10 results
40-F
2018 FY
EX-99.1
PLM
Polymet Mining Corp
29 Mar 19
Annual report (Canada)
12:00am
logging takes place prior to sampling.
Drill core samples are placed into plastic sample bags, sealed, and placed into a cardboard box. The cardboard … of drilling. This material was split using a riffle splitter into two samples and placed in plastic bags and stored underwater in five-gallon plastic
40-F
2019 FY
EX-99.1
PLM
Polymet Mining Corp
30 Mar 20
Annual report (Canada)
5:02pm
by trained personnel following written procedures. Each sample is placed in a numbered plastic sample bag with the corresponding sample number tag and placed … are placed into plastic sample bags, sealed, and placed into a cardboard box. The cardboard box is sealed shut with tape and couriered to the laboratory
40-F
2021 FY
EX-99.1
PLM
Polymet Mining Corp
17 Mar 22
Annual report (Canada)
4:42pm
of the total core with a diamond bladed saw by trained personnel following written procedures. Each sample is placed in a numbered plastic sample bag … prior to shipment.
Drill core samples are placed into plastic sample bags, sealed, and placed into a cardboard box. The cardboard box is sealed shut
40-F
2020 FY
EX-99.1
PLM
Polymet Mining Corp
18 Mar 21
Annual report (Canada)
4:08pm
core with a diamond bladed saw by trained personnel following written procedures. Each sample is placed in a numbered plastic sample bag … prior to shipment.
Drill core samples are placed into plastic sample bags, sealed, and placed into a cardboard box. The cardboard box is sealed shut
6-K
EX-99.1
PLM
Polymet Mining Corp
26 Sep 07
Technical Report on the NorthMet Deposit, Minnesota, USA
12:00am
of drilling. This material was split using a riffle splitter into two samples and placed in plastic bags and stored underwater in five gallon plastic
6-K
EX-99.1
uwz9txnhd1zd25
30 Dec 22
Form 43-101F1 Technical Report
5:25pm
6-K
EX-99.1
riq3k7supi3pbqgymha
28 Nov 22
Mesaba Project Form 43-101F1 Technical Report – Mineral Resource Statement
7:02am
6-K
EX-99.1
edbkj1s m9h0pukaf7g6
31 Oct 12
Report of Foreign Private Issuer
12:00am
6-K
EX-99.1
0uqe hb0slj
5 Apr 13
Current report (foreign)
12:00am
6-K
EX-99.1
jv1yorapj9cq
13 Nov 06
Technical Report on the Results of a Definitive Feasibility Study of the NorthMet Project
12:00am
- Prev
- 1
- Next