17 results
6-K
EX-99.1
EGO
Eldorado Gold Corp.
28 Mar 24
Current report (foreign)
11:40am
Permitting and Certifications
Air Quality
Energy and GHG Emissions Management
Water Management
Land Use
Biodiversity
Approvals and Permits
Closure
SECTION … : Mine Building beside South Portal (Eldorado, 2019)
Figure 19-1: Gold Price
Figure 20-1: Continuous Air Quality-Monitoring Station
Figure 20-2: Water
6-K
EX-99.2
EGO
Eldorado Gold Corp.
27 Jul 23
Condensed Consolidated Interim Financial Statements
5:32pm
which caused poor air quality resulting in a number of suspended shifts in the Triangle underground in June. The processing facility was able to keep … due to lower throughput as a result of wildfires in the region reducing available underground mining shifts due to smoke impacting ventilated air
6-K
EX-99.1
EGO
Eldorado Gold Corp.
27 Jul 23
Eldorado Gold Reports Q2 2023 Financial and Operational Results; Well Positioned to Meet 2023 Guidance
5:30pm
fires in the region which caused poor air quality resulting in a number of suspended shifts in the Triangle underground in June. The processing
6-K
EX-99.1
EGO
Eldorado Gold Corp.
31 Mar 22
Current report (foreign)
12:51pm
has High sensitivity taking into account current levels of air quality, while the resilience of the atmospheric environment in the villages … from air emissions on the air quality of the surrounding area ranges from Low to Medium. The limits for gaseous and particulate pollutants
6-K
EX-99.1
EGO
Eldorado Gold Corp.
3 Mar 20
Current report (foreign)
12:59pm
elements of air quality, surface water and ground water monitoring, noise, blast vibration, flora and fauna, social-economy, as well as waste and hazardous
6-K
EX-99.1
e6p9omxc2kvzaw1no
3 Mar 20
Current report (foreign)
12:58pm
6-K
EX-99.1
rljkjsz p36d65
2 Aug 19
Report of Private Foreign Filer
12:00am
6-K
EX-99.1
muedrx2w
21 Jun 18
Current report (foreign)
12:00am
6-K
EX-99.1
v9o2h9adg4qzt zy2gp
30 Mar 18
Current report (foreign)
12:00am
6-K
EX-99.1
nj25sa0mzzbm
7 Apr 14
Technical Report for the Certej Project, Romania
12:00am
40-F
EX-99.1
7o9ud8
28 Mar 13
Annual report (Canada)
12:00am
40-F
EX-99.1
kyx4bin gfz6aavh0
30 Mar 12
Annual report (Canada)
12:00am
6-K
EX-99.2
8bnh6oc4zd6gyis
30 Jan 12
Notice of Special Meeting of Shareholders
12:00am
6-K
EX-99.1
xupmq76
30 Jan 12
Notice of Special Meeting of Shareholders
12:00am
40-F
EX-99.1
e763xvpdndle
31 Mar 11
Annual report (Canada)
12:00am
40-F
EX-99.1
0uo70aofw2djod1
31 Mar 10
Annual report (Canada)
12:00am
6-K
EX-99.1
xwpuof pnk
17 Mar 10
Technical Report for the Kışladağ Gold Mine, Turkey
12:00am
- Prev
- 1
- Next