9 results
40-F
2023 FY
EX-99.1
NXE
NexGen Energy Ltd
6 Mar 24
Annual report (Canada)
9:56pm
of geological technicians splitting cores under the supervision of geologists. One-half of the core is placed in plastic sample bags pre-marked
40-F
2021 FY
EX-99.1
NXE
NexGen Energy Ltd
25 Feb 22
Annual report (Canada)
4:39pm
is placed in plastic sample bags pre-marked with the sample number, along with a sample number tag. The other half is returned to the core box
40-F
2020 FY
EX-99.1
NXE
NexGen Energy Ltd
19 Mar 21
Annual report (Canada)
5:26pm
consists of geological technicians splitting cores under the supervision of geologists. One half of the core is placed in plastic sample bags pre
6-K/A
EX-99.1
NXE
NexGen Energy Ltd
11 Mar 21
Current report (foreign) (amended)
2:17pm
the supervision of geologists. One half of the core is placed in plastic sample bags pre-marked with the sample number, along with a sample number tag … via large plastic bottles. Potable water will be provided in UG workshops, permanent refuge stations, and bottle filling stations.
Fresh water
6-K/A
EX-99.1
NXE
NexGen Energy Ltd
8 Mar 21
Current report (foreign) (amended)
6:09am
of the core is placed in plastic sample bags pre-marked with the sample number, along with a sample number tag. The other half is returned to the core box … potable water will be delivered via large plastic bottles. Potable water will be provided in UG workshops, permanent refuge stations, and bottle filling
6-K
EX-99.1
5hznb0ezb5y
24 Feb 21
Current report (foreign)
12:00am
40-F
EX-99.1
xp4ca4wbkxzl2eu
12 Mar 20
Annual report (Canada)
12:00am
40-F
EX-99.1
ptwvuy2 i4a
5 Mar 19
Annual report (Canada)
12:00am
6-K
EX-99.1
iiq9asmoo3ay 1j2fv5m
20 Dec 18
Current report (foreign)
5:13pm
- Prev
- 1
- Next