90250/180261/1922.5 %2.50 %
Hazard Reduction Program75.0 %100.0 %100.0 %0.5 %0.50 %
Operations(2)
Safety Observation ProgramSafety Observation Program216/120360/240452/4122.5 %2.50 %
Hazard Reduction ProgramHazard Reduction Program75.0 %100.0 %100.0 %0.5 %0.50 %
Operations(2)
Oglethorpe Managed
Oglethorpe Managed
Oglethorpe ManagedOglethorpe ManagedSuccessful Starts98.0 %100.0 %99.9 %4.0 %3.81 %Successful Starts97.2 %100.0 %99.9 %4.0 %3.90 %
FleetFleetSuccessful Dispatch92.5 %97.5 %99.2 %3.0 %3.00 %FleetSuccessful Dispatch90.0 %97.5 %100.0 %2.0 %2.00 %
Peak Season Availability64.9 %99.9 %95.3 %19.0 %18.11 %
Peak Season AvailabilityPeak Season Availability55.6 %99.9 %87.9 %21.0 %18.46 %
Co-Owned FleetCo-Owned FleetCoal Fleet Peak Season Equivalent Forced Outage Rate6.0 %3.9 %9.0 %1.3 %0.67 %Co-Owned FleetCoal Fleet Peak Season Equivalent Forced Outage Rate6.0 %3.0 %0.7 %0.65 %0.65 %
Coal Fleet Annual Equivalent Unplanned Unavailability Factor6.2 %4.3 %2.4 %0.7 %0.59 %
Nuclear Fleet Capability Factor89.9 %91.9 %90.7 %2.0 %0.82 %
Coal Fleet Annual Equivalent Unplanned Unavailability FactorCoal Fleet Annual Equivalent Unplanned Unavailability Factor5.8 %3.3 %2.5 %0.35 %0.35 %
Nuclear Fleet Capability FactorNuclear Fleet Capability Factor90.7 %92.7 %91.7 %2.0 %1.03 %
Construction and Project ManagementConstruction and Project Management
Vogtle Units No. 3 and No. 4Vogtle Units No. 3 and No. 4Oglethorpe Performance0.0 %100.0 %95.0 %7.0 %6.65 %
Status of ProjectMeet applicable deadlines50.0 %3.0 %1.50 %
Vogtle Units No. 3 and No. 4
Vogtle Units No. 3 and No. 4Oglethorpe Performance0.0 %100.0 %100.0 %7.0 %7.00 %
Project MilestonesProject MilestonesMeet applicable deadlines50.0 %3.0 %1.50 %
Oglethorpe Managed ProjectsOglethorpe Managed ProjectsStatus of ProjectsMeet applicable deadlines & budgets83.3 %6.0 %6.00 %Oglethorpe Managed ProjectsStatus of ProjectsMeet applicable deadlines & budgets100.0 %6.0 %6.00 %
Corporate ComplianceCorporate Compliance
EnvironmentalEnvironmentalNoncompliance Notifications1 (if fine is ≤ $5,000) or 24.0 %4.00 %
Reportable Spills4.0 %4.00 %
Environmental
EnvironmentalFinal Notices of Violation and Letters of Non-Compliance1 (if fine is ≤ $5,000) or 24.0 %3.00 %
Reportable SpillsReportable Spills4.0 %4.00 %
Mandatory Electric Reliability StandardsMandatory Electric Reliability StandardsNon-Critical Infrastructure Protection Compliance1+ (if minimal penalty)3.0 %3.00 %Mandatory Electric Reliability StandardsNon-Critical Infrastructure Protection Compliance1+ (if minimal penalty)3.0 3.0 %3.00 %
Critical Infrastructure Protection Compliance1+ (if minimal penalty)3.0 %3.00 %
Critical Infrastructure Protection ComplianceCritical Infrastructure Protection Compliance1+ (if minimal penalty)3.0 %3.00 %
FinancialFinancial
Cost SavingCost SavingCurrent Year / Long-Term Savings$$50,000,000 $409,275,860 14.0 %14.00 %
Additional Cost Savings$$50,000,000 $42,629,094 0-5.0%4.26 %
Cost Saving
Cost SavingCurrent Year / Long-Term Savings$$50,000,000 $516,461,000 14.0 %14.00 %
Additional Cost SavingsAdditional Cost Savings$$50,000,000 $455,753,497 0-5.0%5.00 %
Internal Control over Financial ReportingInternal Control over Financial ReportingSignificant Deficiency or Material Weakness2.0 %2.00 %Internal Control over Financial ReportingSignificant Deficiency or Material Weakness2.0 2.0 %— %
Control Deficiency2.0 %2.00 %
Control DeficiencyControl Deficiency2.0 %2.00 %
QualityQuality
Board SatisfactionBoard SatisfactionBoard of Directors Survey80.0 %100.0 %95.1 %15.0 %14.26 %
Board Satisfaction
Board SatisfactionBoard of Directors Survey80.0 %100.0 %95.0 %15.0 %14.25 %
TotalTotal100.0 %95.67 %
Total
100.0 %96.14 %
__________________
(1)Certain sub-goals are aggregated for purposes of the table.
(2)Operations goals apply to individual units of each generation facility. The thresholds and performance results provided in this summary table are aggregated based on all of the generating units within the category.
As noted above, we achieved 95.67%96.14% of our corporate goals for 2020.2023. As a result, Mr. Smith, Mr. Price, Ms. Higgins and Mr. UsserySorrick received performance pay in an amount equal to 95.67%96.14% of 20%35% of his or her base salary.salary and Mr. Messersmith
88

Table of Contents
Ussery and Ms. Bloodworth received performance pay in an amount equal to 95.67%96.14% of 15%30% of his or her base salary plus 115% of 5% of his base
90


salary. Set forth below is a table showing performance pay figures for each of our executive officers who received performance pay in 2020:2023:
Executive OfficerPerformance Pay*
Michael L. Smith$160,886342,394 
Michael W. Price96,053 
Elizabeth B. Higgins96,435196,174 
David W. Sorrick183,724 
William F. Ussery73,666127,799 
James A. MessersmithAnnalisa M. Bloodworth71,960130,654 
__________________
*Performance pay was calculated based on base salaries as of December 31, 2020.2023. Actual compensation earned in 20202023 is reported in the Summary Compensation Table below.
Employment Agreements
General
We have an employment agreement with Mr. Smith, Mr. Price, Ms. Higgins, Mr. Sorrick, Mr. Ussery and Mr. Ussery.Ms. Bloodworth. We negotiated each of these employment agreements on an arms-length basis, and the compensation committee determined that the terms of each agreement are reasonable and necessary to ensure that these executive officers' goals are aligned with our members' interests and that each performs his or her respective role while acting in our members' best interests. We review these agreements on an annual basis. We do not have an employment agreement with Mr. Messersmith.
Our employment agreement with Mr. Smith extends through December 31, 2023.2026. Mr. Smith's agreement will automatically renew pursuant to the corresponding provision of the agreement for successive one-year periods unless either party provides written notice not to renew the agreement twenty-four months before the expiration of any extended term. Each year, our board of directors makes an affirmative determination as to whether to provide such notice and no such notice has been provided. Mr. Smith's minimum annual base salary under his agreement is $630,000,$956,970, and is subject to review and adjustment by our board of directors. Mr. Smith is eligible to participate in incentive compensation plans generally available to similarly situated employees and for an annual bonus determined by our board of directors at its sole discretion. Mr. Smith is also entitled to an automobile or an automobile allowance during the term of the agreement. Mr. Smith's employment agreement contains severance pay provisions.
We also have employment agreements with Mr. Price, Ms. Higgins, Mr. Sorrick, Mr. Ussery and Mr. Ussery.Ms. Bloodworth. The current term of each agreementMs. Higgins', Mr. Sorrick's, Mr. Ussery's and Ms. Bloodworth's agreements extends through December 31, 20232026 and will automatically renew for successive one-year periods unless either party provides written notice not to renew the agreement twenty-four months before the expiration of any extended term. Each year, our president and chief executive officer makes an affirmative determination as to whether to provide such notice, and no such notices have been provided.
Minimum annual base salaries under these agreements are $445,100 for Mr. Price, $448,250$555,000 for Ms. Higgins, and $348,400$520,000 for Mr. Ussery.Sorrick, $422,000 for Mr. Ussery and $405,000 for Ms. Bloodworth. Salaries are subject to review and possible adjustment as determined by the president and chief executive officer. Each executive is also eligible to participate in incentive compensation plans generally available to similarly situated employees and for an annual bonus determined by the president and chief executive officer at his sole discretion. The employment agreements with Mr. Price, Ms. Higgins, andMr. Sorrick, Mr. Ussery and Ms. Bloodworth contain severance pay provisions.
Assessment of Severance Arrangements
Pursuant to their respective employment agreements, certain of our executive officers are entitled to severance payments and benefits in the event they are terminated not for cause or they resign for good reason.
In determining that the president and chief executive officer's employment agreement was appropriate and necessary, the compensation committee considered Mr. Smith's role and responsibility within Oglethorpe in relation
91


to the total amount of severance pay he would receive upon the occurrence of a severance event. The committee also considered whether the amount Mr. Smith would receive upon severance was appropriate given his total annual compensation. Upon review, the compensation committee determined that a maximum amount of severance compensation equal to a maximum of two year's compensation, plus benefits as described below, was an appropriate amount of severance compensation for Mr. Smith. The compensation committee believes that entering into a severance agreement with our president and chief executive officer is
89

Table of Contents
beneficial because it gives us a measure of stability in this position while affording us the flexibility to change management with minimal disruption, should our board of directors ever determine such a change to be necessary and in our best interests. The compensation committee considers an amount equal to up to two years of compensation and benefits to be an appropriate amount to address competitive concerns and offset any potential risk Mr. Smith faces in his role as our president and chief executive officer. Furthermore, it should be noted that we do not compensate our president and chief executive officer using options or other forms of equity compensation that typically lead to significant wealth accumulation.
Pursuant to the terms of his employment agreement, Mr. Smith will be entitled to a lump-sum severance payment upon the occurrence of any of the following events: (1) we terminate his employment without cause; or (2) he resigns due to a demotion or material reduction of his position or responsibilities, a material reduction of his base salary, or a relocation of his principal office by more than 50 miles. The severance payment will equal Mr. Smith's then current base salary through the rest of the term of the agreement (with a minimum of one year's pay and a maximum of two years' pay), and is payable within 30 days of termination, subject to the provisions of Internal Revenue Code Section 409A. In addition, Mr. Smith will be entitled to outplacement services and an amount equal to his costs for medical and dental continuation coverage under COBRA, each for the longer of one year or the remaining term of the agreement. Severance is payable only if Mr. Smith signs a form releasing all claims against us. The maximum severance that would be payable to Mr. Smith in the circumstances described above is $1,905,975.$2,277,646.
Our president and chief executive officer considered the total amount of compensation Mr. Price, Ms. Higgins, andMr. Sorrick, Mr. Ussery and Ms. Bloodworth would receive upon the occurrence of a severance event and determined that it was appropriate for these executive officers to receive severance compensation equal to a maximum of two years of his or her then current base salary, plus benefits as described below, because such agreements provide a measure of stability for both us and the executive officers. In addition, like our president and chief executive officer, these executive officers are not compensated using options or other forms of equity compensation that lead to significant wealth accumulation. Therefore, our president and chief executive officer believes such severance compensation is necessary to address competitive concerns and offset any potential risk our executive officers face in the course of their employment.
Pursuant to the terms of their employment agreements, Mr. Price, Ms. Higgins, andMr. Sorrick, Mr. Ussery and Ms. Bloodworth will each be entitled to a lump-sum severance payment if we terminate the executive without cause or if the executive resigns after a demotion or material reduction of his or her position or responsibilities, a reduction of his or her base salary, or a relocation of his or her principal office by more than 50 miles. The severance payment will equal the executive officer's then current base salary through the rest of the term of the agreement (with a minimum of one year's pay and a maximum of two years' pay), payable within 30 days of termination, subject to the provisions of Internal Revenue Code Section 409A. In addition, the executive will be entitled to one year of outplacement services and an amount equal to the executive's cost for medical and dental continuation coverage under COBRA for one year. Severance is payable only if the executive signs a form releasing all claims against us. The maximum severance that would be payable to Mr. Price, Ms. Higgins, andMr. Sorrick, Mr. Ussery and Ms. Bloodworth in the circumstances described above is $1,105,577, $1,107,570,$1,312,814, $1,216,914, $988,248 and $839,192,$1,037,478, respectively.
Compensation Committee Interlocks and Insider Participation
Mr. Jakins, Mr. Bailey, Mr. Jakins,McWhorter, Mr. Millwood, Mr. McWhorterNichols and Mr. NicholsWeathersby served as members of our compensation committee during 2020.all or a portion of 2023.
Mr. Jakins is a director of ours and the President and Chief Executive Officer of Jackson Electric Membership Corporation. Jackson is a member of ours and has a wholesale power contract with us. Jackson's revenues of $209.0$262.7 million to us in 20202023 under its wholesale power contract accounted for approximately 15.2%15.1% of our total revenues.
92


Mr. Nichols is a director of ours and is the General ManagerPresident and Chief Executive Officer of Colquitt Electric Membership Corporation. Colquitt is a member of ours and has a wholesale power contract with us. Colquitt's revenues of $41.4$42.8 million to us in 20202023 under its wholesale power contract accounted for approximately 3.0%2.5% of our total revenues.
90

Table of Contents
Summary Compensation Table
The following table sets forth the total compensation paid or earned by each of our executive officers for the fiscal years ended December 31, 2020, 20192023, 2022 and 2018.2021.
Name and Principal PositionName and Principal PositionYearSalaryBonusNon-Equity
Incentive Plan
Compensation
All Other
Compensation(1)
TotalName and Principal PositionYearSalaryBonusNon-Equity
Incentive Plan
Compensation
All Other
Compensation (1)
Total
Michael L. SmithMichael L. Smith2020$833,854 $— $160,886 $166,731 $1,161,471 
President andPresident and2019777,546 — 149,376 156,167 1,083,089 
Chief Executive OfficerChief Executive Officer2018735,773 — 137,337 147,423 1,020,533 
Michael W. Price2020480,501 — 96,053 101,764 678,318 
Executive Vice President and2019459,937 — 88,091 97,313 645,341 
Chief Operating Officer2018442,250 — 82,548 92,629 617,427 
Elizabeth B. Higgins
Elizabeth B. Higgins
Elizabeth B. HigginsElizabeth B. Higgins2020486,547 — 96,435 102,427 685,409 
Executive Vice President andExecutive Vice President and2019463,192 — 88,714 97,554 649,460 
Chief Financial OfficerChief Financial Officer2018445,375 — 83,132 92,600 621,107 
David W. Sorrick(2)
David W. Sorrick(2)
David W. Sorrick(2)
Executive Vice President and
Chief Operating Officer
William F. Ussery
William F. Ussery
William F. UsseryWilliam F. Ussery2020375,231 — 73,666 81,806 530,703 
Executive Vice President,Executive Vice President,2019360,013 — 68,953 78,575 507,541 
Member and External Relations2018346,167 — 64,614 76,047 486,828 
Member Relations
James A. Messersmith2020340,891 — 71,960 77,795 490,646 
Annalisa M. Bloodworth
Annalisa M. Bloodworth
Annalisa M. Bloodworth
Senior Vice President,Senior Vice President,2019328,371 — 66,052 74,458 468,881 
Plant Operations2018316,487 — 62,966 73,774 453,227 
and General Counsel
__________________
(1)Figures for 20202023 consist of matching contributions and contributions we made by Oglethorpe under the 401(k) Retirement Savings Plan on behalf of each Mr. Smith, Mr. Price, Ms. Higgins, Mr. Ussery, and Ms. Bloodworth of $43,500 and $43,956 for Mr. Messersmith of $37,500;Sorrick; contributions by Oglethorpe to a nonqualified deferred compensation plan on behalf of Mr. Smith, Mr. Price, Ms. Higgins, Mr. Ussery, Ms. Bloodworth and Mr. Messersmith,Sorrick, respectively of $109,476, $49,404, $49,900, $31,193$133,793, $60,242, $36,363, $35,990 and $26,215;$52,560; car allowances; paid time off, executive health benefits; customary holiday gifts and service awards.
(2)Mr. Sorrick joined Oglethorpe on February 9, 2022.
The following table sets forth the threshold and maximum awards available to the executive officers listed in the Summary Compensation Table who received performance pay for the fiscal year ended December 31, 2020.2023.
Estimated Future
Payouts
Under Non-Equity
Incentive Plan Awards
Estimated Future Payouts Under Non-Equity Incentive Plan AwardsEstimated Future Payouts Under Non-Equity Incentive Plan Awards
NameNameGrant DateThresholdMaximumNameGrant DateThresholdMaximum
Michael L. SmithMichael L. SmithN/A$38,258 $168,168 
Michael W. PriceN/A$22,841 $100,400 
Elizabeth B. HigginsElizabeth B. HigginsN/A$22,932 $100,800 
David W. Sorrick
William F. UsseryWilliam F. UsseryN/A$17,518 $77,000 
James A. MessersmithN/A$26,537 $89,500 
Annalisa M. Bloodworth
93


__________________
For an explanation of the criteria and formula used to determine the awards listed above, please refer to "– Compensation Discussion and Analysis – Assessment of Performance of 20202023 Corporate Goals.Goals."
Nonqualified Deferred Compensation
We maintain a Fidelity Non-Qualified Deferred Compensation Program for each of the executive officers in the table below. This non-qualified deferred compensation program serves as a vehicle through which we can continue our employer retirement contributions to our executive officers beyond the IRS salary limits on the retirement plan ($285,000330,000 as indexed).
91

Table of Contents
The following table sets forth contributions for the fiscal year ended December 31, 20202023 along with aggregate earnings for the same period.
NameNameExecutive
Contributions
in Last FY
Registrant
Contributions
in Last FY(1)
Aggregate
Earnings (Loss)
in Last FY(2)
Aggregate
Withdrawals/
Distributions
in Last FY
Aggregate
Balance at
Last FYE
NameExecutive Contributions in Last FY
Registrant Contributions in Last FY(1)
Aggregate Earnings (Loss) in Last FY(2)
Aggregate Withdrawals/Distributions in Last FYAggregate Balance at Last FYE
Michael L. SmithMichael L. Smith$35,000 $109,476 $140,843 $— $1,023,909 
Michael W. Price$7,920 $49,404 $95,936 $— $635,230 
Elizabeth B. HigginsElizabeth B. Higgins$8,300 $49,900 $142,937 $— $729,063 
David W. Sorrick
William F. UsseryWilliam F. Ussery$1,000 $31,193 $39,581 $— $298,256 
James A. Messersmith$— $26,215 $42,846 $— $220,429 
Annalisa M. Bloodworth
__________________
(1)All registrant contribution amounts shown have been included in the "All Other Compensation" column of the Summary Compensation Table above and are limited to the Fidelity Non-Qualified Deferred Compensation Program.
(2)A participant's accounts under the deferred compensation program are invested in the investment options selected by the participant. The accounts are credited with gains and losses actually experienced by the investments.
Pay Ratio Disclosure
We strive to provide fair and equitable compensation to each of our employees through a combination of competitive base pay, performance incentives, retirement plans and other benefits. The following pay ratio and supporting information compares the annual total compensation of Mr. Smith, our president and chief executive officer, to the annual total compensation of our median employee for the fiscal year ended December 31, 2020.2023.
To identify our median employee, we determined that as of December 31, 2020,2023, we had 299337 employees, including full-time, part-time, temporary and seasonal workers (excluding our president and chief executive officer), who were all located in the United States. We then calculated the annual total compensation for each of these employees for the fiscal year ended December 31, 20202023 in the same manner in which we calculated our president and chief executive officer's total annual compensation presented in the "Summary Compensation Table." Employee compensation includes salary, performance pay and benefits.
Based upon this analysis, we determined that our median employee's annual total compensation for 20202023 was $152,601.$169,500. As set forth in the Summary Compensation Table, our president and chief executive officer's annual total compensation for 20202023 was $1,161,471.$1,546,661. The ratio of our president and chief executive officer's annual total compensation to our median employee's annual total compensation for the fiscal year ended December 31, 20202023 was 7.61:9.12:1.
Compensation Policies and Practices As They Relate to Our Risk Management
We believe that our compensation policies and practices for all employees, including executive officers, do not create risks that are reasonably likely to have a material adverse effect on us.
Director Compensation
The following table sets forth the total compensation paid or earned by each of our directors for the fiscal year ended December 31, 2020.2023.
9294

Table of Contents
NameTotal Fees
Earned or Paid
in Cash
Member Directors
Jimmy G. Bailey$12,50018,200 
Randy Crenshaw$11,60017,160 
Ernest A. "Chip" Jakins III$11,30014,560 
Fred A. McWhorter$12,90020,280 
Marshall S. Millwood, Vice-ChairmanChairman$11,30020,020 
Jeffrey W. Murphy$11,60017,290 
Danny L. Nichols$11,30016,900 
Sammy G. Simonton$13,400 
Bobby C. Smith, Jr., Chairman$14,94020,670 
Horace H. Weathersby III$17,440 
George L. Weaver$11,60020,730 
James I. White, Vice-Chairman$11,40026,600 
Outside Director
Wm. Ronald Duffey$30,80038,830 
(1)
During 2020,In 2023, we paid our member directors a fee of $1,200$1,560 per board meeting and $800$1,040 per day for attending committee meetings, other meetings, or other official business approved by the chairman of the board of directors. Member directors arewere paid $600$780 per day for attending the annual meeting of members and member advisory board meetings and $300$390 per day for participation by video conference for a meeting of the advisory board. We paid our outside director a fee of $5,500 per board meeting for four meetings a year and a fee of $1,000 per board meeting for the remaining board meetings held during the year. Our outside director was also paid $1,000 per day for attending committee meetings, annual meetings of the members or other official business. In addition, we reimburse all directors for out-of-pocket expenses incurred in attending a meeting. All directors, areincluding the outside director, were paid $100$130 per hour, or for each fraction thereof, up to a daily cap of $600,$780, when participating in meetings by conference call. The chairman of the board of directors is paid an additional 20% of his director's fee per board meeting for time involved in preparing for the meetings. The audit committee financial expert is paid an additional $400 per audit committee meeting for the time involved in fulfilling that role. If more than one meeting is held the same day, only one day's per diem is paid. Neither our outside director nor member directors receive any perquisites or other personal benefits from us.
Directors may choose up to three external training courses related to their role as director and/or the energy industry per year to attend. Our directors will be paid $600 per day for each day of an external training course plus, where applicable, up to two additional days for time spent traveling to and from an external training course. Directors will be reimbursed for travel and out-of-pocket expenses for attending external training. We will also pay any fees charged for such training. Directors may choose one external training course per year to attend.
9395

Table of Contents

SECURITY OWNERSHIP OF CERTAIN BENEFICIAL OWNERS AND MANAGEMENT AND RELATED STOCKHOLDER MATTERS
Not Applicable.applicable.
96


CERTAIN RELATIONSHIPS AND RELATED TRANSACTIONS, AND DIRECTOR INDEPENDENCE

Certain Relationships and Related Transactions
Randy Crenshaw is a director of ours and the President and Chief Executive Officer of Irwin Electric Membership Corporation and Middle Georgia Electric Membership Corporation. Irwin and Middle Georgia are membersis a member of ours and each has a wholesale power contract with us. Irwin's revenues of $8.0$9.1 million to us in 20202023 under its wholesale power contract accounted for approximately 0.6% of our total revenues. Middle Georgia's revenues of $5.1 million to us in 2020 under its wholesale power contract accounted for approximately 0.4%0.5% of our total revenues.
Chip Jakins is a director of ours and the President and Chief Executive Officer of Jackson Electric Membership Corporation. Jackson is a member of ours and has a wholesale power contract with us. Jackson's revenues of $209.0$262.7 million to us in 20202023 under its wholesale power contract accounted for approximately 15.2%15.1% of our total revenues.
Jeffrey Murphy is a director of ours and the President and Chief Executive Officer of Hart Electric Membership Corporation. Hart is a member of ours and has a wholesale power contract with us. Hart's revenues of $18.0$23.9 million to us in 20202023 under its wholesale power contract accounted for approximately 1.3%1.4% of our total revenues.
Danny Nichols is a director of ours and is the General ManagerPresident and Chief Executive Officer of Colquitt Electric Membership Corporation. Colquitt is a member of ours and has a wholesale power contract with us. Colquitt's revenues of $41.4$42.8 million to us in 20202023 under its wholesale power contract accounted for approximately 3.0%2.5% of our total revenues.
George Weaver is a director of ours and the President and Chief Executive Officer of Central Georgia Electric Membership Corporation. Central Georgia is a member of ours and has a wholesale power contract with us. Central Georgia's revenues of $41.1$65.5 million to us in 20202023 under its wholesale power contract accounted for approximately 3.0%3.8% of our total revenues.
We have a Standards of Conduct/Conflict of Interest policy that sets forth guidelines that our employees and directors must follow in order to avoid conflicts of interest, or any appearance of conflicts of interest, between an individual's personal interests and our interests. Pursuant to this policy, each employee and director must disclose any conflicts of interest, actions or relationships that might give rise to a conflict. Our president and chief executive officer is responsible for taking reasonable steps to ensure that the employees are complying with this policy and the audit committee is responsible for taking reasonable steps to ensure that the directors are complying with this policy. The audit committee is charged with monitoring compliance with this policy and making recommendations to the board of directors regarding this policy. Certain actions or relationships that might give rise to a conflict of interest are reviewed and approved by our board of directors.
Director Independence
Because we are an electric cooperative, theour members own and manage us. Our bylaws set forth specific requirements regarding the composition of our board of directors. See "DIRECTORS, EXECUTIVE OFFICERS AND CORPORATE GOVERNANCE – Our Board of Directors – Structure of Our Board of Directors" for a detailed discussion of the specific requirements contained in our bylaws regarding the composition of our board of directors.
In addition to meeting the requirements set forth in our bylaws, all directors, with the exception of Chip Jakins, satisfy the definition of director independence as prescribed by the NASDAQ Stock Market and otherwise meet the requirements set forth in our bylaws. Mr. Jakins does not qualify as an independent director because he is the President and Chief Executive Officer of Jackson Electric Membership Corporation, an organization from which we received more than 5% of our gross revenues for the fiscal year ended December 31, 2020.2023. Although we do not have any securities listed on the NASDAQ Stock Market, we have used its independence criteria in making this determination in accordance with applicable SEC rules.
9497


THE EXCHANGE OFFER

General; Purpose of the Exchange Offer
In connection with the issuance of the original bonds on August 25, 2020,December 5, 2023, we entered into a registration rights agreement with MUFG Securities Americas Inc., as representative of the initial purchasers, which provides for this registered exchange offer. The exchange offer will permit eligible holders of original bonds to exchange their original bonds for exchange bonds, which are identical in all material respects to the original bonds, except that:
i.the exchange bonds have been registered with the SEC under U.S. federal securities laws and will not bear any legend restricting their transfer;
ii.the exchange bonds generally will not be subject to transfer restrictions and will not be entitled to registration rights;
iii.the holders of the exchange bonds will not be entitled to earn additional interest under circumstances related to our registration obligations under the registration rights agreement; and
iv.the exchange bonds will bear a different CUSIP number than the original bonds.
Pursuant to the registration rights agreement, we agreed, for the benefit of the holders of the original bonds, at our cost, to file an exchange offer registration statement relating to an offer to exchange the original bonds for exchange bonds and to:
i.file the exchange offer registration statement with the SEC no later than 220180 days after the issue date of the original bonds;
ii.use commercially reasonable efforts to cause the exchange offer registration statement to become effective under the Securities Act within 310270 days after the issue date of the original bonds; and
iii.complete the exchange offer no later than 60 business days after commencing the exchange offer.
If we do not meet the timing obligations in the preceding sentence, or if we fail to meet certain other conditions described in the registration rights agreement, each, a “registration default,” from and including the date on which a registration default occurs, the interest rate borne by the original bonds will increase at a rate of 0.25% per annum for the first 90-days90-day period immediately following the occurrence of suchthe registration default period and at a rate of 0.50% per annum for remainderthe remaining portion of the registration default period to, but excluding,default. Immediately upon the date on whichcure of all registration defaults, have been cured.the accrual of the additional interest will cease and the interest rate on the original bonds will revert to the original rate.
Under some circumstances set forth in the registration rights agreement, holders of the original bonds, including holders who are not permitted to participate in the exchange offer, may require us to file, and cause to become effective, a shelf registration statement covering resales of the original bonds by these holders.
We are making the exchange offer in reliance on the position of the SEC as described in previous no-action letters issued to third parties, including in Exxon Capital Holdings Corporation (April 13, 1988), Morgan Stanley & Co., Inc. (June 5, 1991), Shearman & Sterling (July 2, 1993) and similar no-action letters. However, we have not sought our own no-action letter. Based upon these interpretations by the SEC, we believe that a holder who exchanges original bonds for exchange bonds in the exchange offer generally may offer the exchange bonds for resale, sell the exchange bonds and otherwise transfer the exchange bonds without further registration under the Securities Act and without delivery of a prospectus that satisfies the requirements of Section 10 of the Securities Act. The preceding sentence does not apply, however, to a holder who is our “affiliate” within the meaning of Rule 405 of the Securities Act. We also believe that a holder may offer, sell or transfer the exchange bonds only if the holder acknowledges that the holder is acquiring the exchange bonds in the ordinary course of its business and is not participating, does not intend to participate and has no arrangement or understanding with any person to participate in a “distribution”, as defined in the Securities Act, of the exchange bonds. We have not entered into any arrangement or understanding with any person who will receive exchange bonds in the exchange offer to distribute such exchange bonds following completion of the exchange offer, and, to the best of our information and belief, we
98


are not aware of any person that will participate in the exchange offer with a view to distribute the exchange bonds. A holder who exchanges original bonds for exchange bonds in the exchange offer for the purpose of distributing such exchange bonds cannot rely on the interpretations of the staff of the SEC in the aforementioned no-action letters, must comply with the
95

Table of Contents
registration and prospectus delivery requirements of the Securities Act in connection with any secondary resale of the exchange bonds and must be identified as an underwriter in the prospectus.
Each broker-dealer that receives the exchange bonds for its own account in exchange for the original bonds, where the original bonds were acquired by it as a result of market-making activities or other trading activities, must acknowledge that it will deliver a prospectus that meets the requirements of the Securities Act in connection with any resale of the exchange bonds and that it has not entered into any agreement or understanding with us or any of our “affiliates”, as defined in Rule 405 under the Securities Act, to participate in a “distribution”, as defined under the Securities Act, of the exchange bonds. By so acknowledging and by delivering a prospectus, a broker-dealer will not be deemed to admit that it is an “underwriter” within the meaning of the Securities Act. See “PLAN OF DISTRIBUTION.”
This summary of certain provisions of the registration rights agreement does not purport to be complete, and is qualified in its entirety by reference to, all the provisions of the registration rights agreement, a copy of which is incorporated by reference as an exhibit to the registration statement of which this prospectus forms a part.
NEITHER WE NOR THE EXCHANGE AGENT MAKE ANY RECOMMENDATION TO YOU AS TO WHETHER YOU SHOULD TENDER OR REFRAIN FROM TENDERING ALL OR ANY PORTION OF YOUR ORIGINAL BONDS INTO THIS EXCHANGE OFFER. IN ADDITION, NO ONE HAS BEEN AUTHORIZED TO MAKE THIS RECOMMENDATION. YOU MUST MAKE YOUR OWN DECISION WHETHER TO TENDER INTO THIS EXCHANGE OFFER AND, IF SO, THE AGGREGATE AMOUNT OF ORIGINAL BONDS TO TENDER AFTER READING THIS PROSPECTUS AND THE ACCOMPANYING LETTER OF TRANSMITTAL AND CONSULTING WITH YOUR ADVISORS, IF ANY, BASED ON YOUR FINANCIAL POSITION AND REQUIREMENTS.
Terms of the Exchange Offer
We are offering holders of the original bonds the opportunity to exchange their original bonds for exchange bonds subject to the terms and conditions set forth in this prospectus and in the accompanying letter of transmittal. Subject to the terms and the satisfaction or waiver of the conditions detailed in this prospectus, we will accept for exchange all original bonds properly tendered on or prior to 5:00 p.m., New York City time, on               , 2021,2024, which we refer to as the expiration date, and not validly withdrawn as permitted below. However, we may extend, in our sole discretion, the period of time during which the exchange offer is open. If extended, the term expiration date shall mean the latest time and date to which the exchange offer is extended.
The terms of the exchange bonds will be substantially identical to the terms of the original bonds, except the exchange bonds will be registered under the Securities Act, will not bear legends restricting their transfer and will not contain terms with respect to additional interest upon our failure to fulfill our obligations under the registration rights agreement. The exchange bonds will evidence the same debt as the original bonds. The exchange bonds will be issued under and secured by the same indenture under which the original bonds were issued. For a description of the indenture, see “SUMMARY OF THE FIRST MORTGAGE INDENTURE.”
As of the date of this prospectus, $450,000,000$400,000,000 aggregate principal amount of the 3.75%6.20% First Mortgage Bonds, Series 2020A2023A due 20502053 are outstanding. This prospectus and the accompanying letter of transmittal are being sent to all registered holders of original bonds. There will be no fixed record date for determining registered holders of original bonds entitled to participate in the exchange offer. We intend to conduct the exchange offer in accordance with the provisions of the registration rights agreement, the applicable requirements of the Securities Act and the Exchange Act and the rules and regulations of the SEC.
The exchange offer is not conditioned upon any minimum aggregate principal amount of original bonds being tendered for exchange. Any original bonds not tendered will remain outstanding and continue to accrue interest and will be entitled to the rights and benefits such holders have under the first mortgage indenture except we will not have any further obligation under the registration rights agreement, except as otherwise specified therein.
99


Original bonds may only be tendered in minimum denominations of $2,000 and integral multiples of $1,000 in excess thereof. We will issue exchange bonds in principal amounts identical to original bonds surrendered in the exchange offer.
96

Table of Contents
We expressly reserve the right, at any time prior to the expiration of the exchange offer, to extend the period of time during which the exchange offer is open and delay acceptance for exchange of any exchange bonds, by giving oral or written notice of such extension to holders thereof as described below. Any extension notice will disclose the approximate number of original bonds tendered by holders as of the date of the extension notice. During any such extension, all the original bonds previously tendered will remain subject to the exchange offer and may be accepted for exchange by us. Any original bonds not accepted for exchange for any reason will be returned without expense to an account maintained with DTC promptly upon expiration or termination of the exchange offer.
Subject to the terms of the registration rights agreement, we expressly reserve the right to amend or terminate the exchange offer, and not to accept for exchange any original bonds, upon the occurrence of any of the conditions of the exchange offer specified under “—Conditions to the Exchange Offer.” We will give oral or written notice of any extension, amendment, non-acceptance or termination to the holders of the original bonds as promptly as practicable. Such notice, in the case of any extension, will be issued by means of a press release or other public announcement no later than 9:00 AM, New York City time, on the next business day after the previously scheduled expiration date.
Procedures for Tendering Original Bonds
Your tender to us of original bonds as set forth below and our acceptance of the original bonds will constitute a binding agreement between us and you upon the terms and subject to the conditions set forth in this prospectus and the accompanying letter of transmittal. Except as set forth below, to tender original bonds for exchange pursuant to the exchange offer, you must transmit a properly completed and duly executed letter of transmittal, including all other documents required by the letter of transmittal or, in the case of a book-entry transfer, an agent’s message in lieu of the letter of transmittal, to U.S. Bank Trust Company, National Association, as exchange agent, at the address set forth below under “—Exchange Agent” on or prior to the expiration date. In addition, either:
certificates for such original bonds must be received by the exchange agent along with the letter of transmittal; or
a timely confirmation of a book-entry transfer of such original bonds, if such procedure is available, into the exchange agent’s account at DTC pursuant to the procedure for book-entry transfer must be received by the exchange agent, prior to the expiration date, with the letter of transmittal or an agent’s message in lieu of such letter of transmittal, or
you must comply with the guaranteed delivery procedures described below.
The term “agent’s message” means a message, transmitted by DTC to and received by the exchange agent and forming a part of a book-entry transfer, which states that DTC has received an express acknowledgment from the tendering participant stating that such participant has received and agrees to be bound by the letter of transmittal, or, in the case of an agent’s message relating to guaranteed delivery, that such participant has received and agrees to be bound by the notice of guaranteed delivery.
The method of delivery of original bonds, letters of transmittal and all other required documents is at your election and risk. Delivery of such documents will be deemed made only when actually received by the exchange agent. If such delivery is by mail, it is recommended that you use registered mail, properly insured, with return receipt requested. In all cases, you should allow sufficient time to assure timely delivery. No letter of transmittal or original bonds should be sent to us.
100


Signatures on a letter of transmittal or a notice of withdrawal, as the case may be, must be guaranteed unless the original bonds surrendered for exchange are tendered:
by a holder of the original bonds who has not completed the box entitled “Special Issuance Instructions” or “Special Delivery Instructions” on the letter of transmittal; or
for the account of an eligible institution (as defined below).
In the event that signatures on a letter of transmittal or a notice of withdrawal are required to be guaranteed, such guarantees must be by a firm which is a member of the Securities Transfer Agent Medallion Program, the Stock Exchanges Medallion Program or the New York Stock Exchange Medallion Program (each such entity being hereinafter referred to as an “eligible institution”). If original bonds are registered in the name of a person other than the signer of the letter of transmittal,
97

Table of Contents
the original bonds surrendered for exchange must be endorsed by, or be accompanied by a written instrument or instruments of transfer or exchange, in satisfactory form as we or the exchange agent determine in our discretion, duly executed by the registered holders with the signature thereon guaranteed by an eligible institution.
If the letter of transmittal is signed by a person or persons other than the registered holder or holders of original bonds, such original bonds must be endorsed or accompanied by powers of attorney signed exactly as the name(s) of the registered holder(s) that appear on the original bonds.
If the letter of transmittal or any original bonds or powers of attorney are signed by trustees, executors, administrators, guardians, attorneys-in-fact, officers of corporations or others acting in a fiduciary or representative capacity, such persons should so indicate when signing. Unless waived by us or the exchange agent, proper evidence satisfactory to us of their authority to so act must be submitted with the letter of transmittal.
If you are a beneficial owner whose original bonds are registered in the name of a broker, dealer, commercial bank, trust company or other nominee and wish to tender your original bonds, you should promptly instruct the registered holder to tender such original bonds on your behalf. Any registered holder that is a participant in DTC’s book-entry transfer facility system may make book-entry delivery of the original bonds by causing DTC to transfer the original bonds into the exchange agent’s account.
If you wish to tender your original bonds in the exchange offer on your own behalf, prior to completing and executing the letter of transmittal and delivering your original bonds, you must either make appropriate arrangements to register ownership of the original bonds in your name with DTC or obtain a properly completed bond power from the person in whose name the original bonds are registered.
We or the exchange agent, in our discretion, will make a final and binding determination on all questions as to the validity, form, eligibility (including time of receipt) and acceptance of the original bonds tendered for exchange. We reserve the right to reject any and all tenders not validly tendered or to not accept any tender which acceptance might, in our judgment or our counsel’s, be unlawful. We also reserve the right to waive any defects or irregularities or conditions of the exchange offer as to any individual tender before the expiration date (including the right to waive the ineligibility of any holder who seeks to tender the original bonds in the exchange offer). Our or the exchange agent’s interpretation of the terms and conditions of the exchange offer (including the letter of transmittal and the instructions thereto) as to any particular tender either before or after the expiration date will be final and binding on all parties. Unless waived, any defects or irregularities in connection with tenders of the original bonds for exchange must be cured within a reasonable period of time, as we determine. We are not nor is the exchange agent or any other person under any duty to notify you of any defect or irregularity with respect to your tender of the original bonds for exchange, and no one will be liable for failing to provide such notification.
By tendering the original bonds, you represent to us that:
i.any exchange bonds you receive will be acquired in the ordinary course of your business;
ii.you are not participating and have no arrangement or understanding with any person to participate in the distribution (within the meaning of the Securities Act) of the exchange bonds;
101


iii.you are not our “affiliate” (within the meaning of Rule 405 under the Securities Act); and
iv.if you are a broker-dealer that will receive exchange bonds for your own account in exchange for original bonds that were acquired as a result of market-making or other trading activities, then you will deliver a prospectus (or, to the extent permitted by law, make available a prospectus to purchasers) in connection with any resale of such exchange bonds.
For further information regarding resales of the exchange bonds by participating broker-dealers, see “Plan of Distribution.“PLAN OF DISTRIBUTION.
If any holder or other person is an “affiliate” of ours (within the meaning of Rule 405 under the Securities Act), or is participating or has an arrangement or understanding with any person to participate in the distribution (within the meaning of the Securities Act) of the exchange bonds, that holder or other person cannot rely on the applicable interpretations of the staff
98

Table of Contents
of the SEC, may not tender its original bonds in the exchange offer and must comply with the registration and prospectus delivery requirements of the Securities Act in connection with any resale transaction.
Each broker-dealer that receives the exchange bonds for its own account in exchange for the original bonds, where the original bonds were acquired by it as a result of market-making activities or other trading activities, must acknowledge that it will deliver a prospectus that meets the requirements of the Securities Act in connection with any resale of the exchange bonds. By so acknowledging and by delivering a prospectus, a broker-dealer will not be deemed to admit that it is an “underwriter” within the meaning of the Securities Act (other than in connection with a resale of an unsold allotment from the original sale of the original bonds).
Furthermore, any broker-dealer that acquired any of its original bonds directly from us:
may not rely on the applicable interpretation of the SEC staff’s position contained in its Exxon Capital Holdings Corp. (April 13, 1988), Morgan, Stanley & Co. Inc.Inc. (June 5, 1991) and Shearman & Sterling (July 2, 1993) no-action letters; and
must also be named as a selling noteholder in connection with the registration and prospectus delivery requirements of the Securities Act relating to any resale transaction.
By delivering a letter of transmittal or an agent’s message, a holder or a beneficial owner (whose original bonds are registered in the name of a broker, dealer, commercial bank, trust company or other nominee) will have or will be deemed to have irrevocably appointed the exchange agent as its agent and attorney-in-fact (with full knowledge that the exchange agent is also acting as an agent for us in connection with the exchange offer) with respect to the original bonds, with full power of substitution (such power of attorney being deemed to be an irrevocable power coupled with an interest subject only to the right of withdrawal described in this prospectus), to receive for our account all benefits and otherwise exercise all rights of beneficial ownership of such original bonds, in accordance with the terms and conditions of the exchange offer.
Each holder or beneficial owner will also have or be deemed to have represented and warranted to us that it has authority to tender, exchange, sell, assign and transfer the original bonds it tenders and that, when the same are accepted for exchange, we will acquire good, marketable and unencumbered title to such original bonds, free and clear of all liens, restrictions, charges and encumbrances, and that the original bonds tendered are not subject to any proxies or adverse claims.
Guaranteed Delivery Procedures
If you wish to tender your original bonds but your original bonds are not immediately available or you cannot deliver your original bonds, the letter of transmittal or any other required documents to the exchange agent or comply with the procedures under DTC’s automatic tender offer program in the case of original bonds, prior to the expiration date, you may still tender if:
the tender is made through an eligible guarantor institution;
102


prior to the expiration date, the exchange agent receives from such eligible guarantor institution, either a properly completed and duly executed notice of guaranteed delivery, by facsimile transmission, mail, or hand delivery or a properly transmitted agent’s message and notice of guaranteed delivery, that (1) sets forth your name and address, the certificate number(s) of such original bonds and the principal amount of original bonds tendered; (2) states that the tender is being made thereby; and (3) guarantees that, within three New York Stock Exchange trading days after the expiration date, the letter of transmittal, or facsimile thereof, together with the original bonds or a book-entry confirmation, and any other documents required by the letter of transmittal, will be deposited by the eligible guarantor institution with the exchange agent; and
the exchange agent receives the properly completed and executed letter of transmittal or facsimile thereof, with any required signature guarantees, as well as certificate(s) representing all tendered original bonds in proper form for transfer or a book-entry confirmation of transfer of the original bonds into the exchange agent’s account at DTC and all other documents required by the letter of transmittal within three New York Stock Exchange trading days after the expiration date.
99

Table of Contents
Upon request, the exchange agent will send to you a notice of guaranteed delivery if you wish to tender your original bonds according to the guaranteed delivery procedures.
Acceptance of Original Bonds for Exchange; Delivery of Exchange Bonds
Upon satisfaction or waiver of all of the conditions to the exchange offer, we will accept, promptly upon the expiration date, all the original bonds properly tendered and not validly withdrawn and will issue the exchange bonds promptly after acceptance of the original bonds. See “—Conditions to the Exchange Offer.”
For purposes of the exchange offer, we will be deemed to have accepted validly tendered original bonds for exchange if and when we give written notice to the exchange agent. The exchange agent will act as agent for the tendering holders for the purposes of receiving the exchange bonds from us and delivering exchange bonds to holders.
The holder of each original bond accepted for exchange will receive an exchange bond in an amount equal to the principal amount of the surrendered original bond. Holders of the exchange bonds on the record date for the first interest payment date following the consummation of the exchange offer will receive interest accruing from the most recent date to which interest has been paid on the original bonds. Holders of the exchange bonds will not receive any payment in respect of accrued interest on the original bonds otherwise payable on any interest payment date, the record date for which occurs on or after the consummation of the exchange offer. Interest on the original bonds accepted for exchange will cease to accrue upon the issuance of the exchange bonds.
In all cases, issuance of the exchange bonds for original bonds that are accepted for exchange will be made only after timely receipt by the exchange agent of an agent’s message and a timely confirmation of book-entry transfer of the original bonds into the exchange agent’s account at DTC. If a tender is made pursuant to a letter of transmittal, a holder must complete, sign and date the letter of transmittal, or a facsimile thereof; have the signatures guaranteed if required by the letter of transmittal; and mail or otherwise deliver the signed letter of transmittal or the signed facsimile, the original bonds and any other required documents to the exchange agent prior to 5:00 p.m., New York City time, on the expiration date.
If any tendered original bonds are not accepted for any reason set forth in the terms and conditions of the exchange offer, such unaccepted original bonds will be returned without expense to the holder or, in the case of original bonds tendered by book-entry transfer into the exchange agent’s account at DTC pursuant to the book-entry procedures described below, an account maintained by the holder or on the holder’s behalf with DTC promptly upon the expiration or termination of the exchange offer.
Book-Entry Transfers
Promptly after the date of this prospectus, the exchange agent will make a request to establish an account for the original bonds at DTC for purposes of the exchange offer. Any financial institution that is a participant in DTC’s
103


systems may make book-entry delivery of the original bonds by causing DTC to transfer those original bonds into the exchange agent’s account at DTC in accordance with DTC’s transfer procedures. This participant should transmit its acceptance to DTC on or prior to the expiration date. DTC will verify this acceptance, execute a book-entry transfer of the tendered original bonds into the exchange agent’s account at DTC and then send to the exchange agent confirmation of this book-entry transfer. A tender of original bonds through a book-entry transfer into the exchange agent’s account will only be effective if an agent’s message or the letter of transmittal with any required signature guarantees and any other required documents are transmitted to and received or confirmed by the exchange agent at the address set forth under “—Exchange Agent” prior to 5:00 p.m., New York City time, on the expiration date. Delivery of documents to DTC in accordance with its procedures does not constitute delivery to the exchange agent.
Withdrawal Rights
You may withdraw your tender of original bonds at any time prior to 5:00 p.m., New York City time, on the expiration date. For a withdrawal to be effective, the exchange agent must receive either:
a valid withdrawal request through the DTC’s Automated Tender Offer Program system from the tendering DTC participant before the expiration date. Any such request for withdrawal must include the VOI number of the tender to be withdrawn and the name of the ultimate beneficial owner of the related original bonds in order that such original bonds may be withdrawn; or
100

Table of Contents
a written notice of withdrawal from a holder, delivered to one of the addresses set forth under “—Exchange Agent,” which includes a statement that such holder is withdrawing its original bonds and specifies (i) the name of the person having tendered the original bonds to be withdrawn; (ii) the original bonds to be withdrawn; and (iii) where certificates for the original bonds have been transmitted, the name in which such original bonds are registered, if different from that of the withdrawing holder. If certificates for original bonds have been delivered or otherwise identified to the exchange agent, then, prior to the release of such certificates, the withdrawing holder must also submit the serial numbers of the particular certificates to be withdrawn and a signed notice of withdrawal with signatures guaranteed by an eligible institution, unless such holder is an eligible institution.institution.
Properly withdrawn original bonds may be retendered at any time prior to the expiration of the exchange offer by following the procedures described under “—Procedures for Tendering Original Bonds.”
We will determine all questions as to the validity, form and eligibility (including time of receipt) of notices of withdrawal. Any original bonds so withdrawn will be deemed not to have been validly tendered for exchange.
Conditions to the Exchange Offer
Despite any other term of the exchange offer, we are not be required to accept for exchange, or to issue exchange bonds in exchange for, any original bonds and we may terminate or amend the exchange offer as provided in this prospectus prior to the expiration date if in our reasonable judgment:
the exchange offer or the making of any exchange by a holder violates any applicable law or interpretation of the staff of the SEC; or
any action or proceeding has been instituted or threatened in writing in any court or by or before any governmental agency with respect to the exchange offer that, in our judgment, would reasonably be expected to impair our ability to proceed with the exchange offer
there has occurred: (i) any limitation by a governmental agency or authority which may adversely affect our ability to complete the transactions contemplated by the exchange offer, (ii) a declaration of a banking moratorium or any suspension of payments in respect to banks in the United States or any limitation by any governmental agency or authority which adversely affects the extension of credit, or (iii) a commencement of a war, armed hostilities or other similar international calamity directly or indirectly involving the United States, or, in the case of any of the foregoing existing at the time of the commencement of the exchange
104


offer, a material acceleration or worsening thereof; which makes it inadvisable to proceed with the exchange offer.
We also expressly reserve the right to amend or terminate the exchange offer and to reject for exchange any original bonds not previously accepted for exchange, if we determine that any of the conditions of the exchange offer specified above have not been satisfied. We will give oral or written notice of any extension, amendment, non-acceptance or termination to the holders of the original bonds as promptly as practicable. In the case of any extension, such notice will be issued no later than 9:00 a.m., New York City time, on the next business day after the previously scheduled expiration date.
We reserve the right to waive any defects, irregularities or conditions to the exchange as to particular original bonds.
These conditions are for our benefit, and we may assert them regardless of the circumstances that may give rise to them or waive them in whole or in part at any or at various times prior to the expiration of the exchange offer in our reasonable discretion. If we fail at any time to exercise any of the foregoing rights, this failure will not constitute a waiver of such right. Each such right will be deemed an ongoing right that we may assert at any time or at various times prior to the expiration of the exchange offer.
In addition, we will not accept for exchange any original bonds tendered, and will not issue exchange bonds in exchange for any such original bonds, if at such time any stop order is threatened or in effect with respect to the registration statement of which this prospectus constitutes a part or the qualification of the first mortgage indenture under the Trust Indenture Act of 1939, as amended.
101

Table of Contents
Exchange Agent
We have appointed U.S. Bank Trust Company, National Association as the exchange agent for the exchange offer. U.S. Bank Trust Company also acts as trustee under the first mortgage indenture. You should direct all executed letters of transmittal and all questions and requests for assistance, requests for additional copies of this prospectus or of the letter of transmittal, or requests for notice of guaranteed delivery to the exchange agent addressed as follows:

By Registered or Certified Mail, Overnight Courier or Hand Delivery:
By Facsimile:
(Eligible Institutions Only)
U.S. Bank Trust Company, National Association
(651) 495-8158
Global Corporate Trust Services
Attention: Specialized Finance
111 Fillmore Avenue E
St. Paul, Minnesota 55107


By Facsimile: (Eligible Institutions Only)
(651) 495-8158
Attention: Specialized Finance

Confirm by Telephone or for Information:
(800) 934-6802


DELIVERY OF A LETTER OF TRANSMITTAL TO AN ADDRESS OTHER THAN AS SET FORTH ABOVE DOES NOT CONSTITUTE A VALID DELIVERY OF THE LETTER OF TRANSMITTAL.
Fees and Expenses
We will pay the exchange agent customary fees for its services, reimburse the exchange agent for its reasonable out-of-pocket expenses incurred in connection with the provision of these services and pay other registration and exchange offer expenses, including registration and filing fees, fees and expenses of compliance with federal securities and state blue sky securities laws, printing expenses, messenger and delivery services and telephone fees and disbursements to our counsel, application and filing fees and any fees and disbursements to our independent certified public accountants. No dealer manager has been retained in connection with this exchange offer and we will not make any payment to brokers, dealers or others soliciting acceptances of the exchange offer.
105


This solicitation is being made primarily by electronic means. Additional solicitation may be made by telephone, facsimile or in person by our and our affiliates’ officers and regular employees and by persons so engaged by the exchange agent.
Accounting Treatment
We will record the exchange bonds in our accounting records at the same carrying value as the original bonds which is the aggregate principal amount as reflected in our accounting records on the date of exchange. Accordingly, we will not recognize any gain or loss for accounting purposes upon the consummation of the exchange offer. The expenses of the exchange offer will be amortized over the term of the exchange bonds.
Transfer Taxes
You will not be obligated to pay any transfer tax in connection with the tender of the original bonds for the exchange bonds unless you instruct us to register exchange bonds in the name of, or request that original bonds not tendered or not accepted in the exchange offer be returned to, a person other than the registered tendering holder or unless a transfer tax is imposed for any reason other than the exchange of the original bonds in connection with the exchange offer. In those cases, the tendering holder will be responsible for the payment of any applicable transfer tax. If the tendering holder does not submit satisfactory evidence of payment of such taxes or exemption therefrom with the letter of transmittal, the amount of such transfer taxes will be billed to that tendering holder.
Consequences of Failure to Exchange
If you do not exchange your original bonds for exchange bonds under the exchange offer, your original bonds will remain subject to the restrictions on transfer of such original bonds:
102

Table of Contents
as set forth in the legend printed on the original bonds as a consequence of the issuance of the original bonds pursuant to the exemptions from, or in transactions not subject to, the registration requirements of the Securities Act and applicable state securities laws; and
as otherwise set forth in the offering memorandum distributed in connection with the private offering of the original bonds.
In general, you may not offer or sell your original bonds unless they are registered under the Securities Act or if the offer or sale is exempt from registration under the Securities Act and applicable state securities laws. Except as required by the registration rights agreement, we do not intend to register resales of the original bonds under the Securities Act.

103106

DESCRIPTION OF THE EXCHANGE BONDS

General Description of the Exchange Bonds
The terms of the exchange bonds to be issued in the exchange offer are substantially identical to the original bonds, except that the exchange bonds will be registered under the Securities Act, and will not have transfer restrictions, registration rights or additional interest provisions. The exchange bonds will mature on AugustDecember 1, 2050.2053. We will pay interest on the exchange bonds at the annual rate of 3.75%6.20% (on the basis of a 360-day year of twelve 30-day months). Interest on the exchange bonds will accrue from the last date on which interest was paid on the original bonds, and is payable semi-annually on AprilJune 1 and OctoberDecember 1 of each year. On each interest payment date, we will pay interest to the person in whose name the exchange bonds are registered at 5:00 P.M. New York City time on the regular record date for that interest payment, which is the 15th day (whether or not a business day) of the calendar month immediately preceding such interest payment date. If interest on the exchange bonds is not punctually paid or duly provided for, instead of paying such interest to the registered holders as of the regular record date, we will propose a new payment date and such interest will be paid to the registered holders of the exchange bonds as of a special record date, which will be no more than 15 days and no less than 10 days prior to the proposed payment date. If any interest payment date, redemption date or the maturity date of the exchange bonds falls on a day that is not a business day, the payment due on that interest payment date, redemption date or the maturity date will be made on the next business day, and without any interest or other payment in respect of such delay. Principal of, and premium (if any) and interest on, the exchange bonds will be payable, and the transfer of interests in the exchange bonds will be effected, through the facilities of DTC, as described under “– Book-Entry.” The exchange bonds will be issued in minimum denominations of $2,000 and integral multiples of $1,000 in excess thereof.
The exchange bonds will be registered in the name of Cede & Co., as nominee of DTC, pursuant to DTC’s book-entry system. Purchases of beneficial interests in the exchange bonds will be made in book-entry form, without certificates. If at any time the book-entry system is discontinued for the exchange bonds, the exchange bonds will be exchangeable for other fully registered certificated exchange bonds of like tenor and of an equal aggregate principal amount, in authorized denominations. See “– Book-Entry.” The trustee may impose a charge sufficient to reimburse us or the trustee for any tax, fee or other governmental charge required to be paid with respect to such exchange or any transfer of an exchange bond. The cost to us or the trustee, if any, of preparing each new exchange bond issued upon such exchange or transfer, and any other expenses incurred by us or the trustee in connection therewith, will be paid by the person requesting such exchange or transfer.
The exchange bonds will be issued pursuant to the same indenture as the original bonds. The exchange bonds will be secured by a first mortgage lien on substantially all our owned tangible and certain of our intangible property equally and ratably with all our other obligations issued under the first mortgage indenture, subject to certain exceptions and exclusions as described or referred to herein. See “SUMMARY OF THE FIRST MORTGAGE INDENTURE—Security for Payment.”
Interest on the exchange bonds will be payable by check mailed to the registered owners thereof. However, interest on the exchange bonds will be paid to any holder of $1,000,000 or more in aggregate principal amount of exchange bonds by wire transfer to a wire transfer address within the continental United States upon the written request of such holder received by the trustee not less than five days prior to the record date for the particular interest payment. As long as the exchange bonds are registered in the name of Cede & Co., as nominee of DTC, such payments will be made directly to DTC. See “– Book-Entry.”
Redemption Provisions
At any time or from time to time before FebruaryJune 1, 20502053 (the date six months prior to the maturity date of the exchange bonds), we may redeem the exchange bonds, in whole or in part at a “make-whole” redemption price equal to the greater of:
100% of the principal amount of the exchange bonds being redeemed; and
the sum of the present values of the remaining principal and interest payments on the exchange bonds being redeemed that would be due if such exchange bonds matured on FebruaryJune 1, 20502053 (excluding interest accrued
107


and unpaid through the redemption date), discounted on a semi-annual basis (on the basis of a 360-day year of twelve 30-day months) at a rate equal to the sum of (i) the yield to maturity, determined on the third business day prior to the redemption date, of the U.S. Treasury security having a life equal to the remaining average life of the maturity of
104

Table of Contents
exchange bonds being redeemed (assuming for this purpose that the exchange bonds matured on FebruaryJune 1, 2050)2053) and trading in the secondary market at the price closest to par, and (ii) 4035 basis points,
plus in each case accrued and unpaid interest through the redemption date.
If there is no U.S. Treasury security having a life equal to the remaining average life of the exchange bonds being redeemed, the discount rate will be calculated using a yield to maturity determined on a straight-line basis (rounding to the nearest calendar month, if necessary) from the average yield to maturity, determined on the third business day prior to the redemption date, of two U.S. Treasury securities having lives most closely corresponding to the remaining average life of the exchange bonds being redeemed and trading in the secondary market at the price closest to par.
At any time or from time to time on or after FebruaryJune 1, 2050,2053, we may redeem the exchange bonds, in whole or in part at a redemption price equal to 100% of the principal amount of the exchange bonds being redeemed, plus accrued and unpaid interest thereon to, but excluding, the redemption date.
We must give at least 30 days’, but not more than 60 days’, prior notice of redemption mailed to the registered address of each holder of exchange bonds being redeemed except as otherwise required by the procedures of DTC. If less than all of the outstanding exchange bonds are to be redeemed, the exchange bonds to be redeemed will be selected by the trustee in any method it deems fair and appropriate, and the portion of the exchange bonds not so redeemed will be in a minimum denomination of $2,000 and integral multiples of $1,000 in excess thereof.
If at the time of mailing of notice for the optional redemption we have not deposited with the trustee moneys sufficient to redeem all of the exchange bonds called for redemption, the notice of optional redemption given by the trustee will so state and will further state that the redemption of the exchange bonds is conditional upon our providing, or causing to be provided, to the trustee, by 2:00 p.m. New York City time, on the redemption date, funds sufficient to effect the redemption, and the exchange bonds will not be redeemed unless such funds are deposited. The failure of the trustee to have sufficient funds to effect the redemption will not constitute a payment or other default by us under the first mortgage indenture and we will not be liable to any holder of those exchange bonds as a result of the failed redemption. If the trustee has enough designated funds on deposit to effect a redemption at the time we give notice of the redemption, then we are obligated to redeem the exchange bonds as provided in that notice.
Book-Entry
The certificates representing the exchange bonds will be issued in fully registered form, without interest coupons. The exchange bonds will be deposited with, or on behalf of, DTC, and registered in the name of Cede & Co., as DTC’s nominee in the form of one or more global certificates. Upon the issuance of the global certificates, DTC or its nominee will credit, on its internal system, the respective principal amount of the individual beneficial interests represented by such global certificates to the accounts of persons who have accounts with such depositary. Ownership of beneficial interests in a global certificate will be limited to persons who have accounts with DTC (participants) or persons who hold interests through participants. Ownership of beneficial interests in a global certificate will be shown on, and the transfer of that ownership will be effected only through, records maintained by DTC or its nominee (with respect to interests of participants) and the records of participants (with respect to interests of persons other than participants).
Investors that exchange original bonds for exchange bonds may also hold their interests directly through Clearstream Banking or Euroclear, if they are participants in such systems, or indirectly through organizations that are participants in such systems. Investors may also hold such interests through organizations other than Clearstream Banking or Euroclear that are participants in the DTC system. Clearstream Banking and Euroclear will hold interests in the global certificate representing exchange bonds on behalf of their participants through DTC.
108


So long as DTC, or its nominee, is the registered owner or holder of a global certificate, DTC or such nominee, as the case may be, will be considered the sole owner or holder of the exchange bonds represented by such global certificate for all purposes under the first mortgage indenture. No beneficial owner of an interest in a global certificate will be able to transfer the interest except in accordance with DTC’s applicable procedures, in addition to those provided for under the first mortgage indenture and, if applicable, those of Euroclear and Clearstream Banking.
Payments of the principal of and interest on a global certificate will be made to DTC or its nominee, as the case may be, as the registered owner of the global certificate. Neither us, the trustee nor any paying agent will have any responsibility or
105

Table of Contents
liability for any aspect of the records relating to or payments made on account of beneficial ownership interests in a global certificate or for maintaining, supervising or reviewing any records relating to such beneficial ownership interests. DTC or its nominee, upon receipt of any payment of principal or interest in respect of a global certificate, will credit participants’ accounts with payments in amounts proportionate to their respective beneficial interests in the principal amount of such global certificate as shown on the records of DTC or its nominee. We also expect that payments by participants to owners of beneficial interests in such global certificate held through such participants will be governed by standing instructions and customary practices, as is now the case with securities held for the accounts of customers registered in the names of nominees for such customers. Such payments will be the responsibility of such participants.
Transfers between participants in DTC will be effected in the ordinary way in accordance with DTC rules. If a holder requires physical delivery of a certificated exchange bond for any reason, including to sell exchange bonds to persons in jurisdictions which require such delivery of such exchange bonds or to pledge such exchange bonds, the holder must transfer its interest in a global certificate in accordance with DTC’s applicable procedures and the procedures set forth in the first mortgage indenture and, if applicable, those of Euroclear and Clearstream Banking. Because DTC can act only on behalf of participants in DTC, which in turn act on behalf of indirect participants, the ability of a person having beneficial interests in a global certificate to pledge such interests to persons that do not participate in the DTC system, or otherwise take actions in respect of such interests, may be affected by the lack of a physical certificate evidencing such interests.
DTC will take any action permitted to be taken by a holder of exchange bonds (including the presentation of exchange bonds for exchange as described below) only at the direction of one or more participants to whose account the DTC interests in a global certificate is credited and only in respect of such portion of the aggregate principal amount of the exchange bonds as to which such participant or participants has or have given such direction. However, if there is an event of default under the exchange bonds, DTC will exchange a global certificate for certificated exchange bonds, which it will distribute to its participants.
DTC is a limited purpose trust company organized under the laws of the State of New York, a “banking organization” within the meaning of New York Banking Law, a member of the Federal Reserve System, a “clearing corporation” within the meaning of the Uniform Commercial Code and a “Clearing Agency” registered pursuant to the provisions of Section 17A of the Exchange Act. DTC was created to hold securities for its participants and facilitate the clearance and settlement of securities transactions between participants through electronic book-entry changes in accounts of its participants, thereby eliminating the need for physical movement of certificates. Participants include securities brokers and dealers, banks, trust companies and clearing corporations and may include certain other organizations. Indirect access to the DTC system is available to others such as banks, brokers, dealers and trust companies that clear through or maintain a custodial relationship with a participant, either directly or indirectly (indirect participants). The rules applicable to DTC and its participants are on file with the SEC.
Although DTC, Euroclear and Clearstream Banking are expected to follow the foregoing procedures in order to facilitate transfers of interests in the exchange bonds represented by global certificates among their respective participants, they are under no obligation to perform or continue to perform such procedures, and such procedures may be discontinued at any time. Neither we nor the trustee will have any responsibility for the performance by DTC, Euroclear or Clearstream Banking or their respective participants or indirect participants of their respective obligations under the rules and procedures governing their operations.
109


If DTC is at any time unwilling or unable to continue as a depositary for a global certificate and a successor depositary is not appointed, we will issue certificated exchange bonds in exchange for a global certificate.
We will make all payments of principal and interest in immediately available funds.
The information in this subsection concerning DTC and DTC’s book-entry system has been obtained from sources that we believe to be reliable, but we do not take any responsibility for the accuracy of this information.

106110

SUMMARY OF THE FIRST MORTGAGE INDENTURE

The exchange bonds will be secured under the first mortgage indenture on a parity basis with other obligations issued or to be issued under the first mortgage indenture. The following is a summary of selected provisions of the first mortgage indenture and is qualified in its entirety by reference to all of the provisions of the first mortgage indenture. The first mortgage indenture contains the full text of the provisions summarized in this section. You should read the first mortgage indenture, which is filed as an exhibit to the registration statement of which this prospectus forms a part and is also available for inspection at our principal office and the principal office of the trustee. Capitalized terms used in this section but not otherwise defined in this prospectus have the meaning set forth in the first mortgage indenture.
Security for Payment
The exchange bonds will be secured equally and ratably under the first mortgage indenture by a lien on substantially all of our owned tangible and certain of our intangible property, including property we acquire in the future. The mortgaged property includes our owned electric generating plants, the wholesale power contracts with our members and some of our contracts relating to the ownership, operation or maintenance of electric generation facilities owned by us, but excluding all excepted property and excludable property described below.
The first mortgage indenture does not include in the mortgaged property the following excepted property, among other things:
cash on hand or in banks or in other financial institutions (excluding certain amounts deposited or required to be deposited with the trustee pursuant to the first mortgage indenture);
other contracts and related accounts and contract rights not specifically subject to the lien of the first mortgage indenture;
instruments and certain securities (other than those required to be deposited with the Trusteetrustee under the first mortgage indenture);
allowances for emissions or similar rights and credits;
patents and trademarks;
the right to bring an action or enforce a judgment;
vehicles, vessels and airplanes;
office furniture, equipment and supplies and data processing, accounting and other computer equipment, software and supplies;
leases for a term of less than five years;
timber, coal, ore, gas, oil and other minerals and all electric energy generated;
non-assignable permits, licenses, franchises, leases, contracts and contractual and other rights;
our interest in other property in which a security interest cannot legally be perfected; and
all nuclear fuel, coal, oil and natural gas located outside of the State of Georgia.
The first mortgage indenture also excludes from mortgaged property excludable property, which is property as to which we have delivered to the trustee prior to acquiring such property a certificate stating that such property is to be excluded from the lien of the first mortgage indenture and that we would remain capable of meeting the rate covenant described below even if we do not have use of such property.
107111

Our title to the mortgaged property and the lien of the first mortgage indenture are subject to permitted exceptions and encumbrances, which include, among other things, (i) identified exceptions and encumbrances existing in March 1997, as long as such matters do not materially impair the use of such property; (ii) non-delinquent or contested taxes; (iii) mechanics’, materialmen’s or contractors’ liens; (iv) local improvement district assessments; (v) leases for a term of not more than ten years or, if for a term of more than ten years, leases which would not materially impair our use of the leased property in the conduct of our business; (vi) specified easements; (vii) the undivided interests of other co-owners in our facilities and liens on our undivided interests in co-owned facilities, and rights of such owners in property owned jointly with us; (viii) the pledge of current assets to secure current liabilities; (ix) liens which have been bonded for or for the payment of which a deposit had been made in the full amount of such lien; and (x) other exceptions and encumbrances which we do not believe adversely affect in any material respect our right to use our property to secure the exchange bonds. The lien of the first mortgage indenture is also shared with the trustee under the first mortgage indenture to secure and allow the trustee to recover amounts that may be owed to the trustee under the first mortgage indenture.
All of our property acquired after the date of this prospectus, other than excepted property and excludable property discussed above, will become subject to the lien of the first mortgage indenture, but subject to:
permitted exceptions and specified purchase money and pre-existing liens;
limitations, in the case of any consolidation, merger or sale of substantially all of our assets; and
recordation of supplements to the first mortgage indenture describing that after-acquired property, in the case of real property.
Release and Substitution of Mortgaged Property
So long as no event of default exists under the first mortgage indenture, we will be able to sell, exchange or otherwise dispose of any part of the mortgaged property to facilitate our day-to-day operations. We may also release mortgaged property from the lien of the first mortgage indenture other than in connection with a sale, exchange or other disposition. In order to obtain a release of the mortgaged property from the trustee, we must find that the release will not impair the security under the first mortgage indenture and that the release is:
(a)desirable in the conduct of our business and the property to be released is no longer necessary in the conduct of our business; or
(b)made in lieu and reasonable anticipation of the taking of the property by eminent domain or the exercise by a governmental entity of a right to purchase or order the sale of the property.
Some of these releases also require the substitution of bondable additions, as defined in the first mortgage indenture, the deposit of cash with the trustee (which would constitute trust moneys as described below), the retirement or defeasance of first mortgage indenture obligations, or the deposit of designated qualifying securities with the trustee, in each case of equal value to the fair value of the mortgaged property to be released. Trust moneys can be withdrawn against bondable additions, retired or defeased first mortgage indenture obligations, or deposited designated qualifying securities, in each case of equal value, and can, at our option, be used for the redemption of first mortgage indenture obligations prior to their maturity, for the payment of principal on first mortgage indenture obligations at their maturity or for the purchase of first mortgage indenture obligations. To the extent that any trust moneys consist of the proceeds of insurance upon any part of the mortgaged property, those trust moneys can be withdrawn to reimburse us for costs to repair, rebuild or replace the destroyed or damaged property.
Trust moneys is all money received by the trustee:
(a)upon the release of property from the lien of the first mortgage indenture, including all moneys received in respect of the principal of all purchase money obligations deposited with the trustee in respect of its release of property;
(b)as compensation for, or proceeds of sale of, any part of the mortgaged property that has been taken by eminent domain or purchased by, or sold pursuant to an order of, a governmental authority;
108112

(c)as proceeds of insurance upon any part of the mortgaged property required to be paid to the trustee under the first mortgage indenture;
(d)as principal paid on designated qualifying securities in excess of the principal then due on the first mortgage indenture obligations issued on the basis of the designated qualifying securities; or
(e)for application as trust moneys under the first mortgage indenture or whose disposition was not otherwise specifically provided for in the first mortgage indenture.
Additional Obligations
The aggregate principal amount of obligations that may be issued under the first mortgage indenture is not limited. Additional first mortgage indenture obligations, ranking equally and ratably with the existing first mortgage indenture obligations, may be issued from time to time:
(a)against:
i.(i)90.91% of the amount of bondable additions,
ii.(ii)the aggregate principal amount of retired or defeased first mortgage indenture obligations,
iii.(iii)the aggregate principal amount of designated qualifying securities deposited with the trustee,
iv.(iv)the amount of cash deposited with the trustee, and
v.(v)80% of the amount of certified progress payments (discussed below); and
(b)to evidence any reimbursement obligations that we have to Credit Enhancers (as defined herein), the Rural Utilities Service or the Department of Energy as a result of Credit Enhancement that we have obtained in connection with or guarantees of other first mortgage indenture obligations.
The amount of bondable additions available for the issuance of additional first mortgage indenture obligations is equal to (a) the existing balance of bondable additions, plus (b) the amount of property additions available to be certified to the trustee as bondable additions, less (c) the amount of retirements not yet counted in the calculation of bondable additions. Property additions are limited under the first mortgage indenture to certain of our property that is (a)(i) chargeable to our fixed plant accounts and for which evidence of our title thereto is provided, (b)(ii) subject to the lien of the first mortgage indenture, (c)(iii) acquired or constructed by us since March 1, 1997, and (d)(iv) not subject to pre-existing liens securing indebtedness prior to or on a parity with the lien of the first mortgage indenture. The amount of property additions available to be certified to the Trusteetrustee is calculated as the lesser of the cost or fair value to us of such property additions (fair value to be determined as of the time of acquisition). Retirements consist of property subject to the lien of the first mortgage indenture that has been retired or otherwise disposed of free from the lien of the first mortgage indenture. The amount of retirements is (a)(A) for retired property acquired by us after March 1, 1997, the lesser of the cost or fair value to us of such property (fair value to be determined as of the time of acquisition), and (b)(B) for retired property acquired by us on or before March 1, 1997, the net book value of such property as of March 1, 1997. However, to the extent we establish a regulatory asset with respect to any bondable property and certain other conditions are met, we may defer the retirement of a portion of such bondable property until the end of the recovery period for such regulatory asset. Specifically, if our Board of Directors has approved the recovery in our rates of all or some portion of the value of property that would otherwise be considered retired under the first mortgage indenture in the form of a regulatory asset, such property would not be retired in an amount equal to the approved amount of the regulatory asset if (a) we obtain all required regulatory approvals for the regulatory asset accounting treatment, (b) we have in place power contracts with our members that have a term at least equal to the recovery period for the regulatory asset, and (c) we continue throughout the approved recovery period to meet the requirements of the rate covenant in the first mortgage indenture. We utilized this option in connection with the retirement of Plant Wansley in 2022 and expect to amortize the regulatory asset through 2040.
Designated qualifying securities are securities, including bonds or other debt instruments, held by the trustee and issued by one of our subsidiaries under an indenture, mortgage or other security instrument substantially
113


identical in substance to the provisions of our first mortgage indenture (subject to limited exceptions), which securities we have designated as (a) the basis for additional first mortgage indenture obligations, (b) the withdrawal of trust moneys, deposited cash or other specified
109

Table of Contents
assets held by the trustee, or (c) the release of mortgaged property. The aggregate amount of designated qualifying securities that can be deposited with the trustee at any one time cannot exceed 20% of the aggregate principal amount of first mortgage indenture obligations then outstanding.
We may also use certified progress payments (as defined below) as the basis for the issuance of additional first mortgage indenture obligations in order to finance the construction of generation and related facilities. Certified progress payments are payments we make pursuant to a qualified EPC contract (as defined below), which payments we are certifying as the basis for the issuance of additional first mortgage indenture obligations. These are amounts that we would assign to our fixed plant accounts and that will constitute property additions upon the performance of the qualified EPC contract. A qualified EPC contract is defined as any contract providing for the engineering, procurement or construction of generation or related facilities (including electric transmission and fuel supply facilities) that we intend to own upon performance of the qualified EPC contract, and the payments for which are used as the basis for the issuance of additional first mortgage indenture obligations. We can issue additional first mortgage indenture obligations up to 80% of the amount of the certified progress payments. The total amount of first mortgage indenture obligations outstanding at any time on the basis of certified progress payments may not exceed 40% of the total obligations then outstanding under the first mortgage indenture. Upon performance of the qualified EPC contract, we may convert the amounts outstanding under the first mortgage indenture obligations that were issued on the basis of certified progress payments, in an aggregate principal amount up to but not exceeding 90.91% of bondable additions acquired with the proceeds of certified progress payments and made the basis of such conversion, to amounts outstanding under first mortgage indenture obligations issued on the basis of bondable additions.
As of December 31, 2020,2023, the amount of certified bondable additions and retired or defeased first mortgage indenture obligations available for the issuance of additional first mortgage indenture obligations was approximately $2.0$3.1 billion. In addition, as of December 31, 2020,2023, we had over $662$780 million of property additions and certified progress payments under qualified EPC contracts that, once certified to the trustee in accordance with the first mortgage indenture, will be available for the issuance of additional first mortgage indenture obligations.
Before we may issue additional first mortgage indenture obligations on the basis of bondable additions, retirements or defeasance of first mortgage indenture obligations, the deposit of cash with the trustee, the deposit of designated qualifying securities with the trustee, or certified progress payments, we must certify that our margins for interest ratio (as defined below) was at least 1.10 during the immediately preceding fiscal year or during any consecutive 12-month period within the 18-month period immediately preceding our request for additional first mortgage indenture obligations.
Covenants
Rate Covenant
The first mortgage indenture requires us to establish and collect rates for the use or the sale of the output, capacity or service of our properties that produce money sufficient, together with other money available to us, to enable us to comply with all covenants under the first mortgage indenture. Subject to any necessary approval or determination of any regulatory or judicial authority with jurisdiction over our rates, the first mortgage indenture requires us to establish and collect rates for the use or the sale of the output, capacity or service of our properties which are reasonably expected, together with our other revenue, to yield a margins for interest ratio equal to at least 1.10 for each fiscal year. The “margins for interest ratio” is the ratio of margins for interest for any period to total interest charges for that period. Margins for interest means, for any period, the sum of each of the following for that period:
(a)our net margins (which includes our revenues subject to refund at a later date but excludes provisions for (i) non-recurring charges to income, including the non-recoverability of assets or expenses, except to the extent we determine to recover such charges in rates and (ii) refunds of revenues collected or accrued in any prior year subject to possible refund); plus
114


(b)interest charges (discussed below); plus
(c)any amount included in net margins for accruals for federal and state income and other taxes imposed on income after deduction of interest expense; plus
(d)any amount included in net margins for any losses incurred by any subsidiary or affiliate of ours; plus
110

Table of Contents
(e)any amount we actually receive during that period as a dividend or other distribution of earnings of any subsidiary or affiliate of ours; minus
(f)any amount included in net margins for any earnings or profits of any subsidiary or affiliate of ours; minus
(g)any amount we actually contribute to the capital of, or actually pay under a guarantee of an obligation of, any subsidiary or affiliate to the extent of any accumulated losses incurred by the subsidiary or affiliate, but only to the extent (i) the losses have not otherwise caused other contributions or payments to be included in net margins for purposes of computing margins for interest for a prior period and (ii) the amount has not otherwise been included in net margins.
Interest charges means, for any period, our total interest charges (whether capitalized or expensed, provided that the payment of such charge is secured under the first mortgage indenture or any lien ranking prior to or on a parity with the lien of the first mortgage indenture, other than permitted exceptions and encumbrances) for the period with respect to interest accruing on all outstanding first mortgage indenture obligations and on all debt secured by a lien equal to or prior to the lien of the first mortgage indenture, but excludes interest accruing in respect of some first mortgage indenture obligations that were issued on the basis of designated qualifying securities.
Promptly upon any material change in the circumstances which were contemplated at the time the rates were most recently reviewed, but at least once every 12 months, we are required to review our rates and, subject to any necessary regulatory approval, promptly establish or revise our rates as necessary to comply with the foregoing requirements. However, if (i) upon any such review of our rates based on a material change in circumstances, we determine that rates are required to be established or revised in order for us to comply with the rate covenant, and (ii) there are less than 6 months remaining in the current fiscal year, it will satisfy the rate covenant if we establish or revise our rates for the next fiscal year so as to reasonably expect to meet the rate covenant for such next fiscal year. A failure by us to actually achieve a 1.10 margins for interest ratio will not itself constitute an event of default under the first mortgage indenture. However, a failure to establish rates reasonably expected to achieve a 1.10 margins for interest ratio will be an event of default if the failure continues for 45 days after we receive notice thereof from the trustee or the holders of at least 10% in principal amount of the first mortgage indenture obligations, unless the failure results from our inability to obtain regulatory approval. For 2021,2024, our board of directors approved a budget to achieve a 1.14 margins for interest ratio, above the minimum 1.10 ratio required by the first mortgage indenture. As our capital requirements continue to evolve, our board of directors will continue to evaluate the level of margin coverage and may choose to change the targeted margins for interest ratio in the future, although not below 1.10.
Limitation on Distributions, Payments or Retirement of Patronage Capital
The first mortgage indenture prohibits us from making any distribution, payment or retirement of patronage capital to our members if, at the time thereof or after giving effect thereto:
(a)an event of default exists,
(b)our aggregate margins and equities as of the end of the most recent fiscal quarter would be less than 20% of our total long-term debt and equities at such time, or
(c)the aggregate amount expended for the distribution, payment or retirement on or after the date on which our aggregate margins and equities first reach 20% of our total long-term debt and equities would exceed 35% of our aggregate net margins earned after that date. The restrictions set forth in this clause (c) and in clause (b) above, however, would not apply if, after giving effect to the distribution, payment or retirement, our aggregate margins and equities as of the end of the most recent fiscal quarter would not be less than 30% of our total long-term debt and equities.
115


Limitation on Liens
The first mortgage indenture obligates us to keep all of the mortgaged property free and clear of other liens, subject to permitted exceptions and purchase money or pre-existing liens on our after-acquired property not in excess of 80% (or with respect to property that is not necessary to the operations of the remaining portion of our system, 100%) of the lesser of the
111

Table of Contents
cost or the fair value of the property and in the aggregate not in excess of 15% of the aggregate principal amount of all first mortgage indenture obligations.
Required Investment of Trust Moneys and Certain Cash
The first mortgage indenture requires us to invest or direct the trustee to invest at least 75% of each of (i) trust moneys and (ii) cash deposited under the first mortgage indenture, in:
(a)defeasance securities;
(b)securities issued by any agency or instrumentality of the United States of America or any corporation created pursuant to any act of the Congress of the United States;
(c)commercial paper rated in either of the two highest rating categories by a national credit rating agency;
(d)demand or time deposits, certificates of deposit and bankers’ acceptances issued or accepted by any bank or trust company having capital surplus and undivided profits aggregating at least $50 million and whose long-term debt is rated in any of the three highest rating categories by a national credit rating agency;
(e)any non-convertible debt securities rated in any of the three highest rating categories by a national credit rating agency;
(f)repurchase agreements that are secured by a perfected security interest in securities listed in clauses (a) or (b) above entered into with a government bond dealer recognized as a primary dealer by the Federal Reserve Bank of New York or any bank described in clause (d) above; or
(g)any short-term institutional investment fund or account which invests solely in any of the foregoing obligations.
Consolidation, Merger, Conveyance or Transfer
The first mortgage indenture provides that we will not consolidate with or merge into any other person or convey or transfer the mortgaged property as an entirety to any person, unless:
(a)the consolidation, merger, conveyance or transfer is on terms that fully preserve the lien and security of the first mortgage indenture as provided for in the first mortgage indenture and the rights and powers of the trustee and the holders of first mortgage indenture obligations;
(b)the successor is a person organized and validly existing under the laws of the United States of America, any State of the United States of America or the District of Columbia;
(c)the successor executes and delivers to the trustee a supplement to the first mortgage indenture in accordance with the requirements of the first mortgage indenture in which (i) the successor assumes the due and punctual payment of the principal of, and premium, if any, and interest on all the outstanding first mortgage indenture obligations and the performance and observance of every covenant and condition of the first mortgage indenture that we would otherwise have to perform or observe and (ii) there is a grant, conveyance, transfer and mortgage complying with the first mortgage indenture;
(d)immediately after giving effect to the transaction, no event of default under the first mortgage indenture will exist; and
(e)we deliver to the trustee an officers’ certificate and an opinion of counsel, each of which state that such consolidation, merger, conveyance or transfer and the related supplement to the first mortgage indenture
116


comply with the requirements of the first mortgage indenture and that all conditions precedent provided for in the first mortgage indenture relating to the transaction have been complied with.

112

Table of Contents
Credit Enhancement
The first mortgage indenture provides that first mortgage indenture obligations of any series may have the benefit of an insurance policy, letter of credit, financial guaranty insurance policy or other similar obligation to pay when due (to the extent not paid by us) the principal and interest on first mortgage indenture obligations or on another obligation the payment of which is secured by a first mortgage indenture obligation or credited against the principal and interest due on such first mortgage indenture obligation (each, a “Credit Enhancement”) issued by a credit enhancer (a “Credit Enhancer”). See “–Action by Credit Enhancer, the Rural Utilities Service or the Department of Energy.”
Events of Default and Remedies
Events of default under the first mortgage indenture consist of:
(a)failure to pay principal of or premium, if any, on any first mortgage indenture obligation when due unless otherwise provided with respect to such first mortgage indenture obligation (we have provided for grace periods with respect to the payment of principal for certain first mortgage indenture obligations); provided, however, that no payment by the Rural Utilities Service pursuant to any guarantee by the United States of America, or pursuant to any Rural Utilities Service insuring of, or, unless otherwise provided in the obligation, by any other guarantor or insurer of, any first mortgage indenture obligation will be considered a payment under this paragraph for purposes of determining the existence of such a failure to pay;
(b)failure to pay any interest on any first mortgage indenture obligation when due if the failure to pay is continued for 45 days unless otherwise provided with respect to such first mortgage indenture obligation (we have provided for shorter grace periods with respect to the payment of interest for certain first mortgage indenture obligations); provided, however, that no payment by the Rural Utilities Service pursuant to any guarantee by the United States of America, or pursuant to any Rural Utilities Service insuring of, or, unless otherwise provided in the obligation, by any other guarantor or insurer of, any first mortgage indenture obligation will be considered a payment under this paragraph for purposes of determining the existence of such a failure to pay;
(c)default in the performance, or breach, by us of any of our warranties or covenants contained in the first mortgage indenture if the breach is continued for 45 days after written notice thereof from the trustee or the holders of at least 10% in principal amount of the outstanding first mortgage indenture obligations;
(d)failure to pay when due (including any applicable grace period) any portion of principal (other than amounts due on acceleration) under any bond, debenture, note or other indebtedness for money borrowed (other than indebtedness secured by first mortgage indenture obligations), which failure has resulted in the acceleration of indebtedness in excess of $25 million, if such indebtedness is not discharged or such acceleration is not rescinded or annulled within 10 days after the failure or acceleration;
(e)a judgment against us in excess of $25 million which remains unsatisfied or unstayed for 45 days after either entry of judgment or termination of stay, and such judgment remains unstayed or unsatisfied for a period of 10 days after notice thereof from the trustee or the holders of at least 10% in principal amount of the outstanding first mortgage indenture obligations; or
(f)other proceedings in bankruptcy, receivership, insolvency, liquidation or reorganization.
Subject to the provisions of the first mortgage indenture relating to the duties of the trustee, if an event of default occurs and is continuing, the trustee will be under no obligation to exercise any of its rights or powers under the first mortgage indenture at the request or direction of any of the holders, unless those holders (other than the United States of America or its agencies or instrumentalities) have offered to the trustee reasonable indemnity. Subject to provisions for the indemnification of the trustee, the holders of a majority in aggregate principal amount
117


of the outstanding first mortgage indenture obligations will have the right to direct the time, method and place of conducting any proceeding for any remedy available to the trustee or exercising any trust or power conferred on the trustee, except that, so long as it is not in default with respect to its Credit Enhancement for any first mortgage indenture obligations, a Credit Enhancer for, and not the actual holders of, those first mortgage indenture obligations would be deemed to be the holder of those first mortgage indenture obligations for purposes of, among other things, taking action in connection with the remedies set forth in the first mortgage indenture.
113

Table of Contents
If an event of default occurs and is continuing, either the trustee or the holders of at least 25% in aggregate principal amount of the outstanding first mortgage indenture obligations may accelerate the maturity of all first mortgage indenture obligations. However, after the acceleration, but before a sale of any of the mortgaged property or a judgment or decree based on acceleration, the holders of a majority in aggregate principal amount of outstanding first mortgage indenture obligations may, under certain circumstances, rescind the acceleration if all events of default, other than the non-payment of accelerated principal, have been cured or waived as provided in the first mortgage indenture.
No holder of any first mortgage indenture obligation has any right to institute any proceeding with respect to the first mortgage indenture or for any remedy thereunder, unless:
(a)the holder has previously given to the trustee written notice of a continuing event of default;
(b)the holders of at least 25% in aggregate principal amount of the outstanding first mortgage indenture obligations have made written request to the trustee to institute the proceeding as trustee;
(c)the holders (other than the United States of America or its agencies or instrumentalities) have offered reasonable indemnity to the trustee against the costs to be incurred in compliance with the request;
(d)the trustee for 60 days after its receipt of such notice, request and indemnity has failed to institute the proceeding; and
(e)the trustee has not received from the holders of a majority in aggregate principal amount of the outstanding first mortgage indenture obligations a direction inconsistent with the request.
However, the limitations on the holders’ rights to institute proceedings do not apply to a suit instituted by a holder of a first mortgage indenture obligation for the enforcement of payment of the principal of and premium, if any, or interest on the first mortgage indenture obligation on or after the respective due dates stated therein.
The first mortgage indenture provides that the trustee, within 90 days after the occurrence of the event of default (but at least 60 days after the occurrence of some specified events of default), will give to the holders of first mortgage indenture obligations notice of all uncured defaults known to it, provided that, except that in the case of a default in the payment of principal of, and premium, if any, or interest on any first mortgage indenture obligations, the trustee will be protected in withholding that notice if it in good faith determines that the withholding of that notice is in the interest of the holders of the first mortgage indenture obligations.
If an event of default occurs and is continuing, the trustee may sell the mortgaged property, in either judicial or nonjudicial proceedings. The proceeds from the disposition of the mortgaged property will be applied as follows:
(a)first,, to the payment of all amounts due to the trustee;
(b)second,,
(i)if all first mortgage indenture obligations have become due and payable, to the payment of outstanding first mortgage indenture obligations without preference or priority between interest, principal and redemption price, including premium, if any, among first mortgage indenture obligations, or
(ii)if the principal of all first mortgage indenture obligations have not become due and payable, then (A) first to interest installments in the order of their maturity and (B) second to principal or redemption price;
118


(c)third, to the payment of penalties, costs and expenses associated with first mortgage indenture obligations;
(d)fourth, to payment of amounts to maintain the value of any reserve funds relating to tax exempt bonds; and
(e)fifth, to us or whoever may be lawfully entitled to receive any remaining amount.
114

Table of Contents
The first mortgage indenture requires us to deliver to the trustee, within 120 days after the end of each calendar year, a written statement as to our compliance (determined without regard to any grace period or notice requirement) with all of our obligations under the first mortgage indenture. In addition, we are required to deliver to the trustee, promptly after any of our officers may be reasonably deemed to have knowledge of a default under the first mortgage indenture, a written notice specifying the nature and duration of the default and the action we are taking and propose to take with respect to the default.
Amendments and Supplements to the First Mortgage Indenture
Waiver of Covenants
Our compliance with the covenants contained in the first mortgage indenture relating to (i) limitation on liens, (ii) payment of taxes, (iii) maintenance of properties, (iv) insurance, (v) delivery of annual compliance certificates and notices of default under the first mortgage indenture, (vi) establishing and reviewing certain rates, (vii) distributions to our members and (viii) investment of certain moneys, may be waived by a vote of the holders of a majority of the aggregate principal amount of the outstanding first mortgage indenture obligations.
Supplements to the First Mortgage Indenture without Consent of Holders
Without the consent of the holders of any first mortgage indenture obligations, we and the trustee may, from time to time, enter into one or more supplements to the first mortgage indenture:
(a)to correct or amplify the description of any property at any time subject to the lien of the first mortgage indenture;
(b)to confirm property subject or required to be subjected to the lien of the first mortgage indenture or to subject additional property to the lien of the first mortgage indenture;
(c)to add to the conditions, limitations and restrictions on the authorized amount, terms or purposes of the issue, authentication and delivery of first mortgage indenture obligations or of any series of first mortgage indenture obligations;
(d)to create any new series of first mortgage indenture obligations;
(e)to modify or eliminate any of the terms of the first mortgage indenture, provided in the event the modification or elimination would adversely affect or diminish the rights of any holder, the supplement to the first mortgage indenture must state that any such modification or elimination will become effective only when there are no first mortgage indenture obligations outstanding under any series created prior to the supplement to the first mortgage indenture and provided the trustee may decline to execute the supplement to the first mortgage indenture if, in the trustee’s opinion, it does not afford adequate protection to the trustee;
(f)to evidence the succession of another corporation to us and the assumption by any such successor of our covenants;
(g)to add to our covenants or events of default for the benefit of the holders of all or any series of first mortgage indenture obligations or to surrender any of our rights or powers;
(h)to evidence the succession of another trustee or the appointment of a co-trustee or separate trustee;
(i)to cure any ambiguity, to correct or supplement any provision in the first mortgage indenture which may be inconsistent with any other provision or to make any other provision, with respect to matters or questions
119


arising under the first mortgage indenture, which is not inconsistent with the provisions of the first mortgage indenture, provided such action shall not, in our opinion, adversely affect the interests of the holders of the first mortgage indenture obligations in any material respect;
115

Table of Contents
(j)to modify, eliminate or add to the provisions of the first mortgage indenture to the extent necessary to effect the qualification of the first mortgage indenture under the Trust Indenture Act of 1939 or under any similar federal statute hereafter enacted;
(k)to add or change any provision of the first mortgage indenture to the extent necessary to permit or facilitate the issuance of first mortgage indenture obligations in bearer or book-entry form; or
(l)to make any change in the first mortgage indenture that, in the reasonable judgment of the trustee, would not materially and adversely affect the rights of holders of first mortgage indenture obligations.
A supplement to the first mortgage indenture will be presumed not to materially and adversely affect the rights of holders for purposes of paragraph (l) above if (i) the first mortgage indenture, as supplemented and amended, secures equally and ratably the payment of principal of (and premium, if any) and interest on the first mortgage indenture obligations which are to remain outstanding and (ii) we furnish to the trustee written evidence from at least two nationally recognized statistical rating organizations then rating the first mortgage indenture obligations (or other obligations primarily secured by first mortgage indenture obligations) that their respective underlying ratings of the first mortgage indenture obligations (or other obligations primarily secured by first mortgage indenture obligations) will not be withdrawn or reduced as a result of the changes in the first mortgage indenture effected by the supplement to the first mortgage indenture, provided that any changes in the first mortgage indenture that require the consent of all of the holders of first mortgage indenture obligations affected thereby may not be made on the basis that they do not materially and adversely affect the rights of holders.
Supplements to the First Mortgage Indenture with Consent of Holders
With the consent of the holders of not less than a majority in principal amount of the first mortgage indenture obligations of all series then outstanding affected by the supplement to the first mortgage indenture, we and the trustee may, from time to time, enter into one or more supplements to the first mortgage indenture to add, change or eliminate any of the provisions of the first mortgage indenture or modify the rights of the holders of the first mortgage indenture obligations. However, no supplement to the first mortgage indenture will, without the consent of the holder of each outstanding first mortgage indenture obligation affected thereby:
(a)change the stated maturity (the date specified in each first mortgage indenture obligation as the date on which the principal of the first mortgage indenture obligation or an installment of interest on any first mortgage indenture obligation is due and payable) of any first mortgage indenture obligation;
(b)reduce the principal of, or any installment of interest on, any first mortgage indenture obligation, or any premium payable upon the redemption of the first mortgage indenture obligation;
(c)change any place of payment (the city or political subdivision thereof in which we are required by the first mortgage indenture to maintain an office or agency for payment of the principal of or interest on the first mortgage indenture obligations) where, or the currency in which, any first mortgage indenture obligation, or the interest thereon, is payable;
(d)impair the right to institute suits for the enforcement of any payment on or after the stated maturity thereof (or, in the case of redemption, on or after the redemption date);
(e)reduce the percentage in principal amount of the outstanding first mortgage indenture obligations, the consent of the holders of which is required for various purposes;
(f)permit the creation of any lien ranking prior to or on a parity with the lien of the first mortgage indenture with respect to any of the mortgaged property;
120


(g)modify the provisions of any mandatory sinking fund so as to affect the rights of a holder to the benefits of the mandatory sinking fund; or
(h)modify certain other provisions of the first mortgage indenture.

116

Table of Contents
Action by Credit Enhancer, the Rural Utilities Service or the Department of Energy
Under the first mortgage indenture, any Credit Enhancer that agrees to provide any undertaking to pay amounts due with respect to any first mortgage indenture obligations to the extent those amounts are not paid by us will be considered a holder of those first mortgage indenture obligations for the purpose of (i) giving any requisite approval or consent to supplements or amendments to the first mortgage indenture (other than those amendments which require the consent of the holders of each first mortgage indenture obligation affected thereby) and (ii) giving any other approval or consent, giving any notice, effecting any waiver or authorization, exercising any remedies or taking any other action that can be taken by the holder of those first mortgage indenture obligations. However, if the Credit Enhancer is in default with respect to the performance of its undertaking, it will not be considered a holder in place of the holders of those first mortgage indenture obligations.
With respect to first mortgage indenture obligations guaranteed or insured by the United States of America, acting by and through the Administrator of the Rural Utilities Service, the Rural Utilities Service, rather than the actual payee of the first mortgage indenture obligations, will have all of the rights of a holder of the first mortgage indenture obligations for the period in which those first mortgage indenture obligations are guaranteed or insured by the United States of America, acting by and through the Administrator of the Rural Utilities Service, regardless of whether the Rural Utilities Service actually possesses those first mortgage indenture obligations. All the applicable first mortgage indenture obligations must be registered to show the United States of America, acting by and through the Administrator of the Rural Utilities Service, as the registered holder of the first mortgage indenture obligations, unless the Rural Utilities Service otherwise requests.
With respect to first mortgage indenture obligations guaranteed or insured by the U.S. Department of Energy, acting through the Secretary of Energy (or appropriate representative thereof), the U.S. Department of Energy, rather than the actual payee of the first mortgage indenture obligations, will have all of the rights of a holder of the first mortgage indenture obligations for the period in which those first mortgage indenture obligations are guaranteed or insured by the U.S. Department of Energy, acting through the Secretary of Energy (or appropriate representative thereof), regardless of whether the U.S. Department of Energy actually possesses those first mortgage indenture obligations. All the applicable first mortgage indenture obligations must be registered to show the U.S. Department of Energy, acting through the Secretary of Energy (or appropriate representative thereof), as the registered holder of the first mortgage indenture obligations, unless the U.S. Department of Energy otherwise requests.
Defeasance
Subject to some conditions, the first mortgage indenture provides that first mortgage indenture obligations of any series, or any maturity within a series, will be deemed to have been paid and our obligations to the holders of those first mortgage indenture obligations will be discharged, if we deposit with the trustee or paying agent cash or defeasance securities maturing as to principal and interest in such amounts and at such times as are sufficient, without consideration of reinvestment of such interest, to pay when due the principal or (if applicable) redemption price and interest due and to become due on those first mortgage indenture obligations. Defeasance securities include non-callable bonds or other obligations, the principal and interest on which constitute direct obligations of, or are unconditionally guaranteed by, the United States of America, or certificates of interest or participation in any of these obligations, or in specified portions of these obligations (which may consist of specified portions of the interest on the certificates).
Concerning the Trustee
U.S. Bank Trust Company, National Association is the trustee under the first mortgage indenture and is also serving as exchange agent in connection with the exchange offer. We may maintain other banking relationships in the ordinary course of business with U.S. Bank National AssociationTrust Company for which it may receive customary fees.
121


Governing Law
The first mortgage indenture and the exchange bonds are governed by and construed in accordance with the laws of the State of Georgia.

117122

SUMMARY OF MATERIAL U.S. FEDERAL INCOME TAX CONSEQUENCES

We are subject to United States federal and state corporate income taxation but, as a cooperative, we are allowed a deduction for patronage sourced dividends that we allocate to our members. We are, however, liable for United States federal and state income taxes on that portion of our taxable income which is not derived from patronage sources, and we are entitled to no special deduction with respect to our non-patronage sourced taxable income. Due to the availability of the special deduction for patronage sourced dividends that we allocate to our members, we do not anticipate that the amount of our United States federal and state corporate income taxes will be material in the foreseeable future. See Note 5 to Notes to Consolidated Financial Statements for a discussion of our net operating loss carryforwards.
Like any corporation, the relevant taxing authorities may challenge how we treat certain items on our tax returns. Because we are a cooperative, these authorities may also challenge our classification of items of income and expense between patronage and non-patronage sources. If, in any year, the relevant authorities were to reclassify any of our patronage sourced income as non-patronage sourced, or any of our non-patronage sourced expenses as patronage sourced, it is possible that we might owe income taxes in that year and the amount of those income taxes might be material.
Exchange Offer
The exchange of the original bonds for exchange bonds pursuant to the exchange offer should not be treated as a taxable event for United States federal income tax purposes because the exchange bonds will not differ materially in kind or extent from the original bonds, with the result that the holding period for your exchange bonds will include the holding period of the original bonds you surrender in exchange therefor, and the basis of your exchange bonds will be the same as the basis of the original bonds you surrender in exchange (as determined immediately prior to the date of exchange).
In any event, persons considering the exchange of original bonds for exchange bonds should consult their own tax advisors concerning the United States federal income tax consequences in light of their particular situations as well as any consequences arising under the laws of any other taxing jurisdiction.
Tax Considerations Applicable to Holders of the Exchange Bonds
The following is a summary of certain United States federal income tax consequences relating to the ownership and disposition of the exchange bonds by an initial beneficial holder of the original bonds who purchased the original bonds for cash at the original offering price, exchanges its original bonds for exchange bonds pursuant to the exchange offer, and who holds the bonds as capital assets within the meaning of section 1221 of the Internal Revenue Code of 1986 (the Code).
This section does not apply to you if you are subject to special tax rules, such as those that apply to:
brokers and dealers;
traders in securities that elect to mark to market;
banks;
certain former citizens or residents of the United States;
life insurance companies, real estate investment trusts and regulated investment companies;
individual retirement accounts and other tax-deferred accounts;
tax-exempt organizations;
persons who will hold the exchange bonds as part of a hedging, straddle, integrated or conversion transaction;
grantor trusts;
123


S corporations;
Certain U.S. Holders that use the accrual method of accounting for United States federal income tax purposes and are required to prepare certified financial statements or file financial statements with certain regulatory of governmental agencies;
“controlled foreign corporations” or “passive foreign investment companies” for United States federal income tax purposes; or
persons whose functional currency for United States federal income tax purposes is not the U.S. dollar.
Finally, this section does not address any foreign, state or local tax issues or any United States federal estate, gift or alternative minimum tax issues. This discussion is based upon the Code, existing and proposed United States Treasury Regulations and judicial decisions and administrative interpretations thereof, all as of the date of this prospectus and all of
118

Table of Contents
which are subject to change, possibly with retroactive effect, or to different interpretations. We cannot assure you that the Internal Revenue Service will not challenge one or more of the tax consequences described in this section. We have not obtained, nor do we intend to obtain, a ruling from the IRS or an opinion of counsel with respect to the United States federal tax consequences of exchanging, owning or disposing of the bonds.
As used herein, “U.S. Holder” means a beneficial owner of a bond that is:
an individual citizen or resident of the United States for United States federal income tax purposes;
a corporation or other entity taxable as a corporation created or organized in or under the laws of the United States or any state thereof (including the District of Columbia);
an estate, the income of which is subject to United States federal income taxation regardless of its source; or
a trust, where a court within the United States is able to exercise primary supervision over the administration of the trust and one or more United States persons (as defined in the Internal Revenue Code of 1986, as amended) have the authority to control all substantial decisions of the trust (or a trust that has made a valid election under U.S. Treasury Regulations to be treated as a domestic trust).
A “Non-U.S. Holder” generally means any owner (or beneficial owner) of an exchange bond that is not a U.S. Holder and is not a partnership for United States federal income tax purposes. If a partnership holds bonds, the tax treatment of such partnership or a partner in such partnership generally will generally depend upon the status of the partner and upon the activities of the partnership. Partnerships and partners of partnerships holding bonds should consult their own tax advisors regarding the tax consequences of an investment in the exchange bonds (including their status as U.S. Holders or Non-U.S. holders).
THIS DISCUSSION IS FOR GENERAL INFORMATION ONLY AND IS NOT INTENDED TO CONSTITUTE A COMPLETE DESCRIPTION OF ALL TAX CONSIDERATIONS RELATING TO THE EXCHANGE, OWNERSHIP OR DISPOSITION OF THE BONDS. YOU SHOULD CONSULT YOUR OWN TAX ADVISOR AS TO THE PARTICULAR TAX CONSEQUENCES TO YOU OF THE EXCHANGE, OWNERSHIP AND DISPOSITION OF THE BONDS, INCLUDING THE EFFECT AND APPLICABILITY OF STATE, LOCAL OR FOREIGN TA LAWS OR TAX TREATIES AND THE POSSIBLE EFFECTS OF CHANGES IN THE TAX LAW.
THIS PROSPECTUS IS NOT INTENDED OR WRITTEN TO BE USED, AND IT CANNOT BE USED, BY ANY PURCHASER FOR THE PURPOSE OF AVOIDING PENALTIES THAT MAY BE IMPOSED UNDER THE CODE. THIS PROSPECTUS WAS WRITTEN, IN PART, TO SUPPORT THE PROMOTION AND MARKETING OF THE BONDS. EACH POTENTIAL INVESTOR SHOULD SEEK ADVICE BASED ON THE INVESTOR'S PARTICULAR CIRCUMSTANCES FROM AN INDEPENDENT TAX ADVISOR.
U.S. Holders
Interest
The original bonds were not issued with original issue discount for United States federal income tax purposes. As a result, you will be taxed on interest on the exchange bonds when it is received or accrued (depending upon your method of tax accounting). Certain U.S. Holders that use the accrual method of accounting for United States federal income tax purposes generally will be required to include certain amounts in income with respect to the exchange bonds no later than the time that such amounts are reflected on certain financial statements of such U.S. Holders.
Sale or Exchange of Exchange Bond
Upon a sale, exchange (other than in connection with the Exchange Offer) or redemption of a Bond, you generally will recognize gain or loss equal to the difference between the amount realized on the sale (not including any amounts attributable to accrued and unpaid interest, which will be taxed in the manner described above under the heading “Interest”) and your adjusted United States federal income tax basis in the Bond. Except to the extent attributable to accrued but unpaid interest, any gain or loss you recognize on the sale of a Bond should generally be capital gain or loss.
119124

We may deposit with the Trusteetrustee or paying agent cash or defeasance securities in amounts sufficient to cause the exchange bonds to be deemed under the first mortgage indenture to have been paid. See “SUMMARY OF THE FIRST MORTGAGE INDENTURE – Defeasance.” For United States federal income tax purposes, such a defeasance generally will result in you being deemed to have exchanged your exchange bonds for reissued exchange bonds, and you may recognize gain or loss on such deemed exchange, without any corresponding receipt of money. Ownership of an exchange bond subsequent to any such defeasance may have tax consequences different from those described in this section, and you should consult with your own tax advisor regarding the tax consequences to you of a defeasance of the exchange bonds.
Medicare Tax
Certain non-corporate U.S. Holders will be subject to a 3.8% tax on the lesser of (1) the U.S. Holder’s “net investment income” (in the case of individuals) or “undistributed net investment income” (in the case of estates and trusts (other than grantor trusts)) for the relevant taxable year and (2) the excess of the U.S. Holder’s “modified adjusted gross income” (in the case of individuals) or “adjusted gross income” (in the case of estates and trusts (other than grantor trusts)) for the taxable year over a certain threshold (which in the case of individuals will be between $125,000 and $250,000, depending on the individual’s circumstances). A U.S. Holder’s calculation of net investment income generally will include amounts treated as interest that are received on the exchange bonds and its net gains from the disposition of the exchange bonds, unless such interest or net gains are derived in the ordinary course of the conduct of a trade or business (other than a trade or business that consists of certain passive or trading activities). If you are a non-corporate U.S. Holder, (other than a grantor trust), you should consult your own tax advisor regarding the applicability of this tax to your income and gains in respect of your investment in the exchange bonds.
Non-U.S. Holders
If you are a Non-U.S. holder,Holder, subject to the discussions under the headings “Backup Withholding and Information Reporting for U.S. and Non-U.S. Holders” and “Foreign Account Tax Compliance Act” below, interest paid to you in respect of the exchange bonds generally should not be subject to United States federal income or withholding tax provided that:
such interest is not effectively connected with your conduct of a trade or business in the United States;
you do not actually or constructively own 10% or more of the total combined voting power of all classes of our stock entitled to vote;
you are not a controlled foreign corporation that is related directly or constructively to us through stock ownership;
you are not a bank that acquired the exchange bonds in consideration for an extension of credit made pursuant to a loan agreement entered into in the ordinary course of your trade or business; and
you timely and properly provide the withholding agent with a statement to the effect that you are not a U.S. person (generally through the provision of a properly executed appropriate IRS Form W-8).
Similarly, if you are a Non-U.S. holder,Holder, subject to the discussions under the headings “Backup Withholding and Information Reporting for U.S. and Non-U.S. Holders” and “Foreign Account Tax Compliance Act” below, any gain recognized by you in connection with a sale, exchange or redemption of your exchange bonds generally should not be subject to United States federal income or withholding tax provided that:
such gain is not effectively connected with your conduct of a trade or business in the United States; and
if you are an individual, you are not present in the United States for 183 days or more in the taxable year of the sale or other disposition and certain other conditions are met.
If you fail to satisfy any of the provisos set forth above, the interest you receive on the exchange bonds and/or the gain you recognize on a sale or disposition of the exchange bonds may be subject to United States federal
125


income tax, and you should consult your own tax advisor as to the United States federal income tax consequences applicable to your acquisition, ownership and disposition of the exchange bonds.
120

Table of Contents
Backup Withholding and Information Reporting for U.S. and Non-U.S. Holders
Information reporting to the IRS may be required with respect to payments on the exchange bonds, and with respect to proceeds from the sale of the exchange bonds, held by holders other than corporations and certain other exempt recipients. A “backup” withholding tax may also apply to those payments if you fail to provide certain identifying information (such as your taxpayer identification number or an attestation to your status as a Non-U.S. Holder). Backup withholding is not an additional tax and may be refunded (or credited against your United States federal income tax liability, if any) provided that certain required information is furnished to the IRS in a timely manner.
Foreign Account Tax Compliance Act
The Foreign Account Tax Compliance provisions of the Code (generally referred to as “FATCA”), when applicable, impose a United States federal withholding tax of 30% on certain payments on, and the gross proceeds from the sale or other disposition of, obligations that produce U.S. source income to foreign financial institutions and certain other non-U.S. entities unless certain information reporting and certification requirements have been satisfied. The obligation to withhold under FATCA, if applicable, will apply to payments of interest made on the exchange bonds. Under proposed Treasury regulations, issued on December 31, 2018, the requirement under FATCA to withhold on to gross proceeds from the sale, exchange, redemption or other disposition of the exchange bonds would be eliminated, and withholding under FATCA on certain foreign pass-through payments would not be required until two years after the date that final regulations defining the term foreign pass-through payment are issued. The U.S. Treasury Department has indicated that taxpayers may rely on these proposed regulations pending their finalization.
Holders are encouraged to consult with their own tax advisors regarding the effects of FATCA on their investment in the exchange bonds.
THIS DISCUSSION IS FOR GENERAL INFORMATION ONLY AND IS NOT INTENDED TO CONSTITUTE A COMPLETE DESCRIPTION OF ALL TAX CONSIDERATIONS RELATING TO THE EXCHANGE, OWNERSHIP OR DISPOSITION OF THE BONDS. YOU SHOULD CONSULT YOUR OWN TAX ADVISOR AS TO THE PARTICULAR TAX CONSEQUENCES TO YOU OF THE EXCHANGE, OWNERSHIP AND DISPOSITION OF THE BONDS, INCLUDING THE EFFECT AND APPLICABILITY OF STATE, LOCAL OR FOREIGN TAX LAWS OR TAX TREATIES AND THE POSSIBLE EFFECTS OF CHANGES IN THE TAX LAW.
126


PLAN OF DISTRIBUTION
Each broker-dealer that receives exchange bonds for its own account pursuant to the exchange offer must acknowledge that it will deliver a prospectus in connection with any resale of such exchange bonds. This prospectus, as it may be amended or supplemented from time to time, may be used by a broker-dealer in connection with resales of exchange bonds received in exchange for original bonds where such original bonds were acquired as a result of market-making activities or other trading activities. We have agreed to keep effective the registration statement of which this prospectus is a part until the earlier of 180 days after the completion of the exchange offer or such time as broker-dealers no longer own any exchange bonds. In addition, all dealers effecting transactions in the exchange bonds may be required to deliver a prospectus.
We will not receive any proceeds from any sale of exchange bonds by broker-dealers. Exchange bonds received by broker-dealers for their own account pursuant to the exchange offer may be sold from time to time in one or more transactions in the over-the-counter market, in negotiated transactions, through the writing of options on the exchange bonds or a combination of such methods of resale, at market prices prevailing at the time of resale, at prices related to such prevailing market prices or at negotiated prices. Any such resale may be made directly to purchasers or through brokers or dealers who may receive compensation in the form of commissions or concessions from any such broker-dealer and/or the purchasers of any such exchange bonds. Any broker-dealer that resells exchange bonds that were received by it for its own account pursuant to the exchange offer and any broker or dealer that participates in a distribution of such exchange bonds may be deemed to be an “underwriter” within the meaning of the Securities Act, and any profit of any such resale of exchange bonds and any commission or concessions received by any such persons may be deemed to be underwriting compensation under the Securities Act. The letter of transmittal states that, by acknowledging that it will deliver and by delivering a prospectus, a broker-dealer will not be deemed to admit that it is an “underwriter” within the meaning of the Securities Act.
For a period of 180 days after the expiration date of the exchange offer (or until the broker-dealer no longer holds registrable securities), we will promptly send additional copies of this prospectus and any amendments or supplements to this prospectus to any broker-dealer that requests such documents in the letter of transmittal. Subject to certain limitations set forth in the registration rights agreement, we have agreed to pay all expenses incident to the exchange offer other than commissions or concessions of any broker-dealer and will indemnify you (including any broker-dealers) against certain liabilities under the Securities Act.
121127


LEGAL MATTERS
The validity and enforceability of the exchange bonds will be passed upon for us by Eversheds Sutherland (US) LLP.

EXPERTS
The consolidated financial statements of Oglethorpe Power Corporation at December 31, 20202023 and 2019,2022, and for each of the three years in the period ended December 31, 2020,2023, appearing in this Prospectus and Registration Statement have been audited by Ernst & Young LLP, independent registered public accounting firm, as set forth in their report thereon appearing elsewhere herein, and are included in reliance upon such report given on the authority of such firm as experts in accounting and auditing.

AVAILABLE INFORMATION

We have filed with the SEC a registration statement on Form S-4 under the Securities Act with respect to the exchange bonds. This prospectus, which forms a part of the registration statement, does not contain all of the information set forth in the registration statement. For further information with respect to us and the exchange bonds, reference is made to the registration statement. Statements contained in this prospectus as to the contents of any contract or other document are not necessarily complete.
We have historically filed, on a voluntary basis, annual, quarterly and current reports and other information with the SEC. You may read and copy any document we have or will file with the SEC at the SEC public website (http://www.sec.gov) or at the SEC’s Public Reference Room at 100 F Street, N.E., Washington, D.C. 20549. Copies of such materials can be obtained from the Public Reference Room of the SEC at prescribed rates. The public may obtain information on the operation of the Public Reference Room by calling the SEC at 1-800-SEC-0330..
You should rely only upon the information provided in this prospectus. We have not authorized anyone to provide you with different information. You should not assume that the information in this prospectus is accurate as of any date other than the date of this prospectus.


122128

APPENDIX A - A—FINANCIAL STATEMENTS
Index To Financial Statements

A-1

OGLETHORPE POWER CORPORATION
CONSOLIDATED STATEMENTS OF REVENUES AND EXPENSES
For the years ended December 31, 2020, 20192023, 2022 and 20182021

(dollars in thousands)
202320222021
Operating revenues:
Sales to members$1,681,566 $1,974,683 $1,557,109 
Sales to non-members58,619 155,454 47,754 
Total operating revenues
1,740,185 2,130,137 1,604,863 
Operating expenses:
Fuel$578,794 $1,045,089 $598,996 
Production413,312 468,754 410,708 
Depreciation and amortization330,449 283,774 275,346 
Purchased power74,657 82,516 69,346 
Accretion65,907 55,953 56,086 
Total operating expenses
$1,463,119 $1,936,086 $1,410,482 
Operating margin
$277,066 $194,051 $194,381 
Other income:
Investment income$70,252 $57,564 $45,932 
Amortization of deferred gains1,789 1,789 1,789 
Allowance for equity funds used during construction750 700 385 
Other8,258 12,191 23,148 
Total other income
$81,049 $72,244 $71,254 
Interest charges:
Interest expense$515,862 $455,474 $417,722 
Allowance for debt funds used during construction(234,090)(262,573)(221,463)
Amortization of debt discount and expense10,553 11,690 11,595 
Net interest charges
$292,325 $204,591 $207,854 
Net margin
$65,790 $61,704 $57,781 
(dollars in thousands)
202020192018
Operating revenues:
Sales to Members$1,377,010 $1,429,852 $1,479,379 
Sales to non-Members608 440 734 
Total operating revenues1,377,618 1,430,292 1,480,113 
Operating expenses:
Fuel$360,254 $440,214 $502,904 
Production427,808 410,328 417,391 
Depreciation and amortization248,888 243,512 233,284 
Purchased power68,484 68,556 63,468 
Accretion54,475 50,473 38,090 
Total operating expenses$1,159,909 $1,213,083 $1,255,137 
Operating margin$217,709 $217,209 $224,976 
Other income:
Investment income$43,294 $59,182 $60,055 
Amortization of deferred gains1,789 1,788 1,788 
Allowance for equity funds used during construction374 771 1,006 
Other5,238 2,448 5,413 
Total other income$50,695 $64,189 $68,262 
Interest charges:
Interest expense$409,145 $403,244 $381,242 
Allowance for debt funds used during construction(207,972)(187,954)(151,643)
Amortization of debt discount and expense11,336 11,647 12,440 
Net interest charges$212,509 $226,937 $242,039 
Net margin$55,895 $54,461 $51,199 

The accompanying notes are an integral part of these consolidated financial statements.
A-2

Table of Contents
OGLETHORPE POWER CORPORATION
CONSOLIDATED BALANCE SHEETS
December 31, 20202023 and 20192022

(dollars in thousands)
20202019
(dollars in thousands)(dollars in thousands)
202320232022
AssetsAssets
Electric plant:Electric plant:
Electric plant:
Electric plant:
In service
In service
In serviceIn service$9,394,112 $9,209,983 
Right-of-use assets--finance leasesRight-of-use assets--finance leases302,732 302,732 
Less: Accumulated provision for depreciationLess: Accumulated provision for depreciation(4,968,294)(4,833,025)
4,728,550 4,679,690 
Electric plant in service, net
Nuclear fuel, at amortized costNuclear fuel, at amortized cost358,728 359,270 
Construction work in progressConstruction work in progress5,783,579 4,816,896 
Total electric plantTotal electric plant10,870,857 9,855,856 
Investments and funds:Investments and funds:
Nuclear decommissioning trust fundNuclear decommissioning trust fund598,181 511,339 
Nuclear decommissioning trust fund
Nuclear decommissioning trust fund
Investment in associated companiesInvestment in associated companies74,844 73,318 
Long-term investmentsLong-term investments518,065 254,864 
Restricted investments306,601 461,757 
Other
Other
OtherOther29,189 26,422 
Total investments and fundsTotal investments and funds1,526,880 1,327,700 
Current assets:Current assets:
Cash and cash equivalentsCash and cash equivalents405,511 448,612 
Restricted short-term investments180,986 71,833 
Cash and cash equivalents
Cash and cash equivalents
Restricted cash and short-term investments
Short-term investments
ReceivablesReceivables152,466 166,429 
Inventories, at average costInventories, at average cost280,289 277,729 
Prepayments and other current assetsPrepayments and other current assets33,839 9,862 
Total current assetsTotal current assets1,053,091 974,465 
Deferred charges and other assets:Deferred charges and other assets:
Regulatory assetsRegulatory assets731,438 763,512 
Regulatory assets
Regulatory assets
Prepayments to Georgia Power CompanyPrepayments to Georgia Power Company37,601 48,052 
OtherOther20,289 20,528 
Total deferred chargesTotal deferred charges789,328 832,092 
Total assetsTotal assets$14,240,156 $12,990,113 
A-3

Table of Contents
OGLETHORPE POWER CORPORATION
CONSOLIDATED BALANCE SHEETS
December 31, 20202023 and 20192022
(dollars in thousands)
20202019
(dollars in thousands)(dollars in thousands)
202320232022
Equity and LiabilitiesEquity and Liabilities
Capitalization:Capitalization:
Capitalization:
Capitalization:
Patronage capital and membership fees
Patronage capital and membership fees
Patronage capital and membership feesPatronage capital and membership fees$1,072,642 $1,016,747 
Long-term debtLong-term debt10,298,385 9,403,847 
Obligations under finance leasesObligations under finance leases68,876 75,649 
Obligation under Rocky Mountain transactions
OtherOther26,861 25,196 
Total capitalizationTotal capitalization11,466,764 10,521,439 
Current liabilities:Current liabilities:
Long-term debt and finance leases due within one year
Long-term debt and finance leases due within one year
Long-term debt and finance leases due within one yearLong-term debt and finance leases due within one year208,649 217,440 
Short-term borrowingsShort-term borrowings383,498 282,370 
Accounts payableAccounts payable162,249 165,049 
Accrued interestAccrued interest72,434 65,895 
Member power bill prepayments, currentMember power bill prepayments, current46,068 77,066 
Other current liabilitiesOther current liabilities68,932 49,443 
Total current liabilitiesTotal current liabilities941,830 857,263 
Deferred credits and other liabilities:Deferred credits and other liabilities:
Asset retirement obligationsAsset retirement obligations1,135,983 1,070,640 
Asset retirement obligations
Asset retirement obligations
Member power bill prepayments, non-currentMember power bill prepayments, non-current98,113 134,396 
Regulatory liabilitiesRegulatory liabilities566,399 364,241 
OtherOther31,067 42,134 
Total deferred credits and other liabilitiesTotal deferred credits and other liabilities1,831,562 1,611,411 
Total equity and liabilitiesTotal equity and liabilities$14,240,156 $12,990,113 
Commitments and Contingencies (Notes 1, 7, 10, 11 and 12)Commitments and Contingencies (Notes 1, 7, 10, 11 and 12)00
Commitments and Contingencies (Notes 1, 7, 10, 11 and 12)
Commitments and Contingencies (Notes 1, 7, 10, 11 and 12)

The accompanying notes are an integral part of these consolidated financial statements.
A-4

Table of Contents
OGLETHORPE POWER CORPORATION
CONSOLIDATED STATEMENTS OF CAPITALIZATION
December 31, 20202023 and 20192022

(dollars in thousands)
20232022
Secured Long-term debt:
First mortgage notes payable to the Federal Financing Bank at interest rates varying from 1.03% to 8.21% (average rate of 3.38% at December 31, 2023) due in quarterly installments through 2048$2,663,385 $2,758,753 
First mortgage notes payable to the Federal Financing Bank at interest rates varying from 1.44% to 4.01% (average rate of 2.94% at December 31, 2023) due in quarterly installments through 20444,177,967 4,325,395 
First mortgage bonds payable:
•   Series 2006
First Mortgage Bonds, 5.534%, due 2031 through 2035
300,000 300,000 
•   Series 2007
First Mortgage Bonds, 6.191%, due 2024 through 2031
500,000 500,000 
•   Series 2009B
First Mortgage Bonds, 5.95%, due 2039
400,000 400,000 
•   Series 2009
Clean renewable energy bond, 1.81%, due 2024
1,010 2,021 
•   Series 2010A
First Mortgage Bonds, 5.375% due 2040
450,000 450,000 
•   Series 2011A
First Mortgage Bonds, 5.25% due 2050
300,000 300,000 
•   Series 2012A
First Mortgage Bonds, 4.20% due 2042
250,000 250,000 
•   Series 2014A
First Mortgage Bonds, 4.55% due 2044
250,000 250,000 
•   Series 2016A
First Mortgage Bonds, 4.25% due 2046
250,000 250,000 
•   Series 2018A
First Mortgage Bonds, 5.05% due 2048
500,000 500,000 
•   Series 2020A
First Mortgage Bonds, 3.75% due 2050
450,000 450,000 
•   Series 2022A
First Mortgage Bonds, 4.50% due 2047
500,000 500,000 
•   Series 2023A
First Mortgage Bonds, 6.20% due 2053
400,000 — 
First mortgage notes issued in connection with the sale of pollution control revenue bonds through the Development Authorities of Appling, Burke and Monroe Counties, Georgia:
•   Series 2013A Appling, Burke and Monroe
Term rate bonds, 1.50% through February 3, 2025, due 2038 through 2040
212,760 212,760 
•   Series 2017A, B Burke
Indexed put bonds–weekly reset, 4.82% due 2045
91,645 91,645 
•   Series 2017C, D Burke
Fixed rate bonds, 4.125%, due 2041 through 2045
200,000 200,000 
•   Series 2017E Burke
Term rate bonds, 3.25% through February 3, 2025, due 2041 through 2045
100,000 100,000 
•   Series 2017F Burke
Indexed put bonds-weekly reset, 5.07% due 2040 through 2045
99,785 99,785 
Total Secured Long-term debt
$12,096,552 $11,940,359 
Obligations under finance leases
52,937 61,335 
Obligation under Rocky Mountain transactions
29,862 27,945 
Other
5,152 2,256 
Patronage capital and membership fees
1,257,917 1,192,127 
Subtotal$13,442,420 $13,224,022 
Less: long-term debt and finance leases due within one year(384,426)(322,102)
Less: unamortized debt issuance costs(97,850)(96,588)
Less: unamortized bond discounts on long-term debt(22,710)(17,554)
Total capitalization
$12,937,434 $12,787,778 
(dollars in thousands)
20202019
Secured Long-term debt:
First mortgage notes payable to the Federal Financing Bank at interest rates varying from 1.03% to 8.21% (average rate of 3.65% at December 31, 2020) due in quarterly installments through 2046$2,430,810 $2,526,867 
First mortgage notes payable to the Federal Financing Bank at interest rates varying from 1.44% to 3.87% (average rate of 2.87% at December 31, 2020) due in quarterly installments through 20443,554,205 3,013,348 
First mortgage notes payable to National Rural Utilities Cooperative Finance Corporation at interest rate of 4.90% due in quarterly installments through 20200 391 
First mortgage bonds payable:
•   Series 2006
First Mortgage Bonds, 5.534%, due 2031 through 2035
300,000 300,000 
•   Series 2007
First Mortgage Bonds, 6.191%, due 2024 through 2031
500,000 500,000 
•   Series 2009B
First Mortgage Bonds, 5.95%, due 2039
400,000 400,000 
•   Series 2009
Clean renewable energy bond, 1.81%, due 2024
4,041 5,052 
•   Series 2010A
First Mortgage Bonds, 5.375% due 2040
450,000 450,000 
•   Series 2011A
First Mortgage Bonds, 5.25% due 2050
300,000 300,000 
•   Series 2012A
First Mortgage Bonds, 4.20% due 2042
250,000 250,000 
•   Series 2014A
First Mortgage Bonds, 4.55% due 2044
250,000 250,000 
•   Series 2016A
First Mortgage Bonds, 4.25% due 2046
250,000 250,000 
•   Series 2018A
First Mortgage Bonds, 5.05% due 2048
500,000 500,000 
•   Series 2020A
First Mortgage Bonds, 3.75% due 2050
450,000 
First mortgage notes issued in connection with the sale of pollution control revenue bonds through the Development Authorities of Appling, Burke, Heard and Monroe Counties, Georgia:
•   Series 2009A Heard and Monroe, and 2009B Monroe
Weekly rate bonds, 0.08%, due 2030 through 2038
112,055 112,055 
•   Series 2010A Burke and Monroe, and 2010B Burke
Weekly rate bonds, 0.09% to 0.16%, due 2036 through 2037
133,550 133,550 
•   Series 2013A Appling, Burke and Monroe
Term rate bonds, 1.50% through February 3, 2025, due 2038 through 2040
212,760 212,760 
•   Series 2017A Burke, Heard, Monroe and 2017B Burke
Indexed put bonds–weekly reset, 1.19% due 2040 through 2045
122,620 122,620 
•   Series 2017C, D Burke
Fixed rate bonds, 4.125%, due 2041 through 2045
200,000 200,000 
•   Series 2017E Burke
Term rate bonds, 3.25% through February 3, 2025, due 2041 through 2045
100,000 100,000 
•   Series 2017F Burke
Term rate bonds, 3.00% through February 1, 2023, due 2041 through 2045
99,785 99,785 
Total Secured Long-term debt$10,619,826 $9,726,428 
Obligations under finance leases75,649 81,730 
Obligation under Rocky Mountain transactions26,861 25,196 
Patronage capital and membership fees1,072,642 1,016,747 
Subtotal$11,794,978 $10,850,101 
Less: long-term debt and finance leases due within one year(208,649)(217,440)
Less: unamortized debt issuance costs(102,914)(100,680)
Less: unamortized bond discounts on long-term debt(16,651)(10,542)
Total capitalization$11,466,764 $10,521,439 

The accompanying notes are an integral part of these consolidated financial statements.
A-5

Table of Contents
OGLETHORPE POWER CORPORATION
CONSOLIDATED STATEMENTS OF CASH FLOWS
For the years ended December 31, 2020, 20192023, 2022 and 20182021

(dollars in thousands)
202320222021
Cash flows from operating activities:
Net margin$65,790 $61,704 $57,781 
Adjustments to reconcile net margin to net cash provided by operating activities:
Depreciation and amortization, including nuclear fuel$441,926 $451,899 $400,681 
Accretion cost65,907 55,953 56,086 
Amortization of deferred gains(1,789)(1,789)(1,789)
Allowance for equity funds used during construction(750)(700)(385)
Deferred outage costs(32,390)(30,926)(30,746)
(Gain) loss on sale of investments(6,954)21,950 (13,516)
Gain on sale of spare parts — (15,734)
Regulatory deferral of costs associated with nuclear decommissioning(21,449)(54,529)(19,318)
Other(5,150)(712)(2,528)
Change in operating assets and liabilities:
Receivables12,011 (68,550)(5,693)
Inventories(38,562)(36,235)23,232 
Prepayments and other current assets(2,211)25,031 577 
Accounts payable(104,164)7,008 31,790 
Accrued interest903 9,042 23,976 
Accrued taxes1,087 52,764 (36,301)
Other current liabilities(65,795)32,300 (14,292)
Rate management program (billings credits applied) collections, net(56,612)19,847 144,763 
Other(57,281)2,217 (38,078)
Total adjustments$128,727 $484,570 $502,725 
Net cash provided by operating activities
$194,517 $546,274 $560,506 
Cash flows from investing activities:
Property additions$(474,952)$(1,156,383)$(1,203,050)
Plant acquisition(16,743)(86,826)(233,156)
Activity in nuclear decommissioning trust fund – Purchases(535,027)(204,500)(675,153)
– Proceeds520,986 194,046 667,344 
Proceeds from the sale of spare parts — 18,500 
Decrease in restricted investments74,031 246,022 167,535 
Activity in other long-term investments – Purchases(262,712)(185,092)(433,532)
– Proceeds199,200 107,082 246,256 
Other13,782 4,040 14,843 
Net cash used in investing activities
$(481,435)$(1,081,611)$(1,430,413)
Cash flows from financing activities:
Long-term debt proceeds$506,272 $1,414,925 $757,032 
Long-term debt payments(358,477)(397,162)(468,577)
(Decrease) increase in short-term borrowings, net(47,765)(440,321)712,473 
Other51,699 2,526 44,618 
Net cash provided by financing activities
151,729 579,968 1,045,546 
Net (decrease) increase in cash, cash equivalents and restricted cash
$(135,189)$44,631 $175,639 
Cash, cash equivalents and restricted cash at beginning of period
625,781 581,150 405,511 
Cash, cash equivalents and restricted cash at end of period
$490,592 $625,781 $581,150 
Supplemental cash flow information:
Cash paid for –
Interest (net of amounts capitalized)$278,952 $182,066 $170,605 
Supplemental disclosure of non-cash investing and financing activities:
Change in asset retirement obligations$63,803 $10,486 $107,677 
Accrued property additions at end of period$39,854 $65,686 $89,640 
(dollars in thousands)
202020192018
Cash flows from operating activities:
Net margin$55,895 $54,461 $51,199 
Adjustments to reconcile net margin to net cash provided by operating activities:
Depreciation and amortization, including nuclear fuel$376,639 $377,853 $371,234 
Accretion cost54,475 50,473 38,090 
Amortization of deferred gains(1,789)(1,788)(1,788)
Allowance for equity funds used during construction(374)(771)(1,006)
Deferred outage costs(38,278)(34,505)(31,863)
(Gain) loss on sale of investments(19,779)(6,058)4,871 
Regulatory deferral of costs associated with nuclear decommissioning(10,691)(23,982)(26,511)
Other(5,587)(1,097)(5,676)
Change in operating assets and liabilities:
Receivables(3,659)24,251 8,424 
Inventories(2,409)(18,597)5,487 
Prepayments and other current assets(23,754)(1,992)4,544 
Accounts payable1,504 (27,668)1,360 
Accrued interest6,539 4,924 (18,539)
Accrued and withheld taxes33,588 2,943 (21,351)
Other current liabilities9,439 (24,069)25,723 
Member power bill prepayments(67,281)(68,245)69,921 
Rate management program collections146,917 45,228 15,578 
Total adjustments$455,500 $296,900 $438,498 
Net cash provided by operating activities$511,395 $351,361 $489,697 
Cash flows from investing activities:
Property additions$(1,335,380)$(1,255,188)$(1,185,367)
Activity in nuclear decommissioning trust fund – Purchases(578,610)(374,338)(457,909)
                                    – Proceeds570,294 365,871 449,895 
Decrease in restricted investments46,003 119,568 229,751 
Activity in other long-term investments – Purchases(425,628)(251,077)(207,670)
                        – Proceeds186,219 178,172 176,717 
Other7,982 (21,493)9,144 
Net cash used in investing activities$(1,529,120)$(1,238,485)$(985,439)
Cash flows from financing activities:
Long-term debt proceeds$2,221,685 $1,266,950 $813,028 
Long-term debt payments(1,334,368)(523,691)(201,354)
Increase (decrease) in short-term borrowings, net101,128 (154,257)246,001 
Other(13,821)(5,884)(7,010)
Net cash provided by financing activities974,624 583,118 850,665 
Net (decrease) increase in cash and cash equivalents$(43,101)$(304,006)$354,923 
Cash and cash equivalents at beginning of period448,612 752,618 397,695 
Cash and cash equivalents at end of period$405,511 $448,612 $752,618 
Supplemental cash flow information:
Cash paid for –
Interest (net of amounts capitalized)$193,063 $208,892 $245,085 
Supplemental disclosure of non-cash investing and financing activities:
Change in asset retirement obligations$18,709 $5,282 $248,608 
Accrued property additions at end of period$89,640 $94,492 $121,557 
Interest paid-in-kind$0 $67,028 $59,137 

The accompanying notes are an integral part of these consolidated financial statements.
A-6

Table of Contents
OGLETHORPE POWER CORPORATION
CONSOLIDATED STATEMENTS OF PATRONAGE CAPITAL AND MEMBERSHIP FEES
For the years ended December 31, 2020, 20192023, 2022 and 20182021

(dollars in thousands)
Balance at December 31, 20172020
$911,0871,072,642 
Components of comprehensive margin in 2018:2021:
  Net margin51,19957,781 
Balance at December 31, 20182021
$962,2861,130,423 
Components of comprehensive margin in 2019:2022:
  Net margin54,46161,704 
Balance at December 31, 20192022
$1,016,7471,192,127 
Components of comprehensive margin in 2020:2023:
  Net margin55,89565,790 
Balance at December 31, 20202023
$1,072,6421,257,917 

The accompanying notes are an integral part of these consolidated financial statements.
A-7

Table of Contents
NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2020, 20192023, 2022 and 20182021

1. Summary of significant accounting policies:
a. Business description
Oglethorpe Power Corporation is an electric membership corporation incorporated in 1974 and headquartered in metropolitan Atlanta, Georgia that operates on a not-for-profit basis. We are owned by 38 retail electric distribution cooperative members in Georgia. We provide wholesale electric power from a combination of owned and co-owned generating units of which our ownership share totals 7,1257,792 megawatts of summer planning reserve capacity. We also manage and operate Smarr EMC which owns 737733 megawatts of summer planning reserve capacity. In addition, we supply financial and management services to Green Power EMC, which purchases energy from renewable energy facilities totaling 320756 megawatts of capacity, including 288724 megawatts sourced by solar energy. Georgia Power Company is a co-owner and the operating agent of our nuclear and coal-fired generating units. Our members in turn distribute energy on a retail basis to approximately 4.3 million people.
b. Basis of accounting
Our consolidated financial statements include our accounts and the accounts of our majority-owned and controlled subsidiary. We have determined that there are no accounts of variable interest entities for which we are the primary beneficiary. We have eliminated any intercompany profits and transactions in consolidation.
We follow generally accepted accounting principles in the United States. We maintain our accounts in accordance with the Uniform System of Accounts of the Federal Energy Regulatory Commission as modified and adopted by the Rural Utilities Service. We also apply the accounting guidance for regulated operations.
The preparation of financial statements in conformity with accounting principles generally accepted in the United States requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities as of December 31, 20202023 and 20192022 and the reported amounts of revenues and expenses for each of the three years in the period ended December 31, 2020.2023. Examples of estimates used include items related to our asset retirement obligations. Accounting for asset retirement and environmental obligations requires legal obligations associated with the retirement of long-lived assets to be recognized at fair value when incurred and capitalized as part of the related long-lived asset. In the absence of quoted market prices, we estimate the fair value of our asset retirement obligations using present value techniques, in which estimates of future cash flows associated with retirement activities are discounted using a credit-adjusted risk-free rate. Estimating the amount and timing of future expenditures includes, among other things, making projections of when assets will be retired and ultimately decommissioned, the amount of decommissioning costs, and how costs will escalate with inflation. Actual results could differ from those estimates.
c. Patronage capital and membership fees
We are organized and operate as a cooperative. Our members paid a total of $190 in membership fees. Patronage capital includes retained net margin. Any excess of revenues over expenditures from operations is treated as an advance of capital by our members and is allocated to each member on the basis of their fixed percentage capacity cost responsibilities in our generation.generation resources.
Any distributions of patronage capital are subject to the discretion of our board of directors, subject to first mortgage indenture requirements. Under our first mortgage indenture, we are prohibited from making any distribution of patronage capital to our members if, at the time of or after giving effect to, (i) an event of default exists under the indenture, (ii) our equity as of the end of the immediately preceding fiscal quarter is less than 20% of our total long-term debt and equities, or (iii) the aggregate amount expended for distributions on or after the date on which our equity first reaches 20% of our total long-term debt and equities exceeds 35% of our aggregate net margins earned after such date. This last restriction, however will not apply if, after giving effect to such distribution, our equity as of the end of the immediately preceding fiscal quarter is not less than 30% of our long-term debt and equities.
A-8

Table of ContentsNOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
d. Margin policy
We are required under our first mortgage indenture to produce a margins for interest ratio of at least 1.10 for each fiscal year. For the years 2020, 20192023, 2022 and 2018,2021, we achieved a margins for interest ratio of 1.14.
e. Revenue recognition
As an electric membership cooperative, our principal business is providing wholesale electric service to our members. Our operating revenues are derived primarily from wholesale power contracts we have with each of our 38 members. TheseOn November 15, 2023, we and each of our members amended the wholesale power contracts whichto extend the term from December 31, 2050 to December 31, 2050,2085. These contracts, are substantially identical and obligate our members jointly and severally to pay all expenses associated with owning and operating our power supply business. As a cooperative, we operate on a not-for-profit basis and, accordingly, seek only to generate revenues sufficient to recover our cost of service and to generate margins sufficient to establish reasonable reserves and meet certain financial coverage requirements. While not significant, weWe also have short-termsell energy salesand capacity to non-members made through industry standard contracts.contracts and negotiated agreements, respectively. We do not have multiple operating segments.
Pursuant to our contracts, we primarily provide 2two services, capacity and energy. Capacity and energy revenues are recognized by us upon transfer of control of promised services to our members and non-members in an amount that reflects the consideration we expect to receive in exchange for those services. Capacity and energy are distinct and we account for them as separate performance obligations. The obligations to provide capacity and energy are satisfied over time as the customer simultaneously receives and consumes the benefit of these services. Both performance obligations are provided directly by us and not through a third party.
Each of our members is obligated to pay us for capacity and energy we furnish under its wholesale power contract in accordance with rates we establish. We review our rates periodically but are required to do so at least once every year. Revenues from our members are derived through a cost-plus rate structure which is set forth as a formula in the rate schedule to the wholesale power contracts. The formulary rate provides for the pass-through of our (i) fixed costs (net of any income from other sources) plus a targeted margin as capacity revenues and (ii) variable costs as energy revenues from our members. Power purchase and sale agreements between us and non-members obligate each non-member to pay us for capacity, if any, and energy furnished in accordance with the prices mutually agreed upon. Margins produced from non-member sales are included in our rate schedule formula and reduce revenue requirements from our members. As of December 31, 2023 and 2022, we did not have any significant long-term contracts with non-members.
The consideration we receive for providing capacity services to our members is determined by our formulary rate on an annual basis. The components of the formulary rate associated with capacity costs include the annual budget of fixed costs, a targeted margin and income from other sources. Capacity revenues, therefore, vary to the extent these components vary. Fixed costs include items such as fixed operation and maintenance expenses, administrative and general expenses, depreciation and interest. Year to year, capacity revenue fluctuations are generally due to the recovery of fixed operation and maintenance expenses. Fixed costs also include certain costs, such as major maintenance costs, which will be recognized as expense in future periods. Recognition of revenues associated with these future expenses is deferred pursuant to Accounting Standards Codification (ASC) 980, Regulated Operations. The regulatory liabilities are amortized to revenue in accordance with the associated revenue deferral plan as the expenses are recognized. For information regarding regulatory accounting, see Note 1q.
Capacity revenues are recognized by us for standing ready to deliver electricity to our customers. Our member capacity revenues are based on the associated costs we expect to recover in a given year and are recognized and billed to our members in equal monthly installments over the course of the year regardless of whether our generation and purchased power resources are dispatched to produce electricity. Non-member capacity revenues if any, are typically billed and recognized in equal monthly installments overaccordance with the termterms of the associated contract.
We have a power bill prepayment program pursuant to which our members may prepay future capacity costs and receive a discount. As this program provides us with financing, we adjust our capacity revenues by the amount of the discount, which is based on our avoided cost of borrowing. For additional information regarding our member prepayment program, see Note 1p.
A-9

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
We satisfy our performance obligations to deliver energy as energy is delivered to the applicable meter points. We determine the standard selling price for energy we deliver to our members based upon the variable costs incurred to generate or purchase that energy. Fuel expense is the primary variable cost. Energy revenue recognized equals the actual variable expenses incurred in any given accounting period. Our member energy revenues fluctuate from period to period based on
A-9

Table of Contents
several factors, including fuel costs, weather and other seasonal factors, load requirements in our members’ service territories, variable operating costs, the availability of electric generation resources, our decisions of whether to dispatch our owned or purchased resources or member-owned resources over which we have dispatch rights, and by members’ decisions of whether to purchase a portion of their hourly energy requirements from our resources or from other suppliers. In 2020, 2019 and 2018, we provided approximately 57%, 58% and 57% of our members’ energy requirements, respectively. The standard selling price for our energy revenues from non-members is the price mutually agreed upon.
We are required under our first mortgage indenture to produce a margins for interest ratio of at least 1.10 for each fiscal year. For 2020, 20192023, 2022 and 2018,2021, our board approved, and we achieved, a targeted margins for interest ratio of 1.14. Historically, our board of directors has approved adjustments to revenue requirements by year end such that revenue in excess of that required to meet the targeted margins for interest ratio is refunded to the members. Given that our capacity revenues are based upon budgeted expenditures and generally recognized and billed to our members in equal monthly installments over the course of the year, we may recognize capacity revenues that exceed our actual fixed costs and targeted margins in any given interim reporting period. At each interim reporting period we assess our projected revenue requirements through year end to determine whether a refund to our members of excess consideration is likely. If so, we reduce our capacity revenues and recognize a refund liability to our members. Refund liabilities, if any, are included in accounts payable on our consolidated balance sheets. As of December 31, 20202023 and December 31, 2019,2022, we recognized refund liabilities totaling $32,318,000$34,266,000 and $14,989,000,$28,471,000, respectively. Based on our current agreements with non-members, we do not refund any consideration received from non-members.
Sales to members were as follows:
(dollars in thousands)
202020192018
(dollars in thousands)(dollars in thousands)
2023202320222021
Capacity revenuesCapacity revenues$971,071 $942,057 $927,419 
Energy revenuesEnergy revenues405,939 487,795 551,960 
TotalTotal$1,377,010 $1,429,852 $1,479,379 
The following table reflects members whose revenues accounted for 10% or more of our total operating revenues in 2020, 20192023, 2022 or 2018:2021:
202020192018
2023202320222021
Jackson EMCJackson EMC15.2 %14.4 %14.1 %Jackson EMC15.1 %16.0 %15.2 %
GreyStone Power Corporation, an EMCGreyStone Power Corporation, an EMC11.4 %9.5 %12.3 %
Cobb EMCCobb EMC13.2 %13.8 %13.9 %Cobb EMC8.5 %10.0 %8.7 %
Receivables from contracts with our members at December 31, 20202023 and December 31, 20192022 were $135,462,000$170,901,000 and $142,946,000,$187,401,000, respectively.
Energy revenues from non-members were primarily due from the sale of the BC Smith deferring members' output into the wholesale market. In 2023 and 2022, we recognized capacity revenues from non-members relating to our Washington County acquisition, which we acquired in December 2022.
A-10

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
Sales to non-members during years 2020, 2019 and 2018 were insignificant.as follows:
(dollars in thousands)
202320222021
Energy revenues$44,995 $155,372 $47,754 
Capacity revenues13,624 82 — 
Total$58,619 $155,454 $47,754 
Electric capacity and energy revenues are recognized by us without any obligation for returns, warranties or taxes collected. As our members are jointly and severally obligated to pay all expenses associated with owning and operating our power supply business and we perform an on-going assessment of the credit worthiness of non-members and have not had a history of any write-offs from non-members, we have not recorded an allowance for doubtful accounts associated with our receivables from members or non-members.
We have a rate management program that allows us to expense and recover interest costs associated with the construction of Vogtle Units No. 3 and No. 4, on a current basis, that would otherwise be deferred or capitalized. The subscribing members of Vogtle Units No. 3 and No. 4 can elect to participate in this program on an annual basis. The Vogtle program allows for the recovery of financing costs associated with the construction of Vogtle Units No. 3 and No. 4 on a current basis. Under this program, amounts billed to participating members in 2020, 20192023, 2022 and 20182021 were $14,684,000, $14,943,000$9,261,000, $14,796,000 and $12,229,000,$15,693,000, respectively. The cumulative amount billed since inception of the program totaled $95,943,000.$135,693,000.
In 2018, we began an additional rate management program that allowsallowed us to recover future expense on a current basis from our members. In general, the program allowsallowed for additional collections over a five-yearfive-year period with those amounts then
A-10

Table of Contents
applied to billings over the subsequent five-year period. The program is designed primarily as a mechanism to assist our members in managing the rate impacts associated with the commercial operation of the new Vogtle units. During the first quarter of 2022, we began applying billing credits to some of our participating members within this program. In December 2022, collections from our members ended for this rate management program. Under this program, net billing credits and amounts billed to participating members during 2020, 20192023, 2022 and 20182021 were $125,842,000 ($52,378,000), $73,051,000$11,774,000 and $15,435,000$143,000,000 respectively. Funds collected through this program are invested and held until applied to members’ bills. Investments that mature and are expected to be applied to members' bills within the next twelve months are included in the Short-term investments line item within our consolidated balance sheets. In conjunction with this program, we are applying regulated operations accounting to defer these revenues and related investment income on the funds collected. Amounts deferred under the program will be amortized to income when applied to members’ bills. The net cumulative amount billed since inception of the program totaled $214,328,000.$369,102,000. As of December 31, 2023, $308,507,000 is our remaining liability to be credited to our members' bills. For additional information regarding our revenue deferral plan, see Note 1q.
f. Receivables
A substantial portion of our receivables are related to capacity and energy sales to our members. These receivables are recorded at the invoiced amount and do not bear interest. Our members are required through the wholesale power contracts to reimburse us for all costs, plus a margin requirement. Receivables from contracts with our members at December 31, 2020, 20192023, 2022 and 20182021 were $135,462,000, $142,946,000$170,901,000, $187,401,000 and $122,888,000,$143,715,000, respectively. Payment is typically received the following month in which capacity and energy are billed. Estimated energy charges are billed based on the amount of energy supplied during the month and are adjusted when actual costs are available, generally the following month.
The remainder of our receivables is primarily related to transactions with non-members from the sale of the BC Smith deferring members' output, affiliated companies and investment income. Our receivables from non-members at December 31, 2023 and 2022 were $30,883,000 and $32,614,000, respectively. Our receivables from non-members were insignificant at December 31, 2021.
As a result of our historical experience, the short duration lifetime of our receivables and the short time horizon over which to consider expectations of future economic conditions, we have assessed that non-collection of the cost
A-11

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
basis of our receivables is remote. During 2020, 20192023, 2022 and 2018, 02021, no credit losses were recognized on any receivables that arose from contracts with members or non-members.
g. Nuclear fuel cost
The cost of nuclear fuel is amortized to fuel expense based on usage. The total nuclear fuel expense for 2020, 20192023, 2022 and 20182021 amounted to $75,968,000, $79,893,000,$84,192,000, $73,871,000, and $85,949,000,$77,366,000, respectively.
Contracts with the U.S. Department of Energy have been executed to provide for the permanent disposal of spent nuclear fuel produced at Plants Hatch and Vogtle. The Department of Energy failed to begin disposing of spent fuel in January 1998 as required by the contracts, and Georgia Power, as agent for the co-owners of the plants has pursued and continues to pursue legal remedies against the Department of Energy for breach of contract.
Georgia Power filed claims against the U.S. government in 2014 (as amended) seeking damages for spent nuclear fuel storage costs at Plant Hatch and Plant Vogtle Units No. 1 and No. 2 covering the period from January 1, 2011 through December 31, 2014. On June 12, 2019, the U.S. Court of Federal Claims granted Georgia Power’s motion for summary judgement on damages not disputed by the U.S. Government and awarded the undisputed damages to Georgia Power. However, these undisputed damages are not collectable by Georgia Power and no amounts will be recognized in our financial statements until the court enters final judgement on the remaining damages.
Georgia Power filed additional claims against the U.S. government in 2017 seeking damages for spent nuclear fuel storage costs at Plant Hatch and Plant Vogtle Units No. 1 and No. 2 covering the period from January 1, 2015 through December 31, 2017. On August 13, 2020, Georgia Power filed amended complaints in each of the lawsuits against the U.S. government in the Court of Federal Claims for damages from January 1, 2018 to December 31, 2019.
Our share of the claims outstanding for the period January 1, 2011 through December 31, 2019 are approximately $84,000,000. Damages will continue to accumulate until the issue is resolved or storage is provided. NaNNo amounts werehave been recognized in the consolidated financial statements as of December 31, 20202023 or December 31, 20192022 for these additional claims. The final outcome of these matters cannot be determined at this time.
Both Plants Hatch and Vogtle have on-site dry spent storage facilities in operation. FacilitiesWe expect that facilities at both plants can be expanded to accommodate spent fuel through the expected life of each plant.
h. Asset retirement obligations and other retirement costs
Asset retirement obligations are legal obligations associated with the retirement of long-lived assets. These obligations represent the present value of the estimated costs for an asset's future retirement discounted using a credit-adjusted risk-free rate, and are recorded in the period in which the liability is incurred. The liabilities we have recognized primarily relate to the
A-11

Table of Contents
decommissioning of our nuclear facilities and coal ash ponds. In addition, we have retirement obligations related to gypsum cells, powder activated carbon cells, landfill sites and asbestos removal. Under the accounting provision for regulated operations, we record a regulatory asset or liability to reflect the difference in timing of recognition of the costs related to nuclear and coal ash related decommissioning for financial statement purposes and for ratemaking purposes.
Periodically, we obtain revised cost studies associated with our nuclear and fossil plants' asset retirement obligations. Actual retirement costs may vary from these estimates. The estimated costs of nuclear and coal ash pond decommissioning are based on the most recent studies performed in 20182020, 2021 and 2019,2023, respectively.
A-12

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
The following table reflects the details of the asset retirement obligations included in the consolidated balance sheets for the years 20202023 and 2019.2022.
(dollars in thousands)
NuclearCoal Ash PondOtherTotal
Balance at December 31, 2019$697,441 $329,264 $43,935 1,070,640 
(dollars in thousands)(dollars in thousands)
NuclearNuclearCoal Ash PondOtherTotal
Balance at December 31, 2022
Liabilities incurred
Liabilities settledLiabilities settled0 (4,656)(2,332)(6,988)
AccretionAccretion40,776 12,059 1,640 54,475 
Deferred accretionDeferred accretion0 (853)0 (853)
Change in cash flow estimatesChange in cash flow estimates0 10,775 7,934 18,709 
Balance at December 31, 2020$738,217 $346,589 $51,177 $1,135,983 
Balance at December 31, 2023

(dollars in thousands)
NuclearCoal Ash PondOtherTotal
Balance at December 31, 2018$658,956 $326,248 $32,359 $1,017,563 
(dollars in thousands)(dollars in thousands)
NuclearNuclearCoal Ash PondOtherTotal
Balance at December 31, 2021
Liabilities incurred
Liabilities settledLiabilities settled(3,380)(1,158)(4,538)
AccretionAccretion38,485 10,494 1,494 50,473 
Deferred accretionDeferred accretion1,860 1,860 
Change in cash flow estimatesChange in cash flow estimates(5,958)11,240 5,282 
Balance at December 31, 2019$697,441 $329,264 $43,935 $1,070,640 
Balance at December 31, 2022
Asset Retirement Obligations
Nuclear Decommissioning.    Nuclear decommissioning cost estimates are based on site studies and assume prompt dismantlement and removal of both the radiated and non-radiated portions of the plant from service, as well as the management of spent fuel. We do not have a legal obligation to decommission non-radiated structures and, therefore, these costs are excluded from the related asset retirement obligation and the amounts in the table above. Actual decommissioning costs may vary from these estimates because of, but not limited to, changes in the assumed date of decommissioning, changes in regulatory requirements, changes in technology, and changes in costs of labor, materials and equipment. Our most recent assessment of the nuclear asset obligation for Plant Hatch and Plant Vogtle Units No. 1 and No. 2, which occurred in 20182021 resulted in an increasea slight decrease in the obligation for nuclear decommissioning. That increaseOn March 6, 2023 and February 14, 2024, Plant Vogtle Units No. 3's and No. 4's nuclear reactors achieved self-sustaining nuclear fission, commonly referred to as initial criticality. As a result, in March 2023, we recognized a new nuclear asset retirement obligation totaling $62,841,000 for Plant Vogtle Unit No. 3. We expect to record an asset retirement obligation of approximately $65,000,000 for Plant Vogtle Unit No. 4 in the cash flow estimates was primarily attributable to general inflation, labor costs, volumefirst quarter of low-level radioactive waste
A-13

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and spent fuel management, among other factors.2021
2024. Our portion of the estimated costs of decommissioning co-owned nuclear facilities for which we have recorded asset retirement obligations as of December 31, 2023 are as follows:
(dollars in thousands)
2018 site studyHatch
Unit No. 1
Hatch
Unit No. 2
Vogtle
Unit No. 1
Vogtle
Unit No. 2
(dollars in thousands)(dollars in thousands)
2021 site study2021 site studyHatch
Unit No. 1
Hatch
Unit No. 2
Vogtle
Unit No. 1
Vogtle
Unit No. 2
Expected start date of decommissioningExpected start date of decommissioning2034203820472049Expected start date of decommissioning2034203820472049
Estimated costs based on site study in 2018 dollars:
Estimated costs based on site study in 2021 dollars:
Radiated structures
Radiated structures
Radiated structuresRadiated structures$209,000 $231,000 $188,000 $206,000 
Spent fuel managementSpent fuel management54,000 49,000 55,000 51,000 
Non-radiated structuresNon-radiated structures14,000 19,000 23,000 29,000 
Total estimated site study costsTotal estimated site study costs$277,000 $299,000 $266,000 $286,000 
A-12

Table of Contents
(dollars in thousands)
2020 site studyVogtle
Unit No. 3
Expected start date of decommissioning2061
Estimated costs based on site study in 2020 dollars:
Radiated structures$187,000 
Spent fuel management19,000 
Non-radiated structures22,000 
Total estimated site study costs$228,000 
We have established funds to comply with the Nuclear Regulatory Commission regulations regarding the decommissioning of our nuclear plants. See Note 1i for information regarding the nuclear decommissioning funds.
We apply the provision of regulated operations to nuclear decommissioning transactions such that collections and investment income (interest, dividends and realized gains and losses) of our nuclear decommissioning funds are compared to the associated decommissioning expenses with the difference deferred as regulatory asset or liability. As this difference is largely attributable to the timing of decommissioning fund earnings, the difference is recorded as an adjustment to investment income in our consolidated statements of revenues and expenses. Unrealized gains and losses of the decommissioning funds are recorded directly to the regulatory asset or liability for asset retirement obligations in accordance with our ratemaking treatment.
Coal Combustion Residuals.    Coal combustion residuals (CCR) are subject to Federal and State regulations. Our obligations associated with CCR are primarily for the closure of coal ash ponds. During 20202023 and 2019,2022, assessments of the coal ash pond asset retirement obligation resulted in a $10,775,000$321,000 increase and a $5,958,000 decrease$16,301,000 increase in the obligationcash flow estimates for coal ash decommissioning, respectively. Estimates are based on various assumptions including, but not limited to, closure and post-closure cost estimates, timing of expenditures, escalation factors, discount rates and methods for complying with the CCR regulations. The 2022 increase in cash flow estimates was primarily due to the Georgia Public Service Commission's approval of Georgia Power's request to revise the closure of the Plant Wansley coal ash pond from in-place to removal. Additional adjustments to the asset retirement obligations are expected periodically due to potential changes in estimates and assumptions.
We have internally segregated the funds collected for coal ash pond and landfillother CCR decommissioning costs, including earnings thereon. As of December 31, 20202023 and December 31, 20192022, the fund balances were $120,536,000$176,630,000 and $93,184,000,$153,208,000, respectively.
We apply the provision of regulated operations to coal ash pond and landfillother CCR decommissioning transactions such that collections and investment income (interest, dividends and realized gains and losses) are compared to the associated decommissioning expenses with the difference deferred to or amortized from the regulatory asset. This difference is recorded to the associated expenses in our consolidated statements of revenues and expenses.
A-14

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
Unrealized gains and losses of the associated decommissioning fund are recorded directly to the regulatory asset in accordance with our ratemaking treatment.
Other Retirement Costs
Accounting standards for asset retirement and environmental obligations do not apply to a retirement cost for which there is no legal obligation to retire the asset, and non-regulated entities are not allowed to accrue for such future retirement costs. We continue to recognize retirement costs for these other obligations in our depreciation rates under the accounting provisions for regulated operations. Accordingly, the accumulated retirement costs for other obligations are reflected as a regulatory liability in our balance sheets. For information regarding accumulated retirement costs for other obligations, see Note 1q.
i. Nuclear decommissioning funds
The Nuclear Regulatory Commission (NRC) requires all licensees operating commercial power reactors to establish a plan for providing, with reasonable assurance, funds for decommissioning. The NRC definition of decommissioning does not include all costs that may be associated with decommissioning, such as spent fuel management and non-radiated structures. We have established external trust funds to comply with the NRC's regulations. Upon approval by the NRC, any funding in the external trust in excess of their requirements may be used for other decommissioning costs. In 2020As a result of nuclear fuel load for Plant Vogtle Units No. 3 and 2019, 0 additional amounts wereNo. 4, in 2023 and 2022, we contributed $4,619,000 and $2,643,000, respectively, to the external trust funds. These funds are managed by unrelated third party investment managers with the discretion to buy, sell and invest pursuant to investment objectives and restrictions set forth in agreements entered into between us and the investment managers. We record the investment securities held in the nuclear decommissioning trust fund at fair value, as disclosed in Note 2. Because day-to-day investment decisions are made by third party investment managers, the ability to hold investments in unrealized loss positions is outside our control.
In addition to the external trust funds, we maintain unrestricted investments internally designated for nuclear decommissioning. These internal funds are available to be utilized to fund the external trust funds, should additional funding be required, as well as other decommissioning costs outside the scope of the NRC funding regulations. The funds are included in long-term investments on our consolidated balance sheet. In both 2020sheets. We contributed $10,000,000 and 2019, we contributed $4,750,000$8,350,000 into the internal funds.
A-13

Table of Contents
funds.in 2023 and 2022, respectively.
The following table outlines the fair value of our nuclear decommissioning funds as of December 31, 20202023 and December 31, 2019.2022. The funds were invested in a diversified mix of approximately 64%71% equity and 36%29% fixed income securities in 20202023 and 2019.69% equity and 31% fixed income securities in 2022.
2020
20232023
External Trust Funds:External Trust Funds:(dollars in thousands)External Trust Funds:(dollars in thousands)
Cost
12/31/2019
PurchasesNet Proceeds(1)Unrealized Gain(Loss)Fair Value 12/31/2020
Cost
12/31/2022
Cost
12/31/2022
Purchases
Net Proceeds(1)
Unrealized Gain(Loss)Fair Value 12/31/2023
EquityEquity$212,585 $27,707 $(16,444)$177,866 $401,714 
DebtDebt174,645 536,147 (523,926)11,100 197,966 
OtherOther(702)14,756 (15,553)0 (1,499)
$386,528 $578,610 $(555,923)$188,966 $598,181 
$
(1)Also included in net proceeds are net realized gains or losses, interest income, dividends and fees of $22,686,000.
2020
Internal Funds:(dollars in thousands)
Cost
12/31/2019
PurchasesNet
Proceeds(1)
Unrealized
Gain(Loss)
Fair Value
12/31/2020
Equity$47,062 $0 $3,586 $33,665 $84,313 
Debt44,347 132,710 (126,590)2,519 52,986 
$91,409 $132,710 $(123,004)$36,184 $137,299 
__________________
(1)Also included in net proceeds are net realized gains or losses, interest income, dividends, contributions and fees of $9,705,000.$22,078,000.
2019
External Trust Funds:(dollars in thousands)
Cost
12/31/2018
PurchasesNet
Proceeds(1)
Unrealized
Gain(Loss)
Fair Value
12/31/2019
Equity$207,313 $11,950 $(6,678)$119,263 $331,848 
Debt166,023 361,844 (353,222)5,548 180,193 
Other115 544 (1,361)(702)
$373,451 $374,338 $(361,261)$124,811 $511,339 
A-15

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
(1)Also included in net proceeds are net realized gains or losses, interest income, dividendsFor the years ended December 31, 2023, 2022 and fees of $13,078,000.2021
2019
20232023
Internal Funds:Internal Funds:(dollars in thousands)Internal Funds:(dollars in thousands)
Cost
12/31/2018
PurchasesNet
Proceeds(1)
Unrealized
Gain(Loss)
Fair Value
12/31/2019
Cost
12/31/2022
Cost
12/31/2022
Purchases
Net
Proceeds(1)
Unrealized
Gain(Loss)
Fair Value
12/31/2023
EquityEquity$44,295 $$2,767 $19,578 $66,640 
DebtDebt38,382 140,997 (135,033)1,161 45,507 
$82,677 $140,997 $(132,266)$20,739 $112,147 
$
__________________
(1)Also included in net proceeds are net realized gains or losses, interest income, dividends, contributions and fees of $8,732,000.$13,542,000.
2022
External Trust Funds:(dollars in thousands)
Cost
12/31/2021
Purchases
Net
Proceeds(1)
Unrealized
Gain(Loss)
Fair Value
12/31/2022
Equity$223,336 $9,255 $(3,655)$131,572 $360,508 
Debt204,935 191,958 (203,907)(12,869)180,117 
Other(795)3,287 (2,401)— 91 
$427,476 $204,500 $(209,963)$118,703 $540,716 
__________________
(1)Also included in net proceeds are net realized gains or losses, interest income, dividends and fees of $5,463,000.
2022
Internal Funds:(dollars in thousands)
Cost
12/31/2021
Purchases
Net
Proceeds(1)
Unrealized
Gain(Loss)
Fair Value
12/31/2022
Equity$68,914 $— $10,005 $18,995 $97,914 
Debt46,856 76,207 (79,828)(2,741)40,494 
$115,770 $76,207 $(69,823)$16,254 $138,408 
__________________
(1)Also included in net proceeds are net realized gains or losses, interest income, dividends, contributions and fees of $6,384,000.
Realized and unrealized gains and losses of the nuclear decommissioning funds that would be recorded in earnings by a non-regulated entity are directly deducted from or added to the regulatory asset or liability for asset retirement obligations in accordance with our rate-making treatment.
The nuclear decommissioning trust fund has produced an average annualized return of approximately 8.4%6.2% in the last ten years and 6.9%6.0% since inception in 1990. Based on current funding and cost study estimates, we expect the current balances and anticipated investment earnings of our decommissioning fund assets to be sufficient to meet all of our future nuclear decommissioning costs. Notwithstanding the above assumption, our management believes that increases in cost estimates of decommissioning can be recovered in future rates.
A-14

Table of Contents
j. Depreciation
Depreciation is computed on additions when they are placed in service using the composite straight-line method. We use standardprescribed depreciation rates as well as site specific rates determined through depreciation studies as approved by the Rural Utilities Service. The depreciation rates for steam, nuclear and nuclearother production in the table below reflect revised rates from depreciation rate studies completed in 2015.2020 or 2021. Site specific depreciation
A-16

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
studies are performed every five years. Annual weighted average depreciation rates in effect in 2020, 2019,2023, 2022, and 20182021 were as follows:
Range of
Useful Life in
years*
202020192018
Remaining Useful Life Range in years*
Remaining Useful Life Range in years*
202320222021
Steam productionSteam production49-652.58 %2.61 %2.57 %Steam production19-213.05 %13.77 %14.47 %
Nuclear productionNuclear production37-601.93 %1.94 %1.92 %Nuclear production11-591.87 %2.17 %2.18 %
Hydro productionHydro production502.00 %2.00 %2.00 %Hydro production432.00 %2.00 %2.00 %
Other productionOther production25-352.61 %2.61 %2.61 %Other production16-302.73 %2.68 %2.60 %
TransmissionTransmission362.75 %2.75 %2.75 %Transmission11-592.75 %2.75 %2.75 %
GeneralGeneral3-502.00-33.33%2.00-33.33%2.00-33.33%General1-422.00-33.33%2.00-33.33%
__________________
*CalculatedBased on estimated retirement dates as of 2023. Actual retirement dates may be different. Remaining useful lives for nuclear production are based on the composite depreciation rates in effect for 2020.

expiration date of the applicable operating license approved by the NRC.
Depreciation expense for the years 2020, 20192023, 2022 and 20182021 was $242,822,000, $237,447,000,$321,047,000, $278,452,000, and $227,213,000,$269,280,000, respectively. In 2023, depreciation expense increased by $42,595,000 compared to 2022 primarily due to Plant Vogtle Unit No. 3 achieving commercial operation in July 2023. In 2021, the composite depreciation rate for Plant Wansley was increased in anticipation of the plant’s retirement in 2022. In addition to the depreciation expense recognized in 2022 and 2021, $165,013,000 and $204,891,000, respectively, of Plant Wansley’s depreciation expense was deferred. Subsequent to the retirement of Plant Wansley, we amortized $25,900,000 and $8,120,000 of deferred depreciation expense in 2023 and 2022, respectively. See Note 1q for information regarding regulatory assets and liabilities.
k. Electric plant
Electric plant is stated at original cost, which is the cost of the plant when first dedicated to public service, including acquisition adjustments, if any, plus the cost of any subsequent additions. Cost includes an allowance for the cost of equity and debt funds used during construction and allocable overheads. For the years 2020, 20192023, 2022 and 2018,2021, the allowance for funds used during construction rates were 4.00%4.18%, 4.30%4.03% and 4.25%3.90%, respectively.
Replacements and renewals of items considered to be units of property, the lowest level of property for which we capitalize, are charged to the plant accounts. At the time properties are disposed of, the original cost is charged to the accumulated provision for depreciation. Cost of removal, less salvage, is charged to a regulatory liability, accumulated retirement costs for other assets. Maintenance and repairs of property and replacements and renewals of items determined to be less than units of property are charged to expense, including certain major maintenance costs at our natural gas-fired plants.
l. Cash and cash equivalents
We consider all temporary cash investments purchased with an original maturity of three months or less to be cash equivalents. Temporary cash investments with maturities at the time of purchase of more than three months are classified as short-term investments.
m. Restricted cash and investments
Restricted short-term investments consistconsisted of funds on deposit with the Rural Utilities Service in the Cushion of Credit Account that arewere held by the U.S. Treasury, acting through the Federal Financing Bank. We can only utilize theseAt December 31, 2022, we had restricted investments totaling $74,031,000, all of which were classified as current. During the three-month period ended March 31, 2023, we utilized all of our restricted investments for futurescheduled Rural Utilities Service-guaranteed Federal Financing Bank debt service payments. Through September 30, 2020 funds earned interestNo restricted investments were held at a rate of 5% per annum. Beginning October 1, 2020, deposits earn interest at 4% per annum and beginning October 1, 2021, the rates will be set at the 1-year floating treasury rate. The program no longer allows additional funds to be deposited into the account. At December 31, 20202023.
Restricted cash consists of collateral posted by our counterparties under our natural gas swap agreements. The following table provides a reconciliation of cash, cash equivalents and 2019, we had restricted investments totaling $487,587,000cash reported within the
A-17

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and $533,590,000, respectively,2021
consolidated balance sheets that sum to the total of which $306,601,000 and $461,757,000, respectively, were classified as long-term.the same such amounts reported in the consolidated statements of cash flows.
Classification
Twelve months ended
December 31, 2023December 31, 2022
(dollars in thousands)
Cash and cash equivalents$490,592 $595,381 
Restricted cash included in restricted cash and short-term investments 30,400 
Total cash, cash equivalents and restricted cash reported in the consolidated statements of cash flows
$490,592 $625,781 
n. Inventories
We maintain inventories of fossil fuel and spare parts, including materials and supplies for our generation plants. These inventories are stated at weighted average cost.
A-15

Table of Contents
The fossil fuel inventories primarily include the direct cost of coal and related transportation charges. The cost of fossil fuel inventories is carried at weighted average cost and is charged to fuel expense as consumed. The spare parts inventories primarily include the direct cost of generating plant spare parts. The spare parts inventory is carried at weighted average cost and the parts are charged to expense or capitalized, as appropriate when installed.
At December 31, 20202023 and December 31, 2019,2022, fossil fuels inventories were $83,547,000$74,149,000 and $74,257,000,$64,386,000, respectively. Inventories for spare parts at 20202023 and 20192022 were $196,742,000$262,896,000 and $203,472,000,$233,565,000, respectively.
o. Deferred charges and other assets
Other deferredDeferred charges primarilyand other assets represent advance depositsregulatory assets, long-term prepayments to Georgia Power Company related to the Vogtle construction project and future generation project costs.
other deferred charges. For a discussion regarding regulatory assets, see Note 1q. Other deferred charges primarily represent the fair value of our natural gas contracts that will settle after the next twelve months and other long-term prepayments.
p. Deferred credits and other liabilities
We have a power bill prepayment program pursuant to which members can prepay their power bills from us at a discount based on our avoided cost of borrowing. The prepayments are credited against the participating members' power bills in the month(s) agreed upon in advance. The discounts are credited against the power bills monthly and are recorded as a reduction to member revenues. The prepayments are being credited against members' power bills through December 2024,2028, with the majority of the balance scheduled to be credited by the end of 2023.2025.
Deferred credits and other liabilities also consists of asset retirement obligations as discussed in Note 1h and regulatory liabilities in Note 1q.
q. Regulatory assets and liabilities
We apply the accounting guidance for regulated operations. Regulatory assets represent certain costs that are probable of recovery from our members in future revenues through rates established under the wholesale power contracts we have with
A-16

Table of Contents
each of our members. These contracts extend through December 31, 2050.2085. Regulatory
A-18

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
liabilities represent certain items of income that we are retaining and that will be applied in the future to reduce revenues required to be recovered from members.
(dollars in thousands)
20202019
Regulatory Assets:
Premium and loss on reacquired debt(a)$35,433 $40,067 
Amortization on financing leases(b)35,328 35,433 
Outage costs(c)35,232 34,367 
Asset retirement obligations –  Ashpond and other(k)242,832 245,932 
Depreciation expense(d)38,396 39,820 
Deferred charges related to Vogtle Units No. 3 and No. 4 training costs(e)55,430 53,466 
Interest rate options cost(f)126,813 121,938 
Deferral of effects on net margin – Smith Energy Facility(g)148,620 154,564 
Other regulatory assets(m)13,354 37,925 
Total Regulatory Assets$731,438 $763,512 
Regulatory Liabilities:
Accumulated retirement costs for other obligations(h)$20,054 $12,692 
Deferral of effects on net margin – Hawk Road Energy Facility(g)17,869 18,485 
Major maintenance reserve(i)39,776 50,144 
Amortization on financing leases(b)11,356 14,256 
Deferred debt service adder(j)123,772 114,453 
Asset retirement obligations – Nuclear(k)130,901 61,516 
Revenue deferral plan(l)220,111 90,066 
Other regulatory liabilities(m)2,560 2,629 
Total Regulatory Liabilities$566,399 $364,241 
Net regulatory assets$165,039 $399,271 
(dollars in thousands)
20232022
Regulatory Assets:
Premium and loss on reacquired debt(a)
$25,476 $29,494 
Amortization on financing leases(b)
28,780 31,908 
Outage costs(c)
30,040 29,317 
Asset retirement obligations –  Ashpond and other(l)
343,523 353,212 
Asset retirement obligations – Nuclear(l)
 32,192 
Depreciation expense - Plant Vogtle(d)
34,125 35,549 
Depreciation expense - Plant Wansley(e)
335,884 361,784 
Deferred charges related to Vogtle Units No. 3 and No. 4 training costs(f)
55,159 54,701 
Interest rate options cost(g)
137,463 136,827 
Deferral of effects on net margin – TA Smith Energy Facility(h)
130,786 136,730 
Other regulatory assets(o)
10,253 10,591 
Total Regulatory Assets$1,131,489 $1,212,305 
Regulatory Liabilities:
Accumulated retirement costs for other obligations(i)
$25,992 $35,580 
Deferral of effects on net margin – Hawk Road Energy Facility(h)
16,020 16,636 
Deferral of effects on net margin – BC Smith Energy Facility(p)
546 14,825 
Major maintenance reserve(j)
120,547 74,584 
Amortization on financing leases(b)
2,658 5,557 
Deferred debt service adder(k)
170,466 154,514 
Asset retirement obligations – Nuclear(l)
47,217 — 
Revenue deferral plan(m)
308,507 357,460 
Natural gas hedges(n)
13,445 131,804 
Other regulatory liabilities(o)
922 1,230 
Total Regulatory Liabilities$706,320 $792,190 
Net regulatory assets$425,169 $420,115 
__________________
(a)Represents premiums paid, together with unamortized transaction costs related to reacquired debt that are being amortized over the lives of the refunding debt, which range up to 2320 years.
(b)Represents the difference between expense recognized for rate-making purposes versus financial statement purposes related to finance lease payments and the aggregate of the amortization of the asset and interest on the obligation.
(c)Consists of both coal-fired maintenance and nuclear refueling outage costs. Coal-fired outage costs are amortized on a straight-line basis to expense over periods up to 60 months, depending on the operating cycle of each unit. Nuclear refueling outage costs are amortized on a straight-line basis to expense over the 18 or 24-month operating cycles of each unit.
(d)Prior to Nuclear Regulatory Commission (NRC) approval of a 20-year license extension for Plant Vogtle, we deferred the difference between Plant Vogtle depreciation expense based on the then 40-year operating license and depreciation expense assuming an expected 20-year license extension. Amortization commenced upon NRC approval of the license extension in 2009 and is being amortized over the remaining life of the plant.
(e)Represents the deferral of accelerated depreciation associated with the early retirement of Plant Wansley, which occurred on August 31, 2022. Amortization commenced upon the retirement of Plant Wansley and will end no later than December 31, 2040.
(f)Deferred charges consist of training related costs, including interest and carrying costs of such training. Amortization will commence effective with the commercial operation date of each unit and amortized to expense over the life of the units.
(f)(g)Deferral of premiums paid to purchase interest rate options used to hedge interest rates on certain borrowings, related carrying costs and other incidentals associated with construction of Vogtle Units No. 3 and No. 4. Amortization will commence whencommenced in August 2023 after Vogtle Unit No. 3 goes in-service, which is expected November 2021.was placed in service on July 31, 2023.
(g)(h)Effects on net margin for TA Smith and Hawk Road Energy Facilities were deferred through the end of 2015 and are being amortized over the remaining life of each respective plant.
(h)(i)Represents the accrual of retirement costs associated with long-lived assets for which there are no legal obligations to retire the assets.
A-19

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
(i)(j)Represents collections for future major maintenance costs; revenues are recognized as major maintenance costs are incurred.
(j)(k)Represents collections to fund certain debt payments to be made through the end of 2025 which will be in excess of amounts collected through depreciation expense; the deferred credits will be amortized over the remaining useful life of the plants.
A-17

Table of Contents
(k)(l)Represents the difference in the timing of recognition of decommissioning costs for financial statement purposes versus ratemaking purposes, as well as the deferral of unrealized gains and losses of funds set aside for decommissioning.
(l)(m)Deferred revenues under a rate management program that allowsallowed for additional collections over a five-yearfive-year period beginning in 2018. These amounts will beare being amortized to income and applied to member billings, per each member's election, over the subsequent five-yearfive-year period.
(m)(n)Represents the deferral of unrealized gains on natural gas contracts.
(o)The amortization periods for other regulatory assets range up to 2930 years and the amortization periods of other regulatory liabilities range up to 63 years.
(p)Effects on net margin for the BC Smith Energy Facility that are being deferred until on or before January 2026 and will be amortized over the remaining life of the plant.
r. Related parties
We and our 38 members are members of Georgia Transmission. Georgia Transmission provides transmission services to its members for delivery of its members' power purchases from us and other power suppliers. We have entered into an agreement with Georgia Transmission to provide transmission services for third party transactions and for service to our owned facilities. For 2020, 2019,2023, 2022, and 2018,2021, we incurred expenses from Georgia Transmission of $37,931,000, $37,156,000$41,426,000, $40,774,000 and $30,428,000,$39,677,000, respectively.
We, Georgia Transmission and 38 of our members are members of Georgia SystemsSystem Operations. Georgia SystemsSystem Operations operates the system control center and currently provides us system operations services and administrative support services. For 2020, 2019,2023, 2022, and 2018,2021, we incurred expenses from Georgia SystemsSystem Operations of $27,104,000, $26,730,000,$30,109,000, $27,416,000, and $25,578,000,$26,936,000, respectively.
s. Other income
Other income includes net revenue from Georgia Transmission and Georgia SystemsSystem Operations for administrative costs, as well as capital credits from investments in associated organizations and other miscellaneous income. In 2021, other income increased due to the recognition of gains on the sale of spare inventory parts from one of our generating facilities.
t. Recently issued or adopted accounting pronouncements
In March 2020,November 2023, the Financial Accounting Standards Board (FASB) issued “Reference Rate Reform“Segment Reporting (Topic 848)280): Facilitation of the Effects of Reference Rate Reform on Financial Reporting”.Improvements to Reportable Segment Disclosures.” The amendments in this update applyare intended to all entities that have contracts, hedging relationships, and other transactions that reference London Interbank Offered Rate (LIBOR) or another reference rate expected to be discontinued because of reference rate reform.improve reportable segment disclosure requirements, primarily through enhanced disclosures about significant expenses. The amendments in this update provide optional expedientsrequire disclosures to include significant segment expenses that are regularly provided to the chief operating decision maker (CODM), a description of other segment items by reportable segment, and exceptions for applying U.S. GAAP to transactions affected by reference rate reform if certain criteria are met. The expedients and exceptions providedany additional measures of a segment's profit or loss used by the amendments in this update do not applyCODM when deciding how to contract modifications made and hedging relationships entered into or evaluated after December 31, 2022, except for hedging relationships existing as of December 31, 2022, for which an entity has elected certain optional expedients that are retained through the end of the hedging relationship.
In January 2021, the FASB issued “Reference Rate Reform (Topic 848): Scope,” to further clarify the scope of the reference rate reform guidance in Topic 848.allocate resources. The amendments in this update refine the scope of Topic 848are also applicable to clarify that certain optional expedients and exceptions therein for contract modifications and hedge accounting apply to contracts that are affected by the discounting transition. Specifically, modifications related to reference rate reform would not be considered an event that requires reassessment of previous accounting conclusions.entities with only one reportable segment. The amendments in this update also amend the expedients and exceptionsrequire all annual disclosures currently required by Topic 280 to be included in Topic 848 to capture the incremental consequences of the scope clarification and to tailor the existing guidance to derivative instruments affected by the discounting transition.
interim periods. The amendments in these updates arenew standard is effective for us for annual reporting periods beginning after December 15, 2023 and interim periods within fiscal years beginning after December 15, 2024. Early adoption is permitted and requires retrospective application to all entities as of March 12, 2020 through December 31, 2022.prior periods presented in the financial statements. We are currently evaluating the future impact of this standard on our consolidated financial statements.
In June 2016,December 2023, the FASB issued "Financial Instruments—Credit Lossesamended "Income Taxes (Topic 326)740): Measurement of Credit Losses on Financial Instruments."Improvements to Income Tax Disclosures”. The standard wasamendments in this update requires additional disclosures related to the rate reconciliation, income taxes paid and other amendments intended to improve effectiveness and comparability. The amendments in this update are effective for us prospectively for annual reporting periods beginning after December 15, 2019,2024. Early adoption is permitted and interim periods therein. On January 1, 2020,should be applied on a prospective basis. Retrospective application is permitted. We are currently evaluating the future impact of this standard on our consolidated financial statements, however, we adopted this standard. The standard requires considerationdo not anticipate the impact will be significant.
A-20

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
u. Measurement of a broad range of information to estimate expected credit losses over the lifetime ofon financial assets measured at amortized cost. The new credit losses standard replaced the “incurred loss” methodology for recognizing credit losses that delayed recognition until it was probable a loss had been incurred. instruments
The financial assets we hold that are subject to the new standardcredit losses (Topic 326) are predominately accounts receivable and certain cash equivalents classified as held-to-maturity debt (e.g. commercial paper). Our receivables are generally due within thirty days or less with a significant portion related to billings to our members. See Notes 1e andNote 1f for information regarding our member receivables. Commercial paper issuances we invest
A-18

Table of Contents
in areis rated as investment grade and backed by a credit facility.grade. Given our historical experience, the short duration lifetime of these financial assets and the short time horizon over which to consider expectations of future economic conditions, we have assessed that non-collection of the cost basis of these financial assets is remote. The adoption of the standard didremote and we have not materially impact our consolidated financial statements.
In August 2018, the FASB issued "Fair Value Measurement (Topic 820): Disclosure Framework - Changes to the Disclosure Requirementsrecognized an allowance for Fair Value Measurement." This standard eliminated, added and modified certain disclosure requirements for fair value measurements as part of the FASB's disclosure framework project. Entities are no longer required to disclose the amount of and reasons for transfers between Level 1 and Level 2 of the fair value hierarchy, the policy for timing of transfers between levels and the valuation processes for Level 3 fair value measurements. However, public business entities are required to disclose the range and weighted average of significant unobservable inputs used to develop Level 3 fair value measurements. The amendments in this update were effective for all entities for fiscal years, and interim periods within those fiscal years, beginning after December 15, 2019. An entity was permitted to early adopt any removed or modified disclosures upon issuance of this update and delay adoption of the additional disclosures until their effective date. The adoption of the standard did not have a material impact on our consolidated financial statements.
In December 2019, the FASB issued “Income Taxes (Topic 740): Simplifying the Accounting for Income Taxes”, as part of its initiative to reduce complexity in the accounting standards. The amendments in the standard remove certain exceptions and also clarify and simplify various aspects of accounting for income taxes. The new standard is effective for us prospectively for annual reporting periods beginning after December 15, 2020, and interim periods therein. Early adoption is
permitted, which we are not electing to do. The adoption of this standard on January 1, 2021 is not expected to have a material impact on our consolidated financial statements.

credit losses.
2. Fair Value:
Authoritative guidance regarding fair value measurements for financial and non-financial assets and liabilities defines fair value, establishes a framework for measuring fair value in accordance with generally accepted accounting principles, and expands disclosures about fair value measurements.
The guidance establishes a three-tier fair value hierarchy which prioritizes the inputs used in measuring fair value as follows:
Level 1.1.  Quoted prices from active markets for identical assets or liabilities as of the reporting date. Active markets are those in which transactions for the asset or liability occur in sufficient frequency and volume to provide pricing information on an ongoing basis. Quoted prices in active markets provide the most reliable evidence of fair value and are used to measure fair value whenever available. Level 1 primarily consists of financial instruments that are exchange-traded.
Level 2.2.  Pricing inputs other than quoted prices in active markets included in Level 1, which are either directly or indirectly observable as of the reporting date. Level 2 includes financial instruments that are valued using models or other valuation methodologies. These models are primarily industry-standard models that consider various assumptions, including quoted forward prices for commodities, time value, volatility factors, and current market and contractual prices for the underlying instruments, as well as other relevant economic measures. Level 2 primarily consists of financial instruments that are non-exchange-traded but have significant observable inputs.
Level 3.3.  Pricing inputs that include significant inputs which are generally less observable from objective sources. These inputs may include internally developed methodologies that result in management's best estimate of fair value. Level 3 financial instruments are those whose fair value is based on significant unobservable inputs.
A-19

Table of Contents
Assets and liabilities measured at fair value are based on one or more of the following three valuation techniques:
(1)Market approach.approach.  The market approach uses prices and other relevant information generated by market transactions involving identical or comparable assets or liabilities (including a business) and deriving fair value based on these inputs.
(2)Income approach.approach.  The income approach uses valuation techniques to convert future amounts (for example, cash flows or earnings) to a single present amount (discounted). The measurement is based on the value indicated by current market expectations about those future amounts.
(3)Cost approach.approach.  The cost approach is based on the amount that currently would be required to replace the service capacity of an asset (often referred to as current replacement cost). This approach assumes that the fair value would not exceed what it would cost a market participant to acquire or construct a substitute asset or comparable utility adjusted for obsolescence.
Fair Value Measurements at Reporting Date Using
December 31, 2020Quoted Prices in
Active Markets for
Identical Assets
(Level 1)
Significant Other
Observable Inputs
(Level 2)
Significant
Unobservable Inputs
(Level 3)
(dollars in thousands)
Nuclear decommissioning trust funds:
Domestic equity$198,325 $198,325 $$
International equity trust$120,645 120,645 
Corporate bonds and debt$98,129 97,788 341 
US Treasury securities$46,963 46,963 
Mortgage backed securities$45,039 45,039 
Domestic mutual funds$70,813 70,813 
Municipal bonds$1,362 1,362 
Federal agency securities$6,054 6,054 
Other$10,851 7,720 3,131 
Long-term investments:
International equity trust$31,378 31,378 
Corporate bonds and debt$29,870 29,661 209 
US Treasury securities$7,437 7,437 
Mortgage backed securities$11,432 11,432 
Domestic mutual funds$224,536 224,536 
Federal agency securities$537 537 
Treasury STRIPS$209,165 209,165 
Other$3,710 3,710 
Natural gas swaps$10,248 10,248 

A-20A-21

Table of ContentsNOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
Fair Value Measurements at Reporting Date Using
December 31, 2019Quoted Prices in
Active Markets for
Identical Assets
(Level 1)
Significant Other
Observable
Inputs
(Level 2)
Significant
Unobservable
Inputs
(Level 3)
(dollars in thousands)
Fair Value Measurements at Reporting Date UsingFair Value Measurements at Reporting Date Using
December 31, 2023December 31, 2023Quoted Prices in
Active Markets for
Identical Assets
(Level 1)
Significant Other
Observable Inputs
(Level 2)
Significant
Unobservable Inputs
(Level 3)
(dollars in thousands)(dollars in thousands)
Nuclear decommissioning trust funds:Nuclear decommissioning trust funds:
Domestic equity
Domestic equity
Domestic equityDomestic equity$179,346 $179,346 $$
International equity trustInternational equity trust$96,204 96,204 
Corporate bonds and debtCorporate bonds and debt$63,849 63,849 
US Treasury securitiesUS Treasury securities$45,522 45,522 
Mortgage backed securitiesMortgage backed securities$62,400 62,400 
Domestic mutual fundsDomestic mutual funds$55,522 55,522 
Municipal bondsMunicipal bonds$1,189 1,189 
Federal agency securitiesFederal agency securities$2,586 2,586 
Non-US Gov't bonds & private placements
International mutual funds
OtherOther$4,721 4,450 271 
Long-term investments:Long-term investments:
International equity trust
International equity trust
International equity trustInternational equity trust$23,161 23,161 
Corporate bonds and debtCorporate bonds and debt$20,395 20,395 
US Treasury securitiesUS Treasury securities$9,257 9,257 
Mortgage backed securitiesMortgage backed securities$12,867 12,867 
Domestic mutual fundsDomestic mutual funds$126,380 126,380 
Federal agency securities$1,082 1,082 
Treasury STRIPSTreasury STRIPS$59,816 59,816 
Treasury STRIPS
Treasury STRIPS
Non-US Gov't bonds & private placements
OtherOther$1,906 1,906 
Short-term investments: Treasury STRIPS
Natural gas swapsNatural gas swaps$32,256 32,256 
A-22

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
Fair Value Measurements at Reporting Date Using
December 31, 2022Quoted Prices in
Active Markets for
Identical Assets
(Level 1)
Significant Other
Observable
Inputs
(Level 2)
Significant
Unobservable
Inputs
(Level 3)
(dollars in thousands)
Nuclear decommissioning trust funds:
Domestic equity$204,129 $204,129 $— $— 
International equity trust$111,266 — 111,266 — 
Corporate bonds and debt$60,806 — 60,788 18 
US Treasury securities$49,775 49,775 — — 
Mortgage backed securities$41,210 — 41,210 — 
Domestic mutual funds$57,348 57,348 — — 
Federal agency securities$2,037 — 2,037 — 
Non-US Gov't bonds & private placements$2,890 — 2,890 — 
International mutual funds$653 653 
Other$10,602 10,602 — — 
Long-term investments:
International equity trust$33,606 — 33,606 — 
Corporate bonds and debt$10,473 — 10,473 — 
US Treasury securities$15,488 15,488 — — 
Mortgage backed securities$12,113 — 12,113 — 
Domestic mutual funds$302,302 302,302 — — 
Treasury STRIPS$293,281 — 293,281 — 
Non-US Gov't bonds & private placements$1,976 — 1,976 — 
Other$240 240 — — 
Short-term investments: Treasury STRIPS$61,702 61,702 
Natural gas swaps$131,804 — 131,804 — 
The Level 2 investments above in corporate bonds and debt, federal agency mortgage backed securities, and mortgage backed securities may not be exchange traded. The fair value measurements for these investments are based on a market approach, including the use of observable inputs. Common inputs include reported trades and broker/dealer bid/ask prices. The fair value of the Level 2 investments above in international equity trust are calculated based on the net asset value per share of the fund. There are 0no unfunded commitments for the international equity trust and redemption may occur daily with a 3-day redemption notice period.
The Level 3 investments above in corporate bonds and debt consist of investments in bank loans which are not exchange traded. Although these securities may be liquid and priced daily, their inputs are not observable.
The estimated fair values of our long-term debt, including current maturities at December 31, 20202023 and 20192022 were as follows:
20202019
(in thousands)
Carrying
Value
Fair
Value
Carrying
Value
Fair
Value
Long-term debt$10,619,826 $13,161,146 $9,726,428 $11,180,658 
20232022
(in thousands)
Carrying
Value
Fair
Value
Carrying
Value
Fair
Value
Long-term debt$12,096,552 $10,638,749 $11,940,359 $10,194,954 
The estimated fair value of long-term debt is classified as Level 2 and is based on observed or quoted market prices for the same or similar issues, or based on current rates offered to us for debt of similar maturities. The
A-23

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
primary sources of our long-term debt consist of first mortgage bonds, pollution control revenue bonds and long-term debt issued by the Federal Financing Bank that is guaranteed by the Rural Utilities Service or the U.S. Department of Energy. The valuations for the first mortgage bonds and the pollution control revenue bonds were obtained from a third party data reporting service, and are based on secondary market trading of our debt. Valuations for debt issued by the Federal Financing Bank are based on U.S. Treasury rates as of December 31, 20202023 plus an applicable spread, which reflects our borrowing rate for new loans of this type from the Federal Financing Bank.
A-21

Table of Contents
For cash and cash equivalents, restricted cash and short-term investments and receivables, the carrying amount approximates fair value because of the short-term maturity of those instruments. Restricted investments consist of funds on deposit with the Rural Utilities Service in the Cushion of Credit Account and the carrying amount of these investments approximates fair value because of the liquid nature of the deposits with the U.S. Treasury.

3. Derivative instruments:
We use commodity trading derivatives to manage our exposure to fluctuation in the market price of natural gas. Our risk management and compliance committee provides general oversight over all derivative activities. We do not apply hedge accounting to derivative transactions, but instead apply regulated operations accounting. Consistent with our rate-making, unrealized gains or losses on our natural gas swaps are reflected as regulatory assets or liabilities, as appropriate. Realized gains and losses on natural gas swaps are included in fuel expense within our consolidated statements of revenues and expenses and, therefore, net margins within our consolidated statements of cash flows.
We are exposed to credit risk as a result of entering into these hedging arrangements. Credit risk is the potential loss resulting from a counterparty's nonperformance under an agreement. We have established policies and procedures to manage credit risk through counterparty analysis, exposure calculation and monitoring, exposure limits, collateralization and certain other contractual provisions.
It is possible that volatility in commodity prices could cause us to have credit risk exposures with one or more counterparties. If such counterparties fail to perform their obligations, we could suffer a financial loss. However, as of December 31, 20202023 all of the counterparties with transaction amounts outstanding under our hedgingderivative programs are rated investment grade by the major rating agencies or have provided a guaranty from one of their affiliates that is rated investment grade.
We have entered into International Swaps and Derivatives Association agreements with our natural gas hedgederivative counterparties that mitigate credit exposure by creating contractual rights relating to creditworthiness, collateral, termination and netting (which, in certain cases, allows us to use the net value of affected transactions with the same counterparty in the event of default by the counterparty or early termination of the agreement).
Additionally, we have implemented procedures to monitor the creditworthiness of our counterparties and to evaluate nonperformance in valuing counterparty positions. We have contracted with a third party to assist in monitoring certain of our counterparties' credit standing and condition. Net liability positions are generally not adjusted as we use derivative transactions as hedges and have the ability and intent to perform under each of our contracts. In the instance of net asset positions, we consider general market conditions and the observable financial health and outlook of specific counterparties, forward looking data such as credit default swaps, when available, and historical default probabilities from credit rating agencies in evaluating the potential impact of nonperformance risk to derivative positions.
The contractual agreements contain provisions that could require us or the counterparty to post collateral or credit support. The amount of collateral or credit support that could be required is calculated as the difference between the aggregate fair value of the hedges and pre-established credit thresholds. The credit thresholds are contingent upon each party's credit ratings from the major credit rating agencies. The collateral and credit support requirements vary by contract and by counterparty.
Under the natural gas swap arrangements, we pay the counterparty a fixed price for specified natural gas quantities and receive a payment for such quantities based on a market price index. These payment obligations are netted, such that if the market price index is lower than the fixed price, we will make a net payment, and if the market price index is higher than the fixed price, we will receive a net payment.
A-24

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
At December 31, 20202023 and 2019,2022, the estimated fair valuevalues of our natural gas contracts was awere net liabilityassets of $10,248,000$13,445,000 and $32,256,000,$131,804,000, respectively.
As of December 31, 2020 and 2019, neither we nor any counterparties2023, none of our counterparties were required to post credit support or collateral under theunder our natural gas swap agreements. If the credit-risk-related contingent features underlying these agreements were triggered onAs of December 31, 2020 due to2022, one of our credit rating being downgraded below investment grade, we would have beencounterparties was required to post letters of credit of approximately $10,248,000 withcollateral totaling $30,400,000 under our counterparties.
A-22

natural gas swap agreements. Table of ContentsSuch posted collateral was classified as restricted cash and included in the Restricted cash and short-term investments line item within our consolidated balance sheets.
The following table reflects the volume activity of our natural gas derivatives as of December 31, 20202023 that is expected to settle or mature each year:
YearYearNatural Gas
Swaps
(MMBTUs)
YearNatural Gas
Swaps
(MMBTUs)
(in millions)
202127.5 
202223.7 
202318.7 
(in millions)(in millions)
2024202417.5 
2025202513.4 
2026
2027
2028
TotalTotal100.8 
The table below reflects the fair value of derivative instruments and their effect on our consolidated balance sheets at December 31, 20202023 and 2019.2022.
Consolidated Balance Sheet
Location
Fair Value
20202019
(dollars in thousands)
Consolidated
Balance Sheet
Location
Consolidated
Balance Sheet
Location
Fair Value
202320232022
(dollars in thousands)(dollars in thousands)
AssetsAssets
Natural gas swaps
Natural gas swaps
Natural gas swaps
Natural gas swapsNatural gas swapsOther current assets$222 $
LiabilitiesLiabilities
Natural gas swapsNatural gas swapsOther current liabilities$2,305 $12,898 
Natural gas swapsNatural gas swapsOther deferred credits$8,165 $19,358 
Natural gas swaps
Natural gas swaps
The following table presents the realized gains and (losses) on derivative instruments recognized in margin for the years ended December 31, 2020, 20192023, 2022 and 2018.2021.
Consolidated
Statement of
Revenues and
Expenses Location
202020192018
(dollars in thousands)
Natural Gas SwapsFuel$830 $224 $6,088 
Natural Gas SwapsFuel(21,179)(9,308)(956)
Total$(20,349)$(9,084)$5,132 
Consolidated
Statement of
Revenues and
Expenses Location
202320222021
(dollars in thousands)
Natural gas swaps gainsFuel$2,001 $121,626 $31,440 
Natural gas swaps lossesFuel(22,924)(6,587)(1,431)
Total
$(20,923)$115,039 $30,009 
A-25

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
The following table presents the unrealized (gains) and losses on derivative instruments deferred on the consolidated balance sheetsheets at December 31, 20202023 and 2019.2022.
Consolidated Balance
Sheet Location
2023
2023
20232022
(dollars in thousands)(dollars in thousands)
Consolidated Balance
Sheet Location
20202019
(dollars in thousands)
Natural Gas SwapsRegulatory asset$10,248 $32,256 
Natural gas swaps
Natural gas swaps
Natural gas swaps
TotalTotal$10,248 $32,256 

A-23

Table of Contents
4. Investments:
Investments in debt and equity securities
Investment securities we hold are recorded at fair value in the accompanying consolidated balance sheets. We apply regulated operations accounting to the unrealized gains and losses of all investment securities. All realized and unrealized gains and losses are determined using the specific identification method.
The following tables summarize debt and equity securities at December 31, 20202023 and 2019.2022.
(dollars in thousands)
Gross Unrealized
2020CostGainsLossesFair Value
(dollars in thousands)(dollars in thousands)
Gross UnrealizedGross Unrealized
20232023CostGainsLossesFair Value
EquityEquity$262,564 $219,658 $(8,127)$474,095 
DebtDebt613,271 18,090 (641)630,720 
OtherOther11,431 0 0 11,431 
TotalTotal$887,266 $237,748 $(8,768)$1,116,246 

(dollars in thousands)
Gross Unrealized
2022CostGainsLossesFair Value
Equity$323,907 $159,445 $(8,949)$474,403 
Debt833,035 372 (46,369)787,038 
Other10,445 20 (9)10,456 
Total$1,167,387 $159,837 $(55,327)$1,271,897 
(dollars in thousands)
Gross Unrealized
2019CostGainsLossesFair Value
Equity$258,870 $144,832 $(5,990)$397,712 
Debt354,535 8,474 (874)362,135 
Other6,356 6,356 
Total$619,761 $153,306 $(6,864)$766,203 
The cost basis of our debt securities that were in unrealized loss positions at December 31, 2023 was $788,798,000. At December 31, 2023, $3,362,000 of the $25,181,000 of unrealized losses relates to securities that have been in unrealized loss positions for less than twelve months and $21,819,000 relates to securities that have
A-26

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
been in unrealized loss positions for greater than twelve months. These unrealized losses are primarily attributable to increases in market interest rates.
The contractual maturities of debt securities, which are included in the estimated fair value table above, at December 31, 20202023 and 20192022 are as follows:
(dollars in thousands)
20202019
CostFair ValueCostFair Value
(dollars in thousands)(dollars in thousands)
202320232022
CostCostFair ValueCostFair Value
Due within one yearDue within one year$163,890 $164,635 $81,637 $81,914 
Due after one year through five yearsDue after one year through five years242,958 247,857 47,212 48,188 
Due after five years through ten yearsDue after five years through ten years68,659 73,479 51,892 54,184 
Due after ten yearsDue after ten years137,764 144,749 173,794 177,849 
TotalTotal$613,271 $630,720 $354,535 $362,135 
The following table summarizes the realized gains and losses and proceeds from sales of securities for the years ended December 31, 2020, 20192023, 2022 and 2018:2021:
(dollars in thousands)
202020192018
Gross realized gains$36,647 $18,076 $14,268 
Gross realized losses(16,868)(12,018)(19,139)
Proceeds from sales756,513 544,043 626,612 
A-24

Table of Contents
(dollars in thousands)
202320222021
Gross realized gains$15,518 $10,029 $33,501 
Gross realized losses(8,564)(31,979)(19,985)
Proceeds from sales720,186 301,128 913,600 
Investment in associated companies
Investments in associated companies were as follows at December 31, 20202023 and 2019:2022:
(dollars in thousands)
20202019
(dollars in thousands)(dollars in thousands)
202320232022
National Rural Utilities Cooperative Finance Corporation (CFC)National Rural Utilities Cooperative Finance Corporation (CFC)$24,080 $24,065 
CT Parts, LLCCT Parts, LLC6,554 7,175 
Georgia Transmission CorporationGeorgia Transmission Corporation33,943 32,106 
Georgia System Operations
Corporation7,500 7,000 
Georgia System Operations Corporation
OtherOther2,767 2,972 
TotalTotal$74,844 $73,318 
The CFC investments consist of capital term certificates required in connection with our membership in CFC and a voluntary investment in CFC member capital securities. Accordingly, there is no market for these investments and they are valued at cost. The investment in Georgia Transmission represents capital credits valued at cost. The investment in Georgia System Operations represents loan advances. Repayments of these advances are due by December 2024.2028.
CT Parts, LLC is an affiliated organization formed by us and Smarr EMC for the purpose of purchasing and maintaining spare parts inventory and for the administration of contracted services for combustion turbine generation facilities. Such investment is recorded at cost.
Rocky Mountain transactions
In December 1996 and January 1997, we entered into 6six long-term lease transactions relating to our 74.61% undivided interest in Rocky Mountain. In each transaction, we leased a portion of our undivided interest in Rocky Mountain to 6six separate owner trusts for the benefit of 3three investors, referred to as owner participants, for a term equal to 120% of the estimated useful life of Rocky Mountain. Immediately thereafter, the owner trusts leased their
A-27

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
undivided interests in Rocky Mountain to our wholly owned subsidiary, Rocky Mountain Leasing Corporation, or RMLC, for a term of 30 years under 6six separate leases. RMLC then subleased the undivided interests back to us under 6six separate leases for an identical term.
In 2012, we terminated 5five of the 6six lease transactions prior to the end of their lease terms. The remaining lease in place represented approximately 10% of the original lease transactions. Pursuant to a payment undertaking agreement, we have a guarantee for the annual basic rent payments due under the remaining lease. The fair value amount relating to the guarantee of basic rent payment is immaterial to us principally due to the high credit rating of the payment undertaker, Rabobank Nederland. The basic rental payments remaining through the end of the lease, which expires in 2027, are approximately $30,892,000.$13,901,000.
At the end of the term of the remaining facility lease, we have the option to cause RMLC to purchase the owner trust's undivided interest in Rocky Mountain at a fixed purchase option price of approximately $112,000,000. The payment undertaking agreement, along with the equity funding agreement with AIG Matched Funding Corp., would fund approximately $74,000,000 and $37,928,000 of this amount, respectively, and these amounts would be paid to the owner trust over 5five installments in 2027. If we do not elect to cause RMLC to purchase the owner trust's undivided interest in Rocky Mountain, Georgia Power has an option to purchase the undivided interest. If neither we nor Georgia Power exercise our purchase option, and we return (through RMLC) the undivided interest in Rocky Mountain to the owner trust, the owner trust has several options it can elect, including:
causing RMLC and us to renew the related facility lease and facility sublease for up to an additional 16 years and provide collateral satisfactory to the owner trust,
leasing its undivided interest to a third party under a replacement lease, or
retaining the undivided interest for its own benefit.
A-25

Table of Contents
Under the first two of these options we must arrange new financing for the outstanding amount of the loan used to finance the owner trust's upfront rental payment made to us when the lease closed on December 31, 1996. At the end of the lease term, the amount of the outstanding loan is anticipated to be approximately $74,000,000. If new financing cannot be arranged, the owner trust can ultimately cause us to purchase 49%, in the case of the first option above, or all, in the case of the second option above, of the loan certificate or cause RMLC to exercise its purchase option or RMLC to renew the facility lease and facility sublease, respectively.
The assets of RMLC are not available to pay our creditors.

5. Income taxes:
While we are a not-for-profit membership corporation formed under the laws of the state of Georgia, we are subject to federal and state income taxation. As a taxable cooperative, we are allowed to deduct patronage dividends that we allocate to our members for purposes of calculating our taxable income. We annually allocate income and deductions between patronage and non-patronage activities and substantially all of our income is from patronage-sourced activities, resulting in 0no current period income tax expense or current or deferred income tax liability.
Although we believe that treatment of non-member sales as patronage-sourced income is appropriate, this treatment has not been examined by the Internal Revenue Service. If this treatment was not sustained, we believe that the amount of taxes on such non-member sales, after allocating related expenses against the revenues from such sales, would not have a material adverse effect on our financial condition or results of operations and cash flows.
We account for income taxes pursuant to the authoritative guidance for accounting for income taxes, which requires the recognition of deferred tax assets and liabilities for the expected future tax consequences of events that have been included in the financial statements or tax returns.
A-28

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
The difference between the statutory federal income tax rate on income before income taxes and our effective income tax rate is summarized as follows:
202020192018
Statutory federal income tax rate21.0 %21.0 %21.0 %
Patronage exclusion(21.0)%(21.0)%(20.8)%
AMT credit monetization0.0 %0.0 %0.0 %
Other0.0 %0.0 %(0.2)%
Effective income tax rate0.0 %0.0 %0.0 %


A-26

Table of Contents
202320222021
Statutory federal income tax rate21.0 %21.0 %21.0 %
Patronage exclusion(21.0)%(21.0)%(21.0)%
Effective income tax rate0.0 %0.0 %0.0 %
The components of our net deferred tax assets and liabilities as of December 31, 20202023 and 20192022 were as follows:

(dollars in thousands)
20232022
Deferred tax assets
Net operating losses$109,447 $115,080 
Obligation related to asset retirements375,530 345,879 
Advance payments176,956 183,833 
Other regulatory liabilities23,652 18,687 
Other assets30,085 30,373 
Deferred tax assets715,670 693,852 
Less: Valuation allowance — 
Net deferred tax assets
$715,670 $693,852 
Deferred tax liabilities
Fixed assets and intangibles$(154,219)$(140,095)
Right-of-use assets-finance leases(77,923)(77,923)
Other regulatory asset(373,802)(343,230)
Other liabilities(15,679)(15,352)
Deferred tax liabilities(621,623)(576,600)
Net deferred tax assets (liabilities)
$94,047 $117,252 
Less: Patronage exclusion(94,047)(117,252)
Net deferred taxes
$ $— 
(dollars in thousands)
20202019
Deferred tax assets
   Net operating losses$0 $1,123 
   Tax credits (alternative minimum tax and other)
Accounting for Rocky Mountain transactions232,169 231,844 
Advance payments112,394 74,482 
Other assets91,938 88,821 
Deferred tax assets436,501 396,270 
Less: Valuation allowance0 (1,123)
Net deferred tax assets$436,501 $395,147 
Deferred tax liabilities
Depreciation$254,047 $258,724 
Accounting for Rocky Mountain transactions119,773 118,021 
Other liabilities63,797 68,035 
Deferred tax liabilities437,617 444,780 
Net deferred tax assets/(liabilities)(1,116)(49,633)
Less: Patronage exclusion1,116 49,633 
Net deferred taxes$0 $
Federal taxAs of December 31, 2023, we have federal net operating loss carryforwards of $4,362,000 expired in$425,203,000 which may be carried forward indefinitely. Due to the current year.tax basis method for allocating patronage dividends, we will utilize this loss to offset any future federal taxable income prior to member allocation per the bylaws. There is no net impact to the deferred tax asset after the patronage exclusion.
The authoritative guidance for income taxes addresses the determination of whether tax benefits claimed or expected to be claimed on a tax return should be recorded in the financial statements. We may recognize the tax benefit from an uncertain tax position only if it is more likely than not that the tax position will be sustained on examination by the taxing authorities, based on the technical merits of the position. The tax benefits recognized in the financial statements from such a position should be measured based on the largest benefit that has a greater than fifty percent likelihood of being realized upon ultimate settlement.
We file a U.S. federal consolidated income tax return. The U.S. federal statute of limitations remains open for the year 20172020 and forward. State jurisdictions have statutes of limitations generally ranging from three to five years from the filing of an income tax return. The state impact of any federal changes remains subject to examination by various states for a period of up to one year after formal notification to the states. Years still open to examination by tax authorities in major state jurisdictions include 20172020 and forward. We have no liabilities recorded for uncertain tax positions.

A-29

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
6. Leases:
As a lessee, we have a relatively small portfolio of leases with the most significant being our 60% undivided interest in Scherer Unit No. 2 and railcar leases for the transportation of coal. We also have various other leases of minimal value.
We classify our four Scherer Unit No. 2 leases as finance leases and our railcar leases as operating leases. We have made an accounting policy election not to recognize right-of-use assets and lease liabilities that arise from short-term leases, leases having an initial term of 12 months or less, for any class of underlying asset. We recognize lease expense for short-term leases on a straight-line basis over the lease term. Lease expense recognized for our short-term leases during 20202023 and 20192022 was insignificant.
Finance Leases
NaNThree of our Scherer Unit No. 2 finance leases have lease terms through December 31, 2027, and 1one lease extends through June 30, 2031. At the end of the leases, we can elect at our sole discretion to:
Renew the leases for a period of not less than one year and not more than five years at fair market value,
A-27

Table of Contents
Purchase the undivided interest at fair market value, or
Redeliver the undivided interest to the lessors.
For rate-making purposes, we include the actual lease payments for our finance leases in our cost of service. The difference between lease payments and the aggregate of the amortization on the right-of-use asset and the interest on the finance lease obligation is recognized as a regulatory asset. Finance lease amortization is recorded in depreciation and amortization expense.
Operating Leases
Our railcar operating leases have terms that extend through March 16, 2024.November 30, 2028. At the end of the railcar operating leases, we can renew at terms mutually agreeable by us and the lessors, purchase the assets or return the assets to the lessors. We have an additional operating leaseleases including one for office equipment that has a term extending through October 31, 2028 and one for real property at one of our electric generating facilities that extendshas a term extending through February 2042 with one renewal option for a 20-year term.
The exercise of renewal options for our finance and operating leases is at our sole discretion.
As all of our operating leases do not provide an implicit rate, we useduse our incremental borrowing rate based on the information available at the time new lease agreements are entered into or reassessed to determine the present value of lease payments.
For lease agreements entered into or reassessed after the adoption of the new leases standard, weWe combine lease and nonlease components.components for all lease agreements.

Classification20202019
(dollars in thousands)
Right-of-Use Assets - Finance leases
   Right-of-use assets$302,732 $302,732 
   Less: Accumulated provision for depreciation(262,774)(257,504)
      Total finance lease assets$39,958 $45,228 
Lease liabilities - Finance leases
   Obligations under finance leases$68,876 $75,649 
   Long-term debt and finance leases due within one year6,773 6,081 
      Total finance lease liabilities$75,649 $81,730 

Classification20202019
(dollars in thousands)
Right-of-Use Assets - Operating leases
   Electric plant in service$3,283 $3,237 
      Total operating lease assets$3,283 $3,237 
Lease liabilities - Operating leases
   Capitalization - Other$2,388 $2,293 
   Other current liabilities990 1,252 
      Total operating lease liabilities$3,378 $3,545 

Classification20232022
(dollars in thousands)
Right-of-use assets - Finance leases
   Right-of-use assets$302,732 $302,732 
   Less: Accumulated provision for depreciation(278,586)(272,876)
      Total finance lease assets$24,146 $29,856 
Lease liabilities - Finance leases
   Obligations under finance leases$43,586 $52,937 
   Long-term debt and finance leases due within one year9,351 8,398 
      Total finance lease liabilities$52,937 $61,335 
A-28A-30

Table of ContentsNOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
20202019
(dollars in thousands)
Lease CostClassification
Finance lease cost:
   Amortization of leased assetsDepreciation and amortization$5,376 $4,756 
   Interest on lease liabilitiesInterest expense$8,868 $9,488 
Operating lease costInventory(1) & production expense$1,305 $3,179 
      Total lease cost$15,549 $17,423 
Classification20232022
(dollars in thousands)
Right-of-use assets - Operating leases
   Electric plant in service, net$6,587 $3,326 
      Total operating lease assets$6,587 $3,326 
Lease liabilities - Operating leases
   Capitalization - Other$5,152 $2,256 
   Other current liabilities1,529 1,164 
      Total operating lease liabilities$6,681 $3,420 

20232022
(dollars in thousands)
Lease CostClassification
Finance lease cost:
   Amortization of leased assetsDepreciation and amortization$8,398 $7,542 
   Interest on lease liabilitiesInterest expense$6,551 $7,408 
Operating lease cost
Inventory(1) & production expense
$1,441 $995 
      Total lease cost$16,390 $15,945 
__________________
(1)The majority of our operating lease costs relate to our railcar leases and such costs are added to the cost of our fossil-fuel inventories and are recognized in fuel expense as the inventories are consumed.

December 31, 2023December 31, 2022
Lease Term and Discount Rate
Weighted-average remaining lease term (in years):
   Finance leases5.265.94
   Operating leases5.776.44
Weighted-average discount rate:
   Finance leases11.05 %11.05 %
   Operating leases6.37 %5.52 %
December 31, 2020December 31, 2019
Lease Term and Discount Rate
Weighted-average remaining lease term (in years):
   Finance leases7.868.84
   Operating leases7.277.39
Weighted-average discount rate:
   Finance leases11.05 %11.05 %
   Operating leases4.63 %5.12 %
20232022
(dollars in thousands)
Other Information:
Cash paid for amounts included in the measurement of lease liabilities
   Operating cash flows from finance leases$6,551 $7,408 
   Operating cash flows from operating leases$1,410 $1,009 
   Financing cash flows from finance leases$8,398 $7,541 
Right-of-use assets obtained in exchange for new operating lease liabilities$4,503 $1,954 

A-31

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS

For the years ended December 31, 2023, 2022 and 2021
20202019
(dollars in thousands)
Other Information:
Cash paid for amounts included in the measurement of lease liabilities
   Operating cash flows from finance leases$8,868 $9,488 
   Operating cash flows from operating leases$1,540 $3,710 
   Financing cash flows from finance leases$6,082 $5,461 
Right-of-use assets obtained in exchange for new operating lease liabilities$1,227 $6,983 
Maturity analysis of our finance and operating lease liabilities as of December 31, 20202023 is as follows:

A-29

Table of Contents
(dollars in thousands)
(dollars in thousands)(dollars in thousands)
Year Ending December 31,Year Ending December 31,Finance LeasesOperating LeasesTotalYear Ending December 31,Finance LeasesOperating LeasesTotal
2021$14,949 $1,119 $16,068 
202214,949 929 15,878 
202314,949 708 15,657 
2024202414,949 234 15,183 
2025202514,949 72 15,021 
2026
2027
2028
ThereafterThereafter40,583 1,012 41,595 
Total lease payments Total lease payments$115,328 $4,074 $119,402 
Less: imputed interest Less: imputed interest(39,679)(696)(40,375)
Present value of lease liabilitiesPresent value of lease liabilities$75,649 $3,378 $79,027 
As a lessor, we primarily lease office space to several tenants within our headquarters building. Several of these tenants are related parties. We account for all of these lease agreements as operating leases.
Lease income recognized during 20202023 and 20192022 was as follows:

20202019
Lease income$6,171 $6,071 

20232022
(dollars in thousands)
Lease income$6,776 $6,539 
7. Debt:
Long-term debt consists of first mortgage notes payable to the United States of America acting through the Federal Financing Bank (FFB) and guaranteed by the Rural Utilities Service or the U.S. Department of Energy, first mortgage bonds payable (FMBs) and first mortgage notes issued in conjunction with the sale by public authorities of pollution control revenue bonds (PCBs)(PCRBs). Substantially all of our owned tangible and certain of our intangible assets are pledged under our first mortgage indenture as collateral for the Federal Financing Bank notes, the first mortgage bonds, and the first mortgage notes issued in conjunction with the sale of pollution control revenue bonds.
Maturities for long-term debt and finance lease obligations through 20252028 are as follows:
(dollars in thousands)
20212022202320242025
FFB$200,867 $275,553 $247,601 $222,273 $229,168 
FMBs1,010 1,010 1,010 63,510 62,500 
PCBs(1)
122,620 245,605 
$201,877 $276,563 $371,231 $531,388 $291,668 
Finance Leases6,772 7,541 8,398 9,351 10,413 
Total$208,649 $284,104 $379,629 $540,739 $302,081 
(1)In addition to regularly scheduled principal payments included are amounts that would be due at the later of (i) maturity date of the credit support facilities backing the Series 2009 and Series 2010 pollution control bonds, or at the mandatory redemption date of the Series 2017A and Series 2017B pollution control bonds or (ii) at the maturity of an alternative back-up credit facility we currently have available to refinance draws on the credit facilities or provide alternative credit support for these bonds. We currently maintain a $1.21 billion syndicated bank credit facility with a maturity date of December 2024 which backs the Series 2010 pollution control bonds and would be available as an alternative back-up credit facility for the Series 2009 pollution control bonds noted above. As such, December 2024 is the designated maturity date for the Series 2019 and Series 2020 pollution control bonds totaling $245.6 million. The Series 2017 bonds totaling $122.6 million have a mandatory redemption in 2023 if the bonds are not remarketed before then, and as such, October 2023 is the designated maturity date for the Series 2017 bonds. The nominal maturities of the Series 2017 pollution control bonds range from 2040 to 2045.
(dollars in thousands)
20242025202620272028
FFB$311,565 $284,714 $265,177 $242,177 $283,089 
FMBs63,510 62,500 62,500 62,500 62,500 
PCRBs— — — — — 
$375,075 $347,214 $327,677 $304,677 $345,589 
Finance Leases9,351 10,413 11,595 12,912 2,153 
Total$384,426 $357,627 $339,272 $317,589 $347,742 
The weighted average interest rate on our long-term debt at December 31, 20202023 and 20192022 was 3.73%3.89% and 3.96%3.78%, respectively. The weighted average interest rate on our short-term borrowings at December 31, 2023 and 2022 was 5.72% and 4.84%, respectively.
A-30A-32

Table of ContentsNOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
Long-term debt outstanding and the associated unamortized debt issuance costs and debt discounts at December 31, 20202023 and December 31, 20192022 are as follows:
20202019
PrincipalUnamortized Debt
Issuance Costs
and
Debt Discounts
PrincipalUnamortized Debt
Issuance Costs
and
Debt Discounts
(dollars in thousands)
202320232022
PrincipalPrincipalUnamortized Debt
Issuance Costs
and
Debt Discounts
PrincipalUnamortized Debt
Issuance Costs
and
Debt Discounts
(dollars in thousands)(dollars in thousands)
FFBFFB$5,985,015 $57,971 $5,540,215 $60,356 
FMBsFMBs3,654,041 49,134 3,205,052 39,793 
PCRBsPCRBs980,770 12,460 980,770 11,073 
CFC0 0 391 
$10,619,826 $119,565 $9,726,428 $111,222 
$
$
$
We use the effective interest rate method to amortize debt issuance costs and debt discounts as well as the straight-line method when the results approximate those of the effective interest rate method. Unamortized debt issuance costs and debt discounts are being amortized to expense over the life of the respective debt issues.
a)Department of Energy Loan Guarantee:
Pursuant to the loan guarantee program established under Title XVII of the Energy Policy Act of 2005, we and the U.S. Department of Energy, acting by and through the Secretary of Energy, entered into a Loan Guarantee Agreement on February 20, 2014 pursuant to which the Department of Energy agreed to guarantee our obligations under a Note Purchase Agreement, dated as of February 20, 2014 (the Original Note Purchase Agreement), among us, the Federal Financing Bank and the Department of Energy and 2two future advance promissory notes, each dated February 20, 2014, made by us to the Federal Financing Bank in the aggregate amount of $3,057,069,461 (the Original FFB Notes and together with the Original Note Purchase Agreement, the Original FFB Documents).
On March 22, 2019, we and the Department of Energy entered into an Amended and Restated Loan Guarantee Agreement (as amended, the Loan Guarantee Agreement) which increased the aggregate amount guaranteed by the Department of Energy to $4,676,749,167. We also entered into a Note Purchase Agreement dated as of March 22, 2019 (the Additional Note Purchase Agreement), among us, the Federal Financing Bank and the Department of Energy and a future advance promissory note, dated March 22, 2019, made by us to the Federal Financing Bank in the amount of $1,619,679,706 (the Additional FFB Note and together with the Additional Note Purchase Agreement, the Additional FFB Documents).
Together, the Original FFB Documents and Additional FFB Documents provide for a multi-advance term loan facility (the Facility) under which we may make long-term loan borrowings through the Federal Financing Bank.
Proceedsborrowed a total of advances made$4,633,028,088. We received our final advance under the Facility are used to reimburse us for a portion of certain costs of construction relating to Vogtle Units No. 3in December 2022. Interest is payable quarterly in arrears and No. 4 that are eligible for financingprincipal payments on all advances under the Title XVII loan guarantee program (Eligible Project Costs). Borrowings under the Original FFB Notes could not exceed $3,057,069,461,began in February 2020. As of which $335,471,604 was designated for capitalized interest. WeDecember 31, 2023, we have advanced all amounts available underrepaid $455,060,646 of principal on the Original FFB Notes. We were unable to advance $43,721,079 of the amount designated for capitalized interest under the Original FFB Notes due toand the timing of borrowing and lower than expected interest rates.
Borrowings under the Additional FFB Note may not exceed (i) $1,619,679,706 or (ii) an amount that, when aggregated with borrowings under the Original FFB Notes, equals 70% of Eligible Project Costs less the $1,104,000,000 guarantee payment we received from Toshiba Corporation in late 2017. At December 31, 2020, borrowings under the Additional FFB Note totaled $620,000,000.
At December 31, 2020, aggregate Department of Energy-guaranteed borrowings outstanding, including capitalized interest, totaled $3,633,348,382.$4,177,967,442. The final maturity date is February 20, 2044. We may voluntarily prepay outstanding borrowings under the Facility. Under the FFB Documents, any prepayment will be subject to a make-whole premium or discount, as applicable. Any amounts prepaid may not be re-borrowed.
Under the Loan Guarantee Agreement, we are obligated to reimburse the Department of Energy in the event it is required to make any payments to the Federal Financing Bank under its guarantee. Our payment obligations to the Federal Financing
A-31

Table of Contents
Bank under the FFB Notes and reimbursement obligations to the Department of Energy under its guarantee, but not our covenants to the Department of Energy under the Loan Guarantee Agreement, are secured equally and ratably with all of our other obligations issued under our first mortgage indenture. The final maturity date for each advance is February 20, 2044. Interest is payable quarterly in arrears and principal payments on all advances under the FFB Notes began on February 20, 2020. As of December 31, 2020, we have repaid $79,100,000 of principal on the FFB Notes. Interest rates on advances during the applicable interest rate periods will equal the current average yield on U.S. Treasuries of comparable maturity at the beginning of the interest rate period, plus a spread equal to 0.375%.
Advances under the Additional FFB Note may be requested on a quarterly basis through November 30, 2023, one year beyond the current anticipated commercial operation date of Vogtle Unit No. 4.
Future advances under the Facility are subject to satisfaction of customary conditions, as well as (i) certification of compliance with the requirements of the Title XVII loan guarantee program, (ii) accuracy of project-related representations and warranties, (iii) delivery of updated project-related information, (iv) no Project Adverse Event (as described in Note 8) having occurred or, if a Project Adverse Event has occurred, that Co-owners (as described in Note 8) representing at least 90% of the ownership interests have voted to continue construction, have not deferred construction and we have provided the Department of Energy with certain additional information, (v) certification regarding Georgia Power's compliance with certain obligations relating to the Cargo Preference Act, as amended, (vi) evidence of compliance with the applicable wage requirements of the Davis-Bacon Act, as amended, (vii) certification from the Department of Energy's consulting engineer that proceeds of the advance are used to reimburse Eligible Project Costs and (viii) if either the Services Agreement or the Bechtel Agreement (each, as described in Note 8) are terminated, or rejected in bankruptcy proceedings, the Department of Energy has approved the replacement agreement.
We may voluntarily prepay outstanding borrowings under the Facility. Under the FFB Documents, any prepayment will be subject to a make-whole premium or discount, as applicable. Any amounts prepaid may not be re-borrowed.
Under the Loan Guarantee Agreement, we are subject to customary borrower affirmative and negative covenants and events of default. In addition, we are subject to project-related reporting requirements and other project-specific covenants and events of default.
A-33

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
If certain events occur, referred to as an "Alternate Amortization Event," at the Department of Energy's option the Federal Financing Bank's commitment to make further advances under the Facility will terminate and we will be required to repay the outstanding principal amount of all borrowings under the Facility over a period of five years, with level principal amortization. These events include (i) abandonment of the Vogtle Units No. 3 and No. 4 project, including a decision by Georgia Power to cancel the project, (ii) cessation of the construction of Vogtle Units No. 3 and No. 4 for twelve consecutive months, (iii) termination of the Services Agreement or rejection of the Services Agreement in bankruptcy, if Georgia Power does not maintain access to certain related intellectual property rights, (iv) termination of the Services Agreement by Westinghouse or termination of the Bechtel Agreement by Bechtel Power Corporation, (v) delivery of certain notices by the Co-owners to the Department of Energy of their intent to cancel construction of Vogtle Units No. 3 and No. 4 coupled with termination by the Co-owners of the Services Agreement or the Bechtel Agreement, (vi) failure of the Co-owners to enter into a replacement contract with respect to the Services Agreement or the Bechtel Agreement following the Co-owners' termination of such agreement with the intent to replace it, (vii) the Department of Energy's takeover of construction of Vogtle Units No. 3 and No. 4 under certain conditions, (viii) the occurrence of any Project Adverse Event that results in a cancellation of the Vogtle Units No. 3 and No. 4 project or the cessation or deferral of construction beyond the periods permitted under the Loan Guarantee Amendment,Agreement, (ix) loss of or failure to receive necessary regulatory approvals under certain circumstances, (x) loss of access to intellectual property rights necessary to construct or operate Vogtle Units No. 3 and No. 4 under certain circumstances, (xi) our failure to fund our share of operation and maintenance expenses for Vogtle Units No. 3 and No. 4 for twelve consecutive months, (xii) change of control of Oglethorpe and (xiii) certain events of loss or condemnation. If we receive proceeds from an event of condemnation relating to Vogtle Units No. 3 and No. 4, such proceeds must be applied to immediately prepay outstanding borrowings under the Facility.
b)Rural Utilities Service Guaranteed Loans:
During 2020,2023, we received advances on Rural Utilities Service-guaranteed Federal Financing Bank loans totaling $45,925,000$70,272,000 for long-term financing of general and environmental improvements at existing plants.
A-32

Table of Contents
plants and the BC Smith acquisition.
In January 2021,February 2024, we received an additional $238,578,000$6,067,000 in advances on Rural Utilities Service-guaranteed Federal Financing Bank loans for long-term financing of general and environmental improvements at existing plants.
c)Credit Facilities:
As of December 31, 2020,2023, we had a total of $1,823,000,000$1,810,000,000 of committed credit arrangements comprised of 4four separate facilities with maturity dates that range from October 20212024 to December 2024.2028. These credit facilities are for general working capital purposes, issuing letters of credit and backing up outstanding commercial paper. Under our unsecured committed lines of credit that we had in place at December 31, 2020,2023, we had the ability to issue letters of credit totaling $973,000,000$960,000,000 in the aggregate, of which $721,600,000$957,000,000 remained available. At December 31, 2020,2023, we had (i) $252,000,000$2,504,000 under these lines of credit in the form of issued letters of credit supporting variable rate demand bonds and collateral postings to third parties, and (ii) $383,498,000$611,000,000 dedicated under one of these lines of credit to support a like amountface value of commercial paper that was outstanding.
d)Lines of Credit:
In mid-March 2020, due to significant disruptions in the commercial paper markets, we began to borrow directly under our $1.2 billion syndicated CFC line of credit in lieu of issuing commercial paper. During the second quarter of 2020, we repaid the borrowings under this line of credit with the proceeds of commercial paper we were able to issue as markets stabilized.
On March 27, 2020, we amended our JPMorgan Chase line of credit, increasing the commitment from $150,000,000 to $363,000,000. On March 31, 2020, we borrowed $213,000,000 under this line of credit to purchase $212,760,000 of Series 2013 pollution control bonds that were subject to mandatory tender on April 1, 2020. On July 30, 2020, we repaid these borrowings utilizing proceeds from commercial paper issuances.
e)Pollution Control Revenue Bonds:
On August 25, 2020, we remarketed $212,760,000 of Series 2013A term rate pollution control revenue bonds that were subject to mandatory tender on April 1, 2020. The proceeds from the remarketing were used to repay outstanding commercial paper that was used to refinance the purchase of the Series 2013 bonds. The notes issued in connection with the Series 2013 bonds are secured under our first mortgage indenture.
f)First Mortgage Bonds:
On August 25, 2020,December 5, 2023, we issued $450,000,000$400,000,000 of 3.75%6.20% first mortgage bonds, Series 2020A2023A, for the purpose of providing long-term financing for expenditures related to the construction of Vogtle Units No. 3 and No. 4. In conjunction with the issuance of the bonds, we repaid $439,200,000$390,612,000 of outstanding commercial paper. The bonds are due to mature August 2050December 2053 and are secured under our first mortgage indenture.

e)
Pollution Control Revenue Bonds:
On February 1, 2023, we remarketed $99,785,000 of Series 2017 pollution control revenue bonds. The remarketed bonds bear interest at indexed put rate modes until February 1, 2028 and are scheduled to mature in 2045. Our payment obligations related to these bonds are secured under our first mortgage indenture.
A-34

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
8. Electric plant, construction and related agreements:
a.Electric plant
We, along with Georgia Power, have entered into agreements providing for the purchase and subsequent joint operation of certain electric generating plants. Each co-owner is responsible for providing their own financing. The plant investments
A-33

Table of Contents
disclosed in the table below represent our undivided interest in each plant. A summary of our plant investments and related accumulated depreciation as of December 31, 20202023 and 20192022 is as follows:
20202019
(dollars in thousands)
202320232022
(dollars in thousands)(dollars in thousands)
PlantPlantInvestmentAccumulated
Depreciation
InvestmentAccumulated
Depreciation
PlantInvestmentAccumulated
Depreciation
InvestmentAccumulated
Depreciation
In-service(1)
In-service(1)
Owned propertyOwned property
Owned property
Owned property
Vogtle Units No. 1 & No. 2
(Nuclear – 30% ownership)
Vogtle Units No. 1 & No. 2
(Nuclear – 30% ownership)
$3,008,848 $(1,845,863)$2,989,693 $(1,815,258)
Vogtle Units No. 3 & No. 4
(Nuclear – 30% ownership)
57,631 (5,785)56,991 (4,956)
Vogtle Units No. 1 & No. 2
(Nuclear – 30% ownership)
Vogtle Units No. 1 & No. 2
(Nuclear – 30% ownership)
Vogtle Unit No. 3
(Nuclear – 30% ownership)
Hatch Units No. 1 & No. 2
(Nuclear – 30% ownership)
Hatch Units No. 1 & No. 2
(Nuclear – 30% ownership)
952,159 (479,628)934,567 (462,063)
Wansley Units No. 1 & No. 2(2)
(Fossil – 30% ownership)
764,315 (370,177)749,971 (360,014)
Wansley Units No. 1 & No. 2
(Fossil – 30% ownership)
Scherer Unit No. 1
(Fossil – 60% ownership)
Scherer Unit No. 1
(Fossil – 60% ownership)
1,379,513 (569,357)1,284,508 (545,908)
Doyle (Combustion Turbine - 100% ownership)
Doyle (Combustion Turbine - 100% ownership)
139,853 (117,005)137,513 (113,259)
Rocky Mountain Units No. 1, No. 2 & No. 3
(Hydro – 75% ownership)
Rocky Mountain Units No. 1, No. 2 & No. 3
(Hydro – 75% ownership)
618,965 (281,763)618,939 (270,058)
Hartwell (Combustion Turbine - 100% ownership)
Hartwell (Combustion Turbine - 100% ownership)
227,154 (113,879)226,316 (110,008)
Hawk Road (Combustion Turbine - 100% ownership)
Hawk Road (Combustion Turbine - 100% ownership)
263,673 (63,907)260,494 (67,065)
Talbot (Combustion Turbine - 100% ownership)
Talbot (Combustion Turbine - 100% ownership)
296,398 (152,859)294,809 (144,847)
Chattahoochee (Combined cycle - 100% ownership)
Chattahoochee (Combined cycle - 100% ownership)
319,234 (160,194)317,210 (150,805)
Smith (Combined cycle - 100% ownership)
672,358 (174,176)655,106 (195,638)
Wansley (Combustion Turbine – 30% ownership)(2)
3,942 (3,847)3,887 (3,738)
BC Smith (Combined cycle - 100% ownership)
TA Smith (Combined cycle - 100% ownership)
Washington County (Combustion Turbine – 100% ownership)
Baconton (Combustion Turbine – 100% ownership)
Transmission plantTransmission plant100,344 (60,688)96,198 (59,096)
OtherOther98,406 (60,904)96,522 (57,826)
Property under capital lease:
Property under finance lease:
Scherer Unit No. 2 (Fossil – 60% leasehold)
Scherer Unit No. 2 (Fossil – 60% leasehold)
Scherer Unit No. 2 (Fossil – 60% leasehold)
Scherer Unit No. 2 (Fossil – 60% leasehold)
794,051 (508,262)789,991 (472,486)
Total in-serviceTotal in-service$9,696,844 $(4,968,294)$9,512,715 $(4,833,025)
Construction work in progressConstruction work in progress
Vogtle Units No. 3 & No. 4$5,696,342 $4,617,654 
Environmental and other
generation improvements
87,237 199,242 
Total construction work in progress$5,783,579 $4,816,896 
Vogtle Unit No. 4
Vogtle Unit No. 4
Vogtle Unit No. 4
A-35

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
Environmental and other generation improvements165,921 132,744 
Total construction work in progress$3,294,641 $7,716,035 
_______________
(1)Amounts include plant acquisition adjustments at December 31, 20202023 of $290,725,000 and 2019December 31, 2022 of $197,000,000.$280,396,000.
(2)Georgia Power is considering retiring Plant Wansley UnitsVogtle Unit No. 1 and No. 2 as early as fall 2022. Although this decision has not been finalized or filed with the Georgia Public Service Commission, we are preparing for a scenario3 was placed in which a retirement occurs in 2022; including seeking authorization to create a regulatory asset to defer a portion of the accelerated depreciation expense and recover the deferred costs over an extended period.


service on July 31, 2023.
Our proportionate share of direct expenses of joint operation of the above plants is included in the corresponding operating expense captions (e.g., fuel, production) on the accompanying Statementconsolidated statements of Revenuesrevenues and Expenses.expenses.
b.Construction
Vogtle Units No. 3 and No. 4
We, Georgia Power, the Municipal Electric Authority of Georgia (MEAG), and the City of Dalton, Georgia, acting by and through its Board of Water, Light and Sinking Fund Commissioners, doing business as Dalton Utilities (collectively, the Co-owners) are parties to an Ownership Participation Agreement that, along with other agreements, governs our participation in 2two additional nuclear units under construction at Plant Vogtle, Units No. 3 and No. 4. The Co-owners appointed Georgia Power to act as agent under this agreement. Our ownership interest and proportionate share of the cost to construct these units is
A-34

Table of Contents
30%. Pursuant to this agreement, Georgia Power has designated Southern Nuclear Operating Company, Inc. as its agent for licensing, engineering, procurement, contract management, construction and pre-operation services.
In 2008, Georgia Power, acting for itself and as agent for the Co-owners, entered into an Engineering, Procurement and Construction Agreement (the EPC Agreement) with Westinghouse Electric Company LLC and Stone & Webster, Inc., which was subsequently acquired by Westinghouse and changed its name to WECTEC Global Project Services Inc. (collectively, Westinghouse). Pursuant to the EPC Agreement, Westinghouse agreed to design, engineer, procure, construct and test 2two 1,100 megawatt nuclear units using the Westinghouse AP1000 technology and related facilities at Plant Vogtle.
Until March 2017, construction on Units No. 3 and No. 4 continued under the substantially fixed price EPC Agreement. In March 2017, Westinghouse filed for bankruptcy protection under Chapter 11 of the United States Bankruptcy Code. Effective in July 2017, Georgia Power, acting for itself and as agent for the other Co-owners, and Westinghouse entered into a services agreement (the Services Agreement), pursuant to which Westinghouse is providing facility design and engineering services, procurement and technical support and staff augmentation on a time and materials cost basis. The Services Agreement provides that it will continue until the start-up and testing of Vogtle Units No. 3 and No. 4 is complete and electricity is generated and sold from both units. The Services Agreement is terminable by the Co-owners upon 30 days' written notice.
In October 2017, Georgia Power, acting for itself and as agent for the other Co-owners, entered into a construction completion agreement with Bechtel Power Corporation, pursuant to which Bechtel serves as the primary contractor for the remaining construction activities for Vogtle Units No. 3 and No. 4 (the Bechtel Agreement). The Bechtel Agreement is a cost reimbursable plus fee arrangement, whereby Bechtel and is reimbursed for actual costs plus a base fee and an at-risk fee, which is subject to adjustment based on Bechtel'sBechtel’s performance against cost and schedule targets. Each Co-owner is severally, and not jointly, liable for its proportionate share, based on its ownership interest, of all amounts owed to Bechtel under the Bechtel Agreement. The Co-owners may terminate the Bechtel Agreement at any time for their convenience, provided that the Co-owners will be required to pay amounts related to work performed prior to the termination (including the applicable portion
On July 31, 2023, Georgia Power placed Unit No. 3 in service.
Cost and Schedule
Our ownership interest and proportionate share of the base fee), certain termination-related costs and, at certain stages of the work, the applicable portion of the at-risk fee. Bechtel may terminate the Bechtel Agreement under certain circumstances, including certain Co-owner suspensions of work, certain breaches of the Bechtel Agreement by the Co-owners, Co-owner insolvency and certain other events.
Our current budget for our 30% ownership interest incost to construct Vogtle Units No. 3 and No. 4 is $7.530%, representing approximately 660 megawatts. As of December 31, 2023, our actual costs related to the new Vogtle units were approximately $8.2 billion, net of $1.1 billion we received from Toshiba Corporation under a Guarantee Settlement Agreement and approximately $384 million we received from Georgia Power in connection with cost-sharing provisions of the Global Amendments and settlement agreement described below.
Our current budget, which includes capital costs and allowance for funds used during construction, our allocationis a range of the project-level contingency and a separate Oglethorpe-level contingency$8.3-8.35 billion and is based on a commercial operation date in the Georgia Public Service Commission approved in-service datessecond quarter of November 20212024 for Unit No. 4 and November 2022, respectively. As of
A-36

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2020,2023, 2022 and 2021
Georgia Power continuing to pay 66% of our total investment in30% share of the additional Vogtle units wasremaining cost of construction pursuant to the settlement agreement described below. Any schedule extension beyond June 2024 for Unit No. 4 is expected to increase our costs by approximately $6.0 billion.$20 million per month. We and some of our members have implemented various rate management programs to lessen the impact on rates whenrelated to the additional Vogtle Units No. 3 and No. 4 reach commercial operation. The Georgia Public Service Commission approved in-service dates for Vogtle Units No. 3 and No. 4 are November 2021 and November 2022, respectively.units.
As part of its ongoing process,processes, Southern Nuclear continues to evaluate cost and schedule forecasts for Unit No. 4 on a regular basis to incorporate current information available, particularly in the areas of engineering support, commodity installation, system turnoversstart-up testing and related test results and workforce statistics.engineering support.
TheOn May 1, 2023, hot functional testing was completed for Unit No. 4. On July 20, 2023, Southern Nuclear announced that all Unit No. 4 inspections, tests, analyses, and acceptance criteria documentation had been submitted to the Nuclear Regulatory Commission, and, on July 28, 2023, the Nuclear Regulatory Commission published its 103(g) finding that the accepted criteria in the combined license for Unit No. 4 had been met, which allowed nuclear fuel to be loaded and start-up testing to begin. Fuel load was completed on August 2018 project-level budget included an $800 million construction contingency estimate, of which our 30% interest was $240 million. As of June 30, 2020, assignments of contingency exceeded the 2018 construction contingency estimate by $75 million (of which our 30% interest was $23 million) and19, 2023. On October 6, 2023, Georgia Power established $250 millionannounced that during start-up and pre-operational testing for Unit No. 4, Southern Nuclear had identified a motor fault in one of additional construction contingency (offour reactor coolant pumps, which our 30% interestwas replaced. With Unit No. 3’s four reactor coolant pumps operating as designed, Southern Nuclear has stated that it believes that the motor fault on the single Unit No. 4 reactor coolant pump is $75 million). During the third and fourth quarters of 2020, this construction contingency, plus an additional $10 million (of which our 30% interest was $3 million) was assignedisolated event. However, any findings related to the base capital cost forecast. Assignmentroot cause analysis of contingency during 2020 addressed cost risksthe motor fault on the affected pump could require engineering changes or remediation related to construction productivity, including the April 2020 reduction in workforce designed to mitigate impacts of the COVID-19 pandemic described below; other COVID-19 impacts; craft labor incentives; additional resources for supervision, field support, project management, initial test program, start-up, engineering support and operations and maintenance support; subcontracts; and procurement, among other factors. These factors continue to represent further potential cost risk to the project; therefore Georgia Power established $375 million of additional contingency as of December 31, 2020 (of which our 30% interest is $112.5 million). Georgia Power has stated its expectation to allocate the remainder of this project-level contingency by completion of the project.
A-35

Table of Contents
The project-level contingency is separate and in addition to our Oglethorpe-level contingency. The Oglethorpe-level contingency, which we have carried at various levels since the beginning of the project, was designed to cover potential cost, schedule, and financing risks associated with our share of the project which may not be covered by project-level contingencies. As construction progresses, the Oglethorpe-level contingency may continue to fluctuate as it represents the difference between known project-level costs and contingencies and our total budget of $7.5 billion. At the end of the project, if there is remaining Oglethorpe-level contingency, we will adjust our project budget to remove this contingency and bill our members based on the actual project costs. The table below shows our project budget and actual costs through December 31, 2020 for our 30% interest in the project.
(in millions)
Project BudgetActual Costs at December 31, 2020Remaining Project Budget
Construction Costs (1)
$5,559 $4,754 $805 
Financing Costs1,578 1,259 319 
   Total Costs$7,137 $6,013 $1,124 
Project-Level Contingency$113 $$113 
Oglethorpe-Level Contingency250 250 
   Total Contingency$363 $$363 
Totals$7,500 $6,013 $1,487 
(1) Construction costs are net of $1.1 billion received from Toshiba Corporation under a Guarantee Settlement Agreement.

In mid-March 2020, Southern Nuclear began implementing policies and procedures designed to mitigate the risk of transmission of COVID-19 at the construction site, including worker distancing measures, isolating individuals who have tested positive for COVID-19, are showing symptoms consistent with COVID-19, are being tested for COVID-19, or have been in close contact with such persons, requiring self-quarantine, and adopting additional precautionary measures. In April 2020, Georgia Power, acting for itself and as agent for the other Co-owners, announced a reduction in workforce at Vogtle UnitsUnit No. 3 and Unit No. 4 and began reducing the then-existing site workforce by approximately 20%. This reduction in workforce was a mitigation action intended to address ongoing challenges with labor productivity that were exacerbated by the impact of the COVID-19 pandemic on the Vogtle Units No. 3 and No. 4 workforce and construction site by increasing productivity of the remaining workforce and reducing workforce fatigue and absenteeism. Further, it was also intended to allow for increased social distancing by the workforce and facilitate compliance with the recommendations from the Centers for Disease Control and Prevention. The April 2020 workforce reduction did reduce absenteeism, providing an improvement in operational efficiency and allowing for increased social distancing. Since April 2020, the number of active cases of COVID-19 at the site has fluctuated and continues to impact productivity levels and pace of the activity completion.reactor coolant pumps.
From November 2020 through January 2021, the number of active COVID-19 cases at the site increased significantly, consistent with a national rise in cases, which further impacted productivity and the pace of activity completion. Although still present, this spike in cases has since abated intoOn February and early March. The incremental cost associated with COVID-19 mitigation actions and impacts on construction productivity is currently estimated by1, 2024, Georgia Power to be between $325announced that during start-up and $415 million (of which our 30% interest is $98 to $125 million) and is included in the project budget. As described previously, Georgia Power included estimated costs associated with near-term COVID-19 mitigation actions and related impacts on construction productivity in the additional project-level contingency established as of December 31, 2020. The continuing effects of the COVID-19 pandemic could further disrupt or delay construction,pre-operational testing supervisory, and support activities at Vogtle Units No. 3 and No. 4.
The project continues to face challenges, exacerbated by this recent rise in COVID-19 cases, including, but not limited to, higher than expected absenteeism; overall construction and subcontractor labor productivity; system turnover and testing activities; and electrical equipment and commodity installation.
As a result of these factors, overall production levels were not achieved at the levels anticipated, contributing to the December 31, 2020 allocation of construction contingency and increase in total project capital cost forecast described previously. Southern Nuclear has further extended certain milestone dates, including the start of hot functional testing and
A-36

Table of Contents
fuel load for Unit No. 3. The4, Southern Nuclear had identified, and remediated, vibrations associated with certain piping within the cooling system. Considering the remaining pre-operational testing, Georgia Power disclosed that it projects Unit No. 3 schedule is challenged,4 will be placed in service during the second quarter 2024. On February 14, 2024, Unit No. 4 achieved self-sustaining nuclear fission, commonly referred to as initial criticality, and whileon March 1, 2024, the ability to achieve the November 2021 regulatory in-service date remains a target for Southern Nuclear, we believe a delay is likely which could add a month or moregenerator successfully synchronized to the Unit No. 3 in-service date. As Unit No. 3 approaches hot functional testing, key factors impactingpower grid and generated electricity for the schedule include bothfirst time.
Meeting the pace of work package completion and system turnovers, and required construction remediation work
Achievement of the November 2022 regulatoryprojected in-service date for Unit No. 4 primarilysignificantly depends on overall construction productivitythe progression of start-up and production levels significantly improving as well as appropriate levels of craft laborers, particularly electrical and pipefitter craft labor, being added and maintained. In the event that there is any schedule extension beyond the November 2021 and November 2022 regulatory in-service dates for Units No. 3 and No. 4, respectively, the Oglethorpe-level contingency level in our current $7.5 billion budget is expected topre-operational testing, which may be sufficient to withstand up to a 4-month delay for Unit No. 3 and a 3-month delay for Unit No. 4. Any further delays beyond these extended dates are expected to impact our costimpacted by approximately $55 million per month for both units and approximately $25 million per month forequipment or other operational failures. As Unit No. 4 only, including financing costs.
As construction, including subcontract work, continuesprogresses further through testing, ongoing and testing and system turnover activities increase, risks remain thatpotential future challenges withmay also include the management of contractors and vendors; subcontractor performance; supervisionvendors, the availability of craft labormaterials and related productivity, particularly in the installation of electrical, mechanical, and instrumentation and controls commodities, ability to attract and retain craft labor,parts, and/or related cost escalation; procurement, fabrication, delivery, assembly, installation, system turnover,the availability of supervisory and technical support resources; and the initialtimeframe and duration of pre-operational testing.
New challenges also may continue to arise as Unit No. 4 moves further into testing and start-up, including anywhich may result in required engineering changes or any remediation related thereto, ofto plant systems, structures or components (some of which are based on new technology that has only within the last fewseveral years began initial operation in the global nuclear industry at this scale), any. These challenges may result in further schedule delays and/or cost increases.
With the receipt of which may require additional labor and/or materials; or other issues could arise and further impact the projected schedule and estimated cost.
There have been technical and procedural challenges to the construction and licensing of VogtleNuclear Regulatory Commission’s 103(g) findings for Units No. 3 and No. 4 atin August 2022 and July 2023, respectively, the federal and state level and additional challenges may arise. Processes are in place that are designed to assure compliance with the requirements specified in the Westinghouse Design Control Document and the combined construction and operating licenses, including inspections by Southern Nuclear and the Nuclear Regulatory Commission that occur throughout construction. Findings from such inspections could require additional remediation and/or further Nuclear Regulatory Commission oversight. In addition, certain license amendment requests have been filed and approved or are pending before the Nuclear Regulatory Commission. On August 10, 2020, the Atomic Safety Licensing Board rejected the Blue Ridge Environmental Defense League's May 11, 2020 petition challenging a license amendment request. The staff of the Nuclear Regulatory Commission has issued the requested amendment to the combined construction and operating license for Vogtle Unit No. 3. The Blue Ridge Environmental Defense League appealed the Atomic Safety Licensing Board's decisionsite is subject to the Nuclear Regulatory Commission, which was denied on December 22, 2020. The Blue Ridge Environmental Defense League also filed a motion to reopen the proceedingCommission’s operating reactor oversight process and submitted an amended contention on December 7, 2020, which is pending before the Nuclear Regulatory Commission.
must meet applicable technical and operational requirements contained in its operating license. Various design and other licensing-based compliance matters including the timely submittal by Southern Nuclear of the inspections, tests, analyses, and acceptance criteria documentation for each unit and the related reviews and approvals by the Nuclear Regulatory Commission necessary to support authorization to load fuel, may arise, which may result in additional license amendmentsamendment requests or require other resolution. If any license amendment requests or other licensing-based compliance issues including inspections, tests, analyses, and acceptance criteria, are not resolved in a timely manner, there may be further delays in the project schedule that could result in increased costs to the Co-owners.costs.
The ultimate outcome of these matters cannot be determined at this time.
c. Effingham CountyCo-Owner Contracts and Other Information
In November 2017, the Co-owners entered into an amendment to their joint ownership agreements for Vogtle Units No. 3 and No. 4 to provide for, among other conditions, additional Co-owner approval requirements. These joint ownership agreements, including the Co-owner approval requirements, were subsequently amended, effective August 2018. As described below, certain provisions of the Joint Ownership Agreements were modified further in September 2018 by the Term Sheet that was memorialized in February 2019 when the Co-owners entered into
A-37

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
certain amendments (the Global Amendments) to the Joint Ownership Agreements (as amended, the Joint Ownership Agreements).
As a result of an increase in the total project capital cost forecast and Georgia Power’s decision not to seek recovery of its allocation of the increase in the base capital costs and the increased construction budget in connection with Georgia Power’s nineteenth Vogtle construction monitoring report (VCM 19) in 2018, the holders of at least 90% of the ownership interests in Vogtle Units No. 3 and No. 4 were required to vote to continue construction. In September 2018, the Co-owners unanimously voted to continue construction of Vogtle Units No. 3 and No. 4.
In connection with the September 2018 vote to continue construction, Georgia Power entered into a binding term sheet with the other Co-owners and MEAG’s wholly-owned subsidiaries MEAG Power SPVJ, LLC, MEAG Power SPVM, LLC, and MEAG Power SPVP, LLC to mitigate certain financial exposure for the other Co-owners and offered to purchase production tax credits from each of the other Co-Owners, at that Co-owner’s option (the Term Sheet). In February 2019, the Co-owners entered into the Global Amendments to memorialize the provisions of the Term Sheet. Pursuant to the Global Amendments and consistent with the Term Sheet, the Joint Ownership Agreements provide that:
each Co-owner was obligated to pay its proportionate share of construction costs for Vogtle Units No. 3 and No. 4 based on its ownership interest up to (i) the estimated cost at completion (EAC) for Vogtle Units No. 3 and No. 4 which formed the basis of Georgia Power's forecast of $8.4 billion in Georgia Power's VCM 19 filed with the Georgia Public Service Commission plus (ii) $800 million of additional construction costs.
Georgia Power was responsible for 55.7% of construction costs, subject to exceptions such as costs that are a result of a force majeure event, that exceed the EAC in VCM 19 by $800 million to $1.6 billion (resulting in up to $80 million of potential additional costs to Georgia Power which would save Oglethorpe up to $44 million), with the remaining Co-owners responsible for 44.3% of such costs pro rata in accordance with their respective ownership interests (equal to 24.5% for our 30% ownership interest); and
Georgia Power was responsible for 65.7% of construction costs, subject to exceptions such as costs that are a result of a force majeure event, that exceed the EAC in VCM 19 by $1.6 billion to $2.1 billion (resulting in up to a further $100 million of potential additional costs to Georgia Power which would save Oglethorpe up to an additional $55 million), with the remaining Co-owners responsible for 34.3% of such costs pro rata in accordance with their respective ownership interests (equal to 19.0% for our 30% ownership interest).
If the EAC was revised and exceeded the EAC in VCM 19 by more than $2.1 billion, each of the Co-owners, other than Georgia Power, had a one-time option to tender a portion of its ownership interest to Georgia Power in exchange for Georgia Power’s agreement to pay 100% of such Co-owner’s share of construction costs actually incurred in excess of the EAC in VCM 19 plus $2.1 billion.
On March 1, 2021,October 5, 2023, we entered into a purchase and salesettlement agreement with Southeast PowerGen, LLC, an affiliateGeorgia Power to resolve the litigation regarding the proper interpretation of the Carlyle Group Inc.,cost-sharing and tender provisions of the Global Amendments. Under the terms of the agreement, among other items:
Georgia Power agreed that its total liability with respect to purchase Effingham Countythe cost-sharing bands was $99 million, plus $5 million of financing costs related to certain payments made under protest related to the cost-sharing bands. Georgia Power made $37.5 million of cost-sharing payments prior to the settlement date and paid us an additional $66.5 million at the time of the settlement agreement for the remaining balance.
Georgia Power will pay 66% of our 30% share of incremental costs of construction that exceed a 511 megawatt natural gas combined cycle facility locatedtotal project budget of $19.2 billion as such costs are incurred and with no adjustment for costs related to COVID-19 or any other force majeure event. Based on the current project budget, Georgia Power would pay a total of $346.3 million of our construction costs. Georgia Power paid us $241.2 million at the time of the settlement agreement for construction costs previously paid by us and, based on the current project budget, would make $105.1 million in Georgia. This acquisition is subjecttotal payments after the settlement date for remaining construction costs. Georgia Power’s ultimate payments pursuant to customary closing conditions,this arrangement will depend on the final cost of
A-38

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
Vogtle Units No. 3 and No. 4 and may be greater or less than the estimated payments based on the current project budget.
We retracted our tender offer and retained our full 30% ownership interest in Vogtle Units No. 3 and No. 4.
Pursuant to the Joint Ownership Agreements, as amended by the Global Amendments, the holders of at least 90% of the ownership interests in Vogtle Units No. 3 and No. 4 must vote to continue construction, or can vote to suspend construction, if certain adverse events occur, including: (i) the bankruptcy of Toshiba Corporation; (ii) termination or rejection in bankruptcy of certain agreements, including regulatory approvals,the Services Agreement, the Bechtel Agreement or the agency agreement with Southern Nuclear; (iii) Georgia Power publicly announces its intention not to submit for rate recovery any portion of its investment in Vogtle Units No. 3 and is expectedNo. 4 (or associated financing costs) or the Georgia Public Service Commission determines that any of Georgia Power's costs relating to closethe construction of Vogtle Units No. 3 and No. 4 will not be recovered in retail rates, excluding any additional amounts paid by Georgia Power on behalf of the other Co-owners pursuant to the Global Amendment provisions described above and the first 6% of costs during any six-month VCM reporting period that are disallowed by the Georgia Public Service Commission for recovery, or for which Georgia Power elects not to seek cost recovery, through retail rates or (iv) an incremental extension of one year or more from the seventeenth VCM report estimated in-service dates of November 2021 and November 2022 for Units No. 3 and No. 4, respectively (each a Project Adverse Event). The schedule extensions, announced in February 2022, which reflected a cumulative delay of over a year for each unit from the schedules approved in the second quarterseventeenth VCM report, triggered the requirement for the holders of 2021.at least 90% of the ownership interests in Vogtle Units No. 3 and No. 4 to vote to continue construction, and the Co-owners unanimously voted to continue construction. On August 30, 2023, Georgia Power filed an application with the Georgia Public Service Commission, which included a public announcement that Georgia Power did not intend to submit for rate recovery an amount that is greater than 6% of costs during any VCM reporting period, which triggered the requirement for a Co-owner vote to continue construction. All of the Co-owners voted to continue construction.
The ultimate outcome of these matters cannot be determined at this time.

Plant Vogtle Unit No. 3 Commercial Operations
A-37
On July 31, 2023, Plant Vogtle Unit No. 3 reached commercial operation and was placed in service. The total amount in service related to Unit No. 3, including common facilities, as of December 31, 2023, was approximately $4.8 billion. In 2023, since Plant Vogtle Unit No. 3 was placed in service, we sold to Georgia Power $21.7 million of nuclear production tax credits ("NPTCs"), earned by us pursuant to Section 45J of the Internal Revenue Code and recognized the amount as a credit to the Production expense line item within our consolidated income statements.

Table of Contents
9. Employee benefit plans:
Our retirement plan is a contributory 401(k) that covers substantially all employees. An employee may contribute, subject to IRS limitations, up to 60% of his or her eligible annual compensation. At our discretion, we may match the employee's contribution and have done so each year of the plan's existence. The match, which is calculated each pay period, currently can be equal to as much as three-quarters of the first 6% of an employee's eligible compensation, depending on the amount and timing of the employee's contribution. Our contributions to the matching feature of the plan were approximately $1,716,000, $1,632,000$2,143,000, $2,017,000 and $1,497,000$1,811,000 in 2020, 20192023, 2022 and 2018,2021, respectively.
Our 401(k) plan also includes an employer retirement contribution feature, which subject to IRS limitations, contributes 11% of an employee's eligible annual compensation. Our contributions to the employer retirement contribution feature of the 401(k) plan were approximately $4,371,000, $4,172,000$5,655,000, $5,098,000 and $3,903,000$4,527,000 in 2020, 20192023, 2022 and 2018,2021, respectively.
We also sponsor 2two deferred compensation plans for eligible employees. Eligible employees are defined as highly compensated individuals within the definition of the Internal Revenue Code. The plans offer investment options to all eligible participants without regard to salary limits. In addition, one plan enables us to continue employer retirement contributions to highly compensated employees who exceed Internal Revenue Code salary
A-39

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
limits for retirement plan contributions. The value of the plans is recorded as an asset and an equal offsetting liability with balances of $4,716,000$5,723,000 and $3,440,000$4,616,000 in 20202023 and 2019,2022, respectively.

10. Nuclear insurance:
The Price-Anderson Act limits public liability claims that could arise from a single nuclear incident to $13.8$16.2 billion. This amount is covered by private insurance and a mandatory program of deferred premiums that could be assessed against all owners of nuclear power reactors. Such private insurance provided by American Nuclear Insurers (ANI), is carried by Georgia Power for the benefit of all the co-owners of Plants Hatch and Vogtle. Agreements of indemnity have been entered into by and between each of the co-owners and the NRC. In the event of a nuclear incident involving any commercial nuclear facility in the country involving total public liability in excess of $450 million, a licensee of a nuclear power plant could be assessed a deferred premium of up to $138$166 million per incident for each licensed reactor operated by it, but not more than $20$25 million per reactor per incident to be paid in a calendar year. On the basis of our ownership interest in 4six nuclear reactors, we could be assessed a maximum of $165$299 million per incident, but not more than $25$44 million in any one year. Both the maximum assessment per reactor and the maximum yearly assessment are adjusted for inflation at least every 5 years, and exclude any applicable state premium taxes. The next scheduled adjustment is due no later than November 1, 2023.2028.
Georgia Power, on behalf of all the co-owners of Plants Hatch and Vogtle, is a member of Nuclear Electric Insurance, Ltd. (NEIL), a mutual insurer established to provide property damage insurance coverage in an amount up to $1.5 billion for members' operating nuclear generating facilities. Additionally, there is coverage through NEIL for decontamination, excess property insurance, and premature decommissioning coverage up to $1.25 billion for nuclear losses and policies providing coverage up to $750 million for non-nuclear losses in excess of the $1.5 billion primary coverage.
NEIL also covers the additional costs that could be incurred in obtaining replacement power during a prolonged accidental outage at a member's nuclear plant. Members can purchase this coverage, subject to a deductible waiting period of up to 26 weeks, with a maximum per occurrence per unit limit of $490 million. After the deductible period, weekly indemnity payments would be received until either the unit is operational or until the limit is exhausted. We started purchasing this coverage in April 2023.
Georgia Power, on behalf of all the co-owners has purchased a builders' risk property insurance policy from NEIL for Vogtle Units No. 3 and No. 4. This policy provides the Vogtle owners up to $2.75 billion in limits for accidental property damage occurring during construction.
Under each of the NEIL policies, members are subject to retroactive assessments in proportion to their premiums, if losses each year exceed the accumulated reserve funds available to the insurer. The portion of the current maximum annual assessment for Georgia Power that would be payable by Oglethorpe based on ownership share, is limited to approximately $42$55 million.
Claims resulting from terrorist acts and cyber events are covered under both the ANI and NEIL policies (subject to normal policy limits). The maximum aggregate however, that NEIL will pay for all claims resulting from terrorist acts in any 12-month period is $3.2 billion plus such additional amounts NEIL can recover through reinsurance, indemnity, or other sources. The maximum aggregate that NEIL will pay for all claims resulting from cyber acts and cyber events in any 12-month period is $3.2 billion each, plus such additional amounts NEIL can recover through reinsurance, indemnity, or other sources.
A-38

Table of Contents
For all on-site property damage insurance policies for commercial nuclear power plants, the NRC requires that the proceeds of such policies shall be dedicated first for the sole purpose of placing the reactor in a safe and stable condition after an accident. Any remaining proceeds are next to be applied toward the costs of decontamination and debris removal operations ordered by the NRC, and any further remaining proceeds are to be paid either to Georgia Power, for the benefit of all the co-owners, or to bond trustees as may be appropriate under the policies and applicable trust indentures.
All retrospective assessments, whether generated for liability or property, may be subject to applicable state premium taxes. In the event of a loss, the amount of insurance available may not be adequate to cover property
A-40

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
damage and other incurred expenses. Uninsured losses and other expenses could have a material adverse effect on our financial condition and results of operations.

11. Commitments:
We have entered into long-term commitments to meet fuel, transportation, maintenance and asset retirement requirements.
To supply a portion of the fuel requirements to our co-owned generating units, Georgia Power, on our behalf for coal and Southern Nuclear on our behalf for nuclear fuel, have entered into various long-term commitments for the procurement of coal and nuclear fuel. The contracts in most cases contain provision for price escalations, minimum and maximum purchase levels and other financial commitments. The value of the coal commitments is based on maximum coal prices and minimum volumes as provided in the contracts and does not include taxes, transportation, government impositions or railcar costs.
We have entered into long-term agreements with various counterparties to provide firm natural gas transportation to our natural gas-fired facilities. The value of these agreements is based on fixed rates as provided in the contracts and does not include variable costs.
We have also entered into long-term maintenance agreements for certain of our natural gas-fired facilities. In most cases, these agreements include provisions for price escalation and performance bonuses and, if applicable, are included in the values; timing of expenditures is based on current operational assumptions. Certain agreements contain significant cancellation for convenience penalties and, therefore, amounts in the table below include total estimated expenditures over the life of the agreement. If these agreements were terminated by us in 20212024 for convenience, our cancellation obligation would be approximately $54,007,000.$70,699,000.
We have asset retirement obligations which are legal obligations to retire long-lived assets. These obligations are primarily for the decommissioning of our nuclear units and coal ash ponds. Expenditures are based on estimates determined through decommissioning studies and include provisions for price escalation and other factors. See Note 1h for information regarding our asset retirement obligations.
We have a small portfolio of leases with the most significant being a finance lease for our 60% undivided interest in Scherer Unit No. 2. In addition, we have other operating leases including railcar leases for the transportation of coal at our coal-fired plantsplant and various other leases of minimal value. For information regarding these leases, see Note 6.
As of December 31, 2020,2023, our estimated commitments are as follows:
(dollars in thousands)
CoalNuclear FuelGas
Transportation
Maintenance
Agreements
Asset
Retirement
Obligations
Finance and Operating Leases
2021$5,168 $73,500 $63,385 $14,429 $17,821 $16,068 
20223,017 33,060 53,268 14,896 31,780 15,878 
202317,340 48,707 3,325 34,372 15,657 
(dollars in thousands)(dollars in thousands)
CoalCoalNuclear FuelGas
Transportation
Maintenance
Agreements
Asset
Retirement
Obligations
Finance and Operating Leases
2024202422,650 48,034 30,316 41,840 15,183 
2025202511,250 46,350 43,212 74,077 15,021 
2026
2027
2028
ThereafterThereafter15,930 746,160 176,751 3,400,140 41,595 

A-39

Table of Contents
12. Contingencies and Regulatory Matters:
We do not anticipate that the liabilities, if any, for any current proceedings against us will have a material effect on our financial condition or results of operations. However, at this time, the ultimate outcome of any pending or potential litigation cannot be determined.
A-41

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
Environmental Matters
As is typical for electric utilities, we are subject to various federal, state and local environmental laws which represent significant future risks and uncertainties. Air emissions, water discharges and water usage are extensively controlled, closely monitored and periodically reported. Handling and disposal requirements govern the manner of transportation, storage and disposal of various types of waste. We aremay also become subject to climate change regulations that impose restrictions on emissions of greenhouse gases, including carbon dioxide.
Such requirements may substantially increase the cost of electric service, by requiring modifications in the design or operation of existing facilities or the purchase of emission allowances. Failure to comply with these requirements could result in civil and criminal penalties and could include the complete shutdown of individual generating units not in compliance. Certain of our debt instruments require us to comply in all material respects with laws, rules, regulations and orders imposed by applicable governmental authorities, which include current and future environmental laws or regulations. Should we fail to be in compliance with these requirements, it would constitute a default under those debt instruments. We believe that we are in compliance with those environmental regulations currently applicable to our business and operations. Although it is our intent to comply with current and future regulations, we cannot provide assurance that we will always be in compliance.
TheAt this time, the ultimate impact of any proposed or potential new and more stringent environmental regulations described above is uncertain and could have an effect on our financial condition, results of operations and cash flows as a result of future additional capital expenditures and increased operations and maintenance costs.
Additionally, litigation over environmental issues and claims of various types, including property damage, personal
injury, common law nuisance, and citizen enforcement of environmental requirements such as air quality and water standards, has increased generally throughout the United States. In particular, personal injury and other claims for damages caused by alleged exposure to hazardous materials, and common law nuisance claims for injunctive relief, personal injury and property damage allegedly caused by coal combustion residue, greenhouse gas and other emissions have become more frequent.
OnIn July 29, 2020, a group of individual plaintiffs filed a complaint, which was amended in December 2022, in the Superior Court of Fulton County, Georgia against Georgia Power alleging that releases fromthe construction and operation of Plant Scherer, of which we are a co-owner, havehas impacted groundwater, surface water, and air, resulting in alleged personal injuries and property damage. The plaintiffs seek an unspecified amount of monetary damages including punitive damages, a medical monitoring fund, and injunctive relief. In December 2022, the Superior Court of Fulton County granted Georgia Power’s motion to transfer the case to the Superior Court of Monroe County. On May 9, 2023, the Superior Court of Monroe County denied Georgia Power’s motion to dismiss the case for lack of subject matter jurisdiction. On July 27, 2023, the Superior Court of Monroe County denied the remaining motions to dismiss certain claims and plaintiffs that Georgia Power filed at the outset of the case. As of the date of this annual report, this case has approximately 48 plaintiffs.

Eight additional complaints, three on October 8, 2021, four on February 7, 2022, and one on January 9, 2023, were filed in the Superior Court of Monroe County, Georgia against Georgia Power alleging that releases from Plant Scherer have impacted groundwater and air, resulting in alleged personal injuries and property damage. The plaintiffs sought an unspecified amount of monetary damages including punitive damages. After Georgia Power removed each of these cases to the U.S. District Court for the Middle District of Georgia, the plaintiffs voluntarily dismissed their complaints without prejudice in November 2022 and February 2023. On May 12, 2023, the plaintiffs refiled their eight complaints in the Superior Court of Monroe County. Also on May 12, 2023, a new complaint was filed in the Superior Court of Monroe County, Georgia against Georgia Power alleging that the construction and operation of Plant Scherer have impacted groundwater and air, resulting in alleged personal injuries. The plaintiff seeks an unspecified amount of monetary damages, including punitive damages. On May 18, 2023, Georgia Power removed all of these cases to the U.S. District Court for the Middle District of Georgia. The plaintiffs are requesting the court remand the cases back to the Superior Court of Monroe County.
The amount of any possible losses from these matters cannot be estimated at this time.
A-42

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
In May 2022, Florida Power & Light Company and JEA filed a complaint in the U.S. District Court for the Northern District of Georgia against us and the other co-owners of Plant Scherer alleging that their contractual responsibility for a proportionate share of certain common facility costs relating to future environmental projects at Plant Scherer should be decreased following the retirement of Scherer Unit No. 4 at the end of 2021. We and the other co-owners of Plant Scherer filed motions to dismiss Florida Power & Light and JEA's complaint and, on February 9, 2023, the court granted our motions to dismiss with leave to amend. On March 13, 2023, Florida Power & Light and JEA filed an amended complaint and on April 17, 2023, we and the other co-owners filed motions to dismiss this amended complaint. While we do not believe that the co-ownership agreements support the arguments raised by Florida Power & Light Company and JEA, if their arguments were to be successful in this case, we could be responsible for an increased percentage of these costs relating to our interests in Scherer Unit Nos. 1 and 2. The amount of additional costs relating to these future projects, if any, cannot be determined at this time.
13. Plant Acquisitions:
Baconton Power Facility
On May 25, 2023, we acquired one generating unit at the Baconton Power Plant, a four-unit 188 megawatt natural gas-fired combustion turbine facility located near Baconton, Georgia, from Baconton Power, LLC. Our unit has an aggregate summer planning reserve generation capacity of approximately 45 megawatts. Our unit also features dual-fuel capability and can run on diesel fuel that is stored on site.
The purchase price was $16,743,000 and the acquisition also included other transaction costs of approximately $746,000 (consisting primarily of legal and professional services). We accounted for the acquisition as an asset acquisition. We financed the acquisition on an interim basis through the issuance of commercial paper. In February 2024, we received a conditional commitment for a Rural Utilities Service-guaranteed loan totaling $17.5 million for the Baconton acquisition and we expect to draw on the loan by the end of 2024. For any amounts not funded through the Rural Utilities Service, we intend to issue first mortgage bonds. We expect that any financing from the Rural Utilities Service or through first mortgage bonds will be secured under our first mortgage indenture.
The following amounts represent the identifiable assets acquired and liabilities assumed in the Baconton acquisition:
Classification(dollars in thousands)
Recognized identifiable assets acquired and liabilities assumed:
Electric plant in service, net$16,450 
Other current assets323 
Other current liabilities(30)
Total identifiable net assets
$16,743 
Some of our members elected to take service (scheduling members) at the date of acquisition and some members have elected to defer (deferring members) their share of output until on or before January 2026. Prior to the deferring members’ use of Baconton, their share of output is being sold into the wholesale market. Revenues and costs of output associated with scheduling members are recognized in the current period. Residual net results of operations, including related interest costs of deferring members are deferred as a regulatory asset. This regulatory asset will be amortized over the then remaining life of the plant, estimated to be 14 years at January 2026. If a deferring member elects to take service before January 2026, amortization of that member's share of the regulatory asset will begin upon taking service.
Walton County Plant
On August 22, 2023, we signed a membership interest purchase agreement with Mackinaw Power, LLC to purchase Walton County Power, LLC, owner of the Walton County Power Plant. The Walton facility consists of three natural gas-fired combustion turbine electric generating units with a combined nominal capacity of 465
A-43

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
For the years ended December 31, 2023, 2022 and 2021
megawatts located in Walton County, Georgia. The acquisition is subject to customary closing conditions and is expected to close in the second quarter of 2024.
14. Quarterly financial data (unaudited):
Summarized quarterly financial information for 20202023 and 20192022 is as follows:
First
Quarter
Second
Quarter
Third
Quarter
Fourth
Quarter
(dollars in thousands)
2020
Operating revenues$341,674 $330,944 $366,239 $338,761 
Operating margin62,515 65,532 47,862 41,800 
Net margin23,204 26,162 8,471 (1,942)
2019
Operating revenues$356,600 $358,860 $382,623 $332,209 
Operating margin66,032 51,712 59,209 40,256 
Net margin23,596 9,383 18,286 3,196 
The negative net margins in the fourth quarter of 2020 were due to reductions to revenue requirements in order to achieve, but not exceed, the targeted margins for interest ratio of 1.14.
First
Quarter
Second
Quarter
Third
Quarter
Fourth
Quarter
(dollars in thousands)
2023
Operating revenues
$389,453 $389,389 $500,776 $460,567 
Operating margin
57,006 49,987 92,317 77,756 
Net margin
24,410 18,414 27,127 (4,161)
2022
Operating revenues$420,442 $533,128 $704,265 $472,302 
Operating margin57,845 54,269 64,553 17,384 
Net margin21,980 18,167 32,097 (10,540)
A-40A-44

Table of Contents
Report of Independent Registered Public Accounting Firm

REPORT OF INDEPENDENT REGISTERED PUBLIC ACCOUNTING FIRM
To the Members and the Board of Directors of Oglethorpe Power Corporation

Opinion on the Financial Statements

We have audited the accompanying consolidated balance sheets and consolidated statements of capitalization of Oglethorpe Power Corporation (the Company) as of December 31, 20202023 and 2019,2022, the related consolidated statements of revenues and expenses, comprehensive margin, patronage capital and membership fees and cash flows for each of the three years in the period ended December 31, 2020,2023, and the related notes (collectively referred to as the "consolidated“consolidated financial statements"statements”). In our opinion, the consolidated financial statements present fairly, in all material respects, the financial position of the Company at December 31, 20202023 and 2019,2022, and the results of its operations and its cash flows for each of the three years in the period ended December 31, 2020,2023, in conformity with U.S. generally accepted accounting principles.

Basis for Opinion

These financial statements are the responsibility of the Company'sCompany’s management. Our responsibility is to express an opinion on the Company'sCompany’s financial statements based on our audits. We are a public accounting firm registered with the Public Company Accounting Oversight Board (United States) (PCAOB) and are required to be independent with respect to the Company in accordance with the U.S. federal securities laws and the applicable rules and regulations of the Securities and Exchange Commission and the PCAOB.

We conducted our audits in accordance with the standards of the PCAOB. Those standards require that we plan and perform the audit to obtain reasonable assurance about whether the financial statements are free of material misstatement, whether due to error or fraud. The Company is not required to have, nor were we engaged to perform, an audit of its internal control over financial reporting. As part of our audits, we are required to obtain an understanding of internal control over financial reporting but not for the purpose of expressing an opinion on the effectiveness of the Company'sCompany’s internal control over financial reporting. Accordingly, we express no such opinion.

Our audits included performing procedures to assess the risks of material misstatement of the financial statements, whether due to error or fraud, and performing procedures that respond to those risks. Such procedures included examining, on a test basis, evidence regarding the amounts and disclosures in the financial statements. Our audits also included evaluating the accounting principles used and significant estimates made by management, as well as evaluating the overall presentation of the financial statements. We believe that our audits provide a reasonable basis for our opinion.

Critical Audit Matter
The critical audit matter communicated below is a matter arising from the current period audit of the financial statements that was communicated or required to be communicated to the audit committee and that: (1) relates to accounts or disclosures that are material to the financial statements and (2) involved our especially challenging, subjective or complex judgments. The communication of the critical audit matter does not alter in any way our opinion on the consolidated financial statements, taken as a whole, and we are not, by communicating the critical audit matter below, providing a separate opinion on the critical audit matter or on the account or disclosure to which it relates.


Description of the Matter        Disclosures relating to on-going construction of Vogtle No. 3 and No. 4 units

As more fully described in Note 8b to the consolidated financial statements, the Company, together with Georgia Power Company, the Municipal Electric Authority of Georgia and the City of Dalton, are parties to an ownership participation agreement related to the construction of two additional nuclear power plants – Plant Vogtle Unit No. 3 and Plant Vogtle Unit No. 4 (the Plants). The Company owns a 30% interest in the Plants and the current budget for the Company's portion of cost to be incurred in constructing the Plants is $7.5 billion, which includes capital costs, allowance for funds used during construction and certain project-level and Company-specific contingencies. As of December 31, 2020, the total investment in the Plants was approximately $6.0
A-41A-45

Table of Contents
billion. Since the inception of construction activities, there have been technical and procedural challenges encountered in the construction and licensing of the Plants, including changes to the cost estimate and the timing of the completion of the project.

Auditing the Company's disclosure related to the Plants is especially challenging given some of the subjective assumptions made by management which includes estimates of expected remaining construction costs and the timing of completion of these activities.These significant assumptions are forward looking and could be affected by numerous uncertainties, including actions by co-owners of the Plants, challenges with the management of contractors and vendors, subcontractor performance, labor productivity, the ability to attract and retain skilled labor, and cost escalations. The final construction timeline and costs may also be impacted by the results of remaining initial testing and start-up activities, including any required engineering changes or remediation related thereto and other unforeseen matters that could arise.

How We Addressed the
Matter in Our Audit        To test the adequacy of the Company's disclosures regarding the status, risks and current
budget for the nuclear construction project at the Plants,ouraudit procedures included, among others, evaluating the sensitivity of the Company's project budget to changes in the assumed project completion date based upon the current project status, expected remaining costs and construction costs incurred to date.For example, we tested the underlying incurred cost information by obtaining external confirmation of the construction costs incurred through December 31, 2020 from Georgia Power Company, in its capacity as agent for the joint owners, and compared the confirmed costs to the amounts recorded by the Company in the consolidated financial statements. We also inspected reports regarding the project construction status and other key performance metrics that are used by the Company in assessing the project status and evaluating the adequacy of its project budget.In addition, we discussed with management and the Company's Director of Nuclear Development regarding the project status, progress against key milestones, challenges encountered and the related impact on estimated costs to complete the project. We compared this information to the budgeted costs and remaining project contingency funds included in the Company's disclosure. In addition, we read minutes of the Company's construction committee meetings as well as reports of external independent monitors employed by the Georgia Public Service Commission to monitor the state of construction at the Plants and compared this information to the project status.

Description of the MatterAsset retirement obligation related to Plant Vogtle Unit No. 3
As described in Note 1h to the consolidated financial statements, the Company has a legal obligation associated with the future decommissioning of its nuclear facilities. Each asset retirement obligation recorded represents the present value of the estimated future costs expected to be incurred during decommissioning discounted using a credit-adjusted risk-free rate. The cost estimates are based on a site study and assumes the prompt dismantlement and removal of the radiated portions of the plant from service, as well as the management of spent fuel. On March 6, 2023, Plant Vogtle Unit No. 3 reached self-sustained nuclear fission. As a result, the Company recorded an initial asset retirement obligation for the decommissioning of Plant Vogtle Unit No. 3 of $62.8 million during the first quarter of 2023.
Auditing the asset retirement obligation for Plant Vogtle Unit No. 3 is complex due to the highly judgmental nature of the assumptions used in determining the liability including the projected timing of when the assets will be retired and ultimately be decommissioned, the amount of estimated future dismantling and removal of radiated portions of the plant from service and spent fuel management costs, the factors used to reflect how the costs will escalate with inflation and the appropriate credit adjusted, risk free rate.
How We Addressed the
Matter in Our Audit
To test the Plant Vogtle Unit No. 3 asset retirement obligation initially recorded during 2023, we performed audit procedures that included, among others, assessing the methodology used by the Company, testing the significant assumptions described above and testing the mathematical accuracy of management’s calculation. We involved EY engineering professionals, who assisted us in evaluating the Company’s planned method of decommissioning, assessing the completeness of costs included in the cost estimates based upon the requirements of the applicable decommissioning regulations, comparing the cost assumptions to available industry historical cost data and evaluating the professional qualifications and objectivity of management’s third-party specialist.
/s/ Ernst & Young LLP

We have served as the Company'sCompany’s auditor since 2010.

Atlanta, Georgia
March 19, 202125, 2024
A-42A-46

Table of Contents
APPENDIX B—MEMBERS'MEMBERS’ FINANCIAL AND STATISTICAL INFORMATION
FINANCIAL AND STATISTICAL INFORMATION FOR
38 MEMBERS OF OGLETHORPE POWER CORPORATION
Our members operate their systems on a not-for-profit basis.Accumulated margins derived after payment of operating expenses and provision for depreciation constitute patronage capital of the consumers of our members.Refunds of accumulated patronage capital to the individual consumers may be made from time to time subject to limitations contained in mortgages between our members and the Rural Utilities Service or loan documents with other lenders.The Rural Utilities Service mortgage generally prohibits such distributions unless, after any such distribution, the member'smember’s total equity will equal at least 30% of its total assets, except that distributions may be made of up to 25% of the margins and patronage capital received by the member in the preceding year provided that equity is at least 20%.
We are a membership corporation, and our members are not our subsidiaries.Except with respect to the obligations of our members under each member'smember’s wholesale power contract with us and our rights under such contracts to receive payment for power and energy supplied, we have no legal interest in, or obligations in respect of, any of the assets, liabilities, equity, revenues or margins of our members.
The following selected information on the individual members is intended to show, in the aggregate, the assets, liabilities, equity, revenues and margins of our members.Member assets, liabilities, equity, revenues and margins should not, however, be attributed to us.In addition, the revenues of our members are not pledged to us, but such revenues are received by the respective members and are the source from which moneys are derived by our members to pay for power and energy received from us.Revenues of our members are, however, pledged under their respective Rural Utilities Service mortgages or loan documents with other lenders.
The information contained in these tables was taken from Rural Utilities Service Financial and Statistical Reports (RUS Form 7) or similar reports prepared for other lenders or provided directly by a member.This information has not been independently verified by the Rural Utilities Service, any lender or us.The "Total"“Total” columns were not supplied or compiled by the Rural Utilities Service, any lender or our members.The "Total"“Total” column in each table is for informational purposes only, inasmuch as each member operates independently and is not responsible for the obligations of other members, except as provided in the wholesale power contracts (see "OUR“OUR BUSINESS - Business Overview - Wholesale Power Contracts")Contracts”.In addition, the Times Interest Earned, Equity to Assets and Equity to Total Capitalization ratios were calculated by us from information obtained from each member'smember’s RUS Form 7 or other financial information provided to us, but the calculations were not independently verified by our members.No adjustments were made by us in calculating these ratios for items such as debt refinancings that are not reflected separately on the financial information provided to us.
For the calendar years 2017, 20182020, 2021 and 2019,2022, the information on the individual members is presented in the succeeding tables as follows:
Table 1 - Selected Statistics,
Table 2 - Average Number of Consumers Served,
Table 3 - Annual Megawatt-hour Sales by Consumer Class,
Table 4 - Annual Revenues by Consumer Class,
Table 5 - Summary of Operating Results, and
Table 6 - Condensed Balance Sheet Information.
B-1

Table of Contents

FINANCIAL AND STATISTICAL INFORMATION FOR THE
FINANCIAL AND STATISTICAL INFORMATION FOR THE
38 MEMBERS OF OGLETHORPE POWER CORPORATION
Table 1
SELECTED STATISTICS OF EACH MEMBER
(as of December 31)
CentralCoweta-
AltamahaAmicalolaCanoocheeCarrollGeorgiaCoastalCobbColquittFayetteDiverse
2019
Avg. Monthly Residential Rev. ($)145.62138.93145.41144.06134.37171.97129.66129.66142.86180.84
Avg. Monthly Residential kWh1,0731,2371,1741,2031,3191,2351,1681,2161,2711,253
Avg. Residential Rev.(cents per kWh)13.5711.2312.3811.9810.1913.9211.1010.6611.2414.44
Times Interest Earned Ratio (1)
2.932.042.762.772.272.603.442.853.841.33
Equity / Assets (1)
56%44%49%45%33%38%42%46%46%34%
Equity / Total Capitalization (1)
62%60%57%53%39%43%51%53%53%39%
2018
Avg. Monthly Residential Rev. ($)146.46139.84144.42145.49132.10173.15130.00132.33141.41183.37
Avg. Monthly Residential kWh1,0931,2521,2151,2311,3391,2731,1901,2261,2891,304
Avg. Residential Rev.(cents per kWh)13.4011.1711.8911.829.8713.6010.9210.7910.9714.06
Times Interest Earned Ratio (1)
2.672.112.233.192.004.512.722.232.661.29
Equity / Assets (1)
54%45%47%46%34%37%41%44%45%33%
Equity / Total Capitalization (1)
60%61%56%51%42%41%50%52%53%38%
2017
Avg. Monthly Residential Rev. ($)141.53130.92145.14135.06121.48171.71128.13122.76130.48160.37
Avg. Monthly Residential kWh1,0291,1251,1401,1181,2421,2211,1031,1551,1941,192
Avg. Residential Rev.(cents per kWh)13.7611.6412.7312.089.7814.0611.6210.6310.9313.45
Times Interest Earned Ratio (1)
2.242.272.213.132.032.541.952.232.261.30
Equity / Assets (1)
55%48%46%46%35%34%36%43%45%35%
Equity / Total Capitalization (1)
61%64%56%52%40%37%46%52%51%40%
Footnotes:
(1) Times Interest Earned and Equity ratios were calculated from information contained on each Member's RUS Form 7, or similar form provided to another lender, and were not independently verified by each respective Member.
38 MEMBERS OF OGLETHORPE POWER CORPORATION

Table 1
SELECTED STATISTICS OF EACH MEMBER
(as of December 31)
AltamahaAmicalolaCanoocheeCarroll
Central
Georgia
CoastalCobbColquitt
Coweta-
Fayette
Diverse
2022
Avg. Monthly Residential Rev. ($)149.75 145.85 145.48 152.65 152.18 175.67 135.38 154.74 151.37 205.92 
Avg. Monthly Residential kWh1,056 1,218 1,164 1,181 1,296 1,255 1,124 1,149 1,216 1,210 
Avg. Residential Rev.(cents per kWh)14.18 11.97 12.50 12.93 11.74 14.00 12.05 13.46 12.45 17.02 
Times Interest Earned Ratio (1)
1.40 1.48 1.63 2.91 2.15 1.83 7.31 1.88 1.94 2.00 
Equity / Assets (1)
48 %35 %42 %44 %26 %37 %57 %46 %44 %33 %
Equity / Total Capitalization (1)
55 %46 %52 %49 %35 %43 %64 %54 %51 %37 %
2021
Avg. Monthly Residential Rev. ($)146.47 136.42 140.02 140.96 134.59 168.29 128.58 128.62 137.13 180.61 
Avg. Monthly Residential kWh1,029 1,217 1,138 1,177 1,251 1,223 1,088 1,174 1,208 1,212 
Avg. Residential Rev.(cents per kWh)14.24 11.21 12.30 11.97 10.76 13.76 11.82 10.96 11.35 14.90 
Times Interest Earned Ratio (1)
2.93 2.26 2.21 3.58 2.39 3.92 5.32 1.58 3.26 1.16 
Equity / Assets (1)
55 %40 %46 %45 %31 %40 %51 %44 %45 %33 %
Equity / Total Capitalization (1)
61 %52 %56 %51 %39 %45 %60 %53 %58 %38 %
2020
Avg. Monthly Residential Rev. ($)142.11 133.05 142.92 138.15 132.92 171.42 128.96 124.22 134.02 175.42 
Avg. Monthly Residential kWh1,062 1,170 1,155 1,140 1,268 1,252 1,115 1,185 1,204 1,213 
Avg. Residential Rev.(cents per kWh)13.38 11.37 12.38 12.12 10.48 13.69 11.57 10.48 11.13 14.47 
Times Interest Earned Ratio (1)
3.38 2.89 2.49 3.71 2.03 3.85 3.55 2.39 3.28 1.30 
Equity / Assets (1)
54 %44 %47 %44 %32 %39 %41 %45 %46 %33 %
Equity / Total Capitalization (1)
60 %59 %59 %51 %38 %44 %52 %53 %56 %38 %
B-2

Table of Contents1 (Continued)

ExcelsiorFlintGradyGrey StoneHabershamHartIrwinJacksonJefferson
Little
Ocmulgee
2022
Avg. Monthly Residential Rev. ($)154.99 168.19 164.74 129.87 139.80 164.11 156.48 149.77 143.45 134.15 
Avg. Monthly Residential kWh1,204 1,268 1,088 1,189 1,078 1,170 1,026 1,232 1,137 949 
Avg. Residential Rev.(cents per kWh)12.87 13.27 15.15 10.92 12.97 14.02 15.25 12.16 12.62 14.14 
Times Interest Earned Ratio (1)
3.01 2.30 5.98 2.61 0.69 8.68 0.09 3.38 1.53 2.01 
Equity / Assets (1)
52 %35 %51 %47 %31 %53 %29 %45 %33 %40 %
Equity / Total Capitalization (1)
65 %43 %62 %55 %39 %66 %31 %53 %41 %48 %
2021
Avg. Monthly Residential Rev. ($)129.06 160.79 150.70 123.24 132.84 142.60 146.91 133.89 136.92 133.56 
Avg. Monthly Residential kWh1,194 1,235 1,092 1,186 1,032 1,133 1,037 1,182 1,099 955 
Avg. Residential Rev.(cents per kWh)10.81 13.02 13.80 10.39 12.87 12.59 14.17 11.33 12.46 13.99 
Times Interest Earned Ratio (1)
2.74 2.74 3.44 3.88 2.78 6.44 2.15 3.10 2.03 2.16 
Equity / Assets (1)
53 %38 %48 %49 %36 %50 %37 %46 %34 %41 %
Equity / Total Capitalization (1)
67 %46 %58 %55 %46 %65 %40 %53 %43 %47 %
2020
Avg. Monthly Residential Rev. ($)125.72 158.97 152.40 123.05 134.64 134.78 144.95 137.93 137.23 128.28 
Avg. Monthly Residential kWh1,220 1,265 1,097 1,176 1,041 1,107 1,045 1,206 1,117 962 
Avg. Residential Rev.(cents per kWh)10.31 12.56 13.89 10.46 12.94 12.17 13.86 11.44 12.29 13.34 
Times Interest Earned Ratio (1)
2.77 2.32 4.72 2.62 2.36 5.07 1.91 3.14 1.97 2.03 
Equity / Assets (1)
54 %39 %46 %47 %38 %47 %35 %46 %33 %40 %
Equity / Total Capitalization (1)
69 %47 %55 %53 %52 %61 %39 %54 %42 %48 %
Table 1 (continued)
Little
ExcelsiorFlintGradyGreyStoneHabershamHartIrwinJacksonJeffersonOcmulgee
2019
Avg. Monthly Residential Rev. ($)129.61161.97143.68124.57136.32148.86150.82139.40138.84135.16
Avg. Monthly Residential kWh1,2371,2831,1281,2351,0411,1321,0711,2531,158987
Avg. Residential Rev.(cents per kWh)10.4712.6212.7410.0813.0913.1514.0811.1211.9913.70
Times Interest Earned Ratio (1)
2.662.212.993.422.243.971.652.732.141.71
Equity / Assets (1)
56%39%44%49%39%44%33%46%35%39%
Equity / Total Capitalization (1)
68%48%52%55%50%57%37%54%43%47%
2018
Avg. Monthly Residential Rev. ($)130.61168.63139.03130.38136.85151.48150.30135.54141.11132.36
Avg. Monthly Residential kWh1,2821,2981,1011,2511,1121,1721,0771,2861,1671,001
Avg. Residential Rev.(cents per kWh)10.1912.9912.6210.4212.3112.9213.9610.5412.1013.22
Times Interest Earned Ratio (1)
2.521.912.634.172.423.141.782.592.112.42
Equity / Assets (1)
60%39%41%48%38%47%34%43%34%38%
Equity / Total Capitalization (1)
71%48%56%55%47%59%37%53%42%46%
2017
Avg. Monthly Residential Rev. ($)123.29158.07148.42114.93133.66136.28146.71123.41138.36125.45
Avg. Monthly Residential kWh1,1951,3051,0551,1531,0131,0521,0171,1841,081943
Avg. Residential Rev.(cents per kWh)10.3212.1214.069.9713.1912.9514.4310.4212.8013.30
Times Interest Earned Ratio (1)
2.591.923.252.812.522.881.852.802.161.89
Equity / Assets (1)
58%39%45%46%38%48%33%43%44%36%
Equity / Total Capitalization (1)
68%48%55%51%50%57%37%50%52%42%
Footnotes:
(1) Times Interest Earned and Equity ratios were calculated from information contained on each Member's RUS Form 7, or similar form provided to another lender, and were not independently verified by each respective Member.
__________________
Footnotes:

(1)

Times Interest Earned and Equity ratios were calculated from information contained on each Member's RUS Form 7, or similar form provided to another lender, and were not independently verified by each respective Member.
B-3

Table of Contents1 (Continued)

Table 1 (continued)
MiddleSlash
GeorgiaMitchellOcmulgeeOconeeOkefenokePlantersRayleSatillaSawneePine
2019
Avg. Monthly Residential Rev. ($)155.31165.85127.36155.32148.87159.92141.49138.78128.08139.97
Avg. Monthly Residential kWh1,2211,1911,0021,2001,1841,2281,1021,2201,2341,115
Avg. Residential Rev.(cents per kWh)12.7213.9312.7112.9512.5813.0312.8411.3810.3812.55
Times Interest Earned Ratio (1)
2.222.174.181.991.613.462.672.692.733.89
Equity / Assets (1)
42%46%64%41%36%48%38%48%34%46%
Equity / Total Capitalization (1)
47%61%79%48%42%56%44%57%47%54%
2018
Avg. Monthly Residential Rev. ($)158.26160.66127.21150.66148.00159.34144.41142.01131.65138.40
Avg. Monthly Residential kWh1,2501,1861,0091,2131,2031,2441,1201,2321,2611,118
Avg. Residential Rev.(cents per kWh)12.6613.5412.6112.4212.3012.8112.9011.5310.4412.38
Times Interest Earned Ratio (1)
2.301.833.731.932.253.572.852.683.025.48
Equity / Assets (1)
41%47%62%40%38%51%35%46%37%45%
Equity / Total Capitalization (1)
45%65%75%47%43%58%40%55%53%52%
2017
Avg. Monthly Residential Rev. ($)149.93157.95117.75141.42146.24148.85141.16135.28129.20133.83
Avg. Monthly Residential kWh1,1501,1189401,1281,1581,1581,0001,1561,1781,082
Avg. Residential Rev.(cents per kWh)13.0414.1312.5312.5412.6312.8514.1111.7010.9612.37
Times Interest Earned Ratio (1)
1.022.653.161.871.952.792.653.553.112.04
Equity / Assets (1)
41%52%57%39%37%51%33%45%37%41%
Equity / Total Capitalization (1)
47%64%71%46%41%58%38%56%51%50%
Footnotes:
(1) Times Interest Earned and Equity ratios were calculated from information contained on each Member's RUS Form 7, or similar form provided to another lender, and were not independently verified by each respective Member.


Middle
Georgia
MitchellOcmulgeeOconeeOkefenokePlantersRayleSatillaSawnee
Slash
Pine
2022
Avg. Monthly Residential Rev. ($)175.23 178.39 132.19 160.38 162.32 157.32 155.92 156.80 142.17 142.62 
Avg. Monthly Residential kWh1,162 1,136 941 1,136 1,196 1,165 1,109 1,165 1,180 1,062 
Avg. Residential Rev.(cents per kWh)15.09 15.70 14.05 14.12 13.57 13.50 14.06 13.46 12.05 13.43 
Times Interest Earned Ratio (1)
1.64 2.48 -1.59 0.81 1.82 3.79 2.79 1.76 3.92 1.12 
Equity / Assets (1)
31 %47 %66 %41 %35 %46 %41 %39 %33 %42 %
Equity / Total Capitalization (1)
40 %58 %76 %54 %40 %56 %46 %46 %46 %50 %
2021
Avg. Monthly Residential Rev. ($)163.64 169.26 124.08 155.63 145.84 157.36 140.49 140.92 138.97 140.20 
Avg. Monthly Residential kWh1,183 1,147 961 1,153 1,164 1,187 1,064 1,195 1,164 1,084 
Avg. Residential Rev.(cents per kWh)13.84 14.75 12.91 13.49 12.53 13.26 13.21 11.79 11.94 12.93 
Times Interest Earned Ratio (1)
1.77 2.32 7.05 2.10 2.45 4.16 2.85 2.59 4.03 3.32 
Equity / Assets (1)
42 %48 %72 %43 %37 %48 %41 %45 %33 %44 %
Equity / Total Capitalization (1)
47 %59 %83 %53 %42 %58 %46 %55 %47 %52 %
2020
Avg. Monthly Residential Rev. ($)149.94 165.99 124.51 151.18 149.97 158.18 139.38 132.91 133.50 137.55 
Avg. Monthly Residential kWh1,165 1,152 950 1,151 1,201 1,192 1,066 1,188 1,177 1,079 
Avg. Residential Rev.(cents per kWh)12.88 14.41 13.10 13.14 12.49 13.27 13.08 11.19 11.34 12.75 
Times Interest Earned Ratio (1)
2.23 3.30 5.53 1.99 2.16 3.90 2.80 2.26 2.74 4.10 
Equity / Assets (1)
43 %48 %68 %42 %37 %48 %39 %48 %32 %48 %
Equity / Total Capitalization (1)
48 %61 %81 %51 %43 %59 %45 %58 %46 %56 %
B-4

Table of Contents1 (Continued)
Table 1 (continued)
SnappingSouthernThreeTri-MEMBER
ShoalsRiversSumterNotchCountyUpsonWaltonWashingtonWTD. AVG
2019
Snapping
Shoals
Snapping
Shoals
Southern
Rivers
Sumter
Three
Notch
Tri-
County
UpsonWaltonWashington
MEMBER
WTD. AVG.
2022
Avg. Monthly Residential Rev. ($)
Avg. Monthly Residential Rev. ($)
Avg. Monthly Residential Rev. ($)Avg. Monthly Residential Rev. ($)134.01165.22172.19126.07157.38127.32147.44127.09139.74154.72 186.47 186.47 169.99 169.99 130.71 130.71 170.89 170.89 140.26 140.26 158.61 158.61 151.45 151.45 150.85150.85
Avg. Monthly Residential kWhAvg. Monthly Residential kWh1,3401,3091,3119361,2451,1281,2881,0641,223Avg. Monthly Residential kWh1,299 1,262 1,262 1,268 1,268 878 878 1,176 1,176 1,075 1,075 1,266 1,266 1,042 1,042 1,1901,190
Avg. Residential Rev.(cents per kWh)Avg. Residential Rev.(cents per kWh)10.0012.6013.1413.5012.6411.2811.4511.9511.42Avg. Residential Rev.(cents per kWh)11.91 14.80 14.80 13.40 13.40 14.90 14.90 14.54 14.54 13.04 13.04 12.52 12.52 14.54 14.54 12.6712.67
 
Times Interest Earned Ratio (1)
Times Interest Earned Ratio (1)
2.223.562.162.633.354.285.002.172.84
Times Interest Earned Ratio (1)
Times Interest Earned Ratio (1)
1.96 1.61 2.70 3.08 1.54 1.50 2.48 1.61 3.04
Equity / Assets (1)
Equity / Assets (1)
36%41%49%38%34%67%37%53%44%
Equity / Assets (1)
33 %33 %48 %49 %28 %66 %41 %40 %42%
Equity / Total Capitalization (1)
Equity / Total Capitalization (1)
55%48%55%54%37%75%64%57%52%
Equity / Total Capitalization (1)
51 %39 %56 %52 %32 %75 %61 %44 %51%
2018
2021
2021
2021
Avg. Monthly Residential Rev. ($)
Avg. Monthly Residential Rev. ($)
Avg. Monthly Residential Rev. ($)Avg. Monthly Residential Rev. ($)133.25163.79172.89118.03149.94127.7151.05130.86140.57135.59 162.03 162.03 166.91 166.91 125.36 125.36 151.74 151.74 119.39 119.39 145.74 145.74 129.41 129.41 138.94138.94
Avg. Monthly Residential kWhAvg. Monthly Residential kWh1,3561,2981,3348951,2091,1441,3051,0941,244Avg. Monthly Residential kWh1,289 1,216 1,216 1,281 1,281 891 891 1,142 1,142 1,078 1,078 1,219 1,219 1,016 1,016 1,1691,169
Avg. Residential Rev.(cents per kWh)Avg. Residential Rev.(cents per kWh)9.8312.6212.9613.1812.4111.1611.5711.9611.30Avg. Residential Rev.(cents per kWh)10.52 13.30 13.30 13.03 13.03 14.10 14.10 13.28 13.28 11.08 11.08 11.96 11.96 12.74 12.74 11.8811.88
 
Times Interest Earned Ratio (1)
Times Interest Earned Ratio (1)
2.052.602.084.912.133.911.852.672.64
Times Interest Earned Ratio (1)
Times Interest Earned Ratio (1)
2.19 1.88 2.47 1.74 2.49 6.27 2.83 1.79 3.22
Equity / Assets (1)
Equity / Assets (1)
34%41%48%39%38%64%37%52%43%
Equity / Assets (1)
33 %36 %48 %50 %33 %68 %42 %49 %43%
Equity / Total Capitalization (1)
Equity / Total Capitalization (1)
54%50%55%53%42%73%61%56%51%
Equity / Total Capitalization (1)
51 %42 %54 %54 %37 %75 %63 %53 %53%
2017
2020
2020
2020
Avg. Monthly Residential Rev. ($)
Avg. Monthly Residential Rev. ($)
Avg. Monthly Residential Rev. ($)Avg. Monthly Residential Rev. ($)121.84151.83161.21117.82136.04121.97136.19124.24132.06125.83 158.42 158.42 165.90 165.90 123.47 123.47 149.50 149.50 120.98 120.98 144.01 144.01 125.29 125.29 137.13137.13
Avg. Monthly Residential kWhAvg. Monthly Residential kWh1,2391,1971,2428531,1031,0791,2041,0091,156Avg. Monthly Residential kWh1,261 1,231 1,231 1,265 1,265 890 890 1,166 1,166 1,076 1,076 1,234 1,234 1,027 1,027 1,1771,177
Avg. Residential Rev.(cents per kWh)Avg. Residential Rev.(cents per kWh)9.8312.6812.9813.8012.3411.3112.3111.43Avg. Residential Rev.(cents per kWh)9.97 12.87 12.87 13.12 13.12 13.87 13.87 12.83 12.83 11.24 11.24 11.67 11.67 12.20 12.20 11.6511.65
Times Interest Earned Ratio (1)
Times Interest Earned Ratio (1)
1.892.081.933.031.923.583.102.402.43
Times Interest Earned Ratio (1)
Times Interest Earned Ratio (1)
2.09 3.64 2.51 4.15 3.41 5.26 4.48 2.35 2.95
Equity / Assets (1)
Equity / Assets (1)
35%41%50%46%37%61%33%52%42%
Equity / Assets (1)
33 %42 %48 %49 %36 %68 %36 %52 %42%
Equity / Total Capitalization (1)
Equity / Total Capitalization (1)
55%50%55%51%41%69%56%57%50%
Equity / Total Capitalization (1)
53 %49 %54 %52 %39 %75 %59 %56 %52%
Footnotes:
(1) Times Interest Earned and Equity ratios were calculated from information contained on each Member's RUS Form 7, or similar form provided to another lender, and were not independently verified by each respective Member.
__________________
Footnotes:

(1)
Times Interest Earned and Equity ratios were calculated from information contained on each Member's RUS Form 7, or similar form provided to another lender, and were not independently verified by each respective Member.
B-5

Table of Contents

FINANCIAL AND STATISTICAL INFORMATION FOR THE
FINANCIAL AND STATISTICAL INFORMATION FOR THE
38 MEMBERS OF OGLETHORPE POWER CORPORATION
Table 2
AVERAGE NUMBER OF CONSUMERS SERVED BY EACH MEMBER
AltamahaAmicalolaCanoocheeCarrollCentral GeorgiaCoastalCobbColquittCoweta-FayetteDiverse
2019
Residential Service18,705 44,909 20,998 48,821 52,721 17,393 187,233 61,093 75,361 30,111 
Commercial & Industrial1,873 5,074 371 2,555 5,206 2,673 16,969 3,591 6,319 4,210 
 Other255 765 384 345 141 5,388 3,156 817 994 
     Total Consumers Served20,833 49,991 22,134 51,760 58,272 20,207 209,590 67,840 82,497 35,315 
2018
Residential Service18,636 44,166 20,892 48,313 51,547 16,877 185,039 60,458 74,306 29,926 
Commercial & Industrial1,851 4,972 372 2,543 5,149 2,645 16,785 3,552 6,187 4,176 
Other248 460 381 337 141 5,358 3,100 792 969 
Total Consumers Served20,735 49,146 21,724 51,237 57,033 19,663 207,182 67,110 81,285 35,071 
2017
Residential Service18,524 43,564 20,636 47,873 50,524 16,174 183,170 59,857 73,281 29,812 
Commercial & Industrial1,835 4,810 360 2,525 4,914 2,454 16,590 3,527 6,100 4,174 
Other227 452 376 322 143 5,352 3,008 777 969 
Total Consumers Served20,586 48,382 21,448 50,774 55,760 18,771 205,112 66,392 80,158 34,955 
38 MEMBERS OF OGLETHORPE POWER CORPORATION

Table 2

AVERAGE NUMBER OF CONSUMERS SERVED BY EACH MEMBER
AltamahaAmicalolaCanoocheeCarrollCentral
Georgia
CoastalCobbColquittCoweta-
Fayette
Diverse
2022
Residential Service19,261 47,831 22,664 51,513 57,588 19,144 195,037 64,161 80,242 31,305 
Commercial & Industrial1,906 5,821 398 2,642 5,642 2,921 17,625 3,781 6,551 4,330 
Other272 827 392 398 135 5,449 3,273 987 1,054 
Total Consumers Served21,439 53,657 23,889 54,547 63,628 22,200 218,111 71,215 87,780 36,689 
2021
Residential Service19,096 46,675 21,956 50,451 55,732 18,634 192,756 63,154 78,622 30,743 
Commercial & Industrial1,897 5,459 390 2,603 5,579 2,826 17,388 3,714 6,452 4,305 
Other262 808 385 383 136 5,430 3,237 951 1,032 
Total Consumers Served21,255 52,139 23,154 53,439 61,694 21,596 215,574 70,105 86,025 36,080 
2020
Residential Service18,827 45,653 21,412 49,511 53,933 17,950 190,114 61,923 76,940 30,348 
Commercial & Industrial1,877 5,171 391 2,566 5,318 2,815 17,152 3,650 6,382 4,258 
Other260 783 383 363 139 5,420 3,220 892 1,024 
Total Consumers Served20,964 50,829 22,586 52,460 59,614 20,904 212,686 68,793 84,214 35,630 
B-6

Table of Contents2 (Continued)
Table 2 (continued)
ExcelsiorFlintGradyGreyStoneHabershamHartIrwinJacksonJeffersonLittle Ocmulgee
2019
Residential Service21,489 76,082 18,681 123,383 32,498 28,344 10,634 210,196 32,277 10,884 
Commercial & Industrial1,440 10,586 492 10,394 2,563 8,308 226 17,902 1,799 147 
Other429 1,134 692 1,813 11 1,617 5,003 431 441 
Total Consumers Served23,358 87,802 19,865 135,590 35,067 36,663 12,477 233,101 34,507 11,472 
2018
Residential Service21,259 75,165 18,673 120,754 32,222 28,213 10,611 206,476 32,030 10,833 
Commercial & Industrial1,407 10,417 493 10,587 2,526 8,100 225 17,583 1,776 145 
Other413 1,114 685 1,586 11 1,581 4,891 427 432 
Total Consumers Served23,079 86,696 19,851 132,927 34,754 36,324 12,417 228,950 34,233 11,410 
2017
Residential Service20,982 73,923 18,594 118,255 32,019 28,147 10,619 202,989 31,799 10,795 
Commercial & Industrial1,373 10,284 490 10,509 2,482 7,844 225 17,305 1,760 143 
Other396 1,092 683 1,531 11 1,569 4,793 420 435 
Total Consumers Served22,751 85,299 19,767 130,295 34,504 36,002 12,413 225,087 33,979 11,373 


ExcelsiorFlintGradyGreyStoneHabershamHartIrwinJacksonJeffersonLittle
Ocmulgee
2022
Residential Service22,630 79,919 19,032 131,489 33,899 29,200 10,863 225,116 33,694 11,202 
Commercial & Industrial1,524 11,369 497 10,742 2,566 8,965 242 19,030 1,889 157 
Other473 1,194 717 1,965 20 1,660 5,360 448 461 
Total Consumers Served24,627 92,482 20,246 144,196 36,474 38,185 12,765 249,506 36,031 11,820 
2021
Residential Service22,172 78,564 18,899 128,478 33,222 28,879 10,789 219,455 33,101 11,095 
Commercial & Industrial1,488 11,154 491 10,699 2,552 8,821 238 18,591 1,860 152 
Other460 1,185 704 1,969 11 1,652 5,212 446 461 
Total Consumers Served24,120 90,903 20,094 141,146 35,782 37,711 12,679 243,258 35,407 11,708 
2020
Residential Service21,799 77,451 18,708 125,898 32,749 28,513 10,669 214,537 32,661 10,930 
Commercial & Industrial1,471 10,883 489 10,394 2,530 8,477 233 18,177 1,826 149 
Other441 1,175 701 1,908 11 1,630 5,103 439 450 
Total Consumers Served23,711 89,509 19,898 138,200 35,287 37,001 12,532 237,817 34,926 11,529 
B-7

Table of Contents2 (Continued)
Table 2 (continued)
Middle GeorgiaMitchellOcmulgeeOconeeOkefenokePlantersRayleSatillaSawneeSlash Pine
2019
Residential Service5,160 20,900 10,934 10,447 34,834 15,536 15,632 50,980 164,076 8,165 
Commercial & Industrial1,747 1,161 679 2,093 2,364 626 2,923 2,690 16,961 611 
Other1,207 2,960 624 194 442 994 — 2,449 2,016 217 
Total Consumers Served8,114 25,021 12,237 12,734 37,640 17,156 18,555 56,119 183,053 8,993 
2018
Residential Service5,174 20,993 10,914 10,417 34,311 15,442 15,579 50,705 160,224 8,527 
Commercial & Industrial1,740 1,162 672 2,033 2,294 606 2,865 2,676 16,653 167 
Other1,186 2,925 608 186 439 974 — 2,396 1,970 201 
Total Consumers Served8,100 25,080 12,194 12,636 37,044 17,022 18,444 55,777 178,847 8,895 
2017
Residential Service5,164 21,139 10,893 10,406 33,645 15,372 15,567 50,490 156,377 8,173 
Commercial & Industrial1,714 1,173 666 1,998 2,421 587 2,815 2,669 16,388 372 
Other1,158 2,892 598 180 435 964 — 2,345 1,964 273 
Total Consumers Served8,036 25,204 12,157 12,584 36,501 16,923 18,382 55,504 174,729 8,818 


Middle
Georgia
MitchellOcmulgeeOconeeOkefenokePlantersRayleSatillaSawneeSlash
Pine
2022
Residential Service5,281 21,209 11,368 10,575 37,023 16,151 16,118 52,861 174,430 8,557 
Commercial & Industrial1,826 1,209 710 2,329 2,306 705 3,248 2,890 17,754 618 
Other1,282 3,098 720 196 455 1,036 — 2,567 2,041 243 
Total Consumers Served8,389 25,516 12,798 13,100 39,784 17,892 19,366 58,318 194,225 9,418 
2021
Residential Service5,186 21,157 11,212 10,544 36,122 16,008 15,949 52,301 171,185 8,420 
Commercial & Industrial1,805 1,195 710 2,246 2,307 697 3,134 2,833 17,512 616 
Other1,252 3,055 709 195 439 1,020 — 2,546 2,040 226 
Total Consumers Served8,243 25,407 12,631 12,985 38,868 17,725 19,083 57,680 190,737 9,262 
2020
Residential Service5,172 20,953 11,035 10,475 35,348 15,733 15,755 51,565 167,510 8,290 
Commercial & Industrial1,776 1,169 691 2,161 2,367 662 3,007 2,759 17,259 615 
Other1,231 3,017 648 193 434 1,010 — 2,498 2,037 220 
Total Consumers Served8,179 25,139 12,374 12,829 38,149 17,405 18,762 56,822 186,806 9,125 
B-8

Table of Contents2 (Continued)
Table 2 (continued)
MEMBER
Snapping ShoalsSouthern RiversSumterThree NotchTri-CountyUpsonWaltonWashingtonTOTAL
2019
Residential Service95,317 18,490 14,730 13,309 19,649 8,462 120,480 14,872 1,763,786 
Commercial & Industrial4,135 1,069 5,062 472 2,101 555 8,153 601 156,701 
Other1,324 21 806 981 — 133 1,680 130 40,008 
Total Consumers Served100,776 19,580 20,598 14,762 21,750 9,150 130,313 15,603 1,960,495 
2018
Residential Service93,985 18,226 14,761 13,778 19,453 8,362 118,824 14,800 1,740,871 
Commercial & Industrial4,120 1,066 5,034 501 2,074 626 8,045 596 154,421 
Other1,296 20 781 982 — 124 1,682 130 38,840 
Total Consumers Served99,401 19,312 20,576 15,261 21,527 9,112 128,551 15,526 1,934,132 
2017
Residential Service92,596 17,976 14,758 13,820 19,320 8,321 117,269 14,740 1,717,563 
Commercial & Industrial4,112 1,067 4,997 509 2,048 661 7,922 605 152,428 
Other1,272 19 757 962 — 120 1,689 124 38,319 
Total Consumers Served97,980 19,062 20,512 15,291 21,368 9,102 126,880 15,469 1,908,310 


Snapping
Shoals
Snapping
Rivers
SumterThree
Notch
Tri-
County
UpsonWaltonWashington
MEMBER
TOTAL
2022
Residential Service99,814 19,691 14,921 13,881 20,547 8,790 127,193 14,981 1,859,181 
Commercial & Industrial4,358 1,145 5,234 489 2,171 544 8,674 946 165,754 
Other1,778 21 891 1,048 — 143 1,485 162 42,265 
Total Consumers Served105,950 20,857 21,046 15,418 22,718 9,477 137,352 16,089 2,067,200 
2021
Residential Service98,760 19,274 14,838 13,607 20,208 8,666 124,848 15,118 1,825,876 
Commercial & Industrial4,279 1,102 5,161 482 2,149 552 8,524 678 162,641 
Other1,379 21 860 1,027 — 137 1,482 143 41,268 
Total Consumers Served104,418 20,397 20,859 15,116 22,357 9,355 134,854 15,939 2,029,785 
2020
Residential Service96,969 18,855 14,777 13,504 19,855 8,525 122,399 14,991 1,792,237 
Commercial & Industrial4,199 1,081 5,093 477 2,122 545 8,268 621 159,081 
Other1,350 21 837 1,012 — 140 1,674 132 40,809 
Total Consumers Served102,518 19,957 20,707 14,993 21,977 9,210 132,341 15,744 1,992,127 
B-9

Table of Contents
FINANCIAL AND STATISTICAL INFORMATION FOR THE
38 MEMBERS OF OGLETHORPE POWER CORPORATION
Table 3
ANNUAL MWh SALES BY CONSUMER CLASS OF EACH MEMBER
AltamahaAmicalolaCanoocheeCarrollCentral GeorgiaCoastalCobbColquittCoweta-FayetteDiverse
2019
Residential Service240,929 666,875 295,932 704,773 834,284 257,810 2,624,574 891,503 1,149,419 452,653 
Commercial & Industrial178,404 119,378 127,780 388,212 460,689 253,956 1,210,103 295,643 466,686 209,021 
 Other12,376 134 18,128 6,725 3,808 2,529 250,006 110,243 7,472 45,664 
     Total MWh Sales431,709 786,387 441,840 1,099,710 1,298,781 514,295 4,084,682 1,297,389 1,623,576 707,339 
2018
Residential Service244,482 663,321 304,568 713,714 827,959 257,867 2,642,429 889,645 1,149,478 468,382 
Commercial & Industrial173,694 118,902 121,043 390,532 443,688 263,344 1,214,563 281,552 462,895 205,920 
Other6,983 164 5,135 6,750 4,001 2,652 257,274 84,912 8,046 36,048 
     Total MWh Sales425,158 782,387 430,745 1,110,995 1,275,648 523,862 4,114,266 1,256,109 1,620,419 710,350 
2017
Residential Service228,658 588,113 282,349 642,477 753,012 237,054 2,424,326 829,766 1,050,168 426,514 
Commercial & Industrial168,606 110,224 115,166 375,690 424,127 247,319 1,184,070 277,134 451,792 200,473 
Other9,197 166 5,900 6,319 4,314 2,487 257,839 91,794 8,284 39,966 
     Total MWh Sales406,461 698,502 403,415 1,024,486 1,181,453 486,860 3,866,234 1,198,694 1,510,244 666,952 


FINANCIAL AND STATISTICAL INFORMATION FOR THE
38 MEMBERS OF OGLETHORPE POWER CORPORATION
Table 3
ANNUAL MWh SALES BY CONSUMER CLASS OF EACH MEMBER
AltamahaAmicalolaCanoocheeCarrollCentral
Georgia
CoastalCobbColquittCoweta-
Fayette
Diverse
2022
Residential Service244,092 699,329 316,540 729,990 895,626 288,254 2,630,027 884,946 1,170,511 454,391 
Commercial & Industrial274,337 122,842 141,079 403,565 495,162 264,429 1,151,120 299,281 471,846 224,913 
Other10,396 86 17,517 6,175 3,736 2,369 239,232 95,730 6,432 45,353 
Total MWh Sales528,825 822,257 475,135 1,139,730 1,394,525 555,051 4,020,380 1,279,957 1,648,789 724,656 
2021
Residential Service235,684 681,433 299,920 712,650 836,527 273,499 2,516,660 889,519 1,139,558 447,099 
Commercial & Industrial176,729 117,260 134,211 412,211 458,238 247,070 1,131,685 286,853 462,301 206,192 
Other7,264 92 15,276 5,777 3,622 2,066 230,838 74,793 6,721 36,030 
Total MWh Sales419,677 798,784 449,408 1,130,638 1,298,387 522,636 3,879,183 1,251,165 1,608,580 689,321 
2020
Residential Service239,873 641,083 296,717 677,457 820,697 269,638 2,543,578 880,402 1,111,393 441,588 
Commercial & Industrial172,340 109,568 131,095 372,821 434,170 235,347 1,116,709 284,411 436,835 201,968 
Other9,625 95 14,744 5,216 3,524 2,107 220,365 86,445 6,956 39,248 
Total MWh Sales421,837 750,747 442,556 1,055,494 1,258,391 507,092 3,880,653 1,251,259 1,555,184 682,804 
B-10

Table of Contents3 (Continued)
Table 3 (continued)
ExcelsiorFlintGradyGreyStoneHabershamHartIrwinJacksonJeffersonLittle Ocmulgee
2019
Residential Service319,103 1,171,442 252,909 1,828,915 406,101 385,131 136,731 3,161,520 448,435 128,863 
Commercial & Industrial71,620 620,395 44,127 1,022,482 102,485 202,778 32,844 2,062,290 123,937 53,397 
Other7,138 55,144 20,882 14,605 94 786 37,740 304,513 25,502 9,015 
Total MWh Sales397,861 1,846,981 317,917 2,866,003 508,679 588,695 207,315 5,528,323 597,875 191,275 
2018
Residential Service327,007 1,171,060 246,801 1,813,154 429,836 396,864 137,097 3,186,606 448,418 130,133 
Commercial & Industrial71,565 597,767 36,102 1,057,917 107,621 200,322 33,333 2,096,687 121,603 52,713 
Other4,247 45,772 15,009 14,757 101 684 19,610 299,703 18,893 4,932 
Total MWh Sales402,819 1,814,599 297,912 2,885,829 537,558 597,870 190,041 5,582,996 588,914 187,779 
2017
Residential Service300,791 1,157,198 235,483 1,636,365 389,221 355,448 129,568 2,883,533 412,559 122,162 
Commercial & Industrial67,486 601,128 33,290 1,014,581 92,456 190,696 32,697 2,014,145 112,056 51,164 
Other3,977 47,044 18,351 15,178 10,108 624 25,916 294,638 18,604 6,394 
Total MWh Sales372,254 1,805,370 287,124 2,666,125 491,785 546,768 188,181 5,192,316 543,219 179,721 


ExcelsiorFlintGradyGreyStoneHabershamHartIrwinJacksonJeffersonLittle
Ocmulgee
2022
Residential Service327,084 1,215,797 248,393 1,876,572 438,519 410,046 133,760 3,327,794 459,678 127,566 
Commercial & Industrial73,097 639,544 40,630 1,063,758 104,136 217,001 31,948 2,066,222 160,625 52,906 
Other5,517 47,178 17,834 10,704 123 979 30,170 314,111 21,150 6,709 
Total MWh Sales405,698 1,902,519 306,856 2,951,033 542,778 628,027 195,878 5,708,128 641,452 187,181 
2021
Residential Service317,664 1,164,173 247,692 1,829,269 411,491 392,546 134,254 3,113,308 436,444 127,152 
Commercial & Industrial69,517 612,517 41,145 1,042,924 99,702 205,795 30,989 2,013,130 138,498 48,226 
Other4,191 38,189 14,748 11,226 47 643 16,645 304,339 18,232 4,137 
Total MWh Sales391,372 1,814,879 303,585 2,883,418 511,239 598,984 181,888 5,430,778 593,174 179,515 
2020
Residential Service319,106 1,176,028 246,250 1,776,843 408,915 378,774 133,847 3,105,148 437,678 126,159 
Commercial & Industrial66,862 589,703 39,039 988,478 90,821 199,726 30,832 1,952,614 120,962 49,393 
Other6,695 42,763 17,776 12,969 6,717 621 32,714 281,927 20,704 6,750 
Total MWh Sales392,663 1,808,495 303,065 2,778,290 506,453 579,120 197,394 5,339,689 579,344 182,302 
B-11

Table of Contents3 (Continued)
Table 3 (continued)
Middle GeorgiaMitchellOcmulgeeOconeeOkefenokePlantersRayleSatillaSawneeSlash Pine
2019
Residential Service75,630 298,611 131,456 150,414 494,842 228,886 206,767 746,215 2,428,883 109,246 
Commercial & Industrial45,994 77,321 49,619 116,751 76,708 30,170 66,234 327,777 1,048,639 67,667 
Other33,316 81,802 14,511 8,262 17,482 34,075 — 48,105 179,062 5,789 
Total MWh Sales154,940 457,734 195,586 275,428 589,033 293,131 273,000 1,122,096 3,656,585 182,703 
2018
Residential Service77,589 298,891 132,120 151,675 495,273 230,479 209,327 749,663 2,424,473 114,359 
Commercial & Industrial44,699 78,282 52,217 120,606 61,528 27,248 66,796 315,381 1,038,654 63,607 
Other18,790 52,894 6,629 5,223 17,415 19,652 — 32,155 173,179 3,552 
Total MWh Sales141,078 430,067 190,965 277,504 574,216 277,379 276,122 1,097,199 3,636,306 181,518 
2017
Residential Service71,249 283,533 122,811 140,821 467,470 213,615 186,864 700,359 2,211,477 106,134 
Commercial & Industrial41,838 78,844 49,331 115,294 59,222 26,706 61,647 318,399 1,003,193 63,379 
Other21,316 70,189 8,549 5,465 16,582 22,221 — 34,418 161,278 3,500 
Total MWh Sales134,403 432,566 180,691 261,580 543,274 262,543 248,511 1,053,176 3,375,948 173,013 


Middle
Georgia
MitchellOcmulgeeOconeeOkefenokePlantersRayleSatillaSawneeSlash
Pine
2022
Residential Service73,611 289,178 128,314 144,165 531,475 225,872 214,462 739,024 2,469,224 109,029 
Commercial & Industrial46,902 77,104 44,571 99,634 85,609 34,800 72,737 329,376 1,018,679 71,496 
Other29,814 74,645 11,543 6,530 17,088 26,526 — 44,921 185,155 5,126 
Total MWh Sales150,327 440,927 184,428 250,328 634,171 287,198 287,199 1,113,321 3,673,058 185,651 
2021
Residential Service73,594 291,274 129,348 145,920 504,382 227,976 203,603 750,190 2,390,472 109,569 
Commercial & Industrial42,771 75,326 46,076 105,309 80,072 34,091 67,885 325,764 1,009,171 72,678 
Other14,370 50,154 6,789 4,292 16,060 20,083 — 34,216 182,526 3,932 
Total MWh Sales130,736 416,754 182,214 255,521 600,514 282,150 271,487 1,110,170 3,582,168 186,179 
2020
Residential Service72,274 289,601 125,815 144,650 509,397 225,017 201,446 735,093 2,365,426 107,312 
Commercial & Industrial42,768 76,984 47,355 106,722 81,739 32,328 67,764 318,372 972,180 73,535 
Other24,957 69,919 10,273 6,007 15,983 26,487 — 42,805 166,606 4,345 
Total MWh Sales139,998 436,504 183,443 257,378 607,119 283,832 269,211 1,096,270 3,504,212 185,193 
B-12

Table of Contents3 (Continued)
Table 3 (continued)
MEMBER
Snapping ShoalsSouthern RiversSumterThree NotchTri-CountyUpsonWaltonWashingtonTOTAL
2019
Residential Service1,532,624 290,391 231,701 149,558 293,503 114,580 1,861,914 189,863 25,892,987 
Commercial & Industrial466,838 54,236 92,649 25,685 107,708 15,501 692,079 165,573 11,573,381 
Other18,191 5,354 44,913 51,141 — 2,863 75,600 8,130 1,561,101 
Total MWh Sales2,017,653 349,981 369,264 226,385 401,211 132,945 2,629,594 363,567 39,027,470 
2018 
Residential Service1,529,226 283,906 236,288 148,019 282,158 114,832 1,861,384 194,279 25,982,761 
Commercial & Industrial478,524 52,012 94,976 26,150 100,564 15,941 698,569 178,775 11,566,289 
Other18,090 5,133 31,203 31,064 — 2,968 75,432 5,360 1,334,413 
Total MWh Sales2,025,840 341,051 362,467 205,233 382,722 133,741 2,635,384 378,414 38,883,463 
2017 
Residential Service1,376,773 258,258 219,955 141,542 255,630 107,716 1,693,836 178,472 23,821,280 
Commercial & Industrial475,406 51,672 92,711 28,492 97,103 15,911 674,333 177,466 11,195,246 
Other17,849 5,117 31,841 44,192 — 3,821 73,943 5,430 1,392,808 
Total MWh Sales1,870,028 315,047 344,507 214,225 352,733 127,448 2,442,111 361,368 36,409,335 

Snapping ShoalsSouthern RiversSumterThree NotchTri-CountyUpsonWaltonWashington
MEMBER
TOTAL
2022
Residential Service1,556,491 298,307 227,101 146,333 289,840 113,432 1,932,954 187,259 26,554,983 
Commercial & Industrial476,707 58,221 90,670 29,518 106,364 16,569 1,382,244 168,867 12,508,511 
Other17,779 4,627 44,380 47,562 — 3,051 58,182 7,422 1,465,849 
Total MWh Sales2,050,978 361,155 362,151 223,413 396,204 133,052 3,373,380 363,548 40,529,342 
2021
Residential Service1,527,814 281,221 228,111 145,484 277,007 112,083 1,826,312 184,299 25,615,201 
Commercial & Industrial461,786 55,928 87,885 28,703 102,432 16,831 938,130 163,586 11,649,614 
Other18,286 4,501 29,817 34,381 — 2,572 55,660 5,311 1,277,828 
Total MWh Sales2,007,886 341,650 345,813 208,568 379,438 131,486 2,820,102 353,196 38,542,643 
2020
Residential Service1,467,869 278,542 224,260 144,233 277,714 110,101 1,812,514 184,787 25,307,226 
Commercial & Industrial434,257 53,055 87,258 28,147 101,207 14,944 692,403 151,802 11,006,513 
Other18,245 4,381 37,320 47,798 — 2,483 67,425 6,609 1,369,607 
Total MWh Sales1,920,371 335,978 348,838 220,178 378,921 127,528 2,572,342 343,198 37,683,346 
B-13

Table of Contents

FINANCIAL AND STATISTICAL INFORMATION FOR THE
FINANCIAL AND STATISTICAL INFORMATION FOR THE
38 MEMBERS OF OGLETHORPE POWER CORPORATION
Table 4
ANNUAL REVENUES BY CONSUMER CLASS OF EACH MEMBER
AltamahaAmicalolaCanoocheeCarrollCentral GeorgiaCoastalCobbColquittCoweta-FayetteDiverse
2019
Residential Service$32,685,358$74,868,918$36,640,315$84,397,569$85,009,865$35,893,223$291,307,996$95,052,444$129,192,456$65,341,537
Commercial & Industrial17,160,00814,726,32411,252,17930,783,90934,530,90823,403,673111,724,00826,499,49644,926,94420,893,222
Other1,429,73534,2762,354,480978,401756,261441,37822,672,84111,863,4301,932,0035,840,411
Total Electric Sales$51,275,101$89,629,518$50,246,974$116,159,879$120,297,034$59,738,274$425,704,845$133,415,370$176,051,403$92,075,170
Other Operating Revenue597,61839,7319,581,3363,682,112(1,741,117)(3,756,934)9,440,4533,587,873971,7972,301,453
Total Operating Revenue$51,872,719$89,669,249$59,828,310$119,841,991$118,555,917$55,981,340$435,145,298$137,003,243$177,023,200$94,376,623
2018
Residential Service$32,752,880$74,113,228$36,207,840$84,350,577$81,709,339$35,067,018$288,651,411$96,004,648$126,091,128$65,849,485
Commercial & Industrial16,793,30014,587,1499,972,99330,558,97033,146,91323,463,497113,517,18825,498,09843,576,51620,729,601
Other861,94535,121773,740904,816736,024444,12623,163,7719,175,3851,902,3154,722,492
Total Electric Sales$50,408,125$88,735,498$46,954,573$115,814,363$115,592,276$58,974,641$425,332,370$130,678,131$171,569,959$91,301,578
Other Operating Revenue644,174(2,829,155)8,733,0483,902,1396,119,163834,1029,154,4253,399,061(1,611,741)1,032,426
Total Operating Revenue$51,052,299$85,906,343$55,687,621$119,716,502$121,711,439$59,808,743$434,486,795$134,077,192$169,958,218$92,334,004
2017
Residential Service$31,461,457$68,442,415$35,940,832$77,588,814$73,652,564$33,327,307$281,638,519$88,179,161$114,740,389$57,371,191
Commercial & Industrial16,699,06513,891,37710,668,68429,357,82631,599,25814,629,110114,276,07725,094,48541,787,30519,714,963
Other1,094,52935,016915,897846,824705,9648,542,98224,121,8829,630,9521,852,2854,873,068
Total Electric Sales$49,255,051$82,368,808$47,525,413$107,793,464$105,957,786$56,499,399$420,036,478$122,904,598$158,379,979$81,959,222
Other Operating Revenue591,1006,893,2719,923,4023,649,0015,090,391790,8209,699,8273,272,4512,146,9802,922,513
Total Operating Revenue$49,846,151$89,262,079$57,448,815$111,442,465$111,048,177$57,290,219$429,736,305$126,177,049$160,526,959$84,881,735
38 MEMBERS OF OGLETHORPE POWER CORPORATION

Table 4

ANNUAL REVENUES BY CONSUMER CLASS OF EACH MEMBER
AltamahaAmicalolaCanoocheeCarroll
Central
Georgia
CoastalCobbColquitt
Coweta-
Fayette
Diverse
2022
Residential Service$34,611,328 $83,713,185 $39,565,688 $94,360,649 $105,164,396 $40,356,183 $316,853,414 $119,140,699 $145,755,946 $77,356,082 
Commercial & Industrial23,073,256 16,467,533 11,910,805 34,092,521 42,300,137 25,410,283 115,030,381 32,065,097 50,336,931 24,590,702 
Other1,311,581 27,415 2,342,584 1,053,490 958,715 459,692 23,678,374 12,610,926 2,119,531 7,520,986 
Total Electric Sales$58,996,165 $100,208,133 $53,819,077 $129,506,660 $148,423,248 $66,226,158 $455,562,169 $163,816,722 $198,212,408 $109,467,770 
Other Operating Revenue2,041,601 9,174,772 14,004,902 8,831,980 14,287,025 834,566 10,211,711 4,051,932 10,014,298 1,949,985 
Total Operating Revenue$61,037,766 $109,382,905 $67,823,979 $138,338,640 $162,710,273 $67,060,724 $465,773,880 $167,868,654 $208,226,706 $111,417,755 
2021
Residential Service$33,564,038 $76,406,079 $36,890,611 $85,335,988 $90,010,762 $37,630,443 $297,411,036 $97,471,103 $129,375,339 $66,630,291 
Commercial & Industrial17,186,413 14,790,193 11,033,271 31,220,869 35,447,473 23,474,737 110,121,821 26,782,676 45,210,012 21,300,819 
Other913,432 27,940 2,019,448 948,985 903,728 397,225 22,320,434 8,379,370 2,041,411 4,806,178 
Total Electric Sales$51,663,883 $91,224,212 $49,943,330 $117,505,842 $126,361,963 $61,502,405 $429,853,291 $132,633,149 $176,626,762 $92,737,288 
Other Operating Revenue806,594 (46,600)10,542,687 6,065,971 7,203,320 866,251 9,226,399 3,442,407 3,246,149 2,973,705 
Total Operating Revenue$52,470,477 $91,177,612 $60,486,017 $123,571,813 $133,565,283 $62,368,656 $439,079,690 $136,075,556 $179,872,911 $95,710,993 
2020
Residential Service$32,105,318 $72,888,512 $36,723,596 $82,079,923 $86,027,796 $36,923,668 $294,194,966 $92,307,200 $123,733,422 $63,885,361 
Commercial & Industrial16,892,426 13,872,280 10,643,640 29,835,106 32,933,177 22,534,941 107,503,767 25,066,207 41,970,853 20,396,185 
Other1,159,794 27,980 2,161,442 877,493 818,416 395,366 21,120,519 9,068,749 1,962,648 5,134,294 
Total Electric Sales$50,157,538 $86,788,772 $49,528,678 $112,792,522 $119,779,389 $59,853,975 $422,819,252 $126,442,156 $167,666,923 $89,415,840 
Other Operating Revenue295,933 3,218,356 10,136,532 5,604,455 (1,357,085)656,034 7,911,894 2,717,768 5,182,920 7,122,381 
Total Operating Revenue$50,453,471 $90,007,128 $59,665,210 $118,396,977 $118,422,304 $60,510,009 $430,731,146 $129,159,924 $172,849,843 $96,538,221 
B-14

Table of Contents4 (Continued)
Table 4 (Continued)
ExcelsiorFlintGradyGreyStoneHabershamHartIrwinJacksonJeffersonLittle Ocmulgee
2019
Residential Service$33,423,559$147,876,722$32,209,023$184,433,166$53,162,849$50,633,076$19,245,457$351,619,943$53,774,702$17,652,798
Commercial & Industrial7,559,16061,872,8404,347,78090,175,89912,042,92025,107,7633,756,687193,094,16312,083,0165,023,280
Other1,044,0946,948,0802,736,6392,918,60610,36384,3385,590,67235,453,1893,283,6281,283,683
Total Electric Sales$42,026,813$216,697,642$39,293,442$277,527,671$65,216,132$75,825,177$28,592,816$580,167,295$69,141,346$23,959,761
Other Operating Revenue(2,274,383)6,056,9101,233,0147,060,0032,057,968(5,151,886)(2,098,620)7,726,2832,881,651443,968
Total Operating Revenue$39,752,430$222,754,552$40,526,456$284,587,674$67,274,100$70,673,291$26,494,196$587,893,578$72,022,997$24,403,729
2018
Residential Service$33,318,941$152,098,460$31,152,965$188,929,439$52,915,402$51,285,058$19,138,282$335,818,765$54,238,259$17,206,722
Commercial & Industrial7,389,07664,360,6263,724,32997,365,72411,846,33624,512,4153,842,470188,556,03212,090,0824,967,324
Other810,7565,907,6062,116,3512,751,56811,14074,2143,302,33933,947,3472,651,282785,861
Total Electric Sales$41,518,773$222,366,692$36,993,645$289,046,731$64,772,878$75,871,687$26,283,091$558,322,144$68,979,623$22,959,907
Other Operating Revenue(974,576)(2,290,969)1,182,3127,053,523(164,273)(7,603,735)419,1527,328,7982,822,240170,804
Total Operating Revenue$40,544,197$220,075,723$38,175,957$296,100,254$64,608,605$68,267,952$26,702,243$565,650,942$71,801,863$23,130,711
2017
Residential Service$31,043,522$140,217,382$33,116,818$163,092,978$51,356,267$46,029,491$18,694,502$300,601,232$52,796,484$16,251,109
Commercial & Industrial7,002,48760,606,0043,946,29088,058,52811,088,69622,968,4373,912,295179,244,10511,516,1834,811,396
Other704,2045,310,1832,704,7732,605,514873,84467,4814,180,67832,730,7062,703,846950,708
Total Electric Sales$38,750,213$206,133,569$39,767,881$253,757,020$63,318,807$69,065,409$26,787,475$512,576,043$67,016,513$22,013,213
Other Operating Revenue289,0133,924,4701,294,3907,598,3772,225,5993,347,412631,36512,580,3493,339,268970,730
Total Operating Revenue$39,039,226$210,058,039$41,062,271$261,355,397$65,544,406$72,412,821$27,418,840$525,156,392$70,355,781$22,983,943


ExcelsiorFlintGradyGreyStoneHabershamHartIrwinJacksonJeffersonLittle Ocmulgee
2022
Residential Service$42,090,017 $161,300,664 $37,624,910 $204,914,449 $56,868,706 $57,503,106 $20,397,592 $404,591,448 $57,999,341 $18,032,789 
Commercial & Industrial9,518,833 69,360,175 4,854,173 100,296,904 12,188,976 28,967,356 4,043,564 207,540,163 14,543,778 5,043,049 
Other1,170,485 6,853,394 2,960,373 3,239,532 29,316 109,410 4,918,654 40,013,617 3,151,557 1,016,363 
Total Electric Sales$52,779,335 $237,514,233 $45,439,456 $308,450,885 $69,086,998 $86,579,872 $29,359,810 $652,145,228 $75,694,676 $24,092,201 
Other Operating Revenue4,726,028 14,170,904 2,079,685 22,487,564 6,413,431 2,747,570 59,733 9,912,071 2,456,524 1,006,852 
Total Operating Revenue$57,505,363 $251,685,137 $47,519,141 $330,938,449 $75,500,429 $89,327,442 $29,419,543 $662,057,299 $78,151,200 $25,099,053 
2021
Residential Service$34,338,592 $151,587,175 $34,177,652 $189,997,776 $52,957,313 $49,418,392 $19,019,786 $352,599,873 $54,384,738 $17,782,609 
Commercial & Industrial7,697,465 63,358,835 4,310,320 96,332,535 11,482,430 24,691,411 3,619,982 191,353,853 13,194,552 4,754,418 
Other773,208 5,557,184 2,368,854 3,157,114 12,836 69,919 3,022,144 35,916,869 2,817,874 720,184 
Total Electric Sales$42,809,265 $220,503,194 $40,856,826 $289,487,425 $64,452,579 $74,179,722 $25,661,912 $579,870,595 $70,397,164 $23,257,211 
Other Operating Revenue293,183 7,963,214 924,099 17,549,540 4,099,002 2,821,911 2,874,120 3,995,007 2,789,387 39,693 
Total Operating Revenue$43,102,448 $228,466,408 $41,780,925 $307,036,965 $68,551,581 $77,001,633 $28,536,032 $583,865,602 $73,186,551 $23,296,904 
2020
Residential Service$32,887,036 $147,752,394 $34,214,217 $185,908,336 $52,910,424 $46,115,527 $18,557,194 $355,099,317 $53,786,609 $16,825,846 
Commercial & Industrial7,106,560 58,743,762 4,157,541 92,644,991 10,872,879 22,971,749 3,473,997 188,217,738 12,085,451 4,804,263 
Other1,009,893 5,797,905 2,662,554 2,832,696 984,574 64,755 4,838,314 34,943,277 3,048,652 1,008,946 
Total Electric Sales$41,003,489 $212,294,061 $41,034,312 $281,386,023 $64,767,877 $69,152,031 $26,869,505 $578,260,332 $68,920,712 $22,639,055 
Other Operating Revenue(2,283,074)5,657,457 1,380,823 5,717,967 2,360,186 2,580,999 438,985 17,549,022 2,487,567 329,921 
Total Operating Revenue$38,720,415 $217,951,518 $42,415,135 $287,103,990 $67,128,063 $71,733,030 $27,308,490 $595,809,354 $71,408,279 $22,968,976 
B-15

Table of Contents4 (Continued)

Table 4 (Continued)
Middle GeorgiaMitchellOcmulgeeOconeeOkefenokePlantersRayleSatillaSawneeSlash Pine
2019
Residential Service$9,616,936$41,594,118$16,710,997$19,471,885$62,227,116$29,813,748$26,541,828$84,902,534$252,169,482$13,714,331
Commercial & Industrial5,887,3088,969,3214,987,49710,412,5138,180,1653,261,2528,239,51523,018,34895,598,6326,758,631
Other4,881,32410,957,9632,063,394911,8771,953,1934,628,734-6,152,83917,638,710697,412
Total Electric Sales$20,385,568$61,521,402$23,761,888$30,796,275$72,360,474$37,703,734$34,781,343$114,073,721$365,406,824$21,170,374
Other Operating Revenue(987,647)1,990,693708,353(1,644,363)848,147(1,247,006)1,004,8003,347,448(4,349,572)458,858
Total Operating Revenue$19,397,921$63,512,095$24,470,241$29,151,912$73,208,621$36,456,728$35,786,143$117,421,169$361,057,252$21,629,232
2018
Residential Service$9,826,245$40,473,625$16,661,091$18,833,671$60,935,397$29,526,060$26,996,437$86,406,145$253,116,707$14,161,574
Commercial & Industrial5,774,0658,876,7865,082,35210,364,9727,350,8793,128,7218,389,13822,444,43696,078,3836,291,246
Other3,067,8327,273,1131,109,522604,5111,964,1112,913,525-4,675,61617,284,810483,837
Total Electric Sales$18,668,142$56,623,524$22,852,965$29,803,154$70,250,387$35,568,306$35,385,575$113,526,197$366,479,900$20,936,657
Other Operating Revenue227,5681,477,630712,424717,181801,656(1,318,206)(33,567)3,292,757(6,375,816)411,608
Total Operating Revenue$18,895,710$58,101,154$23,565,389$30,520,335$71,052,043$34,250,100$35,352,008$116,818,954$360,104,084$21,348,265
2017
Residential Service$9,290,686$40,066,499$15,392,419$17,659,610$59,043,533$27,456,940$26,369,391$81,964,318$242,447,445$13,125,701
Commercial & Industrial5,590,8699,421,3564,655,3329,952,3677,313,6273,024,3428,384,95121,944,19295,847,8156,509,174
Other3,451,5199,686,4971,297,207616,2201,948,6203,188,293-4,678,43116,751,901503,573
Total Electric Sales$18,333,074$59,174,352$21,344,958$28,228,197$68,305,780$33,669,575$34,754,342$108,586,941$355,047,161$20,138,448
Other Operating Revenue234,2962,348,934680,691570,648836,9581,428,024897,0113,408,907824,646397,617
Total Operating Revenue$18,567,370$61,523,286$22,025,649$28,798,845$69,142,738$35,097,599$35,651,353$111,995,848$355,871,807$20,536,065


Middle
Georgia
MitchellOcmulgeeOconeeOkefenokePlantersRayleSatillaSawnee
Slash
Pine
2022
Residential Service$11,104,763 $45,401,693 $18,032,704 $20,352,223 $72,116,307 $30,491,126 $30,157,737 $99,461,450 $297,588,972 $14,644,320 
Commercial & Industrial6,840,960 10,084,219 5,548,168 9,838,058 9,904,549 3,733,348 9,823,738 26,411,702 104,525,418 7,426,830 
Other5,041,661 11,083,290 2,012,549 814,343 2,201,449 3,932,479 — 7,242,820 19,405,620 736,293 
Total Electric Sales$22,987,384 $66,569,202 $25,593,421 $31,004,624 $84,222,305 $38,156,953 $39,981,475 $133,115,972 $421,520,010 $22,807,443 
Other Operating Revenue936,013 3,123,560 680,967 2,280,664 1,380,719 2,109,933 1,293,060 4,596,975 30,823,506 816,990 
Total Operating Revenue$23,923,397 $69,692,762 $26,274,388 $33,285,288 $85,603,024 $40,266,886 $41,274,535 $137,712,947 $452,343,516 $23,624,433 
2021
Residential Service$10,183,787 $42,971,237 $16,694,199 $19,691,458 $63,214,287 $30,227,476 $26,888,343 $88,440,099 $285,469,555 $14,165,755 
Commercial & Industrial5,823,549 9,285,528 4,871,181 9,886,366 8,221,611 3,573,505 8,565,018 23,248,861 102,551,294 7,189,949 
Other2,596,794 7,439,203 1,128,389 565,585 1,894,492 3,114,719 — 5,121,754 18,485,060 577,905 
Total Electric Sales$18,604,130 $59,695,968 $22,693,769 $30,143,409 $73,330,390 $36,915,700 $35,453,361 $116,810,714 $406,505,909 $21,933,609 
Other Operating Revenue1,174,087 1,351,327 735,654 (311,332)2,252,283 (1,858,873)335,510 3,466,205 (6,916,291)130,123 
Total Operating Revenue$19,778,217 $61,047,295 $23,429,423 $29,832,077 $75,582,673 $35,056,827 $35,788,871 $120,276,919 $399,589,618 $22,063,732 
2020
Residential Service$9,305,779 $41,737,073 $16,487,631 $19,003,717 $63,613,395 $29,864,226 $26,351,947 $82,243,351 $268,347,683 $13,683,306 
Commercial & Industrial5,370,804 9,356,554 4,764,109 9,764,392 8,131,784 3,419,230 8,428,571 21,731,177 96,208,244 7,323,180 
Other3,906,149 9,794,705 1,610,536 700,107 1,854,977 3,845,967 — 5,284,985 18,156,173 584,454 
Total Electric Sales$18,582,732 $60,888,332 $22,862,276 $29,468,216 $73,600,156 $37,129,423 $34,780,518 $109,259,513 $382,712,100 $21,590,940 
Other Operating Revenue532,323 2,337,166 640,556 (1,248,202)615,441 (1,107,333)965,402 3,295,836 (7,632,635)581,548 
Total Operating Revenue$19,115,055 $63,225,498 $23,502,832 $28,220,014 $74,215,597 $36,022,090 $35,745,920 $112,555,349 $375,079,465 $22,172,488 
B-16

Table of Contents4 (Continued)

Table 4 (Continued)
MEMBER
Snapping ShoalsSouthern RiversSumterThree NotchTri-CountyUpsonWaltonWashingtonTOTAL
2019
Residential Service$153,277,676$36,659,428$30,436,355$20,133,741$37,109,095$12,928,433$213,163,820$22,681,031$2,957,573,530
Commercial & Industrial37,474,7175,778,13912,884,3883,855,05810,312,7981,830,15768,713,88012,894,1711,080,020,669
Other3,304,542483,6236,298,6598,564,842-372,36310,135,153892,252187,593,388
Total Electric Sales$194,056,935$42,921,190$49,619,402$32,553,641$47,421,893$15,130,953$292,012,853$36,467,454$4,225,187,587
Other Operating Revenue(2,142,904)1,057,853(1,722,384)642,4531,212,229378,26120,316,388886,55963,397,396
Total Operating Revenue$191,914,031$43,979,043$47,897,018$33,196,094$48,634,122$15,509,214$312,329,241$37,354,013$4,288,584,983
2018
Residential Service$150,286,034$35,823,848$30,624,808$19,514,389$35,001,919$12,814,282$215,383,921$23,240,650$2,936,526,650
Commercial & Industrial37,818,5625,664,89212,938,2263,883,0639,709,1771,888,27370,620,62313,867,5301,080,669,963
Other3,257,955461,8254,797,7866,050,135-368,7449,636,480676,831159,704,832
Total Electric Sales$191,362,551$41,950,565$48,360,820$29,447,587$44,711,096$15,071,299$295,641,024$37,785,011$4,176,901,445
Other Operating Revenue6,399,6681,052,900(1,329,513)640,8481,157,946662,985(15,430,949)843,67031,231,708
Total Operating Revenue$197,762,219$43,003,465$47,031,307$30,088,435$45,869,042$15,734,284$280,210,075$38,628,681$4,208,133,153
2017
Residential Service$135,383,653$32,750,660$28,549,744$19,539,046$31,540,619$12,179,381$191,643,993$21,976,425$2,721,922,497
Commercial & Industrial37,176,5115,482,84912,490,8304,194,5769,041,1061,208,07566,432,26413,874,9571,033,417,764
Other3,209,309474,0094,739,4337,724,973-473,8739,293,331677,677174,166,202
Total Electric Sales$175,769,473$38,707,518$45,780,007$31,458,595$40,581,725$13,861,329$267,369,588$36,529,059$3,929,506,463
Other Operating Revenue8,816,449941,1781,094,569705,4201,144,414718,3997,610,452856,518114,695,860
Total Operating Revenue$184,585,922$39,648,696$46,874,576$32,164,015$41,726,139$14,579,728$274,980,040$37,385,577$4,044,202,323

Snapping
Shoals
Southern
Rivers
Sumter
Three
Notch
Tri-
County
UpsonWaltonWashington
MEMBER
TOTAL
2022
Residential Service$185,317,977 $44,062,102 $30,436,922 $21,772,179 $42,135,551 $14,794,261 $242,083,316 $27,226,024 $3,365,380,219 
Commercial & Industrial43,866,960 7,455,565 13,036,283 4,491,619 12,559,026 2,078,749 102,853,775 17,431,178 1,229,544,762 
Other3,442,986 551,577 6,418,361 8,748,557 — 433,667 8,626,990 1,060,224 197,298,861 
Total Electric Sales$232,627,923 $52,069,244 $49,891,566 $35,012,355 $54,694,577 $17,306,677 $353,564,081 $45,717,426 $4,792,223,842 
Other Operating Revenue28,871,248 1,679,249 3,125,268 693,050 1,572,169 657,079 23,213,987 1,302,429 250,620,000 
Total Operating Revenue$261,499,171 $53,748,493 $53,016,834 $35,705,405 $56,266,746 $17,963,756 $376,778,068 $47,019,855 $5,042,843,842 
2021
Residential Service$160,688,027 $37,475,681 $29,719,439 $20,469,574 $36,797,298 $12,415,924 $218,337,156 $23,476,636 $3,044,315,527 
Commercial & Industrial38,738,312 6,210,131 12,429,415 4,189,777 10,298,146 1,896,719 81,564,442 14,229,106 1,110,136,995 
Other3,398,833 442,143 4,673,254 6,820,441 — 325,447 8,052,283 727,268 162,537,907 
Total Electric Sales$202,825,172 $44,127,955 $46,822,108 $31,479,792 $47,095,444 $14,638,090 $307,953,881 $38,433,010 $4,316,990,429 
Other Operating Revenue7,312,526 1,071,173 999,552 486,018 1,316,143 435,564 29,595,170 908,132 130,159,010 
Total Operating Revenue$210,137,698 $45,199,128 $47,821,660 $31,965,810 $48,411,587 $15,073,654 $337,549,051 $39,341,142 $4,447,149,439 
2020
Residential Service$146,415,651 $35,844,380 $29,418,721 $20,008,108 $35,620,043 $12,376,327 $211,515,231 $22,538,567 $2,949,301,798 
Commercial & Industrial35,417,245 5,650,288 12,299,707 4,251,948 9,535,209 1,757,642 67,420,519 12,326,140 1,049,884,256 
Other3,355,681 482,655 5,532,796 8,535,010 — 304,810 9,607,775 783,312 174,258,359 
Total Electric Sales$185,188,577 $41,977,323 $47,251,224 $32,795,066 $45,155,252 $14,438,779 $288,543,525 $35,648,019 $4,173,444,413 
Other Operating Revenue4,024,433 943,569 144,055 326,453 1,287,009 648,961 26,809,219 865,747 111,738,589 
Total Operating Revenue$189,213,010 $42,920,892 $47,395,279 $33,121,519 $46,442,261 $15,087,740 $315,352,744 $36,513,766 $4,285,183,002 
B-17

Table of Contents

FINANCIAL AND STATISTICAL INFORMATION FOR THE
FINANCIAL AND STATISTICAL INFORMATION FOR THE
38 MEMBERS OF OGLETHORPE POWER CORPORATION
Table 5
SUMMARY OF OPERATING RESULTS OF EACH MEMBER
AltamahaAmicalolaCanoocheeCarrollCentral GeorgiaCoastalCobbColquittCoweta-FayetteDiverse
2019
Operating Revenue & Patronage Capital$51,872,719$89,669,249$59,828,310$119,841,992$118,555,917$55,981,340$435,145,298$137,003,243$177,023,200$94,376,623
Depreciation and Amortization3,946,6026,651,9525,751,8169,311,5747,485,4583,782,69232,739,4639,755,61511,012,3489,813,601
Other Operating Expenses44,488,91278,958,36048,539,416100,591,952102,583,36746,932,224358,379,038116,077,827147,878,86578,917,247
   Electric Operating Margin$3,437,205$4,058,937$5,537,078$9,938,466$8,487,092$5,266,424$44,026,798$11,169,801$18,131,987$5,645,775
Other Income1,634,1982,496,3621,490,6232,442,4254,496,4161,095,11429,155,8951,969,9978,328,4741,803,391
   Gross Operating Margin$5,071,403$6,555,299$7,027,701$12,380,891$12,983,508$6,361,538$73,182,693$13,139,798$26,460,461$7,449,166
Interest on Long-term Debt1,722,1053,157,1812,542,4104,445,7145,567,1792,445,48920,863,2404,606,7916,803,2635,601,151
Other Deductions25,308122,0687,14764,098342,77514,6141,331,599-343,37913,328
   Net Margins$3,323,990$3,276,050$4,478,144$7,871,079$7,073,554$3,901,435$50,987,853$8,533,007$19,313,819$1,834,687
2018
Operating Revenue & Patronage Capital$51,052,299$85,906,343$55,687,621$119,716,502$121,711,439$59,808,743$434,486,795$134,077,192$169,958,219$92,334,004
Depreciation and Amortization3,815,9626,350,6825,666,6708,718,6847,031,6903,521,20129,070,5509,332,11410,596,7939,490,820
Other Operating Expenses42,013,89576,065,50345,758,80098,667,076107,868,37946,164,841378,738,824116,491,583149,219,26177,410,372
   Electric Operating Margin$5,222,442$3,490,158$4,262,151$12,330,742$6,811,370$10,122,701$26,677,421$8,253,495$10,142,165$5,432,812
Other Income1,588,3842,804,4681,473,9882,780,1734,180,277961,09831,378,1761,926,8337,795,9611,505,972
   Gross Operating Margin$6,810,826$6,294,626$5,736,139$15,110,915$10,991,647$11,083,799$58,055,597$10,180,328$17,938,126$6,938,784
Interest on Long-term Debt2,062,1342,793,9502,567,6594,693,8565,374,8572,454,69020,957,5804,560,8916,570,5765,296,076
Other Deductions1,309,388408,1607,984149,625266,60023,6871,132,158-471,770106,658
   Net Margins$3,439,304$3,092,516$3,160,496$10,267,434$5,350,190$8,605,422$35,965,859$5,619,437$10,895,780$1,536,050
2017
Operating Revenue & Patronage Capital$49,846,151$89,262,079$57,448,815$111,442,466$111,048,177$57,290,219$429,736,305$126,177,049$160,526,957$84,881,735
Depreciation and Amortization3,549,7516,129,9014,782,7238,532,0196,727,3163,364,71328,481,5428,929,22710,250,3898,777,717
Other Operating Expenses44,003,67579,314,56048,285,36890,944,11397,891,98048,536,510371,854,308109,075,602139,835,24570,838,803
   Electric Operating Margin$2,292,725$3,817,618$4,380,724$11,966,334$6,428,881$5,388,996$29,400,455$8,172,220$10,441,323$5,265,215
Other Income1,521,6973,012,0071,512,7672,801,9464,181,705832,89913,589,4601,882,8244,171,6911,518,118
   Gross Operating Margin$3,814,422$6,829,625$5,893,491$14,768,280$10,610,586$6,221,895$42,989,915$10,055,044$14,613,014$6,783,333
Interest on Long-term Debt1,675,8582,961,7062,659,6924,694,7035,172,2082,412,96721,632,7754,508,5776,343,6645,214,871
Other Deductions55,944115,3572,90575,66097,97989,751847,824-259,83113,744
   Net Margins$2,082,620$3,752,562$3,230,894$9,997,917$5,340,399$3,719,177$20,509,316$5,546,467$8,009,519$1,554,718
38 MEMBERS OF OGLETHORPE POWER CORPORATION
Table 5
SUMMARY OF OPERATING RESULTS OF EACH MEMBER
AltamahaAmicalolaCanoocheeCarroll
Central
Georgia
CoastalCobbColquitt
Coweta
Fayette
Diverse
2022
Operating Revenue & Patronage Capital$61,037,766 $109,382,905 $67,823,979 $138,338,640 $162,710,273 $67,060,725 $465,773,880 $167,868,654 $208,226,706 $111,417,755 
Depreciation and Amortization4,490,139 7,738,396 6,591,212 10,433,307 8,824,503 4,666,217 33,294,569 11,541,110 12,632,273 9,815,658 
Other Operating Expenses54,254,694 98,391,170 59,145,035 116,288,238 145,432,838 59,096,564 408,423,697 149,538,320 186,478,716 186,478,716 
Electric Operating Margin$2,292,933 $3,253,339 $2,087,732 $11,617,095 $8,452,932 $3,297,944 $24,055,614 $6,789,224 $9,115,717 $9,115,717 
Other Income541,960 1,623,473 1,373,440 714,489 4,187,305 1,354,906 101,704,719 2,327,475 2,077,264 2,077,264 
Gross Operating Margin$2,834,893 $4,876,812 $3,461,172 $12,331,584 $12,640,237 $4,652,850 $125,760,333 $9,116,699 $11,192,981 $11,192,981 
Interest on Long-term Debt1,913,496 3,192,160 2,118,093 4,229,043 5,208,630 2,538,089 17,074,533 4,854,707 5,502,620 5,502,620 
Other Deductions164,422 140,619 10,955 40,517 1,451,491 12.537 998,921 — 540,910 540,910 
Net Margins$756,975 $1,544,033 $1,332,124 $8,062,024 $5,980,116 $2,102,224 $107,686,879 $4,261,992 $5,149,451 $5,149,451 
2021
Operating Revenue & Patronage Capital$52,470,476 $91,177,614 $60,486,017 $123,571,813 $133,565,283 $62,368,655 $439,079,690 $136,075,556 $179,872,911 $95,710,993 
Depreciation and Amortization4,357,572 7,267,588 6,025,422 9,984,048 8,364,722 4,393,308 32,333,041 10,890,404 11,929,991 9,843,373 
Other Operating Expenses44,159,823 83,054,400 50,956,279 100,092,448 116,046,167 49,419,240 373,298,742 119,968,126 158,706,395 81,093,870 
Electric Operating Margin$3,953,081 $855,626 $3,504,316 $13,495,317 $9,154,394 $8,556,107 $33,447,907 $5,217,026 $9,236,525 $4,773,750 
Other Income1,112,678 5,622,541 1,152,763 987,606 2,876,507 1,083,982 69,247,915 2,040,411 6,560,069 1,698,945 
Gross Operating Margin$5,065,759 $6,478,167 $4,657,079 $14,482,923 $12,030,901 $9,640,089 $102,695,822 $7,257,437 $15,796,594 $6,472,695 
Interest on Long-term Debt1,715,240 2,852,304 2,102,589 4,042,744 4,916,054 2,455,293 19,164,118 4,583,870 4,641,091 5,577,757 
Other Deductions43,311 26,853 10,123 5,085 263,377 7,437 687,053 — 670,272 26,809 
Net Margins$3,307,208 $3,599,010 $2,544,367 $10,435,094 $6,851,470 $7,177,359 $82,844,651 $2,673,567 $10,485,231 $868,129 
2020
Operating Revenue & Patronage Capital$50,453,474 $90,007,128 $59,665,210 $118,396,975 $118,422,304 $60,510,009 $430,731,145 $129,159,924 $172,849,844 $96,538,221 
Depreciation and Amortization4,167,374 6,912,180 5,868,562 9,585,535 7,928,944 4,132,942 32,436,976 10,401,376 11,581,685 10,421,272 
Other Operating Expenses42,131,986 79,319,293 49,250,931 95,171,701 102,918,321 48,065,693 368,410,352 109,949,058 151,023,398 80,165,101 
Electric Operating Margin$4,154,114 $3,775,655 $4,545,717 $13,639,739 $7,575,039 $8,311,374 $29,883,817 $8,809,490 $10,244,761 $5,951,848 
Other Income1,688,397 3,360,899 1,199,602 1,671,223 3,552,898 1,136,446 39,122,045 2,150,674 10,045,610 1,263,941 
Gross Operating Margin$5,842,511 $7,136,554 $5,745,319 $15,310,962 $11,127,937 $9,447,820 $69,005,862 $10,960,164 $20,290,371 $7,215,789 
Interest on Long-term Debt1,723,771 2,447,584 2,306,658 4,121,289 5,421,390 2,418,250 19,364,278 4,593,728 6,109,128 5,522,036 
Other Deductions12,485 67,776 4,944 15,219 141,126 132,606 234,717 — 257,210 28,648 
Net Margins$4,106,255 $4,621,194 $3,433,717 $11,174,454 $5,565,421 $6,896,964 $49,406,867 $6,366,436 $13,924,033 $1,665,105 
B-18

Table of Contents5 (Continued)

Table 5 (Continued)
ExcelsiorFlintGradyGreyStoneHabershamHartIrwinJacksonJeffersonLittle Ocmulgee
2019
Operating Revenue & Patronage Capital$39,752,431$222,754,550$40,526,456$284,587,674$67,274,100$70,673,291$26,494,196$587,893,578$72,022,996$23,665,085
Depreciation and Amortization2,872,21214,648,2343,466,87416,884,2416,112,3595,293,7813,151,21037,478,2985,673,1811,770,809
Other Operating Expenses35,317,178195,658,77034,342,115241,128,02157,005,07458,112,38720,688,383516,274,01760,872,41419,711,635
   Electric Operating Margin$1,563,041$12,447,546$2,717,467$26,575,412$4,156,667$7,267,123$2,654,603$34,141,263$5,477,401$2,182,641
Other Income1,868,8193,042,1352,519,0788,296,7683,165,0594,658,522626,03524,932,374785,464237,781
   Gross Operating Margin$3,431,860$15,489,681$5,236,545$34,872,180$7,321,726$11,925,645$3,280,638$59,073,637$6,262,865$2,420,422
Interest on Long-term Debt1,291,0676,738,8431,540,65510,091,1023,268,5553,001,3941,943,79921,574,5792,882,1301,416,000
Other Deductions-578,355636,628317,36913,4126,47868,098124,02798,440-
   Net Margins$2,140,793$8,172,483$3,059,262$24,463,709$4,039,759$8,917,773$1,268,741$37,375,031$3,282,295$1,004,422
2018
Operating Revenue & Patronage Capital$40,544,197$220,075,723$38,175,956$296,100,253$64,608,605$68,267,952$26,702,242$565,650,942$71,801,863$23,130,712
Depreciation and Amortization2,765,23914,240,4963,390,57716,499,5765,539,4755,144,5243,048,33935,461,9185,332,7461,749,395
Other Operating Expenses36,038,358194,385,39732,258,630244,507,15155,000,80557,275,74220,848,688496,953,27960,783,97618,280,843
   Electric Operating Margin$1,740,600$11,449,830$2,526,749$35,093,526$4,068,325$5,847,686$2,805,215$33,235,745$5,685,141$3,100,474
Other Income1,586,4853,500,3801,283,1538,914,5433,319,3473,738,937682,10022,898,3381,224,629269,353
   Gross Operating Margin$3,327,085$14,950,210$3,809,902$44,008,069$7,387,672$9,586,623$3,487,315$56,134,083$6,909,770$3,369,827
Interest on Long-term Debt1,317,7437,554,9541,297,35610,536,6362,882,7493,048,8181,924,12821,611,4453,265,5361,392,000
Other Deductions-542,565393,001122,739418,9011,40067,85588,90412,997-
   Net Margins$2,009,342$6,852,691$2,119,545$33,348,694$4,086,022$6,536,405$1,495,332$34,433,734$3,631,237$1,977,827
2017
Operating Revenue & Patronage Capital$37,410,715$210,058,039$41,062,272$261,355,397$65,544,405$72,412,820$27,418,839$525,156,392$70,355,781$22,983,943
Depreciation and Amortization2,655,11113,753,8953,270,63516,843,1685,210,8585,072,5002,928,27233,926,0805,230,0401,721,623
Other Operating Expenses32,864,452184,463,05635,618,949223,709,71755,014,08862,606,49821,530,151454,060,86860,713,75419,297,814
   Electric Operating Margin$1,891,152$11,841,088$2,172,688$20,802,512$5,319,459$4,733,822$2,960,416$37,169,444$4,411,987$1,964,506
Other Income1,416,3232,938,3962,578,3427,248,8371,631,1703,096,511615,56023,530,1362,545,539303,453
   Gross Operating Margin$3,307,475$14,779,484$4,751,030$28,051,349$6,950,629$7,830,333$3,575,976$60,699,580$6,957,526$2,267,959
Interest on Long-term Debt1,276,9877,414,0311,395,2399,971,0182,720,2152,717,8821,863,89921,711,6553,211,7201,200,000
Other Deductions-515,090215,69537,555106,9579,635125,89410,00016,496-
   Net Margins$2,030,488$6,850,363$3,140,096$18,042,776$4,123,457$5,102,816$1,586,183$38,977,925$3,729,310$1,067,959


ExcelsiorFlintGradyGreyStoneHabershamHartIrwinJacksonJefferson
Little
Ocmulgee
2022
Operating Revenue & Patronage Capital$57,505,363 $251,685,137 $47,519,141 $330,938,449 $75,500,429 $89,327,442 $29,419,544 $662,057,299 $78,151,200 $25,099,053 
Depreciation and Amortization3,270,383 16,241,278 3,670,698 21,559,980 7,466,653 5,976,089 3,486,809 40,768,375 6,129,635 2,494,794 
Other Operating Expenses52,801,777 222,177,485 38,185,470 293,437,428 68,759,893 70,389,573 26,362,733 588,992,605 69,005,654 21,352,580 
Electric Operating Margin$1,433,203 $13,266,374 $5,662,973 $15,941,041 $(726,117)$12,961,780 $(429,998)$32,296,319 $3,015,911 $1,251,679 
Other Income1,725,077 1,119,666 4,509,641 9,771,437 3,186,452 3,374,069 703,980 22,372,846 1,022,350 150,636 
Gross Operating Margin$3,158,280 $14,386,040 $10,172,614 $25,712,478 $2,460,335 $16,335,849 $273,982 $54,669,165 $4,038,261 $1,402,315 
Interest on Long-term Debt1,048,979 6,024,325 1,661,961 9,669,569 3,072,624 1,882,325 2,144,675 16,160,016 2,536,713 699,000 
Other Deductions— 511,394 228,306 440,510 345,797 2,583 87,851 — 150,940 — 
Net Margins$2,109,301 $7,850,321 $8,282,347 $15,602,399 $(958,086)$14,450,941 $(1,958,544)$38,488,471 $1,350,608 $703,315 
2021
Operating Revenue & Patronage Capital$43,102,448 $228,466,408 $41,780,925 $307,036,964 $68,551,581 $77,001,634 $28,536,032 $583,865,602 $73,185,551 $23,296,905 
Depreciation and Amortization3,097,051 15,759,780 3,585,669 19,075,276 6,727,175 5,707,348 3,374,195 38,596,482 6,002,989 2,209,116 
Other Operating Expenses38,828,109 200,322,301 33,608,001 269,650,406 57,488,913 62,900,405 21,698,943 516,642,333 61,426,705 19,580,951 
Electric Operating Margin$1,177,288 $12,384,327 $4,587,255 $18,311,282 $4,335,493 $8,393,881 $3,462,894 $28,626,787 $5,755,857 $1,506,838 
Other Income1,565,650 1,637,405 801,223 19,912,039 2,477,289 4,069,883 538,075 17,854,839 (1,181,369)657,113 
Gross Operating Margin$2,742,938 $14,021,732 $5,388,478 $38,223,321 $6,812,782 $12,463,764 $4,000,969 $46,481,626 $4,574,488 $2,163,951 
Interest on Long-term Debt1,000,159 4,958,399 1,521,747 9,832,261 2,354,627 1,935,557 1,835,611 14,992,742 2,218,962 1,000,000 
Other Deductions— 431,511 156,321 115,002 274,874 2,859 62,304 — 59,086 — 
Net Margins$1,742,779 $8,631,822 $3,710,410 $28,276,058 $4,183,281 $10,525,348 $2,103,054 $31,488,884 $2,296,440 $1,163,951 
2020
Operating Revenue & Patronage Capital$38,720,416 $217,951,518 $42,415,133 $287,103,981 $67,128,063 $71,733,031 $27,308,490 $595,809,354 $71,408,278 $22,968,977 
Depreciation and Amortization2,991,389 15,250,294 3,516,670 17,298,454 6,397,382 5,504,610 3,253,905 37,589,426 5,808,451 1,898,501 
Other Operating Expenses34,249,232 189,649,248 33,575,781 247,918,425 56,109,944 58,790,434 21,086,743 524,379,528 61,117,716 18,899,345 
Electric Operating Margin$1,479,795 $13,051,976 $5,322,682 $21,887,102 $4,620,737 $7,437,987 $2,967,842 $33,840,400 $4,482,111 $2,171,131 
Other Income1,415,324 1,944,945 2,682,171 4,496,708 2,422,410 4,367,787 634,439 18,997,728 261,894 269,589 
Gross Operating Margin$2,895,119 $14,996,921 $8,004,853 $26,383,810 $7,043,147 $11,805,774 $3,602,281 $52,838,128 $4,744,005 $2,440,720 
Interest on Long-term Debt1,043,309 6,244,800 1,668,125 10,035,502 2,904,396 2,327,222 1,871,066 16,835,438 2,356,844 1,200,000 
Other Deductions— 490,650 136,144 46,535 185,146 800 34,844 3,884 104,877 — 
Net Margins$1,851,810 $8,261,471 $6,200,584 $16,301,773 $3,953,605 $9,477,752 $1,696,371 $35,998,806 $2,282,284 $1,240,720 
B-19

Table of Contents5 (Continued)


Table 5 (Continued)
Middle GeorgiaMitchellOcmulgeeOconeeOkefenokePlantersRayleSatillaSawneeSlash Pine
2019
Operating Revenue & Patronage Capital$19,397,921$63,512,095$24,470,241$29,151,912$73,208,621$36,456,731$35,786,143$117,421,165$361,057,252$21,629,231
Depreciation and Amortization1,849,0234,297,0451,595,1302,254,1705,580,4652,537,8213,021,4417,392,84320,072,2071,122,854
Other Operating Expenses15,613,26254,791,29019,836,82324,419,64461,156,28830,714,82129,061,389101,113,457318,136,53217,090,282
   Electric Operating Margin$1,935,636$4,423,760$3,038,288$2,478,098$6,471,868$3,204,089$3,703,313$8,914,865$22,848,513$3,416,095
Other Income409,4261,600,2441,023,493856,646(724,025)2,028,6931,220,2323,176,08110,074,502428,711
   Gross Operating Margin$2,345,062$6,024,004$4,061,781$3,334,744$5,747,843$5,232,782$4,923,545$12,090,946$32,923,015$3,844,806
Interest on Long-term Debt992,7742,461,274968,5541,678,4493,512,8361,514,3051,845,3264,454,93612,003,299794,744
Other Deductions136,308693,16116,6501,67783,040-3,084119,834127,200750,000
   Net Margins$1,215,980$2,869,569$3,076,577$1,654,618$2,151,967$3,718,477$3,075,135$7,516,176$20,792,516$2,300,062
2018
Operating Revenue & Patronage Capital$18,895,710$58,101,153$23,565,389$30,520,335$71,052,043$34,250,099$35,352,008$116,818,952$360,104,084$21,348,265
Depreciation and Amortization1,661,6044,279,1891,554,7492,195,5825,288,5852,440,1132,877,7647,237,08119,278,8011,054,336
Other Operating Expenses15,389,38351,018,36319,161,26325,905,69660,479,73428,338,08228,612,616101,350,305312,165,04016,424,701
   Electric Operating Margin$1,844,723$2,803,601$2,849,377$2,419,057$5,283,724$3,471,904$3,861,628$8,231,566$28,660,243$3,869,228
Other Income407,2751,501,075994,207739,0452,435,6761,751,0371,311,1423,182,2336,475,410407,726
   Gross Operating Margin$2,251,998$4,304,676$3,843,584$3,158,102$7,719,400$5,222,941$5,172,770$11,413,799$35,135,653$4,276,954
Interest on Long-term Debt934,1892,154,3291,023,1461,597,1253,379,9051,464,4041,785,7464,068,36911,587,177778,809
Other Deductions107,779353,62924,85272,952123,67575880,720514,670176,0059,166
   Net Margins$1,210,030$1,796,718$2,795,586$1,488,025$4,215,820$3,757,779$3,306,304$6,830,760$23,372,471$3,488,979
2017
Operating Revenue & Patronage Capital$18,567,370$61,523,286$22,025,649$28,798,845$69,142,738$35,097,600$35,651,353$111,995,845$355,871,804$20,536,064
Depreciation and Amortization1,561,6394,139,3271,498,6902,159,0175,105,0002,284,9312,919,3987,070,45020,378,4961,025,712
Other Operating Expenses16,377,74252,784,54118,021,75824,243,32758,538,88230,558,14129,000,32794,075,957307,237,64618,455,761
   Electric Operating Margin$627,989$4,599,418$2,505,201$2,396,501$5,498,856$2,254,528$3,731,628$10,849,438$28,255,662$1,054,591
Other Income392,8871,591,401903,849788,9401,056,2641,655,0281,201,9363,193,5678,244,323456,744
   Gross Operating Margin$1,020,876$6,190,819$3,409,050$3,185,441$6,555,120$3,909,556$4,933,564$14,043,005$36,499,985$1,511,335
Interest on Long-term Debt906,0632,255,4751,074,3451,684,9113,322,9621,401,2021,852,4593,861,34311,739,856728,087
Other Deductions98,210217,92114,90838,39779,1234,99220,639345,60424,35726,194
   Net Margins$16,603$3,717,423$2,319,797$1,462,133$3,153,035$2,503,362$3,060,466$9,836,058$24,735,772$757,054

Middle
Georgia
MitchellOcmulgeeOconeeOkefenokePlantersRayleSatillaSawnee
Slash
Pine
2022
Operating Revenue & Patronage Capital$23,923,397 $69,692,762 $26,274,388 $33,285,288 $85,603,024 $40,266,887 $41,274,535 $137,712,945 $452,343,517 $23,624,433 
Depreciation and Amortization2,020,033 5,001,400 1,651,204 2,463,029 6,242,402 2,804,453 3,080,493 8,373,385 23,317,019 1,300,451 
Other Operating Expenses20,433,253 59,252,431 25,318,028 30,459,546 74,076,344 34,836,609 34,818,923 123,067,403 396,832,069 20,944,391 
Electric Operating Margin$1,470,111 $5,438,931 $(694,844)$362,713 $5,284,278 $2,625,825 $3,375,119 $6,272,157 $32,194,429 $1,379,591 
Other Income729,823 1,668,838 309,395 868,223 1,958,518 1,570,766 1,103,661 3,256,161 8,351,313 355,439 
Gross Operating Margin$2,199,934 $7,107,769 $(385,449)$1,230,936 $7,242,796 $4,196,591 $4,478,780 $9,528,318 $40,545,742 $1,735,030 
Interest on Long-term Debt1,217,653 2,827,102 253,078 1,347,642 3,951,256 1,106,754 1,601,131 5,241,838 10,349,046 867,422 
Other Deductions199,101 109,255 17,781 139,071 52,763 1,275 12,237 313,716 3,488 766,467 
Net Margins$783,180 $4,171,412 $(656,308)$(255,777)$3,238,777 $3,088,562 $2,865,412 $3,972,764 $30,193,208 $101,141 
2021
Operating Revenue & Patronage Capital$19,778,218 $61,047,295 $23,432,378 $29,832,077 $73,582,674 $36,854,842 $35,788,871 $120,276,917 $399,589,618 $22,063,730 
Depreciation and Amortization1,981,542 4,610,725 1,694,580 2,393,510 5,993,376 2,703,177 2,987,839 7,943,365 22,186,511 1,263,554 
Other Operating Expenses16,409,661 51,740,825 20,382,093 25,145,169 62,751,579 29,972,252 29,544,524 104,305,004 343,161,555 17,871,152 
Electric Operating Margin$1,387,015 $4,695,745 $1,355,705 $2,293,398 $4,837,719 $4,179,413 $3,256,508 $8,028,548 $34,241,552 $2,929,024 
Other Income396,674 1,420,160 181,261 762,113 3,362,998 255,892 950,836 1,914,045 4,639,601 511,447 
Gross Operating Margin$1,783,689 $6,115,905 $1,536,966 $3,055,511 $8,200,717 $4,435,305 $4,207,344 $9,942,593 $38,881,153 $3,440,471 
Interest on Long-term Debt974,539 2,576,283 217,650 1,454,874 3,267,113 1,064,662 1,468,661 3,748,871 9,650,691 808,040 
Other Deductions60,262 133,152 2,171 4,220 201,671 3,658 28,989 221,212 10,167 754,717 
Net Margins$748,888 $3,406,470 $1,317,145 $1,596,417 $4,731,933 $3,366,985 $2,709,694 $5,972,510 $29,220,295 $1,877,714 
2020
Operating Revenue & Patronage Capital$19,115,055 $63,225,498 $23,502,832 $28,220,014 $72,715,598 $36,022,090 $35,745,920 $112,555,347 $375,079,465 $22,172,487 
Depreciation and Amortization1,928,036 4,445,748 1,645,054 2,327,698 5,827,368 2,624,468 3,140,910 7,599,074 21,248,227 1,218,823 
Other Operating Expenses15,347,508 50,557,965 18,990,444 23,480,794 61,025,117 30,294,946 29,010,121 98,049,397 331,810,023 17,486,856 
Electric Operating Margin$1,839,511 $8,221,785 $2,867,334 $2,411,522 $5,863,113 $3,102,676 $3,594,889 $6,906,876 $22,021,215 $3,466,808 
Other Income427,240 404,234 637,953 755,029 1,411,222 1,763,099 1,011,452 2,575,692 6,278,841 541,292 
Gross Operating Margin$2,266,751 $8,626,019 $3,505,287 $3,166,551 $7,274,335 $4,865,775 $4,606,341 $9,482,568 $28,300,056 $4,008,100 
Interest on Long-term Debt999,219 2,550,544 633,152 1,584,300 3,278,307 1,247,064 1,641,929 4,160,602 10,232,977 795,319 
Other Deductions41,955 220,822 4,321 9,222 187,059 — 10,973 93,192 288,829 750,000 
Net Margins$1,225,577 $5,854,653 $2,867,814 $1,573,029 $3,808,969 $3,618,711 $2,953,439 $5,228,774 $17,778,250 $2,462,781 
B-20

Table of Contents5 (Continued)


Table 5 (Continued)
MEMBER
Snapping ShoalsSouthern RiversSumterThree NotchTri-CountyUpsonWaltonWashingtonTOTAL
2019
Operating Revenue & Patronage Capital$191,914,031$43,979,044$47,897,018$33,196,094$48,634,122$15,509,213$312,329,241$37,360,120$4,287,852,443
Depreciation and Amortization11,098,7963,018,9863,799,5532,383,1124,112,932900,57314,908,4342,700,132290,247,837
Other Operating Expenses174,118,64735,994,08240,274,97327,888,36634,881,62912,905,796282,406,09632,524,4143,675,384,993
   Electric Operating Margin$6,696,588$4,965,976$3,822,492$2,924,616$9,639,561$1,702,844$15,014,711$2,135,574$322,219,614
Other Income2,431,6491,160,5181,757,0872,089,962887,453795,0679,548,6651,096,402144,905,736
   Gross Operating Margin$9,128,237$6,126,494$5,579,579$5,014,578$10,527,014$2,497,911$24,563,376$3,231,976$467,125,350
Interest on Long-term Debt4,061,2491,723,2482,452,7741,550,4763,118,929580,4534,879,8801,487,777161,583,930
Other Deductions97,029-278,707938,37167,41215,086182,672-7,617,354
   Net Margins$4,969,959$4,403,246$2,848,098$2,525,731$7,340,673$1,902,372$19,500,824$1,744,199$297,924,065
2018
Operating Revenue & Patronage Capital$197,762,219$43,003,465$47,031,307$30,088,436$45,869,042$15,734,284$280,210,075$38,628,680$4,208,133,148
Depreciation and Amortization10,648,7572,833,8543,650,5492,313,2143,929,620889,03514,488,5042,621,657276,010,445
Other Operating Expenses181,984,88436,627,19339,549,83723,289,92736,510,15412,961,432267,223,78933,224,7163,644,948,518
   Electric Operating Margin$5,128,578$3,542,418$3,830,921$4,485,295$5,429,268$1,883,817-$1,502,218$2,782,307$287,174,185
Other Income3,451,3641,235,3111,705,1132,314,0501,643,265721,65610,870,1411,084,574146,042,895
   Gross Operating Margin$8,579,942$4,777,729$5,536,034$6,799,345$7,072,533$2,605,473$9,367,923$3,866,881$433,217,080
Interest on Long-term Debt4,059,7101,836,4542,640,4451,347,9353,300,777662,2644,954,0681,449,308161,187,794
Other Deductions254,868-49,962176,17626,09118,577200,736-7,715,008
   Net Margins$4,265,364$2,941,275$2,845,627$5,275,234$3,745,665$1,924,632$4,213,119$2,417,573$264,314,278
2017
Operating Revenue & Patronage Capital$184,585,922$39,648,695$46,874,576$32,164,014$41,726,139$14,579,728$274,980,040$37,385,576$4,042,573,800
Depreciation and Amortization10,173,3882,664,4533,495,4902,225,4983,762,410867,20414,006,0072,467,265267,941,855
Other Operating Expenses169,715,87334,257,21239,890,08027,573,69033,262,97512,493,483254,478,33332,791,1333,504,216,372
   Electric Operating Margin$4,696,661$2,727,030$3,489,006$2,364,826$4,700,754$1,219,041$6,495,700$2,127,178$270,415,573
Other Income3,351,5461,036,7491,665,6931,762,2851,547,919791,6029,150,5461,196,220120,916,880
   Gross Operating Margin$8,048,207$3,763,779$5,154,699$4,127,111$6,248,673$2,010,643$15,646,246$3,323,398$391,332,453
Interest on Long-term Debt4,181,6311,805,7672,661,4731,331,8873,235,864557,2324,988,0831,382,384159,730,691
Other Deductions126,848-29,65396,36749,05018,203159,951-3,946,734
   Net Margins$3,739,728$1,958,012$2,463,573$2,698,857$2,963,759$1,435,208$10,498,212$1,941,014$227,655,028

Snapping
Shoals
Southern
Rivers
Sumter
Three
Notch
Tri-
County
UpsonWaltonWashington
MEMBER
TOTAL
2022
Operating Revenue & Patronage Capital$261,499,170 $53,748,494 $53,016,834 $35,705,405 $56,266,746 $17,963,752 $376,778,069 $47,019,852 $5,042,843,838 
Depreciation and Amortization12,058,802 3,735,601 4,306,282 2,758,576 4,476,631 1,001,687 16,611,632 3,024,595 325,319,753 
Other Operating Expenses244,398,779 48,021,609 44,611,163 32,016,025 45,479,975 17,019,068 354,043,262 42,007,891 4,468,744,445 
Electric Operating Margin$5,041,589 $1,991,284 $4,099,389 $930,804 $6,310,140 $(57,033)$6,123,175 $1,987,366 $248,779,640 
Other Income3,053,358 1,164,815 1,337,128 4,366,873 (1,179,390)494,893 7,562,039 802,631 204,027,243 
Gross Operating Margin$8,094,947 $3,156,099 $5,436,517 $5,297,677 $5,130,750 $437,890 $13,685,214 $2,789,997 $452,806,883 
Interest on Long-term Debt4,114,436 1,963,478 1,934,407 1,707,284 3,308,605 280,326 5,403,917 1,728,508 146,357,607 
Other Deductions42,420 500 215,812 34,847 30,893 16,092 300,869 — 7,593,900 
Net Margins$3,938,091 $1,192,121 $3,286,298 $3,555,546 $1,791,252 $141,472 $7,980,428 $1,061,489 $298,855,376 
2021 
Operating Revenue & Patronage Capital$210,137,699 $45,199,127 $47,821,664 $31,965,809 $48,411,586 $15,073,652 $337,549,051 $39,341,139 $4,446,949,405 
Depreciation and Amortization11,485,998 3,416,694 4,096,515 2,574,808 4,227,537 973,761 16,038,068 2,890,972 308,987,082 
Other Operating Expenses192,550,408 39,254,335 40,080,734 27,049,533 36,765,257 13,199,446 314,341,252 34,925,135 3,858,392,471 
Electric Operating Margin$6,101,293 $2,528,098 $3,644,415 $2,341,468 $7,418,792 $900,445 $7,169,731 $1,525,032 $279,569,852 
Other Income2,781,657 435,299 1,305,154 646,324 (1,327,995)378,900 7,311,106 852,968 167,494,004 
Gross Operating Margin$8,882,950 $2,963,397 $4,949,569 $2,987,792 $6,090,797 $1,279,345 $14,480,837 $2,378,000 $447,063,856 
Interest on Long-term Debt4,035,854 1,575,534 1,976,951 1,699,418 2,441,356 200,098 5,055,913 1,326,124 137,243,757 
Other Deductions55,164 — 72,330 22,402 19,097 25,101 167,237 — 4,623,827 
Net Margins$4,791,932 $1,387,863 $2,900,288 $1,265,972 $3,630,344 $1,054,146 $9,257,687 $1,051,876 $305,196,272 
2020 
Operating Revenue & Patronage Capital$189,213,010 $42,920,892 $47,395,279 $33,121,519 $46,442,261 $15,087,745 $315,352,744 $36,513,765 $4,283,682,996 
Depreciation and Amortization11,169,486 3,239,695 3,894,093 2,479,809 4,205,901 927,658 15,337,295 2,796,474 299,001,745 
Other Operating Expenses$172,389,703 $34,770,610 $39,763,305 $27,594,193 $33,783,127 $12,338,146 $285,828,457 $31,714,799 $3,686,417,741 
Electric Operating Margin5,653,821 4,910,587 3,737,881 3,047,517 8,453,233 1,821,941 14,186,992 2,002,492 298,263,510 
Other Income2,865,107 744,329 1,416,183 3,493,798 399,436 596,144 8,530,778 930,382 137,466,941 
Gross Operating Margin$8,518,928 $5,654,916 $5,154,064 $6,541,315 $8,852,669 $2,418,084 $22,717,770 $2,932,874 $435,730,450 
Interest on Long-term Debt4,021,840 1,553,183 2,037,597 1,499,839 2,591,675 456,144 5,036,792 1,247,343 146,082,640 
Other Deductions117,697 — 30,652 321,709 23,574 18,183 159,366 — 4,175,165 
Net Margins$4,379,391 $4,101,733 $3,085,815 $4,719,767 $6,237,420 $1,943,757 $17,521,612 $1,685,531 $285,472,645 
B-21

Table of Contents

FINANCIAL AND STATISTICAL INFORMATION FOR THE
FINANCIAL AND STATISTICAL INFORMATION FOR THE
38 MEMBERS OF OGLETHORPE POWER CORPORATION
Table 6
CONDENSED BALANCE SHEET INFORMATION OF EACH MEMBER
(as of December 31)
AltamahaAmicalolaCanoocheeCarrollCentral GeorgiaCoastalCobbColquittCoweta-FayetteDiverse
2019
ASSETS
Total Utility Plant (1)
$132,841,049$227,821,866$152,556,866$297,881,481$258,402,925$123,618,767$932,582,516$317,219,483$378,761,564$250,132,228
Depreciation35,668,48285,149,00644,345,23585,367,34757,907,22428,645,610266,727,73697,088,048127,532,59782,997,181
Net Plant97,172,567142,672,860108,211,631212,514,134200,495,70194,973,157665,854,780220,131,435251,228,967167,135,047
Other Assets45,339,55333,272,62930,237,52944,875,58072,637,52831,078,329333,818,65371,518,000126,002,77040,784,229
Total Assets$142,512,120$175,945,489$138,449,160$257,389,714$273,133,229$126,051,486$999,673,433$291,649,435$377,231,737$207,919,276
EQUITY & LIABILITIES
Equity$80,452,137$78,152,363$67,518,307$115,395,750$90,623,066$47,532,571$424,057,135$132,734,560$174,769,587$70,174,989
Long-term Debt49,047,31152,421,62450,649,465104,242,245139,465,80762,670,528400,291,787117,542,627156,563,177111,729,471
Other Liabilities13,012,67245,371,50220,281,38837,751,71943,044,35615,848,387175,324,51041,372,24845,898,97326,014,816
Total Equity and Liabilities$142,512,120$175,945,489$138,449,160$257,389,714$273,133,229$126,051,486$999,673,433$291,649,435$377,231,737$207,919,276
2018
ASSETS
Total Utility Plant (1)
$128,252,494$217,227,510$147,431,688$278,342,697$247,121,395$112,611,085$907,189,136$299,017,679$362,770,394$241,418,772
Depreciation34,700,62881,312,39341,413,34984,996,83355,112,99026,500,477263,556,48189,240,287122,616,42978,939,324
Net Plant93,551,866135,915,117106,018,339193,345,864192,008,40586,110,608643,632,655209,777,392240,153,965162,479,448
Other Assets47,574,01734,173,37028,141,86243,764,18859,300,89534,412,533319,769,54263,654,708103,797,33940,755,865
Total Assets$141,125,883$170,088,487$134,160,201$237,110,052$251,309,300$120,523,141$963,402,197$273,432,100$343,951,304$203,235,313
EQUITY & LIABILITIES
Equity$76,361,489$77,160,220$63,682,162$108,102,568$86,039,573$45,008,072$390,514,143$119,722,014$153,548,848$67,011,163
Long-term Debt50,769,06249,348,70650,569,595101,893,715118,471,79865,264,674390,291,786110,308,463138,068,803109,296,308
Other Liabilities13,995,33243,579,56119,908,44427,113,76946,797,92910,250,395182,596,26843,401,62352,333,65326,927,842
Total Equity and Liabilities$141,125,883$170,088,487$134,160,201$237,110,052$251,309,300$120,523,141$963,402,197$273,432,100$343,951,304$203,235,313
2017
ASSETS
Total Utility Plant (1)
$121,986,655$204,766,617$145,155,214$267,281,107$232,311,988$107,534,708$925,146,501$284,661,260$348,310,104$231,613,058
Depreciation32,710,94877,580,09539,665,69281,063,14152,638,65924,049,233304,465,34782,215,898117,614,38775,117,407
Net Plant89,275,707127,186,522105,489,522186,217,966179,673,32983,485,475620,681,154202,445,362230,695,717156,495,651
Other Assets42,492,09633,264,91327,759,77473,552,53959,933,14226,065,989293,550,57865,116,87795,293,57728,694,441
Total Assets$131,767,803$160,451,435$133,249,296$259,770,505$239,606,471$109,551,464$914,231,732$267,562,239$325,989,294$185,190,092
EQUITY & LIABILITIES
Equity$72,529,613$76,904,712$61,416,406$119,208,053$83,144,158$37,611,805$333,552,091$115,923,627$146,075,458$65,123,874
Long-term Debt46,034,19442,723,41948,981,686109,252,392125,396,17462,763,673394,716,000109,053,408138,426,44399,407,505
Other Liabilities13,203,99640,823,30422,851,20431,310,06031,066,1399,175,986185,963,64142,585,20441,487,39320,658,713
Total Equity and Liabilities$131,767,803$160,451,435$133,249,296$259,770,505$239,606,471$109,551,464$914,231,732$267,562,239$325,989,294$185,190,092
Footnotes:
(1) Including construction work in progress
38 MEMBERS OF OGLETHORPE POWER CORPORATION

Table 6
CONDENSED BALANCE SHEET INFORMATION OF EACH MEMBER
(as of December 31)
AltamahaAmicalolaCanoocheeCarroll
Central
Georgia
CoastalCobbColquitt
Coweta-
Fayette
Diverse
2022
ASSETS
Total Utility Plant (1)
$168,772,625 $265,816,628 $176,399,666 $343,948,470 $357,636,123 $150,257,207 $1,041,956,909 $364,339,508 $436,286,157 $295,205,313 
Depreciation45,590,296 93,694,979 52,501,813 98,762,539 62,555,311 35,854,378 313,174,767 122,293,338 147,135,853 102,377,286 
Net Plant123,182,329 172,121,649 123,897,853 245,185,931 295,080,812 114,402,829 728,782,142 242,046,170 289,150,304 192,828,027 
Other Assets63,027,533 54,319,547 39,883,474 51,273,826 99,005,741 37,676,689 444,680,410 101,422,886 145,277,399 45,763,159 
Total Assets$186,209,862 $226,441,196 $163,781,327 $296,459,757 $394,086,553 $152,079,518 $1,173,462,552 $343,469,056 $434,427,703 $238,591,186 
EQUITY & LIABILITIES
Equity$89,677,082 $79,540,486 $69,468,144 $129,450,710 $101,002,281 $56,906,155 $672,469,164 $158,564,105 $189,909,719 $78,954,344 
Long-term Debt72,129,136 92,615,584 63,152,367 134,344,474 188,701,235 76,300,457 372,804,266 136,302,038 183,043,939 132,506,991 
Other Liabilities24,403,644 54,285,126 31,160,816 32,664,573 104,383,037 18,872,906 128,189,122 48,602,913 61,474,045 27,129,851 
Total Equity and Liabilities$186,209,862 $226,441,196 $163,781,327 $296,459,757 $394,086,553 $152,079,518 $1,173,462,552 $343,469,056 $434,427,703 $238,591,186 
2021
ASSETS
Total Utility Plant (1)
$148,212,395 $248,279,704 $167,770,781 $323,477,065 $299,153,030 $139,598,636 $986,191,276 $348,252,644 $412,001,682 $277,454,236 
Depreciation41,492,247 91,580,020 51,011,068 92,656,196 63,970,166 33,038,615 289,295,844 113,503,594 139,128,837 97,051,275 
Net Plant106,720,148 156,699,684 116,759,713 230,820,869 235,182,864 106,560,021 696,895,432 234,749,050 272,872,845 180,402,961 
Other Assets54,374,114 45,149,102 36,765,842 51,121,057 80,874,821 34,173,642 400,931,599 78,975,883 144,042,838 35,837,680 
Total Assets$161,094,262 $201,848,786 $153,525,555 $281,941,926 $316,057,685 $140,733,663 $1,097,827,031 $313,724,933 $416,915,683 $216,240,641 
EQUITY & LIABILITIES
Equity$88,011,983 $81,097,276 $70,845,186 $126,840,419 $97,786,250 $56,355,574 $564,357,405 $138,898,489 $188,198,511 $72,104,987 
Long-term Debt55,417,383 73,989,675 54,767,552 124,144,796 151,173,121 68,572,500 382,090,190 122,847,254 136,365,969 119,310,020 
Other Liabilities17,664,896 46,761,835 27,912,817 30,956,711 67,098,314 15,805,589 151,379,436 51,979,190 92,351,203 24,825,634 
Total Equity and Liabilities$161,094,262 $201,848,786 $153,525,555 $281,941,926 $316,057,685 $140,733,663 $1,097,827,031 $313,724,933 $416,915,683 $216,240,641 
2020
ASSETS
Total Utility Plant (1)
$138,532,955 $235,984,228 $158,856,105 $309,846,692 $277,043,422 $130,715,506 $963,434,008 $328,905,467 $393,509,331 $264,849,924 
Depreciation38,283,109 87,855,607 47,704,130 87,890,521 60,656,156 30,410,041 280,856,941 104,103,479 132,504,549 91,278,147 
Net Plant100,249,846 148,128,621 111,151,975 221,956,171 216,387,266 100,305,465 682,577,067 224,801,988 261,004,782 173,571,777 
Other Assets57,582,711 33,633,543 35,053,348 55,148,976 75,437,215 31,965,660 405,725,071 74,352,452 136,778,788 39,780,692 
Total Assets$157,832,557 $181,762,164 $146,205,323 $277,105,147 $291,824,481 $132,271,125 $1,088,302,138 $299,154,440 $397,783,570 $213,352,469 
EQUITY & LIABILITIES
Equity$85,162,297 $80,527,546 $69,053,287 $121,592,108 $93,634,641 $52,069,969 $441,992,625 $135,651,822 $181,336,925 $71,203,383 
Long-term Debt57,362,139 55,618,915 47,478,788 118,832,418 151,143,494 65,753,527 405,717,261 120,451,024 141,670,939 115,869,053 
B-22

Table of Contents6 (Continued)

AltamahaAmicalolaCanoocheeCarroll
Central
Georgia
CoastalCobbColquitt
Coweta-
Fayette
Diverse
2022
Other Liabilities15,308,121 45,615,703 29,673,248 36,680,621 47,046,346 14,447,629 240,592,252 43,051,594 74,775,706 26,280,033 
Total Equity and Liabilities$157,832,557 $181,762,164 $146,205,323 $277,105,147 $291,824,481 $132,271,125 $1,088,302,138 $299,154,440 $397,783,570 $213,352,469 
Table 6 (Continued)
ExcelsiorFlintGradyGreyStoneHabershamHartIrwinJacksonJefferson
Little
Ocmulgee
2019
ASSETS
Total Utility Plant (1$90,200,098$454,119,666$117,671,754$527,752,106$177,132,480$184,493,722$102,010,977$1,118,033,853$187,178,494$68,764,365
Depreciation23,652,799156,192,20827,008,502135,477,93774,219,58864,080,76336,172,946353,233,52248,065,81818,280,395
Net Plant66,547,299297,927,45890,663,252392,274,169102,912,892120,412,95965,838,031764,800,331139,112,67650,483,970
Other Assets40,321,55581,233,19036,480,572187,297,55837,160,99193,830,72620,269,305364,845,30110,041,13910,894,761
Total Assets$106,868,854$379,160,648$127,143,824$579,571,727$140,073,883$214,243,685$86,107,336$1,129,645,632$149,153,815$61,378,731
EQUITY & LIABILITIES
Equity$59,441,334$149,637,695$55,958,635$283,628,946$54,785,360$94,708,565$28,546,000$519,926,477$51,734,646$24,044,088
Long-term Debt28,503,613$163,816,34751,194,291234,346,14155,430,54271,316,00349,499,967437,714,91567,499,11027,347,812
Other Liabilities18,923,90765,706,60619,990,89861,596,64029,857,98148,219,1178,061,369172,004,24029,920,0599,986,831
Total Equity and Liabilities$106,868,854$379,160,648$127,143,824$579,571,727$140,073,883$214,243,685$86,107,336$1,129,645,632$149,153,815$61,378,731
2018
ASSETS
Total Utility Plant (1$86,418,222$439,206,424$119,744,355$507,820,179$173,916,261$181,440,837$98,906,761$1,076,169,320$181,411,262$66,514,452
Depreciation22,234,356146,517,84825,808,397127,872,07672,506,16563,367,61733,846,480335,066,37451,274,79617,299,309
Net Plant64,183,866292,688,57693,935,958379,948,103101,410,096118,073,22065,060,281741,102,946130,136,46649,215,143
Other Assets31,782,11780,271,14231,490,094182,402,60739,135,36273,558,86616,520,217349,085,05617,332,63710,793,401
Total Assets$95,965,983$372,959,718$125,426,052$562,350,710$140,545,458$191,632,086$81,580,498$1,090,188,002$147,469,103$60,008,544
EQUITY & LIABILITIES
Equity$57,294,310$145,317,034$51,671,437$270,630,264$53,044,474$90,073,632$27,479,752$469,663,135$50,437,383$22,832,325
Long-term Debt23,108,534$158,833,88040,364,684225,666,80659,250,69361,602,97547,689,492418,669,97870,057,96926,748,866
Other Liabilities15,563,13968,808,80433,389,93166,053,64028,250,29139,955,4796,411,254201,854,88926,973,75110,427,353
Total Equity and Liabilities$95,965,983$372,959,718$125,426,052$562,350,710$140,545,458$191,632,086$81,580,498$1,090,188,002$147,469,103$60,008,544
2017
ASSETS
Total Utility Plant (1$84,195,112$429,275,970$109,453,621$490,513,864$165,511,882$176,806,830$96,706,779$1,036,646,922$174,403,299$64,468,329
Depreciation21,774,307139,176,87725,716,622120,099,45370,123,75761,118,16831,878,721317,934,05148,868,85216,135,976
Net Plant62,420,805290,099,09383,736,999370,414,41195,388,125115,688,66264,828,058718,712,871125,534,44748,332,353
Other Assets29,352,42870,394,07330,599,778169,956,77036,494,21960,471,68014,210,275313,701,04741,642,11710,080,682
Total Assets$91,773,233$360,493,166$114,336,777$540,371,181$131,882,344$176,160,342$79,038,333$1,032,413,918$167,176,564$58,413,035
EQUITY & LIABILITIES
Equity$53,509,316$141,687,971$51,514,156$248,546,220$50,099,302$84,475,160$26,121,119$445,196,671$72,935,438$21,159,818
Long-term Debt24,751,032154,591,68242,319,848235,413,94250,679,95263,291,93944,911,931439,166,33567,162,82429,294,775
Other Liabilities13,512,88564,213,51320,502,77356,411,01931,103,09028,393,2438,005,283148,050,91227,078,3027,958,442
Total Equity and Liabilities$91,773,233$360,493,166$114,336,777$540,371,181$131,882,344$176,160,342$79,038,333$1,032,413,918$167,176,564$58,413,035
Footnotes:
(1) Including construction work in progress
__________________
Footnotes:

(1)

Including construction work in progress.
B-23

Table of Contents6 (Continued)


Table 6 (Continued)
Middle GeorgiaMitchellOcmulgeeOconeeOkefenokePlantersRayleSatillaSawneeSlash Pine
2019
ASSETS
Total Utility Plant (1$58,667,443167,413,618$61,781,356$81,283,181$198,832,925$83,679,633$105,621,993$230,698,833$659,661,686$44,984,285
Depreciation13,430,18533,741,90121,480,83423,899,21466,002,76223,362,63535,353,13749,912,479127,826,61210,134,414
Net Plant45,237,258133,671,71740,300,52257,383,967132,830,16360,316,99870,268,856180,786,354531,835,07434,849,871
Other Assets11,879,34352,904,20016,697,93222,818,31734,801,28338,302,13220,438,90663,460,836268,462,63514,692,625
Total Assets$57,116,601$186,575,917$56,998,454$80,202,284$167,631,446$98,619,130$90,707,762$244,247,190$800,297,709$49,542,496
EQUITY & LIABILITIES
Equity$23,918,580$85,821,533$36,635,989$32,641,839$61,076,149$46,990,616$34,624,913$117,714,798$272,093,469$22,853,099
Long-term Debt26,485,48955,234,6539,694,87435,137,06785,665,60036,558,58644,244,19890,146,201301,695,61019,702,440
Other Liabilities6,712,53245,519,73110,667,59112,423,37820,889,69715,069,92811,838,65136,386,191226,508,6306,986,957
Total Equity and Liabilities$57,116,601$186,575,917$56,998,454$80,202,284$167,631,446$98,619,130$90,707,762$244,247,190$800,297,709$49,542,496
2018
ASSETS
Total Utility Plant (1$55,005,729173,596,210$61,174,549$78,921,700$188,048,686$80,835,015$101,296,543$224,196,897$629,882,751$43,200,828
Depreciation12,257,97233,933,65320,924,23022,955,15262,911,06023,430,21333,813,78547,114,160126,927,04310,028,883
Net Plant42,747,757139,662,55740,250,31955,966,548125,137,62657,404,80267,482,758177,082,737502,955,70833,171,945
Other Assets10,558,67738,432,20414,317,31822,253,00333,435,85627,002,00321,056,10772,078,297210,132,02711,098,527
Total Assets$53,306,434$178,094,761$54,567,637$78,219,551$158,573,482$84,406,805$88,538,865$249,161,034$713,087,735$44,270,472
EQUITY & LIABILITIES
Equity$21,804,848$83,910,498$34,064,977$31,106,060$60,196,505$42,821,258$30,765,165$114,697,666$261,538,484$19,940,155
Long-term Debt26,292,66544,512,71411,225,56834,745,70379,153,61430,634,15446,205,30595,375,190227,918,48518,095,885
Other Liabilities5,208,92149,671,5499,277,09212,367,78819,223,36310,951,39311,568,39539,088,178223,630,7666,234,432
Total Equity and Liabilities$53,306,434$178,094,761$54,567,637$78,219,551$158,573,482$84,406,805$88,538,865$249,161,034$713,087,735$44,270,472
2017
ASSETS
Total Utility Plant (1$51,685,836$159,546,602$59,502,690$76,501,643$182,071,005$78,024,646$98,166,954$222,399,689$601,692,492$41,351,029
Depreciation11,096,39435,067,00119,769,45421,644,15259,994,89323,097,00032,600,65347,185,053124,073,1789,678,393
Net Plant40,589,442124,479,60139,733,23654,857,491122,076,11254,927,64665,566,301175,214,636477,619,31431,672,636
Other Assets9,356,58536,693,38213,172,00320,179,67832,020,45722,909,32719,191,74969,687,049197,734,94210,026,386
Total Assets$49,946,027$161,172,983$52,905,239$75,037,169$154,096,569$77,836,973$84,758,050$244,901,685$675,354,256$41,699,022
EQUITY & LIABILITIES
Equity$20,599,995$83,048,553$30,141,867$29,082,988$57,219,649$40,004,491$28,094,269$109,093,008$248,429,609$16,953,678
Long-term Debt23,226,70346,954,07212,594,63333,614,96482,598,37128,805,82045,823,42386,529,927239,182,73117,165,856
Other Liabilities6,119,32931,170,35810,168,73912,339,21714,278,5499,026,66210,840,35849,278,750187,741,9167,579,488
Total Equity and Liabilities$49,946,027$161,172,983$52,905,239$75,037,169$154,096,569$77,836,973$84,758,050$244,901,685$675,354,256$41,699,022
Footnotes:
(1) Including construction work in progress

ExcelsiorFlintGradyGreyStoneHabershamHartIrwinJacksonJefferson
Little
Ocmulgee
2022
ASSETS
Total Utility Plant (1)
$105,467,366 $506,114,203 $126,169,028 $667,441,746 $227,476,773 $206,434,064 $125,298,592 $1,272,588,313 $206,209,210 $75,652,518 
Depreciation28,447,832 189,861,618 29,506,763 151,956,175 89,020,164 68,656,605 44,451,694 416,329,238 53,674,362 21,975,064 
Net Plant77,019,534 316,252,585 96,662,265 515,485,571 138,456,609 137,777,459 80,846,898 856,259,075 152,534,848 53,677,454 
Other Assets48,161,873 123,348,356 45,730,443 123,057,066 50,492,567 105,349,320 26,351,823 449,969,252 15,926,673 13,070,461 
Total Assets$125,181,407 $439,600,941 $142,392,708 $638,542,637 $188,949,176 $243,126,779 $107,198,721 $1,306,228,327 $168,461,521 $66,747,915 
EQUITY & LIABILITIES
Equity$65,065,115 $155,629,924 $73,054,253 $299,843,080 $57,638,000 $127,774,024 $30,583,820 $585,850,613 $56,309,533 $26,471,860 
Long-term Debt34,423,410 208,516,979 44,385,723 241,889,470 88,370,944 66,127,089 66,770,116 525,480,781 79,513,478 28,643,606 
Other Liabilities25,692,882 75,454,038 24,952,732 96,810,087 42,940,232 49,225,666 9,844,785 194,896,933 32,638,510 11,632,449 
Total Equity and Liabilities$125,181,407 $439,600,941 $142,392,708 $638,542,637 $188,949,176 $243,126,779 $107,198,721 $1,306,228,327 $168,461,521 $66,747,915 
2021
ASSETS
Total Utility Plant (1)
$98,185,339 $484,095,363 $121,118,711 $636,053,981 $204,630,282 $198,139,595 $110,147,432 $1,210,339,737 $199,293,533 $73,095,734 
Depreciation26,278,401 178,957,775 28,035,372 136,713,423 84,318,490 65,284,825 41,351,890 392,615,368 50,267,110 20,998,145 
Net Plant71,906,938 305,137,588 93,083,339 499,340,558 120,311,792 132,854,770 68,795,542 817,724,369 149,026,423 52,097,589 
Other Assets47,454,331 90,454,412 40,250,932 108,986,359 43,497,406 95,223,719 19,716,521 406,578,826 13,676,313 10,998,586 
Total Assets$119,361,269 $395,592,000 $133,334,271 $608,326,917 $163,809,198 $228,078,489 $88,512,063 $1,224,303,195 $162,702,736 $63,096,175 
EQUITY & LIABILITIES
Equity$63,065,805 $151,710,954 $63,584,914 $295,596,622 $58,905,871 $113,647,701 $32,828,981 $562,158,310 $56,012,112 $25,706,482 
Long-term Debt31,698,488 177,017,584 46,536,649 244,360,499 69,470,232 61,552,043 48,592,967 494,774,274 75,161,178 28,615,765 
Other Liabilities24,596,976 66,863,462 23,212,708 68,369,796 35,433,095 52,878,745 7,090,115 167,370,611 31,529,446 8,773,928 
Total Equity and Liabilities$119,361,269 $395,592,000 $133,334,271 $608,326,917 $163,809,198 $228,078,489 $88,512,063 $1,224,303,195 $162,702,736 $63,096,175 
2020
ASSETS
Total Utility Plant (1)
$93,665,370 $469,771,547 $117,401,828 $548,055,935 $187,440,225 $196,148,469 $106,019,106 $1,162,810,520 $193,108,618 $70,575,935 
Depreciation24,734,629 167,767,317 26,799,294 141,141,148 78,212,543 67,267,555 38,535,828 376,100,834 49,046,643 19,477,785 
Net Plant68,930,741 302,004,230 90,602,534 406,914,787 109,227,682 128,880,914 67,483,278 786,709,686 144,061,975 51,098,150 
Other Assets43,609,431 87,151,121 40,575,406 174,626,292 42,839,493 99,138,479 19,987,780 394,000,537 11,019,098 11,711,339 
Total Assets$112,540,172 $389,155,351 $131,177,940 $581,541,079 $152,067,175 $228,019,393 $87,471,058 $1,180,710,223 $155,081,073 $62,809,489 
EQUITY & LIABILITIES
Equity$61,304,783 $153,307,365 $59,922,794 $274,845,366 $57,299,760 $108,138,271 $30,973,538 $544,485,013 $51,930,913 $24,908,813 
Long-term Debt28,145,494 170,943,337 48,870,450 239,492,556 53,572,859 68,363,797 48,075,456 467,348,067 72,483,244 26,516,847 
Other Liabilities23,089,895 64,904,649 22,384,696 67,203,157 41,194,556 51,517,325 8,422,064 168,877,143 30,666,916 11,383,829 
Total Equity and Liabilities$112,540,172 $389,155,351 $131,177,940 $581,541,079 $152,067,175 $228,019,393 $87,471,058 $1,180,710,223 $155,081,073 $62,809,489 
B-24

Table of Contents6 (Continued)

Middle
Georgia
MitchellOcmulgeeOconeeOkefenokePlantersRayleSatillaSawnee
Slash
Pine
2022
ASSETS
Total Utility Plant (1)
$81,350,448 $193,375,419 $71,746,494 $89,026,945 $224,650,439 $93,726,622 $118,907,708 $295,606,356 $784,334,597 $53,733,210 
Depreciation15,930,213 42,446,838 24,998,650 28,374,036 74,860,769 26,891,011 38,816,722 55,681,743 136,296,312 11,258,332 
Net Plant65,420,235 150,928,581 46,747,844 60,652,909 149,789,670 66,835,611 80,090,986 239,924,613 648,038,285 42,474,878 
Other Assets19,680,875 46,770,846 17,910,618 24,759,254 45,178,468 44,625,955 25,864,529 109,829,025 291,893,284 19,798,013 
Total Assets$85,101,110 $197,699,427 $64,658,462 $85,412,163 $194,968,138 $111,461,566 $105,955,515 $349,753,638 $939,931,569 $62,272,891 
EQUITY & LIABILITIES
Equity$26,301,713 $93,797,835 $42,721,165 $34,623,486 $68,410,112 $51,826,641 $43,360,201 $135,789,886 $312,328,666 $26,092,195 
Long-term Debt39,015,553 69,090,794 13,189,535 29,107,488 103,720,395 41,129,527 50,212,262 159,084,180 372,445,557 26,296,296 
Other Liabilities19,783,844 34,810,798 8,747,762 21,681,189 22,837,631 18,505,398 12,383,052 54,879,572 255,157,346 9,884,400 
Total Equity and Liabilities$85,101,110 $197,699,427 $64,658,462 $85,412,163 $194,968,138 $111,461,566 $105,955,515 $349,753,638 $939,931,569 $62,272,891 
2021
ASSETS
Total Utility Plant (1)
$63,783,298 $185,640,808 $66,367,916 $85,800,828 $212,313,316 $89,236,765 $113,606,593 $252,484,233 $729,046,717 $50,298,782 
Depreciation16,217,688 39,584,048 24,304,725 26,710,055 73,021,959 25,343,124 37,260,688 55,770,533 133,207,655 10,848,915 
Net Plant47,565,610 146,056,760 42,063,191 59,090,773 139,291,357 63,893,641 76,345,905 196,713,700 595,839,062 39,449,867 
Other Assets13,128,225 41,893,075 16,688,950 23,284,212 39,950,610 42,064,042 21,736,146 72,002,922 285,933,651 19,899,391 
Total Assets$60,693,835 $187,949,835 $58,752,141 $82,374,985 $179,241,967 $105,957,683 $98,082,051 $268,716,622 $881,772,713 $59,349,258 
EQUITY & LIABILITIES
Equity$25,681,857 $90,406,827 $42,168,013 $35,228,785 $66,847,802 $50,452,156 $39,890,214 $120,365,729 $290,418,850 $26,293,796 
Long-term Debt29,403,489 63,300,052 8,660,317 31,075,142 92,916,236 36,040,267 46,138,121 99,484,591 332,440,853 24,574,337 
Other Liabilities5,608,489 34,242,956 7,923,811 16,071,058 19,477,929 19,465,260 12,053,716 48,866,302 258,913,010 8,481,125 
Total Equity and Liabilities$60,693,835 $187,949,835 $58,752,141 $82,374,985 $179,241,967 $105,957,683 $98,082,051 $268,716,622 $881,772,713 $59,349,258 
2020
ASSETS
Total Utility Plant (1)
$60,813,881 $178,608,729 $64,091,391 $83,488,534 $206,677,684 $86,758,958 $108,932,219 $238,822,302 $699,592,798 $47,402,601 
Depreciation14,860,335 36,124,366 23,040,987 24,943,927 70,114,514 24,179,816 36,341,783 52,539,354 132,589,958 10,716,104 
Net Plant45,953,546 142,484,363 41,050,404 58,544,607 136,563,170 62,579,142 72,590,436 186,282,948 567,002,840 36,686,497 
Other Assets11,939,623 40,073,287 17,179,863 22,887,001 36,386,645 38,304,827 22,923,557 63,351,564 265,529,457 15,476,552 
Total Assets$57,893,169 $182,557,650 $58,230,267 $81,431,608 $172,949,815 $100,883,969 $95,513,993 $249,634,512 $832,532,297 $52,163,049 
EQUITY & LIABILITIES
Equity$25,029,338 $88,440,279 $39,415,544 $33,940,146 $63,460,716 $48,729,156 $37,298,168 $118,730,227 $269,552,162 $24,861,707 
Long-term Debt27,289,601 56,912,500 9,113,782 33,100,027 82,429,785 34,277,086 45,403,795 84,842,195 319,927,545 19,720,923 
Other Liabilities5,574,230 37,204,871 9,700,941 14,391,435 27,059,314 17,877,727 12,812,030 46,062,090 243,052,590 7,580,419 
Total Equity and Liabilities$57,893,169 $182,557,650 $58,230,267 $81,431,608 $172,949,815 $100,883,969 $95,513,993 $249,634,512 $832,532,297 $52,163,049 
__________________
Footnotes:

(1)
Table 6 (Continued)
MEMBER
Snapping ShoalsSouthern RiversSumterThree NotchTri-CountyUpsonWaltonWashingtonTOTAL
2019
ASSETS
Total Utility Plant (1$306,651,981$96,672,808$130,444,700$87,832,533$132,122,453$29,928,431$467,472,412$92,035,009$6,099,176,260
Depreciation126,773,50429,665,57631,719,69727,748,43127,951,44511,714,061180,207,29232,346,7071,847,812,944
Net Plant179,878,47767,007,23298,725,00360,084,102104,171,00818,214,370287,265,12059,688,3024,251,363,316
Other Assets102,372,30337,454,87636,795,09950,898,7456,980,42218,218,005274,564,18129,042,9501,711,939,898
Total Assets$282,250,780$104,462,108$135,520,102$110,982,847$111,151,430$36,432,375$561,829,301$88,731,252$5,963,303,214
EQUITY & LIABILITIES
Equity$101,620,390$42,830,794$66,213,366$42,099,358$37,495,589$24,433,749$209,820,389$46,690,818$2,603,822,211
Long-term Debt82,023,82345,894,73554,273,12736,586,86562,633,0747,936,405116,061,27435,215,2852,431,292,783
Other Liabilities98,606,56715,736,57915,033,60932,296,62411,022,7674,062,221235,947,6386,825,149928,188,219
Total Equity and Liabilities$282,250,780$104,462,108$135,520,102$110,982,847$111,151,430$36,432,375$561,829,301$88,731,252$5,963,303,214
2018
ASSETS
Total Utility Plant (1$298,111,198$118,335,979$127,421,357$81,096,590$127,760,759$29,372,758$448,244,911$89,046,376$5,872,930,923
Depreciation122,135,26926,669,34432,403,19826,285,61826,956,82211,136,034170,540,51230,063,3961,774,182,609
Net Plant175,975,92991,666,63595,018,15954,810,972100,803,93718,236,724277,704,39958,982,9804,098,748,314
Other Assets88,757,561(2,751,933)38,470,18750,437,72421,288,98117,421,245240,822,13327,743,8971,607,715,818
Total Assets$264,733,490$88,914,702$133,488,346$105,248,696$122,092,918$35,657,969$518,526,532$86,726,877$5,706,464,132
EQUITY & LIABILITIES
Equity$91,009,952$36,675,597$64,424,382$41,514,200$46,694,709$22,975,378$193,806,092$44,998,530$2,425,593,998
Long-term Debt77,253,21836,777,17351,674,92836,415,38665,658,8208,705,129121,633,40935,193,1552,316,276,787
Other Liabilities96,470,32015,461,93217,389,03627,319,1109,739,3893,977,462203,087,0316,535,192964,593,347
Total Equity and Liabilities$264,733,490$88,914,702$133,488,346$105,248,696$122,092,918$35,657,969$518,526,532$86,726,877$5,706,464,132
2017
ASSETS
Total Utility Plant (1$288,241,357$85,284,124$123,682,559$78,817,757$123,550,863$28,823,411$437,823,987$86,923,943$5,696,749,820
Depreciation115,827,91426,669,34430,705,64424,588,53026,851,36010,820,037161,678,00328,041,5361,739,947,591
Net Plant172,413,44358,614,78092,976,91554,229,22796,699,50318,003,374276,145,98458,882,4073,956,802,229
Other Assets86,680,57724,154,57830,782,95624,666,66020,983,41917,050,442216,132,12424,645,2401,522,626,995
Total Assets$259,094,020$82,769,358$123,759,871$78,895,887$117,682,922$35,053,816$492,278,108$83,527,647$5,479,429,224
EQUITY & LIABILITIES
Equity$91,111,796$33,960,481$61,763,490$36,662,830$43,840,527$21,538,932$162,244,957$43,542,725$2,306,734,968
Long-term Debt74,868,05933,739,87450,863,00234,974,80464,101,7599,823,869127,211,12633,323,4502,328,339,154
Other Liabilities93,114,16515,069,00311,133,3797,258,2539,740,6363,691,015202,822,0256,661,472844,355,102
Total Equity and Liabilities$259,094,020$82,769,358$123,759,871$78,895,887$117,682,922$35,053,816$492,278,108$83,527,647$5,479,429,224
Footnotes:
(1) Including construction work in progress

Including construction work in progress.
B-25

Table 6 (Continued)
Snapping
Shoals
Southern
Rivers
Sumter
Three
Notch
Tri-
County
UpsonWaltonWashington
MEMBER
TOTAL
2022
ASSETS
Total Utility Plant (1)
$349,192,776 $145,748,290 $150,290,327 $99,116,524 $175,645,900 $33,468,079 $531,241,510 $120,005,874 $10,730,637,937 
Depreciation152,112,096 32,962,735 37,622,838 32,975,555 34,735,450 14,171,795 212,521,461 37,837,019 3,178,313,650 
Net Plant197,080,680 112,785,555 112,667,489 66,140,969 140,910,450 19,296,284 318,720,049 82,168,855 7,552,324,287 
Other Assets110,425,816 33,000,188 39,657,862 37,442,287 21,967,870 19,481,723 258,126,580 37,055,119 3,287,256,810 
Total Assets$307,506,496 $145,785,743 $152,325,351 $103,583,256 $162,878,320 $38,778,007 $576,846,629 $119,223,974 $10,839,581,097 
EQUITY & LIABILITIES
Equity$101,571,758 $47,608,781 $73,594,774 $50,594,632 $46,339,256 $25,494,587 $234,920,020 $47,562,926 $4,567,101,046 
Long-term Debt95,873,587 75,519,784 57,865,582 45,797,023 97,072,357 8,583,665 149,405,562 60,844,094 4,330,275,324 
Other Liabilities110,061,151 22,657,178 20,864,995 7,191,601 19,466,707 4,699,755 192,521,047 10,816,954 1,942,204,727 
Total Equity and Liabilities$307,506,496 $145,785,743 $152,325,351 $103,583,256 $162,878,320 $38,778,007 $576,846,629 $119,223,974 $10,839,581,097 
2021
ASSETS
Total Utility Plant (1)
$331,579,681 $114,541,647 $142,001,583 $95,284,016 $148,577,527 $32,536,138 $506,594,363 $100,680,327 $10,005,865,694 
Depreciation142,435,632 31,316,095 35,812,629 30,571,811 32,063,729 13,306,492 201,135,009 36,823,381 3,003,282,829 
Net Plant189,144,049 83,225,552 106,188,954 64,712,205 116,513,798 19,229,646 305,459,354 63,856,946 7,002,582,865 
Other Assets108,794,642 46,625,749 40,533,418 29,144,645 18,102,018 18,915,651 221,942,978 33,894,396 2,933,618,704 
Total Assets$297,938,691 $129,851,301 $146,722,372 $93,856,850 $134,615,816 $38,145,297 $527,402,332 $97,751,342 $9,936,201,569 
EQUITY & LIABILITIES
Equity$97,164,114 $46,499,532 $70,982,902 $47,124,930 $44,658,405 $26,009,349 $221,387,486 $47,544,977 $4,296,839,556 
Long-term Debt91,663,182 64,732,812 59,839,283 40,320,152 77,445,465 8,657,065 132,318,295 41,475,552 3,846,943,350 
Other Liabilities109,111,395 18,618,957 15,900,187 6,411,768 12,511,946 3,478,883 173,696,551 8,730,813 1,792,418,663 
Total Equity and Liabilities$297,938,691 $129,851,301 $146,722,372 $93,856,850 $134,615,816 $38,145,297 $527,402,332 $97,751,342 $9,936,201,569 
2020
ASSETS
Total Utility Plant (1)
$318,287,714 $105,762,547 $136,401,073 $93,167,777 $136,024,055 $31,295,247 $485,937,949 $94,852,524 $9,523,593,174 
Depreciation135,357,688 30,604,592 33,733,177 30,030,233 29,721,328 12,453,573 191,050,581 34,604,970 2,873,633,542 
Net Plant182,930,026 75,157,955 102,667,896 63,137,544 106,302,727 18,841,674 294,887,368 60,247,554 6,649,959,632 
Other Assets111,876,461 36,521,552 41,066,903 31,398,384 9,399,341 19,392,330 272,351,372 31,038,692 2,957,214,843 
Total Assets$294,806,487 $111,679,507 $143,734,799 $94,535,928 $115,702,068 $38,234,004 $567,238,740 $91,286,246 $9,607,174,475 
EQUITY & LIABILITIES
Equity$98,295,279 $46,723,586 $68,842,206 $46,129,270 $42,199,485 $25,873,313 $203,486,507 $47,430,142 $4,027,778,450 
Long-term Debt86,767,433 49,182,412 58,386,388 42,367,866 65,136,651 8,499,489 138,911,083 37,057,201 3,703,035,427 
Other Liabilities109,743,775 15,773,509 127,228,594 6,038,792 8,365,932 3,861,202 224,841,150 6,798,903 1,876,360,598 
Total Equity and Liabilities$294,806,487 $111,679,507 $143,734,799 $94,535,928 $115,702,068 $38,234,004 $567,238,740 $91,286,246 $9,607,174,475 
__________________
Footnotes:
(1)Including construction work in progress.
B-26

Table of Contents





opc-20210323_g2.jpg





OglethorpeLogo1a.jpg
Offer to Exchange

$450,000,000

400,000,000
Registered
3.75%6.20% First Mortgage Bonds
Series 2020A2023A due 2050

2053
for any and all

Unregistered
3.75%6.20% First Mortgage Bonds,
Series 2020A2023A due 20502053

________________________

PROSPECTUS
___________, 20212024






No dealer, salesperson or other person is authorized to give any information or to represent anything not contained in this prospectus.You must not rely on any unauthorized information or representations.This prospectus is an offer to exchange only the exchange bonds offered hereby, but only under circumstances and in jurisdictions where it is lawful to do so.The information contained in this prospectus is current only as of its date.

________________________





Table of Contents

PART II

INFORMATION NOT REQUIRED IN PROSPECTUS
Item 20. Indemnification of Directors and Officers
Georgia Statute
Section 46-3-306 of the Official Code of Georgia Annotated which governs indemnification of our officers and directors provides as follows:
46-3-306. Indemnification of officers, directors, employees, and agents; insurance.
(a)As used in this Code section, the term “the electric membership corporation” shall include, in addition to the surviving or new electric membership corporation, any merging or consolidating electric membership corporation, including any merging or consolidating electric membership corporation of a merging or consolidating electric membership corporation, absorbed in a merger or consolidation so that any person who is or was a director, officer, employee, or agent of such merging or consolidating electric membership corporation, or is or was serving at the request of such merging or consolidating electric membership corporation as a director, officer, employee, or agent of another corporation, partnership, joint venture, trust, or other enterprise, shall stand in the same position under this Code section with respect to the resulting or surviving electric membership corporation as he would if he had served the resulting or surviving electric membership corporation in the same capacity, provided that no indemnification under subsections (b) and (c) of this Code section which are permitted by this subsection shall be mandatory under this subsection or any bylaw of the surviving or new electric membership corporation without the approval of such indemnification by the board of directors or members of the surviving or new electric membership corporation, in the manner provided in paragraphs (1) and (3) of subsection (e) of this Code section.
(b)An electric membership corporation shall have power to indemnify any person who was or is a party or is threatened to be made a party to any threatened, pending, or completed action or proceeding, whether civil, criminal, administrative, or investigative (other than an action by or in the right of the electric membership corporation), by reason of the fact that he is or was a director, officer, employee, or agent of the electric membership corporation, or is or was serving at the request of the electric membership corporation as a director, officer, employee, or agent of another corporation, partnership, joint venture, trust, or other enterprise, against expenses, including attorneys’attorney’s fees, judgments, fines, and amounts paid in settlement actually and reasonably incurred by him in connection with such action or proceeding if he acted in a manner he reasonably believed to be in or not opposed to the best interests of the electric membership corporation and, with respect to any criminal action or proceeding, had no reasonable cause to believe his conduct was unlawful. The termination of any action or proceeding by judgment, order, settlement, or conviction, or upon a plea of nolo contendere or its equivalent, shall not of itself create a presumption that the person did not act in a manner which he reasonably believed to be in or not opposed to the best interests of the electric membership corporation and, with respect to any criminal action or proceeding, had reasonable cause to believe that his conduct was unlawful.
(c)An electric membership corporation shall have the power to indemnify any person who was or is a party or who is threatened to be made a party to any threatened, pending, or completed action or suit by, or in the right of, the electric membership corporation to procure a judgment in its favor, by reason of the fact he is or was a director, officer, employee, or agent of the electric membership corporation or is or was serving at the request of the electric membership corporation as a director, employee, or agent of another corporation, partnership, joint venture, trust, or other enterprise, against expenses, including attorney’s fees, actually and reasonably incurred by him in connection with the defense or settlement of such action or suit, if he acted in good faith and in a manner he reasonably believed to be in or not opposed to the best interests of the electric membership corporation; except that no indemnification shall be made in respect to any claim, issue, or matter as to which such person shall have been adjudged to be liable to the electric membership corporation, unless and only to the extent that the court in which such action or suit was brought shall
II-1


determine upon application that, despite the adjudication of liability but in view of all the circumstances of the case, such person is fairly and reasonably entitled to indemnity for such expenses which the court shall deem proper.
(d)To the extent that a director, officer, employee, or agent of an electric membership corporation has been successful, on the merits or otherwise, in defense of any action, suit, or proceeding referred to in subsections (b) and (c) of
II-1

Table of Contents
this Code section or in defense of any claim, issue, or matter therein, he shall be indemnified against expenses, including attorney’s fees, actually and reasonably incurred by him in connection therewith.
(e)Any indemnification under subsections (b) and (c) of this Code section, unless ordered by a court, shall be made by the electric membership corporation only as authorized in the specific case, upon a determination that indemnification of the director, officer, employee, or agent is proper in the circumstances because he has met the applicable standard of conduct set forth in subsections (b) and (c) of this Code section. Such determination shall be made:
(1)By the board of directors by a majority vote of a quorum consisting of directors who were not parties to such action, suit, or proceeding;
(2)If such a quorum is not obtainable or, even if obtainable, if a quorum of disinterested directors so directs, by independent legal counsel in a written opinion; or
(3)By the affirmative vote of the members present and voting at the meeting at which such determination is made.
(f)Expenses incurred in defending a civil or criminal action, suit, or proceeding may be paid by the electric membership corporation in advance of the final disposition of such action, suit, or proceeding upon receipt of an undertaking by or on behalf of the director, officer, employee, or agent to repay such amount if it shall ultimately be determined that he is not entitled to be indemnified by the electric membership corporation as authorized in this Code section.
(g)The indemnification and advancement of expenses provided by or granted pursuant to this Code section shall not be deemed exclusive of any other rights, in respect to indemnification or otherwise, to which those seeking indemnification or advancement of expenses may be entitled under any bylaw, resolution, or agreement, either specifically or in general terms approved by the affirmative vote of a majority of the members entitled to vote thereon, taken at a meeting, the notice of which specified that such bylaw, resolution, or agreement would be placed before the members, both as to action by a director, officer, employee, or agent in his official capacity and as to action in another capacity while holding such office or position, except that no such other rights, in respect to indemnification or otherwise, may be provided or granted to a director, officer, employee, or agent pursuant to this subsection by an electric membership corporation with respect to the liabilities described in divisions (b)(3)(A)(i) through (b)(3)(A)(iii) of Code Section 46-3-321.
(h)An electric membership corporation shall have the power to purchase and maintain insurance on behalf of any person who is or was a director, officer, employee, or agent of the electric membership corporation or who is or was serving at the request of the electric membership corporation as a director, officer, employee, or agent of another corporation, partnership, joint venture, trust, or other enterprise, against any liability asserted against him and incurred by him in any such capacity, or arising out of his status as such, whether or not the electric membership corporation would have the power to indemnify him against such liability under this Code section.
(i)If any expenses or other amounts are paid by way of indemnification, otherwise than by court order or action by the members or by an insurance carrier pursuant to insurance maintained by the electric membership corporation, the electric membership corporation, not later than the next annual meeting of members, unless such meeting is held within three months from the date of such payment, and in any event, within 15 months from the date of such payment, shall send to its members who are entitled to vote for the
II-2


election of directors a statement specifying the persons paid, the amounts paid, and the nature and status at the time of such payment of the litigation or threatened litigation. Such statement shall be provided to the members in the manner provided in subsection (a) of Code Section 46-3-263 for giving notice of members’ meetings.
(j)The indemnification and advancement of expenses provided by or granted pursuant to this Code section shall, unless otherwise provided when authorized or ratified, continue as to a person who has ceased to be a director, officer, employee, or agent and shall inure to the benefit of the heirs, executors, and administrators of such a person. (Code 1933, § 34C-617, enacted by Ga. L. 1981, p. 1587, § 1; Ga. L. 1988, p. 1451, § 2; Ga. L. 1989, p. 14, § 46.)
Articles of Incorporation
Our Restated Articles of Incorporation contain the following provision:
II-2

Table of Contents
“Article VII. A director of the Corporation shall not be personally liable to the Corporation or its members for monetary damages for breach of duty of care or other duty as a director, except for liability:
(i)For any appropriation, in violation of his duties, of any business opportunity of the Corporation;
(ii)For acts or omissions not in good faith or which involve intentional misconduct or a knowing violation of law; or
(iii)For any transaction from which the director derives an improper personal benefit.
The liability of directors shall be deemed further limited or eliminated to the fullest extent permitted by changes in the law governing the Corporation. Any repeal or modification of the provisions of this Article VII shall not adversely affect the duty, liability, rights or protection of a director existing at the time of such repeal or modification.”
Bylaws
Our bylaws contain the following provisions relating to indemnification and insurance:
Article IX
Indemnification and Insurance
Section 1. Indemnification.
The Corporation shall indemnify each person who is or was a Director, officer, employee or agent of the Corporation (including the heirs, executors, administrators or estate of such person) or is or was serving at the request of the Corporation as a director, officer, employee or agent of another corporation, partnership, joint venture, trust or other enterprise to the full extent permitted under Sections 46-3-306(b), (c) and (d) of the Georgia Electric Membership Corporation Act or any successor provisions of the laws of the State of Georgia. If any such indemnification is requested pursuant to Sections 46-3-306(b) or (c) of said Act or laws, the Board of Directors shall cause a determination to be made (unless a court has ordered the indemnification) in one of the manners prescribed in Section 46- 3-306(e) of said Act or laws as to whether indemnification of the party requesting indemnification is proper in the circumstances because he has met the applicable standard of conduct set forth in Sections 46-3-306(b) or (c) of said Act or laws. Upon any such determination that such indemnification is proper, the Corporation shall make indemnification payments of liability, cost, payment or expense asserted against, or paid or incurred by, him in his capacity as such a director, officer, employee or agent to the maximum extent permitted by said Sections of said Act or laws. The indemnification obligation of the Corporation set forth herein shall not be deemed exclusive of any other rights, in respect of indemnification or otherwise, to which any party may be entitled under any other bylaw provision or resolution approved by the members pursuant to Section 46-3- 306(g) of said Act or laws.
II-3


Section 2. Insurance.
The Corporation may purchase and maintain insurance at its expense, to protect itself and any Director, officer, employee or agent of the Corporation (including the heirs, executors, administrators or estate of any such person) against any liability, cost, payment or expense described in Section 1 of this Article IX, whether or not the Corporation would have the power to indemnify such person against such liability.”
Insurance
We maintain director and officer insurance policies which insure our present and former directors and officers against certain claims and liabilities asserted against them in their capacities or arising out of their status as our directors and officers.

II-3

Table of Contents
Item 21. Exhibits and Financial Statement Schedules
(a)Exhibits:Exhibits marked with an asterisk (*) are hereby incorporated by reference to exhibits previously filed by the Registrant as indicated in parentheses following the description of the exhibit.
NumberDescription
*3.1(a)Restated Articles of Incorporation of Oglethorpe, dated as of July 26, 1988. (Filed as Exhibit 3.1 to the Registrant's Form 10-K for the fiscal year ended December 31, 1988, File No. 33-7591.)
*3.1(b)
*3.2
*4.1
*4.2.1(a)
*4.2.1(b)
*4.2.1(c)
*4.2.1(d)
*4.2.1(e)
*4.2.1(f)
*4.2.1(g)
II-4


*4.2.1(h)
*4.2.1(i)
*4.2.1(j)
*4.2.1(k)
II-4

Table of Contents
*4.2.1(l)
*4.2.1(m)
*4.2.1(n)
*4.2.1(o)
*4.2.1(p)
*4.2.1(q)
*4.2.1(r)
*4.2.1(s)
*4.2.1(t)
*4.2.1(u)
II-5


*4.2.1(v)
*4.2.1(w)
*4.2.1(x)
*4.2.1(y)
*4.2.1(z)
II-5

Table of Contents
*4.2.1(aa)
*4.2.1(bb)
*4.2.1(cc)
*4.2.1(dd)
*4.2.1(ee)
*4.2.1(ff)
*4.2.1(gg)
*4.2.1(hh)
*4.2.1(ii)
II-6


*4.2.1(jj)
*4.2.1(kk)
*4.2.1(ll)
*4.2.1(mm)
*4.2.1(nn)
II-6

Table of Contents
*4.2.1(oo)
*4.2.1(pp)
*4.2.1(qq)
*4.2.1(rr)
*4.2.1(ss)
*4.2.1(tt)
*4.2.1(uu)
II-7


*4.2.1(vv)
*4.2.1(ww)
*4.2.1(xx)
*4.2.1(yy)
*4.2.1 (zz)
*4.2.1 (aaa)
II-7

Table of Contents
*4.2.1 (bbb)
*4.2.1 (ccc)
*4.2.1 (ddd)
*4.2.1 (eee)
*4.2.1(fff)
*4.2.1(ggg)
II-8


*4.2.1(hhh)
*4.2.1(iii)
*4.2.1(jjj)
*4.2.1(kkk)
*4.2.1(lll)
*4.2.1(mmm)
*4.2.1(nnn)
II-8

Table of Contents
*4.2.1(ooo)
*4.2.1(ppp)
*4.2.1(qqq)
*4.2.1(rrr)
*4.2.1(sss)
II-9


*4.2.1(ttt)
*4.2.1(uuu)
*4.2.1(vvv)
*4.2.1(www)
*4.2.1(xxx)
*4.2.1(yyy)
*4.2.1(zzz)
*4.2.1(aaaa)
*4.2.1(bbbb)
II-9

Table of Contents
*4.2.1(cccc)
*4.2.1(dddd)
*4.2.1(eeee)
*4.2.1(ffff)
II-10


*4.2.1(gggg)
*4.2.1(hhhh)
*4.2.1(iiii)
*4.2.1(jjjj)
*4.2.2
*4.3
4.4.1(1)
Loan Agreement, dated as of December 1, 2009, between the Development Authority of Monroe County and Oglethorpe relating to the Development Authority of Monroe County Pollution Control Revenue Bonds (Oglethorpe Power Corporation Scherer Project), Series 2009A, and five other substantially identical (Variable Rate Bonds) loan agreements.
4.4.2(1)
Note, dated December 10, 2009, from Oglethorpe to U.S. Bank National Association, as trustee, acting pursuant to a Trust Indenture, dated as of December 1, 2009, between the Development Authority of Monroe County and U.S. Bank National Association relating to the Development Authority of Monroe County Pollution Control Revenue Bonds (Oglethorpe Power Corporation Scherer Project), Series 2009A, and five other substantially identical notes.
4.4.3(1)
Trust Indenture, dated as of December 1, 2009, between the Development Authority of Monroe County and U.S. Bank National Association, as trustee, relating to the Development Authority of Monroe County Pollution Control Revenue Bonds (Oglethorpe Power Corporation Scherer Project), Series 2009A, and five other substantially identical indentures.
4.5.1(1)
Loan Agreement, dated as of April 1, 2013, between the Development Authority of Appling County and Oglethorpe relating to the Development Authority of Appling County Pollution Control Revenue Bonds (Oglethorpe Power Corporation Hatch Project), Series 2013A, and two other substantially identical (Term Rate Bonds) loan agreements.
4.5.24.4.2(1)
Note, dated April 23, 2013, from Oglethorpe to U.S. Bank National Association, as trustee, acting pursuant to a Trust Indenture, dated as of April 1, 2013, between the Development Authority of Appling County and U.S. Bank National Association relating to the Development Authority of Appling County Pollution Control Revenue Bonds (Oglethorpe Power Corporation Hatch Project), Series 2013A, and two other substantially identical notes.
4.5.34.4.3(1)
Trust Indenture, dated as of April 1, 2013, between the Development Authority of Appling County and U.S. Bank National Association, as trustee, relating to the Development Authority of Appling County Pollution Control Revenue Bonds (Oglethorpe Power Corporation Hatch Project), Series 2013A, and two other substantially identical indentures.
4.6.14.5.1(1)
Loan Agreement, dated as of October 1, 2017, between the Development Authority of Burke County and Oglethorpe relating to the Development Authority of Burke County Pollution Control Revenue Bonds (Oglethorpe Power Corporation Vogtle Project), Series 2017A, and threetwo other substantially identical (Indexed Put Rate Bonds) loan agreements.
4.6.24.5.2(1)
Note, dated October 12, 2017, from Oglethorpe to U.S. Bank National Association, as trustee, acting pursuant to a Trust Indenture, dated as of October 1, 2017, between the Development Authority of Burke County and U.S. Bank National Association relating to the Development Authority of Burke County Pollution Control Revenue Bonds (Oglethorpe Power Corporation Vogtle Project), Series 2017A, and threetwo other substantially identical notes.
4.6.34.5.3(1)
Trust Indenture, dated as of October 1, 2017, between the Development Authority of Burke County and U.S. Bank National Association, as trustee, relating to the Development Authority of Burke County Pollution Control Revenue Bonds (Oglethorpe Power Corporation Vogtle Project), Series 2017A, and threetwo other substantially identical indentures.
4.6.44.5.4(1)
Bondholder's Agreement, dated as of October 1, 2017, by and between Oglethorpe and RBC Municipal Products, LLC, relating to the Development Authority of Burke County Pollution Control Revenue Bonds (Oglethorpe Power Corporation Vogtle Project), Series 2017A, and threetwo other substantially identical bondholder's agreements.
II-10II-11

Table of Contents
4.7.14.6.1(1)
Loan Agreement, dated as of December 1, 2017, between the Development Authority of Burke County and Oglethorpe relating to the Development Authority of Burke County Pollution Control Revenue Bonds (Oglethorpe Power Corporation Vogtle Project), Series 2017C, and threetwo other substantially identical (Fixed Rate and Term Rate Bonds) loan agreements.
4.7.24.6.2(1)
Note, dated December 28, 2017, from Oglethorpe to U.S. Bank National Association, as trustee, acting pursuant to a Trust Indenture, dated as of December 1, 2017, between the Development Authority of Burke County and U.S. Bank National Association relating to the Development Authority of Burke County Pollution Control Revenue Bonds (Oglethorpe Power Corporation Vogtle Project), Series 2017C, and threetwo other substantially identical notes.
4.7.34.6.3(1)
Trust Indenture, dated as of December 1, 2017, between the Development Authority of Burke County and U.S. Bank National Association, as trustee, relating to the Development Authority of Burke County Pollution Control Revenue Bonds (Oglethorpe Power Corporation Vogtle Project), Series 2017C, and threetwo other substantially identical indentures.
4.8.14.7.1(1)
Bond Purchase Agreement, dated as of December 30, 2009, between Oglethorpe and CoBank, ACB, relating to Oglethorpe Power Corporation (An Electric Membership Corporation) First Mortgage Bond, Series 2009 CoBank (Clean Renewable Energy Bond).
4.8.24.7.2(1)
Oglethorpe Power Corporation (An Electric Membership Corporation) First Mortgage Bond, Series 2009 CoBank (Clean Renewable Energy Bond), dated December 30, 2009, from Oglethorpe to CoBank, ACB, in the original principal amount of $16,165,400.
*4.9.14.8.1
*4.9.24.8.2
*4.9.34.8.3
*4.9.44.8.4
*4.9.54.8.5
*4.9.64.8.6
*4.9.6(a)4.8.6(a)
*4.9.6(b)4.8.6(b)
*4.9.6(c)4.8.6(c)
*4.9.6(d)4.8.6(d)
*4.9.6(e)4.8.6(e)
II-12


*4.9.6(f)4.8.6(f)
*4.8.6(g)
*4.8.7
*4.8.8
*4.8.9
5.1
*10.1.1(a)Participation Agreement No. 2 among Oglethorpe as Lessee, Wilmington Trust Company as Owner Trustee, The First National Bank of Atlanta as Indenture Trustee, Columbia Bank for Cooperatives as Loan Participant and Ford Motor Credit Company as Owner Participant, dated December 30, 1985, together with a schedule identifying three other substantially identical Participation Agreements. (Filed as Exhibit 10.1.1(b) to the Registrant's Form S-1 Registration Statement, File No. 33-7591.)
*10.1.1(b)Supplemental Participation Agreement No. 2. (Filed as Exhibit 10.1.1(a) to the Registrant's Form S-1 Registration Statement, File No. 33-7591.)
*10.1.1(c)Supplemental Participation Agreement No. 1, dated as of June 30, 1987, among Oglethorpe as Lessee, IBM Credit Financing Corporation as Owner Participant, Wilmington Trust Company and The Citizens and Southern National Bank as Owner Trustee, The First National Bank of Atlanta, as Indenture Trustee, and Columbia Bank for Cooperatives, as Loan Participant. (Filed as Exhibit 10.1.1(c) to the Registrant's Form 10-K for the fiscal year ended December 31, 1987, File No. 33-7591.)
*10.1.1(d)
Second Supplemental Participation Agreement No. 2, dated as of December 17, 1997, among Oglethorpe as Lessee, DFO Partnership, as assignee of Ford Motor Credit Company, as Owner Participant, Wilmington Trust Company and NationsBank, N.A. as Owner Trustee, The Bank of New York Trust Company of Florida, N.A. as Indenture Trustee, CoBank, ACB as Loan Participant, OPC Scherer Funding Corporation, as Original Funding Corporation, OPC Scherer 1997 Funding Corporation A, as Funding Corporation, and SunTrust Bank, Atlanta, as Original Collateral Trust Trustee and Collateral Trust Trustee, with a schedule identifying three substantially identical Second Supplemental Participation Agreements and any material differences. (Filed as Exhibit 10.1.1(d) to Registrant's Form S-4 Registration Statement, File No. 333-4275.)
*10.1.2General Warranty Deed and Bill of Sale No. 2 between Oglethorpe, Grantor, and Wilmington Trust Company and William J. Wade, as Owner Trustees under Trust Agreement No. 2, dated December 30, 1985, with Ford Motor Credit Company, Grantee, together with a schedule identifying three substantially identical General Warranty Deeds and Bills of Sale. (Filed as Exhibit 10.1.2 to the Registrant's Form S-1 Registration Statement, File No. 33-7591.)
*10.1.3
II-11II-13

Table of Contents
*4.9.6(g)
*4.9.7
*4.9.8
*4.9.9
4.10
5.1
*10.1.1(a)Participation Agreement No. 2 among Oglethorpe as Lessee, Wilmington Trust Company as Owner Trustee, The First National Bank of Atlanta as Indenture Trustee, Columbia Bank for Cooperatives as Loan Participant and Ford Motor Credit Company as Owner Participant, dated December 30, 1985, together with a schedule identifying three other substantially identical Participation Agreements. (Filed as Exhibit 10.1.1(b) to the Registrant's Form S-1 Registration Statement, File No. 33-7591.)
*10.1.1(b)Supplemental Participation Agreement No. 2. (Filed as Exhibit 10.1.1(a) to the Registrant's Form S-1 Registration Statement, File No. 33-7591.)
*10.1.1(c)Supplemental Participation Agreement No. 1, dated as of June 30, 1987, among Oglethorpe as Lessee, IBM Credit Financing Corporation as Owner Participant, Wilmington Trust Company and The Citizens and Southern National Bank as Owner Trustee, The First National Bank of Atlanta, as Indenture Trustee, and Columbia Bank for Cooperatives, as Loan Participant. (Filed as Exhibit 10.1.1(c) to the Registrant's Form 10-K for the fiscal year ended December 31, 1987, File No. 33-7591.)
*10.1.1(d)
Second Supplemental Participation Agreement No. 2, dated as of December 17, 1997, among Oglethorpe as Lessee, DFO Partnership, as assignee of Ford Motor Credit Company, as Owner Participant, Wilmington Trust Company and NationsBank, N.A. as Owner Trustee, The Bank of New York Trust Company of Florida, N.A. as Indenture Trustee, CoBank, ACB as Loan Participant, OPC Scherer Funding Corporation, as Original Funding Corporation, OPC Scherer 1997 Funding Corporation A, as Funding Corporation, and SunTrust Bank, Atlanta, as Original Collateral Trust Trustee and Collateral Trust Trustee, with a schedule identifying three substantially identical Second Supplemental Participation Agreements and any material differences. (Filed as Exhibit 10.1.1(d) to Registrant's Form S-4 Registration Statement, File No. 333-4275.)
*10.1.2General Warranty Deed and Bill of Sale No. 2 between Oglethorpe, Grantor, and Wilmington Trust Company and William J. Wade, as Owner Trustees under Trust Agreement No. 2, dated December 30, 1985, with Ford Motor Credit Company, Grantee, together with a schedule identifying three substantially identical General Warranty Deeds and Bills of Sale. (Filed as Exhibit 10.1.2 to the Registrant's Form S-1 Registration Statement, File No. 33-7591.)
*10.1.3
*10.1.4(a)Lease Agreement No. 2, dated December 30, 1985, between Wilmington Trust Company and William J. Wade, as Owner Trustees under Trust Agreement No. 2, dated December 30, 1985, with Ford Motor Credit Company, Lessor, and Oglethorpe, Lessee, with a schedule identifying three other substantially identical Lease Agreements. (Filed as Exhibit 4.5(b) to the Registrant's Form S-1 Registration Statement, File No. 33-7591.)
*10.1.4(b)First Supplement to Lease Agreement No. 2 (included as Exhibit B to the Supplemental Participation Agreement No. 2 listed as Exhibit 10.1.1(b)).
II-12

Table of Contents
*10.1.4(a)Lease Agreement No. 2, dated December 30, 1985, between Wilmington Trust Company and William J. Wade, as Owner Trustees under Trust Agreement No. 2, dated December 30, 1985, with Ford Motor Credit Company, Lessor, and Oglethorpe, Lessee, with a schedule identifying three other substantially identical Lease Agreements. (Filed as Exhibit 4.5(b) to the Registrant's Form S-1 Registration Statement, File No. 33-7591.)
*10.1.4(b)First Supplement to Lease Agreement No. 2 (included as Exhibit B to the Supplemental Participation Agreement No. 2 listed as Exhibit 10.1.1(b)).
*10.1.4(c)First Supplement to Lease Agreement No. 1, dated as of June 30, 1987, between The Citizens and Southern National Bank as Owner Trustee under Trust Agreement No. 1 with IBM Credit Financing Corporation, as Lessor, and Oglethorpe, as Lessee. (Filed as Exhibit 4.5(c) to the Registrant's Form 10-K for the fiscal year ended December 31, 1987, File No. 33-7591.)
*10.1.4(d)
*10.1.5(a)Supporting Assets Lease No. 2, dated December 30, 1985, between Oglethorpe, Lessor, and Wilmington Trust Company and William J. Wade, as Owner Trustees, under Trust Agreement No. 2, dated December 30, 1985, with Ford Motor Credit Company, Lessee, together with a schedule identifying three substantially identical Supporting Assets Leases. (Filed as Exhibit 10.1.3 to the Registrant's Form S-1 Registration Statement, File No. 33-7591.)
*10.1.5(b)First Amendment to Supporting Assets Lease No. 2, dated as of November 19, 1987, together with a schedule identifying three substantially identical First Amendments to Supporting Assets Leases. (Filed as Exhibit 10.1.3(a) to the Registrant's Form 10-K for the fiscal year ended December 31, 1987, File No. 33-7591.)
*10.1.5(c)
*10.1.6(a)Supporting Assets Sublease No. 2, dated December 30, 1985, between Wilmington Trust Company and William J. Wade, as Owner Trustees under Trust Agreement No. 2, dated December 30, 1985, with Ford Motor Credit Company, Sublessor, and Oglethorpe, Sublessee, together with a schedule identifying three substantially identical Supporting Assets Subleases. (Filed as Exhibit 10.1.4 to the Registrant's Form S-1 Registration Statement, File No. 33-7591.)
*10.1.6(b)First Amendment to Supporting Assets Sublease No. 2, dated as of November 19, 1987, together with a schedule identifying three substantially identical First Amendments to Supporting Assets Subleases. (Filed as Exhibit 10.1.4(a) to the Registrant's Form 10-K for the fiscal year ended December 31, 1987, File No. 33-7591.)
*10.1.6(c)
*10.1.7(a)Tax Indemnification Agreement No. 2, dated December 30, 1985, between Ford Motor Credit Company, Owner Participant, and Oglethorpe, Lessee, together with a schedule identifying three substantially identical Tax Indemnification Agreements. (Filed as Exhibit 10.1.5 to the Registrant's Form S-1 Registration Statement, File No. 33-7591.)
*10.1.7(b)
II-14


*10.1.8Assignment of Interest in Ownership Agreement and Operating Agreement No. 2, dated December 30, 1985, between Oglethorpe, Assignor, and Wilmington Trust Company and William J. Wade, as Owner Trustees under Trust Agreement No. 2, dated December 30, 1985, with Ford Motor Credit Company, Assignee, together with a schedule identifying three substantially identical Assignments of Interest in Ownership Agreement and Operating Agreement. (Filed as Exhibit 10.1.6 to the Registrant's Form S-1 Registration Statement, File No. 33-7591.)
II-13

Table of Contents
*10.1.9(a)Consent, Amendment and Assumption No. 2, dated December 30, 1985, among Georgia Power Company and Oglethorpe and Municipal Electric Authority of Georgia and City of Dalton, Georgia and Gulf Power Company and Wilmington Trust Company and William J. Wade, as Owner Trustees under Trust Agreement No. 2, dated December 30, 1985, with Ford Motor Credit Company, together with a schedule identifying three substantially identical Consents, Amendments and Assumptions. (Filed as Exhibit 10.1.9 to the Registrant's Form S-1 Registration Statement, File No. 33-7591.)
*10.1.9(b)Amendment to Consent, Amendment and Assumption No. 2, dated as of August 16, 1993, among Oglethorpe, Georgia Power Company, Municipal Electric Authority of Georgia, City of Dalton, Georgia, Gulf Power Company, Jacksonville Electric Authority, Florida Power & Light Company and Wilmington Trust Company and NationsBank of Georgia, N.A., as Owner Trustees under Trust Agreement No. 2, dated December 30, 1985, with Ford Motor Credit Company, together with a schedule identifying three substantially identical Amendments to Consents, Amendments and Assumptions. (Filed as Exhibit 10.1.9(a) to the Registrant's Form 10-Q for the quarterly period ended September 30, 1993, File No. 33-7591.)
*10.2.1(a)Plant Robert W. Scherer Units Numbers One and Two Purchase and Ownership Participation Agreement among Georgia Power Company, Oglethorpe, Municipal Electric Authority of Georgia and City of Dalton, Georgia, dated as of May 15, 1980. (Filed as Exhibit 10.6.1 to the Registrant's Form S-1 Registration Statement, File No. 33-7591.)
*10.2.1(b)Amendment to Plant Robert W. Scherer Units Numbers One and Two Purchase and Ownership Participation Agreement among Georgia Power Company, Oglethorpe, Municipal Electric Authority of Georgia and City of Dalton, Georgia, dated as of December 30, 1985. (Filed as Exhibit 10.1.8 to the Registrant's Form S-1 Registration Statement, File No. 33-7591.)
*10.2.1(c)Amendment Number Two to the Plant Robert W. Scherer Units Numbers One and Two Purchase and Ownership Participation Agreement among Georgia Power Company, Oglethorpe, Municipal Electric Authority of Georgia and City of Dalton, Georgia, dated as of July 1, 1986. (Filed as Exhibit 10.6.1(a) to the Registrant's Form 10-K for the fiscal year ended December 31, 1987, File No. 33-7591.)
*10.2.1(d)Amendment Number Three to the Plant Robert W. Scherer Units Numbers One and Two Purchase and Ownership Participation Agreement among Georgia Power Company, Oglethorpe, Municipal Electric Authority of Georgia and City of Dalton, Georgia, dated as of August 1, 1988. (Filed as Exhibit 10.6.1(b) to the Registrant's Form 10-Q for the quarterly period ended September 30, 1993, File No. 33-7591.)
*10.2.1(e)Amendment Number Four to the Plant Robert W. Scherer Units Number One and Two Purchase and Ownership Participation Agreement among Georgia Power Company, Oglethorpe, Municipal Electric Authority of Georgia and City of Dalton, Georgia, dated as of December 31, 1990. (Filed as Exhibit 10.6.1(c) to the Registrant's Form 10-Q for the quarterly period ended September 30, 1993, File No. 33-7591.)
*10.2.2(a)Plant Robert W. Scherer Units Numbers One and Two Operating Agreement among Georgia Power Company, Oglethorpe, Municipal Electric Authority of Georgia and City of Dalton, Georgia, dated as of May 15, 1980. (Filed as Exhibit 10.6.2 to the Registrant's Form S-1 Registration Statement, File No. 33-7591.)
*10.2.2(b)Amendment to Plant Robert W. Scherer Units Numbers One and Two Operating Agreement among Georgia Power Company, Oglethorpe, Municipal Electric Authority of Georgia and City of Dalton, Georgia, dated as of December 30, 1985. (Filed as Exhibit 10.1.7 to the Registrant's Form S-1 Registration Statement, File No. 33-7591.)
II-15


*10.2.2(c)Amendment Number Two to the Plant Robert W. Scherer Units Numbers One and Two Operating Agreement among Georgia Power Company, Oglethorpe, Municipal Electric Authority of Georgia and City of Dalton, Georgia, dated as of December 31, 1990. (Filed as Exhibit 10.6.2(a) to the Registrant's Form 10-Q for the quarterly period ended September 30, 1993, File No. 33-7591.)
*10.2.2(d)
*10.2.3Plant Scherer Managing Board Agreement among Georgia Power Company, Oglethorpe, Municipal Electric Authority of Georgia, City of Dalton, Georgia, Gulf Power Company, Florida Power & Light Company and Jacksonville Electric Authority, dated as of December 31, 1990. (Filed as Exhibit 10.6.3 to the Registrant's Form 10-Q for the quarterly period ended September 30, 1993, File No. 33-7591.)
*10.3.1(a)Alvin W. Vogtle Nuclear Units Numbers One and Two Purchase and Ownership Participation Agreement among Georgia Power Company, Oglethorpe, Municipal Electric Authority of Georgia and City of Dalton, Georgia, dated as of August 27, 1976. (Filed as Exhibit 10.7.1 to the Registrant's Form S-1 Registration Statement, File No. 33-7591.)
II-14

Table of Contents
*10.3.1(b)Amendment Number One, dated January 18, 1977, to the Alvin W. Vogtle Nuclear Units Numbers One and Two Purchase and Ownership Participation Agreement among Georgia Power Company, Oglethorpe, Municipal Electric Authority of Georgia and City of Dalton, Georgia. (Filed as Exhibit 10.7.3 to the Registrant's Form 10-K for the fiscal year ended December 31, 1986, File No. 33-7591.)
*10.3.1(c)Amendment Number Two, dated February 24, 1977, to the Alvin W. Vogtle Nuclear Units Numbers One and Two Purchase and Ownership Participation Agreement among Georgia Power Company, Oglethorpe, Municipal Electric Authority of Georgia and City of Dalton, Georgia. (Filed as Exhibit 10.7.4 to the Registrant's Form 10-K for the fiscal year ended December 31, 1986, File No. 33-7591.)
*10.3.2
*10.3.2(a)
*10.3.2(b)
*10.3.2(c)
*10.3.2(d)
II-16


*10.3.2(e)
*10.3.3
*10.3.3(a)
*10.3.3(b)
*10.3.4
II-15

Table of Contents
*10.3.4(a)
*10.3.510.3.5(2)(2)
*10.3.6(a)(2)
*10.3.6(b)(2)
II-17


*10.3.6(c)
*10.4.110.3.7
*10.4.2(a)Plant Hal Wansley Operating Agreement between Georgia Power Company and Oglethorpe, dated as of March 26, 1976. (Filed as Exhibit 10.8.2 to the Registrant's Form S-1 Registration Statement, File No. 33-7591.)
*10.4.2(b)
*10.4.2(c)
*10.4.2(d)
*10.4.3Plant Hal Wansley Combustion Turbine Agreement between Georgia Power Company and Oglethorpe, dated as of August 2, 1982 and Amendment No. 1, dated October 20, 1982. (Filed as Exhibit 10.18 to the Registrant's Form S-1 Registration Statement, File No. 33-7591.)
*10.5.110.4.1Edwin I. Hatch Nuclear Plant Purchase and Ownership Participation Agreement between Georgia Power Company and Oglethorpe, dated as of January 6, 1975. (Filed as Exhibit 10.9.1 to the Registrant's Form S-1 Registration Statement, File No. 33-7591.)
II-16

Table of Contents
*10.5.210.4.2Edwin I. Hatch Nuclear Plant Operating Agreement between Georgia Power Company and Oglethorpe, dated as of January 6, 1975. (Filed as Exhibit 10.9.2 to the Registrant's Form S-1 Registration Statement, File No. 33-7591.)
*10.6.110.5.1Rocky Mountain Pumped Storage Hydroelectric Project Ownership Participation Agreement, dated as of November 18, 1988, by and between Oglethorpe and Georgia Power Company. (Filed as Exhibit 10.22.1 to the Registrant's Form 10-K for the fiscal year ended December 31, 1988, File No. 33-7591.)
*10.6.210.5.2Rocky Mountain Pumped Storage Hydroelectric Project Operating Agreement, dated as of November 18, 1988, by and between Oglethorpe and Georgia Power Company. (Filed as Exhibit 10.22.2 to the Registrant's Form 10-K for the fiscal year ended December 31, 1988, File No. 33-7591.)
*10.7.110.6.1(a)
*10.7.210.6.1(b)
*10.7.310.6.1(c)
*10.6.2
*10.7.410.6.3
*10.7.510.6.4
*10.7.610.6.5
II-18


*10.810.7ITSA, Power Sale and Coordination Umbrella Agreement between Oglethorpe and Georgia Power Company, dated as of November 12, 1990. (Filed as Exhibit 10.28 to the Registrant's Form 8-K, filed January 4, 1991, File No. 33-7591.)
*10.910.8
*10.9(a)10.8(a)
*10.9(b)10.8(b)
*10.1010.9Supplemental Agreement by and among Oglethorpe, Tri-County Electric Membership Corporation and Georgia Power Company, dated as of November 12, 1990, together with a schedule identifying 37 other substantially identical Supplemental Agreements. (Filed as Exhibit 10.30 to the Registrant's Form 8-K, filed January 4, 1991, File No. 33-7591.)
*10.10.1(a)
*10.10.1(b)
*10.10.2
*10.10.3
*10.11
*10.12(a)
*10.12(b)
*10.13(3)
*10.14(3)
*10.15(3)
II-17II-19

Table of Contents
*10.11.1(a)
*10.11.1(b)
*10.11.2
*10.11.3
*10.12
*10.13
*10.14(a)(3)
*10.14(b)(3)
*10.15(3)
*10.16(3)
*10.17(3)
14.1Code of Conduct, available on our website, www.opc.com.
23.1
23.2
24.1Power of Attorney (included on signature page)
25.1
99.1
99.2
99.3
99.4
101XBRL Interactive Data File.
*10.16(3)
*10.17(3)
10.18
14.1Code of Conduct, available on our website, www.opc.com.
23.1
23.2
24.1
25.1
99.1
99.2
99.3
99.4
101XBRL Interactive Data File.
104Cover Page Interactive Data File (formatted as inline XBRL and contained in Exhibit 101).
107

__________________
(1)Pursuant to 17 C.F.R. 229.601(b)(4)(iii), this document(s) is not filed herewith; however the registrant hereby agrees that such document(s) will be provided to the Commission upon request.
(2)Confidential treatment has been requested for certain confidential portions of this exhibit pursuant to Rule 24b-2 under the Securities Exchange Act of 1934. In accordance with Rule 24b-2, these confidential portions have been omitted from this exhibit and filed separately with the SEC.
(3)Indicates a management contract or compensatory arrangement required to be filed as an exhibit to this Report.

(b)Financial Statement Schedules:
None applicable.
II-18

Table of Contents
Item 22. Undertakings
(a)the undersigned registrant hereby undertakes:
(1)to file, during any period in which offers and sales are being made, a post-effective amendment to this registration statement:
(i)to include any prospectus required by Section 10(a)(3) of the Securities Act;
(ii)to reflect in the prospectus any facts or events arising after the effective date of the registration statement (or the most recent post-effective amendment thereof) which, individually or in the aggregate, represent a fundamental change in the information set forth in the registration statement. Notwithstanding the foregoing, any increase or decrease in volume of securities offered (if the total dollar value of securities offered would not exceed that which was registered) and any deviation from the low or high end of the estimated maximum offering range may be reflected in the form of prospectus filed with the Securities and Exchange Commission pursuant to Rule 424(b) if, in the aggregate, the changes in volume and price represent no more than a 20 percent change in the maximum aggregate offering price set forth in the “Calculation of Registration Fee” table in the effective registration statement; and
II-20


(iii)to include any material information with respect to the plan of distribution not previously disclosed in the registration statement or any material change to such information in the registration statement.
(2)that, for the purpose of determining any liability under the Securities Act, each such post-effective amendment shall be deemed to be a new registration statement relating to the securities offered therein, and the offering of such securities at that time shall be deemed to be the initial bona fideoffering thereof;
(3)to remove from registration by means of a post-effective amendment any of the securities being registered which remain unsold at the termination of the offering;
(4)that, for the purpose of determining liability under the Securities Act to any purchaser, each prospectus filed pursuant to Rule 424(b) as part of a registration statement relating to an offering, other than registration statements relying on Rule 430B or other than prospectuses filed in reliance on Rule 430A, shall be deemed to be part of and included in the registration statement as of the date it is first used after effectiveness; provided, however, that no statement made in a registration statement or prospectus that is part of the registration statement or made in a document incorporated or deemed incorporated by reference into the registration statement or prospectus that is part of the registration statement will, as to a purchaser with a time of contract of sale prior to such first use, supersede or modify any statement that was made in the registration statement or prospectus that was part of the registration statement or made in any such document immediately prior to such date of first use; and
(5)    hat,that, for the purpose of determining liability of the registrant under the Securities Act to any purchaser in the initial distribution of the securities, the undersigned registrant undertakes that in a primary offering of securities of the undersigned registrant pursuant to this registration statement, regardless of the underwriting method used to sell the securities to the purchaser, if the securities are offered or sold to such purchaser by means of any of the following communications, the undersigned registrant will be a seller to the purchaser and will be considered to offer or sell such securities to such purchaser:
(i)any preliminary prospectus or prospectus of the undersigned registrant relating to the offering required to be filed pursuant to Rule 424;
(ii)any free writing prospectus relating to the offering prepared by or on behalf of the undersigned registrant or used or referred to by the undersigned registrant;
(iii)the portion of any other free writing prospectus relating to the offering containing material information about the undersigned registrant or its securities provided by or on behalf of the undersigned registrant; and
II-19

Table of Contents(iv)
(iv) any other communication that is an offer in the offering made by the undersigned registrant to the purchaser.
(b)Insofar as indemnification for liabilities arising under the Securities Act may be permitted to directors, officers and controlling persons of the registrant pursuant to the foregoing provisions, or otherwise, the registrant has been advised that in the opinion of the SEC such indemnification is against public policy as expressed in the Securities Act and is, therefore, unenforceable. In the event that a claim for indemnification against such liabilities (other than the payment by the registrant of expenses incurred or paid by a director, officer or controlling person of the registrant in the successful defense of any action, suit or proceeding) is asserted by such director, officer or controlling person in connection with the securities being registered, the registrant will, unless in the opinion of its counsel the matter has been settled by controlling precedent, submit to a court of appropriate jurisdiction the question whether such indemnification by it is against public policy as expressed in the Securities Act and will be governed by the final adjudication of such issue.
II-21


(c)The undersigned registrant hereby undertakes to respond to requests for information that is incorporated by reference into the prospectus pursuant to Item 4, 10(b), 11 or 13 of Form S-4 within one business day of receipt of such request and to send the incorporated documents by first class mail or equally prompt means. This includes information contained in documents filed subsequent to the effective date of the registration statement through the date of responding to the request.
(d)The undersigned registrant hereby undertakes to supply by means of a post-effective amendment all information concerning a transaction, and the company being acquired involved therein, that was not the subject of and included in the registration statement when it became effective.
II-20II-22

Table of Contents
SIGNATURES
Pursuant to the requirements of the Securities Act of 1933, the registrant has duly caused this registration statement to be signed on its behalf by the undersigned, thereunto duly authorized, in the City of Tucker, State of Georgia, on the 2327rdth day of March, 2021.2024.
OGLETHORPE POWER CORPORATION
(AN ELECTRIC MEMBERSHIP CORPORATION)
By:/s/ MICHAEL L. SMITH
MICHAEL L. SMITH
President and Chief Executive Officer

Each person whose signature appears below constitutes and appoints Michael L. Smith and Elizabeth B. Higgins and each of them, his or her true and lawful attorneys-in-fact and agents, with full and several power of substitution and resubstitution, for him or her and his or her name, place and stead, in any and all capacities, to sign any and all amendments (including post-effective amendments) to this registration statement, and to file the same, with all exhibits thereto, and all documents in connection therewith, with the Securities and Exchange Commission, granting unto said attorneys-in-fact and agents, and each of them full power and authority to do and perform each and every act and thing requisite and necessary to be done in and about the premises, as fully to all intents and purposes as he or she might or could do in person, hereby ratifying and confirming all that said attorneys-in-fact and agents or any of them, or their substitutes, may lawfully do or cause to be done by virtue hereof.



Pursuant to the requirements of the Securities Act of 1933, this registration statement has been signed by the following persons in the capacities and on the dates indicated.
SignatureTitleDate
/s/ MICHAEL L. SMITH
President and Chief Executive Officer (Principal
(Principal Executive Officer)
March 23, 202127, 2024
MICHAEL L. SMITH
/s/ ELIZABETH B. HIGGINS
Executive Vice President and Chief Financial Officer (Principal
(Principal Financial Officer)
March 23, 202127, 2024
ELIZABETH B. HIGGINS
/s/ G. KENNETH WARREN, JR.JR
Vice President, Controller (Principal
(Principal Accounting Officer)
March 23, 202127, 2024
G. KENNETH WARREN, JR.
/s/ JIMMY G. BAILEYDirectorMarch 23, 202127, 2024
JIMMY G. BAILEY
/s/ RANDY CRENSHAWDirectorMarch 23, 202127, 2024
RANDY CRENSHAW
/s/ WM. RONALD DUFFEYDirectorMarch 23, 202127, 2024
WM. RONALD DUFFEY
/s/ ERNEST A. JAKINS IIIDirectorMarch 23, 202127, 2024
ERNEST A. JAKINS III


Table of Contents
SignatureTitleDate
/s/ FRED MCWHORTERDirectorMarch 23, 202127, 2024
FRED MCWHORTER
/s/ MARSHALL S. MILLWOODDirectorMarch 23, 202127, 2024
MARSHALL S. MILLWOOD
/s/ JEFFREY W. MURPHYDirectorMarch 23, 202127, 2024
JEFFREY W. MURPHY
/s/ DANNY L. NICHOLSDirectorMarch 23, 202127, 2024
DANNY L. NICHOLS
/s/ SAMMY G. SIMONTONDirectorMarch 23, 202127, 2024
SAMMY G. SIMONTON
/s/ BOBBY C. SMITH, JR.HORACE H. WEATHERSBY, IIIDirectorMarch 23, 202127, 2024
BOBBY C. SMITH, JR.HORACE H. WEATHERSBY, III
/s/ GEORGE L. WEAVERDirectorMarch 23, 202127, 2024
GEORGE L. WEAVER
/s/ JAMES I. WHITEDirectorMarch 23, 202127, 2024
JAMES I. WHITE