177 results
8-K
POR
Portland General Electric Co
8 Jan 10
Other Events
12:00am
, or the Company) in 2005 for its Pelton/Round Butte hydroelectric project on the Deschutes River, PGE began construction of a selective water withdrawal … salmon and steelhead, allowing them to bypass the dam when migrating to the Pacific Ocean, and help regulate downstream water temperature. In April 2009
8-K
EX-99.1
POR
Portland General Electric Co
17 Sep 08
Regulation FD Disclosure
12:00am
p.31
Trojan Remand Case p.32
Trojan Class Action Suits p.33
Diverse Mix of Resources – Hydro p.34-35
Hydro Supply p.36
Selective Water …
Salem
Willamette River
RoundButte
Sullivan River Mill Faraday North Fork Oak Grove
Selective Water Withdrawal Update
Meet water quality standards
10-K
Portland General Corp
1 Mar 94
Annual report
12:00am
and
water heating. PGE captures the
majority of the space and water
heating market for new multi-
family construction, but most new
single-family homes … are built
with natural gas heat and hot
water. PGE operates within a
state-approved service area and
is substantially free from direct
competition
8-K
EX-99.1
POR
Portland General Electric Co
31 Mar 09
Regulation FD Disclosure
12:00am
billion plus Biglow Canyon Phase II, the Selective Water Withdrawal project, and the Smart Metering project. Excludes potential benefits from … decision
Reduction from 10.1% to 10.0% as a condition of decoupling.
(2) Excludes smart metering, selective water withdrawal and Phases II & III
8-K
EX-99.1
POR
Portland General Electric Co
24 Jun 08
Regulation FD Disclosure
12:00am
— Hydro
Sullivan
River Mill
Faraday
Clackamas & Willamette River Projects
190 MW Net Capability
Oak Grove North Fork
Selective Water Withdrawal … Update
Meet water quality standards for lower river & project reservoirs
Temperature pH
Dissolved oxygen
Provide a downstream fish passage system
8-K
EX-99.1
e0y4uf oimq7bm1w1
19 May 09
Regulation FD Disclosure
12:00am
8-K
EX-99.1
wtil1
9 Sep 09
Barclays Capital 2009 CEO Energy/Power Conference
12:00am
8-K
EX-99.1
g759dosi13946f
25 Feb 11
Portland General Electric Reports
12:00am
8-K
EX-99.1
c0nh38vgvj1eqt
25 Feb 10
Portland General Electric Reports
12:00am
8-K
vw9mby9 iht
7 Dec 12
Regulation FD Disclosure
12:00am
8-K
EX-99.1
ekyzk qfcp7qkl
5 Aug 10
Portland General Electric Reports
12:00am