roads Rail network including locomotive services and re-fueling facilities Natural gas supply FTB with return water barge and pumps Mining and plant … . Phase I Operating Cost Estimate Summary 32,000 STPD OPEX Parameter Units Value Fraction (%) Tonnage Processed tpa Labor USD/t Power USD/t Natural Gas USD
40-F
2019 FY
EX-99.1
PLM Polymet Mining Corp
30 Mar 20
Annual report (Canada)
5:02pm
services and re-fueling facilities Natural gas supply FTB with return water barge and pumps Mining and plant workshops A description of the existing … I Operating Cost Estimate Summary 32,000 STPD OPEX Parameter Units Value Fraction (%) Tonnage Processed tpa Labor USD/t Power USD/t Natural Gas USD
40-F
2018 FY
EX-99.1
PLM Polymet Mining Corp
28 Mar 19
Annual report (Canada)
8:00pm
roads Rail network including locomotive services and re-fueling facilities Natural gas supply FTB with return water barge and pumps Mining and plant … tpa Labor USD/t Power USD/t Natural Gas USD/t Consumables/Water Treatment USD/t Maintenance Supplies & Plant Vehicles USD/t Assay Costs USD/t Phase I
6-K
EX-99.1
PLM Polymet Mining Corp
27 Mar 18
Form NI 43-101F1 Technical Report
8:00pm
Emergency Power Plant Natural Gas Supply Accommodations MARKET STUDIES AND CONTRACTS Commodity Price Projections Contracts ENVIRONMENTAL STUDIES … Power Draw Summary Table 21-12: HVAC and Dust Collection Electric Power Summary Table 21-13: Summary of Natural Gas Costs (Heating) Table 21-14: HVAC
40-F
2017 FY
EX-99.1
PLM Polymet Mining Corp
27 Mar 18
Annual report (Canada)
8:00pm
network including locomotive services and re-fueling facilities Natural gas supply FTB with return water barge and pumps Mining and plant workshops … STPD OPEX Parameter Units Value Fraction (%) Tonnage Processed tpa Labor USD/t Power USD/t Natural Gas USD/t Consumables/Water Treatment USD/t
6-K
EX-99.1
PLM Polymet Mining Corp
4 Apr 13
Current report (foreign)
8:00pm
air accumulator and dried in a duty/standby arrangement of driers and air filters General Shop Building Provide air for instruments Steam Natural gas-fired … road and on-site railroad system railroad connection to common carrier rail network workshops natural gas supply communications mine railroad
6-K
EX-99.1
PLM Polymet Mining Corp
30 Oct 12
Report of Foreign Private Issuer
8:00pm
in a duty/standby arrangement of driers and air filters General Shop Building Provide air for instruments Steam Natural gas-fired boiler … railroad connection to common carrier rail network workshops natural gas supply communications mine railroad and locomotive services and refuelling
6-K
EX-99.1
PLM Polymet Mining Corp
19 May 08
Report of Foreign Private Issuer
8:00pm
to the United States. Copper is the material of choice for transmission of electricity and heat. Regardless of how electricity is generated – coal, natural gas, nuclear
6-K
EX-99.1
PLM Polymet Mining Corp
12 Nov 06
Technical Report on the Results of a Definitive Feasibility Study of the NorthMet Project
7:00pm
-fired equipment will be reconditioned. (The plant site is served by a natural gas pipeline which supplied LTVSMC with up to 13,000 M cu ft/day of natural … and storage facilities; Road and on-site railroad system; Railroad connection to common carrier rail network; Workshops; Natural Gas Supply; PolyMet Mining