17 results
6-K
EX-99.1
EGO
Eldorado Gold Corp.
28 Mar 24
Current report (foreign)
11:40am
Permitting and Certifications
Air Quality
Energy and GHG Emissions Management
Water Management
Land Use
Biodiversity
Approvals and Permits
Closure
SECTION … : Mine Building beside South Portal (Eldorado, 2019)
Figure 19-1: Gold Price
Figure 20-1: Continuous Air Quality-Monitoring Station
Figure 20-2: Water
6-K
EX-99.1
EGO
Eldorado Gold Corp.
3 Mar 20
Current report (foreign)
12:58pm
IMPACT
Introduction
Air Quality
Water Quality
Land Use
Flora and Fauna
Approvals and Permits
Conclusions
SECTION 21 CAPITAL AND OPERATING COSTS
Capital … and North Portal
Figure 18 10: Mine Building beside South Portal
Figure 19 1: Gold Price Movement
Figure 20 1: Air Quality-Monitoring Station
Figure
6-K
EX-99.1
EGO
Eldorado Gold Corp.
21 Jun 18
Current report (foreign)
12:00am
for local employment or air quality and emission thresholds. Our various mine departments – notice alleged that the Technical Study including Environmental … equipment, allowing us to collect air quality data around our sites and throughout the region. Throughuniquepartnershipssuchasthis,weare Airplane used
6-K
EX-99.1
EGO
Eldorado Gold Corp.
2 Aug 19
Report of Private Foreign Filer
12:00am
5-5. The sum does not sum to 100% as it accounts for duration where wind speed is zero.
5-7
Figure 5-5: Wind Directions History
5.3.3 Air Quality
Air … quality for the region is unknown as the region has no industrial activity and minimal habitation within 100 km radius of the site. No air quality information
6-K
EX-99.2
EGO
Eldorado Gold Corp.
27 Jul 23
Condensed Consolidated Interim Financial Statements
5:32pm
which caused poor air quality resulting in a number of suspended shifts in the Triangle underground in June. The processing facility was able to keep … due to lower throughput as a result of wildfires in the region reducing available underground mining shifts due to smoke impacting ventilated air
6-K
EX-99.1
p30q3 uskjg
27 Jul 23
Eldorado Gold Reports Q2 2023 Financial and Operational Results; Well Positioned to Meet 2023 Guidance
5:30pm
40-F
EX-99.1
05q3jk8vk2c0x
31 Mar 11
Annual report (Canada)
12:00am
6-K
EX-99.1
49v4vx3q
17 Mar 10
Technical Report for the Kışladağ Gold Mine, Turkey
12:00am
40-F
EX-99.1
azypgpbjaxi
30 Mar 12
Annual report (Canada)
12:00am
6-K
EX-99.2
lx4ir
30 Jan 12
Notice of Special Meeting of Shareholders
12:00am
40-F
EX-99.1
36owlw ir
28 Mar 13
Annual report (Canada)
12:00am
6-K
EX-99.1
epyp1o02o
3 Mar 20
Current report (foreign)
12:59pm
6-K
EX-99.1
82ro8qu8dqqys
31 Mar 22
Current report (foreign)
12:51pm
6-K
EX-99.1
zmicpw
7 Apr 14
Technical Report for the Certej Project, Romania
12:00am
40-F
EX-99.1
80wwqlvfpwo0l1tyj4b
31 Mar 10
Annual report (Canada)
12:00am
6-K
EX-99.1
04kw5 fggpc6yzbd8srf
30 Mar 18
Current report (foreign)
12:00am
6-K
EX-99.1
oedqhl bhpvmx
30 Jan 12
Notice of Special Meeting of Shareholders
12:00am
- Prev
- 1
- Next