Re: | ReoStar Energy Corporation Form 10-KSB/A for the Fiscal Year Ended March 31, 2008 Filed July 23, 2008 Form 10-Q for Fiscal Quarter ended December 31, 2008 Filed February 13, 2009 Response Letter Dated April 21, 2009 Response Letter Date June 4, 2009 Response Letter Dated July 24, 2009 File No. 000-52316 |
Dear Mr. Schwall:
We have reviewed your comment letter dated September 15, 2009 in respect of the above-referenced filings. This letter sets forth our responses to your comment. We will file a responsive Amendment No. 2 to the 2008 Form 10-KSB/A and a responsive Amendment No. 1 to the 2009 Form 10-K upon confirmation that our response adequately address your comments.
Engineering Comments on Form 10-KSB for the Fiscal Year Ended March 31, 2008
We have reviewed your responses to our prior comment one of our letter dated July 8, 2009. We do not believe that a relatively small pilot alkalai-surfactant polymer injection project that recovered an estimated 35,000 barrels of incremental oil is sufficient to demonstrate reasonable certainty and support classification as proved reserves for over 10 million barrels of undeveloped reserves on an offsetting lease. Among other conerns, we note that the injection project you are operating is not an alkali-surfactant flood as the pilot projects were. Please revise your 2008 and 2009 10-K reports to remove the proved undeveloped reserves for the Corsicana field polymer injection project from the proved category.
We respectfully disagree with your opinion that we have not demonstrated the level of reasonable certainty for the attribution of proved reserves for the following reasons:
The staff's primary concern noted above was based upon the conclusion that the J. O. Burke pilot project was an alkali-surfactant flood, and was therefore different from the surfactant polymer injection project we have begun implementing. We believe the staff has not considered all of the relevant facts in its comment letter. The pilot project was a surfactant polymer project - no alkali was included in the mix. Therefore, the pilot project and our surfactant polymer project are substantially similar, and our engineers were justified in using the offset pilot as a baseline for the reserve study. Further, the staff's opinion does not take into consideration the fact that ReoStar began polymer injection in the first stage of our project in June 2007 and that the oil recovery response observed through the evaluation date was within the expected range of response indicated by the J.O. Burke pilot project. This response not only validates the J.O. Burke pilot, it also validates the recoverable volumes shown in the reserve report - they are achievable. |
If the staff disagrees with our response and is requiring us to amend our filings to remove the reserves associated with the surfactant-polymer project from the proven category, we propose the following amendments to our 2008 and 2009 10-K reports accordingly.
Changes to the 2008 10-KSB:
We propose Footnote 15 - Supplemental info on oil and gas exploration, development and production activities from the 2008 10-K be amended to the following:
(15) SUPPLEMENTAL INFO ON OIL AND GAS EXPLORATION, DEVELOPMENT AND
PRODUCTION ACTIVITIES (UNAUDITED).
The following information concerning our natural gas and oil operations has been provided pursuant to Statement of Financial Accounting Standards No. 69, "Disclosures about Oil and Gas Producing Activities," ("SFAS No. 69"). Our natural gas and oil producing activities are conducted onshore within the continental United States.
Estimated Quantities of Proved Oil and Gas Reserves (Unaudited)
We engaged Forrest A. Garb & Associates, Inc. to conduct a reserve study and to estimate our reserves of crude oil, condensate, natural gas liquids and natural gas. Reserves are adjusted to reflect contractual arrangements and royalty rates in effect at the end of each year. Many assumptions and judgmental decisions are required to estimate reserves. Reported quantities are subject to future revisions, some of which may be substantial, as additional information becomes available from reservoir performance, new geological and geophysical data, additional drilling, technological advancements, price changes and other economic factors.
The SEC defines proved reserves as those volumes of crude oil, condensate, natural gas liquids and natural gas that geological and engineering data demonstrate with reasonable certainty are recoverable from known reservoirs under existing economic and operating conditions. Proved developed reserves are those proved reserves which can be expected to be recovered from existing wells with existing equipment and operating methods. Proved undeveloped reserves are volumes expected to be recovered as a result of additional investments for drilling new wells to offset productive units, recompleting existing wells, and/or installing facilities to collect and transport production.
Production quantities shown are net volumes sold. These may differ from volumes withdrawn from reservoirs due to inventory changes, and, especially in the case of natural gas, volumes consumed for fuel and/or shrinkage from extraction of natural gas liquids.
The reported value of proved reserves is not necessarily indicative of either fair market value or present value of future net cash flows because prices, costs and governmental policies do not remain static, appropriate discount rates may vary, and extensive judgment is required to estimate the timing of production. Other logical assumptions would likely have resulted in significantly different amounts.
The reports utilize a base oil price of $101.54 per barrel (Bbl) and a base gas price of $9.86 per thousand cubic feet (Mcf). The base prices equate to average realized prices at April 1, 2008 of $99.26 per barrel for oil and condensate in the Barnett project, $93.33 per barrel for oil produced in the Corsicana project, $101.54 for oil produced in the East Texas project, $9.35 per mcf for gas produced in the Barnett project, and $9.86 per mcf for gas produced in the East Texas project.
The following table reflects total reserves as of April 1, 2008.
Crude Oil (MBBL) | Natural Gas (MMCF) | Crude Oil Equivalents (MBOE) | |||||
Proved Developed Producing | 602 | 3,447 | 1,177 | ||||
Proved Developed Non-Producing | 199 | 3,051 | 708 | ||||
Proved Undeveloped | 610 | 12,311 | 2,662 | ||||
Total Proved Reserves at April 1, 2008 | 1,411 | 18,809 | 4,546 | ||||
Barnett Shale Project | Corsicana Project | East Texas Project | ||||||||||||
Crude Oil (MBBL) | Natural Gas (MMCF) | Crude Oil Equivalents (MBOE) | Crude Oil (MBBL) | Crude Oil Equivalents (MBOE) | ||||||||||
Proved Developed Producing | 164 | 3,446 | 738 | 430 | 8 | |||||||||
Proved Developed Non-Producing | 190 | 3,050 | 698 | - | 9 | |||||||||
Proved Undeveloped | 590 | 12,311 | 2,642 | 20 | - | |||||||||
Total Proved Reserves at April 1, 2008 | 944 | 18,807 | 4,079 | 450 | 17 | |||||||||
The following summarizes the policies we used in the preparation of the accompanying natural gas and oil reserve disclosures, standardized measures of discounted future net cash flows from proved natural gas and oil reserves and the reconciliations of standardized measures from year to year. The information disclosed, as prescribed by SFAS No. 69, is an attempt to present the information in a manner comparable with industry peers.
The information is based on estimates of proved reserves attributable to our interest in natural gas and oil properties as of April 1, 2008. These estimates were prepared by Forest Garb and Associates. Proved reserves are estimated quantities of natural gas and crude oil which geological and engineering data demonstrate with reasonable certainty to be recoverable in future years from known reservoirs under existing economic and operating conditions.
The standardized measure of discounted future net cash flows from production of proved reserves was developed as follows:
• | Estimates are made of quantities of proved reserves and future amounts expected to be produced based on current year-end economic conditions. | |
• | Estimated future cash inflows are calculated by applying current year-end prices of natural gas and oil relating to our proved reserves to the quantities of those reserves produced in each future year. | |
• | Future cash flows are reduced by estimated production costs, costs to develop and produce the proved reserves and abandonment costs, all based on current year-end economic conditions. | |
• | The resulting future net cash flows are discounted to present value by applying a discount rate of 10%. |
The standardized measure of discounted future net cash flows does not purport, nor should it be interpreted, to present the fair value of our natural gas and oil reserves. An estimate of fair value would also take into account, among other things, the recovery of reserves not presently classified as proved, anticipated future changes in prices and costs and a discount factor more representative of the time value of money and the risks inherent in the industry.
The standardized measure of discounted future net cash flows relating to proved natural gas and oil reserves is as follows:
Total | Barnett Project | Corsicana Project | East Texas Project | |||||||||
In thousands | April 1, 2008 | April 1, 2008 | April 1, 2008 | April 1, 2008 | ||||||||
Future Cash Inflows | $ | 311,067 | $ | 267,363 | $ | 41,944 | $ | 1,760 | ||||
Future Production and Development Costs | (107,196 | ) | (92,186 | ) | (13,919 | ) | (1,091 | ) | ||||
Income Taxes | (71,355 | ) | (61,312 | ) | (9,809 | ) | (234 | ) | ||||
Future Net Cash Flows | 132,516 | 113,865 | 18,216 | 435 | ||||||||
10% Annual Discount | (64,215 | ) | (55,724 | ) | (8,374 | ) | (117 | ) | ||||
Standardized Measure of Discounted Future Net Cash Flow | $ | 8,301 | $ | 58,141 | $ | 9,842 | $ | 318 |
The following reconciles the change in the standardized measure of discounted future net cash flow during the fiscal year ended March 31, 2008.
In Thousands | ||||||||||||
Balance at beginning of year | $ | 117,629 | ||||||||||
Net change in prices and production costs | 19,348 | |||||||||||
Net changes in future development costs | (14,805 | ) | ||||||||||
Sales of oil & gas produced net of production costs | (2,458 | ) | ||||||||||
Extensions and discoveries | 98,476 | |||||||||||
Previously estimated development costs incurred | 2,188 | |||||||||||
Revisions of previous quantity estimates | (372,372 | ) | ||||||||||
Purchases of reserves | 1,815 | |||||||||||
Net change in income taxes | 93,733 | |||||||||||
Accretion of discount | 124,747 | |||||||||||
End of Year | $ | 68,301 | ||||||||||
As of March 31, 2008, total proved developed reserves were 430 MBOE and proved undeveloped reserves totaled 20 MBOE.
The reserve table on page 15 will be amended to the following:
Reserves | Barnett Shale | Corsicana Field | E. Texas Field | Total | ||||||||
Proved Developed (MBOE) | 1,437 | 430 | 9 | 1,876 | ||||||||
Proved Undeveloped (MBOE) | 2,642 | 20 | 9 | 2,671 | ||||||||
Total Proven Reserves at March 31, 2008 | 4,079 | 450 | 18 | 4,547 | ||||||||
Benchmark Pricing | ||||||||||||
Natural Gas per mcf | $ | 9.86 | ||||||||||
Crude Oil per barrel | $ | 101.54 |
The second paragraph of the Results and Analysis of Financial Condition, Cash Flows, and Liquidity section on page 20 will be revised to the following:
We began injecting surfactant polymer in the pilot project in June 2007. Production responded positively with monthly production for the fourth quarter on the pilot increasing by 50% when compared to the pre-injection production. We began the permitting process for the second stage of the pilot and expect to complete the pilot expansion and to begin injection during the second quarter of the next fiscal year. Based upon an engineering review, the proven undeveloped reserves originally attributed to the polymer flood project have been reclassified to probable. The following chart summarizes pertinent reserve information for our Corsicana properties at March 31, 2008 and March 31, 2007.
Net Reserves (MBOE) | ||||||||||||
2008 | 2007 | % Change | ||||||||||
Proved Developed | 430 | 106 | 406.4% | |||||||||
Proved Undeveloped | 20 | 11,302 | -99.8% | |||||||||
450 | 11,408 | -96.1% | ||||||||||
We propose that Footnote 17, Supplemental info on oil and gas exploration, development, and production activities from the 2009 10-K be amended to the following:
(17) SUPPLEMENTAL INFO ON OIL AND GAS EXPLORATION, DEVELOPMENT AND PRODUCTION ACTIVITIES (UNAUDITED).
The following information concerning our natural gas and oil operations has been provided pursuant to Statement of Financial Accounting Standards No. 69, "Disclosures about Oil and Gas Producing Activities," ("SFAS No. 69"). All of our natural gas and oil producing activities are located in Texas.
Capitalized Costs Relating to Oil and Gas Producing Activities
Fiscal Year Ended March 31, | |||||||
2009 | 2008 | ||||||
Unproved oil and gas properties | $ | 484,198 | $ | 2,445,556 | |||
Proved oil and gas properties | 23,920,960 | 14,456,967 | |||||
Support Equipment and facilities | - | - | |||||
Capitalized Interest | 999,620 | 930,408 | |||||
Total Capitalized Cost of Oil and Gas Properties | 25,404,778 | 17,832,931 | |||||
Less accumulated depletion, depreciation, and amortization | (6,206,558 | ) | (4,139,337 | ) | |||
Net Capitalized Costs | $ | 19,198,220 | $ | 13,693,594 | |||
Fiscal Year Ended March 31, | |||||||
2009 | 2008 | ||||||
Property Acquisition Costs | |||||||
Proved | $ | 427,676 | $ | 1,814,718 | |||
Unproved | 15,472 | 271,151 | |||||
Exploration Costs | 267,212 | 4,933,277 | |||||
Development Costs | 7,393,929 | 696,594 | |||||
Asset retirement costs recognized according to SFAS No. 143 | 344,079 | - | |||||
Total Costs Incurred | $ | 8,448,368 | $ | 7,715,740 | |||
The following reflects the oil and gas production for the fiscal years ended March 31, 2008 and 2009:
Oil & Gas Production | ||||||||||||
Oil (Bbl) | Gas (Mcf) | Total BOE | ||||||||||
Fiscal Year Ended | 3/31/2008 | 33,602 | 351,538 | 92,192 | ||||||||
Fiscal Year Ended | 3/31/2009 | 45,105 | 479,180 | 124,968 |
Results of Operations for Producing Activities:
The following reflects results of operations for the fiscal years ended March 31, 2009 and 2008:
Fiscal Years Ended March 31, | ||||||||||||
2009 | 2008 | |||||||||||
Oil & Gas Revenue | $ | 6,558,069 | $ | 4,902,072 | ||||||||
Gain on Sale of Oil & Gas Leases | 18,005 | 307,028 | ||||||||||
Production Costs | 3,140,198 | 2,800,388 | ||||||||||
Exploration Costs | 2,975 | 61,179 | ||||||||||
Expired Leases and Plugging Costs | 433,969 | 290,959 | ||||||||||
Depreciation, Depletion, & Amortization | 4,591,131 | 1,399,293 | ||||||||||
(1,592,199 | ) | 657,281 | ||||||||||
Income Taxes | 557,270 | (230,048 | ) | |||||||||
Results of operations for oil and gas producing activities (excluding corporate overhead and financing costs) | (1,034,929 | ) | 427,233 | |||||||||
We engaged Forrest A. Garb & Associates, Inc. to conduct a reserve study and to estimate our reserves of crude oil, condensate, natural gas liquids and natural gas. Reserves are adjusted to reflect contractual arrangements and royalty rates in effect at the end of each year. Many assumptions and judgmental decisions are required to estimate reserves. Reported quantities are subject to future revisions, some of which may be substantial, as additional information becomes available from reservoir performance, new geological and geophysical data, additional drilling, technological advancements, price changes and other economic factors.
The SEC defines proved reserves as those volumes of crude oil, condensate, natural gas liquids and natural gas that geological and engineering data demonstrate with reasonable certainty are recoverable from known reservoirs under existing economic and operating conditions. Proved developed reserves are those proved reserves which can be expected to be recovered from existing wells with existing equipment and operating methods. Proved undeveloped reserves are volumes expected to be recovered as a result of additional investments for drilling new wells to offset productive units, recompleting existing wells, and/or installing facilities to collect and transport production.
Changes in estimates of proved reserves significantly impact the depletion expense we record each year. When proved reserves increase, our depletion rate decreases, resulting in a lower depletion expense and higher net income. Conversely, when proved reserves decrease, our depletion rate increases, resulting in a higher depletion expense and lower net income. Changes in estimates of proved reserves are frequently the result of changes in commodity prices, changes in operating costs, and reservoir performance history.
Production quantities shown are net volumes sold. These may differ from volumes withdrawn from reservoirs due to inventory changes, and, especially in the case of natural gas, volumes consumed for fuel and/or shrinkage from extraction of natural gas liquids.
The reported value of proved reserves is not necessarily indicative of either fair market value or present value of future net cash flows because prices, costs and governmental policies do not remain static, appropriate discount rates may vary, and extensive judgment is required to estimate the timing of production. Other logical assumptions would likely have resulted in significantly different amounts.
The reports utilize the base crude oil and natural gas prices in effect at March 31, 2009 and 2008, respectively. For the reserves at March 31, 2009, the base crude oil and natural gas prices were $49.65 per barrel ("Bbl") and $3.58 per million British thermal units ("MMbtu"), respectively. For the reserves at March 31, 2008, the base crude oil and natural gas prices were $101.54 per bbl and $9.86 MMbtu, respectively. The base prices for both crude oil and natural gas are adjusted by the normal price differential between the prices we historically have received for our products and the spot price quoted on the relevant market exchange.
Our proved reserves (000's omitted) are summarized in the table below.
Oil (MBBL) | Gas (MMCF) | |||||||||||
Reserves at March 31, 2007 | 11,677 | 3,392 | ||||||||||
Revisions of previous estimates | (10,970 | ) | (133 | ) | ||||||||
Improved recovery | 124 | 4,786 | ||||||||||
Purchases of minerals in place | 24 | 525 | ||||||||||
Extensions and discoveries | 590 | 10,591 | ||||||||||
Production | (34 | ) | (351 | ) | ||||||||
Sales of minerals in place | - | - | ||||||||||
Reserves at March 31, 2008 | 1,411 | 18,809 | ||||||||||
Revisions of previous estimates | (739 | ) | (11,269 | ) | ||||||||
Improved recovery | - | - | ||||||||||
Purchases of minerals in place | 1 | 25 | ||||||||||
Extensions and discoveries | 397 | 4,725 | ||||||||||
Production | (45 | ) | (479 | ) | ||||||||
Sales of minerals in place | - | - | ||||||||||
Reserves at March 31, 2009 | 1,025 | 11,811 | ||||||||||
Improved recovery: During the fiscal year ended March 31, 2008, the Company implemented changes to the completion techniques on its Barnett Shale properties that resulted in increased recoverable reserves. Consequently, estimates of recoverable reserves for properties shown as proved undeveloped reserves on the March 31, 2007 were increased to reflect the increase in estimated reserves from the new techniques.
Purchases of minerals in place: The Company began a working interest repurchase program in its Barnett Shale properties in December 2007. On December 4, 2007, the Company agreed to repurchase working interests in 27 wells and has subsequently from time to time, repurchased smaller working interests.
Extensions and discoveries: The Company successfully drilled 8 and 18 of the Barnett shale locations that were classified as proven undeveloped properties for the years ending March 31, 2009 and 2008, respectively. The successful drilling of the wells resulted in additional proven undeveloped reserves in offset locations.
The following table reflects total reserves by project at April 1, 2009:
Barnett Shale Project | Corsicana Project | East Texas Project | ||||||||||||
Crude Oil (MBBL) | Natural Gas (MMCF) | Crude Oil Equivalents (MBOE) | Crude Oil (MBBL) | Crude Oil Equivalents (MBOE) | ||||||||||
Proved Developed Producing | 94 | 2,812 | 563 | 100 | 11 | |||||||||
Proved Developed Non-Producing | 43 | 494 | 125 | 87 | 2 | |||||||||
Proved Undeveloped | 655 | 8,505 | 2,073 | 33 | - | |||||||||
Total Proved Reserves at April 1, 2009 | 792 | 11,811 | 2,761 | 220 | 13 | |||||||||
The following summarizes the policies we used in the preparation of the accompanying natural gas and oil reserve disclosures, standardized measures of discounted future net cash flows from proved natural gas and oil reserves and the reconciliations of standardized measures from year to year. The information disclosed, as prescribed by SFAS No. 69, is an attempt to present the information in a manner comparable with industry peers.
The information is based on estimates of proved reserves attributable to our interest in natural gas and oil properties as of April 1, 2009. These estimates were prepared by an independent petroleum engineering firm, Forest Garb and Associates, Inc. Proved reserves are estimated quantities of natural gas and crude oil which geological and engineering data demonstrate with reasonable certainty to be recoverable in future years from known reservoirs under existing economic and operating conditions.
The standardized measure of discounted future net cash flows from production of proved reserves was developed as follows:
• | Estimates are made of quantities of proved reserves and future amounts expected to be produced based on current year-end economic conditions. | |
• | Estimated future cash inflows are calculated by applying current year-end prices of natural gas and oil relating to our proved reserves to the quantities of those reserves produced in each future year. | |
• | Future cash flows are reduced by estimated production costs, costs to develop and produce the proved reserves and abandonment costs, all based on current year-end economic conditions. | |
• | The resulting future net cash flows are discounted to present value by applying a discount rate of 10%. |
The standardized measure of discounted future net cash flows does not purport, nor should it be interpreted, to present the fair value of our natural gas and oil reserves. An estimate of fair value would also take into account, among other things, the recovery of reserves not presently classified as proved, anticipated future changes in prices and costs and a discount factor more representative of the time value of money and the risks inherent in the industry.
The standardized measure of discounted future net cash flows relating to proved natural gas and oil reserves as of March 31, 2009 and 2008 is as follows:
As of March 31, | ||||||||||||
In thousands | 2009 | 2008 | ||||||||||
Future Cash Inflows | $ | 90,391 | $ | 311,067 | ||||||||
Future Production and Development Costs | (55,865 | ) | (107,195 | ) | ||||||||
Income Taxes | (12,084 | ) | (71,355 | ) | ||||||||
Future Net Cash Flows | 22,442 | 132,517 | ||||||||||
10% Annual Discount | (12,120 | ) | (64,216 | ) | ||||||||
Standardized Measure of Discounted Future Net Cash Flow | $ | 10,322 | $ | 68,301 | ||||||||
Year Ended March 31, | ||||||||||||
In Thousands | 2009 | 2008 | ||||||||||
Balance at beginning of year | $ | 68,301 | $ | 117,629 | ||||||||
Net change in prices and production costs | (194,933 | ) | 19,348 | |||||||||
Net changes in future development costs | 6,807 | (14,805 | ) | |||||||||
Sales of oil & gas produced net of production costs | (3,533 | ) | (2,458 | ) | ||||||||
Extensions and discoveries | 23,664 | 98,476 | ||||||||||
Previously estimated development costs incurred | 8,243 | 2,188 | ||||||||||
Revisions of previous quantity estimates | (10,020 | ) | (372,372 | ) | ||||||||
Purchases of reserves | 427 | 1,815 | ||||||||||
Net change in income taxes | 59,271 | 93,733 | ||||||||||
Accretion of discount | 52,095 | 124,747 | ||||||||||
End of Year | $ | 10,322 | $ | 68,301 | ||||||||
Total | Barnett Project | Corsicana Project | East Texas Project | |||||||||
In thousands | April 1, 2009 | April 1, 2009 | April 1, 2009 | April 1, 2009 | ||||||||
Future Cash Inflows | $ | 90,391 | $ | 79,631 | $ | 10,095 | $ | 665 | ||||
Future Production and Development Costs | (55,865 | ) | (48,034 | ) | (7,588 | ) | (243 | ) | ||||
Income Taxes | (12,084 | ) | (11,059 | ) | (878 | ) | (147 | ) | ||||
Future Net Cash Flows | 22,442 | 20,538 | 1,629 | 275 | ||||||||
10% Annual Discount | (12,120 | ) | (11,366 | ) | (668 | ) | (86 | ) | ||||
Standardized Measure of Discounted Future Net Cash Flow | $ | 10,322 | $ | 9,172 | $ | 961 | $ | 189 | ||||
The last sentence in Item 2 Description of Properties; Corsicana Field (page 15) will be adjusted to the following:
As of March 31, 2009, total proved developed reserves were 187 MBOE and proved undeveloped reserves totaled 33 MBOE.
The table disclosing estimated proved reserves on page 16 will be adjusted to the following:
Estimated Proved Reserves | Barnett Shale | Corsicana Field | E. Texas Field | Total | ||||||||
Proved Developed (MBOE) | 688 | 187 | 13 | 888 | ||||||||
Proved Undeveloped (MBOE) | 2,073 | 33 | - | 2,106 | ||||||||
Total Proven Reserves at March 31, 2009 | 2,761 | 220 | 13 | 2,994 | ||||||||
Benchmark Pricing | ||||||||||||
Natural Gas per mmbtu | $ | 3.58 | ||||||||||
Crude Oil per barrel | $ | 49.65 |
*****
We have endeavored to fully respond to the Staff's comments set forth in its September 15, 2009 letter. On behalf of ReoStar Energy, please be advised that we acknowledge that:
• | The company is responsible for the adequacy and accuracy of the disclosure in the filings; | |
• | Staff comments or changes to disclosure in response to staff comments do not prevent the Commission from taking any action with respect to the filings; and | |
• | The company may not assert staff comments as a defense in any proceeding initiated by the Commission or any person under the federal securities laws of the United States. |
Thank you in advance for your review. Please contact the undersigned at (817) 989-7367 if you have any questions.
Very truly yours, /s/ Scott D. Allen Scott D. Allen Chief Financial Officer |
cc: Greenberg Traurig, LLP