- Track your favorite companies
- Receive email alerts for new filings
- Personalized dashboard of news and more
- Access all data and search results
- 40FR12B Initial registration of securities (Canada)
- 99.1 Exhibit 99.1
- 99.2 Exhibit 99.2
- 99.3 Exhibit 99.3
- 99.4 Exhibit 99.4
- 99.5 Exhibit 99.5
- 99.6 Exhibit 99.6
- 99.7 Exhibit 99.7
- 99.8 Exhibit 99.8
- 99.9 Exhibit 99.9
- 99.10 Exhibit 99.10
- 99.11 Exhibit 99.11
- 99.12 Exhibit 99.12
- 99.13 Exhibit 99.13
- 99.14 Exhibit 99.14
- 99.15 Exhibit 99.15
- 99.16 Exhibit 99.16
- 99.17 Exhibit 99.17
- 99.18 Exhibit 99.18
- 99.19 Exhibit 99.19
- 99.20 Exhibit 99.20
- 99.21 Exhibit 99.21
- 99.22 Exhibit 99.22
- 99.23 Exhibit 99.23
- 99.24 Exhibit 99.24
- 99.25 Exhibit 99.25
- 99.26 Exhibit 99.26
- 99.27 Exhibit 99.27
- 99.28 Exhibit 99.28
- 99.29 Exhibit 99.29
- 99.30 Exhibit 99.30
- 99.31 Exhibit 99.31
- 99.32 Exhibit 99.32
- 99.33 Exhibit 99.33
- 99.34 Exhibit 99.34
- 99.35 Exhibit 99.35
- 99.36 Exhibit 99.36
- 99.37 Exhibit 99.37
- 99.38 Exhibit 99.38
- 99.39 Exhibit 99.39
- 99.40 Exhibit 99.40
- 99.41 Exhibit 99.41
- 99.42 Exhibit 99.42
- 99.43 Exhibit 99.43
- 99.44 Exhibit 99.44
- 99.45 Exhibit 99.45
- 99.46 Exhibit 99.46
- 99.47 Exhibit 99.47
- 99.48 Exhibit 99.48
- 99.49 Exhibit 99.49
- 99.50 Exhibit 99.50
- 99.51 Exhibit 99.51
- 99.52 Exhibit 99.52
- 99.53 Exhibit 99.53
- 99.54 Exhibit 99.54
- 99.55 Exhibit 99.55
- 99.56 Exhibit 99.56
- 99.57 Exhibit 99.57
- 99.58 Exhibit 99.58
- 99.59 Exhibit 99.59
- 99.60 Exhibit 99.60
- 99.61 Exhibit 99.61
- 99.62 Exhibit 99.62
- 99.63 Exhibit 99.63
- 99.64 Exhibit 99.64
- 99.65 Exhibit 99.65
- 99.66 Exhibit 99.66
- 99.67 Exhibit 99.67
- 99.68 Exhibit 99.68
- 99.69 Exhibit 99.69
- 99.70 Exhibit 99.70
- 99.71 Exhibit 99.71
- 99.72 Exhibit 99.72
- 99.73 Exhibit 99.73
- 99.74 Exhibit 99.74
- 99.75 Exhibit 99.75
- 99.76 Exhibit 99.76
- 99.77 Exhibit 99.77
- 99.78 Exhibit 99.78
- 99.79 Exhibit 99.79
- 99.80 Exhibit 99.80
- 99.81 Exhibit 99.81
- 99.82 Exhibit 99.82
- 99.83 Exhibit 99.83
- 99.84 Exhibit 99.84
- 99.85 Exhibit 99.85
- 99.86 Exhibit 99.86
- 99.87 Exhibit 99.87
- 99.88 Exhibit 99.88
- 99.89 Exhibit 99.89
- 99.90 Exhibit 99.90
- 99.91 Exhibit 99.91
- 99.92 Exhibit 99.92
- 99.93 Exhibit 99.93
- 99.94 Exhibit 99.94
- 99.95 Exhibit 99.95
- 99.96 Exhibit 99.96
- 99.97 Exhibit 99.97
- 99.98 Exhibit 99.98
- 99.99 Exhibit 99.99
- 99.100 Exhibit 99.100
- 99.101 Exhibit 99.101
- 99.102 Exhibit 99.102
- 99.103 Exhibit 99.103
- 99.104 Exhibit 99.104
- 99.105 Exhibit 99.105
- 99.107 Exhibit 99.107
- 99.108 Exhibit 99.108
- 99.109 Exhibit 99.109
- 99.110 Exhibit 99.110
- 99.111 Exhibit 99.111
- 99.112 Exhibit 99.112
- 99.113 Exhibit 99.113
Exhibit 99.95
FORM 51-102F3
MATERIAL CHANGE REPORT
1. | Name and Address of Company |
Timmins Gold Corp. | |
Suite 1900 – 570 Granville Street | |
2. | Date of Material Change |
September 1, 2011. | |
3. | Press Release |
The Press Release dated September 1, 2011 was disseminated via Marketwire. | |
4. | Summary of Material Change |
Timmins Gold Corp. announced drilling results completed during the months of June and July, 2011 at the existing La Chicharra open pit located 2 kilometres west of the San Francisco open pit, in the state of Sonora, Mexico. | |
5. | Full Description of Material Change |
See Schedule “A” attached. | |
6. | Reliance on Subsection 7.1(2) or (3) of National Instrument 51-102 |
Not Applicable. | |
7. | Omitted Information |
Not Applicable. | |
8. | Executive Officer |
Bruce Bragagnolo, Chief Executive Officer | |
9. | Date of Report |
September 1, 2011. |
SCHEDULE “A”
TIMMINS GOLD CORP.
Suite 1900 - 570 Granville Street
Vancouver, BC, V6C 3P1
Tel.: (604) 682-4002
Fax: (604) 682-4003
September 1, 2011 | TSX: TMM |
NEWS RELEASE
Timmins Gold intersects 36.58 metres grading 0.816 grams per tonne gold at La Chicharra Open Pit
Timmins Gold Corp. (TSX:TMM) is pleased to announce results for drilling completed during the months of June and July, 2011 at the existing La Chicharra open pit located 2 kilometres west of the San Francisco open pit, in the state of Sonora, Mexico.
The most significant results were obtained along the projection of the La Chicharra mineral trend located 500 meters to the south of the San Francisco mine and 1,200 meters to the southeast of the La Chicharra pit along what appears to be a parallel mineral system to the San Francisco deposit.
Drilling at La Chicharra commenced in June and 16,204 meters of reverse circulation drilling were completed to the end of July. Drill results to date show similar grades and geological characteristics to initial results obtained from the San Francisco open pit in the late 1990’s. Results to date indicate the mineralized zone at La Chicharra extends down dip from the existing pit to a depth of 200 metres beneath the north wall, and 300 meters parallel to the previously known gold mineralization. Ongoing drilling continues to the northwest of the La Chicharra prospect with the objective of testing mineralization along strike.
Highlights of selected holes from the drill program at La Chicharra are as follows:
Drill Intersections | |||||
Drill Hole Number | Depth (m) | From (m) | To (m) | True Width (m) | Au g/t |
TF-1501 | 152.40 | 32.00 | 39.62 | 7.62 | 1.350 |
TF-1505 | 161.54 | 47.24 | 60.96 | 13.72 | 0.560 |
TF -1511 | 179.83 | 70.10 | 83.82 | 13.72 | 1.680 |
TF-1512 | 155.45 | 62.48 | 68.58 | 6.10 | 1.090 |
67.06 | 68.58 | 1.52 | 2.932 | ||
TF-1515 | 185.93 | 68.58 | 85.39 | 16.81 | 0.480 |
94.49 | 124.97 | 30.48 | 0.770 | ||
TF-1517 | 185.93 | 48.77 | 51.82 | 3.05 | 0.410 |
80.77 | 123.44 | 42.67 | 0.460 | ||
146.30 | 156.97 | 10.67 | 1.331 | ||
TF-1520 | 185.93 | 0.00 | 1.52 | 1.52 | 0.507 |
59.44 | 71.63 | 12.19 | 1.240 | ||
109.73 | 141.73 | 32.00 | 0.790 | ||
TF-1539 | 234.7 | 12.19 | 15.24 | 3.05 | 0.788 |
99.06 | 126.49 | 27.43 | 0.781 | ||
106.68 | 111.25 | 4.57 | 1.498 | ||
120.40 | 123.44 | 3.05 | 1.475 | ||
131.06 | 134.11 | 3.05 | 0.961 | ||
TF- 1541 | 222.5 | 185.93 | 214.88 | 28.96 | 0.909 |
2
TF-1545 | 222.5 | 64.01 | 118.87 | 54.86 | 0.529 |
TF-1547 | 222.5 | 3.05 | 12.19 | 9.14 | 1.139 |
102.11 | 120.40 | 18.29 | 0.932 | ||
TF-1554 | 158.5 | 115.82 | 117.35 | 1.52 | 1.015 |
TF-1560 | 185.93 | 82.30 | 134.11 | 51.82 | 0.528 |
TF-1561 | 210.31 | 0.00 | 1.52 | 1.52 | 1.110 |
32.00 | 44.20 | 12.19 | 0.949 | ||
TF-1562 | 207.26 | 115.82 | 184.40 | 68.58 | 0.567 |
153.92 | 170.69 | 16.76 | 1.279 | ||
TF-1564 | 207.26 | 112.78 | 149.35 | 36.58 | 0.816 |
TF-1570 | 204.22 | 47.24 | 51.82 | 4.57 | 1.086 |
47.24 | 50.29 | 3.05 | 1.380 | ||
82.30 | 131.06 | 48.77 | 0.469 | ||
TF-1574 | 204.22 | 67.06 | 80.77 | 13.72 | 0.995 |
152.40 | 163.07 | 10.67 | 1.287 | ||
152.40 | 160.02 | 7.62 | 1.726 |
For a map of the drill hole locations, please refer to the Company’s website at www.timminsgold.com or under the heading http://www.timminsgold.com/i/maps/la-chicharra-plan-map-and-cross-sections.jpg.
The samples collected during the drilling were prepared by the Company and assayed by Inspectorate-Vancouver using fire assay and gravimetric finish. Strict sampling and QA-QC protocol were followed to ensure the best practices in sampling and analysis of the drill samples. Duplicates, standards and blanks were inserted into the sampling stream at intervals of 25 samples.