2 results
40-F/A
2023 FY
EX-99.3
NSRCF
NextSource Materials Inc.
1 Aug 23
Annual report (Canada) (amended)
11:50am
finalization to incorporate the improved process and wastewater designs. ESIA stakeholder engagement meetings have begun and are due to close … of the FEED input are the approval of the design package for the wastewater treatment plant (“WTP”), the WTP shelter structure, and the connection
6-K
EX-99.1
NSRCF
NextSource Materials Inc.
1 Aug 23
Current report (foreign)
6:02am
finalization to incorporate the improved process and wastewater designs. ESIA stakeholder engagement meetings have begun and are due to close with the public … are the approval of the design package for the wastewater treatment plant (“WTP”), the WTP shelter structure, and the connection to the wastewater utility
- Prev
- 1
- Next