Docoh
Loading...

22 results

Filter options loading...
Top filers
Top filing types
Recent filing years
40-F
2020 FY
EX-99.1
PLM Polymet Mining Corp
18 Mar 21
Annual report (Canada)
4:08pm
is the transfer point where the run-of-mine ore is placed into the side dump rail cars for hauling to the Coarse Crusher. In addition to the railroads
40-F
2019 FY
EX-99.1
PLM Polymet Mining Corp
30 Mar 20
Annual report (Canada)
5:02pm
is placed into the side dump rail cars for hauling to the Coarse Crusher. In addition to the railroads and the loading pocket, infrastructure
40-F
2018 FY
EX-99.1
PLM Polymet Mining Corp
28 Mar 19
Annual report (Canada)
8:00pm
is the transfer point where the run-of-mine ore is placed into the side dump rail cars for hauling to the Coarse Crusher. In addition to the railroads
6-K
EX-99.1
PLM Polymet Mining Corp
27 Mar 18
Form NI 43-101F1 Technical Report
8:00pm
Time / Pass (min) Waiting for Truck (min) Truck Spot Time (min) Shovel Dump Time (min) N.A. Passes / Truck (passes) Tons Per Truck (Dry) (st) Tons Per … Requirements The auxiliary equipment fleet is sized to handle all of the on-going road construction and maintenance, dump maintenance and clean up around
40-F
2017 FY
EX-99.1
PLM Polymet Mining Corp
27 Mar 18
Annual report (Canada)
8:00pm
is the transfer point where the run-of-mine ore is placed into the side dump rail cars for hauling to the Coarse Crusher. In addition to the railroads
20-F
cabs6l3
24 Apr 14
Annual report (foreign)
8:00pm
20-F
sit30b
21 Apr 13
Annual report (foreign)
8:00pm
6-K
EX-99.1
oyxfzkhcf1ba2zc
4 Apr 13
Current report (foreign)
8:00pm
6-K
EX-99.1
5wp idoni60
30 Oct 12
Report of Foreign Private Issuer
8:00pm
20-F
wlcxmzjc96c7l9wh
30 Apr 12
Annual report (foreign)
8:00pm
20-F/A
78cjdldlt5
30 May 11
Annual report (foreign) (amended)
8:00pm
20-F
9u3tsx3 d4
8 May 11
Annual report (foreign)
8:00pm
20-F
76b kr0i5o2mqxkw
2 May 10
Annual report (foreign)
8:00pm
20-F
6nc2hne5u kfxqq6
29 Apr 09
Annual report (foreign)
8:00pm
20-F/A
czp au9p5z71
16 Apr 09
Annual report (foreign) (amended)
8:00pm
20-F/A
p25 qzeom8muwvx9k
27 Aug 08
Annual report (foreign) (amended)
8:00pm
20-F
y39n8f u6dwi0jx7f75
29 Apr 08
Annual report (foreign)
8:00pm
20-F
wlfxjt2c9
30 May 07
Annual report (foreign)
8:00pm
6-K
EX-99.1
xenm dh7g
12 Nov 06
Technical Report on the Results of a Definitive Feasibility Study of the NorthMet Project
7:00pm
20-F
r0jiq3
30 Jul 06
Annual report (foreign)
8:00pm