2 results
6-K
EX-99.1
NXE
NexGen Energy Ltd
8 May 24
Message from the Chair of the Board chris mcfadden
4:49pm
, Environment, Quality software modules.
Strengthened Field Level Hazard Assessment protocols at Rook I.
Implemented real-time GPS tracking on entire NexGen
6-K
EX-99.1
NXE
NexGen Energy Ltd
20 Dec 18
Current report (foreign)
5:13pm
, and infrastructure and conduct a site-specific hazard assessment for these locations. Some of this work will require information to be available from the Phase … hazard assessment for these locations.
This program is estimated at $1.0 million.
Hydrological and Hydrogeological Studies
The following studies
- Prev
- 1
- Next