18 results
8-K
EX-96.1
IE
Ivanhoe Electric Inc
6 Sep 23
Ivanhoe Electric Announces Completion of the Initial Assessment for the Santa Cruz Copper Project in Arizona
6:45am
of Engineers
USCS
Unified Soil Classification System
USFWS
U.S. Fish and Wildlife Service
volts
VFD
variable frequency drive
VOC
Volatile Organic Compounds
VWP … and covered with a soil cover and vegetated to limit infiltration and resist erosion. Closure channels will be constructed to shed water off
8-K
IE
Ivanhoe Electric Inc
6 Sep 23
Ivanhoe Electric Announces Completion of the Initial Assessment for the Santa Cruz Copper Project in Arizona
6:45am
with a soil cover and vegetated to limit infiltration and resist erosion. Closure channels will be constructed to shed water off the impoundment surface
8-K
EX-10.1
IE
Ivanhoe Electric Inc
15 May 23
Ivanhoe Electric and Ma’aden Sign Definitive Agreement and Finalize Terms for Exploration Joint Venture and Strategic Investment
7:27am
(including water under or within land or in drains or sewers); soil and land and any ecological systems and living organisms supported by these media
8-K/A
EX-10.1
xefgprk
11 May 23
Ivanhoe Electric to Acquire 6,205 Acres of Private Land at the Santa Cruz Copper Project Near Casa Grande, Arizona
5:03pm
8-K
EX-10.1
cgtui
11 May 23
Ivanhoe Electric to Acquire 6,205 Acres of Private Land at the Santa Cruz Copper Project Near Casa Grande, Arizona
7:33am
DRS
p1aw2l7vld7roh4q 42
19 Dec 22
Draft registration statement
12:00am
424B4
d1sl9f
29 Jun 22
Prospectus supplement with pricing info
6:02am
S-1
EX-96.2
cotsx4hvwcwauzvll6js
24 May 22
IPO registration
4:23pm
S-1
0ygi7
24 May 22
IPO registration
4:23pm
S-1
EX-10.8
vszpqxjuzcf ogsn
24 May 22
IPO registration
4:23pm
S-1
EX-10.10
ndz ng8m682vq595cq0
24 May 22
IPO registration
4:23pm
DRS/A
1t0f06x1 9w8c1g8q
22 Apr 22
Draft registration statement (amended)
12:00am
- Prev
- 1
- Next