195 results
6-K
EX-99.1
EGO
Eldorado Gold Corp.
23 Mar 10
Eldorado Gold Corporation - Form 6-K
12:00am
INTRODUCTION
19-1
19.1.2
PIT DEVELOPMENT
19-1
19.1.3
WASTE DISPOSAL
19-3
19.1.4
MINING SCHEDULE
19-5
19.1.5
MINING METHOD AND EQUIPMENT
19-6 …
SURFACE WATER DIVERSION CHANNEL
19-14
19.6
WASTE DUMP DESIGN
19-14
19.7
MINE OPERATION
19-14
19.7.1
WASTE DUMPS AND HAUL ROADS
19-15
19.7.2
6-K
EX-99.1
EGO
Eldorado Gold Corp.
7 Apr 14
Technical Report for the Certej Project, Romania
12:00am
the Mineral Reserve Estimate
SECTION 16
Mining Methods
Introduction
Geotech Parameters
Mining Phases
Mining Schedule
Waste Rock and Low Grade Ore … Infrastructure
Transportation and Logistics
Access
Power
REV-A
T O C iii
Certej Project, Romania
Technical Report
Fresh Water
Consumables
Waste Rock and Low
6-K
EX-99.2
EGO
Eldorado Gold Corp.
30 Jan 12
Notice of Special Meeting of Shareholders
12:00am
Mining
Stage 4 Open Pit Wall Design Parameters
Open Pit Optimizations
Open Pit Designs
Waste Dump Design
Open Pit Mine Equipment
Mining Contractors … 0
TOC iv
Jingeng Gold Mine, China
Technical Report
Environmental Risks
Mine Waste Rock
Flotation Tails Dam
CIL Tailings Dam
Soil Inventory
6-K
EX-99.1
EGO
Eldorado Gold Corp.
31 Mar 22
Current report (foreign)
12:51pm
design and overall size is also affected by a requirement to provide construction materials for the integrated extractive waste management facility … , with consideration for the capacity of the surface tailings and waste management facilities
The LOM ore production schedule is shown in Figure 1.1
6-K
EX-99.1
EGO
Eldorado Gold Corp.
17 Oct 19
Eldorado Gold Reports Preliminary Third Quarter 2019 Results
12:42pm
guidance. Waste stripping to support a mine life extension will commence prior to the end of October 2019. Test work is still ongoing to determine … the ultimate heap leach recovery of this material and thus the ultimate length of the mine life extension. Waste stripping over the remainder of 2019
6-K
EX-99.1
q4b2f570
19 May 11
Current report (foreign)
12:00am
6-K
EX-99.1
t8i rflal1blwh
3 Mar 20
Current report (foreign)
12:59pm
6-K
EX-99.1
flql 35e1uzkbg5unpv
17 Mar 10
Technical Report for the Kışladağ Gold Mine, Turkey
12:00am
6-K
EX-99.1
7vkxxsaivxo0 21
8 Apr 14
Eldorado Gold Corporation - 6-K
12:00am
6-K
EX-99.1
sndht zziy1
21 Feb 20
Provides 2020 Guidance and Long-term Outlook
12:00am
6-K
EX-99.1
lv7w3yut p63
16 Jan 14
Eldorado Gold Corporation 6-K
12:00am
6-K
EX-99.1
n88c20kj1evqa
3 Mar 20
Current report (foreign)
12:58pm
6-K
EX-99.1
8edjop9
9 Jan 13
2012 Operating Results and 2013 Operating Guidance
12:00am
6-K
EX-99.1
54sugtp6s 14aphopepk
28 Mar 24
Current report (foreign)
11:40am
6-K
EX-99.1
b4ut7 e7m
24 Feb 20
Report of Foreign Private Issuer
4:34pm
6-K
EX-99.1
fucif7
16 Jan 24
Achieves 2023 Production Guidance; Provides Conference Call Details
9:49am
40-F
EX-99.1
nu98u66sqm
28 Mar 24
Annual report (Canada)
2:02pm
6-K
EX-99.1
3c9gnax vlpyz
21 Jan 15
Eldorado Achieves Record Annual Production with All-In-Sustaining-Costs of $780/oz
12:00am
6-K
EX-99.1
amfu iq4b
2 Aug 19
Report of Private Foreign Filer
12:00am
6-K
EX-99.2
cnb9oed1vbx 0xt
31 Oct 14
Eldorado Gold Corporation - 6-K - Q3
12:00am