6 results
8-K
EX-96.1
PZG
Paramount Gold Nevada Corp
8 Sep 23
Paramount Gold Completes an Updated Technical Report Summary for the Sleeper Gold Project
7:01am
, 2010-2013
Table 10-1. Waste Dump Composite Make-Up Information
Table 10-2. Summary Metallurgical Results, Agitated Cyanidation Tests, Sleeper Waste … Dump Composites, P80 19mm
Feeds
Table 10-3. Summary Metallurgical Results, Bulk Sulfide Flotation Tests (for Ro. Concs.), North Waste Dump
Composites
8-K
EX-96.1
PZG
Paramount Gold Nevada Corp
6 Oct 22
Paramount Gold Files S-K 1300 Technical Report Summary Confirming Economic Feasibility of the Grassy Mountain Gold Project
6:40am
will access up to five production levels. Each station will have a truck loading bay (used to load trucks with load–haul–dump (LHD) vehicles), power bay … a waste rock excavation volume of 1,120,305 ft3, which will be transported and disposed of in the waste rock dump facility designed for the mine
FWP
PZG
Paramount Gold Nevada Corp
24 Jun 20
Free writing prospectus
5:07pm
recovery based on test work performed on Sleeper core and waste dump material and consideration of historical operating results for heap leaching … a basis to project potential process recoveries for oxide, sulphide and mine dump material. Data was available from bottle roll testing and column
FWP
sdplyx 9rgeg09h6l7
22 Jun 20
Free writing prospectus
5:21pm
- Prev
- 1
- Next