59 results
8-K
EX-99.1
UEC
Uranium Energy Corp
31 Oct 11
Entry into a Material Definitive Agreement
12:00am
, detailed Track Etch surveys, geochemical stream sediment and soil sampling, and drilling. A total of 18 wide-spaced holes were drilled on this new
8-K
EX-96.1
UEC
Uranium Energy Corp
13 Nov 23
Other Events
6:04am
of:
A soil layer at the surface, generally with organic matter;
A ‘laterite’ horizon consisting of red-brown kaolinitic clay, black ilmenite, magnetite … -surface soil horizon and the underlying laterite horizon (see Section 6.2 - Local geology).
Figure 6‑22: Drillholes on Block A showing average whole-rock
CORRESP
UEC
Uranium Energy Corp
28 Apr 08
Correspondence with SEC
12:00am
engineering firm was engaged by the Company to perform and has completed required geotechnical studies; (iii) a qualified soil scientist has completed
8-K
EX-96.1
f8xeyze
19 Jul 22
Other Events
4:32pm
8-K
EX-96.1
vwh3itdah
2 May 23
Other Events
12:00am
10-K
3esb2xu5 6aw
22 Oct 08
Annual report
12:00am
8-K
EX-10.1
qlg9nkc6hqvg 2a375r
27 Nov 09
Entry into a Material Definitive Agreement
12:00am
8-K
EX-10
q6lrrbmkb
19 Oct 09
Entry into a Material Definitive Agreement
12:00am
8-K
EX-10.1
aa3z0u as
13 Oct 22
Entry into a Material Definitive Agreement
7:30am