10 results
6-K
EX-99.1
EGO
Eldorado Gold Corp.
7 Apr 14
Technical Report for the Certej Project, Romania
12:00am
low grade stockpile reaches capacity.
As shown on Figure 18-8, in Year 11, waste rock will begin to be stored to the east, inside the same watershed … Mare valley located immediately north of the minesite is within the watershed of the project and has a total storage capacity of 35 million cubic meters
6-K
EX-99.1
EGO
Eldorado Gold Corp.
30 Mar 18
Current report (foreign)
12:00am
impoundments at the Sigma mine
Figure 18.13 – View of the existing tailings impoundments at the Sigma mine
Figure 18.14 – Watershed of the Sigma open pit …
18.22
TAILINGS STORAGEIN SIGMA PIT
The watershed area of the Sigma open pit corresponds to an area of 958,167 m2 extending from the north of the open
6-K
EX-99.2
EGO
Eldorado Gold Corp.
30 Jan 12
Notice of Special Meeting of Shareholders
12:00am
by the underlying geology. The Jinfeng mine area is located on the watershed between the Beipan River to the east and the Luofan River to the west
40-F
2009 FY
EX-99.1
EGO
Eldorado Gold Corp.
31 Mar 10
Annual report (Canada)
12:00am
on the watershed between the Beipan River to the east and the Luofan River to the West.
To the west of Jinfeng, where the lithology is predominantly Permian
40-F
2022 FY
EX-99.1
EGO
Eldorado Gold Corp.
30 Mar 23
Annual report (Canada)
2:17pm
storage of waste streams in the IEWMF all within one watershed.
The water within the Project site can be classified into two categories, contact water
40-F
EX-99.1
1765iy rkhyx7
28 Mar 24
Annual report (Canada)
2:02pm
40-F
EX-99.1
adv0n
30 Mar 20
Annual report (Canada)
3:50pm
40-F
EX-99.1
3prxo7 liz3d68ru
31 Mar 21
Annual report (Canada)
12:00am
6-K
EX-99.1
ffh8lj pdlc
31 Mar 22
Current report (foreign)
12:51pm
40-F
EX-99.1
jnw ugs0xyopsbqa
31 Mar 22
Annual report (Canada)
2:38pm
- Prev
- 1
- Next