UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
Form 6-K
REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE
13a-16 OR 15d-16 UNDER
THE SECURITIES EXCHANGE ACT OF 1934
For the month of April 2022
Commission File Number 001-13314
Huaneng Power International, Inc.
(Translation of registrant’s name into English)
Huaneng Power International, Inc.
Huaneng Building,
6 Fuxingmennei Street,
Xicheng District,
Beijing, 100031 PRC
(Address of principal executive office)
Indicate by check mark whether the registrant files or will file annual reports under cover Form 20-F or Form 40-F. Form 20-F x Form 40-F ¨
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1): ¨
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7): ¨
This Form 6-K consists of:
An announcement regarding generation of domestic on-grid electricity in the first quarter of 2022 of Huaneng Power International, Inc.(the "Registrant"), made by the Registrant on April 15, 2022.
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
HUANENG POWER INTERNATIONAL, INC. | ||
| ||
By: | /s/ Huang Chaoquan | |
Name: | Huang Chaoquan | |
Title: | Company Secretary | |
Date: April 20, 2022 |
Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss however arising from or reliance upon the whole or any part of the contents of this announcement.
DOMESTIC ON-GRID ELECTRICITY IN THE FIRST QUARTER OF 2022 INCREASED BY 2.42% YEAR-ON-YEAR
This announcement is made pursuant to Rule 13.10B of the Rules Governing the Listing of Securities on The Stock Exchange of Hong Kong Limited.
According to the preliminary statistics of Huaneng Power International, Inc. (the “Company”), for the first quarter of 2022, the Company’s total on-grid electricity by power plants within China on consolidated basis amounted to 107.717 billion KWh, representing an increase of 2.42% over the same period last year. For the first quarter of 2022, the Company’s average on-grid electricity settlement price for its power plants within China amounted to RMB501.96 per MWh, representing an increase of 19.47% over the same period last year. For the first quarter of 2022, the ratio of Company’s market based electricity sold reached 88.92%, representing an increase of 31.58 percentage points over the same period last year
The increase in the Company’s electricity was mainly attributable to:
1. | In the first quarter of 2022, the national electricity consumption maintained steady growth, and at the same time it was in the heat supply season, driving the power generation side to increase year-on-year. Among them, the on-grid electricity by Company's power plants in areas of Guizhou, Jiangxi, Anhui, Jilin, Hebei, Shandong, Guangxi, and Hainan increased year-on-year. |
2. | The Company continued to promote green and low-carbon transformation, thus the Company’s installed capacity and power generation of new energy had a relatively higher growth rate year- on-year. |
- 1 -
The Company's domestic on-grid electricity (in billions of kilowatt-hours) in the first quarter of 2022 is as follows:
| On-grid electricity | |||||||
Types of generation units/region | January to March 2022 | Year-on-Year Change | ||||||
Coal-fired | 93.365 | 1.38 | % | |||||
Combined Cycle | 6.644 | -2.77 | % | |||||
Wind-power | 6.26 | 17.89 | % | |||||
PV | 1.087 | 59.03 | % | |||||
Heilongjiang Province | 2.901 | -0.24 | % | |||||
Coal-fired | 2.430 | -6.03 | % | |||||
Wind-power | 0.384 | 32.17 | % | |||||
PV | 0.077 | 142.55 | % | |||||
Biomass power | 0.010 | – | ||||||
Jilin Province | 2.665 | 17.57 | % | |||||
Coal-fired | 1.977 | 10.32 | % | |||||
Wind-power | 0.544 | 63.92 | % | |||||
Hydro-power | – | -100.00 | % | |||||
PV | 0.069 | 9.12 | % | |||||
Biomass power | 0.076 | -5.38 | % | |||||
Liaoning Province | 4.097 | -2.44 | % | |||||
Coal-fired | 3.708 | -8.29 | % | |||||
Wind-power | 0.345 | 189.04 | % | |||||
Hydro-power | 0.001 | 116.53 | % | |||||
PV | 0.043 | 19.49 | % | |||||
Inner Mongolia | 0.194 | 25.56 | % | |||||
Wind-power | 0.194 | 25.56 | % | |||||
Hebei Province | 3.108 | 11.72 | % | |||||
Coal-fired | 2.846 | 8.03 | % | |||||
Wind-power | 0.170 | 23.45 | % | |||||
PV | 0.092 | 815.35 | % | |||||
Gansu Province | 3.762 | -14.45 | % | |||||
Coal-fired | 3.244 | -13.59 | % | |||||
Wind-power | 0.518 | -19.48 | % | |||||
Ningxia | 0.004 | 7.34 | % | |||||
PV | 0.004 | 7.34 | % | |||||
Beijing | 2.40 | 1.80 | % |
- 2 -
| On-grid electricity | |||||||
Types of generation units/region | January to March 2022 | Year-on-Year Change | ||||||
Coal-fired | 0.588 | -9.18 | % | |||||
Combined Cycle | 1.811 | 5.95 | % | |||||
Tianjin | 1.689 | 3.03 | % | |||||
Coal-fired | 1.213 | 4.58 | % | |||||
Combined Cycle | 0.473 | -0.75 | % | |||||
PV | 0.003 | 6.38 | % | |||||
Shanxi Province | 2.794 | -2.82 | % | |||||
Coal-fired | 1.231 | -14.60 | % | |||||
Combined Cycle | 1.198 | 1.95 | % | |||||
Wind-power | 0.156 | 41.69 | % | |||||
PV | 0.209 | 40.60 | % | |||||
Shandong Province | 21.054 | 8.56 | % | |||||
Coal-fired | 20.302 | 7.63 | % | |||||
Wind-power | 0.496 | 34.15 | % | |||||
PV | 0.169 | 36.55 | % | |||||
Biomass power | 0.087 | 129.88 | % | |||||
Henan Province | 5.551 | 4.52 | % | |||||
Coal-fired | 4.675 | 7.87 | % | |||||
Combined Cycle | 0.027 | 34.70 | % | |||||
Wind-power | 0.844 | -11.25 | % | |||||
PV | 0.005 | -17.34 | % | |||||
Jiangsu Province | 9.479 | -7.38 | % | |||||
Coal-fired | 6.831 | -13.42 | % | |||||
Combined Cycle | 1.423 | 17.42 | % | |||||
Wind-power | 1.164 | 8.36 | % | |||||
PV | 0.061 | 3.14 | % | |||||
Shanghai | 5.602 | 4.38 | % | |||||
Coal-fired | 5.357 | 3.82 | % | |||||
Combined Cycle | 0.239 | 18.78 | % | |||||
PV | 0.007 | -1.41 | % | |||||
Chongqing | 3.679 | 0.36 | % |
- 3 -
| On-grid electricity | |||||||
Types of generation units/region | January to March 2022 | Year-on-Year Change | ||||||
Coal-fired | 3.086 | 9.07 | % | |||||
Combined Cycle | 0.515 | -33.37 | % | |||||
Wind-power | 0.078 | 22.40 | % | |||||
Zhejiang Province | 6.720 | 3.14 | % | |||||
Coal-fired | 6.463 | 1.95 | % | |||||
Combined Cycle | 0.036 | -78.22 | % | |||||
Wind-power | 0.181 | – | ||||||
PV | 0.040 | 292.91 | % | |||||
Hubei Province | 4.612 | -1.24 | % | |||||
Coal-fired | 4.346 | -2.29 | % | |||||
Wind-power | 0.156 | -13.00 | % | |||||
Hydro-power | 0.057 | 48.49 | % | |||||
PV | 0.053 | 1008.82 | % | |||||
Hunan Province | 2.622 | -3.09 | % | |||||
Coal-fired | 2.331 | -5.85 | % | |||||
Wind-power | 0.178 | 1.56 | % | |||||
Hydro-power | 0.101 | 120.77 | % | |||||
PV | 0.012 | 33.11 | % | |||||
Jiangxi Province | 7.211 | 39.91 | % | |||||
Coal-fired | 6.917 | 41.71 | % | |||||
Wind-power | 0.209 | 9.40 | % | |||||
PV | 0.085 | 3.53 | % | |||||
Anhui Province | 1.888 | 22.50 | % | |||||
Coal-fired | 1.574 | 25.43 | % | |||||
Wind-power | 0.282 | 10.10 | % | |||||
Hydro-power | 0.019 | -39.33 | % | |||||
PV | 0.014 | – | ||||||
Fujian Province | 3.814 | -10.22 | % | |||||
Coal-fired | 3.811 | -10.24 | % | |||||
PV | 0.003 | 18.38 | % | |||||
Guangdong Province | 6.320 | -11.90 | % |
- 4 -
| On-grid electricity | |||||||
Types of generation units/region | January to March 2022 | Year-on-Year Change | ||||||
Coal-fired | 5.531 | -11.67 | % | |||||
Combined Cycle | 0.783 | -13.55 | % | |||||
PV | 0.006 | -1.65 | % | |||||
Guangxi | 0.196 | 6.47 | % | |||||
Combined Cycle | 0.102 | -3.08 | % | |||||
Wind-power | 0.094 | 19.11 | % | |||||
Yunnan Province | 2.769 | -9.15 | % | |||||
Coal-fired | 2.591 | -10.76 | % | |||||
Wind-power | 0.177 | 22.56 | % | |||||
Hydro-power | 0.001 | 354.69 | % | |||||
Guizhou Province | 0.179 | 145.18 | % | |||||
Wind-power | 0.064 | 17.68 | % | |||||
PV | 0.115 | 515.04 | % | |||||
Hainan Province | 2.408 | 4.74 | % | |||||
Coal-fired | 2.314 | 7.69 | % | |||||
Combined Cycle | 0.037 | -58.75 | % | |||||
Wind-power | 0.028 | 29.91 | % | |||||
Hydro-power | 0.009 | -48.04 | % | |||||
PV | 0.021 | -11.05 | % | |||||
Total | 107.717 | 2.42 | % |
Note 1: In accordance with the relevant provisions of the notice “No.15 Interpretation of Accounting Standards for Enterprises” issued by the Ministry of Finance, the on-grid electricity generated by the trial operation units is included in the caliber of electricity statistics, and the on-grid electricity of the trial operation units in the same period last year is restated and adjusted.
For the first quarter of 2022, the power generation of Tuas Power Limited in Singapore, which is wholly-owned by the Company, accounted for a market share of 22.7% in Singapore, representing an increase of 2.1 percentage points over the same period last year.
- 5 -
The Company’s newly added capacity in the first quarter of 2022 are as follows
(Unit: in MW) | ||||||||
Type of Generation Unit | Controlled installed capacity | Equity-based installed | ||||||
Coal-fired | 40 | 24 | ||||||
Wind-power | 1,491.7 | 1,408.9 | ||||||
PV | 860.3 | 845.8 | ||||||
Hydro power | 1.4 | 1.4 | ||||||
Acquisition | 30 | 30 | ||||||
Total | 2,423.4 | 2,310.1 |
Note 2: Adjust the statistical caliber of installed capacity according to note 1.
In addition, the installed capacity of some of the power plants in which the Company has equity interests changed in the first quarter of 2022.
Based on the above, as of 31 March 2022, the Company had a controlled installed generation capacity of 121,118 MW and equity-based installed generation capacity of 108,588 MW.
By order of the Board | |
Huaneng Power International, Inc. | |
Huang Chaoquan | |
Company Secretary |
As of the date of the announcement, the directors of the Company are:
Zhao Keyu (Executive Director) | Xu Mengzhou (Independent Non-executive Director) |
Zhao Ping (Executive Director) | Liu Jizhen (Independent Non-executive Director) |
Huang Jian (Non-executive Director) | Xu Haifeng (Independent Non-executive Director) |
Wang Kui (Non-executive Director) | Zhang Xianzhi (Independent Non-executive Director) |
Lu Fei (Non-executive Director) | Xia Qing (Independent Non-executive Director) |
Teng Yu (Non-executive Director) | |
Mi Dabin (Non-executive Director) | |
Cheng Heng (Non-executive Director) | |
Li Haifeng (Non-executive Director) | |
Lin Chong (Non-executive Director) |
Beijing, the PRC
15 April 2022
- 6 -