56 results
6-K
EX-99.1
EGO
Eldorado Gold Corp.
30 Mar 18
Current report (foreign)
12:00am
Study
FS
Flocculant
FLOC
Fresh Air Raise
FAR
Front End Loader
FEL
Geological Strength Index
GSI
Ground-Engaging Tools
GET
Gold
Au
Gold Equivalent …
2018 Final Report
LAMAQUE PROJECT, QUÉBEC, CANADA
TECHNICAL REPORT
Return Air Raise
RAR
Reverse Circulation
RC
Rock Mass Rating
RMR
Rock Quality
6-K
EX-99.1
EGO
Eldorado Gold Corp.
2 Aug 19
Report of Private Foreign Filer
12:00am
Temperature Range at Itaituba Station
Figure 5-2: Characteristic Distribution of Air Relative Humidity at Itaituba Station
Figure 5-3: Characteristic … 5-1: Estimated Distance of Main Access – Roads
Table 5-2: Estimated Distance of Main Access - Air
Table 5-3: Itaituba Climate Normals Station Data
6-K
EX-99.1
EGO
Eldorado Gold Corp.
3 Mar 20
Current report (foreign)
12:58pm
IMPACT
Introduction
Air Quality
Water Quality
Land Use
Flora and Fauna
Approvals and Permits
Conclusions
SECTION 21 CAPITAL AND OPERATING COSTS
Capital … and North Portal
Figure 18 10: Mine Building beside South Portal
Figure 19 1: Gold Price Movement
Figure 20 1: Air Quality-Monitoring Station
Figure
6-K
EX-99.1
EGO
Eldorado Gold Corp.
3 Mar 20
Current report (foreign)
1:09pm
Mixing, Storage, and Distribution
17.6 Services, Water, and Air Distribution
SECTION 18 PROJECT INFRASTRUCTURE
18.1 Site Access
18.2 Local Services
18.3 … drills, two trucks, and three loaders.
The ventilation system consists of a single exhaust raise with fan. Air intake is via the two declines
6-K
EX-99.1
EGO
Eldorado Gold Corp.
31 Mar 22
Current report (foreign)
12:51pm
) will provide access to all sides of the orebody and terminate at return air raise (RAR) locations. Ore drives for stope extraction will traverse the orebody … monitoring program covering air, water, noise, and vibration; this program will continue through the LOM and post closure.
There is currently high
6-K
EX-99.1
mc5wcol15588w8na
28 Mar 24
Current report (foreign)
11:40am
6-K
EX-99.1
4wd31bhz
28 Mar 24
Current report (foreign)
11:48am
6-K
EX-99.2
kxo8e0xkc25af
30 Jan 12
Notice of Special Meeting of Shareholders
12:00am
6-K
EX-99.1
elsxb86
31 Mar 22
Current report (foreign)
11:47am
6-K
EX-99.1
1e864xaq
7 Apr 14
Technical Report for the Certej Project, Romania
12:00am
6-K
EX-99.1
gpsmd ek9o1pmj
23 Mar 10
Eldorado Gold Corporation - Form 6-K
12:00am
6-K
EX-99.1
6qoi4dr7t a0oju9l1t
21 Jun 18
Current report (foreign)
12:00am
6-K
EX-99.1
p4k52qh
19 May 11
Current report (foreign)
12:00am
6-K
EX-99.1
5a9heirsl6svgztq9
3 Mar 20
Report of Foreign Private Issuer
2:08pm
40-F
EX-99.1
nv9fa72x43 l63nma
30 Mar 12
Annual report (Canada)
12:00am
40-F
EX-99.1
2i3zlmz8y g4h
31 Mar 11
Annual report (Canada)
12:00am
40-F
EX-99.1
kyisdwubqmerflusd5zz
28 Mar 13
Annual report (Canada)
12:00am
40-F
EX-99.1
t1q9ufy
31 Mar 21
Annual report (Canada)
12:00am
40-F
EX-99.1
pidg4p8 w4wye518
31 Mar 22
Annual report (Canada)
2:38pm
40-F
EX-99.1
37mc vwg44
30 Mar 20
Annual report (Canada)
3:50pm