AIA Document A102™ - 2007 (formerly A111™ - 1997). Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 13:15:24 on 01/04/2016 under Order No.3294902806_1 which expires on 12/13/2016, and is not for resale. User Notes: |
1 | THE CONTRACT DOCUMENTS |
2 | THE WORK OF THIS CONTRACT |
3 | RELATIONSHIP OF THE PARTIES |
4 | DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION |
5 | CONTRACT SUM |
6 | CHANGES IN THE WORK |
7 | COSTS TO BE REIMBURSED |
8 | COSTS NOT TO BE REIMBURSED |
9 | DISCOUNTS, REBATES AND REFUNDS |
10 | SUBCONTRACTS AND OTHER AGREEMENTS |
11 | ACCOUNTING RECORDS |
12 | PAYMENTS |
13 | DISPUTE RESOLUTION |
14 | TERMINATION OR SUSPENSION |
15 | MISCELLANEOUS PROVISIONS |
16 | ENUMERATION OF CONTRACT DOCUMENTS |
17 | INSURANCE AND BONDS |
AIA Document A102™ - 2007 (formerly A111™ - 1997). Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 13:15:24 on 01/04/2016 under Order No.3294902806_1 which expires on 12/13/2016, and is not for resale. User Notes: |
AIA Document A102™ - 2007 (formerly A111™ - 1997). Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 13:15:24 on 01/04/2016 under Order No.3294902806_1 which expires on 12/13/2016, and is not for resale. User Notes: |
Portion of Work | Substantial Completion date |
AIA Document A102™ - 2007 (formerly A111™ - 1997). Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 13:15:24 on 01/04/2016 under Order No.3294902806_1 which expires on 12/13/2016, and is not for resale. User Notes: |
Item | Units and Limitations | Price Per Unit ($0.00) |
AIA Document A102™ - 2007 (formerly A111™ - 1997). Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 13:15:24 on 01/04/2016 under Order No.3294902806_1 which expires on 12/13/2016, and is not for resale. User Notes: |
.1 | A list of the Drawings and Specifications, including all Addenda thereto, and the Conditions of the Contract; |
.2 | A list of the clarifications and assumptions made by the Contractor in the preparation of the Guaranteed Maximum Price proposal, including assumptions to supplement the information provided by the Owner and contained in the Drawings and Specifications; |
.3 | A statement of the proposed Guaranteed Maximum Price, including a statement of the estimated Cost of the Work organized by trade categories or systems, allowances, contingency, and the Contractor’s Fee; |
.4 | The anticipated date of Substantial Completion upon which the proposed Guaranteed Maximum Price is based (i.e., the proposed “Substantial Completion Deadline”); and |
.5 | A date by which the Owner must accept or reject the Guaranteed Maximum Price, which shall not be less than 30 days from the date of the Guaranteed Maximum Price proposal (it being agreed if Owner does not accept or reject the Guaranteed Maximum Price proposal in writing, it shall be deemed rejected). |
AIA Document A102™ - 2007 (formerly A111™ - 1997). Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 13:15:24 on 01/04/2016 under Order No.3294902806_1 which expires on 12/13/2016, and is not for resale. User Notes: |
Item | Price |
AIA Document A102™ - 2007 (formerly A111™ - 1997). Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 13:15:24 on 01/04/2016 under Order No.3294902806_1 which expires on 12/13/2016, and is not for resale. User Notes: |
• | Wages or salaries of on-site personnel directly employed by the Contractor to supervise the Work at the site. Wages or salaries of supervisory and administrative personnel directly employed by the Contractor engaged in the performance of the Work and located at the Site or working off-Site but only for that portion of their time required for the Work |
• | Travel, accommodations and meals for Contractor’s personnel necessarily and directly incurred in connection with the performance of the Work. |
• | Travel to Owners office and other ADC’s sites as specifically described in Exhibit C. |
• | Expenses incurred in accordance with the Contractor’s standard written personnel policy for relocation and temporary living allowance of the Contractor’s personnel required for the Work. |
• | Reasonable costs of expenses incurred in operating, maintaining and demobilizing the Site office, including the cost of office furniture, telephones, internet, postage, express delivery charges, computing equipment, software, printing equipment, office supplies, photocopying and other miscellaneous expenses as detailed in Exhibit C. |
• | Accounting and data processing costs related to the Work, including the cost of information technologies support services, check processing charges and document archiving. |
• | On-site meeting expenses |
• | Preparation and management of the Contractor’s loss prevention program including safety orientations for all site personnel and visitors, site safety signage, the cost for the Contractor’s sponsored safety incentive program for all project participants, and any required drug testing. |
• | Personal protective equipment including, hardhats, safety glasses, safety vests, gloves for Contractor’s employees and visitors to the Site. |
• | Preparation and management of the Contractor’s quality control program. |
• | Preparation and periodic update of the construction master project schedule. |
• | Drug testing for Skanska employees |
• | Temporary jobsite signage |
• | Blue print reproduction |
AIA Document A102™ - 2007 (formerly A111™ - 1997). Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 13:15:24 on 01/04/2016 under Order No.3294902806_1 which expires on 12/13/2016, and is not for resale. User Notes: |
AIA Document A102™ - 2007 (formerly A111™ - 1997). Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 13:15:24 on 01/04/2016 under Order No.3294902806_1 which expires on 12/13/2016, and is not for resale. User Notes: |
AIA Document A102™ - 2007 (formerly A111™ - 1997). Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 13:15:24 on 01/04/2016 under Order No.3294902806_1 which expires on 12/13/2016, and is not for resale. User Notes: |
.1 | Salaries and other compensation of the Contractor’s personnel stationed at the Contractor’s principal office or offices other than the site office, except as specifically provided in Section 7.2. or as may be expressly provided in Article 15; |
.2 | Expenses of the Contractor’s principal office and offices other than the site office; |
.3 | Overhead and general expenses, except as may be expressly included in Article 7; |
.4 | The Contractor’s capital expenses, including interest on the Contractor’s capital employed for the Work; |
.5 | Except as provided in Section 7.7.3 of this Agreement, costs due to the negligence or failure of the Contractor, Subcontractors and suppliers or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable to fulfill a specific responsibility of the Contract; |
.6 | Any cost not specifically and expressly described in Article 7; |
.7 | Costs, other than costs included in Change Orders approved by the Owner, that would cause the Guaranteed Maximum Price to be exceeded; |
.8 | Any cost that is counted more than once (e.g., an item that is part of the General Condition Items may not also be counted as part of the other Cost of Work); |
.9 | Amounts required to be paid by Contractor for federal, state or local income or franchise taxes; |
AIA Document A102™ - 2007 (formerly A111™ - 1997). Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 13:15:24 on 01/04/2016 under Order No.3294902806_1 which expires on 12/13/2016, and is not for resale. User Notes: |
.10 | Unless otherwise agreed by Owner in writing, any acceleration costs, including any and all overtime wages, arising as a result of delay in carrying out the Work caused by Contractor or its Subcontractors of any tier; |
.11 | Any costs or expenses in connection with any indemnity provided by Contractor pursuant to the Contract Documents; |
.12 | Costs associated with Contractor’s failure to obtain any and all applicable permits for which Contractor is responsible in a timely manner, as more fully described in the General Conditions; and |
.13 | The costs incurred by Contractor resulting from the failure of Contractor or its Subcontractors to coordinate their work with the work of Owner and its contractors, if any, or otherwise to fail to comply with written directives of Owner not in conflict with the Schedule. |
AIA Document A102™ - 2007 (formerly A111™ - 1997). Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 13:15:24 on 01/04/2016 under Order No.3294902806_1 which expires on 12/13/2016, and is not for resale. User Notes: |
AIA Document A102™ - 2007 (formerly A111™ - 1997). Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 13:15:24 on 01/04/2016 under Order No.3294902806_1 which expires on 12/13/2016, and is not for resale. User Notes: |
.1 | Take that portion of the Guaranteed Maximum Price properly allocable to completed Work as determined by multiplying the percentage of completion of each portion of the Work by the share of the Guaranteed Maximum Price allocated to that portion of the Work in the schedule of values, less retainage of ten percent (10%). Pending final determination of cost to the Owner of changes in the Work, amounts not in dispute shall be included as provided in Section 7.3.9 of the General Conditions; |
.2 | Add that portion of the Guaranteed Maximum Price properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the Work, or if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing, less retainage of five percent (5%); |
.3 | Add the Contractor’s Fee, less retainage of zero percent ( 0 %).The Contractor’s Fee shall be computed upon the Cost of the Work at the rate stated in Section 5.1.1 or, if the Contractor’s Fee is stated as a fixed sum in that Section, shall be an amount that bears the same ratio to that fixed-sum fee as the Cost of the Work bears to a reasonable estimate of the probable Cost of the Work upon its completion; |
.4 | Subtract the aggregate of previous payments made by the Owner; |
.5 | Subtract the shortfall, if any, indicated by the Contractor in the documentation required by Section 12.1.4 to substantiate prior Applications for Payment, or resulting from errors subsequently discovered by the Owner’s auditors in such documentation; and |
.6 | Subtract amounts, if any, for which the Architect (or Owner) has withheld or nullified a Certificate for Payment as provided in Section 9.5 of the General Conditions and as allowed by the Arizona Prompt Pay Act, § 32-1129.01 et seq., if applicable. |
AIA Document A102™ - 2007 (formerly A111™ - 1997). Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 13:15:24 on 01/04/2016 under Order No.3294902806_1 which expires on 12/13/2016, and is not for resale. User Notes: |
.1 | the Contractor has fully performed the Contract (including all Punch List work) except for the Contractor’s responsibility to correct Work as provided in Section 12.2.2 of the General Conditions, and to satisfy other requirements, if any, which extend beyond final payment; |
.2 | the Contractor has submitted a final accounting for the Cost of the Work and a final Application for Payment; |
.3 | a final Certificate for Payment has been issued by the Architect; |
.4 | a Temporary Certificate of Occupancy has been issued by the appropriate governmental agencies or all governmental sign-offs for Work; and |
.5 | a Conditional Waiver and Release of Lien Upon Final Payment has been issued by Contractor and all of its Subcontractors, materialmen, vendors and suppliers of all tiers. |
AIA Document A102™ - 2007 (formerly A111™ - 1997). Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 13:15:24 on 01/04/2016 under Order No.3294902806_1 which expires on 12/13/2016, and is not for resale. User Notes: |
[ | X | ] | Arbitration pursuant to Section 15.4 of AIA Document A201–2007 | |
[ | ] | Litigation in a court of competent jurisdiction | ||
[ | ] | Other (Specify) | ||
.1 | Take the Cost of the Work incurred by the Contractor to the date of termination; |
.2 | Add the Contractor’s Fee computed upon the Cost of the Work to the date of termination at the rate stated in Section 5.1.1 or, if the Contractor’s Fee is stated as a fixed sum in that Section, an amount that bears the same ratio to that fixed-sum Fee as the Cost of the Work at the time of termination bears to a reasonable estimate of the probable Cost of the Work upon its completion; and |
.3 | Subtract the aggregate of previous payments made by the Owner. |
AIA Document A102™ - 2007 (formerly A111™ - 1997). Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 13:15:24 on 01/04/2016 under Order No.3294902806_1 which expires on 12/13/2016, and is not for resale. User Notes: |
AIA Document A102™ - 2007 (formerly A111™ - 1997). Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 13:15:24 on 01/04/2016 under Order No.3294902806_1 which expires on 12/13/2016, and is not for resale. User Notes: |
Document | Title | Date | Pages |
AIA Document A102™ - 2007 (formerly A111™ - 1997). Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 13:15:24 on 01/04/2016 under Order No.3294902806_1 which expires on 12/13/2016, and is not for resale. User Notes: |
Section | Title | Date | Pages |
Number | Title | Date |
Number | Date | Pages |
.1 | AIA Document E201™–2007, Digital Data Protocol Exhibit, if completed by the parties, or the following: |
.2 | Other documents, if any, listed below: |
AIA Document A102™ - 2007 (formerly A111™ - 1997). Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 13:15:24 on 01/04/2016 under Order No.3294902806_1 which expires on 12/13/2016, and is not for resale. User Notes: |
THE OWNER DexCom, Inc. a Delaware corporation s/ Jess Roper By: Jess Roper Its: CFO Date: 4/29/16 | THE CONTRACTOR Skanska USA Building Inc. s/ Ross A Vroman By: Ross A. Vroman Its: Area General Manager, EVP Date: 5/2/16 | |
AIA Document A102™ - 2007 (formerly A111™ - 1997). Copyright © 1920, 1925, 1951, 1958, 1961, 1963, 1967, 1974, 1978, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 13:15:24 on 01/04/2016 under Order No.3294902806_1 which expires on 12/13/2016, and is not for resale. User Notes: |
EXHIBIT A
APPROVAL LETTER
AWARD APPROVAL LETTER NO.014
May 16, 2016
DexCom
6340 Sequence Drive
San Diego, CA 92121 m
Attention: Project: | Gary Ghio DexCom Phoenix – Phase One Phoenix, AZ | |||
Subject: | Subcontractor /Vendor Award Recommendation | |||
Bid Package No.: | 4415014-012 | |||
Trade: | Fire Sprinkler System | |||
Subcontractor: | Fire Protection Systems | |||
Award Amount: | $832,500 |
In accordance with the Agreement, we submit as follows our Bid Package Report and Award recommendation for the above Subcontract. We have included the final bid leveling sheet detailing the costs proposals provided. The award to Fire PS was based on the price, availability and schedule to complete the Fire Sprinkler scope items.
Note, as directed by DexCom,this Approval Letter includes the design and installation of the sprinkler system. If the supply of materials and install is wanted at a later date, an official AL will need to be signed.
Attached is the bid leveling sheet and proposals issued previously on January 08th, 2016 from the fire sprinkler bidders for your reference. Fire alarm, wiring of equipment, permits have been excluded. Also excluded are sprinklers under the equipment platform. Proposals are based off of the 10/22/15 drawings and specifications.
1.0 | Bid Submission Results and Analysis: |
Vendor: | Firetrol Protection Systems | |||
Fire PS | $ | 832,500 | ||
Olympic | $ | 880,028 | ||
Aero | $ | 954,650 | ||
American | $ | 968,200 |
2.0 | Pricing Details: |
a) | Included/Excluded in the amount of this award is ALLOWANCE/Alternates: |
�� | 1. | EXCLUDED ALLOWANCE – Fire/Jockey Pumps/Control Panel $205,000 |
2. | EXCLUDED ALLOWANCE – Sprinkler System under Equipment Platform per Fire Marshall $140,000 |
3. | EXCLUDED Alternate – Nitrogen Gen System $49,385 plus Skanska’s Markups |
4. | EXCLUDED Alternate – Credit to not remove the underground ductile pipe noted on FP-101A and cap riser with blind flange at riser stub up. ($17,000) |
Exhibit A - Approval Letter - Fire Sprinkler System 1
Exhibit A | Page 1 |
b) Recommended amount of this award. (Please refer to attached Bid Leveling Documentation for additional breakdown.)
As directed by DexCom, the price below only includes the design costs associated to the fire sprinkler system.
Fire PS (Design Only) | $ | 45,000 | ||||||
CCIP | 1.88 | % | $ | 846.00 | ||||
Subguard | 0.90 | % | $ | 405.00 | ||||
Builders Risk | 1.25 | % | $ | 563.00 | ||||
Skanska - Fee | 3.25 | % | $ | 1,521.00 | ||||
TAX | EXCLUDED | |||||||
Total: | $ | 48,335.00 |
As issued previously, the complete system for the fire sprinkler system for design, supply and install is as follows:
Fire PS | $ | 832,500 | ||||||
CCIP | 1.88 | % | $ | 15,651.00 | ||||
Subguard | 0.90 | % | $ | 7,493.00 | ||||
Builders Risk | 1.25 | % | $ | 10,406.00 | ||||
Skanska - Fee | 3.25 | % | $ | 28,147.00 | ||||
TAX | EXCLUDED | |||||||
Total: | $ | 894,197.00 |
** | Note: Taxes have been excluded from this AL. A specific AL for taxes will be issued if taxes are ever to be included. |
3.0 | Alternates. The Award Recommendation amount includes the following alternates (as noted above): |
x | The Award Recommendation amount does not incorporate any alternates |
OR
¨ | The Award Recommendation amount includes the following alternates/allowances: |
5. | EXCLUDED ALLOWANCE – Fire/Jockey Pumps/Control Panel $205,000 |
Please refer to attached Bid Leveling Documentation for additional breakdown:
We have evaluated the Sub-contractors proposal, and have determined that the Sub-contractor has included the full scope of work. Any deviations from the original drawings, specifications, bid package documents or subcontract documents are clearly delineated in the revised scope of work which shall become part of the subcontract documents. The following documents shall be incorporated into the subcontract documents:
A | CM’s standard form of subcontract agreement with no changes | |||
B | CM’s project schedule dated | N/A | ||
C | Site Logistics Plan dated | N/A | ||
D | Issue for Construction specifications dated | 10/22/2015 | ||
E | Pre-Bid Meeting Minutes dated | Dec. 2015 | ||
F | Meeting minutes from Scope review meeting dated | N/A | ||
G | Bid Addendum (a) No(s). 2 | Dated | ||
H | Other items as appropriate |
Exhibit A - Approval Letter - Fire Sprinkler System 2
Exhibit A | Page 2 |
4.0 | Schedule. We have reviewed the subcontractor’s proposal, and proposed execution of the scope, and confirm that the subcontractor will work to the Project Schedule as defined in the Contract Documents. Please note key schedule dates/durations: |
5.0 | M/WBE Participation. |
The recommended Contractoris not a M/WBE and has submitted a M/WBE utilization plan, which lists0% Dollars ($0) of M/WBE participation.
We hereby recommend that the award of this sub-contract is made toFire PS for the purchase order price of:
Forty Eight Thousand Three Hundred Thirty Five | $ | 48,335.00 | Dollars |
In making this recommendation, we have carried out certain checks and procedures to satisfy ourselves as to the present capability of (Firetrol) to perform the sub-contract work; details of these are given on the attached Bid Recording Sheet.
If you are in agreement with the above recommendation, please sign where indicated below and return one signed copy of this letter authorizing us to award the subcontract. Upon receipt of this signed approval letter we will incorporate the committed sub-contract price and pending items into our next Anticipated Cost Report.
Sincerely, | DexCom | |||
Todd Kadjan Project Manager | Approved By: |
| ||
Date: |
| |||
Cc: Kevin Devlin, Skanska USA Building Ian Miles, Aligned Energy |
Exhibit A - Approval Letter - Fire Sprinkler System 3
Exhibit A | Page 3 |
EXHIBIT B
CLARIFICATIONS AND ASSUMPTIONS TO GMP
Exhibit B
GMP Assumptions & Clarifications
- | N/A – to be issued when GMP is established |
Exhibit B | Page 1 |
EXHIBIT C
LUMP SUM GENERAL CONDITIONS & SCHEDULE OF BILLABLE RATES
EXHIBIT “C”
SCHEDULE OF BILLABLE RATES
Project Executive | $ | 135/hr | ||
Project Manager | $ | 100/hr | ||
Superintendent | $ | 110/hr | ||
Preconstruction Director | $ | 100/hr | ||
MEP Coordinator | $ | 135/hr | ||
Mechanical Estimator | $ | 100/hr | ||
C/S/A Estimator | $ | 100/hr | ||
Electrical Estimator | $ | 100/hr | ||
Accounting | $ | 70/hr | ||
Director of Accounting | $ | 80/hr |
Page 1 of 1 | ||||
Alternates, Unit Prices, and Labor Rates (05/2009 ed. Rev. 1) |
Exhibit C | Page 1 |
EXHIBIT C
DEXCOM Preconstruction & Construction General Conditions, General Requirements& Closeout, Start-up & Commission Support
Description | 2016 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Jan | Feb | Mar | Apr | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Preconstruction GC’s | Rate | Unit | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Mechanical Estimator | $ | 100.00 | hour | 70 | 40 | 40 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
C/S/A Estimator | $ | 100.00 | hour | 30 | 30 | 20 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electrical Estimator | $ | 100.00 | hour | 30 | 30 | 20 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Admin | $ | 55.00 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Accountant | $ | 70.00 | hour | 8 | 8 | 8 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Director of accounting | $ | 80.00 | hour | 4 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
IT | $ | 45.00 | hour | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
VDC Budget | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
VDC Director | $ | 110.00 | Hour | 19 | 5 | 5 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
VDC Manager | $ | 75.00 | Hour | 20 | 20 | 20 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
VDC travel | $ | 1,100.00 | Per Trip | 1 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
General travel to SAN (single day) | $ | 600.00 | Per Trip | 10 | 5 | 5 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
General travel to SAN (with overnight) | $ | 1,100.00 | Per Trip | 7 | 5 | 5 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Meeting Expenses | $ | 750.00 | ea | 2 | 2 | 2 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Blueprints | $ | 250.00 | per month | 2 | 2 | 2 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
FEDEX | $ | 175.00 | per month | 1 | 1 | 1 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Management Software | $ | 150.00 | ea | 2 | 2 | 2 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Construction GC’s | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Executive | $ | 135.00 | hour | 70 | 70 | 70 | 70 | 70 | 70 | 70 | 70 | 70 | 70 | 70 | 70 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Manager | $ | 100.00 | hour | 175 | 175 | 175 | 175 | 175 | 175 | 175 | 175 | 175 | 175 | 175 | 175 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Engineer | $ | 85.00 | hour | 175 | 175 | 175 | 175 | 175 | 175 | 175 | 175 | 175 | 175 | 175 | 175 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Superintendent | $ | 110.00 | hour | 175 | 175 | 175 | 175 | 175 | 175 | 175 | 175 | 175 | 175 | 175 | 175 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Precon Dir/Coordination Specialist | $ | 100.00 | hour | 40 | 40 | 40 | 40 | 40 | 40 | 40 | 40 | 40 | 40 | 40 | 40 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Safety | $ | 75.00 | hour | 20 | 20 | 20 | 20 | 20 | 20 | 20 | 20 | 20 | 20 | 20 | 20 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
QA/QC - TOP Manager | $ | 75.00 | hour | 40 | 88 | 175 | 175 | 175 | 175 | 175 | 175 | 175 | 175 | 175 | 40 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Admin | $ | 55.00 | hour | 175 | 175 | 175 | 175 | 175 | 175 | 175 | 175 | 175 | 175 | 155 | 20 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Accountant | $ | 70.00 | hour | 15 | 15 | 15 | 15 | 15 | 15 | 15 | 15 | 15 | 15 | 15 | 15 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Director of accounting | $ | 80.00 | hour | 5 | 5 | 5 | 5 | 5 | 5 | 5 | 5 | 5 | 5 | 5 | 5 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
IT | $ | 45.00 | hour | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
VDC Budget | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
VDC Director | $ | 110.00 | Hour | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | 8 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
VDC Manager | $ | 75.00 | Hour | 20 | 64 | 64 | 20 | 20 | 20 | 20 | 20 | 20 | 20 | 20 | 20 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
VDC travel | $ | 2,500.00 | Per Trip | 2 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Check Processing | $ | 175.00 | per million | 29 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Archiving | $ | 135.00 | per million | 29 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Meeting Expenses | $ | 750.00 | ea | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Legal Costs for Contract Nego | $ | 5,000.00 | LS | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Job Meetings | $ | 150.00 | per month | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Blueprints | $ | 250.00 | per month | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
FEDEX | $ | 175.00 | per month | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Water | $ | 200.00 | per month | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
VDC software license | $ | 950.00 | per month | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Management Software | $ | 150.00 | ea | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | 3 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Office Supplies | $ | 200.00 | per month | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
WIFI | $ | 250.00 | per month | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Computers/Printers | $ | 5,000.00 | LS | 2 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Owner Connectivity | $ | 5,000.00 | Is | 1 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Prolog for 5 users | $ | 350.00 | 5 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Safety Orientation | $ | 50.00 | ea | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Hardhats | $ | 50.00 | ea | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Safety Glasses | $ | 50.00 | ea | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
OSHA PPE | $ | 250.00 | ea | 1 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Safety Equipment | $ | 150.00 | ea | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Fuel/Oil/Truck | $ | 900.00 | ea | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | 2 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
GR’s - FROM GC’s | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Jobsite signage | $ | 3,000.00 | LS | 1 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Office Furniture (In Existing Facility) | $ | 15,000.00 | LS | 1 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Field Toilets | $ | 350.00 | ea | 2 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Temporary Fencing (access control) | LS | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Office Cleaning | $ | 150.00 | ea | 2 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Permits | By Owner | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Subguard | 0.90 | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Dumpsters - Below | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Laborer - Below | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
GR’s - FROM Logistics | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
General Conditions — Laborers | 32.50 | HR | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Cleanroom Protocol — Consumables | 15,000.00 | MO | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Final Clean — Cleanroom — 2ea | 3.00 | SF | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Final Clean — Site | 25,000.00 | LS | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
HEPA Filter — Replacement | 150.00 | EA | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
SuperClean — Certification | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
General Requirements — Misc Equipment Dumpsters | 650.00 | EA | 2 | 4 | 4 | 4 | 6 | 6 | 6 | 6 | 6 | 6 | 6 | 4 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Start-up & Commission - FROM Logistics | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Closeout, Start-up, Functional Testing & Commissioning Support | $ | 1.00 | LS | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTALS |
Exhibit C | Page 2 |
Description | Total MH | Cost | ||||||||||||||||||||||||||||||||||||||||||||||||||
=sum(D:P) | =T x B | Precon Allowance | GC-Original | Re-Allocation 1-28-16 | 4-19-16 | Logistics - Original | Logistics - Revised | General Req. 1-28-16 | General Req. 4-19-16 | |||||||||||||||||||||||||||||||||||||||||||
Preconstruction GC’s | Rate | Unit | ||||||||||||||||||||||||||||||||||||||||||||||||||
Mechanical Estimator | $ | 100.00 | hour | 150 | $ | 15,000.00 | $ | 15,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
C/S/A Estimator | $ | 100.00 | hour | 80 | $ | 8,000.00 | $ | 8,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
Electrical Estimator | $ | 100.00 | hour | 80 | $ | 8,000.00 | $ | 8,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
Admin | $ | 55.00 | 0 | $ | — | $ | — | |||||||||||||||||||||||||||||||||||||||||||||
Accountant | $ | 70.00 | hour | 24 | $ | 1,680.00 | $ | 1,680.00 | ||||||||||||||||||||||||||||||||||||||||||||
Director of accounting | $ | 80.00 | hour | 4 | $ | 320.00 | $ | 320.00 | ||||||||||||||||||||||||||||||||||||||||||||
IT | $ | 45.00 | hour | 0 | $ | — | $ | — | ||||||||||||||||||||||||||||||||||||||||||||
VDC Budget | ||||||||||||||||||||||||||||||||||||||||||||||||||||
VDC Director | $ | 110.00 | Hour | 29 | $ | 3,190.00 | $ | 3,190.00 | ||||||||||||||||||||||||||||||||||||||||||||
VDC Manager | $ | 75.00 | Hour | 60 | $ | 4,500.00 | $ | 4,500.00 | ||||||||||||||||||||||||||||||||||||||||||||
VDC travel | $ | 1,100.00 | Per Trip | 1 | $ | 1,100.00 | $ | 1,100.00 | ||||||||||||||||||||||||||||||||||||||||||||
General travel to SAN (single day) | $ | 600.00 | Per Trip | 20 | $ | 12,000.00 | $ | 12,000.00 | ||||||||||||||||||||||||||||||||||||||||||||
General travel to SAN (with overnight) | $ | 1,100.00 | Per Trip | 17 | $ | 18,700.00 | $ | 18,700.00 | ||||||||||||||||||||||||||||||||||||||||||||
Meeting Expenses | $ | 750.00 | ea | 6 | $ | 4,500.00 | $ | 4,500.00 | ||||||||||||||||||||||||||||||||||||||||||||
Blueprints | $ | 250.00 | per month | 6 | $ | 1,500.00 | $ | 1,500.00 | ||||||||||||||||||||||||||||||||||||||||||||
FEDEX | $ | 175.00 | per month | 3 | $ | 525.00 | $ | 525.00 | ||||||||||||||||||||||||||||||||||||||||||||
Project Management Software | $ | 150.00 | ea | 6 | $ | 900.00 | $ | 900.00 | ||||||||||||||||||||||||||||||||||||||||||||
Construction GC’s | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Executive | $ | 135.00 | hour | 840 | $ | 113,400.00 | $ | 68,040.00 | $ | 68,040.00 | $ | 113,400.00 | $ | — | $ | — | ||||||||||||||||||||||||||||||||||||
Project Manager | $ | 100.00 | hour | 2,100 | $ | 210,000.00 | $ | 122,300.00 | $ | 122,300.00 | $ | 210,000.00 | $ | — | $ | — | ||||||||||||||||||||||||||||||||||||
Project Engineer | $ | 85.00 | hour | 2,100 | $ | 178,500.00 | $ | 103,955.00 | $ | 103,955.00 | $ | 178,500.00 | $ | — | $ | — | ||||||||||||||||||||||||||||||||||||
Superintendent | $ | 110.00 | hour | 2,100 | $ | 231,000.00 | $ | 134,530.00 | $ | 134,530.00 | $ | 231,000.00 | $ | — | $ | — | ||||||||||||||||||||||||||||||||||||
Precon Dir/Coordination Specialist | $ | 100.00 | hour | 480 | $ | 48,000.00 | $ | 28,000.00 | $ | 28,000.00 | $ | 48,000.00 | $ | — | $ | — | ||||||||||||||||||||||||||||||||||||
Safety | $ | 75.00 | hour | 240 | $ | 18,000.00 | $ | 11,100.00 | $ | 11,100.00 | $ | 18,000.00 | $ | — | $ | — | ||||||||||||||||||||||||||||||||||||
QA/QC - TOP Manager | $ | 75.00 | hour | 1,743 | $ | 130,725.00 | $ | 65,100.00 | $ | 65,100.00 | $ | 130,725.00 | $ | — | $ | — | ||||||||||||||||||||||||||||||||||||
Admin | $ | 55.00 | hour | 1,945 | $ | 106,975.00 | $ | 59,950.00 | $ | 59,950.00 | $ | 106,975.00 | $ | — | $ | — | ||||||||||||||||||||||||||||||||||||
Accountant | $ | 70.00 | hour | 180 | $ | 12,600.00 | $ | 8,400.00 | $ | 8,400.00 | $ | 12,600.00 | $ | — | $ | — | ||||||||||||||||||||||||||||||||||||
Director of accounting | $ | 80.00 | hour | 60 | $ | 4,800.00 | $ | 3,200.00 | $ | 3,200.00 | $ | 4,800.00 | $ | — | $ | — | ||||||||||||||||||||||||||||||||||||
IT | $ | 45.00 | hour | 96 | $ | 4,320.00 | $ | 4,320.00 | $ | 4,320.00 | $ | 4,320.00 | $ | — | $ | — | ||||||||||||||||||||||||||||||||||||
VDC Budget | ||||||||||||||||||||||||||||||||||||||||||||||||||||
VDC Director | $ | 110.00 | Hour | 96 | $ | 10,560.00 | $ | 7,040.00 | $ | 7,040.00 | $ | 10,560.00 | $ | — | $ | — | ||||||||||||||||||||||||||||||||||||
VDC Manager | $ | 75.00 | Hour | 328 | $ | 24,600.00 | $ | 18,600.00 | $ | 18,600.00 | $ | 24,600.00 | $ | — | $ | — | ||||||||||||||||||||||||||||||||||||
VDC travel | $ | 2,500.00 | Per Trip | 2 | $ | 5,000.00 | $ | 5,000.00 | $ | 5,000.00 | $ | 5,000.00 | $ | — | $ | — | ||||||||||||||||||||||||||||||||||||
Check Processing | $ | 175.00 | per million | 29 | 29 | $ | 5,075.00 | $ | 3,150.00 | $ | 3,150.00 | $ | 5,075.00 | |||||||||||||||||||||||||||||||||||||||
Archiving | $ | 135.00 | per million | 29 | 29 | $ | 3,915.00 | $ | 2,430.00 | $ | 2,430.00 | $ | 3,915.00 | |||||||||||||||||||||||||||||||||||||||
Meeting Expenses | $ | 750.00 | ea | 12 | $ | 9,000.00 | $ | 6,000.00 | $ | 6,000.00 | $ | 9,000.00 | ||||||||||||||||||||||||||||||||||||||||
Legal Costs for Contract Nego | $ | 5,000.00 | LS | 0 | $ | — | $ | — | $ | — | $ | — | ||||||||||||||||||||||||||||||||||||||||
Job Meetings | $ | 150.00 | per month | 36 | $ | 5,400.00 | $ | 3,150.00 | $ | 3,150.00 | $ | 5,400.00 | ||||||||||||||||||||||||||||||||||||||||
Blueprints | $ | 250.00 | per month | 12 | $ | 3,000.00 | $ | 2,000.00 | $ | 2,000.00 | $ | 3,000.00 | ||||||||||||||||||||||||||||||||||||||||
FEDEX | $ | 175.00 | per month | 12 | $ | 2,100.00 | $ | 1,400.00 | $ | 1,400.00 | $ | 2,100.00 | ||||||||||||||||||||||||||||||||||||||||
Water | $ | 200.00 | per month | 12 | $ | 2,400.00 | $ | 1,600.00 | $ | 1,600.00 | $ | 2,400.00 | ||||||||||||||||||||||||||||||||||||||||
VDC software license | $ | 950.00 | per month | 12 | $ | 11,400.00 | $ | 7,600.00 | $ | 7,600.00 | $ | 11,400.00 | ||||||||||||||||||||||||||||||||||||||||
Project Management Software | $ | 150.00 | ea | 36 | $ | 5,400.00 | $ | 3,600.00 | $ | 3,600.00 | $ | 5,400.00 | ||||||||||||||||||||||||||||||||||||||||
Office Supplies | $ | 200.00 | per month | 12 | $ | 2,400.00 | $ | 1,600.00 | $ | 1,600.00 | $ | 2,400.00 | ||||||||||||||||||||||||||||||||||||||||
WIFI | $ | 250.00 | per month | 2 | 12 | $ | 3,000.00 | $ | 2,000.00 | $ | 2,000.00 | $ | 3,000.00 | |||||||||||||||||||||||||||||||||||||||
Computers/Printers | $ | 5,000.00 | LS | 1 | 2 | $ | 10,000.00 | $ | 5,000.00 | $ | 5,000.00 | $ | 10,000.00 | |||||||||||||||||||||||||||||||||||||||
Owner Connectivity | $ | 5,000.00 | Is | 5 | 1 | $ | 5,000.00 | $ | 5,000.00 | $ | 5,000.00 | $ | 5,000.00 | |||||||||||||||||||||||||||||||||||||||
Prolog for 5 users | $ | 350.00 | 5 | $ | 1,750.00 | $ | 1,750.00 | $ | 1,750.00 | $ | 1,750.00 | |||||||||||||||||||||||||||||||||||||||||
Safety Orientation | $ | 50.00 | ea | 12 | $ | 600.00 | $ | 400.00 | $ | 400.00 | $ | 600.00 | ||||||||||||||||||||||||||||||||||||||||
Hardhats | $ | 50.00 | ea | 12 | $ | 600.00 | $ | 400.00 | $ | 400.00 | $ | 600.00 | ||||||||||||||||||||||||||||||||||||||||
Safety Glasses | $ | 50.00 | ea | 12 | $ | 600.00 | $ | 400.00 | $ | 400.00 | $ | 600.00 | ||||||||||||||||||||||||||||||||||||||||
OSHA PPE | $ | 250.00 | ea | 1 | $ | 250.00 | $ | 250.00 | $ | 250.00 | $ | 250.00 | ||||||||||||||||||||||||||||||||||||||||
Safety Equipment | $ | 150.00 | ea | 11 | $ | 1,650.00 | $ | 1,050.00 | $ | 1,050.00 | $ | 1,650.00 | ||||||||||||||||||||||||||||||||||||||||
Fuel/Oil/Truck | $ | 900.00 | ea | 22 | $ | 19,800.00 | $ | 12,600.00 | $ | 12,600.00 | $ | 19,800.00 | ||||||||||||||||||||||||||||||||||||||||
GR’s - FROM GC’s | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Jobsite signage | $ | 3,000.00 | LS | 1 | 1 | $ | 3,000.00 | $ | 3,000.00 | $ | — | $ | — | $ | 3,000.00 | $ | 3,000.00 | |||||||||||||||||||||||||||||||||||
Office Furniture (In Existing Facility) | $ | 15,000.00 | LS | 1 | 1 | $ | 15,000.00 | $ | 15,000.00 | $ | — | $ | — | $ | 15,000.00 | $ | 15,000.00 | |||||||||||||||||||||||||||||||||||
Field Toilets | $ | 350.00 | ea | 46 | $ | 16,100.00 | $ | 9,800.00 | $ | — | $ | — | $ | 9,800.00 | $ | 16,100.00 | ||||||||||||||||||||||||||||||||||||
Temporary Fencing (access control) | LS | 0 | $ | — | $ | — | $ | — | $ | — | $ | — | $ | — | ||||||||||||||||||||||||||||||||||||||
Office Cleaning | $ | 150.00 | ea | 46 | $ | 6,900.00 | $ | 4,200.00 | $ | — | $ | — | $ | 4,200.00 | $ | 6,900.00 | ||||||||||||||||||||||||||||||||||||
Permits | By Owner | 0 | ||||||||||||||||||||||||||||||||||||||||||||||||||
Subguard | 0.90 | % | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||
Dumpsters - Below | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||
Laborer - Below | 0 | |||||||||||||||||||||||||||||||||||||||||||||||||||
GR’s - FROM Logistics | ||||||||||||||||||||||||||||||||||||||||||||||||||||
General Conditions — Laborers | 32.50 | HR | 4,160 | $ | 135,200.00 | $ | 270,400.00 | $ | 135,200.00 | $ | 135,200.00 | |||||||||||||||||||||||||||||||||||||||||
Cleanroom Protocol — Consumables | 15,000.00 | MO | 6 | $ | 90,000.00 | $ | 90,000.00 | $ | 90,000.00 | $ | 90,000.00 | |||||||||||||||||||||||||||||||||||||||||
Final Clean — Cleanroom — 2ea | 3.00 | SF | 28,000 | $ | 84,000.00 | $ | 84,000.00 | $ | 84,000.00 | $ | 84,000.00 | |||||||||||||||||||||||||||||||||||||||||
Final Clean — Site | 25,000.00 | LS | 1 | $ | 25,000.00 | $ | 25,000.00 | $ | 25,000.00 | $ | 25,000.00 | |||||||||||||||||||||||||||||||||||||||||
HEPA Filter — Replacement | 150.00 | EA | 351 | $ | 52,650.00 | $ | 52,650.00 | $ | 52,650.00 | $ | 52,650.00 | |||||||||||||||||||||||||||||||||||||||||
SuperClean — Certification | 0 | By Owner | By Owner | By Owner | $ | — | ||||||||||||||||||||||||||||||||||||||||||||||
General Requirements — Misc Equipment Dumpsters | 650.00 | EA | 60 | $ | 39,000.00 | $ | 50,000.00 | $ | 20,800.00 | $ | 39,000.00 | |||||||||||||||||||||||||||||||||||||||||
Start-up & Commission - FROM Logistics | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Closeout, Start-up, Functional Testing & Commissioning Support | $ | 1.00 | LS | $ | 160,900.00 | |||||||||||||||||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||||||||||||||||||||||||||||||||||
TOTALS | 1,738,585 | 79,915 | 732,915 | 700,915 | 1,191,820 | 572,050 | 160,900 | 439,650 | 466,850 | |||||||||||||||||||||||||||||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Exhibit C | Page 3 |
EXHIBIT D
DRAWINGS
Exhibit D – Drawings
N/A – Drawing List to be issued when GMP is established.
Exhibit D | Page 1 |
EXHIBIT E
SPECIFICATIONS
Exhibit E – Specifications
N/A – no final specifications have been issued on the project to date.
Exhibit E | Page 1 |
EXHIBIT F
CCIP INSURANCE EXHIBIT
FORMS
Forward the completed Enrollment Application to the Aon administrator identified at the bottom of page 2 of this form. The administrator prior to the start of your work on-site must receive this form.
|
EXHIBIT 1 – Sample Enrolled Off-Site Certificate of Insurance
ACORD© CERTIFICATE OF INSURANCE | ISSUE DATE: CURRENT DATE | |||||||||||
PRODUCER Insurance Agent’s Name And Address | THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW | |||||||||||
TELEPHONE # | COMPANIES AFFORDING COVERAGE | |||||||||||
INSURED | COMPANY ALETTER | INSURANCE CARRIER | ||||||||||
Subcontractor’s Name and Address | COMPANY BLETTER | |||||||||||
Sample Certificate forEnrolled Parties | COMPANY CLETTER | |||||||||||
Required Insurance | COMPANY DLETTER | |||||||||||
COVERAGES | ||||||||||||
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN. THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. | ||||||||||||
CO LTR | TYPE OF INSURANCE | POLICY NO. | POLICY EFF. DATE MM/DD/YY | POLICY EXP. DATE MM/DD/YY | ALL LIMITS | |||||||
A | GENERAL LIABILITY | Policy Number | GENERAL AGGREGATE | $2,000,000 | ||||||||
x COMMERCIAL GEN. LIABILITY | PRODUCTS-COMP/OPS AGGREGATE | $2,000,000 | ||||||||||
¨ CLAIMS MADE x OCCUR. | PERSONAL & ADVERTISING INJURY | $1,000,000 | ||||||||||
¨ OWNER’S & CONTRACTOR’S PROT. | EACH OCCURRENCE | $1,000,000 | ||||||||||
x PER PROJECT AGGREGATE ENDORSEMENT | FIRE DAMAGE (Any one fire) MEDICAL EXPENSE (Any one person) | |||||||||||
A | AUTOMOBILE LIABILITY | Policy Number | COMBINED SINGLE LIMIT | $1,000,000 | ||||||||
x ANY AUTO | BODILY INJURY (Per person) | |||||||||||
¨ ALL OWNED AUTOS | BODILY INJURY (Per accident) | |||||||||||
¨ SCHEDULED AUTOS | PROPERTY DAMAGE | |||||||||||
x HIRED AUTOS | ||||||||||||
x NON-OWNED AUTOS | ||||||||||||
A | EXCESS LIABILITY | Policy Number | EACH OCCURRENCE | $5,000,000 | ||||||||
x UMBRELLA | AGGREGATE | $5,000,000 | ||||||||||
¨ OTHER THAN UMBRELLA FORM | ||||||||||||
A |
WORKERS’ COMPENSATION AND EMPLOYER’S LIABILITY | Policy Number | STATUTORY LIMITSx Florida | |||||||||
(Each accident) | $500,000 | |||||||||||
(Disease-policy limit) | $500,000 | |||||||||||
(Disease-each employee) | $500,000 | |||||||||||
A | OTHER: EQUIPMENT FLOATER | Policy Number | Limit equal to Full Coverage of Subcontractor’s owned or rented machinery, equipment, tools, & temporary structures not designed to become a permanent part of the Work | |||||||||
DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES/SPECIAL ITEMS: RE: Work performed at the Skanska USA Building ABC Project. Certificate Holders are Additional Insureds on a Primary and Non-contributing basis on the General Liability (ISO endorsement CG 20 10-11/85 or its equivalent), Automobile and Excess/Umbrella Liability Policies. Waiver of Subrogation in favor of Certificate Holders applies to all policies. GL and WC coverage apply off-site. | ||||||||||||
CERTIFICATE HOLDER
Skanska USA Building Inc., Skanska USA, Inc. Indemnified Parties, any other parties as required by the Owner contract, Skanska Inc., and their respective directors, officers, employees and affiliates and ALL ENROLLED PARTIES c/o Aon Risk Services, Inc. 4 Overlook Point Lincolnshire, IL 60069 | CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL | |||||||||||
Attention: | AUTHORIZED REPRESENTATIVE | |||||||||||
By: (original signature) | ||||||||||||
ACORD 25-S (3/93) | © ACORD CORPORATION 1993 |
Skanska USA Building Inc. CCIP Insurance Manual – Exhibit G1
Exhibit F | Page 1 |
FORMS
EXHIBIT 2 – Sample Excluded On/Off-Site Certificate of Insurance
ACORD© CERTIFICATE OF INSURANCE | ISSUE DATE: CURRENT DATE | |||||||||||
PRODUCER Insurance Agent’s Name and Address | THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW | |||||||||||
TELEPHONE # | COMPANIES AFFORDING COVERAGE | |||||||||||
INSURED | COMPANY A LETTER | INSURANCE CARRIER | ||||||||||
Name and Address | COMPANY B LETTER | |||||||||||
Sample Certificate forExcluded Parties | COMPANY C LETTER | |||||||||||
Required Insurance | COMPANY D LETTER | |||||||||||
COVERAGES | ||||||||||||
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN. THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. | ||||||||||||
CO LTR | TYPE OF INSURANCE | POLICY NO. | POLICY EFF. DATE MM/DD/YY | POLICY EXP. DATE MM/DD/YY | ALL LIMITS | |||||||
A | GENERAL LIABILITY | Policy Number | GENERAL AGGREGATE | $2,000,000 | ||||||||
x COMMERCIAL GEN. LIABILITY | PRODUCTS-COMP/OPS AGGREGATE | $2,000,000 | ||||||||||
¨ CLAIMS MADE x OCCUR. | PERSONAL & ADVERTISING INJURY | $1,000,000 | ||||||||||
¨ OWNER’S & CONTRACTOR’S PROT. | EACH OCCURRENCE | $1,000,000 | ||||||||||
x PER PROJECT AGGREGATE ENDORSEMENT | FIRE DAMAGE (Any one fire) MEDICAL EXPENSE (Any one person) | |||||||||||
A | AUTOMOBILE LIABILITY | Policy Number | COMBINED SINGLE LIMIT | $1,000,000 | ||||||||
x ANY AUTO | BODILY INJURY (Per person) | |||||||||||
¨ ALL OWNED AUTOS | BODILY INJURY (Per accident) | |||||||||||
¨ SCHEDULED AUTOS | PROPERTY DAMAGE | |||||||||||
x HIRED AUTOS | ||||||||||||
x NON-OWNED AUTOS | ||||||||||||
A | EXCESS LIABILITY | Policy Number | EACH OCCURRENCE | $5,000,000 | ||||||||
x UMBRELLA | AGGREGATE | $5,000,000 | ||||||||||
¨ OTHER THAN UMBRELLA FORM | ||||||||||||
A | WORKERS’ COMPENSATION AND EMPLOYER’S LIABILITY | Policy Number | STATUTORY LIMITSx Florida | |||||||||
(Each accident) | $500,000 | |||||||||||
(Disease-policy limit) | $500,000 | |||||||||||
(Disease-each employee) | $500,000 | |||||||||||
A | OTHER: EQUIPMENT FLOATER | Policy Number | Limit equal to Full Coverage of Subcontractor’s owned or rented machinery, equipment, tools, & temporary structures not designed to become a permanent part of the Work | |||||||||
DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES/SPECIAL ITEMS: RE: Work performed at the Skanska USA Building ABC Project. Certificate Holders are Additional Insureds on a Primary and Non-contributing basis on the General Liability (ISO endorsement CG 20 10-11/85 or its equivalent – attached a copy with this Certificate of Insurance), Automobile and Excess/Umbrella Liability Policies. Waiver of Subrogation in favor of Certificate Holders applies to all policies.ALL COVERAGES LISTED APPLY ON AND OFF-SITE FOR ALL OPERATIONS OF THE INSURED. | ||||||||||||
Skanska USA Building Inc., Skanska USA, Inc. Indemnified Parties, any other parties as required by the Owner contract, Skanska Inc., and their respective directors, officers, employees and affiliates and ALL ENROLLED PARTIES c/o Aon Risk Services, Inc. 4 Overlook Point Lincolnshire, IL 60069
| CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELED BEFORE THE EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL | |||||||||||
Attention: | AUTHORIZED REPRESENTATIVE | |||||||||||
By: (original signature) | ||||||||||||
ACORD 25-S (3/93) | © ACORD CORPORATION 1993 |
Skanska USA Building Inc. CCIP Insurance Manual – Exhibit G1
Exhibit F | Page 2 |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
1 | GENERAL PROVISIONS |
2 | OWNER |
3 | CONTRACTOR |
4 | ARCHITECT |
5 | SUBCONTRACTORS |
6 | CONSTRUCTION BY OWNER OR BY SEPARATE CONTRACTORS |
7 | CHANGES IN THE WORK |
8 | TIME |
9 | PAYMENTS AND COMPLETION |
10 | PROTECTION OF PERSONS AND PROPERTY |
11 | INSURANCE AND BONDS |
12 | UNCOVERING AND CORRECTION OF WORK |
13 | MISCELLANEOUS PROVISIONS |
14 | TERMINATION OR SUSPENSION OF THE CONTRACT |
15 | CLAIMS AND DISPUTES |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
.1 | Allowances shall cover the cost to the Contractor of materials and equipment delivered at the site and all required taxes, less applicable trade discounts; |
.2 | Contractor’s and its Subcontractors’ (of every tier), and suppliers’ costs for unloading and handling at the site, labor, installation costs, overhead, profit and other expenses contemplated for stated allowance amounts shall be included in the Contract Sum but not in the allowances; and |
.3 | Whenever costs are more than or less than allowances, the Contract Sum and Guaranteed Maximum Price shall be adjusted accordingly by Change Order. The amount of the Change Order shall reflect (1) the difference |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
.1 | assignment is effective only after termination of the Contract by the Owner pursuant to Article 14 and only for those subcontract agreements that the Owner accepts by notifying the Subcontractor and Contractor in writing; and |
.2 | assignment is subject to the prior rights of the surety, if any, obligated under bond relating to the Contract. |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
.1 | The change in the Work; |
.2 | The amount of the adjustment, if any, in the Contract Sum and Guaranteed Maximum Price; and |
.3 | The extent of the adjustment, if any, in the Contract Time. |
.1 | Mutual acceptance of a lump sum properly itemized and supported by sufficient substantiating data to permit evaluation; |
.2 | Unit prices stated in the Contract Documents or subsequently agreed upon; |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
.3 | Cost to be determined in a manner agreed upon by the parties, plus the Contractor’s Fee set forth in Section 5.1.1 of the Agreement; or |
.4 | As provided in Section 7.3.7. |
.1 | Costs of labor, including social security, old age and unemployment insurance, fringe benefits required by agreement or custom, and workers’ compensation insurance; |
.2 | Costs of materials, supplies and equipment, including cost of transportation, whether incorporated or consumed; |
.3 | Rental costs of machinery and equipment, exclusive of hand tools, whether rented from the Contractor or others; |
.4 | Costs of premiums for all bonds and insurance, permit fees, and sales, use or similar taxes related to the Work; |
.5 | Additional costs of supervision and field office personnel directly attributable to the change; and |
.6 | Any additional costs allowed by Article 6 of the Agreement. |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
.1 | defective Work not remedied; |
.2 | third party claims filed or reasonable evidence indicating probable filing of such claims unless security acceptable to the Owner is provided by the Contractor; |
.3 | failure of the Contractor to make payments properly to Subcontractors or for labor, materials or equipment; |
.4 | reasonable evidence that the Work cannot be completed for the unpaid balance of the Contract Sum; |
.5 | damage to the Owner or a separate contractor; |
.6 | reasonable evidence that the Work will not be completed within the Contract Time, and that the unpaid balance would not be adequate to cover actual or liquidated damages for the anticipated delay; or |
.7 | material failure to carry out the Work in accordance with the Contract Documents. |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
.1 | liens, Claims, security interests or encumbrances arising out of the Contract and unsettled; |
.2 | failure of the Work to comply with the requirements of the Contract Documents; or |
.3 | terms of special warranties required by the Contract Documents. |
.1 | employees on the Work and other persons who may be affected thereby; |
.2 | the Work and materials and equipment to be incorporated therein, whether in storage on or off the site, under care, custody or control of the Contractor or the Contractor’s Subcontractors or Sub-subcontractors; and |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
.3 | other property at the site or adjacent thereto, such as trees, shrubs, lawns, walks, pavements, roadways, structures and utilities not designated for removal, relocation or replacement in the course of construction. |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
.1 | Claims under workers’ compensation, disability benefit and other similar employee benefit acts that are applicable to the Work to be performed; |
.2 | Claims for damages because of bodily injury, occupational sickness or disease, or death of the Contractor’s employees; |
.3 | Claims for damages because of bodily injury, sickness or disease, or death of any person other than the Contractor’s employees; |
.4 | Claims for damages insured by usual personal injury liability coverage; |
.5 | Claims for damages, other than to the Work itself, because of injury to or destruction of tangible property; |
.6 | Claims for damages because of bodily injury, death of a person or property damage arising out of ownership, maintenance or use of a motor vehicle; |
.7 | Claims for bodily injury or property damage arising out of completed operations; and |
.8 | Claims involving contractual liability insurance applicable to the Contractor’s obligations under Section 3.18. |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
.1 | Issuance of an order of a court or other public authority having jurisdiction that requires all Work to be stopped; |
.2 | An act of government, such as a declaration of national emergency that requires all Work to be stopped; |
.3 | Because the Architect has not issued a Certificate for Payment and has not notified the Contractor of the reason for withholding certification as provided in Section 9.4.1, or because the Owner has not made payment on a Certificate for Payment within the time stated in the Contract Documents; or |
.4 | The Owner has failed to furnish to the Contractor promptly, upon the Contractor’s request, reasonable evidence as required by Section 2.2.1. |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
.1 | repeatedly refuses or fails to supply enough properly skilled workers or proper materials; |
.2 | fails to make payment to Subcontractors for materials or labor in accordance with the respective agreements between the Contractor and the Subcontractors; |
.3 | repeatedly disregards applicable laws, statutes, ordinances, codes, rules and regulations, or lawful orders of a public authority; or |
.4 | otherwise is guilty of substantial breach of a provision of the Contract Documents. |
.1 | Exclude the Contractor from the site and take possession of all materials, and equipment stored on the site that are intended to be incorporated into the Work; |
.2 | Accept assignment of subcontracts pursuant to Section 5.4; and |
.3 | Finish the Work by whatever reasonable method the Owner may deem expedient. Upon written request of the Contractor, the Owner shall furnish to the Contractor a detailed accounting of the costs incurred by the Owner in finishing the Work. |
.1 | that performance is, was or would have been so suspended, delayed or interrupted by another cause for which the Contractor is responsible; or |
.2 | that an equitable adjustment is made or denied under another provision of the Contract. |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
.1 | cease operations as directed by the Owner in the notice; |
.2 | take actions necessary, or that the Owner may direct, for the protection and preservation of the Work; and |
.3 | except for Work directed to be performed prior to the effective date of termination stated in the notice, terminate all existing subcontracts and purchase orders and enter into no further subcontracts and purchase orders. |
.1 | damages incurred by the Owner for rental expenses, for losses of use, income, profit, financing, business and reputation, and for loss of management or employee productivity or of the services of such persons; and |
.2 | damages incurred by the Contractor for principal office expenses including the compensation of personnel stationed there, for losses of financing, business and reputation, and for loss of profit except anticipated profit arising directly from the Work. |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |
AIA Document A201™ - 2007 Copyright © 1911, 1915, 1918, 1937, 1951, 1958, 1961, 1963, 1966, 1970, 1976, 1987, 1997 and 2007 by The American Institute of Architects. All rights reserved. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This draft was produced by AIA software at 16:06:04 on 04/28/2016 under Order No.5763238807_1 which expires on 09/23/2016, and is not for resale. User Notes: |